RecordWell Data

Physical Development Committee Meeting — Agenda Packet

City of Lynchburg · Lynchburg City County · Physical Development Committee · meeting of Jan 9, 2024 · Agenda packets

Open the original document More from City of Lynchburg

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PHYSICAL DEVELOPMENT COMMITTEE City Council Committee Tuesday, January 9, 2024 | 3:00 PM 2nd Floor Training Room- City Hall 900 Church Street Lynchburg, VA 24504 PHYSICAL DEVELOPMENT COMMITTEE AGENDA I. Welcome Councilmember Larry Taylor, Chair II. Information Items II.1. Update on 501/221 Project III. General Business III.2. Additional City Street Mileage for VDOT Highway Maintenance Payments IV. Roll Call V. Next Regular Meeting Page 1 of 23 PROGRESS MADE ON THE 501/221 ROAD IMPROVEMENT PROJECT January 9, 2024 Page 2 of 23 PROJECT BACKGROUND • Began as “Crosstown Connector” Project in 2002 • Included in City’s capital program in 2013 • Selected TY Lin as design engineering consultant in 2013 • Applied for SMARTSCALE funds in 2016 and 2019 • Awarded SMARTSCALE funds in 2019 • Contracted with TY Lin for construction design in April 2019 Page 3 of 23 PROJECT BACKGROUND • Bridge/Flyover over Old Forest Road added in 2020 • In 2021 previous TY Lin project manager retired suddenly • Increasing concerns about project schedule and quality • Hired McCormick- Taylor (M-T) to assist staff with project management • April 2023- Terminated design contract with TY Lin Page 4 of 23 STAFF PROGRESS UPDATE Worked with M-T to review the current construction documents for quality and completion Analyzed best project delivery method with VDOT • Design, Bid, Build • Design,Build • Public Private Partnership Determined Design,Bid, Build best option Page 5 of 23 STAFF PROGRESS UPDATE Worked with M-T to develop proposed schedule and updated cost estimate Plan to award contract to finish design to M-T because they: • Worked on project since October 2021 • Familiar with project and existing construction documents Page 6 of 23 PROPOSED PROJECT SCHEDULE The projected schedule is as follows: • Additional survey and design work to continue • Right of Way and Utility Relocations May 2025 - May 2026 • Advertisement June 2026 • Construction starting November 2026 • Construction finishing and project close-out August 2029 Page 7 of 23 UPDATED PROJECT COST ESTIMATE New project cost- 74M Project shortfall- $17.5 M • Inflationary increases • Project delays Additional funds are not needed until FY 2027 Page 8 of 23 FEDERAL AND STATE FUNDING OPTIONS Possible funding options: Possible influx of $3.7M from the Federal Infrastructure Grant Apply for a Federal RAISE grant that could fund between $5-25M of the project Delay several transportation projects from the FY 24, FY25 and FY26 CIP budgets $14.5 M Other VDOT inflationary funding if available Page 9 of 23 Questions? Page 10 of 23 Physical Development Committee Agenda Item III.2. Action AGENDA ITEM SUMMARY MEETING DATE PRESENTED BY January 9, 2024 Joseph Newland, City Engineer AGENDA ITEM # III.2 Additional City Street Mileage for VDOT Highway Maintenance Payments RECOMMENDATION This item will come before Council for action at its January 23, 2024, meeting. Approve the attached resolution requesting Virginia Department of Transportation (VDOT) to increase the official City Street lane mileage for reimbursement of highway maintenance funds for FY 2025. SUMMARY When required, usually each year, the City submits a list of new or improved streets to VDOT for acceptance into the street maintenance system for payments to the City from the Commonwealth. For FY 2025, staff has identified 3.74 lane miles of street segments that need to be added. These street segments are shown on the attached maps and VDOT U-1 Form. This action is required by VDOT to add these segments to the system. PRIOR ACTION(S) None FISCAL IMPACT 3.74 additional lane miles will increase highway maintenance funds in the amount of $62,180 annually. CONTACT(S) Joseph Newland, City Engineer Gaynelle Hart, Director of Public Works ATTACHMENT(S) 1. Resolution 2. U1 FORM 2024 3. Blackwater Run (Elmwood Ave & Courtney Springs Dr) 4. Locust Thicket (Thicket Dr & Robinia Rd) 5. Creekside Reserve (Jordan Ct & Ethan Ct) 6. Bennetts Grove (Bennetts Way & Lincolns Way) 7. Knott (Knott St & Latham St) 8. Candlers Delete Page 11 of 23 9. Carroll Ave 10. Gaddy Rd 11. Enterprise Dr REVIEWED BY Date: January 04, 2024 Gaynelle Hart, Director of Public Works Date: January 04, 2024 Gregory Patrick, Deputy City Manager Date: January 04, 2024 Alicia Finney, Clerk of Council Page 12 of 23 RESOLUTION: WHEREAS, the Virginia Department of Transportation (VDOT) requires action to increase the lane mileage for street maintenance entitlement funds from the Commonwealth; and, WHEREAS, 3.74 lane miles of local and arterial streets have been identified to be added to the system; and, NOW, THEREFORE, BE IT RESOLVED THAT: The Lynchburg City Council requests the Commonwealth Transportation Board to approve the addition of lane mileage as enumerated on Form U-1. Adopted:______________________ Certified:______________________ Clerk of Council Page 13 of 23 1 Appendix B LOCAL ASSISTANCE DIVISION VDOT REQUEST FOR STREET ADDITION, DELETIONS AND CONVERSIONS FOR STREET PAYMENTS SECTION 33.2-319 CODE OF VIRGINIA Form U-1 (rev. 7-1-17) MUNICIPALITY Lynchburg DISTRICT Lynchburg ACTION REQUIRED (SELECT BELOW) STREET NAME ROUTE NUMBER FROM TERMINI TO R/W (Width) (FEET) PAVEMENT WIDTH (FEET) CENTER LANE (MILES) NUMBER OF LANES MOVING LANE MILES Eligibility Code Reference Link FUNC. CLASS. (TMPD USE except for HR and NOVA) ADD (New Road) Elmwood Avenue Goodyear Drive to End 50 30 0.19 2 0.38 1 ADD (New Road) Courtney Springs Drive Elmwood Avenue to End 50 24 0.12 2 0.24 5 ADD (New Road) Robinia Road Thicket Drive to End 50 24 0.19 2 0.37 5 ADD (New Road) Thicket Drive Confederate Avenue to End 50 24 0.34 2 0.67 5 ADD (New Road) Jordan Court Fleetwood Drive to End 50 24 0.26 2 0.52 5 ADD (New Road) Ethan Court End to End 50 24 0.20 2 0.40 5 ADD (New Road) Lincolns Way Bennetts Way to Grove Road 50 24 0.13 2 0.26 5 ADD (New Road) Bennetts Way Alta Lane to End 50 24 0.22 2 0.43 5 ADD (New Road) Knott Street .1 Mi W Hartford Street to Latham Street 50 24 0.08 2 0.16 5 ADD (New Road) Latham Street .012 Mi N Knott St to .013 Mi S Knott St 50 24 0.03 2 0.05 5 DELETE (Existing Segment) Candlers Mountain Road Woodall Road to 0.22E Woodall Road 0 17 0.22 1 0.22 6 ADD (New Road) Carroll Avenue Mayflower Drive to Odd Fellows Road 40 20 0.09 2 0.18 3 ADD (New Road) Gaddy Road Gaddy Road to .15 Mi S Gaddy Rd. 40 20 0.15 2 0.30 3 Change Exsisting Segment Enterprise Drive Change Functional Class Local to Arterial 89 66 1.58 4 6.32 1 SELECT ONE 0.00 Select one SELECT ONE 0.00 Select one SELECT ONE 0.00 Select one SELECT ONE 0.00 Select one * Council Resolution and Map Attached SIGNED SIGNED MUNICIPAL OFFICIAL DATE AUTHORIZED VDOT OFFICIAL DATE Submit to: District Point of Contact in triplicate CLASSIFIED BY T&MPD ENGINEER DATE Page 14 of 23 Elmwood Ave. & Courtney Springs Dr. µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 300 600 ft 1 inch = 300 feet PRINTED ON December 27, 20231:3,600 Page 15 of 23 Thicket Dr. & Robinia Rd. µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 300 600 ft 1 inch = 300 feet PRINTED ON December 27, 20231:3,600 Page 16 of 23 Jordan Ct. & Ethan Ct. µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 300 600 ft 1 inch = 300 feet PRINTED ON December 27, 20231:3,600 Page 17 of 23 Bennetts Way & Lincolns Way µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 300 600 ft 1 inch = 300 feet PRINTED ON December 27, 20231:3,600 Page 18 of 23 Knott St. & Latham St. µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 300 600 ft 1 inch = 300 feet PRINTED ON December 27, 20231:3,600 Page 19 of 23 Candlers Mountain Deletion µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 300 600 ft 1 inch = 300 feet PRINTED ON December 27, 20231:3,600 Page 20 of 23 Carroll Ave. µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 300 600 ft 1 inch = 300 feet PRINTED ON December 27, 20231:3,600 Page 21 of 23 Gaddy Rd. µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 300 600 ft 1 inch = 300 feet PRINTED ON December 27, 20231:3,600 Page 22 of 23 Enterprise Dr. Functional Change µ DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE. 0 990 1,980 ft 1 inch = 1,000 feet PRINTED ON December 27, 20231:12,000 Page 23 of 23

Source: City of Lynchburg website. First collected Nov 10, 2026.