RecordWell Data

Minutes (September)

City of Lynchburg · Lynchburg City County · meeting of Sep 21, 2026 · Minutes

Open the original document More from City of Lynchburg

This document is no longer listed on City of Lynchburg's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 Historic Preservation Commission Minutes of September 21, 2026 MEMBERS PRESENT: Peter Alexander Austin Englund, Vice-Chair Michael Erquiaga, Chair Palmer Ferguson Emmett Lifsey Dr. Gerry Sherayko MEMBERS ABSENT: Tracey Langseth OTHERS PRESENT: Ms. Eve Mergenthaler , Secretary to the Historic Preservation Commission ; Ms. Natalya Murray, Planning Technician; and the public. ROLL CALL: After a quorum was established, Chair Erquiaga called the meeting to order at 4:00 p.m. 1. CONSENT AGENDA: Commissioner Lifsey made a moti on to accept the consent agenda, which was seconded by Commissioner Ferguson, and passed by a unanimous vote. 2. NEW BUSINESS a) ACTION (Advocate-Englund): Request of Victor Munoz of Maintenance Services & Supplies LLC to replace a window with a door at 1308 Clay Street. (HPC2609-0001) Mr. Victor Munoz of Maintenance Services & Supplies LLC was present to represent the application. A four (4) foot by four (4) foot window will be converted into a door to provide tenants with access to the utility room and make the building code compliant. The door will replicate the design of the existing window. Commissioner Sherayko said the change would be an elegant solution to the issue. Commissioner Englund asked Ms. Eve Mergenthaler if the size of the door would be code compliant. Ms. Mergenthaler replied she had confirmed with the inspector that the door would be compliant. Commissioner Englund recommended that Mr. Munoz keep the original window and trim in storage. That way in the future, if someone wished to restore the window, it would be available. Mr. Munoz noted that the framing would remain in place. Commissioner Alexander asked if this door would be the only access to the electrical panel and if there would be any steps down from the window. Mr. Munoz replied that three (3) steps would be put in. Commissioner Sherayko made a motion to approve the application as submitted. The motion was seconded by Commissioner Englund and passed by the following vote: 2 AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 b) ACTION (Advocate-Ferguson): Request of Adam Mullins to install a concrete driveway and fencing at 317 Cabell Street. (HPC2608-0003) No one was present to represent the application. Ms. Eve Mergenthaler explained that Mr. Adam Mullins had originally submitted a Certificate of Appropriateness (COA) application prior to installation of the driveway. Due to miscommunication , the driveway was then later installed without COA approval. The Commission should consider both the driveway application and relocation / installation of fencing surrounding the driveway. The property ha d fencing previously in place. Chair Erquiaga said that the driveway was concrete and adhered to the Residential Design Review Guidelines, though it was unfortunate that it was installed prior to COA approval. The fencing also seemed appropriate. Commissioner Lifsey shared agreement. Commissioner Lifsey made a motion to approve the application as submitted . The motion was seconded by Commissioner Sherayko and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 c) ACTION (Advocate-Erquiaga): Request of Ralph Wilson to construct a pool house and install a walkway and fencing at 406 Harrison Street. (HPC2608-0005) Ms. Lauren Di anich of A telier 11 Architecture was present to represent the application and the property owners. The proposed pool house would contain pool equipment and a restroom. The design of the structure would be reminiscent of a dependency , such as a smokehouse or small workshop, and would have hooks on the back of the house to store hosing. The materials of the pool house would match that of the main house. The brick fence would help screen equipment from the road. The proposed pool house would sit significantly back from the street and the previously approved house, to be constructed, will block most of the pool house from street view. A section of open steel fencing, previously approved by the Commission, was constructed as brick fencing instead due to logistical issues . The owners were requesting after-the-fact approval for that section of brick fencing. Chair Erquiaga stated that the Commission would go through the items one at a time, starting with item one, construction of an approximately fourteen (14) foot by eight ( 8) foot pool house for use as storage and a restroom with location, design, colors, and materials depicted in the submitted drawings. Commissioner Alexander asked if the k-style gutters on the pool house would match the main house. Ms. Dianich replied that the main house has hidden gutters. The pool house would be a new, free-standing structure and the design would be compatible, though not a complete match, to the main house. 3 Chair Erquiaga stated that the gutters did not need to match per the Residential Design Review Guidelines. Ms. Mergenthaler noted that the building would be secondary and largely hidden from street view. Commissioner Englund made a motion to approve construction of a pool house as submitted . The motion was seconded by Commissioner Sherayko and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 Chair Erquiaga moved the Commission to item two , installation of an appro ximately five (5) foot by six (6) foot walkway constructed with pavers. Ms. Dianich explained that the paver walkway would connect the pool to the pool house. Commissioner Sherayko made a motion to approve installation of a paver walkway as submitted . The motion was seconded by Commissioner Ferguson and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 Chair Erquiaga moved the Commission to item three, installation of a six (6) foot tall brick fence (instead of an open fence) along the driveway to match other existing brick fences. Commissioner Sherayko made a motion to approve installation of brick fencing as submitted . The motion was seconded by Commissioner Englund and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 d) ACTION (Advocate -Ferguson): Request of Eagles Nest Regeneration, Inc. to do extensive work at 405 Cabell Street. (HPC2608-0004) Mr. Richard Morris of Richard Morris Architecture was present representing the application and pr operty owner. A portion of the project previously received conceptual approval. This application is for final materials and additional work. Proposed materials for the rebuilt staircase tower include Marvin Ultimate double hung aluminum clad wood windows; exterior stucco to match the existing; white six (6) inch aluminum half round gutters; standing seam metal roofing in a terra cotta color to match that of the auxiliary building ; a concrete porch floor; eight (8) by eight (8) PVC columns; and PVC banding for trim. A six-foot-tall wooden fence with a two -foot-tall lattice top would be installed at the si de of the struct ure to screen the HVAC unit and commercial kitchen exhaust. The back facing brick wall of the sunroom will be removed and rebuilt . The wall has been deteriorating and started to collapse, which has caused the glass roof to separate from the building. Other work to the sunroom w ill include repairing the architectural cast iron for the skylights ; replacing the skylight glazing ; repointing of the brick ; repairing and painting of woodwork; and the restoration and reuse of the wood windows. Aspects of t he main structure will be restored or replaced in - kind. Mechanical systems will be installed and screened. A ladder will be removed from the staircase tower 4 and installed on the back of the main structure to allow for third-floor egress. The balustrades on top of the front porch will be restored and reinstalled. The wood windows in the main structure will be restored. Chair Erquiaga stated that the Commission would go through the items one at a time starting with item one, rebuilding and modifying the rear stair tower to match the submitted elevations. Commissioner Alexander made a motion to approve rebuilding and modifying the rear stair tower to match the submitted elevations . The motion was seconded by Commissioner Sherayko and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 Chair Erquiaga moved the commission on to item two, the sunroom. Commissioner Englund made a motion to approve work to the sunroom as submitted . The motion was seconded by Commissioner Ferguson and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 Chair Erquiaga moved the commission on to item three, the main structure. Commissioner Lifsey made a motion to approve work to the main structure as submitted . The motion was seconded by Commissioner Sherayko and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 Chair Erquiaga moved the commission on to item four, fencing. Commissioner Ferguson made a motion to approve installation of fencing as submitted. The motion was seconded by Commissioner Sherayko and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 e) ACTION (Advocate -Lifsey): Request of Sherri & Thomas Meyer to construct a swimming pool, pavilion, and retaining walls at 102 Oakwood Place. (HPC2609-0002) Mr. Cabell Cro wther of Crowther Landscape Architecture was present to represent the application. The project received conceptual approval years ago but was not resubmitted for final approval . Due to the elevation of th e property, the pool will be located in the side yard. Existing hardscapes and walls will be demolished and replaced by staircases, the pool, a pavilion, and hardscaping. The elevation of the pool site will be nine (9) feet below street level and will not be v isible from the road. Existing landscaping will also 5 contribute to screening the area. The proposed pavilion will be two (2) levels. The lower level will be for pool equipment, and the upper level will include a sea ting area located at the end of the pool. Materials will include white painted brick, copper roofing to match the main house, iron railings, and blue stone. Commissioner Lifsey and Chair Erquiaga agreed that the landscaping will be helpful in screening the area and voiced support for the project. Commissioner Lifsey made a motion to approve the application as submitted . The motion was seconded by Chair Erquiaga and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 3. OLD BUSINESS a) ACTION (Advocate -Sherayko): Request of Shantae Younger to install a rooftop railing at 2024 Rivermont Avenue. (HPC2607-0005) Mr. Joshua Alatis was present representing the application and property owner . The railing plans were updated based on the discussion at the last meeting. Commissioner Englund noted that more detail could have been added but the inclusion of additional newel s was appropriate. He asked how the railings would be fastened to the roof. Mr. Alatis responded that there would be structural beams and components underneath which will be drilled into with fasteners below the roof surface. Commissioner Englund noted that additional support blocks may need to be added underneath the longer runs to help prevent sagging. Commissioner Lifsey agreed, noting that they could be small blocks located about eight (8) foot on center. Commissioner Alexander asked if that roof would be accessible. Mr. Alatis replied that it will be accessible. Commissioner Alexander said the applicant would need to speak with a building code inspector as the railing will need more posts to be code compliant. Commissioner Ferguson agreed and stated that the newels are currently forty -two (42) inc hes tall and the handrail will also likely need to be at that height. Commissioner Sherayko made a motion to approve the application as submitted with the allowance for additional support as dictated by building code . The motion was seconded by Commissioner Lifsey and passed by the following vote: AYES: Alexander, Englund, Erquiaga, Ferguson, Lifsey, Sherayko 6 NOES: 0 ABSTENTIONS: 0 ABSENT: Langseth 1 6 Commissioner Englund said that if code required the applicant to significantly modify the design of the railing, then a new application would need to be submitted to the Commission. 4. NEXT MEETING: The next regular meeting is scheduled for October 19, 2026. 5. ADJOURNMENT: There being no further business, the meeting was adjourned at 4:42 p.m. ATTEST: ____________________________________ ATTEST: _________________________________ Secretary Chair

Source: City of Lynchburg website. First collected Nov 3, 2026.