City Council Work Session — Agenda Packet
City of Lynchburg · Lynchburg City County · City Council · meeting of Jul 11, 2023 · Agenda packets
Open the original document More from City of Lynchburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY COUNCIL
Tuesday, July 11, 2023 | 4:00 PM
Council Chamber- City Hall
900 Church Street
Lynchburg, VA 24504
WORK SESSION AGENDA
I. Welcome Stephanie T. Reed, Mayor
II. Work Session Agenda Overview Wynter C. Benda, City Manager
III. Work Session Agenda Items Wynter C. Benda, City Manager
III.1. Launch LYH and Fireworks on the River Front Update
III.2. CSO Tunnel Project Update
IV. Business Item Briefing(s)
IV.3. Conditional Use Permit (CUP) - Telecommunications Tower - 109 Leroy Bowen
Drive
V. Roll Call
VI. Closed Session
VI.4. Consideration of a closed meeting to discuss appointments for vacancies to the
following Boards and Commissions: Central Virginia Community College Board
of Directors, Economic Development Advisory, Historic Preservation
Commission, Martin Luther King, Jr./Lynchburg Community Council, and
Museum Advisory Board, pursuant to Section 2.2-3711(A.)(1) of the Code of
Virginia, 1950, as amended.
Page 1 of 66
City Council
Agenda Item III.1.
Information Only
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
July 11, 2023 Ashley Kershner - Executive Director - DLA
AGENDA ITEM # III.1
Launch LYH and Fireworks on the River Front Update
RECOMMENDATION
Informational only - No City Council action is required at this time
SUMMARY
Downtown Lynchburg Association Executive Director Ashley Kershner will provide City Council with
an update on the Launch LYH Pitch Competition and the Fireworks on the Riverfront Event. The
Launch LYH Pitch Competition is a grant funded program designed to fill vacant downtown
storefronts and to provide current and potential small business owners with funding to start or
expand a business in Downtown Lynchburg. The competition just wrapped and saw seven local
businesses receive $115K in funds to help with business startup costs.
PRIOR ACTION(S)
N/A
FISCAL IMPACT
N/A
CONTACT(S)
Greg Patrick, Deputy City Manager
ATTACHMENT(S)
1. July Council Update LaunchFireworks
REVIEWED BY
Date: July 06, 2023
Alicia Finney, Clerk of Council
Page 2 of 66
This program is dedicated to
fosteri ng economi c growth
and further revital izing the
heart of L ynchburg by
s up p o rt ing p ro m is ing
entrepreneurs eager to start,
rel ocate, or ex pand thei r
businesses in Downtown
L ynchburg.
Page 3 of 66
PROGRAM
GO ALS
0 1.
0 2.
REDUCE STOREFRONT VACANCY
CREATE NEW AMENITIES AND ATTRACTIONS
03. SUPPORT LOCAL ENTREPRENEURS
Page 4 of 66
PROGRAM OUTCOMES
• 110+ applicants
• 25 accepted into the
program
• 8 weeks of education
provided by SBDC -
Lynchburg Region
• 7 winners to open a
business in Downtown
Lynchburg in the next year
Page 5 of 66
$ 2 5 ,0 0 REC IP IENTS $1 0, 000 R E C I P I E N T S
LYN CH B U R G
GOLF & SOCIAL
Page 6 of 66
FIREWORKS ON THE
RIVERFRONT
Our Fireworks on the Riverfront event
on Friday, June 30 was a resounding
success, attracting thousands of
peopl e to Downtown L ynchburg for an
unforgettabl e evening.
T he event of f ered a bl end of
entertainment, food, and famil y - frie n d ly
acti vi ti es that capti vated attendees
throughout the night whil e showcasing
the vibrant and wel coming community
s p irit t ha t t hrive s in o ur c it y.
Page 7 of 66
Page 8 of 66
City Council
Agenda Item III.2.
Information Only
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
July 11, 2023 Tim Mitchell, Director of Water Resources
AGENDA ITEM # III.2
CSO Tunnel Project Update
RECOMMENDATION
This item is an informational update only. No additional action is needed at this point.
SUMMARY
In 2015 the Department of Water Resources renegotiated a 1993 State Water Control Board
Consent Special Order. The new Order eliminated the need to completely separate all sanitary and
storm systems and the need to remove all of the remaining permitted Combined Sewer Overflow
(CSO) points resulting in a savings of nearly $300 million (in today's dollars) to the citizens of
Lynchburg. Under the new Order, a certain amount of combined sewage is to be captured and
treated at the Water Resource Recovery Facility prior to discharge to the James River. CSO 52,
along the Point of Honor Trail, is the largest and most challenging remaining project. Not only do
we need to control the volume and frequency of the combined sewer overflows, we also need to
restore flow capacity for future development in nearly 2/3rds of the City. After extensive analysis, it
was determined that a CSO tunnel was the most effective option. This briefing will highlight the
progress of that project.
PRIOR ACTION(S)
Various CSO Appropriations and Updates.
FISCAL IMPACT
Current estimates indicate a project cost of approximately $110 million.
CONTACT(S)
Tim Mitchell, Director of Water Resources
ATTACHMENT(S)
1. CSO 52 Update Meeting 7-11-23 final
REVIEWED BY
Page 9 of 66
Date: June 30, 2023
Tim Mitchell, Director of Water Resources
Date: July 06, 2023
Greg Patrick, Deputy City Manager
Date: July 06, 2023
Alicia Finney, Clerk of Council
Page 10 of 66
CSO 52 TUNNEL PROJECT
(BLACKWATER CSO TUNNEL)
UPDATE
July 11, 2023
Page 11 of 66
WHAT IS COMBINED SEWER OVERFLOW (CSO)?
Page 12 of 66
▪ 860+ CSO Cities Nationwide
▪ Three in Virginia: Alexandria, Richmond, Lynchburg
▪ Alexandria and Richmond have specified completion
dates from the Virginia General Assembly
▪ Original 1993 State Consent Order required the
elimination of all overflow points
▪ Consent Order renegotiated in 2015 to allow an
alternate plan, saving nearly $300 million
▪ Successfully lobbied and received over $100 million
in State and Federal funding
▪ CSO Program to date:
• Eliminated 115 of 132 overflow points
• Reduced overflow volume by 93%
• Spent $307 million to date
OVERVIEW
Page 13 of 66
▪ Most costly and complex remaining CSO project
▪ Existing Blackwater Creek Interceptor overflows at
CSO 52 and manholes along trail during rain events
▪ Not just a CSO compliance issue – Limits future
development within the watershed
▪ Options Considered included:
• Parallel Pipe
• Storage
• Separation
• Combination of Pipe and Storage
• Deep Tunnel
CSO 52
Page 14 of 66
TUNNEL ALIGNMENT
▪ With the exception of US
Pipe and Crossing under a NS
railroad track – Alignment is
completely under City
owned property
▪ 4,700+ feet long, 12 feet
finished diameter, 80+ feet
deep
▪ Alignment allows for use of a
tunnel boring machine or
drill and blast
Page 15 of 66
TUNNEL CONSTRUCTION
AL TERNATIVES
Tunnel Boring Machine (TBM) Drill & Blast (D&B)
▪ 12 feet finished diameter
▪ Approximately 80 feet deep and 4,700
feet long
Page 16 of 66
▪ Orange – 12’ Diameter Tunnel and Tunnel Shaft
▪ Blue and Green – Mostly below grade, top of
structure, hatches, and vent pipes will be visible
▪ Red – Electrical and Control Building
▪ Yellow – Possible Future Odor Control equipment if
needed
SHAFT AND PUMP STATION
Page 17 of 66
SHAFT
EXCAVATION
Shaft Design:
▪ Remove overburden
▪ Approx. 42 ft in dia.
▪ 80 ft deep
▪ Concrete lined
▪ Converted to Pump
Station
Page 18 of 66
PUMP STATION AND ELECTRICAL BUILDING
Page 19 of 66
▪ Obtain Norfolk Southern approval for tunnel
crossing in a timely manner
▪ Obtain a Categorical Exclusion designation from the
Virginia Department of Environmental Quality
(DEQ). DEQ has stated that a full Environmental
Assessment would needed – this could have serious
impacts to the project schedule
▪ Negotiate acquisition of US Pipe property including
potential property swap and appropriate
compensation associated with impact to their
operations
KEYS TO PROJECT SUCCESS
Page 20 of 66
▪ Received 60% Design Plans on 6-20-23 –
Currently being reviewed by City Staff
• 90% plans due in September
• Final plans due in December
▪ Geotechnical Field Work Complete
• Good “competent” rock
• Thorough and accurate geotechnical work critical for
design and to minimize construction claims
▪ Negotiating with DEQ on Categorical
Exclusion Designation
▪ Ongoing discussion with US Pipe
▪ Railroad reviews seem to be on track
• Excellent meeting with NS and their consultant
RailPros on 6-29-23
CURRENT STATUS
Page 21 of 66
▪ Current CSO Program Available
Appropriations = $112 million
▪ American Rescue Plan Act Funding
• $25 million ARPA – 2021 GA Special Session
• $25 million required local match requirement
• $25 million ARPA – 2022 GA Session
• ARPA Projects must: Bid project and close on grant
by December, 2024 and be complete by December,
2026
▪ Virginia Clean Water Revolving Loan Fund
• Applications due end of July – typically 0% interest or
some principal forgiveness, we will apply for the
balance of the needed funding
CSO COST & FUNDING
Page 22 of 66
PROJECT SCHEDULE
2022
OCT 2022
Initial
Geotechnical
Work Completed
JUN 2023
60% Design
Complete
DEC 2023
Design
Complete
SPRING 2024
Begin Construction
2023 2024 2025 2026
DEC 2026
Tunnel Construction
Completion
Page 23 of 66
Page 24 of 66
City Council
Agenda Item IV.3.
Business Item Briefings
AGENDA ITEM SUMMARY
MEETING DATE PRESENTED BY
July 11, 2023 Rachel Frischeisen, Senior Planner
AGENDA ITEM # IV.3
Conditional Use Permit (CUP) - Telecommunications Tower - 109 Leroy Bowen Drive
RECOMMENDATION
This item will appear for City Council vote on the August 8, 2023 Public Hearing Agenda. Approval
of the petition to allow the construction of a one-hundred fifty (150) foot tall telecommunications
tower in a B-1C, Limited Business District (Conditional).
SUMMARY
LCC Telecom Services, on behalf of US Cellular, is petitioning for a Conditional Use Permit to allow
the construction of a one-hundred fifty (150) foot tall telecommunications tower at 119 Leroy Bowen
Drive. Telecommunications towers of this height are permitted in the B-1C, Limited Business District
(Conditional) upon approval of a CUP from City Council.
PRIOR ACTION(S)
The Planning Commission will review this item on July 12, 2023.
The Planning Division recommended approval of the CUP petition.
FISCAL IMPACT
N/A
CONTACT(S)
Rachel Frischeisen, Senior Planner
Tom Martin, City Planner
ATTACHMENT(S)
1. Planning Commission Report and Attachments
REVIEWED BY
Date: July 05, 2023
Kent White, Director of Community Development
Page 25 of 66
Date: July 06, 2023
Mercedes Braun, Executive Assistant to the City Manager
Date: July 06, 2023
Wynter C. Benda, City Manager
Date: July 06, 2023
Alicia Finney, Clerk of Council
Page 26 of 66
The Department of Community Development
City Hall, Lynchburg, VA 24504 434-455-3900
To: Planning Commission
From: Planning Division
Date: July 12, 2023
Re: Conditional Use Permit (CUP): 150’ Telecommunications Tower – 119 Leroy Bowen
Drive
I. PETITIONER
LCC Telecom Services, on behalf of US Cellular, 10700 W. Higgins Road, Rosemont, IL 60018
Representative: John Wallace, LCC Telecom Services, 10700 W. Higgins Road, Rosemont, IL
60018
II. LOCATION
The subject property is located at 119 Leroy Bowen Drive and contains approximately two and
five tenths (2.5) acres. The portion of the property leased by US Cellular is approximately ten
thousand (10,000) square feet, or twenty-three hundredths (0.23) of an acre.
Property Owner:
Women’s Health Services of Central Virginia (WHSCV) Real Estate Company LLC, 114
Nationwide Drive, Lynchburg, VA 24502
III. PURPOSE
The purpose of the petition is to allow the construction of a one hundred fifty (150) foot
telecommunications tower.
IV. SUMMARY
• The Comprehensive Plan 2013-2030 recommends an Employment 1 use for the property.
• The property is zoned B-1C, Limited Business District (Conditional). Telecommunications
towers are permitted within this district upon approval of a CUP by Council.
• The surrounding area is mostly undeveloped and zoned for commercial/industrial uses.
The Planning Division recommends approval of the CUP petition.
V. FINDINGS OF FACT
1. Comprehensive Plan. The Future Land Use Map (FLUM) recommends an Employment 1
use for the property. These areas are intended for large-scale office (greater than 20,000
square foot floor areas and/or more than four stories), small-scale office, research and
development, and light manufacturing uses. "Flex-space," an industry term for flexible
building space that is designed to accommodate office, small-scale storage, and/or light
manufacturing uses, is also appropriate for Employment 1 areas. Restaurant, small scale
retail, hotel and business service (e.g., copy shop, computer sales and service) uses that
support the office/industrial uses can be constructed in Employment 1 areas, though
shopping centers are not recommended. When a corporate campus development is
proposed, integrated residential development at medium to high densities may be approved.
The mix of uses should be determined as part of a development approval. (p.75)
Page 27 of 66
Planning Commission: Conditional Use Permit –119 Leroy Bowen Drive – July 12, 2023 2
2. Zoning. The subject property was annexed into the City in 1976. The existing B-1C,
Limited Business District (Conditional) was established in 1999. The petition would not
change the underlying zoning.
The City’s Zoning Ordinance provides that telecommunications towers are permitted by-
right if the tower height is one hundred (100) feet or less; towers up to one hundred fifty
(150) feet may be permitted upon approval of a Conditional Use Permit from City Council.
3. Board of Zoning Appeals (BZA). The Zoning Official has determined that no variances
would be needed for the development of the property as proposed.
4. Surrounding Area. There have been several items requiring City Council approval in the
immediate area:
On April 10, 1979, Council approved the CUP petition of BPO Elks Lodge #321 to
construct a new lodge at 6235 Old Mill Road.
On June 14, 1988, Council approved the petition of J.W. Wood, Inc. to rezone five (5)
acres near the intersection of Nationwide Drive and Graves Mill Road from I-1, Limited
Industrial District, to B-5C, General Business District (Conditional) to allow the
construction of a wholesale/retail warehouse and food distribution center.
On October 8, 1991, Council approved the CUP petition of Babcock & Wilcox to erect
a microwave transmission tower at 155 Mill Ridge Road.
On October 13, 1992, Council adopted the Graves Mill Road/US 221 Area Land Use
Study & Growth Management Program, which altered the zoning of several parcels in
the area and created the Scenic Corridor Overlay District.
On March 9, 1993, Council approved the petition of Obaugh Chevrolet Geo & Cadillac
to rezone 801 Graves Mill Road from B-5C, General Business District (Conditional) to
B-5C, General Business District (Conditional) to amend previously approved proffers to
allow the expansion of the existing auto body shop.
On December 12, 1995, Council approved the petition of James Anderson to rezone
2.95 acres at 327 Graves Mill Road from I-1, Limited Industrial District, to B-5C,
General Business District (Conditional) for the expansion of an existing commercial
amusement facility.
On December 9, 1997, Council approved the petition of William Overacre to rezone
nine (9) acres at 427 Graves Mill Road from I-1, Limited Industrial District, to B-3C,
Community Business District (Conditional) to allow for the construction and operation
of buildings for commercial service and retail use.
On May 11, 1999, Council approved the petition of Scott Zechini and Richard Zechini
to rezone three and seven tenths (3.7) acres in the 400 block of Graves Mill Road from
R-4, Multi-Family Residential District, to B-1C, Limited Business District (Conditional)
and a CUP to allow the construction of a Cluster Commercial Development.
On June 8, 1999, Council approved the petition of Rock Castle Partners to rezone
twenty (20) acres in the 700 block of Graves Mill Road from I-1, Restricted Industrial
District, to B-1C, Limited Business District (Conditional) to allow speculative office,
restaurant and retail sales uses. The subject property was included in this petition.
On October 10, 2000, Council approved the CUP petition of L. E. Lichford, Inc. to
develop a truck refueling facility at 166 Mill Ridge Road.
Page 28 of 66
Planning Commission: Conditional Use Permit –119 Leroy Bowen Drive – July 12, 2023 3
On June 14, 2005, Council approved the petition of Jerry Brammer to rezone six tenths
(0.6) of an acre at 430 Graves Mill Road from R-4, Medium-High Density Multi-Family
Residential District to B-1C, Limited Business District (Conditional) to allow the use of
an existing building as a real estate office.
On December 11, 2007, Council approved the petition of Anderson Mediation Services
to rezone 434 Graves Mill Road from R-4, Medium-High Density Multi-Family
Residential District to B-1C, Limited Business District (Conditional) to allow the
construction of a Cluster Commercial Development.
5. Site Description. The subject property is located at 119 Leroy Bowen Drive and contains
approximately two and five tenths (2.5) acres. The portion of the property leased by US
Cellular is approximately ten thousand (10,000) square feet, or twenty-three hundredths
(0.23) of an acre.
The property is currently undeveloped. The property is bound to the north, west, and south,
by medical and office uses. Surrounding properties to the east and across Leroy Bowen
Drive are also undeveloped.
6. Proposed Use of Property. The purpose of the CUP petition is to allow the construction
of a telecommunications tower. The facility is to be used by US Cellular and potential other
wireless carriers. The proposed project will consist of a one hundred forty-eight (148) foot
tall monopole tower with a two (2) foot lightning rod, for a total height of one hundred fifty
(150) feet, to be located within a 100’x100’ leasehold. A 60’x 60’ portion of the lease area will
be fenced-in, enclosing the tower base and ground equipment. The proposed tower would
be located seventy-five (75) feet from all property lines to meet the Zoning Ordinance
setback requirement of fifty (50) percent of the tower height.
The facility is unstaffed and will only require service technicians, in a pick-up/van sized
vehicle, to visit the site approximately once per month after the facility is completed.
7. Traffic, Parking and Public Transit. N/A
8. Stormwater Management. An Erosion & Sediment Control plan would be required prior
to final site plan approval. A Stormwater Management Plan would be required if disturbed
areas exceed five thousand (5,000) square feet.
9. Emergency Services. The City’s Fire Marshal had no concerns regarding the CUP, but
noted the need for vehicular access/turnaround space in accordance with 2018 International
Fire Code (IFC).
The City Police Department had no concerns regarding the CUP.
10. Impact. The proposed construction of the telecommunications tower should have minimal
impact on the area. The surrounding area is mostly undeveloped and zoned for
commercial/industrial uses. The closest residentially zoned property, an R-4, High Density
Residential District, is located approximately six hundred (600) feet away on Old Mill Road;
however, the area is separated by an R-C, Resource Conservation area along Dreaming
Creek.
11. Technical Review Committee. The TRC reviewed the concept plan on June 20, 2023.
Comments related to the proposed use were minor in nature and have been, or will be,
addressed by the petitioner prior to final site plan approval.
Page 29 of 66
Planning Commission: Conditional Use Permit –119 Leroy Bowen Drive – July 12, 2023 4
VI. PLANNING DIVISION RECOMMENDATION
Based on the preceding Findings of Fact, the Planning Commission
recommends to City Council approval of LCC Telecom Services
petition for a conditional use permit (CUP) at 119 Leroy Bowen Drive
to allow the construction of a one hundred fifty (150) foot
telecommunications tower and associated equipment subject to the
following condition:
The property shall be developed in substantial compliance with
the site plan entitled “Blackwater, Site Number 765365, 119 Leroy
Bowen Dr., Lynchburg, VA” dated July 3, 2023.
This matter is respectfully offered for your consideration.
William T. Martin, AICP
City Planner
pc: Wynter Benda, City Manager
Greg Patrick, Deputy City Manager
Kent White, Director of Community Development
Matthew Freedman, City Attorney
J. Lee Newland, City Engineer
Cynthia Kozerow, Lynchburg Police Department
Thomas Goode, Fire Marshal
Doug Saunders, Building Official
Kevin Henry, Zoning Administrator
US Cellular, Petitioner
John Wallace of LCC Telecom Services, Representative
WHSCV Real Estate Company, LLC, Property Owner
VII. ATTACHMENTS
1. Zoning Map with Adjoining Property Owners
2. Future Land Use Map
3. Watershed Map
4. Planimetric and Topographic Map
5. Application Materials Packet
a. Letter of Application
b. Narrative Overview
c. Conditional Use Standards for Requested Permit
d. Photo Simulations from Nearest Roads
e. RF Propagation Maps
f. RF Engineer’s Statement regarding Collocation, Existing Site and Interference
g. Phase I Environmental Assessment
h. Archaeology Survey
i. FAA and FCC Filings
j. Economic Statement of Unreasonable Costs
k. Site Plan
6. Property Photograph
Page 30 of 66
ZoningZoning
TRCTRC
149.57
758.22
287.35
109.34
152.46
112.48
418.59
669.77
446.53
310
175.71
264.52
470.87
54
76.28
464.48
190.00
120
440
35.8
69.62
536.02
361.94
497.75
665.00
66.34
348.54
102.97
115.96
101.84
70.02
121.17
78.28
135.12
37.55
40.99
96.20
125.55
133.11
131.25
141.71
27.22
127.45
323.14
43.96
478.89
48.53
46.87
481.87
259.60
131.64
50.00
29.60
446.18
429.28
450.83
50.72
143.20
101.97
173.84
13.47
78.30
47.21
70.11
114.42
63.41
54.69
92.98
138.31
180.00
190.00
166.39
195.63
220.00
160.74
529.75
487.61
262.04
27.75
267.49
203.66
471.15299.52
434.42
715.77
273.46
639.07
59.04
144.55
394.29
154.72
505.20
116.74
348.89
600.00
228.90
190.55
180.55
383.90374.17
9.73
532.30532.37
112.85
187.27
99.07
46.25
40.92
123.41
39.68
262.44
49.14
109.86
50
110
130
(1)
(3)
(4)
(2)
(1)
(5)
(1)
(6)
(7)
(B)
(1)
(2)
(3)
(1)
!
!
!
!
!
!
!
!
!
!
!
!
!
!
B-1C
B-5C
B-1C
B-1C
B-1C
R-CR-C
R-4R-4
R-CR-C
I-1I-1
R-CR-C
I-1I-1
I-1I-1800800
114114
112112
106106
100100
119119
113113
107107
101101
799799
116116
601601
707707
114114
1608
1607
LEROY BOWEN DR
N A TIO N W ID E D R
GRAVES MILL RD
LYNCHBURG
EXPY
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA
OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
MAP SCALE: DATE PRINTED: 7/4/2023
PROPERTY INFORMATIONPROPERTY INFORMATION LEGENDLEGEND
µµ
PARCEL ID ADDRESS
OLDMILL RD
MORRISLN
BRIDGETONCT
NORTONDR
NAVAJO
CIR
DUBLIN
ST
PILGRIM
RD
PATRIOTDR
SANHILL DR
CREEKSIDE DR
SANHILLDR
CHIKASAW RD
LYNNDALE PL
CUSTER
DR
SANGLOE PL
PIEDMONT PL
PAWNEE DR
LOOKOUT
DR
PEGGYBOWEN DR
APACHE LN
MORTON
DR
MORTON
DR
LEROY
BOWEN DR
NEWPORT DR
O
LD
M
ILL
RD
MODAC
PL
SUNDERLAND
PL
RHONDA RD
NELSON
DR
PAW
NEE
DR
MAYFIELD DR
PAWTUCKET DR
HAYES DRMOHAWK DR
STONEMILL DR
CUSTER
DR
CHINOOK
PL
OLD
M
ILL RD
RHONDA
RD
NATIONWIDE
DR
M
ILL RIDG E R D
GRAVES
MILL RD
GRAVES
MILL RD
LONGMEADOWS DRLONGMEADOWS DR
SANDUSKY
DR
SANDUSKY
DR
GRAVES
MILL RD
GRAVES
MILL RD
FENWICK
DR
FENWICK
DR
GRAVES
MILL RD
GRAVES
MILL RD
PAWNEE
DRPAWN EE
DR
OLD GRAVESMILL RDOLD GRAVESMILL RD G R A V E S
M I L L R D
G R A V E SM IL L R D
GRAVES
MILLRD
GRAVES
MILL RD
GRAVES
M
ILLRD
GRAVES
M
ILLRD
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
MCCONVILLE
RD
MCCONVILLE
RD
FORT
AVE
FORT
AVE
FORT
AVE
FORT
AVE
FORT
AVE
FORT
AVE
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CHBURG
EXPY
LYN
CHBURG
EXPY
LYNCHBURG
EXPY
LYNCHBURG
EXPY
LYNCHBURG
EXPY
LYNCHBURG
EXPY
OVERVIEW MAPOVERVIEW MAP
Subject PropertySubject Property
B-1B-1
B-4B-4
B-5B-5
I-1I-1
I-2I-2
I-3I-3
R-1R-1
R-2R-2
R-3R-3
R-4R-4IN-1IN-1
IN-2IN-2
B-3B-3
R-CR-C
1:48,000
215 Foot Buffer215 Foot Buffer
US Cellular
23814004 119 LEROY BOWEN DR
Parcel ID Address
119 LEROY BOWEN DR
Address
Page 31 of 66
119 Leroy Bowen Drive Adjoining Owners
Parcel ID Address Owner
23807002 800 GRAVES MILL RD LIBERTY UNIVERSITY INC
23807003 114 NATIONWIDE DR MMPF III WH-CENTRAL VA LLC
23807008 114 LEROY BOWEN DR SOCIETY OF ST ANDREW INC
23814002 107 LEROY BOWEN DR BEACON CREDIT UNION INC
23814003 113 LEROY BOWEN DR BEACON CREDIT UNION INC
23814004 119 LEROY BOWEN DR WHSCV REAL ESTATE COMPANY LLC
23814005 112 LEROY BOWEN DR SOCIETY OF ST ANDREW INC
23814006 106 LEROY BOWEN DR SOCIETY OF ST ANDREW INC
Page 32 of 66
FLUMFLUM
TRCTRC
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
800800
114114
112112
106106
100100
119119
113113
107107
101101
799799
116116
601601
707707
114114
LEROY BOWEN DR
N ATIONW
IDE DR
GRAVES MILL RD
LYNCHBURG EXPY
MAP SCALE: DATE PRINTED: 7/4/2023
PROPERTY INFORMATIONPROPERTY INFORMATION LEGENDLEGEND
µµ
PARCEL ID ADDRESS
OLDMILL RD
MORRISLN
NORTONDR
NAVAJO
CIR
PILGRIM
RD
PATRIOTDR
SANHILL DR
CREEKSIDE DR
SANHILLDR
CHIKASAWRD
DUBLIN
ST
CUSTER
DR
SANGLOEPL
RHONDA RD
PIEDMONT PL
LO O KO U T
D R
PAWNEE DR
LOOKOUT DR
PEGGYBOWEN DR
APACHE LN
MORTON
DR
MORTON
DR
LEROY
BOWEN DR
NEWPORT DR
O
LD
M
ILL
RD
MODAC
PL
SUNDERLAND
PL
RHONDA RD
NELSON
DR
PAW
NEE
DR
PAWTUCKET DR
HAYES
DR
MOHAWK
DR
STONEMILL DR
CUSTER
DR
CHINOOK
PL
OLD
M
ILL RD
RHONDA
RD
NATIONWIDE
DR
M
ILL RIDG E R D
IGLOE
DR
IGLOE
DR
GRAVES
MILL RD
GRAVES
MILL RD
LONGMEADOWS DRLONGMEADOWS DR
SANDUSKY
DR
SANDUSKY
DR
FENWICK
DR
FENWICK
DR
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
PAWNEE
DRPAWN EE
DR
OLD GRAVESMILL RDOLD GRAVESMILL RD G R A V E S
M I L L R D
G R A V E SM IL L R D
GRAVES
MILLRD
GRAVES
MILL RD
GRAVES
M
ILLRD
GRAVES
M
ILLRD
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
MCCONVILLE
RD
MCCONVILLE
RD
FORT
AVE
FORT
AVE
FORT
AVE
FORT
AVE
FORT
AVE
FORT
AVE
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CHBURG
EXPY
LYN
CHBURG
EXPY
LYNCHBURG
EXPY
LYNCHBURG
EXPY
LYNCHBURG
EXPY
LYNCHBURG
EXPY
OVERVIEW MAPOVERVIEW MAP
1:48,000
23814004 119 LEROY BOWEN DR
Parcel ID Address
119 LEROY BOWEN DR
Address
US Cellular
Local Historic DistrictLocal Historic District
Traditional ResidentialTraditional Residential
Low Density ResidentialLow Density Residential
Medium Density ResidentialMedium Density Residential
High Density ResidentialHigh Density Residential
Neighborhood CommercialNeighborhood Commercial
Community CommercialCommunity Commercial
Employment 2Employment 2
InstitutionInstitution
DowntownDowntown
Public UsePublic Use
Public ParksPublic Parks
Resource ConservationResource Conservation
Employment 1Employment 1
Mixed UseMixed Use
Page 33 of 66
Page 34 of 66
Planimetric and Topographic-TRCPlanimetric and Topographic-TRC
TRCTRC
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!!
!
!
!
!
!
!
!
!
112112
106106
100100
119119
113113
107107
101101
114114
D R E A M I N G
CREEK
D R E A M I N G
CREEK
D
REAMING
CREEK
D
REAMING
CREEK
LEROY BOWEN DR
G R A VE S M ILL R D
790
780
770
760
750
740
730
720
710
700
690
680
800
800
790
700
670
680
670
City of Lynchburg - GIS Office - 434.455.3961 - GIS@lynchburgva.gov
DISCLAIMER: THIS MAP IS NEITHER A LEGALLY RECORDED MAP NOR A SURVEY AND IS NOT INTENDED TO BE USED AS SUCH. THE INFORMATION DISPLAYED IS A COMPILATION OF RECORDS, INFORMATION, AND DATA
OBTAINED FROM VARIOUS SOURCES. THE CITY OF LYNCHBURG IS NOT RESPONSIBLE FOR ITS ACCURACY OR HOW CURRENT IT MAY BE.
MAP SCALE: DATE PRINTED: 7/4/2023
PROPERTY INFORMATIONPROPERTY INFORMATION LEGENDLEGEND
µµ
PARCEL ID ADDRESS
OLDMILL RD
NELSONDR
MAYFIELD DR
PATRIOTDR
CREEKSIDE DR
SANHILL DR
HINES
CIR
CHIKASAW RD
CUSTER
DR
SANGLOEPL
LO O KO U T
D R
PAWNEE
DR
LOOKOUT DR
PEGGYBOWEN DR
DUBLIN ST
APACHE LN
L IC H F O R D
L N
MORTON
DR
LEROY
BOWEN DR
NEWPORT DR
O
LD
M
ILL
RD
M ODAC PL
SUNDERLAND
PL
SUNCREST DR NELSON
DR
PAW
NEE
DR
M
O
HAW
K
DR
PAWTUCKET DR
MOHAWK DR
MEADOWBROOK
RD
BROOKVILLELNTOMAHAWK DR
LYNNDALE
PL
SANHILL
DR
CUSTER DR
CHINOOK
PL
OLD
M
ILL RD
R H O N D A R D
NATIONWIDE
DR
M
ILL RIDG E R D
GRAVES
MILL RD
GRAVES
MILL RD
IGLOE
DR
IGLOE
DR
SANDUSKY
DR
SANDUSKY
DR
IGLOE
DR
IGLOE
DR
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
SANDUSKY DRSANDUSKY DR
PAWNEE
DRPAWN EE
DR
FENWICK
DR
FENWICK
DR
OLD GRAVESMILL RDOLD GRAVESMILL RD
GRAVES
MILLRD
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
MILL RD
GRAVES
M
ILLRD
GRAVES
M
ILLRD
GRAVES
MILL RD
GRAVES
MILL RD
MCCONVILLE
RD
MCCONVILLE
RD
FORT AVEFORT AVE
FORT
AVE
FORT
AVE
FORT
AVE
FORT
AVELYNCHBURG
EXPY
LYNCHBURG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CH
BU
RG
EXPY
LYN
CHBURG
EXPY
LYN
CHBURG
EXPY
LYNCHBURG
EXPY
LYNCHBURG
EXPY
OVERVIEW MAPOVERVIEW MAP
1:48,000
UtilitiesUtilities
WaterWater
ActiveActive ProposedProposed AbandonedAbandoned
SanitarySanitary
StormStorm
Planimetrics Planimetrics
PavedPaved UnpavedUnpaved OtherOther
SidewalkSidewalk
RoadwayRoadway
ParkingParking
DrivewayDriveway - - - -
- - - -StructureStructure
- -
- -
- - - -
TopographyTopography ContourContour
20'20'
10'10'
100'100'
50'50'
5'5'
1'1'
US Cellular
119 LEROY BOWEN DR
Address
23814004 119 LEROY BOWEN DR
Parcel ID Address
Page 35 of 66
3
Letter of Application
July 3, 2023
Ms. Rachel Frischeisen,
Senior Planner
900 Church Street
Lynchburg, Virginia 24504
RE: Conditional Use Permit Application for a 150’ Telecommunication Facility, 119 Leroy
Bowen Dr., Lynchburg, VA
Dear Ms. Frischeisen:
The enclosed is an updated application based on the TRC comments received 6/26/23.
This telecommunications tower is being proposed pursuant to in Sec. 35.2-73. -
Telecommunications facilities. Conditional Use approval is required for the siting and
construction of any new telecommunication tower, with approval of the Technical Review
Committee and subsequent planning boards of the City. The proposed telecommunications
tower will consist of a 148’-00” tall monopole tower with a 2’00” lightning rod for a total height
of 150’-0”, to be located within a 100’x100’ leasehold. A 60’’-0” x 60’-0” portion of the lease
area will be fenced-in, enclosing the tower base and ground equipment. The proposed tower
will be erected, owned and managed by USCellular. The facility is unstaffed and will only
require service technicians, in a pick-up/van sized vehicle, to visit the site approximately once
per month after the facility is completed.
On behalf of USCellular, LCC Telecom Services has submitted all required documentation for
the proposed tower in accordance with the City of Lynchburg Code of Ordinances for this
application to be deemed complete. Should you have any questions please feel free to contact
me. I look forward to working with you during the approval process in order to provide the
residents of the City of Lynchburg improved wireless coverage.
Sincerely,
John Wallace
LCC Telecom Services
Page 36 of 66
7
Narrative Overview
USCOC Virginia RSA #3, LLC (“US Cellular”) seeks approval of a Conditional Use Permit
and any other permits or approvals necessary in order to install a 150’ tall telecommunications
tower on the property located at 119 Leroy Bowen Dr., VA USCellular proposes to develop the
site for its own use and it will also be offered as a shared facility to any other communication
carriers that have a need for a facility in this area. USCellular has a cquired the necessary
licenses from the Federal Communications Commission (“FCC”) to provide Personal
Communications Services (“PCS”) coverage throughout the United States. These licenses
include City of Lynchburg.
The proposed site is located in Sec. 35.2-7 3. - Telecommunications facilities (the
“Zoning Ordinance”), and specifically Sec. 35.2-7 3.6. - Standard process projects requiring a
conditional use permit, telecommunication facilities are allowed in this district with Conditional
Use approval requiring Board of Zoning Appea ls authorization. The site has been located in an
inconspicuous location in an undeveloped area zoned B-1C, to not front on any arterial road or
abut a developed land use, while meeting the radio frequency needs of USCe llular engineers.
The wireless telecommunications facility US Cellular is proposing to install on the
property is necessary to provide uninterrupted PCS services t o the residents of City of
Lynchburg, including wireless telephone service, voice paging, messaging and wireless internet
and broadband data transmission. All registered wireless provider’s technology operates a t
various radio frequency bands allocated by the FCC as part of their license.
PCS systems operate on a grid system where overlapping cells mesh together, forming
a seamless network. No single site can function as a stand-a lone entity as each site
is interconnected, forming the network. The technical criteria for establishing cell sites are
very exact as to the location and height. The proposed site at located on the north side of
the 501 Lynchburg Expressway and is within the geographic area deemed necessary for
USCellular and various other wireless telecommunications providers to provide uninterrupted
services.
Page 37 of 66
8
The facility is unstaffed and will require service technicians, in a pick-up/van sized vehicle,
to visit the site approximately once per month. Access will be provided via an easement and the
proposed property entry off of Leroy Bowen Dr. where there is currently a section of curb missing
on a cul-de-sac The site is entirely self-monitored through a sophisticated alarm system which is
connected to a main switch station. The system alerts personnel to any equipment malfunction
or breach of security. There is no need for additional police or fire support. Additionally, there is
no impact on the County’s utilities such as water, sanitation as they are not used at the site. The
only utilities used in connection with the mobile service facility are power and land -line
telephone.
In accordance with FCC regulations, the mobile service facility will not interfere with any
form of communications, including but not limited to, land -line phones, cable and satellite
television and radio broadcasts. PCS technology has become a vital part of emergency services,
aiding residents and motorists in a variety of situations, thus helping to protect the gene ral
public’s health, safety and welfare. The proposed wireless telecommunications facility at this
site will further enhance the goals of providing the most reliable network possible in this area.
The proposed mobile service facility will be designed and constructed to meet all
applicable governmental and industry safety standards. Specifically, US Cellular will comply with
all FCC and FAA rules and regulations regarding construction requirements and technical
standards. Any and all RF emissions are subj ect to the exclusive jurisdiction of the FCC. Any
height, lighting or marking issues are subject to the exclusive jurisdiction of the FAA, whose final
determination will be submitted before any building permit application.
LCC Telecom Services, on behalf of US Cellular, looks forward to working with the City of
Lynchburg to bring the benefits of the proposed service to the area. The addition of the facility
will ensure the best uninterrupted wireless services for the City of Lynchburg. This application
addresses all standards of the City of Lynchburg Code of Zoning Ordinance.
Page 38 of 66
9
CUP Standards for requested permit
Sec. 35.2-73. - Telecommunications facilities
Sec. 35.2-73.6. - Standard process projects.
(a)Review of standard process projects. Standard process projects may require the approval of a
conditional use permit and/or a site plan for the installation or construction of such a project, and
City staff review may also be required for the issuance of any zoning permit, or an
acknowledgment that zoning approval is not required, for a standard process
project.(b)Application requirements for standard process projects. Applications for wireless
support structures, wireless facilities, and/or base stations that constitute standard process
projects shall include the following:
(1)The name, address, telephone number, and electronic mail address of the applicant. If the
applicant is not the owner of the land on which the wireless support structure, wireless facility,
and/or base station is proposed to be located, then the applicant shall provide written consent of
the owner, and the name, address, telephone number, and the electronic mail address of the
owner. If the land on which the proposed wireless support structure, wireless facility, or base
station is proposed to be located is, in whole or in part, within the City's right-of-way, then the
applicant shall be required to secure written consent from the City for the proposed wireless
support structure, wireless facility, or base station to be located within the City's right-of-way
prior to filing such application and shall include such written consent as part of any such
application. The owner’s information has been duly signed and included as part of the
Telecommunications Application enclosed herewith.
(2) An affirmative written statement signed by the applicant and the owner that the applicant and
the owner are aware of and agree to comply with the provisions of this Zoning Ordinance set
forth in Section 35.2-73.24 (Abandonment) regarding removal and dismantlement of all wireless
support structures, wireless facilities, base stations, and related equipment in the event such a
structure, facility, base station, or related equipment is no longer in use. Please see signed
telecommunication application included herewith of which abandonment is addressed.
(3)The valuation map number and address of the parcel of land on which the wireless support
structure, wireless facility, and/or base station is proposed to be located. Parcel ID 23814004
(4)The names, addresses, and telephone numbers of the owners of and a map showing the
location and height of all wireless support structures or potential wireless support structures taller
than 50 feet that are within a one-mile radius of the proposed new site for a wireless support
structure, wireless facility, and/or base station, including City-owned property. There is one
tower within 1 mile, 150 Mill Ridge Rd, owned by American Tower (“ATC”), ATC: please
Page 39 of 66
10
contact onairaccess@americantower.com or call 877-ATC-SITE (282-7483)
https://www.americantower.com/us/find-sites/
(5)Written documentation that the applicant has made diligent, but unsuccessful, efforts to secure
the permission to co-locate the applicant's proposed wireless facility on an existing or proposed
wireless support structure owned by others, including the City, within a one-mile radius of the
proposed wireless support structure, wireless facility, and/or base station. There is only one
tower within one-mile. US Cellular currently leases space on this tower and seeks to which
relocate due to burdsome costs, unwillingness of the owner to renegotiate and to allow
effiency to local market with latest technological upgrades not encumbered by the
collocation process of the existing tower owner.
(6)Written, technical evidence from a radio frequency engineer that the proposed wireless
support structure, wireless facility, base station, or project cannot be installed or co-located on
another existing or proposed wireless support structure within a one-mile radius of the proposed
site for a wireless support structure, wireless facility, or base station and must be located at the
proposed site in order to meet the coverage requirements for applicant's wireless
telecommunications system. Please see RF Engineer statement enclosed herewith.
(7)Written, technical evidence from a structural engineer that the proposed wireless support
structure can support the wireless facilities and base stations of other carriers for the purposes of
co-location. The proposed tower’s construction drawings show both ground space and
tower space for at least three collocators.
(8)Written, technical evidence from a radio frequency engineer that the proposed facilities meet
the standards set forth in this Ordinance, including, but not limited to, the requirements set forth
in Section 35.2-73.13 (Interference With Public Safety Radio Services), and will not materially
interfere with other pre-existing communications facilities or with future communications
facilities that have already been designed and planned for a specific location or that have been
reserved for future public safety communications facilities. Please see RF Engineer statement
enclosed herewith.
(9)Written, technical evidence from an electrical engineer that the proposed site of the wireless
support structure, wireless facility, and/or base station does not pose a risk of explosion, fire, or
other danger due to its proximity to volatile, flammable, explosive, or hazardous materials such
as propane, gasoline, natural gas, or corrosive or other dangerous chemicals. Please see RF
Engineer statement enclosed herewith.
(10)A map of the City and the first half-mile of all bordering communities showing the design of
the applicant's entire existing or proposed telecommunications network. Such map shall, at a
minimum, indicate the general location of all proposed or existing sites of the applicant's
wireless support structures, wireless facilities, base stations, and related equipment, the
Page 40 of 66
11
dimensions of the sites, specifications relating to the facilities, and signal area coverage. Please
see RF propgation maps enclosed herewith
(11)Color photo simulations showing the proposed site of the proposed wireless support
structure, wireless facility, base station, or project with a photo-realistic representation of the
proposed structure and facility as they would appear viewed from at least four substantially
different vantage points on the eight closest residential properties or adjacent roadways. Please
find the Photosimiluations Exhibit further below in its own exhibit secion.
(12)Any initial application fee required by Section 35.2-73.6(d) (Fees for Standard Process
Projects). Fee included with application.
(13)A site plan, including a depiction of the lot lines, setbacks, existing structures and other
improvements on the property, the location of adjacent and nearby structures, the proposed
location of the proposed wireless support structure, wireless facility, and base station that are the
subject of the application, separation distances, proposed height of any new structure, screening
and landscaping, existing and proposed, access, parking, security, zoning district(s) for the
subject property and all adjacent properties, and any floodplain on the subject property. Please
find the preliminary construction drawings enclosed herewith. The construction drawings
include the requirements outlined above.
(14)A copy of any approval granted by a federal agency, including any conditions imposed by
that agency, regarding the proposed wireless support structure, wireless facility, and/or base
station. Please find the FCC required Phase Environmental and Archaeology Surveys
enclosed.
(15)Evidence relating to any other factors the applicant believes are relevant to the City's
consideration of whether the applicant's proposed standard process project should be approved.
US Cellular has diligently sought out a parcel that is isolated from residential, screened by
mature trees and will not be a burden on existing traffic circulation. The proposed
unmanned telecommunication facility will not be a hindrance to future development, but
will indeed provide a boon with strong wireless strength for wireless users as the industrial
park and surrounding area continues to develop.
(16)Written documentation regarding whether and how the location of the proposed wireless
support structure and/or wireless facility in relation to existing structures, trees, and other visual
buffers, minimizes, to the greatest extent reasonably practicable under the circumstances, any
significant negative adverse impact. There is an existing curb cut off the Leroy Bowen cul-
de-sac which will easily allow a fully improved ingress/egress, and will curve in a
northwesterly direction through approximately six (6) trees over a 3” caliper to where the
parcel opens out to red soil (see aerial photograph on page C-1 of the enclosed construction
drawings) . While the majority of trees will continue to provide screening of the entire
Page 41 of 66
12
parcel, USCellular will adjust its site plan to replace the trees about its fenced-in compound
per the species recommendation of a city appointed arborist.
(17)Witten documentation regarding whether and how the location of the wireless support
structure and/or wireless facility will not have a significant detrimental impact on the property
values of adjacent and nearby properties. Just as the existing American Tower facility located
out in the open on the side of a slope at 150 Mill Ridge Rd, Lynchburg, VA 24502, with no
mature tree screening, has had no impact on development in that area, the proposed
USCellular will have even less of an impact due to aforementioned landscape screening.
(18)Written documentation regarding any other factors the applicant believes are relevant to the
City's consideration of whether the applicant's proposed standard process project should be
approved. The entirety off this exhibit application package addrsses all facets of the
proposed location.
(19)Evidence that the applicant has given written notice to all adjacent landowners regarding the
applicant's intent to file the application at least 15 days before the filing of any application to
locate a new structure on the subject property. Please find scans of certified mail receipts
included herewith.
(c)Fee limitations for standard process projects.
When an application for a standard process project is filed, the following provisions shall apply
to the fee that must be paid by the applicant:(1)The fee must be reasonable.(2)The fee charged by
the City shall not include direct payment or reimbursement of third-party fees charged on a
contingency basis or a result-based arrangement.(3)The fee charged by the City shall not exceed
the actual direct costs to process the application, including permits and inspection.(4)The City
shall not charge market-based or value-based fees for the processing of any such
application.(5)Upon request, the City shall, within a reasonable amount of time after such
request, provide the applicant with the cost basis for any fee charged by the City for a standard
process project.(d)Fees for standard process projects. Each application for a wireless support
structure, wireless facility, or base station that constitutes a standard process project shall be
accompanied by payment of the following fees for the processing of the application:(1)For an
application for a standard process project that requires the approval of a conditional use
permit and a site plan, the initial fee shall be $900.00.(2)For an application for a standard
process project that requires the approval of a site plan, but not a conditional use permit, the
initial fee shall be $500.00.(3)The City reserves the right to employ an outside consultant to
assist in the review of any application for a standard process project. In the event the City
employs an outside consultant to review an application for a standard process project, the
applicant shall reimburse the City for the reasonable expenses related to such review as an
additional application fee, provided, however, that the fee limitations set forth in Section 35.2-
Page 42 of 66
13
73.6(c) (Fee Limitations for Standard Process Projects) shall apply to the calculation of any such
additional fee.(4)For any standard process project that requires the approval of a conditional use
permit, the applicant shall be responsible for the payment of any costs for any legal notices that
may be required for the conditional use permit. USCellular agrees to pay this fee and sent
separately (scan of check enclosed herewith).
(g)Disapproval considerations for standard process projects.
Nothing in this Ordinance shall be construed to prohibit the City from disapproving an
application for a standard process project:(1)On the basis of the fact that the proposed height of
any wireless support structure, wireless facility, or wireless support structure with attached
wireless facilities exceeds 50 feet above ground level, provided that the City follows a local
ordinance or regulation that does not unreasonably discriminate between the applicant and other
wireless services providers, wireless infrastructure providers, providers of telecommunications
services, and other providers of functionally equivalent services; or(2)That proposes to locate a
new structure, or to co-locate a wireless facility in an area where all cable and public utility
facilities are required to be placed underground by a date certain or encouraged to be
undergrounded as part of a transportation improvement project or rezoning proceeding as set
forth in objectives contained in a comprehensive plan, if:a.The undergrounding requirement or
comprehensive plan objective existed at least three months prior to the submission of the
application;b.The City allows the co-location of wireless facilities on existing utility poles,
government-owned structures with the government's consent, existing wireless support
structures, or a building within that area;c.The City allows the replacement of existing utility
poles and wireless support structures with poles or support structures of the same size or similar
within that area; andd.The disapproval of the application does not unreasonably discriminate
between the applicant and other wireless services providers, wireless infrastructure providers,
providers of telecommunications services, and other providers of functionally equivalent
services, and other providers of functionally equivalent services.(h)Disapproval limitation if
standard process project does not substantially change physical dimensions. The City may not
deny, and shall approve, within 60 days, any standard process project which requests any
modification of an existing base station or wireless support structure that does not substantially
change, as that term is defined by federal law, the physical dimensions of such support structure
or base station and that involves the co-location of new transmission equipment, the removal of
transmission equipment, or the replacement of transmission equipment.(i)Disapproval allowed if
written notice not provided to adjacent property owners. The City may disapprove an application
for a standard process project if the applicant has not given written notice to all adjacent property
owners at least 15 days before the applicant applies to locate a new structure on the subject
property.
( Ord. No. O-21-009 , 2-9-21)
Page 43 of 66
14
Sec. 35.2-73.8. - Conditional use permit required.
(a)The following uses require the approval of a conditional use permit by the City Council:(1)In
the R-C, R-1, R-2, R-3, R-4, IN-1, or B-4 Districts, any standard process project that is between
50 and 150 feet in height, provided, however, that no new wireless support structure and/or
wireless facility in such districts shall exceed 150 feet in height;(2)In the B-1 District, any
standard process project in which a new wireless support structure and/or wireless facility
exceeds 100 feet in height; provided, however, that the maximum height for any wireless
facility and/or wireless support structure in the B-1 District shall be 150 feet;(3)In the B-3,
B-5, IN-2, I-1, I-2, or I-3 Districts, any standard process project in which a new wireless support
structure and/or wireless facility exceeds 150 feet in height;(4)Any base station that is a standard
process project and exceeds 72 cubic feet above ground and/or six feet in height;(5)Any base
station associated with a lawfully existing wireless support structure and/or wireless facility that
is a standard process project, is not located inside the wireless support structure, is visible at
ground level from off-site, and/or is not located within 50 feet of the base of the wireless support
structure;(6)The co-location of a wireless facility on a lawfully existing wireless support
structure in any zoning district that, after the proposed co-location, would result in an increase in
height of the wireless support structure and/or wireless facility, provided, however, that no such
structure and/or facility shall be allowed to increase more than 15 feet in height as a result of the
approval of such a conditional use permit; and(7)Any other project that constitutes a standard
process project.(b)Whenever a conditional use permit is required for a proposed wireless
structure or wireless facility, any application for such a conditional use permit shall be made to
the City Planner in the manner provided in Article 2 of this Zoning Ordinance. In districts for
which a conditional use permit is required, the City Council shall make its decision to approve or
deny such permit in writing and in a manner consistent with applicable state and federal
law.(c)Any wireless support structure, wireless facility, or base station that is not permitted by
right or upon the approval of a conditional use permit under this Ordinance shall be considered to
be in violation of this Ordinance.(d)No new wireless support structure and/or wireless facility for
which a conditional use permit is approved shall exceed a maximum height of 150 feet in the R-
C, R-1, R-2, R-3, R-4, IN-1, or B-4 Districts.
( Ord. No. O-21-009 , 2-9-21)
USCellular is proposing a 150’ in the B-1C district.
Sec. 35.2-73.9 - Setbacks.
c)Any wireless support structure and/or wireless facility greater than 35 feet in height in the B-1,
B-3, B-5, IN-2, I-1, I-2, or I-3 Districts that is on a parcel adjacent to any parcel that is zoned R-
C, R-1, R-2, R-3, R-4, IN-1, or B-4 shall be set back a distance at least the height of such
structure and/or facility from the R-C, R-1, R-2, R-3, R-4, IN-1, or B-4 District.(d)Any wireless
Page 44 of 66
15
support structure and/or wireless facility in the B-1, B-3, B-5, IN-2, I-1, I-2, or I-3 Districts that
is greater than 35 feet in height but less than 50 feet in height shall be required to set back a
distance from all property lines at least the minimum applicable setback for the district in which
it is located.(e)Any wireless support structure and/or wireless facility in the B-1, B-3, B-5,
IN-2, I-1, I-2, or I-3 Districts that is a height greater than 50 feet shall be required to set
back a distance from all property lines at least one-half the height of such structure and/or
facility.(f)Setback requirements for wireless support structures and/or wireless facilities shall be
measured from the base of the structure and/or facility to the property lines of the parcel on
which the structure and/or facility is located. The proposed tower is setback 75’ (50% of 150’
proposed tower) from all property lines as indictaed on the construction drawings.
( Ord. No. O-21-009 , 2-9-21)
Sec. 35.2-73.10. - Standards for conditional use permits for standard process projects.
In order to approve a conditional use permit for a standard process project, the City Council must
find that the application for such project satisfies all of the following standards:
(1)The proposed use is in substantial conformance with the provisions of the City's
Comprehensive Plan. The proposed location does not impact any proposed land uses of the
Comprehensive Plan and meets the goal of providing improved communications.
(2)The proposed use will not result in any significant adverse impact on the use and enjoyment
of nearby properties. The unmanned utility structure will not impact any existing use nor
conceivably any propoised use for the currerntly vacant end of the industrial park served
by Leroy Bowen Dr.
(3)The proposed use will not have any significant negative impact on the value of nearby
properties. The telecommunication facility will have no impact than any other unmanned
utility structure.
(4)The proposed use will not cause any material potential interference with other pre-existing
communications facilities or with future communications facilities that have already been
planned or designed for a specific location or that have been reserved for future public safety
communications facilities. The FCC regulates this and will require USCellular as a FCC
commercial wirless licnese to cease and desist from any inteference caused by a new facility
or new collocation.
(5)The proposed use will not result in any significant adverse impact on public safety or other
critical public service needs. The facility is sparately monitoired for security purposes, will
Page 45 of 66
16
have a fence and barbed wire around it and should havce zero impact on public safety
services.
(6)The proposed use must be compatible with the character of the area in which it is proposed to
be located. The proposed site is in at the dn of a cul-de-sac with of a portion of an
undeveloped business park, and a steep incline into a wooded creek beyond it, which we
believe has the most minimal impact on existing land uses and wholly appropriate for this
use.
(7)There are no existing wireless support structures within a reasonable distance from the
proposed wireless support structure, wireless facility, and/or base station that are available to be
used for co-location at reasonable terms and conditions without imposing technical limitations on
the applicant. The only tower within one mile of the proposed location is the existing
American Tower from which USCellular wishes to relocate due to burdensome economic
reasons as discussed in detail in the enclosed economic affidavit from USCelllular.
(8)The proposed use shall not conflict with any City ordinance adopted pursuant to Code of
Virginia § 15.2-2306, or pursuant to local charter on a historic property that is not eligible for the
review process established under 54 U.S.C. § 306108. An archaeology survey as part of the
state historic preservation approval has been enclosed herewith, demonstrating no historic
impact.
(9)The proposed use satisfies all other applicable requirements set forth in this chapter with
respect to the location, size, design, and construction of wireless support structures, wireless
facilities, and base stations. Enclosed are the detailed construction drawings showing
compliance with all applicable requirements.
( Ord. No. O-21-009 , 2-9-21)
Sec. 35.2-61.3. – [relevant District] Setbacks.
(i) B-1 District Abutting and R-1, R-2 or R-3 District. Where a B-1 lot abuts a R-1, R-2 or R-3
lot, the minimum front setbacks along block faces shall be the lesser of the neighborhood norm
as provided in paragraph (f) of this section or 20 feet.
Page 46 of 66
17
Photo-simulations from nearest roads
From clockwise at north
1. Facing South (from n. end of Nationwide Dr)
2. Facing East (from Leroy Bowen Dr. near proposed entrance)
3. Facing North (from further south down Leroy Bowen, looking N/NW)
4. Facing East (from Liberty U. east parking lot off Grave Mills Rd., looking E/NE)
5.
Page 47 of 66
18
Looking South
Looking West
Page 48 of 66
19
Looking North
Looking East
Page 49 of 66
23
RF Propagation Maps
All UScellular sites in the City of Lynchburg and the three counties surrounding the City (so sites
out to and beyond ½ mile from the city limits of Lynchburg)
Proposed site – Blackwater II – and surrounding/existing USCellular sites
Page 50 of 66
24
Existing ATC tower USC is collocated on and surrounding sites.
Page 51 of 66
25
Page 52 of 66
26
RF Engineer ’s Statement regarding Collocation,
Existing Site and Interference
Page 53 of 66
27
Page 54 of 66
28
Phase I Environmental Site Assessment –
Summary (full report submitted separately to City of Lynchburg )
[complete phase I study can be provided at any time for the city’s records]
Page 55 of 66
29
Archaeological Survey
Page 56 of 66
30
Page 57 of 66
31
[introduction and conclusion provided above – full report available to City]
Page 58 of 66
32
FAA and FCC Filings
Page 59 of 66
33
Economic Statement of Unreasonable Costs
Page 60 of 66
34
Page 61 of 66
35
Page 62 of 66
SHEET TITLE:SHEET NUMBER:SCALE IS BASED ON 22" x 34" "D" SIZEC1
PLANS PREPARED FOR:
STAMP:
REVISION HISTORYDESCRIPTIONDATEREV BYA01/19/2023PRELIM CDTH
10700 W HIGGINS, SUITE 240ROSEMONT, IL 60018PHONE: 847.608.6300
SITE NAME:BLACKWATERSITE NUMBER:765365SITE ADDRESS:119 LEROY BOWEN DRLYNCHBURG, VA 24502CAMPBELL COUNTY
(281)797-4387WWW.ARIA-CORP.COMTX FIRM REG# F-13104ARIAServices,Inc.ARIA SERVICES, INC.
8410 WEST BRYN MAWR AVENUECHICAGO, IL 60631
PLANS PREPARED BY:
PLANS PREPARED FOR:
B06/06/2023PRELIM CDTHC07/03/2023PRELIM CDTH
1TRUENORTHOVERALL SITE PLANOVERALL SITE PLAN
Page 63 of 66
SHEET TITLE:SHEET NUMBER:SCALE IS BASED ON 22" x 34" "D" SIZEC2
PLANS PREPARED FOR:
STAMP:
REVISION HISTORYDESCRIPTIONDATEREV BYA01/19/2023PRELIM CDTH
10700 W HIGGINS, SUITE 240ROSEMONT, IL 60018PHONE: 847.608.6300
SITE NAME:BLACKWATERSITE NUMBER:765365SITE ADDRESS:119 LEROY BOWEN DRLYNCHBURG, VA 24502CAMPBELL COUNTY
(281)797-4387WWW.ARIA-CORP.COMTX FIRM REG# F-13104ARIAServices,Inc.ARIA SERVICES, INC.
8410 WEST BRYN MAWR AVENUECHICAGO, IL 60631
PLANS PREPARED BY:
PLANS PREPARED FOR:
B06/06/2023PRELIM CDTHC07/03/2023PRELIM CDTH
ENLARGED SITE PLAN1TRUENORTHENLARGED SITE PLAN
Page 64 of 66
SHEET TITLE:SHEET NUMBER:SCALE IS BASED ON 22" x 34" "D" SIZEC3
PLANS PREPARED FOR:
STAMP:
REVISION HISTORYDESCRIPTIONDATEREV BYA01/19/2023PRELIM CDTH
10700 W HIGGINS, SUITE 240ROSEMONT, IL 60018PHONE: 847.608.6300
SITE NAME:BLACKWATERSITE NUMBER:765365SITE ADDRESS:119 LEROY BOWEN DRLYNCHBURG, VA 24502CAMPBELL COUNTY
(281)797-4387WWW.ARIA-CORP.COMTX FIRM REG# F-13104ARIAServices,Inc.ARIA SERVICES, INC.
8410 WEST BRYN MAWR AVENUECHICAGO, IL 60631
PLANS PREPARED BY:
PLANS PREPARED FOR:
B06/06/2023PRELIM CDTHC07/03/2023PRELIM CDTH
TOWER ELEVATION1TOWER ELEVATION2TYPICAL CABLE BRIDGE DETAIL
Page 65 of 66
Page 66 of 66
Source: City of Lynchburg website. First collected Nov 10, 2026.