RecordWell Data

Physical Development Committee Meeting — Agenda Packet

City of Lynchburg · Lynchburg City County · Physical Development Committee · meeting of Dec 12, 2023 · Agenda packets

Open the original document More from City of Lynchburg

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PHYSICAL DEVELOPMENT COMMITTEE City Council Committee Tuesday, December 12, 2023 | 3:00 PM 2nd Floor Training Room- City Hall 900 Church Street Lynchburg, VA 24504 PHYSICAL DEVELOPMENT COMMITTEE AGENDA I. Welcome Councilmember Larry Taylor, Chair II. Information Items II.1. College Lake Dam Removal Update III. General Business IV. Roll Call V. Next Regular Meeting Page 1 of 27 Physical Development Committee Agenda Item II.1. Information Only AGENDA ITEM SUMMARY MEETING DATE PRESENTED BY December 12, 2023 Timothy Mitchell, Director of Water Resources, Erin Hawkins, Water Quality Manager AGENDA ITEM # II.1 College Lake Dam Removal Update RECOMMENDATION Information Only. SUMMARY College Lake Dam is considered a high hazard dam and is not in compliance with the Department of Conservation and Recreation's Dam Safety Regulations. In order to comply with the regulations, either the dam would need to undergo major safety upgrades or be removed. In August 2018, the College Lake Dam over-topped and nearly failed. The City of Lynchburg recently received bids for the College Lake Dam Removal and Restoration Project and English Construction was the successful low bidder with costs coming in on budget. Staff will provide an update of the project status including purpose and goals, budget, construction activities, and long-term management. PRIOR ACTION(S) Previous Budget and Capital Improvement Plan authorizations. Various City Council briefings and updates. FISCAL IMPACT Prior CIP appropriations totaling $22,500,000 have been authorized by City Council. The funding sources include $5 million in DCR Dam Safety Grants, $10 million from Virginia Clean Water Revolving Loan Fund with an additional $2.5 million in principal forgiveness with the remaining $5 million in General Obligation Bonds. Total project costs including contingencies equal $22,500,000. CONTACT(S) Timothy Mitchell, Director of Water Resources ATTACHMENT(S) 1. Council PDC Mtg College Lake Update Dec 2023 REVIEWED BY Page 2 of 27 Date: November 30, 2023 Timothy Mitchell, Director of Water Resources Date: December 05, 2023 Gregory Patrick, Deputy City Manager Date: December 07, 2023 Alicia Finney, Clerk of Council Page 3 of 27 COLLEGE LAKE DAM REMOVAL  AND RESTORATION PROJECT Physical Development Committee December 12, 2023 Page 4 of 27 OVERVIEW 1. Project 2. Budget 3. Construction Activities 4. Long‐Term Management Page 5 of 27 REMOVE       RESTORE       RECONNECT Project Overview Page 6 of 27 PROJECT OVERVIEW PROJECT  PURPOSE  AND GOALS  Removal of a high‐ hazard dam to  provide protection of  life, property, and the  environment.  Preserve floodplain capacity and  coordination with  FEMA on current  mapping. Page 7 of 27 PROJECT OVERVIEW  PROJECT PURPOSE AND GOALS  Manage historical sediment accumulated  behind the dam in a way that minimizes  downstream water quality impacts.  Restore Blackwater Creek and its adjacent  tributaries that have been impacted by  the dam.  Provide wetland restoration and  establishment opportunities in the  former and adjacent floodplain. Page 8 of 27 PROJECT OVERVIEW BLACKWATER CREEK  –P R O P O S E D  IMPROVEMENTS Armored cascade grade control Toe wood bank protection Page 9 of 27 Increased meandering  of Blackwater Creek Log cross vane grade control PROJECT OVERVIEW BLACKWATER CREEK – PROPOSED IMPROVEMENTS Page 10 of 27 Boulder grade control vane Dense native vegetation PROJECT OVERVIEW BLACKWATER CREEK – PROPOSED IMPROVEMENTS Page 11 of 27 REMOVE       RESTORE       RECONNECT Budget Page 12 of 27 BUDGET OVERVIEW  Funding Sources  $5M DCR Dam Safety Grant  $10M Virginia Clean Water Revolving  Loan Fund + $2.5M Principal Forgiveness  General Fund Project Costs Engineering $1,809,716.76 Land Acq/ROW $62,559 Construction Administration  $1,587,680.80 Construction Base Bid $17,478,495.35 Misc $35,572.68 Contingency $1,525,975.41 Total 22,500,000.00 Page 13 of 27 REMOVE       RESTORE       RECONNECT Construction Activities Page 14 of 27 CONSTRUCTION ACTIVITIES CONTRACTOR INTRODUCTION  Primary contractor: W. C. English, Incorporated  Subcontractor: Resource Environmental Solutions Contractor qualifications:  Lynchburg company with local resources.  Experts in mass excavation.  Experience with dewatering.  Experience with erosion and sediment controls.  Experts in stream and wetland restoration.  Knowledgeable about history of College Lake and Dam  as well as stakeholder concerns. Page 15 of 27 CONSTRUCTION ACTIVITIES CONSTRUCTION SCHEDULE Page 16 of 27 CONSTRUCTION ACTIVITIES  ANTICIPATED DAIL Y SCHEDULE  Monday – Friday  Work to be conducted 24‐hours a day on infrequent occasion for impacts  to dam itself (breaching and dewatering installation).  Expected hours: 7 AM – 5/6 PM Saturdays and Sundays  Limited to required 24‐hour operations for dam breaching and dewatering  installation.  Limited to adhere to schedule and to overcome any delays. Holidays  Work will be halted on the following holidays: Veterans Day,  Thanksgiving Day, Christmas Day, New Years Day, etc. Page 17 of 27 CONSTRUCTION ACTIVITIES CONSTRUCTION SIGNAGE  During construction, Creekside Trail  will be closed from Lakeside Drive  to Shirley Road.  Signage will be posted for duration  of project.  Close coordination with Parks &  Recreation and the University of  Lynchburg. Page 18 of 27 CONSTRUCTION ACTIVITIES  CONSTRUCTION  TRAFFIC  Construction traffic will enter and exit Old Lakeside Drive via New Lakeside Drive  on the west and Hopwood Drive on the east.  Construction traffic will utilize Faculty Drive’s dead end for access to site.  Construction traffic will utilize Hopwood Drive and Westover Drive on University  of Lynchburg campus for site access by Wake Field House and Fox Field.  Routes to be refined as construction progresses. Page 19 of 27 CONSTRUCTION ACTIVITIES DEWATERING  Flexible water level management to facilitate  sediment management upstream  Slow, controlled rate of dewatering  Targeted seasonal dewatering Page 20 of 27 CONSTRUCTION ACTIVITIES RESTORATION & SEDIMENT MANAGEMENT Sediment traps will be constructed to capture and transport  sediment to permanent stockpile areas Impounded sediment will be removed by mechanical  methods with specialized equipment Page 21 of 27 CONSTRUCTION ACTIVITIES EXPECTED SITE CONDITIONS DURING CONSTRUCTION During construction, you may notice: • Unpleasant odor • Construction noise • Unattractive view • Murky water Page 22 of 27 CONSTRUCTION ACTIVITIES SEDIMENT STOCKPILES • Sediment may be stored on site in designated, convenient stockpiles. • Stockpiles are designed to blend into the valley and will be planted  with natural vegetation. • Stockpiles will consist of up to approximately 150,000 cubic yards  spread across potentially 3 stockpile locations. Post construction 30 days post construction Erosion control matting and  coir logs will stabilize  stockpiles and slow run‐off Page 23 of 27 CONSTRUCTION ACTIVITIES DAM REMOVAL • Install dewatering system & dewater College Lake. • Excavate dam breach creating 15ft wide stream channel  (24‐hour continuous operation). • Continue dam excavation to final stream elevations and  complete removal of earthen dam. • Stabilize slopes and create proposed stream and banks  per design. Page 24 of 27 CONSTRUCTION ACTIVITIES MONITORING & CONSTRUCTION OVERSIGHT Cellular alert monitoring of dissolved oxygen and turbidity Construction operations will be observed by  engineers specializing in stream restoration,  sediment management, dam removal, and  geotechnical engineering Page 25 of 27 REMOVE       RESTORE       RECONNECT Long‐Term Management  Page 26 of 27 LONG‐TERM MANAGEMENT COMPLIANCE  MONITORING • Annual monitoring of physical stream and wetland stability • Minimum of 5 years required by USACE • Perpetual Stewardship will remain with the University Page 27 of 27

Source: City of Lynchburg website. First collected Nov 10, 2026.