City Council Work Session — Agenda Packet
City of Lynchburg · Lynchburg City County · City Council · meeting of May 14, 2024 · Agenda packets
Open the original document More from City of Lynchburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY COUNCIL WORK SESSION
Tuesday, May 14, 2024 | 4:00 PM
Council Chamber- City Hall
900 Church Street
Lynchburg, VA 24504
AGENDA
I. Welcome Stephanie T. Reed, Mayor
II. Work Session Agenda Overview Wynter C. Benda, City Manager
III. Work Session Agenda Items Wynter C. Benda, City Manager
III.1. Request to amend the Lynchburg City Schools Major Classification Funding for
FY 2024
III.2. Comprehensive Plan Update
IV. Business Item Briefing(s)
IV.3. Siting Agreement - 3920 Harbor Street & 109 Old Trents Ferry Road
IV.4. Siting Agreement - 2904 Carroll Avenue
IV.5. VA 250 Local Committee
V. Roll Call
VI. Closed Session
Page 1 of 67
City Council
Agenda Item III.1.
Business Item Briefings
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
May 14, 2024 Dr. Crystal Edwards - LCS Superintendent
AGENDA ITEM # III.1
Request to amend the Lynchburg City Schools Major Classification Funding for FY 2024
RECOMMENDATION
City Council will consider this item at its regular meeting on April 23, 2024. Consideration of
adopting a resolution to amend FY 2024 Schools Operating Budget by major classification.
SUMMARY
In a letter dated March 19, 2024 Lynchburg City Schools Superintendent reported, "On March 12,
2024, the Lynchburg City School Board voted to request that the City Council transfer the remaining
$1,671,820 in the FY 2024 LCS Contingency Reserve to the Instruction category. This request is
crucial for addressing several pressing financial challenges faced by our school division."
If approved, the FY 2024 Adopted Schools Operating Budget would be amended by transferring
$1,671,820 from Contingency Reserves to Instruction. This request does not change the total
operating revenues appropriated by City Council but rather moves $1,671,820 from Contingency
Reserves to Instruction.
PRIOR ACTION(S)
May 23, 2023: City Council, FY 2024 Schools Operating Budget adopted by major classification
June 27, 2023: City Council, FY 2024 Schools Operating Budget amended by major classification
September 12, 2023: City Council, FY 2024 Schools Operating Budget amended by major
classification
February 13, 2024: City Council, FY 2024 Schools Operating Budget amended by major
classification
FISCAL IMPACT
This request does not change the total operating revenues appropriated by City Council but rather
moves $1,671,820 from Contingency Reserves to Instruction.
CONTACT(S)
Gregory Patrick, Deputy City Manager
Donna Witt, Chief Financial Officer
ATTACHMENT(S)
Page 2 of 67
1. Contingency Reserve Request City Manager 03192024
2. Resolution to Amend FY 2024 Operating Budget - Schools 042324
REVIEWED BY
Date: May 09, 2024
Gregory Patrick, Deputy City Manager
Date: May 09, 2024
Alicia Finney, Clerk of Council
Page 3 of 67
Office of the Superintendent
915 Court Street
P.O. Box 2497
Lynchburg, VA 24505
March 19, 2024
Wynter Benda, City Manager
900 Church Street
Lynchburg, Virginia 24504
Dear Mr. Benda:
On March 12, 2024, the Lynchburg City School Board voted to request that the City Council transfer the
remaining $1,671,820 in the FY 2024 LCS Contingency Reserve to the Instruction category. This request
is crucial for addressing several pressing financial challenges faced by our school division.
Despite receiving additional FY 2024 revenue of $3.7 million from the state, it is imperative to note that
this revenue is restricted exclusively to support the Governor’s All In program. The ALL In spending
plans which can be found on the VDOE website, require that revenue be allocated and s pent as follows:
70% for tutoring, 20% for implementing the Virginia Literacy Act, and 10% for addressing chronic
absenteeism. As such, this revenue cannot be utilized to meet our other operational needs that are
expressed in this letter.
The decision to seek a transfer of the remaining c ontingency funds stems from several mitigating factors
outlined below:
1. The Governor’s recent budget amendment (Jan 2024) to the FY 2024 LCS sales tax revenue
resulted in a reduction of $1,214,657.
2. The updated VDOE calc tool (Jan 2024) also indicates a reduction in the Grocery Tax Hold
Harmless Funds by $81,565.
3. Given the rise of utilities costs, LCS estimates the FY 2024 expenditures associated with electric,
water, and gas to be approximately $2.0 million over the current FY 2024 operating budget
allocation.
4. Given the costs of monthly health insurance claims, LCS estimates that FY 2024 claims will
exceed employee contributions by $1.5 million in the current year, despite an increase of employee
contributions beginning in January 2024.
To address the deficit caused by reduction in S tate revenue and the projected increases in healthcare and
utilities during the current school year, the school division has canceled all purchase orders not directly
associated with immediate and direct student learning or experiences, frozen all non -grant funded hiring
and travel, implemented an overtime reduction plan, and instituted an electricity consumption reduction
Page 4 of 67
Office of the Superintendent
915 Court Street
P.O. Box 2497
Lynchburg, VA 24505
challenge for schools and facilities. We have also redirected some ESSER/CARES funds that were
identified for important, but not as immediately critical needs.
LCS believes that the successful completion of the current fiscal year relies on our combined efforts,
encompassing both expenditure reductions by LCS and the transfer of the remaining contingency revenue
by the City Council.
Thank you for you r time, consideration, and support in this matter . Should you have any questions or
require additional information, please do not hesitate to contact me.
Sincerely,
Crystal M. Edwards, EdD
Superintendent
cc: Members, Lynchburg City School Board
Amy Pugh, Deputy Superintendent of Instruction and Programs
Reid Wodicka, Deputy Superintendent of Operations & Strategic Planning
Sonia Jammes, Chief Financial Officer
Page 5 of 67
RESOLUTION: #R-24 -______________
BE IT RESOLVED that by majority vote of the Lynchburg City Council, the FY 2024 Adopted Schools
Operating Budget is hereby amended by transferring $1,671,820 from Contingency Reserves to Instruction with
the FY 2024 Adopted Schools Operating Budget, beginning July 1, 2023, through June 30, 2024, pursuant to
Sections 22.1-94 and 22.1-115 of the Code of Virginia, 1950, as amended, being amended, readopted, and
appropriated by major classification as follows:
Introduced: Adopted:
Certified:
Clerk of Council
SCHOOLS INCOME SCHOOLS EXPENDITURES BY MAJOR CLASSIFICATION
State $68,137,129 Instruction $77,563,338
Federal 925,000 Administration, Attendance and Health 7,723,076
Local - Operating 39,375,355 Pupil Transportation 6,599,342
Miscellaneous 888,000 Operation and Maintenance 12,474,168
School Food Services and Other Noninstructional Operations 42,145
Facilities 25,210
Debt and Fund Transfers 0
Technology 4,898,205
Contingency Reserves 0
Total $109,325,484 Total $109,325,484
Page 6 of 67
City Council
Agenda Item III.2.
Information Only
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
May 14, 2024 Rachel Frischeisen, City Planner
AGENDA ITEM # III.2
Comprehensive Plan Update
RECOMMENDATION
Staff will provide an update of the Comprehensive Plan process. No City Council action is required
at this time.
SUMMARY
During City Council’s December 1, 2023 retreat, representatives from The Berkley Group provided
an overview of the community engagement process for updating Lynchburg's Comprehensive
Plan. City staff will provide an overview of where we are currently with that process, highlights of
the feedback we have received to date and next steps.
PRIOR ACTION(S)
N/A
FISCAL IMPACT
N/A
CONTACT(S)
Rachel Frischeisen, City Planner
ATTACHMENT(S)
1. Presentation
REVIEWED BY
Date: April 18, 2024
William Martin, Community Development Director
Page 7 of 67
Date: April 18, 2024
Kent White, Assistant City Manager
Date: April 18, 2024
Alicia Finney, Clerk of Council
Page 8 of 67
COMPREHENSIVE PLAN UPDATE
Tuesday, April 23, 2024
Page 9 of 67
PUBLIC ENGAGEMENT
SUMMARY
• Survey
• 257 individual responses
• Interactive Map
• 68 suggestions
• Public Workshops
• 4 locations
• Pop-up sessions
• Focus Groups
• 8 Topics
Page 10 of 67
TRENDS
• General positivity toward the City as a whole
• Major discussion themes and priorities:
• Economic Development
• Housing
• Crime Reduction
• Public Schools
• Infrastructure
Page 11 of 67
NEXT STEPS
- Planning Commission Work Sessions begin in May and run through February 2025
- Plan draft available to the public in March 2025
- Possible Joint Planning Commission & City Council Work Session
- Zoning Map Evaluation
- Public hearings in May & June 2025
Page 12 of 67
City Council
Agenda Item IV.3.
Business Item Briefings
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
May 14, 2024 William Martin, Community Development
Director
AGENDA ITEM # IV.3
Siting Agreement - 3920 Harbor Street & 109 Old Trents Ferry Road
RECOMMENDATION
This item will appear for City Council vote on the May 28, 2024, Public Hearing agenda. Approval of
adopting Siting Agreement for 3920 Harbor Street & 109 Old Trents Ferry Road.
SUMMARY
James Energy Center, LLC is requesting that the City enter into a "Siting Agreement" for a proposed
battery energy storage facility to be located at 3920 Harbor Street & 109 Trents Ferry Road. City
Council approved a Conditional Use Permit (CUP) to allow for up to a twenty (20) megawatt facility
on April 11, 2023. The Code of Virginia §15.2-2316.7 provides that the City and the applicant may
enter into a Siting Agreement in order to mitigate impacts related to the facility and provide financial
compensation to the City in order to address capital needs. Impacts related to these types of
facilities include emergency response, and depending on the underlying zoning, loss of housing
opportunities or job creation.
James Energy Center, LLC is offering a total of $55,000 payment to the City which would be
disbursed based upon a Capital Payment Schedule as listed in Exhibit C of the Agreement:
$5,000 - within ninety (90) days of agreement.
$10,000 - commencement of construction.
$30,000 (for fire department equipment) - commencement of construction
$10,000 -within ninety (90) days of commercial operation.
In addition to the cash payment, James Energy Center, LLC will fund specialized training for the
Lynchburg Fire Department that may be needed to respond to an emergency at the facility.
These one-time payments are separate from and in addition to real estate taxes and proposed
revenue sharing.
PRIOR ACTION(S)
April 11, 2023: City Council approved the Conditional Use Permit (CUP) request of James Energy,
LLC to allow a battery storage facility at 3920 Harbor Street & 109 Old Trents Ferry Road.
January 23, 2024: City Council adopted Zoning Ordinance Section 35.2-74, Decommissioning
Surety for Energy Storage Facilities.
Page 13 of 67
April 23, 2024: City Council Business Item Briefing on Revenue Sharing Ordinance.
FISCAL IMPACT
One-time City revenue of $55,000.
CONTACT(S)
William Martin, Community Development Director
Matthew Freedman, City Attorney
ATTACHMENT(S)
1. Siting Agreement (JamesEC)
2. Proposed Resolution - James Energy Center LLC Siting Agreement
REVIEWED BY
Date: May 01, 2024
William Martin, Community Development Director
Date: May 02, 2024
Kent White, Assistant City Manager
Date: May 08, 2024
Alicia Finney, Clerk of Council
Page 14 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 1 of 13
ENERGY STORAGE FACILITY SITING AGREEMENT
This Energy Storage Facility Siting Agreement (“Agreement”), da ted as of May 28, 2024
(the “Effective Date”), is by and between the City of Lynchburg, Virginia , a municipal
corporation and political subdivision of the Commonwealth of Vi rginia (“City”) and James
Energy Center LLC (“Applicant”). The City and Applicant are herein each a “Party ” and
collectively, the “Parties”.
RECITALS
A. The Applicant owns, has acquired, has leased, or has a right to acquire or lease
certain parcels of land in the City consisting of 4.3 acres, identified as Tax Map Nos. 13701006 &
13701025, and more fully described on the Concept Plan attached hereto as Exhibit A
(collectively, the “Property”).
B. The Applicant intends to develop, install, build, and operat e an approximately
20MW megawatt battery energy sto rage facility on the Property ( “Project”) based upon an
interconnection application, a c opy of which is attached hereto a s Exhibit B . This Project is
commonly known as James Energy Center.
C. Pursuant to Chapter 22, Title 15.2, Article 7.3 of the Code of Virginia, titled “Siting
of Solar Projects and Energy Storage Projects,” the Applicant and the City may enter into a siting
agreement (“Siting Agreement”) for the Project.
D. The parties have negotiated this Siting Agreement pursuant t o Virginia Code §
15.2-2316.7. The City and the Applicant enter into this Agreeme nt for the purpose of complying
with Virginia Code § 15.2-2316.7 and to set forth their respective rights, duties, and obligations.
E. Pursuant to Virginia Code § 58.1-3660, the battery storage systems associated with
the Project, which are considered “certified pollution control equipment” are partially exempt from
local property taxation pursuant to Article X, Section 6(d) of the Constitution of Virginia (“Tax
Exemption”). The Tax Exemption relates to personal property (or machinery and tools) taxes on
the energy storage facility only and does not affect the City’s right to collect real estate taxes for
the Property. However, the parties have agreed to use a revenu e share as contemplated under
Lynchburg City Code § 36-154.2 (effective July 1, 2024) in lieu of machinery and tools taxes for
the facilities related to the Project.
G. In addition to its real estate tax obligations, which are n ot affected by this
Agreement, the Applicant has agreed to make the Capital Payment s set out in Exhibit C in order
to mitigate the impacts of the Project and for the other reason s stated in Virginia Code § 15.2-
2316.7.
H. Pursuant to Virginia Code § 15.2-2316.8(B), the City has hel d a public hearing in
accordance with subsection A of Virginia Code § 15.2-2204 for t he purpose of considering this
Page 15 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 2 of 13
Agreement, after which a majority of a quorum of the members of the City Council of the City of
Lynchburg (“Council”) approved this Agreement.
NOW, THEREFORE, pursuant to Cha pter 22, Title 15.2, Article 7.3 o f t h e C o d e o f
Virginia, intending to be legally bound hereby and in considera tion of the mutual covenants
contained herein, the receipt and sufficiency of which are here by acknowledged, the City and
Applicant hereby agree as follows:
Article I
Project Conditions, Valuation, Enforcement and Mitigation
1. Decommissioning and Surety Bond. The Applicant shall procure and maintain
decommissioning security for the Project as a condition of appr oval of a site plan for the Project
as required by the Code. Further, within ten (10) days of a wri tten request after approval of a site
plan for the Project, and as directed by the City, in the City’ s sole discretion, the Applicant shall
provide such surety bonds, removal bonds, letters of credit, guaranties, and the like for the Project
and for the benefit of the City from banks and/or companies aut horized to do business in the
Commonwealth of Virginia and ex ecute a decommissioning agreemen t in accordance with the
Code, in form and substance reasonably acceptable to the City.
Article II
Payments
1. Capital Payments. The Applicant shall make Capital Payments to the City as set
forth in Exhibit C attached hereto (each a “Paymen t” and collectively, the “Payme nts”) in the
amounts and on the schedule contained therein. The Parties acknowledge that, except as otherwise
provided herein, the Applicant’s obligation to make Payments sh all be conditioned upon the
Project achieving the corresponding milestones referenced in Exhibit C. For the purposes of the
Payment to be made upon Commercial Operation of the Project, “Commercial Operation” means
the date upon which the Applicant first receives or transmits e lectricity at the Project to an
electrical substation or otherwise transmits or distributes electricity generated from the Project to
the power grid. For the purposes of the Payment to be made upon the Commencement of
Construction, “Commencement of Construction” means the earliest date on which construction
equipment is mobilized at the Project site.
2. Statutory Structure of Payments ; Statement of Benefit. The Applicant agrees
that by entering into this Agreement, pursuant to Virginia Code § 15.2-2316.6 et seq., the Payments
are authorized by statute and it acknowledges that it is bound by law to make the Payments in
accordance with this Agreement. The Parties acknowledge that this Agreement is fair and mutually
beneficial to them both. The App licant acknowledges that this A greement is beneficial to
Applicant in allowing it to proceed with the installation of th e Project with clear project design
terms, which provide for mitigation of effects on the surroundi ng properties and the City of
Lynchburg community. Additionally, the Applicant acknowledges t hat this Agreement provides
for a clear and predictable stream of future payments to the City in amounts fair to both Parties.
Page 16 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 3 of 13
3. Revenue Share and Real Estate Taxes. The Payments are separate and distinct
from any amounts that are or will be owed by the Applicant to the City for any other tax or financial
obligations. The Payments shall be in addition to any other tax or financial obligations that may
be applicable to the Project or the Applicant. Without limiting the foregoing, nothing in this
Agreement shall limit the application of the Code to the Project.
4. Use of Payments by the City. The City shall use the Payments as permitted under
Virginia Code § 15.2-2316.7(B) or as otherwise permitted by law.
5. Effect of Agreement. This Agreement shall be binding in the City pursuant to
Virginia Code § 15.2-2316.8(A)(3). This Agreement is expressly conditioned upon the City’s
approval of a site plan for the P roject in accordance with the Code. If such approvals are not
granted, this Agreement shall be void.
Article III
Emergency Response Training
1. Emergency Resources. The Applicant will pay directly for any specialized
training the City and the Applicant mutually determine is necessary to prepare for responding to
a fire or similar event at the P roject, is to be provided by a fire safety subject matter expert and
include at a minimum an Emergency Response Plan and an Emergency Response Training.
Article IV
Compliance, Permits and Approvals
1. Compliance. The Applicant will develop, install, build, operate, and decommission
the Project in compliance with all applicable federal, state, and local laws, regulations, ordinances,
licenses, approvals, and permits. In the event that the Applica nt is notified of any violation at the
Project of any applicable federal, state or local laws, regulat ions, ordinances, licenses, approvals,
and permits, the Applicant shall (a) notify the City of said violation within ten (10) business days,
(b) diligently cooperate with the applicable regulatory agency, and (c) take all reasonable and
necessary actions to attempt to cure the violation.
2. Approvals. If the Applicant elects to develop, install, build, and opera te the
Project, the Applicant will apply to all federal, state, and local regulating authorities and will seek
to obtain all required licenses, approvals, and permits for the Project. The Applicant agrees that
all activities associated with the Project shall be in accordan ce with the CUP Conditions, the
terms of this Agreement, the Code, all other applicable buildin g and zoning regulations, and all
other applicable federal, state, and local laws, ordinances, and regulations.
3. Cooperation. As part of the consideration for this Agreement, the City will
cooperate fully with the Applicant’s efforts to obtain licenses, approvals, and permits as required
by federal, state, and local laws, regulations, and ordinances authorizing the Project construction
and/or operation, including, but not limited to, the performan ce of infrastructure studies, traffic
studies, environmental studies, and the collection and analysis of other information necessary for
Page 17 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 4 of 13
those licenses, approvals, and permits. The City will make avai lable to the Applicant, upon
request, access to all records and data in its possession or co ntrol pertaining to the Project that
are not otherwise required to be confidential by law, or subjec t to attorney-client privilege or
other applicable legal privilege or confidentiality requirement . The City will use its best efforts
to support and cooperate with the Applicant’s efforts to obtain necessary licenses, approvals, and
permits, including any necessary amendments thereto, for the Pr oject construction, and for the
Project’s operation, and will process requests for permits and other approvals required by City
ordinances. The City will take no action intended to frustrate or prevent the Applicant from
receiving and maintaining any license, approval, or permit that is consistent with the applicable
ordinances and zoning, including any Conditional Use Permit (CUP). Provided however, nothing
herein shall be construed to require the City or the Council to undertake any action not authorized
by law or to exercise any legislative function in favor of the Applicant.
4. Construction. Site construction shall be in accordance with all licenses,
approvals, and permits, including, but not limited to, the CUP.
5. Decommissioning. The Project shall be decommissioned in accordance with the
requirements in the Lynchburg City Code and a decommissioning a greement entered in
accordance therewith.
Article V
Miscellaneous Terms
1. Term; Termination. This Agreement shall commence on the Effective Date and
shall continue until the Termination Date. The Applicant shall have no obligation hereunder after
the Termination Date. The termination of this Agreement shall n ot limit the Applicant’s legal
obligation to pay local taxes in accordance with applicable law at such time and for such period
as the Project remains in ope ration. “Termination Date” means the Applicant’s commencement
of the decommissioning of all or a material portion of the Project or its written notification to the
City that it is no longer developing the Project pursuant to Article V.3 of this Agreement.
2. Mutual Covenants. The Applicant covenants to the City that it will pay the City
the amounts due hereunder when due in accordance with the terms of this Agreement, and will not
seek to invalidate this Agreement, or otherwise take a position adverse to the purpose or validity
of this Agreement. So long as Applicant is not in breach of thi s Agreement during its term, the
City covenants to the Applicant that it will not seek to invalidate this Agreement or otherwise take
a position adverse to the purpose or validity of this Agreement. If after twenty (20) years from the
Commercial Operation Date a Termination Date has not occurred, then the Parties covenant to
discuss in good faith any ongoing impacts of the Project that n eed additional mitigation and the
acceptable forms of mitigation, including evaluation of additional compensation.
3. No Obligation to Develop. The Applicant has no obligation to develop the Project.
It is understood that development of the Project by Applicant i s contingent upon a number of
factors including, but not limited to, regulatory approvals, availability and cost of equipment and
financing, and demand for renewable energy and renewable energy credits. No election by the
Page 18 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 5 of 13
Applicant to terminate, defer, suspend or modify plans to devel op the Project shall be deemed a
default of Applicant under this Ag reement. Any Payment by the A pplicant prior to a decision to
suspend or abandon the Project is non-refundable.
4. Successors and Assigns. This Agreement will be binding upon the assigns and
successors in interest of the Applicant, and the obligations cr eated hereunder shall be covenants
running with the Property upon which the Project is developed. No assignment of this Agreement
or any right or obligation accruing under this Agreement shall be made by the Applicant without
the express written consent of the City, which consent shall no t be unreasonably withheld or
delayed. Any assignment, other than as permitted by this Section, without the consent of the City,
shall be void. In the event of a ny approved assignment, the assignee or successor in interest shall
assume the liabilities of the Applicant. For the purpose of thi s Section, an assignment shall occur
if the Applicant sells, transfers, leases or assigns all or substantially all of its interest in the Project
or the ownership of the Applicant to another individual or entity. The Applicant and any permitted
assignee or successor in interest shall execute such documentation as reasonably requested by the
City to memorialize the assignment and assumption by the assignee or successor in interest.
5. Memorandum of Agreement. A memorandum of this Agreement, in a form
acceptable to the City Attorney, shall be recorded in the land records of the Clerk’s Office of the
Circuit Court of the City of Lynchburg, Virginia. Such recordation shall be at the Applicant’s sole
cost and expense and shall occur as soon as reasonably practica ble after the full execution of this
Agreement. If the Applicant chooses to not develop the Project, in its sole discretion, the City shall
execute a release of the memorandum filed in the aforementioned Clerk’s Office.
6. Notices. Except as otherwise provided herein, all notices required to b e given or
authorized to be given pursuant to this Agreement shall be in writing and shall be delivered or sent
by registered or certified mail, postage prepaid, by recognized overnight courier, or by commercial
messenger to:
CITY
City of Lynchburg, Virginia
Council / Manager’s Office
Attn: Wynter Benda, City Manager
900 Church Street – 3
rd Floor
Lynchburg, VA 24504
With copies to:
City of Lynchburg, Virginia
City Attorney’s Office
Attn: Matthew Freedman, City Attorney
900 Church Street – 3
rd Floor
Lynchburg, VA 24504
City of Lynchburg, Virginia
Page 19 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 6 of 13
Department of Community Development
Attn: Tom Martin, Director
900 Church Street – 2
nd Floor
Lynchburg, VA 24504
APPLICANT
East Point Energy
Attn: General Counsel
310 4
th Street NE, 3rd Floor
Charlottesville, VA 22902
The City and the Applicant, by notice given hereunder, may desi gnate any further or different
persons or addresses to which subsequent notices shall be sent without need of a formal
amendment to this Agreement. All notices provided as contempla ted hereunder shall be deemed
received after five (5) calendar days have passed from their mailing/sending date.
7. Governing Law; Jurisdiction; Venue. This Agreement shall be governed by and
construed in accordance with the laws of the Commonwealth of Virginia, without regard to any of
its principles of conflicts of laws or other laws which would r esult in the application of the laws
of another jurisdiction. The Part ies (a) agree that any suit, a ction or other legal proceeding, as
between the parties hereto, arising out of or relating to this agreement shall be brought and tried
only in the Circuit Court or General District Court of the City of Lynchburg, Virginia, as
jurisdiction may lie, (b) consent to the jurisdiction of such c ourt in any such suit, action or
proceeding, and (c) waive any objection which any of them may h ave to the laying of venue or
any such suit, action, or proceeding in such court and any clai m that any such suit, action, or
proceeding has been brought in an inconvenient forum. The Parties agree that a final judgment in
any such suit, action, or proceeding shall be conclusive and may be enforced in other jurisdictions
by suit on the judgment or in any other manner provided by law.
8. Confidentiality. This Agreement, once placed on the agenda for consideration by
the Council, is a public document, subject to production under the Freedom of Information Act
(FOIA). The City understands and acknowledges the Applicant, and as applicable, their associates,
contractors, partners and affiliates utilize confidential and p roprietary “state-of-the-art”
information and data in their operations (“Confidential Informa tion”), and that disclosure of any
information, including, but not limited to, disclosures of tech nical, financial or other information
concerning the Applicant or any affiliated entity could result in substantial harm to them and could
thereby have a significant detrimental impact on their employees and also upon the City. The City
acknowledges that during the deve lopment of this Agreement, cer tain Confidential Information
may be shared with the City by the Applicant. Applicant agrees to clearly identify any information
it deems to be Confidential and not subject to mandatory disclo sure under the Virginia Freedom
of Information Act or other applicable law as Confidential Information at the time it provides such
information to the City. The City agrees that, except as required by law and pursuant to the City’s
police powers, neither the City nor any employee, agent or cont ractor of the City will knowingly
or intentionally disclose or other wise divulge any such Confide ntial Information to any person,
firm, governmental body or agency, or any other entity unless t he request for Confidential
Page 20 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 7 of 13
Information is made under a provision of local, state or federa l law. Upon receipt of such request
but before transmitting any documents or information which may contain Confidential
Information, the City will contact Applicant to review the requ est for information and associated
documents to determine if any Confidential Information is at ri sk of disclosure. If Confidential
Information exists, Applicant may intervene on behalf of the City and defend against disclosure of
the Confidential Information. The City agrees to cooperate in this defense and to the extent allowed
by law, work to protect the Confidential Information of the Applicant.
9. Subject-to-Appropriation. All payments and other performances by the City
under this Agreement are subject to Council approval and annual appropriation of funds by the
Council. It is understood and agreed among the parties that the City shall be bound hereunder only
to the extent of the funds legally available or which may hereafter become legally available for the
purposes of this Agreement.
10. Severability; Invalidity Clause. Any provision of this Agreement that conflicts
with applicable law or is held to be void or unenforceable shall be ineffective to the extent of such
conflict, voidness or unenforceability without invalidating the remaining provisions hereof, which
remaining provisions shall be enforceable to the fullest extent permitted under applicable law. If,
for any reason, including a cha nge in applicable law, it is eve r determined by any court or
governmental authority of competent jurisdiction that this Agre ement is invalid then the parties
shall, subject to any necessary Council meeting vote or procedu res, undertake reasonable efforts
to amend and or reauthorize this Agreement so as to render the invalid provisions herein lawful,
valid and enforceable. If the Parties are unable to do so, this Agreement shall terminate as of the
date of such determination of invalidity. The Parties will coop erate with each other and use
reasonable efforts to defend against and contest any challenge to this Agreement by a third party.
11. Entire Agreement. This Agreement and its exhibits constitute the entire agreement
and supersedes all other prior agreements and understandings, b oth written and oral, between the
Parties with respect to the subject matter hereof. No provision of this Agreement can be modified,
altered or amended except in a writing executed by the Parties. All exhibits to this Agreement are
expressly incorporated into this Agreement by reference.
12. Construction. This Agreement was drafted with input by the City and the
Applicant, and no presumption shall exist against any Party.
13. Insurance. The Applicant will obtain and maintain all insurance coverage required
by applicable law. Further, the Applicant will obtain and maintain in effect until decommissioning
and removal comprehensive general liability insurance in an amo unt $5,000,000. The City, its
officers, employees, and agents shall be listed as additional insureds under such policy. All rights
of subrogation shall be waived against the City, its officers, employees, and agents (the
“Indemnified Parties”) under such policy. Such additional insur ed status and subrogation
requirement shall be shown on all Certificates of Insurance issues under such policy. The Applicant
shall indemnify and hold harmless the Indenified Parties for al l claims arising out of this
Agreement, including reasonable costs of defense of such claims
, provided such claims do not
arise solely from the gross negligence of the Indemnified Party.
Page 21 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 8 of 13
14. Default.
a. In the event of a default under this Agreement, if a Party has not cured, as
described by this Agreement, its default after thirty (30) days of receiving written notice
of the default from the non-defaulting Party, the non-defaulting Party shall have the right,
but not the obligation, to cure such default and to charge the defaulting Party for the cost
of curing such default, including the right to offset said costs of curing the default against
any sums due or which become due to the defaulting Party under this Agreement. Such
non-defaulting Party shall, in its reasonable judgment, attempt to use the most
economically reasonable method of curing any such default.
b. This Agreement may be terminated by the City in the event of a material breach
of this Agreement by the Applicant that has not been cured with in sixty (60) days of
written notice thereof being received by the Applicant. If the Applicant initiates a cure
within such period and continues to diligently pursue such cure to completion, the
Agreement shall not terminate. A material breach shall mean a failure to comply with (1)
any of the provisions of this Agreement, (2) the permits and ap provals under which the
Project will be operated or built, including without limitation the CUP Conditions, or (3)
applicable federal, state laws or local laws, regulations, ordi nances, licenses, approvals,
and permits. A material breach shall also include the insolvenc y of the Applicant or its
assignee or successor in interest, such insolvency to be established by the filing of either
a voluntary petition in bankruptcy showing the Applicant as the debtor or an involuntary
petition that is not dismissed within one hundred eighty (180) days of its filing, a written
admission of inability to pay its bills as they come due, entry of receivership, trusteeship,
composition, or similar arrangement, or a general assignment for the benefit of creditors.
A material breach shall also include a violation of the CUP issued to the Applicant, if any.
Provided, however, the Applicant’s complying or taking action c onsistent with any
governmental or regulatory warning letter, notice of violation, or plan of action shall be
deemed a cure if the compliance or the action is initiated by t he Applicant within sixty
(60) days of the Applicant receiving the warning letter, notice of violation, or action plan.
The Applicant’s failure after receiving written notice to resol ve as soon as practically
possible, a material breach tha t state or federal authorities d etermine threaten the safety
of the public or threatens to cause material environmental dama ge, shall entitle the City
to terminate this Agreement effective immediately upon the Appl icant’s failure to act as
soon as practically possible. Fur ther, the City may terminate t his Agreement effective
immediately if the Applicant fails to pay an amount due under t his Agreement within
thirty (30) days of receiving from the City’s written notice of the failure to pay.
c. In the event of a breach and the appropriate notice thereof to the Applicant by the
City, the cure periods noted above may be extended at the sole discretion of the City
without the City waiving its right to terminate the Agreement at any time prior to the cure
being made by the Applicant.
Page 22 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 9 of 13
d. If the City terminates this A greement as provided herein, the Applicant shall cease
operations at the Project and commence decommissioning the Proj ect. If the Applicant
fails to decommission the Project, the City may call on the decommissioning security.
e. If the City or the Applicant files a lawsuit, counterclaim, or cross-claim to enforce
any provision of this Agreement, t he prevailing Party is entitl ed to all reasonable
attorneys’ fees, litigation expenses, and court costs.
15. Force Majeure. Neither Party will be liable for any failure or delay in performing
an obligation under this Agreement, other than the obligation to make timely Payments, that is due
to any of the following causes, to the extent beyond its reason able control: acts of God, accident,
riots, war, terrorist act, epidem ic, pandemic, quarantine, civi l commotion, breakdown of
communication facilities, breakdown of web host, breakdown of internet service provider, natural
catastrophes, governmental acts or omissions, changes in laws or regulations, national strikes, fire,
explosion, generalized lack of availability of raw materials or energy. For the avoidance of doubt,
Force Majeure shall not include (a) financial distress nor the inability of either party to make a
profit or avoid a financial loss, (b) changes in market prices or conditions, or (c) a party’s financial
inability to perform its obligations hereunder.
16. Third Party Beneficiaries. This Agreement is solely for the benefit of the Parties
hereto and their respective successors and permitted assigns, a nd no other person shall have any
right, benefit, priority or interest in, under or because of the existence of, this Agreement.
17. Counterparts; Electronic Signatures . This Agreement may be executed
simultaneously in any number of counterparts, each of which sha ll be deemed to be an original,
and all of which shall constitute but one and the same instrument. A signed copy of this Agreement
delivered by facsimile, e-mail/PDF or other means of electronic transmission shall be deemed to
have the same legal effect as delivery of an original signed copy of this Agreement.
18. Recitals and Exhibits. The above stated recitals and previously described exhibits
are expressly incorporated herein by reference.
[signature page follows]
Page 23 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 10 of 13
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed
by the officers whose names appear below as of the Effective Date.
J A M E S E N E R G Y C E N T E R L L C
d / b / a E A S T P O I N T E N E R G Y
(SEAL)
B y :
N a m e : ________________________
T itle: _________________________
Attest:_____________________
Name:_____________________
Title:______________________
CITY OF LYNCHBURG, VIRGINIA
B y :
N a m e : W y n t e r C . B e n d a
T itle: City Manager
(SEAL)
Attest:_____________________
Name:_____________________
Title:______________________
Approved as to form:
____________________
City Attorney/Designee
Page 24 of 67
PARCELS UNDER SITE CONTROL
ADJACENT PARCEL LINES
PROJECT FENCE
C & O RAILROAD TRACKS
ROADS
NEW DISTRIBUTION LINES
EXISTING DISTRIBUTION LINES
20' WIDE VEGETATIVE BUFFER
INTERNAL PROJECT ROAD
POINT OF INTERCONNECTION
0.2% ANNUAL CHANCE FLOOD HAZARD
1% ANNUAL CHANCE FLOOD HAZARD
JAMES RIVER
OLD TRENTS FERRY RD
HARBOR ST
INVERTER/TRANSFORMER PADS
HEIGHT 10' MAXIMUM
BATTERY ENCLOSURES
HEIGHT 12' MAXIMUM
STORMWATERRETENTION POND
PROJECT GATE
O&M
SHEDS/ENCLOSURES
PROJECT FENCE
HEIGHT 6' MINIMUM
CONCEPT PLAN
1.THIS DRAWING IS A
PRELIMINARY DESIGN - NOT
FOR CONSTRUCTION. ALL
DIMENSIONS ARE
APPROXIMATE.
2.EQUIPMENT IS
REPRESENTATIVE ONLY AND
MAY CHANGE BASED ON
AVAILABILITY AND MARKET
CONDITIONS.
3.STORMWATER
MANAGEMENT PLAN TO BE
SUBMITTED PRIOR TO
CONSTRUCTION.
STORMWATER PLAN TO
COMPLY WITH CHAPTER 16.2
OF CITY OF LYNCHBURG
ORDINANCE.
4.EROSION AND SEDIMENT
CONTROL PLAN TO BE
SUBMITTED PRIOR TO
CONSTRUCTION. PLAN TO
COMPLY WITH CHAPTER 16.1
OF CITY OF LYNCHBURG
ORDINANCE.
5.LIGHTING PLAN TO BE
SUBMITTED PRIOR TO
CONSTRUCTION. PLAN TO
COMPLY WITH SECTION
35.2-65 OF THE CITY OF
LYNCHBURG ORDINANCE.
6.EXISTING VEGETATION AND
TREE COVER TO BE
PRESERVED WHERE
POSSIBLE AND USED AS
PART OF 20' VEGETATION
BUFFER IN ACCORDANCE
WITH SEC 35.2-63 OF THE
CITY OF LYNCHBURG
ORDINANCE.
JAMES ENERGY CENTER, LLC
3920 HARBOR ST & 109 OLD TRENTS FERRY RD
LYNCHBURG, VA 24503PREPARED FOR CITY OF LYNCHBURG
CONDITIONAL USE PERMIT APPLICATION
PRELIMINARY
NOT FOR
CONSTRUCTION
GENERAL NOTES
20' WIDE VEGETATIVE BUFFER
Feet
200 100 0
DATE
BYTD
3/13/2023
PAGE #2
EXISTING RESIDENCE
TO BE DEMOLISHED
1% ANNUAL CHANCE
FLOOD HAZARD
0.2% ANNUAL CHANCE
FLOOD HAZARD, NO
PROPOSED IMPACT (SEE
NOTE #6)
0.2% ANNUAL CHANCE FLOOD
HAZARD, NO PROPOSED
IMPACT (SEE NOTE #6)
PROPERTY BOUNDARY
A
A1
SECTION LINE
Page 25 of 67
/
ATTACHMENT N
Form of
Generation Interconnection Feasibility Study Agreement
RECITALS
1. This Generation Interconnection Feasibility Study Agreement, dated as of 02/23/2021 , is entered into, by and
between James Energy Center, LLC ("Interconnection Customer") and PJM Interconnection, L.L.C.
("Transmission Provider") (individually referred to as a "Party," or collectively referred to as the "Parties")
pursuant to Part IV and Part VI of the PJM Interconnection, L.L.C. Open Access Transmission Tariff ("PJM Tariff")
(the "Agreement"). Capitalized terms used in this agreement, unless otherwise indicated, shall have the
meanings ascribed to them in the PJM Tariff.
2. By submitting this Agreement and complying with Section 36.1.01, 110.1, 111.1, or 112.1, as applicable, of the
PJM Tariff, the Interconnection Customer has submitted an Interconnection Request. In accordance with
Section 36.1.01, 110.1, 111.1, or 112.1, as applicable, of the PJM Tariff, the Interconnection Customer has also
submitted with this Agreement the applicable required deposit to the Transmission Provider.
3. By submitting this Agreement to the Transmission Provider, the Interconnection Customer requests
interconnection to the Transmission System of a generating project with the following specifications:
a. Location of generating unit site (include both a written description (e.g., street address, global
positioning coordinates) and attach a map in PDF format depicting the property boundaries and the
location of the generating unit site):
Latitude: 37.4642860 Longitude: -79.1879190
b. Identification of evidence of ownership interest in, or right to acquire or control, the generating site for
a minimum of three years for large generation, or for a minimum of two years for small generation.
Include both a written description of the evidence to be relied upon and attach a Word or PDF version
copy thereof. If the evidence of ownership interest in, or right to acquire or control the generating site
is not yet available, provide a detailed explanation of why such evidence is not available and provide a
good faith estimated date upon which such evidence shall be submitted to the Transmission Provider.
Though site control evidence may be submitted separately from this Agreement, the Interconnection
Request is still subject to the overall deficiency review period and deficiency response period time
constraints provided for in Section 36.1.01, 110.1, 111.1, or 112.1, as applicable, of the PJM Tariff, and
shall not be assigned a Queue Position without site control evidence acceptable to the Transmission
Provider.:
c. Specification of Requested Maximum Facility Output and Requested Capacity Interconnection Rights. The
requested Maximum Facility Output megawatts and requested Capacity Interconnection Rights
megawatts indicated in this section may be reduced as this Interconnection Request proceeds in the
Transmission Provider Interconnection Request process, but may not be increased after this Agreement is
submitted to the Transmission Provider.
Page 26 of 67
/
i. For new generating units, complete the following chart:
Total Requested Maximum Facility Output (as defined in the PJM Tariff) in
Megawatts 20.000000
Total Requested Capacity Interconnection Rights (as defined in the PJM Tariff)
in Megawatts 20.000000
ii. For existing generating units that will be adding megawatt capability, complete the following
chart:
Existing
Facility
Proposed Facility
Incremental IncreaseTotal
Maximum Facility Output (as defined in the
PJM Tariff) in Megawatts
Capacity Interconnection Rights (as defined
in the PJM Tariff) in Megawatts
iii. For new Behind The Meter generating units, complete the following chart:
Gross Generator Output in Megawatts
Behind the Meter Load in Megawatts (the sum of the MW generation auxiliary load
and any other MW load to be served behind the Point of Interconnection)
Total Requested Maximum Facility Output (as defined in the PJM Tariff) in
Megawatts
Total Requested Capacity Interconnection Rights (as defined in the PJM Tariff) in
Megawatts
iv. For existing Behind The Meter generating units that will be adding megawatt capability, complete
the following chart:
Existing
Facility
Requested
Facility
Increase
Total
Gross Generator Output in Megawatts
Behind the Meter Load in Megawatts (the sum of the MW
generation auxiliary load and any other MW load to be
served behind the Point of Interconnection)
Maximum Facility Output (as defined in the PJM Tariff) to
be exported from the Behind the Meter Generator onto
the PJM System, in Megawatts
Capacity Interconnection Rights, in Megawatts
d. Identify the fuel type of the new or existing generating unit:
Storage
Page 27 of 67
/
e. A PDF format attachment of the site plan/single line diagram together with a description of the
equipment configuration, including a set of preliminary electrical design specifications, and if the
generating unit is a wind generation facility, then also submit a set of preliminary electrical design
specifications depicting the wind generation facility as a single equivalent generator:
f. Planned date the new generating unit or increase in capability will be in service:
10/31/2022
Page 28 of 67
/
g. Other related information, including for example, but not limited to, identifying: all of Interconnection
Customer's prior Queue Positions; stating whether the Interconnection Customer has submitted a
previous Interconnection Request for this particular project; and, if this Interconnection Request
proposes an increase in capability to an existing generating unit, then identify whether the existing
generating unit is subject to an existing Interconnection Agreement and/or Power Purchase Agreement:
200 MWh
THE FOLLOWING APPLIES TO BEHIND THE METER GENERATION:
a. If Behind the Meter Generation is identified in this Agreement, all of the requirements in Section 36.1A
of the PJM Tariff must also be met.
b
. Identify the type and size of the load located (or to be located) at the site of such generation, and
attach a PDF format single line diagram depicting the location of the load in relation to the site of such
generation:
c
. Describe the electrical connections between the generation facility and the load.
THE FOLLOWING APPLIES TO ENERGY STORAGE RESOURCES
Primary frequency response range for Energy Storage Resources:
Minimum State of Charge: : and
Maximum State of Charge: .
PURPOSE OF THE FEASIBILITY STUDY
4. Consistent with Section 36.2 of the PJM Tariff, the Transmission Provider shall conduct a Generation
Interconnection Feasibility Study to provide the Interconnection Customer with preliminary determinations of:
(i) the type and scope of the Attachment Facilities, Local Upgrades, and Network Upgrades that will be
necessary to accommodate the Interconnection Customer's Interconnection Request; (ii) the time that will be
required to construct such facilities and upgrades; and (iii) the Interconnection Customer's cost responsibility
for the necessary facilities and upgrades. In the event that the Transmission Provider is unable to complete the
Generation Interconnection Feasibility Study within the timeframe prescribed in Section 36.2 of the PJM Tariff,
the Transmission Provider shall notify the Interconnection Customer and explain the reasons for the delay.
5
. The Generation Interconnection Feasibility Study conducted hereunder will provide only preliminary non-final
estimates of the cost and length of time required to accommodate the Interconnection Customer's
Interconnection Request. More comprehensive estimates will be developed only upon execution of a System
Impact Study Agreement and a Facilities Study Agreement in accordance with Part VI of the PJM Tariff. The
Generation Interconnection Feasibility Study necessarily will employ various assumptions regarding the
Interconnection Request, other pending requests, and PJM's Regional Transmission Expansion Plan at the time of
the study. The Generation Interconnection Feasibility Study shall not obligate the Transmission Provider or the
Transmission Owners to interconnect with the Interconnection Customer or construct any facilities or upgrades.
0%
100%
Page 29 of 67
/
CONFIDENTIALITY
6. The Interconnection Customer agrees to provide all information requested by the Transmission Provider
necessary to complete the Generation Interconnection Feasibility Study. Subject to paragraph 7 of this
Agreement and to the extent required by Section 222 of the PJM Tariff, information provided pursuant to this
Section 6 shall be and remain confidential.
7
. Until completion of the Generation Interconnection Feasibility Study, the Transmission Provider shall keep
confidential all information provided to it by the Interconnection Customer. Upon completion of the Generation
Interconnection Feasibility Study, the study will be listed on the Transmission Provider's website and, to the
extent required by Commission regulations, will be made publicly available upon request, except that the
identity of the Interconnection Customer shall remain confidential and will not be posted on the Transmission
Provider's website.
8
. Interconnection Customer acknowledges that, consistent with the PJM Tariff, the Transmission Provider may
contract with consultants, including the Transmission Owners, to provide services or expertise in the
Generation Interconnection Feasibility Study process and that the Transmission Provider may disseminate
information to the Transmission Owners.
COST RESPONSIBILITY
9
. The Interconnection Customer shall reimburse the Transmission Provider for the actual cost of the Generation
Interconnection Feasibility Study. The refundable portion of the deposit paid by the Interconnection Customer
described in Section 2 of this Agreement shall be applied toward the Interconnection Customer's Generation
Interconnection Feasibility Study cost responsibility. Pursuant to Section 36.1.01, 110, 111, or 112 of the PJM
Tariff, as applicable, during the deficiency review of this Agreement, in the event that the Transmission
Provider anticipates that the actual study costs will exceed the refundable portion of the deposit described in
Section 2 of this agreement, the Transmission Provider shall provide the Interconnection Customer with an
estimate of the additional study costs. The estimated additional study costs are non-binding, and additional
actual study costs may exceed the estimated additional study cost increases provided by the Transmission
Provider. Regardless of whether the Transmission Provider provides the Interconnection Customer with
estimated additional study costs, the Interconnection Customer is responsible for and must pay all actual study
costs. If the Transmission Provider sends the Interconnection Customer notification of estimated additional
study costs during the deficiency review period (as described in Sections 36.1.01, 110, 111, or 112), then the
Interconnection Customer must either: (1) withdraw the Generation Interconnection Request during the
deficiency response period (as described in Sections 36.1.01, 110, 111, or 112); or (2) pay all additional
estimated costs prior to the expiration of the deficiency response period (as described in Sections 36.1.01, 110,
111, or 112). If the Interconnection Customer fails to complete either (1) or (2), then the Generation
Interconnection Request shall be deemed to be terminated and withdrawn. If at any time after the deficiency
review period the Transmission Provider provides the Interconnection Customer with notification of estimated
additional study costs, the Interconnection Customer must pay such estimated additional study costs within ten
business days of Transmission Provider sending the Interconnection Customer notification of such estimated
additional study costs. If the Interconnection Customer fails to pay such estimated additional study costs within
ten business days of Transmission Provider sending the Interconnection Customer notification of such estimated
additional study costs, then the Generation Interconnection Request shall be deemed to be terminated and
withdrawn.
Page 30 of 67
/
DISCLAIMER OF WARRANTY, LIMITATION OF LIABILITY
10. In analyzing and preparing the Generation Interconnection Feasibility Study, the Transmission Provider, the
Transmission Owner(s), and any other subcontractors employed by the Transmission Provider shall have to rely
on information provided by the Interconnection Customer and possibly by third parties and may not have
control over the accuracy of such information. Accordingly, NEITHER THE TRANSMISSION PROVIDER, THE
TRANSMISSION OWNER(S), NOR ANY OTHER SUBCONTRACTORS EMPLOYED BY THE TRANSMISSION PROVIDER
MAKES ANY WARRANTIES, EXPRESS OR IMPLIED, WHETHER ARISING BY OPERATION OF LAW, COURSE OF
PERFORMANCE OR DEALING, CUSTOM, USAGE IN THE TRADE OR PROFESSION, OR OTHERWISE, INCLUDING
WITHOUT LIMITATION IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE
WITH REGARD TO THE ACCURACY, CONTENT, OR CONCLUSIONS OF THE FEASIBILITY STUDY. The Interconnection
Customer acknowledges that it has not relied on any representations or warranties not specifically set forth
herein and that no such representations or warranties have formed the basis of its bargain hereunder. Neither
this Agreement nor the Generation Interconnection Feasibility Study prepared hereunder is intended, nor shall
either be interpreted, to constitute agreement by the Transmission Provider or the Transmission Owner(s) to
provide any transmission or interconnection service to or on behalf of the Interconnection Customer either at
this point in time or in the future.
11
. In no event will the Transmission Provider, Transmission Owner(s) or other subcontractors employed by the
Transmission Provider be liable for indirect, special, incidental, punitive, or consequential damages of any kind
including loss of profits, whether under this Agreement or otherwise, even if the Transmission Provider,
Transmission Owner(s), or other subcontractors employed by the Transmission Provider have been advised of
the possibility of such a loss. Nor shall the Transmission Provider, Transmission Owner(s), or other
subcontractors employed by the Transmission Provider be liable for any delay in delivery or of the non-
performance or delay in performance of the Transmission Provider's obligations under this Generation
Interconnection Feasibility Study Agreement.
Without limitation of the foregoing, the Interconnection Customer further agrees that Transmission Owner(s)
and other subcontractors employed by the Transmission Provider to prepare or assist in the preparation of any
Generation Interconnection Feasibility Study shall be deemed third party beneficiaries of this provision entitled
"Disclaimer of Warranty/Limitation of Liability."
MISCELLANEOUS
12
. Any notice or request made to or by either Party regarding this Agreement shall be made to the representative
of the other Party as indicated below.
Transmission Provider
PJM Interconnection, L.L.C.
2750 Monroe Blvd.
Audubon, PA 19403
Interconnection Customer
James Energy Center, LLC
200 Garrett Street, Suite J
Charlottesville, Virginia 22902
13
. No waiver by either Party of one or more defaults by the other in performance of any of the provisions of this
Agreement shall operate or be construed as a waiver of any other or further default or defaults, whether of a
like or different character.
Page 31 of 67
/
14. This Agreement or any part thereof, may not be amended, modified, or waived other than by a writing signed
by all Parties hereto.
Page 32 of 67
/
15. This Agreement shall be binding upon the Parties hereto, their heirs, executors, administrators, successors, and
assigns.
16. Neither this Agreement nor the Generation Interconnection Feasibility Study performed hereunder shall be
construed as an application for service under Part II or Part III of the PJM Tariff.
17
. The provisions of Part IV of the PJM Tariff are incorporated herein and made a part hereof.
18. Governing Law, Regulatory Authority, and Rules
The validity, interpretation and enforcement of this Agreement and each of its provisions shall be governed by
the laws of the state of Virginia (the state where the Point of Interconnection is located),
without regard to its conflicts of law principles. This Agreement is subject to all Applicable Laws and
Regulations. Each Party expressly reserves the right to seek changes in, appeal, or otherwise contest any laws,
orders, or regulations of a Governmental Authority.
19
. No Third-Party Beneficiaries
This Agreement is not intended to and does not create rights, remedies, or benefits of any character
whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the
obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and
where permitted, their assigns.
20
. Multiple Counterparts
This Agreement may be executed in two or more counterparts, each of which is deemed an original but all of
which constitute one and the same instrument.
21. No Partnership
This Agreement shall not be interpreted or construed to create an association, joint venture, agency
relationship, or partnership between the Parties or to impose any partnership obligation or partnership liability
upon either Party. Neither Party shall have any right, power or authority to enter into any agreement or
undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the
other Party.
22
. Severability
If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or
unenforceable by any court of competent jurisdiction or other Governmental Authority, (1) such portion or
provision shall be deemed separate and independent, (2) the Parties shall negotiate in good faith to restore
insofar as practicable the benefits to each Party that were affected by such ruling, and (3) the remainder of
this Agreement shall remain in full force and effect.
23
. Reservation of Rights
The Transmission Provider shall have the right to make a unilateral filing with the Federal Energy Regulatory
Commission ("FERC") to modify this Agreement with respect to any rates, terms and conditions, charges,
classifications of service, rule or regulation under section 205 or any other applicable provision of the Federal
Power Act and FERC's rules and regulations thereunder, and the Interconnection Customer shall have the right
to make a unilateral filing with FERC to modify this Agreement under any applicable provision of the Federal
Power Act and FERC's rules and regulations; provided that each Party shall have the right to protest any such
filing by the other Party and to participate fully in any proceeding before FERC in which such modifications may
be considered. Nothing in this Agreement shall limit the rights of the Parties or of FERC under sections 205 or
Page 33 of 67
/
206 of the Federal Power Act and FERC's rules and regulations, except to the extent that the Parties otherwise
agree as provided herein.
Page 34 of 67
/
CERTIFICATION
By initialing the line next to each of the following required elements, Interconnection Customer hereby
certifies that it has submitted with this executed Agreement each of the required elements (if this
Interconnection Request is being submitted electronically, each of the required elements must be submitted
electronically as individual PDF files, together with an electronic PDF copy of this signed Agreement):
___________
Specification of the location of the proposed generating unit site or existing generating unit
(including both a written description (e.g., street address, global positioning coordinates)
and attach a map in PDF format depicting the property boundaries and the location of the
generating unit site)
___________ Evidence of an ownership interest in, or right to acquire or control the generating unit site
___________
The megawatt size of the proposed generating unit or the amount of increase in megawatt
capability of an existing generating unit, and identification of any megawatt portion of the
facility's capability that will be a Capacity Resource
___________ Identification of the fuel type of the proposed generating unit or upgrade thereto
___________
Description of the equipment configuration and a set of preliminary electrical design
specifications, and, if the generating unit is a wind generation facility, then the set of
preliminary electrical design specifications must depict the wind plant as a single
equivalent generator
___________
The planned date that the proposed generating unit or increase in megawatt capability of
an existing generating unit will be in service, where such date is to be no more than seven
years from the date that a complete and fully executed Generation Interconnection
Feasibility Study Agreement is received by the Transmission Provider unless the
Interconnection Customer demonstrates that engineering, permitting, and construction of
the generating unit or increase in capability will take more than seven years
___________ All additional information prescribed by the Transmission Provider in the PJM Manuals
___________ The full amount (including both the refundable and non-refundable portions) of the
required deposit
IN WITNESS WHEREOF, the Transmission Provider and the Interconnection Customer have caused this Agreement to be
executed by their respective authorized officials.
Transmission Provider: PJM Interconnection, L.L.C.
Printed Name
Interconnection Customer: James Energy Center, LLC
Andrew Foukal
Printed Name
By:
Name Title Date
By: President
Name Title Date
2/23/21
Jason Shoemaker
Manager, Interconnection Projects 3/18/2021
Page 35 of 67
City of Lynchburg – James Energy Center LLC
Energy Storage Facility Siting Agreement
Page 13 of 13
EXHIBIT C
Capital Payment Schedule
Within 90 days after signing of Siting Agreement for the Project
$5,000.00
Commencement of Construction on the Project $10,000.00
Lynchburg Fire Department special equipment contribution at
Commencement of Construction of the Project
$30,000.00
Within 90 days of Commercial Operation of Project $10,000.00
Page 36 of 67
RESOLUTION: #R-24-______
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF LYNCHBURG:
1. That, pursuant to the authorities described under Article 7.3, Chapter 22, Title 15.2 of the Code
of Virginia, 1950, as amended, the ENERGY STORAGE FACILITY SITING AGREEMENT,
dated as of May 28, 2024, between the City of Lynchburg, Virginia (“City”) and James Energy
Center LLC (d/b/a East Point Energy), being specific to the development, installation, building,
and operation of an approximately 20MW megawatt battery energy storage facility upon Tax
Map Nos. 13701006 (3920 Harbor Street, Lynchburg, Virginia 24503) & 13701025 (109 Old
Trents Ferry Road, Lynchburg, Virginia 24503), is hereby approved. Such agreement is
incorporated herein by reference.
2. That the City Manager is hereby authorized to execute the said agreement on behalf of the
City and he, or his designee where permitted, is further authorized to take any and all other
actions on behalf of the City and execute any and all other documents connected to the same
or connected to the said energy storage facility on behalf of the City.
3. That this Resolution shall become effective upon its adoption.
Adopted:
Certified: ________________________________
Clerk of Council
Page 37 of 67
City Council
Agenda Item IV.4.
Business Item Briefings
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
May 14, 2024 William Martin, Community Development
Director
AGENDA ITEM # IV.4
Siting Agreement - 2904 Carroll Avenue
RECOMMENDATION
This item will appear for City Council vote on the May 28, 2024, Public Hearing agenda. Approval of
adopting Siting Agreement for 2904 Carroll Avenue.
SUMMARY
Quarry Energy Center, LLC is requesting that the City enter into a "Siting Agreement" for a
proposed battery energy storage facility to be located at 2904 Carroll Avenue. The proposed facility
would be permitted "by-right" on the industrial zoned property. The submitted siting agreement
indicates the facility could be as much as twenty (20) megawatts. The Code of Virginia §15.2-
2316.7 provides that the City and the applicant may enter into a Siting Agreement in order to
mitigate impacts related to the facility and provide financial compensation to the City in order to
address capital needs. Impacts related to these types of facilities include emergency response, and
depending on the underlying zoning, loss of housing opportunities or job creation.
Quarry Energy Center, LLC is offering a total of $65,000 payment to the City which would be
disbursed based upon a Capital Payment Schedule as listed in Exhibit C of the Agreement:
$5,000 - within ninety (90) days of agreement.
$20,000 - commencement of construction.
$40,000 -within ninety (90) days of commercial operation.
These one-time payments are separate from and in addition to real estate taxes and proposed
revenue sharing.
PRIOR ACTION(S)
January 23, 2024: City Council adopted Zoning Ordinance Section 35.2-74, Decommissioning
Surety for Energy Storage Facilities.
April 23, 2024: City Council Business Item Briefing on Revenue Sharing Ordinance.
FISCAL IMPACT
One-time City revenue of $65,000.
CONTACT(S)
Page 38 of 67
William Martin, Community Development Director
Matthew Freedman, City Attorney
ATTACHMENT(S)
1. Siting Agreement (QuarryEC)
2. Proposed Resolution - Quarry Energy Center LLC Siting Agreement
REVIEWED BY
Date: May 01, 2024
William Martin, Community Development Director
Date: May 02, 2024
Kent White, Assistant City Manager
Date: May 08, 2024
Alicia Finney, Clerk of Council
Page 39 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 1 of 13
ENERGY STORAGE FACILITY SITING AGREEMENT
This Energy Storage Facility Siting Agreement (“Agreement”), da ted as of May 28, 2024
(the “Effective Date”), is by and between the City of Lynchburg, Virginia , a municipal
corporation and political subdivi sion of the Commonwealth of Vi rginia (“City”) and Quarry
Energy Center LLC (“Applicant”). The City and Applicant are herein each a “Par ty” and
collectively, the “Parties”.
RECITALS
A. The Applicant owns, has acquired, has leased, or has a right to acquire or lease
certain parcels of land in the City consisting of 11.5 acres, i dentified as Tax Map No. 05106011,
and more fully described on the Concept Plan attached hereto as Exhibit A (collectively, the
“Property”).
B. The Applicant intends to develop, install, build, and operat e an approximately
20MW megawatt battery energy sto rage facility on the Property ( “Project”) based upon an
interconnection application, a c opy of which is attached hereto a s Exhibit B . This Project is
commonly known as Quarry Energy Center.
C. Pursuant to Chapter 22, Title 15.2, Article 7.3 of the Code of Virginia, titled “Siting
of Solar Projects and Energy Storage Projects,” the Applicant and the City may enter into a siting
agreement (“Siting Agreement”) for the Project.
D. The parties have negotiated this Siting Agreement pursuant t o Virginia Code §
15.2-2316.7. The City and the Applicant enter into this Agreeme nt for the purpose of complying
with Virginia Code § 15.2-2316.7 and to set forth their respective rights, duties, and obligations.
E. Pursuant to Virginia Code § 58.1-3660, the battery storage systems associated with
the Project, which are considered “certified pollution control equipment” are partially exempt from
local property taxation pursuant to Article X, Section 6(d) of the Constitution of Virginia (“Tax
Exemption”). The Tax Exemption relates to personal property (or machinery and tools) taxes on
the energy storage facility only and does not affect the City’s right to collect real estate taxes for
the Property. However, the parties have agreed to use a reven ue share as contemplated under
Lynchburg City Code § 36-154.2 (effective July 1, 2024) in lieu of machinery and tools taxes for
the facilities related to the Project.
G. In addition to its real estate tax obligations, which are n ot affected by this
Agreement, the Applicant has agreed to make the Capital Payment s set out in Exhibit C in order
to mitigate the impacts of the Project and for the other reason s stated in Virginia Code § 15.2-
2316.7.
H. Pursuant to Virginia Code § 15.2-2316.8(B), the City has hel d a public hearing in
accordance with subsection A of Virginia Code § 15.2-2204 for t he purpose of considering this
Page 40 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 2 of 13
Agreement, after which a majority of a quorum of the members of the City Council of the City of
Lynchburg (“Council”) approved this Agreement.
NOW, THEREFORE, pursuant to Cha pter 22, Title 15.2, Article 7.3 o f t h e C o d e o f
Virginia, intending to be legally bound hereby and in considera tion of the mutual covenants
contained herein, the receipt and sufficiency of which are here by acknowledged, the City and
Applicant hereby agree as follows:
Article I
Project Conditions, Valuation, Enforcement and Mitigation
1. Decommissioning and Surety Bond. The Applicant shall procure and maintain
decommissioning security for the Project as a condition of appr oval of a site plan for the Project
as required by the Code. Further, within ten (10) days of a wri tten request after approval of a site
plan for the Project, and as directed by the City, in the City’ s sole discretion, the Applicant shall
provide such surety bonds, removal bonds, letters of credit, guaranties, and the like for the Project
and for the benefit of the City from banks and/or companies aut horized to do business in the
Commonwealth of Virginia and ex ecute a decommissioning agreemen t in accordance with the
Code, in form and substance reasonably acceptable to the City.
Article II
Payments
1. Capital Payments. The Applicant shall make Capital Payments to the City as set
forth in Exhibit C attached hereto (each a “Paymen t” and collectively, the “Payme nts”) in the
amounts and on the schedule contained therein. The Parties acknowledge that, except as otherwise
provided herein, the Applicant’s obligation to make Payments sh all be conditioned upon the
Project achieving the corresponding milestone referenced in Exhibit C. For the purposes of the
Payment to be made upon Commercial Operation of the Project, “Commercial Operation” means
the date upon which the Applicant first receives or transmits e lectricity at the Project to an
electrical substation or otherwise transmits or distributes electricity generated from the Project to
the power grid. For the purposes of the Payment to be made upon the Commencement of
Construction, “Commencement of Construction” means the earliest date on which construction
equipment is mobilized at the Project site.
2. Statutory Structure of Payments ; Statement of Benefit. The Applicant agrees
that by entering into this Agreement, pursuant to Virginia Code § 15.2-2316.6 et seq., the Payments
are authorized by statute and it acknowledges that it is bound by law to make the Payments in
accordance with this Agreement. The Parties acknowledge that this Agreement is fair and mutually
beneficial to them both. The App licant acknowledges that this A greement is beneficial to
Applicant in allowing it to proceed with the installation of th e Project with clear project design
terms, which provide for mitigation of effects on the surroundi ng properties and the City of
Lynchburg community. Additionally, the Applicant acknowledges t hat this Agreement provides
for a clear and predictable stream of future payments to the City in amounts fair to both Parties.
Page 41 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 3 of 13
3. Revenue Share and Real Estate Taxes. The Payments are separate and distinct
from any amounts that are or will be owed by the Applicant to the City for any other tax or financial
obligations. The Payments shall be in addition to any other tax or financial obligations that may
be applicable to the Project or the Applicant. Without limiting the foregoing, nothing in this
Agreement shall limit the application of the Code to the Project.
4. Use of Payments by the City. The City shall use the Payments as permitted under
Virginia Code § 15.2-2316.7(B) or as otherwise permitted by law.
5. Effect of Agreement. This Agreement shall be binding in the City pursuant to
Virginia Code § 15.2-2316.8(A)(3). This Agreement is expressly conditioned upon the City’s
approval of a site plan for the P roject in accordance with the Code. If such approvals are not
granted, this Agreement shall be void.
Article III
Emergency Response Training
1. Emergency Resources. The Applicant will pay directly for any specialized
training the City and the Applicant mutually determine is necessary to prepare for responding to
a fire or similar event at the P roject, is to be provided by a fire safety expert and include at a
minimum an Emergency Response Plan and an Emergency Response Training.
Article IV
Compliance, Permits and Approvals
1. Compliance. The Applicant will develop, install, build, operate, and decommission
the Project in compliance with all applicable federal, state, and local laws, regulations, ordinances,
licenses, approvals, and permits. In the event that the Applica nt is notified of any violation at the
Project of any applicable federal, state or local laws, regulat ions, ordinances, licenses, approvals,
and permits, the Applicant shall (a) notify the City of said violation within ten (10) business days,
(b) diligently cooperate with the applicable regulatory agency, and (c) take all reasonable and
necessary actions to attempt to cure the violation.
2. Approvals. If the Applicant elects to develop, install, build, and opera te the
Project, the Applicant will apply to all federal, state, and local regulating authorities and will seek
to obtain all required licenses, approvals, and permits for the Project. The Applicant agrees that
all activities associated with the Project shall be in accordance with the terms of this Agreement,
the Code, all other applicable b uilding and zoning regulations, and all other applicable federal,
state, and local laws, ordinances, and regulations.
3. Cooperation. As part of the consideration for this Agreement, the City will
cooperate fully with the Applicant’s efforts to obtain licenses, approvals, and permits as required
by federal, state, and local laws, regulations, and ordinances authorizing the Project construction
and/or operation, including, but not limited to, the performan ce of infrastructure studies, traffic
studies, environmental studies, and the collection and analysis of other information necessary for
Page 42 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 4 of 13
those licenses, approvals, and permits. The City will make avai lable to the Applicant, upon
request, access to all records and data in its possession or co ntrol pertaining to the Project that
are not otherwise required to be confidential by law, or subjec t to attorney-client privilege or
other applicable legal privilege or confidentiality requirement . The City will use its best efforts
to support and cooperate with the Applicant’s efforts to obtain necessary licenses, approvals, and
permits, including any necessary amendments thereto, for the Pr oject construction, and for the
Project’s operation, and will process requests for permits and other approvals required by City
ordinances. The City will take no action intended to frustrate or prevent the Applicant from
receiving and maintaining any license, approval, or permit that is consistent with the applicable
ordinances and zoning, including any Conditional Use Permit (CUP). Provided however, nothing
herein shall be construed to require the City or the Council to undertake any action not authorized
by law or to exercise any legislative function in favor of the Applicant.
4. Construction. Site construction shall be in accordance with all licenses,
approvals, and permits, including, but not limited to, the CUP.
5. Decommissioning. T h e P r o j e c t s h a l l b e d e c o m m i s s i o n e d i n a c c o r d a n c e w i t h
requirements in the Lynchburg City Code and a decommissioning a g r e e m e n t e n t e r e d i n
accordance therewith.
Article V
Miscellaneous Terms
1. Term; Termination. This Agreement shall commence on the Effective Date and
shall continue until the Termination Date. The Applicant shall have no obligation hereunder after
the Termination Date. The termination of this Agreement shall n ot limit the Applicant’s legal
obligation to pay local taxes in accordance with applicable law at such time and for such period
as the Project remains in ope ration. “Termination Date” means the Applicant’s commencement
of the decommissioning of all or a material portion of the Project or its written notification to the
City that it is no longer developing the Project pursuant to Article V.3 of this Agreement.
2. Mutual Covenants. The Applicant covenants to the City that it will pay the City
the amounts due hereunder when due in accordance with the terms of this Agreement, and will not
seek to invalidate this Agreement, or otherwise take a position adverse to the purpose or validity
of this Agreement. So long as Applicant is not in breach of thi s Agreement during its term, the
City covenants to the Applicant that it will not seek to invalidate this Agreement or otherwise take
a position adverse to the purpose or validity of this Agreement. If after twenty (20) years from the
Commercial Operation Date a Termination Date has not occurred, then the Parties covenant to
discuss in good faith any ongoing impacts of the Project that n eed additional mitigation and the
acceptable forms of mitigation, including evaluation of additional compensation.
3. No Obligation to Develop. The Applicant has no obligation to develop the Project.
It is understood that development of the Project by Applicant i s contingent upon a number of
factors including, but not limited to, regulatory approvals, availability and cost of equipment and
financing, and demand for renewable energy and renewable energy credits. No election by the
Page 43 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 5 of 13
Applicant to terminate, defer, suspend or modify plans to devel op the Project shall be deemed a
default of Applicant under this Ag reement. Any Payment by the A pplicant prior to a decision to
suspend or abandon the Project is non-refundable.
4. Successors and Assigns. This Agreement will be binding upon the assigns and
successors in interest of the Applicant, and the obligations cr eated hereunder shall be covenants
running with the Property upon which the Project is developed. No assignment of this Agreement
or any right or obligation accruing under this Agreement shall be made by the Applicant without
the express written consent of the City, which consent shall no t be unreasonably withheld or
delayed. Any assignment, other than as permitted by this Section, without the consent of the City,
shall be void. In the event of a ny approved assignment, the assignee or successor in interest shall
assume the liabilities of the Applicant. For the purpose of thi s Section, an assignment shall occur
if the Applicant sells, transfers, leases or assigns all or substantially all of its interest in the Project
or the ownership of the Applicant to another individual or entity. The Applicant and any permitted
assignee or successor in interest shall execute such documentation as reasonably requested by the
City to memorialize the assignment and assumption by the assignee or successor in interest.
5. Memorandum of Agreement. A memorandum of this Agreement, in a form
acceptable to the City Attorney, shall be recorded in the land records of the Clerk’s Office of the
Circuit Court of the City of Lynchburg, Virginia. Such recordation shall be at the Applicant’s sole
cost and expense and shall occur as soon as reasonably practica ble after the full execution of this
Agreement. If the Applicant chooses to not develop the Project, in its sole discretion, the City shall
execute a release of the memorandum filed in the aforementioned Clerk’s Office.
6. Notices. Except as otherwise provided herein, all notices required to b e given or
authorized to be given pursuant to this Agreement shall be in writing and shall be delivered or sent
by registered or certified mail, postage prepaid, by recognized overnight courier, or by commercial
messenger to:
CITY
City of Lynchburg, Virginia
Council / Manager’s Office
Attn: Wynter Benda, City Manager
900 Church Street – 3
rd Floor
Lynchburg, VA 24504
With copies to:
City of Lynchburg, Virginia
City Attorney’s Office
Attn: Matthew Freedman, City Attorney
900 Church Street – 3
rd Floor
Lynchburg, VA 24504
Page 44 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 6 of 13
City of Lynchburg, Virginia
Department of Community Development
Attn: Tom Martin, Director
900 Church Street – 2
nd Floor
Lynchburg, VA 24504
APPLICANT
East Point Energy
Attn: General Counsel
310 4
th Street NE, 3rd Floor
Charlottesville, VA 22902
The City and the Applicant, by notice given hereunder, may desi gnate any further or different
persons or addresses to which subsequent notices shall be sent without need of a formal
amendment to this Agreement. All notices provided as contempla ted hereunder shall be deemed
received after five (5) calendar days have passed from their mailing/sending date.
7. Governing Law; Jurisdiction; Venue. This Agreement shall be governed by and
construed in accordance with the laws of the Commonwealth of Virginia, without regard to any of
its principles of conflicts of laws or other laws which would r esult in the application of the laws
of another jurisdiction. The Part ies (a) agree that any suit, a ction or other legal proceeding, as
between the parties hereto, arising out of or relating to this agreement shall be brought and tried
only in the Circuit Court or General District Court of the City of Lynchburg, Virginia, as
jurisdiction may lie, (b) consent to the jurisdiction of such c ourt in any such suit, action or
proceeding, and (c) waive any objection which any of them may h ave to the laying of venue or
any such suit, action, or proceeding in such court and any clai m that any such suit, action, or
proceeding has been brought in an inconvenient forum. The Parties agree that a final judgment in
any such suit, action, or proceeding shall be conclusive and may be enforced in other jurisdictions
by suit on the judgment or in any other manner provided by law.
8. Confidentiality. This Agreement, once placed on the agenda for consideration by
the Council, is a public document, subject to production under the Freedom of Information Act
(FOIA). The City understands and acknowledges the Applicant, and as applicable, their associates,
contractors, partners and affiliates utilize confidential and p roprietary “state-of-the-art”
information and data in their operations (“Confidential Informa tion”), and that disclosure of any
information, including, but not limited to, disclosures of tech nical, financial or other information
concerning the Applicant or any affiliated entity could result in substantial harm to them and could
thereby have a significant detrimental impact on their employees and also upon the City. The City
acknowledges that during the deve lopment of this Agreement, cer tain Confidential Information
may be shared with the City by the Applicant. Applicant agrees to clearly identify any information
it deems to be Confidential and not subject to mandatory disclo sure under the Virginia Freedom
of Information Act or other applicable law as Confidential Information at the time it provides such
information to the City. The City agrees that, except as required by law and pursuant to the City’s
Page 45 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 7 of 13
police powers, neither the City nor any employee, agent or cont ractor of the City will knowingly
or intentionally disclose or other wise divulge any such Confide ntial Information to any person,
firm, governmental body or agency, or any other entity unless t he request for Confidential
Information is made under a provision of local, state or federa l law. Upon receipt of such request
but before transmitting any documents or information which may contain Confidential
Information, the City will contact Applicant to review the requ est for information and associated
documents to determine if any Confidential Information is at ri sk of disclosure. If Confidential
Information exists, Applicant may intervene on behalf of the City and defend against disclosure of
the Confidential Information. The City agrees to cooperate in this defense and to the extent allowed
by law, work to protect the Confidential Information of the Applicant.
9. Subject-to-Appropriation. All payments and other performances by the City
under this Agreement are subject to Council approval and annual appropriation of funds by the
Council. It is understood and agreed among the parties that the City shall be bound hereunder only
to the extent of the funds legally available or which may hereafter become legally available for the
purposes of this Agreement.
10. Severability; Invalidity Clause. Any provision of this Agreement that conflicts
with applicable law or is held to be void or unenforceable shall be ineffective to the extent of such
conflict, voidness or unenforceability without invalidating the remaining provisions hereof, which
remaining provisions shall be enforceable to the fullest extent permitted under applicable law. If,
for any reason, including a cha nge in applicable law, it is eve r determined by any court or
governmental authority of competent jurisdiction that this Agre ement is invalid then the parties
shall, subject to any necessary Council meeting vote or procedu res, undertake reasonable efforts
to amend and or reauthorize this Agreement so as to render the invalid provisions herein lawful,
valid and enforceable. If the Parties are unable to do so, this Agreement shall terminate as of the
date of such determination of invalidity. The Parties will coop erate with each other and use
reasonable efforts to defend against and contest any challenge to this Agreement by a third party.
11. Entire Agreement. This Agreement and its exhibits constitute the entire agreement
and supersedes all other prior agreements and understandings, b oth written and oral, between the
Parties with respect to the subject matter hereof. No provision of this Agreement can be modified,
altered or amended except in a writing executed by the Parties. All exhibits to this Agreement are
expressly incorporated into this Agreement by reference.
12. Construction. This Agreement was drafted with input by the City and the
Applicant, and no presumption shall exist against any Party.
13. Insurance. The Applicant will obtain and maintain all insurance coverage required
by applicable law. Further, the Applicant will obtain and maintain in effect until decommissioning
and removal comprehensive general liability insurance in an amo unt $5,000,000. The City, its
officers, employees, and agents shall be listed as additional insureds under such policy. All rights
of subrogation shall be waived against the City, its officers, employees, and agents (the
“Indemnified Parties”) under such policy. Such additional insur ed status and subrogation
requirement shall be shown on all Certificates of Insurance issues under such policy. The Applicant
Page 46 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 8 of 13
shall indemnify and hold harmless the Indenified Parties for al l claims arising out of this
Agreement, including reasonable costs of defense of such claims , provided such claims do not
arise solely from the gross negligence of the Indemnified Party.
14. Default.
a. In the event of a default under this Agreement, if a Party has not cured, as
described by this Agreement, its default after thirty (30) days of receiving written notice
of the default from the non-defaulting Party, the non-defaulting Party shall have the right,
but not the obligation, to cure such default and to charge the defaulting Party for the cost
of curing such default, including the right to offset said costs of curing the default against
any sums due or which become due to the defaulting Party under this Agreement. Such
non-defaulting Party shall, in its reasonable judgment, attempt to use the most
economically reasonable method of curing any such default.
b. This Agreement may be terminated by the City in the event of a material breach
of this Agreement by the Applicant that has not been cured with in sixty (60) days of
written notice thereof being received by the Applicant. If the Applicant initiates a cure
within such period and continues to diligently pursue such cure to completion, the
Agreement shall not terminate. A material breach shall mean a failure to comply with (1)
any of the provisions of this Agreement, (2) the permits and ap provals under which the
Project will be operated or built, or (3) applicable federal, s tate laws or local laws,
regulations, ordinances, license s, approvals, and permits. A ma terial breach shall also
include the insolvency of the Applicant or its assignee or succ essor in interest, such
insolvency to be established by the filing of either a voluntar y petition in bankruptcy
showing the Applicant as the debtor or an involuntary petition that is not dismissed within
one hundred eighty (180) days of its filing, a written admission of inability to pay its bills
as they come due, entry of receivership, trusteeship, composition, or similar arrangement,
or a general assignment for the benefit of creditors. Provided, however, the Applicant’s
complying or taking action consistent with any governmental or regulatory warning letter,
notice of violation, or plan of action shall be deemed a cure if the compliance or the action
is initiated by the Applicant within sixty (60) days of the Applicant receiving the warning
letter, notice of violation, or action plan. The Applicant’s fa ilure after receiving written
notice to resolve as soon as practically possible, a material b reach that state or federal
authorities determine threaten the safety of the public or thre atens to cause material
environmental damage, shall entitle the City to terminate this Agreement effective
immediately upon the Applicant’s failure to act as soon as prac tically possible. Further,
the City may terminate this Agreement effective immediately if the Applicant fails to pay
an amount due under this Agreement within thirty (30) days of receiving from the City’s
written notice of the failure to pay.
c. In the event of a breach and the appropriate notice thereof to the Applicant by the
City, the cure periods noted above may be extended at the sole discretion of the City
without the City waiving its right to terminate the Agreement at any time prior to the cure
being made by the Applicant.
Page 47 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 9 of 13
d. If the City terminates this A greement as provided herein, the Applicant shall cease
operations at the Project and commence decommissioning the Proj ect. If the Applicant
fails to decommission the Project, the City may call on the decommissioning security.
e. If the City or the Applicant files a lawsuit, counterclaim, or cross-claim to enforce
any provision of this Agreement, t he prevailing Party is entitl ed to all reasonable
attorneys’ fees, litigation expenses, and court costs.
15. Force Majeure. Neither Party will be liable for any failure or delay in performing
an obligation under this Agreement, other than the obligation to make timely Payments, that is due
to any of the following causes, to the extent beyond its reason able control: acts of God, accident,
riots, war, terrorist act, epidem ic, pandemic, quarantine, civi l commotion, breakdown of
communication facilities, breakdown of web host, breakdown of internet service provider, natural
catastrophes, governmental acts or omissions, changes in laws or regulations, national strikes, fire,
explosion, generalized lack of availability of raw materials or energy. For the avoidance of doubt,
Force Majeure shall not include (a) financial distress nor the inability of either party to make a
profit or avoid a financial loss, (b) changes in market prices or conditions, or (c) a party’s financial
inability to perform its obligations hereunder.
16. Third Party Beneficiaries. This Agreement is solely for the benefit of the Parties
hereto and their respective successors and permitted assigns, a nd no other person shall have any
right, benefit, priority or interest in, under or because of the existence of, this Agreement.
17. Counterparts; Electronic Signatures . This Agreement may be executed
simultaneously in any number of counterparts, each of which sha ll be deemed to be an original,
and all of which shall constitute but one and the same instrument. A signed copy of this Agreement
delivered by facsimile, e-mail/PDF or other means of electronic transmission shall be deemed to
have the same legal effect as delivery of an original signed copy of this Agreement.
18. Recitals and Exhibits. The above stated recitals and previously described exhibits
are expressly incorporated herein by reference.
[signature page follows]
Page 48 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 10 of 13
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed
by the officers whose names appear below as of the Effective Date.
Q UARRY ENERGY CENTER LLC
d/b/a EAST POINT ENERGY
(SEAL)
B y :
N a m e : _________________________
T itle: _________________________
Attest:_____________________
Name:_____________________
Title:______________________
CITY OF LYNCHBURG, VIRGINIA
B y :
N a m e : W y n t e r C . B e n d a
T itle: City Manager
(SEAL)
Attest:_____________________
Name:_____________________
Title:______________________
Approved as to form:
____________________
City Attorney/Designee
Page 49 of 67
PROJECT GATE(30' WIDE SWINGING GATEW/ KNOX BOX)
PROPERTY BOUNDARYPROJECT ACCESS ROAD(25' WIDTH)BATTERY ENCLOSURES
STORMWATER PONDPCS SKIDSPROJECT FENCE
O&M ENCLOSURESPERKINS PARK SUBSTATION
VEGETATIVE BUFFER20' MEETING SEC 35.2-63.10 OF ORDINANCEEXISTING VEGETATION TO BE PRESERVEDWHERE POSSIBLE
PID: 05101005APPALACHIAN ELECTRICPOWERZONING: I-32651 CLOVER PL.
PID: 05106008APPLEGATE INVESTMENTS LLCZONING: I-32920 CARROLL AVEDOC. NO. 050006226
PID: 05106012NBS HOLDINGS LLCZONING: I-32916 CARROLL AVEDOC. NO. 190007663PID: 05106009WILSON, W PAGEZONING: I-32912 CARROLL AVEDB. 466 PG. 698PID: 05106010BAILEY, RICHARD L REV LIV TRZONING: I-32908 CARROLL AVEDB. 1104 PG. 705
PID: 02702002NORFOLK SOUTHERN RAILWAYZONING: R-3, I-3, I-21811 12TH ST
PID: 05106007HARRIS, DEVETA J MZONING: I-32701 CLOVER PLDB. 661 PG. 650
PID: 11208007MVE CONSTRUCTION LLCZONING: I-32650 CLOVER PLDOC. NO. 230007129
PID: 11208008MVE CONSTRUCTION LLCZONING: I-32610 CLOVER PLDOC. NO. 230007129
PID: 11111012NORFOLK SOUTHERNRAILWAYZONING: IN-2, I-3, B-52601 GREENE ST
PID: 0510514FOREST VIEWS LLCZONING: I-22905 CARROLL AVEDOC. NO. 200009927
PID:05106011ZONING: I-32904 CARROLL AVE.DOC. NO. 050012961
PID: 11402007NORFOLK SOUTHERNRAILWAYZONING: I-3, I-2, B-3, B-53534 CANDLERSMOUNTAIN RD.PID: 0510515BURKS, HORANCE M & DORA BZONING: I-22909 CARROLL AVEDB. 396 PG. 581
SIDEWALKALONGFRONTAGEOF CARROLLAVE
EXISTINGFIRE HYDRANT
PROPOSED TREES
1.THIS DRAWING IS APRELIMINARY DESIGN -NOT FOR CONSTRUCTION.2.ALL DIMENSIONSSPECIFIED HERE ARE FORREFERENCE ONLY, DO NOTSCALE THIS DRAWING.3.EQUIPMENT TYPE,QUANTITY, AND LOCATIONIS REPRESENTATIVE ONLYAND MAY CHANGE BASEDON AVAILABILITY ANDFINAL DESIGN.4.LIGHTING PLAN TO BECOMPLIANT WITH SECTION35.2-65 WITH FULL PLANSUBMITTAL.5.ALL AREAS NOT USED FOROPERATIONS TO BEREFORESTED PER CITYORDINANCE SECTION35.2-63.4.
QUARRY ENERGY CENTER, LLC2904 CARROLL AVENUELYNCHBURG, VA 24501PREPARED FOR INTERNAL USEPRELIMINARYNOT FORCONSTRUCTION
GENERAL NOTES
DATEBYTD04/10/2024PAGE1
WETLANDS AS DELINEATED BY ECSMID-ATLANTIC, LLC IN JUNE 2021
QUANTITIESTREES 2
Page 50 of 67
/
ATTACHMENT N
Form of
Generation Interconnection Feasibility Study Agreement
RECITALS
1. This Generation Interconnection Feasibility Study Agreement, dated as of 02/23/2021 , is entered into, by and
between Quarry Energy Center, LLC ("Interconnection Customer") and PJM Interconnection, L.L.C.
("Transmission Provider") (individually referred to as a "Party," or collectively referred to as the "Parties")
pursuant to Part IV and Part VI of the PJM Interconnection, L.L.C. Open Access Transmission Tariff ("PJM Tariff")
(the "Agreement"). Capitalized terms used in this agreement, unless otherwise indicated, shall have the
meanings ascribed to them in the PJM Tariff.
2. By submitting this Agreement and complying with Section 36.1.01, 110.1, 111.1, or 112.1, as applicable, of the
PJM Tariff, the Interconnection Customer has submitted an Interconnection Request. In accordance with
Section 36.1.01, 110.1, 111.1, or 112.1, as applicable, of the PJM Tariff, the Interconnection Customer has also
submitted with this Agreement the applicable required deposit to the Transmission Provider.
3. By submitting this Agreement to the Transmission Provider, the Interconnection Customer requests
interconnection to the Transmission System of a generating project with the following specifications:
a. Location of generating unit site (include both a written description (e.g., street address, global
positioning coordinates) and attach a map in PDF format depicting the property boundaries and the
location of the generating unit site):
Latitude: 37.3882640 Longitude: -79.1551830
b. Identification of evidence of ownership interest in, or right to acquire or control, the generating site for
a minimum of three years for large generation, or for a minimum of two years for small generation.
Include both a written description of the evidence to be relied upon and attach a Word or PDF version
copy thereof. If the evidence of ownership interest in, or right to acquire or control the generating site
is not yet available, provide a detailed explanation of why such evidence is not available and provide a
good faith estimated date upon which such evidence shall be submitted to the Transmission Provider.
Though site control evidence may be submitted separately from this Agreement, the Interconnection
Request is still subject to the overall deficiency review period and deficiency response period time
constraints provided for in Section 36.1.01, 110.1, 111.1, or 112.1, as applicable, of the PJM Tariff, and
shall not be assigned a Queue Position without site control evidence acceptable to the Transmission
Provider.:
c. Specification of Requested Maximum Facility Output and Requested Capacity Interconnection Rights. The
requested Maximum Facility Output megawatts and requested Capacity Interconnection Rights
megawatts indicated in this section may be reduced as this Interconnection Request proceeds in the
Transmission Provider Interconnection Request process, but may not be increased after this Agreement is
submitted to the Transmission Provider.
Page 51 of 67
/
i. For new generating units, complete the following chart:
Total Requested Maximum Facility Output (as defined in the PJM Tariff) in
Megawatts 20.000000
Total Requested Capacity Interconnection Rights (as defined in the PJM Tariff)
in Megawatts 20.000000
ii. For existing generating units that will be adding megawatt capability, complete the following
chart:
Existing
Facility
Proposed Facility
Incremental IncreaseTotal
Maximum Facility Output (as defined in the
PJM Tariff) in Megawatts
Capacity Interconnection Rights (as defined
in the PJM Tariff) in Megawatts
iii. For new Behind The Meter generating units, complete the following chart:
Gross Generator Output in Megawatts
Behind the Meter Load in Megawatts (the sum of the MW generation auxiliary load
and any other MW load to be served behind the Point of Interconnection)
Total Requested Maximum Facility Output (as defined in the PJM Tariff) in
Megawatts
Total Requested Capacity Interconnection Rights (as defined in the PJM Tariff) in
Megawatts
iv. For existing Behind The Meter generating units that will be adding megawatt capability, complete
the following chart:
Existing
Facility
Requested
Facility
Increase
Total
Gross Generator Output in Megawatts
Behind the Meter Load in Megawatts (the sum of the MW
generation auxiliary load and any other MW load to be
served behind the Point of Interconnection)
Maximum Facility Output (as defined in the PJM Tariff) to
be exported from the Behind the Meter Generator onto
the PJM System, in Megawatts
Capacity Interconnection Rights, in Megawatts
d. Identify the fuel type of the new or existing generating unit:
Storage
Page 52 of 67
/
e. A PDF format attachment of the site plan/single line diagram together with a description of the
equipment configuration, including a set of preliminary electrical design specifications, and if the
generating unit is a wind generation facility, then also submit a set of preliminary electrical design
specifications depicting the wind generation facility as a single equivalent generator:
f. Planned date the new generating unit or increase in capability will be in service:
10/31/2022
Page 53 of 67
/
g. Other related information, including for example, but not limited to, identifying: all of Interconnection
Customer's prior Queue Positions; stating whether the Interconnection Customer has submitted a
previous Interconnection Request for this particular project; and, if this Interconnection Request
proposes an increase in capability to an existing generating unit, then identify whether the existing
generating unit is subject to an existing Interconnection Agreement and/or Power Purchase Agreement:
200 MWh
THE FOLLOWING APPLIES TO BEHIND THE METER GENERATION:
a. If Behind the Meter Generation is identified in this Agreement, all of the requirements in Section 36.1A
of the PJM Tariff must also be met.
b
. Identify the type and size of the load located (or to be located) at the site of such generation, and
attach a PDF format single line diagram depicting the location of the load in relation to the site of such
generation:
c
. Describe the electrical connections between the generation facility and the load.
THE FOLLOWING APPLIES TO ENERGY STORAGE RESOURCES
Primary frequency response range for Energy Storage Resources:
Minimum State of Charge: : and
Maximum State of Charge: .
PURPOSE OF THE FEASIBILITY STUDY
4. Consistent with Section 36.2 of the PJM Tariff, the Transmission Provider shall conduct a Generation
Interconnection Feasibility Study to provide the Interconnection Customer with preliminary determinations of:
(i) the type and scope of the Attachment Facilities, Local Upgrades, and Network Upgrades that will be
necessary to accommodate the Interconnection Customer's Interconnection Request; (ii) the time that will be
required to construct such facilities and upgrades; and (iii) the Interconnection Customer's cost responsibility
for the necessary facilities and upgrades. In the event that the Transmission Provider is unable to complete the
Generation Interconnection Feasibility Study within the timeframe prescribed in Section 36.2 of the PJM Tariff,
the Transmission Provider shall notify the Interconnection Customer and explain the reasons for the delay.
5
. The Generation Interconnection Feasibility Study conducted hereunder will provide only preliminary non-final
estimates of the cost and length of time required to accommodate the Interconnection Customer's
Interconnection Request. More comprehensive estimates will be developed only upon execution of a System
Impact Study Agreement and a Facilities Study Agreement in accordance with Part VI of the PJM Tariff. The
Generation Interconnection Feasibility Study necessarily will employ various assumptions regarding the
Interconnection Request, other pending requests, and PJM's Regional Transmission Expansion Plan at the time of
the study. The Generation Interconnection Feasibility Study shall not obligate the Transmission Provider or the
Transmission Owners to interconnect with the Interconnection Customer or construct any facilities or upgrades.
0%
100%
Page 54 of 67
/
CONFIDENTIALITY
6. The Interconnection Customer agrees to provide all information requested by the Transmission Provider
necessary to complete the Generation Interconnection Feasibility Study. Subject to paragraph 7 of this
Agreement and to the extent required by Section 222 of the PJM Tariff, information provided pursuant to this
Section 6 shall be and remain confidential.
7. Until completion of the Generation Interconnection Feasibility Study, the Transmission Provider shall keep
confidential all information provided to it by the Interconnection Customer. Upon completion of the Generation
Interconnection Feasibility Study, the study will be listed on the Transmission Provider's website and, to the
extent required by Commission regulations, will be made publicly available upon request, except that the
identity of the Interconnection Customer shall remain confidential and will not be posted on the Transmission
Provider's website.
8. Interconnection Customer acknowledges that, consistent with the PJM Tariff, the Transmission Provider may
contract with consultants, including the Transmission Owners, to provide services or expertise in the
Generation Interconnection Feasibility Study process and that the Transmission Provider may disseminate
information to the Transmission Owners.
COST RESPONSIBILITY
9. The Interconnection Customer shall reimburse the Transmission Provider for the actual cost of the Generation
Interconnection Feasibility Study. The refundable portion of the deposit paid by the Interconnection Customer
described in Section 2 of this Agreement shall be applied toward the Interconnection Customer's Generation
Interconnection Feasibility Study cost responsibility. Pursuant to Section 36.1.01, 110, 111, or 112 of the PJM
Tariff, as applicable, during the deficiency review of this Agreement, in the event that the Transmission
Provider anticipates that the actual study costs will exceed the refundable portion of the deposit described in
Section 2 of this agreement, the Transmission Provider shall provide the Interconnection Customer with an
estimate of the additional study costs. The estimated additional study costs are non-binding, and additional
actual study costs may exceed the estimated additional study cost increases provided by the Transmission
Provider. Regardless of whether the Transmission Provider provides the Interconnection Customer with
estimated additional study costs, the Interconnection Customer is responsible for and must pay all actual study
costs. If the Transmission Provider sends the Interconnection Customer notification of estimated additional
study costs during the deficiency review period (as described in Sections 36.1.01, 110, 111, or 112), then the
Interconnection Customer must either: (1) withdraw the Generation Interconnection Request during the
deficiency response period (as described in Sections 36.1.01, 110, 111, or 112); or (2) pay all additional
estimated costs prior to the expiration of the deficiency response period (as described in Sections 36.1.01, 110,
111, or 112). If the Interconnection Customer fails to complete either (1) or (2), then the Generation
Interconnection Request shall be deemed to be terminated and withdrawn. If at any time after the deficiency
review period the Transmission Provider provides the Interconnection Customer with notification of estimated
additional study costs, the Interconnection Customer must pay such estimated additional study costs within ten
business days of Transmission Provider sending the Interconnection Customer notification of such estimated
additional study costs. If the Interconnection Customer fails to pay such estimated additional study costs within
ten business days of Transmission Provider sending the Interconnection Customer notification of such estimated
additional study costs, then the Generation Interconnection Request shall be deemed to be terminated and
withdrawn.
Page 55 of 67
/
DISCLAIMER OF WARRANTY, LIMITATION OF LIABILITY
10. In analyzing and preparing the Generation Interconnection Feasibility Study, the Transmission Provider, the
Transmission Owner(s), and any other subcontractors employed by the Transmission Provider shall have to rely
on information provided by the Interconnection Customer and possibly by third parties and may not have
control over the accuracy of such information. Accordingly, NEITHER THE TRANSMISSION PROVIDER, THE
TRANSMISSION OWNER(S), NOR ANY OTHER SUBCONTRACTORS EMPLOYED BY THE TRANSMISSION PROVIDER
MAKES ANY WARRANTIES, EXPRESS OR IMPLIED, WHETHER ARISING BY OPERATION OF LAW, COURSE OF
PERFORMANCE OR DEALING, CUSTOM, USAGE IN THE TRADE OR PROFESSION, OR OTHERWISE, INCLUDING
WITHOUT LIMITATION IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE
WITH REGARD TO THE ACCURACY, CONTENT, OR CONCLUSIONS OF THE FEASIBILITY STUDY. The Interconnection
Customer acknowledges that it has not relied on any representations or warranties not specifically set forth
herein and that no such representations or warranties have formed the basis of its bargain hereunder. Neither
this Agreement nor the Generation Interconnection Feasibility Study prepared hereunder is intended, nor shall
either be interpreted, to constitute agreement by the Transmission Provider or the Transmission Owner(s) to
provide any transmission or interconnection service to or on behalf of the Interconnection Customer either at
this point in time or in the future.
11. In no event will the Transmission Provider, Transmission Owner(s) or other subcontractors employed by the
Transmission Provider be liable for indirect, special, incidental, punitive, or consequential damages of any kind
including loss of profits, whether under this Agreement or otherwise, even if the Transmission Provider,
Transmission Owner(s), or other subcontractors employed by the Transmission Provider have been advised of
the possibility of such a loss. Nor shall the Transmission Provider, Transmission Owner(s), or other
subcontractors employed by the Transmission Provider be liable for any delay in delivery or of the non-
performance or delay in performance of the Transmission Provider's obligations under this Generation
Interconnection Feasibility Study Agreement.
Without limitation of the foregoing, the Interconnection Customer further agrees that Transmission Owner(s)
and other subcontractors employed by the Transmission Provider to prepare or assist in the preparation of any
Generation Interconnection Feasibility Study shall be deemed third party beneficiaries of this provision entitled
"Disclaimer of Warranty/Limitation of Liability."
MISCELLANEOUS
12. Any notice or request made to or by either Party regarding this Agreement shall be made to the representative
of the other Party as indicated below.
Transmission Provider
PJM Interconnection, L.L.C.
2750 Monroe Blvd.
Audubon, PA 19403
Interconnection Customer
Quarry Energy Center, LLC
200 Garrett Street, Suite J
Charlottesville, Virginia 22902
13. No waiver by either Party of one or more defaults by the other in performance of any of the provisions of this
Agreement shall operate or be construed as a waiver of any other or further default or defaults, whether of a
like or different character.
Page 56 of 67
/
14. This Agreement or any part thereof, may not be amended, modified, or waived other than by a writing signed
by all Parties hereto.
Page 57 of 67
/
15. This Agreement shall be binding upon the Parties hereto, their heirs, executors, administrators, successors, and
assigns.
16. Neither this Agreement nor the Generation Interconnection Feasibility Study performed hereunder shall be
construed as an application for service under Part II or Part III of the PJM Tariff.
17. The provisions of Part IV of the PJM Tariff are incorporated herein and made a part hereof.
18. Governing Law, Regulatory Authority, and Rules
The validity, interpretation and enforcement of this Agreement and each of its provisions shall be governed by
the laws of the state of Virginia (the state where the Point of Interconnection is located),
without regard to its conflicts of law principles. This Agreement is subject to all Applicable Laws and
Regulations. Each Party expressly reserves the right to seek changes in, appeal, or otherwise contest any laws,
orders, or regulations of a Governmental Authority.
19. No Third-Party Beneficiaries
This Agreement is not intended to and does not create rights, remedies, or benefits of any character
whatsoever in favor of any persons, corporations, associations, or entities other than the Parties, and the
obligations herein assumed are solely for the use and benefit of the Parties, their successors in interest and
where permitted, their assigns.
20. Multiple Counterparts
This Agreement may be executed in two or more counterparts, each of which is deemed an original but all of
which constitute one and the same instrument.
21. No Partnership
This Agreement shall not be interpreted or construed to create an association, joint venture, agency
relationship, or partnership between the Parties or to impose any partnership obligation or partnership liability
upon either Party. Neither Party shall have any right, power or authority to enter into any agreement or
undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise bind, the
other Party.
22. Severability
If any provision or portion of this Agreement shall for any reason be held or adjudged to be invalid or illegal or
unenforceable by any court of competent jurisdiction or other Governmental Authority, (1) such portion or
provision shall be deemed separate and independent, (2) the Parties shall negotiate in good faith to restore
insofar as practicable the benefits to each Party that were affected by such ruling, and (3) the remainder of
this Agreement shall remain in full force and effect.
23. Reservation of Rights
The Transmission Provider shall have the right to make a unilateral filing with the Federal Energy Regulatory
Commission ("FERC") to modify this Agreement with respect to any rates, terms and conditions, charges,
classifications of service, rule or regulation under section 205 or any other applicable provision of the Federal
Power Act and FERC's rules and regulations thereunder, and the Interconnection Customer shall have the right
to make a unilateral filing with FERC to modify this Agreement under any applicable provision of the Federal
Power Act and FERC's rules and regulations; provided that each Party shall have the right to protest any such
filing by the other Party and to participate fully in any proceeding before FERC in which such modifications may
be considered. Nothing in this Agreement shall limit the rights of the Parties or of FERC under sections 205 or
Page 58 of 67
/
206 of the Federal Power Act and FERC's rules and regulations, except to the extent that the Parties otherwise
agree as provided herein.
Page 59 of 67
/
CERTIFICATION
By initialing the line next to each of the following required elements, Interconnection Customer hereby
certifies that it has submitted with this executed Agreement each of the required elements (if this
Interconnection Request is being submitted electronically, each of the required elements must be submitted
electronically as individual PDF files, together with an electronic PDF copy of this signed Agreement):
___________
Specification of the location of the proposed generating unit site or existing generating unit
(including both a written description (e.g., street address, global positioning coordinates)
and attach a map in PDF format depicting the property boundaries and the location of the
generating unit site)
___________ Evidence of an ownership interest in, or right to acquire or control the generating unit site
___________
The megawatt size of the proposed generating unit or the amount of increase in megawatt
capability of an existing generating unit, and identification of any megawatt portion of the
facility's capability that will be a Capacity Resource
___________ Identification of the fuel type of the proposed generating unit or upgrade thereto
___________
Description of the equipment configuration and a set of preliminary electrical design
specifications, and, if the generating unit is a wind generation facility, then the set of
preliminary electrical design specifications must depict the wind plant as a single
equivalent generator
___________
The planned date that the proposed generating unit or increase in megawatt capability of
an existing generating unit will be in service, where such date is to be no more than seven
years from the date that a complete and fully executed Generation Interconnection
Feasibility Study Agreement is received by the Transmission Provider unless the
Interconnection Customer demonstrates that engineering, permitting, and construction of
the generating unit or increase in capability will take more than seven years
___________ All additional information prescribed by the Transmission Provider in the PJM Manuals
___________ The full amount (including both the refundable and non-refundable portions) of the
required deposit
IN WITNESS WHEREOF, the Transmission Provider and the Interconnection Customer have caused this Agreement to be
executed by their respective authorized officials.
Transmission Provider: PJM Interconnection, L.L.C.
Printed Name
Interconnection Customer: Quarry Energy Center, LLC
Andrew Foukal
Printed Name
By:
Name Title Date
By: President
Name Title Date
2/23/21
Manager, Interconnection Projects 3/18/2021
Jason Shoemaker
Page 60 of 67
City of Lynchburg – Quarry Energy Center LLC
Energy Storage Facility Siting Agreement
Page 13 of 13
EXHIBIT C
Capital Payment Schedule
Within 90 days after signing of Siting Agreement for the Project
$5,000.00
Commencement of Construction on the Project $20,000.00
Within 90 days of Commercial Operation of Project $40,000.00
Page 61 of 67
RESOLUTION: #R-24-______
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF LYNCHBURG:
1. That, pursuant to the authorities described under Article 7.3, Chapter 22, Title 15.2 of the Code
of Virginia, 1950, as amended, the ENERGY STORAGE FACILITY SITING AGREEMENT,
dated as of May 28, 2024, between the City of Lynchburg, Virginia (“City”) and Quarry Energy
Center LLC (d/b/a East Point Energy), being specific to the development, installation, building,
and operation of an approximately 20MW megawatt battery energy storage facility upon Tax
Map No. 05106011 (2904 Carroll Avenue, Lynchburg, Virginia 24501), is hereby approved.
Such agreement is incorporated herein by reference.
2. That the City Manager is hereby authorized to execute the said agreement on behalf of the
City and he, or his designee where permitted, is further authorized to take any and all other
actions on behalf of the City and execute any and all other documents connected to the same
or connected to the said energy storage facility on behalf of the City.
3. That this Resolution shall become effective upon its adoption.
Adopted:
Certified: ________________________________
Clerk of Council
Page 62 of 67
City Council
Agenda Item IV.5.
Business Item Briefings
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
May 14, 2024 Thomas Delaney, Museum Director
AGENDA ITEM # IV.5
VA 250 Local Committee
RECOMMENDATION
This item will appear for City Council vote on the May 28, 2024,General Business agenda. Establish
the City of Lynchburg's VA 250 Local Committee.
SUMMARY
VA 250 local committees work with the State’s VA 250 Commission to commemorate the 250th
anniversary of Virginia’s role in American independence (1776–1781). The state’s commission will
provide grant funding opportunities for commemorative events or projects and will make available
programs to include traveling exhibitions and teacher resources to the local committee. Grants are
offered through the Virginia Tourism Corporation and Virginia Humanities.
Local representatives have self-selected as Lynchburg’s committee and listed themselves on the
VA250 website; the committee contact is listed as Ashleigh Meyer, with the Old City Cemetary
(Southern Memorial Association). The narrative from the website listing notes “Old City Cemetery
will serve as the focal point for Lynchburg’s 250th programming, and we are excited to work with the
Lynchburg Museum, Jones Memorial Library, area historians, and the nearby counties of Bedford
and Campbell to bring about a regional celebration of this important anniversary for our nation.”
To have an officially recognized (or “certified”) VA 250 committee, City Council must pass a support
resolution. The attached resolution formally designates the local committee through December 31,
2026 and assigns the Southern Memorial Association as the fiscal agent for purposes of applying
for receiving and managing state programs and grants on behalf of the committee.
PRIOR ACTION(S)
April 23, 2024: Vice-Mayor Faraldi asked that a resolution be prepared to support formation of
Lynchburg's VA 250 local committee.
FISCAL IMPACT
N/A - The resolution assigns the Southern Memorial Association as the fiscal agent for the
committee.
CONTACT(S)
Thomas Delaney, Museum Director
Page 63 of 67
ATTACHMENT(S)
1. Proposed Resolution - VA250 Local Committee
REVIEWED BY
Date: May 08, 2024
Marjette Upshur, Director of Economic Devleopment & Toursim
Date: May 08, 2024
Kent White, Assistant City Manager
Date: May 08, 2024
Alicia Finney, Clerk of Council
Page 64 of 67
1
RESOLUTION: #R-24-______
WHEREAS, the Council of the City of Lynchburg, Virginia is dedicated to the furtherance of
economic development and tourism in the Commonwealth of Virginia and within the corporate
limits of the City of Lynchburg, Virginia (the “City”); and
WHEREAS, the Virginia American Revolution 250 Commission (“VA250”) was created in 2020
by the Virginia General Assembly for the purposes of preparing for and commemorating the
250th anniversary of Virginia’s participation in American independence; and
WHEREAS, VA250 has requested that each locality in Virginia form a committee to aid in
planning of the said commemoration; and
WHEREAS, the Council of the City desires to form a VA250 committee, and that committee will
plan and coordinate programs specific to VA250’s aforesaid purposes and communicate
regularly with VA250; and
WHEREAS, the Council of the City desires to undertake this endeavor with VA250 to promote
and commemorate this important historic milestone; and
WHEREAS, the Southern Memorial Association has agreed to serve as the fiscal agent (in lieu
of the City) for the local VA 250 committee if created by the Council of the City.
WHEREAS, the Southern Memorial Association has also agreed to serve as the liason between
the City, the said local VA 250 committee, and VA250 for purposes of assisting the said local
VA250 committee in its operations, to help the said local VA250 committee communicate with
VA250, and to assist the said local VA250 committee in fulfilling its purposes
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF LYNCHBURG:
1.That the VA250 Committee for the City of Lynchburg, Virginia (the “Committee”) is hereby
created for the purposes of preparing for and commemorating the 250th anniversary of
Virginia’s participation in American independence.
2.That the Council of the City shall appoint the membership of the Committee, which, to the
extent possible, should include representatives from the following:
Tourism, especially local attractions, lodging, and restaurants
Economic development
Education – primary through college level where possible
Tribal representatives
Museums and historic sites
Local historical and cultural groups
Local governing body
3.That the membership of the Committee shall be composed of no less than seven (7)
persons nor more than fifteen (15) persons. In addition to its membership, the Southern
Memorial Association (or any successor entity of the same), a Virginia nonstock corporation,
shall serve as the liaison between the City, the Committee, and VA250 for purposes of
Page 65 of 67
2
assisting the Committee in its operations, to help the Committee communicate with VA250,
and to assist the Committee in fulfilling its purposes.
4.That, where necessary and where requested by the Committee, the Southern Memorial
Association (or any successor entity of the same) shall serve as the fiscal agent for the
Committee and, if needed, apply for, receive, manage, and expend grants/funds on its
behalf. The City shall not serve as the fiscal agent for the Committee nor apply for, receive,
manage, nor expend grants/funds on the Committee’s behalf.
5.That all funds received by/for the purposes of the Committee shall be properly managed,
accounted for, and used lawfully. When requested, financial accountings and other related
records will be provided to the Chief Financial Officer of the City and/or VA250.
6.That the Committee shall be deemed automatically dissolved and terminated upon all of its
affairs, obligations, and purposes being concluded, which shall be accomplished no later than
December 31, 2026. A letter from the former Committee Chairperson or the President of the
Southern Memorial Association (or any successor entity of the same) confirming such
dissolution shall be forwarded to the City Manager by January 10, 2027. Such letter shall
include an accounting showing how the Committee and the Southern Memorial Association
(or any successor entity of the same) handled all of the financial assets connected to the
Committee before its dissolution.
7.That this Resolution shall become effective upon its adoption.
Adopted:
Certified: ________________________________
Clerk of Council
(Remainder of Page Intentionally Left Blank)
Page 66 of 67
3
By joining in this Resolution through signature of its authorized representative, the
Southern Memorial Association agrees to the content of this Resolution.
Southern Memorial Association
By:__________________________________
Printed Name:_________________________
Its: __________________________________
Commonwealth of Virginia,
City of Lynchburg, to-wit:
The foregoing instrument was acknowledged before me by
_______________________________, the ______________________________ of the
Southern Memorial Association, on this the _________ day of ___________________, 2024,
on behalf of the said association.
_______________________________
Notary Public
My Commission Expires:_________________________
Notary Registration No.__________________________
Page 67 of 67