Revised Board Package
Fairfax County · Fairfax County · Notices
Open the original document More from Fairfax County
This document is no longer listed on Fairfax County's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
FAIRFAX COUNTY
BOARD OF SUPERVISORS
November 17, 2026
REVISED
AGENDA
9:30 Presentations
9:30 Moved to
12/08/2026
Presentation by Kate Hanley, Chairman of the Electoral Board,
Regarding Election Year 2026
9:30 Board Appointments to Citizen Boards, Authorities, Commissions,
and Advisory Groups
10:00 Matters Presented by Board Members
10:00 Items Presented by the County Executive
ADMINISTRATIVE
ITEMS
1 Authorization to Advertise a Public Hearing on a Proposal to
Vacate a Portion of Wood Oak Drive (Dranesville District)
2 Authorization to Advertise a Public Hearing to Consider an
Ordinance to Amend Article 33 of Chapter 4 (Taxation and
Finance) of the Code of the County of Fairfax Virginia to Exempt
by Designation Certain Property Owned by Dulles Greene North
Four Limited Partnership from Real Estate and Personal Property
Taxes (Dranesville District)
3 Authorization to Advertise a Public Hearing to Consider an
Ordinance to Amend Article 33 of Chapter 4 (Taxation and
Finance) of the Code of the County of Fairfax Virginia to Exempt
by Designation Certain Property Owned by Dulles Greene North
Nine Limited Partnership from Real Estate and Personal Property
Taxes (Dranesville District)
4 Authorization to Advertise a Public Hearing to Consider an
Ordinance to Amend the Code of the County of Fairfax, Virginia
by Adopting Article 33 of Chapter 4 (Taxation and Finance)
relating to Affordable Housing Property Exempted by Designation
and to Exempt by Designation Certain Property Owned by
Columbia Crossroads 9 Limited Partnership from Real Estate and
Personal Property Taxes (Mason District)
5 Authorization to Advertise a Public Hearing to Consider an
Ordinance to Amend Article 33 of Chapter 4 (Taxation and
Finance) of the Code of the County of Fairfax Virginia to Exempt
by Designation Certain Property Owned by Columbia Crossroads
4 Limited Partnership from Real Estate and Personal Property
Taxes (Mason District)
1
FAIRFAX COUNTY
BOARD OF SUPERVISORS
November 17, 2026
REVISED
ADMINISTRATIVE
ITEMS
(continued)
6 Extension of Review Period for 2232 Application for Audrey
Moore Rec Center Site (Braddock District)
7 Extension of Review Period for 2232 Application for Hollin Hall
Substation (Mount Vernon District)
8 Approval of Traffic Calming Measures as Part of the Residential
Traffic Administration Program – Doyle Road (Springfield District)
9 Authorization to Execute Standard Project Agreements with the
Northern Virginia Transportation Commission for the Fiscal Year
2027-2028 I-66 Commuter Choice Program (Braddock, Hunter
Mill, Providence and Sully Districts)
CLOSED SESSION
Closed Session
PUBLIC
HEARINGS
3:30 Public Hearing on RZ-2025-PR-00004 (Tysons A, LLC)
(Providence District)
3:30 Public Hearing on PCA-2011-PR-011-005/CDPA-2011-PR-011-
002 (RZPA-2025-PR-00058) (Cityline Partners LLC and Galerie
Development, LLC) (Providence District)
3:30 Public Hearing on RZ-2023-SU-00007 (K. Hovnanian at Lincoln
Park, LLC) (Sully District) (Concurrent with PCA-75-2-016-04
(RZPA-2023-SU-00037), PCA-75-2-016-05 and RZ-2025-SU-
00024)
3:30 Public Hearing on PCA-75-2-016-04 (RZPA-2023-SU-00037) (K.
Hovnanian at Lincoln Park, LLC) (Sully District) (Concurrent with
RZ-2023-SU-00007, PCA-75-2-016-05 and RZ-2025-SU-00024)
3:30 Public Hearing on RZ-2025-SU-00024 (K. Hovnanian at Lincoln
Park, LLC) (Sully District) (Concurrent with PCA-75-2-016-05,
PCA-75-2-016-04 (RZPA-2023-SU-00037) and RZ-2023-SU-
00007)
2
FAIRFAX COUNTY
BOARD OF SUPERVISORS
November 17, 2026
REVISED
PUBLIC
HEARINGS
(continued)
3:30 Public Hearing on PCA-75-2-016-05 (K. Hovnanian at Lincoln
Park, LLC) (Sully District) (Concurrent with RZ-2025-SU-00024,
PCA-75-2-016-04 (RZPA-2023-SU-00037) and RZ-2023-SU-
00007)
3:30 Public Hearing on SE-2025-DR-00005 (CVP Operations VA
LLC) (Dranesville District)
3:30 Public Hearing on SE-2026-SU-00012 (Love Hand Home Health,
Inc.) (Sully District)
3:30 Public Hearing on RZ-2025-HM-00002 (EYA Development LLC)
(Hunter Mill District) (Concurrent with PCA-79-C-090-03 and
PCA-77-C-019-03 (RZPA-2025-HM-00010))
3:30 Public Hearing on PCA-79-C-090-03 (EYA Development LLC)
(Hunter Mill District) (Concurrent with RZ-2025-HM-00002 and
PCA-77-C-019-03 (RZPA-2025-HM-00010))
3:30 Public Hearing on PCA-77-C-019-03 (RZPA-2025-HM-00010)
(EYA Development LLC) (Hunter Mill District) (Concurrent with
RZ-2025-HM-00002 and PCA-79-C-090-03)
3:30 Public Hearing on SE-2025-MA-00043 (Fairfax County Water
Authority) (Mason District)
4:00 Public Hearing on AF-2026-MV-00003 (Belmont Bay Farms II)
(Mount Vernon District)
4:00 Public Hearing on Proposed Public Facilities Policy Plan - Phase
II 2020-CW-1CP and Public Facilities Comprehensive Plan Map
Updates 2013-CW-5CP
4:00 Intent to Defer to
12/08/2026 at
3:30p.m.
Public Hearing on Proposed Site Specific Plan Amendment
2025-II-2M, Vinson Hall, in the Kirby Community Planning Sector
of McLean Planning District (Dranesville District)
4:00 Public Hearing on a Proposal to Vacate and Abandon Redskin
Drive (Sully District)
4:00 Public Hearing to Convey Certain Land Rights in County-Owned
Property at 8243 Gregory Drive to the Virginia Department of
Transportation for the Bus Rapid Transit Project (Franconia
District)
3
FAIRFAX COUNTY
BOARD OF SUPERVISORS
November 17, 2026
REVISED
PUBLIC
HEARINGS
(continued)
4:00 Public Hearing to Convey Certain Land Rights in Board-Owned
Property at 8323 and 8333 Richmond Highway to the Virginia
Department of Transportation for the Bus Rapid Transit Project
(Mount Vernon District)
4:00 Public Hearing to Consider an Ordinance Amending Articles 7.2
and 17.1 of Chapter 4 (Taxation and Finance) of the Code of the
County of Fairfax, Virginia
4:30 Public Hearing on a Proposed Zoning Ordinance Amendment
Re: Accessory Living Units
4:30 Public Comment
4
Fairfax County, Virginia
BOARD OF SUPERVISORS
AGENDA
Tuesday
November 17, 2026
9:30 a.m.
PRESENTATIONS
RESOLUTION — To recognize Dr. Gloria Addo-Ayensu, Director of the Fairfax County
Health Department, for her dedicated service and contributions to public health in
Fairfax County. Requested by Chairman McKay.
PROCLAMATION — To designate November 2026 as Veterans and Military Families
Month in Fairfax County and recognize the service, sacrifices and contributions of
veterans and military families. Requested by Chairman McKay and Supervisor Lusk.
RESOLUTION — To recognize students of Thomas Jefferson High School for Science
and Technology for developing SafeWalkr, a tool that helps students find safer walking
routes to school. Requested by Chairman McKay.
RESOLUTION — To recognize the Tech of Tomorrow student founders for their
innovation, leadership and contributions to advancing technology and inspiring future
generations. Requested by Chairman McKay and Supervisor Palchik.
STAFF:
Tony Castrilli, Director, Office of Public Affairs
Jeremy Lasich, Office of Public Affairs
Imtiaz Ali, Office of Public Affairs
5
Board Agenda Item
November 17, 2026
Moved to
12/08/2026
9:30 a.m.
Presentation by Kate Hanley, Chairman of the Electoral Board, Regarding Election Year
2026
ENCLOSED DOCUMENTS:
None.
PRESENTED BY:
Kate Hanley, Chairman, Electoral Board
6
Board Agenda Item
November 17, 2026
9:30 a.m.
Board Appointments to Citizen Boards, Authorities, Commissions, and Advisory Groups
ENCLOSED DOCUMENTS:
Attachment 1: Appointments to be heard November 17, 2026
STAFF:
Jill G. Cooper, Clerk for the Board of Supervisors
7
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 1
NOTE: This document is current as of November 6, 2026. The final document – as
approved by the Board of Supervisors - will be included in the final board package that is
posted to the website the day following the meeting.
APPOINTMENTS TO BE HEARD NOVEMBER 17, 2026
(ENCOMPASSING VACANCIES PROJECTED THROUGH NOVEMBER 30, 2026)
(Unless otherwise noted, members are eligible for reappointment)
ADVISORY SOCIAL SERVICES BOARD
(4-year terms – limited to 2 full terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Ben Zuhl; appointed
12/21 by Foust)
Term exp. 9/25
Resigned
Dranesville District
Representative
Bierman Dranesville
AFFORDABLE DWELLING UNIT ADVISORY BOARD (4-year terms)
Incumbent History Requirement Nominee Supervisor District
Richard N. Rose
(Appointed 7/97-4/01
by Hanley; 9/05-5/09
by Connolly; 6/13-
6/17 by Bulova)
Term exp. 5/21
Builder
(Multi-Family)
Representative
By Any
Supervisor
At-Large
Continued on next page
8
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 2
AFFORDABLE DWELLING UNIT ADVISORY BOARD (4-year terms)
Continued from previous page
Incumbent History Requirement Nominee Supervisor District
James H. Scanlon
(Appointed 6/93-5/17
by Bulova)
Term exp. 5/21
Engineer/Architect/
Planner #1
Representative
By Any
Supervisor
At-Large
Mark Drake
(Appointed 2/09-5/12
by McKay)
Term exp. 5/16
Engineer/Architect/
Planner #2
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
James Francis Carey;
appointed 5/06 by
Connolly)
Term exp. 5/10
Resigned
Lending Institution
Representative
By Any
Supervisor
At-Large
Francis C. Steinbauer
(Appointed 8/02-5/18
by Hudgins)
Term exp. 5/22
Non-Profit Housing
Representative
By Any
Supervisor
At-Large
AGRICULTURAL AND FORESTAL DISTRICT ADVISORY BOARD
(Serves at the pleasure of the Board)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Mariette Newcomb;
appointed 2/88 by
Richards)
Resigned
Farmer #2
Representative
By Any
Supervisor
At-Large
9
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 3
ALCOHOL SAFETY ACTION PROGRAM LOCAL
POLICY BOARD (ASAP) (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Ronald Boggio;
appointed 5/22 by
McKay)
Term exp. 10/23
Resigned
At-Large #1
Representative
By Any
Supervisor
At-Large
Grant J. Nelson
(Appointed 10/95-
5/01 by Hanley; 6/04-
9/07 by Connolly;
6/10-9/19 by Bulova)
Term exp. 6/22
At-Large #2
Representative
By Any
Supervisor
At-Large
Darren Dickens
(Appointed 11/96-
5/01 by Hanley; 6/04-
10/07 by Connolly;
6/10-9/19 by Bulova)
Term exp. 6/22
At-Large #3
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Linda Perlstein;
appointed 11/22 by
Alcorn)
Term exp. 10/25
Resigned
At-Large #6
Representative
By Any
Supervisor
At-Large
10
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 4
ARCHITECTURAL REVIEW BOARD (3-year terms)
NOTE: Members shall be appointed by the Board as follows: At least two (2) members shall be
certified architects; one member shall be a landscape architect authorized to practice in Virginia;
one member shall be a lawyer with membership in the Virginia Bar; six (6) members shall be
drawn from the ranks of related professional groups such as archaeologists, historians, lawyers,
and real estate brokers.
Incumbent History Requirement Nominee Supervisor District
Christopher Daniel
(Appointed 10/23 by
McKay)
Term exp. 9/26
Architectural
Historian
Representative
By Any
Supervisor
At-Large
Kaye Orr
(Appointed 6/18-9/21
by Gross)
Term exp. 9/24
Related
Professional Group
#1 Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by Ali
A. Sohanghpurwala;
appointed 9/23 by
Smith)
Term exp. 9/24
Resigned
Related
Professional Group
#2 Representative
By Any
Supervisor
At-Large
11
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 5
ATHLETIC COUNCIL (2-year terms)
Incumbent History Requirement Nominee Supervisor District
NEW POSITION
At-Large #2
Representative
By Any
Supervisor
At-Large
Brian Luwis
(Appointed 7/19-6/21
by Foust)
Term exp. 3/23
Dranesville
District Alternate
Representative
Bierman Dranesville
VACANT
(Formerly held by
Hillary Richardson;
appointed 9/20-6/22
by Alcorn)
Term exp. 6/24
Resigned
Women's Sports
Alternate
Representative
By Any
Supervisor
At-Large
BOARD OF BUILDING AND FIRE PREVENTION CODE APPEALS (4-year terms)
NOTE: No official, technical assistant, inspector or other employee of the
Department of Public Works and Environmental Services, Department of Planning and
Development, or Fire and Rescue Department shall serve as a member on this Board.
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Amado Fernandez;
appointed 6/16-2/23
by Smith)
Term exp. 2/27
Resigned
Alternate #3
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Michael Sanio;
appointed 2/23 by
Alcorn)
Term exp. 2/27
Resigned
Alternate #4
Representative
By Any
Supervisor
At-Large
12
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 6
CHESAPEAKE BAY PRESERVATION ORDINANCE
EXCEPTION REVIEW COMMITTEE (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Anne Kanter;
appointed 9/11-10/18
by Bulova)
Term exp. 9/23
Resigned
At-Large #1
Representative
McKay At-Large
Chairman’s
VACANT
(Formerly held by
David W. Schnare;
appointed 11/10-9/23
by Herrity)
Term exp. 9/27
Resigned
Springfield District
Representative
Herrity Springfield
13
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 7
CHILD CARE ADVISORY COUNCIL (2-year terms)
Incumbent History Requirement Nominee Supervisor District
NEW POSITION
At-Large
Chairman's #2
Representative
McKay At-Large
Chairman’s
NEW POSITION
At-Large
Chairman's #3
Representative
McKay At-Large
Chairman’s
NEW POSITION
At-Large
Chairman's #4
Representative
McKay At-Large
Chairman’s
Valerie Inman
(Appointed 6/25 by
Bierman)
Term exp. 9/26
Dranesville
District
Representative
Bierman Dranesville
VACANT
(Formerly held by
Mercedes Dash;
appointed 10/25 by
Palchik)
Term exp. 9/27
Resigned
Providence
District
Representative
Palchik Providence
CIVIL SERVICE COMMISSION (2-year terms)
NOTE: The Commission shall include at least 3 members who are male, 3 members who are
female, and 3 members who are from a minority group.
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Janice Hill; appointed
12/21 by Gross; 6/24
by Jimenez)
Term exp. 12/25
Deceased
At-Large #9
Representative
By Any
Supervisor
At-Large
14
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 8
CONTINUUM OF CARE BOARD (CoC) (2-year terms)
Incumbent History Requirement Nominee Supervisor District
NEW POSITION
Dranesville District
Representative
Bierman Dranesville
VACANT
(Formerly held by
Adwoa Rey;
appointed 6/25 by
Lusk)
Term 6/27
Resigned
Franconia District
Representative
Lusk Franconia
Ruth Pearson
(Appointed 9/23 by
Smith)
Term exp. 6/25
Sully District
Representative
Smith Sully
CONFIRMATION NEEDED:
• Ms. Sue Armstrong as the City of Falls Church Representative
CRIMINAL JUSTICE ADVISORY BOARD (CJAB) (3-year terms)
Incumbent History Requirement Nominee Supervisor District
Ricardo E. Coleman
(Appointed 9/16-3/21
by Gross)
Term exp. 3/24
Mason District
Representative
Jimenez Mason
15
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 9
DULLES RAIL TRANSPORTATION IMPROVEMENT
DISTRICT ADVISORY BOARD, PHASE II (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Richard Fernicola;
appointed 1/22 by
McKay)
Term exp. 1/24
Resigned
BOS At-Large #6
Representative
By Any
Supervisor
At-Large
ENGINEERING STANDARDS REVIEW COMMITTEE (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Maya Huber;
appointed 12/09-1/14
by Confirmation; 5/18
by Bulova)
Term exp. 3/21
Resigned
Citizen #4
Representative
By Any
Supervisor
At-Large
ENVIRONMENTAL COMMISSION (3-year terms)
Incumbent History Requirement Nominee Supervisor District
NEW POSITION College/University
Student
Representative
Confirmed
by the Board
Confirmation
16
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 10
FAIRFAX AREA DISABILITY SERVICES BOARD
(3-year terms - limited to 2 full terms)
NOTE: Members may be reappointed after being off the Board for three years. State Code
requires that the membership in the local disabilities board include at least 30 percent
representation by individuals who have physical, visual, or hearing disabilities or their family
members. For this 15-member board, the minimum number for this representation would be five
members.
Incumbent History Requirement Nominee Supervisor District
David Simon
(Appointed 3/24
By McKay)
Term exp. 11/26
At-Large
Chairman's
Representative
McKay At-Large
Chairman's
Andrew Magill
(Appointed 3/24 by
McKay)
Term exp. 11/26
Not eligible for
reappointment
At-Large #2
Business
Community
Representative
By Any
Supervisor
At-Large
Mike Keppler
(Appointed 5/26 by
Sizemore Heizer)
Term exp. 11/26
Braddock District
Representative
Sizemore
Heizer
Braddock
VACANT
(Formerly held by
Courtney Cezair
Mayers; appointed
6/21 by Foust)
Term exp. 11/24
Resigned
Dranesville District
Representative
Bierman Dranesville
Robin Rinearson
(Appointed 6/24 by
Jimenez)
Term exp. 11/26
Mason District
Representative
Jimenez Mason
Continued on next page
17
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 11
FAIRFAX AREA DISABILITY SERVICES BOARD
(3-year terms - limited to 2 full terms)
Continued from previous page
Incumbent History Requirement Nominee Supervisor District
Deborah K. Hammer
(Appointed 3/16-1/20
by Storck)
Term exp. 11/22
Not eligible for
reappointment
Mount Vernon
District
Representative
Storck Mount
Vernon
VACANT
(Formerly held by
Michael Ritter;
appointed 6/22 by
Herrity)
Term exp. 11/24
Resigned
Springfield District
Representative
Herrity Springfield
FAIRFAX COUNTY EMPLOYEES' RETIREMENT
SYSTEM BOARD OF TRUSTEES (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Anthony Griffin;
appointed 9/20-10/23
by Gross)
Term exp. 6/27
Resigned
At-Large #2
Representative
By Any
Supervisor
At-Large
18
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 12
HEALTH CARE ADVISORY BOARD (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Marlene Blum;
appointed 6/23 by
Palchik)
Term exp. 6/27
Resigned
Providence District
Representative
Palchik Providence
HEALTH SYSTEMS AGENCY BOARD (3-year terms - limited to 2 full terms)
NOTE: Members may be reappointed after a 1-year break
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Cody J. Hennelly;
appointed 3/25 by
Lusk)
Term exp. 6/27
Resigned
Consumer #3
Representative
By Any
Supervisor
At-Large
Maria Zlotnik
(Appointed 9/22 by
McKay)
Term exp. 6/25
Consumer #4
Representative
By Any
Supervisor
At-Large
Lydia Lawrence
(Appointed 2/22 by
Foust)
Term exp. 6/24
Consumer #5
Representative
By Any
Supervisor
At-Large
Bridget Jennison
(Appointed 5/22 by
Walkinshaw)
Term exp. 6/24
Provider #1
Representative
By Any
Supervisor
At-Large
Continued on next page
19
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 13
HEALTH SYSTEMS AGENCY BOARD (3-year terms - limited to 2 full terms)
NOTE: Members may be reappointed after a 1-year break
Continued from previous page
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Maria Zlotnick;
appointed 6/20 by
Alcorn)
Term exp. 6/25
Resigned
Provider #4
Representative
By Any
Supervisor
At-Large
HISTORY COMMISSION (3-year terms)
NOTE: The Commission shall include at least one member who is a resident from each District.
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Jenee Lindner;
appointed 12/21-1/25
by Herrity)
Term exp. 12/27
Resigned
Citizen #4
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Lynne Garvey-Hodge;
appointed 12/21 by
Gross)
Term exp. 12/24
Resigned
Historian #1
Representative
By Any
Supervisor
At-Large
20
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 14
HUMAN RIGHTS COMMISSION (3-year terms)
Incumbent History Requirement Nominee Supervisor District
Adnan Bokhari
(Appointed 5/23 by
McKay)
Term exp. 9/26
At-Large #9
Representative
By Any
Supervisor
At-Large
Shahid Malik
(Appointed 1/24 by
McKay)
Term exp. 9/26
At-Large #11
Representative
By Any
Supervisor
At-Large
HUMAN SERVICES COUNCIL (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Edward Yost
appointed 3/23 by
Smith)
Term exp. 7/27
Resigned
Sully District #2
Representative
Smith Sully
21
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 15
INDUSTRIAL DEVELOPMENT AUTHORITY (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Christopher Glaser;
appointed 11/21 by
Alcorn)
Term exp. 10/25
Resigned
At-Large #4
Representative
By Any
Supervisor
At-Large
INFORMATION TECHNOLOGY POLICY
ADVISORY COMMITTEE (ITPAC) (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Dennis Carlton;
appointed 11/25 by
Smith)
Term exp. 12/28
Resigned
Sully District
Representative
Smith Sully
22
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 16
JUVENILE AND DOMESTIC RELATIONS DISTRICT COURT
CITIZENS ADVISORY COUNCIL (2-year terms)
Incumbent History Requirement Nominee Supervisor District
Crystopher Herrera
(Appointed 2/22 by
Foust)
Term exp. 1/24
Dranesville District
Representative
Bierman Dranesville
PARK AUTHORITY (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Johna Toomey;
appointed 1/24 by
McKay)
Term exp. 12/27
Resigned
At-Large #1
Representative
By Any
Supervisor
At-Large
POLICE OFFICERS RETIREMENT SYSTEM BOARD OF TRUSTEES (4-year terms)
Incumbent History Requirement Nominee Supervisor District
Jay Jupiter
(Appointed 2/17-3/22
by Storck)
Term exp. 12/25
Citizen At-Large #1
Representative
By Any
Supervisor
At-Large
23
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 17
RESTON TRANSPORTATION SERVICE DISTRICT
ADVISORY BOARD (4-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Angela E. Roberts;
appointed 9/21 by
Alcorn)
Term exp. 9/25
Resigned
Apartment or
Rental Owner
Associations
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Margaret Parker;
appointed 10/1 by
Alcorn)
Term exp. 9/25
Resigned
Commercial or
Retail Ownership
#1 Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Peter Henry;
appointed 9/21 by
Alcorn)
Term exp. 9/25
Resigned
Commercial or
Retail Ownership
#3 Representative
By Any
Supervisor
At-Large
Michael
Shindledecker
(Appointed 9/21 by
Foust)
Term exp. 9/25
Dranesville District
Representative
Bierman Dranesville
VACANT
(Formerly held by
Stephanie Weber:
appointed 8/22 by
Alcorn)
Term exp. 9/25
Resigned
Residential
Owners/HOA/Civic
Association #3
Representative
By Any
Supervisor
At-Large
24
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 18
TRAILS, SIDEWALKS AND BIKEWAYS COMMITTEE (2-year terms)
Incumbent History Requirement Nominee Supervisor District
Lydia Lawrence
(Appointed 9/24 by
Bierman)
Term exp. 1/26
Dranesville District
Representative
Bierman Dranesville
VACANT
(Formerly held by
Henry Bankester;
appointed 1/26 by
Jimenez)
Term exp. 1/28
Resigned
Mason District
Representative
Jimenez Mason
TRANSPORTATION ADVISORY COMMISSION (2-year terms)
Incumbent History Requirement Nominee Supervisor District
Keith Foxx
(Appointed 2/24 by
Lusk)
Term exp. 6/26
Franconia District
Representative
Lusk Franconia
25
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 19
TRESPASS TOWING ADVISORY BOARD (3-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held
Denver Supinger;
appointed 9/24 by
McKay)
Term exp. 9/27
Resigned
Citizen Alternate
Representative
By Any
Supervisor
At-Large
Ashley Miller
(Appointed 6/26 by
McKay)
Term exp. 9/26
Towing #1
Representative
By Any
Supervisor
At-Large
Alvin Leach
(Appointed 10/10-
11/22 by Foust)
Term exp. 9/25
Towing #2
Representative
By Any
Supervisor
At-Large
26
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 20
WETLANDS BOARD (5-year terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Kimberly Larkin;
appointed 12/22 by
Storck)
Term exp. 12/27
Resigned
At-Large #1
Representative
By Any
Supervisor
At-Large
VACANT
(Formerly held by
Bert Cramer;
appointed 1/21-12/21
by Storck)
Term exp. 12/26
Resigned
Mount Vernon
District #2
Representative
Storck Mount
Vernon
VACANT
(Formerly held by
John Collins;
appointed 1/22-12/24
by Storck)
Term exp. 12/29
Resigned
Mount Vernon
District #3
Representative
Storck Mount
Vernon
YOUNG ADULTS ADVISORY COUNCIL
(2-year terms - limited to 2 full terms)
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Timothy Klein;
appointed 7/25 by
Lusk)
Term exp. 1/26
Resigned
Franconia District
Representative
Lusk Franconia
Continued on next page
27
ATTACHMENT 1
November 17, 2026 Appointments to Boards, Authorities, and Commissions Page 21
YOUNG ADULTS ADVISORY COUNCIL
(2-year terms - limited to 2 full terms)
Continued from previous page
Incumbent History Requirement Nominee Supervisor District
VACANT
(Formerly held by
Daniel Morgan;
appointed 2/26 by
Jimenez)
Term exp. 1/28
Resigned
Mason District
Representative
Jimenez Mason
Zafar Mahnoor
(Appointed 1/24 by
Storck)
Term exp. 1/26
Not eligible for
reappointment
Mount Vernon
District
Representative
Storck Mount
Vernon
Neel Daugherty-
Shrivastava
(Appointed 3/24 by
Palchik)
Term exp. 1/26
Providence District
Representative
Palchik Providence
Samuel Niner
(Appointed 1/22-1/24
by Herrity)
Term exp. 1/26
Not eligible for
reappointment
Springfield District
Representative
Herrity Springfield
VACANT
(Formerly held by
Eddy Sandoval;
appointed 9/21 by
Smith)
Term exp. 1/24
Resigned
Sully District
Representative
Smith Sully
28
Board Agenda Item
November 17, 2026
10:00 a.m.
Matters Presented by Board Members
29
Board Agenda Item
November 17, 2026
10:00 a.m.
Items Presented by the County Executive
30
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 1
Authorization to Advertise a Public Hearing on a Proposal to Vacate a Portion of Wood
Oak Drive (Dranesville District)
ISSUE:
Board authorization to advertise a public hearing on a proposal to vacate a portion of
Wood Oak Drive (Route 6534) north of the intersection of Sunrise Valley Drive and
Wood Oak Drive.
RECOMMENDATION:
The County Executive recommends that the Board authorize advertisement of a public
hearing for December 8, 2026, at 4:30 p.m.
TIMING:
Board action is requested on November 17, 2026, to provide sufficient time to advertise
the public hearing for December 8, 2026, at 4:30 p.m.
BACKGROUND:
The applicant, Pulte Home Company, LLC, is requesting that a portion of Wood Oak
Drive (Route 6534) be vacated under §15.2-2272 of the Virginia Code. The applicant is
seeking to vacate the right of way to redevelop their adjacent properties pursuant to
approved rezoning application RZ-2022-DR-00021 and amendments RZPA-2022-DR-
00134. The proposed vacation would not irreparably harm any properties, no public
necessity exists for the continuance of this right of way, the right of way is not necessary
for use in the public secondary system, and the right of way has no historic value.
The subject portion of Wood Oak Drive proposed to be vacated is built and is part of the
Virginia Department of Transportation Secondary System of Highways. The subject
vacation area was dedicated for public street purposes by a deed recorded in Deed
Book 7519 at Page 560. VDOT has no outstanding issues with this application.
EQUITY IMPACT:
None.
31
Board Agenda Item
November 17, 2026
FISCAL IMPACT:
None.
ENCLOSED DOCUMENTS:
Attachment 1: Letter of Request and Justification
Attachment 2: Notice of Public Hearing
Attachment 3: Vacation Ordinance
Attachment 4: Vacation Plat
Attachment 5: Vicinity Map
STAFF:
Jennifer Miller, Deputy County Executive
Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT)
Martha Coello, Deputy Director, FCDOT
Jeffrey Hermann, Chief, Site Analysis & Transportation Planning Division, FCDOT
Gregory Fuller, Jr., Chief, Site Analysis Section (SAS), FCDOT
Brittany Nixon, Transportation Planner IV, SAS, FCDOT
Jeffrey Edmondson, Transportation Planner III, SAS, FCDOT
ASSIGNED COUNSEL:
Randall T. Greehan, Assistant County Attorney
32
ACTIVE\1609566189.1
DLA Piper LLP (US)
One Fountain Square
11911 Freedom Drive
Suite 300
Reston, Virginia 20190 -5602
www.dlapiper.com
Brian J. Winterhalter
brian.winterhalter@us.dlapiper.com
T 703.773.4016
F 703.773.5016
M 703.867.0708
April 29, 2024
Jeff Edmondson
Fairfax County Department of Transportation
4050 Legato Road, Suite 400
Fairfax, VA 22033
Re: Request to Abandon and Vacate a Portion of Wood Oak Drive
Dear Jeff:
I’m writing on behalf of Pulte Home Company, LLC (the “Applicant”) to request the abandonment
and vacation of a portion of Wood Oak Drive in the Dranesville District. GS Property NR I, LLC
and GS Property NR II, LLC (the “Owners”) are the respective owners of the property identified
as Fairfax County Tax Map Numbers 16 -3 ((1)) 29B and 16 -3 ((11)) 5A (collectively, the
“Property”). The Applicant is the contract purchaser of approximately 12.02 acres of the Property
and has filed a Rezoning application and two Proffered Condition Amendment applications to
permit a residential development comprised of two (2) multi -family residential buildings (the
“Proposed Development”). Below please find a map with the Property outlined in red.
Map depicting the location of the Property
33
Jeff Edmondson
April 29, 2024
Page Two
ACTIVE\1609566189.1
I. Background
The Property is located on the northwest corner of Sunrise Valley Drive and Wood Oak Drive and
is currently developed with two office buildings and surface parking lots. The portion of the right-
of-way of Wood Oak Drive proposed to be vacated was established via the deed recorded in the
Fairfax County land records in Deed Book 7515, at Page 560.
The Applicant proposes to vacate the portion of Wood Oak Drive from the southeasternmost point
of Lot 5A to the northeastern-most point of Lot 29B for a total distance of 609.08 feet and shown
on the plat titled “PLAT SHOWING THE VACATION OF A PORTION OF WOOD OAK DRIVE ,”
dated January 17, 2024, and prepared by Land Design Consultants , and further defined within
the metes and bounds property description.
Map depicting the area of the proposed Wood Oak Drive ROW Vacation
II. Abandonment/Vacation Request and Justification
As part of the Rezoning and Proffered Condition Amendment applications, the Applicant proposes
to incorporate a portion of the southbound segment of Wood Oak Drive, located between Sunrise
Valley Drive to the south and Cooperative Way to the north, within the application as suggested
34
Jeff Edmondson
April 29, 2024
Page Three
ACTIVE\1609566189.1
by and coordinated with the Department of Planning and Development. Doing so requires the
vacation of this portion of Wood Oak Drive. This segment of Wood Oak Drive is currently a divided
two-lane right-of-way leading to left and right-turn lanes onto Sunrise Valley Drive. As part of the
Proposed Development, the Applicant proposes to imple ment a road diet to establish the
southbound segment of Wood Oak Drive as a one-lane road.
As part of this road diet and the vacation of the portion of Wood Oak Drive along the eastern
boundary of the Property, the Applicant will be able to incorporate streetscapes consistent with
the recommendations for the Guidelines for Development: Reston Transit Station Areas. This will
allow for a sizeable amenity area, an 8’ building zone and an 8’ planning area, a 6’ sidewalk, a 7’
landscaped amenity panel, and two 11’ travel lanes with an 8’ median. The creation of this
streetscape would not be possible without the vacation of this portion of Wood Oak Drive.
Cross-Section of Wood Oak Drive Streetscape Improvements
III. Conclusion
The Applicant is looking forward to working with Fairfax County and VDOT on the abandonment
and vacation of the Wood Oak Drive right -of-way. This proposal has been discussed with
representatives from the Fairfax County Department of Transportation, who do not object to the
proposed vacation/abandonment.
35
Jeff Edmondson
April 29, 2024
Page Four
ACTIVE\1609566189.1
Please let me know if you have any questions or need any additional information in connection
with the requested abandonment and vacation.
Best regards,
Brian J. Winterhalter
cc: James N. Bierman, Jr., Dranesville District Supervisor
John C. Ulfelder, Dranesville District Planning Commissioner
Katie Quinn, Department of Planning and Development
David DeMarco, Pulte Home Company, LLC
Stephen Durr, Goodstone LLC
Greg Riegle, McGuire Woods LLP
36
ATTACHMENT 2
NOTICE OF INTENT TO ADOPT AN
ORDINANCE VACATING FOR A PORTION OF A ROAD
(Wood Oak Drive – State Route 6534)
Dranesville District,
Fairfax County, Virginia
Notice is hereby given that the Board of Supervisors of Fairfax County, Virginia, will hold a public
hearing on December 8, 2026, at 4:30pm during its regular meeting in the Board Auditorium of
the Fairfax County Government Center Parkway, Fairfax, Virginia pursuant to Virginia Code Ann.
§15.2-2204, and §15.2-2722, vacating a total of 7,599 square feet of Wood Oak Drive (Route
6534) north of Sunrise Valley Drive , which was dedicated for public street purposes pursuant to
that certain Deeds dated April 19, 1989, recorded in Deed Book 7519, at Page 560, located in the
land records of Fairfax County, Virginia . The road is located on Tax Map Number: 016-3 and is
shown on the plat prepared by Land Design Consultants , which is on file in the Fairfax County
Department of Transportation, 4050 Legato Road, Suite 400, Fairfax, Virginia 22033, Telephone
Number (703) 877-5600.
Public hearings are available to view live on Channel 16 and stream live online at
www.fairfaxcounty.gov/cableconsumer/channel-16/live-video-stream. Live audio of the meeting
may be accessed at 703-324-7700. Those wishing to testify may do so in person, unless the meeting
is held electronically, or via phone or pre -recorded YouTube video. Speakers wishing to testify
via video must register by signing up online at the web address shown below or by calling the
Department of Clerk Services at 703 -324-1315, TTY 711, and must submit their video no later
than 9 a.m. on the day prior to the hearing. Speakers wishing to testify via phone must sign up to
testify no later than 12:00 p.m. the day of the hearing to be placed on the Speakers List. Speakers
not on the Speakers List may be heard after the registered speakers have testified.
In addition, written testimony and other submissions will be received by mail at 12000
Government Center Parkway, Suite 552, Fairfax, Virginia 22035 or by email at
clerktotheBOS@fairfaxcounty.gov. More information on the ways to testify can be found at
www.fairfaxcounty.gov/clerkservices/ways-provide-public-hearing-testimony.
Questions regarding this proposal may be directed to the Fairfax County Department of
Transportation at 703-877-5600.
Fairfax County supports the Americans with Disabilities Act by making reasonable
accommodations for persons with disabilities. Open captioning will be provided in the Board
Auditorium. For sign language interpreters or other accommodation, please call the Clerk's Office,
703-324-3151, TTY: 711, as soon as possible, but no later than 48 hours before the public hearing.
Assistive listening devices are available at the meeting.
DRANESVILLE DISTRICT
37
ADOPTION OF AN ORDINANCE VACATING
OF A ROAD
(Wood Oak Drive – Route 6534)
Dranesville District,
Fairfax County, Virginia
At a regular meeting of the Board of Supervisors of Fairfax County, Virginia, held on December
8, 2026, at which meeting a quorum was present and voting, the Board, a fter conducting a public
hearing upon due notice given pursuant to Virginia Code Ann. §15.2 -2204 and as otherwise
required by law, adopted the following ordinance, to-wit:
BE IT ORDAINEDby the Board of Supervisors of Fairfax County, Virginia, pursuant to Virginia
Code §15.2 -2272, does hereby vacate a portion of Wood Oak Drive as formerly dedicated in
certain Deed, recorded in Deed Book 7519, at Page 560. The road vacated is currently shown on
Tax Map 16-3 and is shown on the plat prepared by Land Design Consultants identified as
Attachment 5. The Board finds that the portion to be vacated and abandoned has no historic value,
will not cause any property owners to be irreparably harmed, and is not necessary for use in the
public secondary system and that no public necessity exists for the continuance of the right of way.
This vacation is subject to any right, privilege, permit, license, easement, in favor of any public
service company, utility, or other person or entity, including any political subdivision, whether
located above, upon, or under the surface, either currently in use or of record, including the right to
operate, maintain, replace, alter, extend, increase, or decrease in size any facilities in the vacated
roadway, without any permission of the landowner.
A Copy Teste:
Jill G. Cooper
Clerk for the Board of Supervisors
ATTACHMENT 3
38
PH: 703-680-4585 FX: 703-680-4775
4585 DAISY REID AVENUE, SUITE 201 WOODBRIDGE, VIRGINIA 22192
LAND DESIGN CONSULTANTS
A
I NI GRIV
FO
HTLAEWNOMMOCLAND
SURVEYOR
ELIS A. LIBRADA
Lic. No. 3169
39
PH: 703-680-4585 FX: 703-680-4775
4585 DAISY REID AVENUE, SUITE 201 WOODBRIDGE, VIRGINIA 22192
LAND DESIGN CONSULTANTS
AI NI GRIV
FO
HTLAEWNOMMOCLAND
SURVEYOR
ELIS A. LIBRADA
Lic. No. 3169
40
PH: 703-680-4585 FX: 703-680-4775
4585 DAISY REID AVENUE, SUITE 201 WOODBRIDGE, VIRGINIA 22192
LAND DESIGN CONSULTANTS
AI NI GRIV
FO
HTLAEWNOMMOCLAND
SURVEYOR
ELIS A. LIBRADA
Lic. No. 3169
41
Sources: Esri, HERE, Garmin, Intermap, increment P Corp.,
GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster
NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong
Kong), (c) OpenStreetMap contributors, and the GIS User
Community
Vacation and Abandonment of Wood Oak Drive
k
¯
0 0.065 0.130.0325
Miles
Tax Map 16-3
k Denotes Area to be Vacated
Dranesville District
k
k
WoodOakDrive
k
k
DullesAccessRoad
SunriseValleyDrive
42
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 2
Authorization to Advertise a Public Hearing to Consider an Ordinance to Amend Article
33 of Chapter 4 (Taxation and Finance) of the Code of the County of Fairfax Virginia to
Exempt by Designation Certain Property Owned by Dulles Greene North Four Limited
Partnership from Real Estate and Personal Property Taxes (Dranesville District)
ISSUE:
Authorization of the Board of Supervisors (Board) to advertise a public hearing to
consider an ordinance to amend Article 33 of Chapter 4 (Taxation and Finance) of the
Fairfax County Code, effective January 2, 2027.
RECOMMENDATION:
The County Executive recommends that the Board authorize the advertisement of a
public hearing on December 8, 2026, at 4:00 p.m. to consider an ordinance to amend
Article 33 to Chapter 4 of the Fairfax County Code to exempt by designation certain
property owned by Dulles Greene North Four Limited Partnership from real and
personal property taxes, with an effective date of January 2, 2027.
TIMING:
Board action is requested on November 17, 2026, to provide sufficient time to advertise
the proposed hearing on December 8, 2026, at 4:00 p.m. The property tax exemption
ordinance, if passed, needs to be in place prior to the approval of any subordinate
financing from the Fairfax County Redevelopment and Housing Authority (“FCRHA”),
which is planned to be presented to the FCRHA and the Board in January and
February, respectively.
BACKGROUND:
The 2026 General Assembly passed HB 854 which amended Va. Code § 58.1-3651 to
allow a local government to exempt from real and personal property taxes property
owned by organizations that is used for the charitable or benevolent purposes of
providing affordable housing, as long as the controlling interest of the organization is
held directly or indirectly by one or more nonprofit organizations. This amendment took
effect on July 1, 2026.
True Ground Housing Partners (True Ground), is a non-profit affordable housing
provider that FCRHA selected through a competitive process subject to the Virginia
Public-Private Education Facilities and Infrastructure Act of 2002 (PPEA) to develop
affordable housing on a site (Dulles Greene or Project) comprising a parcel (County Tax
43
Board Agenda Item
November 17, 2026
Map 016-1-01-0011B) owned by the FCRHA (and previously conveyed to the FCRHA
by the County) and an adjacent parcel (016-1-01-0011A) currently owned by a
subsidiary of The Peterson Companies and which True Ground currently has under
contract (Site). The development proposal currently contemplates 435 housing units
split between two, distinct buildings (Dulles Greene North and Dulles Greene South,
respectively) that will serve low-to-moderate income households across the Project.
True Ground is currently working on securing all needed approvals and financing for
Dulles Greene North, while financing and approvals for Dulles Greene South is
anticipated to occur at a later date. True Ground has applied for FCRHA subordinate
loans to support the financial feasibility of Dulles Greene North.
Dulles Greene North is currently contemplated to contain 211 units, split into two
different condominium units (Part A and Part B, respectively), each owned by different
affiliate entities of True Ground. This splitting of Dulles Greene North into two separate
ownership entities allows for Part A and Part B to pursue different sources of financing,
including simultaneously pursuing both 9% and 4% Low Income Housing Tax Credits
alongside the FCRHA Blueprint Loans and other financing sources. Each unit will in
turn be long-term ground leased by the FCRHA to the applicable True Ground affiliate.
Part B of Dulles Greene North will be owned by Dulles Greene North Four Limited
Partnership (DGN4). Part B of Dulles Greene North project is eligible for a property tax
exemption under 58.1-3651 because the project is owned “by an ownership entity of
which a controlling interest of the managing member or general partner of such
ownership entity is held directly or indirectly by one or more nonprofit organizations”.
A property tax exemption for DGN4’s property at the Dulles Greene Site could
meaningfully impact the financial feasibility of the Project. Property tax exemptions
reduce a property’s annual operating costs, which allows the project to leverage a larger
amount of private, senior debt and/or frees up net cashflow to fund resident services or
reduce rents. This in turn will directly decrease the amount of FCRHA subordinate debt
required to make the Project financially feasible. A tax exemption would diversify the
tools that support the continued progress towards the Country’s goal of 10,000 net new
affordable housing units by 2034.
Prior to the public hearing on this proposed ordinance, the Board will consider adopting
an ordinance that will establish Article 33 of the Fairfax County Code, which will set forth
the process to allow certain entities that provide affordable housing to obtain an
exemption from real and personal property taxes. The proposed ordinance attached to
this Board Item will specifically designate that the property owned by DGN4 in Part B of
the Dulles Greene North project will be exempt from real and personal property taxes.
The proposed ordinance sets forth when the exemption will expire, which includes the
earlier of 50 years, or when DGN4 ceases to use the property for the charitable or
benevolent purpose of providing affordable housing, or when the controlling interest of
DGN4 is no longer held directly or indirectly by a nonprofit organization.
44
Board Agenda Item
November 17, 2026
EQUITY IMPACT:
A property tax exemption will increase the financial feasibility of the Project and allow for
the FCRHA’s investment to better leverage private resources. In turn, the Project will
contribute to achieving the Board’s goal of increasing the supply of affordable housing
by a minimum of 10,000 new units to meet the County’s housing needs. With Fairfax
County’s Area Median Income at $166,100 for a family of four, the delivery of new
affordable housing units with this Project aligns with the One Fairfax Policy, which
recommends, in part, (i) the implementation of housing policies and practices that
encourage all who want to live in Fairfax to be able to do so, and (ii) the provision of a
full spectrum of housing opportunities across the County, most notably those in mixed-
use areas that are accessible to multiple modes of transport. Dulles Greene will
promote opportunities for everyone to fully participate in the region’s economic vitality,
contribute to its readiness for the future, and connect to its assets and resources.
FISCAL IMPACT:
Currently, tax parcel 0161 01 0011B is owned by the FCRHA and is thus currently
exempt from property taxes. Tax parcel 0161 01 0011A is currently owned by a private
owner and will be acquired by the FCRHA. For 2026, the property tax assessment for
this parcel is $1,462,170 which yields a tax levy of $20,448. After acquisition by the
FCRHA, the privately-owned property would be tax-exempt until a subsequent
disposition of the property. The property tax exemption will further reduce the amount
of FCRHA subordinate debt required to make the Project financially feasible and
expand the FCRHA’s ability to leverage such funds towards the Board’s 10,000 net new
affordable housing units by 2034.
ENCLOSED DOCUMENTS:
Attachment 1 – Draft Ordinance
Attachment 2 – Location Map
STAFF:
Jessica Werder, Deputy County Executive
Thomas Fleetwood, Director, Housing and Community Development (HCD)
Jay Doshi, Director, Department of Tax Administration (DTA)
Anna Shapiro, Deputy Director, Real Estate Finance and Development, HCD
Callahan Seltzer, Division Director, Real Estate and Community Development Finance,
HCD
Lisa Jacobs, Assistant Division Director, DTA
Rachel Waldman, Associate Director, Real Estate Finance, HCD
45
Board Agenda Item
November 17, 2026
ASSIGNED COUNSEL:
Daniel Robinson, Deputy County Attorney
Ryan Wolf, Senior Assistant County Attorney
46
Attachment 1
Page 1
AN ORDINANCE AMENDING 1
ARTICLE 33 OF CHAPTER 4 OF THE FAIRFAX COUNTY CODE, RELATING TO 2
PROPERTY USED FOR THE CHARITABLE AND BENEVOLENT PURPOSE OF 3
PROVIDING AFFORDABLE HOUSING THAT IS EXEMPTED FROM TAX BY 4
DESIGNATION 5
6
AN ORDINANCE to amend the Fairfax County Code by adopting a new 7
Section 4-33-6 of Article 33 to Chapter 4 relating to the designation of 8
certain property owned by Dulles Greene North Four Limited Partnership 9
as exempt from taxes. 10
11
Draft of October 21, 2026 12
13
Be it ordained by the Board of Supervisors of Fairfax County: 14
1. That Section 4-33-6 of Article 33 of Chapter 4 of the Fairfax County Code is adopted as 15
follows: 16
17
CHAPTER 4 – TAXATION AND FINANCE 18
ARTICLE 33 – Affordable housing property exempted by designation. 19
Section 4-33-6. – Property of Dulles Greene North Four Limited Partnership. 20
(a) Dulles Greene North Four Limited Partnership is a Virginia limited partnership for 21
which a controlling interest of the general partner is held directly or indirectly by a nonprofit 22
organization, and it uses its real and personal property to provide affordable housing. 23
(b) Dulles Greene North Four Limited Partnership is designated as a charitable and 24
benevolent organization as set forth in Va. Code § 58.1-3651 because it uses its real and personal 25
property to provide affordable housing. 26
(c) As used in this Section 4-33-6, the term “Site” means land set forth as depicted on 27
Fairfax County Tax Map Numbers 016-1-01-0011A and 016-1-01-0011B as of the date of the 28
adoption of this ordinance. 29
(d) “Dulles Greene North Four Limited Partnership’s Property” means the real and 30
personal property that is owned by Dulles Greene North Four Limited Partnership or the real and 31
personal property that is deemed to be taxable to Dulles Greene North Four Limited Partnership 32
pursuant to Va. Code § 58.1-3203. 33
(e) Dulles Greene North Four Limited Partnership’s Property that is or will be located at 34
or on any portion of the Site is hereby exempt from property taxation for so long as and to the 35
extent it is used for the charitable and benevolent purpose of providing affordable housing. This 36
47
Attachment 1
Page 2
exemption applies only to Dulles Greene North Four Limited Partnership and does not transfer if 37
Dulles Greene North Four Limited Partnership’s Property is sold to another entity. 38
(f) The exemption set forth in this Section 4-33-6 will expire on the earlier of 1) 50 years 39
from the date of enactment of this ordinance, 2) when Dulles Greene North Four Limited 40
Partnership fails to use its exempt property on the Site for the charitable and benevolent purpose 41
of providing affordable housing, 3) when the controlling interest of Dulles Greene North Four 42
Limited Partnership’s general partner is no longer held directly or indirectly by a nonprofit 43
organization, or 4) when Dulles Greene North Four Limited Partnership’s Property at the Site no 44
longer qualifies for a tax exemption under Va. Code § 58.1-3651 or Section 4-33-1(b). If any 45
portion of Dulles Greene North Four Limited Partnership’s Property is not used for the charitable 46
and benevolent purpose of providing affordable housing that portion is not exempt from taxes 47
under this Section. 48
2. That the provisions of this ordinance will take effect on January 2, 2027. 49
50
GIVEN under my hand this ______ day of ______, 2026 51
52
53
_____________________________________ 54
Jill Cooper 55
Clerk for the Board of Supervisors 56
48
Attachment 2
Map ID:
0161-01-0011A
Map ID:
0161-01-0011B
49
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 3
Authorization to Advertise a Public Hearing to Consider an Ordinance to Amend Article
33 of Chapter 4 (Taxation and Finance) of the Code of the County of Fairfax Virginia to
Exempt by Designation Certain Property Owned by Dulles Greene North Nine Limited
Partnership from Real Estate and Personal Property Taxes (Dranesville District)
ISSUE:
Authorization of the Board of Supervisors (Board) to advertise a public hearing to
consider an ordinance to amend Article 33 of Chapter 4 (Taxation and Finance) of the
Fairfax County Code, effective January 2, 2027.
RECOMMENDATION:
The County Executive recommends that the Board authorize the advertisement of a
public hearing on December 8, 2026, at 4:00 p.m. to consider an ordinance to amend
Article 33 to Chapter 4 of the Fairfax County Code to exempt by designation certain
property owned by Dulles Greene North Nine Limited Partnership from real and
personal property taxes, with an effective date of January 2, 2027.
TIMING:
Board action is requested on November 17, 2026, to provide sufficient time to advertise
the proposed hearing on December 8, 2026, at 4:00 p.m. The property tax exemption
ordinance, if passed, needs to be in place prior to the approval of any subordinate
financing from the Fairfax County Redevelopment and Housing Authority (“FCRHA”),
which is planned to be presented to the FCRHA and the Board in January and
February, respectively.
BACKGROUND:
The 2026 General Assembly passed HB 854, which amended Va. Code § 58.1-3651 to
allow a local government to exempt from real and personal property taxes property,
owned by organizations, that is used for the charitable or benevolent purposes of
providing affordable housing, as long as the controlling interest of the organization is
held directly or indirectly by one or more nonprofit organizations. This amendment took
effect on July 1, 2026.
True Ground Housing Partners (True Ground), is a non-profit affordable housing
provider that FCRHA selected through a competitive process subject to the Virginia
Public-Private Education Facilities and Infrastructure Act of 2002 (PPEA) to develop
affordable housing on a site (Dulles Greene or Project) comprising a parcel (County Tax
50
Board Agenda Item
November 17, 2026
Map 016-1-01-0011B) owned by the FCRHA (and previously conveyed to the FCRHA
by the County) and an adjacent parcel (016-1-01-0011A) currently owned by a
subsidiary of The Peterson Companies and which True Ground currently has under
contract (site). The development proposal currently contemplates 435 housing units
split between two, distinct buildings (Dulles Greene North and Dulles Greene South,
respectively) that will serve low-to-moderate income households across the Project.
True Ground is currently working on securing all needed approvals and financing for
Dulles Greene North, while financing and approvals for Dulles Greene South is
anticipated to occur at a later date. True Ground has applied for FCRHA subordinate
loans to support the financial feasibility of Dulles Greene North.
Dulles Greene North is currently contemplated to contain 211 units, split into two
different condominium units (Part A and Part B, respectively), each owned by a different
affiliated entity of True Ground. This splitting of Dulles Greene North into two separate
ownership entities allows for Part A and Part B to pursue different sources of financing,
including simultaneously pursuing both 9% and 4% Low Income Housing Tax Credits
alongside the FCRHA Blueprint Loans and other financing sources. Each unit will in
turn be long-term ground leased by the FCRHA to the applicable True Ground affiliate.
Part A of Dulles Greene North will be owned by Dulles Greene North Nine Limited
Partnership (DGN9). Part A of Dulles Greene North project is eligible for a property tax
exemption under 58.1-3651 because the project is owned “by an ownership entity of
which a controlling interest of the managing member or general partner of such
ownership entity is held directly or indirectly by one or more nonprofit organizations”.
A property tax exemption for DGN9’s property at the Dulles Greene Site could
meaningfully impact the financial feasibility of the Project. Property tax exemptions
reduce a property’s annual operating costs, which allows the project to leverage a larger
amount of private, senior debt and/or frees up net cashflow to fund resident services or
reduce rents. This in turn will directly decrease the amount of FCRHA subordinate debt
required to make the Project financially feasible. A tax exemption would diversify the
tools that support the continued progress towards the Country’s goal of 10,000 net new
affordable housing units by 2034.
Prior to the public hearing on this proposed ordinance, the Board will consider adopting
an ordinance that will establish Article 33 of the Fairfax County Code, which will set forth
the process to allow certain entities that provide affordable housing to obtain an
exemption from real and personal property taxes. The proposed ordinance attached to
this Board Item will specifically designate that the property owned by DGN9 in Part A of
the Dulles Greene North project will be exempt from real and personal property taxes.
The proposed ordinance sets forth when the exemption will expire, which includes the
earlier of 50 years, or when DGN9 ceases to use the property for the charitable or
benevolent purpose of providing affordable housing, or when the controlling interest of
DGN9 is no longer held directly or indirectly by a nonprofit organization.
51
Board Agenda Item
November 17, 2026
EQUITY IMPACT:
A property tax exemption will increase the financial feasibility of the Project and allow for
the FCRHA’s investment to better leverage private resources. In turn, the Project will
contribute to achieving the Board’s goal of increasing the supply of affordable housing
by a minimum of 10,000 new units to meet the County’s housing needs. With Fairfax
County’s Area Median Income at $166,100 for a family of four, the delivery of new
affordable housing units with this Project aligns with the One Fairfax Policy, which
recommends, in part, (i) the implementation of housing policies and practices that
encourage all who want to live in Fairfax to be able to do so, and (ii) the provision of a
full spectrum of housing opportunities across the County, most notably those in mixed-
use areas that are accessible to multiple modes of transport. Dulles Greene will
promote opportunities for everyone to fully participate in the region’s economic vitality,
contribute to its readiness for the future, and connect to its assets and resources.
FISCAL IMPACT:
Currently, tax parcel 0161 01 0011B is owned by the FCRHA and is thus currently
exempt from property taxes. Tax parcel 0161 01 0011A is currently owned by a private
owner and will be acquired by the FCRHA. For 2026, the property tax assessment for
this parcel is $1,462,170 which yields a tax levy of $20,448.44. After acquisition by the
FCRHA, the privately-owned property would be tax-exempt until a subsequent
disposition of the property. The property tax exemption will further reduce the amount
of FCRHA subordinate debt required to make the Project financially feasible and
expand the FCRHA’s ability to leverage such funds towards the Board’s 10,000 net new
affordable housing units by 2034.
ENCLOSED DOCUMENTS:
Attachment 1 – Draft Ordinance
Attachment 2 – Location Map
STAFF:
Jessica Werder, Deputy County Executive
Thomas E. Fleetwood, Director, Housing and Community Development (HCD)
Jay Doshi, Director, Department of Tax Administration (DTA)
Anna Shapiro, Deputy Director, Real Estate Finance and Development, HCD
Callahan Seltzer, Division Director, Real Estate and Community Development Finance,
HCD
Lisa Jacobs, Assistant Division Director, DTA
Rachel Waldman, Associate Director, Real Estate Finance, HCD
52
Board Agenda Item
November 17, 2026
ASSIGNED COUNSEL:
Daniel Robinson, Deputy County Attorney
Ryan Wolf, Senior Assistant County Attorney
53
Attachment 1
Page 1
AN ORDINANCE AMENDING 1
ARTICLE 33 OF CHAPTER 4 OF THE FAIRFAX COUNTY CODE, RELATING TO 2
PROPERTY USED FOR THE CHARITABLE AND BENEVOLENT PURPOSE OF 3
PROVIDING AFFORDABLE HOUSING THAT IS EXEMPTED FROM TAX BY 4
DESIGNATION 5
6
AN ORDINANCE to amend the Fairfax County Code by adopting a new 7
Section 4-33-5 of Article 33 to Chapter 4 relating to the designation of 8
certain property owned by Dulles Greene North Nine Limited Partnership 9
as exempt from taxes. 10
11
Draft of October 21, 2026 12
13
Be it ordained by the Board of Supervisors of Fairfax County: 14
1. That Section 4-33-5 of Article 33 of Chapter 4 of the Fairfax County Code is adopted as 15
follows: 16
17
CHAPTER 4 – TAXATION AND FINANCE 18
ARTICLE 33 – Affordable housing property exempted by designation. 19
Section 4-33-5. – Property of Dulles Greene North Nine Limited Partnership. 20
(a) Dulles Greene North Nine Limited Partnership is a Virginia limited partnership for 21
which a controlling interest of the general partner is held directly or indirectly by a nonprofit 22
organization, and it uses its real and personal property to provide affordable housing. 23
(b) Dulles Greene North Nine Limited Partnership is designated as a charitable and 24
benevolent organization as set forth in Va. Code § 58.1-3651 because it uses its real and personal 25
property to provide affordable housing. 26
(c) As used in this Section 4-33-5, the term “Site” means land set forth as depicted on 27
Fairfax County Tax Map Numbers 016-1-01-0011A and 016-1-01-0011B as of the date of the 28
adoption of this ordinance. 29
(d) “Dulles Greene North Nine Limited Partnership’s Property” means the real and 30
personal property that is owned by Dulles Greene North Nine Limited Partnership or the real and 31
personal property that is deemed to be taxable to Dulles Greene North Nine Limited Partnership 32
pursuant to Va. Code § 58.1-3203. 33
(e) Dulles Greene North Nine Limited Partnership’s Property that is or will be located at 34
or on any portion of the Site is hereby exempt from property taxation for so long as and to the 35
extent it is used for the charitable and benevolent purpose of providing affordable housing. This 36
54
Attachment 1
Page 2
exemption applies only to Dulles Greene North Nine Limited Partnership and does not transfer if 37
Dulles Greene North Nine Limited Partnership’s Property is sold to another entity. 38
(f) The exemption set forth in this Section 4-33-5 will expire on the earlier of 1) 50 years 39
from the date of enactment of this ordinance, 2) when Dulles Greene North Nine Limited 40
Partnership fails to use its exempt property on the Site for the charitable and benevolent purpose 41
of providing affordable housing, 3) when the controlling interest of Dulles Greene North Nine 42
Limited Partnership’s general partner is no longer held directly or indirectly by a nonprofit 43
organization, or 4) when Dulles Greene North Nine Limited Partnership’s Property at the Site no 44
longer qualifies for a tax exemption under Va. Code § 58.1-3651 or Section 4-33-1(b). If any 45
portion of Dulles Greene North Nine Limited Partnership’s Property is not used for the charitable 46
and benevolent purpose of providing affordable housing that portion is not exempt from taxes 47
under this Section. 48
2. That the provisions of this ordinance will take effect on January 2, 2027. 49
50
GIVEN under my hand this ______ day of ______, 2026 51
52
53
_____________________________________ 54
Jill Cooper 55
Clerk for the Board of Supervisors 56
55
Attachment 2
Map ID:
0161-01-0011A
Map ID:
0161-01-0011B
56
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 4
Authorization to Advertise a Public Hearing to Consider an Ordinance to Amend the
Code of the County of Fairfax, Virginia by Adopting Article 33 of Chapter 4 (Taxation
and Finance) Relating to Affordable Housing Property Exempted by Designation and to
Exempt by Designation Certain Property Owned by Columbia Crossroads 9 Limited
Partnership from Real Estate and Personal Property Taxes (Mason District)
ISSUE:
Authorization of the Board of Supervisors (Board) to advertise a public hearing to
consider an ordinance to adopt Article 33 of Chapter 4 (Taxation and Finance) of the
Fairfax County Code, effective January 1, 2027.
RECOMMENDATION:
The County Executive recommends that the Board authorize the advertisement of a
public hearing on December 8, 2026, at 4:00 p.m. to consider establishment of Article
33 to Chapter 4 of the Fairfax County Code, with an effective date of January 1, 2027.
TIMING:
Board action is requested on November 17, 2026, to provide sufficient time to advertise
the proposed hearing on December 8, 2026, at 4:00 p.m. The property tax exemption
ordinance, if passed, needs to be in place prior to the approval of any subordinate
financing from the Fairfax County Redevelopment and Housing Authority (“FCRHA”),
which is planned to be presented to the FCRHA and the Board in January and
February, respectively.
BACKGROUND:
The 2026 General Assembly passed HB 854 which amended Va. Code § 58.1-3651 to
allow a local government to exempt from real and personal property taxes property
owned by organizations that is used for the charitable or benevolent purposes of
providing affordable housing, as long as the controlling interest of the organization is
held directly or indirectly by one or more nonprofit organizations. This amendment took
effect on July 1, 2026. Under the amended Va. Code § 58.1-3651, the Board may
consider adopting an ordinance that will establish Article 33 of the Fairfax County Code,
which will set forth the process to allow certain entities that provide affordable housing
to obtain an exemption from real and personal property taxes.
57
Board Agenda Item
November 17, 2026
The NHP Foundation (NHP), is a non-profit affordable housing provider that FCRHA
selected through a competitive process subject to the Virginia Public-Private Education
Facilities and Infrastructure Act of 2002 (PPEA) to develop affordable housing on a site
(East County or the Site) comprising a parcel (County Tax Map 061-2-01-0113E) owned
by the FCRHA (and previously conveyed to the FCRHA by the County) (“Columbia
Crossroads” or “Project”). The development proposal currently contemplates 160 units
that will serve low-to-moderate income households. NHP is currently working on
securing all needed approvals and financing for the Project. NHP has applied for
FCRHA subordinate loans to support the financial feasibility of Columbia Crossroads.
Columbia Crossroads is currently contemplated to be split into two different
condominium units (Part A and Part B, respectively), each owned by different affiliate
entities of NHP. This splitting of Columbia Crossroads into two separate ownership
entities allows for Part A and Part B to pursue different sources of financing, including
simultaneously pursuing both 9% and 4% Low Income Housing Tax Credits alongside
the FCRHA Blueprint Loans and other financing sources. Each unit will in turn be long-
term ground leased by the FCRHA to the applicable NHP affiliate.
Part A of Columbia Crossroads will be owned by Columbia Crossroads 9 Limited
Partnership (CC9). Part A of Columbia Crossroads project is eligible for a property tax
exemption under 58.1-3651 because the project is owned “by an ownership entity of
which a controlling interest of the managing member or general partner of such
ownership entity is held directly or indirectly by one or more nonprofit organizations”.
A property tax exemption for CC9’s property at East County could meaningfully impact
the financial feasibility of the Project. Property tax exemptions reduce a property’s
annual operating costs, which allows the project to leverage a larger amount of private,
senior debt and/or frees up net cashflow to fund resident services or reduce rents. This
in turn will directly decrease the amount of FCRHA subordinate debt required to make
the Project financially feasible. A tax exemption would diversify the tools that support
the continued progress towards the Country’s goal of 10,000 net new affordable
housing units by 2034.
The proposed ordinance attached to this Board Item will specifically designate that the
property owned by CC9 in Part A of the Columbia Crossroads project will be exempt
from real and personal property taxes. The proposed ordinance sets forth when the
exemption will expire, which includes the earlier of 50 years, or when CC9 ceases to
use the property for the charitable or benevolent purpose of providing affordable
housing, or when the controlling interest of CC9 is no longer held directly or indirectly by
a nonprofit organization.
58
Board Agenda Item
November 17, 2026
EQUITY IMPACT:
A property tax exemption will increase the financial feasibility of the Project and allow for
the FCRHA’s investment to better leverage private resources. In turn, the Project will
contribute to achieving the Board’s goal of increasing the supply of affordable housing
by a minimum of 10,000 new units to meet the County’s housing needs. With Fairfax
County’s Area Median Income at $166,100 for a family of four, the delivery of new
affordable housing units with this project aligns with the One Fairfax Policy, which
recommends, in part, (i) the implementation of housing policies and practices that
encourage all who want to live in Fairfax to be able to do so, and (ii) the provision of a
full spectrum of housing opportunities across the County, most notably those in mixed-
use areas that are accessible to multiple modes of transport. Columbia Crossroads will
promote opportunities for everyone to fully participate in the region’s economic vitality,
contribute to its readiness for the future, and connect to its assets and resources.
FISCAL IMPACT:
Currently, tax parcel 061-2-01-0113E has a 2026 assessed value of $4,868,630.
However, because the parcel is owned by the FCRHA it is currently exempt from
property taxes. As such, a property tax exemption for the Project will not impact the
current property tax revenues generated from the Site. The property tax exemption will
further reduce the amount of FCRHA subordinate debt required to make the Project
financially feasible and expand the FCRHA’s ability to leverage such funds towards the
Board’s 10,000 net new affordable housing units by 2034.
ENCLOSED DOCUMENTS:
Attachment 1 – Draft Ordinance
Attachment 2 – Location Map
STAFF:
Jessica Werder, Deputy County Executive
Thomas Fleetwood, Director, Housing and Community Development (HCD)
Jay Doshi, Director, Department of Tax Administration (DTA)
Anna Shapiro, Deputy Director, Real Estate Finance and Development, HCD
Callahan Seltzer, Division Director, Real Estate and Community Development Finance,
HCD
Lisa Jacobs, Assistant Division Director, DTA
Rachel Waldman, Associate Director, Real Estate Finance, HCD
59
Board Agenda Item
November 17, 2026
ASSIGNED COUNSEL:
Daniel Robinson, Deputy County Attorney
Ryan Wolf, Senior Assistant County Attorney
60
Attachment 1
Page 1
AN ORDINANCE ADOPTING 1
ARTICLE 33 OF CHAPTER 4 OF THE FAIRFAX COUNTY CODE, RELATING TO 2
PROPERTY USED FOR THE CHARITABLE AND BENEVOLENT PURPOSE OF 3
PROVIDING AFFORDABLE HOUSING THAT IS EXEMPTED FROM TAX BY 4
DESIGNATION 5
6
AN ORDINANCE to amend the Fairfax County Code by adopting 7
Article 33 to Chapter 4 relating to affordable housing property exempted 8
from taxes by designation and the designation of certain property owned 9
by Columbia Crossroads 9 Limited Partnership as exempt from taxes. 10
11
Draft of October 21, 2026 12
13
Be it ordained by the Board of Supervisors of Fairfax County: 14
1. That Article 33 of Chapter 4 of the Fairfax County Code is adopted as follows: 15
CHAPTER 4 – TAXATION AND FINANCE 16
ARTICLE 33 – Affordable housing property exempted by designation. 17
Section 4-33-1. – Exemption by designation. 18
(a) Pursuant to Va. Code § 58.1-3651(A)(2), the Board of Supervisors may by designation 19
exempt from real or personal property taxes, or both, by ordinance duly adopted, certain 20
real or personal property, or both, owned by either a nonprofit organization or an 21
ownership entity of which a controlling interest of the managing member or general 22
partner of such ownership entity is held directly or indirectly by one or more nonprofit 23
organizations, notwithstanding any for -profit ownership interests , if the property is 24
used for the charitable or benevolent purposes of the provision of affordable housing 25
and if it meets the requirements of subsection (b). 26
(b) The Board of Supervisors may only exempt by designation the real or personal property 27
taxes, or both, of an entity pursuant to Va. Code § 58.1-3651 when such property (1) is 28
or will be, or is located on real property that is or will be, leased from the Fairfax County 29
Redevelopment and Housing Authority and (2) is otherwise taxable under general law 30
or under Va. Code § 58.1-3203. 31
(c) In this Article 33, the term “affordable housing” has the same meaning as is set forth 32
in Va. Code § 58.1-3651. 33
Section 4-33-2. – Procedure for exemption by designation. 34
The ordinance exempting property pursuant to Section 4-33-1 must comply with the notice and 35
public hearing requirements set forth in Va. Code § 58.1-3651. 36
Section 4-33-3. – Property of Columbia Crossroads 9 Limited Partnership. 37
61
Attachment 1
Page 2
(a) Columbia Crossroads 9 Limited Partnership is a Virginia limited partnership for 38
which a controlling interest of the general partner is held directly or indirectly by a nonprofit 39
organization, and it uses its real and personal property to provide affordable housing. 40
(b) Columbia Crossroads 9 Limited Partnership is designated as a charitable and 41
benevolent organization as set forth in Va. Code § 58.1-3651 because it uses its real and personal 42
property to provide affordable housing. 43
(c) As used in this Section 4-33-3, the term “Site” means land set forth as depicted on 44
Fairfax County Tax Map Number 061-2-01-0113E, with the address of 5831 Columbia Pike, 45
Fairfax County, Virginia, as of the date of the adoption of this ordinance. 46
(d) “Columbia Crossroads 9 Limited Partnership’s Property” means the real and personal 47
property that is owned by Columbia Crossroads 9 Limited Partnership or the real and personal 48
property that is deemed to be taxable to Columbia Crossroads 9 Limited Partnership pursuant to 49
Va. Code § 58.1-3203. 50
(e) Columbia Crossroads 9 Limited Partnership’s Property that is or will be located at or 51
on any portion of the Site is hereby exempt from property taxation for so long as and to the 52
extent it is used for the charitable and benevolent purpose of providing affordable housing. This 53
exemption applies only to Columbia Crossroads 9 Limited Partnership and does not transfer if 54
Columbia Crossroads 9 Limited Partnership’s Property is sold to another entity. 55
(f) The exemption set forth in this Section 4-33-3 will expire on the earlier of 1) 50 years 56
from the date of enactment of this ordinance, 2) when Columbia Crossroads 9 Limited 57
Partnership fails to use its exempt property on the Site for the charitable and benevolent purpose 58
of providing affordable housing, 3) when the controlling interest of Columbia Crossroads 9 59
Limited Partnership’s general partner is no longer held directly or indirectly by a nonprofit 60
organization, or 4) when Columbia Crossroads 9 Limited Partnership’s Property at the Site no 61
longer qualifies for a tax exemption under Va. Code § 58.1-3651 or Section 4-33-1(b). If any 62
portion of Columbia Crossroads 9 Limited Partnership’s Property is not used for the charitable 63
and benevolent purpose of providing affordable housing that portion is not exempt from taxes 64
under this Section. 65
66
67
68
69
2. That the provisions of this ordinance will take effect on January 1, 2027. 70
62
Attachment 1
Page 3
71
GIVEN under my hand this ______ day of ______, 2026 72
73
74
_____________________________________ 75
Jill Cooper 76
Clerk for the Board of Supervisors 77
63
Attachment 2
64
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 5
Authorization to Advertise a Public Hearing to Consider an Ordinance to Amend Article
33 of Chapter 4 (Taxation and Finance) of the Code of the County of Fairfax Virginia to
Exempt by Designation Certain Property Owned by Columbia Crossroads 4 Limited
Partnership from Real Estate and Personal Property Taxes (Mason District)
ISSUE:
Authorization of the Board of Supervisors (Board) to advertise a public hearing to
consider an ordinance to amend Article 33 of Chapter 4 (Taxation and Finance) of the
Fairfax County Code, effective January 2, 2027.
RECOMMENDATION:
The County Executive recommends that the Board authorize the advertisement of a
public hearing on December 8, 2026, at 4:00 p.m. to consider an ordinance to amend
Article 33 to Chapter 4 of the Fairfax County Code to exempt by designation certain
property owned by Columbia Crossroads 4 Limited Partnership from real and personal
property taxes, with an effective date of January 2, 2027.
TIMING:
Board action is requested on November 17, 2026, to provide sufficient time to advertise
the proposed hearing on December 8, 2026, at 4:00 p.m. The property tax exemption
ordinance, if passed, needs to be in place prior to the approval of any subordinate
financing from the Fairfax County Redevelopment and Housing Authority (“FCRHA”),
which is planned to be presented to the FCRHA and the Board in January and
February, respectively.
BACKGROUND:
The 2026 General Assembly passed HB 854 which amended Va. Code § 58.1-3651 to
allow a local government to exempt from real and personal property taxes property
owned by organizations that is used for the charitable or benevolent purposes of
providing affordable housing, as long as the controlling interest of the organization is
held directly or indirectly by one or more nonprofit organizations. This amendment took
effect on July 1, 2026.
The NHP Foundation (NHP), is a non-profit affordable housing provider that FCRHA
selected through a competitive process subject to the Virginia Public-Private Education
Facilities and Infrastructure Act of 2002 (PPEA) to develop affordable housing on a site
65
Board Agenda Item
November 17, 2026
(East County or the Site) comprising a parcel (County Tax Map 061-2-01-0113E) owned
by the FCRHA (and previously conveyed to the FCRHA by the County) (“Columbia
Crossroads” or “Project”). The development proposal currently contemplates 160 units
that will serve low-to-moderate income households. NHP is currently working on
securing all needed approvals and financing for the Project. NHP has applied for
FCRHA subordinate loans to support the financial feasibility of Columbia Crossroads.
Columbia Crossroads is currently contemplated to be split into two different
condominium units (Part A and Part B, respectively), each owned by different affiliate
entities of NHP. This splitting of Columbia Crossroads into two separate ownership
entities allows for Part A and Part B to pursue different sources of financing, including
simultaneously pursuing both 9% and 4% Low Income Housing Tax Credits alongside
the FCRHA Blueprint Loans and other financing sources. Each unit will in turn be long-
term ground leased by the FCRHA to the applicable NHP affiliate.
Part B of Columbia Crossroads will be owned by Columbia Crossroads 4 Limited
Partnership (CC4). Part B of the Columbia Crossroads project is eligible for a property
tax exemption under 58.1-3651 because the project is owned “by an ownership entity of
which a controlling interest of the managing member or general partner of such
ownership entity is held directly or indirectly by one or more nonprofit organizations”.
A property tax exemption for CC4’s property at East County could meaningfully impact
the financial feasibility of the Project. Property tax exemptions reduce a property’s
annual operating costs, which allows the project to leverage a larger amount of private,
senior debt and/or frees up net cashflow to fund resident services or reduce rents. This
in turn will directly decrease the amount of FCRHA subordinate debt required to make
the Project financially feasible. A tax exemption would diversify the tools that support
the continued progress towards the Country’s goal of 10,000 net new affordable
housing units by 2034.
Prior to the public hearing on this proposed ordinance, the Board will consider adopting
an ordinance that will establish Article 33 of the Fairfax County Code, which will set forth
the process to allow certain entities that provide affordable housing to obtain an
exemption from real and personal property taxes. The proposed ordinance attached to
this Board Item will specifically designate that the property owned by CC4 in Part B of
the Columbia Crossroads project will be exempt from real and personal property taxes.
The proposed ordinance sets forth when the exemption will expire, which includes the
earlier of 50 years, or when CC4 ceases to use the property for the charitable or
benevolent purpose of providing affordable housing, or when the controlling interest of
CC4 is no longer held directly or indirectly by a nonprofit organization.
66
Board Agenda Item
November 17, 2026
EQUITY IMPACT:
A property tax exemption will increase the financial feasibility of the Project and allow for
the FCRHA’s investment to better leverage private resources. In turn, the Project will
contribute to achieving the Board’s goal of increasing the supply of affordable housing
by a minimum of 10,000 new units to meet the County’s housing needs. With Fairfax
County’s Area Median Income at $166,100 for a family of four, the delivery of new
affordable housing units with this Project aligns with the One Fairfax Policy, which
recommends, in part, (i) the implementation of housing policies and practices that
encourage all who want to live in Fairfax to be able to do so, and (ii) the provision of a
full spectrum of housing opportunities across the County, most notably those in mixed-
use areas that are accessible to multiple modes of transport. Columbia Crossroads will
promote opportunities for everyone to fully participate in the region’s economic vitality,
contribute to its readiness for the future, and connect to its assets and resources.
FISCAL IMPACT:
Currently, tax parcel 061-2-01-0113E has a 2026 assessed value of $4,868,630.
However, because the parcel is owned by the FCRHA it is currently exempt from
property taxes. As such, a property tax exemption for the Project will not impact the
current property tax revenues generated from the Site. The property tax exemption will
further reduce the amount of FCRHA subordinate debt required to make the Project
financially feasible and expand the FCRHA’s ability to leverage such funds towards the
Board’s 10,000 net new affordable housing units by 2034.
ENCLOSED DOCUMENTS:
Attachment 1 – Draft Ordinance
Attachment 2 – Location Map
STAFF:
Jessica Werder, Deputy County Executive
Thomas Fleetwood, Director, Housing and Community Development (HCD)
Jay Doshi, Director, Department of Tax Administration (DTA)
Anna Shapiro, Deputy Director, Real Estate Finance and Development, HCD
Callahan Seltzer, Division Director, Real Estate and Community Development Finance,
HCD
Lisa Jacobs, Assistant Division Director, DTA
Rachel Waldman, Associate Director, Real Estate Finance, HCD
ASSIGNED COUNSEL:
Daniel Robinson, Deputy County Attorney
Ryan Wolf, Senior Assistant County Attorney
67
Attachment 1
Page 1
AN ORDINANCE AMENDING 1
ARTICLE 33 OF CHAPTER 4 OF THE FAIRFAX COUNTY CODE, RELATING TO 2
PROPERTY USED FOR THE CHARITABLE AND BENEVOLENT PURPOSE OF 3
PROVIDING AFFORDABLE HOUSING THAT IS EXEMPTED FROM TAX BY 4
DESIGNATION 5
6
AN ORDINANCE to amend the Fairfax County Code by adopting a new 7
Section 4-33-4 of Article 33 to Chapter 4 relating to the designation of 8
certain property owned by Columbia Crossroads 4 Limited Partnership as 9
exempt from taxes. 10
11
Draft of October 21, 2026 12
13
Be it ordained by the Board of Supervisors of Fairfax County: 14
1. That Section 4-33-4 of Article 33 of Chapter 4 of the Fairfax County Code is adopted as 15
follows: 16
17
CHAPTER 4 – TAXATION AND FINANCE 18
ARTICLE 33 – Affordable housing property exempted by designation. 19
Section 4-33-4. – Property of Columbia Crossroads 4 Limited Partnership. 20
(a) Columbia Crossroads 4 Limited Partnership is a Virginia limited partnership for 21
which a controlling interest of the general partner is held directly or indirectly by a nonprofit 22
organization, and it uses its real and personal property to provide affordable housing. 23
(b) Columbia Crossroads 4 Limited Partnership is designated as a charitable and 24
benevolent organization as set forth in Va. Code § 58.1-3651 because it uses its real and personal 25
property to provide affordable housing. 26
(c) As used in this Section 4-33-4, the term “Site” means land set forth as depicted on 27
Fairfax County Tax Map Number 061-2-01-0113E, with the address of 5831 Columbia Pike, 28
Fairfax County, Virginia, as of the date of the adoption of this ordinance. 29
(d) “Columbia Crossroads 4 Limited Partnership’s Property” means the real and personal 30
property that is owned by Columbia Crossroads 4 Limited Partnership or the real and personal 31
property that is deemed to be taxable to Columbia Crossroads 4 Limited Partnership pursuant to 32
Va. Code § 58.1-3203. 33
(e) Columbia Crossroads 4 Limited Partnership’s Property that is or will be located at or 34
on any portion of the Site is hereby exempt from property taxation for so long as and to the 35
extent it is used for the charitable and benevolent purpose of providing affordable housing. This 36
68
Attachment 1
Page 2
exemption applies only to Columbia Crossroads 4 Limited Partnership and does not transfer if 37
Columbia Crossroads 4 Limited Partnership’s Property is sold to another entity. 38
(f) The exemption set forth in this Section 4-33-4 will expire on the earlier of 1) 50 years 39
from the date of enactment of this ordinance, 2) when Columbia Crossroads 4 Limited 40
Partnership fails to use its exempt property on the Site for the charitable and benevolent purpose 41
of providing affordable housing, 3) when the controlling interest of Columbia Crossroads 4 42
Limited Partnership’s general partner is no longer held directly or indirectly by a nonprofit 43
organization, or 4) when Columbia Crossroads 4 Limited Partnership’s Property at the Site no 44
longer qualifies for a tax exemption under Va. Code § 58.1-3651 or Section 4-33-1(b). If any 45
portion of Columbia Crossroads 4 Limited Partnership’s Property is not used for the charitable 46
and benevolent purpose of providing affordable housing that portion is not exempt from taxes 47
under this Section. 48
2. That the provisions of this ordinance will take effect on January 2, 2027. 49
50
GIVEN under my hand this ______ day of ______, 2026 51
52
53
_____________________________________ 54
Jill Cooper 55
Clerk for the Board of Supervisors 56
69
Attachment 2
70
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 6
Extension of Review Period for 2232 Application for Audrey Moore Rec Center Site
(Braddock District)
ISSUE:
Extension of review period for 2232 application to ensure compliance with review
requirements of Section 15.2-2232 of the Code of Virginia.
PROJECT DESCRIPTION:
Department of Public Works and Environmental Services (DPWES) is requesting 2232
approval for construction of a new recreation center to replace the existing Audrey
Moore Rec Center building. The extension period request is to allow the applicant,
county agency review, and the Planning Commission sufficient time to complete the
2232 review.
The review period for the following application should be extended:
2232-2026-BR-00007 Department of Public Works and Environmental Services
Tax Map No. 70-4 ((1)) 2
8100 Braddock Road, Annandale, VA 22003
Braddock District
Accepted on September 25, 2026
Application to expire on November 24, 2026
Requesting extension to August 25, 2027
RECOMMENDATION:
The County Executive recommends that the Board extend the review period for the
following application: 2232-2026-BR-00007.
TIMING:
Board action is requested on November 17, 2026, to extend the review period for the
application prior to the expiration of the review period on November 24, 2026.
BACKGROUND:
Subsection B of Section 15.2-2232 of the Code of Virginia states: “Failure of the
commission to act within 60 days of a submission, unless the time is extended by the
71
Board Agenda Item
November 17, 2026
governing body, shall be deemed approval.” The full length of an extension period may
not be necessary, and any extension is not intended to set a date for final action.
EQUITY IMPACT:
None.
FISCAL IMPACT:
None.
ENCLOSED DOCUMENTS:
None.
STAFF:
Jennifer Miller, Deputy County Executive
Tracy Strunk, Director, Department of Planning and Development (DPD)
Salem Bush, Branch Chief, Public Facilities and Development Review Branch, Planning
Division, DPD
Nathalie Degraff, Planner II, Public Facilities and Development Review Branch,
Planning Division, DPD
72
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 7
Extension of Review Period for 2232 Application for Hollin Hall Substation (Mount
Vernon District)
ISSUE:
Extension of review period for 2232 application to ensure compliance with review
requirements of Section 15.2-2232 of the Code of Virginia.
PROJECT DESCRIPTION:
Dominion Energy is requesting 2232 approval to expand and upgrade an existing
electrical distribution substation facility to continue serving the electrical demands of the
surrounding area. The proposal also requires special exception review;
SE-2024-MV-00015 is under review and will be reviewed concurrently with the 2232
application. The extension review request is to allow the applicant sufficient time to
resubmit materials for the concurrent SE review, so that the 2232 and SE applications
can continue to be concurrently reviewed and presented at the same Planning
Commission public hearing.
The review period for the following application should be extended:
2232-2025-MV-00012 Dominion Energy
Tax Map No. 93-1 ((1)) 63
2420 Ross St, Alexandria, VA 22306
Mount Vernon District
Accepted on December 4, 2025
Initial Board extension granted on January 13, 2026
Current extension will expire on December 20, 2026
Requesting extension to December 17, 2027
RECOMMENDATION:
The County Executive recommends that the Board extend the review period for the
following application: 2232-2025-MV-00012.
TIMING:
Board action is requested on November 17, 2026, to extend the review period for the
application prior to the expiration of the review period on December 20, 2026.
73
Board Agenda Item
November 17, 2026
BACKGROUND:
Subsection B of Section 15.2-2232 of the Code of Virginiastates: “Failure of the
commission to act within 60 days of a submission, unless the time is extended by the
governing body, shall be deemed approval.” The full length of an extension period may
not be necessary, and any extension is not intended to set a date for final action.
EQUITY IMPACT:
None.
FISCAL IMPACT:
None.
ENCLOSED DOCUMENTS:
None.
STAFF:
Jennifer Miller, Deputy County Executive
Tracy Strunk, Director, Department of Planning and Development (DPD)
Salem Bush, Branch Chief, Public Facilities and Development Review Branch, Planning
Division, DPD
Mohamed Ali, Planner II, Public Facilities and Development Review Branch, Planning
Division, DPD
74
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 8
Approval of Traffic Calming Measures as Part of the Residential Traffic Administration
Program – Doyle Road (Springfield District)
ISSUE:
Board endorsement of Traffic Calming measures as part of the Residential Traffic
Administration Program (RTAP).
RECOMMENDATION:
The County Executive recommends that the Board approve a resolution (Attachment 1)
endorsing a traffic calming plan for Doyle Road (Attachment 2), consisting of the
following:
∑ One Speed Hump and three Speed Tables on Doyle Road (Springfield District)
In addition, the County Executive recommends that the Fairfax County Department of
Transportation (FCDOT) be requested to schedule the installation of the approved traffic
calming measure(s) as soon as possible.
TIMING:
Board action is requested on November 17, 2026, to allow the proposed measure(s) to
be installed as soon as possible.
BACKGROUND:
As part of RTAP, roads are reviewed for traffic calming when requested by a Board
member on behalf of a homeowners or civic association. Traffic calming employs the
use of physical devices such as speed humps, speed tables, raised pedestrian
crosswalks, chokers, or median islands to reduce the speed of traffic on a residential
street. Staff performs engineering studies documenting the attainment of qualifying
criteria. Staff works with the local Supervisor’s office and community to determine the
viability of the requested traffic calming measure to reduce the speed of traffic. Once
the plan for the road under review is approved and adopted by staff, that plan is then
submitted for approval to the residents within the ballot area in the adjacent community.
On September 25, 2026, FCDOT received verification from the Springfield District
Supervisor’s office confirming community support for the Doyle Road traffic calming
plan.
75
Board Agenda Item
November 17, 2026
EQUITY IMPACT:
None.
FISCAL IMPACT:
Funding in the amount of $79,000 is necessary to fund the traffic calming measures
associated with this traffic calming project. Funds are currently available in Project
2G25-076-000, Traffic Calming Program, Fund 300-C30050, Transportation
Improvements.
ENCLOSED DOCUMENTS:
Attachment 1: Traffic Calming Resolution for Doyle Road
Attachment 2: Traffic Calming Plan for Doyle Road
STAFF:
Jennifer Miller, Deputy County Executive
Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT)
Martha Elena Coello, Deputy Director, FCDOT
Eric Teitelman, Chief, Active Transportation, Capital Projects and Traffic Engineering
Division, FCDOT
Neil Freschman, Chief, Traffic Engineering Section, FCDOT
Nicole Machacuay, Transportation Planner, Traffic Engineering Section, FCDOT
Grace Vaughn, Planning Technician, Traffic Engineering Section, FCDOT
76
Attachment 1
RESOLUTION
FAIRFAX COUNTY DEPARTMENT OF TRANSPORTATION
RESIDENTIAL TRAFFIC ADMINISTRATION PROGRAM (RTAP)
TRAFFIC CALMING MEASURES
DOYLE ROAD
SPRINGFIELD DISTRICT
At a regular meeting of the Board of Supervisors of Fairfax County, Virginia, held in the Board
Auditorium of the Government Center in Fairfax, Virginia, on Tuesday, November 17, 2026, at
which a quorum was present and voting, the following resolution was adopted:
WHEREAS, the residents in the vicinity of Doyle Road have requested the Springfield District
Supervisor’s Office of Fairfax County to consider remedial measures to reduce the speed of
traffic on Doyle Road; and
WHEREAS, an engineering study by the Fairfax County Department of Transportation
(FCDOT) for Doyle Road indicates that all basic traffic calming criteria are met pertaining to
functional classification of the roadway, identification of a significant speeding concern, and
proof of community support; and
WHEREAS, the proposed Traffic Calming Plan was properly presented to the community in the
affected survey area for their review and consideration; and
WHEREAS, the Traffic Calming Plan was subsequently approved by the occupied residences
within the appropriate surveyed area; and
WHEREAS, the intended source of funding for the Traffic Calming Plan is Fairfax County.
NOW THEREFORE BE IT RESOLVED, that the Board of Supervisors endorses the
proposed Traffic Calming Plan and requests that the Virginia Department of Transportation
review and approve the feasibility of implementing traffic calming measures on Doyle Road as
part of FCDOT's Residential Traffic Administration Program.
ADOPTED this 17th day of November, 2026.
A Copy Teste:
.
Jill G. Cooper
Clerk for the Board of Supervisors
77
October 2026Tax Map: 66-1, 66-2, 66-3, & 66-4
CDOT
Fairfax County Department of Transportation
Residential Traffic Administration Program
Traffic Calming Plan
Doyle Road
Springfield District
78
Board Agenda Item
November 17, 2026
ADMINISTRATIVE – 9
Authorization to Execute Standard Project Agreements with the Northern Virginia
Transportation Commission for the Fiscal Year 2027-2028 I-66 Commuter Choice
Program (Braddock, Hunter Mill, Providence and Sully Districts)
ISSUE:
Board of Supervisors’ (Board) approval of a resolution (Attachment 1) authorizing the
Director of the Fairfax County Department of Transportation (FCDOT), or designee, to
execute the Standard Project Agreements (SPAs), substantially in the form of
Attachment 2, with the Northern Virginia Transportation Commission (NVTC), totaling
$12,860,322, for the Fiscal Year (FY) 2027-2028 I-66 Communter Choice Program.
RECOMMENDATION:
The County Executive recommends that the Board of Supervisors approve a resolution
(Attachment 1) authorizing the Director of FCDOT, or designee, to execute the SPAs
with NVTC, substantially in the form of Attachment 2, along with any subsequent
amendments, for the funding and implementation of the following Commuter Choice
Program projects (in the amounts shown below):
∑ Route 598: Reston to the Pentagon Express Service (Continuation): $2,600,000
∑ Route 697: Stringfellow Road Park-and-Ride to L’Enfant Plaza Express Service
(Continuation): $4,200,000
∑ Route 698: Stringfellow Road Park-and-Ride to the Pentagon Express Service
(Continuation): $1,700,000
∑ Route 699: Monument Drive Park-And-Ride to Downtown Washington D.C.
Express Service (Continuation): $4,700,000
TIMING:
Board approval is requested on November 17, 2026, so that NVTC can begin
distributing funding and these routes can continue to operate and provide service to the
region.
BACKGROUND:
In January 2017, the Commonwealth Transportation Board (CTB), the Virginia
Department of Transportation (VDOT), and NVTC signed a Memorandum of Agreement
(MOA) Transform66: Inside the Beltway Project to initiate a multimodal transportation
program, which was called the Commuter Choice Program. The Commuter Choice
79
Board Agenda Item
November 17, 2026
Program was designed to enhance Transform 66, the reconstruction and widening
project for the I-66 corridor, by funding and implementing solutions that facilitate the
movement of people in the corridor. This program uses toll revenues collected from
automobiles traveling on I-66 inside the I-495 Beltway to support mobility projects
reasonably expected to benefit the toll payers. Tolls are collected in the peak direction
during the morning and evening peak periods.
The MOA states that NVTC will use toll revenues to support the financing of approved
projects. To accomplish this, NVTC developed SPAs, in consultation with the
respective localities and public transportation providers, to govern the terms of the toll
revenue transfers and ensure that the requirements of the MOA are met. The County
and NVTC must approve an SPA for each project that receives funding before
distributions can occur.
In October 2025, NVTC issued its Call for Projects for Round Six of the Commuter
Choice Program (FY 2027 – 2028). In December 2025, the Board approved a
resolution authorizing FCDOT to apply for I-66 Commuter Choice funding for Fiscal
Years (FY) 2027-2028 to support multi-modal projects that will increase travel options
for commuters on I-66 inside of the Capital Beltway. At staff’s recommendation, the
Board endorsed the following County project submissions (and amounts) for NVTC’s I-
66 Commuter Choice Program:
∑ New bus service from Tysons Metrorail-Franconia Springfield Metrorail and VRE
Station (Route 400X) - $4,400,000
∑ Continuation of bus service from Reston to the Pentagon Express Service (Route
598) - $2,600,000
∑ Continuation of bus service from Stringfellow Road Park-and-Ride to L’Enfant
Plaza, (Route 697) - $4,200,000
∑ Continuation of operating funds for bus service from the Stringfellow Road Park-
and-Ride to the Pentagon Express Service (Route 698) - $1,700,000
∑ Continuation of operating funds and capital funds for bus service from the
Monument Drive Park-and-Ride to Downtown Washington, D.C Express Service
(Route 699) - $4,700,000
While the new bus service request was not approved, the four bus service continuation
projects were approved for funding by NVTC on May 7, 2026, and submitted to the
Commonwealth Transportation Board (CTB) for consideration. On June 16, 2026, the
CTB approved the FY 2027-2033 Six-Year Improvement Program, inclusive of NVTC’s
I-66 Commuter Choice FY 2027-2028 Program of Projects and the County’s four bus
service continuation projects. This Board Item is needed because the Commuter
Choice grant awards require an agreement execution resolution from the local
governing body.
80
Board Agenda Item
November 17, 2026
EQUITY IMPACT:
The use of grant funds to support transit operating assistance should have a neutral or
positive impact on equity. Fairfax County is required by statute to meet the
requirements of Title VI of the Civil Rights Act of 1964, which prohibits discrimination
based on race, color, or national origin in federally funded programs, including public
transportation. A detailed Title VI analysis of the transit system, including the routes
proposed here, is completed every three years to ensure that transit services are
provided equitably throughout the County. This grant funding operating assistance is in
alignment with the One Fairfax Policy, as it helps allow for a multi-modal transportation
system supporting economic growth, health, and congestion mitigation, and it also helps
provide accessible mobility solutions for all transportation users in Fairfax County.
FISCAL IMPACT:
The County has been awarded I-66 Inside the Beltway toll revenues in the amount of
$12.9 million through Round Six of the FY 2027 – 2028 I-66 Commuter Choice Program
for continued support of multimodal projects throughout the corridor. Funding required
to operate Routes 598, 697, 698, and 699 in FY 2027 has been included in Fund 40000,
County Transit Systems, as part of the FY 2027 Adopted Budget Plan and funds to
operate these routes in FY 2028 will be included in the FY 2028 Advertised Budget
Plan.
ENCLOSED DOCUMENTS:
Attachment 1: Resolution for the Execution of Agreements for the Distribution of I-66
Inside the Beltway Revenues
Attachment 2: Standard Project Agreements for Transform 66: Inside the Beltway
Project, Toll Revenue Funding of Projects and Administration
STAFF:
Jennifer Miller, Deputy County Executive
Gregg Steverson, Director, Fairfax County Department of Transportation (FCDOT)
Noelle Dominguez, Chief, Coordination and Funding Division, FCDOT
Dwayne Pelfrey, Chief, Transit Services Division, FCDOT
Michael Felschow, Planning Section Chief, Transit Services Division, FCDOT
Brent Riddle, Chief, Coordination Section, FCDOT
Dharm Guruswamy, Transportation Planner, FCDOT
ASSIGNED COUNSEL:
John A. Dorsey, Assistant County Attorney
81
Attachment 1
RESOLUTION
AGREEMENT EXECUTION RESOLUTION
A RESOLUTION FOR THE BOARD OF SUPERVISORS OF THE COUNTY OF FAIRFAX,
VIRGINIA
FOR THE EXECUTION OF AGREEMENTS FOR THE
DISTRIBUTION OF I-66 INSIDE THE BELTWAY TOLL REVENUES
At a regular meeting of the Board of Supervisors of Fairfax County, Virginia, held in the Board
Auditorium of the Government Center in Fairfax, Virginia, on Tuesday, October 27, 2026, at
which meeting a quorum was present and voting, the following resolution was adopted:
WHEREAS, on December 9, 2025, the Board of Supervisors of Fairfax County approved a
resolution endorsing multi-modal transportation projects and allowing for their submittal to
request funding from the FY2027-2028 I-66 Commuter Choice program; and
WHEREAS, on June 16, 2026, the Commonwealth Transportation Board (CTB) approved the
projects in the I-66 Commuter Choice program; and
WHEREAS, the Northern Virginia Transportation Commission (NVTC) developed a Standard
Project Agreement (SPA) to govern the terms of the toll revenue transfers and ensure that the
requirements of the Memorandum of Agreement (MOA) Transform66: Inside the Beltway
Project are met; and
WHEREAS, the SPAs for these projects must be executed by the County and NVTC before
distribution(s) of toll revenues can occur.
NOW, THEREFORE, BE IT RESOLVED, that the Board of Supervisors of Fairfax County,
Virginia, authorizes the Director of the Fairfax County Department of Transportation, or
designee, to execute, on behalf of the County of Fairfax, the following four Standard Project
Agreements, along with any subsequent amendments, for distribution of I-66 toll revenues (in
the amounts shown below):
• Route 598: Reston to the Pentagon Express Service (Continuation): $2,600,000
• Route 697: Stringfellow Road Park-and-Ride to L’Enfant Plaza Express Service
(Continuation): $4,200,000
• Route 698: Stringfellow Road Park-and-Ride to the Pentagon Express Service
(Continuation): $1,700,000
• Route 699: Monument Drive Park-And-Ride to Downtown Washington D.C. Express
Service (Continuation): $4,700,000
ADOPTED this 17th day of November, 2026
A Copy Teste:
_____________________________
Jill G. Cooper
Clerk for the Board of Supervisors
82
Form Version 2026-07-01 1
Standard Project Agreement for Transform 66: Inside the Beltway Project, Toll
Revenue Funding of Projects and Administration
Between the Northern Virginia Transportation Commission and
Fairfax County
NVTC Project Number: 059-64-27
NVTC Project Name: Route 598: Reston to the Pentagon Express Service (Continuation)
This Standard Project Agreement for Transform 66: Inside the Beltway Project, Toll
Revenue Funding of Projects and Administration (“this Agreement”) is made and executed
in duplicate on _____ ___________________ by and between the Northern Virginia
Transportation Commission (“NVTC”) and Fairfax County (“Recipient Entity”).
WITNESSETH
WHEREAS, NVTC is a political subdivision of the Commonwealth of Virginia
created by the General Assembly in accordance with the Transportation District Act of
1964, §§ 33.2-1900 et seq. of the Code of Virginia, 1950, as amended, and is authorized to
enter into this Agreement by the provisions of § 33.2-1915 and 1919 of the Code of Virginia,
1950, as amended;
WHEREAS, NVTC entered into a Memorandum of Agreement Transform 66: Inside
the Beltway Project (“MOA”), as most recently amended on May 19, 2021, with the
Commonwealth Transportation Board (“CTB”), and the Virginia Department of
Transportation (“VDOT”), and the Virginia Department of Rail and Public Transportation
(“DRPT”), as such MOA may be further amended from time to time, which MOA delegated to
NVTC the authority to select and administer the implementation of multimodal
transportation improvements to the roadways and associated transportation and transit
facilities (“Components” as used in the MOA and, for purposes of this Agreement, “Projects”)
in the vicinity of the portion of I-66 beginning at the intersection of I-66 and I-495 (the
“Beltway”) and ending at U.S. Route 29 in the Rosslyn area of Arlington County, Virginia (said
portion of I-66 being referred to as the “Facility”) which Projects are designed to attain the
Improvement Goals defined in the MOA as amended, specifically, to (1) maximize person
throughput in the Corridor; and (2) implement multimodal improvements to: (i) improve
mobility along the Corridor, (ii) support new, diverse travel choices, and (iii) enhance
transportation safety and travel reliability, all of which are reasonably expected to benefit
the toll paying users of the Facility;
Attachment 2
83
Form Version 2026-07-01 2
WHEREAS, the MOA provides for the transfer to and use by NVTC of a portion of the
funds collected from the CTB’s tolling of the Facility and the I-66 Outside the Beltway Express
Lanes concessionaire’s payments to the Commonwealth (hereinafter referred to for
purposes of this Agreement as “Toll Revenue”) for the implementation of Projects selected
by NVTC and approved by the CTB, as well as operating costs related to Projects, and NVTC
financing and debt service payments and any allowable costs related thereto;
WHEREAS, based on information provided by Recipient Entity in response to NVTC’s
call for Projects, NVTC has determined the Project set forth and described on Appendix A to
this Agreement satisfies the requirements of Section II.B.1 of the MOA, and the provisions of
§ 33.2-309 of the Code of Virginia, 1950, as amended , and the CTB has approved use of Toll
Revenue to fund such Project;
WHEREAS, the Toll Revenue to be provided by NVT C described in Appendix B have
been duly authorized and directed by Recipient Entity to finance the Project, and the
Recipient Entity is authorized to enter into this Agreement and has authorized execution of
it on its behalf;
WHEREAS, NVTC agrees that Recipient Entity will, itself or through its contractors or
agents, design, construct, acquire and/or operate the Project or perform such other specific
work for the Project and Recipient Entity agrees that it will perform or have performed, such
work on the terms and conditions set forth in this Agreement and the Appendices appended
thereto;
WHEREAS, both parties have concurred in the Recipient Entity ’s administration,
performance, and completion of the Project on the terms and conditions set forth in this
Agreement and its Appendices and in accordance with all applicable federal, state, and local
laws and regulations; and
WHEREAS, NVTC’s governing body and Recipient Entity’s governing body have each
authorized that their respective designee(s) execute this Agreement on their respective
behalf(s) as evinced by copies of each such entity’s resolution or clerk’s minutes which are
appended hereto as Appendix E;
NOW THEREFORE, in consideration of the promises made mutual covenants , and
agreements contained herein, the parties hereto agree as follows:
A. Recipient Entity’s Obligations
Recipient Entity shall:
l. Complete or perform allsaid work as described in Appendix A, advancing such
work diligently and ensuring that all work is completed in accordance with all
applicable federal, state, and local law s and regulations , and all terms and
Attachment 2
84
Form Version 2026-07-01 3
conditions of this Agreement. Recipient Entity expressly agrees that, for non-
debt financed Projects, Recipient Entity must obligate the Toll Revenue to the
cost of the Project within two (2) fiscal years and to expend the Toll Revenue
within five (5) fiscal years of the first day of the fiscal year for which the funds
for the Project were allocated by the CTB unless an extension has been
approved by NVTC and the CTB. In the event an extension is not approved by
the Commissions and the CTB, then Recipient Entity shall release or return to
NVTC all unexpended funds no later than 90 days after receipt of NVTC’s
written request for such release or return. If the Project i s cancelled at any
time, for any reason, before or after work has commenced, Recipient Entity
shall immediately notify NVTC in writing of the cancellation and shall
immediately cease to incur Project costs. Concurrently, and in no event later
than 90 days after the date of cancellation, Recipient Entity shall refund to
NVTC 100% of all funds provided for the Project unless ot herwise approved
by NVTC, and the CTB as necessary, and set forth in an amendment to this
Agreement.
2. Ensure that all work performed or to be performed under this Agreement is in
accordance with the Project Description Sheets attached to Appendix A.
3. Perform or have performed, and remit all payment requisitions and other
requests for funding for design and engineering, including all environmental
work, right-of-way acquisition, construction, contract administration, testing
services, inspection services, capital asset acquisitions, or operations, and all
allowable expenses for the Project, as is required by this Agreement and that
may be necessary for completion of the Project.
4. Not use the NVT C Toll Revenues specified on Appendix B to pay any Project
cost if the MOA or any applicable provision of law does not permit such Project
cost to be paid with NVT C Toll Revenue . For transit, bikeshare and other
operations projects that generate revenues, the Recipient Entity shall deduct
revenues earned from Project operations from any requests for
reimbursement of operating expenses.
5. Recognize that, if the Project is anticipated to receive additional ATI funds in a
future funding round as reflected in Appendix B to this Agreement, Recipient
Entity may only pursue reimbursement of eligible Project expenses from ATI
funds that have been allocated to the Project to date by the CTB. Recipient
Entity is not entitled to the anticipated additional ATI funds unless and until
they are allocated to the Project by the CTB. Each allocation of ATI funds
carries its own requirement that the Recipient obligate the ATI funds to the
cost of the Project within two (2) fiscal years and expendthe ATI funds within
five (5) fiscal years of the first day of the fiscal year for which the funds were
Attachment 2
85
Form Version 2026-07-01 4
allocated by the CTB unless an extension has been approved by the
Commissions and the CTB. Nothing herein, however, shall prohibit Recipient
Entity from providing its own funds to advance the Project prior to the CTB
allocating anticipated funding, and from later, once the CTB has allocated the
anticipated funds, requesting reimbursement from NVTC for having advance
funded the Project.
6. Acknowledge that NVTC’s Executive Director will periodically update NVTC’s
cash flow estimates with the objective toward keeping those estimates
accurate throughout the life of the Project. Recipient Entity shall provide all
information required by NVTC so as to ensureand facilitate accurate cash flow
estimates and accurate updates to those cash flow estimates throughout the
life of the Project as described in Appendix B.
7. Provide to NVT C requests for payment consistent with Appendix B and the
most recently approved NVT C cash flow estimates that include NVTC’s
standard payment requisition(s), containing detailed summaries of actual
Project costs incurred with supporting documentation as required by NVTC
and that certify all such costs were incurred in the performance of work for
the Project as authorized by this Agreement . Each payment requisition shall
be in substantially the same form as set forth in Appendix C of this Agreement,
include a manual signature of the individual authorized to submit the request,
and be submitted electronically to reimbursements@novatransit.org. If
approved by NVT C, Recipient Entity can expect to receive payment within
forty-five (45) business days upon receipt by NVTC. Approved payments will
be made by means of electronic transfer of funds from NVT C to or for the
account of Recipient Entity.
8. Promptly n otify NVTC’s Executive Director of any additional Project costs
resulting from unanticipated circumstances which costs exceed the amount
allocated by the CTB for the Project, and provide to NVTC detailed estimates
of additional costs associated with those circumstances . Recipient Entity
understands that it will be within NVT C’s sole discretion, subject to CTB
approval, whether to seek and to provide any additional funding to the Project
in such circumstances and that NVT C will do so only in accordance with
NVTC’s approved Project selection process and upon formal action and
approval by NVT C. Recipient Entity shall timely provide to NVT C a complete
and accurate update to Appendix B if NVT C and the CTB approve funding of
any additional Project costs for the Project under this Paragraph.
9. Submit a final reimbursement request for Project expenses and release or
return any unexpended funds to NVTC no later than 90 days after Project
completion. The final reimbursement request shall be accompanied by a
Attachment 2
86
Form Version 2026-07-01 5
certification to NVTC that Recipient Entity adhered to all applicable laws and
regulations and all requirements of this Agreement.
10. Should Recipient Entity be required to provide matching funds in order to
proceed or complete the funding necessary for the Project, Recipient Entity
shall certify to NVTC that all such matching funds have been either authorized
and/or appropriated by Recipient Entity’ s governing body or have been
obtained through another, independent funding source.
11. Maintain complete and accurate financial records relative to the Project for all
time periods as may be required by the Virginia Public Records Act and by all
other applicable state or federal records retention laws or regulations, unless
superseded by the laws that govern Recipient Entity and provide copies of any
such financial records to NVTC, free of charge, upon request.
12. Maintain all original conceptual drawings and renderings, architectural and
engineering plans, site plans, inspection records, testing records, and as built
drawings for the Project for the time periods required by the Virginia Public
Records Act and any other applicable records retention laws or regulations ,
unless superseded by the laws that govern Recipient Entity ; and provide to
NVTC copies of all such drawings and plans free of charge, upon request.
13. Reimburse NVTC for all NVTC Toll Revenue (with interest earned at the rate
earned by NVTC) that Recipient Entity misapplied or used in contravention of
the MOA or any term or condition of this Agreement.
14. Name NVTC and its Bond Trustee , the Commonwealth of Virginia, the CTB,
VDOT, DRPT and their officers, employees and agents, or require that all
Recipient Entity ’s contractors name NVTC and its Bond Trustee, the
Commonwealth of Virginia, the CTB, VDOT, DRPT and their officers, employees
and agents as additional insureds on any insurance policy issued for the work
to be performed and/or services to be provided by or on behalf of Recipient
Entity for the Project, and present NVTC with satisfactory evidence thereof
before any work on the Project commences or continues, so that they are
protected from and against any losses actually suffered or incurred, except for
losses to the extent caused by the negligence or willful misconduct of such
entity or person, from third party claims that are directly related to or arise
out o f: (a) any failure by Recipient Entity to comply with, to observe or to
perform in any material respect any of the covenants, obligations, agreements,
terms or conditions in this Agreement, or any breach by Recipient Entity of its
representations or warranties in this Agreement; (b) any actual or willful
misconduct or negligence ofRecipient Entity, its employees or agents in direct
connection with the Projects; (c) any actual or alleged patent or copyright
Attachment 2
87
Form Version 2026-07-01 6
infringement or other actual or alleged improper appropriation or use of trade
secrets, patents proprietary information, know-how, trademarked or service-
marked materials, equipment devices or processes, copyright rights or
inventions by Recipient Entity in direct connection with the Project; (d)
inverse condemnation, trespass, nuisance or similar taking of or harm to real
property committed or caused by Recipient Entity, its employees or agents in
direct connection with the Project; or (e) any assumed liabilities. Recipient
Entity will contractually require its contractors, subcontractors, vendors and
other third parties working or performing services related to any Project
funded by NVTC Toll Revenue to indemnify NVTC and its Bond Trustee , the
Commonwealth of Virginia, the CTB, VDOT, DRPT, and their officers,
employees and agents from the same losses.
15. Recipient Entity covenants and agrees it will comply with all applicable
requirements of state and federal laws relating to anti -discrimination,
including but not limited to Titles VI and VII of the Civil Rights Act of 1964, as
amended, and the Americans with Disabilities Act, and shall contractually
require the same of all contractors, subcontractors, vendors, and recipients of
any funding. Recipient Entity recognizes the importance of the participation of
minority, women-owned and small businesses through the federal and local
Disadvantaged Business Enterprise programs and will abide by such
programs in implementing the Project. Recipient Entity shall comply with all
applicable federal requirements, including those applicable to highways that
are part of the National Highway System.
16. Give notice to NVTC that Recipient Entity may use NVTC Toll Revenue to pay
outside legal counsel services (as opposed to utilizing the services of its own
in-house counsel or NVT C’s in-house legal counsel) in connection with the
work performed under this Agreement so as to ensure that no conflict of
interest may arise from any such representation.
17. Provide certification to NVT C, that upon final payment to all contractors for
the Project, Recipient Entity will use the Project for its intended purposes for
the duration of the Project’s useful life. Under no circumstances will NVTC be
considered responsible or obligated to operate and/or maintain the Project
after its completion.
18. Comply with all requirements of the Virginia Public Procurement Act and
other applicable Virginia Code provisions , or local ordinances which govern
the letting of public contracts , unless supe rseded by the laws that govern
Recipient Entity.
Attachment 2
88
Form Version 2026-07-01 7
19. Acknowledge that if the Project is being funded in whole or in part by NVT C
Bond Proceeds, comply with the applicable tax covenants as may be attached
as Appendix D.
20. Acknowledge that if Recipient Entity expects and/or intends that the Project
is to be submitted for acceptance by the Com monwealth into its system that
Recipient Entity agrees to comply with VDOT’s “Standards, Requirements and
Guidance” applicable to the Project.
21. Recognize that Recipient Entity is solely responsible for obtaining all permits,
permissions and regulatory approval necessary to develop, construct, operate
and/or maintain the Project, including but not limited to , obtaining all
required VDOT and local land use permits, applications for zoning approvals,
and regulatory approvals.
22. Recognize that if Recipient Entity is funding the Project, in whole or in part,
with federal and/or state funds, in addition to NVT C Toll Revenue and/or
NVTC Bond Proceeds, that Recipient Entity will need to comply with all federal
and Commonwealth funding requirements, including but not limited to, the
completion and execution of VDOT’s Standard Project Administration
Agreement and acknowledge that NVTC will not be a partyor signatory to that
agreement; nor will NVTC have any obligation to comply with the
requirements of that agreement.
23. Provide quarterly (January 30th, April 30th, July 30th, and October 30th) written
status updates on all approved, active Projects to NVTC on all items described
in the Recipient’s Project application including progress toward milestones
and/or statistics including such information as ridership and/or percent
completion.
24. Assist NVTC in the preparation of the annual report to the CTB required by the
MOA, by providing data in regard to the Project performance measures
identified on Appendix A of this Agreement, as well as other reporting as may
be requested or required by NVTC.
25. To the greatest extent possible, i nclude the Commuter Choice logo and
recognition of Project funding source as being from the Commuter Choice
Program, in a form approved by NVTC , in all p ublicly-available materials,
documents, websites, etc.
B. NVTC’s Obligations
NVTC shall:
Attachment 2
89
Form Version 2026-07-01 8
l. Provide to Recipient Entity the funding authorized by NVT C for design work,
engineering, including all environmental work, all right-of-way acquisition,
inspection services, testing services, construction, and/or capital asset
acquisition(s), and operations, and all allowable expenses, net of any revenue
generated by the Project , on a reimbursement basis as set forth in this
Agreement and as specified in the Project Budget and Cash Flow contained in
Appendix B to this Agreement or the most updated amendment thereto.
2. If the Project is anticipated to receive additional NVTC Toll Revenuein a future
funding round as reflected in Appendix B to this Agreement, include the funds
as an off -the-top deduction within the proposed funding allocations for the
indicated fiscal year that are advanced for the Commission’s and CTB’s
adoption and approval, subject to the availability of NVTC Toll Revenue to
support the award and provided that the Recipient Entity continues to
advance Project implementation in a manner consistent with this Agreement.
3. Assign a Program Coordinator for the Project. NVTC’s Program Coordinator
will be responsible for monitoring the Project on behalf of NVT C so as to
ensure compliance with this Agreement and the MOA, and all NVT C’s
requirements and for overseeing, managing, reviewing , and processing, in
consultation with NVT C’s Executive Director and its Director of Finance and
Administration (DFA), all payment requisitions submitted by Recipient Entity
for the Project. NVTC’s Program Coordinator will have no independent
authority to direct changes or make additions, modifications , or revisions to
the Project Scope of Work as set forth on Appendix A or to the Project Budget
and Cash Flow as set forth on Appendix B.
4. Route to NVTC’s assigned Program Coordinator all Recipient Entity’s payment
requisitions, containing detailed summaries of actual Project costs incurred
which are in substantially the same form as shown on Appendix C submitted
to NVT C for the Project. After submission to NVT C, NVTC’s Program
Coordinator will conduct an initial review of all payment requisitions and
supporting documentation for the Project in order to determine the
submission’s sufficiency. NVTC’s Program Coordinator will then make a
recommendation to the NVT C’s DFA and Executive Director whether to
authorize payment, refuse payment, or seek additional information from
Recipient Entity. If the payment requisition is sufficient as submitted, payment
will be made within forty-five (45) business days from receipt. If the payment
requisition is deemed insufficient, within twenty (20) business days from
receipt, NVTC will notify Recipient Entity in writing and set forth the reasons
why the payment requisition was declined or why and whatspecific additional
information is needed for processing the payment request . Payment will be
withheld until all deficiencies identified by NVTC have been corrected. Under
Attachment 2
90
Form Version 2026-07-01 9
no circumstances will NVTC authorize payment for any work performed by or
on behalf of Recipient Entity that is not in conformity with the requirements
of this Agreement or the MOA.
5. Route all Recipient Entity’ s supplemental requests for funding from NVT C
under Paragraphs A.5 and A.8 of this Agreement to NVTC’s Executive Director.
NVTC’s Executive Director will initially review those requests and all
supporting documentation with NVTC’s DFA. After such initial review, NVTC’s
Executive Director will make a recommendation to NVT C’s Executive
Committee for its independent consideration and review of whether CTB
approval of, and an allocation for, supplemental funding should be sought .
NVTC’s Executive Committee will thereafter make a recommendation on any
such request to NVT C for final determination by NVT C, and approval by the
CTB.
6. Conduct periodic compliance reviews scheduled in advance for the Project so
as to determine whether the work being performed remains within the scope
of this Agreement , the MOA , and other applicable law . Such compliance
reviews may entail review of Recipient Entity ’s financial records for the
Project and on-site inspections.
7. Acknowledge that if, as a result of NVTC’s review of any payment requisition
or of a ny NVTC compliance review, NVT C staff determines that Recipient
Entity has misused or misapplied any NVTC Toll Revenue in derogation of this
Agreement or in contravention of the MOA or applicable law, NVTC staff will
promptly advise NVTC’s Executive Director and will advise Recipient Entity’s
designated representative in writing. Recipient Entity will thereafter have
thirty (30) days to respond in writing to NVT C’s initial findings. NVT C’s
Executive Director will review Recipient Entity ’s response and make a
recommendation to the NVTC Executive Committee which will, in turn, make
a recommendation to NVTC for a final determination. Pending final resolution
of the matter, NVTC will withhold further funding of the Project. If NVTC makes
a final determination that Recipient Entity has misused or misapplied funds in
contravention of this Agreement, the MOA, or other applicable law, NVTC will
cease further funding for the Project and will seek reimbursement from
Recipient Entity of all funds previously remitted by NVT C (with interest
earned at the rate earned by NVT C) which were misapplied or misused by
Recipient Entity . Nothing herein shall, however, be construed as denying ,
restricting or limiting the pursuit of either party’s legal rights or available legal
remedies.
8. Make guidelines available to Recipient Entity to assist the parties in carrying
out the terms of this Agreement in accordance with applicable law.
Attachment 2
91
Form Version 2026-07-01 10
9. Upon recipient’s final payment to all contractors, retain copies of all contracts,
financial records , design, construction , and as-built project drawings and
plans for the Project for the time periods required by the Virginia Public
Records Act and as may be required by other applicable records retention laws
and regulations.
C. Term
1. This Agreement shall be effective upon adoption and execution by both parties
and, unless terminated in accordance with the express provisions hereof, shall
continue until completion of the Project and final payment of Toll Revenue
hereunder, with the exception of those provisions which, by their express
terms, survive termination.
2. Recipient Entity may terminate this Agreement , for cause, in the event of a
material breach by NVTC of this Agreement. If so terminated, NVT C shall pay
for all Project costs incurred through the date of termination and all
reasonable costs incurred by Recipient Entity to terminate all Project related
contracts. The Virginia General Assembly’s failure to appropriate funds , or
CTB’s failure to allocate, or VDOT’s failure to distribute to NVTC as described
in paragraph F of this Agreement shall not be considered material breaches of
this Agreement by NVTC. Before initiating any proceedings to terminate under
this Paragraph, Recipient Entity shall give NVTC sixty (60) days written notice
of any claimed material breach of this Agreement; thereby allowing NVT C an
opportunity to investigate and cure any such alleged breach.
3. NVTC may terminate this Agreement , for cause , resulting from Recipient
Entity’s material breach of this Agreement. If so terminated, Recipient Entity
shall refund to NVT C all funds NVT C provided to Recipient Entity for t he
Project (including interest earned at the rate earned by NVT C). NVTC will
provide Recipient Entity with sixty (60) days written notice that NVTC is
exercising its rights to terminate this Agreement and the reasons for
termination. Prior to termination, Recipient Entity may request that NVT C
excuse Recipient Entity from refunding all funds NVTC provided to Recipient
Entity for the Project based upon Recipient Entity’s substantial completion of
the Project or severable portions thereof; and NVTC may, in its sole discretion,
excuse Recipient Entity from refunding all or a portion of the funds NVT C
provided to Recipient Entity for the Project. No such request to be excused
from refunding will be allowed where Recipient Entity has either misused or
misapplied NVTC funds in contravention of applicable law.
4. Upon termination and payment of all eligible expenses as set forth in
Paragraph C.3 above, Recipient Entity will release or return to NVT C all
Attachment 2
92
Form Version 2026-07-01 11
unexpended NVT C Toll Revenue with interest earned at the rate earned by
NVTC no later than sixty (60) days after the date of termination.
D. Dispute
In the event of a dispute under this Agreement, the parties agree to meet and confer
in order to ascertain if the dispute can be resolved informally without the need of a
third party or judicial intervention. NVTC’s Executive Director and Recipient Entity’s
Chief Executive Officer or Chief Administrative Officer shall be authorized to conduct
negotiations on behalf of their respective entities. If a resolution of the dispute is
reached via a meet and confer dispute resolution method, it sha ll be presented to
NVTC and to Recipient Entity’s governing body for formal confirmation and approval.
If no satisfactory resolution can be reached via the meet and confer method, either
party is free to pursue whatever remedies it may have at law, including all judicial
remedies.
E. NVTC’s Entitlement to Refund of Value of Project Assets
Recipient Entity agrees to use the real property and appurtenances and fixtures
thereto, capital assets, equipment and all other transportation facilities that are part
of the Project and funded by NVT C Toll Revenues under this Agreement ( “Project
Assets”) for the designated transportation purposes of the Project under this
Agreement and in accordance with applicable law throughout the useful life of each
Project Asset. In the event that Recipient Entity fails to use any of the Project Assets
funded under this Agreement for the transportation purposes as authorized by this
Agreement or applicable law throughout its respective useful life, Recipient Entity
shall refund to NVT C, with interest at the rate earned by NVT C, the amount of the
value of each of the Project Assets, whether any such Project Asset may have
depreciated or appreciated throughout its respective useful life, proportionate to the
amount of the cost of the Project Asset funded by NVTC under this Agreement . If
Recipient Entity refuses or fails to refund said monies to NVT C, NVTC may recover
the proportionate value from Recipient Entity by pursuit of any remedies available to
NVTC, including but not limited to NVT C’s withholding of commensurate amounts
from future distributions of NVTC Toll Revenue to Recipient Entity. In no event shall
the Recipient Entity be obligated to refund the aforesaid value to both NVTC and the
Commonwealth.
F. Appropriations Requirements
1. Nothing herein shall require or obligate any party to commit or obligate funds
to the Project beyond those funds that have been duly authorized and
appropriated by their respective governing bodies.
Attachment 2
93
Form Version 2026-07-01 12
2. The parties acknowledge that all Toll Revenues provided by NVTC pursuant to
the MOA are subject to appropriation by the Virginia General Assembly ,
allocation by the CTB and distribution by VDOT. The parties further
acknowledge that NVTC’s obligations under this Agreement are subject to such
funds being appropriated by the General Assembly , allocated by the CTB and
distributed by VDOT to NVTC.
G. Notices
All notices under this Agreement to either party shall be in writing and forwarded to
the other party by U.S. mail, care of the following authorized representatives:
1) to: NVTC, to the attention of its Executive Director;
2300 Wilson Blvd., Suite 230
Arlington, VA 22201
2) to: Fairfax County Department of Transportation,
to the attention of Gregg Steverson, Director
4050 Legato Road, Suite 400
Fairfax, VA 22033
H. Assignment
This Agreement shall not be assigned by either party unless express written consent
is given by the other party.
I. Modification or Amendment
This Agreement may be modified, in writing, upon mutual agreement of both parties.
J. No Personal Liability or Creation of Third Party Rights
This Agreement shall not be construed as creating any personal liability on the part
of any officer, employee, or agent of the parties; nor shall it be construed as giving any
rights or benefits to anyone other than the parties hereto.
K. No Agency
Recipient Entity represents that it is not acting as a partner or agent of NVTC; and
nothing in this Agreement shall be construed as making any party a partner or agent
with any other party.
Attachment 2
94
Form Version 2026-07-01 13
L. Sovereign Immunity
The provisions of this Agreement shall not be construed as a waiver of either party’s
sovereign immunity rights.
M. Incorporation of Recitals
The recitals to this Agreement are hereby incorporated into this Agreement and are
expressly made a part hereof. The parties to this Agreement acknowledge and agree
that such recitals are true and correct.
N. Mutual Preparation and Fair Meaning
The parties acknowledge that this Agreement has been prepared on behalf of all
parties thereto and shall be construed in accordance with its fair meaning and not
strictly construed for or against either party.
O. Governing Law
This Agreement is governed by the laws of the Commonwealth of Virginia.
IN WITNESS WHEREOF, each party hereto has caused this Agreement to be executed
as of the day, month, and year first herein written by their duly authorized
representatives.
Northern Virginia Transportation Commission
By: _________________________________
Katherine A. Mattice
NVTC Executive Director
Date: _________________________________
Fairfax County
By: _________________________________
_________________________________ (Print Name)
_________________________________ (Title)
Attachment 2
95
Form Version 2026-07-01 14
Date: _________________________________
Attachment 2
96
Form Version 2026-07-01
Appendix A –Project Description and Performance Measures
Project Number: 059-64-27
Project Title: Route 598: Reston to the Pentagon Express Service (Continuation)
Recipient Entity: Fairfax County
Toll Revenue Funds: $2,514,209
Project Description
This project funds the continued operation of Fairfax Connector Route 598, an express
bus service operating between the Reston South and Reston North Park and Ride Lots,
the Pentagon and Crystal City.
Project opening year inbound AM peak period increase in person throughputthat was the
basis for project evaluation: 172 persons.
Performance Measures and Reporting
Performance Measures
Report morning peak-period and daily ridership for the Commuter Choice funded trips
on the route.
Collection Period
Data should be collected over a two-week period in March or April. Chosen period
should not include any holiday periods and the weekday average should be calculated
from Tuesdays, Wednesdays, and Thursdays during the period.
Reporting
Report data to NVTC in a technical memorandum outlining the following:
1. Data collection methodology
2. Data collection dates
3. Results – data
4. Notes (if necessary)
Reports are due each July 1 or as otherwise identified by NVTC. Submit reports by email
to commuterchoice@novatransit.org.
Attachment 2
97
michael.riddle@fairfaxcounty.gov
703-877-5659
Project Title: Project Number: 059-64-27
:Revision NumberRecipient Entity: Fairfax County
Revision Date:Recipient Contact:
Name Brent Riddle
Email
Phone
Route 598: Reston to the Pentagon Express Service
(Continuation)
TABLE B-3 QUARTERLY PROJECT CASH FLOW FOR NVTC TOLL REVENUE FUNDS ONLY
APPENDIX B - PROJECT BUDGET & CASH FLOW
TABLE B-1 PROJECT BUDGET
Project Type Budget applicable) Source of Other Funds
Total Project Toll Revenue Other Funds (if
Funds
Funding Sources
Approved NVTC
Study
Preliminary Engineering (PE)
Right-of-Way (ROW)
Construction (CN)
Capital Asset Acquisition
Other-Marketing 60,000 60,000
Transit Service 2,583,378 2,454,209 129,169 Fare revenue
Other Operations
Total 2,643,378$ 2,514,209$ 129,169$
TABLE B-2 NVTC PROJECT FUNDS PROGRAMMED
Project Type FY2027
Study -$
Preliminary Engineering (PE) -
Right-of-Way (ROW) -
Construction (CN)
Capital Asset Acquisition
Other-Marketing 60,000
Transit Service 2,454,209
Other Operations -
Total 2,514,209$
Quarter FY2027 FY2028 FY2029 FY2030 FY2031
1st, September 30th 314,276$ 314,276$
2nd, December 31st 314,276$ 314,276$
3rd, March 31st 314,276$ 314,276$
4th, June 30th 314,276$ 314,277$
Total 1,257,104$ 1,257,105$ -$ -$ -$
Recipient Entity Northern Virginia Transportation Commission
Signature Signature Signature
NVTC Executive Director NVTC Director of Finance and Administration
Title Title Title
Date Date Date
_______________________________
This attachment is certified and made an official attachment to the Standard Project Agreement document by the parties of this agreement.
_______________________________
_______________________________
Print name of person signing
_______________________________
Attachment 2
98
Revised 2026-07-01
Attachment 2
99
Form Version 2026-07-01 1
Standard Project Agreement for Transform 66: Inside the Beltway Project, Toll
Revenue Funding of Projects and Administration
Between the Northern Virginia Transportation Commission and
Fairfax County
NVTC Project Number: 059-63-27
NVTC Project Name: Route 697: Stringfellow Road Park-and-Ride to L’Enfant Plaza Express
Service (Continuation)
This Standard Project Agreement for Transform 66: Inside the Beltway Project, Toll
Revenue Funding of Projects and Administration (“this Agreement”) is made and executed
in duplicate on _____ ___________________ by and between the Northern Virginia
Transportation Commission (“NVTC”) and Fairfax County (“Recipient Entity”).
WITNESSETH
WHEREAS, NVTC is a political subdivision of the Commonwealth of Virginia
created by the General Assembly in accordance with the Transportation District Act of
1964, §§ 33.2-1900 et seq. of the Code of Virginia, 1950, as amended, and is authorized to
enter into this Agreement by the provisions of § 33.2-1915 and 1919 of the Code of Virginia,
1950, as amended;
WHEREAS, NVTC entered into a Memorandum of Agreement Transform 66: Inside
the Beltway Project (“MOA”), as most recently amended on May 19, 2021, with the
Commonwealth Transportation Board (“CTB”), and the Virginia Department of
Transportation (“VDOT”), and the Virginia Department of Rail and Public Transportation
(“DRPT”), as such MOA may be further amended from time to time, which MOA delegated to
NVTC the authority to select and administer the implementation of multimodal
transportation improvements to the roadways and associated transportation and transit
facilities (“Components” as used in the MOA and, for purposes of this Agreement, “Projects”)
in the vicinity of the portion of I-66 beginning at the intersection of I-66 and I-495 (the
“Beltway”) and ending at U.S. Route 29 in the Rosslyn area of Arlington County, Virginia(said
portion of I-66 being referred to as the “Facility”) which Projects are designed to attain the
Improvement Goals defined in the MOA as amended, specifically, to (1) maximize person
throughput in the Corridor; and (2) implement multimodal improvements to: (i) improve
mobility along the Corridor, (ii) support new, diverse travel choices, and (iii) enhance
transportation safety and travel reliability, all of which are reasonably expected to benefit
the toll paying users of the Facility;
Attachment 2
100
Form Version 2026-07-01 2
WHEREAS, the MOA provides for the transfer to and use by NVTC of a portion of the
funds collected from the CTB’s tolling of the Facility and the I-66 Outside the Beltway Express
Lanes concessionaire’s payments to the Commonwealth (hereinafter referred to for
purposes of this Agreement as “Toll Revenue”) for the implementation of Projects selected
by NVTC and approved by the CTB, as well as operating costs related to Projects, and NVTC
financing and debt service payments and any allowable costs related thereto;
WHEREAS, based on information provided by Recipient Entity in response to NVTC’s
call for Projects, NVTC has determined the Project set forth and described on Appendix A to
this Agreement satisfies the requirements of Section II.B.1 of the MOA, and the provisions of
§ 33.2-309 of the Code of Virginia, 1950, as amended , and the CTB has approved use of Toll
Revenue to fund such Project;
WHEREAS, the Toll Revenue to be provided by NVT C described in Appendix B have
been duly authorized and directed by Recipient Entity to finance the Project, and the
Recipient Entity is authorized to enter into this Agreement and has authorized execution of
it on its behalf;
WHEREAS, NVTC agrees that Recipient Entity will, itself or through its contractors or
agents, design, construct, acquire and/or operate the Project or perform such other specific
work for the Project and Recipient Entity agrees that it will perform or have performed, such
work on the terms and conditions set forth in this Agreement and the Appendices appended
thereto;
WHEREAS, both parties have concurred in the Recipient Entity ’s administration,
performance, and completion of the Project on the terms and conditions set forth in this
Agreement and its Appendices and in accordance with all applicable federal, state, and local
laws and regulations; and
WHEREAS, NVTC’s governing body and Recipient Entity’s governing body have each
authorized that their respective designee(s) execute this Agreement on their respective
behalf(s) as evinced by copies of each such entity’s resolution or clerk’s minutes which are
appended hereto as Appendix E;
NOW THEREFORE, in consideration of the promises made mutual covenants , and
agreements contained herein, the parties hereto agree as follows:
A. Recipient Entity’s Obligations
Recipient Entity shall:
l. Complete or perform allsaid work as described in Appendix A, advancing such
work diligently and ensuring that all work is completed in accordance with all
applicable federal, state, and local law s and regulations , and all terms and
Attachment 2
101
Form Version 2026-07-01 3
conditions of this Agreement. Recipient Entity expressly agrees that, for non-
debt financed Projects, Recipient Entity must obligate the Toll Revenue to the
cost of the Project within two (2) fiscal years and to expend the Toll Revenue
within five (5) fiscal years of the first day of the fiscal year for which the funds
for the Project were allocated by the CTB unless an extension has been
approved by NVTC and the CTB. In the event an extension is not approved by
the Commissions and the CTB, then Recipient Entity shall release or return to
NVTC all unexpended funds no later than 90 days after receipt of NVTC’s
written request for such release or return. If the Project i s cancelled at any
time, for any reason, before or after work has commenced, Recipient Entity
shall immediately notify NVTC in writing of the cancellation and shall
immediately cease to incur Project costs. Concurrently, and in no event later
than 90 days after the date of cancellation, Recipient Entity shall refund to
NVTC 100% of all funds provided for the Project unless ot herwise approved
by NVTC, and the CTB as necessary, and set forth in an amendment to this
Agreement.
2. Ensure that all work performed or to be performed under this Agreement is in
accordance with the Project Description Sheets attached to Appendix A.
3. Perform or have performed, and remit all payment requisitions and other
requests for funding for design and engineering, including all environmental
work, right-of-way acquisition, construction, contract administration, testing
services, inspection services, capital asset acquisitions, or operations, and all
allowable expenses for the Project, as is required by this Agreement and that
may be necessary for completion of the Project.
4. Not use the NVT C Toll Revenues specified on Appendix B to pay any Project
cost if the MOA or any applicable provision of law does not permit such Project
cost to be paid with NVT C Toll Revenue . For transit, bikeshare and other
operations projects that generate revenues, the Recipient Entity shall deduct
revenues earned from Project operations from any requests for
reimbursement of operating expenses.
5. Recognize that, if the Project is anticipated to receive additional ATI funds in a
future funding round as reflected in Appendix B to this Agreement, Recipient
Entity may only pursue reimbursement of eligible Project expenses from ATI
funds that have been allocated to the Project to date by the CTB. Recipient
Entity is not entitled to the anticipated additional ATI funds unless and until
they are allocated to the Project by the CTB. Each allocation of ATI funds
carries its own requirement that the Recipient obligate the ATI funds to the
cost of the Project within two (2) fiscal years and expendthe ATI funds within
five (5) fiscal years of the first day of the fiscal year for which the funds were
Attachment 2
102
Form Version 2026-07-01 4
allocated by the CTB unless an extension has been approved by the
Commissions and the CTB. Nothing herein, however, shall prohibit Recipient
Entity from providing its own funds to advance the Project prior to the CTB
allocating anticipated funding, and from later, once the CTB has allocated the
anticipated funds, requesting reimbursement from NVTC for having advance
funded the Project.
6. Acknowledge that NVTC’s Executive Director will periodically update NVTC’s
cash flow estimates with the objective toward keeping those estimates
accurate throughout the life of the Project. Recipient Entity shall provide all
information required by NVTC so as to ensureand facilitate accurate cash flow
estimates and accurate updates to those cash flow estimates throughout the
life of the Project as described in Appendix B.
7. Provide to NVT C requests for payment consistent with Appendix B and the
most recently approved NVT C cash flow estimates that include NVTC’s
standard payment requisition(s), containing detailed summaries of actual
Project costs incurred with supporting documentation as required by NVTC
and that certify all such costs were incurred in the performance of work for
the Project as authorized by this Agreement . Each payment requisition shall
be in substantially the same form as set forth in Appendix C of this Agreement,
include a manual signature of the individual authorized to submit the request,
and be submitted electronically to reimbursements@novatransit.org. If
approved by NVT C, Recipient Entity can expect to receive payment within
forty-five (45) business days upon receipt by NVTC. Approved payments will
be made by means of electronic transfer of funds from NVT C to or for the
account of Recipient Entity.
8. Promptly n otify NVTC’s Executive Director of any additional Project costs
resulting from unanticipated circumstances which costs exceed the amount
allocated by the CTB for the Project, and provide to NVTC detailed estimates
of additional costs associated with those circumstances . Recipient Entity
understands that it will be within NVT C’s sole discretion, subject to CTB
approval, whether to seek and to provide any additional funding to the Project
in such circumstances and that NVT C will do so only in accordance with
NVTC’s approved Project selection process and upon formal action and
approval by NVT C. Recipient Entity shall timely provide to NVT C a complete
and accurate update to Appendix B if NVT C and the CTB approve funding of
any additional Project costs for the Project under this Paragraph.
9. Submit a final reimbursement request for Project expenses and release or
return any unexpended funds to NVTC no later than 90 days after Project
completion. The final reimbursement request shall be accompanied by a
Attachment 2
103
Form Version 2026-07-01 5
certification to NVTC that Recipient Entity adhered to all applicable laws and
regulations and all requirements of this Agreement.
10. Should Recipient Entity be required to provide matching funds in order to
proceed or complete the funding necessary for the Project, Recipient Entity
shall certify to NVTC that all such matching funds have been either authorized
and/or appropriated by Recipient Entity’ s governing body or have been
obtained through another, independent funding source.
11. Maintain complete and accurate financial records relative to the Project for all
time periods as may be required by the Virginia Public Records Act and by all
other applicable state or federal records retention laws or regulations, unless
superseded by the laws that govern Recipient Entity and provide copies of any
such financial records to NVTC, free of charge, upon request.
12. Maintain all original conceptual drawings and renderings, architectural and
engineering plans, site plans, inspection records, testing records, and as built
drawings for the Project for the time periods required by the Virginia Public
Records Act and any other applicable records retention laws or regulations ,
unless superseded by the laws that govern Recipient Entity ; and provide to
NVTC copies of all such drawings and plans free of charge, upon request.
13. Reimburse NVTC for all NVTC Toll Revenue (with interest earned at the rate
earned by NVTC) that Recipient Entity misapplied or used in contravention of
the MOA or any term or condition of this Agreement.
14. Name NVTC and its Bond Trustee , the Commonwealth of Virginia, the CTB,
VDOT, DRPT and their officers, employees and agents, or require that all
Recipient Entity ’s contractors name NVTC and its Bond Trustee, the
Commonwealth of Virginia, the CTB, VDOT, DRPT and their officers, employees
and agents as additional insureds on any insurance policy issued for the work
to be performed and/or services to be provided by or on behalf of Recipient
Entity for the Project, and present NVTC with satisfactory evidence thereof
before any work on the Project commences or continues, so that they are
protected from and against any losses actually suffered or incurred, except for
losses to the extent caused by the negligence or willful misconduct of such
entity or person, from third party claims that are directly related to or arise
out o f: (a) any failure by Recipient Entity to comply with, to observe or to
perform in any material respect any of the covenants, obligations, agreements,
terms or conditions in this Agreement, or any breach by Recipient Entity of its
representations or warranties in this Agreement; (b) any actual or willful
misconduct or negligence ofRecipient Entity, its employees or agents in direct
connection with the Projects; (c) any actual or alleged patent or copyright
Attachment 2
104
Form Version 2026-07-01 6
infringement or other actual or alleged improper appropriation or use of trade
secrets, patents proprietary information, know-how, trademarked or service-
marked materials, equipment devices or processes, copyright rights or
inventions by Recipient Entity in direct connection with the Project; (d)
inverse condemnation, trespass, nuisance or similar taking of or harm to real
property committed or caused by Recipient Entity, its employees or agents in
direct connection with the Project; or (e) any assumed liabilities. Recipient
Entity will contractually require its contractors, subcontractors, vendors and
other third parties working or performing services related to any Project
funded by NVTC Toll Revenue to indemnify NVTC and its Bond Trustee , the
Commonwealth of Virginia, the CTB, VDOT, DRPT, and their officers,
employees and agents from the same losses.
15. Recipient Entity covenants and agrees it will comply with all applicable
requirements of state and federal laws relating to anti -discrimination,
including but not limited to Titles VI and VII of the Civil Rights Act of 1964, as
amended, and the Americans with Disabilities Act, and shall contractually
require the same of all contractors, subcontractors, vendors, and recipients of
any funding. Recipient Entity recognizes the importance of the participation of
minority, women-owned and small businesses through the federal and local
Disadvantaged Business Enterprise programs and will abide by such
programs in implementing the Project. Recipient Entity shall comply with all
applicable federal requirements, including those applicable to highways that
are part of the National Highway System.
16. Give notice to NVTC that Recipient Entity may use NVTC Toll Revenue to pay
outside legal counsel services (as opposed to utilizing the services of its own
in-house counsel or NVT C’s in-house legal counsel) in connection with the
work performed under this Agreement so as to ensure that no conflict of
interest may arise from any such representation.
17. Provide certification to NVT C, that upon final payment to all contractors for
the Project, Recipient Entity will use the Project for its intended purposes for
the duration of the Project’s useful life. Under no circumstances will NVTC be
considered responsible or obligated to operate and/or maintain the Project
after its completion.
18. Comply with all requirements of the Virginia Public Procurement Act and
other applicable Virginia Code provisions , or local ordinances which govern
the letting of public contracts , unless supe rseded by the laws that govern
Recipient Entity.
Attachment 2
105
Form Version 2026-07-01 7
19. Acknowledge that if the Project is being funded in whole or in part by NVT C
Bond Proceeds, comply with the applicable tax covenants as may be attached
as Appendix D.
20. Acknowledge that if Recipient Entity expects and/or intends that the Project
is to be submitted for acceptance by the Com monwealth into its system that
Recipient Entity agrees to comply with VDOT’s “Standards, Requirements and
Guidance” applicable to the Project.
21. Recognize that Recipient Entity is solely responsible for obtaining all permits,
permissions and regulatory approval necessary to develop, construct, operate
and/or maintain the Project, including but not limited to , obtaining all
required VDOT and local land use permits, applications for zoning approvals,
and regulatory approvals.
22. Recognize that if Recipient Entity is funding the Project, in whole or in part,
with federal and/or state funds, in addition to NVT C Toll Revenue and/or
NVTC Bond Proceeds, that Recipient Entity will need to comply with all federal
and Commonwealth funding requirements, including but not limited to, the
completion and execution of VDOT’s Standard Project Administration
Agreement and acknowledge that NVTC will not be a partyor signatory to that
agreement; nor will NVTC have any obligation to comply with the
requirements of that agreement.
23. Provide quarterly (January 30th, April 30th, July 30th, and October 30th) written
status updates on all approved, active Projects to NVTC on all items described
in the Recipient’s Project application including progress toward milestones
and/or statistics including such information as ridership and/or percent
completion.
24. Assist NVTC in the preparation of the annual report to the CTB required by the
MOA, by providing data in regard to the Project performance measures
identified on Appendix A of this Agreement, as well as other reporting as may
be requested or required by NVTC.
25. To the greatest extent possible, i nclude the Commuter Choice logo and
recognition of Project funding source as being from the Commuter Choice
Program, in a form approved by NVTC , in all p ublicly-available materials,
documents, websites, etc.
B. NVTC’s Obligations
NVTC shall:
Attachment 2
106
Form Version 2026-07-01 8
l. Provide to Recipient Entity the funding authorized by NVT C for design work,
engineering, including all environmental work, all right-of-way acquisition,
inspection services, testing services, construction, and/or capital asset
acquisition(s), and operations, and all allowable expenses, net of any revenue
generated by the Project , on a reimbursement basis as set forth in this
Agreement and as specified in the Project Budget and Cash Flow contained in
Appendix B to this Agreement or the most updated amendment thereto.
2. If the Project is anticipated to receive additional NVTC Toll Revenuein a future
funding round as reflected in Appendix B to this Agreement, include the funds
as an off -the-top deduction within the proposed funding allocations for the
indicated fiscal year that are advanced for the Commission’s and CTB’s
adoption and approval, subject to the availability of NVTC Toll Revenue to
support the award and provided that the Recipient Entity continues to
advance Project implementation in a manner consistent with this Agreement.
3. Assign a Program Coordinator for the Project. NVTC’s Program Coordinator
will be responsible for monitoring the Project on behalf of NVT C so as to
ensure compliance with this Agreement and the MOA, and all NVT C’s
requirements and for overseeing, managing, reviewing , and processing, in
consultation with NVT C’s Executive Director and its Director of Finance and
Administration (DFA), all payment requisitions submitted by Recipient Entity
for the Project. NVTC’s Program Coordinator will have no independent
authority to direct changes or make additions, modifications , or revisions to
the Project Scope of Work as set forth on Appendix A or to the Project Budget
and Cash Flow as set forth on Appendix B.
4. Route to NVTC’s assigned Program Coordinator all Recipient Entity’s payment
requisitions, containing detailed summaries of actual Project costs incurred
which are in substantially the same form as shown on Appendix C submitted
to NVT C for the Project. After submission to NVT C, NVTC’s Program
Coordinator will conduct an initial review of all payment requisitions and
supporting documentation for the Project in order to determine the
submission’s sufficiency. NVTC’s Program Coordinator will then make a
recommendation to the NVT C’s DFA and Executive Director whether to
authorize payment, refuse payment, or seek additional information from
Recipient Entity. If the payment requisition is sufficient as submitted, payment
will be made within forty-five (45) business days from receipt. If the payment
requisition is deemed insufficient, within twenty (20) business days from
receipt, NVTC will notify Recipient Entity in writing and set forth the reasons
why the payment requisition was declined or why and whatspecific additional
information is needed for processing the payment request . Payment will be
withheld until all deficiencies identified by NVTC have been corrected. Under
Attachment 2
107
Form Version 2026-07-01 9
no circumstances will NVTC authorize payment for any work performed by or
on behalf of Recipient Entity that is not in conformity with the requirements
of this Agreement or the MOA.
5. Route all Recipient Entity’ s supplemental requests for funding from NVT C
under Paragraphs A.5 and A.8 of this Agreement to NVTC’s Executive Director.
NVTC’s Executive Director will initially review those requests and all
supporting documentation with NVTC’s DFA. After such initial review, NVTC’s
Executive Director will make a recommendation to NVT C’s Executive
Committee for its independent consideration and review of whether CTB
approval of, and an allocation for, supplemental funding should be sought .
NVTC’s Executive Committee will thereafter make a recommendation on any
such request to NVT C for final determination by NVT C, and approval by the
CTB.
6. Conduct periodic compliance reviews scheduled in advance for the Project so
as to determine whether the work being performed remains within the scope
of this Agreement , the MOA , and other applicable law . Such compliance
reviews may entail review of Recipient Entity ’s financial records for the
Project and on-site inspections.
7. Acknowledge that if, as a result of NVTC’s review of any payment requisition
or of a ny NVTC compliance review, NVT C staff determines that Recipient
Entity has misused or misapplied any NVTC Toll Revenue in derogation of this
Agreement or in contravention of the MOA or applicable law, NVTC staff will
promptly advise NVTC’s Executive Director and will advise Recipient Entity’s
designated representative in writing. Recipient Entity will thereafter have
thirty (30) days to respond in writing to NVT C’s initial findings. NVT C’s
Executive Director will review Recipient Entity ’s response and make a
recommendation to the NVTC Executive Committee which will, in turn, make
a recommendation to NVTC for a final determination. Pending final resolution
of the matter, NVTC will withhold further funding of the Project. If NVTC makes
a final determination that Recipient Entity has misused or misapplied funds in
contravention of this Agreement, the MOA, or other applicable law, NVTC will
cease further funding for the Project and will seek reimbursement from
Recipient Entity of all funds previously remitted by NVT C (with interest
earned at the rate earned by NVT C) which were misapplied or misused by
Recipient Entity . Nothing herein shall, however, be construed as denying ,
restricting or limiting the pursuit of either party’s legal rights or available legal
remedies.
8. Make guidelines available to Recipient Entity to assist the parties in carrying
out the terms of this Agreement in accordance with applicable law.
Attachment 2
108
Form Version 2026-07-01 10
9. Upon recipient’s final payment to all contractors, retain copies of all contracts,
financial records , design, construction , and as-built project drawings and
plans for the Project for the time periods required by the Virginia Public
Records Act and as may be required by other applicable records retention laws
and regulations.
C. Term
1. This Agreement shall be effective upon adoption and execution by both parties
and, unless terminated in accordance with the express provisions hereof, shall
continue until completion of the Project and final payment of Toll Revenue
hereunder, with the exception of those provisions which, by their express
terms, survive termination.
2. Recipient Entity may terminate this Agreement , for cause, in the event of a
material breach by NVTC of this Agreement. If so terminated, NVT C shall pay
for all Project costs incurred through the date of termination and all
reasonable costs incurred by Recipient Entity to terminate all Project related
contracts. The Virginia General Assembly’s failure to appropriate funds , or
CTB’s failure to allocate, or VDOT’s failure to distribute to NVTC as described
in paragraph F of this Agreement shall not be considered material breaches of
this Agreement by NVTC. Before initiating any proceedings to terminate under
this Paragraph, Recipient Entity shall give NVTC sixty (60) days written notice
of any claimed material breach of this Agreement; thereby allowing NVT C an
opportunity to investigate and cure any such alleged breach.
3. NVTC may terminate this Agreement , for cause , resulting from Recipient
Entity’s material breach of this Agreement. If so terminated, Recipient Entity
shall refund to NVT C all funds NVT C provided to Recipient Entity for t he
Project (including interest earned at the rate earned by NVT C). NVTC will
provide Recipient Entity with sixty (60) days written notice that NVTC is
exercising its rights to terminate this Agreement and the reasons for
termination. Prior to termination, Recipient Entity may request that NVT C
excuse Recipient Entity from refunding all funds NVTC provided to Recipient
Entity for the Project based upon Recipient Entity’s substantial completion of
the Project or severable portions thereof; and NVTC may, in its sole discretion,
excuse Recipient Entity from refunding all or a portion of the funds NVT C
provided to Recipient Entity for the Project. No such request to be excused
from refunding will be allowed where Recipient Entity has either misused or
misapplied NVTC funds in contravention of applicable law.
4. Upon termination and payment of all eligible expenses as set forth in
Paragraph C.3 above, Recipient Entity will release or return to NVT C all
Attachment 2
109
Form Version 2026-07-01 11
unexpended NVT C Toll Revenue with interest earned at the rate earned by
NVTC no later than sixty (60) days after the date of termination.
D. Dispute
In the event of a dispute under this Agreement, the parties agree to meet and confer
in order to ascertain if the dispute can be resolved informally without the need of a
third party or judicial intervention. NVTC’s Executive Director and Recipient Entity’s
Chief Executive Officer or Chief Administrative Officer shall be authorized to conduct
negotiations on behalf of their respective entities. If a resolution of the dispute is
reached via a meet and confer dispute resolution method, it sha ll be presented to
NVTC and to Recipient Entity’s governing body for formal confirmation and approval.
If no satisfactory resolution can be reached via the meet and confer method, either
party is free to pursue whatever remedies it may have at law, including all judicial
remedies.
E. NVTC’s Entitlement to Refund of Value of Project Assets
Recipient Entity agrees to use the real property and appurtenances and fixtures
thereto, capital assets, equipment and all other transportation facilities that are part
of the Project and funded by NVT C Toll Revenues under this Agreement ( “Project
Assets”) for the designated transportation purposes of the Project under this
Agreement and in accordance with applicable law throughout the useful life of each
Project Asset. In the event that Recipient Entity fails to use any of the Project Assets
funded under this Agreement for the transportation purposes as authorized by this
Agreement or applicable law throughout its respective useful life, Recipient Entity
shall refund to NVT C, with interest at the rate earned by NVT C, the amount of the
value of each of the Project Assets, whether any such Project Asset may have
depreciated or appreciated throughout its respective useful life, proportionate to the
amount of the cost of the Project Asset funded by NVTC under this Agreement . If
Recipient Entity refuses or fails to refund said monies to NVT C, NVTC may recover
the proportionate value from Recipient Entity by pursuit of any remedies available to
NVTC, including but not limited to NVT C’s withholding of commensurate amounts
from future distributions of NVTC Toll Revenue to Recipient Entity. In no event shall
the Recipient Entity be obligated to refund the aforesaid value to both NVTC and the
Commonwealth.
F. Appropriations Requirements
1. Nothing herein shall require or obligate any party to commit or obligate funds
to the Project beyond those funds that have been duly authorized and
appropriated by their respective governing bodies.
Attachment 2
110
Form Version 2026-07-01 12
2. The parties acknowledge that all Toll Revenues provided by NVTC pursuant to
the MOA are subject to appropriation by the Virginia General Assembly ,
allocation by the CTB and distribution by VDOT. The parties further
acknowledge that NVTC’s obligations under this Agreement are subject to such
funds being appropriated by the General Assembly , allocated by the CTB and
distributed by VDOT to NVTC.
G. Notices
All notices under this Agreement to either party shall be in writing and forwarded to
the other party by U.S. mail, care of the following authorized representatives:
1) to: NVTC, to the attention of its Executive Director;
2300 Wilson Blvd., Suite 230
Arlington, VA 22201
2) to: Fairfax County Department of Transportation,
to the attention of Gregg Steverson, Director
4050 Legato Road, Suite 400
Fairfax, VA 22033
H. Assignment
This Agreement shall not be assigned by either party unless express written consent
is given by the other party.
I. Modification or Amendment
This Agreement may be modified, in writing, upon mutual agreement of both parties.
J. No Personal Liability or Creation of Third Party Rights
This Agreement shall not be construed as creating any personal liability on the part
of any officer, employee, or agent of the parties; nor shall it be construed as giving any
rights or benefits to anyone other than the parties hereto.
K. No Agency
Recipient Entity represents that it is not acting as a partner or agent of NVTC; and
nothing in this Agreement shall be construed as making any party a partner or agent
with any other party.
Attachment 2
111
Form Version 2026-07-01 13
L. Sovereign Immunity
The provisions of this Agreement shall not be construed as a waiver of either party’s
sovereign immunity rights.
M. Incorporation of Recitals
The recitals to this Agreement are hereby incorporated into this Agreement and are
expressly made a part hereof. The parties to this Agreement acknowledge and agree
that such recitals are true and correct.
N. Mutual Preparation and Fair Meaning
The parties acknowledge that this Agreement has been prepared on behalf of all
parties thereto and shall be construed in accordance with its fair meaning and not
strictly construed for or against either party.
O. Governing Law
This Agreement is governed by the laws of the Commonwealth of Virginia.
IN WITNESS WHEREOF, each party hereto has caused this Agreement to be executed
as of the day, month, and year first herein written by their duly authorized
representatives.
Northern Virginia Transportation Commission
By: _________________________________
Katherine A. Mattice
NVTC Executive Director
Date: _________________________________
Fairfax County
By: _________________________________
_________________________________ (Print Name)
_________________________________ (Title)
Attachment 2
112
Form Version 2026-07-01 14
Date: _________________________________
Attachment 2
113
Form Version 2026-07-01
Appendix A –Project Description and Performance Measures
Project Number: 059-63-27
Project Title: Route 697: Stringfellow Road Park-and-Ride to L’Enfant Plaza Express Service
(Continuation)
Recipient Entity: Fairfax County
Toll Revenue Funds: $4,072,453
Project Description
This project funds the continued operation of Fairfax Connector Route 697, an express
bus service operating between the Stringfellow Road Park and Ride Lot and L’Enfant
Plaza in Washington D.C. This funding provides for three new morning and four new
afternoon trips as well as the purchase of a new hybrid bus to support enhanced
service.
Project opening year inbound AM peak period increase in person throughputthat was the
basis for project evaluation: 254 persons.
Performance Measures and Reporting
Performance Measures
Report morning peak-period and daily ridership for the Commuter Choice funded trips
on the route.
Collection Period
Data should be collected over a two-week period in March or April. Chosen period
should not include any holiday periods and the weekday average should be calculated
from Tuesdays, Wednesdays, and Thursdays during the period.
Reporting
Report data to NVTC in a technical memorandum outlining the following:
1. Data collection methodology
2. Data collection dates
3. Results – data
4. Notes (if necessary)
Reports are due each July 1 or as otherwise identified by NVTC. Submit reports by email
to commuterchoice@novatransit.org.
Attachment 2
114
APPENDIX B - PROJECT BUDGET & CASH FLOW
Project Title: Project Number: 059-63-27
Recipient Entity: Revision Number:
Recipient Contact: Revision Date:
Name
Email
Phone
TABLE B-1 PROJECT BUDGET
Funding Sources
Project Type
Total Project
Budget
Approved NVTC
Toll Revenue
Funds
Other Funds (if
applicable)
Study
Preliminary Engineering (PE)
Right-of-Way (ROW)
Construction (CN)
Capital Asset Acquisition 1,200,000 1,200,000
Other-Marketing 60,000 60,000
Transit Service 2,960,476 2,812,453 148,023
Other Operations
Total 4,220,476$ 4,072,453$ 148,023$
TABLE B-2 NVTC PROJECT FUNDS PROGRAMMED
Project Type FY2027
Study -$
Preliminary Engineering (PE) -
Right-of-Way (ROW) -
Construction (CN)
Capital Asset Acquisition 1,200,000
Other-Marketing 60,000
Transit Service 2,812,453
Other Operations -
Total 4,072,453$
TABLE B-3 QUARTERLY PROJECT CASH FLOW FOR NVTC TOLL REVENUE FUNDS ONLY
Quarter FY2027 FY2028 FY2029 FY2030 FY2031
1st, September 30th 1,559,057$ 359,057$
2nd, December 31st 359,057$ 359,056$
3rd, March 31st 359,057$ 359,056$
4th, June 30th 359,057$ 359,056$
Total 2,636,228$ 1,436,225$ -$ -$ -$
Recipient Entity Northern Virginia Transportation Commission
Signature Signature Signature
NVTC Executive Director NVTC Director of Finance and Administration
Title Title Title
Date Date Date
Print name of person signing
_______________________________
_______________________________
Fare revenue
This attachment is certified and made an official attachment to the Standard Project Agreement document by the parties of this agreement.
_______________________________
_______________________________
Fairfax County
Route 697: Stringfellow Road Park-and-Ride to L’Enfant
Plaza Express Service (Continuation)
Brent Riddle
michael.riddle@fairfaxcounty.gov
703-877-5659
Source of Other Funds
Attachment 2
115
Revised 2026-07-01
Attachment 2
116
Form Version 2026-07-01 1
Standard Project Agreement for Transform 66: Inside the Beltway Project, Toll
Revenue Funding of Projects and Administration
Between the Northern Virginia Transportation Commission and
Fairfax County
NVTC Project Number: 059-62-27
NVTC Project Name: Route 698: Stringfellow Road Park-and-Ride to the Pentagon Express
Service (Continuation)
This Standard Project Agreement for Transform 66: Inside the Beltway Project, Toll
Revenue Funding of Projects and Administration (“this Agreement”) is made and executed
in duplicate on _____ ___________________ by and between the Northern Virginia
Transportation Commission (“NVTC”) and Fairfax County (“Recipient Entity”).
WITNESSETH
WHEREAS, NVTC is a political subdivision of the Commonwealth of Virginia
created by the General Assembly in accordance with the Transportation District Act of
1964, §§ 33.2-1900 et seq. of the Code of Virginia, 1950, as amended, and is authorized to
enter into this Agreement by the provisions of § 33.2-1915 and 1919 of the Code of Virginia,
1950, as amended;
WHEREAS, NVTC entered into a Memorandum of Agreement Transform 66: Inside
the Beltway Project (“MOA”), as most recently amended on May 19, 2021, with the
Commonwealth Transportation Board (“CTB”), and the Virginia Department of
Transportation (“VDOT”), and the Virginia Department of Rail and Public Transportation
(“DRPT”), as such MOA may be further amended from time to time, which MOA delegated to
NVTC the authority to select and administer the implementation of multimodal
transportation improvements to the roadways and associated transportation and transit
facilities (“Components” as used in the MOA and, for purposes of this Agreement, “Projects”)
in the vicinity of the portion of I-66 beginning at the intersection of I-66 and I-495 (the
“Beltway”) and ending at U.S. Route 29 in the Rosslyn area of Arlington County, Virginia(said
portion of I-66 being referred to as the “Facility”) which Projects are designed to attain the
Improvement Goals defined in the MOA as amended, specifically, to (1) maximize person
throughput in the Corridor; and (2) implement multimodal improvements to: (i) improve
mobility along the Corridor, (ii) support new, diverse travel choices, and (iii) enhance
transportation safety and travel reliability, all of which are reasonably expected to benefit
the toll paying users of the Facility;
Attachment 2
117
Form Version 2026-07-01 2
WHEREAS, the MOA provides for the transfer to and use by NVTC of a portion of the
funds collected from the CTB’s tolling of the Facility and the I-66 Outside the Beltway Express
Lanes concessionaire’s payments to the Commonwealth (hereinafter referred to for
purposes of this Agreement as “Toll Revenue”) for the implementation of Projects selected
by NVTC and approved by the CTB, as well as operating costs related to Projects, and NVTC
financing and debt service payments and any allowable costs related thereto;
WHEREAS, based on information provided by Recipient Entity in response to NVTC’s
call for Projects, NVTC has determined the Project set forth and described on Appendix A to
this Agreement satisfies the requirements of Section II.B.1 of the MOA, and the provisions of
§ 33.2-309 of the Code of Virginia, 1950, as amended , and the CTB has approved use of Toll
Revenue to fund such Project;
WHEREAS, the Toll Revenue to be provided by NVT C described in Appendix B have
been duly authorized and directed by Recipient Entity to finance the Project, and the
Recipient Entity is authorized to enter into this Agreement and has authorized execution of
it on its behalf;
WHEREAS, NVTC agrees that Recipient Entity will, itself or through its contractors or
agents, design, construct, acquire and/or operate the Project or perform such other specific
work for the Project and Recipient Entity agrees that it will perform or have performed, such
work on the terms and conditions set forth in this Agreement and the Appendices appended
thereto;
WHEREAS, both parties have concurred in the Recipient Entity ’s administration,
performance, and completion of the Project on the terms and conditions set forth in this
Agreement and its Appendices and in accordance with all applicable federal, state, and local
laws and regulations; and
WHEREAS, NVTC’s governing body and Recipient Entity’s governing body have each
authorized that their respective designee(s) execute this Agreement on their respective
behalf(s) as evinced by copies of each such entity’s resolution or clerk’s minutes which are
appended hereto as Appendix E;
NOW THEREFORE, in consideration of the promises made mutual covenants , and
agreements contained herein, the parties hereto agree as follows:
A. Recipient Entity’s Obligations
Recipient Entity shall:
l. Complete or perform allsaid work as described in Appendix A, advancing such
work diligently and ensuring that all work is completed in accordance with all
applicable federal, state, and local law s and regulations , and all terms and
Attachment 2
118
Form Version 2026-07-01 3
conditions of this Agreement. Recipient Entity expressly agrees that, for non-
debt financed Projects, Recipient Entity must obligate the Toll Revenue to the
cost of the Project within two (2) fiscal years and to expend the Toll Revenue
within five (5) fiscal years of the first day of the fiscal year for which the funds
for the Project were allocated by the CTB unless an extension has been
approved by NVTC and the CTB. In the event an extension is not approved by
the Commissions and the CTB, then Recipient Entity shall release or return to
NVTC all unexpended funds no later than 90 days after receipt of NVTC’s
written request for such release or return. If the Project i s cancelled at any
time, for any reason, before or after work has commenced, Recipient Entity
shall immediately notify NVTC in writing of the cancellation and shall
immediately cease to incur Project costs. Concurrently, and in no event later
than 90 days after the date of cancellation, Recipient Entity shall refund to
NVTC 100% of all funds provided for the Project unless ot herwise approved
by NVTC, and the CTB as necessary, and set forth in an amendment to this
Agreement.
2. Ensure that all work performed or to be performed under this Agreement is in
accordance with the Project Description Sheets attached to Appendix A.
3. Perform or have performed, and remit all payment requisitions and other
requests for funding for design and engineering, including all environmental
work, right-of-way acquisition, construction, contract administration, testing
services, inspection services, capital asset acquisitions, or operations, and all
allowable expenses for the Project, as is required by this Agreement and that
may be necessary for completion of the Project.
4. Not use the NVT C Toll Revenues specified on Appendix B to pay any Project
cost if the MOA or any applicable provision of law does not permit such Project
cost to be paid with NVT C Toll Revenue . For transit, bikeshare and other
operations projects that generate revenues, the Recipient Entity shall deduct
revenues earned from Project operations from any requests for
reimbursement of operating expenses.
5. Recognize that, if the Project is anticipated to receive additional ATI funds in a
future funding round as reflected in Appendix B to this Agreement, Recipient
Entity may only pursue reimbursement of eligible Project expenses from ATI
funds that have been allocated to the Project to date by the CTB. Recipient
Entity is not entitled to the anticipated additional ATI funds unless and until
they are allocated to the Project by the CTB. Each allocation of ATI funds
carries its own requirement that the Recipient obligate the ATI funds to the
cost of the Project within two (2) fiscal years and expendthe ATI funds within
five (5) fiscal years of the first day of the fiscal year for which the funds were
Attachment 2
119
Form Version 2026-07-01 4
allocated by the CTB unless an extension has been approved by the
Commissions and the CTB. Nothing herein, however, shall prohibit Recipient
Entity from providing its own funds to advance the Project prior to the CTB
allocating anticipated funding, and from later, once the CTB has allocated the
anticipated funds, requesting reimbursement from NVTC for having advance
funded the Project.
6. Acknowledge that NVTC’s Executive Director will periodically update NVTC’s
cash flow estimates with the objective toward keeping those estimates
accurate throughout the life of the Project. Recipient Entity shall provide all
information required by NVTC so as to ensureand facilitate accurate cash flow
estimates and accurate updates to those cash flow estimates throughout the
life of the Project as described in Appendix B.
7. Provide to NVT C requests for payment consistent with Appendix B and the
most recently approved NVT C cash flow estimates that include NVTC’s
standard payment requisition(s), containing detailed summaries of actual
Project costs incurred with supporting documentation as required by NVTC
and that certify all such costs were incurred in the performance of work for
the Project as authorized by this Agreement . Each payment requisition shall
be in substantially the same form as set forth in Appendix C of this Agreement,
include a manual signature of the individual authorized to submit the request,
and be submitted electronically to reimbursements@novatransit.org. If
approved by NVT C, Recipient Entity can expect to receive payment within
forty-five (45) business days upon receipt by NVTC. Approved payments will
be made by means of electronic transfer of funds from NVT C to or for the
account of Recipient Entity.
8. Promptly n otify NVTC’s Executive Director of any additional Project costs
resulting from unanticipated circumstances which costs exceed the amount
allocated by the CTB for the Project, and provide to NVTC detailed estimates
of additional costs associated with those circumstances . Recipient Entity
understands that it will be within NVT C’s sole discretion, subject to CTB
approval, whether to seek and to provide any additional funding to the Project
in such circumstances and that NVT C will do so only in accordance with
NVTC’s approved Project selection process and upon formal action and
approval by NVT C. Recipient Entity shall timely provide to NVT C a complete
and accurate update to Appendix B if NVT C and the CTB approve funding of
any additional Project costs for the Project under this Paragraph.
9. Submit a final reimbursement request for Project expenses and release or
return any unexpended funds to NVTC no later than 90 days after Project
completion. The final reimbursement request shall be accompanied by a
Attachment 2
120
Form Version 2026-07-01 5
certification to NVTC that Recipient Entity adhered to all applicable laws and
regulations and all requirements of this Agreement.
10. Should Recipient Entity be required to provide matching funds in order to
proceed or complete the funding necessary for the Project, Recipient Entity
shall certify to NVTC that all such matching funds have been either authorized
and/or appropriated by Recipient Entity’ s governing body or have been
obtained through another, independent funding source.
11. Maintain complete and accurate financial records relative to the Project for all
time periods as may be required by the Virginia Public Records Act and by all
other applicable state or federal records retention laws or regulations, unless
superseded by the laws that govern Recipient Entity and provide copies of any
such financial records to NVTC, free of charge, upon request.
12. Maintain all original conceptual drawings and renderings, architectural and
engineering plans, site plans, inspection records, testing records, and as built
drawings for the Project for the time periods required by the Virginia Public
Records Act and any other applicable records retention laws or regulations ,
unless superseded by the laws that govern Recipient Entity ; and provide to
NVTC copies of all such drawings and plans free of charge, upon request.
13. Reimburse NVTC for all NVTC Toll Revenue (with interest earned at the rate
earned by NVTC) that Recipient Entity misapplied or used in contravention of
the MOA or any term or condition of this Agreement.
14. Name NVTC and its Bond Trustee , the Commonwealth of Virginia, the CTB,
VDOT, DRPT and their officers, employees and agents, or require that all
Recipient Entity ’s contractors name NVTC and its Bond Trustee, the
Commonwealth of Virginia, the CTB, VDOT, DRPT and their officers, employees
and agents as additional insureds on any insurance policy issued for the work
to be performed and/or services to be provided by or on behalf of Recipient
Entity for the Project, and present NVTC with satisfactory evidence thereof
before any work on the Project commences or continues, so that they are
protected from and against any losses actually suffered or incurred, except for
losses to the extent caused by the negligence or willful misconduct of such
entity or person, from third party claims that are directly related to or arise
out o f: (a) any failure by Recipient Entity to comply with, to observe or to
perform in any material respect any of the covenants, obligations, agreements,
terms or conditions in this Agreement, or any breach by Recipient Entity of its
representations or warranties in this Agreement; (b) any actual or willful
misconduct or negligence ofRecipient Entity, its employees or agents in direct
connection with the Projects; (c) any actual or alleged patent or copyright
Attachment 2
121
Form Version 2026-07-01 6
infringement or other actual or alleged improper appropriation or use of trade
secrets, patents proprietary information, know-how, trademarked or service-
marked materials, equipment devices or processes, copyright rights or
inventions by Recipient Entity in direct connection with the Project; (d)
inverse condemnation, trespass, nuisance or similar taking of or harm to real
property committed or caused by Recipient Entity, its employees or agents in
direct connection with the Project; or (e) any assumed liabilities. Recipient
Entity will contractually require its contractors, subcontractors, vendors and
other third parties working or performing services related to any Project
funded by NVTC Toll Revenue to indemnify NVTC and its Bond Trustee , the
Commonwealth of Virginia, the CTB, VDOT, DRPT, and their officers,
employees and agents from the same losses.
15. Recipient Entity covenants and agrees it will comply with all applicable
requirements of state and federal laws relating to anti -discrimination,
including but not limited to Titles VI and VII of the Civil Rights Act of 1964, as
amended, and the Americans with Disabilities Act, and shall contractually
require the same of all contractors, subcontractors, vendors, and recipients of
any funding. Recipient Entity recognizes the importance of the participation of
minority, women-owned and small businesses through the federal and local
Disadvantaged Business Enterprise programs and will abide by such
programs in implementing the Project. Recipient Entity shall comply with all
applicable federal requirements, including those applicable to highways that
are part of the National Highway System.
16. Give notice to NVTC that Recipient Entity may use NVTC Toll Revenue to pay
outside legal counsel services (as opposed to utilizing the services of its own
in-house counsel or NVT C’s in-house legal counsel) in connection with the
work performed under this Agreement so as to ensure that no conflict of
interest may arise from any such representation.
17. Provide certification to NVT C, that upon final payment to all contractors for
the Project, Recipient Entity will use the Project for its intended purposes for
the duration of the Project’s useful life. Under no circumstances will NVTC be
considered responsible or obligated to operate and/or maintain the Project
after its completion.
18. Comply with all requirements of the Virginia Public Procurement Act and
other applicable Virginia Code provisions , or local ordinances which govern
the letting of public contracts , unless supe rseded by the laws that govern
Recipient Entity.
Attachment 2
122
Form Version 2026-07-01 7
19. Acknowledge that if the Project is being funded in whole or in part by NVT C
Bond Proceeds, comply with the applicable tax covenants as may be attached
as Appendix D.
20. Acknowledge that if Recipient Entity expects and/or intends that the Project
is to be submitted for acceptance by the Com monwealth into its system that
Recipient Entity agrees to comply with VDOT’s “Standards, Requirements and
Guidance” applicable to the Project.
21. Recognize that Recipient Entity is solely responsible for obtaining all permits,
permissions and regulatory approval necessary to develop, construct, operate
and/or maintain the Project, including but not limited to , obtaining all
required VDOT and local land use permits, applications for zoning approvals,
and regulatory approvals.
22. Recognize that if Recipient Entity is funding the Project, in whole or in part,
with federal and/or state funds, in addition to NVT C Toll Revenue and/or
NVTC Bond Proceeds, that Recipient Entity will need to comply with all federal
and Commonwealth funding requirements, including but not limited to, the
completion and execution of VDOT’s Standard Project Administration
Agreement and acknowledge that NVTC will not be a partyor signatory to that
agreement; nor will NVTC have any obligation to comply with the
requirements of that agreement.
23. Provide quarterly (January 30th, April 30th, July 30th, and October 30th) written
status updates on all approved, active Projects to NVTC on all items described
in the Recipient’s Project application including progress toward milestones
and/or statistics including such information as ridership and/or percent
completion.
24. Assist NVTC in the preparation of the annual report to the CTB required by the
MOA, by providing data in regard to the Project performance measures
identified on Appendix A of this Agreement, as well as other reporting as may
be requested or required by NVTC.
25. To the greatest extent possible, i nclude the Commuter Choice logo and
recognition of Project funding source as being from the Commuter Choice
Program, in a form approved by NVTC , in all p ublicly-available materials,
documents, websites, etc.
B. NVTC’s Obligations
NVTC shall:
Attachment 2
123
Form Version 2026-07-01 8
l. Provide to Recipient Entity the funding authorized by NVT C for design work,
engineering, including all environmental work, all right-of-way acquisition,
inspection services, testing services, construction, and/or capital asset
acquisition(s), and operations, and all allowable expenses, net of any revenue
generated by the Project , on a reimbursement basis as set forth in this
Agreement and as specified in the Project Budget and Cash Flow contained in
Appendix B to this Agreement or the most updated amendment thereto.
2. If the Project is anticipated to receive additional NVTC Toll Revenuein a future
funding round as reflected in Appendix B to this Agreement, include the funds
as an off -the-top deduction within the proposed funding allocations for the
indicated fiscal year that are advanced for the Commission’s and CTB’s
adoption and approval, subject to the availability of NVTC Toll Revenue to
support the award and provided that the Recipient Entity continues to
advance Project implementation in a manner consistent with this Agreement.
3. Assign a Program Coordinator for the Project. NVTC’s Program Coordinator
will be responsible for monitoring the Project on behalf of NVT C so as to
ensure compliance with this Agreement and the MOA, and all NVT C’s
requirements and for overseeing, managing, reviewing , and processing, in
consultation with NVT C’s Executive Director and its Director of Finance and
Administration (DFA), all payment requisitions submitted by Recipient Entity
for the Project. NVTC’s Program Coordinator will have no independent
authority to direct changes or make additions, modifications , or revisions to
the Project Scope of Work as set forth on Appendix A or to the Project Budget
and Cash Flow as set forth on Appendix B.
4. Route to NVTC’s assigned Program Coordinator all Recipient Entity’s payment
requisitions, containing detailed summaries of actual Project costs incurred
which are in substantially the same form as shown on Appendix C submitted
to NVT C for the Project. After submission to NVT C, NVTC’s Program
Coordinator will conduct an initial review of all payment requisitions and
supporting documentation for the Project in order to determine the
submission’s sufficiency. NVTC’s Program Coordinator will then make a
recommendation to the NVT C’s DFA and Executive Director whether to
authorize payment, refuse payment, or seek additional information from
Recipient Entity. If the payment requisition is sufficient as submitted, payment
will be made within forty-five (45) business days from receipt. If the payment
requisition is deemed insufficient, within twenty (20) business days from
receipt, NVTC will notify Recipient Entity in writing and set forth the reasons
why the payment requisition was declined or why and whatspecific additional
information is needed for processing the payment request . Payment will be
withheld until all deficiencies identified by NVTC have been corrected. Under
Attachment 2
124
Form Version 2026-07-01 9
no circumstances will NVTC authorize payment for any work performed by or
on behalf of Recipient Entity that is not in conformity with the requirements
of this Agreement or the MOA.
5. Route all Recipient Entity’ s supplemental requests for funding from NVT C
under Paragraphs A.5 and A.8 of this Agreement to NVTC’s Executive Director.
NVTC’s Executive Director will initially review those requests and all
supporting documentation with NVTC’s DFA. After such initial review, NVTC’s
Executive Director will make a recommendation to NVT C’s Executive
Committee for its independent consideration and review of whether CTB
approval of, and an allocation for, supplemental funding should be sought .
NVTC’s Executive Committee will thereafter make a recommendation on any
such request to NVT C for final determination by NVT C, and approval by the
CTB.
6. Conduct periodic compliance reviews scheduled in advance for the Project so
as to determine whether the work being performed remains within the scope
of this Agreement , the MOA , and other applicable law . Such compliance
reviews may entail review of Recipient Entity ’s financial records for the
Project and on-site inspections.
7. Acknowledge that if, as a result of NVTC’s review of any payment requisition
or of a ny NVTC compliance review, NVT C staff determines that Recipient
Entity has misused or misapplied any NVTC Toll Revenue in derogation of this
Agreement or in contravention of the MOA or applicable law, NVTC staff will
promptly advise NVTC’s Executive Director and will advise Recipient Entity’s
designated representative in writing. Recipient Entity will thereafter have
thirty (30) days to respond in writing to NVT C’s initial findings. NVT C’s
Executive Director will review Recipient Entity ’s response and make a
recommendation to the NVTC Executive Committee which will, in turn, make
a recommendation to NVTC for a final determination. Pending final resolution
of the matter, NVTC will withhold further funding of the Project. If NVTC makes
a final determination that Recipient Entity has misused or misapplied funds in
contravention of this Agreement, the MOA, or other applicable law, NVTC will
cease further funding for the Project and will seek reimbursement from
Recipient Entity of all funds previously remitted by NVT C (with interest
earned at the rate earned by NVT C) which were misapplied or misused by
Recipient Entity . Nothing herein shall, however, be construed as denying ,
restricting or limiting the pursuit of either party’s legal rights or available legal
remedies.
8. Make guidelines available to Recipient Entity to assist the parties in carrying
out the terms of this Agreement in accordance with applicable law.
Attachment 2
125
Form Version 2026-07-01 10
9. Upon recipient’s final payment to all contractors, retain copies of all contracts,
financial records , design, construction , and as-built project drawings and
plans for the Project for the time periods required by the Virginia Public
Records Act and as may be required by other applicable records retention laws
and regulations.
C. Term
1. This Agreement shall be effective upon adoption and execution by both parties
and, unless terminated in accordance with the express provisions hereof, shall
continue until completion of the Project and final payment of Toll Revenue
hereunder, with the exception of those provisions which, by their express
terms, survive termination.
2. Recipient Entity may terminate this Agreement , for cause, in the event of a
material breach by NVTC of this Agreement. If so terminated, NVT C shall pay
for all Project costs incurred through the date of termination and all
reasonable costs incurred by Recipient Entity to terminate all Project related
contracts. The Virginia General Assembly’s failure to appropriate funds , or
CTB’s failure to allocate, or VDOT’s failure to distribute to NVTC as described
in paragraph F of this Agreement shall not be considered material breaches of
this Agreement by NVTC. Before initiating any proceedings to terminate under
this Paragraph, Recipient Entity shall give NVTC sixty (60) days written notice
of any claimed material breach of this Agreement; thereby allowing NVT C an
opportunity to investigate and cure any such alleged breach.
3. NVTC may terminate this Agreement , for cause , resulting from Recipient
Entity’s material breach of this Agreement. If so terminated, Recipient Entity
shall refund to NVT C all funds NVT C provided to Recipient Entity for t he
Project (including interest earned at the rate earned by NVT C). NVTC will
provide Recipient Entity with sixty (60) days written notice that NVTC is
exercising its rights to terminate this Agreement and the reasons for
termination. Prior to termination, Recipient Entity may request that NVT C
excuse Recipient Entity from refunding all funds NVTC provided to Recipient
Entity for the Project based upon Recipient Entity’s substantial completion of
the Project or severable portions thereof; and NVTC may, in its sole discretion,
excuse Recipient Entity from refunding all or a portion of the funds NVT C
provided to Recipient Entity for the Project. No such request to be excused
from refunding will be allowed where Recipient Entity has either misused or
misapplied NVTC funds in contravention of applicable law.
4. Upon termination and payment of all eligible expenses as set forth in
Paragraph C.3 above, Recipient Entity will release or return to NVT C all
Attachment 2
126
Form Version 2026-07-01 11
unexpended NVT C Toll Revenue with interest earned at the rate earned by
NVTC no later than sixty (60) days after the date of termination.
D. Dispute
In the event of a dispute under this Agreement, the parties agree to meet and confer
in order to ascertain if the dispute can be resolved informally without the need of a
third party or judicial intervention. NVTC’s Executive Director and Recipient Entity’s
Chief Executive Officer or Chief Administrative Officer shall be authorized to conduct
negotiations on behalf of their respective entities. If a resolution of the dispute is
reached via a meet and confer dispute resolution method, it sha ll be presented to
NVTC and to Recipient Entity’s governing body for formal confirmation and approval.
If no satisfactory resolution can be reached via the meet and confer method, either
party is free to pursue whatever remedies it may have at law, including all judicial
remedies.
E. NVTC’s Entitlement to Refund of Value of Project Assets
Recipient Entity agrees to use the real property and appurtenances and fixtures
thereto, capital assets, equipment and all other transportation facilities that are part
of the Project and funded by NVT C Toll Revenues under this Agreement ( “Project
Assets”) for the designated transportation purposes of the Project under this
Agreement and in accordance with applicable law throughout the useful life of each
Project Asset. In the event that Recipient Entity fails to use any of the Project Assets
funded under this Agreement for the transportation purposes as authorized by this
Agreement or applicable law throughout its respective useful life, Recipient Entity
shall refund to NVT C, with interest at the rate earned by NVT C, the amount of the
value of each of the Project Assets, whether any such Project Asset may have
depreciated or appreciated throughout its respective useful life, proportionate to the
amount of the cost of the Project Asset funded by NVTC under this Agreement . If
Recipient Entity refuses or fails to refund said monies to NVT C, NVTC may recover
the proportionate value from Recipient Entity by pursuit of any remedies available to
NVTC, including but not limited to NVT C’s withholding of commensurate amounts
from future distributions of NVTC Toll Revenue to Recipient Entity. In no event shall
the Recipient Entity be obligated to refund the aforesaid value to both NVTC and the
Commonwealth.
F. Appropriations Requirements
1. Nothing herein shall require or obligate any party to commit or obligate funds
to the Project beyond those funds that have been duly authorized and
appropriated by their respective governing bodies.
Attachment 2
127
Form Version 2026-07-01 12
2. The parties acknowledge that all Toll Revenues provided by NVTC pursuant to
the MOA are subject to appropriation by the Virginia General Assembly ,
allocation by the CTB and distribution by VDOT. The parties further
acknowledge that NVTC’s obligations under this Agreement are subject to such
funds being appropriated by the General Assembly , allocated by the CTB and
distributed by VDOT to NVTC.
G. Notices
All notices under this Agreement to either party shall be in writing and forwarded to
the other party by U.S. mail, care of the following authorized representatives:
1) to: NVTC, to the attention of its Executive Director;
2300 Wilson Blvd., Suite 230
Arlington, VA 22201
2) to: Fairfax County Department of Transportation,
to the attention of Gregg Steverson, Director
4050 Legato Road, Suite 400
Fairfax, VA 22033
H. Assignment
This Agreement shall not be assigned by either party unless express written consent
is given by the other party.
I. Modification or Amendment
This Agreement may be modified, in writing, upon mutual agreement of both parties.
J. No Personal Liability or Creation of Third Party Rights
This Agreement shall not be construed as creating any personal liability on the part
of any officer, employee, or agent of the parties; nor shall it be construed as giving any
rights or benefits to anyone other than the parties hereto.
K. No Agency
Recipient Entity represents that it is not acting as a partner or agent of NVTC; and
nothing in this Agreement shall be construed as making any party a partner or agent
with any other party.
Attachment 2
128
Form Version 2026-07-01 13
L. Sovereign Immunity
The provisions of this Agreement shall not be construed as a waiver of either party’s
sovereign immunity rights.
M. Incorporation of Recitals
The recitals to this Agreement are hereby incorporated into this Agreement and are
expressly made a part hereof. The parties to this Agreement acknowledge and agree
that such recitals are true and correct.
N. Mutual Preparation and Fair Meaning
The parties acknowledge that this Agreement has been prepared on behalf of all
parties thereto and shall be construed in accordance with its fair meaning and not
strictly construed for or against either party.
O. Governing Law
This Agreement is governed by the laws of the Commonwealth of Virginia.
IN WITNESS WHEREOF, each party hereto has caused this Agreement to be executed
as of the day, month, and year first herein written by their duly authorized
representatives.
Northern Virginia Transportation Commission
By: _________________________________
Katherine A. Mattice
NVTC Executive Director
Date: _________________________________
Fairfax County
By: _________________________________
_________________________________ (Print Name)
_________________________________ (Title)
Attachment 2
129
Form Version 2026-07-01 14
Date: _________________________________
Attachment 2
130
Form Version 2026-07-01
Appendix A –Project Description and Performance Measures
Project Number: 059-62-27
Project Title: Route 698: Stringfellow Road Park -and-Ride to the Pentagon Express Service
(Continuation)
Recipient Entity: Fairfax County
Toll Revenue Funds: $1,684,916
Project Description
This project would fund the continued operation of Fairfax Connector Route 698, an
express bus service operating between Stringfellow Road Park and Ride Lot, Vienna
Metro Station and the Pentagon.
Project opening year inbound AM peak period increase in person throughputthat was the
basis for project evaluation persons.: 297
Performance Measures and Reporting
Performance Measures
Report morning peak-period and daily ridership for the Commuter Choice funded trips
on the route. DRPT funded trips on the route should be excluded from the totals.
Collection Period
Data should be collected over a two-week period in March or April. Chosen period
should not include any holiday periods and the weekday average should be calculated
from Tuesdays, Wednesdays, and Thursdays during the period.
Reporting
Report data to NVTC in a technical memorandum outlining the following:
1. Data collection methodology
2. Data collection dates
3. Results – data
4. Notes (if necessary)
Reports are due each July 1 or as otherwise identified by NVTC. Submit reports by email
to commuterchoice@novatransit.org.
Attachment 2
131
APPENDIX B - PROJECT BUDGET & CASH FLOW
Project Title: Project Number: 059-62-27
Recipient Entity: Revision Number:
Recipient Contact: Revision Date:
Name
Email
Phone
TABLE B-1 PROJECT BUDGET
Funding Sources
Project Type
Total Project
Budget
Approved NVTC
Toll Revenue
Funds
Other Funds (if
applicable)
Study
Preliminary Engineering (PE)
Right-of-Way (ROW)
Construction (CN)
Capital Asset Acquisition
Other-Marketing 60,000 60,000
Transit Service 1,710,438 1,624,916 85,522
Other Operations
Total 1,770,438$ 1,684,916$ 85,522$
TABLE B-2 NVTC PROJECT FUNDS PROGRAMMED
Project Type FY2027
Study -$
Preliminary Engineering (PE) -
Right-of-Way (ROW) -
Construction (CN)
Capital Asset Acquisition
Other-Marketing 60,000
Transit Service 1,624,916
Other Operations -
Total 1,684,916$
TABLE B-3 QUARTERLY PROJECT CASH FLOW FOR NVTC TOLL REVENUE FUNDS ONLY
Quarter FY2027 FY2028 FY2029 FY2030 FY2031
1st, September 30th 210,615$ 210,614$
2nd, December 31st 210,615$ 210,614$
3rd, March 31st 210,615$ 210,614$
4th, June 30th 210,615$ 210,614$
Total 842,460$ 842,456$ -$ -$ -$
Recipient Entity Northern Virginia Transportation Commission
Signature Signature Signature
NVTC Executive Director NVTC Director of Finance and Administration
Title Title Title
Date Date Date
Print name of person signing
_______________________________
_______________________________
Fare revenue
This attachment is certified and made an official attachment to the Standard Project Agreement document by the parties of this agreement.
_______________________________
_______________________________
Fairfax County
Route 698: Stringfellow Road Park-and-Ride to the
Pentagon Express Service (Continuation)
Brent Riddle
michael.riddle@fairfaxcounty.gov
703-877-5659
Source of Other Funds
Attachment 2
132
Revised 2026-07-01
Attachment 2
133
Form Version 2026-07-01 1
Standard Project Agreement for Transform 66: Inside the Beltway Project, Toll
Revenue Funding of Projects and Administration
Between the Northern Virginia Transportation Commission and
Fairfax County
NVTC Project Number: 059-61-27
NVTC Project Name: Route 699: Monument Drive Park-And-Ride to Downtown Washington
D.C. Express Service (Continuation)
This Standard Project Agreement for Transform 66: Inside the Beltway Project, Toll
Revenue Funding of Projects and Administration (“this Agreement”) is made and executed
in duplicate on _____ ___________________ by and between the Northern Virginia
Transportation Commission (“NVTC”) and Fairfax County (“Recipient Entity”).
WITNESSETH
WHEREAS, NVTC is a political subdivision of the Commonwealth of Virginia
created by the General Assembly in accordance with the Transportation District Act of
1964, §§ 33.2-1900 et seq. of the Code of Virginia, 1950, as amended, and is authorized to
enter into this Agreement by the provisions of § 33.2-1915 and 1919 of the Code of Virginia,
1950, as amended;
WHEREAS, NVTC entered into a Memorandum of Agreement Transform 66: Inside
the Beltway Project (“MOA”), as most recently amended on May 19, 2021, with the
Commonwealth Transportation Board (“CTB”), and the Virginia Department of
Transportation (“VDOT”), and the Virginia Department of Rail and Public Transportation
(“DRPT”), as such MOA may be further amended from time to time, which MOA delegated to
NVTC the authority to select and administer the implementation of multimodal
transportation improvements to the roadways and associated transportation and transit
facilities (“Components” as used in the MOA and, for purposes of this Agreement, “Projects”)
in the vicinity of the portion of I-66 beginning at the intersection of I-66 and I-495 (the
“Beltway”) and ending at U.S. Route 29 in the Rosslyn area of Arlington County, Virginia(said
portion of I-66 being referred to as the “Facility”) which Projects are designed to attain the
Improvement Goals defined in the MOA as amended, specifically, to (1) maximize person
throughput in the Corridor; and (2) implement multimodal improvements to: (i) improve
mobility along the Corridor, (ii) support new, diverse travel choices, and (iii) enhance
transportation safety and travel reliability, all of which are reasonably expected to benefit
the toll paying users of the Facility;
Attachment 2
134
Form Version 2026-07-01 2
WHEREAS, the MOA provides for the transfer to and use by NVTC of a portion of the
funds collected from the CTB’s tolling of the Facility and the I-66 Outside the Beltway Express
Lanes concessionaire’s payments to the Commonwealth (hereinafter referred to for
purposes of this Agreement as “Toll Revenue”) for the implementation of Projects selected
by NVTC and approved by the CTB, as well as operating costs related to Projects, and NVTC
financing and debt service payments and any allowable costs related thereto;
WHEREAS, based on information provided by Recipient Entity in response to NVTC’s
call for Projects, NVTC has determined the Project set forth and described on Appendix A to
this Agreement satisfies the requirements of Section II.B.1 of the MOA, and the provisions of
§ 33.2-309 of the Code of Virginia, 1950, as amended , and the CTB has approved use of Toll
Revenue to fund such Project;
WHEREAS, the Toll Revenue to be provided by NVT C described in Appendix B have
been duly authorized and directed by Recipient Entity to finance the Project, and the
Recipient Entity is authorized to enter into this Agreement and has authorized execution of
it on its behalf;
WHEREAS, NVTC agrees that Recipient Entity will, itself or through its contractors or
agents, design, construct, acquire and/or operate the Project or perform such other specific
work for the Project and Recipient Entity agrees that it will perform or have performed, such
work on the terms and conditions set forth in this Agreement and the Appendices appended
thereto;
WHEREAS, both parties have concurred in the Recipient Entity ’s administration,
performance, and completion of the Project on the terms and conditions set forth in this
Agreement and its Appendices and in accordance with all applicable federal, state, and local
laws and regulations; and
WHEREAS, NVTC’s governing body and Recipient Entity’s governing body have each
authorized that their respective designee(s) execute this Agreement on their respective
behalf(s) as evinced by copies of each such entity’s resolution or clerk’s minutes which are
appended hereto as Appendix E;
NOW THEREFORE, in consideration of the promises made mutual covenants , and
agreements contained herein, the parties hereto agree as follows:
A. Recipient Entity’s Obligations
Recipient Entity shall:
l. Complete or perform allsaid work as described in Appendix A, advancing such
work diligently and ensuring that all work is completed in accordance with all
applicable federal, state, and local law s and regulations , and all terms and
Attachment 2
135
Form Version 2026-07-01 3
conditions of this Agreement. Recipient Entity expressly agrees that, for non-
debt financed Projects, Recipient Entity must obligate the Toll Revenue to the
cost of the Project within two (2) fiscal years and to expend the Toll Revenue
within five (5) fiscal years of the first day of the fiscal year for which the funds
for the Project were allocated by the CTB unless an extension has been
approved by NVTC and the CTB. In the event an extension is not approved by
the Commissions and the CTB, then Recipient Entity shall release or return to
NVTC all unexpended funds no later than 90 days after receipt of NVTC’s
written request for such release or return. If the Project i s cancelled at any
time, for any reason, before or after work has commenced, Recipient Entity
shall immediately notify NVTC in writing of the cancellation and shall
immediately cease to incur Project costs. Concurrently, and in no event later
than 90 days after the date of cancellation, Recipient Entity shall refund to
NVTC 100% of all funds provided for the Project unless ot herwise approved
by NVTC, and the CTB as necessary, and set forth in an amendment to this
Agreement.
2. Ensure that all work performed or to be performed under this Agreement is in
accordance with the Project Description Sheets attached to Appendix A.
3. Perform or have performed, and remit all payment requisitions and other
requests for funding for design and engineering, including all environmental
work, right-of-way acquisition, construction, contract administration, testing
services, inspection services, capital asset acquisitions, or operations, and all
allowable expenses for the Project, as is required by this Agreement and that
may be necessary for completion of the Project.
4. Not use the NVT C Toll Revenues specified on Appendix B to pay any Project
cost if the MOA or any applicable provision of law does not permit such Project
cost to be paid with NVT C Toll Revenue . For transit, bikeshare and other
operations projects that generate revenues, the Recipient Entity shall deduct
revenues earned from Project operations from any requests for
reimbursement of operating expenses.
5. Recognize that, if the Project is anticipated to receive additional ATI funds in a
future funding round as reflected in Appendix B to this Agreement, Recipient
Entity may only pursue reimbursement of eligible Project expenses from ATI
funds that have been allocated to the Project to date by the CTB. Recipient
Entity is not entitled to the anticipated additional ATI funds unless and until
they are allocated to the Project by the CTB. Each allocation of ATI funds
carries its own requirement that the Recipient obligate the ATI funds to the
cost of the Project within two (2) fiscal years and expendthe ATI funds within
five (5) fiscal years of the first day of the fiscal year for which the funds were
Attachment 2
136
Form Version 2026-07-01 4
allocated by the CTB unless an extension has been approved by the
Commissions and the CTB. Nothing herein, however, shall prohibit Recipient
Entity from providing its own funds to advance the Project prior to the CTB
allocating anticipated funding, and from later, once the CTB has allocated the
anticipated funds, requesting reimbursement from NVTC for having advance
funded the Project.
6. Acknowledge that NVTC’s Executive Director will periodically update NVTC’s
cash flow estimates with the objective toward keeping those estimates
accurate throughout the life of the Project. Recipient Entity shall provide all
information required by NVTC so as to ensureand facilitate accurate cash flow
estimates and accurate updates to those cash flow estimates throughout the
life of the Project as described in Appendix B.
7. Provide to NVT C requests for payment consistent with Appendix B and the
most recently approved NVT C cash flow estimates that include NVTC’s
standard payment requisition(s), containing detailed summaries of actual
Project costs incurred with supporting documentation as required by NVTC
and that certify all such costs were incurred in the performance of work for
the Project as authorized by this Agreement . Each payment requisition shall
be in substantially the same form as set forth in Appendix C of this Agreement,
include a manual signature of the individual authorized to submit the request,
and be submitted electronically to reimbursements@novatransit.org. If
approved by NVT C, Recipient Entity can expect to receive payment within
forty-five (45) business days upon receipt by NVTC. Approved payments will
be made by means of electronic transfer of funds from NVT C to or for the
account of Recipient Entity.
8. Promptly n otify NVTC’s Executive Director of any additional Project costs
resulting from unanticipated circumstances which costs exceed the amount
allocated by the CTB for the Project, and provide to NVTC detailed estimates
of additional costs associated with those circumstances . Recipient Entity
understands that it will be within NVT C’s sole discretion, subject to CTB
approval, whether to seek and to provide any additional funding to the Project
in such circumstances and that NVT C will do so only in accordance with
NVTC’s approved Project selection process and upon formal action and
approval by NVT C. Recipient Entity shall timely provide to NVT C a complete
and accurate update to Appendix B if NVT C and the CTB approve funding of
any additional Project costs for the Project under this Paragraph.
9. Submit a final reimbursement request for Project expenses and release or
return any unexpended funds to NVTC no later than 90 days after Project
completion. The final reimbursement request shall be accompanied by a
Attachment 2
137
Form Version 2026-07-01 5
certification to NVTC that Recipient Entity adhered to all applicable laws and
regulations and all requirements of this Agreement.
10. Should Recipient Entity be required to provide matching funds in order to
proceed or complete the funding necessary for the Project, Recipient Entity
shall certify to NVTC that all such matching funds have been either authorized
and/or appropriated by Recipient Entity’ s governing body or have been
obtained through another, independent funding source.
11. Maintain complete and accurate financial records relative to the Project for all
time periods as may be required by the Virginia Public Records Act and by all
other applicable state or federal records retention laws or regulations, unless
superseded by the laws that govern Recipient Entity and provide copies of any
such financial records to NVTC, free of charge, upon request.
12. Maintain all original conceptual drawings and renderings, architectural and
engineering plans, site plans, inspection records, testing records, and as built
drawings for the Project for the time periods required by the Virginia Public
Records Act and any other applicable records retention laws or regulations ,
unless superseded by the laws that govern Recipient Entity ; and provide to
NVTC copies of all such drawings and plans free of charge, upon request.
13. Reimburse NVTC for all NVTC Toll Revenue (with interest earned at the rate
earned by NVTC) that Recipient Entity misapplied or used in contravention of
the MOA or any term or condition of this Agreement.
14. Name NVTC and its Bond Trustee , the Commonwealth of Virginia, the CTB,
VDOT, DRPT and their officers, employees and agents, or require that all
Recipient Entity ’s contractors name NVTC and its Bond Trustee, the
Commonwealth of Virginia, the CTB, VDOT, DRPT and their officers, employees
and agents as additional insureds on any insurance policy issued for the work
to be performed and/or services to be provided by or on behalf of Recipient
Entity for the Project, and present NVTC with satisfactory evidence thereof
before any work on the Project commences or continues, so that they are
protected from and against any losses actually suffered or incurred, except for
losses to the extent caused by the negligence or willful misconduct of such
entity or person, from third party claims that are directly related to or arise
out o f: (a) any failure by Recipient Entity to comply with, to observe or to
perform in any material respect any of the covenants, obligations, agreements,
terms or conditions in this Agreement, or any breach by Recipient Entity of its
representations or warranties in this Agreement; (b) any actual or willful
misconduct or negligence ofRecipient Entity, its employees or agents in direct
connection with the Projects; (c) any actual or alleged patent or copyright
Attachment 2
138
Form Version 2026-07-01 6
infringement or other actual or alleged improper appropriation or use of trade
secrets, patents proprietary information, know-how, trademarked or service-
marked materials, equipment devices or processes, copyright rights or
inventions by Recipient Entity in direct connection with the Project; (d)
inverse condemnation, trespass, nuisance or similar taking of or harm to real
property committed or caused by Recipient Entity, its employees or agents in
direct connection with the Project; or (e) any assumed liabilities. Recipient
Entity will contractually require its contractors, subcontractors, vendors and
other third parties working or performing services related to any Project
funded by NVTC Toll Revenue to indemnify NVTC and its Bond Trustee , the
Commonwealth of Virginia, the CTB, VDOT, DRPT, and their officers,
employees and agents from the same losses.
15. Recipient Entity covenants and agrees it will comply with all applicable
requirements of state and federal laws relating to anti -discrimination,
including but not limited to Titles VI and VII of the Civil Rights Act of 1964, as
amended, and the Americans with Disabilities Act, and shall contractually
require the same of all contractors, subcontractors, vendors, and recipients of
any funding. Recipient Entity recognizes the importance of the participation of
minority, women-owned and small businesses through the federal and local
Disadvantaged Business Enterprise programs and will abide by such
programs in implementing the Project. Recipient Entity shall comply with all
applicable federal requirements, including those applicable to highways that
are part of the National Highway System.
16. Give notice to NVTC that Recipient Entity may use NVTC Toll Revenue to pay
outside legal counsel services (as opposed to utilizing the services of its own
in-house counsel or NVT C’s in-house legal counsel) in connection with the
work performed under this Agreement so as to ensure that no conflict of
interest may arise from any such representation.
17. Provide certification to NVT C, that upon final payment to all contractors for
the Project, Recipient Entity will use the Project for its intended purposes for
the duration of the Project’s useful life. Under no circumstances will NVTC be
considered responsible or obligated to operate and/or maintain the Project
after its completion.
18. Comply with all requirements of the Virginia Public Procurement Act and
other applicable Virginia Code provisions , or local ordinances which govern
the letting of public contracts , unless supe rseded by the laws that govern
Recipient Entity.
Attachment 2
139
Form Version 2026-07-01 7
19. Acknowledge that if the Project is being funded in whole or in part by NVT C
Bond Proceeds, comply with the applicable tax covenants as may be attached
as Appendix D.
20. Acknowledge that if Recipient Entity expects and/or intends that the Project
is to be submitted for acceptance by the Com monwealth into its system that
Recipient Entity agrees to comply with VDOT’s “Standards, Requirements and
Guidance” applicable to the Project.
21. Recognize that Recipient Entity is solely responsible for obtaining all permits,
permissions and regulatory approval necessary to develop, construct, operate
and/or maintain the Project, including but not limited to , obtaining all
required VDOT and local land use permits, applications for zoning approvals,
and regulatory approvals.
22. Recognize that if Recipient Entity is funding the Project, in whole or in part,
with federal and/or state funds, in addition to NVT C Toll Revenue and/or
NVTC Bond Proceeds, that Recipient Entity will need to comply with all federal
and Commonwealth funding requirements, including but not limited to, the
completion and execution of VDOT’s Standard Project Administration
Agreement and acknowledge that NVTC will not be a partyor signatory to that
agreement; nor will NVTC have any obligation to comply with the
requirements of that agreement.
23. Provide quarterly (January 30th, April 30th, July 30th, and October 30th) written
status updates on all approved, active Projects to NVTC on all items described
in the Recipient’s Project application including progress toward milestones
and/or statistics including such information as ridership and/or percent
completion.
24. Assist NVTC in the preparation of the annual report to the CTB required by the
MOA, by providing data in regard to the Project performance measures
identified on Appendix A of this Agreement, as well as other reporting as may
be requested or required by NVTC.
25. To the greatest extent possible, i nclude the Commuter Choice logo and
recognition of Project funding source as being from the Commuter Choice
Program, in a form approved by NVTC , in all p ublicly-available materials,
documents, websites, etc.
B. NVTC’s Obligations
NVTC shall:
Attachment 2
140
Form Version 2026-07-01 8
l. Provide to Recipient Entity the funding authorized by NVT C for design work,
engineering, including all environmental work, all right-of-way acquisition,
inspection services, testing services, construction, and/or capital asset
acquisition(s), and operations, and all allowable expenses, net of any revenue
generated by the Project , on a reimbursement basis as set forth in this
Agreement and as specified in the Project Budget and Cash Flow contained in
Appendix B to this Agreement or the most updated amendment thereto.
2. If the Project is anticipated to receive additional NVTC Toll Revenuein a future
funding round as reflected in Appendix B to this Agreement, include the funds
as an off -the-top deduction within the proposed funding allocations for the
indicated fiscal year that are advanced for the Commission’s and CTB’s
adoption and approval, subject to the availability of NVTC Toll Revenue to
support the award and provided that the Recipient Entity continues to
advance Project implementation in a manner consistent with this Agreement.
3. Assign a Program Coordinator for the Project. NVTC’s Program Coordinator
will be responsible for monitoring the Project on behalf of NVT C so as to
ensure compliance with this Agreement and the MOA, and all NVT C’s
requirements and for overseeing, managing, reviewing , and processing, in
consultation with NVT C’s Executive Director and its Director of Finance and
Administration (DFA), all payment requisitions submitted by Recipient Entity
for the Project. NVTC’s Program Coordinator will have no independent
authority to direct changes or make additions, modifications , or revisions to
the Project Scope of Work as set forth on Appendix A or to the Project Budget
and Cash Flow as set forth on Appendix B.
4. Route to NVTC’s assigned Program Coordinator all Recipient Entity’s payment
requisitions, containing detailed summaries of actual Project costs incurred
which are in substantially the same form as shown on Appendix C submitted
to NVT C for the Project. After submission to NVT C, NVTC’s Program
Coordinator will conduct an initial review of all payment requisitions and
supporting documentation for the Project in order to determine the
submission’s sufficiency. NVTC’s Program Coordinator will then make a
recommendation to the NVT C’s DFA and Executive Director whether to
authorize payment, refuse payment, or seek additional information from
Recipient Entity. If the payment requisition is sufficient as submitted, payment
will be made within forty-five (45) business days from receipt. If the payment
requisition is deemed insufficient, within twenty (20) business days from
receipt, NVTC will notify Recipient Entity in writing and set forth the reasons
why the payment requisition was declined or why and whatspecific additional
information is needed for processing the payment request . Payment will be
withheld until all deficiencies identified by NVTC have been corrected. Under
Attachment 2
141
Form Version 2026-07-01 9
no circumstances will NVTC authorize payment for any work performed by or
on behalf of Recipient Entity that is not in conformity with the requirements
of this Agreement or the MOA.
5. Route all Recipient Entity’ s supplemental requests for funding from NVT C
under Paragraphs A.5 and A.8 of this Agreement to NVTC’s Executive Director.
NVTC’s Executive Director will initially review those requests and all
supporting documentation with NVTC’s DFA. After such initial review, NVTC’s
Executive Director will make a recommendation to NVT C’s Executive
Committee for its independent consideration and review of whether CTB
approval of, and an allocation for, supplemental funding should be sought .
NVTC’s Executive Committee will thereafter make a recommendation on any
such request to NVT C for final determination by NVT C, and approval by the
CTB.
6. Conduct periodic compliance reviews scheduled in advance for the Project so
as to determine whether the work being performed remains within the scope
of this Agreement , the MOA , and other applicable law . Such compliance
reviews may entail review of Recipient Entity ’s financial records for the
Project and on-site inspections.
7. Acknowledge that if, as a result of NVTC’s review of any payment requisition
or of a ny NVTC compliance review, NVT C staff determines that Recipient
Entity has misused or misapplied any NVTC Toll Revenue in derogation of this
Agreement or in contravention of the MOA or applicable law, NVTC staff will
promptly advise NVTC’s Executive Director and will advise Recipient Entity’s
designated representative in writing. Recipient Entity will thereafter have
thirty (30) days to respond in writing to NVT C’s initial findings. NVT C’s
Executive Director will review Recipient Entity ’s response and make a
recommendation to the NVTC Executive Committee which will, in turn, make
a recommendation to NVTC for a final determination. Pending final resolution
of the matter, NVTC will withhold further funding of the Project. If NVTC makes
a final determination that Recipient Entity has misused or misapplied funds in
contravention of this Agreement, the MOA, or other applicable law, NVTC will
cease further funding for the Project and will seek reimbursement from
Recipient Entity of all funds previously remitted by NVT C (with interest
earned at the rate earned by NVT C) which were misapplied or misused by
Recipient Entity . Nothing herein shall, however, be construed as denying ,
restricting or limiting the pursuit of either party’s legal rights or available legal
remedies.
8. Make guidelines available to Recipient Entity to assist the parties in carrying
out the terms of this Agreement in accordance with applicable law.
Attachment 2
142
Form Version 2026-07-01 10
9. Upon recipient’s final payment to all contractors, retain copies of all contracts,
financial records , design, construction , and as-built project drawings and
plans for the Project for the time periods required by the Virginia Public
Records Act and as may be required by other applicable records retention laws
and regulations.
C. Term
1. This Agreement shall be effective upon adoption and execution by both parties
and, unless terminated in accordance with the express provisions hereof, shall
continue until completion of the Project and final payment of Toll Revenue
hereunder, with the exception of those provisions which, by their express
terms, survive termination.
2. Recipient Entity may terminate this Agreement , for cause, in the event of a
material breach by NVTC of this Agreement. If so terminated, NVT C shall pay
for all Project costs incurred through the date of termination and all
reasonable costs incurred by Recipient Entity to terminate all Project related
contracts. The Virginia General Assembly’s failure to appropriate funds , or
CTB’s failure to allocate, or VDOT’s failure to distribute to NVTC as described
in paragraph F of this Agreement shall not be considered material breaches of
this Agreement by NVTC. Before initiating any proceedings to terminate under
this Paragraph, Recipient Entity shall give NVTC sixty (60) days written notice
of any claimed material breach of this Agreement; thereby allowing NVT C an
opportunity to investigate and cure any such alleged breach.
3. NVTC may terminate this Agreement , for cause , resulting from Recipient
Entity’s material breach of this Agreement. If so terminated, Recipient Entity
shall refund to NVT C all funds NVT C provided to Recipient Entity for t he
Project (including interest earned at the rate earned by NVT C). NVTC will
provide Recipient Entity with sixty (60) days written notice that NVTC is
exercising its rights to terminate this Agreement and the reasons for
termination. Prior to termination, Recipient Entity may request that NVT C
excuse Recipient Entity from refunding all funds NVTC provided to Recipient
Entity for the Project based upon Recipient Entity’s substantial completion of
the Project or severable portions thereof; and NVTC may, in its sole discretion,
excuse Recipient Entity from refunding all or a portion of the funds NVT C
provided to Recipient Entity for the Project. No such request to be excused
from refunding will be allowed where Recipient Entity has either misused or
misapplied NVTC funds in contravention of applicable law.
4. Upon termination and payment of all eligible expenses as set forth in
Paragraph C.3 above, Recipient Entity will release or return to NVT C all
Attachment 2
143
Form Version 2026-07-01 11
unexpended NVT C Toll Revenue with interest earned at the rate earned by
NVTC no later than sixty (60) days after the date of termination.
D. Dispute
In the event of a dispute under this Agreement, the parties agree to meet and confer
in order to ascertain if the dispute can be resolved informally without the need of a
third party or judicial intervention. NVTC’s Executive Director and Recipient Entity’s
Chief Executive Officer or Chief Administrative Officer shall be authorized to conduct
negotiations on behalf of their respective entities. If a resolution of the dispute is
reached via a meet and confer dispute resolution method, it sha ll be presented to
NVTC and to Recipient Entity’s governing body for formal confirmation and approval.
If no satisfactory resolution can be reached via the meet and confer method, either
party is free to pursue whatever remedies it may have at law, including all judicial
remedies.
E. NVTC’s Entitlement to Refund of Value of Project Assets
Recipient Entity agrees to use the real property and appurtenances and fixtures
thereto, capital assets, equipment and all other transportation facilities that are part
of the Project and funded by NVT C Toll Revenues under this Agreement ( “Project
Assets”) for the designated transportation purposes of the Project under this
Agreement and in accordance with applicable law throughout the useful life of each
Project Asset. In the event that Recipient Entity fails to use any of the Project Assets
funded under this Agreement for the transportation purposes as authorized by this
Agreement or applicable law throughout its respective useful life, Recipient Entity
shall refund to NVT C, with interest at the rate earned by NVT C, the amount of the
value of each of the Project Assets, whether any such Project Asset may have
depreciated or appreciated throughout its respective useful life, proportionate to the
amount of the cost of the Project Asset funded by NVTC under this Agreement . If
Recipient Entity refuses or fails to refund said monies to NVT C, NVTC may recover
the proportionate value from Recipient Entity by pursuit of any remedies available to
NVTC, including but not limited to NVT C’s withholding of commensurate amounts
from future distributions of NVTC Toll Revenue to Recipient Entity. In no event shall
the Recipient Entity be obligated to refund the aforesaid value to both NVTC and the
Commonwealth.
F. Appropriations Requirements
1. Nothing herein shall require or obligate any party to commit or obligate funds
to the Project beyond those funds that have been duly authorized and
appropriated by their respective governing bodies.
Attachment 2
144
Form Version 2026-07-01 12
2. The parties acknowledge that all Toll Revenues provided by NVTC pursuant to
the MOA are subject to appropriation by the Virginia General Assembly ,
allocation by the CTB and distribution by VDOT. The parties further
acknowledge that NVTC’s obligations under this Agreement are subject to such
funds being appropriated by the General Assembly , allocated by the CTB and
distributed by VDOT to NVTC.
G. Notices
All notices under this Agreement to either party shall be in writing and forwarded to
the other party by U.S. mail, care of the following authorized representatives:
1) to: NVTC, to the attention of its Executive Director;
2300 Wilson Blvd., Suite 230
Arlington, VA 22201
2) to: Fairfax County Department of Transportation,
to the attention of Gregg Steverson, Director
4050 Legato Road, Suite 400
Fairfax, VA 22033
H. Assignment
This Agreement shall not be assigned by either party unless express written consent
is given by the other party.
I. Modification or Amendment
This Agreement may be modified, in writing, upon mutual agreement of both parties.
J. No Personal Liability or Creation of Third Party Rights
This Agreement shall not be construed as creating any personal liability on the part
of any officer, employee, or agent of the parties; nor shall it be construed as giving any
rights or benefits to anyone other than the parties hereto.
K. No Agency
Recipient Entity represents that it is not acting as a partner or agent of NVTC; and
nothing in this Agreement shall be construed as making any party a partner or agent
with any other party.
Attachment 2
145
Form Version 2026-07-01 13
L. Sovereign Immunity
The provisions of this Agreement shall not be construed as a waiver of either party’s
sovereign immunity rights.
M. Incorporation of Recitals
The recitals to this Agreement are hereby incorporated into this Agreement and are
expressly made a part hereof. The parties to this Agreement acknowledge and agree
that such recitals are true and correct.
N. Mutual Preparation and Fair Meaning
The parties acknowledge that this Agreement has been prepared on behalf of all
parties thereto and shall be construed in accordance with its fair meaning and not
strictly construed for or against either party.
O. Governing Law
This Agreement is governed by the laws of the Commonwealth of Virginia.
IN WITNESS WHEREOF, each party hereto has caused this Agreement to be executed
as of the day, month, and year first herein written by their duly authorized
representatives.
Northern Virginia Transportation Commission
By: _________________________________
Katherine A. Mattice
NVTC Executive Director
Date: _________________________________
Fairfax County
By: _________________________________
_________________________________ (Print Name)
_________________________________ (Title)
Attachment 2
146
Form Version 2026-07-01 14
Date: _________________________________
Attachment 2
147
Form Version 2026-07-01
Appendix A –Project Description and Performance Measures
Project Number: 059-61-27
Project Title: Route 699: Monument Drive Park -And-Ride to Downtown Washington D.C.
Express Service (Continuation)
Recipient Entity: Fairfax County
Toll Revenue Funds: $4,588,744
Project Description
This project funds the continued operation of Fairfax Connector Route 699, an express
bus service operating between the Monument Drive Transit Center and downtown
Washington D.C. This funding provides for three new morning and afternoon trips, the
purchase of a new hybrid bus to support enhanced service and expansion of the route
to serve the Farragut West Metro station.
Project opening year inbound AM peak period increase in person throughputthat was the
basis for project evaluation: 279 persons.
Performance Measures and Reporting
Performance Measures
Report morning peak-period and daily ridership for the route.
Collection Period
Data should be collected over a two-week period in March or April. Chosen period
should not include any holiday periods and the weekday average should be calculated
from Tuesdays, Wednesdays, and Thursdays during the period.
Reporting
Report data to NVTC in a technical memorandum outlining the following:
1. Data collection methodology
2. Data collection dates
3. Results – data
4. Notes (if necessary)
Reports are due each July 1 or as otherwise identified by NVTC. Submit reports by email
to commuterchoice@novatransit.org.
Attachment 2
148
APPENDIX B - PROJECT BUDGET & CASH FLOW
Project Title: Project Number: 059-61-27
Recipient Entity: Revision Number:
Recipient Contact: Revision Date:
Name
Email
Phone
Fairfax County
Route 699: Monument Drive Park-And-Ride to
Downtown Washington D.C. Express Service
Brent Riddle
michael.riddle@fairfaxcounty.gov
703-877-5659
TABLE B-1 PROJECT BUDGET
Project Type Budget
Total Project
Funding
Funds
Toll Revenue
Approved NVTC
Sources
applicable)
Other Funds (if
Source of Other Funds
Study
Preliminary Engineering (PE)
Right-of-Way (ROW)
Construction (CN)
Capital Asset Acquisition 1,200,000 1,200,000
Other-Marketing 60,000 60,000
Transit Service 3,503,941 3,328,744 175,197 Fare revenue
Other Operations
Total 4,763,941$ 4,588,744$ 175,197$
TABLE B-2 NVTC PROJECT FUNDS PROGRAMMED
Project Type FY2027
Study -$
Preliminary Engineering (PE) -
Right-of-Way (ROW) -
Construction (CN)
Capital Asset Acquisition 1,200,000
Other-Marketing 60,000
Transit Service 3,328,744
Other Operations -
Total 4,588,744$
TABLE B-3 QUARTERLY PROJECT CASH FLOW FOR NVTC TOLL REVENUE FUNDS ONLY
1st, September 30th 1,623,593$ 423,593$
2nd, December 31st 423,593$ 423,593$
Quarter FY2027 FY2028 FY2029 FY2030 FY2031
3rd, March 31st 423,593$ 423,593$
4th, June 30th 423,593$ 423,593$
Total 2,894,372$ 1,694,372$ -$ -$ -$
Recipient Entity Northern Virginia Transportation Commission
Signature Signature Signature
NVTC Executive Director
Title
NVTC Director of Finance and Administration
Title
Date
Print name of person signing
__________________________
__________________________
_____
_____
Title
Date Date
This attachment is certified and made an official attachment to the Standard Project Agreement document by the parties of this agreem
_______________________________
_______________________________
ent.
Attachment 2
149
Revised 2026-07-01
Attachment 2
150
Board Agenda Item
November 17, 2026
CLOSED SESSION:
(a) Discussion or consideration of personnel matters pursuant to Virginia Code
§ 2.2-3711(A) (1).
(b) Discussion or consideration of the acquisition of real property for a public
purpose, or of the disposition of publicly held real property, where discussion in
an open meeting would adversely affect the bargaining position or negotiating
strategy of the public body, pursuant to Virginia Code § 2.2-3711(A) (3).
(c) Consultation with legal counsel and briefings by staff members or consultants
pertaining to actual or probable litigation, as identified below, where discussion
in an open session would adversely affect the negotiating or litigating posture of
the public body, as well as consultation with legal counsel regarding specific
legal matters listed below requiring the provision of legal advice by such
counsel, all as permitted by Virginia Code § 2.2-3711(A) (7) and (8).
1. Shaun Devon Jenkins v. Fairfax County, Virginia, and Fairfax County
Police Department, Case No. 1:26-cv-668 (E.D.Va.)
2. Diamani Bacon v. County of Fairfax, Case No. CL-2026-0003554 (Fx.
Co. Cir. Ct.)
3. Jonathan Love v. Iman Jennings, and Fairfax County, Virginia, Case No.
CL-2026-0000041 (Fx. Co. Cir. Ct.)
4. Jung Ai Kim v. Martha Byars, Case No. GV26-05998 (Fx. Co. Gen. Dist.
Ct.)
5. Jay Riat, Building Official for Fairfax County, Virginia v. Santa L.
Centellas, Wilson Centellas, and Luz S. Centellas, Case No. GV26-
12599 (Fx. Co. Gen. Dist. Ct.) (Braddock District)
6. Andrew B. Hushour, Fairfax County Zoning Administrator v. Maria
Antonia Quintanilla Grande, Case No. CL-2025-0016576 (Fx. Co. Cir.
Ct.) (Franconia District)
7. Jay Riat, Building Official for Fairfax County, Virginia v. Anthony V. Lada,
Case No. CL-2026-0012623 (Fx. Co. Cir. Ct.) (Franconia District)
151
Board Agenda Item
November 17, 2026
8. Andrew B. Hushour, Fairfax County Zoning Administrator, and Gabriel
M. Zakkak, Property Maintenance Code Official for Fairfax County,
Virginia v. Robert F. Payne a/k/a Robert Franklin Payne a/k/a Robert
Frank Payne, Case No. CL-2026-0016704 (Fx. Co. Cir. Ct.) (Franconia
District)
9. Jay Riat, Building Official for Fairfax County, Virginia v. Hometown
Audubon, LLC., Lucio Grijalva Hernandez, and Jose Grijalva, Case No.
CL-2026-0017080 (Fx. Co. Cir. Ct.) (Franconia District)
10. Andrew B. Hushour, Fairfax Couty Zoning Administrator v. The
Katherine Brown Living Trust, Case No. GV26-15348 (Fx. Co. Gen. Dist.
Ct.) (Franconia District)
11. Andrew B. Hushour, Fairfax County Zoning Administrator v. Phillip Q. Le,
and Noelle Thanh Nguyen, Case No. CL-2026-0000670 (Fx. Co. Cir. Ct.)
(Mason District)
12. Jay Riat, Building Official for Fairfax County, Virginia v. Marcelino Victor
Arias, Case No. CL-2026-0001694 (Fx. Co. Cir. Ct.) (Mason District)
13. Jay Riat, Building Official for Fairfax County, Virginia v. Yamil D. Rocha
Belmonte, Case No. CL-2026-0006063 (Fx. Co. Cir. Ct.) (Mason District)
14. Gabriel M. Zakkak, Property Maintenance Code Official for Fairfax
County, Virginia v. Elaine Eckert, Successor Trustee of the Eckert
Family Trust, Case No. CL-2026-0011113 (Fx. Co. Cir. Ct.) (Mason
District)
15. Gabriel M. Zakkak, Property Maintenance Code Official for Fairfax
County, Virginia v. Jeannine J. Dietz, Case No. CL-2026-0016149 (Fx.
Co. Cir. Ct.) (Mason District)
16. Andrew B. Hushour, Fairfax County Zoning Administrator v. Phu Bui,
Case No. CL-2026-0016946 (Fx. Co. Cir. Ct.) (Mason District)
17. Jay Riat, Building Official for Fairfax County, Virginia v. Elias A.
Gutierrez, and Blanca Gutierrez, Case No. CL-2026-0017078 (Fx. Co.
Cir. Ct.) (Mason District)
152
Board Agenda Item
November 17, 2026
18. Jay Riat, Building Official for Fairfax County, Virginia v. Shafiqul Islam,
and Salina Khatun, Case No. GV26-32775 (Fx. Co. Gen. Dist. Ct.)
(Mason District)
19. Jay Riat, Building Official for Fairfax County, Virginia v. Robert L. Harris,
and Romantic Relaxing Spa, Inc., Case No. GV26-09972 (Fx. Co. Gen.
Dist. Ct.) (Mason District)
20. Jay Riat, Building Official for Fairfax County, Virginia v. Jamal Shajaiah.,
Case No. GV26-16613 (Fx. Co. Gen. Dist. Ct.) (Mason District)
21. Andrew B. Hushour, Fairfax County Zoning Administrator v. Purita B.
Gonzales, and Manuel F. Gonzales, Trustee of the Purita B. Gonzales
Revocable Trust, Case No. GV26-19421 (Fx. Co. Gen. Dist. Ct.) (Mason
District)
22. Jay Riat, Building Official for Fairfax County, Virginia v. Sara
Gerbremichael Kinfe a/k/a Sara Gerbremichael Solomon, and Daniel
Legese Asfaw a/k/a Daniel Beyene Solomon, Case No. CL-2026-
0008153 (Fx. Co. Cir. Ct.) (Mount Vernon District)
23. Jay Riat, Building Official for Fairfax County, Virginia v. V-NBC, LLC, and
Atlantic Seafood International Group, Inc., Case No. CL-2026-0016703
(Fx. Co. Cir. Ct.) (Mount Vernon District)
24. Jay Riat, Building Official for Fairfax County, Virginia v. V-NBC, LLC.,
and JDL Ventures, Inc., Case No. CL-2026-0016706 (Fx. Co. Cir. Ct.)
(Mount Vernon District)
25. Jay Riat, Building Official for Fairfax County, Virginia v. Robert Zaman,
Case No. GV26-03104 (Fx. Co. Gen. Dist. Ct.) (Mount Vernon District)
26. Jay Riat, Building Official for Fairfax County, Virginia v. Sarad Bhandari,
and Deepa Sharma, Case No. GV26-03551 (Fx. Co. Gen. Dist. Ct.)
(Providence District)
27. Gabriel M. Zakkak, Property Maintenance Code Official for Fairfax
County, Virginia v. Asrat Betew Lule, Case No. CL-2021-00011872 (Fx.
Co. Cir. Ct.) (Sully District)
153
Board Agenda Item
November 17, 2026
28. Andrew B. Hushour, Fairfax County Zoning Administrator, and Jay Riat,
Building Official for Fairfax County, Virginia v. PMG Northern Virginia,
LLC., and T&N Chantilly Shell, LLC., Case No. CL-2026-0011064 (Fx.
Co. Cir. Ct.) (Sully District)
29. Gabriel M. Zakkak, Property Maintenance Code Official for Fairfax
County, Virginia v. Ivy M. Lindsay, Case No. CL-2026-0016007 (Fx. Co.
Cir. Ct.) (Sully District)
154
Board Agenda Item
November 17, 2026
3:30 p.m.
Public Hearing on RZ-2025-PR-00004 (Tysons A, LLC) to Rezone from C-4 and SC to
PTC and SC to Permit Two-Multifamily Residential Buildings at a 7.47 Floor Area Ratio
and Consider the Conceptual Development Plan, Located on Approximately 2.39 Acres
of Land (Providence District)
This property is located in the S.E. of the intersection of Greensboro Dr. and Solutions
Dr. Tax Map 29-3 ((15)) 11A2.
PLANNING COMMISSION RECOMMENDATION:
On October 21, 2026, the Planning Commission voted 12-0 to recommend to the Board
of Supervisors approval of the following:
• RZ-2025-PR-00004 and the associated conceptual development plan, subject to
the execution of proffers consistent with those dated October 19, 2026;
• Adoption of the proposed ordinance amending the Zoning Ordinance and
reflecting approval of these applications; and
• Modification of subsection 2105.6.B(1) of the Zoning Ordinance for the 10 acre
minimum district size in the PTC District to permit a minimum district size of 2.39
acres.
In a related action, the Planning Commission voted 12-0 to approve FDP-2025-PR-
00004.
ENCLOSED DOCUMENTS:
Additional information available online at:
https://www.fairfaxcounty.gov/planning-development/board-packages
Planning Commission Meetings Video Archive available online at:
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
STAFF:
Suzanne L. Wright, Director, Zoning Evaluation Division (ZED), Department of Planning
and Development (DPD)
Karen Yee, Planner, ZED, DPD
155
Board Agenda Item
November 17, 2026
3:30 p.m.
Public Hearing on PCA-2011-PR-011-005/CDPA-2011-PR-011-002 (RZPA-2025-PR-
00058) (Cityline Partners LLC and Galerie Development, LLC) to Amend the Proffers
and Conceptual Development Plan, to Permit a Continuing Care Facility with
Retail/Services and Associated Modifications to Proffers and Site Design at a 3.88 Floor
Area Ratio, Located on Approximately 5.01 Acres of Land Zoned PTC and HC
(Providence District)
This property is located in the W. of Colshire Dr. and S. of Chain Bridge Rd. Tax Map
30-3 ((28)) C3.
PLANNING COMMISSION RECOMMENDATION:
On October 21, 2026, the Planning Commission voted 12-0 to recommend to the Board
of Supervisors approval of the following:
• PCA-2011-PR-011-005 and CDPA-2011-PR-011-002, subject to the execution of
proffers consistent with those dated October 5, 2026;
• Adoption of the proposed ordinance amending the Zoning Ordinance, reflecting
approval of these applications;
• Modification of subsection 5100.2.C(5) of the Zoning Ordinance to allow a
parapet wall, cornice, or similar projection to exceed the height limit established
by more than three (3) feet to that shown on the CDPA/FDPA; and
• Modification of subsection 5100.2.D(4)(c) of the Zoning Ordinance to allow
buildings/structures to be constructed to the streetscape building zone line on
corner lots on public streets and lots with private street easements that may
create a corner lot configuration as defined in the ordinance.
In a related action, the Planning Commission voted 12-0 to approve FDPA-2011-PR-
011-03-002.
ENCLOSED DOCUMENTS:
Additional information available online at:
https://www.fairfaxcounty.gov/planning-development/board-packages
156
Board Agenda Item
November 17, 2026
Planning Commission Meetings Video Archive available online at:
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
STAFF:
Suzanne L. Wright, Director, Zoning Evaluation Division (ZED), Department of Planning
and Development (DPD)
Sunny Yang, Planner, ZED, DPD
157
Board Agenda Item
November 17, 2026
3:30 p.m.
Public Hearing on RZ-2023-SU-00007 (K. Hovnanian at Lincoln Park, LLC) to Rezone
from I-5 and WS to PDH-20 and WS to Permit Residential Uses with an Overall Density
of 18.97 Dwelling Units per Acre (DU/AC) (Inclusive of Bonus Density for Affordable
Housing) and Consider the Conceptual Development Plan, Located on Approximately
10.08 Acres of Land (Sully District) (Concurrent with PCA-75-2-016-04 (RZPA-2023-
SU-00037), PCA-75-2-016-05 and RZ-2025-SU-00024)
and
Public Hearing on PCA-75-2-016-04 (RZPA-2023-SU-00037) (K. Hovnanian at Lincoln
Park, LLC) to Amend the Proffers for RZ-75-2-016 to Permit Deletion of Land Area,
Located on Approximately 10.08 Acres of Land Zoned I-5 and WS (Sully District)
(Concurrent with RZ-2023-SU-00007, PCA-75-2-016-05 and RZ-2025-SU-00024)
and
Public Hearing on RZ-2025-SU-00024 (K. Hovnanian at Lincoln Park, LLC) to Rezone
from I-5 and WS to PDH-20 and WS to Permit Residential Uses with an Overall Density
of 17.23 Dwelling Units per Acre (DU/AC) (Inclusive of Bonus Density for Affordable
Housing) and Consider the Conceptual Development Plan, Located on Approximately
5.45 Acres of Land (Sully District) (Concurrent with PCA-75-2-016-05, PCA-75-2-016-04
(RZPA-2023-SU-00037) and RZ-2023-SU-00007)
and
Public Hearing on PCA-75-2-016-05 (K. Hovnanian at Lincoln Park, LLC) to Amend the
Proffers for RZ-75-2-016 to Permit Deletion of Land Area, Located on Approximately
5.45 Acres of Land Zoned I-5 and WS (Sully District) (Concurrent with RZ-2025-SU-
00024, PCA-75-2-016-04 (RZPA-2023-SU-00037) and RZ-2023-SU-00007)
This property is located on the W. side of Centreville Rd., S. side of EDS Dr., E. of Air
and Space Museum Pkwy. Tax Map 24-4 ((1)) 6E and 6F.
This property is located on the W. side of Centreville Rd., S. side of EDS Dr., E. of Air
and Space Museum Pkwy. Tax Map 24-4 ((1)) 6E and 6F.
This property is located E. of EDS Dr., generally S. of McLearen Rd. and W. of
Centreville Rd. Tax Map 24-4 ((1)) 6D3.
158
Board Agenda Item
November 17, 2026
This property is located E. of EDS Dr., generally S. of McLearen Rd. and W. of
Centreville Rd. Tax Map 24-4 ((1)) 6D3.
PLANNING COMMISSION RECOMMENDATION:
On October 14, 2026, the Planning Commission voted 9-0-1 (Commissioners Clarke
and James Thomas were absent from the meeting. Commissioner Batchelor-Causey
abstained from the vote) to recommend to the Board of Supervisors approval of the
following applications and adoption of the proposed ordinances amending the Zoning
Ordinance and reflecting approval of these applications:
• PCA-75-2-016-04;
• PCA-75-2-016-05;
• RZ-2023-SU-00007 and the associated Conceptual Development Plan, subject
to the execution of proffers consistent with those dated September 29, 2026;
• RZ-2025-SU-00024 and the associated Conceptual Development Plan, subject
to the execution of proffers consistent with those dated September 29, 2026;
• Waiver of subsection 2105.5.B(2) requiring a minimum 200 square foot yard for
each townhome unit;
• Modification of subsection 5107.3.A(2) to permit private streets not less than 22
feet in width from 24 feet in width; and
• Waiver of subsection 5107.3.A(3) to permit private streets greater than 600 feet
in length, as shown on the CDP/FDP.
In a related action, the Planning Commission voted 9-0-1 (Commissioners Clarke and
James Thomas were absent from the meeting. Commissioner Batchelor-Causey
abstained from the vote) to approve FDP-2023-SU-00007 and FDP-2025-SU-00024.
ENCLOSED DOCUMENTS:
Additional information available online at:
https://www.fairfaxcounty.gov/planning-development/board-packages
Planning Commission Meetings Video Archive available online at:
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
159
Board Agenda Item
November 17, 2026
STAFF:
Suzanne L. Wright, Director, Zoning Evaluation Division (ZED), Department of Planning
and Development (DPD)
Katie Quinn, Planner, ZED, DPD
160
Board Agenda Item
November 17, 2026
3:30 p.m.
Public Hearing on SE-2025-DR-00005 (CVP Operations VA LLC) to Permit a Kennel
and Veterinary Hospital with Outdoor Components, Located on Approximately 1.69
Acres of Land Zoned C-8 and R-1 (Dranesville District)
This property is located in the Dranesville District. Tax Map 6-4 ((1)) 80.
PLANNING COMMISSION RECOMMENDATION:
On September 30, 2026, the Planning Commission voted 12-0 to recommend to the
Board of Supervisors approval of the following actions:
• SE-2025-DR-00005, subject to the proposed development conditions dated
September 28, 2026;
• Increase in fence height in the front yard to that shown on the SE Plat; and
• Modification of the transitional screening and barrier requirements along the
eastern property line in favor of that shown on the SE Plat.
ENCLOSED DOCUMENTS:
Additional information available online at:
https://www.fairfaxcounty.gov/planning-development/board-packages
Planning Commission Meetings Video Archive available online at:
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
STAFF:
Suzanne L. Wright, Director, Zoning Evaluation Division (ZED), Department of Planning
and Development (DPD)
Savannah Murray, Planner, ZED, DPD
161
Board Agenda Item
November 17, 2026
3:30 p.m.
Public Hearing on SE-2026-SU-00012 (Love Hand Home Health, Inc.) to Permit Adult
Day Care Center, Located on Approximately 3.25 Acres of Land Zoned I-5, WS and AN
(Sully District)
This property is located in the Sully District. Tax Map 34-4 ((13)) 2.
PLANNING COMMISSION RECOMMENDATION:
On October 21, 2026, the Planning Commission voted 12-0 to defer the public hearing
for SE-2026-SU-00012 to November 4, 2026.
On November 4, 2026, the Planning Commission voted 10-0 (Commissioners Clarke
and Landgraf were absent from the meeting) to recommend to the Board of Supervisors
approval of SE-2026-SU-00012, subject to the development conditions dated November
4, 2026.
ENCLOSED DOCUMENTS:
Additional information available online at:
https://www.fairfaxcounty.gov/planning-development/board-packages
Planning Commission Meetings Video Archive available online at:
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
STAFF:
Suzanne L. Wright, Director, Zoning Evaluation Division (ZED), Department of Planning
and Development (DPD)
Ciarra Downing, Planner, ZED, DPD
162
Board Agenda Item
November 17, 2026
3:30 p.m.
Public Hearing on RZ-2025-HM-00002 (EYA Development LLC) to Rezone from I-3 and
I-4 to PRM to Permit Residential Mixed Use with an Overall Floor Area Ratio (FAR) of
0.93 (Inclusive of Bonus Intensity for Affordable Housing) and Consider the Conceptual
Development Plan, Located on Approximately 49.37 Acres of Land (Hunter Mill District)
(Concurrent with PCA-79-C-090-03 and PCA-77-C-019-03 (RZPA-2025-HM-00010))
and
Public Hearing on PCA-79-C-090-03 (EYA Development LLC) to Amend RZ-79-C-090
to Delete Land Area, Located on Approximately 18.41 Acres of Land Zoned I-3 and I-4
(Hunter Mill District) (Concurrent with RZ-2025-HM-00002 and PCA-77-C-019-03
(RZPA-2025-HM-00010))
and
Public Hearing on PCA-77-C-019-03 (RZPA-2025-HM-00010) (EYA Development LLC)
to Amend RZ-77-C-019 to Delete Land Area, Located on Approximately 23.39 Acres of
Land Zoned I-3 and I-4 (Hunter Mill District) (Concurrent with RZ-2025-HM-00002 and
PCA-79-C-090-03)
This property is located along Business Center Dr. and Wildlife Center Dr. Tax Map 18-
3 ((8)) 1, 2, 4A, 5A1, 7A, 8, 18B, F and G; 18-3 ((1)) 12B.
This property is located in the Hunter Mill District. Tax Map 18-3 ((8)) 1 (pt.), 2 (pt.), 7A
(pt.), 8, F and G (pt.).
This property is located in the Hunter Mill District. Tax Map 18-3 ((1)) 12 B; 18-3 ((8)) 1
(pt.), 2 (pt.), 4A, 5A1, and G (pt.).
PLANNING COMMISSION RECOMMENDATION:
On October 14, 2026, the Planning Commission voted 9-0-1 (Commissioners Clarke
and James Thomas were absent from the meeting. Commissioner Sargeant abstained
from the vote) to recommend to the Board of Supervisors approval of the following
applications and adoption of the proposed ordinance amending the Zoning Ordinance
and reflecting approval of these applications:
• PCA-77-C-019-03;
• PCA-79-C-090-03;
163
Board Agenda Item
November 17, 2026
• RZ-2025-HM-00002 and the associated Conceptual Development Plan, subject
to the execution of proffers consistent with those dated October 1, 2026;
• Waiver of subsection 2105.5.B(2) requiring a minimum 200 square foot yard for
each rear-loading townhome unit in favor of the yards shown on the CDP/FDP;
• Waiver of subsection 2105.5.C(1) to permit single family attached as the principal
residential use in the PRM District;
• Waiver of subsection 2105.5.C(2)(a) to permit retail as a secondary use when
less than 50% of the total gross area is devoted to multifamily residential;
• Modification of subsection 5107.3.A(2) to permit private streets not less than 20
feet in width from 24 feet in width, subject to the FDP development conditions;
• Waiver of subsection 5107.3.A(3) to permit private streets greater than 600 feet
in length, as shown on the CDP/FDP;
• Modification of subsection 5108.3.A(2) to permit street frontage landscaping with
less than the required 10-foot-wide minimum landscape strip in favor of what is
shown on the CDP/FDP; and
• Modification of subsection 5108.5.A(6)(d) transitional screening requirements for
a public use in favor of the transitional screening shown on the CDP/FDP.
In a related action, the Planning Commission voted 9-0-1 (Commissioners Clarke and
James Thomas were absent from the meeting. Commissioner Sargeant abstained from
the vote) to approve FDP-2025-HM-00002, subject to the development conditions dated
October 9, 2026.
ENCLOSED DOCUMENTS:
Additional information available online at:
https://www.fairfaxcounty.gov/planning-development/board-packages
Planning Commission Meetings Video Archive available online at:
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
STAFF:
Suzanne L. Wright, Director, Zoning Evaluation Division (ZED), Department of Planning
and Development (DPD)
Katie Quinn, Planner, ZED, DPD
164
Board Agenda Item
November 17, 2026
3:30 p.m.
Public Hearing on SE-2025-MA-00043 (Fairfax County Water Authority) to Permit a
Utility Facility, Light, Located on Approximately 14,457 Square Feet of Land Zoned R-20
and CRD (Mason District)
This property is located in the Mason District. Tax Map 51-3 ((18)) E1 (pt.).
The Board of Supervisors deferred this public hearing from October 27, 2026, at 3:30
p.m., to November 17, 2026, at 3:30 p.m.
PLANNING COMMISSION RECOMMENDATION:
On October 7, 2026, the Planning Commission voted 9-0 (Commissioners Batchelor-
Causey, Hancock and James Thomas were absent from the meeting) to find that the
proposal by Fairfax Water to replace the Willston water storage tank under 2232-2025-
MA-00011 satisfies the criteria of general or approximate location, character, and
extent, as specified in Section 15.2-2232 of the Code of Virginia, as amended, and
therefore, is substantially in accord with the Comprehensive Plan, for the reasons set
forth in the Staff Report dated September 21, 2026.
The Planning Commission also recommended to the Board of Supervisors approval of
the following actions:
∑ SE-2025-MA-00043 subject to the proposed development conditions dated
October 5, 2026;
∑ Modification of the transitional screening requirement along the northeast,
northwest, southwest, and southeast boundary lines in favor of the proposed
landscaping as shown on the SE Plat; and
∑ Modification of the barrier requirement along the southern boundary line in favor
of the proposed fencing as shown on the SE Plat.
ENCLOSED DOCUMENTS:
Additional information available online at:
https://www.fairfaxcounty.gov/planning-development/board-packages
Planning Commission Meetings Video Archive available online at:
165
Board Agenda Item
November 17, 2026
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
STAFF:
Suzanne L. Wright, Director, Zoning Evaluation Division (ZED), Department of Planning
and Development (DPD)
Kevin McMahan, Planner, ZED, DPD
166
Board Agenda Item
November 17, 2026
4:00 p.m.
Public Hearing on AF-2026-MV-00003 (Belmont Bay Farms II) to Permit the Re-
Creation of an Agricultural and Forestal District, Located on Approximately 114.99
Acres of Land Zoned R-E (Mount Vernon District)
This property is located in the Mount Vernon District. Tax Map 113-4 ((1)) Parcel 27Z.
PLANNING COMMISSION RECOMMENDATION:
On October 14, 2026, the Planning Commission voted 10-0 (Commissioners Clarke and
James Thomas were absent from the meeting) to recommend that the Board of
Supervisors adopt a district ordinance reestablishing the Belmont Bay Farms II Local
Agricultural and Forestal District, to be codified in Appendix F of the County Code, as
proposed in AF 2026-MV-00003, pursuant to Chapter 44 of Title 15.2 of the Code of
Virginia and Chapter 115 of the Fairfax County Code, as set forth in the Staff Report
dated September 29, 2026.
ENCLOSED DOCUMENTS:
Additional information available online at:
https://www.fairfaxcounty.gov/planning-development/board-packages
Planning Commission Meetings Video Archive available online at:
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
STAFF:
Suzanne L. Wright, Director, Zoning Evaluation Division (ZED), Department of Planning
and Development (DPD)
Sophia Fisher, Planner, ZED, DPD
167
Board Agenda Item
November 17, 2026
4:00 p.m.
Public Hearing on Proposed Public Facilities Policy Plan - Phase II 2020-CW-1CP and
Public Facilities Comprehensive Plan Map Updates 2013-CW-5CP
ISSUE:
Plan amendments 2013-CW-5CP and 2020-CW-1CP propose to amend the
Comprehensive Plan Policy Plan and Area Plans recommendations as they pertain to
public facilities, amend the Comprehensive Plan Land Use Map to update and
accurately identify existing Public Facility, Governmental, and Institutional land uses,
and develop a new Comprehensive Plan Public Facilities Map. This amendment
constitutes the second of two phases to the update of the Public Facilities element of
the Policy Plan.
PLANNING COMMISSION RECOMMENDATION:
On September 23, 2026, the Planning Commission voted 9-0 (Commissioners Hancock,
Sargeant, and Wang were absent from the meeting) to recommend to the Board of
Supervisors the adoption of the staff recommendation for Plan Amendments 2020-CW-
1CP and 2013-CW-5CP, as found in the Staff Report dated August 19, 2026, with the
Planning Commission proposed edits as outlined in the PC Modification Handout dated
September 23, 2026 (Attachment 1).
RECOMMENDATION:
The County Executive recommends that the Board of Supervisors adopt the Planning
Commission recommendation.
TIMING:
Planning Commission Public Hearing – September 23, 2026, at 7:30 PM
Board of Supervisors Public Hearing – November 17, 2026, at 4:00 PM
BACKGROUND:
On July 14, 2020, the Board of Supervisors (“Board”) authorized the consideration of a
Comprehensive Plan amendment (2020-CW-1CP) to update the Public Facilities
Element of the Policy Plan (PFEPP) and related Area Plans, including an evaluation of
how updates align with the Capital Improvement Program (CIP). This Plan amendment
was divided into two phases. On May 7, 2024, the Board adopted Phase I, which
comprehensively updated the objectives and policies contained within the PFEPP.
168
Board Agenda Item
November 17, 2026
Phase II (this Plan amendment) proposes to revise the PFEPP to add objectives and
policies from the former Human Services element, create a new Health and Human
Services section, add an Early Childhood Education subsection within the Education
section, update the Water Supply section introduction, and other editorial revisions. This
amendment also proposes to amend the Areawide, District, and Special Planning Areas
of the Comprehensive Plan to remove existing public facilities inventory tables from the
Area Plans and replace those tables with a new countywide GIS-based Comprehensive
Plan Public Facilities Map as an inventory of existing public facilities.
On July 9, 2013, the Board authorized consideration of a Comprehensive Plan
amendment (2013-CW- 5CP) to update existing and planned parcels designated for
Public Facilities, Governmental, and Institutional uses on the existing Comprehensive
Plan Land Use Map. This amendment was a follow-on consideration to Plan
amendment S11-CW-1CP, which updated the Comprehensive Plan Land Use Map.
Limited revisions to the Comprehensive Plan Land Use Map are proposed to update
parcels that have transitioned to public facility uses.
2020-CW-1CP and 2013-CW-5CP are being processed concurrently due to the public
facility subject matter and their shared focus on improving the accuracy and consistency
of public facility information within the Comprehensive Plan. Together, these
amendments update public facility information within the Comprehensive Plan by
revising applicable Policy Plan and Area Plan references and establishing an updated
framework and interactive map for identifying existing and planned public facilities.
EQUITY IMPACT:
The provision and planning of public facilities are essential to meeting community needs
and delivering services. Maintaining an accurate and current inventory supports these
efforts by providing the public, staff, and decision makers with a clearer understanding
of existing facilities, helping identify service gaps, and highlighting opportunities for co-
locations that can improve access to services and reduce the need for new facilities and
capital projects. Together, the amendments increase transparency in the review
process and enhance the accuracy of the Comprehensive Plan that will now be linked
with a Public Facilities Map which provides a single, publicly accessible source of
information that will be updated annually without changing the underlying 2232 Review
process. As a result, Fairfax County will be better positioned to anticipate, plan for, and
deliver the public facilities needed to equitably serve residents now and in the future.
The amendments further the One Fairfax Policy Area of Focus 10, which promotes a
health and human services system with accessible, high quality, affordable, and
culturally appropriate services, by incorporating Health and Human Services guidance
emphasizing accessible facility locations, multimodal transportation and safe pedestrian
access, co-location of services, and inclusive facility design. Community engagement
169
Board Agenda Item
November 17, 2026
and disaggregated data will help inform how differences in community needs are
considered in planning for these services. The Early Childhood Education guidance
supports these efforts by promoting a well-distributed and accessible network of
facilities serving children from birth through age five. The amendments also further One
Fairfax Policy Area of Focus 11, supporting a built and natural environment that
accommodates anticipated growth and change in an economically, socially, and
environmentally sustainable and equitable manner, by providing an updated facility
inventory and land use designations, which improve understanding of facility distribution
and support planning for growth.
Together, these updates support more equitable access to public facilities and services
by providing better information, strengthening planning guidance, and helping the
County respond to the needs of communities across the County.
FISCAL IMPACT:
None.
ENCLOSED DOCUMENTS:
Attachment 1 - Planning Commission Recommended Modifications Handout,
September 23, 2026
The Planning Commission Meetings Video Archive is available online at:
https://www.fairfaxcounty.gov/cableconsumer/channel-16/planning-commission-
meetings-video-archives
The Planning Commission Actions are accessible at:
https://www.fairfaxcounty.gov/planningcommission/planning-commission-actions-2026
The Staff Report for PA 2020-CW-1CP & PA 2013-CW-5CP has been previously
furnished and is available online at:
https://www.fairfaxcounty.gov/planning-development/plan-amendments/staff-reports
STAFF:
Jennifer Miller, Deputy County Executive
Tracy Strunk, Director, Department of Planning and Development (DPD)
Kelly Atkinson, Director, Planning Division (PD), DPD
Salem Bush, Branch Chief, Public Facilities & Development Review Branch, PD, DPD
Mohamed Ali, Planner II, Public Facilities & Development Review Branch, PD, DPD
170
Attachment 1
PLANNING COMMISSION RECOMMENDED MODIFICATIONS
HANDOUT
PUBLIC FACILITIES PLAN AMENDMENT 2020-CW-1CP & 2013-CW-5CP
Chairman Phillip Niedzielski-Eichner
Countywide
Public Hearing – September 23, 2026
The following proposed text is based on the Staff Report for Plan Amendments 2020-
CW-1CP & 2013-CW-5CP dated August 19, 2026, Recommendation section.
Draft modifications to the staff report recommendation are shown in bold with
underline and yellow highlight for proposed additions and bold with double strike
throughs and yellow highlight for proposed deletions.
MODIFY: Fairfax County Comprehensive Plan, 2026 Edition, Policy Plan,
Public Facilities [Amended Date: 5-7-2024], The Public Facilities
Element
Education
Public Schools
Additionally, FCPS offers several unique instructional, nontraditional, and special
education programs in their facilities. Instructional programs include FCPS Pre-
Kindergarten (PreK), Advanced Academic Programs, High School Advanced
Placement, International Baccalaureate Diploma Program, and High School Academy.
Nontraditional programs include Fairfax County Adult High School; Achievement,
Integrity, and Maturity program; Alternative Learning Centers; Nontraditional Career
Readiness Academy; Transition Support Resource Center; and Adult and Community
Education….
Capacity is the number of students a school can support when the restriction of program
of studies is applied. Capacity is measured differently for the elementary, middle, and
high school levels. For all school levels, both a design capacity and program capacity is
are calculated. Design capacity reflects the capacity of a building as it was originally
constructed. Newly constructed and renovated facilities are designed in accordance
with approved education and safety specifications….
Libraries
Introduction
The mission FCLP FCPL’s mission is to actively build community further literacy, and
promote freedom of access and expression through programing, community spaces,
technology, and collections of educational and recreational resources, in a variety of
formats, thus enhancing individual and community life. To achieve fulfillment of this
mission, FCLP FCPL will continue to:
171
Attachment 1
Objective 17: Locate library facilities to provide service to the greatest
number of persons within designated service areas, and provide
high visibility, safe and easy access, and ample size for the building,
parking areas, landscaping and future expansion.
Policy d. Promote co-location of libraries with other County services so users can
combine library visits with accessing other County resources and services
promoting visibility and convenience.
Policy e. Locate library facilities on sites that are centrally located in terms of
service area, population distribution and distance. Specifically, library
locations should be prioritized so that they are integrated into the
community, if possible, near community centers with high levels of
pedestrian, bicycle and transit access.
Policy f. Promote co-location of libraries with other County services so users
can combine library visits with accessing other County resources
and services promoting visibility and convenience.
Health and Human Services
Health and human services facilities are owned or operated by the county and include
human services regional offices, community centers, senior centers, adult day health
care, public health centers, health clinics, and treatment facilities. Human services
regional offices and other co-located facilities provide access to community members
who need assistance from multiple health and human services agencies.
Objective 22: Health and human services facilities should be designed to
enhance service delivery and efficiently meet community needs.
Policy b. Ensure inclusive outdoor leisure space that enables social and community
connectedness is included in the design of new community centers. For
instance, include features such as like playgrounds, athletic courts,
and exercise equipment, and comfortable seating areas.
Policy c. Integrate health and human services with other county services and
community amenities to increase access, enhance service delivery, and
maximize efficient use of shared resources.
Police
Objective 26: Locate police stations and facilities so as to provide the most
efficient and expeditious law enforcement/protective service to the
county as a whole and to the individual police districts.
Policy b. Plan for a new police substations in growing areas of the county.
Policy f. Evaluate and support any identified need for an Officer Wellness and
Incident Support Services (ISS) facilities.
Fire and Rescue
172
Attachment 1
Objective 28: Establish and maintain at a minimum, a seven-minute total
response time coverage for fire and rescue emergencies to at least
95 per cent of the county's population.
Policy b. Locate new fire and rescue stations at the most strategic point in a
proposed service area to achieve a seven-minute total response time
coverage to all points of the area and/or provide the most optimalum
service to that area based on locational criteria to include the following:
Locate stations close to intersections where there is no problem with
highway access;
Locate stations on relatively flat topography and provide the
opportunity to buffer the station from adjoining properties;
Locate stations on the side where the greatest hazard or higher
incident activity exists, where there is either a man-made or natural
obstacle such as a railroad or river; and
Locate stations to minimize service area overlap When there is
unavoidable overlap with other existing service area, the new station
should be located so that any service overlap benefits the high density
areas and alleviates the response requirements of other high activity
areas.
Sheriff
Objective 30: Meet the State Department of Corrections rated capacity
standards for Average Daily Population at the Adult Detention Center
(ADC) and provide for sentenced offenders not incarcerated at the
ADC.
Policy a. The Ccounty should utilize excess unused space in the ADC, until such
time that it is needed for its intended purpose. Based on financial
considerations and/or the temporary needs of other county agencies, such
space could be effectively utilized by leasing to other county or outside
agencies.
Courts
Introduction
These court's facilities are primarily located on the Judicial Center/Courthouse
Complex in Fairfax City in the Fairfax County Courthouse.
Animal Services Division and the Department of Animal Sheltering
Introduction
The Animal Services Division of the Fairfax County Police Department safeguards the
residents of the county against stray and unwanted animals; protects residents and
animals from certain animal diseases, enforces the state and local animal related laws
and ordinances, and addresses issues concerning wild life."
173
Attachment 1
Utilities and Services
Water Supply
Objective 37: Plan and provide for facilities to treat, transmit and distribute a
safe and adequate potable water supply.
Policy b Coordinate all Fairfax Water projects by continuing the Water Facilities
Agreement between the Board of Supervisors and the Fairfax Water
which requires:
Fairfax County Board’s review and approval of the Fairfax Water’s
Capital Improvement Program (CIP) as part of the county’s CIP;
Policy d. Promote opportunities, including formation of water districts, for extending
access to water service to communities or areas within Fairfax County that
are threatened by failure of private wells and are without public water
service as long as such districts do not require the Fairfax Water to
contribute more than provided for under Fairfax Water's Bad Well Policy,
dated June 3, 2021, which specifies the conditions and terms for financial
assistance.
Sanitary Sewer
Introduction
Additional treatment capacity is provided by contractual agreement with the DC Water,
Alexandria Renew, Arlington County and the Upper Occoquan Sewage Service
Authority.
Solid Waste and Recycling
Objective 40: Provide conveniently located solid waste management
facilities and operations, while ensuring that these facilities area
compatible with adjacent land uses.
Wireless Telecommunications Services
Objective 51: With Planning Commission approval, wireless
telecommunication facilities proposed on existing or replacement
structures, or new poles of 50 feet or less in height and designed to
support small cell facilities, that do not meet the Administrative
Review or Deemed Approved Guidelines but are otherwise
consistent with Plan guidance may be processed without a public
hearing as a “feature shown” of the Comprehensive Plan when in
conformance with the following policies:
Policy a. In determining that proposed telecommunication facilities are a feature
shown of the Comprehensive Plan, ensure that the following general
factors are met:
174
Attachment 1
The proposed installation has no material adverse impact on the visual
quality or character of the general area in which it is to be placed,
including any surrounding residential properties;
The proposed installation is located and designed to blend with the
structure on which it is placed such as flush-mounting antennas or
screening the antennas and equipment as appropriate to the site;
The proposed installation, when in a grouping of other similar
structures, is consistent with the pattern of those surrounding
structures;
Related equipment cabinets or shelters located on the ground or on a
rooftop are appropriately screened or placed to obscure their visibility
from surrounding properties;
Building rooftop antennas are either flush mounted to surface walls,
screened or placed to not be visible from the surrounding area unless
the antenna has a minimal visual impact if installed above the roofline;
Access to the proposed installation for purposes of maintenance has
no material adverse impact on adjoining properties;.
Administrative Review Guidelines
Objective 52: Consider the co-location, replacement, or modification of
antennas, and their associated equipment to be an Administrative
Review “feature shown” of the Comprehensive Plan requiring no
Planning Commission review when the colocation, replacement or
modification of, antennas, and the related equipment is in full
conformance with all Fairfax County Zoning Ordinance provisions
and the following applicable policies:
Policy b. Consider a new monopoles or towers great than 50 feet in height to be a
feature shown of the Comprehensive Plan if located in major utility
transmission easements or rights-of-way; and if the easement or right-of-
way is at least 100 feet wide and not used for underground gas
transmission lines, and if the following guidelines are met:”
Objective 53: Consider the placement of new structures 50 feet or less in
height and designed to support small cell facilities to be an
Administrative Review feature shown of the Comprehensive Plan
requiring no Planning Commission review when the location and
character of the new structure is in full conformance with all Fairfax
County Zoning Ordinance provisions and the following applicable
policies:
…………
Policy d. Locate so as to not impede pedestrian, bicycle, or vehicular travel by not
obstructing walkways, driveways, entrances or other means of travel.
175
Attachment 1
Policy e. Locate so as to not impede or obstruct pedestrian, bicycle, or
vehicular
travel.
Policy e f. The pole design should conform to the aesthetics of existing adjacent
streetlights or utility poles and/or conform to existing area or district
specific urban design guidelines or manuals (ex. Tysons Urban Design
Guidelines).
Policy f g. Locate the pole in conformance with existing area or district specific urban
design guidelines or manuals and/or Standard Pole Locations as defined
in the Fairfax County Public Facilities Manual and restore any disturbed
streetscape after installation.
Policy g h. In areas where there are no existing adjacent streetlights, utility poles, or
district specific urban design guidelines or manuals, new poles should be
designed to look the same as or substantially similar to existing poles
elsewhere in the same zoning district.
Policy h i. Locate new structures 50 feet or less in height within the bounds of a
historic overlay district only if infeasible to co-locate associated wireless
telecommunication facilities on existing structures or to locate new
structures outside of the historic overlay district or in the public right-of-
way.
Policy i j. When placing in a historic overlay district:
Site the structure so as to not be located along the frontage of a historic
building, deemed historic on a federal, state, or local level; and Site the
structure so as not to be on an existing structure located on, adjacent to,
or visible from a major thoroughfare, historic byway, road listed or
determined to be eligible for listing in the National Register, or a
contributing or historic property in a County Historic District.
Policy j k. Locate proposed wireless telecommunication facilities so that views of and
vistas from architecturally and/or historically significant structures,
landscapes, or cultural resources are not impaired or diminished.
Fairfax County Comprehensive Plan 2026 Edition - Area Plans > Area Plan I >
Lincolnia Planning District Overview [May 5, 2026] > Lincolnia Community
Business Center > Public Facilities
Schools
The Lincolnia CBC is served by four public schools: Parklawn and Weyanoke
Elementary Schools, Holmes Middle School, and Annandale High School using
attendance areas for School Year 2017-18. Under the envisioned Comprehensive
Plan buildout, approximately 1,468 additional primarily multi-family dwelling units
are recommended. Using the 2018 student generation ratio, this number of units
could generate approximately 169 additional students (93 elementary, 29 middle,
and 47 high school).
176
Attachment 1
The increase in students is not anticipated to generate a need for new school
facilities to support the increased enrollment based on 2017-2018 school
capacities. Accommodating the increased student yield at existing facilities should be
addressed through various means that may include additions to existing facilities,
interior architectural modifications, use of modular buildings, changes to programs,
and/or changes to attendance areas.
Police and Fire and Rescue
Emergency and other fire and rescue services are primarily provided by the Edsall Road
Fire and Rescue Station. Several other fire and rescue stations provide coverage to the
Lincolnia CBC area, including the Bailey’s Crossroads Volunteer Fire and Rescue
Station and the Annandale Volunteer Fire and Rescue Station.
Fairfax County Comprehensive Plan 2026 Edition - Area Plans > Area Plan I > The
Merrifield Suburban Center Overview [May 5, 2026] > Area-wide
Recommendations > Public Facilities/infrastructure
Library
Tysons-Pimmit Regional Library began was renovatedion in 20167. These
renovations will meet the county’s library level of service standards with no additional
facilities being anticipated….
Fairfax County Comprehensive Plan 2026 Edition - Area Plans > Area Plan II >
Fairfax Planning District Overview [May 5, 2026] > District-Wide
Recommendations > Public Facilities Public Facilities
Pu
Text truncated. Open the original for the full document.
Source: Fairfax County website. First collected Nov 15, 2026.