CITY COUNCIL WORK SESSION
Tuesday, February 27, 2024 | 4:00 PM
Council Chamber- City Hall
900 Church Street
Lynchburg, VA 24504
AGENDA
I. Welcome Stephanie T. Reed, Mayor
II. Work Session Agenda Overview Wynter C. Benda, City Manager
III. Work Session Agenda Items Wynter C. Benda, City Manager
III.1. Presentation of the FY 2025 - 2029 Capital Improvement Program - City and
Schools
IV. Business Item Briefing(s)
IV.2. City and ApCo Easement (3405 Odd Fellows Road - LPD Facility)
IV.3. Rezoning: I-2, Light Industrial District to B-3, Community Business District &
FLUM Amendment: Resource Conservation to Community Commercial - 6201
Fort Avenue
IV.4. PPTA/PPEA Guidelines Update
V. Roll Call
V.5. Vice Mayor Faraldi: Flag Display
VI. Closed Session
VI.6. Consideration of a closed meeting to discuss the investment of public funds in
relation to a project with a private party, where competition or bargaining will be
involved, where if made public initially, the financial interest of the City would be
adversely affected, pursuant to Section 2.2-3711(A)(6) of the Code of Virginia,
1950, as amended.
VI.7. Consideration of a closed meeting to discuss the performance of specific
membership of the City’s Youth Services Advisory Board and the Lynchburg
Youth Services, Inc., in relation to the operations of the City, and to receive legal
advice regarding the same, pursuant to Sections 2.2-3711(A)(1) and 2.2-
3711(A)(8) of the Code of Virginia, 1950, as amended.
VI.8. Consideration of a closed meeting to discuss probable litigation being brought by
the City in relation to a development project within the corporate limits of the City
and to receive legal advice regarding the same, pursuant to Sections 2.2-
3711(A)(7) and 2.2-3711(A)(8) of the Code of Virginia, 1950, as amended.
VI.9. Consideration of a closed meeting to discuss appointments for vacancies to the
following Boards and Commissions: MLK/Lynchburg Community Council,
Greater Lynchburg Transit Company Board of Directors, pursuant to Section 2.2-
3711(A.)(1) of the Code of Virginia, 1950, as amended.
Page 1 of 309
City Council
Agenda Item III.1.
Information Only
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
February 27, 2024 Donna Witt, Chief Financial Officer
AGENDA ITEM # III.1
Presentation of the FY 2025 - 2029 Capital Improvement Program - City and Schools
RECOMMENDATION
Hear a presentation regarding the FY 2025 - 2029 Capital Improvement Program - City and Schools
SUMMARY
As part of the FY 2025 budget, the FY 2025 - 2029 Capital Improvement Program will be presented
to highlight City and Schools capital projects that are funded by the general fund.
PRIOR ACTION(S)
February 13, 2024 Physical Development Committee
February 27, 2024 Finance Committee
FISCAL IMPACT
Fiscal Impact will depend on adoption of the program
CONTACT(S)
Donna Witt, Chief Financial Officer
ATTACHMENT(S)
1. FY 2025-2029 Capital Improvement Program 022724 Presentation
2. FY 2025-2029 Capital Improvement Program 022724 Appendix
3. Proposed FY 2025 - 2029 Capital Improvement Program 02272024
REVIEWED BY
Date: February 05, 2024
Donna Witt, Chief Financial Officer
Page 2 of 309
Date: February 22, 2024
Gregory Patrick, Deputy City Manager
Date: February 22, 2024
Alicia Finney, Clerk of Council
Page 3 of 309
FY 2025 – 2029
CAPITAL IMPROVEMENT PROGRAM
CITY AND SCHOOLS
February 27, 2024
Page 4 of 309
CITY ASSETS
• Approximately 200 structures, including:
• Over 1 million square feet of space (not including schools)
• Public Safety Buildings and Structures
• Community Centers
• Courts
• Libraries
• Public Works Complex
• Human Services Buildings
• Municipal Building
• 16 primary and secondary schools
• 817 lane miles
• 78 bridges/major culverts
• 953 acres of parks and more than 23 miles of trails
Page 5 of 309
WHERE WE WERE
• Limited newly designed buildings; repurposed existing space
• In general, submitted projects from departments were included in the
Proposed Capital Improvement Program (CIP)
• Funding was available when needed
• Debt Service grew year-over-year; organic revenue growth covered the
increased cost
• This process worked for 20+ years
Page 6 of 309
WHERE WE ARE NOW
• Aging infrastructure
• Project funding is no longer guaranteed
• Submitted Projects were eliminated or delayed due to:
• Inflationary Costs of Construction
• Rising Interest Rates
• Limited Capacity to Grow Debt Service
• Inflation for constructing non-residential buildings
• 2011-2020: 3.7%
• 2022: 12%
• Producer price index by commodity for construction materials increased 57%
over 10 years (January 2014 – December 2023), U.S. Labor of Statistics
Page 7 of 309
WHERE WE ARE NOW (CONTINUED)
Submitted Proposed Bond Funding
Buildings 64,663,000 37,583,000 20,568,000
Transportation 167,672,339 149,411,464 79,681,875
Economic Development 51,441,000 40,791,000 27,461,000
Parks and Recreation 20,756,000 8,106,000 2,150,000
Miscellaneous 7,745,000 6,525,000 1,500,000
Reserves 1,450,000 1,750,000 0
Schools 118,769,032 9,952,000 7,090,000
$432,496,371 $254,118,464 $138,450,875
Page 8 of 309
PLAN OF FINANCE
• Over the past several years, the City has followed “Just-In-Time” funding
for its capital needs.
• The “Just-In-Time” financing includes a two- to three-year line of credit
strategy followed by permanent financing.
• Given the success of this funding strategy the City’s financial advisors,
Davenport & Company, have recommended the City continue to utilize
the financing strategy.
• The City anticipates entering into a new line of credit in the spring of
2026 as a part of the next phase of its Capital Improvement Program.
Page 9 of 309
CIP PLAN COMPARISON
Line of Credit/Bonds FY 2025 FY 2026 FY 2027 FY 2028 Total
FY 2024 - 2028 Adopted $47,817,250 $27,675,141 $29,837,000 $24,807,750 $130,137,141
FY 2025 - 2029 Propos ed $33,871,433 $31,444,191 $29,140,300 $17,025,750 $111,481,674
Page 10 of 309
QUESTIONS?
Page 11 of 309
FY 2025 – 2029
CAPITAL IMPROVEMENT PROGRAM
CITY AND SCHOOLS
February 27, 2024
APPENDIX
Page 12 of 309
FY 2025 – 2029 CIP – FUNDED PROJECTS
BUILDINGS
2
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
CIP
Page
Circuit and General District Court Improvements 0 750,000 8,000,000 0 0 0 8,750,000 22
Major Building Repairs and Improvements/Multiple Projects 0 0 4,125,000 4,785,000 2,910,000 4,705,000 16,525,000 23
Parking Lot Repairs and Improvements/Multiple Projects 0 0 485,000 425,000 425,000 425,000 1,760,000 28
Roof Replacement/Multiple Projects 0 470,000 1,060,000 1,785,000 638,000 1,595,000 5,548,000 31
Transfer Station for Refuse 1,900,000 5,000,000 0 0 0 0 5,000,000 33
TOTAL $1,900,000 $6,220,000 $13,670,000 $6,995,000 $3,973,000 $6,725,000 $37,583,000
Page 13 of 309
FY 2025 – 2029 CIP – REMOVED PROJECTS
BUILDINGS
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
Public Library Renovation/Reimagination 1,092,710 9,000,000 1,000,000 0 0 0 10,000,000
Public Safety Firing Range - Building 0 150,000 1,950,000 0 0 0 2,100,000
Public Safety Indoor Firing Range 0 200,000 11,000,000 0 0 0 11,200,000
TOTAL $1,092,710 $9,350,000 $13,950,000 $0 $0 $0 $23,300,000
3
Page 14 of 309
FY 2025 – 2029 CIP – FUNDED PROJECTS
TRANSPORTATION
4
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
CIP
Page
Public Transit Improvements and Bus Replacements 9,606,000 478,000 3,841,050 1,062,950 530,000 3,900,000 9,812,000 36
Bedford Avenue Bridge 14,724,894 0 7,160,915 0 0 0 7,160,915 38
Breezewood Drive Widening 5,280,000 4,473,825 0 1,708,456 0 0 6,182,281 39
Bridge Maintenance 0 1,088,325 625,000 676,000 729,000 765,450 3,883,775 40
Culvert Replacement Program 0 750,000 81,250 845,000 87,750 929,500 2,693,500 41
Forest Brook Road, Phase I 0 0 0 0 0 1,417,500 1,417,500 43
General Street Improvements 0 425,000 1,100,000 1,170,000 1,215,000 1,275,750 5,185,750 44
Hollins Mill Rd Bridge Replacement w/Bikeway Improvemnts 0 8,268,000 0 8,116,410 0 3,466,652 19,851,062 45
John Lynch Bridge Repairs 6,072,567 3,077,433 0 0 0 0 3,077,433 46
Lakeside Drive Arch Bridge Rehabilitation 750,000 93,750 937,500 0 0 0 1,031,250 47
Lakeside Drive Improvements 1,972,000 2,084,849 0 629,168 0 0 2,714,017 48
Leesville Road Pedestrian Improvements 0 0 0 0 0 1,000,000 1,000,000 49
Liberty Mountain Drive Realignment 0 0 0 0 0 810,000 810,000 50
Link Road/Boonsboro Road Intersection Improvements 1,576,000 1,457,794 0 547,898 0 0 2,005,692 51
Lynchburg Center for Industry - Phase II 0 262,007 1,048,030 0 0 0 1,310,037 53
McConville Road Realignment to Lakeside Drive 0 0 0 0 780,000 3,780,000 4,560,000 55
Page 15 of 309
FY 2025 – 2029 CIP – FUNDED PROJECTS
TRANSPORTATION (CONTINUED)
5
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
CIP
Page
Nationwide Drive Roundabout 0 0 0 0 0 992,250 992,250 56
Public Works Infrastructure Improvements 0 342,000 353,000 375,000 400,000 420,000 1,890,000 57
Retaining Wall Replacement/Repair Program 0 0 500,000 62,500 500,000 62,500 1,125,000 58
Route 501/221 One-Way Pairs 38,335,619 10,087,500 8,219,052 13,136,325 0 0 31,442,877 59
Storm Drainage System Repairs/Replacements 0 142,000 149,000 162,500 177,000 186,000 816,500 60
Street Overlay Program 0 2,659,250 2,769,600 3,000,000 3,280,000 3,444,000 15,152,850 61
Timberlake Road Bridge, West Bound Lanes 0 0 0 0 1,102,500 9,646,875 10,749,375 62
Traffic Signal Repair and Replacement 0 0 500,000 512,500 515,000 547,500 2,075,000 63
Vassar Street at Langhorne Road Intersection Improvements 50,000 0 0 0 9,783,867 0 9,783,867 64
Wards Ferry Road/Atlanta Avenue Turn Lanes 1,340,000 1,597,015 0 779,018 0 0 2,376,033 66
Wards Ferry Road/Simons Run Pedestrian Accommodations 0 0 0 0 0 312,500 312,500 67
TOTAL $79,707,080 $37,286,748 $27,284,397 $32,783,725 $19,100,117 $32,956,477 $149,411,464
Page 16 of 309
FY 2025 – 2029 CIP – REMOVED PROJECTS
TRANSPORTATION
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
Campbell Avenue Intersection and Signal Reconstruction 3,125,000 0 0 0 0 0 0
College Lake Overlook 0 0 0 250,000 1,250,000 0 1,500,000
D Street and Rivermont Avenue Intersection Improvements 945,000 8,775,000 0 0 0 0 8,775,000
Timberlake Road Bridge, East Bound Lanes 0 0 0 0 0 1,000,000 1,000,000
Timberlake Road Improvements 0 0 0 0 0 472,500 472,500
TOTAL $4,070,000 $8,775,000 $0 $250,000 $1,250,000 $1,472,500 $11,747,500
6
Page 17 of 309
FY 2025 – 2029 CIP – FUNDED PROJECTS
ECONOMIC DEVELOPMENT
7
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
CIP
Page
Airport Commerce Park 0 500,000 500,000 5,000,000 5,560,000 0 11,560,000 70
Future Streetscape Improvements Downtown 0 875,000 6,250,000 936,000 7,000,000 1,000,000 16,061,000 71
Ivy Creek Innovation Park - Sites A and B Development 0 2,400,000 350,000 4,400,000 4,770,000 0 11,920,000 72
Street & Utility Extensions to Promote Economic Developmnt 0 250,000 250,000 250,000 250,000 250,000 1,250,000 73
TOTAL $0 $4,025,000 $7,350,000 $10,586,000 $17,580,000 $1,250,000 $40,791,000
Page 18 of 309
FY 2025 – 2029 CIP – REMOVED PROJECTS
ECONOMIC DEVELOPMENT
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
Downtown Development $0 $150,000 $2,500,000 $1,800,000 $1,200,000 $5,000,000 $10,650,000
8
Page 19 of 309
FY 2025 – 2029 CIP – FUNDED PROJECTS
PARKS AND RECREATION
9
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
CIP
Page
Athletic Field Maintenance 0 0 250,000 375,000 300,000 350,000 1,275,000 76
City Stadium - Visitors' Side Improvements 0 0 75,000 500,000 0 0 575,000 78
General Park Maintenance 0 0 160,000 225,000 235,000 230,000 850,000 79
General Park Security Improvements 200,000 0 100,000 100,000 100,000 100,000 400,000 81
Heritage Park Improvements 525,000 0 500,000 250,000 0 0 750,000 82
Jackson Heights Art Studio Renovation 0 0 0 0 75,000 75,000 83
Jefferson Park: Phase 2 0 0 0 0 150,000 500,000 650,000 84
Parks and Trails Paving and Lighting 0 0 370,000 365,000 350,000 396,000 1,481,000 85
Peaks View Park Athletic Field Lighting 0 0 0 75,000 750,000 750,000 1,575,000 88
Templeton Senior Center Renovations 0 0 75,000 0 400,000 0 475,000 89
TOTAL $725,000 $0 $1,530,000 $1,890,000 $2,285,000 $2,401,000 $8,106,000
Page 20 of 309
FY 2025 – 2029 CIP – REMOVED PROJECTS
PARKS AND RECREATION
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
Allen-Morrison Site Assessment/Design 0 0 250,000 0 0 0 250,000
Fireman Fountain Restoration 25,000 250,000 0 0 0 0 250,000
Community Park Investment Fund 0 50,000 50,000 50,000 50,000 50,000 250,000
New Dog Park 210,658 75,000 600,000 0 0 0 675,000
Miller Park Pool Assessment/Replacement 50,000 0 250,000 8,000,000 0 0 8,250,000
Parks Tree Replacement Program 0 50,000 55,000 55,000 55,000 55,000 270,000
Riverside Park Master Plan Implementation 0 0 0 0 75,000 500,000 575,000
Sustainable Infrastructure Program 0 75,000 75,000 100,000 100,000 100,000 450,000
TOTAL $285,658 $500,000 $1,280,000 $8,205,000 $280,000 $705,000 $10,970,000
10
Page 21 of 309
FY 2025 – 2029 CIP – FUNDED PROJECTS
MISCELLANEOUS
11
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
CIP
page
Diamond Hill Neighborhood Improvements 0 500,000 500,000 500,000 500,000 500,000 2,500,000 94
Memorial Avenue Fuel Site Reconstruction 0 250,000 1,500,000 0 0 0 1,750,000 95
Petroleum Storage 0 0 50,000 0 0 0 50,000 96
Pleasant Valley, Phase 1 - Greenway Design 0 0 0 200,000 1,145,000 0 1,345,000 97
Radio Replacement 2,048,740 0 220,000 220,000 220,000 220,000 880,000 98
TOTAL $2,048,740 $750,000 $2,270,000 $920,000 $1,865,000 $720,000 $6,525,000
Five Year Proposed Appropriations to be Financed by the City (General Fund and Schools)
Page 22 of 309
FY 2025 – 2029 CIP – REMOVED PROJECTS
MISCELLANEOUS
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
Computer Aided Dispatch Replacement $5,000,000 $500,000 $500,000 $0 $0 $0 $1,000,000
12
Page 23 of 309
FY 2025 – 2029 CIP – FUNDED PROJECTS
RESERVES
13
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
CIP
Page
Capital Maintenance Reserve 0 300,000 0 0 0 0 300,000 100
Lynchburg City Stadium Capital Maintenance Reserve 800,000 100,000 100,000 0 0 0 200,000 101
Snow, Street, and Bridge Reserve 0 250,000 250,000 250,000 250,000 250,000 1,250,000 102
TOTAL $800,000 $650,000 $350,000 $250,000 $250,000 $250,000 $1,750,000
Page 24 of 309
FY 2025 – 2029 CIP – FUNDED PROJECTS
SCHOOLS
14
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
CIP
Page
Civic Auditorium Reserve 0 0 150,000 150,000 150,000 150,000 600,000 106
Dunbar Middle Chiller and Cooling Tower Replacement 0 0 450,000 0 500,000 0 950,000 107
E.C. Glass Cooling Tower Replacement 1,000,000 1,000,000 0 0 0 0 1,000,000 108
Elementary Playground Modernization 0 0 100,000 100,000 100,000 100,000 400,000 109
Paving and Fencing Improvements 0 0 216,000 224,000 232,000 240,000 912,000 110
School Building Roof Replacements 0 690,000 810,000 575,000 1,415,000 1,750,000 5,240,000 111
Sheffield Elementary Chiller Replacement 0 850,000 0 0 0 0 850,000 113
TOTAL $1,000,000 $2,540,000 $1,726,000 $1,049,000 $2,397,000 $2,240,000 $9,952,000
Page 25 of 309
FY 2025 – 2029 CIP – REMOVED PROJECTS
SCHOOLS
Project Title
Appropriations
Through
06/30/2024
Budget
FY 2025
Planned
FY 2026
Planned
FY 2027
Planned
FY 2028
Planned
FY 2029
Five-Year
Estimated
Net Cost
W. M. Bass Elementary Expansion 0 15,000,000 0 0 0 0 15,000,000
Perrymont Elementary Renovation 0 0 0 21,196,032 0 0 21,196,032
Linkhorne Elementary Renovation and Gymnasium Addition 0 0 0 0 0 24,354,000 24,354,000
School Safety and Maintenance Projects 0 5,170,000 2,750,000 4,125,000 12,760,000 5,225,000 30,030,000
School Security Improvements 2,575,000 1,500,000 1,500,000 0 0 0 3,000,000
Interior and Exterior Painting and Plaster Repair 0 350,000 375,000 400,000 100,000 500,000 1,725,000
Athletics Turf, Track, and Tennis Improvements 0 1,655,000 815,000 900,000 650,000 0 4,020,000
School Gymnasium Additions 0 2,200,000 2,310,000 0 0 0 4,510,000
Middle School Athletic Field Lighting 0 400,000 416,000 433,000 0 0 1,249,000
Dunbar Middle Campus Master Plan 0 125,000 0 0 0 0 125,000
Reserves for Facilities Maintenance Needs 0 250,000 250,000 250,000 250,000 250,000 1,250,000
Electrical and Mechanical Reserve 0 250,000 250,000 250,000 250,000 250,000 1,250,000
TOTAL $2,575,000 $26,900,000 $8,666,000 $27,554,032 $14,010,000 $30,579,000 $107,709,032
15
Page 26 of 309
Table of Contents
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
FY 2025 ‐ 2029 CAPITAL IMPROVEMENT PROGRAM ................................................................................................................ 1
CAPITAL IMPROVEMENT PROGRAM PRIORITIZATION STRATEGIES ................................................................................................ 3
SUMMARY OF PROJECTS
Categorical Expenditure Distribution ................................................................................................................ 15
Summary of Projects for All Funds .................................................................................................................... 16
Total Summary of Appropriations ..................................................................................................................... 17
Total Financing Plan ........................................................................................................................................... 18
CITY CAPITAL PROJECTS FUND
Summary of Appropriations .............................................................................................................................. 19
Financing Plan ................................................................................................................................................... 20
BUILDINGS
Project Detail Summary ..................................................................................................................................... 21
Circuit and General District Court Improvements ............................................................................................. 22
Major Building Repairs and Improvements/Multiple Projects .......................................................................... 23
Project Detail .......................................................................................................................................... 24
Parking Lot Repairs and Improvements/Multiple Projects ............................................................................... 28
Project Detail .......................................................................................................................................... 29
Police Department Headquarters ...................................................................................................................... 30
Roof Replacement/Multiple Projects ................................................................................................................ 31
Project Detail .......................................................................................................................................... 32
Transfer Station for Refuse ................................................................................................................................ 33
TRANSPORTATION
Project Detail Summary ..................................................................................................................................... 35
Public Transit Improvements and Bus Replacements ....................................................................................... 36
5th Street Improvements, Phase IV ................................................................................................................... 37
Bedford Avenue Bridge ..................................................................................................................................... 38
Breezewood Drive Widening ............................................................................................................................. 39
Bridge Maintenance .......................................................................................................................................... 40
Culvert Replacement Program .......................................................................................................................... 41
Florida Avenue Sidewalk ................................................................................................................................... 42
Forest Brook Road, Phase I ................................................................................................................................ 43
General Street Improvements ........................................................................................................................... 44
Hollins Mill Road Bridge Replacement with Bikeway Improvements ............................................................... 45
John Lynch Bridge Repairs ................................................................................................................................. 46
Lakeside Drive Arch Bridge Rehabilitation ........................................................................................................ 47
Lakeside Drive Improvements ........................................................................................................................... 48
Leesville Road Pedestrian Improvements ......................................................................................................... 49
Liberty Mountain Drive Realignment ................................................................................................................ 50
Link Road/Boonsboro Road Intersection Improvements .................................................................................. 51
Lynchburg Center for Industry ‐ Phase I ............................................................................................................ 52
Lynchburg Center for Industry ‐ Phase II ........................................................................................................... 53
Lynchburg Expressway/Candlers Mountain Road Interchange Improvements ................................................ 54
McConville Road Realignment to Lakeside Drive .............................................................................................. 55
Nationwide Drive Roundabout .......................................................................................................................... 56
Page 27 of 309
Table of Contents
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
TRANSPORTATION (CONTINUED)
Public Works Infrastructure Improvements ...................................................................................................... 57
Retaining Wall Replacement/Repair Program ................................................................................................... 58
Route 501/221 One‐Way Pairs .......................................................................................................................... 59
Storm Drainage System Repairs/Replacements ................................................................................................ 60
Street Overlay Program ..................................................................................................................................... 61
Timberlake Road Bridge, West Bound Lanes ..................................................................................................... 62
Traffic Signal Repair and Replacement .............................................................................................................. 63
Vassar Street at Langhorne Road Intersection Improvements ......................................................................... 64
Wards Ferry Road at CVCC Campus Drive Roundabout .................................................................................... 65
Wards Ferry Road/Atlanta Avenue Turn Lanes ................................................................................................. 66
Wards Ferry Road/Simons Run Pedestrian Accommodations .......................................................................... 67
TRANSPORTATION – PLANNED PROJECTS BEYOND FY 2029 ......................................................................................... 68
ECONOMIC DEVELOPMENT
Project Detail Summary ..................................................................................................................................... 69
Airport Commerce Park ..................................................................................................................................... 70
Future Streetscape Improvements Downtown ................................................................................................. 71
Ivy Creek Innovation Park ‐ Sites A and B Development ................................................................................... 72
Street and Utility Extensions to Promote Economic Development ................................................................... 73
PARKS AND RECREATION
Project Detail Summary ..................................................................................................................................... 75
Athletic Field Maintenance ............................................................................................................................... 76
Project Detail .......................................................................................................................................... 77
City Stadium ‐ Visitors' Side Improvements ...................................................................................................... 78
General Park Maintenance ................................................................................................................................ 79
Project Detail .......................................................................................................................................... 80
General Park Security Improvements ................................................................................................................ 81
Heritage Park Improvements ............................................................................................................................ 82
Jackson Heights Art Studio Renovation ............................................................................................................. 83
Jefferson Park: Phase 2 ...................................................................................................................................... 84
Parks and Trails Paving and Lighting .................................................................................................................. 85
Project Detail .......................................................................................................................................... 86
Peaks View Park Athletic Field Lighting ............................................................................................................. 88
Templeton Senior Center Renovations ............................................................................................................. 89
Page 28 of 309
Table of Contents
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
MISCELLANEOUS
Project Detail Summary ..................................................................................................................................... 91
College Lake Dam Removal ............................................................................................................................... 92
Computer Aided Dispatch Replacement ........................................................................................................... 93
Diamond Hill Neighborhood Improvements ..................................................................................................... 94
Memorial Avenue Fuel Site Reconstruction ...................................................................................................... 95
Petroleum Storage ............................................................................................................................................. 96
Pleasant Valley, Phase 1 ‐ Greenway Design ..................................................................................................... 97
Radio Replacement ........................................................................................................................................... 98
R
ESERVES
Project Detail Summary ..................................................................................................................................... 99
Capital Maintenance Reserve ............................................................................................................................ 100
Lynchburg City Stadium Capital Maintenance Reserve ..................................................................................... 101
Snow, Street, and Bridge Reserve ..................................................................................................................... 102
SCHOOLS CAPITAL PROJECTS FUND
Summary of Appropriations .............................................................................................................................. 103
Financing Plan .................................................................................................................................................... 104
Project Detail Summary ..................................................................................................................................... 105
Civic Auditorium Reserve .................................................................................................................................. 106
Dunbar Middle Chiller and Cooling Tower Replacement .................................................................................. 107
E. C. Glass Cooling Tower Replacement ............................................................................................................ 108
Elementary Playground Modernization ............................................................................................................ 109
Paving and Fencing Improvements ................................................................................................................... 110
School Building Roof Replacements .................................................................................................................. 111
Project Detail .......................................................................................................................................... 112
Sheffield Elementary Chiller Replacement ........................................................................................................ 113
AIRPORT CAPITAL PROJECTS FUND
Summary of Appropriations .............................................................................................................................. 115
Financing Plan .................................................................................................................................................... 116
Project Detail Summary ..................................................................................................................................... 117
Airport Rescue & Fire Fighting Vehicle .............................................................................................................. 118
GA Terminal Apron / Taxiway G Rehabilitation ................................................................................................. 119
North GA Development Area (Phase III) ............................................................................................................ 120
Runway 4‐22 MALSF Lighting Upgrade .............................................................................................................. 121
Taxiway B Rehabilitation ................................................................................................................................... 122
Page 29 of 309
Table of Contents
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
WATER CAPITAL PROJECTS FUND
Summary of Appropriations .............................................................................................................................. 123
Financing Plan .................................................................................................................................................... 124
Project Detail Summary ..................................................................................................................................... 125
Annual Water Petitions ..................................................................................................................................... 126
Clay Street Reservoir ......................................................................................................................................... 127
College Hill Optimization and Improvements .................................................................................................... 128
Distribution System Improvements ................................................................................................................... 129
Downtown Area Business Improvements ......................................................................................................... 130
Lead and Copper Water Service Line ................................................................................................................. 131
Water Facility Improvements ............................................................................................................................ 132
Water Meter Register Replacements ................................................................................................................ 133
Water Tank Rehabilitation ................................................................................................................................. 134
S
EWER CAPITAL PROJECTS FUND
Summary of Appropriations .............................................................................................................................. 135
Financing Plan .................................................................................................................................................... 136
Project Detail Summary ..................................................................................................................................... 137
College Hill Optimization and Improvements .................................................................................................... 138
Combined Sewer Overflow (CSO) Program ....................................................................................................... 139
Combined Sewer Overflow (CSO) Program Virginia Clean Water Revolving Loan Fund ................................... 140
Sewer Collection System Improvements ........................................................................................................... 141
Sewer Extension Program ................................................................................................................................. 142
Water Resources Recovery Facility Improvements ........................................................................................... 143
STORMWATER CAPITAL PROJECTS FUND
Summary of Appropriations .............................................................................................................................. 145
Financing Plan .................................................................................................................................................... 146
Project Detail Summary ..................................................................................................................................... 147
College Hill Optimization and Improvements .................................................................................................... 148
Stormwater Coordinated Capital ....................................................................................................................... 149
Stormwater Infrastructure Renewal .................................................................................................................. 150
Stormwater Quality Best Management Practices ............................................................................................. 151
Stormwater System Master Planning ................................................................................................................ 152
Page 30 of 309
Overview
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 1
INTRODUCTION
Capital Improvement Programming is a method of planning for the effective and efficient provision of public facilities,
infrastructure improvements, major maintenance requirements, and a c q u i s i t i o n o f p r o p e r t y a n d e q u i p m e n t . A “ c a p i t a l
project” is defined as an acquisition that represents a public betterment to the community, has a life of not less than twenty
(20) years following its purchase, construction or other acquisition, and has a total cost of not less than twenty‐five thousand
dollars ($25,000). The first year of the Capital Improvement Program represents the City Manager’s proposal to City Council
as the Capital Improvement Program (CIP) budget.
A five‐year CIP allows City Council and citizens an opportunity to view both the five‐year capital construction and infrastructure
maintenance needs of the City and the Lynchburg City Schools. Viewing these needs enables the City to better plan a financing
strategy for capital improvements and annual operating requirements. A five‐year CIP also allows for programming of multi‐
year projects.
The Comprehensive Plan presents a vision of what the community will be like in the future and identifies the steps required
to move toward that vision. Each project is evaluated to deter mine its alignment with the Comprehensive Plan; the project
detail sheets include this relationship. Each project will reference a relationship to the 2013 – 2030 Comprehensive Plan,
adopted by City Council in January 2014.
The Comprehensive plan can be viewed on the City’s website at www.lynchburgva.gov/comprehensive‐plan.
BASIS FOR BUDGETING
The first year of the CIP represents the Capital Improvement Budget for that year. Following adoption by the City Council, the
first year of the CIP should be viewed as the capital budget. The CIP is a proposed expenditure plan; the budget adopted by
the City Council provides the legal authorization to actually expend City funds.
The CIP is based on a fiscal year calendar. The fiscal year calendar for the City of Lynchburg begins July 1 and ends June 30.
BENEFITS OF CAPITAL IMPROVEMENT PROGRAMMING
The principal benefit of Capital Improvement Programming is that it requires the City to plan its capital needs in concert with
available financing over a five‐year period. This process contributes to a responsible fiscal policy. Other benefits of Capital
Improvement Programming include:
Fostering a sound and stable financial program over a five‐year period given a set of revenue and expenditure
assumptions based on current economic trends;
Coordinating various City improvements so that informed decisions can be made and joint programs initiated among
City departments in an effort to avoid duplication;
Enabling private businesses and citizens to have some assurances as to when certain public improvements will be
undertaken so they can plan more efficiently and effectively;
Focusing on the goals and needs of the community through the pr ovision of new facilities and infrastructure
improvements;
Evaluating annually the infrastructure needs of the City to pro vide for the public health and safety of the citizens of
the City; and,
Providing a logical process for assigning priorities to the various projects based on their overall importance to the City.
CONCLUSION
The CIP is a document dedicated to a process designed to identi fy both the capital improvement needs and priorities of the
City over a five‐year period in concert with projected funding levels and City Council’s Vision and Principles. Actual
programming of projects is dependent upon the financial resources available.
The Project Detail Sheets on the following pages reflect those projects proposed for consideration in the FY 2025 – 2029
Capital Improvement Program.
DEFINITIONS
New/Active Projects: FY 2025 – 2029 projects that are presented for approval by City Council.
Project Type – New: Projects designed to enhance existing structures or involve new construction.
Project Type – Maintenance: Projects designed solely to maintain the condition of a current asset.
Page 31 of 309
Overview
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 2
Page 32 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
C I P 3
Capital Improvement Plan
Prioritization Strategies
A. DEFINITION
The Capital Improvements Plan (CIP) is a five‐year method of planning for the effective and efficient
provision of public facilities, infrastructure improvements, major maintenance requirements, and
acquisition of property and equipment. A “capital project” is defined as an acquisition that represents a
public betterment to the community, has a life of not less than twenty (20) years following its purchase,
construction or other acquisition with a total cost equal to or exceeding twenty‐five thousand dollars
($25,000).
B. GOAL
The goal of the CIP is to establish a plan that outlines the projected public facility, infrastructure, major
maintenance, and acquisition of property and equipment for the City to assist in the planning and
budgeting process. The investments in physical assets help the City meet the priorities and goals of the
community.
The City of Lynchburg cannot afford to do everything at once, and goals and resources are constantly
changing. This document intends to outline strategies for proj ect prioritization in the CIP. These
“Prioritization Strategies” are intended to avoid the perception of “winners” and “losers” and each
project should be re‐evaluated each year to reaffirm or reprioritize the Capital Improvements Plan.
C. PRIORITIZATION
The prioritization of eligible projects is completed by city staff through the use of the CIP Prioritization
Strategies listed in this document. Each project must first be classified as a CIP Project according to the
City’s definition of a CIP Project. If a project is eligible, the project will be ranked according to the
Prioritization Strategies and placed into the yearly project groupings for the next five years.
D. PROJECT TYPES
After the overall CIP score is assigned to each project, the projects will be realigned based on the project
type. These types include Buildings, Transportation, Public Transit, Economic Development, Parks and
Recreation, Water, Sewer, Stormwater and Miscellaneous.
E. FUNDING LIMITS
On an annual basis, funding for CIP projects will be limited based on the City’s fund balances and bonding
capabilities. Projects identified in the CIP may be funded by different sources. General Fund,
Unassigned Fund Balance (Pay‐As‐You‐Go), General Obligation (GO) Bonds, Grants, VDOT Revenue
Sharing, Enterprise Funds or Private / Public Partnerships are a few of the options for funding CIP
Projects. During the City’s annual budget process, the projects will be analyzed for sources of funding,
funding availability and impacts to long‐term debt service.
Page 33 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
C I P 4
F. SCHEDULING OF PROJECTS
Project schedules will be developed based upon the available funding and project ranking. The schedules
will determine where each project fits in the five‐year CIP and aid in budgeting and planning to develop a
longer‐term ten‐year CIP. This will be based on the priority of the project, funding availability, and how it
correlates with other projects included in and out of the CIP. The ability to fund projects that have
significant impacts on debt service will be scheduled, to the extent possible, in a manner that seeks to
limit dramatic year‐over‐year increases in debt service payments. In these cases, smaller projects may be
scheduled sooner and larger projects may be deferred until the City has repayment capacity available.
The final CIP document will be produced based on the evaluation of the CIP project, funding, and
schedule. This will be developed for a five‐year duration. The CIP and projects will be re‐evaluated on an
annual basis to align growth, needs, and budgeting. Ultimately, projects included in the adopted CIP are
decided by City Council. These prioritization strategies are intended to be a technical evaluation tool for
aiding in the development of the CIP for a diverse set of projects.
Page 34 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
C I P 5
Budget Impact
Some projects may affect the operational budget by increased maintenance costs, while others may reduce
maintenance costs by reducing the number of repairs needed or operational costs. An example would be
replacing a light with a more energy‐efficient LED may decrease energy bills.
A. Will the project require additional personnel to operate?
B. Will the project require additional annual maintenance?
C. Will the project require additional equipment not included in the project budget?
D. Will the project reduce staff time and City resources currently devoted resulting in a positive effect on
the operational budget?
E. Will efficiency related to the project save money?
F. Will the project present a revenue‐generating opportunity?
Scoring Scale
1 2 3 4 5
The project will
require
additional
funding to
operate.
The project will
not affect the
operating
budget as it is
revenue‐
neutral.
The project will
have a positive
effect on the
operating
budget. It will
create savings in
time, materials
and/or
maintenance or
generate
revenue to
offset costs.
Page 35 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
C I P 6
Economic Development
Some projects create positive economic impact by increasing property values and job creation or by creating
an environment conducive to investment by providing infrastructure, revitalizing neighborhoods and driving
visitor or resident spending in local businesses. An example may be the extension of a public road to provide
access to land for development or investments in placemaking (public art, streetscape improvements,
beautification) that position the area as a destination for visitors and residents.
A. Does the project increase property values or support the creation or retention of jobs?
B. Does the project result in access to promote/increase commercial and/or industrial development?
C. Does the project promote tourism, increasing tax revenue while enriching the citizen experience?
D. Does the project support infrastructure that promotes workforce housing?
E. Will the project provide an amenity or support neighborhood rev italization, such as a sidewalk, pocket
park, etc.?
Scoring Scale
1 2 3 4 5
There is no
increase in
access,
property value,
job creation or
tourism.
The project will
increase access,
property values
or revitalize a
neighborhood.
The project will
increase
property value,
drive tourism
and support
revitalization.
Page 36 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
C I P 7
Funding Sources
Some projects may be eligible for partial funding through Commu nity Development Block Grant, other
Grants, State or Federal funding. Availability of alternative funding sources reduces the fiscal impact on the
City and may allow the project to be completed when it otherwise would not be possible.
A. Is an alternative funding source available?
B. Would the City be able to complete the project in the next five years without the funding?
C. Will the use of alternative funding result in a significant workload for staff managing the project?
D. Will the use of alternative funding result in regulatory issues that may slow or make the project
infeasible?
Scoring Scale
1 2 3 4 5
There is no
alternative
funding source
available.
Alternative
funding sources
are available,
but will result in
significant
management
and will result in
additional
regulatory
issues.
Alternative
funding sources
are available
and the City
would not be
able to
complete the
project in the
next five years
without the
funding.
Page 37 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
C I P 8
Natural Systems
Lynchburg residents place a high value on preserving and enhancing natural and environmental resources.
The City desires to increase efforts to protect natural and environmental resources while being fiscally
responsible, providing for economic development while not compr omising the needs of future generations.
A. Will the project result in a negative impact on the environment?
B. Will the project be environmentally neutral?
C. Will the project provide a positive impact on the environment?
Scoring Scale
1 2 3 4 5
The project will
result in a
negative impact
on the
environment.
The project will
be neutral in the
impacts on the
environment.
The project will
provide a
positive impact
on the
environment.
Hollins Mill Dam
Page 38 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
C I P 9
Plans or Studies
Compliance with the Comprehensive Plan, Strategic Plan, Neighborhood Master Plan or other Studies. Plans
and studies are invaluable in the City’s continuing efforts to meet goals, objectives, and the vision of making
the City of Lynchburg, a Great Place to Live, Work and Play. These plans and studies have been prepared with
Citizen Engagement, Stakeholders and Consultants. These plans a nd studies have been adopted by the
Planning Commission and City Council.
A. Is the proposed project contained in one or more City plan or study?
B. Is the proposed project listed as a high priority, or has it become a high priority of Citizens, Staff, the
Planning Commission or City Council due to an expressed need?
C. Has the project been fully developed and defined in enough detail so that specifics are known?
D. Have adequate public discussion and citizen engagement occurred for broad community support?
E. Does the project meet the goals and objectives of the Comprehensive Plan?
Scoring Scale
1 2 3 4 5
The project
is not part
of any Plan
or Study.
The project is
included in a
Plan or Study,
but may not be a
high priority or
appropriate
citizen
engagement has
not occurred.
The project
is included in
a Plan or
Study, is a
high priority
and has had
appropriate
citizen
engagement.
Downtown 2040 Master Plan – Public Engagement
Page 39 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 10
Public Health and Safety
Some projects provide a direct benefit to public health and safety by reducing traffic accidents, injuries,
death, reducing health hazards related to poor water quality or sewer issues or improve response times or
service by Emergency Services?
A. Will the project reduce traffic accidents resulting in fewer injuries and/or deaths?
B. Will the project result in correcting an existing structural deficiency and result in improved safety?
C. Will the project provide for improved drinking water or sanitary sewer?
D. Will the project result in improved response times or service by Emergency Services?
Scoring Scale
1 2 3 4 5
There is no
direct
impact on
Public
Health or
Safety.
The project
will result in
an
improvement
to overall
public health
and safety.
The project
will result in
reduced
accidents,
deaths or
injuries.
Lynchburg Fire Department
Page 40 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 11
Regulatory Compliance
The project is to ensure compliance with regulatory mandates such as the Environmental Protection Agency
(EPA), Department of Environmental Quality (DEQ), Department of Conservation and Recreation (DCR), the
Americans with Disabilities Act (ADA) or other State and Federal Laws. This strategy also includes self‐
imposed City Ordinances.
A. Does the project address a current regulatory mandate?
B. Will the project proactively address a foreseeable (within the next five years) regulatory mandate?
C. Does the project have a lasting impact on promoting regulatory compliance over the long term (more
than ten years)?
Scoring Scale
1 2 3 4 5
The project
does not
address a
regulatory
compliance
issue.
The project
provides a
short‐term fix
for an existing
regulatory
compliance
issue or one
anticipated in
the near
future.
The project
resolves a
pressing or
long‐term
regulatory
compliance
issue.
College Lake Dam
Page 41 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 12
Social Equity
Lynchburg recognizes that there are disparities in the level of service provided to areas traditionally
populated with minorities and individuals of low to moderate‐income and that these same areas were
typically subject to redlining. Nationwide, these disparities sometimes resulted in increased exposure to
pollutants, higher heat indexes, increased stress and associated health risks. The lack of street trees,
sidewalks, and infrastructure is evident in these areas. Utilities, including water, sewer, street lights, cable,
and internet service may be lacking or be of a lower quality as well. Public investment needs to address these
inequalities and add to the livability of these areas.
A. Will the project have a neutral impact on the livability of the area?
B. Will the project negatively impact the quality of life for the residents?
C. Will the project have a positive impact on the area?
D. Is the project located within a qualified Census Tract for reinvestment?
Scoring Scale
1 2 3 4 5
The project
will result in
a negative
impact on
social
equity.
The project
will be
neutral in
the impacts
on social
equity.
The project
will provide
a positive
impact on
social
equity.
Page 42 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 13
Timing/Location
The timing and location are important pieces of a project. If the project is in close proximity to other CIP
projects there may be an economy of scale. If a project needs to be completed before another project of
high priority it may be rational to move the project ahead of other CIP projects.
A. When is the project needed?
B. Do other projects require this one to be completed first?
C. Does this project require others to be completed first?
D. Can this project be done in conjunction with other projects?
E. Is it more economical to build multiple projects together, reducing the cost and timing of construction?
F. Will the project reduce the overall number of disruptions to a neighborhood from year to year?
G. Is this an existing facility near the end of its functional life?
H. Will deferring the project significantly increase the cost of the project?
Scoring Scale
1 2 3 4 5
The project
does not have
a critical
timing/location
component.
The project
has either a
timing or
location
factor that
is critical.
The project
has both
timing and
location that
are critical
components
of the
project.
Page 43 of 309
Capital Improvement Plan Prioritization Strategies
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 14
Transportation Network Connectivity and Accessibility
Transportation projects have the ability to improve citizens’ quality of life while providing positive
community impact in terms of improving safety, reducing traffic congestion, creating opportunities for
economic development, and creating a multi‐modal transportation system.
A. Will the project reduce congestion in the City’s Transportation network?
B. Will the project provide a citywide or regional benefit by improving a roadway designated as collector or
higher?
C. Will the project result in the improvement or replacement of functionally obsolete transportation
infrastructure? (Functionally obsolete means that the infrastructure no longer meets current standards in
terms of safety or capacity.)
D. Does the project follow Better Streets Policy and provide opportunities for multi‐modal transportation
and accessibility?
E. Does the project improve connectivity between one mode of transportation to another such as a new
trail to a neighborhood?
Scoring Scale
1 2 3 4 5
There is no
direct impact to
the City’s
Transportation
Network.
The project will
provide an
improvement
to a roadway
designated as
collector or
higher.
The project will
result in the
improvement
or replacement
of functionally
obsolete
infrastructure.
The project will
result in the
replacement of
functionally obsolete
infrastructure and
provide
improvements
following the Better
Streets Policy and
includes
opportunities for
multi‐modal options
and accessibility.
Odd Fellows Road Interchange
Page 44 of 309
Summary of Projects
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 15
Categorical Expenditure Distribution
Capital Improvement Program
FY 2025 ‐ 2029
(all sources of funding)
$438,917,064
Page 45 of 309
Summary of Projects
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 16
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Summary ‐ All Funds
Bui l di ngs 6,220,000 13,670,000 6,995,000 3,973,000 6,725,000 37,583,0 00
Tra ns porta ti on 36,808,748 23,443,347 31,720,775 18,570,117 29,056,47 7 139,599,464
Publ i c Tra ns i t 478,000 3,841,050 1,062,950 530,000 3,900,000 9,812,00 0
Economi c De ve l opme nt 4,025,000 7,350,000 10,586,000 17,580,000 1,250 ,000 40,791,000
Pa rks a nd Re cre a ti on 0 1,530,000 1,890,000 2,285,000 2,401,000 8,106, 000
Mi s cel l a ne ous 750,000 2,270,000 920,000 1,865,000 720,000 6,525,000
Re s erves 650,000 350,000 250,000 250,000 250,000 1,750,000
Total City Capital Projects $48,931,748 $52,454,397 $53,424,725 $45 ,053,117 $44,302,477 $244,166,464
School s 2,540,000 1,726,000 1,049,000 2,397,000 2,240,000 9,952,000
Total City Capital and Schools $51,471,748 $54,180,397 $54,473,725 $47,450,117 $46,542,477 $254,118,464
Ai rport 1,500,000 2,500,000 1,500,000 3,000,000 1,000,000 9,500,000
Wa ter 14,873,000 13,653,000 16,252,000 12,238,000 13,540,000 70,556,0 00
Sewer 8,888,600 13,436,000 37,577,500 16,225,000 10,177,500 86,304,60 0
Stormwa te r 2,110,000 4,970,000 3,600,000 3,813,000 3,945,000 18,438,0 00
Grand Total All Funds $78,843,348 $88,739,397 $113,403,225 $82,726, 117 $75,204,977 $438,917,064
Five Year Proposed Appropriations to be Financed By The City Five‐Year
Estimated
Net Cost
Page 46 of 309
Summary of Projects
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 17
TOTAL SUMMARY OF APPROPRIATIONS ‐ This summary demonstrates project appropriations for each Fiscal Year along with
the expected sources of funding.
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Resources
Federa l : CDBG 500,000 500,000 500,000 500,000 500,000
Federa l : Fe de ra l Avi a ti on Admi n 1,350,000 2,250,000 1,350,000 2,700 ,000 900,000
Federa l : Gra nts 0 0 200,000 10,928,867 0
Federa l : Tra ns porta ti on Al te rna ti ves 0 1,048,030 0 0 0
Loca l : Li ne of Cre di t 56,218,033 61,616,191 83,064,800 39,926,750 52 ,286,701
Loca l : Pa y‐As ‐You‐Go 1,502,960 10,570,136 13,806,644 14,049,100 9,87 2,500
Loca l : Pa y‐As ‐You‐Go (Se wer) 1,800,000 1,487,000 2,280,000 1,550,00 0 1,270,000
Loca l : Pa y‐As ‐You‐Go (Stormwa te r) 250,000 0 0 0 200,000
Loca l : Pa y‐As ‐You‐Go (Wa ter) 1,475,000 400,000 625,000 825,000 875,0 00
Loca l : Tra ns fe r from Genera l Fund 300,000 0 0 0 0
Sta te : Gra nts 325,040 2,611,914 722,806 360,400 2,652,000
Sta te : Hi ghwa y Ma i nte na nce (VDOT) 6,031,575 3,896,600 4,213,500 4,5 86,000 4,815,450
Sta te : Re venue Sha ri ng 8,940,740 4,109,526 5,890,475 0 1,733,326
Sta te : VA Dept of Avi a ti on 150,000 250,000 150,000 300,000 100,000
Sta te : VCWRLF 0 0 600,000 7,000,000 0
TOTAL ESTIMATED RESOURCES $78,843,348 $88,739,397 $113,403,225 $82, 726,117 $75,204,977
CAPITAL PROJECTS
Bui l di ngs 6,220,000 13,670,000 6,995,000 3,973,000 6,725,000
Tra ns porta ti on 36,808,748 23,443,347 31,720,775 18,570,117 29,056,47 7
Publ i c Tra ns i t 478,000 3,841,050 1,062,950 530,000 3,900,000
Economi c De ve l opme nt 4,025,000 7,350,000 10,586,000 17,580,000 1,250 ,000
Pa rks a nd Re cre a ti on 0 1,530,000 1,890,000 2,285,000 2,401,000
Mi s cel l a ne ous 750,000 2,270,000 920,000 1,865,000 720,000
Re s erves 650,000 350,000 250,000 250,000 250,000
School s 2,540,000 1,726,000 1,049,000 2,397,000 2,240,000
Ai rport 1,500,000 2,500,000 1,500,000 3,000,000 1,000,000
Wa ter 14,873,000 13,653,000 16,252,000 12,238,000 13,540,000
Sewer 8,888,600 13,436,000 37,577,500 16,225,000 10,177,500
Stormwa te r 2,110,000 4,970,000 3,600,000 3,813,000 3,945,000
TOTAL PROPOSED CAPITAL PROJECTS $78,843,348 $88,739,397 $113,403,2 25 $82,726,117 $75,204,977
Page 47 of 309
Summary of Projects
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 18
TOTAL FINANCING PLAN (CASH FLOWS) ‐ This summary demonstrates project cash flows for each Fiscal Year along with the
expected sources of funding.
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Resources
Federa l : CDBG 500,000 500,000 500,000 500,000 500,000
Federa l : Fe de ra l Avi a ti on Admi n 1,350,000 2,250,000 1,350,000 2,700 ,000 900,000
Federa l : Gra nts 3,000,000 5,000,000 10,609,817 1,800,000 3,345,000
Federa l : Sta te of Good Repa i r 2,751,000 5,661,550 4,239,635 0 0
Federa l : Tra ns porta ti on Al te rna ti ves 80,000 490,000 647,879 428,030 0
Loca l : ARPA ‐ Reve nue Re pl a ce me nt 6,858,893 43,333 423,334 0 0
Loca l : Li ne of Cre di t 57,146,800 61,843,050 72,193,036 69,084,898 66 ,999,514
Loca l : Pa y‐As ‐You‐Go 4,805,706 10,214,936 14,539,034 14,230,692 10,6 19,864
Loca l : Pa y‐As ‐You‐Go (Se wer) 8,394,000 697,000 3,169,000 1,676,000 1 ,215,000
Loca l : Pa y‐As ‐You‐Go (Stormwa te r) 475,600 60,600 70,000 135,000 350, 000
Loca l : Pa y‐As ‐You‐Go (Wa ter) 3,570,000 478,000 625,000 825,000 875,0 00
Loca l : Tra ns fe r from Genera l Fund 300,000 0 0 0 0
Sta te : Gra nts 9,964,620 2,417,114 2,371,098 586,908 940,000
Sta te : Hi ghwa y Ma i nte na nce (VDOT) 7,831,575 3,896,600 4,350,803 4,5 86,000 5,175,453
Sta te : Re venue Sha ri ng 3,786,500 4,500,000 8,753,149 11,168,640 3,84 2,513
Sta te : VA Dept of Avi a ti on 150,000 250,000 150,000 300,000 100,000
Sta te : VCWRLF 10,988,000 23,612,000 27,839,000 6,700,000 6,800,000
TOTAL ESTIMATED RESOURCES $121,952,694 $121,914,183 $151,830,785 $1 14,721,168 $101,662,344
CAPITAL PROJECTS
Bui l di ngs 13,754,386 11,170,000 9,495,000 3,973,000 6,725,000
Tra ns porta ti on 27,910,575 27,351,900 43,145,601 36,401,568 53,298,34 4
Publ i c Tra ns i t 10,084,000 981,050 3,339,850 863,100 500,000
Economi c De ve l opme nt 3,525,000 7,850,000 10,586,000 17,580,000 1,250 ,000
Pa rks a nd Re cre a ti on 0 1,530,000 1,815,000 1,610,000 3,111,000
Mi s cel l a ne ous 9,533,333 11,063,333 6,343,334 1,520,000 1,065,000
Re s erves 650,000 350,000 250,000 250,000 250,000
School s 2,540,000 1,726,000 1,049,000 2,397,000 2,240,000
Ai rport 1,500,000 2,500,000 1,500,000 3,000,000 1,000,000
Wa ter 18,752,700 22,435,200 17,374,000 14,798,000 11,640,000
Sewer 26,267,100 29,680,000 52,713,000 28,281,000 16,488,000
Stormwa te r 7,435,600 5,276,700 4,220,000 4,047,500 4,095,000
TOTAL PROPOSED CAPITAL PROJECTS $121,952,694 $121,914,183 $151,830 ,785 $114,721,168 $101,662,344
Page 48 of 309
City Capital Projects F und
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 19
CITY CAPITAL PROJECTS FUND SUMMARY OF APPROPRIATIONS ‐ This summary demonstrates project appropriations for
each Fiscal Year along with the expected sources of funding.
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Resources
Federa l : CDBG 500,000 500,000 500,000 500,000 500,000
Federa l : Gra nts 0 0 200,000 10,928,867 0
Federa l : Tra ns porta ti on Al te rna ti ves 0 1,048,030 0 0 0
Loca l : Li ne of Cre di t 31,331,433 30,634,191 28,565,300 15,610,750 25 ,219,201
Loca l : Pa y‐As ‐You‐Go 1,502,960 9,654,136 13,332,644 13,067,100 9,382 ,500
Loca l : Tra ns fe r from Genera l Fund 300,000 0 0 0 0
Sta te : Gra nts 325,040 2,611,914 722,806 360,400 2,652,000
Sta te : Hi ghwa y Ma i nte na nce (VDOT) 6,031,575 3,896,600 4,213,500 4,5 86,000 4,815,450
Sta te : Re venue Sha ri ng 8,940,740 4,109,526 5,890,475 0 1,733,326
TOTAL ESTIMATED RESOURCES $48,931,748 $52,454,397 $53,424,725 $45,0 53,117 $44,302,477
CAPITAL PROJECTS
Bui l di ngs 6,220,000 13,670,000 6,995,000 3,973,000 6,725,000
Tra ns porta ti on 36,808,748 23,443,347 31,720,775 18,570,117 29,056,47 7
Publ i c Tra ns i t 478,000 3,841,050 1,062,950 530,000 3,900,000
Economi c De ve l opme nt 4,025,000 7,350,000 10,586,000 17,580,000 1,250 ,000
Pa rks a nd Re cre a ti on 0 1,530,000 1,890,000 2,285,000 2,401,000
Mi s cel l a ne ous 750,000 2,270,000 920,000 1,865,000 720,000
Re s erves 650,000 350,000 250,000 250,000 250,000
TOTAL PROPOSED CAPITAL PROJECTS $48,931,748 $52,454,397 $53,424,72 5 $45,053,117 $44,302,477
Page 49 of 309
City Capital Projects F und
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 20
CITY CAPITAL PROJECTS FUND SUMMARY OF CASH FLOWS ‐ This summary demonstrates project cash flows for each
Fiscal Year along with the expected sources of funding.
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Resources
Federa l : CDBG 500,000 500,000 500,000 500,000 500,000
Federa l : Gra nts 3,000,000 5,000,000 10,609,817 1,800,000 3,345,000
Federa l : Sta te of Good Repa i r 2,751,000 5,661,550 4,239,635 0 0
Federa l : Tra ns porta ti on Al te rna ti ves 80,000 490,000 647,879 428,030 0
Loca l : ARPA ‐ Reve nue Re pl a ce me nt 6,858,893 43,333 423,334 0 0
Loca l : Li ne of Cre di t 22,979,000 21,488,750 28,614,036 29,879,398 42 ,266,514
Loca l : Pa y‐As ‐You‐Go 4,805,706 9,298,936 14,165,034 13,248,692 10,12 9,864
Loca l : Tra ns fe r from Genera l Fund 300,000 0 0 0 0
Sta te : Gra nts 9,964,620 2,417,114 2,371,098 586,908 940,000
Sta te : Hi ghwa y Ma i nte na nce (VDOT) 7,831,575 3,896,600 4,350,803 4,5 86,000 5,175,453
Sta te : Re venue Sha ri ng 3,786,500 4,500,000 8,753,149 11,168,640 3,84 2,513
Sta te : VCWRLF 2,600,000 7,000,000 400,000 0 0
TOTAL ESTIMATED RESOURCES $65,457,294 $60,296,283 $75,074,785 $62,1 97,668 $66,199,344
CAPITAL PROJECTS
Bui l di ngs 13,754,386 11,170,000 9,495,000 3,973,000 6,725,000
Tra ns porta ti on 27,910,575 27,351,900 43,145,601 36,401,568 53,298,34 4
Publ i c Tra ns i t 10,084,000 981,050 3,339,850 863,100 500,000
Economi c De ve l opme nt 3,525,000 7,850,000 10,586,000 17,580,000 1,250 ,000
Pa rks a nd Re cre a ti on 0 1,530,000 1,815,000 1,610,000 3,111,000
Mi s cel l a ne ous 9,533,333 11,063,333 6,343,334 1,520,000 1,065,000
Re s erves 650,000 350,000 350,000 250,000 250,000
TOTAL PROPOSED CAPITAL PROJECTS $65,457,294 $60,296,283 $75,074,78 5 $62,197,668 $66,199,344
Page 50 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 21
Five‐Year Proposed Appropriations
Project Title
Appropriations
Through
06/30/2024 Budget FY 2025
FY 2026 ‐ 2029
Planned
Five‐Year
Estimated Net
Cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Buildings
Circuit and General District Court Improvements 0 750,000 8,000,000 8,750,000 0 8,750,000
Major Building Repairs and Improvements/Multiple Projects Continuing 0 16,525,000 16,525,000 Continuing Continuing
Pa rking Lot Repa irs a nd Improvements /Multiple Projects Continuing 0 1,760,000 1,760,000 Continuing Continuing
Police Department Headquarters 4 9 , 9 6 2 , 6 9 1 0000 4 9 , 9 6 2 , 6 9 1
Roof Replacement/Multiple Projects Continuing 470,000 5,078,000 5,548,000 Continuing Continuing
Transfer Station for Refuse 1,900,000 5,000,000 0 5,000,000 0 6,900,000
Total Proposed FY 2025 ‐ 2029 CIP $51,862,691 $6,220,000 $31,363,000 $37,583,000 $0 $65,612,691
Page 51 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 22
Project Title Project Number Service Area
Circuit and General District Court Improvements To Be Assigned Buildings
Location Project Type Department
Circuit and General District Courts New Public Works
Department Priority
Project supports essential services
Project Description
Make improvements to the court facilities as outlined in the re port given by Atelier 11 Architecture and
Architects Design Group on January 11, 2017. Improvements include security (including bollards), ADA
accessibility, and proper operational space for judges and court proceedings.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Gaynelle Hart, Director of Public Works
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2027 In 2016 an architecture consultant did an assessment of the two court
facilities. The courts were identified as having extensive needs and were
originally scheduled to receive funding for renovations after t he
construction of the new police headquarters.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2025
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 750,000 Principal $8,750,000
FY 2026 ‐ FY 2029 Planned 8, 000,000 Inter est 3,490,232
Remaining Need 0 Total $12,240,232
Total Project Cost $8,750,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $612,012
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 750,000 0 0 0 0 $750,000
Construction 0 8,000,000 0 0 0 $8,000,000
Total $750,000 $8,000,000 $0 $0 $0 $8,750,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 750,000 5,500,000 2,500,000 0 0 $8,750,00 0
Total $750,000 $5,500,000 $2,500,000 $0 $0 $8,750,000
Operating Budget Impact
No additional costs associated with this project.
Page 52 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 23
Project Title Project Number Service Area
Major Building Repairs and Improvements/Multiple Projects Mult iple Buildings
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project supports essential services
Project Description
Annual program for repair and improvements to City owned buildi ngs. A detailed sub‐project list is
attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS‐1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Michael Bodnar, Construction Coordinator
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Funds are used for the upkeep of existing City buildings and assets as they
age and require maintenance and repairs.
In FY 2018, a consultant performed a condition assessment of all City
owned buildings. Results of the a ssessment provided staff with
information to prioritize needs and develop a schedule to addre ss
maintenance and replacement of building systems and components.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 0 Principal $3,075,000
FY 2026 ‐ FY 2029 Planned 16, 525,000 Interest 1,226,567
Remaining Need Continuing Total $4,301,567
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $215,078
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 345,000 280,000 780,000 300,000 $1,705,000
Construction 0 3,780,000 4,505,000 2,130,000 4,405,000 $14,820,000
Total $0 $4,125,000 $4,785,000 $2,910,000 $4,705,000 $16,525,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 2,500,000 3,535,000 2,910,000 4,505,000 $13,450,000
Local: Line of Credit 0 1,625,000 1,250,000 0 200,000 $3,075,00 0
Total $0 $4,125,000 $4,785,000 $2,910,000 $4,705,000 $16,525,000
Operating Budget Impact
Addressing maintenance issues reduces the need for on‐going temporary repairs.
Page 53 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 24
Major Building Repairs and Improvements/Multiple Projects
Fiscal
Year Location Project
Consultant
Engineering Construction Annual Total
$0
2025 Sub‐Totals $0 $0 $0
Ar mor y /C ity M ar ket Replace piping, separ ate sewer and stor m wat er, redo kitchen piping, grease
inter ceptor . Renov ate Ar mor y Bathr oom.
$25,000 $450,000 $475,000
Armory/Ci ty Ma rke t Combi ned HVAC repl a ceme nt 0 1,250,000 1,250,000
City Hall HVAC, AHU and controls replacement (design) 150,000 0 150 ,000
C ity Hall Wallpaper peeling/remov e/skim and paint (split ov er m ultiple y ears) 0 40,000 40,000
City Hall Carpet replacement (split over multiple years) 0 50,000 50,000
City Stadium ‐ Baseball
Side
Offi ces ‐ repl a ce HVAC 0 50,000 50,000
City Stadium ‐ Baseball
Side
Add netti ng to 1s t a nd 3rd ba s e s i des 15,000 200,000 215,000
C ity Wide Emergency and unscheduled building repairs (annual all oca ti on) 75,000 675,000 750,000
C it y Wide C ar pet and paint (annual alloc at ion) 0 1 0 0 , 0 0 0 1 0 0 , 0 0 0
C it y Wide Gat eway /Way finding r eplac ement s (annual alloc at ion) 0 2 5 ,000 25,000
C it y Wide M ult i‐building ‐ maj or bac kflow pr ev ent er s (mult i‐y ear project) 5,000 25,000 30,000
Expressway Repair and stain priv acy fence (annual allocation) 0 50 ,000 50,000
Fire Station 1 Fire alarm system 5,000 40,000 45,000
Fire Station 2 Fire alarm system 5,000 30,000 35,000
Fi re Sta ti on 7 El e ctri ca l pa nel upgra de 15,000 150,000 165,000
Fort Early Building Renovations ‐ Windows & Siding ‐ Design 20,00 00 2 0 , 0 0 0
K emper Str eet Building Boiler /chiller r eplacement. 0 2 2 5 ,00 0 2 25 ,0 0 0
Parks Upgrades to equipment and amenities (annual allocation) 0 25 ,000 25,000
P ar ks Replac e split r ail fenc ing wit h c hain‐link (mult i‐y ear pr o ject) 0 25,000 25,000
Peaks View Park Parking lot lighting replacement ‐ Phase 2. Lot s 1 & 2 0 220,000 220,000
Refuse Building r ehabilit at ion and r enov at ion 0 1 5 0 , 0 0 0 1 5 0 , 0 0 0
Re fus e Re pl a ce fuel s tora ge ta nk ‐ Des i gn 30,000 0 30,000
2026 Sub‐Totals $345,000 $3,780,000 $4,125,000
Page 54 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 25
Major Building Repairs and Improvements/Multiple Projects
Fiscal
Year Location Project
Consultant
Engineering Construction Annual Total
925 Church Stre et
Building
Inte ri or a nd exte ri or renova ti ons $0 $400,000 $400,000
Blac kwat er C r eek A t hlet ic
Area
Repair steps between parking lot and pavilion 0 20,000 20,000
Buildings and Grounds
Building
Ba ckfl ow preve nters for fi re prote cti on 5,000 70,000 75,000
Ci ty Ha l l Ba ckfl ow preve nters for fi re prote cti on 5,000 80,000 85, 000
City Hall Carpet replacement (split over multiple years) 0 50,000 50,000
City Hall HVAC, AHU and controls replacement (construction) 0 1,2 50,000 1,250,000
C ity Hall Wallpaper peeling/remov e/skim and paint (split ov er m ultiple y ears) 0 40,000 40,000
C ity Stadium Fencing for ev ents 0 100,000 100,000
City Stadium ‐ Baseball
Side
Add gate for mower access between dumpster and ADA ramp 0 25,000 2 5,000
C it y Wide C ar pet and paint (annual alloc at ion) 0 1 0 0 , 0 0 0 1 0 0 , 0 0 0
C ity Wide Emergency and unscheduled building repairs (annual all oca ti on) 100,000 1,000,000 1,100,000
C it y Wide Gat eway /Way finding r eplac ement s (annual alloc at ion) 0 2 5 ,000 25,000
C it y Wide M ult i‐building ‐ maj or bac kflow pr ev ent er s (mult i‐y ear project) 5,000 25,000 30,000
Expressway Repair and stain priv acy fence (annual allocation) 0 10 0,000 100,000
Fire Station 4 Fire alarm system 5,000 45,000 50,000
Fire Station 5 Fire alarm system 5,000 45,000 50,000
Fire Station 6 Paint and plaster repair 0 65,000 65,000
Fire Station 8 Fire alarm system 5,000 45,000 50,000
Fort Early Building Renovations ‐ Windows & Siding ‐ Constructio n 0 100,000 100,000
Ol d Courthous e Mus eum Re s troom re nova ti ons 35,000 180,000 215,000
P ar ks Replac e split r ail fenc ing wit h c hain‐link (mult i‐y ear pr o ject) 0 25,000 25,000
Parks Upgrades to equipment and amenities (annual allocation) 0 50 ,000 50,000
Peaks View Park Install HVAC at the maintenance shop 0 15,000 15,00 0
Peaks View Park Parking lot lighting replacement ‐ Phase 3. Lot s 4 & 5 0 200,000 200,000
Pea ks Vi ew Pa rk Sta i n a nd trea t wooden bri dges 0 30,000 30,000
Page 55 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 26
Major Building Repairs and Improvements/Multiple Projects
Fiscal
Year Location Project
Consultant
Engineering Construction Annual Total
Perciv al's Island Bridge Stain and treat wooden bridge 15,000 135, 000 150,000
Re fus e Re pl a ce fuel s tora ge ta nk ‐ Cons tructi on 0 250,000 250,000
Riverside Park Construct a dumpster pad with enclosure 0 35,000 35, 000
Sandusky Park Repair/improve drainage 100,000 0 100,000
2027 Sub‐Totals $280,000 $4,505,000 $4,785,000
City Hall 9th and 10th Street entrances ‐ refurbish exterior doo rs $0 $350,000 $350,000
C it y Wide Building c ondit ion r eassessment 5 5 0 , 0 0 0 0 5 5 0 , 0 0 0
C it y Wide C ar pet and paint (annual alloc at ion) 0 1 0 0 , 0 0 0 1 0 0 , 0 0 0
C ity Wide Emergency and unscheduled building repairs (annual all oca ti on) 100,000 1,000,000 1,100,000
C it y Wide Gat eway /Way finding r eplac ement s (annual alloc at ion) 0 2 5 ,000 25,000
C it y Wide M ult i‐building ‐ maj or bac kflow pr ev ent er s (mult i‐y ear project) 5,000 25,000 30,000
Expressway Repair and stain priv acy fence (annual allocation) 0 50 ,000 50,000
Fire Station 1 Install fans in apparatus area 0 30,000 30,000
Fire Station 2 HVAC replacement 0 50,000 50,000
Fire Station 2 Install fans in apparatus area 0 20,000 20,000
Gar net t St r eet Building Demolit ion (engineer ing) 5 0 , 0 0 0 0 5 0 , 0 0 0
Old C ourthouse Museum Hustings C ourtroom floor and acoustic upgr a de s (de s i gn) 50,000 0 50,000
P ar ks Replac e split r ail fenc ing wit h c hain‐link (mult i‐y ear pr o ject) 0 25,000 25,000
Parks Upgrades to equipment and amenities (annual allocation) 0 25 ,000 25,000
Peaks View Park Parking lot & pathway lighting replacement ‐ Pha se 4. Lot 6 & Pathway 0 400,000 400,000
Pe a ks Vi ew Pa rk Re pl a ce a rchwa y bri dge (de s i gn) 25,000 0 25,000
Pea ks Vi ew Pa rk Sta i n a nd trea t wooden bri dges 0 30,000 30,000
2028 Sub‐Totals $780,000 $2,130,000 $2,910,000
Page 56 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 27
Major Building Repairs and Improvements/Multiple Projects
Fiscal
Year Location Project
Consultant
Engineering Construction Annual Total
C it y Wide C ar pet and paint (annual alloc at ion) $ 0 $ 1 0 0 , 0 0 0 $ 1 0 0 , 0 0 0
C ity Wide Emergency and unscheduled building repairs (annual all oca ti on) 100,000 1,000,000 1,100,000
C it y Wide Gat eway /Way finding r eplac ement s (annual alloc at ion) 0 2 5 ,000 25,000
City Wide Maintenance and repairs to infrastructure based on bui lding c ondit ion
assessment
200,000 1,075,000 1,275,000
Expressway Repair and stain priv acy fence (annual allocation) 0 5 0,000 50,000
Gar net t St r eet Building Demolit ion 0 1,750,000 1,750,000
Old C ourthouse Museum Hustings C ourtroom floor and acoustic upgr a de s (cons tructi on) 0 150,000 150,000
Parks Upgrades to equipment and amenities (annual allocation) 0 25 ,000 25,000
Peaks View Park Replace archway bridge (construction) 0 200,000 200 ,000
Pea ks Vi ew Pa rk Sta i n a nd trea t wooden bri dges 0 30,000 30,000
2029 Sub‐Totals $300,000 $4,405,000 $4,705,000
Grand Totals $1,705,000 $14,820,000 $16,525,000
Page 57 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 28
Project Title Project Number Service Area
Parking Lot Repairs and Improvements/Multiple Projects Multipl e Buildings
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project supports essential services
Project Description
Annual program for repair and improvements to City owned parking lots. A detailed sub‐project list is
attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS‐1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Clay Simmons, Deputy Director of Public Works
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Funds are used for the upkeep of existing City parking lots as they age and
require maintenance and repairs. Annually, funds are allotted t o address
minor paving and lighting needs. Some lots require a wider scope to
address maintenance issues; this work is scheduled in future years based
on parking lot usage.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 1,760,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 10,000 0 0 0 $10,000
Construction 0 475,000 425,000 425,000 425,000 $1,750,000
Total $0 $485,000 $425,000 $425,000 $425,000 $1,760,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 485,000 425,000 425,000 425,000 $1,760,0 00
Total $0 $485,000 $425,000 $425,000 $425,000 $1,760,000
Operating Budget Impact
Addressing maintenance issues reduces the need for on‐going temporary repairs.
Page 58 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 29
Parking Lot Repairs and Improvements/Multiple Projects
Fiscal
Year Location Project
Consultant
Engineering Construction Annual Total
$0
2025 Sub‐Totals $0 $0 $0
Business Dev elopment
Ce nte r
Re pa ve pa rki ng l ot $0 $275,000 $275,000
Ci ty Wi de Li ghti ng, s tri pi ng a nd pa vi ng 0 75,000 75,000
Mid‐town Parking Deck Electric Vehicle C harging Station 10,000 125 ,000 135,000
2026 Sub‐Totals $10,000 $475,000 $485,000
Ci ty Wi de Li ghti ng, s tri pi ng a nd pa vi ng $0 $75,000 $75,000
City Wide Pay station replacement at various lots 0 100,000 100,000
Publ i c Works Re pa ve pa rki ng l ot (Pha s e 1) 0 250,000 250,000
2027 Sub‐Totals $0 $425,000 $425,000
Ci ty Wi de Li ghti ng, s tri pi ng a nd pa vi ng $0 $75,000 $75,000
City Wide Pay station replacement at various lots 0 100,000 100,000
Publ i c Works Re pa ve pa rki ng l ot (Pha s e 2) 0 250,000 250,000
2028 Sub‐Totals $0 $425,000 $425,000
Ci ty Wi de Li ghti ng, s tri pi ng a nd pa vi ng $0 $75,000 $75,000
City Wide Pay station replacement at various lots 0 100,000 100,000
IT Building Repav e par king lot 0 250,000 250,000
2029 Sub‐Totals $0 $425,000 $425,000
Grand Totals $10,000 $1,750,000 $1,760,000
Page 59 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 30
Project Title Project Number Service Area
Police Department Headquarters B0173 Buildings
Location Project Type Department
Odd Fellows Road Ne w Public Works
Department Priority
Project supports essential services
Project Description
Construct a new police headquarters to house all functions of the Police Department in a modern facility.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Clay Simmons, Deputy Director of Public Works
Projected Start Date Q3 FY 2018 Why Now
Projected Completion Date Q4 FY 2025 Land acquisition and design phase is complete and the construction is well
underway; Notice To Proceed was issued October 2022. Construction
completion is expected in February 2025 with move‐in anticipated by
year‐end FY 2025.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2023
Construction Q4 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $49,962,691 Project Tota l Debt Expenditures
Budget FY 2025 0 Principal $27,413,953
FY 2026 ‐ FY 2029 Planned 0 Interest 10,934,977
Remaining Need 0 Total $38,348,930
Total Project Cost $49,962,691
Local Funding Percentage 97.1% Estimated Annual Debt Service $1,917,447
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: ARPA ‐ Revenue Replacement 6,825,560 0 0 0 0 $6,825,560
Local: Pay‐As‐You‐Go 708,826 0 0 0 0 $708,826
Total $7,534,386 $0 $0 $0 $0 $7,534,386
Operating Budget Impact
The new facility will require annual additional grounds and building maintenance, as well as custodial services, utilities, and stormwater (~$83,000).
Page 60 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 31
Project Title Project Number Service Area
Roof Replacement/Multiple Projects Multiple Buildings
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project supports essential services
Project Description
Annual program for repair and replacement of roofs. A detailed sub‐project list is attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS‐1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Michael Bodnar, Construction Coordinator
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Funds are used for the upkeep of the roofs of existing City bui ldings and
assets as they age and require maintenance and repairs.
In FY 2018, a consultant performed a condition assessment of all City
owned buildings. Results of the a ssessment provided staff with
information to prioritize needs and develop a schedule to addre ss
maintenance and replacement of roof systems and components.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 470,000 Principal $3,743,000
FY 2026 ‐ FY 2029 Planned 5, 078,000 Inter est 1,493,021
Remaining Need Continuing Total $5,236,021
Total Project Cost Continuing
Local Funding Percentage 32.5% Estimated Annual Debt Service $261,801
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 20,000 35,000 50,000 8,000 45,000 $158,000
Construction 450,000 1,025,000 1,735,000 630,000 1,550,000 $5,390,000
Total $470,000 $1,060,000 $1,785,000 $638,000 $1,595,000 $5,548,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 590,000 515,000 350,000 350,000 $1,805,0 00
Local: Line of Credit 470,000 470,000 1,270,000 288,000 1,245,0 00 $3,743,000
Total $470,000 $1,060,000 $1,785,000 $638,000 $1,595,000 $5,548,000
Operating Budget Impact
Addressing maintenance issues reduces the need for on‐going temporary repairs.
Page 61 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 32
Roof Replacement/Multiple Projects
Fiscal
Year Location Project
Consultant
Engineering Construction Annual Total
Ci ty Wi de Emergency roof repa i rs $20,000 $450,000 $470,000
2025 Sub‐Totals $20,000 $450,000 $470,000
A llen M or r ison Building Replac e r oof $20,000 $450,000 $470,000
Ci ty Armory Re pl a ce Ba throom Roof 5,000 25,000 30,000
City Stadium ‐ Baseball
Side
Re pl a ce rubbe r roof & Skybox Ki tchen Roof 10,000 175,000 185,000
Ci ty Wi de Emergency roof repa i rs 0 250,000 250,000
C ity Wide Inspections and maintenance 0 100,000 100,000
Ri vers i de Pa rk Re pl a ce Pump Hous e Roof 0 25,000 25,000
2026 Sub‐Totals $35,000 $1,025,000 $1,060,000
Business Inc ubat or Replac e r oof $20,000 $1,250,000 $1,270,000
Ci ty Wi de Emergency roof repa i rs 0 250,000 250,000
C ity Wide Inspections and maintenance 0 100,000 100,000
Public Works Replace Tractor Shed Roof/Structural Repairs 15,000 7 5,000 90,000
Rutherford Site Replace Tractor Shed Roof/Structural Repairs 15,0 00 60,000 75,000
2027 Sub‐Totals $50,000 $1,735,000 $1,785,000
Ci ty Wi de Emergency roof repa i rs $0 $250,000 $250,000
C ity Wide Inspections and maintenance 0 100,000 100,000
Refuse Replace roof 8,000 280,000 288,000
2028 Sub‐Totals $8,000 $630,000 $638,000
Ci ty Wi de Emergency roof repa i rs $0 $250,000 $250,000
C ity Wide Inspections and maintenance 0 100,000 100,000
Hea l th Depa rtment Repl a ce roof 15,000 1,200,000 1,215,000
Police Storage Replace roof & Re‐skin building (asbestos & lead a ba tme nt) ‐ De s i gn 30,000 0 30,000
2029 Sub‐Totals $45,000 $1,550,000 $1,595,000
Grand Totals $158,000 $5,390,000 $5,548,000
Page 62 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 33
Project Title Project Number Service Area
Transfer Station for Refuse B0175 Buildings
Location Project Type Department
TBD New Public Works
Department Priority
Project supports essential services
Project Description
Design and build a refuse transfer station for City refuse operations to accept residential trash, brush, and
bulk before hauling to a permitted landfill. The new facility could possibly serve as the citizen convenience
center.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Gaynelle Hart, Director of Public Works
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2025 A transfer station located within the City should be considered now for
the following reasons: reduced travel time and on‐site wait tim es to/at
the Region 2000 Service Author ity landfill resulting in reduced labor and
fuel costs, reduced travel time creating capacity to serve more t r a s h
customers as the City population grows, reduced damage and repa irs to
refuse vehicles that result from navigating the road to the lan dfill face,
increased capacity to respond to emergencies that result in deb ris, and
the flexibility to respond to regional and national solid waste changes and
trends.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2024
Construction Q4 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $1,900,000 Project Total Debt Expenditures
Budget FY 2025 5, 000,000 Principal $6,900,000
FY 2026 ‐ FY 2029 Planned 0 Interest 2,752,297
Remaining Need 0 Total $9,652,297
Total Project Cost $6,900,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $482,615
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 5,000,000 0 0 0 0 $5,000,000
Total $5,000,000 $0 $0 $0 $0 $5,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 5,000,000 0 0 0 0 $5,000,000
Total $5,000,000 $0 $0 $0 $0 $5,000,000
Operating Budget Impact
Annual operating costs are estimated at $300,000.
Page 63 of 309
City Capital Projects Fund – Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 34
Page 64 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 35
Five‐Year Proposed Appropriations
Project Title
Appropriations
Through
06/30/2024 Budget FY 2025
FY 2026 ‐ 2029
Planned
Five‐Year
Estimated
Net Cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Transportation
Public Transit Improvements and Bus Replacements 9,606,000 478,000 9,334,000 9,812,000 0 19,418,000
5th Stre e t Improve me nts , Pha s e IV 7,814,495 0 0 0 0 7,814,495
Bedford Avenue Bridge 14,724,894 0 7,160,915 7,160,915 0 21,885,809
Breezewood Drive Widening 5,280,000 4,473,825 1,708,456 6,182,281 0 11,462,281
Bridge Maintenance Continuing 1,088,325 2,795,450 3,883,775 Continuing Continuing
Cul ve rt Re pl a ce me nt Progra m Continuing 750,000 1,943,500 2,693,500 Continuing Continuing
Florida Avenue Sidewalk 4,517,516 0 0 0 0 4,517,516
Forest Brook Road, Phase I 0 0 1,417,500 1,417,500 7,938,000 9,355,500
General Street Improvements Continuing 425,000 4,760,750 5,185,750 Continuing Continuing
Hollins Mill Road Bridge Replacement with Bikeway Improvements 0 8,268,000 11,583,062 19,851,062 0 19,851,062
John Lynch Bridge Repairs 6,072,567 3,077,433 0 3,077,433 0 9,150,000
Lakeside Drive Arch Bridge Rehabilitation 750,000 93,750 937,500 1,031,250 0 1,781,250
Lakeside Drive Improvements 1,972,000 2,084,849 629,168 2,714,017 0 4,686,017
Leesville Road Pedestrian Improvements 0 0 1,000,000 1,000,000 10,060,000 11,060,000
Liberty Mountain Drive Realignment 0 0 810,000 810,000 8,505,000 9,315,000
Link Road/Boonsboro Road Intersection Improvements 1,576,000 1,457,794 547,898 2,005,692 0 3,581,692
Lynchburg Center for Industry ‐ Phase I 980,819 0 0 0 0 980,819
Lynchburg Center for Industry ‐ Phase II 0 262,007 1,048,030 1,310,037 0 1,310,037
Lynchburg Expressway/Candlers Mountain Road Interchange 00 0 0 0 0
McConville Roa d Rea lignment to La kes ide Drive 0 0 4,560,000 4,560,000 0 4,560,000
Nationwide Drive Roundabout 0 0 992,250 992,250 8,505,000 9,497,250
Public Works Infrastructure Improvements Continuing 342,000 1,548,000 1,890,000 Continuing Continuing
Retaining Wall Replacement/Repair Program Continuing 0 1,125,000 1,125,000 Continuing Continuing
Route 501/221 One‐Way Pairs 42,905,619 10,087,500 21,355,377 31,442,877 0 74,348,496
Storm Drainage System Repairs/Replacements Continuing 142,000 674,500 816,500 Continuing Continuing
Stre e t Ove rla y Progra m Continuing 2,659,250 12,493,600 15,152,850 Continuing Continuing
Timberlake Road Bridge, West Bound Lanes 0 0 10,749,375 10,749,375 0 10,749,375
Traffic Signal Repair and Replacement Continuing 0 2,075,000 2,075,000 Continuing Continuing
Vassar Street at Langhorne Road Intersection Improvements 50,000 0 9,783,867 9,783,867 0 9,833,867
Wards Ferry Road at CVCC Campus Drive Roundabout 00 0 0 0 0
Wards Ferry Road/Atlanta Avenue Turn Lanes 1,340,000 1,597,015 779,018 2,376,033 0 3,716,033
Wards Ferry Road/Simons Run Pedestrian Accommodations 0 0 312,500 312,500 0 312,500
Total Proposed FY 2025 ‐ 2029 CIP $97,589,910 $37,286,748 $112,124,716 $149,411,464 $35,008,000 $249,1 86,999
Page 65 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 36
Project Title Project Number Service Area
Public Transit Improvements and Bus Replacements T0256 Public Transit
Location Project Type Department
419 Bradley Dr New Greater Lynchburg Transit Company (GLTC)
Department Priority
Project has State and/or Federal funding; Project represents additional essential services; Project required
to support important but not essential services
Project Description
These projects include the repla cement of heavy‐duty transit bu ses as well as replacing light‐duty Body‐
on‐Chassis vehicles for ADA Paratransit as well as technology u pgrades and repairs, the replacement of
service vehicles and tools, and improvements to passenger ameni ties including shelters, lighting, signage,
and seating.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1: Provide safe, efficient, effectiv e, and well‐planned transportation systems
and facilities that enhance economic development and redevelopment opportunities while preserving the
integrity and character of the affected neighborhoods, historic districts, downtown and natural resources.
Project Manager
Josh Moore, General Manager
Projected Start Date Why Now
Projected Completion Date These projects are scored by the VA Dept of Rail and Public Transportation
and the Federal Transit Administration using a Transit Asset Management
(TAM) plan which focuses on the State of Good Repair (SGR) and as
p r o j e c ts me e t th es e th r es h o ld s , th ey b ec o me e ligib le fo r mo re funding
and a greater likelihood of bein g funded to comply with the Fed eral and
State requirements for the TAM.
Projected Schedule
Activity Projected Date
Revenue Vehicle Fleet Continuing
Consultant Engineering Continuing
Construction Continuing
Equipment Continuing
Technology Continuing
Fencing, Lighting, and Signs Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $9,606,000 Project Total Debt Expenditures
Budget FY 2025 478,000 Principal $0
FY 2026 ‐ FY 2029 Planned 9,334,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $19,418,000
Local Funding Percentage 32.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Equipment 63,000 0 0 0 0 $63,000
Revenue Vehicle Fleet 136,000 2,860,000 480,000 0 3,000,000 $6,476,000
Equipment 149,000 211,050 256,750 0 0 $616,800
Technology 80,000 770,000 120,000 500,000 0 $1,470,000
Facilities 50,000 0 0 30,000 900,000 $980,000
Fencing, Lighting, and Signs 0 0 206,200 0 0 $206,200
Total $478,000 $3,841,050 $1,062,950 $530,000 $3,900,000 $9,812,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
State: Grants 6,857,120 667,114 2,271,098 586,908 340,000 $10,7 22,240
Local: Pay‐As‐You‐Go 3,226,880 313,936 1,068,752 276,192 160,00 0 $5,045,760
Total $10,084,000 $981,050 $3,339,850 $863,100 $500,000 $15,768,000
Operating Budget Impact
All projects this year are replacement projects which will result in lower maintenance costs.
Local match may be lower based on MERIT score when grants are applied for. The Revenue vehicle replacement in FY29 may be funded at a higher level
due to possible SGR and additional state programs. Revenue vehicles generally trail a year for expenditure due to 12‐14 month lead time from order.
Page 66 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 37
Project Title Project Number Service Area
5th Street Improvements, Phase IV T0329 Transportation
Location Project Type Department
5th Street from Taylor St. to Pierce St. New Public Works
Department Priority
Project has legal or regulatory m a n d a t e ; P r o j e c t s u p p o r t s e s s e ntial services; Project has State and/or
Federal funding
Project Description
Reconstruct roadway to remove concrete pavement base to eliminate joints and reconstruct sidewalks for
safety and compliance with Americans with Disabilities Act accessibility; includes streetscapes.
Relationship to Comprehensive Plan
T h e F i f t h S t r e e t M a s t e r P l a n w a s a d o p t e d b y C i t y C o u n c i l o n M a y 23, 2006 as part of the City's
Comprehensive Plan 2002 ‐ 2020. Chapter 3, Page 31, Goal T‐1.7 : Commit adequate resources for the
cost‐effective operation and main tenance of streets, including pavement, bikeways, sidewalks,
streetscapes and stormwater management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q2 FY 2020 Why Now
Projected Completion Date Q4 FY 2027 The underlying substructure of the roadway is jointed concrete pavement
that continues to move and cause cracks and bumps in the asphal t
overlay. In order to eliminate the current issues and prevent
deterioration of the road sub ba se, this concrete needs to be r emoved
and the entire road rebuilt including sidewalks and retaining w alls. This
work completes the final phase of Fifth Street's improvement.
Projected Schedule
Activity Projected Date
Land Acquisition/Right‐of‐Way Q4 FY 2025
Consultant Engineering Q3 FY 2025
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $7,814,495 Project Total Debt Expenditures
Budget FY 2025 0 Principal $4,117,880
FY 2026 ‐ FY 2029 Planned 0 Interest 1,642,555
Remaining Need 0 Total $5,760,435
Total Project Cost $7,814,495
Local Funding Percentage 52.8% Estimated Annual Debt Service $288,022
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 300,000 800,000 2,030,000 0 0 $3,130,000
State: Revenue Sharing 300,000 800,000 2,030,000 0 0 $3,130,000
State: Highway Maintenance (VDOT) 0 0 137,303 0 0 $137,303
Local: Pay‐As‐You‐Go 0 0 9,312 0 0 $9,312
Total $600,000 $1,600,000 $4,206,615 $0 $0 $6,406,615
Operating Budget Impact
Additional annual expenses for grounds, maintenance, and stormwater (~$10,000).
Page 67 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 38
Project Title Project Number Service Area
Bedford Avenue Bridge TB054 Transportation
Location Project Type Department
Bedford Avenue at Norfolk Southern Rail New Public Works
Department Priority
Project has legal or regulatory m a n d a t e ; P r o j e c t s u p p o r t s e s s e ntial services; Project has State and/or
Federal funding
Project Description
Replace deteriorating structure over Norfolk Southern Railway.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2023 Why Now
Projected Completion Date Q4 FY 2028 The City’s Comprehensive Bridge Condition Report ranks this bridge as
the most immediate need as it has a “Poor” condition rating. T he
abutments are deteriorated and the bridge deck has spalling concrete and
exposed reinforcing steel.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2025
Construction Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $14,724,894 Project Tota l Debt Expenditures
Budget FY 2025 0 Principal $7,160,915
FY 2026 ‐ FY 2029 Planned 7, 160,915 Inter est 2,856,372
Remaining Need 0 Total $10,017,287
Total Project Cost $21,885,809
Local Funding Percentage 32.8% Estimated Annual Debt Service $500,864
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 0 7,160,915 0 0 0 $7,160,915
Total $0 $7,160,915 $0 $0 $0 $7,160,915
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Federal: State of Good Repair 2,751,000 5,661,550 4,239,635 0 0 $12,652,185
Local: Line of Credit 0 0 3,160,915 4,000,000 0 $7,160,915
Total $2,751,000 $5,661,550 $7,400,550 $4,000,000 $0 $19,813,100
Operating Budget Impact
None anticipated at this time.
Total estimated cost of project is now $21,875,454; $14,714,539 of State of Good Repair funding has been awarded. Additional funding for State of
Good Repair funding of $7,160,915 will be applied for.
Pending 3Q Adjustment
Page 68 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 39
Project Title Project Number Service Area
Breezewood Drive Widening T0331 Transportation
Location Project Type Department
Breezewood Drive New Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Widen and improve road and pedestrian features from the end of the Virginia Department of
Transportation's (VDOT's) 2007 project to the end of the cul‐de‐sac.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q4 FY 2028 Project was cancelled after funds ran out from the 2007 VDOT pr oject.
Roadway has seen increased vehicle and pedestrian traffic due to private
development in the immediate vic inity and safety improvements f or
pedestrians and vehicles are needed. An application was submit ted for
Revenue Sharing Funds.
Projected Schedule
Activity Projected Date
Land Acquisition/Right‐of‐Way Q2 FY 2026
Consultant Engineering Q2 FY 2026
Construction Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $5,280,000 Project Total Debt Expenditures
Budget FY 2025 4, 473,825 Principal $6,046,141
FY 2026 ‐ FY 2029 Planned 1, 708,456 Inter est 2,411,707
Remaining Need 0 Total $8,457,847
Total Project Cost $11,462,281
Local Funding Percentage 52.7% Estimated Annual Debt Service $422,892
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 4,473,825 0 1,708,456 0 0 $6,182,281
Total $4,473,825 $0 $1,708,456 $0 $0 $6,182,281
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 812,500 1,100,000 1,850,000 1,768,641 0 $ 5,531,141
State: Revenue Sharing 812,500 1,100,000 1,850,000 1,768,640 0 $5,531,140
Total $1,625,000 $2,200,000 $3,700,000 $3,537,281 $0 $11,062,281
Operating Budget Impact
Additional annual expenses for tree maintenance and stormwater (~$10,000).
Page 69 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 40
Project Title Project Number Service Area
Bridge Maintenance TB038 Transportation
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project has legal or regulatory mandate; Project has State and/ or Federal funding; Project supports
essential services
Project Description
Annual cleaning of seventy‐nine bridges and culverts; repairs to expansion joints; annual consultant bridge
and safety inspection; and other maintenance.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Bridge inspections must be performed every year; on‐going maintenance
i n c r e a s e s a n a s s e t ’ s u s e f u l l i f e s p a n a n d r e d u c e s t h e n e e d f o r major
repairs.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 1,088, 325 Principal $0
FY 2026 ‐ FY 2029 Planned 2,795,450 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 125,000 137,500 156,000 175,500 184,275 $778,275
Construction 963,325 487,500 520,000 553,500 581,175 $3,105,500
Total $1,088,325 $625,000 $676,000 $729,000 $765,450 $3,883,775
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
State: Highway Maintenance (VDOT) 1,088,325 625,000 676,000 729 ,000 765,450 $3,883,775
Total $1,088,325 $625,000 $676,000 $729,000 $765,450 $3,883,775
Operating Budget Impact
None anticipated at this time.
Page 70 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 41
Project Title Project Number Service Area
Culvert Replacement Program T0258 Transportation
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project supports essential services
Project Description
Managed program to replace and maintain over 100 City culverts. Upcoming culvert replacements include
Young Place Culvert and Mayfield Drive Culvert.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Dee Dee Conner, P.E., Principal Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing City staff performs a bi‐annual Culvert Condition Report to pri oritize
needs to maintain the street int egrity by designing and replaci ng failing
culverts in alternating years.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 750,000 Principal $2,693,500
FY 2026 ‐ FY 2029 Planned 1, 943,500 Inter est 1,074,393
Remaining Need Continuing Total $3,767,893
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $188,395
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 81,250 0 87,750 0 $169,000
Construction 750,000 0 845,000 0 929,500 $2,524,500
Total $750,000 $81,250 $845,000 $87,750 $929,500 $2,693,500
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 750,000 81,250 845,000 87,750 929,500 $2, 693,500
Total $750,000 $81,250 $845,000 $87,750 $929,500 $2,693,500
Operating Budget Impact
Maintenance costs will be reduced.
Page 71 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 42
Project Title Project Number Service Area
Florida Avenue Sidewalk T0324 Transportation
Location Project Type Department
Florida Ave. from Lynchburg Detention Home to Greenfield Dr. Ne w Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Install sidewalk along Florida Avenue from the Lynchburg Detention Home to Greenfield Drive. This project
will require sidewalks, drainage, and curb and gutter.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2020 Why Now
Projected Completion Date Q2 FY 2026 City Council requested sidewalk improvements to improve the saf ety of
the pedestrians that currently traverse the roadway and cross u nder the
railroad bridge without a safe area to do so. The pedestrians are forced
to walk much of the area in the roadway due to obstructions like no
shoulders and rock outcroppings. Project scope was reduced to this first
phase due to significant costs (~additional $15M) to go under the railroad
trestle.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2025
Construction Q2 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $4,517,516 Project Total Debt Expenditures
Budget FY 2025 0 Principal $2,267,516
FY 2026 ‐ FY 2029 Planned 0 Interest 904,475
Remaining Need 0 Total $3,171,991
Total Project Cost $4,517,516
Local Funding Percentage 50.2% Estimated Annual Debt Service $158,600
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 1,000,000 1,000,000 0 0 0 $2,000,000
State: Revenue Sharing 1,000,000 1,000,000 0 0 0 $2,000,000
Total $2,000,000 $2,000,000 $0 $0 $0 $4,000,000
Operating Budget Impact
None anticipated at this time.
Page 72 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 43
Project Title Project Number Service Area
Forest Brook Road, Phase I To Be Assigned Transportation
Location Project Type Department
Forest Brook Road ‐ Old Forest Road to Railroad New Public Wor ks
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Realign the road to remove double curves, widen road to 30‐36 feet, and add sidewalk per the Forest Brook
Road corridor study.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2029 Why Now
Projected Completion Date Q4 FY 2031 Road has no sidewalk in portions and is narrow and rolling. Th ere was
one fatality in FY 2021.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2029
Land Acquisition/Right‐of‐Way Q3 FY 2030
Construction Q4 FY 2031
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $9,355,500
FY 2026 ‐ FY 2029 Planned 1, 417,500 Inter est 3,731,756
Remaining Need 7,938,000 Total $13,087,256
Total Project Cost $9,355,500
Local Funding Percentage 100.0% Estimated Annual Debt Service $654,363
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 0 0 850,500 $850,500
Land Acquisition/Right‐of‐Way 0 0 0 0 567,000 $567,000
Total $0 $0 $0 $0 $1,417,500 $1,417,500
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 0 0 0 535,500 $535,500
Total $0 $0 $0 $0 $535,500 $535,500
Operating Budget Impact
None for years 2030 ‐ 2032 ‐ new structure.
An application will be submitted to VDOT for Revenue Share and/or SMARTSCALE Program funding.
Page 73 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 44
Project Title Project Number Service Area
General Street Improvements TG019 Transportation
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project supports essential services
Project Description
Curb, gutter and sidewalk petitions; annual contractual improvements; subdivisions and storm sewer
improvements; street improvements and signalization.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Improvements in the transportation system due to safety conside rations
and existing deficiencies; reimbursements to developers.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 425,000 Principal $1,442,250
FY 2026 ‐ FY 2029 Planned 4, 760,750 Interest 575,290
Remaining Need Continuing Total $2,017,540
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $100,877
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 60,000 60,000 78,000 81,000 85,000 $364,000
Construction 365,000 1,040,000 1,092,000 1,134,000 1,190,750 $4,821,750
Total $425,000 $1,100,000 $1,170,000 $1,215,000 $1,275,750 $5,185,750
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 1,100,000 845,000 877,500 921,000 $3,743 ,500
Local: Line of Credit 425,000 0 325,000 337,500 354,750 $1,442, 250
Total $425,000 $1,100,000 $1,170,000 $1,215,000 $1,275,750 $5,185,750
Operating Budget Impact
Possible increase in lane mileage, subsequently increasing maintenance costs and State Highway reimbursement. Possible increase in curb and gutter,
number of signals, and square yards of sidewalk, resulting in increased maintenance.
Page 74 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 45
Project Title Project Number Service Area
Hollins Mill Road Bridge Replacement with Bikeway Improvements To Be Assigned Transportation
Location Project Type Department
Hollins Mill Road Bridge New Public Works
Department Priority
Project contributes to the generation of new revenue; Project supports essential services; Project has State
and/or Federal funding
Project Description
Replacement and enhancement of the bridge on Hollins Mill Road at Hollins Mill Park. There is a low water
bridge underneath the Hollins Mill Bridge connecting the Blackwater Creek Bikeway with the Point of Honor
Trail that constantly requires maintenance to remain safely acc essible to pedestrians and bicyclists. This
project will replace the bridge and provide bike and pedestrian enhancements when the low water bridge
is not available. Additional funding for the project will need to be applied for in future grant funding cycles.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2025 Why Now
Projected Completion Date Q4 FY 2030 This project is needed on two fronts: 1) The bridge requires maintenance
and replacement takes care of the maintenance items. 2) Pedestrians and
bicyclists are forced to cross the road and bridge in the travel lane without
a n y p e d e s t r i a n f e a t u r e s w h e n t h e l o w w a t e r c r o s s i n g i s c o v e r e d with
water, which occurs on a regular basis.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2028
Construction Q4 FY 2030
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 8, 268,000 Principal $9,925,531
FY 2026 ‐ FY 2029 Planned 11, 583,062 Interest 3,959,132
Remaining Need 0 Total $13,884,663
Total Project Cost $19,851,062
Local Funding Percentage 50.0% Estimated Annual Debt Service $694,233
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 2,000,000 0 0 0 0 $2,000,000
Construction 6,268,000 0 8,116,410 0 3,466,652 $17,851,062
Total $8,268,000 $0 $8,116,410 $0 $3,466,652 $19,851,062
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 500,000 600,000 0 2,400,000 3,212,766 $6, 712,766
State: Revenue Sharing 500,000 600,000 0 2,400,000 3,212,766 $6 ,712,766
Total $1,000,000 $1,200,000 $0 $4,800,000 $6,425,532 $13,425,532
Operating Budget Impact
Reduces maintenance costs by removal of the low water crossing.
An additional Revenue Share application will be applied for in FY 2026 for the additional funds.
Page 75 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 46
Project Title Project Number Service Area
John Lynch Bridge Repairs TB057 Transportation
Location Project Type Department
John Lynch Bridge Over Railroad & James River Maintenance Publ ic Works
Department Priority
Project has legal or regulatory mandate; Project supports essential services
Project Description
Maintenance improvements to John Lynch Bridge ‐ Joint Replacements.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q2 FY 2023 Why Now
Projected Completion Date Q4 FY 2025 This bridge has had two joint fa ilures within the past three years and has
four additional joints that will require closing lanes and rail road
permitting.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2024
Construction Q4 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $6,072,567 Project Total Debt Expenditures
Budget FY 2025 3, 077,433 Principal $5,550,000
FY 2026 ‐ FY 2029 Planned 0 Interest 2,213,804
Remaining Need 0 Total $7,763,804
Total Project Cost $9,150,000
Local Funding Percentage 60.7% Estimated Annual Debt Service $388,190
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 750,000 0 0 0 0 $750,000
Construction 2,327,433 0 0 0 0 $2,327,433
Total $3,077,433 $0 $0 $0 $0 $3,077,433
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 4,800,000 0 0 0 0 $4,800,000
State: Highway Maintenance (VDOT) 3,600,000 0 0 0 0 $3,600,000
Total $8,400,000 $0 $0 $0 $0 $8,400,000
Operating Budget Impact
None anticipated at this time.
Page 76 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 47
Project Title Project Number Service Area
Lakeside Drive Arch Bridge Rehabilitation TB059 Transportatio n
Location Project Type Department
College Lake New Public Works
Department Priority
Project required to support important but not essential services
Project Description
Modify existing arch bridge for use as an overlook to wetlands created from College Lake. Also ties into
Creekside Trail.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Dee Dee Conner, P.E., Principal Engineer
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2026 This bridge will be saved and turned into an overlook upon the Dam
Removal and Wetlands project completion. This will preserve one of only
two arch bridges within the City.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2026
Construction Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $750,000 Project Total D ebt Expenditures
Budget FY 2025 93,750 Principal $1,781,250
FY 2026 ‐ FY 2029 Planned 937,500 Interest 710,511
Remaining Need 0 Total $2,491,761
Total Project Cost $1,781,250
Local Funding Percentage 100.0% Estimated Annual Debt Service $124,588
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 93,750 0 0 0 0 $93,750
Construction 0 937,500 0 0 0 $937,500
Total $93,750 $937,500 $0 $0 $0 $1,031,250
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 600,000 937,500 0 0 0 $1,537,500
Total $600,000 $937,500 $0 $0 $0 $1,537,500
Operating Budget Impact
None anticipated at this time.
Page 77 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 48
Project Title Project Number Service Area
Lakeside Drive Improvements T0377 Transportation
Location Project Type Department
Lakeside Drive at the Plaza New Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Widen Lakeside Drive from the entrance to the Plaza to Murrell Road; install sidewalks and street trees.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q2 FY 2025 Why Now
Projected Completion Date Q4 FY 2027 This project completes the next section of the Midtown Connector, which
is a corridor to improve transportation from the Lynchburg Expressway to
the 501/221 intersection. This section of the corridor is routinely blocked
due to large delivery trucks park e d a t t h e r e a r l o a d i n g d o c k s of the
businesses in the Plaza. This will correct the inconvenience and safety
concerns to the traveling public.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2026
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $1,972,000 Project Total Debt Expenditures
Budget FY 2025 2, 084,849 Principal $2,343,009
FY 2026 ‐ FY 2029 Planned 629,168 Interest 934,588
Remaining Need 0 Total $3,277,597
Total Project Cost $4,686,017
Local Funding Percentage 50.0% Estimated Annual Debt Service $163,880
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 2,084,849 0 629,168 0 0 $2,714,017
Total $2,084,849 $0 $629,168 $0 $0 $2,714,017
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 486,000 500,000 1,357,009 0 0 $2,343,009
State: Revenue Sharing 486,000 500,000 1,357,008 0 0 $2,343,008
Total $972,000 $1,000,000 $2,714,017 $0 $0 $4,686,017
Operating Budget Impact
Additional annual expenses for tree maintenance and stormwater (~$5,000).
An additional Revenue Share application has been submitted for FY 2027.
Page 78 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 49
Project Title Project Number Service Area
Leesville Road Pedestrian Improvements To Be Assigned Transpo rtation
Location Project Type Department
Leesville Road New Public Works
Department Priority
Project supports essential services
Project Description
Install a shared use path along the north side of Leesville Roa d from Timberlake Road to Greenview Drive
‐ a total distance of approximately 2.2 miles.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2029 Why Now
Projected Completion Date Q2 FY 2032 To improve pedestrian safety on Leesville Road. Development al ong
Leesville Road; citizen requests and VDOT STARS Study for the L eesville
Road corridor has moved this project forward.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2030
Land Acquisition/Right‐of‐Way Q2 FY 2030
Construction Q2 FY 2032
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $11,060,000
FY 2026 ‐ FY 2029 Planned 1, 000,000 Inter est 4,411,653
Remaining Need 10,060,000 Total $15,471,653
Total Project Cost $11,060,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $773,583
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 0 0 1,000,000 $1,000,000
Total $0 $0 $0 $0 $1,000,000 $1,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 0 0 0 500,000 $500,000
Total $0 $0 $0 $0 $500,000 $500,000
Operating Budget Impact
Increase in landscaping maintenance costs (~$8,000).
Page 79 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 50
Project Title Project Number Service Area
Liberty Mountain Drive Realignment T0363 Transportation
Location Project Type Department
Liberty Mountain Dr. at Candlers Mountain Road New Public Work s
Department Priority
Project supports essential services
Project Description
Realign the offset intersection of Liberty Mountain Drive and Candlers Mountain Road.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q4 FY 2029 Why Now
Projected Completion Date Q4 FY 2033 Increased traffic, the offset int ersections, and the close prox imity of the
460 off‐ramp do not meet standards for the volume of traffic.
Improvements are required to inc rease safety and keep traffic f rom
queuing back onto Route 460.
Projected Schedule
Activity Projected Date
Land Acquisition/Right‐of‐Way Q2 FY 2030
Consultant Engineering Q2 FY 2030
Construction Q4 FY 2033
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $9,315,000
FY 2026 ‐ FY 2029 Planned 81 0,000 Interest 3,715,601
Remaining Need 8,505,000 Total $13,030,601
Total Project Cost $9,315,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $651,530
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 0 0 810,000 $810,000
Total $0 $0 $0 $0 $810,000 $810,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 0 0 0 450,000 $450,000
Total $0 $0 $0 $0 $450,000 $450,000
Operating Budget Impact
Additional annual expenses for grounds maintenance and stormwater (~$16,000).
An application for SMARTSCALE funding has been applied for FY 2 029.
Page 80 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 51
Project Title Project Number Service Area
Link Road/Boonsboro Road Intersection Improvements T0376 Tran sportation
Location Project Type Department
Link Road at Boonsboro Road New Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Install a right turn lane from Link Road onto Boonsboro Road to i m p r o v e t h e f l o w o f t r a f f i c a n d a d d
pedestrian features at the intersection.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2024 Why Now
Projected Completion Date Q2 FY 2027 Traffic back‐ups along Link Road are a frequent occurrence. Staff has had
many requests from citizens to create a safe pedestrian crossin g and to
add a turn lane so vehicles making left turns do not block the ability for
right turns on red.
Projected Schedule
Activity Projected Date
Land Acquisition/Right‐of‐Way Q3 FY 2026
Consultant Engineering Q3 FY 2026
Construction Q2 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $1,576,000 Project Total Debt Expenditures
Budget FY 2025 1, 457,794 Principal $1,790,846
FY 2026 ‐ FY 2029 Planned 547,898 Interest 714,339
Remaining Need 0 Total $2,505,185
Total Project Cost $3,581,692
Local Funding Percentage 50.0% Estimated Annual Debt Service $125,259
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 1,457,794 0 547,898 0 0 $2,005,692
Total $1,457,794 $0 $547,898 $0 $0 $2,005,692
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 588,000 0 1,002,846 0 0 $1,590,846
State: Revenue Sharing 588,000 0 1,002,846 0 0 $1,590,846
Total $1,176,000 $0 $2,005,692 $0 $0 $3,181,692
Operating Budget Impact
Slight increase due to pedestrian signals.
An additional Revenue Share application has been submitted for FY 2027.
Page 81 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 52
Project Title Project Number Service Area
Lynchburg Center for Industry ‐ Phase I T0364 Transportation
Location Project Type Department
Lynchburg Center for Industry New Public Works
Department Priority
Project has State and/or Federal funding; Project supports essential services
Project Description
Complete one side of sidewalk at the Lynchburg Center for Indus try located off of Graves Mill Road. This
project is submitted in partnership with Economic Development. Additional funding will need to be applied
for in future grant funding cycles.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Dee Dee Conner, P.E., Principal Engineer
Projected Start Date Q3 FY 2023 Why Now
Projected Completion Date Q3 FY 2027 A need exists for sidewalks to allow business employees to walk without
being in travel lanes of the str eet. This will also reduce cost s for future
business expansion.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2024
Construction Q3 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $980,819 Project Total D ebt Expenditures
Budget FY 2025 0 Principal $163,470
FY 2026 ‐ FY 2029 Planned 0 Interest 65,206
Remaining Need 0 Total $228,676
Total Project Cost $980,819
Local Funding Percentage 33.3% Estimated Annual Debt Service $11,434
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Federal: Transportation Alternatives 80,000 240,000 277,879 0 0 $597,879
Local: Pay‐As‐You‐Go 20,000 60,000 69,470 0 0 $149,470
Local: Line of Credit 20,000 60,000 69,470 0 0 $149,470
Total $120,000 $360,000 $416,819 $0 $0 $896,819
Operating Budget Impact
Minimal with addition of sidewalks.
Page 82 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 53
Project Title Project Number Service Area
Lynchburg Center for Industry ‐ Phase II To Be Assigned Trans portation
Location Project Type Department
Millrace Drive Ne w Public Works
Department Priority
Project has State and/or Federal funding; Project supports essential services
Project Description
Additional sidewalk for the Industrial Park as requested by the Office of Economic Development.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Dee Dee Conner, P.E., Principal Engineer
Projected Start Date Q4 FY 2025 Why Now
Projected Completion Date Q3 FY 2028 A need exists for sidewalks to allow business employees to walk without
being in travel lanes of the str eet. This will also reduce cost s for future
business expansion.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2026
Construction Q3 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 262,007 Principal $262,007
FY 2026 ‐ FY 2029 Planned 1, 048,030 Interest 104,510
Remaining Need 0 Total $366,517
Total Project Cost $1,310,037
Local Funding Percentage 20.0% Estimated Annual Debt Service $18,326
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 262,007 0 0 0 0 $262,007
Construction 0 1,048,030 0 0 0 $1,048,030
Total $262,007 $1,048,030 $0 $0 $0 $1,310,037
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Federal: Transportation Alternatives 0 250,000 370,000 428,030 0 $1,048,030
Local: Line of Credit 60,000 65,000 92,000 45,007 0 $262,007
Total $60,000 $315,000 $462,000 $473,037 $0 $1,310,037
Operating Budget Impact
Minimal with addition of sidewalks.
An application for a Federal Transportation Alternative Grant was applied for in FY 2024.
Page 83 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 54
Project Title Project Number Service Area
Lynchburg Expressway/Candlers Mountain Road Interchange Improvements N/A Transportation (VDOT)
Location Project Type Department
Expressway and Candlers Mountain Road Interchange New Public W orks
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Safety and Ramp Improvements; Bridge Replacement. VDOT will ad minister this project but the City has
to be the applicant, but no money should be appropriated.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer; VDOT
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q2 FY 2029 Bridge requires replacement and interchange reconfiguration. Project
will be a Federal State of Good Repair and Federal SMARTSCALE f unded
project and must be included in the local CIP.
No local funding is required.
Projected Schedule
Activity Projected Date
Land Acquisition/Right‐of‐Way Q3 FY 2027
Consultant Engineering Q3 FY 2026
Construction Q2 FY 2029
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $30,763,000 Project Tota l Debt Expenditures
Budget FY 2025 9,797, 000 Principal $0
FY 2026 ‐ FY 2029 Planned 24,097,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $64,657,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction (VDOT) 9,797,000 9,729,000 14,368,000 0 0 $33,894,000
Total $9,797,000 $9,729,000 $14,368,000 $0 $0 $33,894,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
0 0 0 0 0 $ 0
Total $0 $0 $0 $0 $0 $0
Operating Budget Impact
Additional annual expenses for grounds and tree maintenance, as well as stormwater (~$20,000).
Federal State of Good Repair Program funds and Federal SMARTSCALE Program funds applications were submitted in FY 2021. This project will be
administered by VDOT, but the City has to apply for the Federal grants; thus, it is technically a City of Lynchburg project, but no dollars will flow through
the City's books.
This project detail page is included in the CIP to show that the City applied for Federal Grant funding. Due to VDOT administering the project, the City
will not record these appropriations. The appropriation amounts are not included in the Summary of Appropriations.
Page 84 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 55
Project Title Project Number Service Area
McConville Road Realignment to Lakeside Drive To Be Assigned Transportation
Location Project Type Department
McConville Road to Lakeside Drive New Public Works
Department Priority
Project supports essential services
Project Description
Create a new connection of McConville Road and remove Wyndale D rive connection to Lakeside Drive to
separate traffic signals for better efficiency.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2028 Why Now
Projected Completion Date Q2 FY 2030 There have been 28 crashes over the past 7 years. By moving on e signal
to the new location, the signals would be spread out and would be
coordinated to have better travel flow on Lakeside Drive and le ss
congestion which would improve safety.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2028
Land Acquisition/Right‐of‐Way Q2 FY 2029
Construction Q2 FY 2030
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $4,560,000
FY 2026 ‐ FY 2029 Planned 4, 560,000 Inter est 1,818,909
Remaining Need 0 Total $6,378,909
Total Project Cost $4,560,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $318,945
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 0 390,000 0 $390,000
Land Acquisition/Right‐of‐Way 0 0 0 390,000 0 $390,000
Construction 0 0 0 0 3,780,000 $3,780,000
Total $0 $0 $0 $780,000 $3,780,000 $4,560,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 0 0 585,000 3,500,000 $4,085,000
Total $0 $0 $0 $585,000 $3,500,000 $4,085,000
Operating Budget Impact
Slight increase offset by VDOT increased Highway Maintenance dollars.
Page 85 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 56
Project Title Project Number Service Area
Nationwide Drive Roundabout To Be Assigned Transportation
Location Project Type Department
Nationwide Drive and McConville Road New Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Construct a roundabout at the all‐way stop on Nationwide Drive.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2029 Why Now
Projected Completion Date Q2 FY 2031 Traffic volumes have exceeded capacity at the all‐way stop.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2029
Construction Q2 FY 2031
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $9,497,250
FY 2026 ‐ FY 2029 Planned 99 2,250 Interest 3,788,298
Remaining Need 8,505,000 Total $13,285,548
Total Project Cost $9,497,250
Local Funding Percentage 100.0% Estimated Annual Debt Service $664,277
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 0 0 992,250 $992,250
Total $0 $0 $0 $0 $992,250 $992,250
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 0 0 0 992,250 $992,250
Total $0 $0 $0 $0 $992,250 $992,250
Operating Budget Impact
Increase in landscaping maintenance costs (~$8,000).
An application will be submitted to VDOT for Revenue Share and/or SMARTSCALE Program funding.
Page 86 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 57
Project Title Project Number Service Area
Public Works Infrastructure Improvements T0259 Transportation
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project supports essential services
Project Description
Curb, gutter, sidewalk, transportation maintenance, and any other Public Works infrastructure needs, e.g.
bridges. The program is designed to maintain the City's street infrastructure.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing The City has aging infrastructure and this funding allows city‐ wide
improvements to be made to maintain safe and functional streets a n d
sidewalks.
Projected Schedule
Activity Projected Date
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 342,000 Principal $0
FY 2026 ‐ FY 2029 Planned 1,548,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 342,000 353,000 375,000 400,000 420,000 $1,890,000
Total $342,000 $353,000 $375,000 $400,000 $420,000 $1,890,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
State: Highway Maintenance (VDOT) 342,000 353,000 375,000 400,0 00 420,000 $1,890,000
Total $342,000 $353,000 $375,000 $400,000 $420,000 $1,890,000
Operating Budget Impact
Maintenance and operating costs will be reduced by timely replacement of curbs, gutters, and sidewalks; also allows the City to respond to changing
conditions throughout the City.
Page 87 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 58
Project Title Project Number Service Area
Retaining Wall Replacement/Repair Program T0260 Transportatio n
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project supports essential services
Project Description
Existing retaining walls located throughout the City require re placement or repair as an ongoing program
in order to maintain safe public spaces. Design and constructi on are typically performed in alternating
fiscal years. Upcoming walls to be repaired include Giles Street Retaining Wall, 13th Street Retaining Wall
and 12th Street Retaining Wall.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Dee Dee Conner, P.E., Principal Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing The City maintains walls within the right‐of‐way that are deteriorating
and many need repairs as failure would impact the safety and stability of
the streets and sidewalks. This is a city‐wide process of designing and
then replacing failing walls in alternating years.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 1,125,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 62,500 0 62,500 $125,000
Construction 0 500,000 0 500,000 0 $1,000,000
Total $0 $500,000 $62,500 $500,000 $62,500 $1,125,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 500,000 62,500 500,000 62,500 $1,125,000
Total $0 $500,000 $62,500 $500,000 $62,500 $1,125,000
Operating Budget Impact
None anticipated at this time.
Page 88 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 59
Project Title Project Number Service Area
Route 501/221 One‐Way Pairs T0272 Transportation
Location Project Type Department
Route 501/Route 221 Intersection New Public Works
Department Priority
Project has legal or regulatory m a n d a t e ; P r o j e c t s u p p o r t s e s s e ntial services; Project has State and/or
Federal funding
Project Description
Design of road improvements needed for marketing of excess right‐of‐way for economic development
purposes and to improve function and safety of the intersection/area.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2014 Why Now
Projected Completion Date Q4 FY 2030 Federal SMARTSCALE project that has been approved as the area’s
highest priority project accor ding to City Council, Metropolita n Planning
Organization (MPO), and citizen complaints. Funds have been aw arded
and environmental permitting has finished, with design underway .
Project also supports economic development in the area.
Projected Schedule
Activity Projected Date
Land Acquisition/Right‐of‐Way Q4 FY 2027
Consultant Engineering Q4 FY 2027
Construction Q3 FY 2030
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $42,905,619 Project Tota l Debt Expenditures
Budget FY 2025 10,087,500 Principal $41,753,621
FY 2026 ‐ FY 2029 Planned 21,3 55,377 Interest 16,654,836
Remaining Need 0 Total $58,408,457
Total Project Cost $74,348,496
Local Funding Percentage 58.9% Estimated Annual Debt Service $2,920,423
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 10,087,500 8,219,052 13,136,325 0 0 $31,442,877
Total $10,087,500 $8,219,052 $13,136,325 $0 $0 $31,442,877
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Federal: Grants 3,000,000 5,000,000 10,409,817 0 0 $18,409,817
Local: Pay‐As‐You‐Go 0 0 0 0 1,875,364 $1,875,364
State: Revenue Sharing 0 0 1,255,279 7,000,000 629,747 $8,885,0 26
Local: Line of Credit 0 0 1,255,279 7,000,000 16,839,873 $25,09 5,152
State: Grants 0 0 0 0 600,000 $600,000
State: Highway Maintenance (VDOT) 0 0 0 0 360,003 $360,003
Total $3,000,000 $5,000,000 $12,920,375 $14,000,000 $20,304,987 $55,225,362
Operating Budget Impact
Additional annual expenses for grounds and tree maintenance, snow removal, and stormwater (~$75,000). Additional capital expenditure of $250,000 is
needed for a dump truck / snow plow for snow removal and other maintenance.
14.65 acres of land with a value of $10 million used for Right‐of‐Way was transferred to the City by VDOT (not shown in project funding). Total project
cost = $69,690,996
An additional Revenue Share application has been submitted for FY 2026.
Page 89 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 60
Project Title Project Number Service Area
Storm Drainage System Repairs/Replacements T0261 Transportati on
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project has legal or regulatory mandate; Project has State and/or Federal funding
Project Description
Continuing program for major repairs, replacements and upgrades to a deteriorating storm drainage
system within city streets.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing These funds are used to maintain and replace the older county s ystem
that used corrugated metal pipes with a 30‐year life span and a re
corroding to the point the structural integrity of the pipes, and therefore
the roadways, are compromised. Project funds are also used to meet
current standards for storm drai nage flows across the City that a r e
undersized; these funds are used city‐wide.
Projected Schedule
Activity Projected Date
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 142,000 Principal $0
FY 2026 ‐ FY 2029 Planned 674,500 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 142,000 149,000 162,500 177,000 186,000 $816,500
Total $142,000 $149,000 $162,500 $177,000 $186,000 $816,500
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
State: Highway Maintenance (VDOT) 142,000 149,000 162,500 177,0 00 186,000 $816,500
Total $142,000 $149,000 $162,500 $177,000 $186,000 $816,500
Operating Budget Impact
Reduction in repairs to old system.
Page 90 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 61
Project Title Project Number Service Area
Street Overlay Program T0262 Transportation
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Program is designed to overlay and maintain city streets in a s afe and acceptable condition for general
public use.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Timyarn Benjamin, Construction Coordinator
Projected Start Date Continuing Why Now
Projected Completion Date Continuing The Pavement Condition Index (PCI) is constantly declining due to the age
of the pavement; these funds help to keep the Index at the recommended
levels.
Projected Schedule
Activity Projected Date
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 2,659, 250 Principal $0
FY 2026 ‐ FY 2029 Planned 12,493,600 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 2,659,250 2,769,600 3,000,000 3,280,000 3,444,000 $15,152,850
Total $2,659,250 $2,769,600 $3,000,000 $3,280,000 $3,444,000 $15,152,850
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
State: Highway Maintenance (VDOT) 2,659,250 2,769,600 3,000,000 3,280,000 3,444,000 $15,152,850
Total $2,659,250 $2,769,600 $3,000,000 $3,280,000 $3,444,000 $15,152,850
Operating Budget Impact
Maintenance and operating costs will be reduced by monitoring the Pavement Condition Index (PCI) of streets and planning work accordingly.
Page 91 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 62
Project Title Project Number Service Area
Timberlake Road Bridge, West Bound Lanes TB053 Transportation
Location Project Type Department
Timberlake Road over Route 501 Maintenance Public Works
Department Priority
Project has legal or regulatory mandate; Project supports essential services
Project Description
Maintenance improvements to Timberlake Road Bridge ‐ West Bound lanes.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2028 Why Now
Projected Completion Date Q4 FY 2029 The City’s Comprehensive Bridge Condition Report prioritizes th is bridge
for deck and substructure repairs.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2028
Construction Q4 FY 2029
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $10,749,375
FY 2026 ‐ FY 2029 Planned 10, 749,375 Interest 4,287,750
Remaining Need 0 Total $15,037,125
Total Project Cost $10,749,375
Local Funding Percentage 100.0% Estimated Annual Debt Service $751,856
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 0 1,102,500 0 $1,102,500
Construction 0 0 0 0 9,646,875 $9,646,875
Total $0 $0 $0 $1,102,500 $9,646,875 $10,749,375
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 0 0 1,102,500 9,646,875 $10,749,375
Total $0 $0 $0 $1,102,500 $9,646,875 $10,749,375
Operating Budget Impact
None anticipated at this time.
Page 92 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 63
Project Title Project Number Service Area
Traffic Signal Repair and Replacement T0263 Transportation
Location Project Type Department
Various Maintenance Public Works
Department Priority
Project has legal or regulatory mandate; Project supports essential services
Project Description
Replace or upgrade existing sub‐standard traffic signals throug hout the City by converting from span‐wire
to mast arms to improve operation and maintenance. Priority li st includes the intersections of Memorial
Avenue and Oakley Avenue, Fort Avenue and Wadsworth Street, and Fort Avenue and Graves Mill Road.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1, Ob jective T‐1.5: Manage access t o promote safety and convenience along
streets and on abutting properties for all modes of transportat ion.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing On‐going program to bring traffic signals to current standards by replacing
span‐wire with mast arms. Many signals have outlived their use ful life
and maintenance costs are rising while reliability is declining.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 0 Principal $2,075,000
FY 2026 ‐ FY 2029 Planned 2, 075,000 Interest 827,684
Remaining Need Continuing Total $2,902,684
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $145,134
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 62,500 62,500 65,000 67,500 $257,500
Construction 0 437,500 450,000 450,000 480,000 $1,817,500
Total $0 $500,000 $512,500 $515,000 $547,500 $2,075,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 500,000 512,500 515,000 547,500 $2,075, 000
Total $0 $500,000 $512,500 $515,000 $547,500 $2,075,000
Operating Budget Impact
Reduction in electricity costs and staff maintenance time through a more energy efficient signal.
Page 93 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 64
Project Title Project Number Service Area
Vassar Street at Langhorne Road Intersection Improvements T034 8 Transportation
Location Project Type Department
Vassar St. at Langhorne Rd. New Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Preliminary engineering to determine the appropriate alternativ es for the intersection, followed by
construction of the selected improvements.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2021 Why Now
Projected Completion Date Q4 FY 2031 The intersection has a high crash rate (13 in five years), and a study is
needed to determine the most economical and accepted solution
amongst the stakeholders.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2029
Construction Q4 FY 2031
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $50,000 Project Total De bt Expenditures
Budget FY 2025 0 Principal $50,000
FY 2026 ‐ FY 2029 Planned 9,783,867 Interest 19,944
Remaining Need 0 Total $69,944
Total Project Cost $9,833,867
Local Funding Percentage .5% Estimated Annual Debt Service $3,497
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 0 1,000,000 0 $1,000,000
Construction 0 0 0 8,783,867 0 $8,783,867
Total $0 $0 $0 $9,783,867 $0 $9,783,867
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Federal: Grants 0 0 0 1,000,000 3,000,000 $4,000,000
Total $0 $0 $0 $1,000,000 $3,000,000 $4,000,000
Operating Budget Impact
Increase in landscaping maintenance costs (~$8,000).
An application has been submitted to VDOT for SMARTSCALE Program funding for FY 2028.
Page 94 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 65
Project Title Project Number Service Area
Wards Ferry Road at CVCC Campus Drive Roundabout N/A Transpor tation (VDOT)
Location Project Type Department
Wards Ferry Road at CVCC Campus Drive New Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Construct a roundabout at the intersection of Wards Ferry Road and CVCC Campus Drive.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer; VDOT
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2026 Due to increased traffic in the area, exiting from CVCC Campus Drive and
Harvard Street has become prob lematic and improvements are
necessary. There have been 31 crashes between 2013 and 2020.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2024
Land Acquisition/Right‐of‐Way Q3 FY 2024
Construction Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $11,301,000 Project Tota l Debt Expenditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $11,301,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
0 0 0 0 0 $ 0
Total $0 $0 $0 $0 $0 $0
Operating Budget Impact
Additional annual expenses for landscaping maintenance (~$1,000).
This project will be administered by VDOT, but the City had to apply for the Federal grants; thus, it is technically a City of Lynchburg project, but no
dollars will flow through the City's books.
This project detail page is included in the CIP to show that the City applied for Federal Grant funding. Due to VDOT administering the project, the City
will not record these appropriations. The appropriation amounts are not included in the Summary of Appropriations.
Page 95 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 66
Project Title Project Number Service Area
Wards Ferry Road/Atlanta Avenue Turn Lanes T0378 Transportati on
Location Project Type Department
Wards Ferry Road at Atlanta Ave. New Public Works
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Widen Wards Ferry Road; install turn lanes onto Atlanta Avenue.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T‐1.7: Commit adequate resources for the cost‐effective operation and
maintenance of streets, including p a v e m e n t , b i k e w a y s , s i d e w a l k s, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2024 Why Now
Projected Completion Date Q4 FY 2027 A s p a r t o f t h e W a r d s F e r r y R o a d Corridor Study, this project wa s
designated as high priority to reduce rear‐end crashes on Wards F e r r y
Road and provide better traffic flow for Wards Ferry Road.
Projected Schedule
Activity Projected Date
Land Acquisition/Right‐of‐Way Q1 FY 2026
Consultant Engineering Q3 FY 2026
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $1,340,000 Project Total Debt Expenditures
Budget FY 2025 1, 597,015 Principal $1,858,017
FY 2026 ‐ FY 2029 Planned 779,018 Interest 741,133
Remaining Need 0 Total $2,599,150
Total Project Cost $3,716,033
Local Funding Percentage 50.0% Estimated Annual Debt Service $129,957
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 1,597,015 0 779,018 0 0 $2,376,033
Total $1,597,015 $0 $779,018 $0 $0 $2,376,033
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 100,000 500,000 1,258,017 0 0 $1,858,017
State: Revenue Sharing 100,000 500,000 1,258,016 0 0 $1,858,016
Total $200,000 $1,000,000 $2,516,033 $0 $0 $3,716,033
Operating Budget Impact
None anticipated at this time.
An additional Revenue Share application has been submitted for FY 2027
Page 96 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 67
Project Title Project Number Service Area
Wards Ferry Road/Simons Run Pedestrian Accommodations To Be As signed Transportation
Location Project Type Department
Wards Ferry Road at Simons Run New Public Works
Department Priority
Project supports essential services
Project Description
Improved pedestrian accommodations at intersection.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T‐1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environme ntal considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the neighborhood
character; impact on historical and environmental resources; required right‐of‐way; target levels of service;
public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2029 Why Now
Projected Completion Date Q4 FY 2029 Project is recommended in the Wards Ferry Road Corridor Study. I t
includes installation of pedestrian signals and crosswalks to t ie the two
commercial retail centers together. It is also included as part of the Wards
Road Pedestrian Improvement Stud y. This would complete all of t he
r e c o m m e n d a t i o n s f o r W a r d s F e r r y Road except for the full‐length
sidewalk.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2029
Construction Q4 FY 2029
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $312,500
FY 2026 ‐ FY 2029 Planned 312,500 Interest 124,651
Remaining Need 0 Total $437,151
Total Project Cost $312,500
Local Funding Percentage 100.0% Estimated Annual Debt Service $21,858
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 0 0 31,250 $31,250
Construction 0 0 0 0 281,250 $281,250
Total $0 $0 $0 $0 $312,500 $312,500
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 0 0 0 312,500 $312,500
Total $0 $0 $0 $0 $312,500 $312,500
Operating Budget Impact
Additional annual expenses for electricity and pedestrian equipment maintenance (~$2,000).
Page 97 of 309
City Capital Projects Fund – Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 68
Planned Projects Beyond FY 2029
Project Ti tl e Planned Total Project Cost
A t lant a A v e M ult i‐Use P at h $4,995,000
C olle ge Lake Ov er look 1,662,500
D Street and Rivermont Ave Intersection Im prove me nts 11 ,200,000
Fore s t Brook Roa d Re a l i gnme nt, Pha s e I I 10,597,500
Gra ce Stre et Re a l i gnment a t 12th a nd Ma di s on 5,720,000
Gr av es M ill Road at Rout e 501 S Ra mp Modi fi ca ti ons 6,375,000
Gr av es M ill Road/Ex pr essway Int er c hange Impr ov ement s 3 5 , 100,000
Hill St r eet /M oor mans Road Impr ov ement s 5,857,500
Ja me s Ri ve r Pa rkwa y 135,000,000
Jefferson Ridge Parkway Extension 67,500,000
La ke s i de Dri ve /Murre l l Roa d Rounda bout 9,112,500
Lynchburg Expressway/Grace Street Interchange Improvements 3,037 ,500
Lynchburg Expressway/Odd Fellows Road Interchange Improvements 1 0,462,500
Ma i n Street/Church Street/Ri vermont Avenue Al i gnment Improvemen ts 16,200,000
P leasant Valley Impr ov ements 14,850,000
Rounda bout a t VES Roa d a nd Ri vermont Avenue 17,887,500
Timber lake Road Br id
ge, East Bound Lanes 11 ,200,000
Timberlake Road Im prove me nts 30,400,000
Ti mberl a ke Roa d Intercha nge Improveme nts a t Expres s wa y 54,000,00 0
Ty reeanna Improvements 20,000,000
Wa rds Fe rry Roa d Bi ke/Pedes tri a n Improve ments 10,260,000
Wards Road Improvements 54,000,000
Total $535,417,500
Page 98 of 309
City Capital Projects Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 69
Five‐Year Proposed Appropriations
Project Title
Appropriations
Through
06/30/2024 Budget FY 2025
FY 2026 ‐ 2029
Planned
Five‐Year
Estimated
Net Cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Economic Development
Airport Commerce Pa rk 0 500,000 11,060,000 11,560,000 0 11,560,000
Future Streetscape Improvements Downtown 0 875,000 15,186,000 16,061,000 22,085,000 38,146,000
Ivy Cree k Innova tion Pa rk ‐ Sites A a nd B Development 0 2,400,000 9,520,000 11,920,000 0 11,920,000
Street and Utility Extensions to Promote Economic Development Continuing 250,000 1,000,000 1,250,000 Continuing Continuing
Total Proposed FY 2025 ‐ 2029 CIP $0 $4,025,000 $36,766,000 $40,791,000 $22,085,000 $61,626,000
Page 99 of 309
City Capital Projects Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 70
Project Title Project Number Service Area
Airport Commerce Park To Be Assigned Economic Development
Location Project Type Department
Airport Commerce Park New Economic Development
Department Priority
Project contributes to the generation of new revenue
Project Description
Airport Commerce Park (Park) is an approximate 260‐acre site lo cated west of and adjacent to the
Lynchburg Regional Airport and ea st of US Route 460. Property i s owned by both local governments and
the City‐owned property is also controlled by the Lynchburg Regional Airport Commission. The Park is
intended to be developed into a business and industrial park compatible with aviation uses. The City parcel
is zoned Business, Heavy Commercial (B‐HC) and lies within the County’s Route 29 Transportation Corridor
Overlay District.
Relationship to Comprehensive Plan
Chapter 3, Page 23, Goal ED‐2: Lead and coordinate existing efforts regarding business development,
encouragement of entrepreneurship, and recruitment strategies.
Project Manager
Marjette Upshur, Director of Economic Development and Tourism
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q4 FY 2028 The City has experienced significant growth in recent years and there is a
lack of development‐ready industrial sites. These sites are needed for
both the expansion of existing businesses and for business attraction. This
site provides the potential to develop a shared industrial park that will
generate revenue for both the City and Campbell County.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2025
Construction Q1 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 500,000 Principal $0
FY 2026 ‐ FY 2029 Planned 11,060,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $11,560,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 500,000 500,000 0 0 0 $1,000,000
Construction 0 0 5,000,000 5,560,000 0 $10,560,000
Total $500,000 $500,000 $5,000,000 $5,560,000 $0 $11,560,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 1,000,000 5,000,000 5,560,000 0 $11,560, 000
Total $0 $1,000,000 $5,000,000 $5,560,000 $0 $11,560,000
Operating Budget Impact
This project has the potential to generate considerable revenue for the City for industrial development.
The Economic Development Authority of the City of Lynchburg was awarded a $190,000 GO Virginia grant for initial due diligence and preliminary
engineering studies. Staff will continue to seek additional grant funding for engineering and construction.
Page 100 of 309
City Capital Projects Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 71
Project Title Project Number Service Area
Future Streetscape Improvements Downtown ED017 Economic Devel opment
Location Project Type Department
Downtown New Public Works
Department Priority
Project contributes to the genera tion of new revenue; Project s upports essential services; Project has a
component in the Water Capital Projects Fund
Project Description
This project will enhance the downtown streetscapes in coordination with the downtown water main
replacement project.
Relationship to Comprehensive Plan
Chapter 3, Page 20, Goal AP‐2: M aintain a strong, mixed use do wntown that is a focus for civic, business,
residential, entertainment, art, culture, and recreational activities. Celebrate and strengthen connections
to the James River.
Project Manager
Cheree Taylor, Construction Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2037 Project continues improving ec onomic viability and reliability of utilities
long‐term. Downtown growth reflects the successful revitalization of the
area by increasing residents and businesses.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2028
Construction Q4 FY 2037
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 875,000 Principal $38,146,000
FY 2026 ‐ FY 2029 Planned 15,1 86,000 Interest 15,215,815
Remaining Need 22,085,000 Total $53,361,815
Total Project Cost $38,146,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $2,668,091
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 875,000 0 936,000 0 1,000,000 $2,811,000
Construction 0 6,000,000 0 6,750,000 0 $12,750,000
Contingency 0 250,000 0 250,000 0 $500,000
Total $875,000 $6,250,000 $936,000 $7,000,000 $1,000,000 $16,061,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 875,000 6,250,000 936,000 7,000,000 1,000 ,000 $16,061,000
Total $875,000 $6,250,000 $936,000 $7,000,000 $1,000,000 $16,061,000
Operating Budget Impact
Additional annual expenses for grounds and tree maintenance, as well as trash collection (~$105,000).
Page 101 of 309
City Capital Projects Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 72
Project Title Project Number Service Area
Ivy Creek Innovation Park ‐ Sites A and B Development To Be As signed Economic Development
Location Project Type Department
Ivy Creek Innovation Park New Economic Development
Department Priority
Project contributes to the generation of new revenue
Project Description
This project will result in opening two sites for industrial de velopment in the Ivy Creek Innovation Park.
Funds requested for FY 2025 cover onsite infrastructure constru ction and permitting for road, water and
sewer access. Funds requested in FY 2026 cover mass grading, pe rmitting and construction documents.
Funds requested in FY 2027‐2028 i nclude mass grading constructi on. Together Sites A and B are 64 acres;
Site A can accommodate a buildin g of up to 600,000 square feet. Site B can accommodate one building of
up to 50,000 square feet and another of 20,000 square feet.
Relationship to Comprehensive Plan
Chapter 3, Page 23, Goal ED‐2: Lead and coordinate existing efforts regarding business development,
encouragement of entrepreneurship, and recruitment strategies.
Project Manager
Marjette Upshur, Director of Economic Development and Tourism
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q2 FY 2028 Our city has witnessed substantia l growth in recent years, yet there
remains a pronounced shortage of industrial sites ready for development.
These sites are essential not only to accommodate expansion of our
existing businesses but also to draw in new enterprises. The Vi rginia
Economic Development Partnership (VEDP), operating through its
Business Ready Sites program, has officially designated these locations as
highly developable. Following the successful completion of our
comprehensive master plan for these sites, we've noticed a significant
upswing in prospective businesses expressing interest. Thanks t o a
generous grant from the VEDP's Virginia Business Ready Sites Pr ogram,
we are poised to complete the due diligence process over the next three
months. We must provide access and utilities to these sites to move them
closer to pad‐ready status.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2024
Construction Q3 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 2, 400,000 Princip al $11,4 00,000
FY 2026 ‐ FY 2029 Planned 9, 520,000 Inter est 4,547,274
Remaining Need 0 Total $15,947,274
Total Project Cost $11,920,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $797,364
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 350,000 0 170,000 0 $520,000
Construction 2,400,000 0 4,400,000 4,600,000 0 $11,400,000
Total $2,400,000 $350,000 $4,400,000 $4,770,000 $0 $11,920,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 350,000 0 170,000 0 $520,000
Local: Line of Credit 2,400,000 0 4,400,000 4,600,000 0 $11,400 ,000
Total $2,400,000 $350,000 $4,400,000 $4,770,000 $0 $11,920,000
Operating Budget Impact
This project has the potential to generate considerable revenue for the City for industrial development.
The Economic Development Authority of the City of Lynchburg was awarded a $261,750 grant from the Virginia Business Ready Site s Program for initial
due diligence and preliminary engineering. Staff will continue to seek additional grant funding for engineering and constructi on.
Page 102 of 309
City Capital Projects Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 73
Project Title Project Number Service Area
Street and Utility Extensions to Promote Economic Development EX000 Economic Development
Location Project Type Department
Various New Economic Development
Department Priority
Project supports essential services; Project contributes to the generation of new revenue
Project Description
Plans for and/or construction of streets, water and sewer lines , and/or other amenity improvements to
drive revenue and support private investment and site development throughout the City.
Relationship to Comprehensive Plan
Chapter 3, Page 24, ED‐3.1 Review and amend existing or implement new City policies to maximize
economic development potential.
Project Manager
Marjette Upshur, Director of Economic Development and Tourism
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Project funds are used for infras tructure needs that may be bar riers to
business expansion and benefit community wide goals.
Projected Schedule
Activity Projected Date
Contributions Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 250,000 Principal $0
FY 2026 ‐ FY 2029 Planned 1,000,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Contributions 250,000 250,000 250,000 250,000 250,000 $1,250,000
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 250,000 250,000 250,000 250,000 250,000 $1 ,250,000
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Operating Budget Impact
None anticipated at this time.
Page 103 of 309
City Capital Projects Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 74
Page 104 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 75
Five‐Year Proposed Appropriations
Project Title
Appropriations
Through
06/30/2024 Budget FY 2025
FY 2026 ‐ 2029
Planned
Five‐Year
Estimated
Net Cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Parks and Recreation
Athletic Field Maintenance Continuing 0 1,275,000 1,275,000 Continuing Continuing
City Stadium ‐ Visitors' Side Improvements 0 0 575,000 575,000 0 575,000
Gene ra l Pa rk Ma intena nce Continuing 0 850,000 850,000 Continuing Continuing
Gene ra l Pa rk Security Improvements 200,000 0 400,000 400,000 700,000 1,300,000
Heritage Park Improvements 975,000 0 750,000 750,000 0 1,725,000
Ja cks on Heights Art Studio Re nova tion 0 0 75,000 75,000 500,000 575,000
Jeffers on Pa rk: Pha s e 2 0 0 650,000 650,000 500,000 1,150,000
Parks and Trails Paving and Lighting Continuing 0 1,481,000 1,481,000 Continuing Continuing
Pea ks Vie w Pa rk Athletic Field Lighting 0 0 1,575,000 1,575,000 750,000 2,325,000
Temple ton Se nior Center Renova tions 0 0 475,000 475,000 0 475,000
Total Proposed FY 2025 ‐ 2029 CIP $1,175,000 $0 $8,106,000 $8,106,000 $2,450,000 $8,125,000
Page 105 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 76
Project Title Project Number Service Area
Athletic Field Maintenance P0152 Parks and Recreation
Location Project Type Department
Various Maintenance Parks and Recreation
Department Priority
Project required to support important but not essential service s; Project contributes to the generation of
new revenue
Project Description
Improvements to City‐wide athletic fields and amenities. A detailed project list is attached.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR‐2.5 Fully utilize parks, trails and faci lities to meet the recreational needs of City
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and /or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Continuing Why Now
Projected Completion Date Continuing This project funds many preventative maintenance repairs and up grades
to existing athletic fields and courts. Athletic fields require r e g u l a r
maintenance, due to extremely heavy use, to be maintained in sa fe and
playable conditions. Failure to perform this work will result i n more
expensive repairs later or possible injuries to their users.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Fencing, Lighting, and Signs Continuing
Contingency Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 1,275,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 10,000 50,000 20,000 0 $80,000
Construction 0 205,000 290,000 225,000 275,000 $995,000
Fencing, Lighting, and Signs 0 0 0 0 5,000 $5,000
Contingency 0 35,000 35,000 55,000 70,000 $195,000
Total $0 $250,000 $375,000 $300,000 $350,000 $1,275,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 250,000 375,000 300,000 350,000 $1,275,0 00
Total $0 $250,000 $375,000 $300,000 $350,000 $1,275,000
Operating Budget Impact
None anticipated at this time.
Page 106 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 77
Athletic Field Maintenance
Fiscal
Year Project
Consultant
Engineering Construction
Fencing,
Lighting, and
Signs Contingency Annual Total
$0
2025 Sub‐Totals $0 $0 $0 $0 $0
Pea ks Vi ew ‐ Scoreboa rd Ins ta l l a ti on $10,000 $100,000 $0 $10,000 $12 0,000
Pea ks Vi ew ‐ Dug‐out Upgra des 45,000 0 5,000 50,000
Seeding, aeration and general field maintenance 60,000 0 20,000 80, 000
2026 Sub‐Totals $10,000 $205,000 $0 $35,000 $250,000
Pea ks Vi ew Fi el d 10 ‐ Gra di ng, Dra i na ge & Repa i r $25,000 $150,000 $0 $15,000 $190,000
Peaks View Field 8 & 9 ‐ Grading, Drainage, & Repair 25,000 100,0 00 0 10,000 135,000
Seeding, aeration and general field maintenance 0 40,000 0 10,000 50 ,000
2027 Sub‐Totals $50,000 $290,000 $0 $35,000 $375,000
Pea ks Vi ew Pa rk ‐ Fi el ds 1‐4, i nfi e l d re gra di ng $0 $75,000 $0 $25,0 00 $100,000
Heritage Park ‐ Sport field/renovate existing
amenit ies
20,000 100,000 0 20,000 140,000
Seeding, aeration and general field maintenance 0 50,000 0 10,000 60 ,000
2028 Sub‐Totals $20,000 $225,000 $0 $55,000 $300,000
Pea ks Vi ew Fi el d 5‐7 ‐ In‐fi el d re‐gra de $0 $75,000 $0 $25,000 $100, 000
M iller P ar k ‐ Happy L ee Field r enov at ion 0 8 0 , 0 0 0 5 , 0 0 0 2 0 , 0 0 0 1 0 5 , 0 00
Seeding, aeration and general field maintenance 0 120,000 0 25,000 1 45,000
2029 Sub‐Totals $0 $275,000 $5,000 $70,000 $350,000
Page 107 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 78
Project Title Project Number Service Area
City Stadium ‐ Visitors' Side Improvements To Be Assigned Par ks and Recreation
Location Project Type Department
City Stadium (Football) New Parks and Recreation
Department Priority
Project required to support important but not essential service s; Project contributes to the generation of
new revenue
Project Description
Renovation of the Visitor's side of City Stadium to include seating, bathrooms, press box, and more. This is
the final phase of the City Stadium renovation project. Currentl y p r o j e c t e d f o r d e s i g n i n F Y 2 0 2 5 a n d
construction improvements in FY 2026.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR‐2.5 Fully utilize parks, trails and faci lities to meet the recreational needs of City
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and /or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2027 This funding will complete the C ity Stadium renovation project. T h e
improvements and repairs are greatly needed for the visitor sid e of the
stadium due to it being out‐of‐date and in need of repairs and updates.
Importance of this project is increasing as we continue to mark et it as a
venue not only for City events but also outside event organizers and
sporting organizations. These outside events include, but are not limited
to, high school and college sporting events. The quality of our facilities is
a factor in earning successful bids for these new and on‐going events.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q4 FY 2027
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 575,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $575,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Architectural Services (Contractual) 0 75,000 40,000 0 0 $115,000
Construction 0 0 460,000 0 0 $460,000
Total $0 $75,000 $500,000 $0 $0 $575,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 75,000 500,000 0 0 $575,000
Total $0 $75,000 $500,000 $0 $0 $575,000
Operating Budget Impact
None anticipated at this time.
Page 108 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 79
Project Title Project Number Service Area
General Park Maintenance P0153 Parks and Recreation
Location Project Type Department
Various Maintenance Parks and Recreation
Department Priority
Project required to support important but not essential services
Project Description
Improvements and renovations to park playgrounds, signage, fencing and other amenities and features. A
detailed project list is attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Continuing Why Now
Projected Completion Date Continuing This project funds many preventative maintenance repairs and up grades
to existing playground equipment and other park amenities. This
maintenance and repair work will help alleviate unsafe situatio ns in our
parks as well as prevent more‐ex pensive repairs or replacements in the
future.
Projected Schedule
Activity Projected Date
Construction Continuing
Miscellaneous Continuing
Contingency Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 850,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 0 120,000 141,000 170,000 160,000 $591,000
Miscellaneous 0 10,000 48,000 30,000 35,000 $123,000
Contingency 0 30,000 36,000 35,000 35,000 $136,000
Total $0 $160,000 $225,000 $235,000 $230,000 $850,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 160,000 225,000 235,000 230,000 $850,000
Total $0 $160,000 $225,000 $235,000 $230,000 $850,000
Operating Budget Impact
None anticipated at this time.
Page 109 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 80
General Park Maintenance
Fiscal
Year Project Construction Miscellaneous Contingency Annual Total
$0
2025 Sub‐Totals $0 $0 $0 $0
Miller Park ‐ Playground replacement $110,000 $0 $20,000 $130,000
Genera l s i gna ge, fenci ng, a nd a meni ti es 0 10,000 5,000 15,000
Ska tepa rk ma i ntena nce a nd i mprovements 10,000 0 5,000 15,000
2026 Sub‐Totals $120,000 $10,000 $30,000 $160,000
Pea ks Vi ew Pa rk ba s ketba l l court res urfa ci ng $80,000 $20,000 $20,0 00 $120,000
Va l l ey Vi ew pl a yl ot i mprovements 40,000 15,000 7,000 62,000
Genera l s i gna ge, fenci ng, a nd a meni ti es 11,000 8,000 4,000 23,000
Ska tepa rk ma i ntena nce a nd i mprovements 10,000 5,000 5,000 20,000
2027 Sub‐Totals $141,000 $48,000 $36,000 $225,000
Yoder Center playground replacement $90,000 $0 $5,000 $95,000
Fa i rvi ew Center ba s ketba l l court res urfa ci ng 80,000 20,000 25,000 1 25,000
General signage, fencing, and amenities 0 10,000 0 10,000
Skatepark maintenance and improvements 0 0 5,000 5,000
2028 Sub‐Totals $170,000 $30,000 $35,000 $235,000
Jefferson Park Play ground Replacement $95,000 $0 $5,000 $100,000
General signage, fencing, and amenities 0 35,000 0 35,000
Daniels Hill ‐ Playground Equipment 65,000 15,000 80,000
Skatepark maintenance and improvements 0 0 15,000 15,000
2029 Sub‐Totals $160,000 $35,000 $35,000 $230,000
Grand Totals $591,000 $123,000 $136,000 $850,000
Page 110 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 81
Project Title Project Number Service Area
General Park Security Improvements To Be Assigned Parks and R ecreation
Location Project Type Department
Various New Parks and Recreation
Department Priority
Project required to support important but not essential services
Project Description
Improvements to parks and facilities including site lighting, cameras, and other security measures to
increase safety for citizens. These projects will follow recommended improvements called for by LPD
Security Assessments which are currently underway starting with Miller Park.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR‐2.5 Fully utilize parks, trails and faci lities to meet the recreational needs of City
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and /or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Funding is needed for improvements including better lighting and security
to foster better safety throughou t the City Parks System. Parks a n d
Recreation has been consulting w ith the Community Action Team a t LPD
to develop Security Plans park by park, this project funding will help start
implementing the needed improvements.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Fencing, Lighting, and Signs Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $200,000 Project Total D ebt Expenditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 400,000 Interest 0
Remaining Need 700,000 Total $0
Total Project Cost $1,300,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 20,000 20,000 20,000 20,000 $80,000
Construction 0 60,000 60,000 60,000 60,000 $240,000
Fencing, Lighting, and Signs 0 20,000 20,000 20,000 20,000 $80,000
Total $0 $100,000 $100,000 $100,000 $100,000 $400,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 100,000 100,000 100,000 100,000 $400,000
Total $0 $100,000 $100,000 $100,000 $100,000 $400,000
Operating Budget Impact
Annual maintenance and operating costs will be determined on a project‐by‐project basis.
Page 111 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 82
Project Title Project Number Service Area
Heritage Park Improvements P0181 Parks and Recreation
Location Project Type Department
Heritage Park New Parks and Recreation
Department Priority
Project required to support important but not essential services
Project Description
This project is to fund a park master plan and its implementation via new upgrades mainly of the City
School's "side of the park." This project shall include park features such as playground, pavilion, and walking
loop which the current park is missing. Currently projecting to start the master planning in FY 2023 to
prepare for staged construction in FYs 2024, 2025, 2026, and 20 27.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR‐2.5 Fully utilize parks, trails and faci lities to meet the recreational needs of City
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and /or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2027 This section of the City has been historically underserved and has limited
park space.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2026
Construction Q4 FY 2026
Contingency Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $975,000 Project Total D ebt Expenditures
Budget FY 2025 0 Principal $900,000
FY 2026 ‐ FY 2029 Planned 750,000 Interest 358,995
Remaining Need 0 Total $1,258,995
Total Project Cost $1,725,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $62,950
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 0 450,000 200,000 0 0 $650,000
Contingency 0 50,000 50,000 0 0 $100,000
Total $0 $500,000 $250,000 $0 $0 $750,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 500,000 250,000 0 0 $750,000
Total $0 $500,000 $250,000 $0 $0 $750,000
Operating Budget Impact
Annual maintenance needs and costs will be determined during design development.
Page 112 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 83
Project Title Project Number Service Area
Jackson Heights Art Studio Renovation To Be Assigned Parks an d Recreation
Location Project Type Department
Jackson Heights Art Studio New Parks and Recreation
Department Priority
Project required to support important but not essential service s; Project contributes to the generation of
new revenue
Project Description
Jackson Heights Art Studio Renovation project funding is for professional design, updates to existing
facilities, and expansion of additional square footage either through an addition to existing building or
separate new building's construc tion. Currently projecting to s tart the design/engineering planning in FY
2027 to prepare for construction in FY 2028.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and /or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Q1 FY 2029 Why Now
Projected Completion Date Q4 FY 2030 Jackson Heights Art Studio is an aging historical school house which needs
maintenance and updates which go beyond current maintenance sco pe
and budgets. Also, due to expandi ng art programs at Parks and
Recreation, additional square footage is needed to house them.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q4 FY 2030
Construction Q4 FY 2030
Contingency Q4 FY 2030
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $500,000
FY 2026 ‐ FY 2029 Planned 75,000 Interest 199,442
Remaining Need 500,000 Total $699,442
Total Project Cost $575,000
Local Funding Percentage 81.4% Estimated Annual Debt Service $34,972
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Architectural Services (Contractual) 0 0 0 0 75,000 $75,000
Total $0 $0 $0 $0 $75,000 $75,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 0 0 0 35,000 $35,000
Total $0 $0 $0 $0 $35,000 $35,000
Operating Budget Impact
To be determined during design development phase of project.
Page 113 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 84
Project Title Project Number Service Area
Jefferson Park: Phase 2 To Be Assigned Parks and Recreation
Location Project Type Department
Jefferson Park New Parks and Recreation
Department Priority
Project required to support important but not essential services
Project Description
Jefferson Park has long needed upgrades to better provide recreation to the underserved Dearington
Neighborhood. The City started on phase one of the park's updat es, which was funded by a Community
Development Block Grant in 2021. Phase two would be the continu ation of this same project. This could
include additional amenities on the community's converted Plaza a r e a , t r a i l s , e x e r c i s e e q u i p m e n t ,
interpretive installations memorializing local historic figures, and additional park improvements.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR‐1.7 Incl ude interpretive signage in park s, greenways and blueways to promote a
better understanding of the historic, cultural and environmental resources.
Chapter 3, Page 29, PR‐2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 11: Parks & Recreation ‐ Park & Facility Improvement Several parks, including Miller and Riverside
Parks, contain historic City Beautiful landscapes that need to be preserved, improved and interpreted.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Q1 FY 2028 Why Now
Projected Completion Date Q4 FY 2030 Jefferson Park's new master plan was a large part of the Dearington
Neighborhood Plan adopted into the City's Comprehensive Plan in 2022.
This project is Phase II of this on‐going project and the continuation of the
improvements as outlined in the new Master Plan.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q1 FY 2028
Construction Q1 FY 2029
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $1,150,000
FY 2026 ‐ FY 2029 Planned 650,000 Interest 458,716
Remaining Need 500,000 Total $1,608,716
Total Project Cost $1,150,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $80,436
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Architectural Services (Contractual) 0 0 0 150,000 50,000 $200,000
Construction 0 0 0 0 450,000 $450,000
Total $0 $0 $0 $150,000 $500,000 $650,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 0 0 0 150,000 500,000 $650,000
Total $0 $0 $0 $150,000 $500,000 $650,000
Operating Budget Impact
None anticipated at this time.
Page 114 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 85
Project Title Project Number Service Area
Parks and Trails Paving and Lighting P0156 Parks and Recreati on
Location Project Type Department
Various Maintenance Parks and Recreation
Department Priority
Project required to support important but not essential service s; Project contributes to the generation of
new revenue
Project Description
Renovation of park athletic courts, trails, walks, steps, parki ng lots, and lighting. A detailed project list is
attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and /or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Continuing Why Now
Projected Completion Date Continuing This project funds many preventative maintenance repairs and up grades
to existing trails, athletic courts, and parking lots. This ma intenance and
repair work is needed to extend asset lives and prevent more ex pensive
repairs or replacements in the future.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Miscellaneous Continuing
Contingency Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 1,481,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 5,000 0 10,000 $15,000
Construction 0 215,000 295,000 313,000 360,000 $1,183,000
Miscellaneous 0 100,000 50,000 0 0 $150,000
Contingency 0 55,000 15,000 37,000 26,000 $133,000
Total $0 $370,000 $365,000 $350,000 $396,000 $1,481,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 370,000 365,000 350,000 396,000 $1,481,0 00
Total $0 $370,000 $365,000 $350,000 $396,000 $1,481,000
Operating Budget Impact
None anticipated at this time.
Page 115 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 86
Parks and Trails Paving and Lighting
Fiscal
Year Project
Consultant
Engineering Construction Miscellaneous Contingency Annual T otal
$0
2025 Sub‐Totals $0 $0 $0 $0 $0
Ri vers i de Pa rk entra nce roa d $0 $20,000 $0 $4,000 $24,000
Ri vers i de Pa rk i nteri or pa th 0 30,000 0 6,000 36,000
Pea ks Vi ew Pa rk l i ghti ng upgra de 0 75,000 100,000 25,000 200,000
Fa i rvi ew Tenni s Court Res urfa ce/Repa i r 0 60,000 0 15,000 75,000
Miscellaneous lighting and electrical improv ements 0 30,000 0 5,000 35,000
2026 Sub‐Totals $0 $215,000 $100,000 $55,000 $370,000
Pl a yground ‐ pour‐i n‐pl a ce s urfa ci ng upda tes $0 $210,000 $0 $0 $210, 000
M iller P ar k ‐ basket ball c our t r esur fac ing 0 3 0 , 0 0 0 0 1 0 , 0 0 0 4 0 , 0 0 0
Bi ggers Pa rk ‐ ba s ketba l l court res urfa ci ng 0 20,000 0 5,000 25,000
Mi s cel l a neous l i ghti ng a nd el ectri ca l i mprovements 5,000 35,000 50 ,000 0 90,000
2027 Sub‐Totals $5,000 $295,000 $50,000 $15,000 $365,000
Nei ghborhood Centers pa rki ng l ot res urfa ci ng $0 $120,000 $0 $12,000 $132,000
M iller P ar k pat hway s impr ov ement s 0 9 8 , 0 0 0 0 0 9 8 , 0 0 0
Di a mond Hi l l ‐ ba s ketba l l court res urfa ci ng 0 20,000 0 5,000 25,000
Wes tover Pa rk ‐ ba s ketba l l court res urfa ci ng 0 20,000 0 5,000 25,000
Mi s cel l a neous l i ghti ng a nd el ectri ca l i mprovements 0 55,000 0 15,00 0 70,000
2028 Sub‐Totals $0 $313,000 $0 $37,000 $350,000
Page 116 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 87
Parks and Trails Paving and Lighting
Fiscal
Year Project
Consultant
Engineering Construction Miscellaneous Contingency Annual T otal
Templeton/ Jackson Heights Parking Lot Resurface $0 $75,000 $0 $0 $7 5,000
Tr ailheads P ar king L ot s Resur fac ing 0 4 0 , 0 0 0 0 0 4 0 , 0 0 0
Ri ve rs i de Pa rk ‐ te nni s court re s urfa ci ng 0 65,000 0 10,000 75,000
Riv er side P ar k ‐ basket ball c our t r esur fac ing 0 2 0 , 0 0 0 0 5 , 0 0 0 2 5 , 0 0 0
Fort Ave nue Pa rk ‐ ba s ketba l l court re s urfa ci ng 0 20,000 0 5,000 25, 000
M isc ellaneous L ight ing and Elec t r ic al Repair s and
Upgrade
0 60,000 0 6,000 66,000
Tra i l Re pa i rs a nd Upgra de s 10,000 80,000 0 0 90,000
2029 Sub‐Totals $10,000 $360,000 $0 $26,000 $396,000
Grand Totals $15,000 $1,183,000 $150,000 $133,000 $1,481,000
Page 117 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 88
Project Title Project Number Service Area
Peaks View Park Athletic Field Lighting To Be Assigned Parks and Recreation
Location Project Type Department
Peaks View Park New Parks and Recreation
Department Priority
Project required to support important but not essential services
Project Description
Peaks View Park is a regional sports complex utilized by multiple different sports users with ten formal turf
fields plus many practice areas. It attracts many local leagues and regional tournaments, including US
S o f t b a l l , S p e c i a l O l y m p i c s , a n d Virginia Senior Games. First this project includes an evaluation of the
existing systems and a plan for the updates and/or replacements. Once the evaluation is completed,
implementation of the plans will begin.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR‐2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and /or maintain/renovate existing facilities to
meet the City’s needs.
Chapter 3, Page 37, PFS‐1.3 Coordinate the design of public facilities and utilities to minimize life‐cycle
costs for maintenance and operation
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Q1 FY 2027 Why Now
Projected Completion Date Q4 FY 2030 Pe ak s V ie w Par k is a v ital as s e t to th e C ity as o n e o f o u r lar gest public
green spaces but also the City's most important outdoor sports complex.
It attracts not only local sporting events, but regional events, which have
grown in numbers over the years. Most of the fields have lighting systems
which expand the fields' uses, but the systems are varying in a ge. Many
of the systems are past their "useful life" and in need of upgrades and/or
complete replacement. This issue is causing regular failures of the lighting
systems, which is interrupting sporting events and creating extensive on‐
going maintenance / repair costs.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2027
Construction Q1 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $2,250,000
FY 2026 ‐ FY 2029 Planned 1, 575,000 Interest 897,488
Remaining Need 750,000 Total $3,147,488
Total Project Cost $2,325,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $157,374
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 75,000 75,000 0 $150,000
Construction 0 0 0 675,000 750,000 $1,425,000
Total $0 $0 $75,000 $750,000 $750,000 $1,575,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 0 0 75,000 0 $75,000
Local: Line of Credit 0 0 0 0 1,500,000 $1,500,000
Total $0 $0 $0 $75,000 $1,500,000 $1,575,000
Operating Budget Impact
Lighting System upgrades will create a significate cost savings for both operational and maintenance costs.
Page 118 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 89
Project Title Project Number Service Area
Templeton Senior Center Renovations To Be Assigned Parks and Recreation
Location Project Type Department
Templeton Senior Center New Parks and Recreation
Department Priority
Project required to support important but not essential service s; Project contributes to the generation of
new revenue
Project Description
Interior and exterior renovation and repairs which are much nee ded due to the aging building and heavy
use. Currently projecting to sta rt the design / engineering pla nning in FY 2026 to prepare for construction
in FY 2028.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS‐1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Wyatt Woody, Director of Parks and Recreation
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2028 Templeton Senior Center currently needs renovations and repairs that are
well beyond maintenance activities and budgets. This funding will provide
both design and construction funding for these updates and repairs.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q4 FY 2028
Construction Q4 FY 2028
Contingency Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 475,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $475,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Architectural Services (Contractual) 0 75,000 0 0 0 $75,000
Construction 0 0 0 320,000 0 $320,000
Contingency 0 0 0 80,000 0 $80,000
Total $0 $75,000 $0 $400,000 $0 $475,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 75,000 0 400,000 0 $475,000
Total $0 $75,000 $0 $400,000 $0 $475,000
Operating Budget Impact
None anticipated at this time.
Page 119 of 309
City Capital Projects Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 90
Page 120 of 309
City Capital Projects Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 91
Five‐Year Proposed Appropriations
Project Title
Appropriations
Through
06/30/2024 Budget FY 2025
FY 2026 ‐ 2029
Planned
Five‐Year
Estimated
Net Cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Miscellaneous
College Lake Dam Removal 22,500,000 0 0 0 0 22,500,000
Computer Aided Dispatch Replacement 5,000,000 0 0 0 0 5,000,000
Diamond Hill Neighborhood Improvements 0 500,000 2,000,000 2,500,000 0 2,500,000
Memorial Avenue Fuel Site Reconstruction 0 250,000 1,500,000 1,750,000 0 1,750,000
Pe trole um Stora ge 0 0 50,000 50,000 0 50,000
Plea s a nt Va lley, Pha s e 1 ‐ Gree nwa y Des ign 0 0 1,345,000 1,345,000 0 1,345,000
Ra dio Re pl a ce me nt Continuing 0 880,000 880,000 Continuing Continuing
Total Proposed FY 2025 ‐ 2029 CIP $27,500,000 $750,000 $5,775,000 $6,525,000 $0 $33,145,000
Page 121 of 309
City Capital Projects Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 92
Project Title Project Number Service Area
College Lake Dam Removal ME018 Miscellaneous
Location Project Type Department
College Lake/Lakeside Drive New Water Resources
Department Priority
Project has legal or regulatory mandate
Project Description
The College Lake Dam Removal project will provide for the remov al of the College Lake Dam, including
reestablishment of the Blackwater Creek stream channel and ecol ogical restoration of the former lakebed
area. This project will also update the limits of the FEMA 100 ‐year floodplain and remove the inundation
zone associated with the dam.
Relationship to Comprehensive Plan
Chapter 3, Page 27, Goal NS‐1.4: Promote responsible management and development of lands adjacent to
important natural resources that provide a pleasant, healthy an d safe environment for human activities;
Chapter 3, Page 36, Goal PU‐2: Stormwater Management. Manage st ormwater to protect residents,
property and the environmental integrity of local/regional waterways and ecosystems; Chapter 3, Page 36,
Goal PU‐3: Improved Water Quality. Improve water quality in the City's streams and James River.
Project Manager
Erin Hawkins, Water Quality Manager
Projected Start Date Q2 FY 2020 Why Now
Projected Completion Date Q4 FY 2027 T h i s p r o j e c t h a s a r e g u l a t o r y r e q u i r e m e n t f o r m e e t i n g t h e d a m safety
requirements. The current dam d oes not meet the dam safety
requirements to pass the Probable Maximum Flood and is also
susceptible to failure during an overtopping event.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2020
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $22,500,000 Project Tota l Debt Expenditures
Budget FY 2025 0 Principal $5,000,000
FY 2026 ‐ FY 2029 Planned 0 Interest 1,994,418
Remaining Need 0 Total $6,994,418
Total Project Cost $22,500,000
Local Funding Percentage 22.2% Estimated Annual Debt Service $349,721
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
State: Grants 3,107,500 1,750,000 100,000 0 0 $4,957,500
Local: Line of Credit 3,042,500 0 0 0 0 $3,042,500
State: VCWRLF 2,600,000 7,000,000 400,000 0 0 $10,000,000
Total $8,750,000 $8,750,000 $500,000 $0 $0 $18,000,000
Operating Budget Impact
Operating expenses for maintenance of the Emergency Action Plan, ongoing lake level monitoring and controlling water flow will be eliminated.
Page 122 of 309
City Capital Projects Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 93
Project Title Project Number Service Area
Computer Aided Dispatch Replacement ME019 Miscellaneous
Location Project Type Department
3621 Candlers Mountain Rd Conti nuing Emergency Services
Department Priority
Project supports essential services
Project Description
Our computer aided dispatch system is a call management system that provides information to the police
and fire departments regarding calls for service. The current s ystem has been in place for over 20 years
and is interconnected with many other systems within the City. Because of recent changes with the vendor
it has become clear that we will need to change software and hardware in the near future. This project will
also include the replacement of numerous other connected server s, PCs, tablets and software within the
Police and Fire Departments that are currently connected to the computer aided dispatch system.
Relationship to Comprehensive Plan
Not Applicable
Project Manager
Melissa Foster, Director of Emergency Communications
Projected Start Date Q2 FY 2023 Why Now
Projected Completion Date Q4 FY 2027 The level of service that we are receiving from the vendor is s lowly
declining. There is concern that the vendor may begin trying to migrate
customers to one of their other systems that may not meet the n eeds of
public safety departments.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2023
Request for Proposal Q4 FY 2023
Equipment Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $5,000,000 Project Total Debt Expenditures
Budget FY 2025 0 Principal $4,500,000
FY 2026 ‐ FY 2029 Planned 0 Interest 1,794,976
Remaining Need 0 Total $6,294,976
Total Project Cost $5,000,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $314,749
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: ARPA ‐ Revenue Replacement 33,333 43,333 423,334 0 0 $50 0,000
Local: Line of Credit 0 0 4,500,000 0 0 $4,500,000
Total $33,333 $43,333 $4,923,334 $0 $0 $5,000,000
Operating Budget Impact
None anticipated at this time.
Page 123 of 309
City Capital Projects Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 94
Project Title Project Number Service Area
Diamond Hill Neighborhood Improvements To B e Assigned Miscell aneous
Location Project Type Department
Diamond Hill New Various
Department Priority
Project required to support important but not essential services
Project Description
This project includes multiple improvements to the Diamond Hill Neighborhood, including: complete street
infrastructure around anchor institutions, improvements to public schoolyards, improvements to green
space to coincide with Grace Street Realignment at Twelfth and Madison Streets, and a Twelfth Street
corridor study.
Relationship to Comprehensive Plan
Chapter 3, Page 19, Goal AP‐1: Area and Corridor Planning. Reco gnize and reinforce the unique character
of different neighborhoods and corridors in the City; preserve the elements that strengthen each area; and
foster changes that enhance the areas' stability, vitality and resilience. AP‐1.1 Develop targeted corridor
and neighborhood plans to address the unique needs of specific areas of the City. AP‐1.2 B. Tailor capital
improvement priorities and designs to address specific area needs, reinforce neighborhood character and
serve as a catalyst for private investment.
Project Manager
Charlotte Lester, Planner II
Projected Start Date Q2 FY 2025 Why Now
Projected Completion Date Q4 FY 2029 The creation of the Diamond Hill Neighborhood Plan is currently
underway, to be adopted as part of the City's Comprehensive Pla n 2013‐
2030 upon completion. Throughou t the 2023 planning process,
stakeholders and residents have expressed support for goals and
strategies which position the Diamond Hill as an identifiable, service,
diverse, and connected neighborh ood. The plan framework include s
recommendations for anchor institutions, community streets, housing,
neighborhood marketplace, and parks and historic resources.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q2 FY 2025
Construction Q4 FY 2029
Contingency Q4 FY 2029
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 500,000 Principal $0
FY 2026 ‐ FY 2029 Planned 2,000,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $2,500,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Architectural Services (Contractual) 30,000 30,000 30,000 30,000 30,000 $150,000
Construction 430,000 430,000 430,000 430,000 430,000 $2,150,000
Contingency 40,000 40,000 40,000 40,000 40,000 $200,000
Total $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Federal: CDBG 500,000 500,000 500,000 500,000 500,000 $2,500,00 0
Total $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
Operating Budget Impact
To be determined
Page 124 of 309
City Capital Projects Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 95
Project Title Project Number Service Area
Memorial Avenue Fuel Site Reconstruction To Be Assigned Misce llaneous
Location Project Type Department
Memorial Avenue Fuel Site New Fleet
Department Priority
Project supports essential services to all City departments
Project Description
Complete replacement of underground storage tanks, associated piping, dispensers, pumps, sumps, island,
canopy, and all system monitoring , alarm and control systems, a s well as security cameras and required
software at the Memorial Avenue Fuel Site. This must include alternative fueling (mobile trucks, temporary
tanks, etc.) during construction which shall now become part of the contract bid.
Relationship to Comprehensive Plan
PU‐1.3 Continue to maintain the existing City‐owned infrastructure systems, through replacement or
rehabilitation when required. PFS‐1.1 Plan and develop new faci lities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Charles Cramer, Director of Fleet Services
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2026 Existing equipment and infrastructure are aging, have a limited s e r v i c e
life, and are no longer compatible with current technology. Thi s poses a
potential threat to the essential services provided by the City , as well as
the environment should the tanks, piping, and/or monitoring systems fail.
The projected lifespan of current equipment is 20‐25 years. At the time of
construction the equipment will be 25 years old.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2025
Construction Q1 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 250,000 Principal $1,500,000
FY 2026 ‐ FY 2029 Planned 1, 500,000 Interest 598,325
Remaining Need 0 Total $2,098,325
Total Project Cost $1,750,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $104,916
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 250,000 0 0 0 0 $250,000
Construction 0 1,500,000 0 0 0 $1,500,000
Total $250,000 $1,500,000 $0 $0 $0 $1,750,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 250,000 0 0 0 0 $250,000
Local: Line of Credit 0 1,500,000 0 0 0 $1,500,000
Total $250,000 $1,500,000 $0 $0 $0 $1,750,000
Operating Budget Impact
Potential increases in software, software licensing, and local support; costs unknown.
Note: The increases annotated are based on recent projects our counterparts have bid, and/or completed within the last 6‐months. These costs/quotes
ranged from $1M ‐ $1.25M.
Page 125 of 309
City Capital Projects Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 96
Project Title Project Number Service Area
Petroleum Storage To Be Assigned Miscellaneous
Location Project Type Department
Fleet Services Facility New Fleet
Department Priority
Project supports essential services
Project Description
Fleet Services needs to expand the storage capacity for vehicle & equipment parts, and petroleum
products. The additional storage would be a simple add‐on to th e existing room within the Fleet facility.
The addition would be a simple steel frame and outside skin, and a small extension to the existing concrete
pad. Inside would be the addition of lighting, insulation, a n ew entrance doorway, and a small heater.
There would need to be a small modification to the existing cur b to allow a ramp for moving pallets into
the new area.
Relationship to Comprehensive Plan
PU‐1.3 Continue to maintain the existing City‐owned infrastructure systems, through replacement or
rehabilitation when required.PFS‐1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Charles Cramer, Director of Fleet Services
Projected Start Date Why Now
Projected Completion Date Q2 FY 2026 Recent years have added a great number of new lubricants requir ed for
modern vehicles, to include; engine and transmission oils, and specialized
coolants. Currently we purchase these items in individual quar t and
gallon quantities due to a lack o f bulk storage space. Purchas ing these
items individually increases costs by 200‐300%. Should we move forward
w i t h t h e e x p a n s i o n , t h e c o s t s o f t h e p r o j e c t w o u l d b e o f f s e t b y t h e
anticipated/calculated saving within the first two years.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2026
Construction Q2 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 50,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $50,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 5,000 0 0 0 $5,000
Construction 0 45,000 0 0 0 $45,000
Total $0 $50,000 $0 $0 $0 $50,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 50,000 0 0 0 $50,000
Total $0 $50,000 $0 $0 $0 $50,000
Operating Budget Impact
Page 126 of 309
City Capital Projects Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 97
Project Title Project Number Service Area
Pleasant Valley, Phase 1 ‐ Greenway Design To Be Assigned Mis cellaneous
Location Project Type Department
Tyreeanna New Parks and Recreation
Department Priority
Project required to support important but not essential services
Project Description
Design of Phase 1 of the Pleasant Valley Road Greenway. The con struction of the U.S. 29/U.S. 460 Bypass
in the early 2000s left a four‐lane section of old U.S. 460 (no w known as Pleasant Valley Rd) bisecting the
Tyreeanna/Pleasant area, from Concord Turnpike to the City Limits. The roadway is underutilized and
represents a significant opportunity to improve the livability of the neighborhood and improve quality of
life, as identified in the Tyreeanna and Pleasant Valley Neighb o r h o o d P l a n . T h e P l a n r e c o m m e n d s
converting two underutilized lanes into a multi‐purpose pathway. This phase includes improvements
starting at the west end of Pleasant Valley Road up to the brid ge where the road crosses U.S. Route 29.
(Neighborhood Plan, p. 48‐49)
Relationship to Comprehensive Plan
The Tyreeanna/Pleasant Valley Neighborhood Plan was developed u nder the direction established by the
Comprehensive Plan 2013 ‐ 2030, including the need to develop s trong neighborhoods and enhance the
attractiveness of gateways and travel corridors (Chapter 2, Pag e 5, "Vision"). The Tyreeanna Master Plan
was adopted by City Council on May 24, 2022 and was thereby inc orporated as part of the City's
Comprehensive Plan.
Ch. 3, p. 19, AP‐1.2 Involve neighborhood stakeholders in the d evelopment and implementation of
neighborhood, corridor and gateway planning initiatives; Include improvement plans for gateways.
Ch. 3, p. 29, PR‐2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city residents,
placing emphasis on underserved populations.
Project Manager
Rachel Frischeisen, City Planner
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2029 The Tyreeanna/Pleasant Valley Neighborhood has faced significant issues
in the past, due to the presence of U.S. 460 (and later, the U. S. 29/460
bypass), the location of the former landfill at the center of t he
neighborhood, decreasing residential population, and increasing t r u c k
traffic. The City completed a neighborhood plan in 2003 which was not
implemented. During neighborhoo d e n g a g e m e n t f o r t h e n e w p l a n ,
stakeholders identified the need to improve the livability and identity of
the area to encourage infill residential development and improved quality
of life for the existing residents.
Projected Schedule
Activity Projected Date
Request for Proposal Q1 FY 2025
Consultant Engineering Q2 FY 2026
Construction Q4 FY 2029
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 1,345,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $1,345,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Consultant Engineering 0 0 200,000 0 0 $200,000
Construction 0 0 0 1,145,000 0 $1,145,000
Total $0 $0 $200,000 $1,145,000 $0 $1,345,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Federal: Grants 0 0 200,000 800,000 345,000 $1,345,000
Total $0 $0 $200,000 $800,000 $345,000 $1,345,000
Operating Budget Impact
Ongoing Maintenance.
Page 127 of 309
City Capital Projects Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 98
Project Title Project Number Service Area
Radio Replacement ME017 Miscellaneous
Location Project Type Department
3621 Candlers Mountain Rd Maint enance Emergency Services
Department Priority
Project supports essential services
Project Description
Replacing aging mobile and portable radios currently used by non‐enterprise City departments. This project
is intended to continuously replace aging radios as needed rath er than waiting and trying to replace all
radios at once.
Relationship to Comprehensive Plan
Not Applicable
Project Manager
Corey Gillespie, Network Administrator III
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Radios are reaching "end of parts" status which means it will be more
difficult to have equipment repaired and it will become unusable.
Projected Schedule
Activity Projected Date
Equipment Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 880,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Equipment 0 220,000 220,000 220,000 220,000 $880,000
Total $0 $220,000 $220,000 $220,000 $220,000 $880,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 220,000 220,000 220,000 220,000 $880,000
Total $0 $220,000 $220,000 $220,000 $220,000 $880,000
Operating Budget Impact
None anticipated at this time.
Page 128 of 309
City Capital Projects Fund – Reserves
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 99
Five‐Year Proposed Appropriations
Project Title
Appropriations
Through
06/30/2024 Budget FY 2025
FY 2026 ‐ 2029
Planned
Five‐Year
Estimated
Net Cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Reserves
Capital M aintenance Reserve 0 300,000 0 300,000 Continuing Continuing
Lynchburg City Sta dium Ca pita l Ma intena nce Res erve 800,000 100,000 100,000 200,000 0 1,000,000
Snow, Stree t, a nd Bridge Re s e rve Continuing 250,000 1,000,000 1,250,000 Continuing Continuing
Total Proposed FY 2025 ‐ 2029 CIP $800,000 $650,000 $1,100,000 $1,750,000 $0 $1,000,000
Page 129 of 309
City Capital Projects Fund – Reserves
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 100
Project Title Project Number Service Area
Capital Maintenance Reserve TBD Reserves
Location Project Type Department
N/A Maintenance TBD
Department Priority
Project supports essential services
Project Description
Reserves for unexpected maintenance expenditures needed for Cit y Capital infrastructure.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS‐1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
TBD
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Continuing The reserve provides funds for unexpected and/or emergency
maintenance of City Capital infrastructure.
Projected Schedule
Activity Projected Date
Maintenance
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 300,000 Principal $0
FY 2026 ‐ FY 2029 Planned 0 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Maintenance 300,000 0 0 0 0 $300,000
Total $300,000 $0 $0 $0 $0 $300,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Transfer from General Fund 300,000 0 0 0 0 $300,000
Total $300,000 $0 $0 $0 $0 $300,000
Operating Budget Impact
Funds are supported by recurring revenue from the General Fund
Page 130 of 309
City Capital Projects Fund – Reserves
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 101
Project Title Project Number Service Area
Lynchburg City Stadium Capital Maintenance Reserve BMR01 Rese rves
Location Project Type Department
Lynchburg City Stadium, Calvin Falwell Field Maintenance Publi c Works
Department Priority
Project contributes to the generation of new revenue
Project Description
Reserves for capital maintenance expenditures at the City Baseball Stadium as outlined in the Baseball
Stadium Franchise Agreement. Funds will be used for mutually agreed upon expenditures of a capital
nature such as repair, replacement, maintenance, and improvemen ts of the Stadium structural elements
and associated equipment.
The reserve was established with the FY 2017 Adopted budget. Pe r the Franchise Agreement the reserve
must be maintained for 10 years and increased by $50,000 to $10 0,000 each year. The current Franchise
Agreement will be complete at the end of FY 2026. There is pote ntial of a request for a new agreement
regarding the City Baseball Stadium for maintenance/repair continuing after FY2026.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS‐1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Clay Simmons, Deputy Director of Public Works
Projected Start Date Q1 FY 2017 Why Now
Projected Completion Date Q4 FY 2026 Per the Franchise Agreement the City is required to add $50,000 t o
$100,000 to the Stadium Maintenanc e R e s e r v e e a c h y e a r t h r o u g h FY
2026.
As of October 2023, $700,000 has been used to perform improveme nts
at the Stadium that meet the guidelines of the Agreement.
Projected Schedule
Activity Projected Date
Maintenance Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $800,000 Project Total D ebt Expenditures
Budget FY 2025 100,000 Principal $0
FY 2026 ‐ FY 2029 Planned 100,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $1,000,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Stadium Maintenance 100,000 100,000 0 0 0 $200,000
Total $100,000 $100,000 $0 $0 $0 $200,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 100,000 100,000 0 0 0 $200,000
Total $100,000 $100,000 $0 $0 $0 $200,000
Operating Budget Impact
Annual funding to be used for capital expenditures which have been mutually agreed upon by the City and the Lynchburg Baseball Corporation.
Page 131 of 309
City Capital Projects Fund – Reserves
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 102
Project Title Project Number Service Area
Snow, Street, and Bridge Reserve TR004 Reserves
Location Project Type Department
N/A Maintenance Public Works
Department Priority
Project supports essential services
Project Description
Reserves for unexpected maintenance expenditures related to snow removal. Remaining funds at the end
of the fiscal year will be used to fund street and bridge maintenance.
Relationship to Comprehensive Plan
Chapter 3, page 30, Goal T‐1: Pr ovide safe, efficient, effectiv e, and well‐planned transportation systems
and facilities that enhance economic development and redevelopment opportunities while preserving the
integrity and character of the affected neighborhoods, historic districts, downtown and natural resources.
Project Manager
Gaynelle Hart, Director of Public Works
Projected Start Date Continuing Why Now
Projected Completion Date Continuing T h e C i t y m a i n t a i n s t h i s r e s e r v e t o a s s i s t w i t h a n n u a l s n o w r e m oval
expenses.
Projected Schedule
Activity Projected Date
Snow Removal/Maintenance Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 Continuing Project Total Debt Expenditures
Budget FY 2025 250,000 Principal $0
FY 2026 ‐ FY 2029 Planned 1,000,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Snow Removal/Maintenance 250,000 250,000 250,000 250,000 250,000 $1,250,000
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 250,000 250,000 250,000 250,000 250,000 $1 ,250,000
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Operating Budget Impact
Due to the unpredictability of winter weather, these funds allow the City to budget a moderate amount in the General Fund Operating Budget with the
understanding the Reserve is available for overages.
Page 132 of 309
Schools Capital Projec ts Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 103
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Resources
Loca l : Li ne of Credi t 2,540,000 810,000 575,000 1,415,000 1,750,000
Loca l : Pa y‐As ‐You‐Go 0 916,000 474,000 982,000 490,000
TOTAL ESTIMATED RESOURCES $2,540,000 $1,726,000 $1,049,000 $2,397,0 00 $2,240,000
CAPITAL PROJECTS
School s 2,540,000 1,726,000 1,049,000 2,397,000 2,240,000
TOTAL PROPOSED CAPITAL PROJECTS $2,540,000 $1,726,000 $1,049,000 $2 ,397,000 $2,240,000
SCHOOLS FUND (CITY CAPITAL PROJECTS FUND) SUMMARY OF APPROPRIAT IONS ‐ This summary demonstrates project appropriations for
each Fiscal Year along with the expected sources of funding.
Page 133 of 309
Schools Capital Projec ts Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 104
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Resources
Loca l : Li ne of Credi t 2,540,000 810,000 575,000 1,415,000 1,750,000
Loca l : Pa y‐As ‐You‐Go 0 916,000 474,000 982,000 490,000
TOTAL ESTIMATED RESOURCES $2,540,000 $1,726,000 $1,049,000 $2,397,0 00 $2,240,000
CAPITAL PROJECTS
School s 2,540,000 1,726,000 1,049,000 2,397,000 2,240,000
TOTAL PROPOSED CAPITAL PROJECTS $2,540,000 $1,726,000 $1,049,000 $2 ,397,000 $2,240,000
SCHOOLS FUND (CITY CAPITAL PROJECTS FUND) SUMMARY OF CASH FLOWS ‐ This summary demonstrates project cash flows for each
Fiscal Year along with the expected sources of funding.
Page 134 of 309
Schools Capital Projec ts Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 105
Five‐Year Proposed Appropriations
Project Title
Appropriations
Through
06/30/2024 Budget FY 2025
FY 2026 ‐ 2029
Planned
Five‐Year
Estimated Net
Cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Schools
Civic Auditorium Reserve 0 0 600,000 600,000 Continuing Continuing
Dunbar Middle Chiller and Cooling Tower Replacement 0 0 950,000 950,000 0 950,000
E.C. Glass Cooling Tower Replacement 1,000,000 1,000,000 0 1,000,000 0 2,000,000
Elementary Playground Modernization 0 0 400,000 400,000 Continuing Continuing
Paving and Fencing Improvements 0 0 912,000 912,000 Continuing Continuing
School Building Roof Replacements 0 690,000 4,550,000 5,240,000 Continuing Continuing
Sheffield Elementary Chiller Replacement 0 850,000 0 850,000 0 850,000
Total Proposed FY 2025 ‐ 2029 CIP $1,000,000 $2,540,000 $7,412,000 $9,952,000 $0 $3,800,000
Page 135 of 309
Schools Capital Projec ts Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 106
Project Title Project Number Service Area
Civic Auditorium Reserve To Be Assigned Schools
Location Project Type Department
E.C. Glass New Schools
Department Priority
Project supports essential services
Project Description
This project provides funding to maintain and improve the Civic A u d i t o r i u m l o c a t e d a t E . C . G l a s s H i g h
School. Constructed for use of the entire community, the Civic Auditorium has provided a gathering space
for a wide array of community e vents ‐ from internationally kno wn speakers to community meetings to
high school theater performances. The space needs investment to ensure its longevity and its ability to
serve as an attractor of events for which there is no space in the City. With a nearly 2,300 seat capacity, it
is the only inside venue in the City that can accommodate many acts. Funds will be used to replace critical
components, such as the stage lig hting system, the stage floor, electrical upgrades, curtain replacements,
house seating, etc.
Relationship to Comprehensive Plan
The Educational Facilities sec tion of Chapter 14: Public Facili ties of the City of Lynchburg Comprehensive
Plan notes that "the school system's educational resources are a tremendous asset to residents, business
owners, and employers, as well as the City itself" and that "th e City should continue to invest in public
schools and facilities". Additiona lly, Chapter 9: History, Cult ure, and Education states that, "Maintaining
and improving the quality of the Lynchburg Public Schools' education program is essential because school
quality has an impact on so many other aspects of Lynchburg including the stability of neighborhoods and
the availability of recreational and educational facilities, among others".
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Why Now
Projected Completion Date Continuing The E.C. Glass Civic Auditorium h as served the Lynchburg commun ity for
over 70 years. During FY 2023, the house sound system failed an d was
replaced, demonstrating the need to proactively invest in this space. A
modest investment now will encourage larger acts to choose to p erform
in Lynchburg, resulting in tourism revenue for the City and the business
community and will provide opportunities for our students to interact
with professional performances.
Projected Schedule
Activity Projected Date
Facilities Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 600,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Facilities 0 150,000 150,000 150,000 150,000 $600,000
Total $0 $150,000 $150,000 $150,000 $150,000 $600,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 150,000 150,000 150,000 150,000 $600,000
Total $0 $150,000 $150,000 $150,000 $150,000 $600,000
Operating Budget Impact
Page 136 of 309
Schools Capital Projec ts Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 107
Project Title Project Number Service Area
Dunbar Middle Chiller and Cooling Tower Replacement To Be Assi gned Schools
Location Project Type Department
Dunbar Middle New Schools
Department Priority
Project supports essential services
Project Description
This project will result in the replacement of the existing Central and West Building chillers at Dunbar
Middle School. This equipment is more than 20 years old and is need of replacement.
Relationship to Comprehensive Plan
The Educational Facilities sec tion of Chapter 14: Public Facili ties of the City of Lynchburg Comprehensive
Plan notes that "the school system's educational resources are a tremendous asset to residents, business
owners, and employers, as well as the City itself" and that "th e City should continue to invest in public
schools and facilities". Additiona lly, Chapter 9: History, Cult ure, and Education states that, "Maintaining
and improving the quality of the Lynchburg Public Schools' education program is essential because school
quality has an impact on so many other aspects of Lynchburg including the stability of neighborhoods and
the availability of recreational and educational facilities, among others".
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Why Now
Projected Completion Date Q4 FY 2028 This project, as a complement to t h e h e a t i n g s y s t e m r e p l a c e m e n t
currently underway, will result in the modernization of this HV AC
equipment.
Projected Schedule
Activity Projected Date
Construction Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 950,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $950,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 0 450,000 0 500,000 0 $950,000
Total $0 $450,000 $0 $500,000 $0 $950,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 450,000 0 500,000 0 $950,000
Total $0 $450,000 $0 $500,000 $0 $950,000
Operating Budget Impact
Positive impact as LCS is incurring significant maintenance cost to keep this system functioning. A significant cost savings with reduced maintenance costs
and energy savings with higher efficiency equipment.
Page 137 of 309
Schools Capital Projec ts Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 108
Project Title Project Number Service Area
E.C. Glass Cooling Tower Replacement To Be Assigned Schools
Location Project Type Department
E.C. Glass New Schools
Department Priority
Project supports essential services
Project Description
This project will result in the replacement of the existing cooling tower. In FY 2023, the chillers at E.C. Glass
failed beyond repair and LCS utiliz ed the electrical and mechanical reserve to procure and install two new
chillers. However, the cooling tower is in similar condition and must be replaced before it also fails.
Relationship to Comprehensive Plan
The Educational Facilities sec tion of Chapter 14: Public Facili ties of the City of Lynchburg Comprehensive
Plan notes that "the school system's educational resources are a tremendous asset to residents, business
owners, and employers, as well as the City itself" and that "th e City should continue to invest in public
schools and facilities". Additiona lly, Chapter 9: History, Cult ure, and Education states that, "Maintaining
and improving the quality of the Lynchburg Public Schools' education program is essential because school
quality has an impact on so many other aspects of Lynchburg including the stability of neighborhoods and
the availability of recreational and educational facilities, among others".
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Why Now
Projected Completion Date Q4 FY 2025 The cooling tower is well past its useful life expectancy and h as had one
renovation. The tower is functioning well below full efficiency and is
leaking.
Projected Schedule
Activity Projected Date
Construction Q4 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $1,000,000 Project Total Debt Expenditures
Budget FY 2025 1, 000,000 Principal $2,000,000
FY 2026 ‐ FY 2029 Planned 0 Interest 797,767
Remaining Need 0 Total $2,797,767
Total Project Cost $2,000,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $139,888
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 1,000,000 0 0 0 0 $1,000,000
Total $1,000,000 $0 $0 $0 $0 $1,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Line of Credit 1,000,000 0 0 0 0 $1,000,000
Total $1,000,000 $0 $0 $0 $0 $1,000,000
Operating Budget Impact
Positive impact as LCS is incurring significant maintenance cost to keep this system functioning. A significant cost savings with reduced maintenance costs
and energy savings with higher efficiency equipment.
Page 138 of 309
Schools Capital Projec ts Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 109
Project Title Project Number Service Area
Elementary Playground Modernization To Be Assigned Schools
Location Project Type Department
Elementary Schools New Schools
Department Priority
Project supports essential services
Project Description
The project provides funding for playground improvements and re placements of outdated equipment on
school grounds. Many elementary school playgrounds in the City have fallen into disrepair and do not
substantively contribute to the instructional environment. Mode rn playgrounds are designed with
methods to support classroom instruction and can serve as community public spaces outside of school
hours. This project would provide funding to reimagine critical playgrounds to be more accessible, vibrant,
and instructionally appropriate spaces for young people in our community to learn and grow. This can
greatly reduce the City's extensive park desert problem in many areas in the City.
Relationship to Comprehensive Plan
The Educational Facilities sec tion of Chapter 14: Public Facili ties of the City of Lynchburg Comprehensive
Plan notes that "the school system's educational resources are a tremendous asset to residents, business
owners, and employers, as well as the City itself" and that "th e City should continue to invest in public
schools and facilities". Additiona lly, Chapter 9: History, Cult ure, and Education states that, "Maintaining
and improving the quality of the Lynchburg Public Schools' education program is essential because school
quality has an impact on so many other aspects of Lynchburg including the stability of neighborhoods and
the availability of recreational and educational facilities, among others".
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Why Now
Projected Completion Date Continuing The project provides funding for annual replacement and addition of
outdated and on‐code compliant playground equipment on school
grounds. Many of the City's elementary school playground sites have
fallen into disrepair.
Projected Schedule
Activity Projected Date
Facilities Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 400,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 0 100,000 100,000 100,000 100,000 $400,000
Total $0 $100,000 $100,000 $100,000 $100,000 $400,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2025 FY 2026 FY 2027 FY 2028 FY 2029
Program Period
Total
Local: Pay‐As‐You‐Go 0 100,000 100,000 100,000 100,000 $400,000
Total $0 $100,000 $100,000 $100,000 $100,000 $400,000
Operating Budget Impact
Modernized systems and controls, as well as more efficient appliances will reduce costs and will be less maintenance intensive.
Page 139 of 309
Schools Capital Projec ts Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2025 – 2029
CIP 110
Project Title Project Number Service Area
Paving and Fencing Improvements To Be Assigned Schools
Location Project Type Department
Various Schools New Schools
Department Priority
Project supports essential services
Project Description
The project provides funding for annual paving and fencing replacements on school grounds.
Relationship to Comprehensive Plan
The Educational Facilities sec tion of Chapter 14: Public Facili ties of the City of Lynchburg Comprehensive
Plan notes that "the school system's educational resources are a tremendous asset to residents, business
owners, and employers, as well as the City itself" and that "th e City should continue to invest in public
schools and facilities". Additiona lly, Chapter 9: History, Cult ure, and Education states that, "Maintaining
and improving the quality of the Lynchburg Public Schools' education program is essential because school
quality has an impact on so many other aspects of Lynchburg including the stability of neighborhoods and
the availability of recreational and educational facilities, among others".
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Why Now
Projected Completion Date Continuing The project provides funding for annual paving and fencing replacements
on school grounds.
Projected Schedule
Activity Projected Date
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 06/30/2024 $0 Project Total Debt Ex penditures
Budget FY 2025 0 Principal $0
FY 2026 ‐ FY 2029 Planned 912,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2025
Planned FY
2026
Planned FY
2027
Planned FY
2028
Planned FY
2029
Program Period
Estimate
Construction 0 216,000 224,000 232,000 240,000 $912,000
Total $0 $216,000 $224,000
Text truncated. Open the original for the full document.
Source: City of Lynchburg website. First collected Nov 10, 2026.