Finance Committee Meeting - November 28, 2023 — Agenda Packet
City of Lynchburg · Lynchburg City County · Finance Committee · meeting of Nov 28, 2023 · Agenda packets
Open the original document More from City of Lynchburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
FINANCE COMMITTEE
City Council Committee
Tuesday, November 28, 2023 | 3:00 PM
2nd Floor Training Room- City Hall
900 Church Street
Lynchburg, VA 24504
FINANCE COMMITTEE AGENDA
I. Welcome Vice Mayor Chris Faraldi, Chair
II. General Business
II.1. FY 24 Public Safety Answering Point Grant for Staff Recognition
II.2. FY 24 Public Safety Answering Point Grant for Enterprise Geographic
Information System (GIS) Software
II.3. FY 24 State Homeland Security Program Grant for Registrar's Office Security
II.4. 2023 State Homeland Security Program (SHSP) grant for the Fire Department
Technical Rescue Team
III. Quarterly Reports
III.5. Quarterly Reports
A) Greater Lynchburg Transit Company (GLTC)
B) Regional Airport Fund
C) Lynchburg Regional Juvenile Detention Center
D) Children's Services Act Fund
E) Water Operating Fund
F) Sewer Operating Fund
G) Stormwater Operating Fund
IV. Other Information
IV.6. FY 2024 General Fund Reserve for Contingencies
IV.7. Monthly Revenue Collections Update
V. Roll Call
VI. Next Regular Meeting
VI.8. The next Finance Committee meeting is Tuesday, January 23, 2024 at 3:00 p.m.
Page 1 of 50
Finance Committee
Agenda Item II.1.
Action
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
November 28, 2023 Melissa Foster, Director of Emergency
Services
AGENDA ITEM # II.1
FY 24 Public Safety Answering Point Grant for Staff Recognition
RECOMMENDATION
Adopt a resolution to amend the FY 2024 City/Federal/State Aid Fund budget to appropriate
$102,500 with funding from the Virginia 9-1-1 Services Board FY 2024 Public Safety Answering
Point (PSAP) Staffing Recognition Grant, to be used as a retention bonus and an incentive in the
departmental recruiting process.
SUMMARY
The Virginia 9-1-1 Services Board recognizes that most PSAP's across the Commonwealth are
experiencing severe staffing shortages. This grant is an effort from the board to recognize those that
remain on the front lines and continue providing mission critical services to the citizens and visitors
of the Commonwealth. These 9-1-1 professionals continue to show up each day and work many
hours of overtime to ensure that no call goes unanswered. This grant will provide a one-time
payment of $2,500 for full-time employees and $1,250 for part-time employees that are certified to
take 911 calls. This money will be used as a retention bonus and an incentive in our departmental
recruitment process for 911 Public Safety Commuinications Specialists that are hired prior to June
30, 2024.
PRIOR ACTION(S)
November 28, 2023: Finance Committee
FISCAL IMPACT
This is a reimbursement grant, so the City will need to expend the funds and then submit a request
for reimbursement.
CONTACT(S)
Melissa Foster, Director of Emergency Services
ATTACHMENT(S)
1. RESOLUTION PSAP Staff Recognition
2. Lynchburg_FY24-STAFF
REVIEWED BY
Page 2 of 50
Date:
Melissa Foster, Director of Emergency Services
Date:
Mercedes Braun, Assistant to the City Manager
Date:
Wynter Benda, City Manager
Date:
Alicia Finney, Clerk of Council
Page 3 of 50
RESOLUTION: #R-23-_______
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF LYNCHBURG that the FY 2024
City/Federal/State Aid Fund budget is amended and $102,500 is appropriated therein with
funding/resources from the Virginia 9-1-1 Services Board FY 2024 Public Safety Answering Point
(PSAP) Staffing Recognition Grant, to be used as a one-time retention bonus and an incentive in
the departmental recruiting process.
Introduced: Adopted:
Certified:
Clerk of Council
Page 4 of 50
Virginia 9-1-1 Services Board
Dorothy Spears-Dean, Ph.D.
Deputy State Coordinator
VDEM
(804) 840-7260
Mary Binford
PSC Coordinator
VDEM
(804) 536-8177
Saving lives through effective emergency management and homeland security.
“A Ready Virginia is a Resilient Virginia.”
Justin Martin
Finance Director
Carroll County
Julie Henry
Virginia State Police
Gary Critzer
Emergency Mgmt/ EMS Dir
City of Waynesboro
Todd Brewster
Police Chief
Town of Blacksburg
Terry Ellis
Comcast
John DiBacco
Fire Chief
City of Norfolk
Patricia Turner
Loudoun County
Pete Hatcher
AT&T
Michelle Painter Lama
T Mobile
Matthew Ogburn
Verizon Comminications
Robert Osmond
CIO - VITA
Judson W. Smith
Bedford County
Gabe Elias
SWIC
Advisor
Shawn Talmadge
Chairman
VDEM
Hon Kevin W. Hall
Sheriff
Vice Chairman
City of Covington
Sharon Lawrence
Treasurer
Comptroller
September 28, 2023
Dear Lynchburg PSAP:
I am pleased to advise you that the Virginia 9-1-1 Services Board has
approved your FY24 Staffing Recognition grant request on 9/14/2023.
You have been awarded the following grant:
Grant ID: FY24-STAFF-063
Award Amount: $102,500.00
Award Period Start: 9/14/2023
Award Period End: 6/30/2024
Payment will be made on a reimbursement basis only for allowable costs.
All funding requests must be submitted on the PSAP Grant Funding
Reimbursement Form and submitted to psapgrants@vdem.virginia.gov.
All supporting documentation required by the grant guidelines should be
attached to the form when it is submitted.
If you need to review the grant guidelines or need copies of grant
reimbursement forms, you can visit the Public Safety Communications
Division website which is located at https://psc.vdem.virginia.gov/.
All grant funds for this award must be expended by 6/30/2024.
If you have any questions, please do not hesitate to contact me or your
NGS Outreach Manager. Questions can also be directed to the PSAP
Grants mailbox: psapgrants@vdem.virginia.gov.
Congratulations on your grant award!
Sincerely,
Mary Binford
Public Safety Communications Coordinator
Page 5 of 50
Finance Committee
Agenda Item II.2.
Action
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
November 28, 2023 Melissa Foster, Director of Emergency
Services
AGENDA ITEM # II.2
FY 24 Public Safety Answering Point Grant for Enterprise Geographic Information System (GIS)
Software
RECOMMENDATION
Adopt a resolution to amend the FY 2024 City/Federal/State Aid Fund budget to appropriate $3,000
with funding from the Virginia 9-1-1 Services Board FY 2024 Public Safety Answering Point (PSAP)
Enterprise GIS Software Grant, to support departmental GIS services and software.
SUMMARY
The 9-1-1 Services Board recognizes the importance of GIS to Public Safety Answering Points
across the Commonwealth. The GIS data is used in emergency call routing functions, to determine
which 911 call center a call should be routed to and also in location validation to identify the correct
location of an address (using house number and street name data).This grant is meant to provide
some support to those GIS systems so that they can continue providing this important support.
PRIOR ACTION(S)
November 28,2023: Finance Committee Meeting.
FISCAL IMPACT
This is a reimbursement grant, so the City will need to expend the funds and then submit a request
for reimbursement.
CONTACT(S)
Melissa Foster, Director of Emergency Services
ATTACHMENT(S)
1. RESOLUTION PSAP GIS
2. Lynchburg - FY24-EGS-015 Grant Award Letter
REVIEWED BY
Date:
Melissa Foster, Director of Emergency Services
Date:
Page 6 of 50
Mercedes Braun, Assistant to the City Manager
Date:
Wynter Benda, City Manager
Date:
Alicia Finney, Clerk of Council
Page 7 of 50
RESOLUTION: #R-23-_______
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF LYNCHBURG that the FY 2024
City/Federal/State Aid Fund budget is amended and $3,000 is appropriated therein with
funding/resources from the Virginia 9-1-1 Services Board FY 2024 Public Safety Answering Point
(PSAP) Enterprise GIS Software Grant, to support departmental GIS services and software.
Introduced: Adopted:
Certified:
Clerk of Council
Page 8 of 50
Virginia 9-1-1 Services Board
Dorothy Spears-Dean, Ph.D.
Deputy State Coordinator
VDEM
(804) 840-7260
Mary Binford
PSC Coordinator
VDEM
(804) 536-8177
Saving lives through effective emergency management and homeland security.
“A Ready Virginia is a Resilient Virginia.”
Justin Martin
Finance Director
Carroll County
Julie Henry
Virginia State Police
Gary Critzer
Emergency Mgmt/ EMS Dir
City of Waynesboro
Todd Brewster
Police Chief
Town of Blacksburg
Terry Ellis
Comcast
John DiBacco
Fire Chief
City of Norfolk
Patricia Turner
Loudoun County
Pete Hatcher
AT&T
Michelle Painter Lama
T Mobile
Matthew Ogburn
Verizon Comminications
Robert Osmond
CIO - VITA
Judson W. Smith
Bedford County
Gabe Elias
SWIC
Advisor
Shawn Talmadge
Chairman
VDEM
Hon Kevin W. Hall
Sheriff
Vice Chairman
City of Covington
Sharon Lawrence
Treasurer
Comptroller
September 28, 2023
Dear Lynchburg PSAP:
I am pleased to advise you that the Virginia 9-1-1 Services Board has
approved your FY24 Enterprise GIS Software grant request on 9/14/2023.
You have been awarded the following grant:
Grant ID: FY24-EGS-015
Award Amount: $3,000.00
Award Period Start: 9/14/2023
Award Period End: 6/30/2024
Payment will be made on a reimbursement basis only for allowable costs.
All funding requests must be submitted on the PSAP Grant Funding
Reimbursement Form and submitted to psapgrants@vdem.virginia.gov.
All supporting documentation required by the grant guidelines should be
attached to the form when it is submitted.
If you need to review the grant guidelines or need copies of grant
reimbursement forms, you can visit the Public Safety Communications
Division website which is located at https://psc.vdem.virginia.gov/.
All grant funds for this award must be expended by 6/30/2024.
If you have any questions, please do not hesitate to contact me or your
NGS Outreach Manager. Questions can also be directed to the PSAP
Grants mailbox: psapgrants@vdem.virginia.gov.
Congratulations on your grant award!
Sincerely,
Mary Binford
Public Safety Communications Coordinator
Page 9 of 50
Finance Committee
Agenda Item II.3.
Action
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
November 28, 2023 Melissa Foster, Director of Emergency
Services
AGENDA ITEM # II.3
FY 24 State Homeland Security Program Grant for Registrar's Office Security
RECOMMENDATION
Adopt a resolution to amend the FY 2024 City/Federal/State Aid Fund budget and appropriate
$29,707 with resources from the Virginia Department of Emergency Management, 2023 State
Homeland Security Program Grant to purchase a Security Camera System and Front Counter
Upgrade for the Lynchburg Registrar's Office.
SUMMARY
The Department of Emergency Services was awarded $29,707 through a competitive grant process
from the Virginia Department of Emergency Management, State Homeland Security Program to
purchase a Security Camera System and Front Counter Upgrade for the Lynchburg Registrar's
Office. The purpose of the proposed project is to install a security camera system in the City of
Lynchburg Registrar’s Office at 825 Kemper St, Suite A, Lynchburg, VA 24501, as well as harden
and upgrade the front counter area so as to provide staff a more secure way for staff to greet
customers and provide a place to shelter in place if necessary. The Registrar’s Office is considered
a critical infrastructure. All election administration for the City of Lynchburg takes place within the
office as well as early and absentee voting. Improving the physical security of the building protects
the building and all of the information and technology held within. The total cost is $29,707, which is
fully reimbursable by the grant; no local matching funds are required.
PRIOR ACTION(S)
November 28, 2023: Finance Committee
FISCAL IMPACT
None, no local match is required.
CONTACT(S)
Melissa Foster, Director of Emergency Services
Piper Vandeperre, Emergency Program Specialist
ATTACHMENT(S)
1. RESOLUTION SHSP Registrar Project
2. DES_SHSP_GrantFY23
Page 10 of 50
REVIEWED BY
Date:
Melissa Foster, Director of Emergency Services
Date:
Mercedes Braun, Assistant to the City Manager
Date:
Wynter Benda, City Manager
Date:
Alicia Finney, Clerk of Council
Page 11 of 50
RESOLUTION: #R-23-_______
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF LYNCHBURG that the FY 2024
City/Federal/State Aid Fund budget is amended and $29,707 is appropriated therein with
funding/resources from the Virginia Department of Emergency Management, 2023 State
Homeland Security Program Grant, to purchase Security Cameras and Front Counter Upgrade
for the Lynchburg Registrar’s Office.
Introduced: Adopted:
Certified:
Clerk of Council
Page 12 of 50
1
Foster, Melissa
From: Farnen, Tenny (VDEM) <Tenny.Farnen@vdem.virginia.gov>
Sent: Thursday, November 9, 2023 10:15 AM
To: Benda, Wynter
Cc: Vandeperre, Piper; Foster, Melissa; vdemgrants (VDEM)
Subject: FY 2023 State Homeland Security Program Grant (SHSP) - Lynchburg City
CAUTION: External Sender
November 09, 2023
Mr. Wynter Benda
City Manager
City of Lynchburg
900 Church St.
Lynchburg, VA 24504
RE: FY 2023 State Homeland Security Program Grant (SHSP)
Dear Mr. Benda:
The Virginia Department of Emergency Management (VDEM) is pleased to announce the allocation of
a 2023 State Homeland Security Program Grant (SHSP) CFDA 97.067 from the U.S. Department of
Homeland Security (DHS) Federal Emergency Management Agency (FEMA). Appropriation authority for
this program is The Department of Homeland Security Appropriations Act, 2023 (Public Law 117-328).
Your locality has been allocated funding for:
EM Grants Application Title: Security Cameras and Counter Upgrade
Federal Grant Allocation: $29,707.00
Subrecipient’s Required Cost Share/Match Amount: N/A
Total Grant Award: $29,707.00
Period of Performance (POP): October 01, 2023 to June 30, 2025
*This letter serves as notification of your allocation and is not an authorization to incur
expenditures. Funds will be formally awarded to your locality through a Grant Agreement issued by
VDEM upon its execution following the approval your application package and budget submission in
VDEM’s electronic Grants Management System, VDEM EM Grants.
You must initiate these steps, described under Accessing Your Allocation, within 60 days from the date
of this notification or funds may be re-allocated. If extenuating circumstances such as local board
approval will prevent you from meeting the 60-day deadline, please notify your Grant Administrator as
soon as possible.
OPT-Out Notice
Should your agency decide not to proceed with applying for the allocation, and “Opt-Out” notice must be
submitted to VDEM before 1/8/2024. Please follow the below steps to submit your “Opt-Out” notice:
1. Login to your account at vdem.emgrants.com
Page 13 of 50
2
2. From you Agency’s home page, click on the blue “Apply Now” button, then select the FY2023 SHSP
grant and project type before clicking on the “Create” button.
3. Once the Application loads, select the “Opt-Out” option in the field asking about your agency’s
participation, then complete the remainder of the required fields.
4. Once done, click on the “Submit” button to submit your “Opt-Out” notice to VDEM.
Program Objectives
The objective of the State Homeland Security Program is to assist state and local preparedness
activities that address high-priority preparedness gaps across all core capabilities that support
terrorism preparedness. All supported investments are based on capability targets and gaps identified
during the Threat and Hazard Identification and Risk Assessment (THIRA) process, and assessed in the
State Preparedness Report (SPR).
The FY 2023 Homeland Security Grant Program (HSGP) supports state and local efforts to prevent
terrorism and other catastrophic events and to prepare the Nation for the threats and hazards that
pose the greatest risk to the security of the United States. References to these priorities can be found
throughout this document. The FY 2023 HSGP provides funding to implement investments that
enhance terrorism preparedness and serve to build, sustain, and deliver the 32 core capabilities
essential to achieving the National Preparedness Goal (the Goal) of a secure and resilient Nation. The
allowable costs under FY 2023 HSGP support the core capabilities across the five mission areas of
Prevention, Protection, Mitigation, Response, and Recovery.
Important Award Terms and Conditions
Subrecipients must comply with the following federal requirements:
FY 2023 Homeland Security Grant Program (HSGP) Notice of Funding Opportunity
Homeland Security Grant Program (HSGP) NOFO
Department of Homeland Security Standard Terms and Conditions for 2023
DHS Standard Terms and Conditions
2 CFR Part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal
Awards
2 CFR Part 200 Uniform Administrative Requirements
Management and Administration (M&A)
Your local emergency management agency may retain and use up to five percent of the award for local
management and administration purposes. M&A activities are those directly related to managing and
administering SHSP Program funds, such as financial management and monitoring. It should be noted
that salaries of local emergency managers are not typically categorized as M&A, unless the local
emergency management agency chooses to assign personnel to specific M&A activities.
Indirect (Facilities & Administrative [F&A]) Costs
Page 14 of 50
3
Indirect costs are allowable under this program, as described in 2 C.F.R. § 200.414. With
the exception of recipients who have never received a negotiated, indirect cost rate as
described in 2 C.F.R. § 200.414(f), recipients must have an approved indirect cost rate agreement with their
cognizant Federal agency to charge indirect costs to this award. A copy of the approved rate (a fully executed,
agreement negotiated with the applicant’s cognizant Federal agency) is required at the time of application, and
must be provided to FEMA before indirect costs are charged to the award.
Apply For Your Allocation
Your agency is hereby invited to complete and submit a Grant Application for the full amount of your
organization’s Total Grant Allocation amount. To do so, please follow these steps:
1. Register for and/or login to your account at vdem.emgrants.com.
2. From your Agency’s home page, click on the blue “Apply Now” button, then select the FY2023 SHSP or UASI
grant and project type before clicking on the “Create” button.
3. Complete the entire Application form online and upload all the listed required documents that apply to your
specific Application. Also, as a part of the Grant Application, you will be required to complete and upload the
attached Vendor Maintenance Form (VMF) and W-9 Form into the Grant Application portal.
4. Once completed, click on the “Submit” button to submit your Application to VDEM for review.
An email notification will be generated and sent when the Grant Agreement is ready for your review and
execution. Steps to do so will be provided via that notification.
Requirements: Obtain and provide Unique Entity Identifier (UEI) and Register in the System for Award
Management (SAM)
Each applicant, unless they have a valid exception under 2 CFR 25.110, must:
1) Be registered in SAM.gov before application submission;
2) Provide a valid Unique Entity Identifier (UEI) in its application; and
3) Continue to always maintain an active System for Award Management (SAM) registration with current
information during the Federal Award process.
Note that subrecipients do not need to have a valid UEI at the time of application; however, they must have a
valid UEI in order to receive a subaward.
Reporting
Subrecipients are obligated to submit Quarterly Progress Reports as a condition of their subaward.
Quarterly progress reports must be uploaded directly into your vdem.emgrants.com account within 15
days following the end of the quarter. The schedule for reporting is as follows:
Timetable and Deadlines for 2023 SHSP Progress Reporting (includes SHSP, UASI and NSGP
subawards):
[Quarter 1 of 7] Time Period: October 1, 2023 to December 31, 2023
Quarter 1 Report Due: On or Before January 15, 2024
[Quarter 2 of 7] Time Period: January 1, 2024 to March 31, 2024
Quarter 2 Report Due: On or Before April 15, 2024
Page 15 of 50
4
[Quarter 3 of 7] Time Period: April 1, 2024 to June 30, 2024
Quarter 3 Report Due: On or Before July 15, 2024
[Quarter 4 of 7] Time Period: July 1, 2024 to September 30, 2024
Quarter 4 Report Due: On or Before October 15, 2024
[Quarter 5 of 7] Time Period: October 1, 2024 to December 31, 2024
Quarter 5 Report Due: On or Before January 15, 2025
[Quarter 6 of 7] Time Period: January 1, 2025 to March 31, 2025
Quarter 6 Report Due: On or Before April 15, 2025
[Quarter 7 of 7] Time Period: April 1, 2025 to June 30, 2025
Quarter 7 Report Due: On or Before July 15, 2025
HSGP Final Progress Reports:
Due: On or Before July 30, 2025
Within 30 days following the end of the period of performance, subrecipients must upload a
Final Progress Report detailing all accomplishments throughout the period of performance into their
VDEM EM Grants account. After these reports have been submitted, reviewed and approved by the
Grants Office and Chief Regional Coordinators, a close-out notice will be issued which will indicate the
period of performance as closed, list any remaining funds that will be deobligated and address the
record retention requirements for grant records. The subrecipient must return any funds that have
been drawn down, but remain unliquidated in its financial records.
Period of Performance (POP) Extensions
Extensions to this program are allowed. Extensions to the initial period of performance
identified in the subaward will only be considered through formal, written requests
addressed to VDEM and must contain specific and compelling justifications as to why an extension is
required. Subrecipients are advised to coordinate with the Grant Administrator, as needed, when preparing an
extension request. All extension requests must address the following:
1. Grant program, fiscal year, and subaward ID number in vdem.emgrants.com
2. Reason for delay that must include details of the legal, policy, or operational
challenges that prevent the final outlay of awarded funds by the applicable
deadline
3. Current status of the activity/activities and proposed remedies to address the cause of the
performance delay
4. Proposed period of performance termination date and proposed project completion
5. Amount of funds drawn down to date
6. Remaining available funds, both Federal and non-Federal
7. Budget outlining how remaining Federal and non-Federal funds will be
expended
8. Plan for completion, including milestones and timeframes for achieving each
milestone, and the position/person responsible for implementing the plan for
completion
9. Certification that the activity/activities will be completed within the proposed period of performance
without any modification to the original Statement of Work, as described in the approved budget
Extension requests will be granted only due to compelling legal, policy, or operational
challenges. Extension requests will only be considered for the following reasons:
Page 16 of 50
5
Contractual commitments by the grant recipient with vendors or subrecipients prevent completion of the
project within the existing period of performance
The project must undergo a complex environmental review that cannot be completed within existing period
of performance
Projects are long-term by design and therefore acceleration would compromise core programmatic goals
Where other special circumstances exist
Recipients should electronically submit all extension requests to VDEM via vdem.emgrants.com no later than 90
days prior to June 30, 2025.
Please initiate the steps described under Apply For Your Allocation within 60 days from the date of
this notification. If you have any questions regarding this award, please contact Tenny Farnen at
tenny.farnen@vdem.virginia.gov.
Sincerely,
Cheryl Adkins
Chief Financial Officer
CA/tlf
cc: Ms. Piper VanDePerre, Emergency Programs Specialist
Mr. Andy John, Director of Regional Support, West Division
Mr. Gene Stewart, Chief Regional Coordinator, Region 3
Page 17 of 50
Finance Committee
Agenda Item II.4.
Action
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
November 28, 2023 Gregory Wormser, Fire Chief
AGENDA ITEM # II.4
2023 State Homeland Security Program (SHSP) grant for the Fire Department Technical Rescue
Team
RECOMMENDATION
Adopt a resolution to amend the FY 2024 City/Federal/State Aid Fund budget and appropriate
$70,000 with resources of $70,000 from the 2023 State Homeland Security Program (SHSP) grant
from U.S. Department of Homeland Security (DHS) to fund equipment for the Fire Department
Technical Rescue Team.
SUMMARY
Adopt a resolution to amend the FY 2024 City/Federal/State Aid Fund budget and appropriate
$70,000 with resources of $70,000 from the 2023 State Homeland Security Program (SHSP) from
U.S. Department of Homeland Security (DHS) to fund equipment for the Fire Department Technical
Rescue Team.
The funds will be used for the purchase of PPE (Personal Protective Equipment), rope rescue
equipment, USAR stabilization equipment to include low pressure air bags, confined space rescue
communications equipment and a new exothermic torch system.
The majority of this equipment is replacing existing equipment that has exceeded its useful life, but
there are a few items that are being added to enhance our rescue capabilities. This equipment can
be used in a variety of ways, such as stabilization of a structure that is in danger of collapse,
stabilizing a vehicle after a crash or clearing debris from a trench. This equipment is vital to the
successful mitigation of a variety of incident types and ensures not only the prolonged safety of our
citizens, but also the immediate safety of our responders.
The grant is 100% reimbursable; no local match is required.
PRIOR ACTION(S)
November 28, 2023: Finance Committee
FISCAL IMPACT
None - No local match is required. Future funds may be needed for periodic maintenance of the
equipment purchased.
CONTACT(S)
Gregory Wormser, Fire Chief
Page 18 of 50
Annette Pettyjohn, Administrative Manager
ATTACHMENT(S)
1. Resolution - FY 2023 State Homeland Security Program grant $70,000
REVIEWED BY
Date:
Gregory Wormser, Fire Chief
Date:
Mercedes Braun, Assistant to the City Manager
Date:
Wynter Benda, City Manager
Date:
Alicia Finney, Clerk of Council
Page 19 of 50
RESOLUTION:
BE IT RESOLVED that the FY 2024 City/Federal/State Aid Fund budget is amended and $70,000 is
appropriated with resources from the 2023 State Homeland Security Program (SHSP) grant from U.S.
Department of Homeland Security (DHS) to fund equipment for the Fire Department Technical Rescue Team.
Introduced: Adopted:
Certified: _________________________________
Clerk of Council
Page 20 of 50
Finance Committee
Agenda Item III.5.
Information Only
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
November 28, 2023
AGENDA ITEM # III.5
Quarterly Reports
RECOMMENDATION
Review highlights of the attached quarterly financial reports for the quarter ending June 30, 2023:
(General Fund presented at October 24, 2023 Finance Committee meeting)
FUND Presenter:
A) Greater Lynchburg Transit Company (GLTC) Josh Moore, GLTC General Manager
B) Regional Airport Fund Andrew LaGala, Airport Director
C) Lynchburg Regional Juvenile Detention Center Preston Sellers, Director of Human Services
D) Children's Services Act Fund (CSA) Preston Sellers, Director of Human Services
E) Water Operating Fund Tim Mitchell, Director of Water Resources
F) Sewer Operating Fund Tim Mitchell, Director of Water Resources
G) Stormwater Operating Fund Tim Mitchell, Director of Water Resources
SUMMARY
In compliance with the Finance Committee guidelines, quarterly financial reports are provided for
General, Water, Sewer, Stormwater, Airport, Lynchburg Regional Juvenile Detention Center,
Children’s Services Act (CSA) Funds, and Greater Lynchburg Transit Company (GLTC).
PRIOR ACTION(S)
October 24, 2023: Finance Committee
FISCAL IMPACT
None
CONTACT(S)
Donna Witt, Chief Financial Officer
ATTACHMENT(S)
1. Fourth Quarter Reports ending June 30 2023 - November Finance Committee
REVIEWED BY
Page 21 of 50
GREATER LYNCHBURG TRANSIT COMPANY
We're Here To Get You There!
Finance Committee
Lynchburg City Council
October 17th, 2023
Re: GLTC Quarterly Financial Report – Draft 4th Quarter 2023
REVENUE
GLTC has experienced higher than anticipated revenues in Fixed Route fares with a 39% positive
variance with Paratransit fare revenues down 3% this quarter. Fares have increased commensurate with
ridership as GLTC is projected to finish the year with ridership reaching 78.2% of pre-Covid numbers
(excluding Liberty University service). Non-operating revenues are down 97% ($1,518) this quarter, and
advertising revenue is down 51% ($7,035) for this quarter in the current economic conditions. City,
County, State, and Federal operating assistance revenues have been disbursed to GLTC on time.
There is a decrease of 13% in State and 20% in Federal funds due to GLTC receiving higher
reimbursements as costs trended higher after the beginning of drawing on 5307 Operating funds. This also
includes reimbursement for the 3
rd Quarter TRIP grant service.
Overall revenues were 15% higher than budgeted for the quarter.
EXPENSES
Fixed Route
Total Fixed Route expenses are 13% over budget for the quarter. Overtime for this quarter decreased
significantly to 26% below budget with the addition of new operators. Other Salaries and Wages show an
increase as these were the changes in employee pay which occurred in September of 2022. Fringes and
Supervisor overtime is down for the quarter 7% and 61% respectively. To better show the use of IT in
various departments, IT costs related to Operations and Maintenance have been moved into a new line
item. This has resulted in very large positive variances in Operations and Maintenance and a negative in
Administration.
Demand Response (PTS)
Total Demand Response expenses are 1% above budgeted numbers this quarter. Operator labor and
fringe benefits are down 14% and 14% respectively. Overtime is over budget by 7% due to increased trip
spread. Salaries and wages for the remaining staff in this department are down 5% for the quarter.
Page 22 of 50
GREATER LYNCHBURG TRANSIT COMPANY
We're Here To Get You There!
Maintenance
Maintenance wages and salaries are at 3% below budgeted. Inspection and Servicer Overtime is 60%
below budget as the workload on staff has eased as job openings have been filled. Benefits for both
groups are down 5% for the quarter due to employees not taking benefits through us. Fuel and lubricant
costs have eased and are 23% under budget for the quarter, but 3% under for the year. Diesel prices
spiked in October and early November but have now eased from their high points, but volatility in pricing
remains a concern.
Tires were 32% under for the quarter and are 50% under for the year. GLTC ordered tires from multiple
manufacturers at much higher costs during the shortages earlier in the year and as these orders have been
filled, or canceled, actual expenses were reduced from their previously recorded pricing as shortages
eased. Other materials and supplies are currently 49% above budget for this quarter as GLTC has
completed some preventative maintenance programs to proactively fix issues while parts and supplies
were available.
Administration
Administration is currently 29% below budget. Services were 5% over budget, with IT being 927% under
budget due to the splitting of the IT accounting. Approximately ⅔ of the IT budget as previously shown
was for Operations and Maintenance support functions, both of which had increased costs from vendors
passed through this year.
Casualty and Liability insurance is 7% under budget for this quarter. Utilities are over budget by 10% this
quarter coinciding with the rate increases for both AEP and Columbia Gas. Miscellaneous expenditures
are lower this quarter as staff determined several efficiencies that could be enacted.
SUMMARY
For the quarter, total expenses were over budget by 3% ($65,0710). For the year, GLTC currently has a
draft final budget of $416,244 as a surplus, but is still awaiting the final recordation of several non-
material items including GASB 96 numbers before the books can be closed.
Currently the largest uncertainty for GLTC funding is the pending November 17th expiration of the
Continuing Resolution for the Federal Government. As GLTC is currently utilizing 5307 funds, those
may be unavailable in the advent of the cessation of payments by the Federal Government. GLTC staff
are monitoring the status of negotiations and will be acting as necessary to ensure that GLTC has funding
as needed.
Respectfully,
Joshua A. Moore
General Manager
Page 23 of 50
DRAFT
PENDING
FINAL AUDIT
CENTRAL VIRGINIA TRANSIT MANAGEMENT CO INC.
DRAFT QUARTERLY INCOME STATEMENT
AS OF JUNE 30, 2023
QTR TO DATE
FY2023 FY2023 FY2023 FY2023 %
QTD QTD % YTD YTD of
ACTUAL BUDGET VAR ACTUAL BUDGET Budget
REVENUE
FRT Passenger Revenue 131,124$ 94,248$ 39% 473,057$ 376,992$ 125%
DRT Passenger Revenue 8,541 8,766 -3% 38,662 35,064 110%
Contracts (CVCC Access) 11,814 11,814 0% 47,256 47,256 100%
Non-Operating Revenue 44 1,625 -97% 7,100 6,500 109%
Advertising Revenue 6,715 13,750 -51% 32,134 55,000 58%
City Operating Assistance 316,615 316,614 0% 1,266,454 1,266,454 100%
County Operating Assistance 19,450 19,450 0% 77,800 77,800 100%
State Operating Assistance 688,899 610,032 13% 2,299,721 2,440,128 94%
Federal Operating Assistance 1,488,971 1,244,701 20% 4,875,887 4,978,805 98%
TOTAL REVENUE 2,672,172$ 2,321,000$ 15% 9,118,071$ 9,283,999 $ 98%
EXPENSES
FIXED ROUTE
Operator Labor 427,879 $ 416,257$ 3% 1,697,234$ 1,665,029$ 102%
Operator-Overtime 39,278 53,074 -26% 158,465 212,297 75%
Other Salaries & Wages 127,920 96,338 33% 514,011 385,353 133%
Supervisors-Overtime 1,948 4,956 -61% 10,153 19,824 51%
Fringe Benefits 297,283 278,486 7% 1,094,141 1,113,943 98%
Information Technology 86,272 19,490 343% 86,272 77,960 111%
TOTAL FIXED ROUTE
980,580$ 868,602 $ 13% 3,560,277$ 3,474,406$ 102%
DEMAND RESPONSE
Operator Labor 76,214 $ 88,852$ -14% 292,871$ 355,406$ 82%
Operator-Overtime-PTS 2,831 2,655 7% 11,010 10,621 104%
Other Salaries & Wages 26,168 27,560 -5% 90,137 110,240 82%
Fringe Benefits 52,065 60,246 -14% 181,150 240,984 75%
Information Technology 32,426 8,238 294% 32,426 32,950 98%
TOTAL DEMAND RESPONSE 189,704$ 187,550 $ 1% 607,593$ 750,201 $ 81%
MAINTENANCE
Other Salaries & Wages 190,772$ 197,050$ -3% 763,653$ 788,200$ 97%
Inspection&Maint,Srvc-Overtim
e 5,494 13,775 -60% 18,305 55,100 33%
Fringe Benefits 97,724 102,729 -5% 359,505 410,916 87%
Fuel & Lubricants 171,315 222,568 -23% 860,967 890,270 97%
Tires & Tubes 22,996 33,625 -32% 67,444 134,500 50%
Information Technology 13,638 2,898 371% 13,638 11,590 118%
Other Materials & Supplies 171,507 115,422 49% 453,733 473,279 96%
TOTAL MAINTENANCE 673,447$ 688,066 $ -2% 2,523,608$ 2,752,265 $ 92%
ADMINISTRATION
Other Salaries & Wages 127,429$ 175,278$ -27% 507,043$ 701,110$ 72%
Fringe Benefits 63,441 68,449 -7% 233,113 273,794 85%
Services 145,531 138,293 5% 585,449 553,170 106%
Utilities 52,150 47,219 10% 208,372 188,874 110%
Casualty & Liability Expenses 66,995 71,821 -7% 242,517 287,282 84%
Information Technology (88,938) 10,757 -927% 80,140 43,029 186%
Other Materials & Supplies 12,353 16,519 -25% 45,417 66,076 69%
Miscellaneous 33,236 48,448 -31% 83,352 193,792 43%
TOTAL ADMINISTRATION
412,197$ 576,782 $ -29% 1,985,404$ 2,307,127 $ 86%
TOTAL EXPENSES 2,255,929$ 2,321,000$ -3% 8,676,881$ 9,283,999$ 93%
NET INCOME/(LOSS) 416,244$ - $ 100% 441,190$ -$ 100%
Page 24 of 50
Page 25 of 50
Page 26 of 50
LYNCHBURG REGIONAL AIRPORT
OPERATING FUND FINANCIAL SUMMARY
June 30, 2023 FY 2023
$ Variance
FY 2022 FY 2022 FY 2022 * FY 2023 FY 2023 FY 2023 * FY 2023 FY 2023 Actual vs.
Amended Actual % of * Amended Actual % of * Amended Actual Amended
Budget (thru 6/30/22) Budget * Budget (thru 6/30/23) Budget * Budget Total Budget
* *
BEGINNING NET ASSETS 250,000$ 34,950,037$ * 258,848$ 34,198,656$ (1) * 258,848$ 34,198,656$ (1)
Less: Invested in Capital Assets, net of related debt (34,982,320) * (33,156,798) * (33,156,798)$
* *
BEGINNING UNRESTRICTED NET ASSETS 250,000$ (32,284)$ * 258,848$ 1,041,856$ * 258,848$ 1,041,856$ -$
* *
USE OF ENCUMBRANCES CARRIEDFORWARD 490,663$ 215,397$ 215,397$
TRANSFER OF RESERVES TO CAPITAL FUND * *
REVENUES * *
Airfield 95,000 91,142 96% * 100,000 94,812 95% * 100,000 94,812 (5,188)
Terminal 1,284,583 1,405,684 109% * 1,461,383 1,578,200 108% * 1,461,383 1,578,200 116,817
General Aviation 594,000 690,903 116% * 719,650 817,432 114% * 719,650 817,431 97,781
Other Leased Property 402,050 401,574 100% * 408,050 417,428 102% * 408,050 417,428 9,378
State Airport Aid 535,000 591,407 111% * 335,000 295,272 88% * 335,000 295,272 (39,728)
Federal Security Aid 87,000 87,350 100% * 87,000 87,380 100% * 87,000 87,380 380
Federal CARES/CRRSA/ARPA Grants 4,429,578 2,458,159 55% * 2,400,000 2,465,189 103% * 2,400,000 2,465,189 65,189
Interest & Other 55,000 71,139 129% * 135,000 212,243 157% * 135,000 212,243 77,243
* *
TOTAL REVENUES 7,482,211$ 5,797,358$ * 5,646,083$ 5,967,956$ * 5,646,083$ 5,967,956$ 321,873$
* *
EXPENSES * *
Airfield Operations 304,719 278,060 91% * 321,025 338,377 105% * 321,025 338,377 (17,352)
Terminal Operations 664,597 670,377 101% * 663,875 577,391 87% * 663,875 577,391 86,484
General Aviation 145,815 129,023 88% * 163,119 132,372 81% * 163,119 132,372 30,747
Administration 935,744 979,242 105% * 991,418 1,050,849 106% * 991,418 1,050,849 (59,431)
Safety (ARFF & LEO) 439,510 510,417 116% * 469,889 504,380 107% * 469,889 504,380 (34,491)
Snow Removal 24,030 34,541 144% * 24,030 14,247 59% * 24,030 14,247 9,783
Debt Service 103,312 102,468 99% * 112,363 113,784 101% * 112,363 121,889 (9,526)
Small Projects & Equip. (CARES/CRRSA/ARPA Supported) 4,089,809 1,193,722 29% * 1,787,087 1,231,774 69% * 1,787,087 1,231,774 555,314
Transfers to Other Airport Funds 1,000,000 1,000,000 100% * 1,000,000 1,000,000 100% * 1,000,000 1,000,000 0
Other Airport Expenses 43,532 35,312 81% * 62,188 36,725 59% * 62,188 36,725 25,463
Year-end GASB68 & GASB75 Retiree Accrual Adjustments 15,000 (209,945) 45,000 (303,110) 45,000 (303,110) 348,110
* *
TOTAL EXPENSES 7,766,068$ 4,723,218$ * 5,639,994$ 4,696,789$ * 5,639,994$ 4,704,894$ 935,100$
* *
ENDING UNRESTRICTED NET ASSETS 456,806$ 1,041,856$ * 480,335$ 2,313,023$ * 480,335$ 2,304,917$ (2)
FOOTNOTES:
1) Beginning Net Assets agrees with the Comprehensive Annual Financial Report (CAFR) with the following adjustment:
50,599,946$
(16,401,290)$ Total Revenues 5,967,956$
34,198,656$ Total Expenses 4,704,894$
FY2023 Surplus 1,263,061$
2) FY 2023 Ending Unrestricted Net Assets is comprised of the following:
130,359$ ($88,131.96 beginning + $42,226.90 year end addition to reserve)
141,142$ (encumbrances carried forward to FY2024)
(830,555)$ (net liability as of the end of FY2023)
(659,769)$ (net liability as of the end of FY2023)
1,742$ (net receivables as of 6/30/23 before Soft Close of Fund (not final))
3,521,998$
2,304,917$
GASB87 Net Lease Receivables
FY2023 Projected TotalsTotal Net Assets per CAFR 6/30/22
Less: Net Assets in Capital & PFC Funds
Undesignated Retained Earnings
Total Beginning Net Assets
Des. for Maintenance (Rental Car Facility)
Reserve for Encumbrances at Year-end
GASB68 Pension-related Accrual
GASB75 Other OPEB Obligations
10/19/2023
Page 27 of 50
October 24, 2023
Finance Committee
City Council
City of Lynchburg
Lynchburg, Virginia
RE: June 30, 2023, Quarterly Financial Report - Lynchburg Regional Juvenile Detention Center
Lynchburg Regional Juvenile Detention Center
The attached Lynchburg Regional Juvenile Detention Center (Detention Center) financial report
summarizes the financial activities through June 30, 2023, for FY 2023. The financial spreadsheet
provides comparative year-to-date data for the same period of FY 2022.
REVENUES
Charges for Services
Revenue in this category for the fourth quarter of FY 2023 is $1,696,804 or 106.3% of the budget.
Department of Juvenile Justice Block Grant
This revenue category represents allocations from the Virginia Department of Juvenile Justice (DJJ) for
operational expenses of the Detention Center. Revenues received from the DJJ through the fourth quarter
of FY 2023 are $1,143,152 or 112.4% of the budget.
United States Department of Agriculture (USDA)
This revenue category consists of reimbur sements for meals served to juveniles at the Detention Center.
Year-to-date revenues from USDA for FY 2023 are $38,246 or 95.6% of the budget.
EXPENDITURES
Overall expenditures through the fourth quarter of FY 2023 were $2,984,396 or 85.1% of the budget.
Juvenile Population
The average number of juveniles being served per day during the fourth quarter of FY 2023 is 24 as
compared to 18 in FY 2022. The percentage of Lynchburg City’s juveniles through the fourth quarter is
54% of the total juvenile population.
Page 28 of 50
Finance Committee
October 24, 2023
Page 2
SUMMARY
The Lynchburg Regional Detention Center is recognized for providing educational services, mental health
services, physical health services, and partnerships with local area businesses.
The total revenue through the fourth quarter is $2,885,052 and the total expenditures are $2,984,396.
Respectfully submitted,
Preston Sellers
Director, Department of Human Services
c: Wynter Benda, City Manager
Gregory Patrick, Deputy City Manager
Kent White, Assistant City Manager
Donna Witt, Director, Financial Services
Sherry McIntyre, Accountant, Juvenile Services
Page 29 of 50
FY 2022 FY 2022 FY 2022 FY 2023 FY 2023 FY 2023 FY 2023 FY 2023 FY 2023
Amended Actual % of Amended Actual % of Amended Actual Actual to
Budget 4th QTR YTD Budget Budget 4th QTR YTD Budget Budget 4th QTR YTD Amended
Beginning Funds at July 1 201,324 321,804
Revenues:
Charges for Services 1,175,420 1,227,165 104.4% 1,596,689 1,696,804 106.3% 1,596,689 1,696,804 (100,115)
Intergovernmental- Department of Juvenile Justice Block Grant 1,017,086 1,081,182 106.3% 1,017,086 1,143,152 112.4% 1,017,086 1,143,152 (126,066)
Intergovernmental- USDA 48,000 41,974 87.4% 40,000 38,246 95.6% 40,000 38,246 1,754
Community Placement Program (CPP) 892,600 846,443 94.8% 850,000 0 0.0% 850,000 0 850,000
Miscellaneous and State Ward Per Diem 0 4,300 100.0% 1,400 6,850 489.3% 1,400 6,850 (5,450)
Lease Financing 0 7,179 100.0% 0 0 0.0% 0 0 0
Budget Designations 99,489 0 0.0% 0 0 0.0% 0 0 0
Total Revenues 3,232,595 3,208,243 99.2% 3,505,175 2,885,052 82.3% 3,505,175 2,885,052 620,123
Expenditures:
Salaries 1,606,101 1,678,154 104.5% 1,835,184 1,518,428 82.7% 1,835,184 1,518,428 316,756
Employee Benefits 742,529 654,876 88.2% 834,407 593,756 71.2% 834,407 593,756 240,651
Contractual Services 45,098 76,918 170.6% 52,374 63,706 121.6% 52,374 63,706 (11,332)
Fleet Services 16,958 10,195 60.1% 14,868 8,060 54.2% 14,868 8,060 6,808
Supplies and Materials 216,902 180,798 83.4% 201,900 152,963 75.8% 201,900 152,963 48,937
Utilities 80,750 74,251 92.0% 80,750 84,848 105.1% 80,750 84,848 (4,098)
Training and Conferences 42,550 17,159 40.3% 23,739 2,778 11.7% 23,739 2,778 20,961
Telephone Services 4,993 7,870 157.6% 6,540 7,206 110.2% 6,540 7,206 (666)
Cable/Satellite TV Service 1,460 1,608 110.1% 1,825 1,752 96.0% 1,825 1,752 73
Postage and Mailing 850 (56) -6.6% 850 108 12.7% 850 108 742
Indirect Costs 274,936 274,936 100.0% 272,270 272,270 100.0% 272,270 272,270 0
Self Insurance 20,230 20,230 100.0% 24,310 24,310 100.0% 24,310 24,310 0
Dues and Memberships 500 490 98.0% 500 1,015 203.0% 500 1,015 (515)
Misc. Other Charges 49,464 8,161 16.5% 26,367 1,036 3.9% 26,367 1,036 25,331
Other Charges - Return of Grant Funds (CPP) 0 0 0.0% 0 122,665 100.0% 0 122,665 (122,665)
Rentals and Leases 4,473 2,806 62.7% 4,309 2,928 68.0% 4,309 2,928 1,381
Specific Use Equipment 0 0 0.0% 0 13,770 100.0% 0 13,770 (13,770)
Health and Dental Benefits for Retirees 63,168 56,832 90.0% 63,168 61,584 97.5% 63,168 61,584 1,584
Unemployment Compensation 1,000 80 0.0% 1,000 403 40.3% 1,000 403 597
Workers Comp Indemnity Pymt 10,000 0 0.0% 10,000 0 0.0% 10,000 0 10,000
Professional Services 5,160 5,160 100.0% 5,276 5,276 100.0% 5,276 5,276 0
Serial Bond Principal 6,650 6,650 100.0% 7,000 7,000 100.0% 7,000 7,000 0
Serial Bond Interest 3,465 3,465 100.0% 3,124 3,124 100.0% 3,124 3,124 0
Capital Outlay - Leases 0 7,179 100.0% 0 0 0.0% 0 0 0
Bud Alc Salary Plan Adj 37,045 0 0.0% 0 0 0.0% 0 0 0
TrTo Int Ser Fleet Fund 0 0 0.0% 35,410 35,410 0.0% 35,410 35,410 0
Total Expenditures 3,234,282 3,087,762 95.5% 3,505,171 2,984,396 85.1% 3,505,171 2,948,986 520,775
TOTAL FUND BALANCE 321,805 222,460
Lynchburg Regional Juvenile Detention Center
Special Revenue Fund
Financial Summary
Fourth Quarter: As of June 30, 2023
Page 30 of 50
October 24, 2023
Finance Committee
City Council
City of Lynchburg
Lynchburg, Virginia
Re: Children’s Services Act (CSA) Fund Financial Report for the period ending June 30, 2023.
The attached CSA Fund Financial Summary outlines the financial activity through June 30, 2023. Under
the State guidelines, CSA prior year obligations are paid through September 30th of each year. However,
the annual budget is prepared on a fiscal year basis (July-June). Because of the State guidelines,
expenditures for this fund are unique due to the overlap of grants each fiscal year.
REVENUES
• Public Assistance – Welfare and Administration
The Public Assistance revenue source is the reimbursement received from the State for local expenses
incurred under CSA for providing services to at -risk youth and their families. The current rate of
reimbursement for community-based services is 86.32%, residential services is 65.8%, and for all other
services, 72.64%.
Administrative funds to assist in administering the grant, ($43,896) for FY 2023 were provided by the
State of Virginia.
The State of Virginia r eimbursements for the Children’s Services grant expenditures incurred through
the fourth quarter of 2023 are $5,849,720 or 98.8% of the budget.
• CSA Contribution – General Fund and Schools
These revenue sources are comprised of the required local match for all State funds received for the
Children Services Act. Through the fourth quarter of FY 2023, local matching funds for programs in
the amount of $196,541 or 100.0% of the budget from the Schools and $2,186,054 or 100.0% of the
budget from the General Fund have been received.
• Miscellaneous Revenue/Budget Designations
Miscellaneous Special Welfare revenues in the amount of $22,416 or 46.0% of the budget were
collected through the fourth quarter of FY 2023. These revenues are mainly comprised of recoupments
from children’s social security payments for expenditures incurred on their behalf , and registered
billings for CSA parental co-payments.
Page 31 of 50
Finance Committee
October 24, 2023
Page 2
EXPENSES
• Administrative expenses
CSA Administrative funds are used for salaries, supplies, and materials. Budgeted funds for FY 2023
are $71,917. Actual YTD administrative expenditures through the fourth quarter of FY 2023 are $69,024
or 96.0% of the budget.
• Sum-Sufficient– Foster Care
Foster care expenses include funds for residential facilities, day care, maintenance payments to foster
parents, enhanced maintenance payments to foster parents and foster care prevention services. Year-to-
date foster care expenditures through the fourth quarter of FY 2023 totaled $4,242,017 or 114.4% of
the total budget.
• Sum-Sufficient– Special Education
Special Education expenses include services for Special Education students from the Lynchburg City
Schools. Expenditures through the fourth quarter of FY 2023 total $3,429,863 or 90.4% of the total
budget. Expenditures for this budget line will increase or decrease due to enrollments at private day
placements such as Rivermont School, Bridges and New Vistas School, in addition to students attending
for longer periods of time.
• Non-Sum Sufficient Services (Non-Mandated)
Non-Sum Sufficient expenditures are for services such as counseling, mentoring, crisis intervention,
and foster care prevention services. Non-Sum Sufficient expenditures through the fourth quarter of FY
2023 total $24,223 or 6.4% of the total budget . Non-Sum Sufficient services are provided almost
exclusively to youth involved in the c ourt system. Decreases compared to budget for this category are
attributed to the Court Services Unit accessing alternate funding for court-involved youth.
• Community Base (Sum/Non-Sum Sufficient) Services
This category includes services to children while they are living at home, in the home of an extended
family, in a regular foster family home, or in an independent living arrangement. Community services
may include assessment, crisis stab ilization, therapy, or intervention services provided in the child’s
home. Community Based Services through the fourth quarter of FY 2023 total $767,721, or 106.4% of
the total budget.
Page 32 of 50
Finance Committee
October 24, 2023
Page 3
SUMMARY
While the number of children currently in foster care fluctuates during the year, more children fall into the
“Sum-Sufficient” mandated classification and access CSA funds due to the severity of their needs. Other
factors impacting the budget can be an increase of children receiving more intensive services for extended
periods, increased vendor rates, parental agreements, and an increase in special educational services.
Respectfully submitted,
Preston Sellers
Director of Human Services
c:
Wynter Benda, City Manager
Gregory Patrick, Deputy City Manager
Kent White, Assistant City Manager
Donna Witt, Director of Financial Services
Rhonda Allbeck, Assistant Director of Financial Servicesv
Kathy Collins, Financial Professional IV
Page 33 of 50
FY 2022 FY 2022 FY 2022 FY 2023 FY 2023 FY 2023
Amended Actual 4th QTR % of Amended Actual 4th QTR % of
Budget YTD Budget Budget YTD Budget
Beginning Fund Balance 281,810 0 362,856
Revenues:
Public Assistance - Welfare and Administration 5,319,609 5,081,091 95.5% 5,919,712 5,849,720 98.8%
Transfer from Lynchburg City Schools 196,541 196,541 100.0% 196,541 196,541 100.0%
Transfer from General Fund 2,037,813 2,037,896 100.0% 2,186,054 2,186,054 100.0%
Miscellaneous/Special Welfare 48,600 32,517 66.9% 48,700 22,416 46.0%
Budget Designations 255,817 319,950 0 0.0%
Total Revenues 7,858,380 7,348,045 93.5% 8,670,957 8,254,731 95.2%
Expenses:
Administrative Expenses 70,060 61,941 88.4% 71,917 69,024 96.0%
Sum-Sufficient - Foster Care 3,381,750 3,627,790 107.3% 3,707,383 4,242,017 114.4%
Sum-Sufficient - Special Education 3,238,790 2,857,592 88.2% 3,794,000 3,429,863 90.4%
Non-Sum Sufficient Services 375,907 46,360 12.3% 375,907 24,223 6.4%
Sum-Sufficient and Non-Sum Sufficient Services 791,873 673,316 85.0% 721,750 767,721 106.4%
Miscellaneous/Budget Designations/Transfer to GF 0 0 0 0
Total Expenditures 7,858,380 7,266,999 92.5% 8,670,957 8,532,848 98.4%
ENDING FUND BALANCE 0 362,856 0 84,739
Children's Services Act
Special Revenue Fund
Financial Summary
June 30, 2023
Page 34 of 50
October 24, 2023
Finance Committee
City Council
City of Lynchburg
Lynchburg, Virginia
Re: June 30, 2023 Quarterly Financial Report – Water Operating Fund
The attached Water Operating Fund Financial Summary summarizes the financial activity for this f und
through June 30, 2023. This quarterly report provides comparative financial information for the same
period of the prior fiscal year. Variances between the FY 2023 Adopted Budget and the Department’s year-
end actuals are described below.
REVENUES
Following the completion of the fourth quarter, overall revenues for FY 2023 were $931,191 (5.8%) more
than budget. Explanations of this variance follow:
• Charges for Services:
Revenue in this category wa s $325,153 (2.3%) above budget. This was primarily due to higher than
expected water connections, availability charges , and hydrant rentals being $345,210 more than
budgeted, partially offset by lower than expected water cost plus services of $26,661.
• Water Contracts:
This revenue reflects billing activity to the counties of Amherst, Bedford, and Campbell, and to the
industries of WestRock and Frito- Lay. Revenue in this category was $188,633 (8.6%) above budget.
This was primarily due to WestRock, Frito-Lay, and Bedford County water purchases being $218,785
more than budgeted. This was partially offset by Campbell County being $30,014 less than budgeted.
• Interest and Other:
Interest and Other was $417,405 (1,636.9%) above budget due to higher than expected than expected
interest earnings on investments of $386,541 and increase in miscellaneous revenues of $30,864.
Page 35 of 50
Finance Committee
October 24, 2023
Page 2
EXPENSES
Overall expenses for FY 2023 were $476,873 (2.7%) below budget. Explanations of this variance follow:
• Departmental Operation and Maintenance:
Departmental Operation and Maintenance expenses were $305,202 (2.6%) less than budg et. This
category includes the Water Treatment Plant, Meter Operations, Water Line Maintenance and
Administration. (Water Treatment - $54,959 savings, Meter Operations - $32,012 savings, Water Line
Maintenance - $136,703 savings, Administration - $81,528 savings). This variance is broken down as
follows:
Personnel Services and Benefits $ 158,200
Contractual services 225,209
Chemicals
Utilities
(13,545)
(29,951)
All Other (34,711)
Total $305,202
Personnel Services and Benefits savings were attributable to unfilled positions and lower than expected
health and dental insurance claims. Contractual Services savings were primarily the result of the
following: 1) $56,571 in less than budgeted architectural and engineering services 2) $36,774 in less
than budgeted water plant equipment maintenance and repair services 3) $ 71,834 less than budgeted
water system maintenance and repair services. Chemicals were over budget primarily due to higher
than expected contract pricing that became effective January 1, 2023. Utilities were over budget due to
increased electricity rates starting October 19, 2022.
• Non-Departmental Operation and Maintenance:
Non-Departmental Operation and M aintenance expenses were $198,908 (79.7%) less than budget
mostly due to reduction of estimated worker compensation claims liability that is updated annually at
year end.
• Capital Outlay:
Purchases in this category are reported to be $47,000 (100%) under budget. All purchase activity in this
category met the criteria for capitalization under generally accepted accounting principles rather than
reported as an expense. Actual purchase activity was $16,485.
• Transfers to Capital:
Transfers to Capital were at budget.
• Debt Service:
Page 36 of 50
Finance Committee
October 24, 2023
Page 3
Expenditures in debt service were $74,237 (2.2%) above budget. Although interest payments on the line
of credit were reduced by the February issuance of 2023 general obligation bonds that included proceeds
to cover capital expenditures from February to June, 2023, actual interest expense paid was higher than
budgeted. This was due to actual interest rates to calculate interest charges on line of credit borrowings
were higher than budgeted interest rates.
SUMMARY
The fourth quarter report reflects a stable FY 2023 financial position for this fund. Under the Council
adopted financial policies, two important financial ratios, debt coverage and fund balance exceeded policy
targets. The debt coverage ratio fo r the fiscal year was 1.49, which is above Council’s financial policy
minimum target of 1.20. The fund balance ratio for the end of the fiscal year was 48% compared to target
range of 25% - 40%.
Respectfully submitted,
Timothy A. Mitchell, P.E.
Director of Water Resources
cc: Wynter Benda, City Manager
Greg Patrick, Deputy City Manager
Donna Witt, Chief Financial Officer
Page 37 of 50
WATER OPERATING FUND
FINANCIAL SUMMARY
Quarter Ending June 30, 2023
FY 2023
FY 2022 FY 2022 FY 2022 FY 2023 FY 2023 FY 2023 $ Variance
Adopted Actual % of Adopted Actual % of Adopted Budget
Budget Q4 YTD Budget Budget Q4 YTD Budget vs. Actual
REVENUES:
Charges for Services $13,102,086 $13,661,453 104% $13,979,043 $14,304,196 102% $325,153
Water Contracts 2,108,956 2,460,889 117% 2,192,970 2,381,603 109% 188,633
Interest and Other 45,500 30,197 66% 25,500 442,905 1737% 417,405
$15,256,542 $16,152,539 $16,197,513 $17,128,704 $931,191
EXPENSES
Departmental O&M $10,857,787 $9,772,613 90% $11,897,363 $11,592,161 97% $305,202
Non-Departmental O&M 265,564 274,659 103% 249,636 50,728 20% 198,908
Capital Outlay/Purchases 107,000 - 0% 47,000 - 0% 47,000
Transfers to Capital 1,800,000 1,819,007 101% 2,000,000 2,000,000 100% -
Debt Service 3,506,937 3,407,338 97% 3,404,650 3,478,887 102% (74,237)
$16,537,288 $15,273,617 $17,598,649 $17,121,776 $476,873
Adjustment for Expenses from Capital Projects: ($458,752) ($18,390)
KEY RATIOS:
Unrestricted cash target range as a % of operating expenses & debt service: 25% - 40%
Unrestricted cash as a % of operating expenses & debt service: 48%
Financial Policy targeted debt coverage ratio minimum: 1.20
Ending debt coverage ratio: 1.49 (a)
Note (a) Calculation of debt coverage includes $123,974 of capitalizable costs for internal labor charges applicable to time spent on capital project activities.
Page 38 of 50
October 24, 2023
Finance Committee
City Council
City of Lynchburg
Lynchburg, Virginia
Re: June 30, 2023 Quarterly Financial Report – Sewer Operating Fund
The attached Sew er Operating Fund Financial Summary summarizes the financial activity for this fund
through June 30, 2023. This quarterly report provides comparative financial information for the same
period of the prior fiscal year. Variances between the FY 2023 Adopted Budget and the Department’s year
actuals are described below.
REVENUES
Following the completion of the fourth quarter, overall revenues for FY 2023 were $2,069,647 (7.5%) more
than budget. Explanations of this variance follow:
• Charges for Services:
Revenue in this category was $497,149 (2.2%) above budget. This was mostly due to higher than
expected sewer connections, and availability charges being $341,729 more than budgeted. In addition,
Inside Sewer Sales were $159,937 greater than expected.
.
• Sewer Contracts:
Revenue in this category reflects billing activity in the counties of Amherst, Bedford, and Campbell and
the industries of WestRock and Frito-Lay. Revenue from this source was $760,094 (17.0%) over budget.
Sewer sales and industrial surcharges from WestRock and Frito -Lay were $886,950 more than
anticipated. This was mostly attributable to WestRock’s much higher billable surcharges compare d to
previous years. Revenues in this category were partially offset by less than expected county sales for
sewer treatment services and capital reimbursements of $126,856. Decreases in county sales for sewer
treatment was primarily associated with a closing of one large industrial business in Bedford County.
Less than anticipated county capital reimbursements are correlated with deferred completion of Water
Resources Recovery Facility projects and deferred delivery of several large equipment purchases that
were impacted by supply chain issues.
Page 39 of 50
Finance Committee
October 24, 2023
Page 2
• Interest and Other:
Revenue i n this category was $ 812,404 (2,631.7%) greater than budget primarily due to higher than
expected interest earnings on investments of $729,767 and increased miscellaneous revenues of $78,885.
EXPENSES
Overall expenses for FY 2023 were $70,739 (0.2%) less than budget. Explanations of this variance follow:
• Departmental Operation and Maintenance:
Departmental Operation and Maintenance expenses were $664,965 (4.5%) more than budget . This
category includes the Water Resources Recovery Facility (WRRF) and Sewer Line Maintenance.
WRRF was $784,249 under budget. Sewer Line Maintenance was $119,284 under budget. These
variances are broken down as follows:
Personnel Services and Benefits $ (135,425)
Chemicals (134,309)
Utilities (322,153)
Supplies and Materials (201,200)
Contractual Services 488,183
Rentals and Leases (232,386)
Refuse Disposal (93,096)
All Other (34,579)
Total $ (664,965)
Personnel Services and Benefits were over budget due to unbudgeted wage adjustments. The increased
cost in Chemicals was associated with new contract pricing that became effective January 1, 2023. The
increased cost in Utilities was mostly due to an unexpected large increase in electricity rates. American
Electric Power’s fuel factor rate increased 51% starting October 19, 2022. The variance in Supplies
and Materials was mostly related to higher than expected cost in WRRF replacement equipment parts
and materials used for sewer line repairs . Contractual Services savings consist ed mostly from the
following: 1) Completion of digester study scheduled to be finished in FY 2023 will be completed in
FY 2024 deferring $119,000 to next fiscal year. 2) The James River Interceptor sonar evaluation costing
$100,000 was deferred to Fall of 2023. Other Contractual Services savings were incurred from
laboratory costs, root control services, sewer line aerial crossings, and easement clearing. Rentals and
Leases were over budget primarily due to the following: 1) Outsourcing WRRF sludge trailer logistics
related to driver vacancies for $112,250. 2) Rental of HVAC units, air compressors and generators at
the WRRF for $120,136 to cover for duration of electrical feeder network repairs.
Page 40 of 50
Finance Committee
October 24, 2023
Page 3
• Non-Departmental Operation and Maintenance:
Non-Departmental Operation and Maintenance expenses were $ 79,812 (30.1%) under budget. The
annual estimate of worker compensation claims liability as of June 30, 2023 was reduced thus resulting
in $100,636 of savings. This savings was partially offset by $21,054 due to more than anticipated bad
debt expenses charged to Allowance for Doubtful Accounts.
• Capital Outlay:
Purchases in this category are reported to be $ 715,000 (100%) under budget. All purchase activity in
this category me t the criteria for capitalization under generally accepted accounting principles rather
than reported as an expense. Actual purchase activity was $534,552. Due to supply chain issues sludge
trailers estimated to cost $140,000 were deferred to FY 2024.
• Transfers to Capital:
Transfers to Capital were $2,150 greater than budget.
• Debt Service:
Expenditures in debt service were $56,958 (0.7%) above budget. Although interest payments on line of
credit were reduced by the February issuance of 2023 general obligation bonds that included proceeds
to cover capital expenditures from February to June, 2023, actual interest expense paid was higher than
budgeted. This was due to actual monthly interest rates to calculate interest charges on line of credit
borrowings were higher than budgeted interest rates.
SUMMARY
This fourth quarter report reflects a stable FY 2023 year-end financial position for this fund. Under the
Council adopted financial policies, the two important financial ratios, debt coverage and fund balance
exceeded or within policy targets. The debt coverage ratio for the fiscal year was 1.60 compared to a target
range of 1.20 to 1.50. The fund balance ratio for the end of the fiscal year was 38% compared to a target
range 25% - 40%.
Respectfully submitted,
Timothy A. Mitchell, P.E.
Director of Water Resources
cc: Wynter Benda, City Manager
Greg Patrick, Deputy City Manager
Donna Witt, Chief Financial Officer
Page 41 of 50
SEWER OPERATING FUND
FINANCIAL SUMMARY
Quarter Ending June 30, 2023
FY 2023
FY 2022 FY 2022 FY 2022 FY 2023 FY 2023 FY 2023 $ Variance
Adopted Actual % of Adopted Actual % of Adopted Budget
Budget Q4 YTD Budget Budget Q4 YTD Budget vs. Actual
REVENUES:
Charges for Services $19,440,774 $21,069,887 108% $23,046,719 $23,543,868 102% $497,149
Sewer Contracts 4,017,566 5,694,878 142% 4,470,778 5,230,872 117% 760,094
Interest and Other 51,500 135,471 263% 30,870 843,274 2732% 812,404
$23,509,840 $26,900,236 $27,548,367 $29,618,014 $2,069,647
EXPENSES:
Departmental O&M $12,624,579 $13,039,145 103% $14,716,969 $15,381,934 105% (664,965)
Non-Departmental O&M 272,852 324,498 119% 264,907 185,095 70% 79,812
Capital Outlay/Purchases 795,000 - 0% 715,000 - 0% 715,000
Transfers to Capital 2,000,000 3,503,550 175% 4,800,000 4,802,150 100% (2,150)
Debt service 8,905,557 8,826,113 99% 8,820,175 8,877,133 101% (56,958)
$24,597,988 $25,693,306 $29,317,051 $29,246,312 70,739
Adjustment for Expenses from Capital Projects ($397,083) ($31,442)
KEY RATIOS:
Unrestricted cash target range as a % of operating expenses & debt service: 25% - 40%
Unrestricted cash as a % of operating expenses & debt service: 38%
Financial Policy targeted debt coverage ratio minimum: 1.20
Ending debt coverage ratio: 1.60 (a)
Note (a) Calculation of debt coverage includes $162,000 of capitalizable costs for internal labor charges applicable to time spent on capital project activities.
Page 42 of 50
October 24, 2023
Finance Committee
City Council
City of Lynchburg
Lynchburg, Virginia
Re: June 30, 2023 Quarterly Financial Report – Stormwater Operating Fund
The attached Stormwater Operating Fund Financial Summary summarizes the financial acti vity for this
fund through June 30, 2023. This quarterly report provides comparative financial information for the same
period of the prior fiscal year. Variances between the FY 2023 Adopted Budget and the Department’s year
end actuals are described below.
REVENUES
Following the completion of the fourth quarter, the overall revenues for FY 2023 were $142,857 (3.7%)
more than budget. Explanations of this variance follow:
• Charges for Services:
Revenue in this category reflects billing activity for all known impervious areas, Virginia Stormwater
Management Program (VSMP) permits and delinquent charges on past due accounts. Charges for
Services exceeded budget by $31,523 (.9%). This is primarily associated with new impervious areas
from construction within the City.
• Interest and Other:
Interest and Other was $111,334 (1,391.7%) more than budget. This is was due to higher than expected
interest revenue on investments of $82,169 and proceeds from National Oceanic Atmospheric
Administration (NOAA) grant of $29,164. The NOAA grant was originally set to expire in fiscal year
2021 and was extended to August 31, 2022. The extension was given because of the impacts of COVID-
19. These grant proceeds did not require a local match and were used for reimbursement of expenses
directly associated with elementary student environmental education and engagement. These grant
eligible expenses are discussed in the Non-Departmental Operation and Maintenance category.
• Transfers from Other Funds:
Transfers from General Fund were at budget.
Page 43 of 50
Finance Committee
October 24, 2023
Page 2
EXPENSES
Overall expenses for FY 2023 were $204,490 (5.0%) below budget. Explanations of this variance follow:
• Departmental Operation and Maintenance:
Departmental Operation and Maintenance expenses were $ 240,819 (6.6%) less than budget. This
variance is broken down as follows:
Personnel Services and Benefits $76,170
Supplies and Materials 99,460
Contractual Services 168,837
Internal Service Charges – Fleet 16,214
Public Works and Community Development (141,060)
All Other 21,198
Total $ 240,819
Personnel Services and Benefits savings was attributable to unfilled positions and lower than expected
health and dental insurance claims . S upplies and Materials savings were the result of less materials
used in stormwater repairs. Contractual Services savings were primarily a result of the following: (1)
Standard operating procedures and stormwater pollution prevention plans that were schedu led to be
completed before end of FY 2023 will be completed in FY 2024. (2) Due to capitalization threshold of
$10,000, small outfall replacements activity are taking place in the Stormwater Capital Fund. Internal
Service Charges savings were attributable to less than expected vehicle repairs. Public Works
reimbursable leaf collection costs were greater than budget due to unbudgeted wage adjustments to
bring several City job classifications closer to fair market value and decrease wage compression within
each job classification along with a higher number of hours charged compared to previous years. These
unbudgeted wage adjustments were absorbed within the fund to meet overall budgeted expenditures for
FY 2023.
• Non-Departmental Operation and Maintenance:
Non-Departmental Operation and Maintenance expenses were $55,555 (212%) over budget. Allowance
for Uncollectible Accounts were $34,426 more than estimated for budget. N OAA Grant for
reimbursable elementary student educational and engagement expenses was extended without
anticipation resulting in $25,099 in reimbursements. Other details of the NOAA Grant are discussed in
the revenue category of Interest and Other.
• Capital Outlay:
Purchases in this category are reported to be at budget. All purchase activity in this category met the
criteria for capitalization under generally accepted accounting principles rather than reported as an
Page 44 of 50
Finance Committee
October 24, 2023
Page 3
expense. Actual purchase activity was $8,750 due to a paver cleaning machine that was budgeted and
ordered in FY 2022 but did not arrive until September, 2022.
• Transfers to Capital:
Transfers to Stormwater Capital Fund were at budget.
• Debt Service:
Expenditures in debt service were $19,226 (10.2%) below budget. Annual loan repayments to Virginia
Resource Authority (VRA) were reduced $6,331. This was associated with unused loan proceeds for a
recently completed Stormwater Project which allowed annual loan repayments to be restructured.
Interest expense was $12,344 under budget due to reduced interest paid on line of credit for scheduled
projects to be started and completed in FY 2022 that were completed in FY 2023.
SUMMARY
The fourth quarter report reflects a stable FY 2023 financial position for this fund. Under the Council
adopted financial policies, two important financial ratios, debt coverage and fund balance exceeded policy
targets. The debt coverage ratio fo r the fiscal year was 3.37, which exceeded Council’s financial policy
minimum target of 1.20. The fund balance ratio for the end of the fiscal year was 37% compared to the
target range of 15%- 20%.
Respectfully submitted,
Timothy A. Mitchell, P.E.
Director of Water Resources
cc: Wynter Benda, City Manager
Greg Patrick, Deputy City Manager
Donna Witt, Chief Financial Officer
Page 45 of 50
STORMWATER OPERATING FUND
FINANCIAL SUMMARY
Quarter Ending June 30, 2023
FY 2023
FY 2022 FY 2022 FY 2022 FY 2023 FY 2023 FY 2023 $ Variance
Adopted Actual % of Adopted Actual % of Adopted Budget
Budget Q4 YTD Budget Budget Q4 YTD Budget vs. Actual
REVENUES:
Charges for Services $3,366,400 $3,494,218 104% $3,554,750 $3,586,273 101% $31,523
Interest and Other 6,000 26,270 438% 8,000 119,334 1492% 111,334
Transfers from Other Funds 275,000 275,000 100% 275,000 275,000 100% -
$3,647,400 3,795,488 $3,837,750 $3,980,607 $142,857
EXPENSES:
Departmental O&M $3,361,256 $3,123,392 93% $3,623,518 $3,382,699 93% $240,819
Non-Departmental O&M 31,176 27,903 90% 26,210 81,765 312% (55,555)
Capital Outlay/Purchases 10,000 - 0% - - 0% -
Transfers to Capital 450,000 450,000 100% 270,000 270,000 100% 0
Debt Service 185,655 140,640 76% 187,854 168,628 90% 19,226
$4,038,087 $3,741,935 $4,107,582 3,903,092 $204,490
Adjustment for Expenses from Capital Projects ($88,728) ($2,574)
KEY RATIOS:
Unrestricted cash target range as a % of operating expenses & debt service 15% - 20%
Projected unrestricted cash as a % of operating expenses at year end 37%
Financial Policy targeted debt coverage ratio minimum: 1.20
Ending debt coverage ratio: 3.37 (a)
Note (a) Calculation of debt coverage includes $55,254 of capitalizable costs for internal labor charges applicable to time spent on capital project activities.
Page 46 of 50
Finance Committee
Agenda Item IV.6.
Information Only
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
November 28, 2023 Donna Witt, Chief Financial Officer
AGENDA ITEM # IV.6
FY 2024 General Fund Reserve for Contingencies
RECOMMENDATION
Receive an update on the FY 2024 General Fund Reserve for Contingencies.
SUMMARY
The General Fund Reserve for Contingencies is a reserve in the General Fund Operating Budget
designed to provide a source of funding for items not included in the current fiscal year
budget. Requests for use of this reserve is recommended by the Finance Committee, with final
approval by City Council.
The FY 2024 Reserve for Contingencies was adopted at $1,200,000, including $50,000 for City
Manager's Discretionary expenditures. Updates are presented at the monthly Finance Committee
meeting.
PRIOR ACTION(S)
May 23, 2023: City Council, Adoption of the FY 2024 Operating and Capital Budgets
FISCAL IMPACT
As noted in Attachment A.
CONTACT(S)
Donna Witt, Chief Financial Officer
ATTACHMENT(S)
1. General Fund Reserve for Contingencies - Finance Committee - November 2023
REVIEWED BY
Date: November 21, 2023
Donna Witt, Chief Financial Officer
Page 47 of 50
ATTACHMENT A
City Manager's
Reserve for Discretionary
Contingencies Funding
BEGINNING BALANCE, JULY 1, 2023 $1,150,000 $50,000
Carryforward to FY 2024 Reserve for Contingencies - FY 2024 Adopted Budget 0 0
BALANCE $1,150,000 $50,000
APPROPRIATIONS (Second Reading)
TOTAL APPROPRIATIONS $0 $0
REMAINING BALANCE $1,150,000 $50,000
ITEMS INTRODUCED
TOTAL INTRODUCED ITEMS $0 $0
REMAINING BALANCE $1,150,000 $50,000
PENDING ITEMS
TOTAL PENDING ITEMS $0 $0
ENDING BALANCE, JUNE 30, 2024 $1,150,000 $50,000
FY 2024 GENERAL FUND RESERVE FOR CONTINGENCIES
November 2023
Page 48 of 50
Finance Committee
Agenda Item IV.7.
Information Only
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
November 28, 2023 Donna Witt, Chief Financial Officer
AGENDA ITEM # IV.7
Monthly Revenue Collections Update
RECOMMENDATION
Review collections received from five of the City's revenue sources during Fiscal Year 2024. This
report reflects revenues collected through September 2023.
SUMMARY
A comparison of collections received by month is provided for the following revenues:
1. Sales and Use Tax
2. Consumer Utility Tax - Electric
3. Meals Tax
4. Lodging Tax
5. Amusement Tax
PRIOR ACTION(S)
May 23, 2023: City Council, Adoption of the FY 2024 Operating and Capital Budgets
FISCAL IMPACT
As noted on report.
CONTACT(S)
Donna Witt, Chief Financial Officer
ATTACHMENT(S)
1. Monthly Tax Revenues Comparison FY 2024- Finance Committee November 2023
REVIEWED BY
Date: November 21, 2023
Donna Witt, Chief Financial Officer
Page 49 of 50
Comparison of Collections
Budget to Actual FY 2023 - FY 2024
Actual
FY 2021
Actual
FY 2022
Actual
FY 2023
Adopted
FY 2024
Actual
FY 2024
Actual
FY 2024 to
Adopted
FY 2024
Actual
FY 2024 to
Actual
FY 2023
SALES & USE TAX
ADOPTED FY 2024 BUDGET - $23,100,000
JULY $1,503,837 $1,595,392 $1,752,856 $1,537,816 $1,756,307 $218,491 $3,451
AUGUST 1,396,989 1,567,107 1,734,950 1,510,552 1,735,715 225,163 $765
SEPTEMBER 1,531,422 1,702,723 1,910,727 1,641,274 1,873,719 232,445 ($37,008)
TOTAL $4,432,248 $4,865,222 $5,398,533 $4,689,642 $5,365,741 $676,099 ($32,792)
CONSUMER UTILITY TAX - ELECTRIC
ADOPTED FY 2024 BUDGET - $3,500,000
JULY $329,721 $320,905 $323,534 $304,202 $305,391 $1,189 ($18,143)
AUGUST 331,969 340,374 326,175 322,660 315,489 ($7,171) (10,686)
SEPTEMBER 313,877 321,494 316,174 304,762 313,758 $8,996 (2,416)
TOTAL $975,567 $982,773 $965,883 $931,624 $934,638 $3,014 ($31,245)
Actual
Collected
FY 2021 2
Actual
Collected
FY 2022 2
Actual
Collected
FY 2023 2
Adopted
FY 2024
Actual
Assessed
FY 2024
Actual
Assessed
FY 2024 to
Adopted
FY 2024
Actual
Collected
FY 2024 2
Actual
Collected
FY 2024 to
Adopted
FY 2024
Actual
Collected
FY 2024 to
Collected
FY 2023
MEALS TAX
JULY 1
$1,090,332 $1,381,484 $1,450,812 $1,527,821 $1,585,769 $57,948 $1,445,285 ($82,536) ($5,527)
AUGUST 1,186,360 1,506,141 1,608,171 1,615,040 1,724,625 109,585 1,701,730 86,690 $93,559
SEPTEMBER 1,203,439 1,457,339 1,636,715 1,674,556 1,703,056 28,500 1,815,498 140,942 $178,783
TOTAL $3,480,131 $4,344,964 $4,695,698 $4,817,417 $5,013,450 $196,033 $4,962,513 $145,096 $266,815
LODGING TAX
JULY 1
$155,637 $242,273 $268,473 $298,039 $307,142 $9,103 $287,424 ($10,615) $18,951
AUGUST 213,511 333,446 335,707 416,611 365,472 (51,139) 367,347 (49,264) $31,640
SEPTEMBER 257,411 263,845 301,809 324,922 341,748 16,826 341,274 16,352 $39,465
TOTAL $626,559 $839,564 $905,989 $1,039,572 $1,014,362 ($25,210) $996,045 ($43,527) $90,056
AMUSEMENT TAX
JULY 1
$13,970 $59,351 $46,938 $95,133 $89,628 ($5,505) $88,097 ($7,036) $41,159
AUGUST 19,248 55,160 97,916 60,078 63,590 3,512 62,359 2,281 ($35,557)
SEPTEMBER 19,538 45,639 60,593 66,819 64,099 (2,720) 62,730 (4,089) $2,137
TOTAL $52,756 $160,150 $205,447 $222,030 $217,317 ($4,713) $213,186 ($8,844) $7,739
ADOPTED FY 2024 BUDGET - $20,265,000
ADOPTED FY 2024 BUDGET - $3,775,000
ADOPTED FY 2024 BUDGET - $900,000
1 Due to year end accounting activities, a portion of revenues associated with May and June were posted in June and July.
2 "Actual Collected" includes all revenue received per month regardless of whether the payment is current or delinquent.
Prepared for Finance Committee
Page 50 of 50