PHYSICAL DEVELOPMENT COMMITTEE
City Council Committee
Tuesday, January 9, 2024 | 3:00 PM
2nd Floor Training Room- City Hall
900 Church Street
Lynchburg, VA 24504
PHYSICAL DEVELOPMENT COMMITTEE AGENDA
I. Welcome Councilmember Larry Taylor, Chair
II. Information Items
II.1. Update on 501/221 Project
III. General Business
III.2. Additional City Street Mileage for VDOT Highway Maintenance Payments
IV. Roll Call
V. Next Regular Meeting
Page 1 of 23
PROGRESS MADE ON THE
501/221 ROAD
IMPROVEMENT PROJECT
January 9, 2024
Page 2 of 23
PROJECT BACKGROUND
• Began as “Crosstown Connector” Project in
2002
• Included in City’s capital program in 2013
• Selected TY Lin as design engineering
consultant in 2013
• Applied for SMARTSCALE funds in 2016 and
2019
• Awarded SMARTSCALE funds in 2019
• Contracted with TY Lin for construction
design in April 2019
Page 3 of 23
PROJECT BACKGROUND
• Bridge/Flyover over Old Forest Road added
in 2020
• In 2021 previous TY Lin project manager
retired suddenly
• Increasing concerns about project schedule
and quality
• Hired McCormick- Taylor (M-T) to assist staff
with project management
• April 2023- Terminated design contract with
TY Lin
Page 4 of 23
STAFF PROGRESS UPDATE
Worked with M-T to review the current
construction documents for quality and
completion
Analyzed best project delivery method with
VDOT
• Design, Bid, Build
• Design,Build
• Public Private Partnership
Determined Design,Bid, Build best option
Page 5 of 23
STAFF PROGRESS UPDATE
Worked with M-T to develop proposed
schedule and updated cost estimate
Plan to award contract to finish design to M-T
because they:
• Worked on project since October 2021
• Familiar with project and existing
construction documents
Page 6 of 23
PROPOSED PROJECT
SCHEDULE
The projected schedule is as follows:
• Additional survey and design work to continue
• Right of Way and Utility Relocations May 2025 - May 2026
• Advertisement June 2026
• Construction starting November 2026
• Construction finishing and project close-out August 2029
Page 7 of 23
UPDATED PROJECT COST
ESTIMATE
New project cost- 74M
Project shortfall- $17.5 M
• Inflationary increases
• Project delays
Additional funds are not needed until FY 2027
Page 8 of 23
FEDERAL AND STATE
FUNDING OPTIONS
Possible funding options:
Possible influx of $3.7M from the Federal Infrastructure Grant
Apply for a Federal RAISE grant that could fund between $5-25M of
the project
Delay several transportation projects from the FY 24, FY25 and FY26
CIP budgets $14.5 M
Other VDOT inflationary funding if available
Page 9 of 23
Questions?
Page 10 of 23
Physical Development
Committee
Agenda Item III.2.
Action
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
January 9, 2024 Joseph Newland, City Engineer
AGENDA ITEM # III.2
Additional City Street Mileage for VDOT Highway Maintenance Payments
RECOMMENDATION
This item will come before Council for action at its January 23, 2024, meeting. Approve the
attached resolution requesting Virginia Department of Transportation (VDOT) to increase the official
City Street lane mileage for reimbursement of highway maintenance funds for FY 2025.
SUMMARY
When required, usually each year, the City submits a list of new or improved streets to VDOT for
acceptance into the street maintenance system for payments to the City from the
Commonwealth. For FY 2025, staff has identified 3.74 lane miles of street segments that need to
be added. These street segments are shown on the attached maps and VDOT U-1 Form.
This action is required by VDOT to add these segments to the system.
PRIOR ACTION(S)
None
FISCAL IMPACT
3.74 additional lane miles will increase highway maintenance funds in the amount of $62,180
annually.
CONTACT(S)
Joseph Newland, City Engineer
Gaynelle Hart, Director of Public Works
ATTACHMENT(S)
1. Resolution
2. U1 FORM 2024
3. Blackwater Run (Elmwood Ave & Courtney Springs Dr)
4. Locust Thicket (Thicket Dr & Robinia Rd)
5. Creekside Reserve (Jordan Ct & Ethan Ct)
6. Bennetts Grove (Bennetts Way & Lincolns Way)
7. Knott (Knott St & Latham St)
8. Candlers Delete
Page 11 of 23
9. Carroll Ave
10. Gaddy Rd
11. Enterprise Dr
REVIEWED BY
Date: January 04, 2024
Gaynelle Hart, Director of Public Works
Date: January 04, 2024
Gregory Patrick, Deputy City Manager
Date: January 04, 2024
Alicia Finney, Clerk of Council
Page 12 of 23
RESOLUTION:
WHEREAS, the Virginia Department of Transportation (VDOT) requires action to increase the lane mileage for
street maintenance entitlement funds from the Commonwealth; and,
WHEREAS, 3.74 lane miles of local and arterial streets have been identified to be added to the system; and,
NOW, THEREFORE, BE IT RESOLVED THAT: The Lynchburg City Council requests the Commonwealth
Transportation Board to approve the addition of lane mileage as enumerated on Form U-1.
Adopted:______________________
Certified:______________________
Clerk of Council
Page 13 of 23
1
Appendix B LOCAL ASSISTANCE DIVISION
VDOT
REQUEST FOR STREET ADDITION, DELETIONS AND CONVERSIONS FOR
STREET PAYMENTS SECTION 33.2-319
CODE OF VIRGINIA
Form U-1 (rev. 7-1-17)
MUNICIPALITY Lynchburg DISTRICT Lynchburg
ACTION REQUIRED
(SELECT BELOW)
STREET NAME ROUTE NUMBER FROM TERMINI TO R/W
(Width)
(FEET)
PAVEMENT
WIDTH
(FEET)
CENTER
LANE
(MILES)
NUMBER
OF
LANES
MOVING
LANE
MILES
Eligibility
Code
Reference
Link
FUNC. CLASS.
(TMPD USE
except for HR
and NOVA)
ADD (New Road) Elmwood Avenue Goodyear Drive to End 50 30 0.19 2 0.38 1
ADD (New Road) Courtney Springs Drive Elmwood Avenue to End 50 24 0.12 2 0.24 5
ADD (New Road) Robinia Road Thicket Drive to End 50 24 0.19 2 0.37 5
ADD (New Road) Thicket Drive Confederate Avenue to End 50 24 0.34 2 0.67 5
ADD (New Road) Jordan Court Fleetwood Drive to End 50 24 0.26 2 0.52 5
ADD (New Road) Ethan Court End to End 50 24 0.20 2 0.40 5
ADD (New Road) Lincolns Way Bennetts Way to Grove Road 50 24 0.13 2 0.26 5
ADD (New Road) Bennetts Way Alta Lane to End 50 24 0.22 2 0.43 5
ADD (New Road) Knott Street .1 Mi W Hartford Street to Latham Street 50 24 0.08 2 0.16 5
ADD (New Road) Latham Street .012 Mi N Knott St to .013 Mi S Knott St 50 24 0.03 2 0.05 5
DELETE (Existing Segment) Candlers Mountain Road Woodall Road to 0.22E Woodall Road 0 17 0.22 1 0.22 6
ADD (New Road) Carroll Avenue Mayflower Drive to Odd Fellows Road 40 20 0.09 2 0.18 3
ADD (New Road) Gaddy Road Gaddy Road to .15 Mi S Gaddy Rd. 40 20 0.15 2 0.30 3
Change Exsisting Segment Enterprise Drive Change Functional Class Local to Arterial 89 66 1.58 4 6.32 1
SELECT ONE 0.00 Select one
SELECT ONE 0.00 Select one
SELECT ONE 0.00 Select one
SELECT ONE 0.00 Select one
* Council Resolution and Map Attached
SIGNED SIGNED
MUNICIPAL OFFICIAL DATE AUTHORIZED VDOT OFFICIAL DATE
Submit to: District Point of Contact in triplicate CLASSIFIED BY
T&MPD ENGINEER DATE
Page 14 of 23
Elmwood Ave. & Courtney Springs Dr.
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 300 600
ft
1 inch = 300 feet
PRINTED ON
December 27, 20231:3,600
Page 15 of 23
Thicket Dr. & Robinia Rd.
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 300 600
ft
1 inch = 300 feet
PRINTED ON
December 27, 20231:3,600
Page 16 of 23
Jordan Ct. & Ethan Ct.
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 300 600
ft
1 inch = 300 feet
PRINTED ON
December 27, 20231:3,600
Page 17 of 23
Bennetts Way & Lincolns Way
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 300 600
ft
1 inch = 300 feet
PRINTED ON
December 27, 20231:3,600
Page 18 of 23
Knott St. & Latham St.
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 300 600
ft
1 inch = 300 feet
PRINTED ON
December 27, 20231:3,600
Page 19 of 23
Candlers Mountain Deletion
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 300 600
ft
1 inch = 300 feet
PRINTED ON
December 27, 20231:3,600
Page 20 of 23
Carroll Ave.
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 300 600
ft
1 inch = 300 feet
PRINTED ON
December 27, 20231:3,600
Page 21 of 23
Gaddy Rd.
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 300 600
ft
1 inch = 300 feet
PRINTED ON
December 27, 20231:3,600
Page 22 of 23
Enterprise Dr. Functional Change
µ
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS
SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM
VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
0 990 1,980
ft
1 inch = 1,000 feet
PRINTED ON
December 27, 20231:12,000
Page 23 of 23