City Council Regular Meeting — Agenda Packet
City of Lynchburg · Lynchburg City County · City Council · meeting of Apr 26, 2022 · Agenda packets
Open the original document More from City of Lynchburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
April 26, 2022
CITY COUNCIL AGENDA
City Council Meeting - 7:30 p.m.
Council Chamber | City Hall, 900 Church Street, Lynchburg, VA 24504
IV. Invocation Vice Mayor Wright
V. Recognitions
• Proclamation – Drinking Water
Week
• Proclamation – Gary Christie
Retirement
• Proclamation – Rev. Carl
Hutcherson, Jr. Retirement
VI. Consent Agenda
A) Consideration of adopting Ordinance #O-22-024 to release surplus funds received by
the City from the delinquent tax sale of 1119 Wise Street to Robert L. Crews, Sr., the
prior sole owner of that property.
B) Consideration of adopting Resolution #R-22-029 appropriating $50,000 of the FY 2023
Reserve for Contingencies for use by the City Manager.
C) Consideration of approving the minutes from the February 4, 2022 City Council retreat.
D) Consideration of approving the minutes from the February 8 , 2022 City Council
meeting.
VII. Public Hearing
7) Hold a public hearing to receive citizen input regarding appointments to vacancies that
will exist June 30, 2022, in School Board Districts I, II, III.
April 26, 2022
8) Consideration of introducing Resolution #R-22-___ amending the FY 2022 Operating
and Capital Budgets and appropriating or rescinding funds to reflect the FY 2022 Third
Quarter Detail by Fund.
9) Consideration of adopting Ordinance #O -22-___ gran ting a franchise to Freedom
Aviation, Inc., to construct, manage, and operate a new aircraft maintenance/storage
hangar and office facility.
VIII. Public Comment
*Public Comment Addendum will be posted separately after the citizen sign -up
deadline of Friday at noon preceding the Council meeting.
IX. General Business
10) Consideration of adopting Ordinance #O -22-___ approving the comprehensive
agreement for the design and construction of a new police headquarters and to
approve the acquisition of property.
11) Second Reading on the adoption of the FY 2023 Budget:
A) Consideration of adopting Ordinance #O-22-___ approving a method for returning
surplus Real Estate Tax revenues to taxpayers during the 2023 Fiscal Year.
B) Second Reading: Consideration of adopting Resolution #R-22-025 appropriating
the FY 2023 General Fund Operating Budget (excluding Discretionary External
Service Providers).
C) Second Reading: Consideration of adopting Resolution #R-22-026 appropriating
the FY 2023 Discretionary External Service Providers Budget.
D) Second Reading: Consideration of adopting Resolution #R-22-027 approving FY
2023 Operating Fund Budgets for all other funds and appropriating the sums of
each fund.
E) Second Reading: Consideration of adopting Resolution #R-22-028 approving the
FY 2023 – FY 2027 Capital Improvement Program.
February 4, 2022
1
// An additional meeting of the Council of the City of Lynchburg was held on the 4th day of February,
2022, at 10:00 A.M. at the Academy Center of the Arts, MaryJane Dolan, President, presiding. The
following Members were present at the retreat:
Present: MaryJane Dolan, Beau Wright, Jeff Helgeson, J. Randy Nelson, Treney Tweedy,
Sterling A. Wilder 6
Absent: Chris Faraldi 1
// Mr. John Martin, CEO and Managing Partner, and Ms. Rachel Yost, Managing Partner, both of
Southeast Institute of Research (SIR), the firm hired to conduct the retreat, provided Council with an
overview of proposed events of the day:
• Review 6 Roles of Highly Effective City Councils
• Conduct a SWOT– Internal and External Forces (Trends)
• Based on this Situation Review – Create a Strategic Perspective
• Values, Vision, and Framework
• Look at Current Topics Through this Strategic Perspective
• Outline Next Steps
Mr. Martin discussed the retreat goals:
• Objective: Learn about and inspire a strategic perspective to shape the future of Lynchburg.
• Alignment: Arrive at a consensus perspective on the current state.
• Engagement: Ensure all Councilmembers’ voices are heard.
• Action: Arrive at clear next steps to advance a strategic perspective.
// Mr. Martin led the Council in a group exercise entitled, “Using a Strategic Perspective to Prioritize and
Make Short-Term Decisions”. Separated into three groups of two, Mr. Martin asked Council to choose two
topics among each group of importance to Councilmembers from the following categories: taxes,
compensation, infrastructure, safety, education, upward mobility, environment, branding, and
February 4, 2022
2
partnerships. He then asked each group to consider the following questions as it pertains to each of the
topics:
“What should Lynchburg (all stakeholders) do to strategically address this topic area in a way that
reinforces our story as a great place for young people and young families?”
“How should City Council provide strategic leadership in this topic area?”
Councilmembers then collectively discussed their priorities for the City and organization as it
pertains to the upcoming budget based on the group exercise. Council chose to focus their efforts in the
following areas: Public Safety, Infrastructure, Lifelong Learning, Economic Development, and Quality of
Life.
// The meeting adjourned at 4:00 p.m.
____________________________
Clerk of Council
February 8, 2022
1
// A regular meeting of the Council of the City of Lynchburg was held on the 8th day of February, 2022, at
4:00 P.M. in the 2nd Floor Training Room, City Hall, MaryJane Dolan, President, presiding. The following
Members were present:
Present: MaryJane Dolan, Beau Wright, Jeff Helgeson, J. Randy Nelson, Treney Tweedy,
Sterling A. Wilder, Chris Faraldi 7
Absent: 0
// In the matter of Budget, Agenda Item #1, Deputy City Manager Dr. Reid A. Wodicka and Chief Financial
Officer Ms. Donna Witt presented the FY 2023 – 2027 Capital Improvement Plan which consisted of 95
projects, 32 of which were newly-added to the five-year plan. The presentation did not include Water,
Sewer, Stormwater, Fleet, or Airport Projects. The presentation was informational only and staff will
request approval at the February 22, 2022 City Council meeting. Council was encouraged to submit any
questions via the online submission form.
Councilmember Helgeson asked Council to consider not funding some of the new, General Fund
ARPA-funded projects like the Ivy Creek Innovation Park site developments, the pedestrian waste
receptacle replacements, and some parks and recreation projects and instead fund the police
headquarters. City Manager Mr. Wynter C. Benda replied that the list of projects was reflective of what all
seven Councilmembers said was important to each of them.
Councilmember Nelson stated that having interest from existing businesses in the Ivy Creek
Innovation Park to expand and are ready and willing to occupy the pad-ready sites would be refreshing.
He asked if the $125,000 donated by a private citizen for the Riverfront Park Improvements Project was
part of an in-kind match or if these were actual funds the City anticipates to collect from a private citizen?
Dr. Wodicka replied that the Kiwanas group have already raised the funds for the playground at Riverfront
Park.
Councilmember Tweedy stated that national manufacturing companies who have the potential to
employee a lot of people are the types of clients looking for pad-ready sites and the city is at a deficit. She
stated that the projects that staff are proposing are projects she has heard the community say they want.
February 8, 2022
2
Councilmember Wilder stated that these projects promote high quality of life for citizens and helps
maintain the city’s infrastructure.
// In the matter of Personal Property Tax, Agenda Item #2, Mr. Mitch Nuckles, Commissioner of the
Revenue, made a presentation regarding the 2022 Personal Property Tax Assessment. Due to the
shortage of new vehicles as a result of the economic impacts of COVID-19, vehicles have appreciated in
value, rather than depreciating from the prior year’s assessed value based on the data re ceived from the
National Automobile Dealers Association (NADA) pricing guide. This valuation guide is used by every
locality in the Commonwealth of Virginia. The City of Lynchburg will realize approximately a 30% increase
in the assessed value of vehicles based on this guide, resulting in a higher tax levy to current vehicle
owners. Understanding City Council’s priorities, the Commissioner explored possible options to lower the
tax burden for Lynchburg citizens for this unprecedented appreciation in vehicle values. The
recommended action is to reduce the ratio used against the assessed value (according to the NADA
pricing guide) from 100% to 75% to calculate the personal property tax levy, and is provided for in the
Code of Virginia. Mr. Nuckles stated if there is Council support for the recommendation, the item will be
brought back to the February 22, 2022 City Council meeting for a vote.
Vice Mayor Wright asked if there are any downstream consequences to this proposal. Mr.
Nuckles replied that with the addition of the sunset clause, Council will not have to act to lower the rate
again after one year.
Councilmember Faraldi asked staff to give reasoning on why Council would not want to discuss
adjusting the rate annually. Mr. Nuckles replied that Council would also have to adjust the business
equipment rate because the rate cannot exceed the vehicle rate. If the vehicle rate is lowered, then the
business equipment rate would also have to be lowered. Councilmember Faraldi asked if the sunset
clause should be aligned with assessment years. City Manager Mr. Wynter C. Benda advised that if the
state of the economy were to change, Council would have to revert back.
// In the matter of Redistricting, Agenda Item #3, Mr. Kent White, Director of Community Development,
and Mr. Tom Martin, City Planner, provided updates to Council questions from the January 25, 2022
meeting on redistricting along with an overview of the tools available to assist with drawing ward
February 8, 2022
3
boundaries. Four base maps, labeled options A-D, were provided as a starting point for Council
discussion.
Councilmember Faraldi asked staff to bring back the population variance between each scenario,
going forward.
Councilmember Helgeson stated that Scenario D is based on census tracks and not based on
where citizens currently vote and would be the most disruptive to adopt. He asked for Scenario D be
removed from consideration and Council agreed by a general consensus. He stated that he liked
Scenario C if the process was starting from square one, however, Scenario A provided the less amount of
disruption to citizens overall.
Councilmember Nelson stated that he liked Scenario C because it follows all of the mandated
criteria; it is aligned with the census boundaries; it has no more than a 5% plus or minus population
variance; the Wards are contiguous; it maintains traditional neighborhoods; and it joins several
neighborhoods, that have similar backgrounds, into the same Wards.
Vice Mayor Wright stated that he has not had any constituent reach out to say that they are
unhappy with how their Ward is drawn, so he is excited to get to the public hearing section of the process.
He is disinclined to change anything that would result in confusion for voters.
Councilmember Wilder encouraged citizens to reach out to their Council representatives and
weigh in on each Scenario.
Councilmember Tweedy stated as an at-large representative, she would like to hear from citizens
on their thoughts about the proposed scenarios.
Council decided to work out another Scenario labeled “Scenario D (new)” following major
thoroughfares that staff will prepare and distribute alongside Scenario’s A, B, and C for public input.
// In the matter of Roll Call, Agenda Item #4, Councilmember Nelson asked staff to look into a citizen
inquiry regarding leaf pick-up on Link Road. Councilmember Wilder thanked Public Works staff for going
above and beyond with helping a citizen with a neighborhood complaint who recently suffered the loss of
February 8, 2022
4
her husband. Mayor Dolan stated that she was in favor of utilizing the 2 nd Floor Training Room for Work
Sessions.
// The meeting was recessed at 6:47 p.m.
// City Council reconvened the meeting at 7:30 p.m. in the Council Chamber, City Hall. The following
members were present:
Present: MaryJane Dolan, Beau Wright, Jeff S. Helgeson, J. Randy Nelson, Treney Tweedy,
Sterling A. Wilder, Chris Faraldi 7
Absent: 0
Councilmember Faraldi gave the Invocation, followed by the Pledge of Allegiance.
// In the matter of Recognitions, Mayor Dolan recognized two members of the Mayor’s Youth Council who
were in attendance; Mr. Aiden White, a Senior at Heritage High School, and Mr. Dylan White, a
Sophomore at Heritage High School.
// In the matter of the Consent Agenda Item A, Council conducted a second reading and adopted
Resolution #R-22-005 amending the FY 2022 City/Federal/State Aid Fund budget and appropriating
$33,650 for the preservation of several records. On motion of Vice Mayor Wright, seconded by
Councilmember Wilder, Council by the following recorded vote approved the motion:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// In the matter of the Consent Agenda Item B, Council conducted a second reading and adopted
Resolution #R-22-006 amending the FY 2022 City/Federal/State Aid Fund budget and appropriating
$20,768 to aid in youth affected by the COVID-19 pandemic. On motion of Vice Mayor Wright, seconded
by Councilmember Wilder, Council by the following recorded vote approved the motion:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
February 8, 2022
5
// In the matter of the Consent Agenda Item C, Council conducted a second reading and adopted
Resolution #R-22-007 amending the FY 2022 City/Federal/State Aid Fund budget and appropriating
$42,532 for the purchase of two (2) Power Pro stretchers for the Fire Department . On motion of Vice
Mayor Wright, seconded by Councilmember Wilder, Council by the following recorded vote approved the
motion:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// In the matter of Consent Agenda Items D and E, minutes from the November 9, 2021 and November
16, 2021 Council meetings, respectively, were previously pulled from the agenda to vote on at the next
Council meeting.
// In the matter of Planning, Agenda Item #5, a public hearing was held and Council considered the
adoption of Ordinance #O-22-012 approving the rezoning of four tenths (0.4) of an acre at 3629 Fort
Avenue. Council was previously briefed on this item during its January 25, 2022 Business Item Briefings.
The petitioner, Ms. Megan Shields of True Healing Massage, was in attendance and made a
presentation to Council. She stated that the two complaints heard from the Planning Commission were
concerns about the changes to the neighborhood and the type of business in general. She explained that
currently, the house sits vacant and the business will make cosmetic improvements to the existing
building. She addressed the second complaint by stating the business has waivers to avoid certain types
of behavior.
There was no one to speak in favor. Ms. Cari Ross spoke in opposition through an email sent
previously to the Clerk of Council; her concerns were a) using a residential home as a business when
there is a perceived housing shortage, b) a lack of adequate parking, c) the potential devaluing of the
other homes in the neighborhood by adding a business next door.
Ms. Shields offered a rebuttal and explained there was enough parking in the driveway of the
home for about seven vehicles and there was additional on-street parking near the property. She also
stated that the home sat vacant for over a year when she began working with the seller.
February 8, 2022
6
Mayor Dolan closed the public hearing and the matter rested with Council.
Councilmember Helgeson asked if there was a way to go about this development without
rezoning, specifically if a conditional use permit could be issued in lieu of rezoning. Mr. Tom Martin, City
Planner, replied that no, in order to have a massage therapy business with the number of employees
they’re proposing, a rezoning to B1 is the only way it can be achieved. He also commented that the
Planning Commission and Planning Division thought that given the proximity of this house to other
businesses, it would be a natural transition. Councilmember Helgeson asked to table the ordinance to
garner more input from neighbors. He stated his concerns over the consequences the neighborhood
would face if this home was rezoned, that eventually other homes in the neighborhood would follow suit,
eroding the character of the neighborhood.
Vice Mayor Wright stated that he understood the “slippery slope” argument, but he is comfortable
with the petition brought forward and made the motion to approve the ordinance.
Councilmember Tweedy seconded the motion, stating a small business would be compatible for
that area given how close it is to the road and how other businesses surround the building.
Councilmember Faraldi asked that based on feedback he has seen, would Council be allowed to
oppose a petition based on the type of business. City Attorney Mr. Matthew Freedman replied that
Council could oppose a rezoning if there was proof or reason to believe that the type of business that
would be located in the area would not be consistent with the businesses that were there, or if it may
affect the safety and the welfare of the citizens in that particular location. Council could not oppose a
rezoning simply because they did not like the type of business. Councilmember Faraldi asked staff to
explain a comment made at the Planning Commission meeting about a digital sign. Mr. Martin explained
that digital signs are not permitted in a B1 District and therefore would not be a concern.
Councilmember Nelson stated that this particular property is basically isolated and he d id not
think that rezoning the property would start a commercialization creep into the neighborhood. He stated
that parking is a moot point because there is parking in the back of the property and on the street. He
stated that he can’t in good faith oppose the petitioner.
February 8, 2022
7
Mayor Dolan stated that she is in support of the petition because the property is isolated from the
neighborhood.
With no other discussion from Council, the following vote was recorded:
Ayes: Dolan, Wright, Nelson, Tweedy, Wilder, Faraldi 6
Noes: Helgeson 1
// In the matter of Schools, Agenda Item #6, Council conducted its first reading of Resolution #R -22-013
amending the FY 2022 General Fund budget and appropriating $2,347,404 from the unexpended FY
2021 Schools Operating Fund appropriations for transfer to the FY 2022 Schools Operating Fund and to
the FY 2022 Schools Capital Fund. Council was previously briefed on this item at its January 25, 2022
Business Item Briefings.
Councilmember Tweedy asked staff to explain why mobile classrooms are still being utilized. Mr.
Steve Gatzke, Lynchburg City Schools (LCS) Senior Director for Finance and Operations, stated that this
unit has outlived its useful life and needed to be replaced and that it is mainly resource classes being
taught in these units. Councilmember Tweedy asked if it was being used due to lack of space in the
actual school building for the classes. Mr. Gatzke replied that there is not a lot of room for an addition on
the existing building and that an addition would be very expensive.
Councilmember Wilder asked how many classrooms are in the mobile unit; two, Mr. Gatzke
replied.
Councilmember Nelson asked why there were funds to replace the chillers at Sandusky
Elementary School when the long-range projection calls for that school to be rebuilt. Mr. Gatzke
responded that the funds cover the replacement of a chiller that is nonfunc tioning. Councilmember Nelson
asked why there was funding to replace the plumbing at Sandusky Elementary School in the same year
the school is slated to be rebuilt. Mr. Gatzke replied that the line item is a placeholder in the event the
school is not rebuilt.
February 8, 2022
8
Councilmember Tweedy asked how many vacant classrooms total there are in the elementary
schools? Mr. Gatzke replied that it really depends; there are some classrooms in some schools that are
under capacity and some classrooms in other schools that are over capacity. Councilmember Tweedy
stated that she wanted the community to understand that consolidation is a much larger conversation
than just closing down schools.
Councilmember Helgeson stated that he is not in favor of this; he does not think it’s fiscally
responsible to fix equipment in buildings that will be torn down in the near future. He would like to look
into consolidating some of these buildings.
Vice Mayor Wright stated that the line items in the request are to further the quality of in -person
learning. He stated that the Return to Fund Balance agreement disincentivizes the schools from spending
their full allocation so that they may use the funds for one-time capital costs that largely the City would
otherwise have to pay. He made the motion to approve the resolution. Councilmember Wilder seconded
the motion.
Councilmember Tweedy stated that the City own’s the buildings and have a responsibility for their
upkeep.
Councilmember Faraldi stated that he is wary to commit significant funds to these buildings if they
will be replaced in the near future. He would like to first see the facility study befo re committing these
funds.
Ms. Donna Witt, Chief Financial Officer, stated that the funds for the Sandusky Elementary
School indicated on the spreadsheet are a part of the CARES funding and have already been
appropriated. There are no projects for that school in the Return to Fund Balance.
With no other discussion from Council, the following vote was recorded:
Ayes: Dolan, Wright, Nelson, Tweedy, Wilder 5
Noes: Helgeson, Faraldi 2
February 8, 2022
9
// On motion of Councilmember Wilder, seconded by Vice Mayor Wright, Council, by the following
recorded vote, elected to hold a closed meeting to discuss the settlement of pending litigation
involving the City and the Lynchburg Police Department; and to discuss an appointment to the
Lynchburg Community Action Group Board of Directors, pursuant to Section 2.2-3711(A)(7) and Section
2.2-3711(A)(1) of the Code of Virginia, 1950, as amended.
With no discussion from Council, the following vote was recorded:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Faraldi 6
Noes: Wilder 1
Councilmember Wilder noted that he voted ‘no’ by mistake.
// The meeting was reopened to the public.
// Councilmember Helgeson made the following motion:
WHEREAS, the Council of the City of Lynchburg has convened a closed meeting on this date,
pursuant to an affirmative recorded vote and in accordance with the provisions of The Virginia Freedom of
Information Act; and
WHEREAS, Section 2.2 3712 of the Code of Virginia requires a certification by City Council that
such closed meeting was conducted in conformity with Virginia law;
NOW, THEREFORE, BE IT RESOLVED that the Council of the City of Lynchburg certifies that, to
the best of each member's knowledge, (i) only public business matters lawfully exempted from open
meeting requirements by Virginia law were discussed in the closed meeting to which this certification
resolution applies, and (ii) only such public business matters as were identified in the motion convening
the closed meeting were heard, discussed or considered by Council.
The motion was seconded by Councilmember Wilder, and Council, by the following recorded
vote, adopted the motion:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
February 8, 2022
10
Noes: 0
// On motion of Councilmember Helgeson, seconded by Councilmember Wilder, Council by the following
recorded vote appointed the following members to the respective boards and commissions:
Lynchburg Community Action Group: Trae Watkins– unexpired term ending December 31, 2022.
As Chief Executive Officer of Lynchburg Community Action Group, Councilmember Tweedy
abstained from the vote. With no other discussion, Council approved the appointment with the following
recorded vote:
Ayes: Dolan, Wright, Helgeson, Nelson, Wilder, Faraldi 6
Noes: 0
Abstain: Tweedy 1
// The meeting adjourned at 9:59 p.m.
____________________________
Clerk of Council
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: April 26, 2022 AGENDA ITEM #: 7
CONSENT: REGULAR: X WORK SESSION: CLOSED SESSION:
ACTION: X INFORMATION: (Confidential)
ITEM TITLE: Public Hearing – School Board Appointments
RECOMMENDATION: Conduct a public hearing to receive citizen input regarding appointments, or
reappointments, to vacancies that will exist June 30, 2022, in School Board Districts I, II, III.
SUMMARY: Section §22.1-50 of the Code of Virginia and Section §32-16 of the City Code
provide that within thirty
days preceding July 1st of each year, City Council shall appoint a successor for each school board member whose
term expires on June 30th of that year. Section §22.1-29.1 of the Code of Virginia requires City Council to hold a
public hearing on school board appointments at least seven days prior to making the appointments. It also provides
that no nominee or applicant whose name has not been considered at a public hearing can be appointed to the
school board.
City Council can choose to either continue the public hearing by laying the item over to the first meeting in May, or
close the public hearing at the April 26 th meeting. After the public hearing(s), Council will conduct a closed
meeting(s) to consider all candidates and review the applications filed with the Clerk of Council to determine those
individuals to interview.
PRIOR ACTION(S): According to Section §22.1-29.1 of the Code of Virginia
, notice of the public hearing must be
given at least ten days prior to holding the public hearing. Notice of the public hearing was duly advertised in The
News and Advance on April 14, 2022.
FISCAL IMPACT:
N/A
CONTACT(S):
Alicia L. Finney, Clerk of Council, (434) 455-3990
ATTACHMENT(S):
School Board Appointment List
REVIEWED BY:
raw
064A
Revised: April 21, 2022
Revised: April 25, 2022
LYNCHBURG CITY SCHOOL BOARD
APPOINTMENT LIST | April 26, 2022 City Council Meeting
School District 1
Mr. James Porter
Mr. Clifton Reed
Ms. Ashley Reich
Ms. Brandy Gibbs
Mr. Anthony Andrews
Ms. Mary Wieberg
Dr. Justin Hensley
Mr. Elliott Clifton
School District 2
Dr. Veronica McCue
Ms. Letitia Lowery
Dr. Martin Day
Ms. Erin Cruz
School District 3
Dr. Jason Fleshman
Mr. John Miska
Mr. Gary Woodson
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: April 26, 2022 AGENDA ITEM #: 8
CONSENT: REGULAR: X WORK SESSION: CLOSED SESSION:
ACTION: X INFORMATION: (Confidential)
ITEM TITLE: FY 2022 Third Quarter Adjustment
RECOMMENDATION: Following a public hearing, adopt a resolution amending the FY 202 2 Operating and
Capital Budgets and appropriating or rescinding funds to reflect the FY 202 2 Third Quarter Detail by Fund in
Attachment A.
SUMMARY: In March , staff began the normal review of FY 2022 operating and capital revenues and
expenditures of the City’s various funds to determine if adjustments were needed prior to the end of the fiscal
year. Departments were requested to submit any necessary adjustments that needed to be considered.
Attachment A provides proposed expenditure and revenue adjustments based on the third quarter review.
The General, City/Federal/State Aid, Forfeited Assets , Children’s Services Act (CSA), Regional Juvenile
Detention Home, Sewer, Airport, City Capital Projects, Schools Capital Projects, Sewer Capital Projects, and
Airport Capital/Grant Projects Fund are amended to reflect the FY 2022 Third Quarter Adjustments.
PRIOR ACTION(S):
June 8, 2021: City Council, Adoption of the FY 2022 Operating and Capital Budgets
October 12, 2021: City Council, First Quarter Adjustments
April 12, 2022: City Council, Council Work Session - Business Item Briefing
FISCAL IMPACT: As noted on Attachment A **REVISED**
CONTACT(S): Donna Witt, Chief Financial Officer, 455-3968
ATTACHMENT(S):
• Resolution
• Attachment A: FY 2022 Third Quarter Adjustments – Summary and Detail **REVISED**
REVIEWED BY: MMB WCB
069A
RESOLUTION:
BE IT RESOLVED That the FY 2022 Adopted Budget is amended and funds are appropriated or rescinded to
reflect the Third Quarter Adjustments as identified in Attachment A in the General, City/Federal/State Aid,
Forfeited Assets, Children’s Services Act (CSA), Regional Juvenile Detention Home, Sewer, Airport, City Capital
Projects, Schools Capital Projects, Sewer Capital Projects, and Airport Capital/Grant Projects Fund.
Introduced: Adopted:
Certified: ____________________________
Clerk of Council
**REVISED**
ATTACHMENT A
Expenditures
Additional
Revenues
Transfer or
Use of
Committed/
Assigned/
Unassigned
Fund Balance
$1,602,399 $1,323,460
GENERAL FUND $1,623,749 278,939 $1,344,810
CITY/FEDERAL/STATE AID FUND 117,363 117,363 0
FORFEITED ASSETS FUND 30,343 30,343 0
CHILDREN'S SERVICES ACT (CSA) FUND 920,000 668,840 251,160
REGIONAL JUVENILE DETENTION HOME FUND 124,489 124,489 0
CITY CAPITAL PROJECTS FUND 413,856 348,856 65,000
SCHOOLS CAPITAL PROJECTS FUND (1,500,000) (1,500,000) 0
SEWER FUND 2,001,909 501,909 1,500,000
SEWER CAPITAL PROJECTS FUND 1,500,000 1,500,000 0
AIRPORT FUND 1,837,122 1,837,122 0
AIRPORT CAPITAL/GRANT PROJECTS FUND 5,094,590 1,044,590 4,050,000
RISK MANAGEMENT FUND 894,146 894,146 0
FLEET FUND 88,483 88,483 0
$13,124,700 $7,189,620
TOTALS $13,146,050 $5,935,080 $7,210,970
FY 2022 Third Quarter Adjustment
SUMMARY BY FUND
FY 2022 Third Quarter Adjustment Details **REVISED**
ATTACHMENT A
Department/Division Amount
Additional
Revenues
Transfer or
Use of
Committed/
Assigned/
Unassigned
Fund Balance Purpose
GENERAL FUND
Circuit Court Clerk 18,728 18,728 Appropriate additional Technology Trust Funds (T TF) fully
reimbursable from the Supreme Court of Virginia.
Commonwealth’s Attorney
**ADDED**
7,000 7,000 Appropriate funds to hire an hourly Body Worn Camera temp
through the end of June.
Fire 5,000 5,000 Appropriate funds from the Fire Training Cente r (FTC) Reserve
for building maintenance and renovation.
Fire 23,000 23,000 Appropriate funds from the Partners in Emergency Response
(PIER) Reserve for rescue training and to purchase jackets for
Technical Rescue Team (TRT) members.
Human Services ‐
Juvenile Services
237,100 237,100 Appropriate additional funds for the Lynchburg Dete ntion
Center per diem.
Human Services ‐
Social Services
39,211 39,211 Appropriate additional federal funds received fo r Adult
Protective Services.
Human Services ‐
Social Services
156,000 156,000 Appropriate funds received for additional Adoption Subsidy
mandated maintenance payments fully reimbursable by State
and federal, no local match.
Parks and Recreation 4,000 4, 000 Appropriate funds for additional water/sewer charges needed
to open the Miller Park Pool for the 2022 summer season.
Registrar
**REMOVED** Per Registrar there
will not be a June Primary.
14,350 14,350 Appropriate funds for projected expenses associated with the
primary election to be held. Mailing a notice of primary
election to be held per election law, temporary staffing for
precincts, and early voting and training for new electronic
pollbooks which is required by law when equipment changes.
Registrar
**REMOVED** Per Registrar there
will not be a June Primary.
14,000 14,000 Appropriate funds for mailing notices due to election law
requiring notice of congressional line changes due to
redistricting.
Sheriff's Office 16,000 16,000 Ap propriate funds for an increase in Sheriff's Office rent due
to a new contract.
TRANSFERS
Transfer from Fire ‐ General Fund
Operating Budget to Fire Grants ‐
City/Federal/State Aid Fund
17,454 17,454 Transfer from Fire ‐ General Fund Operating Budget to Fire
Grants ‐ City/Federal/State Aid Fund to appropriate funds for
a new award for the Virginia Department of Fire Programs
Live Fire Training Structure grant.
Source of Funding
1 of 5
FY 2022 Third Quarter Adjustment Details **REVISED**
ATTACHMENT A
Department/Division Amount
Additional
Revenues
Transfer or
Use of
Committed/
Assigned/
Unassigned
Fund Balance Purpose
Source of Funding
Transfer from Fire ‐ General Fund
Operating Budget to Fleet Fund
88,483 88,483 Transfer from Fire ‐ General Fund Operating Budget to Fleet
Fund to appropriate funds moving two full‐time staff as well
as maintenance costs for Fire fleet.
Transfer to Public Works ‐ Snow
and Ice Removal Operating Budget
from City Capital Projects Fund
65,000 65,000 Transfer funds to Public Works ‐ Snow and Ice Removal
Operating Budget from City Capital Projects Fund to
appropriate funds from the Snow, Street, and Bridge Reserve
to cover personnel and contractor expenses associated with
snow removal above the Adopted FY 2022 Snow and Ice
Removal Operating budget.
Transfer from Poverty Initiative ‐
General Fund Operating Budget to
Temporary Assistance for Needy
Families (TANF) Grants ‐
City/Federal/State Aid Fund
31,277 31,277 Transfer from Poverty Initiative ‐ General Fund Operating
Budget to Temporary Assistance for Needy Families (TANF)
Grants ‐ City/Federal/State Aid Fund to appropriate poverty
initiative funds to cover FY 2020 TANF grant expenditures for
which the City is not able to receive reimbursement from the
State.
Transfer from General Fund
Operating Budget to Risk
Management Fund
894,146 894,146 Transfer from General Fund Operating Budget to Risk
Management Fund to appropriate funds to restore and set‐up
a reserve for deductible, additional general fund self
insurance payment due to legal fees and settlements, and
funds for restructuring.
**REVISED** 1,602,399 1,323,460
GENERAL FUND Total 1,623,749 278,939 1,344,810
CITY/FEDERAL/STATE AID FUND
Commonwealth's Attorney 5 5 Appropriate additional funds to true‐u p the amount for the
VSTOP grant in‐kind match; actual is $20,155.
Fire 98 98 Appropriate additional funds for Fire Fu nding Entitlement
funds FY 2021 allocation; actual allocation updated to
$287,991.
Fire 38,849 38,849 Appropriate funds for a new award for the Virgin ia
Department of Fire Programs Live Fire Training Structure
grant; total award $56,303.
Transfer to Fire Grants ‐
City/Federal/State Aid Fund from
Fire ‐ General Fund Operating
Budget
17,454 17,454 Transfer to Fire Grants ‐ City/Federal/State Aid Fund from Fire
‐ General Fund Operating Budget to appropriate funds for a
new award for the Virginia Department of Fire Programs Live
Fire Training Structure grant; total award $56,303.
Human Services ‐
Social Services
5,000 5,000 Appropriate funds received from the Federal G overnment for
an adoption incentive allocation.
2 of 5
FY 2022 Third Quarter Adjustment Details **REVISED**
ATTACHMENT A
Department/Division Amount
Additional
Revenues
Transfer or
Use of
Committed/
Assigned/
Unassigned
Fund Balance Purpose
Source of Funding
Transfer to Temporary Assistance
for Needy Families (TANF) Grants ‐
City/Federal/State Aid Fund from
Poverty Initiative ‐ General Fund
Operating Budget
31,277 31,277 Transfer to Temporary Assistance for Needy Families (TANF)
Grants ‐ City/Federal/State Aid Fund from Poverty Initiative ‐
General Fund Operating Budget to appropriate poverty
initiative funds to cover FY 2020 TANF grant expenditures for
which the City is not able to receive reimbursement from the
State.
Public Works 24,680 24,680 Appropriate funds received for the annual award from the
Virginia Department of Environmental Quality for litter
prevention and recycling, includes $18,680 in non‐competitive
funding and $6,000 in competitive grant funds.
CITY/FEDERAL/STATE AID
FUND Total
117,363 117,363 ‐
FORFEITED ASSETS FUND
Police Department 30,343 30,343 To appropriate Asset Forfeiture revenues receive d.
FORFEITED ASSETS FUND
Total
30,343 30,343 ‐
CHILDREN'S SERVICES ACT (CSA) FUND
Children's Services Act (CSA) 420,000 305,340 114,660 Appropriate funds received for Foster Care Maintena nce,
Enhanced Maintenance, and Independent Living
Maintenance.
Children's Services Act (CSA) 500,000 363,500 136,500 Appropriate funds received for Private Day School e ducation.
CHILDREN'S SERVICES ACT
(CSA) FUND Total
920,000 668,840 251,160
REGIONAL JUVENILE DETENTION HOME FUND
Detention 25,000 25,000 Appropriate funds for COVID related expenses and medical
expenses for residents.
Detention 99,489 99,489 Appropriate additional funds for the Community P lacement
Program, fully funded by Department of Juvenile Justice.
REGIONAL JUVENILE
DETENTION HOME FUND
Total
124,489 124,489 ‐
CITY CAPITAL PROJECTS FUND
Parks and Recreation 31,625 31,625 Appropriate funds received from the Rutherford S treet lease
for parks amenities per the lease agreement.
Public Works ‐ Engineering 105 105 Appropriate Urban Construction Initiative (UCI) interest.
3 of 5
FY 2022 Third Quarter Adjustment Details **REVISED**
ATTACHMENT A
Department/Division Amount
Additional
Revenues
Transfer or
Use of
Committed/
Assigned/
Unassigned
Fund Balance Purpose
Source of Funding
Public Works ‐ Engineering 45,203 45,203 Appropriate additional federal funds awarded by VDOT for the
Graves Mill Road Adaptive Signal System project.
Public Works ‐ Engineering 271,923 271,923 Appropriate additional federal funds awarded by VD OT for the
Kemper Street Bike and Pedestrian Improvements project.
Transfer from City Capital Projects
Fund to Public Works ‐ Snow and
Ice Removal Operating Budget
65,000 65,000 Transfer from City Capital Projects Fund to Public Works ‐
Snow and Ice Removal Operating Budget to appropriate funds
from the Snow, Street, and Bridge Reserve to cover personnel
and contractor expenses associated with snow removal above
the Adopted FY 2022 Snow and Ice Removal Operating
budget.
CITY CAPITAL PROJECTS
FUND Total
413,856 348,856 65,000
SCHOOLS CAPITAL PROJECTS FUND
Schools (1,500,000) (1,500,000) Rescind appropriations for bond funds not expended for the
Sandusky Elementary School project included in the FY 2019
Capital Improvement Program.
SCHOOLS CAPITAL PROJECTS
FUND Total
(1,500,000) (1,500,000) ‐
SEWER FUND
Sewer 501,909 501,909 Appropriate funds received from Bedford Regional W ater
Authority associated with a sale of sewer interceptor capacity
beginning with entry point at Ivy Creek Division and
connecting interceptors downstream. Sale amount of
interceptor capacity was based on replacement costs less
depreciation.
Transfer from Sewer Fund to Sewer
Capital Projects Fund Budget
1,500,000 1,500,000 Transfer from Sewer Operating Fund to Sewer Capital Projects
Fund to remain in compliance with CSO Special Order of
Consent that requires the City "to annually adjust sewer
system reserve funds to equal no more than 40% of the
subsequent year's budgeted operating expenditures.
SEWER FUND Total 2,001,909 501,909 1,500,000
SEWER CAPITAL PROJECTS FUND
Transfer to Sewer Capital Fund
from Sewer Fund Budget
1,500,000 1,500,000 Transfer from Sewer Operating Fund to Sewer Capital Projects
Fund to remain in compliance with CSO Special Order of
Consent that requires the City "to annually adjust sewer
system reserve funds to equal no more than 40% of the
subsequent year's budgeted operating expenditures.
SEWER CAPITAL PROJECTS
FUND Total
1,500,000 1,500,000 ‐
4 of 5
FY 2022 Third Quarter Adjustment Details **REVISED**
ATTACHMENT A
Department/Division Amount
Additional
Revenues
Transfer or
Use of
Committed/
Assigned/
Unassigned
Fund Balance Purpose
Source of Funding
AIRPORT FUND
Airport 1,837,122 1,837,122 Appropriate funds for general Airport Management
consultant services ($18,550); planned gradual shift to
contracted custodial services ($50,000); for new American
Rescue Plan Act (ARPA) grants received through Federal
Aviation Administration (FAA) Airport Improvement Program
(AIP) grant process ($1,768,572). Also adjusting budgeted
revenues.
Transfer to Airport Operating Fund from Airport Capital/Grant
Projects Fund Budget to appropriate funds for 80% State
funding for non‐recurring maintenance/ repair/equipment
purchases; $400,000.
AIRPORT FUND Total 1,837,122 1,837,122 ‐
AIRPORT CAPITAL/GRANT PROJECTS FUND
Airport Capital/Grant Projects 4,694,590 1,044,590 3,650,000 Appropriate additional funds for Mid‐Field Apron Rehab ,
North GA Development Area, and Terminal Sustainability
Upgrades projects including additional federal funding
($1,044,590) for North GA Development Area and Mid‐Field
Apron Rehab projects.
Transfer from Airport Capital/Grant
Projects Fund to Airport Operating
Fund Budget
400,000 400,000 Transfer from Airport Capital/Grant Projects Fund to Airport
Operating Fund Budget to appropriate funds for 80% State
funding for non‐recurring maintenance/ repair/equipment
purchases.
AIRPORT CAPITAL/GRANT
PROJECTS FUND Total
5,094,590 1,044,590 4,050,000
RISK MANAGEMENT FUND
Transfer to Risk Management Fund
from General Fund Operating
Budget
894,146 894,146 Transfer to Risk Management Fund from General Fund
Operating Budget to appropriate funds to create a reserve for
the deductible, additional general fund self insurance
payment due to legal fees and settlements, and funds for
restructuring.
RISK MANAGEMENT FUND
Total
894,146 894,146 ‐
FLEET FUND
Transfer to Fleet Fund from Fire ‐
General Fund Operating Budget
88,483 88,483 Transfer to Fleet Fund from Fire ‐ General Fund Operating
Budget to appropriate funds moving two full‐time staff as
well as maintenance costs for Fire fleet.
FLEET FUND Total 88,483 88,483 ‐
5 of 5
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: April 26, 2022 AGENDA ITEM #: 9
REGULAR: X WORK SESSION: CLOSED SESSION (Confidential):
ACTION: X INFORMATION:
ITEM TITLE: Freedom Aviation Franchise Public Hearing/Ordinance
RECOMMENDATION: Hold a public hearing and where appropriate, adopt the attached franchise ordinance .
SUMMARY: Freedom Aviation has been operating as a fixed base operator (FBO) and tenant at Lynchburg Regional Airport
(LYH) since acquiring Falwell Aviation in 2011. In 2014, Freedom Aviation purchased the airport’s other FBO, Virginia Aviation,
and was subsequently awarded a separate lease by City Council effective October 1, 2015. Since that time, Freedom Aviation
has operated under two separate agreements: the original 20- year, six-month Falwell Aviation franchise agreement with an
expiration of December 2027 and a revised Virginia Aviation lease set to expire in June 2023. Consequently, in order to
consolidate its operations and to accommodate growing demand for its aviation services, Freedom Aviation desires to expand
its aeronautical facilities through the construction of a new 19,600 square- foot aircraft hangar at LYH, while combining its
current facilities contained in its two existing agreements under one franchise ordinance. This Franchise consists of two terms;
Term One is 20- year, six months for c ertain facilities (shown in the presentation) and Term Two is for 5 years with a 5- year
option for the remaining facilities. Based on the terms proposed under the franchise, Virginia law requires advertising for bids
and a public hearing before voting on whether to adopt the franchise and grant proposed.
The Lynchburg Regional Airport Commission has been briefed throughout the negotiation process and has expressed its
support; a formal recommendation to City Council regarding the proposed franchise ordinance was adopted at its meeting on
April 18, 2022.
PRIOR ACTION(S): March 22, 2022: A Business Item Briefing (BIB) was held during City Council’s Work Session
April 18, 2022: The Lynchburg Regional Airport Commission formally recommended adoption
April 26, 2022: A bid will be reviewed and if appropriate accepted by City Council during the Work
Session
FISCAL IMPACT:
As noted
CONTACT(S):
Andrew La Gala, Airport Director, (434) 455-6089
ATTACHMENT(S):
• Ordinance with exhibits
REVIEWED BY: raw
070A
ORDINANCE: #O-22-033
April 26, 2022
CITY COUNCIL AGENDA ADDENDUM | PUBLIC COMMENT
City Council Meeting - 7:30 P.M.
Council Chamber, City Hall, 900 Church Street
A) Hear from a group representative regarding a matter. (John Vassar, Oasis Special
Needs Parents Support Group)
RULES OF PROCEDURE
// An individual may speak for up to 3 minutes ; please state clearly your name and locality
of residence.
// A group spokesperson may speak for up to 5 minutes ; please state clearly your name
and the group you will be representing.
Citizens often express conflicting and diverse positions regarding specific issues under
consideration. To encourage citizen participation and to avoid intimidation to persons who may
express sometimes unpopular opinions, applause, cheers, or jeers from the audience are not
permitted. When appearing before City Council, citizens may not engage in behavior that
intimidates or insults others, engage in disruptive behavior, use profanity or vulgar language,
promote private business ventures or campaign for public office.
1
Finney, Alicia
From: JOHN VASSAR <jvassar639@aol.com>
Sent: Thursday, April 21, 2022 3:59 PM
To: Finney, Alicia
Cc: Faraldi, Chris
Subject: Re: Speaking at the Next City Council Meeting …
Follow Up Flag: Follow up
Due By: Friday, April 22, 2022 9:30 AM
Flag Status: Completed
CAUTION: External Sender
Alica Finney:
Thank you for your response. I would like to address the (TUE) 26 APR 2022 Council Meeting on the topic of the City
Budget for Special Education, as a Representative of the Oasis Special Needs Parents Support Group. I would also make
a brief remark about the upcoming
Budget Surplus.
I trust that this meets the requirement to address the council.
Regards …
______________________________
Dr. JOHN D. VASSAR, Jr. (PMP)
410-292-5371 (24/7)
John.Vassar@iCloud.com
JVassar639@aol.com
http://us.linkedin.com/in/JVassar
Senior Faculty Emeritus, University of Phoenix, AZ
Chief Warrant Officer, US Army Aviation (Retired)
Technical Consultant
107 Emeline Drive
Lynchburg, VA 24502‐5339
______________________________
On Apr 21, 2022, at 10:42 AM, Finney, Alicia <Alicia.Finney@lynchburgva.gov> wrote:
Hello Mr. Vassar,
2
Our process for Public Comment sign‐up is a fairly simple one; a written request must be submitted to
me, the Clerk of Council, before noon the Friday preceding a Council meeting (an email is perfectly fine).
Our next Council meeting is Tuesday, April 26th, so the deadline for that sign‐up is this Friday at noon. I’ll
need just a brief sentence or two on the topic of discussion.
The public comment section of a meeting is a forum for citizens to address their Council, and although
Councilmembers are unable to engage in dialogue,
they may choose to direct any concerns to City staff
to address. Individuals have three minutes to speak, and group representatives have five minutes. Once
you’ve presented on a particular topic, there is a 3‐month waiting period before you’re able to address
Council again on that particular topic. Our meetings start at 7:30 p.m. and I always advise participants to
get to the meeting a little before then to find seating in Council Chamber. Depending on what type of
business Council has on the agenda, the Public Comment section is usually the third section of the
meeting.
If you’ll be
driving, there is on‐street parking located around the block of City Hall, however, I’d
recommend parking in our Midtown Parking Deck (free parking after 5:00 p.m.) located at 910 Main
Street.
There are three entrances to the Midtown Parking Deck:
Main St. entrance between 9th St. and 10th St. This entrance provides access to levels A‐E with a
one ‐way ramp.
9th St. entrance between Main St. and Commerce St. This entrance provides access to levels D‐
E.
Commerce St. entrance between 9th St. and 10th St. This entrance only provides access to level
E.
If you enter City Hall through either 9th or 10th Street entrances, please head up one flight to the 1st Floor
to access Council Chamber. If you come in through the Church Street entrance, Council Chamber will be
straight ahead and on the left.
I hope this is helpful! Please let me know if you have any other questions.
Thank you,
ALICIA L. FINNEY – Clerk of Council
City of
Lynchburg
900 Church Street
Lynchburg, VA 24504
P: (434) 455‐3990 F: (434) 847‐1536
From: JOHN VASSAR <jvassar639@aol.com>
Sent: Wednesday, April 20, 2022 4:43 PM
To: Finney, Alicia <Alicia.Finney@lynchburgva.gov>
Cc: Faraldi, Chris <Chris.Faraldi@lynchburgva.gov>
Subject: Speaking at the Next City Council Meeting …
CAUTION: External Sender
Alicia Finley:
3
I have been attempting to speak at The City Council Meeting on budgetary issues, addressed in an
earlier email, without success for at least a month and Chris Faraldi suggested that I contact you for
guidance, as your procedures are somewhat different than what I am used to.
Thank you for
your service to our community; your time, interest and assistance …
Regards …
Sent from my iPad ...
______________________________
Prof. JOHN D. VASSAR, Jr. (PMP)
410‐292‐5371 (24/7)
JVassar639@aol.com
http://us.linkedin.com/in/JVassar
Senior Faculty Emeritus, University of Phoenix, AZ
Chief Warrant Officer, US Army Aviation (Retired)
Technical Consultant
107 Emeline Drive
Lynchburg, VA 24502‐5339
______________________________
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: April 26, 2022 AGENDA ITEM #: 10
CONSENT: REGULAR: X WORK SESSION: CLOSED SESSION:
ACTION: X INFORMATION: (Confidential)
ITEM TITLE: Lynchburg Police Department Headquarters Comprehensive Agreement
RECOMMENDATION: Review and adopt the accompanying Ordinance to approve a negotiated Comprehensive
Agreement between English Construction Company, Incorporated (“English”) and the City of Lynchburg, Virginia
(“City”) for the design and construction of a new Lynchburg Police Department headquarters (“Project”), and
authorize required actions associated therewith.
SUMMARY: In March 2021, the City received an unsolicited PPEA proposal from English for the design and
construction of the Project. After reviewing said proposal, the City determined the proposal met the City’s
requirements for the Project. The City posted English’s proposal to its website and advertised for competing
proposals in accordance with the requirements of Virginia law . The City received one (1) competing proposal
from Jamerson-Lewis Construction for the Project in May 2021. The City chose to proceed with English’s
proposal based on the City’s needs. Both such proposals were submitted for public comment by way of a duly
advertised public hearing held on March 8, 2022 before the Lynchburg City Council. After thorough negotiation,
the form of the final negotiated Comprehensive Agreement was posted to the City’s website for public inspection
and review on April 19, 2022. Such Comprehensive Agreement is ready for review and approval by the City
Council, but will not be signed until the associated posting requirement is satisfied.
PRIOR ACTION(S):
January 10, 2017: City Council reviewed the key recommendations of a Space Needs Assessment.
May 23, 2017: City Council approved a Capital Improvement Plan Budget that included the Project.
December 14, 2021: Chief Zuidema provided an update to City Council on the status of the Project.
March 8, 2022: City Council held a public hearing on the PPEA proposals received for the Project.
FISCAL IMPACT: $47,448,904+
CONTACT(S): Ryan M. Zuidema, Chief of Police, 455-6145
Stephanie Suter, Procurement Manager, 455-3963
William “Clay” Simmons, Deputy Director of Public Works, 455-4443
Matthew C. Freedman, City Attorney, 455-3976
ATTACHMENT(S):
• Ordinance
• Comprehensive Agreement
REVIEWED BY: MMB WCB
071A
AN UNCODIFIED ORDINANCE TO APPROVE A COMPREHENSIVE AGREEMENT FOR
THE DESIGN AND CONSTRUCTION OF A NEW POLICE HEADQUARTERS BUILDING,
AUTHORIZE THE ACQUISITION OF RELATED REAL PROPERTY, AND AUTHORIZE
OTHER ACTIONS RELATED TO SUCH COMPREHENSIVE AGREEMENT
WHEREAS, the Public -Private Education Facilities and Infrastructure Act of 2002 ( “PPEA”)
grants responsible public entities the authority to create public -private partnerships for the
development of a wide range of public facilities or projects; and
WHEREAS, the City of Lynchburg, Virginia (“City”) is a responsible public entity and has
adopted guidelines which establish procedures for the development of public facilities or projects
through public-private partnerships pursuant to the PPEA; and
WHEREAS, the City received an unsolicited proposal from English Construction Company,
Incorporated (“English”) pursuant to the PPEA and the said g uidelines for the design and
construction of a new police headquarters building (the “Project”), said proposal being expressly
incorporated herein by reference; and
WHEREAS, given the Project is permitted under the PPEA, the City reviewed such proposal,
determined it met the Ci ty’s needs, advertised for competing proposals, received one (1) other
competing proposal, and after reviewing both proposals, selected English’s proposal for
negotiation of a comprehensive agreement; and
WHEREAS, a comprehensive agreement for the Project has been thoroughly negotiated
between the City and English, and the applicable requirements of § 56- 575.17 of the Code of
Virginia, 1950, as amended, were duly satisfied by the City.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF LYNCHBURG:
1. That the negotiated Comprehensive Agreement between the City of Lynchburg, Virginia
(“City”) and English Construction Company, Inc. (English), dated April 29, 2022, specific to
the design and construction of a new police headquarters building, is hereby approved.
Such Comprehensive Agreement is expressly incorporated herein by reference, and the
City Manager is authorized and directed to execute such Comprehensive Agreement on
behalf of the City, on or after April 29, 2022; the Clerk of Council shall attest the same, and
the City Attorney shall approve the form of the same.
2. That the City Manager is authorized and directed, on behalf of the City, under such terms
and conditions as he may deem appropriat e, to acquire and accept all real property,
easement rights, improvements, and the like which may be related to fulfilling the purpose(s)
and/or responsibilities of the said Comprehensive Agreement, and to take any and all other
actions he may deem necessary and pertinent to fulfilling the purpose(s) and/or
responsibilities of the said Comprehensive Agreement.
3. That this Ordinance shall be effective upon its adoption.
Adopted:
Certified: __________________________
Clerk of Council
COMPREHENSIVE AGREEMENT
between
THE CITY OF LYNCHBURG, VIRGINIA
and
ENGLISH CONSTRUCTION COMPANY, INC.
for
DESIGN AND CONSTRUCTION OF A
NEW POLICE HEADQUARTERS BUILDING
Dated as of April 29, 2022
1
THIS COMPREHENSIVE AGREEMENT (this “Agreement” or this “Contract”)
is entered into as of April 29, 2022, between the CITY OF LYNCHBURG , VIRGINIA
(the “City”), a municipal corporation of the Commonwealth of Virginia, and ENGLISH
CONSTRUCTION COMPANY, INC. (“English”), a Virginia stock corporation . The
City and English are referred to individually as a “Party” and collectively as the
“Parties.”
Recitals
1. The City has adopted Public-Private Education Facilities and Infrastructure Act of
2002 – Guidelines, establishing procedures for the development of public
facilities through public -private partnerships (“ Guidelines”), which procedures
satisfy the requirements of the P ublic-Private Education Facilities and
Infrastructure Act of 2002 , Chapter 22.1, Title 56, Code of Virginia, 1950, as
amended (“PPEA”).
2. The City received an unsolicited proposal under the PPEA and the Guidelines
from English for the design and construction of a new police headquarters
building in the City (the “Project”).
3. The City determined that, a mong other things, it would be advantageous to
proceed with procurement of the Project using procedures for competitive
negotiation, rather than using sealed, competitive bids, given the probable scope,
complexity and urgency of the Project; the merits of risk -sharing and the potential
for added value; and the economic benefit from the Project that might otherwise
not be available.
4. The City advertised for competing proposals as required by the PPEA and the
Guidelines, and received one other proposal.
5. After reviewing the proposals, the City selected English for negotiation of a
comprehensive agreement for the Project.
6. As requ ired by the PPEA, City Council has held a public hearing to receive
citizen comment on the proposal and the Project.
7. The Parties acknowledge and agree that this Agreement will function as the
Contract for purposes of the Project.
8. Having considered this Agreement and other information, the City has determined
that the Project to be designed and constructed pursuant to this Agreement serves
the public purpose of the PPEA under the criteria of Section 56-575.4(C) of the
Code of Virginia, 1950, as amended (the “Code”) , and posted this Agreement for
public inspection in accordance with the PPEA and the Guidelines.
NOW THEREFORE, WITNESSETH: for and in consideration of the mutual
promises, conditions and covenants herein set forth, the Parties agree as follows:
2
1. Incorporation of Recitals . The foregoing recitals are incorporated herein by
reference.
2. Contract Documents. The Contract Documents are comprised of the following:
a. This Agreement, including all exhibits and attachments, executed by the
Parties.
b. Insurance certificates of coverage, the Performance Bond and Labor and
Material Payment Bond, each Payment Application, and certificates of
Substantial and Final Completion.
c. Plans and Drawings approved by the City.
3. General Scope. English shall perform, provide or cause to be provided all Work
for the development of the Project , including all design services . A site plan ,
detailed scope of work and English’s proposal for the Project are attached hereto
as Exhibit B. English agrees that the design team, engineers, public safety
consultants, and other consultants and members of the team submitted in the
proposal and present at the oral interviews will work o n this Project, and will not
be changed without the written approval of the City.
4. Interpretation; Intent and Incorporation.
a. The Contract Documents are intended to permit English to complete the
Project and all obligations required by the Contract Documents within the
Contract Time(s) for the Contract Price. The Contract Documents are
intended to be complementary and interpreted in harmony so as to avoid
conflict and to accomplish the Project contemplated hereby , with words
and phrases interpreted in a manner consistent with industry standards.
b. Terms, words and phrases used in the Contract Documents, including this
Agreement, shall have the meanings given to them in this Agreement.
c. The Contract Documents form the entire agreement between the Parties .
No oral representations or other agreements have been made by the Parties
except as specifically stated in the Contract Documents.
5. Ownership of Work Product.
a. Work Product. Conditioned only upon payment of fees due to English for
services that have been performe d under the Contract, a ll drawings,
specifications and other documents and data furnished by English to the
City under the Contract (collectively, the “Work Product”) , whether fully
or partially completed, are deemed to be the sole property of the City,
which shall include but not be limited to, all Work Product for the Project
that has been or will be prepared or created by or on behalf of English for
the Project, as well as any and all derivations, modifications, changes,
3
translations, revisions, elaborations, adaptations, or transformations of the
Work Product. This provision shall not relieve English from, or modify
English’s sole responsibility for, any and all liability for all of its Work
under the Agreement (including labor and materials). It is unde rstood and
agreed that all Work Product prepared by or on behalf of English for this
Project will be applicable only in respect to the Project. The Work Product
is not intended or represented to be suitable for use or reuse by the City or
others for a mate rial extension of the Project or on any other project. The
City has the right, itself or by and through other design professionals , to
modify the Work Product prepared by English for use in connection with
the Project or for any other use whatsoever. In such event, English shall
have no liability for such modifications. English shall ensure that its
consultants agree in writing to the granting of limited, irrevocable , and
non-exclusive license s for use in this Project of the Work Product
produced by the consultants for English that English has agreed to provide
to the City in this Agreement.
b. Retained Rights of English. The City acknowledges that English or its
consultants may have developed materials prior to entering into this
Agreement, and may own other patent, trade secret, and proprietary rights
in techniques and concepts related to interior design elements that were
not conceived or first produced by English in connection with this Project
(collectively “English Intellectual Property”). English Intellectual Property
is proprietary to English and shall remain English's exclusive property.
English identifies to the City that all English Instruments of Service are
Intellectual Property. English hereby grants to the City an irrevocable non-
exclusive license to English's I ntellectual Property to the extent it is
incorporated in any Work Product delivered to the City by English
hereunder. Submission or distribution of any Work Product to meet
official regulatory requirements or for similar purposes in connect ion with
the Project is not to be construed as publication in derogation of the
reserved rights of English and their consultants.
c. Record Drawings. Prior to Final Completion, English shall deliver a full
set of record drawings for the Project. The record dr awings shall contain a
final set of drawings showing the as -built condition of the Project,
including all conditions, locations and dimensions. The record drawings
shall contain the plans, specifications, addenda, shop drawings, and any
other information necessary to show the final condition of the Project, the
actual locations of any permanent structures, piping and utilities, the
depths of foundations, pilings and caissons, and the integration of any
Change Orders into the Work carried out pursuant to the Project.
Intellectual property rights in the record drawings shall belong to the City.
The record drawings shall be on paper, PDF, and AutoCAD formatted.
d. Patent Indemnity. English shall defend, indemnify and hold harmless the
City, its employees, officers , boards, board members, representatives, and
4
agents against liability, including costs and attorney’s fees, arising from
any claim of patent, copyright, or trademark infringement (or unauthorized
use) arising from providing any of the design services prov ided under this
Agreement, unless such infringement occurred at the express direction of
an authorized agent of the City. This obligation shall survive the
termination or expiration of this Agreement for a period of five (5) years.
6. Contract Price.
a. Contract Price . English agrees to complete the Project and the City
agrees to pay English the Contract Price of $47,448,904, subject to
adjustments made in accordance with this Agreement, specifically
including the second paragraph of Section 6(b) below . The Contract Price
is currently based on a preliminary Schedule of Values (Exhibit E). At
35% and 65% completion of the design of the Project, English will
upgrade the Schedule of Values . Unless otherwise provided in the
Contract Documents, the Contract Price includes all sales, use, consumer
and other taxes imposed by law or any governmental authority. English
shall be wholly responsible to fully complete the Project at no
compensation above the Contract Price, subject to any adjustments in the
Contract Price made as a result of changes made in accordance with this
Agreement. The Contract Price includes the +/- 9.27 acre parcel(s) of land
which English will purchase as a site for the new building /Project and
which is shown on Exhibit C. The Contract Price f urther includes a
negotiated easement right on the site and a title insurance policy to be
provided in a form and amount acceptable to the City . Such policy shall
be for a property value that does not exceed $5,000,000. The insurer for
such policy may be chosen by English, but must be licensed and
authorized to engage in business in Virginia. The purchase price of the
property is $2,350,000 with a closing to occur within 120 days after this
Agreement is executed and payment to be made at closing . The dee d
conveying the property to the City shall be accepted by the City Manager
on behalf of the City and approved as to form by the City Attorney. Such
deed shall be with general warranty, include English Covenants of Title,
and properly note any easements, p ermissible exceptions, covenants, or
reservations applicable thereto. English will pay for the closing costs they
incur from the real estate transaction between English and Genworth Life
and Annuity Insurance Company as a result of this Contract (i.e. the
acquisition of the +/ - 9.27 acre parcels for the Project Site). Such
amounts, including the costs of title insurance policies contemplated
hereunder, will be recoverable by English from the Contingency.
b. Contingency. The Contract Price includes a contingency (the
“Contingency”) in the amount of $ 1,750,000. The Contingency shall be
available for the use of English during design and construction in the event
that the cost of materials , labor or subcontractors when actual hard bids
are received are higher than those used by English in arriving at the
5
Contract Price. If, at the conclusion of Construction of the Project there is
any balance remaining in the Contingency, it will be shared by the City
and English on a 70/30 basis; the City shall receive 30% of the remaining
Contingency balance and English shall receive 70% of the remaining
Contingency balance . All uses of the Contingency will be documented
monthly for the City’s information. English will provide the City with
written documentation of the numbers used in arriving at the Contract
Price and the actual hard bids to justify any use of the Contingency.
In the event English notifies the City that the cost of the Project at 35%
completion of the design will exceed the Contract Price, the City in its sole
discretion will consider whether a reduction in the scope of work will
allow the parties to stay within the Contract Price. If the City does not
agree to reduce the scope of work, the parties agree to share any excess at
the completion of bidd ing above the Contract Price up to $2,350,000 on a
70/30 basis, with the City paying 70% of such excess and English paying
30% of such excess. Further, should the Contract Price exceed
$2,350,000 above the Contingency, then the City shall be solely
responsible for such excess.
c. Plans, Specifications and Submittals.
i. The general character and scope of the Work are illustrated by the
plans and the specifications prepared by the Contractor's
Architect/Engineer and in the Contractor’s PPEA sub mission. The
level of detail shown on the plans and stipulated in the
specifications shall be sufficient to clearly demonstrate to the
City’s Director of Public Works that the design conforms to the
requirements described in the Proposal for the Project . T he
Contractor shall carry out the Work in accordance with the plans
and specification s and any additional detail drawings and
instructions provided by the A/E.
ii. Submittals must be approved by the City’s Project Manager for
review prior to commencement o f Work or installation or
incorporation of any equipment or supplies into the Project.
Unless express written authorization from the City’s Project
Manager has been given , proprietary equipment or supplies shall
not be included in the design of the Project.
ii. English shall maintain a complete set of plans, specifications, and
submittals, including draft as-built drawings, onsite at all times.
d. Change Orders. Change Order proposals from each of the Parties shall
be submitted in writing, with sufficient clarity and detail for the other
Party to evaluate the Change Order proposal. The Parties shall negotiate in
good faith and as expeditiously as possible regarding Change Orders. All
6
Change Order proposals from English must include documentation
itemizing the estimated quantities and costs of materials, equipment and
labor required and the markup percentages used.
e. Markups for Changes. If the Contract Price requires an adjustment due
to changes in the Work, the following markups shall be allowed on suc h
changes:
For English: 5.0% fee
For Subcontractors and Sub-Subcontractors (other than design/engineering
consultants): 5% overhead and 5% fee
f. Allowances. The Contract Price includes the following allowances:
i. Stormwater retention, treatment and work – $500,000
ii. Permits – $68,000
iii. Utility and connection fees – $25,000
iv. Technology/Security - $2,384,000
v. Furniture, finishes and equipment - $2,284,255
vi. Signage - $50,000
vii. Landscaping - $45,000
viii. Testing/Commissioning - $258,290
In the event that any portion of an allowance is not used, the Contract Price
will be reduced by that unused amount. In the event that the costs exceed the
allowance, the Contract Price will be increased to reflect the actual cost.
Additionally, if the allowances are exce eded, that will not count against the
Contingency or the aforesaid $2,350,000 limit described under subsection 6.b.
7. Payment.
a. Progress Payments.
i. English shall submit to the City on the twentieth (20th) day of each
month a Payment Application for Wor k performed during the
immediately prior month in accordance with the Project Schedule
and the Schedule of Values. Each Payment Application shall bear a
certificate that, to the best of English’s knowledge and belief, (1)
all Work during the pay period was carried out in accordance with
this Agreement and any applicable laws and permits, (2) all
7
subcontractors and materialmen required to be paid previously
during the course of the Contract have been paid, and (3) English
is legally entitled to payment. All Payment Applications shall be
emailed to the following address(es):
clay.simmons@lynchburgva.gov
Cc: stephanie.suter@lynchburgva.gov
ii. The Parties s hall have a monthly pay meeting in the first 14 days
of each month or as scheduled by the City . English, the Project
Manager, any A/Es who have provided design work during the
previous month, and representatives of principal subcontractors, if
any, providing Work in the previous month should also attend the
monthly pay meeting. The attendees should also discuss:
1. Progress of the Work;
2. Status of any pending Change Orders;
3. Any general issues with the Work;
4. Any potential delays due to weather, transportation
delays, issues with price or availability of materials, or
similar matters;
5. Such other matters as, in the judgment of the attendees,
may make the progress of the Work continue more
smoothly.
iii. The City shall make payment for Work properly performed in
accordance with the Contract Documents within forty-five (45)
days after receipt of each properly submitted and accurate Payment
Application, but in each case less the total of payments previously
made and less amounts properly withheld. The City can pay
English electronically or by paper check. Payments will either be
mailed or deposited into a checking account. To receive payments
electronically, an ACH form must be completed, provided with a
voided check, and return ed to the address above. By signing the
ACH form, the City is authorized to initiate credit entries and, if
necessary, debit entries and adjustments for any errors.
b. Prompt Payment to Subcontractors and Materialmen . Within seven
(7) days after receiving any progress payment, English must either:
i. Pay each subcontractor or materialman its proportionate share of
the total payment received from the City attributable to the Work
performed or materials provided; or
Notify the City and the subcontractor or materialman, in writing, of
its intention to withh old all or part of the subcontractor’s or
materialman’s payment with the reason therefor.
8
c. Retainage on Progress Payments.
i. The City will retain five percent ( 5%) of the amount of each
Payment Application.
ii. Upon Final Completion of the Project and approval of the final
Payment Application, the City shall release to English all retained
amounts. The City agrees to consider reducing the retainage as the
Work progresses upon request of English.
d. Final Payment. English shall submit its final Payment Application to the
City after Final Completion of the Project. If the City finds that all
portions of the Work including any punch list items identified by the City
or English have been completed, the City shall make payment on the final
Payment A pplication within s ixty (60) days after receipt of the same,
provided that English has satisfied the requirements for final payment.
e. Lender Requirements. In the event that the City obtains a loan or other
financial assistance from a third party in connection with the financ ing of
the Project, English shall comply with all conditions established by such
lender or other financial source in connection with Payment Applications
under this Agreement.
f. Payments due and unpaid by the City, whether progress payments or final
payment, shall bear interest commencing forty-five (45) days after payment is
due at a rate equal to the then current prime rate.
(Remainder of Page Intentionally Left Blank)
9
8. Contract Time and Project Schedule.
a. Date of Commencement. The Work shall commence at the time set forth
in the City’s written Notice to Proceed (“Date of Commencement”)
unless the Parties mutually agree otherwise in writing.
b. Preconstruction Meeting. Within fourteen (14) days following receiving
the Notice to Proceed, the Parties s hall have a preconstruction meeting.
Project managers from English, the City, the A/E, and principal
subcontractors should attend the preconstruction meeting. Among matters
to be addressed are: (1) schedule of the Work; (2) procedures for approval
of Submi ttals; (3) change order procedures; (4) potential issues with
materials or labor; (5) any other matters the Parties, A/E, or subcontractors
believe would advance the Project.
c. Project Schedule. Following the completion of the design work and not to
exceed ninety (90) days, English shall prepare and submit to the City a
complete, detailed Project Schedule showing the progress of Work on the
Project using a critical path method (CPM) methodology. Such CPM
schedule shall meet the time schedules provided in subsection 8.d.i. When
the time schedules are established by English and accepted by the City, a
Cash Flow Projection for the Project will be provided by English to the
City.
d. Substantial Completion and Final Completion.
i. The Project Schedule is attached as Exhibit D and has the
Substantial Completion Date and Final Completion Date for the
Project. The total number of days for the entire project is 847 days
from English’s receipt of the City’s Notice to Proceed.
ii. If English’s critical pat h for performance of the Work is delayed
due to strikes, fires, rebellion, unusual delays in transportation,
unavailability of materials, or other causes outside the control of
English or any of the subcontractors for which it is responsible ,
with the exception of weather in the event that weather occurs that
exceeds normal expectations based on National Weather Service
statistics for the Lynchburg metropolitan area, the Contract Times
for performance shall be reasonably extended by the number of
days the critical path is extended. Delays in the performance of the
Work due to weather or the unavailability of materials shall be
documented by English, and submitted to the City’s Project
Manager in writing monthly.
iii. The Parties shall schedule regular m eetings during the design and
construction of the Project to go over the Project Schedule, any
major issues that either party has identified, review of change
10
orders and the Project ’s budget, and any other issues that may be
identified by either Party to make sure that the Project advances on
schedule and within budget.
e. Liquidated Damages. The Parties recognize that time is of the essence
with respect to all dates set forth in th e Contrac t, and that the City will
suffer financial loss if Substantial Comple tion of the Work is not
performed within the time specified in th e Contract including any time
extension(s) allowed pursuant to the Contract. The Parties further
recognize the difficulty of proving actual loss to the City in the event of a
failure to achie ve Substantial Completion in accordance with the date
established in the Contract . Accordingly, instead of requiring such proof,
English acknowledges that the rate of the liquidated damages set forth
herein is reasonable and does not constitute a penalty. English agrees that
if Substantial Completion is not attained by the Scheduled Substantial
Completion Dates, English shall pay on demand to the City One Thousand
and no/100 Dollars ($1000.00) per day as liquidated damages for each day
that Substantial Comp letion extends beyond the Scheduled Substantial
Completion Date. The liquidated damages provided herein shall be in lieu
of all liability for any and all extra costs, losses, expenses, claims,
penalties and any other damages, whether special or consequenti al, and of
whatsoever nature incurred by the City which are occasioned by any delay
in achieving Substantial Completion. English hereby waives any defenses
that the liquidated damages are a penalty or do not bear a reasonable
relation to the actual damages.
9. Plan of Finance . The City will arrange to finance the costs of the Project in a
manner that results in the availability of funds in the amounts and at the times
required to meet the projected needs for the Project.
10. Permitting and Ap provals. English shall be responsible for obtaining all
necessary federal, state and local permits and approvals and conduct the Project in
compliance with all applicable laws and regulations.
11. Construction.
a. All construction provided or caused to be pr ovided by English shall be
performed pursuant to the Contract Documents, in full compliance with all
applicable laws and regulations, and applicable permits, both public and
private.
b. The City, its employees, its agents, and its consultants shall be afforde d
access to the Project during regular business hours in the City of
Lynchburg, Virginia, or at any time when Work is actually being carried
out to ensure that English’s activities are acceptable to the City and are
being performed in accordance with the C ontract, and that the Work is
being properly maintained.
11
c. All construction access points, roadways, paths, and other areas used for
ingress and egress, site access, material handling and storage, and staging,
shall be protected with sediment and erosion control measures in
accordance with federal, state, and local requirements.
d. All construction access points, roadways, paths, and other areas used for
ingress and egress, site access, material handling and storage, and staging
shall be restored to thei r original condition or as otherwise required by
federal, state and local permits and/or agreements with the respective
landowners.
12. Stop Work and Termination for Cause.
a. The City’s Right to Stop Work. At any time and without cause, the City
may suspend the Work or any portion thereof for a period of not more than
thirty (30) consecutive days by notice in writing to English which shall fix
the date on which Work will be resumed. English shall resume the Work
on the date so fixed. English shall be granted an adjustment in the Contract
Price or an extension of the Contract Times, or both, directly attributable
to any such suspension if English makes a claim therefor . Provided,
however, if the City suspends Work or any portion thereof due to its
reasonable judgment that English has or is violating the Contract or any
requirement thereof, including but not limited to violations of any
applicable laws or regulations related to jobsite safety, then English shall
not receive any adjustment in the Contract Price or e xtension of the
Contract Times, even if it is determined that no violation actually existed.
b. The City’s Right to Terminate for Cause.
i. If English repeatedly fails to (i) provide or cause to be provided a
sufficient number of skilled workers; (ii) supply t he materials or
equipment required by the Contract; (iii) comply with applicable
laws and regulations ; (iv) timely pay, without cause, design
consultants or subcontractors; (v) prosecute the Work with
promptness and diligence to ensure that the Work is com pleted by
the Contract Time(s), as such times may be adjusted; or (vi)
perform material obligations under the Contract Documents, or if
English (i) becomes insolvent; (ii) makes a general assignment for
the benefit of its creditors; (iii) commences or cons ents to any
action seeking reorganization, liquidation or dissolution under any
law relating to bankruptcy or relief of debtors; or (iv) commences
or consents to any action seeking appointment of a receiver or
trustee for itself or its assets, then the City, in addition to any other
rights and remedies provided in the Contract Documents or by law,
shall have the right to terminate the Contract as set forth herein.
12
ii. Upon the occurrence of an event set forth in subsection 12.b.i
above, the City may provide wri tten notice to English that it
intends to terminate the Contract unless the problem cited is cured,
or reasonably commenced to be cured and diligently pursued
thereafter, within seven (7) days of English’s receipt of such
notice. If English fails to cure, or reasonably commence to cure,
such problem, then the City may give a second written notice to
English of its intent to terminate the Contract within an additional
seven (7) day period. If English, within such second seven (7) day
period, fails to cure, or reasonably commence to cure, or after
having commence to cure fails to diligently pursue cure, of such
problem, then the City may declare the Contract terminated for
default by providing written notice to English of such declaration.
The City may provi de copies of any notices to the surety on the
performance bond and, in the City’s sole discretion, elect to pursue
any remedies that may be available under the terms of the
performance bond in lieu of proceeding with the termination.
iii. Upon declaring the Con tract terminated, the City may enter upon
the premises and , to the extent the City has made payment, take
possession, for the purpose of completing the Work, of all
English’s (not subcontractor’s) materials, equipment, tools,
appliances and other items for use in the Project, which have been
purchased or provided for the performance of the Work, all of
which English hereby transfers, assigns and sets over to the City
for such purpose, and to employ any person or persons to complete
the Work and provide all of the required labor, services, materials,
equipment and other items. In the event of such termination,
English shall not be entitled to receive any further payments under
the Contract Documents. If the City’s cost and expense of
completing the Work excee ds the unpaid balance of the Contract
Price, then English shall be obligated to pay the difference to the
City. Such costs and expense shall include not only the cost of
completing the Work, but also losses, damages (direct, indirect and
special, and consequential), costs and expenses, including
attorneys’ fees and expenses, incurred by the City in connection
with the re -procurement and defense of claims arising from the
default. Upon completion of the Work, any Contract amounts
remaining shall be paid to English.
iv. If the City improperly terminates the Contract for cause, the
termination for cause will be converted to a termination for
convenience and the City will reimburse English for such costs and
expenses incurred in connection with the improper terminat ion in
accordance with Section 13.
13
b1. The City’s Right to Terminate for Excessive Cost . If at any point the
City desires to terminate this Contract because the cost of the Project is
too great or for other financial considerations, as determined in the s ole
discretion of the City, then the City may terminate this Contract without
penalty and without further obligation to English. However, the City will
be and remain responsible to English for any unpaid Work and/or services
provided pursuant to the Contract through the Contract’s termination date.
c. English’s Right to Stop Work.
i. English may, in addition to any other rights afforded under the
Contract Documents or at law, stop Work upon the City’s failure to
pay for portions of the Work properly performed i n accordance
with the Contract Documents.
ii. Should this occur, English has the right to provide the City with
written notice that English will stop Work unless said event is
cured within seven (7) days from the City’s receipt of the notice.
If the City does not cure the problem within such seven (7) day
period, English may stop Work. If the City later cures the problem
and the parties agree to resume Work on the Project, then English
shall be entitled to an equitable adjustment to the Contract Price
and Contract Time(s) to the extent that English has been adversely,
materially, and demonstrably impacted by such stoppage and if
English is not in default under th e Contract and is otherwise
prepared to proceed with the performance of the Work in
accordance with the provisions of the Contract Documents.
Notwithstanding the foregoing, English shall not stop Work
because of any dispute with the City about all or any portion of any
amount for which English has submitted a Payment Application as
long as the City pays for such portion of the same about which
there is no dispute.
d. English’s Right to Terminate for Cause.
i. English, in addition to any other rights and remedies provided in
the Contract Documents or by law, may terminate the Contract for
cause for the followi ng reasons specified in clauses ii. through iv.
below:
ii. The Work has been stopped for ninety ( 90) consecutive days, or
more than one-hundred twenty (120) days during the duration of
the Project, because of an order by a court or any government
authority having jurisdiction over the Work, or orders by the City
under subsection 12.a.i hereof, provided that such stoppages are
not due to the acts or omissions of English or anyone for whose
14
acts English may be responsible. This provision shall not apply and
shall not be a basis for termination to the extent that any stoppage
is related to or arises as a result of any delay by a governmental
agency in issuing a permit or restrictions set forth in or applicable
to a permit issued by a regulatory authority which is a pplicable to
the Work.
iii. The City’s failure to provide English with any information, permits
or approvals that are the City’s responsibility under the Contract
Documents which result in the Work being stopped for ninety (90)
consecutive days, or more than one-hundred twenty (120) days
during the duration of the Project, provided that English diligently
pursues approval of any such permits or approvals, even though
the City has not ordered English in writing to stop and suspend the
Work and such failure of the City was not due to the acts or
omissions of English or anyone for whose acts English may be
responsible.
iv. The City’s failure to cure the problems that English has specified
in its written notice under subsection 12.c.ii after English has
stopped the Work.
v. Upon the occurrence of an event set forth above, English may
provide written notice to the City that it intends to terminate the
Contract unless the problem cited is cured, or commenced to be
cured, within ten (10) days of the City’s receipt of such notic e. If
the City fails to cure, or reasonably commence to cure, such
problem, then English may give a second written notice to the City
of its intent to terminate within an additional ten (10) day period.
If the City, within such second ten (10) day period, fails to cure, or
reasonably commence to cure, such problem, then English may
declare the Contract terminated for default by providing written
notice to the City of such declaration. In such case, English shall
be entitled to recover in the same manner a s if the City had
terminated the Contract for its convenience.
13. Termination for Conve nience. Upon seven (7) days written notice to English,
the City may, for its convenience and without cause, elect to terminate the
Contract. In such event, the City shall pay English for the following:
a. All Work properly performed inclusive of materials, equipment, and
fabricated items stored on or off site by English in accordance with the
Contract;
b. The reasonable costs and expenses attributable to such termination,
including verifiable demobilization costs and amounts due in settlement of
any terminated subcontracts; and
15
c. Overhead and profit for all portions of the Work properly performed in
accordance with the Contract Documents through the date of termination.
14. Payment Bonds, Performance Bonds, and Other Security.
a. English will maintain surety performance and labor and materials payment
bonds in the amount of the Contract Price for the term of the Contract and
provide such bond s to the City. The bond s will be issued by a c ompany
licensed to issue surety bonds in the Commonwealth of Virginia with an
A. M. Best rating of A- or better and meet the requirements of Section 2.2-
4337 of the Code, and be in a form acceptable to the City Attorney , as
shown on Exhibit F. The bonds shall be provided to the City not later than
the date on which the first building permit for the Project is obtained.
b. English shall cooperate with the City to fulfill any reasonable
requirements in connection with the financing for the Project with respec t
to the form of the bonds provided hereunder.
c. English shall also furnish any cash escrow, funds, cashier’s checks,
certified checks, or letters of credit required for the issuance of any earth -
disturbing or other permit and any bonds or security required by any other
governmental authority.
15. Indemnification. English will defend, indemnify and save harmless the City, its
employees, officers, boards, board members, representatives, and agents from and
against any and all claims, losses, costs, damages or liabilities of any kind caused
by English, its employees, agents, subcontractors, and/or materialmen in
connection with the Work performed under this Agreement, or failure to perform
such Work under this Agreement. This obligation shall survive the terminatio n or
expiration of this Agreement for a period of five (5) years.
16. Insurance.
a. English will maintain a general liability policy with $ 2,000,000 combined
single limits. Coverage is to be on an occurrence basis with an insurer
licensed to conduct business in the Commonwealth of Virginia. The
insurer must have an A. M. Best rating of A - or better. The insurer must
list the City, its employees, officers, boards, board members,
representatives, and agents as an additional insured. The endorsement
must be issued by the insurance company. A notation on the certificate of
insurance is not sufficient.
b. English will maintain workers’ compensation coverage in compliance with
the laws of the Commonwealth of Virginia. The coverage must have
statutory limits and be with an insurer licensed to conduct business in the
Commonwealth of Virginia. The insurer must have an A. M. Best rating of
A- or better. As an alternative, it is acceptable for English to be insured by
a group self -insurance association that is licensed by the Virginia Bureau
16
of Insurance. English will also carry employers ’ liability insurance with a
limit of at least $ 500,000 bodily injury by accident/$ 1,000,000 bodily
injury by disease policy limit/$ 500,000 bodily injury by disease each
employee.
c. English will maintain automobile liability insurance with limits of at least
$1,000,000. The coverage is to be written with a symbol “1”. The insurer
must be licensed to conduct business in the Commonwealth of Virginia.
The insurer must have an A. M. Best rating of A- or better.
d. English will maintain professional liability insurance with a limit of at
least $2,000,000 covering all Work on the Project.
e. English will maintain errors and omissions coverage and builders risk
coverage on a replacement cost basis for the duration of the Contract. The
required coverage will be the full replacement cost of the building and/or
structures being built under this Contract, which the parties agree shall be
the same as the Contract Price. The City will be listed as an insured under
this policy to protect any property owned at the construction site.
Coverage is to be with a company licensed to conduct business in the
Commonwealth of Virginia and have an A. M. Best rating of A- or better.
f. With all policies listed above, the insurer or agent of the insurer must issue
a certificate of insurance to show evidence of including but not limited to
additional insured endorsements . All wording limiting the insurer ’s
responsibility to notify the City of any cancellation or no n-renewal of the
coverage must be removed.
i. English shall be responsible for the filing and settling of claims
and liaison with insurance adjusters.
ii. English shall send proofs of coverage to the City, which shall be
deemed to have approved of such policies unless, within thirty (30)
days after receipt thereof, the City shall by notice in writing advise
English to the contrary.
g. The City reserves the right, but not the obligation, to review and revise
any insurance requirement, including but not limited to limits, sub -limits,
deductibles, self -insured retentions, coverages and endorsements based
upon any material adverse change in insurance market conditions after the
date of this Agreement affecting the availability or affordability of
coverage, or changes in the scope of work/s pecifications affecting the
applicability of coverage, and the costs of any such change shall be an
adjustment to the compensation payable to English. Additionally, the City
reserves the right, but not the obligation, to review and reject any
insurance pol icies failing to meet the criteria stated herein and to reject
any insurer providing coverage due to its poor financial condition or
17
failure to operate legally, provided, however, that if the policy or insurer is
rejected, then English shall be entitled to request, and the City shall grant,
an adjustment of the Contract Price if English’s costs are adversely
impacted by such rejection and subsequent coverage with another policy
or insurer.
h. English shall waive all rights of subrogation against the City.
i. In addition to providing the City with copies of any and all certificates of
insurance as described herein, English also shall provide copies of all
applicable additional insured endorsements.
17. Representations and Warranties.
a. The City hereby represents and warrants to English as follows:
i. The City is a political subdivision operating under the laws of the
Commonwealth of Virginia and has full power, right and authority
to execute, deliver and perform its obligations under, in accordance
with, and subject to, the terms and conditions of this Agreement.
ii. Each person executing this Agreement on behalf of the City is duly
authorized to execute each such document on behalf of the City.
iii. Neither the execution and delivery by the City of this Agreemen t
and any other documents executed concurrently herewith to which
the City is a party, nor the consummation of the transactions
contemplated hereby or thereby, is in conflict with, or will result in
a default under or violation of , any other agreements or
instruments to which it is a party or by which it is bound.
iv. There is no action, suit, proceeding, investigation or litigation
pending and served on the City as of the date of this Agreement
which challenges the City’s authority to execute, deliver or
perform, or the validity or enforceability of this Agreement and the
other related documents to which the City is a party, or which
challenges the authority of the City official executing this
Agreement or the other related documents, and the City has
disclosed to English any pending and unserved or threatened
action, suit, proceeding, investigation or litigation with respect to
such matters of which the City is aware.
b. English hereby represents and warrants to the City as follows:
i. English represents th at it is licensed to conduct business in
Virginia, and in signing this Agreement as well as such
comprehensive agreement as may be entered into between the
18
parties, has full power and authority to bind itself to the terms
thereof.
ii. English has taken or caused to be taken all requisite action to
authorize the execution and delivery of, and the performance of its
obligations under this Agreement and the other related documents
to which English is a party.
iii. Each person executing this Agreement or any o ther related
document on behalf of English has been or will at such time be
duly authorized to execute each such document on behalf of
English.
iv. Neither the execution and delivery by English o f this Agreement
and the other related documents to which English is a party, nor
the consummation of the transactions contemplated hereby or
thereby, is in conflict with or will result in a default under , or a
violation of , the governing instruments of English or any other
agreements or instruments to which it is a party or by which it is
bound.
v. There is no action, suit, proceedings, investigation or litigation
pending and served on English which challenges English’s
authority to execute, deliver or perform, or the validity or
enforceability of this Agreement a nd the other related documents
to which English is a party, or which challenges the authority of
the English official executing this Agreement or the other related
documents; and English has disclosed to the City any pending and
unserved or threatened acti on, suit, proceeding, investigation or
litigation with respect to such matters of which English is aware.
vi. English is in material compliance with all laws, regulations and
ordinances applicable to English or its activities in connection with
this Agreement and the other related documents.
viii. English is a financially viable and capable entity and fully able to
perform its obligations under this Agreement.
18. Warranties; Assignment.
a. General warranty of Work. English warrants that all of the Work
furnished as part of the Project is in accordance with the requirements of
the Contract Documents, free from defect or inferior materials or
equipment, and of such quality workmanship as shall be consistent with
the standard of care, quality, judgment, and atten tion as is industry
standard in the construction industry for the type of work performed, for a
period of one (1) year after the date of Final Completion, and unless
19
otherwise agreed in writing by the City, in the City’s sole discretion, all
materials and equipment furnished are new and in first -class condition.
English will, at Final Completion and acceptance, provide the City with a
list of extended warranties that English or the manufacturers of materials
are assigning to the City, if applicable. All warranties provided or assigned
to the City are to be construed as cumulative, so as to maximize the City’s
warranty protection.
b. Repairs. If, within the warranty period, the City finds that warranted
Work must be repaired or changed because the materials, equ ipment, or
workmanship were inferior, defective, or not in accordance with the
Contract Documents and industry standard for the type of work
performed, English shall promptly, and without expense to the City:
i. Place all warranted Work in a condition consist ent with the
warranties and reasonably satisfactory to the City;
ii. Correct all damage to equipment, the site, the building, or its
contents that is the result of such unsatisfactory work in a manner
reasonably satisfactory to the City; and
iii. Correct any Work, materials, or equipment disturbed in fulfilling
the warranty in accordance with industry standard and reasonably
satisfactory to the City.
Should English fail to proceed promptly in accordance with all warranties,
the City may have the Work performed by an other and submit English a
bill therefor, which must be paid within thirty (30) days of receipt.
c. Transfer of Warranties . English shall obtain transferable guarantees or
warranties for equipment, materials, or installation to the extent furnished
by any manufacturer or installer in the normal course of business or trade.
English shall obtain and furnish to the City all of the information required
to make such guarantee or warranty legal binding and effective for the
City.
d. No Waiver . The City’s accepta nce of a warranty is not an election of
remedies and does not waive any other right or remedy available to the
City at law or in equity.
19. Resolution of Disputes, Claims and Other Matters. Disputes, claims and other
matters in question between the Parties under th e Contract shall be resolved as
follows:
a. Contractual claims, whether for money or for other relief, shall be
submitted to the Project Manager, in writing, no later than sixty (60) days
after Final Payment; however, written notice of English’s intention to file
such claim must be given within fourteen (14) days of the time of the
20
occurrence or beginning of the Work upon which the claim is based. Such
notice shall state that it is a "notice of intent to file a claim" and include a
written statement describing the act or omission of the City or its agents
that allegedly caused or may cause damage to English and the nature of
the claimed damage. Failure to submit such notice of intent within the
time and in the manner required shall be a conclusive waiver of the claim
by English. English is not prevented from submitting claims during the
pendency of the Work, and the City shall not be obligated to render a final
written decision on any claim until after Final Payment. Proposed or
requested Change Orders, demands for money compensation or other
relief, and correspondence and emails to the City or its representatives,
which do not comply with the requirements of this Section, shall not be
considered claims under this Section.
b. Whenever a Party disagrees with the othe r Party’s final decision on a
claim or dispute arising under or related to this Contract, its sole right of
appeal shall be by filing, within six (6) months of date of the other Party’s
final decision, litigation in either the Circuit Court of the City of
Lynchburg, Virginia or the United States District Court for the Western
District of Virginia, Lynchburg Division, and may pursue all available
appeals from such courts. These two courts shall have exclusive and
binding jurisdiction and venue over any and a ll claims arising under the
Contract.
c. Prior to filing litigation, the Parties may first endeavor to resolve any
disputes or claims between them through direct negotiations, and if such
direct negotiations fail, by non -binding mediation, with the site of t he
mediation being held in the City of Lynchburg , Virginia. If the Parties
agree to attempt mediation, then within thirty (30) days of receipt of the
notice requesting mediation, the Parties shall attend a formal mediation
conducted by a single, impartial mediator. Where agreed by the Parties,
the appointment of the mediator may be by The McCammon Group and in
accordance with the rules of the same. The Parties shall share evenly the
fees of the mediator and each shall bear its own costs involved in
participating in the mediation. If they opt to mediate, the Parties shall
participate in the mediation process in good faith. The process shall be
concluded within forty-five ( 45) days of filing of the notice requesting
mediation. Should the dispute or claim rem ain unresolved following
mediation or should the time limit described herein occur during the
course of mediation, either Party may proceed in order to preserve its
rights, but mediation shall not extend the time period set forth herein. If
the claim or d ispute is not resolved by mediation, failure to file an appeal
of the other Party’s final decision within six (6) months after such decision
is issued in writing shall result in the other Party’s final written decision
becoming final and subject to no further appeal.
21
d. Nothing herein shall prevent a Party from seeking temporary injunctive or
other temporary equitable relief in the Circuit Court of the
City of Lynchburg, Virginia, if circumstances so warrant.
e. In the event of any dispute, claim, or other matt er in question arising,
English shall continue its performance diligently during its pendency as if
no dispute, claim or other matter in question had arisen. During the
pendency of any dispute in connection with the payment of moneys,
English shall be entitled to receive payments for non-disputed items.
20. Notices. All notices and demands by any party to any other shall be given in
writing and sent by a nationally recognized overnight courier , or by United States
certified mail, postage prepaid, return receipt requested, or hand -delivered, and
addressed as follows:
To the City:
City of Lynchburg, Virginia
Public Works Department
Administration Building
Attn: Deputy Director
1700 Memorial Avenue
Lynchburg, VA 24501
With a copy to:
City of Lynchburg, Virginia City of Lynchburg, Virginia
City Manager Procurement Manager
900 Church Street – 3rd Floor 900 Church Street – 3rd Floor
Lynchburg, VA 24504 Lynchburg, VA 24504
To English:
William Amos
Vice President
English Construction
615 Church Street
Lynchburg, Virginia 24504
Any party may, upon prior notice to the others, specify a different address for the
giving of notice. Notices shall be effective one (1) day after sending if sent by
overnight courier or hand -delivered, or t hree (3) days after sending if sent by
certified mail, return receipt requested.
21. Successors and Assigns. Except as expressly otherwise provided, all of the terms,
covenants and conditions hereof shall be binding upon and inure to the benefit of
22
the Parties hereto and their respective successors and assigns. Th e Contract may
not be assigned without the prior written consent of the Parties to th is Agreement.
Notwithstanding the foregoing, if financing is obtained for the Project, the City
may assign the Contract to a third party, as needed, consistent with the financing.
The Contract may also be assigned to a mortgagee(s)/trustee(s) of deed(s) of trust
of the fee or leasehold interest in the Site or portions of them. English hereby
consents to collateral ass ignment of the Contract in favor of such mortgagee(s)/
trustee(s) of deed(s) of trust, in a form reasonably satisfactory to such
mortgagee(s)/ trustee(s), provided that no such assignment shall release the City
from its obligations to English under the Contract.
22. Time of the Essence. The time to complete the Project is of the essence. English
shall proceed expeditiously with adequate forces and make diligent efforts to
perform all portions of the Work in accordance with the Project Schedule and
shall achiev e Substantial Completion of the Work and Final Completion of the
Work within the completion times specified in this Agreement and the Project
Schedule. The City will cooperate reasonably with English’s efforts to keep the
Project on schedule.
23. Independent Contractor. It is expressly understood and agreed by the Parties
hereto that English in performing its obligations under th e Contract, shall be
deemed an independent contractor and not an agent, employee , partner or co -
venturer of the City.
24. No Waiver. The failure of either Party to insist upon the strict performance of any
provisions of the Contract, the failure of either Party to exercise any right, option
or remedy hereby reserved, or the existence of any course of performance
hereunder shall not be const rued as a waiver of any provision hereof or of any
such right, option or remedy or as a waiver for the future of any such provision,
right, option or remedy or as a waiver of a subsequent breach thereof. The consent
or approval by the City of any act by English requiring the City’s consent or
approval shall not be construed to waive or render unnecessary the requirement
for the City’s consent or approval of any subsequent similar act by English. No
provision of the Contract shall be deemed to have been waived unless such waiver
shall be in writing signed by the Party to be charged. Further, any approvals
required by the City shall likewise be in writing.
25. Cooperation. The Parties agree to cooperate to achieve the objectives of th e
Contract and to use reasonab le and good faith efforts to resolve all disputes and
disagreements that may arise hereunder. Each Party agrees to designate
representatives with the authority to make decisions binding upon such Party
(subject in the case of the City to those matters requiring an appropriate vote of its
governing body) so as to not unduly delay the Project Schedule.
26. Counterparts. This Agreement may be executed in two or more counterparts,
each of which shall be deemed an original, but both of such counterparts together
shall be deemed to be one and the same instrument. It shall not be necessary in
23
making proof of this Agreement or any counterpart hereof to produce or account
for the other counterpart.
27. Entire Agreement and Order of Precedence . This Agreement, including any
other Contract Documents, and the Exhibits attached hereto and forming a part
hereof set forth all the covenants, promises, agreements, conditions and
understandings between the Parties concerning the Project, and there are no
covenants, promises, agreement s, conditions or understandings, either oral or
written, between them other than are herein set forth. No alteration, amendment,
change or addition to th e Contract shall be binding upon the Parties unless
reduced to writing in a formal amendment signed by each Party. The City
Manager, or his designee, shall execute such amendment(s) on behalf of the City ,
and shall have full authority to do the same . The President, or a Vice President,
shall execute such amendments on behalf of English, and shall have full authority
to do the same.
28. Governing Law. This Agreement and the Contract Documents shall be governed
by, and construed in accordance with, the laws of the Commonwealth of Virginia.
The provisions of this Agreement and the Contract documents shall no t be
construed in favor of or against either Party but shall be construed according to
their fair meaning as if both Parties jointly prepared this Agreement and the
Contract Documents.
29. Annual Appropriation; Filing With Auditor of Public Accounts. The financial
obligations of the City contained in th e Contrac t are subject to annual
appropriation. Within thirty (30) days after the date of this Agreement, the City
shall submit a copy of the Agreement to the Auditor of Public Accounts, to the
extent required by Section 56-575.9(F) or Section 56-575.18 of the Code.
30. Conditions Precedent and Subsequent to Agreement’s Effecti veness. It shall
be a condition precedent to this Agreement’s effectiveness that it first be approved
by City Council as evidenced by the sign ature of the City Manager on behalf of
the City on the signature pages hereof.
31. Compliance with Laws . English, its officers, agents, employees, and any other
persons over whom English has control shall comply with all presently or
subsequently adopted applicable laws, regulations, rules, ordinances, and codes of
federal, state, and local governmental bodies, including the Lynchburg City Code ,
in connection with the Project.
32. Covenant of Non -Discrimination. English will not discriminate against any
subcontractor, materialman, employee, applicant for employment, or other
applicable person, because of race, color, religion, sex, national origin, age,
physical or mental disability, military status, status as a veteran, marital status,
pregnancy, childbirth o r related medical conditions (including lactation), sexual
orientation, gender identity, or any other basis prohibited by federal or Virginia
law. English agrees to post in conspicuous places, available to employees and
24
applicants for employment, notices setting forth the provisions of this covenant.
Further, English, in all solicitations or advertisements for employees, will state
that it is an equal employment opportunity employer. Notices, advertisements,
and solicitations placed in accordance with Vi rginia law and federal law, rules, or
regulations shall be sufficient for the purpose of meeting the se requirements.
English shall ensure this provision is binding upon each subcontractor,
materialman, or any other person who may be responsible to English or the City
pursuant to this Agreement.
33. Drug-Free Workplace Policy. During the Project, English agrees to (i) provide
a drug-free workplace for its employees consistent with all applicable state and
federal regulations; (ii) post in conspicuous place s, available to its employees and
applicants for employment, a statement notifying its employees that the unlawful
manufacture, sale, distribution, dispensation, possession, or use of controlled
substances or marijuana is prohibited in the workplace and sp ecifying the actions
that will be taken for violations of such prohibition; (iii) state in all solicitations or
advertisements for its employees placed by or on behalf of English that English
maintains a drug -free workplace. English shall ensure this provision is binding
upon each subcontractor, materialman, or any other person who may be
responsible to English or the City pursuant to this Agreement . A “drug -free
workplace” shall have its meaning under the Code.
34. Employment of Illegal Aliens Prohibited . English covenants that it does not,
and shall not, during the performance of the Project, knowingly employ an
unauthorized alien as defined in the Federal Immigration Reform and Control Act
of 1986. English shall ensure this provision is binding upon each subcontractor,
materialman, or any other person who may be responsible to English or the City
pursuant to this Agreement.
35. Minority and Women -Owned Businesses . In the performance of the Project,
English agrees to use its best efforts to abide to increase opportunity for small,
minority-owned, and women-owned businesses (as defined in Section 2.2-4310 of
the Code) in applicable subcontracts.
36. Evidence of Authority to Transact Business in Virginia . Upon request,
English shall provide documentation accep table to the City establishing that it is
authorized to transact business in Virginia as a Virginia stock corporation under
the Code. English shall not allow its existence or its certificate of authority or
registration to transact business in Virginia to lapse or to be revoked or cancelled
at any time during the Project. English shall ensure this provision is binding upon
each subcontractor, materialman, or any other person who may be responsible to
English or the City pursuant to this Agreement.
37. Severability. Any provision, term, covenant, or part of this Agreement held by a
court of competent jurisdiction to be void or otherwise deemed unenforceable
under any applicable law shall be deemed stricken and all remaining provisions ,
25
terms, covenants, or pa rts of th is Agreement shall continue to be binding and
remain in full force and effect . Upon such provision , term, covenant, or part of
the Contract being stricken, this Agreement shall be treated in a manner by the
Parties that comes as close as possible to expressing the original intent.
38. Workplace Safety. English, at its sole expense, shall be responsible for ensuring
its workplace, employees, agents, representatives, and any other persons
performing Work under this Agreement conform to all federal and Virginia laws,
regulations, and guidelines concerning workplace safety, including but not limited
to, controlling the spread of COVID -19. Further, English shall defend, hold
harmless, and indemnify the City, its employees, officers, boards, board members,
representatives, and agents for any and all fines, penalties, costs, attorney’s fees,
judgments, and the like which may arise against the same as a result of a
noncompliant workplace operated by English. The indemnification obligation
hereunder shall su rvive the termination or expiration of this Agreement for a
period of five (5) years.
39. Third-party Rights. Nothing in th is Agreement shall be construed as granting
any rights to any person who is not a Party to this Agreement.
40. Subcontractors and Mater ialmen. Upon the City’s request, English shall
provide a listing of all prime subcontractors and materialmen for the Project,
performing Work or providing materials for the Project, including their (i) name;
(ii) contact information ; (iii) address; (iv) phone number ; (v) Work to be
performed/Materials to be provided; (vi) subcontract amount ; (vii) amount
actually paid; and (viii) any other information requested . English shall be fully
responsible to the City for all acts and omissions of all succeeding ti ers of
subcontractors and materialmen per forming Work or providing materials under
the Agreement just as English is responsible to the City for its own acts and
omissions.
41. Right to Inspect . The City shall have access to any books, documents, and
records of English pertinent to the Work, Work Product, or provided for the
Projects for the purpose of making audits, examinations, excerpts, or
transcriptions. All such records shall be maintained by English for at least five
(5) years after the City has made final payment thereto.
42. Easement. The City and English both acknowledge a Sanitary/Sewer or related
easement must be acquired as part of the Project , being shown by a red line on
Exhibit G. The City, at its own expense, shall be responsible for acquirin g the
same.
43. Incorporation of Exhibits. The following exhibits are hereby deemed to be part
of this Agreement:
26
Exhibit A:
Definitions
Exhibit B:
Site Plan, Detailed Scope of Work, and English’s Proposal.
Exhibit C:
Project Property
Exhibit D:
Project Schedule
Exhibit E:
Schedule of Values
Exhibit F:
Bond Forms
Exhibit G:
Sanitary/Sewer Easement
(Remainder of Page Intentionally Left Blank)
27
IN WITNESS WHEREOF , the Parties have executed this Comprehensive
Agreement as of the day, month, and year first above written.
CITY OF LYNCHBURG, VIRGINIA
By:
Name: Wynter C. Benda
Title: City Manager
(SEAL)
Attest:__________________________
Alicia Finney, Clerk of Council
ENGLISH CONSTRUCTION COMPANY, INC.
By:
Name: _________________________________
Title: __________________________________
(SEAL)
Attest:__________________________
Name:____________________
Title:_____________________
Approved as to Form:
____________________________
City Attorney/Designee
28
EXHIBIT A
Definitions
Architect, Engineer, Architect/Engineer, or A/E: The term used to designate the duly
Virginia licensed persons or entities designated by English to perform and provide the
Architectural and Engineering design and related services in connection with the Project.
Change Order: A document issued on or after the effective date of the Agreement which
is agreed to by English and approved by the City, and which authorizes an addition,
deletion, or revision in the Work, including any adjustment in the GMP and/or the
Contract Completion Date. A Change Order, once signed by all parties, is incorporated
into and becomes a part of the Agreement.
Construction: The term used to include new construction, reconstruction, renovation,
restoration, major repair, demolition, and all similar work upon buildings and ancillary
facilities, including any draining, dredging, excavation, grading or similar work upon real
property.
Contract Completion Date: The date by which the Project must be Substantially
Complete, which is set forth in this Agreement.
Contract Documents: This Agreement between the City and English and any documents
or exhibits expressly incorporated therein, and all modifications including addenda and
subsequent Change Orders.
Contract Price or Guaranteed Maximum P rice (GMP) : The total compensation
payable to English for completing the Project, subject to modification by Change Order.
Date of Commencement: The date indicated in the written Notice to Proceed, the receipt
of the earliest Building Permit, or a date mutually agreed to between the City and English
in writing, whichever is the latest.
Day(s): Calendar day(s) unless otherwise noted.
Defective: An adjective which, when modifying the word Work or Project , refers to
Work that is unsatisfactory, faulty, deficie nt, does not conform to the Contract
Documents or does not meet the requirements of inspections, standards, tests or approvals
required by the Contract Documents, does not conform to applicable laws or permits, or
Work that has been damaged prior to the fi nal payment (unless responsibility for the
protection thereof has been assumed by the City at Substantial Completion).
Drawing: A page or sheet of the Plans which presents a graphic representation, usually
drawn to scale, showing the technical information, design, location, and dimensions of
various elements of the Project. The graphic representations include, but are not limited
to, plan views, elevations, transverse, and longitudinal sections, large and small scale
sections and details, isometrics, diagrams, schedules, tables and/or pictures.
29
Emergency: Any unforeseen situation, combination of circumstances, or a resulting state
that poses imminent danger to health, life or property.
Final Completion: Completion and full performance of all Work in accordan ce with the
terms and requirements of the Contract Documents, including the completion of all items
identified on punch lists generated through substantial completion inspections , provision
to the City of releases of all liens, and submission of all inform ation, manuals, as-built
drawings, warranties, and documentation required by the Contract Documents. Unless
otherwise agreed in writing, English should achieve Final Completion not more than 60
days after Substantial Completion.
Float: The excess time incl uded in a construction schedule to accommodate such items
as inclement weather and associated delays, equipment failures, and other such
unscheduled events. It is the contingency time associated with a path or chain of activities
and represents the amount of time by which the early finish date of an activity may be
delayed without impacting the critical path and delaying the overall completion of the
Project.
Notice: All written notices, including demands, instructions, claims, approvals and
disapprovals, required or authorized under the Contract Documents. Any written notice
by either party to the Agreement shall be sufficiently given by any one or combination of
the following, whichever shall first occur: (1) delivered by hand to the last known
business address of the person to whom the notice is due; (2) delivered by hand to the
person's authorized agent, representative or officer wherever they may be found; (3)
enclosed in a postage prepaid envelope addressed to such last known business address
and delivered to a United States Postal Service official or mailbox; or (4) email. Notice is
effective upon such delivery. All notices to the City should be directed to the Project
Manager. All notices shall be titled as to their purpose in the subject line (i.e. “ notice,”
“demand,” “claim,” “instruction,” “approval,” and “disapproval”). The notice must be
dated and should clearly state whether the notice is one required under the Contract
Documents.
Notice to Proceed: A written notice given by the City to English fixing the date on
which the date on which construction will commence for English to begin the prosecution
of the Work in accordance with the requirements of the Contract Documents. The Notice
to Proceed will also customarily identify , or allow definite cal culation of, a Contract
Completion Date.
Person: This term includes any individual, corporation, partnership, association,
company, business, trust, joint venture, or other legal entity.
Plans: The term used to describe the group or set of project -specific drawings prepared
by English’s A/E and that describe the proposed Work in sufficient detail and provide
sufficient information for the Building Official, and other permitting officials to
determine code compliance and for English to perform the Work. Plans, once approved
by the City, shall constitute a part of this Agreement.
30
Project: The term used instead of the specific or proper assigned title of the entire
undertaking which includes, but is not limited to, the "Work" described by the Contract
Documents, including any specific Phases or Subphases of such Work.
Project Manager: The Project Manager as used herein is the City's designated
representative on the Project. The Project Manager is the person through whom the City
generally conveys written decisio ns and notices. All notices due the City and all
information required to be conveyed to the City should be conveyed to the Project
Manager. The scope of the Project Manager's authority is limited to that authorized by the
City, who shall provide written in formation to English at the Preconstruction meeting
defining those limits. Upon receipt of such information, English shall be on notice that it
cannot rely on any decisions of the Project Manager outside the scope of his authority.
Nothing herein shall be construed to prevent the City, through duly authorized officials,
from issuing any notice directly to English. The City may change the Project Manager
from time to time and may, in the event that the Project Manager is absent, disabled or
otherwise temporarily unable to fulfill his duties, appoint an interim Project Manager.
Proposal: The Lynchburg Police Headquarters Conceptual Phase PPEA Proposal, dated
as of March 12, 2021, and any written amendments thereof or supplements thereto
submitted to the City.
Provide: Shall mean furnish and install ready for its intended use.
Punch List: A list of defects in Work, provided following inspection by the City at
Substantial Completion, that must be satisfactorily corrected for the Project or any part
thereof to be accepted for Final Completion.
Schedule of Values: The schedule prepared by English and acceptable to the Owner
which indicates the value of that portion of the Contract Price to be paid for each trade or
major component of the Work.
Site: Shall mean the location at which the Work is performed or is to be performed.
Specifications: That part of the Contract Documents prepared by English's A/E and
acceptable to the City which contain the written design parameters and the technical
descriptions of materials, equipment, construction systems, standards, and workmanship
which describe the proposed Work in sufficient detail and provide sufficient information
for the Building Official, Virginia Department of Health, City Soil Erosion, and Sediment
Control Officials, and City of Lynchburg personnel to determine code compliance and for
English to perform the Work.
Subcontractor: A person having a direct contract with Contractor or with any other
Subcontractor for the performance of the Work. Subcontractor includes an y person who
provides on -site labor but does not include any person who only furnishes or supplies
materials for the Project.
Submittals: All shop, fabrications, setting and installation drawings, diagrams,
illustrations, schedules, samples, and other data required by the Contract Documents
31
which are specifically prepared by or for English to illustrate some portion of the Work
and all illustrations, brochures, standard schedules, performance charts, instructions,
diagrams and other information prepared by a Supplier and submitted by English to
illustrate material or equipment conformance of some portion of the Work with the
requirements of the Contract Documents.
Substantial Completion or Substantially Complete: The condition when the City
agrees that the Work, or a specific portion thereof is sufficiently complete, in accordance
with the Contract Documents, so that it can be u sed by the City for the purposes for
which it was intended.
Supplier or Materialman: A manufacturer, fabricator, distributor, materi alman or
vendor who provides material for the Project but does not provide on-site labor.
Time for Completion: The number of consecutive calendar days following the Date of
Commencement which English has to substantially complete all Work required by the
Agreement.
Work: The services performed under this Agreement including, but not limited to,
furnishing labor, and furnishing and incorporating materials and equipment into the
construction. The Work also includes the entire completed construction, or the va rious
separately identifiable parts thereof, required to be provided under the Contract
Documents or which may reasonably be expected to be provided as part of a complete,
code compliant, and functioning system for those systems depicted i n the plans and
specifications and described in the Project description of this Agreement.
Irrespective of being shown with upper/lowercase letters in the Agreement, where the
context requires, the definitions shown in this exhibit shall apply.
32
EXHIBIT B
Site Plan, Detailed Scope of Work & Proposal
1
.BSDI
.T4UFQIBOJF4VUFS
1SPDVSFNFOU.BOBHFS
$JUZPG-ZODICVSH1VSDIBTJOH%JWJTJPO
5IJSE'MPPS)BMM
$IVSDI4USFFU
-ZODICVSH
7"
3&11&"$PODFQUVBM1IBTF1SPQPTBM]-ZODICVSH1PMJDF)FBERVBSUFST
%FBS.T4VUFS
5IF&OHMJTI$POTUSVDUJPO"SDIJUFDUT%FTJHO(SPVQ5FBNJTQMFB TFEUPTVCNJUUIJTVOTPMJDJUFEQSPQPTBM
VOEFSUIF11&"HVJEFMJOFTUPQSPWJEFGVMMQMBOOJOH
BSDIJUFDUVSBM
FOHJOFFSJOH
BOEDPOTUSVDUJPOTFSWJDFTGPSB
OFX 1PMJDF )FBERVBSUFST GPS UIF $JUZ PG -ZODICVSH &OHMJTI $POTUSVDUJPO JT B ZFBS PME GVMMTFSWJDF
-ZODICVSHCBTFE
DPOTUSVDUJPO DPNQBOZ XJUI BO FYUFOTJWF BOE EJWFSTF QPSUGPMJP JODMVEJOH OVNFSPVT
DJWJDBOEHPWFSONFOUGBDJMJUJFT
8F IBWF QVU UPHFUIFS UIF NPTU FYQFSJFODFE UFBN PG DPOTVMUBOUT UP EFMJWFS B TUBUFPGUIFBSU 1PMJDF
)FBERVBSUFST UP UIF $JUZ PO UJNF BOE PO CVEHFU 0VS UFBN JODMVEFT "SDIJUFDUT %FTJHO (SPVQ "%(
XIPTFTPMFGPDVTJTPOEFTJHOJOHQVCMJDTBGFUZGBDJMJUJFTBDSPT TUIF6OJUFE4UBUFT5IFZBMTPDPNQMFUFEUIF
QSFWJPVT4QBUJBM/FFET"TTFTTNFOUGPSUIJTQSPKFDUXJUIBMPDBMBSDIJUFDUVSBMGJSN"EEJUJPOBMMZ
PVSPUIFSUFBN
NFNCFST
4PVUIFSO"JS
*OD
)VSU1SPGGJUU
BOE%.817IBWFWB TUFYQFSJFODFJOEFTJHOJOHQVCMJDTBGFUZ
GBDJMJUJFT8FXJMMQSPWJEFUIF$JUZXJUIBUFBNXIPDBOiIJUU IFHSPVOESVOOJOHwUPBDDPNQMJTIBOFYQFEJUFE
UJNFMJOFGPSUIFEFMJWFSZPGTFSWJDFT5IFQSPKFDUNBOBHFNFOUU FBNJTGVSUIFSTUSFOHUIFOFECZUIFBEEJUJPOPG
.S #FWFSMZ $BNFSPO
GPSNFS DJUZ NBOBHFS PG 'SFEFSJDLTCVSH
7"
BOE 8JMMJBN )FGUZ
BO BUUPSOFZ BOE
QSJODJQBM XJUI UIF GJSN )FGUZ
8JMFZ
BOE (PSF
1$ 5IFTF JOEJWJEVBMT CSJOH ZFBST PG FYQFSJFODF JO UIF
NBOBHFNFOUPG11&"QSPKFDUTJO7JSHJOJB0VSUFBNPGGFST
• 5IPSPVHI6OEFSTUBOEJOHPGZPVS4QFDJGJD1SPKFDU/FFET
• -PDBM-ZODICVSH#BTFE(FOFSBM$POUSBDUPS
• 2VBMJGJFE-PDBM&OHJOFFST
• 4USPOH1SPKFDU.BOBHFNFOU
• "WBJMBCMF3FTPVSDFTUP'BTU5SBDLUIJT1SPKFDU
• 0VS5FBNIBT&YQFSJFODFPO1VCMJD4BGFUZ'BDJMJUJFT/BUJPO8JEF
• 1SFWJPVT&YQFSJFODFXJUI11&"1VCMJD4BGFUZ1SPKFDUT
5IFFOUJSF&OHMJTI"%(5FBNJTFYDJUFEBCPVUUIJTPQQPSUVOJUZ UPCVJMEPOPVSMPOHSFMBUJPOTIJQXJUIUIF
$JUZPG-ZODICVSH8FCFMJFWFUIFDPNCJOBUJPOPGPVS5FBNTFYQ FSJFODFXJUIJO7JSHJOJBBOEXJUIQVCMJD
TBGFUZFOUJUJFTUISPVHIPVUUIF6OJUFE4UBUFTNBLFTVTVOJRVFMZ RVBMJGJFEUPXPSLXJUIZPVPOUIJTJNQPSUBOU
QSPKFDU5IBOLZPVGPSSFWJFXJOHUIJTQSPQPTBMBOEXFMPPLGPSX BSEUPNFFUJOHJOQFSTPOUPEJTDVTTUIJT
PQQPSUVOJUZJOHSFBUFSEFUBJM
4JODFSFMZ
"MMFO.)BNCMFO
-&&%"1
&OHMJTI$POTUSVDUJPO1SPKFDU&YFDVUJWF
7JSHJOJB$POUSBDUPS3FHJTUSBUJPO/P$MBTT"
BIBNCMFO!FOHMJTIDPOTUDPN
*BO3FFWFT
"*"
*$"
*"-&1
"SDIJUFDUT%FTJHO(SPVQ1SFTJEFOU
7JSHJOJB"SDIJUFDUVSBM3FHJTUSBUJPO/P
JBOS!BEHVTBPSH
$IVSDI4USFFU
OE'MPPS]-ZODICVSH
7"]5FM]'BY]XXXFOHMJTIDPOTUDPN
2
(QJOLVK&RQVWUXFWLRQ&RPSDQ\,QF
!
"
!
##!
$%!&#&
%
'
& !
!
##(
!'$
%
#$
!&
#
&#&! $
$%
# !'
#)**+
!'
%#
#,--,$
$
&!#
& !
# !
!&
&#
$
'&$
%
'
.
!
&#
#
#
$
#
#
!#
&.(#
!#
/
0&
1
#2
PROPOSER’S CERTIFICATION
615 Church Street, 2nd Floor
Lynchburg, VA 24504
No. 270100873 Class A
434-845-0301
434-845-0306
ahamblen@englishconst.com
No. 0401017800
Allen M. Hamblen, LEED AP
Vice President
3
2. Project Characteristics
1. Qualifications and Experience
3. Project Financing
4. Public Support, Project Benefit, & Compatibility
Legal / Organizational Structure
Team’s Experience
Contact Information
Similar Project Experience
Financial Statements
The Virginia State and Local Government
Conflict of Interest Act
S/M/WBE Program
A.
B.
C.
D.
E.
F.
H.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
A.
B.
C.
D.
E.
F.
G.
A.
B.
C.
D.
E.
Conceptual Design
Work Performed by the City
Project Site / Property
Permits
Adverse Impacts
Positive Impacts
Proposed Schedule
Allocation of Risk and Liability
Assumptions
Phasing
Preliminary Contract Cost Limit
Development Plan
Assumptions
Risk Factors
Federal Resources
Financial Stability
Financial Feasibility
Project Benefits
Opposition
Community Involvement
Community Benefits
Compatibility
TABLE OF CONTENTS
5
STRUCTURE
1A. Identify the legal structure of the firm or consortium of firms making the proposal. Identify the
organizational structure for the project, the management approach and how each entity and major
subcontractor in the structure fits into the overall team.
6
Our proposal represents a
teaming agreement between
English Construction Company
and Architects Design Group,
Virginia and Florida corporations,
respectively. We propose to
deliver a completed project using
a Design–Build under the PPEA
methodology. PPEA Design-Build
is a method of project delivery
in which one entity, the design-
build team, works under a single
contract with the project owner to
provide design and construction
services. One entity, one contract,
one unified flow of work from initial
concept through completion,
thereby re-integrating the roles of
designer and constructor.
7
Design–Build under the PPEA is an alternative to the traditional
design-bid-build project delivery method. Under the latter
approach, design and construction services are split into
separate entities, separate contracts, separate work. Across
the Virginia and the country, Design–Build under the PPEA
successfully delivers both horizontal and vertical construction
projects with superior results, no matter what the project type.
English Construction Company and Architects Design Group
both have extensive experience with design-build.
English Construction Company w ill be the prime contractor
in the PPEA Design-Build relationship and Architects Design
Group will be a subcontractor. In its capacity as the PPEA
Design-Builder, English Construction Company will provide
insurance, bonds, and warranties for the project.
The English / ADG Team will utilize a collaborative management
approach that includes the City of Lynchburg as an integral
part of the team. This approach facilitates design and
construction to meet the owner’s specific program needs on
time, within budget, and with no surprises. All of our previous
public-private relationships have been structured to the
specific and unique requirements of each client. This process
is flexible and will allow opportunities to craft a contract and a
relationship that best fits the City of Lynchburg.
Architects Design Group (ADG), under contract with English
Construction Company, will be the “Architect-of-Record” for
the project and will manage the design process and team.
English Construction Company will be the primary point of
contact for the PPEA Design-Build project and will lead the
team through the construction phase of the project. English
will be responsible for the overall performance and quality of
the work. English’s experienced staff will work with the design
team of ADG so that the completed project meets all design
and operational parameters.
8
EXPERIENCE
1B. Describe the experience of the firm or consortium of firms making the proposal and the key
principals involved in the proposed project including the length of time in business experience,
public sector experience, other engagements of the firm or consortium of firms and experience
with projects of comparable size and complexity. Include the identity of any firms that will provide
performance guarantees and warranties and a description of such guarantees and warranties.
English Construction Company
*OD is a fourth-generation family-owned
business that was established in 1909. English has advanced through steady
growth, adding new skills, resources, and technologies. As the company has
kept pace with changes in the construction industry, areas of expertise have
expanded and include a full range of facilities including public safety facilities.
English is a recognized leader in project delivery using Virginia’s Public-Private
Educational Facilities and Infrastructure Act of 2002 (“PPEA”). English has
completed more projects using PPEA than any other contractor in Virginia. Several
of our projects noted on the next page are comparable in size and scope to the
proposed Lynchburg Police Headquarters. Additional information about these
projects is included in Tab 1.d.
English Construction Company
*OD is a multi-disciplined construction firm
licensed in eight states in the Mid-Atlantic and southeast, with primary work in
Virginia, North Carolina, and South Carolina. English maintains a staff of over
600 employees forming construction and support teams that, under the
leadership of 120 tenured personnel, have supported as many as 40 concurrent
projects. English focuses on green building technologies, renewable energy,
and environmental protection. The company employs nine key managers who
have attained certification as Leadership in Energy and Environmental Design
(LEED®) Accredited Professionals. The company ’s core values insist that
projects are delivered in a manner which emphasizes environmental
sustainability, safety, quality, budget, and schedule.
English Construction Company, as design-builder, will provide a master
performance guarantee for the project. An example of a performance guarantee
used on a similar project can be provided. Equipment warranties are typically
provided by equipment suppliers and subcontractors. Our project performance
guarantee serves as an umbrella to ensure performance by all project participants.
&OHMJTI$POTUSVDUJPO$PNQBOZ
*OD] 2VBMJGJDBUJPOTBOE&YQFSJFODF
9
Fredericksburg Courts Complex
Fredericksburg, Virginia
Fredericksburg Police Headquarters
Fredericksburg, Virginia
Stafford County Public Safety Center
Stafford County, Virginia
Green Ridge Recreation Center
Roanoke County, Virginia
Cosby Road High School
Chesterfield County, Virginia
Lafayette Upper Elementary School
Fredericksburg, Virginia
James Monroe High School
Fredericksburg, Virginia
Over 100 years in business - always
family-owned
Experts in excavation and site
preparation
Completed work in 8 states
throughout the Mid-Atlantic and
southeast
Owns one of the largest fleets of
equipment in the Mid-Atlantic
Solid financial standing
Has maintained the same bonding
company and the same workers
compensation insurance company
for over 60 years
English Construction has completed the
following PPEA projects:
Additional notable accomplishments include:
10
Architects Design Group (ADG) was established in 1971 by I.S.K. Reeves, V, FAIA as a full service
architectural and planning firm. Since then, ADG has grown to a national firm providing spatial
needs analysis, site selection, master planning, and design services for over 300 Governmental
agencies across the United States.
ADG is a design-oriented firm blending the science of building technology, problem solving,
and the “art” of architecture. We believe in the tenets of authentic, contemporary architecture,
and direct our practice to achieve the highest standards of design quality. With each project,
we embark on a search for design excellence. Our success reflects the resolution of specific
design issues while meeting the functional needs of the program within the established budget.
Over the years, ADG has narrowed its focus from a diversity of project types to a small
number of areas of specialization. The primary areas of expertise include providing spatial
needs analysis, site selection, master planning, conceptual design, design, and construction
administration services for law enforcement and public safety facilities. Our projects reflect our
current knowledge of facility programming, design, and our ability to focus collective talents
toward innovative applications.
Allen Hamblen, Vice President of English Construction, will serve as
the Project Executive and main contact for the design-build team.
Mr. Hamblen served as Project Executive for the PPEA projects
listed above in Tab 1.b.
Ian Reeves, President of Architects Design Group, will serve as
the Architect of Record and Principal In Charge of the project. Mr.
Reeves will lead the A/E design team utilizing over 20 years of
experience designing award-winning public safety facilities.
Architects Design Group | Qualifications and Experience
11
ADG has two separate, but inter-supporting design studios, each directed by a
registered architect. The Studio Director whose experience best relates to each
project serves as the project architect and client contact. Additionally, each project
is overseen by the firm’s President, Ian Reeves.
ADG is proud to have earned numerous national, regional, and local awards that
reflect our firm’s ability to solve comple x design challenges, use the most innovative
and cost-effective techniques, maximize space functionality, and achieve the highest
level of overall quality. The result is an environment that encourages efficiency and
productivity.
Over the past 48 years, ADG has received many honors and awards for design
excellence including AIA Orlando Firm of the Year and AIA Florida Firm of the Year.
Additionally, ADG has won AIA, design, and technology awards for over 75 of our
municipal projects including the Johnston, IA Public Safety Facility and Georgetown,
TX Public Safety Complex.
ADG is an active member of the following associations: International Association of
Chiefs of Police, International Association of Law Enforcement Planners, International
CPTED Association, and Association of Public Safety and Communications Officers.
12
Lynchburg, VA Police and Courts Spatial Needs
Assessment
Alpharetta Public Safety Facility
Alachua County Sheriff’s Complex
Altamonte Springs Public Safety Complex
Auburndale Police Facility
Aurora Police and Fire Department Joint Training
Facility
Bal Harbour Police Facility
Baytown Police Headquarters
Belton Public Safety Facility Renovation
Boca Raton Police Services Facilities
Boca Raton Public Safety Information
Management Center
Boynton Beach Police Facility
Bradford County Public Safety Facility
Brentwood Police Headquarters Preliminary
Spatial Needs Assessment
Brunswick Police Department
Cape Canaveral Police and Municipal Facilities
Cape Coral Police Headquarters
Cedar Falls Public Safety Facility
Cedar Park Police Headquarters Renovation
Clermont Police Department Headquarters
Cobb County Police Headquarters
Cobb County Training Facility
Cocoa Beach Public Safety Complex
Cookeville Police Headquarters
Corinth Public Safety Facility
Covington Police and Courts Facility
Daytona Beach Shores Public Safety Complex
DeSoto Police Training Facility
Elmira Police Facility
Eastern Florida State College Public Safety
Training Center
Frankfort Public Safety Facility
ADG projects include:
13
Ft. Lauderdale Police Facility
Gainesville Police Facility Renovation
Gainesville Police Department Training Facility
Georgetown Public Safety Operations
and Training Complex
Granbury Police Headquarters
Grand Prairie / Irving Public Safety Training Facility
Greene County Public Safety Coordination Center
Gulfport Public Safety Facility
Highlands County Sheriff’s Law Enforcement
Highlands County Sheriff Detention Center
Reconfiguration
Hillsborough Public Safety Operations Facility
Indian River County Sheriff’s Office
Johnston Public Safety Complex
Kissimmee Police Training Facility
Largo EOC and Police Training Facility
Lebanon Police Department
Linn County Sheriff’s Office
Lowell Police Headquarters
Manchester Police Department Headquarters
Mansfield Police Headquarters
Martin County Public Safety Facility
Miami Fire Department USAR Facility Master Plan
Minneola Police and Fire Facilities
MNCPPC National Division Headquarters
Mount Dora Public Safety Facility Renovation
Niceville Police Headquarters
Northglenn Police and City Hall Complex
Ocoee Police Facility
Orange County Sheriff Sector II
Orlando Police Department Headquarters
Orlando Police Department Firing Range
and Training Facility
Owensboro Police Facility
Palmetto Police Headquarters
14
Pembroke Pines Police Headquarters
Pinellas Park Police Facility
Plantation Firing Range
Polk County Sheriff District Command Center
Port St. Lucie Police and EOC
Port Fourchon Public Safety Center
Provincetown Public Safety Facility
Riviera Beach Police Facility
River Vale Police Department
Rochester Police Department
Rockledge Police Department
Sanford Public Safety Complex
Sarasota Police Facility
Sarasota County Public Safety Center
Silverton Police Department
Springfield Police Headquarters
Spring Hill Police Headquarters
St. Charles County Evidence Facility
Sunrise Public Safety and Training Complex
Tallahassee Police Headquarters
Waukee Public Safety Facility
Wells Public Safety Facility
Wildwood Police Department
Williamson County Public Safety Facility
Winter Haven Police Facility
Winter Park Public Safety and Training Facility
Winter Springs Police and EOC Facility
Wylie Public Safety Facility
15
TLC Engineering for Architecture, Inc. provides exceptional
high-performance engineering design, consulting and
energy services. Founded in 1955 and consistently ranked
among the largest MEP and structural engineering firms in
the country, TLC is an industry leader with expertise on a
wide array of building types. Among the firm’s accolades,
TLC was selected by ENR SE as the 2016 Design Firm of Year.
TLC’s combination of extensive experience and expertise
is applied to engineer high-performance, complex projects
around the world.
Technology – Using the latest software and tools, TLC’s
RCDD-credentialed staff produces cutting-edge designs
that support unique project requirements. Rapidl y evolving technology demands that designs
are crafted for flexibility, growth and change. Specialized applications include integrated
security, audio/visual presentation, voice/video/data distribution, public address/sound,
acoustical analysis, intercom, closed circuit television, broadband distribution and video
telepresence.
Public Safety and Court Facilities – TLC has provided design services for over 50 Public Safety
facilities and more than 70 Courthouses throughout the United States. Our professionals
are adept at designing electronic systems to meet a wide variety of requirements. Using
the latest computer-aided design and testing to ols we produce cutting-edge designs that
support each client’s unique operations. Every design is crafted to allow flexibility for
growth and change. Specialized systems for 911 Communications Centers and Emergency
Operations Centers (EOC) include integrated CCTV and security access control; CAT6 or 6A
with Multimode and Single Mode fiber optics voice/video/data distribution; public address
system; intercom; CATV coax broadband distr ibution and audio/visual presentation systems.
The facilities are provided with redundant telecommunications services for an increase in
survivability; this includes both telecommunic ations connectivity and cable TV from separate
points of presence or different providers. As a support function, the facility does generally
have the need for a dedicated communications tower adjacent to the facility for Multiple RF
radio systems.
TLC Engineering | Security & Technology
Lynchburg Police and Courts Spatial
Needs Assessment
Cookeville Police Headquarters
Spring Hill Police Headquarters
Dover Police Department
Cobb County Police Headquarters
Clermont Police Headquarters
Orlando Police Department
Headquarters
Sunrise Public Safety Complex
Georgetown Public Safety Complex
TLC projects include (all performed with ADG) :
Sanford Public Safety Facility
Cedar Park Police Headquarters
Alpharetta Public Safety Facility
St. Charles Police Evidence Facility
Miramar Public Safety Facility
Springfield Police Headquarters
Boynton Beach Police Station
Pembroke Pines Police Facility
Highlands County Sheriff’s Office
Boca Raton Public Safety Facilities
Baytown Police Headquarters
16
Hurt & Proffitt (H&P), established in 1973, is a full service employee-owned engineering
and surveying firm providing a comprehensive array of services. Their integrity, attention to
detail, vast experience, and commitment to professional standards have helped make us one
of the largest engineering and surveying firms in Central Virginia, with offices in Lynchburg,
Blacksburg, Roanoke, and Wytheville, VA. Hurt & Proffitt’s professional engineers and
surveyors are licensed in Virginia, North Carolina, Maryland, West Virginia, and Kentucky.
Their firm maintains a versatile, highly-qualified staff of 132 employees, working in six in-
house departments. H&P’s employees take great pride in more than 45 years of service
in providing civil engineering, surveying, land development, geotechnical engineering,
environmental services, and construction testing & inspection. Their experienced engineers,
planners, surveyors, and support staff ensure excellent quality while delivering project-
specific solutions to our clients.
SWaM Certified – Small Business
H&P is a SWaM certified small business - #9824S, with the Commonwealth of Virginia
Department of Minority Business Enterprise and a Federal Small Business through the U.S.
Small Business Administration (SBA).
Client Satisfaction
Their ability to respond quickly and cost-effectively, connecting across markets and
disciplines, gives them an unparalleled ability to innovate. They thrive on collaborating with
clients, communities, and colleagues to create quality work every time. Their high standards,
expertise, and work ethic have led to successful partnerships with our clients, municipalities,
and regulatory agencies.
Hurt & Proffitt | Civil, Survey, Environmental, and Landscape
Lynchburg Juvenile & Domestic
Courthouse
U.S. Federal Courthouses / Post
Office (with English)
Roanoke County Public Safety
Building (with English)
Fort T. Humphrey Public Safety
Building (with English)
Lynchburg Airport Fire and
Rescue Facility
H&P projects include:
17
Founded in 1946, Southern Air has grown from a
residential heating company with 15 employees to
a full-service design/build contractor employing
over 750 team members. As one of the southeast’s
leading mechanical and electrical contractors,
Southern Air specializes in the design, installation,
and service of HVAC, electrical, plumbing, and
piping.
Southern Air has been responsible for some of
the most innovative mechanical and electrical
building designs in Virginia in recent years. With
LEED Platinum, Gold, and Certified projects in our
portfolio, they are a leader within the industry for
efficient building engineering design.
Southern Air uses 3D modeling to facilitate
prefab and support installation of their work.
This technology enables the team to model,
coordinate, estimate, plan, and then virtually build
at every step in the construction delivery process.
This begins before a shovel in the ground. After
groundbreaking, virtual design and construction
technology will enable the team to navigate
through spaces, identify and resolve clashes, and
determine available space for any new systems
that are required. This process supports greater
collaboration and project transparency plus saves
time and money on your project.
Southern Air, Inc. | MEP Engineering
Staunton River Administration Bldg
Amherst County Sheriff’s Office
Roanoke Emergency Communication Center
Roanoke Sheriff’s Office
Fort T. Humphrey Public Safety Building
(with English)
Fredericksburg Police Department
Fredericksburg Court Complex
Northumberland High School (with English)
Western State Hospital
Fredericksburg Public Safety (with English)
Amherst County Schools
Southern Air, Inc. projects include:
Meherrin River Jail (with English)
Mecklenburg Jail (with English)
Fredericksburg Courthouse (with English)
Mt. Weather EOC
Bedford County EMS
Blue Ridge Jail Upfit
Amherst Jail
SW Va Regional Jail
Montgomery County Public Safety Bldg
Mt. Weather Bldg 900
Jefferson Forest High School
Staunton River High School
18
Dunbar Milby Williams Pittman & Vaughan, PLLC
(DMWPV) was founded in 1966. The firm has 29
employees, including 19 Registered Professional
Engineers and five graduate engineers (EIT’s),
with two full service offices in Virginia: Richmond
and Charlottesville. This makes us one of the
largest firms in central Virginia dedicated solely
to structural engineering.
DMWPV provides structural engineering services
for an average of $45,000,000 of construction
each month. Structures have included wood,
steel, cast-in-place and precast concrete, and
reinforced masonry. Foundation types include
steel, concrete and wood piles, caissons, floating
mats, and standard spread footings.
DMWPV | Structural Engineering
Virginia State Police Combined Headquarters and New Emergency Operations Center
James City County Fire Station No. 4
Chesterfield County Emergency Communications Center
Children’s Hospital of Richmond Pavilion at VCU
Cosby High School (with English)
Northumberland Middle and High School (with English)
Dinwiddie County Courthouse
Ettrick-Matoaca Rescue Squad Facility
Buckingham County Administration Building
Chesterfield Utilities Building
King George Administration Building
Colonial Heights Courthouse
DMWPV projects include:
19
CONTACT
1C. Provide the names, addresses, email addresses, and telephone numbers of persons
within the firm or consortium of firms who may be contacted for further information.
ALLEN HAMBLEN, LEED AP
Vice President / Project Executive
English Construction Company
615 Church Street
Lynchburg, VA 24504
434 . 455 . 3142
ahamblen@englishconst.com
IAN REEVES, AIA
President / Architect of Record
Architects Design Group
333 North Knowles Avenue
Winter Park, FL 32789
407 . 647 . 1706
marketing@adgusa.org
20
REFERENCES
1D. Provide the address, telephone number, and the name of a specific contact person for an entity, or
entities, for which the firm or consortium of firms, or primary members of the consortium, have completed
a similar project or projects. These references should include: Name and address of project owner /
sponsor, name, telephone number, fax number, and email address of the owner’s project manager, a
summary of the project including budget and final cost, and project schedule (proposed and actual).
21
English Construction, as a General Contractor,
completed this new three-story, 80,000 SF modern
office building. This facility houses the County’s Public
Safety Services featuring the latest technology in 911
communications among the various local, state, and
national agencies. This project was procured under
the new PPEA legislation. We worked with the same
team members that were involved with the Stafford
County Public Safety Building.
English Construction Company
Roanoke County Public Safety Center
Project Budget
Final Cost
Project Schedule
$10,896,881
$10,961,804
Proposed: NTP March 2005 to
completion December 2006
Actual: Start date July 2005 to
completed December 2006
Owner
Contact
Address
Roanoke County, VA
%BO0h%POOFMM
County Administrator
BENJOJTUSBUJPO!SPBOPLFDPVOUZWBHPW
540 . 772 . 2004
P.O. Box 29800
Roanoke, VA 24018
22
English Construction completed this 114,000 SF, two-
story public safety building as a PPEA project and
included an extensive amount of site work. This facility
houses all county public safety agencies and includes
high tech communications equipment for all of the
required dispatch services. This project was also
procured under the new PPEA legislation and many of
our proposed team members were involved with the
Roanoke County PPEA Public Safety Building project.
English Construction Company
Ford T. Humphrey Public Safety Building
Owner
Project Budget
Final Cost
Project Schedule
Contact
Address
Stafford County, VA
$14,822,738
$14,822,738
Proposed: NTP June 2006 to
completion January 2008
Actual: Start date July 2006 to
completed January 2008
Kathleen Fox
Construction Project Manager
kfox@staffordcountyva.gov
540 . 658 . 7300
1300 Courthouse Road
Stafford, VA 22554
23
English Construction, as a General Contractor,
completed the new Fredericksburg Police Headquarters,
which houses police administration, patrol services,
investigations, and forensics operations as well as the
City’s E-911 communication center in a 34,000 SF, one-
story structure. Locker rooms and a fitness facility are
included.
The building features a large multipurpose room for use
by the Police Department for training programs and
for use by community groups. The multipurpose room
can be accessed by the public without compromising
the security of the rest of the facility. Storage is
English Construction Company
Fredericksburg Police Headquarters
Owner
Project Budget
Final Cost
Project Schedule
City of Fredericksburg
$10,232,616
$10,232,616
Proposed: NTP October 2005
to completion July 2007
Actual: Start date February
2006 to completed July 2007
Contact
Address
Bill Downey
Construction Manager
billd@downeyscott.com
540 . 347 . 5001
6799 Kennedy Road Unit F
Warrenton, VA 20817
provided for various equipment and
logistical support needs, including
secure evidence storage. Public
and police vehicle parking are well
separated, with a fenced police
vehicle lot to optimize security.
24
English Construction served as the General Contractor
for the new courthouse. This project was implemented
in phases to comprehensively address the city’s court
facility needs. First, a temporary juvenile and domestic
relations (J&DR) court facility was constructed in an
existing building. A new four-level courthouse with
four courtrooms was subsequently constructed on
the site of the former J&DR court building, which was
demolished. The former general district court building
was then renovated to accommodate the J&DR court.
The new 78,500 SF courthouse contains the circuit
and general district court and their clerks, as well
as secure, enclosed parking in the basement level.
English Construction Company
Fredericksburg Courthouse and Juvenile &
Domestic Court
Owner
Project Budget
Final Cost
Project
Schedule
Contact
Address
City of Fredericksburg
$31,865,831
$31,481,371
Proposed: NTP February 2012
to September 2015
Actual: Start date February
2012 to completed September
2015
Bill Downey
Construction Manager
billd@downeyscott.com
540 . 347 . 5001
6799 Kennedy Road Unit F
Warrenton, VA 20817
The building’s signature cupola is
open to the third floor lobby below.
Occupying a prominent downtown
site, the new courthouse is
contextually appropriate for
Fredericksburg’s Historic District
and draws from elements of
historic architectural styles.
25
English Construction completed this new Federal
Courthouse and Branch Post Office consisting of a
new five-story court and office building, complete
renovation of an existing three-story building for
additional courtroom and offices and a one-story
post office. Working on behalf of the U.S. Postal
Service and the General Services Administration,
Keating Development Company developed a plan to
consolidate the courts, post office, and other federal
agencies into a new state-of-the-art complex. The
project includes the complete renovation of a three-
story schoolhouse, new construction of a five-story
courthouse building and a free-standing, one-story
English Construction Company
United States Federal Courthouse and Post Office
Owner
Project Budget
Final Cost
Project Schedule
Contact
Address
Keating Building Corporation
$15,850,000
$15,767,585
Proposed: NTP September
2003 to completion February
2005
Actual: Start date September
2003 to completed February
2005
Daniel Keating
Chief Executive Officer
610 . 660 . 6060
1600 Arch Street
Philadelphia, PA 19103
post office. The schoolhouse renovation includes
exterior masonry, wood cornice repair, a new roof, and
replacement windows. The Courthouse is comprised
of a District Courtroom, Bankruptcy Courtroom, and
Magistrate Courtroom that can also be used for
bankruptcy jury trials and Grand Jury proceedings.
Site improvements include five vehicle parking areas,
retaining walls, pedestrian paths, and streetscaping.
The new complex provides dignified spaces and
efficient operations for the Courts, Federal Agencies,
the U.S. Postal Service, and the public and serves as
the springboard to encourage further redevelopment
of downtown Lynchburg.
26
English Construction was the General Contractor
for proposed improvements for the downtown
area included replacing aging utilities, updating
streetscape features such as sidewalks, crosswalks
and signals, and creating an overall pedestrian and
business-friendly space for a sustainable downtown.
The primary purpose of this project is to replace
all water lines in downtown Lynchburg. As that
caused significant disruption, additional utility and
streetscape work was done at the same time to
reduce inconvenience. The project was constructed
in multiple phases over the course of several years.
The full project consists of the replacement of water
English Construction Company
City of Lynchburg Utility and Streetscape
Improvements
Owner
Project Budget
Final Cost
Project
Schedule
Contact
Address
City of Lynchburg
$8,500,000
$7,500,000
Proposed: NTP May 2016 to
completion September 2017
Actual: Start date May 2016 to
completed October 2017
James Talian, PE
Chief Engineer
james.talian@lynchburgva.gov
434 . 455 . 3953
900 Church Street
Lynchburg, VA 24504
lines, as well as the reconstruction of streets and
sidewalks for approximately 50 street segments, one
block in length, in the downtown area of Lynchburg
between Commerce and Court Streets and from 5th
to 13th Streets. Major considerations included on
street parking with attention to safety and loading/
unloading. While this project will beautify over 50
blocks of downtown Lynchburg, more importantly,
this is a utility replacement project. Aging waterlines
were replaced throughout the project area, some
dating back to the mid-1800’s.
27
Development, design, and construction of a new
jail facility consisting of approximately 160,000 SF
providing for general population of 400 beds with
core facilities for 600 inmates located in Brunswick
County, VA. The site is at the intersection of two roads
to have access to the jail from two separate points with
main access for the public, staff and intake functions
to come from Route 1 and the secondary road, Route
634 would be to access deliveries to the loading area.
The building construction will incorporate a pre-
engineered metal building exterior white the interior
secure perimeter will be composed of 8” secure CMU,
steel cells and security ceilings. All work outside the
English Construction Company
Meherrin River Regional Jail
Owner
Project Budget
Final Cost
Project Schedule
Meherrin River Regional
Jail Authority
$44,484,924
$40,064,628
Proposed: Start date May
2010 to June 2012
Actual: Start date May 2010 to
completed June 2012
Contact
Address
Sherriff Brian Roberts
broberts@brunswickco.org
434 . 848 . 3133
9000 Boydton Plank Road
Alberta, VA 23821
secure perimeter will be normal
construction. The facility will be
fully sprinkled and conditioned.
Other features include a drive
through sally port, work release,
video visitation, magistrate’s office
and administration space. Targeting
LEED Certification.
28
Development, design and construction of a new
jail facility of approximately 24,000 SF providing for
general population of 60 beds with indirect supervision
and provisions for double bunking to achieve a
capacity of 120 beds, with provision for expanded
kitchen and laundry of 1.454 SF, to be located at the
Site, described as: A 12-acre site located within the
Town limits of Stuart, Virginia. The Site is accessed
from Commerce Street and is situated between the
street and the Mayo River.
English Construction Company
Patrick County Regional Jail
Owner
Project Budget
Final Cost
Project Schedule
Contact
Address
Patrick County Board of
Supervisors
$9,960,000
$9,960,000
Proposed: August 2009 to
December 2010
Actual: August 2009 to
completed December 2010
Sherriff Dan Smith
dmsmith@sherrif.co.patrick.va.us
276 . 694 . 6094
742 Commerce Street
Stuart, VA 24171
29
&OHMJTI
JO B KPJOU WFOUVSF FGGPSU XJUI #BMGPVS #FBUUZ
QSPWJEFE $.!3JTL TFSWJDFT GPS UIF FYQBOTJPO BOE
SFOPWBUJPOT UP UIF FYJTUJOH SFHJPOBM KBJM GBDJMJUZ
0SJHJOBMMZ EFTJHOFE CZ 5IPNQTPO -JUUPO
UIF OFX
DPOTUSVDUJPO DPOTJTUFE PG BQQSPYJNBUFMZ
TG PG
TQBDF XJUI SFOPWBUJPOT UP
TG PG FYJTUJOH TQBDFT
UIBUBDDPNNPEBUFJONBUFT5IFSFOPWBUJPOTUPUIF
FYJTUJOH GBDJMJUZ FOUBJMFE B DPNQMFUF JOUFSJPS
EFNPMJUJPO UP UIF FYJTUJOH GPPE TFSWJDF GBDJMJUZ BOE
SFRVJSFE BO POTJUF UFNQPSBSZ LJUDIFO GBDJMJUZ
4FDVSJUZ FMFDUSPOJD TZTUFN VQHSBEFT XFSF NBEF UP
IFBEFOEFRVJQNFOUJOUIFFYJTUJOHGBDJMJUZ
5IF FYQBOTJPO DPOTJTUFE QSJNBSJMZ PG
OFXIPVTJOHVOJUTGPSUIFFWFSHSPXJOH
JODBSDFSBUFE QPQVMBUJPO " OFX
BQQSPBDI UP CPUI IPVTJOH VOJU EFTJHO
UIF NJESJTF UPXFS
BOE CVJMEJOH
NBJOUFOBODF XBT EFWFMPQFE UP SFEVDF
UPUBM CVJMEJOH TRVBSF GPPUBHF GPS UIJT
TJUFT DPOTUSBJOFE DIBMMFOHFT 5IJT
SFTVMUFE JO NJOJNJ[JOH UIF
JOUSPEVDUJPO PG DPOUSBCBOE
BOE
JOUFSBDUJPO BNPOH JONBUFT BOE
NBJOUFOBODFTUBGG
English Construction Company
New River Valley Regional Jail
Owner
Project Budget
Final Cost
Project Schedule
New River Valley Regional
Jail Authority
$55,200,000
$55,200,000
Proposed: March 2008 to
February 2010
Actual: March 2008 to
completed February 2010
Contact
Address
Gerald McPeak
Superintendent
mcpeak@nrvrj.org
540 . 643 . 2001
108 Baker Road
Dublin, VA 24084
30
English was the GMP general contractor for the
Mecklenburg Regional Facility is a 39,000 SF, 80
bed jail located in Boydton, VA. It serves as a satellite
jail to the main facility in Alberta, VA. It uses pre-
manufactured steel building for a shell with masonry
veneer on the front face of the building. The cells are
manufactured steel cells that will be double stacked in
the housing area. The facility hosts an administration
area, medical area, kitchen, warehouse, and shop
along with the housing area for inmates.
English Construction Company
Mecklenburg Regional Jail
Owner
Project Budget
Final Cost
Project Schedule
Contact
Address
Meherrin River Regional Jail
Authority
$ 11,995,326
$11,340,376
Proposed: August 2011 to
completed December 2012
Actual: August 2011 to
completed December 2012
Sherriff Brian Roberts
broberts@brunswickso.org
434 . 848 . 3133
120 Hicks Street
Lawrenceville, VA 23868
31
ADG, in association with a local architectural firm,
completed a detailed spatial needs assessment for
the Police Department and Courts Facilities. This
study is the basis for the proposed PPEA project
which will consolidate the entire police department
back into one facility. A detailed description on this
project can be found in our team’s Confidential and
Proprietary submittal.
Architects Design Group
Lynchburg Police Department Spatial Needs Study
Owner
Project Budget
Final Cost
Project Schedule
Contact
Address
City of Lynchburg
$40,000,000
TBD
TBD
Ryan Zuidema
Chief
PG1PMJDF
ryan.zuidema@lynchburgva.gov
434 . 455 . 6051
905 Court Street
Lynchburg, VA 24504
Lynchburg, VA
POLICE AND COURTS FACILITIES
SPATIAL NEEDS ASSESSMENT
ATELIER 1 1 ARCHITECTURE LYNCHBURG, VA IN ASSOCIATION WITH
ARCHITECTS DESIGN GROUP WINTER PARK, FL · DALLAS, TX
32
Architects Design Group, in association with a local
architectural firm, was selected for the programming
update, master planning, and design of the new 76,831
SF Public Safety Operations and Training Complex,
which houses over 125 PD staff. An additional 16,697
SF Tactical Training Facility, including a flexible
training area with reconfigurable walls for use with
simulations or other training exercises, was also
designed within the new public safety complex. The
new complex was designed to meet current and future
needs through Year 2030. Designed to withstand
estimated F3 tornado forces, the facility is able to
maintain continuity of operations and accommodate
I have had the distinct privilege of working
very closely with the staff of Architects Design
Group (ADG)...Ian and his staff have become
more than our architectural firm; they have
become part of our family. They have listened
to every concern, met every challenge, looked
out for our best interests, provided the most
value within our budget, and have been keenly
attentive to our needs and preferences.
- Wayne Nero, Chief of Police
Architects Design Group
Georgetown Public Safety Facility
Owner
Project Budget
Final Cost
Project Schedule
Contact
Address
City of Georgetown
$29,000,000
$22,677,306
Design: April 2012 to
April 2013
Construction: NTP April 2012
to February 2015
Wayne Nero
Chief of Police
wayne.nero@georgetown.org
512 . 930 . 8450
3500 D B Wood Road
Georgetown, TX 78628
“ “
33
state-of-the-art technologies throughout the
foreseeable future. In addition to administration
offices and training classrooms, the new facility
houses several specialized areas including a
communications center, evidence processing
and storage, simunitions building, criminal
investigation and interview areas, hybrid indoor/
outdoor firing range, and low speed EVOC track.
A 125 foot high communications tower is included
with an on-site central energy plant. All facilities
can be self-sustaining for up to 24 hours.
The complex includes a chemical processing
lab, crime scene investigations lab, an evidence
processing lab, and two vehicle evidence
processing bays. The labs utilize stainless steel
counters, chemical resistant cabinets, epoxy
flooring, fume hoods, emergency eye wash, and
various counter mounted materials analysis
equipment. The bulk evidence storage is located
directly adjacent to the evidence processing lab
on the building’s lower level. It utilizes high-
density storage units, providing three times the
storage capacity of conventional storage units,
with three industrial size refrigeration units and
additional rooms for storage of weapons, cash,
and narcotics evidence.
34
The City of Manchester was in the process of
launching a large-scale Public Works Complex
project when it became apparent that the property
could also accommodate room for a new planned
Police Headquarters Facility to house the Police
Department’s 230 sworn officers. ADG teamed with the
Architect under contract with the City for the Public
Works Complex. ADG developed a detailed spatial
needs assessment, updated the existing master plan
for the entire complex to reflect the specialized needs
of the Police Department, and developed the interior
operational adjacencies for the new facility.
Architects Design Group
Manchester Police Headquarters
Owner
Contact
Address
City of Manchester
Fred Roach
Retired Captain
Fred-r@comcast.net
603 . 315 . 3393
405 Valley Street
Manchester, NH 03103Despite the pressures of space and budget,
your team rose to the challenge of providing
us with a first class, professional police
department that we can utilize for years to
come.
- David Mara, Retired Chief of Police
Project Budget
Final Cost
Project Schedule
$15,700,000
$15,700,000
Design: June 2010 to January
2011
Construction: April 2011 to
December 2012
“ “
35
Working directly with the Manchester PD staff,
ADG developed detailed design documents
of all interior layouts, specialized equipment
coordination, security systems design and
specification, and development of the critical
infrastructure redundancies to support the facility.
Departments housed in the new facility include
property and evidence, records, investigations
division, communications, detectives unit and a
street crimes unit. This facility also includes a
state of the art evidence storage and processing
lab. Inclusive in the design is an eight lane
indoor firing range as a major component
of the Training Unit. ADG’s expertise in Law
Enforcement planning and design has ensured
that the new facility is designed to stand up to
the most rigorous inspections in the pursuit of
CALEA Accreditation.
36
Architects Design Group, as the prime design
consultant for a Design-Build Team, was selected
to update the design build criteria package and
complete full design services for the new Orlando
Police Department Headquarters. This effort included
analyzing what development could be realized within
the fixed construction budget. It became readily
apparent that the needs of the department far
exceeded the City’s development budget. Working
together, the design team and general contractor
prepared four development options to address the
program requirements, which allows for 450 sworn
officers to operate out of the new headquarters.
Architects Design Group
Orlando Police Headquarters
Owner
Contact
Address
City of Orlando
Claudio Rosado
Support Services Division Manager
claudio.rosado@cityoforlando.net
407 . 246 . 2656
1250 W South Street
Orlando, FL 32805
They have addressed our needs, acted
efficiently to design changes, and have been
positive throughout the process working with
an extremely tight budget. In my experience,
ADG is one of the best in the industry... I
would not hesitate to work with ADG on future
projects, and I would highly recommend them
to other organizations without reservation.
- John Mina, Chief of Police
Project Budget
Final Cost
Project Schedule
$32,000,000
$23,532,755
Design: June 2014 to
February 2015
Construction: April 2015 to
February 2017
“ “
37
Of the four options, only one would conceptually
allow the project to be developed within the
fixed construction budget while meeting all
program needs. This option, in addition to the
construction of a new headquarters facility,
included the adaptive re-use of an off-site
warehouse for property and evidence, crime
scene, and a portion of the training unit program
requirements. The City project management
team, OPD Chief Mina, and his key staff members
all endorsed this solution.
The 100,000 SF Orlando Police Department
Headquarters serves as a major catalyst for
thoughtful urban growth while integrating
itself into the sensitive context of a historic
neighborhood, the Parramore District. This area
is rapidly becoming a vital component to the
downtown urban fabric with three major athletic
venues in proximity to the site. The entrance
plaza is located at the most prominent corner
of the Headquarters site and welcomes public
visitors through the north public entrance
atrium.
The building features a community meeting
room for up to 320 people, a 4,500 SF
gymnasium, and over 35,000 SF of office space
for every bureau within the Police Department.
Openness and transparency is maintained at
the interior of the headquarters, contributing to
daylighting within the interior work spaces. The
meeting room is a multi-purpose space with
an adjacent warming kitchen and chair storage
space offering the flexibility to accommodate
a full range of uses from graduation banquets
for the Police Academy and other community
meetings.
38
As part of a Design-Build team, ADG was selected
to provide programming, master planning, design,
and construction administration of a new Crime
Scene and Evidence Facility for the Orlando Police
Department. The project consists of the adaptive
reuse of an existing 82,000 SF warehouse to
accommodate evidence operations. The evidence
facility includes the property and evidence unit,
storage, crime scene investigations and processing
labs, training rooms, high density storage, bulk
receptor storage, drop lockers, vehicle processing,
narcotics, and weapons storage.
Architects Design Group
Orlando Police Crime Lab & Evidence Facility
Owner
Contact
Address
City of Orlando
Claudio Rosado
Support Services Division Manager
claudio.rosado@cityoforlando.net
407 . 246 . 2656
1250 W South Street
Orlando, FL 32805
We worked with ADG in a design / build
relationship and found them to be attentive to
the project budget and schedule throughout
the project. When issues arose they were
quick to work with us to get them resolved.
We look forward to an opportunity to work
with them again.
- Robert High, HJ High Construction
Project Budget
Final Cost
Project Schedule
$10,752,750
$10,752,750
Design: December 2015 to
April 2017
Construction: July 2017 to
September 2017
“
39
This project provides the department with
55,000 SF of evidence space, with an additional
27,000 SF of shell space to be built out for future
growth. Critical infrastructure components are
tied into the existing emergency operations
center systems to provide redundancies for
continuity of operations.
40
ADG served as the Specialized Facility Design
Architect for the indoor OPD Firearms Training
Facility. The building consists of approximately
67,000 SF and includes a 20 lane tactical target
range and a 20 lane qualification range, both climate
controlled and measuring 50 yards. There is also a
ventilated 15 lane, 100 yard rifle range. The support
spaces in the facility include three large classrooms,
lockers / restrooms, storage and administrative
offices.
In order to replicate “real life” training scenarios,
the facility was designed with the ability to
Architects Design Group
Orlando Police Firearms Training Facility
Owner
Contact
Address
City of Orlando
Claudio Rosado
Support Services Division Manager
claudio.rosado@cityoforlando.net
407 . 246 . 2656
1250 W South Street
Orlando, FL 32805
With each project, we have had terrific
coordination, great responsiveness, and have
had no change orders or surprises. The end
result has been a very satisfied customer each
and every time. We are able to move forward
with confidence when working with ADG and
would recommend them to anyone doing a
range project of any kind. Having worked with
many firms, we would rank ADG as the “best.”
- Robb Anderson, Action Target Systems
Project Budget
Final Cost
Project Schedule
$15,000,000
$14,780,000
Design: December 2007 to
November 2008
Construction: December 2008
to August 2009
“ “
41
create flexible barriers, walls, and covers with
insertable panels, allowing the Orlando Police
Department to train on aspects of traffic stops,
multiple adversaries, working on scanning and
avoiding tunnel vision, decision-making targets
(good guy / bad guy and shoot / no shoot), and
hostage drills.
The facility can also recreate a variety of low
light conditions, duplicating “real life” gun fight
situations. While the national average for hits
in a gun fight 7 yards and closer is about 20%,
OPD’s average for hits is nearly 80%.
The building’s site configuration took into
account the need to accommodate a separate
future “shoot house, ” a future outdoor live fire
range, and a 360 degree ballistically safe training
facility. This state of the art facility has gained
worldwide recognition for its various training
components and has become the model that is
being replicated on an international basis.
42
ADG was selected by the City of Sunrise for the design
of the new Public Safety and Training Complex.
The contracted scope of services included the
development of a detailed spatial needs assessment,
master planning, cost estimating, design, and
construction administration. The 109,412 SF Public
Safety Complex houses the entire operations of
the Sunrise Police Department’s 300+ employees,
the joint County / City 911 communications center
(PSAP), fire rescue administration and training,
municipal EOC, city-wide MIS data center, and an
eight lane indoor firing range.
Architects Design Group
Sunrise Public Safety Complex
Owner
Contact
Address
City of Sunrise
John Brook
Retired Chief
johnebrooks@att.net
954 . 931 . 7117
10440 W Oakland Park Boulevard
Sunrise, FL 33351
ADG’s commitment to professionalism and
quality customer service was showcased
during the inception of the Sunrise Public
Safety Complex project... Their creative
experience and talent provided a vision that
would eventually become a first-class home
for over 300 deserving employees...ADG’s
resourcefulness and ingenuity were the
driving forces of what stands here today.
- John Brooks, Chief of Police
Project Budget
Final Cost
Project Schedule
$32,000,000
$31,930,000
Design: June 2008 to
June 2009
Construction: September
2009 to February 2011
“ “
43
Police divisions wit hin the complex include
administration, internal affairs, records,
detectives division, crime scene unit, crime
analysis unit, property and evidence, victim
advocacy program, patrol, SWAT, and crisis
negotiation unit. The facility includes an
evidence processing lab, located on the 2
nd
floor across from the evidence drop and storage
area. The lab includes stainless steel counters,
chemical resistant cabinets, epoxy flooring, a
fume hood, emergency eye wash, and various
analysis equipment.
The project site is located on the City’s Municipal
Complex. The existing buildings on-site provide
a context for the design that are referenced
through colors, materials, and complimentary
details, creating a unified sense of identity
within the complex. During the project planning
phase, ADG examined vehicle and pedestrian
access, utility network, and overall site
infrastructure connections with modification
recommendations to benefit current Municipal
Complex functionality and enhance future
improvements.
44
ADG was selected to provide a detailed spatial needs
assessment, site analysis of multiple sites, master plan,
full design documents, construction administration,
and voter referendum assistance for the new six-
story Sarasota Police Headquarters, which houses
the department’s 250 employees. The project was
completed on time and under the approved budget.
The new 102,000 SF facility includes spaces for
professional standards, support services, internal
affairs, criminal investigations, property and evidence,
and records. The building also includes 21,790 SF for
crime scene investigations, 9,275 SF for forensics
Architects Design Group
Sarasota Police Headquarters
Owner
Contact
Address
City of Sarasota
Barb Ross
Assistant to Chief
barbara.ross@sarasotafl.gov
941 . 954 . 7012
2099 Adams Lane
Sarasota, FL 34237We would highly recommend the design
services of Architects Design Group... ADG’s
experienced and cooperative approach
focused on guaranteeing project success for
all participants in the process was a unique,
refreshing, and welcome asset to the City.
- Jim Lalumiere, Owner’s Representative
Project Budget
Final Cost
Project Schedule
$36,000,000
$34,050,560
Design: August 2007 to
October 2008
Construction: January 2009
to January 2011
“ “
45
and evidence storage, and 2,860 SF for vehicle
processing.
While design was underway, a proposed joint
parking structure with the county fell through.
This led to the challenge of designing a 200+
space parking structure within an already
constrained site. The design revisions were
accomplished in under 6 months and the building
grew to 196,000 SF. A number of specialized
areas are designed into the secured garage
including a SWAT tactical ready room, SWAT
vehicle storage, vehicle evidence processing
bays, and the central energy plant, which
includes the HVAC chillers and emergency
generator/fuel tank.
The entire facility is designed to withstand
Category 5 hurricane force winds, and with the
critical infrastructure redundancies that are in
place, this headquarters is assured to maintain
operations during or after a significant event.
This LEED Certified facility fronts a beautiful 40
acre passive recreation park, creating a large
scale “backdrop” to the park.
46
The City selected ADG to provide programming, master
planning, design, and construction administration
services. The new 100,755 SF headquarters provides the
Police Department with state of the art facilities for their
345 employees and includes areas for administration,
patrol, investigative services, professional standards,
communications, property and evidence, holding and
processing labs, as well as a multitude of training facilities
outfitted with the necessary technology to be easily
converted to the City’s Emergency Operations Center. The
facility includes 3,200 SF for crime scene investigations,
11,425 SF for forensics and evidence storage, and 1,600
SF for vehicle processing.
Architects Design Group
Cape Coral Police Headquarters
Owner
Contact
Address
City of Cape Coral
Jay Murphy
Retired Police Chief
jmurph@comcast.net
239 . 229 . 0911
1100 Cultural Park Boulevard
Cape Coral, FL 33990The ADG design team, led by Ian Reeves, has
guided our staff throughout the process...
ADG’s expertise in public safety facilities and
its intimate knowledge of law enforcement
accreditation standards ensures that even the
smallest details are included.
- Jay Murphy, Retired Chief of Police
Project Budget
Final Cost
Project Schedule
$23,000,000
$21,657,302
Design: July 2008 to October
2008
Construction: September
2008 to June 2009
“ “
47
Due to very unusual political influences, the
design and construction had to be completed
in less than one year. To accomplish this feat,
ADG delivered this project through a fast
track schedule utilizing a hybrid design and
construction process. Within two and a half
months the City issued a permit for all site
work and the structural envelope. The Team
had completed 100% of the site engineering,
90% of the structural engineering, and a 30%
complete set of construction documents. The
30% complete set was aggressively let out for
competitive bids to the local subcontractor
community and produced 201 bids from 47
disciplines of construction. The team was able
to deliver a GMP to the City, almost $4 million
dollars under the budget. The design team then
completed the remaining design/engineering
documents in less than four months while
construction was ongoing, ultimately completing
the project on time and within less than one
year from start to finish.
48
The City of Winter Park selected ADG for a detailed spatial
needs assessment, master planning, cost estimating,
facilities design, and construction administration
services for a new Winter Park Public Safety Facility. The
new facility totals approximately 78,000 SF and services
both the City’s Fire and Police Operations.
The new public safety facility includes specialized areas
for booking and intake, evidence processing, investigative
services, and an armory. It also features a state of the art
911 dispatch center, flexible training space, a community
meeting room, administrative offices, a fitness center, a
K-9 kennel, and secured employee parking.
Architects Design Group
Winter Park Public Safety Facility
Owner
Contact
Address
City of Winter Park
Jim White
Fire Chief
jwhite@cityofwinterpark.org
407 . 599 . 3297
500 N Virginia Avenue
Winter Park, FL 32789
We appreciate the way that ADG was flexible
and worked with the Winter Park Police
Department to meet the current needs of
the department, keeping in mind our future
expansion requirements. ADG is definitely
a leader in the field of public safety facility
design.
- Brett Railey, Retired Chief of Police
Project Budget
Final Cost
Project Schedule
$8,344,640
$8,344,640
Design: February 2001 to
February 2002
Construction: January 2001 to
June 2003
“ “
49
This joint-use facility is designed to withstand
Category 4 hurricane force winds and pressures.
The building’s envelope is constructed out of 7
¼” thick reinforced concrete “tilt wall” panels
throughout. The roof also has an insulating
lightweight concrete roof slab to provide structural
integrity to the roof which is known to be the
highest area of probable damage during exposure
to hurricane forces. The insulating properties of
the lightweight concrete al so afford the facility
reduced heat gain thus lowering the operational
costs associated with the cooling bands.
50
This facility was a concept nearly two decades in the
making. A spatial needs assessment conducted by
ADG showed the police and fire services had outgrown
their existing facilities. To provide state-of-the-art
facilities, ADG designed a two-story facility housing
the City’s police department, fire administration, and
a five-bay fire station. Both departments are designed
as separate facilities connected by a shared two-story
atrium, which includes vertical circulation, lobby /
reception, a historic apparatus display, and community
meeting room that overlooks the civic plaza.
Architects Design Group
Sanford Public Safety Facility
Owner
Contact
Address
City of Sanford
Jim Krzenski
Admin Services Manager
jim.krzenski@sanfordfl.gov
407 . 688 . 5070
815 Historic Goldsboro Blvd.
Sanford, FL 32771ADG’s initiative and perseverance to this
endeavor was a critical component in making
our project a reality in such an uncertain fiscal
climate. This effort was and continues to be
characteristic of their approach to services
the client.
- Gerard Ransom, Former Fire Chief
Project Budget
Final Cost
Project Schedule
$19,000,000
$15,314,000
Design: November 2006 to
November 2008
Construction: November 2009
to November 2010
“
51
The facility includes a state of the art crime
lab that is part of the investigative services/
crime scene department. Several aspects of
the facility support the crime lab, including
a central evidence drop-off/processing area,
biohazard evidence storage and blood drying
rooms, crime lab with fuming hoods, latent print
analysis, forensic-science support, and forensic
facial imaging.
Exterior walls are concrete tilt wall construction
with hurricane impact glazing throughout,
designed to withstand 150 mph, and is designed
with 100% backup to all mechanical and
electrical systems. Additionally, ADG assisted
the City with obtaining a $1,006,000 in Federal
(FEMA-HMGP) grants.
52
Architects Design Group (ADG), in association with
a local architecture firm, was selected by the City of
Dover, NH to design the new Dover Police Department
Headquarters to be designed for current and future
needs of the expanding department. The facility was
built in the downtown core of Dover, a mature city that
boasts a brick industry and successful mill operations.
One of ADG’s unique design solutions was to leverage
premium building square footage. The facility provides
flexible multi-use opportunities in concert with the
defined spatial requirements. One specific example is
the meticulous design of the sally port. Detainees can
Architects Design Group
Dover Police Headquarters
Owner
Contact
Address
City of Dover
William Breault
Police Captain
w.breault@dover.nh.gov
603 . 742 . 4646
46 Chestnut Street
Dover, NH 03820
Ian and his team’s cooperation with the
police department staff was instrumental in
the planning and budgeting for the project...
Ian’s willingness to meet with City officials,
community members, and police department
staff in order to ensure the overall design
and quality was vital in gaining support and
authorization of the project.
- William Breault, Captain
Project Budget
Final Cost
Project Schedule
$20,000,000
$19,345,000
Design: August 2013 to
December 2014
Construction: February 2015
to April 2016
“ “
53
be brought into the secured booking and intake
area without interfering with police vehicle
storage or additional municipal parking.
This project focused on using space wisely and
working with the community to find solutions to
the multiple requirements, all while melding into
the overall historic urban fabric design. Included
in the space is a jointly accessible police and
community parking garage, a viable community
enhancement. The new police headquarters
is comprised of the police administration,
uniform patrol, communications / dispatch,
criminal investigations division, evidence, code
enforcement, records, booking and intake,
professional services, and an emergency
operations center. The police headquarters
is 28,000 SF and the 121,000 SF municipal
parking garage provides parking spaces for
joint use by the public and law enforcement
with two separate secured entrances for police
department staff only.
54
SECUREACCESS
SALLYPORT
DENTENTION
FIRING RANGE
ANADA ST.
MAIN ST.
MAPLE ST.
POLICE
HEADQUARTERS
ROLLING ASSETS
STORAGE
DETENTION AREA
DETENTION AREA
DETENTION AREA
CEPLOADING
AREA
SECUREACCESS
PARKING RAMP
EMERGENCY VEHICLE
ACCESS
PUBLIC PARKING
SECURE PARKING
SS
200’100’50’0
NN
57,178 SF
32,000 SF
32,000 SF
10,829 SF
14,436 SF
7,000 SF
121,178 SF
173
44
217
SQUARE FOOTAGE CALCULATION
GROUND LEVEL
LEVEL TWO
LEVEL THREE
DETENTION
FIRING RANGE
ROLLING ASSEST STORAGE
POLICE HEADQUARTERS
PARKING COUNT
SECURED
PUBLIC
TOTAL
DEVELOPMENT DATA
Architects Design Group, in association with a
local architectural firm, was selected to design the
Lowell Police Department Headquarters. The new
facility is designed to be a three-story structure
with the front of the building aligned parallel to
Tanner Street creating a protective barrier for the
secured staff parking areas to the east. The public
entrance to the building is directly off the public
plaza adjacent to the public and visitor parking
area. The public lobby is an open atrium with
natural daylighting and the building interior is
organized by two main wings.
Architects Design Group
Lowell Police Headquarters
Owner
Contact
Address
City of Lowell
Maryann Ballotta, Public Safety
Research and Planning Director
mballotta@lowellma.gov
978 . 674 . 1903
50 Arcand Drive
Lowell, MA 01852
Project Budget
Final Cost
Project Schedule
$TBD
$TBD
Study was completed 2016
55
SECURE PATH
SECURE PATHSECURE PATHSECURE PATH
PRISONER RELEASE
The 120,000 SF Headquarters will feature
crime analysis labs, two vehicle evidence bays,
communications / dispatch, physical agility
area, a training auditorium, classrooms, an
emergency operations center, and over 20,000
SF of office space for the various divisions.
The headquarters will serve as the hub for the
department’s 240 sworn officers and 95 civilian
employees.
Police Department staff will enter the building
on the southeast side of the building from the
two-bay parking garage structure through two
bridge connectors on the second level or the
sally port. The indoor firing range, rolling asset
storage, and detention areas will be located
beneath the parking structure on the lower level
with over 150 secure parking spaces on the
upper deck.
56
ADG, working closely with a local architectural
firm, is preparing an implementation plan for the
reorganization of the Rochester Police Department
(PD) into five neighborhood patrol sections. The
PD currently resides in facilities at three separate
locations. The new implementation strategy will
allow the PD’s 850 sworn and non-sworn staff
to provide a “neighborhood beat” structure, for
effective community policing. The 1
st task involved
completing a spatial needs assessment for each
division, including Special Ops and Training.
The 2
nd task, working closely with the City Real
Estate Department, established basic operational
criteria to evaluate existing buildings throughout
the city for suitability for substation locations or
special operations building. The spatial needs
assessment is being used to analyze a wide-range
of facility options. Preliminary recommendations
were presented to City Administration and Elected
Officials, and the final selection of locations is in
negotiations. The 3rd task includes the preparation
of preliminary schematic design documents for
each of the accepted facility locations. ADG
is also assisting preparing a cost estimate for
implementation of the selected design.
Architects Design Group
Rochester Police Reorganization Study
Owner
Contact
Address
City of Rochester
Scott Peters
Deputy Chief
scott.peters@cityofrochester.gov
585 . 428 . 1118
185 Exchange Boulevard
Rochester, NY 14614
57
Architects Design Group, in association with a local
architectural firm, was hired by Cobb County under
two separate competitive RFQ selection processes
to develop the spatial needs assessment, site
analysis, master plan, cost estimates, and bridging
documents for the Police Headquarters, as well as a
Public Safety Training Complex.
The Police Headquarters will consist of approximately
150,000 SF of space to house the majority of the
Police Department’s operations. The current
headquarters is a two-story building constructed in
the 1960’s and is too small for current operations. The
new 150,000 SF headquarters will provide adequate
space for current and future needs. Components
to be included are: administrative area, detectives
space, community meeting room, physical agility,
department meeting rooms, crime lab, evidence
processing and storage, holding, and break areas.
In addition to the Police Headquarters, ADG is
assisting the County with planning for a Public
Safety Training Complex. The complex is to include
a 107,845 SF building for educational, instructional,
and physical training. The training complex will
Architects Design Group
Cobb County Police & Public Safety Training
Owner
Contact
Address
Cobb County
Ronnie Prince
Deputy Chief
ronald.prince@cobbcounty.org
770 . 499 . 3902
140 North Marietta Pkwy NE
Marietta, GA 30060
The quality, professionalism, and responsiveness
to our needs has been exemplary. I extend
the highest recommendation of ADG to any
organization seeking architectural services
for the specialized area of public safety facility
construction.”
- Ronnie Prince, Deputy Chief of Police
“
also include a 107 ,222 SF
indoor firing range with 30
Lane / 150’ Qualifications
Range, 30 Lane / 150’
T actical Range, 20 Lane /
300’ Rifle Range, Weapons
Cleaning Area, Ammunition
Storage Area, Armory /
Weapons Storage Area,
Driving Simulator, and
Shoothouse. Exterior
training components will
include an EVOC course,
driving simulator, rolling
asset storage building, and
a skid pad.
58
FINANCES
1E.Provide the most recent audited financial
statement of the firm or firms, and each partner
with an equity interest of twenty percent or greater.
Such financial statements shall be for a period not
more than one year before the date of the proposal.
Submit the most recent Securities and Exchange
Commission 10-K and 10-Q reports, if such reports
have been filed.
'JOBODJBM TUBUFNFOUT GPS
&OHMJTI $POTUSVDUJPO $PNQBOZ
*OD XJMM CF GVSOJTIFEVQPO
SFRVFTUJGBXBSEFEUIJTQSPKFDU
59
VIRGINIA CODE
1F. Identify any persons known to the proposer who
would be disqualified from participation in any
transaction arising from or in connection to the
project pursuant to The Virginia State and Local
Government Conflict of Interest Act (Virginia Code
§ 2.2-3100 et seq.).
We have reviewed the Virginia State and Local
Government Conflict of Interests Act, and we
confirm that none of the individuals on our
team would be obliged to disqualify himself or
herself from participation in this project.
60
S/M/WBE PROGRAM
1G. Include any planned participation by small, women-owned, or minority-owned businesses
during project development and implementation.
We are aware of the City’s broad goal for participation by small, women-owned,
or minority-owned businesses. According the City’s Procurement Division, in
1993, Lynchburg City Council approved a resolution to provide minority and
women-owned businesses with an equal opportunity to participate in municipal
contracting and purchasing programs including, but not limited to, participation in
the supply of materials, services, construction, and repair activities, as well as in
lease agreements; discrimination against any person or business in pursuit of these
opportunities on the basis of race, color, sex, religion, national origin, handicap, or
age in the conduct of municipal procurement activities was prohibited.
Our PPEA Design-Build Team pledges to fully support this goal in all subcontractor
solicitations. We do not, at this time, have specific Small, Women, and Minority
(SWaM) participation targets for the project.
61
If you are going to build something
and you didn’t hire English
Construction Company, you made
a huge mistake. They have been
unbelievable to work with.
- Brian Roberts
Brunswick County Sheriff
“ “
63
PROPOSED PLAN
2A. Provide a description of the project, including the conceptual design. Describe the proposed
project in sufficient detail so that the type and intent of the project, the location, and the
communities that may be affected are clearly identified. Include a description of any components,
planned initially or for the future, that are expected to generate revenue for the project or the
proposer.
Project Overview
Based on the spatial needs assessment completed by ADG, we anticipate the police
headquarters to be approximately
SF The planned building will consolidate
the entire department back into one facility which will include Administration,
Field Operations, Criminal Investigations, Special Investigations, Evidence and
Forensics, and Information Technology. The project will include training areas with
classrooms, as well as physical agility training areas. A large community meeting
room with support spaces will also be located immediately off of the main lobby,
so it is readily accessible to the public.
Site / Location
The proposed site at the corner of Kemper and 12
th street presents opportunities to
design a building on a prominent corner in close proximity to the center of the city and
become a catalyst for the revitalization of this area. The site has good access to major
roadways to access throughout the city.
Conceptual Design
Several Options for Development were presented with a building of four stories
on different portions of the site depending on how parking for public and staff are
accommodated. These options were developed when the city thought a portion of
the site would need to be developed in phases. This phased approach appears to no
longer be a need, therefore there may be additional options that can be developed for
consideration. Our proposed development option has the public parking in the front
along Kemper Street with a four-story building and secured staff parking behind the
building. The site development concept, as depicted in the images included in the
confidential and proprietary document, does not rely on the City garnering access to
develop within the easement along the railroad track, to ensure the proposed
development can occur should this easement access not be secured. The concept also
adheres to the design principles of CPTED (Crime Prevention Through
Environmental Design), as well as providing a design that supports the
Department’s strong commitment to community-oriented policing.
64
OVERVIEW
Kick Off Meeting / Project Stakeholders Workshop
Our team will conduct an initial meeting with the City and Lynchburg Police Department (LPD)
representatives to review the proposed project and confirm the schedule for specific tasks.
This initial meeting is an orientation to the methodology, project objectives, and responsibilities
of the City’s Project Management Team, Police Department representatives, and project
stakeholders. The goals and objectives for the project, activities, and project milestones are
discussed and agreed upon.
Updated Spatial Needs Assessment
ADG is very familiar with the Lynchburg Police Department needs and project requirements as
they assisted the City with the Spatial Needs Assessment in 2017 in partnership with a local
architecture firm. ADG will prepare an update to the project status and provide recommendations
and refinements to the project needs (program) that are fundamental to delivering a fully
operational facility that exceeds the City’s expectations including, site selection issues and
development of spatial relationships / interactions, and adjacency priorities for the new Police
Headquarters. ADG will lead this task and an initial budget analysis will be provided by English.
65
DESIGN PHASE
Site Analysis
We understand the City has successfully receiv ed the legal title to the property
located at 1301 and 1305 Kemper Street to house the new Police Headquarters and
our team members have already walked the site to obtain a better understanding of
the conditions. During the site analysis phase, the team will prepare a detailed report
of the proposed site. Hurt & Proffitt, as the civil engineer, will obtain to the extent
possible, existing aerial photographs, city maps and legal description and surveys to
assist in documenting the size and the location of primary features, such as buildings,
paved areas, major landscape elements , easements, environmental jurisdictional
limits, and other physical aspects that potentially affect or impact upon current and
future expansion of the facilities. The team will obtain documentation through the
City’s Land Development Ordinance, relative to City codes and/or development
requirements, including criteria relative to buildable area, height limitations, parking
requirements, provision of utilities, storm water retention and disposal, environmental
issues, soil contamination, landscape requirements, setbacks, and similar factors
which may potentially impact upon expansion capability and land usage. During this
phase, the City will need to obtain lot consolidation of parcels 1301 and 1305 in
accordance with the City’s subdivision regulations.
66
PRELIMINARY SITE PROGRAM OVERVIEW
Our team has taken an initial look at the site in order to fully understand the needs of the
police department. The following information is a preliminary analysis. The proposed project
site work for the Police Headquarters will consis t of the construction of a new four-story
police department headquarters, sally port, and public and private parking areas to serve
the facility to be located at 1301 and 1305 Kemper Street. The property is zoned I-2 therefore
the construction of a Police Headquarters would be a use by right. The project will also have
shared and secured access from both 12
th and Kemper Streets.
Site Demolition
Based on the current projected building location as proposed it has been estimated that site
demolition will include the following (please note that these quantities are approximate):
16,500 SF office building
One existing concrete / asphalt entrance at Kemper Street
Existing security fencing around the perimeter of the existing facility
Existing pavement demolition to accommodate the proposed buildings and new parking
Existing sidewalk and curb and gutter internal to the site
Exisitng light poles and support foundations
Earthwork and Erosion Control
Based on the existing elevation of the already developed site it is not anticipated that a large
volume of grading will be required to redevelop the site with the proposed Police Headquarters.
Erosion and Sediment control may be limited to silt fence and drainage structure protection.
All erosion and sediment control measures will be per the most current addition of the Virginia
Erosion and Sediment Control Handbook. It is anticipated that erosion control will consist
of two (2) temporary sediment traps, silt fence and inlet protection. Two to three temporary
construction entrances will be used to enter the project area during construction.
Paving
It is assumed that all new paving will be 2” of VDOT Type SM-9.5A over 4” of VDOT Type BM-
25.0 over 8” of Type 1, Size 21B stone base. Parking spaces will be 2” of VDOT Type SM-9.5A
over 8” of Type 1, Size 21B stone base. Concret e paving will be 6” of reinforced concrete over
6” of base stone. New 6” curb & gutter will be 24” wide over 4” of stone base. Sidewalks and
other pedestrian concrete will be 4” of concrete over 4” of stone base.
67
Water Service
It is anticipated that domestic and fire suppres sion service will be from either the existing
10” main located in 12th Street or the 8” main from Kemper Street. New RPDA and RPZ
backflow prevention devices will likely need to be updated for the fire suppression and
domestic water services. An existing hydrant is located across Kemper Street and a flow
test will be required to determine if adequate fire suppression volume and pressure are
available to the site.
Sanitary Sewer
Existing sanitary sewer is located in 12th Street, Kemper Street and to the west of the site
adjacent to the railroad right of way. The adequacy of the existing sanitary sewer service
will need to be verified by the MEP consultant. Any necessary upgrades would be limited
to the service lateral from the new building to one of the aforementioned sanitary sewer
mains.
Stormwater System
Existing on-site stormwater infrastructure will be utilized if possible but it is likely that
additional subsurface conveyance will be needed. Discharge points will either be to
existing systems located in either Kemper or 12th Streets.
Other Utilities
In addition to the utilities mentioned above there is a main power feed that runs across
the project site that will need to be relocated as part of the project. Natural gas is also
in the project area.
Stormwater Management
It is anticipated that there will be a net decrease in impervious area therefore additional
stormwater quantity may not be required. However, there will need to be approximately
a 20% reduction in nutrient runoff therefore some underground storage or BMP’s may be
required. It is recommended that any stormwater quality requirements be satisfied by the
purchase of Nutrient Credits.
68
Master Planning
After the site information is obtained and reviewed, our team will work with the City to develop
the conceptual site plans and renderings for this facility. To do this, we will explore various
conceptual site plans to achieve current and futu re needs. Our team will also evaluate the
adjacent site areas relative to current zoning and actual land use and reflect this information
in the master plan documents. Based upon the accepted spatial needs assessment and issues
associated with adjacent site areas, our team will prepare a master plan document illustrating:
Proposed land utilization
Location and general configuration of “current need” of the police headquarters
Areas of potential expansion for future needs
Location of vehicle access and egress, both staff and public
Vehicle parking areas for the secured and public access areas
Pedestrian areas and site circulation with at least two egress points for the police
department
Natural vegetation area designed for storm-water retention/detention
Environmentally sensitive areas
Utility access and distribution
Site security
Ability to apply principles of Crime Prevention Through Environmental Design (CPTED)
standards
Conceptual Design
At this point of design, the concept plan will be further detailed into sketches. This will include
site plan refinements showing setbacks, parking and access/egress requirements, block
diagrams / floor plans, 3-D massing diagrams, building elevations, and renderings. Please see
the images on the next page which represent our graphic capabilities on the recent Orlando
Police Headquarters project.
Master Planning and Conceptual Design Review Meeting
Our team will conduct an interactive design meeting to review the proposed master plan and
conceptual design drawings. This meeting will include the design team, city’s project manager,
members of the police department, planning, city management, and project stakeholders,
and if deemed appropriate by the City, interested citizens and / or community groups. The
premise of this meeting will be to obtain consen sus and agreement on the conceptual site plan,
conceptual floor plans, building elevations, and renderings. After feedback from the design
meeting, our team will prepare revised drawings illustrative of the proposed solution for the
new facility.
69
CURTAIN WALL SYSTEM, TYP.
BUILDING SIGNAGE
METAL PANEL SYSTEM, TYP.
SUNSHADE STRUCTURE, TYP.
TILT-WALL SYSTEM, TYP.
STOREFRONT SYSTEM, TYP.
CURTAIN WALL SYSTEM, TYP.
TILT-WALL SYSTEM, TYP.
28’-0”
T.O. Parapet
18’-0”
T.O. Parapet
56’-0”
T.O. Parapet
50’-0”
T.O. Structure
TILT - WALL SYSTEM, TYP.
ALUMINUM WINDOW SYSTEM WITH
INTEGRAL SUNSHADE , TYP.
SUNSHADE SYSTEM, TY
CURTAIN WALL SYSTEM
SUNSHADE SYSTEM, TYP.
STOREFRONT SYSTEM, TYP.
50’-0”
T.O. Parapet
ALUMINUM WINDOW SYSTEM WITH
INTEGRAL SUNSHADE , TYP.
ALUMINUM CANOPY
TILT-WALL SYSTEM, TYP
STREET SCAPE PLA
N
p
142’-0”
T.O. OPENING
130’-0”
T.O. FINISH FLR
127’-0”
T.O. OPENING
115’-0”
T.O. FINISH FLR
110’-0”
T.O. OPENING
100’-0”
T.O. FINISH FLR
100’-0”
T.O. WALL
98’-8”
T.O. WALL
SUNSHADE STRUCTURE
STOREFRONT SYSTEM
WITH LOW-E GLAZING,
TYPICAL
HORIZONTAL LOUVERS
RETE RETAINING
STOREFRONT SYSTEM
WITH LOW-E GLAZING,
TYPICAL
15’-0”
MIN (TYPICAL)
3’-0”
TYPICAL
70
Schematic Design
During the schematic design phase, on-site design sessions will be conducted to refine
design options and alternatives as accepted, which will provide improved facility design
and cost savings. The schematic plans will be developed to establish the best possible
organization for the Lynchburg Police Headquarters. This will take into consideration
the ideal operational adjacencies for the efficient functionality of the facility. In addition,
engineering systems and concepts for the building systems will be evaluated. During
the on-site session, our team will be continually providing value engineering and
constructability reviews. At the end of the schematic design phase, a cost estimate
will be prepared for each of the phases and alternatives. We will work with the City to
address the priorities of the departmental staff and the project budget constraints to
determine an appropriately balanced solution. This phase includes the following:
Preliminary code research and evaluation
Preliminary Floor Plans that provide a layout that has been checked for code
compliance
Concept design for the facility and exterior elevation studies for the project
Preliminary finish schedule for all areas of work
Specification narrative of building systems
Submit to Fire Marshall for preliminary review
A Preliminary Construction Budget
Project Example / Illustrative Only
71
Design Development
During the design development phase, the building materials, systems, and enhanced
functional responses are refined. The design process integrates the design team and
City’s input responding to environmental and survivability issues, life-cycle cost issues,
security issues, and budget considerations. The design approach, preliminary architectural,
structural, mechanical, electrical and plumbing c oncepts are developed to a level of
detail that allows for independent, detailed cost estimating prior to initiating construction
documents. As part of this project, our team will provide interior design services including
furniture recommendations, layout, contract documents, bidding / procurement assistance,
and installation administration. English will pr ovide a GMP at 35% DD’s. The following
items are concluded at this design phase:
Selection of systems, materials, and equipment for program response and sustainable
design goals
Preparation of initial design details
Thorough documentation of architectural, structural, mechanical, electrical, plumbing,
and fire protection systems
Building security (access control and CCTV), audio visual technology, and
identification of survivable systems components
Forecast of potential energy performance, life-cycle cost, and architectural quality of
design relative to the previously determined project goals
Adjustment of the design as necessary to achieve project goals and cost targets
Project Example / Illustrative Only
72
Our team will also implement our
Responsive Security Technology
Approach. This approach is defined
as the review and application of all
available and emerging systems to
secure law enforcement facilities.
Some of the highly secured areas
that are accommodated by these
systems include:
Perimeter surveillance (site and
building)
Site ingress / egress points
Gated access points
All building entrance points
Primary entry lobby
Blind areas around site and
buildings using CPTED design
principals (Crime Prevention
Through Environmental Design)
Interior entrances into secure
zones of the building
Armory
Property and evidence
Forensics section / crime lab
(evidence processing)
Secured interview rooms
Secured staff parking areas
Vehicle processing bays
73
Once the City has accepted and approved the design report and issued the Notice to Proceed,
ADG will begin the construction documents and Engli sh, the sequencing of construction. At the
City’s request, our team can develop an early site package at the end of the Design Document
phase to expedite permitting. This will allow for the exiting buildings to be demolished and site
construction preparation to begin while ADG is completing the Construction Documents.
Construction Documents
During the construction documents phase, our
team will prepare drawings and specifications
necessary for bidding and construction. A
building code analysis will be included during
this phase. Reviews by the City’s Project
Manager, facility stakeholders, and the design
team will be conducted at the 50%, 90%, and
100% complete phases. The plans will integrate
the unique response to the project’s goals and
will incorporate the changes required to keep
the project in budget, on schedule, and to
meet the City’s project goals. The plans and
specifications will undergo ADG’s quality control
review process which involves a comprehensive
review by architects and engineers not assigned
For the 95% DeSoto set, we noticed how
well-done the set is; in our opinion, this
is a high-quality set. We noticed the
documents “read well” and are easier
to understand than others due to the
nomenclature systems and graphics used.
Also, details included are advanced and
there are very few missing. This is across
the board for all design disciplines. In
short, the information is great and this
translates to a better understanding of
the planned scope of work by estimators,
consultants, contractors, and others allied
to the field.
- John Coakley, CPE, LEED AP BD+C
CCM Construction Services
“
“
74
to the project, but who are senior, within our team. This review process begins
during design development and is completed with the completion of construction
documents. Estimation of Probable Costs will be updated at the 50% and 80%
completion phases of construction documents by English. Prior to completing bid
documents, the English / ADG Team will hold an interactive, on-site review session
with the City. This session will allow for the City to provide comments and review
input of the bid package. Our team will pr epare the final set of comprehensive
construction documents to minimize RFI’s, change orders, and any additional
costs. At this time, permits will be submitted.
CONSTRUCTION APPROACH
The English / ADG Team begins our construction approach by establishing budget,
quality and schedule goals, construction means and methods, and critical path
items such as permitting, labor intense trades, and long-lead items. We believe
in building your project virtually before stepping the first foot on the job site. This
level of intense preparation ensures t hat we thoroughly understand your needs,
the City’s intent and the most cost-effective way to deliver the most value to your
project.
Pre-Construction:
During the design phase, our construction team members will attend all of the design
and planning meetings to gain the best understanding of the design requirements,
the limitations placed on the site, t he many building components, and the desires
of the City. Construction team members will also review and provide input
during design planning to ensure constructability, value engineering, sustainable
options, project phasing, cost and schedule implications are considered from the
contractor’s perspective. ADG will utilize their knowledge of design guidelines
to serve as a resource to the team, providing input to various options related to
project phasing, cost options, constructability, timing and details of the “nuts and
bolts” of the project which have worked well on other similar projects.
Detailed progress estimates will be produced as requested to inform the team
of the project’s anticipated costs are and what value engineering options can be
considered to reduce the overall cost withou t sacrificing the quality of the finished
product. Even after the GMP is established, we will continue to work to complete
the project in the most cost-efficient manner in order to best administer the project
budget. Throughout the design process, our team completes constructability
reviews of the documents to evaluate for ease of construction, potential conflicts
in details, and cost efficiency as it relates to the means and methods which will
be required to build the project. Developing a GMP proposal is an exercise in
meaningful communication. It is extremely important that the English / ADG Team
75
and the City of Lynchburg understand exactly what is included in the project and the detail
that accompanies the decision. Quality of t he plans and specifications are paramount to a
good GMP. We have found that the information trail can be accomplished through memos,
specifications on drawings and dialogue with subcontractors to assure that not only are
the specifications being met, but that the City obtains the best value for the dollars spent.
Construction Phase Tasks
Services under this phase of the work include the following items:
Negotiate the subcontracts to complete the project buyout
Prepare estimates during different phases of project--conceptual, schematic,
design development, 50% construction documents.
Convene pre-bid meetings for the subcontractors
Convene pre-mobilization meetings for selected subs to get everyone on the
same page and assimilated into the team--includes review of critical path,
milestones, project goals, scheduling, constructability, safety and quality goals,
and lean construction opportunities
Determine sustainable elements to be used on the project
Site development and preparation
Holds weekly subcontractor coordination meetings
Holds weekly Owner / DB team coordination meetings
Prepare and control submittals, requests for information, and requests for
change orders
Maintain tight control of all activities in t he field, ensuring a safe job site where
all workers go home injury-free
Monitor all work for quality and compliance with the contract documents and
approved submittals
Obtaining a Certificate of Occupancy
Compliance with the City’s Minority Business Enterprise (MBE) and Women
Business Enterprises (WBE)
We will certify, sign, and seal the drawings and specifications in compliance with
Virginia Statutes. ADG will review and approve shop drawings and equipment
submittals during the construction phase of the project
A final as-built package of plan drawings, specifications, shop drawings, and
equipment operation manuals will be certif ied, and furnished to the City of
Lynchburg
76
Scheduling
The English / ADG Team scheduling system for pre-
construction and construction administration is
comprised of several subsections that vary in detail
and duration. All project scheduling is accomplished
using Primavera CPM. Our schedules are developed
with a level of detail to indicate all significant items of
work to be completed, the phasing of the project when
separated into different work areas, the responsibility
of each work item, the area the work to take place, and
includes logic to determine how all activities interact
with each other. The activities reflected on the master
schedule will indicate the critical milestones and key
dates for the client and show the flow of work for the
project. The bidding documents will also indicate the
scheduling requirements for subcontractors.
Owner/architect/contractor (OAC) meetings are
convened weekly to keep everyone informed and the
lines of communication open. At these meetings,
progress is reported and submittals, RFI, and proposed
changes are reviewed. The goal is to keep all issues,
questions, and decisions moving so as not to negatively
impact construction progress.
For an accelerated project like this where it is important
to you for our team to complete work on time, we will be
using a 3 to 5 week look ahead planning process to help
team members stay on track and be ready when they
are needed. Some of the lean construction principles of
last-planner system scheduling and the plan-do-check-
adjust methods will be incorporated to eliminate waste
and streamline operations in the delivery process.
The project schedule is as important to a project as the
blueprints. It assembles an otherwise unordered list of
events into an orderly, sequential list of activities that
can then be communicated, monitored, and adjusted as
events and needs dictate. Without proper scheduling
and schedule maintenance, success on a project is not
77
possible. Through the scheduling control practices
we have implemented, English Construction strives
to achieve on-time or early schedule project delivery.
Construction Phase
As the construction phase begins, our construction
team members will meet with each subcontractor and
specialty contractor to review the scope of work and
project expectations, thereby assuring that the City’s
interests are well protected. During construction
our team will remain actively involved with QA/QC,
budget/cost control, project oversight, and other
activities needed to support project team members.
English’s Project Manager, will attend the weekly
subcontractor coordination meetings to support our
on-site management in making sure the resources
needed to complete the project are available and that
any upper management approvals needed can be
provided quickly. He will also attend the weekly owner
/ architect coordination meetings to assist in making
sure the project is on track and the City’s needs are
being met. The Project Manager will maintain tight
control of submittals, requests for information, and
requests for change order by thoroughly reviewing
those documents to be sure the paperwork is valid
and in compliance with the contract documents. Our
Project Superintendent will maintain tight control of
all activities in the field, closely monitoring the work
for quality, safety, and compliance with the contract
documents and approved submittals.
Project Close-Out Phase
“Project Closeout Begins Day One” . It is never too
early to start getting subcontractors and suppliers to
start thinking about their closeout obligations. The
English / ADG Team builds the required closeout
documents into our submit tal log in order to advise
the subs early in the project what they are obligated
to provide in terms of paperwork. This expedites
the closeout duration greatly, as many closeout
documents are received long before the project is
substantially complete. For those who administer and
78
maintain a facility, there is perhaps
no more important close out
document than the project as-builts.
These serve as the only record of all
concealed work and are invaluable
during the life of the facility. In an
effort to provide our clients with
the best information about their
facility, the English / ADG Team
requires subcontractors to update
the as-built documents a minimum
of once a month as a prerequisite to
payment. During underground and
wall rough in of the various trades,
our team requires the updates to
occur weekly and in some cases
on a daily basis. The updates must
be clear, complete, and provided
with dimensional information before
they will be deemed acceptable. At
project completion our information
is transferred to an updated set
of documents provided by the
architect.
Near the end of each project, the
English / ADG Team will conduct the
required training and demonstrations
for facilities and maintenance
personnel. These demonstrations
will be videotaped and provided to
the City and LPD on DVD in order to
preserve the information for future
personnel. Any systems software
licensing information shall also be
included.
An additional way we work to
expedite the closeout process is
through punch list management.
79
Punch lists are compiled and completed during every phase of work, ensuring when the next
trade begins their work, the substrate which they are working on is properly prepared and
ready to accept the new work. This targeted method of preparing each facet of the work
eliminates the “summation of errors” effect caused by compounding problems instead of
addressing them as they arise. Near the completion of the project, we develop a more formal
“Preliminary Punch List” , identifying those items we would expect to see on the client’s punch
list. This eliminates a vast majority of punch list items, expedites completion, and allows us
to turn the project over in a clean and concise manner. Our objective with each project is to
achieve a zero punch final walk.
As the Police Headquarters nears completion, we will designate a customer service
representative as LPD’s primary point of contact should warranty issues arise. This individual
will notify responsible parties of the warranty item and follow up with them and the client in
order to ensure quick response and resolution. The English / ADG Team also schedules and
conducts an 11 month walk through to identify and address any warranty issues previously
undiscovered or unreported.
80
SPECIALIZED LAW ENFORCEMENT DESIGN EXPERTISE
Over the past 48 years ADG has had the opportunity to be involved in the programming,
master planning, and design of police facilities throughout the United States. This extensive
experience has provided their firm with an insight into those issues which are very specific to
these facilities.
There are many areas of the police facility that should be given special design consideration
including: public lobby, interior corridors, records, investigative services, property and
evidence, crime lab, holding area, armory, SWAT/tactical ready room, briefing and muster,
locker and shower rooms, physical agility rooms, community policing, victim interview/waiting
room, and shooting range.
The crucial components that are to be considered in the planning and design of police facilities
are grounded in the commitment to protect those specialized areas that present the highest
risk and liability to the department, such as property and evidence. For example, if a law
enforcement agency cannot prove in a court of la w that the evidence has been secured and
protected from potential access, tampering, or contamination by an unauthorized individual,
then the evidence may be deemed inadmissible in a court of law.
81
Public Access
The preliminary design approach to protecting the sanctity or chain of custody through
design is to prohibit or limit public access to a controlled, highly visible, secure area
only. The public must enter the facility through secured gate access points which are
monitored and video recorded. With exception to the public accessed lobby/waiting/
property return areas, all exterior doors require security access control. The public
has no access beyond this point. Additionally, all walls, doors, and glazing adjacent to
the lobby / waiting / property return space are bullet resistant, ballistic rated. Secure,
programmable card-key access by authorized personnel only, is required beyond this
point. This ensures both the safety of the public and law enforcement personnel and
any potential contamination from an outside influence.
Evidence Handling / Property and Evidence
The planning and design of Property and Evidence areas must incorporate all
recognized criterion that address the four critical components. They include: (1)
Preparation; (2) Processing; (3) Holding/Storage; (4) Support Infrastructure.
82
placed on a concrete curb with a floor
drain located in close proximity to the
refrigerated units as the condensation
could be released onto the immediate
floor area.
(2) Processing: The processing of
the property and evidence articles
is generally done only by individuals
trained and certified in the proper
techniques to comply with the
“sanctity of custody” regulations.
Initial processing occurs in an open
work area, most typically located
directly on the secure side of the
bank of evidence drop lockers. Again,
chemical-resistant or stainless steel
counter top work areas should be
provided with an integral sink. The
custodians/technicians will finalize
the case identification for the articles
and prepare them for storage. On
many occasions, the evidence will
need to be further examined by the
(1) Preparation: Law enforcement evidence custodians/technicians generally follow
normal 9-5 business hours. However, a large majority of the Property and Evidence
that comes into an agency does so after these hours and therefore must be accurately
documented for the custodians/technicians to process and track the articles. The
facilities must be outfitted with an area ADG refers to as the “bag and tag station.”
This is where the officer will log in the article(s), assign a case number, and securely
store the article(s) avoiding access by an yone other than the evidence custodian/
technician. As an example, in our Miramar Crime Scene Facility design, evidence is
brought to the Evidence Drop-Off through secured corridors and bagged and tagged
for storage or further processing in the specialized, lockable evidence lockers. Also
required is a chemical-resistant counter top work area with access to stored materials
for packaging the property and evidence articles. The space also needs to be located
near a bank of evidence drop lockers, in a variety of sizes, to accommodate anything
from DUI/DWI video tapes to rifles, as well as a group of refrigerated units that will
preserve articles containing DNA or bodily fluids without risk of deterioration. This
bank of evidence lockers is a front-loaded, locked, and rear-retrieving configuration
83
technicians or crime scene analysts. This requires very specialized lab areas with particular
concern to handling of hazardous and bio-hazardous materials. A vehicle evidence bay is often
located adjacent to a vehicle sallyport area of the facility. The vehicle evidence bay must follow
the same regulatory guidelines as other areas associated with the storage and processing of
articles of property and evidence. The bays are typically sized a minimum of twenty (20) feet
wide to accommodate personnel access on both sides of a vehicle with the doors open. They
are outfitted with such components as epoxy chemical-resistant flooring surfaces, floor drains
tied into an oil-water separator, pull-down electrical reels and low-velocity air distribution
systems. Dual means of access control devices to monitor who has accessed these areas, and
CCTV systems (closed circuit television cameras) used to record in color/digital format anyone
occupying these spaces is also included. High performance artificial lighting must be provided.
84
(3) Holding/Storage: The storage of property and evidence is as critical as the processing.
Locating the articles relies on the accurate iden tification and recording of the pertinent case
information associated with each article. The storage of the various types of articles is often
segregated into the following definitions: B ulk Evidence, Cash/Valuables, Narcotics, Weapons,
Cold-Case Files, Capital Case Files, DNA Evidence, etc. All holding areas must be equipped
with dual-recording access control devices to meet law enforcement (CALEA) Accreditation
standards. Likewise, any visitor to these areas must have their personal identification checked
and verified, their times documented when entering and leaving, and signed by a witness,
typically the custodian/technician working this area. High density storage systems are
often utilized to maximize the use of these areas. High volume ceilings shall be provided to
accommodate the storage systems.
(4) Support Infrastructure: The property and evidence areas of any law enforcement agency
pose one of the highest areas of potential liability for that agency. The entire “compound”
of the area must be contained within a security perimeter constructed out of tamper proof
(solid concrete walls) and ceilings, or of similarly secured construction. The area is provided
air conditioning systems designed for 100% exhaust and 100% make-up fresh air to ensure
that none of the air from these areas is recycled into the main facility due to the concern of
airborne pathogens that may be contained wit hin the articles being stored or processed. Any
HVAC ductwork which breaches the perimeter of this area that is larger than six (6) inches
in diameter should be installed with No. 5 steel reinforcing bars (5/8” diameter) at four (4)
inches on center and embedded into the concrete at both ends no less than four inches
on each side. The accessibility to the area is regimentally documented at both entering and
exiting by all individuals. This is easily accommodated through the use of sophisticated dual-
recording access control devices as previously noted. A variety of technology is available
such as fob readers, proximity cards, key pads, biometric readers, or a combination thereof.
Strict adherence to these protocols and the accreditation standards will confirm an agency
maintains the sanctity of custody.
85
Community Engagement For 21 st Century Policing
Law enforcement is constantly evolving to meet the
needs of today’s environment. One of the biggest trends
we have seen in the last few years is the emphasis
on community engagement and policing. The premise
of community engagement is to involve and build
relationships with members of the community in order
to strengthen the department’ s presence. We will work
with LPD staff, as we have done with many other large
police departments, to identify and account for these
spaces within the assessment and design of the new
headquarters.
There are many ways to implement this philosophy;
however, facility design can play a critical part in the
department’s community engagement initiatives. During the planning phases, our staff will meet with
the police department to discuss exactly what their specific community needs are. We will then discuss
contemporary trends in design, which will detail spaces that can be used to connect with the community.
ADG is knowledgeable in this trend and will be able to provide examples related to how the interior and
exterior of the building can facilitate community engagement initiatives. At the 2016 IACP Conference,
ADG spoke on the implementation of design strategies to promote the Community Oriented Policing
Philosophy.
86
CALEA / VLEPSC / CPTED Standards
CALEA Accreditation is recognized as a means of
maintaining the highest standards of professionalism
in many law enforcement agencies and their facilities.
Several states have followed CALEA and established
an Accreditation Commission. Generally, the goals
of accreditation and the process follow the National
Accreditation Program model. The mission of the
Virginia Department of Criminal Justice Services is
to provide leadership to improve the criminal justice
system in Virginia’s communities through effective
training, partnerships, research, regulation, and
support. Although the aim of an accreditation program is to enhance the entire spectrum of
professional law enforcement services, the facilities available to an agency have a significant
impact on success, and more importantly, protects the municipal entity from potentially
frivolous litigation. An agency requires adequate and appropriate space for personnel to
conduct their work. Certain areas of the facility are assessed and continually undergo scrutiny
of how it protects the interests of the depar tment, its personnel, and the citizens coming into
contact within the facility. Areas which may be evaluated include the records unit, training,
patrol, property and evidence, vehicle sally port and detention, hazardous materials storage,
criminal investigations, intake and holding, and dispatch. Programming the facility with these
standards in mind, will assist the City in t he re-accreditation process. We understand the
Lynchburg Police Department received their initial CALEA accreditation and wishes for their
new facilities to comply with these standards.
Crime Prevention Through Environmental Design (CPTED) is defined as a multi-disciplinary
approach to deterring criminal behavior through environmental design. CPTED strategies rely
upon the ability to influence offender decisions that precede criminal acts by affecting the built,
social, and administrative environment. Ian Reeves, AIA, IALEP, ICA, our team’s Architect of
Record, has undergone significant training and is an expert in both CPTED and CALEA design
standards. ADG is often contracted specifically because of his knowledge and experience with
facility design that meets or exceeds accreditation requirements standards.
87
Sufficient Parking for Staff and Public
Site planning begins the process of defining how the proposed facility will come together.
Clearly defined separation of the public and staff vehicles will be accomplished through
a series of design measures including the use of readily discernible signage, perimeter
security walls and gates, and CCTV surveillance systems. The implementation of design
initiatives such as those promoted by the International CPTED Association (ICA), which
ADG is a long-standing member of, will decrease opportunities for crime and provide a
heightened sense of safety to the visitors and users of the facility. These measures have
been incorporated into every law enforcement facility ADG has designed.
Security
Security control is only one of the tools to provide protection of evidence and staff.
Established operational procedures including “chain of custody” must also be established
and followed to be successful. Security measures include the following procedures to
protect and preserve the evidence:
CCTV coverage and NVR hard drive
storage of all areas including the intake,
storage, handling, and disposition times of
evidence.
Vehicle inspection tear down bays to have
door control access where only one door to
the area can be opened at a time. Multiple
cameras will be installed in all corners of
the area used for tear downs/inspections.
Separate controlled access rooms within
the evidence facility for fire arms, narcotics,
and currency/valuables. For each of
these spaces ADG typically provide dual
credential access such as card and pin or
card and biometrics. Additionally, within
the rooms ADG would provide motion
detection, as well as infrared camera
coverage. AC grills shall be outfitted with
internal bars to prevent access via the AC
ducts to these rooms and possibly an in-
duct sensor.
Temperature and humidity sensors/alarms
to security control, as well as tie to cell
phones when settings are exceeded for
specific rooms or spaces.
Specific ventilation needs for areas where
decomposition may occur.
Generator and UPS back up of key areas
and equipment.
88
WORK PERFORMED BY CITY
2B. Identify and fully describe any work to be performed by the City.
The success of this project is based on effective collaboration with the City of
Lynchburg and project stakeholders. The City and project stakeholders will have
review and approval authority on all major project components. We envision that
the City and project stakeholders will acti vely participate in the following activities:
Architectural Program Finalization – The architectural program in this proposal
will be reviewed, discussed, and verified with the City and project stakeholders.
Design Workshop – A Design Workshop will be conducted with the City’s
designated design review committee to work with architects to develop alternative
site master plans, floor plans, and explore various adjacencies, circulation patterns,
entrances, and site features. Consensus w ill be reached within the group to select
the most appropriate solution.
Design Review and Approval – The City will review the proposed design at key
milestones and inform the design-build team of any changes required. The City will
facilitate communication between the design team, Police Department personnel,
and other project stakeholders.
Site Plan Review, Permitting, and Inspections – The City will provide ongoing support
throughout the design and construction process to ensure timely decision making.
The City of Lynchburg will also be responsible for the following:
Moving arrangements – The City is expected to arrange and pay for all
moving expenses associated with the project.
Computer, communications, and office equipment – The City will assist
the design-builder in the selection and procurement of the technology
and furniture systems, under an allowance provided in this proposal.
The design-builder will provide data and communications cabling from
equipment rooms to wall and floor boxes.
Updated environmental assessments – The City will obtain updated
environmental assessments of both parcels and provide to the design-
builder during development of the Detailed Phase proposal.
89
We understand the City has successfully received the legal title to the property located
at 1301 and 1305 Kemper Street to house the new Police Headquarters.
PROJECT SITE / PROPERTY
2C. Provide a statement setting out the plans for securing all necessary property. The statement
must include the names and addresses, if known, of the current owners of the subject property as
well as a list of any property the proposer intends to request the City to condemn.
90
PERMITS
2D. Include a list of all federal, state, and local
permits and approvals required for the project and a
schedule for obtaining such permits and approvals.
Identify which, if any, permits or approvals are to be
obtained by the City.
In general, the project will require site plan
approval and the issuance of a building permit in
accordance with the Virginia Uniform Statewide
Building Code. Typically, the site plan approval
process includes erosion and sedimentation plan
and storm water management plan reviews. These
permits will be obtained by the design-builder.
The project will require permits for the demolition
of the existing structures. These permits will be
obtained by the design-builder.
This project will require Comprehensive Plan
compliance review under Code of Virginia §15.2–
2232. This is a responsibility which the City must
undertake. We encourage the City to begin this
process as soon as possible.
The project will also require lot consolidation of
parcels 1301 and 1305 Kemper Street in accordance
with the City’s subdivision regulations, which will
be the City’s responsibility to undertake. We do
not believe this project will require any zoning
revisions, variances, or conditional use permits.
Our conceptual design will likely require a special
exception for FAR (Floor Area Ratio). Upon the
completion of schematic design, we will be in a
better position to conclusively evaluate zoning
and site development requirements. We do not
currently envision the need for federal or state
permits for the project.
91
ADVERSE IMPACTS
2E. Identify any anticipated adverse social, economic and
environmental impacts of the project. Specify the strategies or
actions to mitigate known impacts of the project.
No long-term adverse social, economic, or environmental
impacts are anticipated as the result of this project.
Construction noise and periodic, short-term disruption of
traffic should be anticipated in the immediate vicinity of the
construction site. The design-builder will make every effort
to ensure that these short-term disruptions are minimized.
92
POSITIVE IMPACTS
2F. Identify the projected positive social, economic, and environmental impacts of the project.
The site for the proposed Police Headquarters
occupies a strategic gateway into downtown. The
corner of 12
th Street and Kemper Street is poised for
redevelopment. The Police Headquarters will be an
attractive building which will provide an employment
center for a large and diverse law enforcement
agency. The new building will encourage additional
redevelopment in the neighborhood. The City’s
investment signals positive change to an area which
has been occupied by light industrial land uses.
Strong relationships among officers and the
community members they serve has never been
more important. Police stations are now expected
to welcome community members with open arms
and reflect the best of their community ’s values and
hopes. No longer glorified bunkers, law enforcement
facilities must instead be beacons of safety that
symbolically and physically act as the center of a
community. They need to be transparent, consider
the cultural and historical context of their location,
and act as safe havens in crises.
93
SCHEDULE
2G. Identify the proposed schedule for work on the project, including the estimated time for completion,
and any extended or maintenance warranties.
Sign Comprehensive Agreement .BZ
Start
Date
Duration
(calendar days)
Completion
Date
0 .BZ
.BZ
60 +VMZ
"VHVTU
"VHVTU
%FDFNCFS
%FDFNCFS
%FDFNCFS
%FDFNCFS
+VMZ
"VHVTU
14
4FQUFNCFS
.BSDI
480
14 .BSDI
90 .BSDI
14
120
Schematic Design for New Police
Facility
Construction Documents for
New Police Facility
City Review and Approval of
Schematic Design
City Review and Approval of
Construction Documents
Design Development for New
Police Facility
Construction of New Police
Facility
City Review and Approval of
Design Development
Occupy New Police Facility
.BSDI
94
RISK AND LIABILITY
2H. Propose allocation of risk and liability for work completed beyond the agreement’s completion date,
and assurances for timely completion of the project.
As part of the PPEA Comprehensive Agreement between the City and the design-builder,
mutually agreeable business terms will address completion dates and penalties for delays
and extensions. We would be pleased to provide examples of agreements made with other
municipal clients.
95
ASSUMPTIONS
2I. State assumptions related to ownership, legal liability, law enforcement, and operation of the project
and the existence of any restrictions on the City’s or the public’s use of the project.
We state the following assumptions:
The project is owned by the City of Lynchburg, a Virginia municipal corporation.
The City will obtain adequate public financing to support all project costs.
Environmental site conditions do not pose extraordinary risks or expense.
The site does not contain soil conditions that will require extraordinary measures
to construct building foundation systems.
96
PHASING
2J. Provide information relative to phased or partial openings of the proposed project prior to completion
of the entire work.
8FBOUJDJQBUFEFWFMPQJOHFBSMZTJUFBOEGPVOEBUJPOQBDLBHFTUP FYQFEJUFQSPDVSFNFOUBOE
EFMJWFSZPGUIFTUSVDUVSBMTUFFM
0VSUFBNXJMMEFMJWFUIF/FX1PMJDF)FBERVBSUFSTPOUIFTDIFEVM FEEBUFQSPWJEFEJOUIF
QSPQPTBMBOEXJMMOPUSFRVJSFQIBTFEPSQBSUJBMPQFOJOHT
97
98
99
PRELIMINARY
CONTRACT COST LIMIT
3A. Provide a preliminary estimate and estimating methodology of the cost of the work by phase and/or
segment (e.g. planning, design, construction).
A preliminary contract cost limit is included in our team’s separate proposal marked “Confidential
and Proprietary.”
100
DEVELOPMENT PLAN
3B. Submit a plan for the development, financing, and operation of the project showing the anticipated
schedule on which funds will be required. Describe the anticipated costs of and proposed sources
and uses for such funds.
Our proposal does not include project financing. We have assumed that the City of
Lynchburg will issue general obligation bonds in an amount sufficient to pay all project
costs. The City’s bond ratings are very strong and thus allow the City to borrow money at
interest rates significantly lower than the private sector. The information below reflects our
preliminary proportioning of project costs:
A/E fees: reimbursed 90% during design phase; 10% during construction phase
Builders’ Risk Insurance: reimbursed 100% during mobilization phase
Performance Bonds: reimbursed 100% during mobilization phase
Site Development: costs proportioned equally during first 7 months
Building Construction: costs proportioned equally during 18 months of project duration
Contractor fee: costs proportioned equally during 18 months of project duration
Allowances: proportioned as reimbursable expenses are incurred
101
ASSUMPTIONS
3C. Include a list and discussion of assumptions (user fees, tolls, usage rates) underlying all major
elements of the plan.
Our proposal does not envision user fees, tolls, or usage rates. The new Lynchburg
Police Headquarters will be a municipal building. Unsecure areas will be available to
the public in accordance with rules and regulations issued by the City of Lynchburg.
102
RISK FACTORS
3D. Identify the proposed risk factors and methods for dealing with these factors.
Economic Risks
Economic risks are those associated with the cost of
the project. For this project, we are most concerned
about the cost of money and construction inflation.
Interest rates, both public and private, are at
historic lows. Should interest rates rise, the City’s
cost of money increases and this directly affects the
budgetary impact of annual debt service payments.
To minimize this risk, the City should make every
effort to expedite its review and approval of the
project, and issue bonds at today’s relatively low
rates. Construction inflation is another significant
project risk–especially to the City. For the past
12 months, we have experienced construction
inflation of approximately 5 percent. A similar trend
has occurred in the past three years. What causes
this inflation is largely a shortage of skilled labor
in construction trades. Again, to minimize this risk,
the City should proceed expeditiously to approve
the project and begin design and construction.
Construction Risks
Construction risks are those associated with
building a structure. Environmental hazards and
subsurface conditions are the two most likely
risks we encounter. Both risks can be minimized
by proper planning. Environment assessments and
geotechnical engineering studies typically assist in
limiting construction risks.
103
FEDERAL RESOURCES
3E. Identify any local, state, or federal resources that the proposer contemplates requesting for the
project. Describe the total commitment (financial, services, property, etc.), if any, expected from
governmental sources and the timing of any anticipated commitment.
We expect the City’s support
and collaboration, as previously
described in our proposal. We
do not contemplate requesting
resources from state or federal
authorities.
104
STABILITY
3F. Provide financial information which indicates the
proposer’s financial stability and ability to finance the
project.As stated previously, our proposal does
not include project financing. Instead, we
have assumed that the City will provide
public financing for the project. We have
provided the design-builder’s confidential
financial statements which we believe
attest to the financial strength and stability
of our team.
105
FEASIBILITY
3G. Include a description and analysis (cost/benefit,
tax, etc.) to demonstrate the project’s financial
feasibility.
Our proposed project is included in the City ’s
Capital Improvement Program. The Capital
Improvement Program was developed in
accordance with the City ’s Financial
Management Policies. These policies (notably
Policy II—Debt Management) provide
guidance on legal debt margin and amounts of
debt service as a percentage of General Fund
Operating Expenditures.
By including this project in the adopted CIP,
City Council and staff have endorsed the
project’s financial feasibility. We are confident
that the City has performed rigorous financial
analyses to prove that the project is financially
viable.
106
107
BENEFITS
4A. Identify who will benefit from the project, how they will benefit, and how the project will benefit
the overall community, region, or state.
The men and women employed by the Lynchburg Police Department will directly
benefit from the project. The City has long-recognized the inadequate facilities within
which these employees currently work. The new Lynchburg Police Headquarters
will provide state-of-the-art, contemporary, spacious facilities for law enforcement.
These men and women will exhibit improved morale and will be more productive.
It has also been our experience that br inging all police divisions together in one
building creates synergies for improved collaboration and problem-solving and
fosters better training opportunities. These benefits, tangible and intangible, are
key to continuous improvement required for CALEA certification.
In a broader sense, the citizens of Lynchburg will also benefit. Improved morale and
increased productivity by members of law enforcement are likely to lead citizens to
be more satisfied with police services. M embers of the community will also benefit
from a centralized service location. Instead of going to various locations to interact
with the Police Department, all law enforcement divisions will be consolidated
in one building.
108
PUBLIC OPINION
4B. Identify any anticipated public support or opposition, as well as
any anticipated government support or opposition for the project.
Large, publicly funded capital projects
almost always encounter opposition
from some taxpayers who do not support
the expenditure and who may not fully
appreciate the need for the project.
However, a decision by City Council to
construct this project would undoubtedly
find widespread support as well.
Current police department facilities are
clearly inadequate. This has been well-
documented in the recent spatial needs
assessment conducted by Architects
Design Group in association with a local
architectural firm.
109
COMMUNITY INVOLVEMENT
4C. Explain the strategy and plans to involve and inform the general public, business community,
and governmental agencies in areas affected by the project.
Keeping the citizens of the City informed about capital
projects through effective communication is essential
to the success of any public building project. Gaining
community consensus is an integral part of the planning
and design process. Nonetheless, experience has
taught us that it is unrealistic to assume that a major
capital project will be totally accepted by everyone,
every step of the way. Often, the need for the facility, its
cost, location, impact on neighbors, and other issues
can be controversial and subject to criticism.
In order to minimize community opposition, our team
would strongly recommend developing a community
awareness plan at the onset of the project. Our team
can work with the City in developing this plan to
educate and involve the community. Although meetings
may not be conducted until the master planning and
conceptual design phase is complete, we would
recommend planning the meetings early on. Our team
can be available to present the development options
and answer any questions regarding the project. Our
team is well versed in presenting this information,
specifically for law enforcement facilities. Any valuable
input from citizens at this meeting will be addressed in
future design phases to follow.
110
COMMUNITY BENEFITS
4D. Describe the anticipated significant benefits to the community, region or state, including
anticipated benefits to the economic condition of the City and whether the project is critical to
attracting or maintaining competitive industries and businesses to the City or the surrounding region.
Please see Tab 2.F, which addresses this question.
This is not a project that spurs economic
development by and of itself. Nonetheless, a
professional police department with adequate
space and physical facilities, is necessary for the
provision of effective law enforcement. Without
effective law enforcement, no modern community
will thrive. By demonstrating its commitment to
a new Police Headquarters, the City signals its
support for local law enforcement, and such support
may create a favorable impression on prospective
businesses.
We do wish to emphasize that this project will
provide direct and indirect economic benefits
during construction. Many construction workers
will be employed by this project. The duration of
construction is approximately two years. Wages
paid to these workers will have an impact on the
broader economy, as they use their compensation
to buy goods and services, which spurs more
economic activity.
111
COMPATIBILITY
4E. Address project compatibility with the City’s master plan, local comprehensive plans, local
infrastructure development plans, the capital improvements plan or other government spending
plan.
As noted previously, this project
is included in the City ’s
Adopted Capital Improvements
Plan.
The City ’s Comprehensive Plan,
Chapter 14—Public Facilities,
discusses this. The Comprehensive
Plan indicates that the Police
Department has a number of key
infrastructure and facility needs,
and that meeting these needs will
require consolidating and replacing
existing facilities.
SCHEDULE - R2 (4/19/2022)
2G. Identi
fy the proposed schedule for work on the project, including the estimated time for completion,
and any e
xtended or maintenance warranties.
Sign Comprehensive Agreement April 26, 2022
Start
Date
Duration
(calendar days)
Completion
Date
0 April 26, 2022
May 2, 2022 60 July 1, 2022
July 15, 2022
September 15, 2 024
October 13, 20 22
October 27, 20 22October 13, 20 22
October 27, 20 22
July 1, 2022
July 15, 2022
14
September 2024
February 3, 202 3 590
14 February 3, 2023
90 January 20, 202 3
14
90
S
chematic Design for New Police
Facility
Construction Documents for
New Police Facility
City Review and Approval of
Schematic Design
City Review and Approval of
Construction Documents
Design Development for New
Police Facility / Early Site Package
Construction of New Police
Facility
City Review and Approval of
Design Development
Occupy New Police Facility
January 20, 202 3
ORDINANCE: #O-22-034
AN UNCODIFIED ORDINANCE TO APPROVE A COMPREHENSIVE AGREEMENT FOR THE DESIGN
AND CONSTRUCTION OF A NEW POLICE HEADQUARTERS BUILDING , AUTHORIZE THE
ACQUISITION OF RELATED REAL PROPERTY, AND AUTHORIZE OTHER ACTIONS RELATED TO
SUCH COMPREHENSIVE AGREEMENT
WHEREAS, the Public-Private Education Facilities and Infrastructure Act of 2002 (“PPEA”) grants responsible
public entities the authority to create public -private partnerships for the development of a wide range of public
facilities or projects; and
WHEREAS, the City of Lynchburg, Virginia (“City”) is a responsible public entity and has adopted guidelines
which establish procedures for the development of public facilities or projects through public-private partnerships
pursuant to the PPEA; and
WHEREAS, t he City received an unsolicited proposal from English Construction Company, Incorporated
(“English”) pursuant to the PPEA and th e said g uidelines for the design and construction of a new police
headquarters building (the “Project”), said proposal being expressly incorporated herein by reference; and
WHEREAS, given the Project is permitted under the PPEA, the City reviewed such proposal, determined it
met the City’s needs, advertised for competing proposals, received one (1) other competing proposal, and after
reviewing both proposals, selected English’s proposal for negotiation of a comprehensive agreement; and
WHEREAS, a comprehensive agreement for the Project has been thoroughly negotiated between the City
and English, and the applicable requirements of § 56-575.17 of the Code of Virginia, 1950, as amended, were
duly satisfied by the City.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF LYNCHBURG:
1. That the negotiated Comprehensive Agreement between the City of Lynchburg, Virginia (“City”) and
English Construction Company, Inc. (English), dated April 29, 2022, specific to the design and construction
of a new police headquarters building, is hereby approved. Such Comprehensive Agreement is expressly
incorporated herein by reference, and the City Manager is authorized and directed to execute such
Comprehensive Agreement on behalf of the Ci ty, on or after April 29, 2022; the Clerk of Council shall
attest the same, and the City Attorney shall approve the form of the same.
2. That the City Manager is authorized and directed, on behalf of the City, under such terms and conditions
as he may deem appropriate, to acquire and accept all real property, easement rights, improvements, and
the like which may be related to fulfilling the purpose(s) and/or responsibilities of the said Comprehensive
Agreement, and to take any and all other actions he may deem necessary and pertinent to fulfilling the
purpose(s) and/or responsibilities of the said Comprehensive Agreement.
3. That this Ordinance shall be effective upon its adoption.
Adopted: April 26, 2022
Certified: ____________________________
Clerk of Council
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: April 26, 2022 AGENDA ITEM #: 11
CONSENT: REGULAR: X WORK SESSION: CLOSED SESSION:
ACTION: X INFORMATION: (Confidential)
ITEM TITLE: **REVISED** 1a) Adopt an Ordinance to establish a Method for Returning Surplus Real
Estate Tax Revenues to Taxpayers during FY 2023; 1b) Adopt and Appropriate the FY 202 3 Operating
Budget; 2) Adopt the FY 202 3 - 2027 Capital Improvement Program and Adopt and Appropriate the FY
2023 Capital Budget.
RECOMMENDATION: Adopt an Ordinance to establish a Method for Returning Surplus Real Estate Tax
Revenues to Taxpayers during FY 2023 ; adopt and appropriate the FY 202 3 Operating Budget; adopt the FY
2023 - 2027 Capital Improvement Program and adopt and appropriate the FY 2023 Capital Budget.
SUMMARY:
Following the March 22, 2022 Public Hearing and further discussions during City Council work
sessions, including staff adjustments, the Proposed FY 2023 General Fund Budget was reconciled as follows:
Specific details of the adjustments are listed below:
FY 2023
Proposed
Budget Adjustments
FY 2023
Adopted
Budget
Revenues and Use of Fund Balance
Revenues $206,486,198 $206,486,198
Use of (Additions to) Committed/Assigned Fund Balance Reserves 39,571 39,571
Use of Fund Balance 16,590,426 16,590,426
Total Revenues and Use of Fund Balance $223,116,195 $0 $223,116,195
Expenditures, Reserves, and Transfers $100,000
Operations $146,662,102 $1,400,000 $148,062,102 $146,762,102
Debt Service 17,212,638 17,212,638
Schools Operations 39,828,498 966,425 40,794,923
Greater Lynchburg Transit Company (GLTC) - City Operating 1,266,454 1,266,454
Transfers to Other Funds 3,462,740 3,462,740
Addition to Reserve: General Fund Reserve for Contingencies 1,200,000 1,200,000
Addition to Reserve: Law Library 5,000 5,000
Addition to Reserve: Public Safety Building Reserve 71,819 71,819
Addition to Reserve: Debt Service Reserve (one-time funds) 755,089 755,089
Addition to Reserve: Debt Service Reserve (recurring funds) 700,000 (626,425) 73,575
Addition to Reserve: Concord Turnpike Maintenance Reserve 240,000 (240,000) 0
Addition to Reserve: Fuel Reserve 200,000 (200,000) 0
Addition to Reserve: Community Corrections and Pretrial Services Reserve 10,000 10,000
Addition to Reserve: Recreation Programs 3,309 3,309
Addition to Reserve: Airline Service 400,000 400,000
Capital Improvements 11,098,546 (1,300,000) 9,798,546 11,098,546
Total Expenditures, Reserves, and Transfers $223,116,195 $0 $223,116,195
BALANCING THE FY 2023 GENERAL FUND BUDGET DETAILS
Increase/(Decrease) Adjustments: Expenditures, Reserves, and Transfers
$100,000 Increase Li brary for the l ease for the Ri ver Ri dge Branch
966,425 Increase Schools funding for the required local match to receive State compensation funds of $1,603,855
(626,425) Decrease recurri ng funds added to the Debt Servi ce Reserve (recurring funds added for FY 2023 - $73,575)
(240,000) Eliminate recurring funds added to the Concord Turnpike
(200,000) Eliminate recurring funds added to the Fuel Reserve
(1,300,000) Decrease one-ti me pay-as-you-go transfer to Ci ty Capi tal Projects Fund
1,300,000 Increase Non-Departmental to provi de $0.02 real estate credi t/rebate
$0 Total Adjustments: Expenditures, Reserves, and Transfers
Also, State code requires the Personal Property Tax Relief Rate be set at the time the budget is adopted.
Adopting the Ordinance (i) requires a majority vote of all of the members of City Council in attendance, said vote
to be taken by ayes and noes.
Adopting Resolutions #R-22-025, #R-22-027, and #R-22-028 requires a majority vote of all of the members of
City Council in attendance, said vote to be taken by ayes and noes.
Adopting Resolution #R -22-026 requires a two – thirds majority vote (i.e. five of seven) among the members
elected to City Council, said vote to be taken by ayes and noes.
Fund Balance
With the adjustments noted above, the General Fund undesignated fund balance as of June 30, 2023 is projected
to be $24,365,371 or 11.8% of revenues. City Council’s target for undesignated fund balance is a minimum of
10% of General Fund revenues with a goal of 15% as the City strives to grow incrementally each year subject to
revenues available.
PRIOR ACTION(S):
February 8, 2022: FY 2023 - FY 2027 Capital Improvement Program (CIP) Presentation;
2022 Personal Property Tax Assessment Presentation
February 22, 2022: FY 2023 - FY 2027 Capital Improvement Program (CIP) Discussion;
2022 Personal Property Tax Assessment Adoption
March 8, 2022: City Manager introduced the Proposed FY 2023 Budgets for General, Schools, Water,
Sewer, Stormwater, Airport, Fleet, and Other Funds, and the FY 2023 - 2027 Capital
Improvement Program
March 22, 2022: City Council and City Schools, Joint Meeting;
Public Hearing on the Proposed FY 2023 Budgets for General, Schools, Water, Sewer,
Stormwater, Airport, Fleet, and Other Funds, and the FY 2023 - 2027 Capital Improvement
Program
March 24, 2022: City Council, FY 2023 Budget Reconciliation and Water Resources Rate Study Briefing
March 29, 2022: City Council, FY 2023 Budget Reconciliation and Water Resources Rate Public Hearing
March 31, 2022: City Council, FY 2023 Budget Reconciliation
April 5, 2022: City Council, FY 2023 Budget Reconciliation
April 12, 2022: City Council, First Reading of the FY 2023 Budget
FISCAL IMPACT:
As noted in budget resolutions and ordinance
CONTACT(S): Wynter C. Benda, City Manager, 455-3990
Donna Witt, Chief Financial Officer, 455-3968
ATTACHMENT(S):
• Ordinance to:
• Adopt a Method for Returning Surplus Real Estate Tax Revenues to Taxpayers during FY 2023
• Resolutions to:
• Adopt and Appropriate the FY 2023 Operating Budget (#R-22-025, #R-22-026, #R-22-027)
• Adopt the FY 2023 - 2027 Capital Improvement Program and Adopt and Appropriate the FY 2023 Capital
Budget (#R-22-028)
REVIEWED BY: MMB WCB
ORDINANCE: #O-22-___
AN UNCODIFIED ORDINANCE TO ADOPT A METHOD FOR RETURNING SURPLUS REAL ESTATE
TAX REVENUES TO TAXPAYERS DURING THE 2023 FISCAL YEAR
WHEREAS, § 15.2 -2511.1 of the Code of Virginia, 1950, as amended, authorizes the Lynchburg City
Council to adopt an ordinance to “develop a method for returning surplus real property tax revenues to taxpayers
who are assessed real property taxes in any fiscal year in which the locality reports a surplus”; and
WHEREAS, Qualified Taxpayer, for purposes of this Ordinance, shall mean any person, persons, entity, or
entities listed as the taxpayer(s) for a Qualified Property in the City’s real estate tax records when the bills are
generated for the first installment due November 15, 2022; and
WHEREAS, Qualified Property, for purposes of this Ordinance, shall mean a parcel of real estate separately
assessed for real estate taxes by the City on July 1, 2022, but shall not include any property that is entirely
exempt from real estate taxation or for which no tax bill would otherwise be issued.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF LYNCHBURG:
1. That the City Council has determined a surplus of real property tax revenues in the amount of $2,655,942
existed in the City’s 202 1 Fiscal Year budget as a result of higher collections of real property tax owed
compared to the Fiscal Year 2021 Adopted Budget based on conservative budgeting of the uncollectible
rate (Allowance of Uncollectible rate increased from 2.5% to 5%) due to the uncertainty of the economic
impact of COVID-19.
2. That the following objective method is hereby adopted by the City Council to refund the equivalent of two
cents per one hundred dollars (2¢ / $100) of the assessed value of the Qualified Property to a Qual ified
Taxpayer during the City’s 2023 Fiscal Year or an amount not to exceed one million three hundred
thousand ($1,300,000):
For each Qualified Property, the City’s Chief Financial Officer will one- time credit the Qualified
Taxpayer’s first real estate billing installment statement (due November 15, 2022) two cents per one
hundred dollars (2¢ / $100) of the assessed value of the Qualified Property. Only one (1) credit will
be made for each Qualified Property, regardless of the number of persons or enti ties who are listed
as taxpayer(s) for the Qualified Property. Changes in the City’s real estate tax records after the bills
are generated for the first installment due November 15, 2022, will not change the Qualified Taxpayer
for any parcel of real estat e.
3. That for any Qualified Property for which delinquent real estate taxes are owed as of July 1, 2022, the
amount of the credit otherwise due to the Qualified Taxpayer shall be reduced by the amount owed up
to the full amount of the said credit.
4. That the one-time tax credit permitted hereunder will be derived from the fund balance of the City’s
General Fund, and adopted and appropriated as part of the City’s 2023 Fiscal Year budget
resolution(s)/ordinance(s).
5. That the City Manager and the City’s Chief Fi nancial Officer are authorized and directed to administer
the requirements of this Ordinance and to ensure the requirements of this Ordinance are duly executed.
6. That this Ordinance shall be effective July 1, 2022.
Adopted:
Certified: ___________________
Clerk of Council
RESOLUTION: #R-22-025
BE IT RESOLVED that by majority vote the FY 202 3 General Fund Operating Budget (excluding Discretionary
External Service Providers) including the revenues and expenditures proposed by the City Manager and revised
by City Council be adopted as the annual operating budget of the City of Lynchburg for the fiscal year beginning
July 1, 2022 and ending June 30, 2023 and said funds be appropriated:
1 Discretionary External Service Providers to be considered separately.
Introduced: April 12, 2022 Adopted:
Certified:
Clerk of Council
RESOLUTION: #R-22-026
BE IT RESOLVED that by two – thirds majority vote (five of seven) the FY 2023 Discretionary External Service
Providers Budget of $80,485 proposed by the City Manager be adopted as part of the operating budget of the
City of Lynchburg for the fiscal year beginning July 1, 2022 and ending June 30, 2023 and said funds be
appropriated:
DISCRETIONARY
Amazement Square - Signal and Rail Car .................................................. $369
Central Virginia Alliance for Community Living .........................................15,000
Central Virginia Community College Board (CVCC) .................................. 1,956
Downtown Lynchburg Association (DLA) ..................................................50,000
Virginia Legal Aid Society .........................................................................13,160
TOTAL DISCRETIONARY ............................................................................ $80,485
Introduced: April 12, 2022 Adopted:
Certified:
Clerk of Council
GENERAL FUND INCOM E GENERAL FUND EXPENDITURES
Non-Dedicated Revenues General Government $15,356,489
General Property Taxes $91,693,674 Judicial Administration 5,667,365
Other Local Taxes 60,702,613 Public Safety 48,152,844
Permits, Fees, and Regulatory Licenses 981,800 Public Works 22,422,227
Fines and Forfeitures 250,000 Health and Welfare 23,632,833
Use of Money and Property 267,720 Parks, Recreation and Cultural 6,472,080
Charges for Services 3,611,595 Community Development 6,022,442
Miscellaneous 368,076 Non-Departmental 12,685,081 11,385,081
Revenue from the Commonw ealth 6,132,584 Transfer to Other Funds 3,462,740
Dedicated Revenues General Fund - Debt Service 8,807,366
Permits, Fees, and Regulatory Licenses 77,000 Schools - Debt Service 8,405,272
Charges for Services 5,439,560 Reserves 2,518,792
Recreation Revenue 485,300 Transfer to Capital - City 9,798,546 11,098,546
Miscellaneous 2,990,677 Transfer to Capital - Schools 0
Revenue from the Commonw ealth Subtotal $173,404,077
Categorical Aid - State Shared Expenditures 3,362,703
Categorical Aid 19,679,634 Component Units
Revenue from the Federal Government 10,443,262 Lynchburg City Schools - Local Operating 40,794,923
Greater Lynchburg Transit Company - Local Operating 1,266,454
Use of Committed/Assigned Fund Balance and Other 39,571
Use of (Additions to) Unassigned Fund Balance 16,590,426 External Service Providers1 7,650,741
Total $223,116,195 Total $223,116,195
RESOLUTION: #R-22-027
BE IT RESOLVED that by majority vote the FY 2023 budgets of the funds mentioned herein be adopted for the
purposes herein mentioned and said funds be appropriated from the funds and resources of the City of
Lynchburg for the fiscal year beginning July 1, 2022 and ending June 30, 2023:
FLEET SERV ICES FUND INCOM E FLEET SERV ICES FUND EXPENDITURES
Revenues $11,909,428 Operations $11,411,858
Use of (Additions to) Unassigned Fund Balance 0 Debt Service 497,570
Total $11,909,428 Total $11,909,428
AIRPORT FUND INCOM E AIRPORT FUND EXPENDITURES
Revenue from Cost Centers $4,473,083 Operations $4,555,090
Interest and Other 55,000 Debt Service 103,515
Use of (Additions to) Unassigned Fund Balance 130,522 Total $4,658,605
Total $4,658,605
WATER FUND INCOM E WATER FUND EXPENDITURES
Charges for Service $13,981,043 Operations $12,193,999
Water Contracts (Amherst/Bedford/Campbell/Industrial) 2,192,970 Debt Service 3,404,650
Interest and Other 23,500 Transfer to Water Capital Fund 2,000,000
Use of (Additions to) Unassigned Fund Balance 1,401,136 Total $17,598,649
Total $17,598,649
SEWER FUND INCOM E SEWER FUND EXPENDITURES
Charges for Services $23,060,219 Operations $15,696,876
Sew er Contracts (Amherst/Bedford/Campbell/Industrial) 4,451,853 Debt Service 8,820,175
Interest and Other 36,295 Transfer to Sew er Capital Fund 3,300,000
Use of (Additions to) Unassigned Fund Balance 268,684 Total $27,817,051
Total $27,817,051
STORM WATER FUND INCOM E STORM WATER FUND EXPENDITURES
Charges for Services $3,554,750 Operations $3,649,728
State Categorical Aid 275,000 Debt Service 187,854
Interest and Other 8,000 Transfer to Stormw ater Capital Fund 270,000
Use of (Additions to) Unassigned Fund Balance 269,832 Total $4,107,582
Total $4,107,582
CITY/FEDERAL/STATE AID FUND INCOM E CITY/FEDERAL/STATE AID FUND EXPENDITURES
Revenue from the Federal Government $2,280,713 Operations $4,531,996
Revenue from the Commonw ealth 1,333,614 Total $4,531,996
Other 691,165
In-Kind 40,705
Transfer from General Fund 185,799
Total $4,531,996
COM M UNITY DEV ELOPM ENT BLOCK GRANT INCOM E COM M UNITY DEV ELOPM ENT BLOCK GRANT EXPENDITURES
Federal Entitlement $729,183 Operations $729,183
Total $729,183 Total $729,183
CHILDREN'S SERV ICES ACT FUND INCOM E CHILDREN'S SERV ICES ACT FUND EXPENDITURES
Miscellaneous $48,700 Operations $6,923,562
Contribution from the General Fund 2,039,543 Total $6,923,562
Lynchburg City School Transfer 196,541
Revenue from the Commonw ealth 4,638,778
Total $6,923,562
HOM E INV ESTM ENT TRUST FUND INCOM E HOM E INV ESTM ENT TRUST FUND EXPENDITURES
Federal Entitlement $413,856 Operations $413,856
Recaptured Funds $0 Total $413,856
Total $413,856
LYNCHBURG EXPRESSWAY APPEARANCE FUND (LEAF) INCOM E LYNCHBURG EXPRESSWAY APPEARANCE FUND (LEAF) EXPENDITURES
Pledges/Donations $0 Operations $75,000
Use of (Additions to) Unassigned Fund Balance 75,000 Total $75,000
Total $75,000
Introduced: April 12, 2022 Adopted:
Certified:
Clerk of Council
RESOLUTION: #R-22-028
BE IT RESOLVED that by majority vote the FY 2023 - 2027 Capital Improvement Program is hereby adopted
and the FY 2023 Capital Budget proposed by the City Manager is hereby adopted and said funds be appropriated
from the funds and resources of the City of Lynchburg for the fiscal year beginning July 1, 2022 and ending June
30, 2023 in the total amount of $96,886,080 $98,186,080 for the City Capital Projects Fund, $0 for the Schools
Capital Projects Fund , $1,100,000 for the Airport Capital Projects Fund, $9,811,000 for the Water Capital
Projects Fund, $65,330,000 for the Sewer Capital Projects Fund, and $ 3,857,100 for the Stormwater Capital
Projects Fund.
Introduced: April 12, 2022 Adopted:
Certified:
Clerk of Council
REGIONAL JUV ENILE DETENTION CENTER FUND INCOM E REGIONAL JUV ENILE DETENTION CENTER FUND EXPENDITURES
Charges for Services $1,473,278 Operations $3,371,640
Intergovernmental 1,907,086 Debt Service 10,124
Miscellaneous 1,400 Total $3,381,764
Total $3,381,764
RISK M ANAGEM ENT FUND INCOM E RISK M ANAGEM ENT FUND EXPENDITURES
Charges for Services $1,761,586 Operations $342,688
Use of (Additions to) Unassigned Fund Balance 0 Insurance and Claims 1,418,898
Total $1,761,586 Total $1,761,586
SPECIAL WELFARE FUND INCOM E SPECIAL WELFARE FUND EXPENDITURES
Donations and Restitutions $128,300 Operations $129,500
Interest 1,200 Total $129,500
Use of (Additions to) Unassigned Fund Balance 0
Total $129,500
TECHNOLOGY FUND INCOM E TECHNOLOGY FUND EXPENDITURES
Use of Money and Property $5,000 Operations $643,536
Transfer from General Fund 430,282 Capital Outlay 255,000
Use of (Additions to) Unassigned Fund Balance 463,254 Total $898,536
Total $898,536
RESOLUTION: #R-22-025
BE IT RESOLVED that by majority vote the FY 2023 General Fund Operating Budget (excluding Discretionary
External Service Providers) including the revenues and expenditures proposed by the City Manager and revised
by City Council be adopted as the annual operating budget of the City of Lynchburg for the fiscal year beginning
July 1, 2022 and ending June 30, 2023 and said funds be appropriated:
1 Discretionary External Service Providers to be considered separately.
Introduced: April 12, 2022 Adopted: April 26, 2022
Certified:
Clerk of Council
ORDINANCE: #O-22-025a
AN UNCODIFIED ORDINANCE TO ADOPT A METHOD FOR RETURNING SURPLUS REAL ESTATE
TAX REVENUES TO TAXPAYERS DURING THE 2023 FISCAL YEAR
WHEREAS, § 15.2-2511.1 of the Code of Virginia, 1950, as amended, authorizes the Lynchburg City Council
to adopt an ordinance to “ develop a method for returning surplus real property tax revenues to taxpayers who
are assessed real property taxes in any fiscal year in which the locality reports a surplus”; and
WHEREAS, Qualified Taxpayer, for purposes of this Ordinance, shall mean any person, persons, entity, or
entities listed as the taxpayer(s) for a Qualified Property in the City’s real estate tax records when the bills are
generated for the first installment due November 15, 2022; and
WHEREAS, Qualified Property, for purposes of this Ordinance, shall mean a parcel of real estate separately
assessed for real estate taxes by the City on July 1, 2022, but shall not include any property that is entirely
exempt from real estate taxation or for which no tax bill would otherwise be issued.
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF LYNCHBURG:
1. That the City Council has determined a surplus of real property tax revenues in the amount of $2,655,942
existed in the City’s 2021 Fiscal Year budget as a result of higher collections of real property tax owed
compared to the Fiscal Year 2021 Adopted Budget based on conservative budgeting of the uncollectible
rate (Allowance of Uncollect ible rate increased from 2.5% to 5%) due to the uncertainty of the economic
impact of COVID-19.
GENERAL FUND INCOM E GENERAL FUND EXPENDITURES
Non-Dedicated Revenues General Government $15,356,489
General Property Taxes $91,693,674 Judicial Administration 5,667,365
Other Local Taxes 60,702,613 Public Safety 48,152,844
Permits, Fees, and Regulatory Licenses 981,800 Public Works 22,422,227
Fines and Forfeitures 250,000 Health and Welfare 23,632,833
Use of Money and Property 267,720 Parks, Recreation and Cultural 6,472,080
Charges for Services 3,611,595 Community Development 6,022,442
Miscellaneous 368,076 Non-Departmental 12,685,081 11,385,081
Revenue from the Commonw ealth 6,132,584 Transfer to Other Funds 3,462,740
Dedicated Revenues General Fund - Debt Service 8,807,366
Permits, Fees, and Regulatory Licenses 77,000 Schools - Debt Service 8,405,272
Charges for Services 5,439,560 Reserves 2,518,792
Recreation Revenue 485,300 Transfer to Capital - City 9,798,546 11,098,546
Miscellaneous 2,990,677 Transfer to Capital - Schools 0
Revenue from the Commonw ealth Subtotal $173,404,077
Categorical Aid - State Shared Expenditures 3,362,703
Categorical Aid 19,679,634 Component Units
Revenue from the Federal Government 10,443,262 Lynchburg City Schools - Local Operating 40,794,923
Greater Lynchburg Transit Company - Local Operating 1,266,454
Use of Committed/Assigned Fund Balance and Other 39,571
Use of (Additions to) Unassigned Fund Balance 16,590,426 External Service Providers1 7,650,741
Total $223,116,195 Total $223,116,195
2. That the following objective method is hereby adopted by the City Council to refund the equivalent of two
cents per one hundred dollars (2¢ / $100) of the assessed value of the Qualified Property to a Qualified
Taxpayer during the City’s 2023 Fiscal Year or an amount not to exceed one million three hundred
thousand ($1,300,000):
For each Qualified Property, the City’s Chief Financial Officer will one- time cre dit the Qualified
Taxpayer’s first real estate billing installment statement (due November 15, 2022) two cents per one
hundred dollars (2¢ / $100) of the assessed value of the Qualified Property. Only one (1) credit will
be made for each Qualified Propert y, regardless of the number of persons or entities who are listed
as taxpayer(s) for the Qualified Property. Changes in the City’s real estate tax records after the bills
are generated for the first installment due November 15, 2022, will not change the Q ualified Taxpayer
for any parcel of real estate.
3. That for any Qualified Property for which delinquent real estate taxes are owed as of July 1, 2022, the
amount of the credit otherwise due to the Qualified Taxpayer shall be reduced by the amount owed up
to the full amount of the said credit.
4. That the one -time tax credit permitted hereunder will be derived from the fund balance of the City’s
General Fund, and adopted and appropriated as part of the City’s 2023 Fiscal Year budget
resolution(s)/ordinance(s).
5. That the City Manager and the City’s Chief Financial Officer are authorized and directed to administer
the requirements of this Ordinance and to ensure the requirements of this Ordinance are duly executed.
6. That this Ordinance shall be effective July 1, 2 022.
Adopted: April 26, 2022
Certified: ____________________________
Clerk of Council
RESOLUTION: #R-22-026
BE IT RESOLVED that by two – thirds majority vote (five of seven) the FY 2023 Discretionary External Service
Providers Budget of $80,485 proposed by the City Manager be adopted as part of the operating budget of the
City of Lynchburg for the fiscal year beginning July 1, 2022 and ending June 30, 2023 and said funds be
appr
Text truncated. Open the original for the full document.