FY2017 BUDGET-IN-BRIEF
Issue 3
BUILDING A BETTER COMMUNITY
CHESTERFIELD COUNT Y, VIRGINIA
1
BUILDING A BETTER COMMUNITY FY2017 BUDGET-IN-BRIEF
Table of Contents
BUDGET CALENDAR
Summer (June, July, August):
Priority setting/strategic planning
December - February:
Budget submissions reviewed internally
January:
Proposed CIP presented to the Board of
Supervisors and land book value fi nalized
February:
Tax rate advertised and revenue work session
with Board of Supervisors
March:
Proposed budget presented to Board of Supervisors
and accompanying work sessions
Fall (September, October, November):
Development of Capital Improvements Program (CIP)
project requests and departmental budget submissions
March-April:
Community meetings and public
hearings
April:
Adoption of the budget
Chesterfi eld County 101..............................................................................Page 3
FY2017 General Fund Highlights,
excerpts from the Transmittal Letter..............................................................Page 4
Key Performance Measures,
Blue Book Highlights......................................................................................Page 5
Chesterfi eld’s Budget by the numbers,
a closer look at the general fund..............................................................Pages 6-7
FY17 County and Schools Five-Year Plan............................................Pages 8-9
Blueprint Chesterfi eld.........................................................................Pages 10-15
Goal 1,
Model for excellence in government
Goal 2, Safety and Security
Goal 3, Economic prosperity and educational excellence
Goal 4, Healthy living and well-being
Goal 5, Thriving communities and environmental stewardship
Meadowville Industrial Park
2
CHESTERFIELD COUNTY, VA
Chesterfield County 101
Founded in 1749, Chesterfi eld County emerged as an important industrial hub as the fi rst place in the na-
tion where coal was mined commercially. As a result of the commercialization of the Midlothian mines, oth-
er “fi rsts” occurred: Midlothian Turnpike, then known as the Manchester or Buckingham Road, was built in 1807
as the fi rst toll road in Virginia. Moreover, in 1831, the fi rst railroad in the area, the Midlothian to Manchester Rail-
road, was built from the mines to the James River so coal could be loaded on ships to be sent to New York, Phila-
delphia and other northern cities. Coal mining operations continued through the Civil War, when coal was
used in cannon casting at the Tredegar Iron Works in Richmond and the Bellona Arsenal on Old Gun Road.
Chesterfi eld County is divided into fi ve magisterial districts, each of which is represented by one supervisor elected to
serve a four-year term. The Board of Supervisors is responsible for establishing local public policy, raising local resources
for the support of County programs and services, and overseeing the conduct of the County’s aff airs through its appointed
administrative offi cials. Chesterfi eld County is a full-service locality comprised of about fi fty general fund departments;
including, police, (professional) fi re, libraries, parks and sheriff services (jail and courtroom securities). In addition, the
County supports an award-winning school division, which is governed by an elected school board. The County also
provides water and sewer service to residents and businesses through its triple AAA rated utility division. The full range
of programs and services provided by Chesterfi eld County are discussed in further detail throughout this document.
The County is ideally located in the mid-Atlantic region
of the United States. This strategic location on the east-
ern seaboard is a valuable asset. Additionally, in 2015
The Boyd Co. ranked Chesterfi eld as the top location on
the East Coast, and one of the best places in the nation,
for logistics-related business. It puts area businesses
halfway between the major east coast markets, within
a one-day commute of 50% of the U.S. population, 65%
of the nation’s manufacturing operations and 60% of
the corporate headquarters in the country. Chesterfi eld
County is part of the Richmond-Petersburg MSA and is
bounded by the cities of Richmond, Petersburg, Hopewell
and Colonial Heights. Situated between the James and
Appomattox Rivers, Chesterfi eld’s land area totals 446
square miles and consists of a pleasant mix of suburban
communities that are within a two-hour drive of Virginia
beaches, the Blue Ridge Parkway and Washington, D.C.
Early History
Government Services
Demograhpics
Chesterfield Quick Facts
Population, 4th most
populated county in the
state
337,000
Median household income,
compared to state avg.
of $64,792 or the national
avg. of $53,482
$75,514
% of residents with a
bachelor’s degree or higher,
compared to the state at
35.8% or the US at 29.3%
36.6%
446 sq.mi.
Total land area
$344,389
Average assessed
value of new single
family home
3
BUILDING A BETTER COMMUNITY FY2017 BUDGET-IN-BRIEF
FY2017 General Fund Budget Highlights
While high profi le dysfunction at the top levels of government and the public’s understandable
reaction dominate the news today, Chesterfi eld stands apart in proving that it is possible to get
government right. The County subscribes to a simple doctrine that we exist to serve the needs
of the community and that we should do so in an effi cient, eff ective, and transparent manner.
FINANCIAL PLAN SUMMARY
This budget paves the way for continued success and is
carefully crafted in the County’s longstanding tradition of
providing exemplary core services and a high quality of life
at the lowest cost possible. This plan is built in accordance
with the fi ve-year plan; strengthens public safety and
education; addresses cleaning up the Chesapeake
Bay; accelerates the school referendum and promotes
revitalization; doubles down on our already successful
economic development eff orts; provides needed funding
for local roads and other bedrock infrastructure — and
does it all at no increase in real, per capita cost of service.
THE FIVE-YEAR PLAN
The FY2017 budget is on target with the fi ve-year plan; the
general fund budget (in combination with the stormwater
utility fund) is 0.05 percent below the prior year’s planned
expenditure total. Programmatically, this budget focuses
on improving service quality by making measured
investments in front line areas. Per the fi ve-year plan, the
budget includes four additional police offi cer positions,
staffi ng to provide 24-hour emergency medical service
in the community served by the Manchester Fire Station
(Medic 2), funds to continue a multi-year eff ort to enhance
the library materials collection, and further investments
in protective equipment replacement for fi rst responders.
Additionally, this plan includes a handful of other targeted
investments aimed at addressing some emerging
challenges in the organization and bolstering service
delivery — enhancements that have all been made possible
by reductions elsewhere in the budget. These amendments
to the fi ve-year plan are headlined by the restoration of
Thursday library hours (as of September 2016), an item that
was cut during the height of the recent economic downturn.
The list of amendments also includes a comprehensive
package to support and encourage small business
growth in the County. Recognizing the important role
small businesses play in our local economy, the Jumpstart
Program provides a new, dedicated staff resource to
Economic Development, additional resources for the
County’s Business Expansion Incentive Fund, and business
license tax relief accomplished through an update to the
BPOL rate structure (the fi rst such revision since 2002). In
addition, there is funding equivalent to a 0.5 percent salary
adjustment built into this plan that will be used to shore up
compensation challenges in high turnover areas and fund
career development plans in Police, Fire and EMS, and
the Sheriff ’s Department. That variable component is in
addition to the two percent merit increase that is included
as part of the fi ve-year plan (for qualifying employees).
The balance of the plan’s amendments relate to various
workload and staffi ng issues throughout the organization.
FURTHER BELT TIGHTENING
The initial forecast for FY2017 showed a projected general
fund defi cit of almost $6 million. As noted, staff has since
worked to identify more than $7 million in general fund
expenditure reductions and other effi ciencies that — in
conjunction with a dedicated stormwater resource — have
positioned this fi nancial plan to fully deliver the quality of life
enhancements approved in the fi ve-year plan. The reductions
in this plan are headlined by $3.6 million in pension plan
savings tied to the aforementioned benefi t reforms. There
are also notable contributions from lower debt service costs,
turnover savings, and a number of contract renegotiations.
LOOKING AHEAD: FY2018 AND BEYOND
Looking ahead into the out years (FY2018-2021) of the
revised fi ve-year plan, the early projections continue
to show cumulative (County and schools) defi cits in all
years when considering enhancements. The margins
over the next two years (FY2018-2019) are generally
manageable and not unlike forecasted defi cits shown in
recent plans. The fi nal two years of the plan show notably
larger spreads, which are largely the result of new capital
facilities (two fi re stations and a library) that are scheduled
to come online in FY2020-2021. As has been the case since
the fi ve-year plan’s inception, the framework is meant to
be used as a planning tool and not a fi rm commitment
to a particular set of spending choices, particularly in
the furthest out years. Accordingly, the current outlook
suggests that continuing to strengthen core services and
invest in the workforce could become more challenging
over the long-run, underscoring the importance of
maintaining our fi scal discipline and not making short-
term decisions with detrimental long-term impacts.
4
CHESTERFIELD COUNTY, VA
Key Measures: The Blue Book
Strategic Plan FY2015-FY2019
Mission - providing a fi rst choice community through excellence in public service
Vision - To be an extraordinary and innovative community in which to live, learn, work and play
Values - Results, Innovation, Service, Ethics
The Blue Book: Blueprint Chesterfi eld relies on a robust measurement system in order to help indicate
whether or not the organization is making progress on its stated goals. The FY2017 budget includes
updated data in the current issue of The Blue Book. Shown below is a sample of the dashboard
measures included in the report. See the full report in “The Blue Book” section of the budget document.
Fire Average Priority 1 Response Times
Recognizing the need to address an upward trend in response
times, funding has been allocated to add 24-hour medic service
to an underserved area in the northeastern part of the County
in FY17. Additionally, the fi ve-year plan indicates funding
in FY20 for a new fi re station at Courthouse Rd and Rt.288.
Library and Park Vistors
(# shown in millions)
0
1
2
3
4
5
6
7
8
9
10
FY2011 FY2012 FY2013 FY2014 FY2015
The County anticipates that library visitation
will increase with the opening of the new North
Courthouse Road Library and the return of Thursday
hours at branch locations beginning in September.
High School Graduation Rates
88%
90% 90%
91% 91%
FY2011 FY2012 FY2013 FY2014 FY2015
The school division’s on-time graduation percentage of
90.9 percent topped the state average of 90.5 percent.
According to the Virginia Department of Education,
60 percent of Chesterfi eld County’s class of 2015
graduated with a more rigorous advanced studies
diploma, topping the state average of 52 percent.
0%
1%
2%
3%
4%
5%
6%
7%
2011 2012 2013 2014 2015
Chesterfield Virginia
Unemployment Rate
The County has made economic development and
jobs creation a major priority, which has broadened
economic opportunity for our residents and helped
reduce the County’s jobless rate, dropping most
recently (as of March 2016) to an eight-year low of 3.8%.
6:43
6:50
6:57
7:04
7:12
7:19
7:26
FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015
Response Time Goal
5
BUILDING A BETTER COMMUNITY FY2017 BUDGET-IN-BRIEF
$0
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
FY2017 Budget
General Fund: Total Revenue
$805.5 million
Property Taxes
50.8%
Utility & Other
Local Taxes
14.8%
Departmental
Revenue
6.8%
State Funding
17.2%
Rainy Day
Fund
7.3%
Other Misc.
2.1%
Feder al
Funding
1.1%
BREAKDOWN OF FUNDING SOURCES
$415,233,400
PROPERTY TAXES
Real estate taxes, personal
property taxes (cars, trucks,
etc.)
$52,683,700
DEPARTMENTAL REVENUE
User fees for recreational
programming, building permit
fees, planning fees
$117,864,000
UTILITY & OTHER LOCAL TAXES
Consumer utility tax, telecom sales
tax, vehicle registration fees, local
recordation tax, business licenses and
local sales tax
$139,361,000
STATE FUNDING
Car tax relief, state sales
tax, compensation board
reimbursement
Source: APA Comparative Report of Local Government Revenues and Expenditures
Local Revenue Burden per Capita 2015
$1,687
$2,225
Chesterfi eld County
maintains the leanest
overall cost structure
among full service
localities as well as the
lowest local revenue
burden per capita.
$2,197
6
CHESTERFIELD COUNTY, VA
General Fund: Total Expenditures
$805.5 million
$338M
EDUCATION
This represents the general government,
local funding for Chesterfi eld County
Public Schools, which is nearly 52% of
the overal school division budget
PUBLIC SAFETY & ADMINISTRATION OF JUSTICE
Police, Fire & EMS, Sheriff , the 911 call center, Animal Services,
the Courts, Circuit Court Clerk, and Commonwealth’s
Attorney
HUMAN SERVICES
Social Services, Mental Health,
Health Department, Senior Advocate,
Juvenile Detention Home/Probation,
Community Corrections, Cooperative
Extension, and Youth Services
CAPITAL/DEBT
Resources dedicated to the provision
of county infrastructure and capital
facilities; includes pay-as-you-go
funding and debt service payments
OTHER
Pass through payments related to
entities such as the The Greater
Richmond Convention Center and
Community Development Authorities, as
well as Tax Relief for the Elderly and the
community contract program
COMMUNITY DEVELOPMENT
Building Inspections, Planning, Economic
Development, Environmental Engineering,
and Transportation
Understanding how your tax dollar is invested
The County’s General Fund budget is organized by program and
service areas that are made up of departments and/or divisions
Education
41.9%
Public Safety &
Admin. of Justice
20.7%
Human Services
8.6%
Rainy Day*
7.4%
Support Services
6.8%
Capital/Debt
6.1%
Other
3.6%
Parks/Libraries
2.5%
Community
Development
2.3%
*The County unassigned fund balance level was adopted at 8.04%.
$167M
$69M
SUPPORT SERVICES
This represents funding for departments
that support front line areas such as
Budget, Human Resource Management,
County Attorney, Information Systems
Technology, Purchasing, and Accounting
$55M
$50M
$18M
$29M
BREAKDOWN OF EXPENDITURES
by the Numbers
7
General Government Five-Year Plan FY2017-FY2021
County Revenue FY2017 FY2018 FY2019 FY2020 FY2021
Real Estate Taxes (@ $0.96) 327,800,200$ 341,179,600$ 354,788,300$ 368,985,700$ 383,785,100$
Other Property Taxes 87,433,200$ 90,495,000$ 90,338,500$ 90,974,600$ 92,545,500$
Other Taxes (sales, BPOL, etc.) 117,864,000$ 119,301,200$ 120,488,200$ 121,984,200$ 123,514,200$
Permits and Fees 6,560,100$ 6,638,500$ 6,717,900$ 6,798,300$ 6,880,200$
Fines and Use of Money 2,694,800$ 2,719,800$ 2,744,800$ 2,744,800$ 2,744,800$
Service Charges 32,889,700$ 33,188,500$ 33,544,700$ 33,872,500$ 34,327,200$
State Revenue 139,361,000$ 141,291,000$ 142,749,800$ 144,237,800$ 145,785,600$
Federal Revenue 8,936,400$ 9,075,100$ 9,187,200$ 9,300,800$ 9,456,400$
Other Revenue 12,438,800$ 12,472,100$ 12,492,800$ 12,524,700$ 12,471,900$
Fund Balance 58,668,400$ 60,004,400$ 62,318,400$ 63,718,400$ 65,518,400$
Use of Reserves (County) 7,376,900$ 3,853,900$ 2,353,900$ 1,353,900$ 1,000,000$
Use of Reserves (Schools) 3,500,000$ 2,612,600$ 2,624,600$ 4,011,900$ 4,246,700$
TOTAL REVENUE 805,523,500$ 822,831,700$ 840,349,100$ 860,507,600$ 882,276,000$
County Expenditures (presented in incremental amounts) FY2017 FY2018 FY2019 FY2020 FY2021
Baseline Increases
Prior Year Adopted Budget 785,610,500$ 805,523,500$ 830,994,500$ 849,703,200$ 876,705,900$
1% Baseline Merit (includes FICA, VRS) 1,954,100$ 1,993,200$ 2,033,100$ 2,073,800$ 2,115,300$
VRS (from rate changes only) (3,604,800)$ -$ (1,363,400)$ -$ -$
Healthcare (includes retirees; 8% increase in FY17, 7% in FY18-21) 2,193,800$ 1,457,400$ 1,612,700$ 1,667,200$ 1,779,100$
Debt Service 753,300$ 1,509,600$ 353,400$ 550,700$ (844,500)$
Pay-as-you-go Capital Funding 1,522,700$ (4,111,600)$ 3,004,500$ 1,771,200$ (167,300)$
Revenue Sharing 1,371,000$ 138,800$ (1,358,600)$ 216,500$ 167,300$
School Transfer (includes dedicated capital dollars in FY18 and FY19) 9,308,100$ 14,810,600$ 10,229,200$ 11,771,400$ 12,258,700$
Riverside Regional (3% increase, FY18-21) -$ 346,000$ 356,400$ 367,100$ 378,100$
Tax Relief for the Elderly 287,100$ 175,000$ 180,300$ 185,700$ 191,300$
Pass-through Expenditures (CDAs, Convention Center) 497,900$ 1,745,300$ (1,782,100)$ (740,600)$ 166,700$
Non-Departmental (Community Contracts, Streetlights, etc.) (47,700)$ (16,100)$ (84,600)$ (71,700)$ 159,400$
Fund Balance (no change in 8% policy level) 1,336,000$ 2,314,000$ 1,400,000$ 1,800,000$ 1,940,700$
Departmental Adjustments (contract increases, new CIP impacts, etc.) 306,300$ 1,455,100$ 400,000$ 400,000$ 400,000$
Technical Adjustments (transfer of school health nurses net of mid-year adjustments) (1,353,800)$ -$ -$ -$ -$
Restoration of CIP Items (to the general fund) 640,000$ 137,800$ -$ -$ -$
Turnover Savings (1,148,900)$ (750,000)$ (750,000)$ (750,000)$ (750,000)$
Program Contingency (for mental health/jail program) 196,900$ -$ -$ -$ -$
Baseline Expenditure Increase 14,212,000$ 21,205,100$ 14,230,900$ 19,241,300$ 17,794,800$
BASELINE SUBTOTAL 799,822,500$ 826,728,600$ 845,225,400$ 868,944,500$ 894,500,700$
Program/Service Enhancements
Communications Officers (2 in FY18) -$ 101,300$ -$ -$ -$
Sheriff Records Room Staffing 133,200$ -$ -$ -$ -$
Police Officers (4 new positions in each year, plus 4 equivalents in overfill funding) 648,700$ 864,900$ 864,900$ 864,900$ 864,900$
Public Safety Equipment 300,000$ 300,000$ 300,000$ 300,000$ 300,000$
Body Worn Cameras -$ 450,000$ 150,000$ -$ -$
Courthouse/288 Fire Station -$ -$ -$ 4,169,500$ -$
Replacement Midlothian Fire Station -$ -$ -$ -$ 2,697,500$
Fire Minimum Staffing Plan 228,200$ 228,200$ 228,200$ 228,200$ 228,200$
Medic 2 24-hour Staffing (net cost; Manchester Fire Station) 228,200$ -$ -$ -$ -$
Medic 21 Staffing (Harrowgate Road Station) -$ -$ 642,600$ -$ -$
Robious Road Library -$ -$ -$ -$ 685,900$
Restore Library Hours (on Thursday; balance of cost shown in FY2018) 610,000$ 203,300$ -$ -$ -$
Library Materials 50,000$ 50,000$ 50,000$ 50,000$ 50,000$
Mental Health Staffing (offset by outside revenue) 207,000$ -$ 134,000$ -$ 134,000$
Jumpstart (Economic Development) Program 170,000$ -$ -$ -$ -$
Additional 1% Merit (for a total of 2%; includes FICA, VRS) 1,954,100$ 1,993,200$ 2,033,100$ 2,073,800$ 2,115,300$
Targeted Staffing Adjustments (Accounting, Building Inspections, Circuit Court Clerk, Human Resources) 194,500$ 75,000$ 75,000$ 75,000$ 75,000$
Targeted Compensation (career development, retention/turnover reduction) 977,100$ -$ -$ -$ -$
Enhanced Expenditure Subtotal 5,701,000$ 4,265,900$ 4,477,800$ 7,761,400$ 7,150,800$
TOTAL EXPENDITURES (Base + Enhanced) 805,523,500$ 830,994,500$ 849,703,200$ 876,705,900$ 901,651,500$
Baseline (Deficit)/Surplus 5,701,000$ (3,896,900)$ (4,876,300)$ (8,436,900)$ (12,224,700)$
Total (Deficit)/Surplus -$ (8,162,800)$ (9,354,100)$ (16,198,300)$ (19,375,500)$
THE FIVE YEAR PLAN EXPLAINED
In keeping with the formal practice begun in FY2015, the out years of this budget (FY2018-FY2021) include and are built on a rolling revised five-year
plan. The
five-year plan is intended to be a general framework to help the County establish and work towards accomplishing certain key priorities. The
out years
of the revised five-year plan in this budget build on last year’s effort with a continued focus on public safety, capital facilities/
infrastructure,
and quality-of-life initiatives. While themes remain consistent, there are a good number of changes to the revised framework
(highlighted in
light orange), though several of those are the result of adding the additional year (FY2021) to the rolling forecast.
Highlighted
revisions to the plan include the equivalent of four additional police officers per year (above those already in the plan; the additional four
could
be accomplished via overfill staffing), the addition of a medic unit to Fire Station 21 (Harrowgate Road), additional firefighter positions needed to
operate the
replacement Midlothian Fire Station (a FY2021 addition), targeted staffing increases in Mental Health and various support areas to address
growing
workloads, and the balance of funding for the restoration of Thursday library hours (which begins in FY2017). The revised plan is a more
comprehensive, staff-driven view of the organization’s needs than has been previously presented, though the five-year framework – especially in out
years
– remains a planning tool and is subject to future changes in economic conditions and community needs. In addition, the Board of Supervisors is
expected to further refine the out years of the plan prior to the next budget season to help ensure its alignment with their collective vision for
the County.
Taken altogether, the revised FY2017-FY2021 five-year plan shows annual deficits in each of the included out years. Projecting out year deficits is not
unusual;
however, FY2017 had a preliminary general fund deficit of almost $6 million, and the initial shortfalls for FY2018 and FY2019 are larger, but still
within a manageable range. FY2020 and FY2021, on the other hand, are showing considerably wider margins that are largely driven by new capital
facilities coming
online in those years (two fire stations and a library). As noted, the five-year plan is meant to be a tool to communicate needs with the
ability to
deliver on those goals tied to a variety of factors that evolve and are reevaluated over time. This plan will be continually refined over
the coming years and much of the projected deficits will likely be addressed via departmental savings, additional turnover, lower debt service,
and/or Board of Supervisor revisions. There is also the possibility that revenue growth (absent of a change in the rate) will be more robust than
forecast. If those
items fail to produce enough savings/additional revenue, enhancement items can be removed from the plan and/or scaled back to
accommodate the available resource level.
8
School Division Five-Year Plan FY2017-FY2021
School Revenue FY2017 FY2018 FY2019 FY2020 FY2021
Local Sources 10,290,000$ 10,290,000$ 10,290,000$ 10,290,000$ 10,290,000$
County
Recurring (baseline funding) 269,992,000$ 281,287,000$ 292,651,200$ 302,906,200$ 313,574,400$
One-time Operating 1,000,000$ -$ -$ -$ -$
One-time Capital -$ -$ -$ 4,850,000$ -$
Prior Year Savings (including the use of debt service reserves) 3,500,000$ 2,612,600$ 2,624,600$ 4,011,900$ 4,246,700$
State Sales Tax 63,400,200$ 65,692,400$ 67,006,300$ 68,346,400$ 69,713,300$
State 248,844,000$ 258,978,100$ 265,452,500$ 270,761,600$ 277,530,600$
Federal 396,500$ 396,500$ 396,500$ 396,500$ 396,500$
TOTAL REVENUE 597,422,700$ 619,256,600$ 638,421,100$ 661,562,600$ 675,751,500$
School Expenditures (presented in incremental amounts) FY2017 FY2018 FY2019 FY2020 FY2021
Baseline Increases
Prior Year Adopted Budget 581,100,000$ 597,422,700$ 619,448,900$ 638,199,100$ 660,762,900$
Healthcare (annualizing and rate increase costs) 4,518,800$ 2,897,000$ 2,897,000$ 2,897,000$ 2,897,000$
VRS (from rate changes only) 1,990,100$ 5,200,000$ 500,000$ -$ 500,000$
Salary Adjustments (1% annually) 3,704,900$ 3,741,900$ 3,779,400$ 3,817,200$ 3,855,300$
Student Growth -$ 250,000$ 250,000$ 250,000$ 250,000$
Increase in County Service Costs 650,700$ 252,000$ 246,600$ 277,800$ 291,700$
Comprehensive Services Act 1,176,800$ 117,700$ 129,500$ 142,400$ 156,600$
Debt Service 131,900$ 1,212,600$ 612,000$ 1,987,300$ 709,800$
Pay-as-you-go Capital Funding 3,884,000$ 2,870,100$ 3,145,900$ 5,434,000$ (3,579,900)$
Other (regional school tuition increases, etc.) 158,400$ -$ -$ -$
Reductions (turnover savings, risk management, custodial contract) (12,827,400)$ (750,000)$ -$ -$ -$
Baseline Expenditure Increase 3,388,200$ 15,791,300$ 11,560,400$ 14,805,700$ 5,080,500$
BASELINE SUBTOTAL 584,488,200$ 613,214,000$ 631,009,300$ 653,004,800$ 665,843,400$
Program/Service Enhancements*
Instruction
Additional PTR Reductions 1,593,600$ 1,600,000$ 1,632,000$ 1,670,000$ 1,700,000$
Targeted Instruction and Attendance Support 789,200$ -$ -$ -$ -$
Elementary Special Education Coordinators 738,700$ -$ -$ -$ -$
Middle School Administrative Assistants 227,300$ -$ -$ -$ -$
High School Dean 59,700$ -$ -$ -$ -$
Additional Collaborative Teaching Staff (middle school-level) 645,000$ -$ -$ -$ -$
Continued Restoration of Elementary Stipends 133,000$ -$ -$ -$ -$
College and Career Readiness 220,000$ -$ -$ -$ -$
CODE RVA 15,000$ 183,000$ 198,000$ 198,000$ 198,000$
Digital Curriculum 250,000$ 125,000$ 375,000$ -$ -$
Permanent Substitutes 275,000$ -$ -$ -$ -$
Opening New Midlothian Elementary School -$ -$ 178,400$ 822,900$ -$
Student and Staff Health and Safety
Student-focused Wellness Positions 90,000$ -$ 277,000$ -$ -$
Instructional Support/Division Operations
Bus Fleet Replacement 250,000$ 250,000$ 250,000$ 250,000$ 250,000$
Staff Computer Replacements -$ -$ 500,000$ 1,000,000$ 3,000,000$
Headstart Support 115,000$ -$ -$ -$ -$
Finance Positions for IRS Reporting Requirements 123,200$ -$ -$ -$ -$
Professional Development -$ 335,000$ -$ -$ -$
Employee Compensation
Additional Salary Adjustment 7,409,800$ 3,741,900$ 3,779,400$ 3,817,200$ 3,855,300$
Enhanced Expenditure Increase 12,934,500$ 6,234,900$ 7,189,800$ 7,758,100$ 9,003,300$
TOTAL EXPENDITURES (Base + Enhanced) 597,422,700$ 619,448,900$ 638,199,100$ 660,762,900$ 674,846,700$
Baseline (Deficit)/Surplus 12,934,500$ 6,042,600$ 7,411,800$ 8,557,800$ 9,908,100$
Total (Deficit)/Surplus -$ (192,300)$ 222,000$ 799,700$ 904,800$
CONSOLIDATED (County and Schools) TOTAL (DEFICIT)/SURPLUS $ - $ (8,355,100) $ (9,132,100) $ (15,398,600) $ (18,470,700)
Major Maintenance Gap Funding $ 3,705,000 $ 3,300,000 $ 2,040,400 $ 1,415,000 2,604,000 $
In addition to the operating items shown above, there is an identified need for additional pay-as-you-go capital funding to bolster the County’s major maintenance efforts. The amounts shown below reflect the delta
between existing funding levels and what would be required to reach the County’s target of reinvesting at least 2.5 percent of facility replacement cost in our physical plant each year.
NOTE: This document is presented as an illustration of various County and School division budget scenarios through FY2021; it is not intended to
be
a formal recommendation, nor is it inclusive of all the resource needs over the next five years , but should serve as a starting point for strategic
discussions moving forward.
9
BUILDING A BETTER COMMUNITY FY2017 BUDGET-IN-BRIEF
Priorities, Measures, Five-Year Plan...
WHAT IS BLUEPRINT CHESTERFIELD?
Blueprint Chesterfi eld is the framework that organizes
longstanding county practices related to budget and
strategic planning. To that end, Blueprint also serves
as a communications tool to facilitate meaningful
dialogue concerning the County’s strategic mission, both
internally and with the community. Blueprint Chesterfi eld
allows us to more easily defi ne why we do what we do.
HOW DOES BLUEPRINT WORK?
Prior to Blueprint Chesterfi eld, planning and budgeting
were generally separate components, surrounded by
complex processes that were diffi cult to communicate and
comprehend. Individual components of the existing system
were good, but not working well together. At the end of
FY2014, the County’s existing strategic plan was due to
expire, which prompted a thorough review and creation
of a new plan with new direction. In FY2013, the County
initiated a comprehensive program and service inventory,
which has since been fully integrated with the FY2017 budget
as well as the County’s fi nancial system. Through these
updates and process reviews, opportunities to address a
need that would better align the County’s priorities with
resource allocation emerged within normal planning and
budgeting cycles. Hence, Blueprint Chesterfi eld was born.
Taking it one step further, in an eff ort to better recognize
and communicate the priority needs of the County, the
Five-Year Plan was developed. Through Blueprint, planning
and budgeting are now part of the same conversation,
under a uniform branding, delivered through a more user-
friendly system, focused on moving the needle on strategic
goals while providing a long-range plan for the future.
Underpinning the entire framework of Blueprint
Chesterfi eld has been the development of a robust
measurement system. Beginning in the FY2016 budget,
departments defi ned and began reporting on measures
for each of their programs. As a complement to the
Budget-in-Brief, the FY2017 Blue Book outlines the various
departmental program measures and associated data.
WHY DOES BLUEPRINT MATTER?
Like many jurisdictions, Chesterfi eld County has faced
the reality of economic challenges. In response to the
most recent economic downturn, FY2015 proved to be a
vivacious year for budgeting. By harnessing the capabilities
of Blueprint Chesterfi eld, the Five-Year Plan emerged. The
Five-Year Plan provides a renewed sense of understanding
and forward thinking as future plans develop. Through
the Five-Year Plan, Chesterfi eld is pushing itself to
identify and recognize the most pressing organizational
needs. Knowing that all needs often cannot be met in a
single fi scal year, the Five-Year Plan aligns departmental
priorities with advancing the strategic plan, while also
supporting clearly documented, data-driven analytics
on why additional resource allocation is warranted.
Priorities Measures Five Year
Plan
Priorities are reviewed
annually and updated
every two years.
Measures are collected in a
central database and up-
dated quarterly, bi-annually,
and annually.
The fi ve-year plan is a rolling
plan and reviewed annually
during the budget process.
10
CHESTERFIELD COUNTY, VA
$1,000
$1,200
$1,400
$1,600
$1,800
$2,000
$2,200
$2,400
$2,600
1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017
Real, per capita cost of general fund services
$2,093 $2,083
Strategic Plan Goal 1
Model for excellence in government
Goal Defi nition: Deliver exceptional service with an engaged workforce that eff ectively
manages public assets
During the summer of 2015, Chesterfi eld’s triple-AAA bond rating
was reaffi rmed. In fact, Standard and Poor’s noted that “Chesterfi eld
County’s general obligation bonds are eligible to be rated above the
sovereign because we believe the County can maintain better credit
characteristics than the U.S. in a stress situation. ” In FY2016, each of the
rating agencies reaffi rmed the county’s AAA rating on general obligation
bonds, with each rating agency providing a “stable outlook” indicator.
Chesterfi eld County remains among the select group of approximately
35 localities nationwide to earn a AAA rating from all three agencies.
Maintaining the triple-AAA status not only ensures access to capital
markets at the lowest available rates but is also a strong endorsement
of the Board of Supervisors’ oversight of the County’s fi nancial and
management practices and the community’s outlook moving forward.
BOND RATING REAFFIRMED
Successful localities off er their customer base — residents, businesses, and visitors alike — a very good product at a
competitive price, and in Chesterfi eld County we get high marks for both. On the price side, no one in the County’s peer
group off ers a similar bundle of services at a lower per capita cost, according to the state Auditor of Public Accounts.
Taking a longer view, the cost of government services in Chesterfi eld County — after controlling for infl ation and
population growth—has been fl at for six consecutive years (including FY2017) and is down more than 16 percent from
FY2008. Moreover, the County’s current real per capita cost structure is on par with the level it operated at in FY1993.
COMMUNITY FOCUSED, BUSINESS MINDED
AAA
S&P
AAA
FITCH
Aaa
MOODY’S
$200 million
County debt is down $207.2
million, or 28.7%, since 2009;
meanwhile, Federal debt has
grown by $6.6 trillon, or 57.2%,
over that same time span.
11
BUILDING A BETTER COMMUNITY: FY2017 BUDGET-IN-BRIEF
Strategic Plan Goal 2
Safety and Security
Goal Defi nition: Partner with residents to provide a safe and secure community through
prevention, readiness, and professional response
The County’s 800 MHz radio system is a regional communication system that allows public safety personnel in the metro-
Richmond area to have interoperability. Work continues with regional radio partners to coordinate actions related to
the replacement of the existing system. The total costs for Richmond, Henrico County, and Chesterfi eld County could
top $125 million, which would make the eff ort one of the most expensive non-construction projects in the area’s history.
RADIO SYSTEM PROJECT
10 years
Chesterfi eld’s overall crime
rate has fallen over the last
7.5%
resulting in the actual number
of incidents decreasing by
MEDIC 2, 24 HOUR STAFFING
Medic 2 Service Area
During the FY2016 budget cycle, VCU committed
a 24/7 fl ight nurse to the MedFlight program,
and, in addition, the state pledged an additional
$400,000. Those additional MedFlight resources
allowed three fi refi ghter positions to be reallocated
to partially staff a medic unit at fi re station 2.
With the adoption of the FY2017 budget and per
the fi ve-year plan, the County allocated another
$228,000 to the Fire and EMS Department, which
funded three more fi refi ghter positions that will
allow the station to sustain 24/7 EMS coverage
in the area surrounding the Manchester Fire
Station, a high volume call area of the County.
$228,200 $196,900 $133,200
$300,000 $648,700 $228,200 $977,100
Fire Minimum
Staffi ng Plan
Mental Health
Program in the Jail
Sheriff Records
Room Staffi ng
Police Offi cers
4 FTEs plus
4 overfi ll
Public Safety
Equipment
Medic 2
24 hour staffi ng
Targeted
Compensation
and Career
Development*
FY2017
FIVE-YEAR
PLAN
INVESTMENTS
*Not exclusivley for Public Safety use
12
CHESTERFIELD COUNTY, VA
Strategic Plan Goal 3
Economic prosperity and educational excellence
Goal Defi nition: Promote a business-friendly community to retain and attract businesses,
diversify the economic base, and create job opportunities for an educated, ready workforce
Chesterfi eld County Economic Development has been
recognized in the “Virginia’s Best Large Market Economic
Development Agencies” category by Southern Business and
Development magazine. “Chesterfi eld Economic Development
is one of the top performing economic development agencies
in the South or the US for that matter. Their list of major
successes continues to grow and is evidence of the quality
and consistency of the program, ” said Michael Randle,
Editor and Publisher of Southern Business and Development.
BEST OF ECONOMIC DEVELOPMENT
FOCUSED ON SMALL BUSINESS
Recognizing the important role small businesses play in our local economy, the Jumpstart Program provides a
new, dedicated staff resource to Economic Development, additional resources for the County’s Business Expansion
Incentive Fund, business license tax relief, and an update to the BPOL rate structure (the fi rst such revision since 2002).
SMALL BUSINESS TAX RELIEF
Business Professional and Occupational License Tax
Increase exemption from $200,000 to $275,000
Business Tangible Personal Property Tax
Raise tax collection threshold from $4.95 to $10.00
S
MALL BUSINESS ORDINANCE REVIEWItinerant Merchants and Event Classifications
Review Code of Ordinance and update/clarify language
BUSI
NESS EXPANSION INCENTIVE FUND
Increase annual contribution to the fund from $100,000 to $200,000
SMALL BUSINESS DEVELOPMENT &
CONSTRUCTION ASSISTANCE
Project manager - Small Business Development Consultant
As a commitment to the Five-Year Plan, the FY2017 budget provides funding to enable
the school division to support approximately 28 new teachers that continuetargeted
reductions in the pupil-to-teacher ratio (PTR). These positions equate to an approximate
PTR reduction of 0.25, focusing on reduced class sizes in kindergarten through second
grade at schools with a poverty level of 30 percent or greater. Other critical instructional
priorities in this budget include the addition of 19 elementary special education coordinators
and 15 special education teachers and instructional aides to support collaborative
classes at the middle school level. There are fi ve additional school administrators
included for the secondary level as well. The addition of English as a Second Language
teachers and social workers will further address targeted instruction and attendance support in schools.
Additionally, the school CIP plan has been revised to complete funding for all 2013 bond referendum
projects by FY2020. This accelerates several of the projects including Matoaca, Reams, Crestwood, and
Ettrick elementary schools. The bond projects will revitalize or replace ten older school facilities throughout
the County and add one new elementary school to provide capacity relief in the Midlothian area.
INVESTING IN THE FUTURE
13
BUILDING A BETTER COMMUNITY: FY2017 BUDGET-IN-BRIEF
Strategic Plan Goal 4
Healthy living and well-being
Goal Defi nition: Promote healthy, active lifestyles and foster self-suffi ciency that enchances
quality of life through physical, mental, emotional, and social well-being
NORTH COURTHOUSE ROAD LIBRARY
The newest Chesterfi eld County Public Library branch offi cially opened
its doors in March 2016. The building was named in honor of Arthur S.
Warren, who recently retired from the Board of Supervisors. Mr. Warren
has been a longtime supporter of the libraries and saw that the North
Courthouse Road Library was funded, designed, and built during his
tenure on the board. The state-of-the-art facility features a multifunction
meeting room and furnishings, two smaller meeting rooms, and two
private study rooms. It has more than 45 public computers and laptops
and designated areas for children and teens. An outdoor reading
veranda provides a comfortable place to read or access the Internet.
SPORTS TOURISM THRIVES
131,000
# of vistors to Metro
Richmond in FY2015
$54 million
and a REGIONAL economic impact of nearly
THURSDAY HOURS RESTORED
During the height of the recent economic downturn, it became
necessary to cut Thursday library hours in order to reduce costs.
When that plan was put into action, the Board of Supervisors had
always intended to restore those hours. Headlining amendments to
the Five-Year Plan is the restoration of Thursday hours. The FY2017
budget includes $610,000 for staffi ng to expand library hours that
were cut during the economic downturn. Beginning in September of
2016, Thursday hours will be restored at all library branches and then
restored year-round in FY2018, at an additional cost of $203,000.
$19.7 million
resulting in an estimated LOCAL economic impact of
14
CHESTERFIELD COUNTY, VA
Strategic Plan Goal 5
Thriving communities and environmental stewardship
Goal Defi nition: Enrich quality of life, preserve natural resources and enhance community
attractiveness through stewardship of the natural and built environment
GROWING COMMUNITIES
BOARD ADOPTS A DEDICATED SOURCE
With adoption of the FY2017 budget, the Board of Supervisors established a dedicated revenue source to fund the County’s
stormw
ater management system for compliance with the federally mandated Chesapeake Bay Total Maximum Daily Load
(TMDL) program. The revenues collected from the Stormwater Utility fee will be dedicated to services directly related to
the control and
treatment of stormwater. The Stormwater Utility fee is applied to all developed properties in the County.
All developed residential
parcels are subject to a fl at base rate of $25 annually. Condominiums and townhouses will
be charged 30 percent of the base rate ($25) per dwelling unit. Developed nonresidential property will be charged
based on the total amount of impervious area on the site. Nonresidential properties that have Best Management
Practices (BMPs) or participate in pollution reduction programs will receive a partial credit against the stormwater
utility fee. Annual reassessment of the assumptions behind this program and construction progress will be necessary
to ensure compliance.
Population + 17,00 0
The Chesterfi eld County Department of Utilities was recognized with a silver medal at the 2016 Governor’s
Environmental Excellence Award program at the Environment Virginia Symposium in Lexington, VA. The
award recognizes Chesterfi eld County’s wastewater treatment process optimization program, which
was initiated by employees as a way of identifying process improvements that have led to signifi cant
energy cost savings. By tracking chemical consumption and process parameters, the Department
identifi ed excess air in the aeration tanks that led to approximately a 520,000 KWH savings annually when the air
demand was decreased. One facility was able to reduce
concurrent peak demand by staggering the startup of
key pieces of equipment, saving over $325,000 dollars
annually. Another project involved cleaning equipment to
increase effi ciency and reduce natural gas usage by
6.6 mmcf. Also, department staff designed and built a
fi ltration system to use treated effl uent, which reduced
the total water usage by 2.3 million gallons per year. Staff
involvement in identifying and implementing process
changes has been key to the success of the program.
ENVIRONMENTAL EXCELLENCE
$35 million
estimated project costs
over next fi ve years
$25 annually
Flat base rate for all developed
residential parcels =
Stormwater Utility Fee
People vote with their feet and since the last census, Chesterfi eld County’s population has grown at a faster
clip (+5.4 percent) than both the metro area and the state. Moreover, in raw terms, Chesterfi eld’s increase is
on par with the combined growth experienced in our two closest peer counties. Looking ahead, the momentum
appears to be building. The pace of home sales in the County is outpacing other localities in the area as families
are drawn to the most sought after new neighborhoods in the region. Two of those booming neighborhoods,
Magnolia Green and Hallsley, respectively issued 647 and 327 certifi cates of occupancy for new homes in 2015.
15
BUILDING A BETTER COMMUNITY FY2017 BUDGET-IN-BRIEF
“Building a Bett er Community: FY2017 Budget-in-Brief”
Director of Budget and Mangement
Allan Carmody
Assistant Director of Budget and Mangement
Matt Harris
Budget and Management Staff
Meghan Coates
Courtney Farrell
Mandy Haasch
Debbie Hughes
Paulette Johnson
David Oakley
Natalie Spillman
Kathleen Thompson
Tammi Tomlinson
Karen Yuhase
For comments or questions about this document
call 804-748-1548
Chesterfi eld County Board of Supervisors
Vice Chairman
Dorothy Jaeckle
Bermuda District
Chris Winslow
Clover Hill
District
Jim Holland
Dale District
Leslie Haley
Midlothian
District
Chairman
Steve Elswick
Matoaca District
16