FY2024 Budget in Brief (PDF)
Chesterfield County · Chesterfield County · Budget documents
Open the original document More from Chesterfield County
This document is no longer listed on Chesterfield County's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
THIS PAGE IS INTENTIONALLY LEFT BLANK
FY2024 BUDGET-IN-BRIEF
WWW.BLUEPRINT.CHESTERFIELD.GOV
2
INTRODUCTION
KEY FACTS & INFORMATION
STRATEGIC PLAN
BUDGET BY THE NUMBERS
BUDGET PROCESS & CALENDAR
FY2024 BUDGET HIGHLIGHTS
INVESTING IN SCHOOL PRIORITIES
CAPITAL OUTLOOK
BOND REFERENDUM UPDATE
0303
04
05
06
08
09
11
12
13 CONTENTS
COUNTY EXECUTIVE LEADERSHIP
FY2024 BUDGET-IN-BRIEF
DR. JOSEPH P.
CASEY
COUNTY ADMINISTRATOR
MATT HARRIS
DEPUTY COUNTY ADMINISTRATOR
FINANCE AND ADMINISTRATRATION
JESSE SMITH
DEPUTY COUNTY ADMINISTRATOR
COMMUNITY DEVELOPMENT
CLAY BOWLES
DEPUTY COUNTY ADMINISTATOR
COMMUNITY OPERATIONS
JAMES WORSELY
DEPUTY COUNTY ADMINISTRATOR
HUMAN SERVICES
3
Over the last four years, we have journeyed through unprecedented changes in the world around us. All
of us have faced challenges, both old and new, in every aspect of our lives, and the County has not been
immune. Throughout this journey, the County’s values and aims have never changed; they would be equally
recognizable to both old and new residents alike. Yet, values and aims alone are not enough. The mantle of a
first-choice community comes at a price: the courage to learn and change; to show that our values and aims
can be applied in a way relevant to changing landscapes. The County’s strength today comes from the journey
of that change and the lessons we have learned along the way.
The budget before you recognizes the journey has not ended – it never ends. However, the next stage for the County is not moving backwards
or accepting the status quo; it is renewing ourselves again. It is across the spectrum of services, in public safety, environmental stewardship,
education, and cost of tax relief, to further the journey of change. All for the same reason: putting the citizen at the heart of our services. The
results of the journey thus far are woven throughout this budget, five-year plan, and Capital Improvement Program. The ultimate test of our
fiscal policy is that we achieve sustained stability, not just for a year or two but for the long term. This budget strikes the right balance between
tax policies that are sustainable, investments that are essential, and stability that is paramount.
Each budget cycle we challenge ourselves to ask the fundamental question: how should our budget and five-year plan serve the changing
priorities of our citizens and businesses? The answer is that as we create the plans that help us optimize opportunities for all, many hands
have been involved. Budgeting, once thought of as a once-a-year exercise, is now built conversation-by-conversation through a year-round
collaborative process. Conversations between leaders, departments, businesses, non-profits, and our citizens have all shaped the budget that
is before you today. Each stakeholder may have different aims, but they all share one vision – to make Chesterfield the best place in which to
live, work, and play. Much has been stated about the relative size of both the County and School Board budgets. However, when this budget was
adopted by the Board, it was adopted as one countywide budget. With the State budget still not finalized, our collective pressure must lean on
them to step up their commitment to our county – from education funding, to funding the numerous unfunded mandates which place undue
fiscal pressure on county residents. Until then, we must forge ahead as one community in building a balanced financial plan
The budget before you today is not the culmination of this budget process, but rather the start of another phase with many community meetings,
public hearings, and updates from the State budget process to come. More importantly, however, is that our budget process is a year-round
conversation. The needs of our community are dynamic and everchanging and our methodical, yet nimble, approach to budgeting reflects this.
Over the last four years, this board has invested unprecedented funds into all areas of our operations: from record investments in schools,
capital investment, to recognizing our workforce. All of this was possible even while returning equally unprecedented levels of tax relief to
our citizens and businesses. It has taken many conversations and hands to build this budget, the results of which are in this document. I want
to thank everyone – from our dedicated employees, elected officials, to, most importantly, our citizens – and I look forward to the discussions
to come.
Dr. Joseph P. Casey, County Administrator
TO THE
MEMBERS
OF OUR
COMMUNITY
FY2024 BUDGET-IN-BRIEF
4
Key Facts & Key Facts &
InformationInformation
Early History
Founded in 1749, Chesterfield County emerged as an
important industrial hub as the first place in the nation
where coal was mined commercially. As a result of
the commercialization of the Midlothian mines, other
“firsts” occurred: Midlothian Turnpike, then known as
the Manchester or Buckingham Road, was built in 1807
as the first toll road in Virginia. Moreover, in 1831, the
first railroad in the area, the Midlothian to Manchester
Railroad, was built from the mines to the James River
so coal could be loaded on ships to be sent to New York,
Philadelphia and other northern cities. Coal mining operations
continued through the Civil War, when coal was used in cannon
casting at the Tredegar Iron Works in Richmond and the Bellona
Arsenal on Old Gun Road.
Government Services
Chesterfield County is divided into five magisterial districts, each of which is represented by one
supervisor elected to serve a four-year term. The Board of Supervisors is responsible for establishing
local public policy, raising local resources for the support of County programs and services, and
overseeing the County’s affairs through its appointed administrative officials. Chesterfield County is a
full-service locality comprised of about fifty departments; including, Police, Fire and EMS, Libraries and
Parks, and Sheriff services (jail and courtroom security). In addition, the County supports an award-
winning school division, which is governed by an elected school board. The County also provides water
and sewer service to residents and businesses through its Triple AAA rated utility division. The full
range of programs and services provided by Chesterfield County are discussed in the departmental
sections of the FY2024 budget.
Demographics
The County is ideally located in the mid-Atlantic region of the United States. This strategic location on the
eastern seaboard is a valuable asset. Additionally, in 2015 The Boyd Co. ranked Chesterfield as the top
location on the East Coast, and one of the best places in the nation, for logistics-related business. It puts
area businesses halfway between the major east coast markets, within a one-day commute of 50% of
the U.S. population, 65% of the nation’s manufacturing operations, and 60% of the corporate headquarters
in the country. Chesterfield County is part of the Richmond-Petersburg MSA and is bounded by the cities
of Richmond, Petersburg, Hopewell and Colonial Heights. Situated between the James and Appomattox
Rivers, Chesterfield boasts a pleasant mix of suburban communities that are within a two-hour drive of
Virginia beaches, the Blue Ridge Parkway, and Washington, D.C.
WWW.BLUEPRINT.CHESTERFIELD.GOV
FY2024 BUDGET-IN-BRIEF
5
STRATEGIC P LL AN
VALUES
VISIONMISSION
Providing a FIRST CHOICE
community through
excellence in public service
To be an extraordinary
and innovative community
in which to live, learn,
work, and play.
RESULTS
We focus on outcomes that add value
INNOVATION
We look for new ways to solve problems
and new approaches to service delivery
SERVICE
We seek to understand and respond
appropriately to customers’ key needs
ETHICS
We are honest, transparent, and
contribute to the county’s reputation
FY2020 - 2024
EVERYDAY EXCELLENCE
1.1 Promote trust and transparency
that strengthens community
engagement
1.2 Continuously improve our
service-centric culture
1.3 Model financial integrity,
considering regional and private
partnerships as appropriate
1.4 Invest in employee engagement
Partner with the community to provide safe and
secure surroundings through prevention, readiness,
and professional response
2.1 Increase safety and
preparedness through prevention
2.2 Foster positive and respectful
community relationships
2.3 Reduce repetitive incidents
that negatively impact resources
2.4 Respond promptly,
professionally, and efficiently to
service calls
Promote healthy, active lifestyles while fostering
self-sufficiency and quality of life
4.1 Provide critical and easily
accessible resources to help
individuals flourish
4.2 Inspire neighbor-to-neighbor
relationships
4.3 Encourage healthy lifestyles
4.4 Demonstrate readiness for
shifting demographics
Support a range of learning opportunities that
sustains quality of life, employment, and well-being
6.1 Collaborate with Chesterfield
County Public Schools to position
students for lifelong success
6.2 Provide access to learning
and enrichment opportunities for
citizens of all demographics
6.3 Equip the workforce with skills
to meet changing business needs
5.1 Foster long-lasting communities
with unique identities
5.2 Enhance, restore, and maintain
neighborhoods and communities using
public and private efforts
5.3 Continuously improve public
infrastructure and facilities
5.4 Responsibly attend to the
environment
Foster a vibrant economy that provides quality jobs,
enhances economic opportunities, and ensures
business diversity
3.1 Attract and retain a variety of
business sectors to match the talents
of existing and future citizens
3.2 Expand available jobs so more
residents can work in the county
3.3 Provide services and venues that
encourage residents to stay and
visitors to return
Demonstrate excellence in public service with a
commitment to fiscal stewardship and efficient use
of resources
Promote healthy, active lifestyles while fostering
self-sufficiency and quality of life
SAFE AND SECURE COMMUNITY
HEALTHY LIVING AND WELL-BEING
LEARNING FOR A LIFETIMETHRIVING COMMUNITIES
ROBUST ECONOMY
General Property TaxesGeneral Property Taxes
Other Local TaxesOther Local Taxes
Intergovernmental RevenueIntergovernmental Revenue
Transfers & ReservesTransfers & Reserves
Charges for ServicesCharges for Services
Permits, Fees, Fines, and ForfeituresPermits, Fees, Fines, and Forfeitures
Use of Money and PropertyUse of Money and Property
Recovered Costs & Misc.Recovered Costs & Misc.
$951,778,800 $951,778,800
$656,546,400
$134,686,900
$90,754,700
$32,799,600
$13,933,900
$9,632,100
$7,930,900
$5,494,300
FY2024 BUDGET-IN-BRIEF
6
BUDGET BY THE NUMBERS
WWW.BLUEPRINT.CHESTERFIELD.GOV
REVENUE
Charges for ServicesCharges for Services
Permits, Fees, Fines, and ForfeituresPermits, Fees, Fines, and Forfeitures
Use of Money and PropertyUse of Money and Property
$951,778,800 $951,778,800
$ 391,073,700
$ 259,500,600
$ 75,334,800
$69,098,200
$ 64,064,500
$ 45,047,100
$ 29,543,400
$ 18,116,500
EducationEducation
Public SafetyPublic Safety
Capital & Debt ServiceCapital & Debt Service
Health & WelfareHealth & Welfare
General GovernmentGeneral Government
Public Works & CommunityPublic Works & Community
Development Development
Parks, Recreation, & Parks, Recreation, &
CulturalCultural
Other Misc.Other Misc.
FY2024 BUDGET-IN-BRIEF
7
BUDGET BY THE NUMBERS
EXPENDITURES
FY2024 BUDGET-IN-BRIEF
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
8
BUDGET PROCESS
& CALENDAR
Budget Development
The development of Chesterfield County’s budget begins each year in September and
continues through the final budget adoption in April. The process is designed to incorporate
a rigorous internal review of each department’s budget and to allocate resources across
departmental programs based on a thorough examination of program alternatives and
justifications. Each funded activity is reviewed by the County’s Budget and Management staff,
executive leadership, the County Administrator, and the Board of Supervisors.
Budget Proposal
By March 15, the County Administrator submits a proposed operating budget for the
upcoming fiscal year beginning July 1 to the Board of Supervisors. This operating budget
includes proposed expenditures and the revenue sources needed to finance them. A public
hearing and Board of Supervisors constituent meetings are conducted in March to inform
residents about the proposed budget and to gather taxpayer input to guide spending decisions.
Budget Approval
Prior to May 1, the Board of Supervisors makes its final revisions to the proposed budget and
adopts the budget by resolution. Funds are generally appropriated by category through the
Board of Supervisors adoption of an Appropriations Resolution. Budgets for all funds are
adopted on a basis consistent with Generally Accepted Accounting Principles (GAAP)
applicable to governmental units. Budgeted amounts reflected within this plan are
reported as adopted. Financial statements outside of this plan may refer to budgeted amounts
as originally adopted, unless amended by the County Administrator or Board of Supervisors.
Appropriations for the general fund, school fund, internal service funds, enterprise funds, and
special revenue funds lapse at fiscal year-end. Appropriations for capital project funds and
grant funds are continued until the completion of the applicable project or grant, even when the
project or grant extends beyond the end of the fiscal year.
Budget Amendments
Amendments that alter the total appropriation of any fund must be approved by the Board of
Supervisors, with some exceptions where approval may be made by the County Administrator
as described by the Appropriations Resolution portion of this document. During the year,
the Board of Supervisors may approve amendments to original appropriations, primarily
in response to various federal and state grant awards. Any appropriation during the year
that would increase the County’s currently adopted total budget by more than one percent can
be approved only after holding a public hearing on the proposed amendment.
WWW.BLUEPRINT.CHESTERFIELD.GOV
FY2024 BUDGET-IN-BRIEF
9
RECOGNIZING THE WORKFORCE
• Phase II of the General Government
Pay Plan, providing an increase to the
minimum wage for full-time employees
at $16 per hour, targeted adjustments
to existing salaries to address market
compression, and a 3.5 percent merit-
based increase to qualified employees in
January 2024.
FY24 BUDGET HIGHLIGHTS
CONTINUING COMMITMENT TO
PUBLIC SAFETY
• Continued implementation of the Public
Safety Pay Plan including the annual step
percent of 2.25 percent (July 2023), a 10
percent raise to starting salaries (July
2023), and 10 percent raise to remaining
sworn public safety personnel and
emergency communications officers’
salaries (January 2024).
• An additional 36 positions to fully staff
and achieve the Fire and EMS’ department
desired minimum staffing level to enhance
24-hour staffing around the county.
• Expansion of the Police Service Aide
program with three new positions and five
additional Traffic Enforcement Officers
beginning in January 2024.
GROWTH IN CONTRACTURAL
OBLIGATIONS
• Funding to support annual inflation-driven
cost increases including mulch grinding,
household hazardous waste, freon
recovery, and other services
• Annual increases in various service
agreements and annual maintenance
costs for technology subscription services
• Funding to support annual increases
to cost of medical supplies, contracted
nursing staff, and food services for
inmates
FY2024 BUDGET-IN-BRIEF
WWW.BLUEPRINT.CHESTERFIELD.GOV
10
FY24 BUDGET HIGHLIGHTS
• Funding will allow for multiple enhancements
for both of the County’s Waste and Recycling
centers including additional personnel to
have each center open seven days a week,
site improvements to improve traffic queues
and dedicated streamlined recycling lanes,
and providing additional recycling containers
at six designated county parks.
• The FY2024-FY2028 Transportation CIP
includes a funding source created through
the Central Virginia Transportation Authority
(CVTA). The plan also includes dedicated
funding for community connectivity projects
such as sidewalks.
• Continued augmentation of the Parks and
Recreation Athletic Field Crew with three
full-time maintenance positions. As the
County’s parks system grows, additional crew
is needed to ensure facilities are maintained
and remain at the high-quality standards
citizens come to expect. Additionally, with
growing sports tourism, the crew will ensure
facilities are properly prepared for upcoming
tournaments and events.
• Additional funding for the county’s internship
program as well as the implementation of
a new Fellowship Program. The Fellowship
Program will allow for a recent graduate
to participate in a two-year rotation with
the goal of working and learning about the
diverse business areas and functions of local
government.
STRENGTHENING INVESTMENT IN
INFRASTRUCTURE AND FACILITIES
ENHANCING QUALITY OF LIFE
INVESTMENT IN SUPPORT SERVICES
FY2024 BUDGET-IN-BRIEF
11
INVESTING IN THE CREATORS OF
A BETTER TOMORROW
SCHOOLS:
One of the hallmarks of Chesterfield County is the school system.
Our student population is growing and the growth is expected to
continue. We are projecting an enrollment increase of more
than 1,600 in the 2023-24 school year.
Our school division is expected to have 68,000 students by
2028. The schools budget takes this growth into account
and provides needed resources to support it.
Schools is consistently a top priority of the County and
remains the largest single expenditure of the annual budget,
and FY2024 is no exception.
FY2024 budget addresses increases
for critical service levels, includes
increasing counselors, improving the
student-teacher ratios for English language learners, adding
security personnel, while tackling cost increases due to
inflation. It also addresses government mandates, including
adding reading and math specialists.
The FY2024 proposed budget includes some familiar
education funding topics. Chief among those are the
implementation of the next phase of the teacher salary study
at $33 million, $23 million to maintain service levels and $6.5
million to address critical service level
needs.
Projected funding increases include $34.3 million in state
revenue and $33.9 million in additional needed local or state
funding to meet requirements and community expectations,
recruit and retain the best talent, and serve our students
appropriately.
Other FY2024 priorities include funding of major
maintenance contracts and increase in the pay of substitute
teachers. The full outline of the School’s FY2024 budget can
be found in the School’s section of this document.
CAPITAL OUTLOOK
FY2024 BUDGET-IN-BRIEF
12
POWHITE PARKWAY
EXTENSION
Since 1989, the extension of Powhite Parkway has been on the County’s thoroughfare plan. With our purchase
and rezoning of the Upper Magnolia Green West site, a 1,700-acre property, this area of the county is poised
to become a hub for advanced manufacturing, research and development, and other technology rich sectors
attracting both significant capital and high-paying jobs. Leaders from all levels of government have identified
this site as one of the premier locations ripe for economic development in the state owing to the county’s
location and access to a deep pool of workers.
Outside of economic development benefits, due to the rapid population growth over the past decade and
mitigating congestion, the extension of Powhite Parkway has become the County’s top transportation priority.
Incrementally funding the project not only allows us to sustainably finance, but also reap the environmental
benefits of pursuing this project. To that end, the extension has been proposed to be completed in two phases:
• Phase I – 2.25 mile project to widen
the last existing section of Powhite
Parkway from two to four lanes,
extend it from Little Tomahawk
Creek to Woolridge Road, create
an interchange at Charter Colony
Parkway and construct overpasses
on Brandermill and Watermill
parkways.
• Phase II – construction of a four-
lane extension of the Powhite
Parkway from Woolridge Road to
Hull Street
As part of this Capital Program, Phase I of the Powhite extension will be fully funded with construction
beginning in FY2026. Not only are the transportation and environmental benefits crystal clear, but by
committing nearly 25% of our entire capital funding to Phase I we recognize the tremendous economic impact
that this extension will unlock.
While funding streams to fully fund Phase II, linking the Upper Magnolia site to Hull Street, are yet to be
finalized, our commitment to realizing this vision is unlocking support, with the state awarding $25 million to
fund infrastructure and utility improvements at the Upper Magnolia site. Coupled with the county already having
committed $8 million to Phase II, this project is proof positive that when we put our minds to something and act
with urgency and creativity – we can do big things.
WWW.BLUEPRINT.CHESTERFIELD.GOV
FY24-29 Referendum Overview
A bond referendum is a vital component of the local democratic process in which citizens
vote on a range of important community-based topics, focused primarily on major capital
projects. Prior to the COVID-19 pandemic, the County had been on track to seek general
obligation bond authority during November of 2021. Emerging from the pandemic, the County
held a vote for a bond referendum in November 2022.
Voters considered one question for a variety of projects ranging from new school facilities,
to new fire stations to new park facilities. With an approval rating of 77%, the vote granted
the County authority to issue bonds to finance a finite list of projects. The total amount of the
bonds for which voters approved is aproximately $540 million, with $165 million allocated to
County projects and $375 million allocated to Schools.
Recognizing the important role our parks facilities play
in contributing to a high quality of life, projects include
River City improvements and park development (Falling
Creek, Horner Park expansion and water access).
Parks
Acknowledging aging facilities that no
longer meet service demands, projects
include replacing the Chester and Ettrick
fire stations and renovating the Dutch Gap
and Clover Hill stations.
Fire Stations
Offering greater community presence in more
accessible locations, four new police stations
will be established: E. Midlothian, Hull Street,
Chester and W. Midlothian.
Schools
Focusing on providing relief and addressing
growth, including a new elementary school in
the upper Matoaca district and two new middle
schools — one to be located in the central/
eastern area and another in the 360W corridor.
In addition, taking care of our existing facilities
and responding to our changing community,
some existing elementary and middle schools
will be identified as rebuild or renovation
projects.
Libraries
Responding to an increasing demand and growing
population accessing our library facilities, projects
include replacing Enon and Hull Street libraries, and
renovating the Ettrick-Matoaca Libray.
$45.7M
$375M
$42M
Police Stations
$39.1M
$38.2M
Note: Project scope, location and cost are estimates based on information currently available and are, therefore, subject to reasonable change
on the basis of new and refined information up to the time of completion.
FY2024 BUDGET-IN-BRIEF
13
BOND REFERENDUM UPDATE
Chesterfield County Board of Supervisors
THIS DOCUMENT IS A PUBLICATION OF CHESTERFIELD COUNTY GOVERNMENT.
GERARD DURKIN
DIRECTOR
LOGAN ASHBY
STEPHANIE DAVIS
JONI DOCTOR
SHANE HILL
DAVID OAKLEY
CHRIS ORRELL
RIANE REISS
AMBER SMITH
COLEMAN WELLS
(Listed from left to right)
James “Jim” M. Holland (Dale District), Jim Ingle (Bermuda District) - Vice-Chair, Kevin Carroll (Matoaca
District) - Chair, Christopher Winslow (Clover Hill District), and Mark Miller, Ph.D. (Midlothian District)
BUDGET AND
MANAGEMENT
CHESTERFIELD, VIRGINIA
FY2024 BUDGET-IN-BRIEF
14
Source: Chesterfield County website. First collected Nov 15, 2026.