Planning Commission Regular Meeting — Agenda Packet
City of Charlottesville · Charlottesville City County · Planning Commission · meeting of Mar 11, 2025 · Agenda packets
Open the original document More from City of Charlottesville
This document is no longer listed on City of Charlottesville's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Agenda
PLANNING COMMISSION REGULAR
TUESDAY, March 11, 2025 at 5:30 P.M.
Hybrid Meeting
I. Commission Pre-Meeting (Agenda discussion(s))
Beginning: 5:00 p.m.
Location: (NDS Conference Room, 610 East Market Street, Charlottesville, VA 22902)
II. Commission Regular Meeting
Beginning: 5:30 p.m.
Location: (Council Chambers, 605 E. Main Street, Charlottesville, VA 22902 and
Electronic/Virtual)
A. COMMISSIONERS' REPORTS
B. UNIVERSITY REPORT
C. CHAIR'S REPORT
D. DEPARTMENT OF NDS
E. MATTERS TO BE PRESENTED BY THE PUBLIC NOT ON THE FORMAL AGENDA
F. CONSENT AGENDA
(Items removed from the consent agenda will be considered at the end of the regular
agenda)
1. Minutes – December 10, 2024 – Regular Meeting
2. Minutes – November 26, 2024 – Work Session
3. Resolution – Planning Commission Regular Meeting Schedule
III. PLANNING COMMISSION PUBLIC HEARING
Beginning: 6:00 p.m.
Continuing: until all public hearings are completed
Format: (i) Staff Report, (ii) Applicant, (iii) Hearing
1. Notice of Intent to Amend the City Comprehensive Plan
PUBLIC HEARING NOTICE: notice is hereby given by the Charlottesville Planning Commission that, on
Tuesday, March 11, 2025, beginning at 6:00 p.m., the Charlottesville Planning Commission will
conduct a public hearing for consideration of a proposed action to amend the Comprehensive Plan for
the City of Charlottesville. Persons affected by the proposed action may appear virtually or in person
at the meeting and present their views. On that same date, following the public hearing, it is the
intention of the City that the Planning Commission will vote on the proposed action. (City Council’s
vote would take place at a later City Council meeting agenda, following receipt of the Commission’s
recommendation). The 2021 Comprehensive Plan, as amended, that is proposed to be amended is
currently available for viewing on the City’s website:
https://www.charlottesville.gov/DocumentCenter/View/7073/Comprehensive-Plan-Document---
2021-1115-Final?bidId=
Proposed Action: the proposed action is as follows: Amendment to Chapter 9 (Community Facilities
and Services), to add the City’s Parks and Recreation Master Plan, provide strategic direction and
vision to meet current and emerging public needs, as well as remain the primary steward of the
significant natural, cultural, and historic resources. The Plan can be reviewed here: Master Plan |
Charlottesville, VA
IV. COMMISSION’S ACTION ITEMS
Beginning: following the hearings
Continuing: until all public hearings and action items are completed
Format: (i) Staff Report, (ii) Applicant, (iii) Hearing (as applicable)
1. Special Exception – Build-To Requirements - 1418 Emmet Street (Bodo’s)
2. Special Exception – Build-To Requirements -1114 E High Street
V. FUTURE MEETING SCHEDULE/ADJOURN
Tuesday April 8, 2025 – 5:00 PM Pre-
Meeting
Tuesday April 8, 2025 – 5:30 PM
Regular
Meeting
Minutes
Anticipated Items on Future Agendas
Site Plan –240 Stribling Ave, 1613 Grove Street Extended
Subdivision – Seminole/Hillsdale
Entrance Corridor Review - 1185 Seminole Trail
PLEASE NOTE: THIS AGENDA IS SUBJECT TO CHANGE PRIOR TO THE MEETING.
PLEASE NOTE: We are including suggested time frames on Agenda items. These times are subject
to change at any time during the meeting.
Individuals with disabilities who require assistance or special arrangements to participate in the public
meeting may call the ADA Coordinator at (434) 970-3185 or submit a request via email to
ada@charlottesville.gov. The City of Charlottesville requests that you provide a 48 hour notice so that
proper arrangements may be made.
Planning Commission premeeting and regular meetings are held in person and by Zoom webinar. The
webinar is broadcast on Comcast Channel 10 and on all the City's streaming platforms including: Facebook,
Twitter, and www.charlottesville.gov/streaming. Public hearings and other matters from the public will be
heard via the Zoom webinar which requires advanced registration here: www.charlottesville.gov/zoom .
You may also participate via telephone and a number is provided with the Zoom registration or by
contacting staff at 434-970-3182 to ask for the dial in number for each meeting.
LIST OF SITE PLANS AND SUBDIVISIONS APPROVED ADMINISTRATIVELY
12/1/2024 TO 12/31/2024
1. Preliminary Site Plans
2. Final Site Plans
a. 409 Stadium Road (VERVE Charlottesville PUD) – September 10, 2024
b. MACAA PUD – December 19, 2024
3. Site Plan Amendments
a. CRHA S First Street Phase Two – December 5, 2024
b. 1150 5th Street SW Amendment #2 – December 5, 2024
c. 250 Bypass Fire Station – December 5, 2024
4. Subdivision
November 26, 2024 and December 10, 2024 Planning
Commission Minutes are included as the last documents in this
packet.
1
CITY OF CHARLOTTESVILLE
NEIGHBORHOOD DEVELOPMENT SERVICES
MEMORANDUM
To: Charlottesville Planning Commission
From: Missy Creasy, NDS Deputy Director
Date: February 28, 2025
Re: Regular meeting schedule
______________________________________________________________________________________
The Code of Virginia allows the City Planning Commission to set a meeting schedule as
well as provide for contingency in the case of inclement weather. Staff has developed the
attached resolution which if approved would provide for the additional flexibility for
weather circumstances. If approval is provided at this meeting, staff will post in the
newspaper as required.
RESOLUTION
OF THE CHARLOTTESVILLE PLANNING COMMISSION
Establishing Days, Times and Places of Regular Meetings of the Charlottesville
Planning Commission During Calendar Year 2025
WHEREAS, § 15.2- 2214 of the Code of Virginia, as amended, authorizes the
Charlottesville Planning Commission (Planning Commission) to fix a schedule of regular meetings
and fix the day or days to which any meeting shall be continued because of inclement weather.
WHEREAS, the Planning Commission now desires to establish its schedule for regular
meetings during calendar year 2025.
WHEREAS, the Planning Commission holds its regular meetings on the second Tuesday
of each month.
NOW, THEREFORE, BE IT RESOLVED by the Charlottesville Planning Commission:
1. The Planning Commission shall hold regular meetings during calendar year 2025, in
City Council Chambers, as set forth below:
DATES:
January 14, 2025
February 11, 2025
March 11, 2025
April 8, 2025
May 13, 2025
June 10, 2025
July 8, 2025
August 12, 2025
September 9, 2025
October 14, 2025
November 11, 2025
December 9, 2025
TIME: 5:00 p.m. Pre-Meeting,
5:30 p.m. Regular meeting
6:00 p.m. Public Hearings
LOCATION: City Hall Council Chamber 605 E. Main Street, 2nd Floor Charlottesville, VA
2. The Planning Commission may hold work sessions and special meetings throughout the
year on an as needed basis. The scheduling of such meetings shall be in accordance with § 15.2 -
2214 of the Code of Virginia. Work sessions are open to the public and shall be advertised in
accordance with § 2.2-3707 of the Code of Virginia.
3. In the event the Chair of the Planning Commission, or the Vice -chair of the Planning
Commission, if the Chair is unable to act, finds and declares that weather or other conditions are
such that it is hazardous for members of the Planning Commission to attend a meeting, such
meeting shall be continued to the next business day on which the said hazardous conditions no
longer exist or to the next regular meeting date. Such finding and declaration shall be
communicated to all planning commissioners and to the press as promptly as possible, along with
the date and time on which the continued meeting will commence. All hearings and other matters
previously advertised shall be conducted at the continued meeting and no further advertisement is
required.
NOW, THEREFORE, BE IT FURTHER RESOLVED, that this resolution be adopted by
the Planning Commission, recorded in its minutes, and inserted in a newspaper having general
circulation in the City at least seven days prior to the first meeting held pursuant to the adopted
schedule.
Adopted by the Charlottesville Planning Commission, the ___ day of March 2025.
Attest:______________________________
Secretary, Charlottesville Planning Commission
Page 1 of 5
City of Charlottesville
Department of Parks & Recreation
Staff Report
PLANNING COMMISSION MEETING
RE: Charlottesville Parks & Recreation Comprehensive Master Plan
Project Leads: City of Charlottesville
Will Bassett, Business Manager, Parks & Recreation
Riaan Anthony, Director, Parks & Recreation
PROS Consulting
Mike Svetz, Principal
Date of Staff Report: January 22, 2025
Background
In November 2024, the Parks and Recreation Department began developing the City’s first
Parks and Recreation Comprehensive Master Plan. This document will guide future planning,
policy, and development of Charlottesville Parks and Recreation programs and facilities for
many years. The goal of the Parks and Recreation Comprehensive Master Plan is to provide a
concise and user-friendly roadmap that will incorporate the community’s values to assist the
City with decision-making regarding key issues.
The City hired PROS Consulting, a national full-service management consulting and planning
firm specializing in government to develop the plan. PROS Consulting has developed over 400
master plans in North America and the Project Manager is Mike Svetz, former Director of
Charlottesville Parks & Recreation.
The Master Plan was developed over the course of 12 – 15 months and consisted of robust
community engagement, parks, facilities and programs assessments, levels of service analysis,
equity mapping, capital investment recommendations and implementation strategies. In
addition to the Master Plan, PROS Consulting also developed conceptual plans for Benjamin
Tonsler Park, Booker T. Washington Park, Court Square Park, and Market Street Park.
Purpose and Goal
The purpose of the Parks and Recreation Master Plan is to provide a roadmap for future
investment in recreational experiences, parks, and facilities for the city over the next 10 years.
Page 2 of 5
This plan is based on recognized park planning principles and standards, and reflects input from
Charlottesville residents including, but not limited to, the City Council, City staff, and the project
steering committee.
The Parks and Recreation Master Plan focuses on identifying the City’s current and future
recreation needs to aid City staff and decision-makers in providing an equitable distribution of
recreational facilities and opportunities to Charlottesville residents and stakeholders. Primary
outcomes of the Master Plan include:
• Evaluation of the existing parks and recreation system.
• Establishing the vision, goals, and policies to guide decision-making.
• Documenting priorities and needs of the current and future population based on data-
driven input.
• Developing a 10-year departmental capital improvement reinvestment strategy that
outlines projects, anticipated costs, and implementation strategy.
• Providing a record of issues discussed and decisions made.
Project Process and Community Engagement
The foundation of the Master Plan was to incorporate a variety of data and mine local knowledge
using a comprehensive stakeholder participation process and community surveys. The
stakeholder input process incorporated a variety of methods that included interviews, focus
group meetings, and public forums/presentations. The data generated from these critical
community interactions helped to define the true unmet recreation needs of the community, as
well as address key operational issues, provide recommendations for business -related changes,
and strategize on how to best position the City and Parks and Recreation Department to move
forward for optimal results.
Over the course of the master plan process, the following community engagements were utilized,
and the statistics are listed below:
• Focus Group Meetings: 23
• Outreach Events: 4
• Statistically Valid Survey: 392 Households
• Online Surveys: 1,083
• Project Website Views: 6,584
• Project Mapping Comments: 608
Next Steps:
Page 3 of 5
Following adoption of the Parks & Recreation Master Plan will be the implementation stage. The
consultant synthesized its findings to develop a framework of goals and outcomes for the City of
Charlottesville Parks and Recreation Department. A complete implementation plan matrix,
including tactics, accountability, timelines, and performance measures, is still in development
and shall be completed by the adoption by City Council in March/April.
Standard of Review
All amendments to the Comprehensive Plan shall be recommended, approved and adopted,
respectively, in accordance with the requirements set forth within Title 15.2, Chapter 22, Article
3 of the Code of Virginia as amended.
Consistency with the Comprehensive Plan
There is extensive overlap between the goals set forth in Charlottesville’s Comprehensive Plan
and the strategies and actions laid out in the Master Plan . The Parks & Recreation Master Plan
complies with the City’s 2021 Comprehensive Plan update in the following areas:
Transportation
• Goal 2 – Coordination with Land Use & Community Design
o Every Charlottesville resident has multi-modal access to a park, recreation facility
and pool through a network of paved trails and sidewalks that meet ADA
standards.
Environment, Climate, and Food Equity
• The Master Plan touches and supports all the Comprehensive Plan’s Environmental goals.
Economic Prosperity & Opportunity
• Goal 1 – Build Community Opportunities, Workforce Development, and Wealth
o Develop and retain a dynamic and diverse workforce that meets the park and
recreation system’s planning, service, and programming needs to increase
recreation and maintenance service levels.
• Goal 4 – Partnerships
o Established partnerships that integrate parks into the education, healthcare, and
economic spaces of Charlottesville.
Community Facilities & Services
• Goal 1 – Efficient Planning for Facilities and Infrastructure
o Public investment in the parks and recreation system is increased to align with
community, service, and infrastructure needs.
• Goal 3 – Government/Public Facilities
o There are well-resourced parks in all parts of the City that provide the recreational
experiences desired by residents.
Page 4 of 5
• Goal 13 – Parks and Recreation – Planning and Expansion
o Parks and Recreation is considered a core service and has an operating budget
that meets the needs and expectations of all residents.
• Goal 14 – Parks and Recreation – Best Practices
o The Department is recognized in the community and across the state as having
well-trained, enthusiastic, and customer-oriented staff.
• Goal 15 – Parks and Recreation – Trails and Connectivity
o Every Charlottesville resident has multi-modal access to a park, recreation facility
and pool through a network of paved trails and sidewalks that meet ADA
standards.
• Goal 16 – Parks & Recreation – Facilities and Programs
o Park/recreation spaces and programming meet the diverse cultural needs and
interests of all Charlottesville residents.
o Park spaces and programming serve Charlottesville residents of all ages at
accessible times and locations.
Community Engagement and Collaboration
• The Master Plan touches and supports all the Community Engagement and
Collaboration’s goals.
Vision St
atement and Guiding Principles:
The guiding principles outlined in the Comprehensive Plan are similar to and complimentary of
those used in the Master Plan:
Equity & Opportunity
• Provide safe, accessible public spaces.
• Prioritize health equity across the city.
Community Culture & Unity
• Offer meaningful recreation programs and events.
Local & Regional Collaboration
• Build innovative and lasting partnerships.
Environmental Stewardship & Sustainability
• Establish an environmentally sustainable park ecosystem.
Connections & Access
• Connect clearly and transparently with the community.
Page 5 of 5
Project Website
Charlottesville Parks and Recreation Master Plan | EngagePros
Plan Document
https://www.charlottesville.gov/DocumentCenter/View/13104
Attachments
Resolution
RESOLUTION
OF THE CHARLOTTESVILLE PLANNING COMMISSION
Recommending Amendment of
the November 15, 2021 Comprehensive Plan, as amended, to add the Parks and Recreation
Master Plan
WHEREAS on March 11, 2025, the Planning Commission held a public hearing on a
proposed amendment to the November 15, 2021 Comprehensive Plan, as amended, after public
notice as set forth within Virginia Code Sec. 15.2-2204, to include the Parks and Recreation
Master Plan as an amendment, and
BE IT RESOLVED that the Planning Commission recommends City Council approve the
Parks and Recreation Master Plan (dated January 27, 2025) as an amendment to the City’s
November 15, 2021 Comprehensive Plan, as amended. A copy of the Parks and Recreation
Master Plan as recommended by the Commission is attached to this Resolution and is hereby
certified to the City Council for its consideration in accordance with City Code Section 34-5.2.3.
Adopted by the Charlottesville Planning Commission, the _____day of March 2025.
Attest: ________________________
Secretary, Charlottesville Planning Commission
Attachment: https://www.charlottesville.gov/1857/Master-Plan
PLANNING COMMISSION REGULAR MEETING
APPLICATION FOR A SPECIAL EXCEPTION PERMIT
APPLICATION NUMBER: PL-25-0004
DATE OF MEETING: March 11, 2025
DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES STAFF REPORT
Project Planner: Dannan O’Connell
Date of Staff Report: February 28, 2025
Applicant: Scott Smith, Nearly Bros. Inc.
Current Property Owner: For My Girls Corp.
Application Information
Property Street Address: 1418 Emmet Street N (“Subject Property”)
Tax Map & Parcel/Tax Status: 400004D00 (real estate taxes paid current - Sec. 34-5.2.1.C.3.e)
Total Square Footage/ Acreage Site: Approx. 1.00 acres (43,700 square feet)
Comprehensive Plan (General Land Use Plan): Urban Mixed-Use Node
Current Zoning Classification: NX-5 Node Mixed Use
Overlay District: Entrance Corridor Overlay District
Applicant’s Request (Summary)
Scott Smith, applicant and property owner, has requested a Special Exception Permit (SEP)
pursuant to City Code Sections 34-2.5.3.A.5 and 34-5.2.15, for build-to width. The applicant has
requested to install an accessory storage shed to the side of his existing commercial structure.
The NX-5 Node Mixed Use district requires a build-to width of 85% along primary streets and
65% along side streets, with a setback range of between 0 and 10 feet. The property is currently
nonconforming to these standards, and per Sec. 34-5.3.3.C.3 all new buildings must occupy the
build-to zone until the required width percentages are met.
The subject property has street frontage on Emmet Street N, the US 250 Bypass and Morton
Drive and is located within an Entrance Corridor Overlay District. Per Section 34-2.10.1.B.1.d,
Emmet Street N is designated as the primary street and Morton Drive and the US 250 Bypass
are designated as the side streets.
CITY OF CHARLOTTESVILLE
Department of Neighborhood Development Services
City Hall Post Office Box 911
Charlottesville, Virginia 22902
Telephone 434-970-3182
Fax 434-970-3359
www.charlottesville.gov
Page 2 of 6
Vicinity Map
Context Map 1
NORTH
Page 3 of 6
Context Map 2- Zoning Classifications
Context Map 3- Future Land Use Plan, 2021 Comprehensive Plan
NX-5
NX-10
R-A
CV
Urban Mixed-Use Node
100 Foot
Stream Buffer
General Residential
Open Space and Parks
NORTH
NORTH
Page 4 of 6
Standard of Review
City Council may grant an applicant a Special Exception Permit (SEP), giving consideration to a
number of factors set forth within Zoning Ordinance Section 34-5.2.15.D. If Council finds that a
proposed use or development will have potentially adverse impacts, and if Council identifies
development conditions that could satisfactorily mitigate such impacts, then Council may set
forth reasonable conditions within its SEP approval. The role of the Planning Commission is to
make an advisory recommendation to the City Council, as to (i) whether or not Council should
approve a proposed SEP and if so, (ii) whether there are any reasonable development
conditions that could mitigate potentially adverse impacts of the proposed development.
Section 34-5.2.15.D of the City’s Zoning Ordinance lists a number of factors that Council will
consider in making a decision on a proposed SEP. Following below is staff’s analysis of those
factors, based on the information provided by the applicant. The applicant’s analysis of their
request can be found in Attachment A.
(1) Whether the proposed modifications to physical dimensional standards will be
harmonious with existing and approved patterns of development on the same or an
opposing block face or abutting property;
The applicant proposes to demolish an existing trash compactor enclosure to the side of the
existing commercial structure and erect a new accessory storage shed in its footprint. Site
location and dimensions can be found within the applicant’s submitted Minor Development
Plan (Attachment B).
Staff Analysis: Emmet Street N is currently developed with a mix of low-intensity
commercial uses. Morton Drive is currently developed with a medium-intensity office
building and commercial hotel. The front yard areas of these properties vary in depth and
include parking lots and landscaping similar to the subject property. Several properties have
small accessory structures or dumpster enclosures like what is proposed for the subject
property. The proposed improvements are harmonious with the existing patterns of
development within the area.
Entrance Corridor Overlay R
eview
Section 34-5.2.15 does not require review of SEP applications by the Preservation Planner
(Administrator for Corridor Review per Section 34-5.2.8). The Preservation Planner has
reviewed the applicant’s Minor Development Plan and indicated that the improvement
proposed can be reviewed and approved administratively.
Page 5 of 6
(2) Whether the proposed modification supports the goals and strategies of the
Comprehensive Plan;
Below are specific areas of the Comprehensive Plan for which the development is in
compliance:
a. Land Use, Urban Form, and Historic & Cultural Preservation
Objectives for Mixed-Use Areas: Promote and encourage design elements that
enhance community livability such as active uses at the ground floor level along
key street frontages.
Goal 3: Protect and enhance the existing distinct identities of the city’s
neighborhoods and places while promoting and prioritizing infill development,
housing options, a mix of uses, and sustainable reuse in our community.
Strategy 7.1: Within Entrance Corridors, encourage placemaking elements and
look for opportunities to support community-centered destinations.
Comprehensive Plan-
Staff Analysis:
The Future Land Use Plan of the 2021 Comprehensive Plan designates the subject property
and surrounding properties as Urban Mixed-Use Node, which is urban mixed use districts
that support community housing, employment, and commercial development. The proposed
accessory shed will not significantly expand the footprint of the existing restaurant (general
food and beverage) use and will allow continued reuse of the existing commercial structure.
Several goals in the Comprehensive Plan speak to a desire for context sensitive
redevelopment. The Preservation Planner has confirmed the proposed accessory shed is
compatible with the Entrance Corridor Overlay district. Staff finds the proposed
improvement supports the goals and strategies of the Comprehensive Plan.
(3) Whether, with conditions, the Special Exception Permit is consistent with the public
necessity, convenience, general welfare, and good zoning practice.
As the application aligns with the Comprehensive Plan and existing patterns of
development, and minimally impacts the existing Emmet Street N streetscape, staff finds
granting the Special Exception Permit is consistent with good zoning practice and general
public welfare.
Public Comments Received
Staff has received no public comments at the publishing of this report.
Page 6 of 6
Staff Recommendation
Staff recommends the Planning Commission recommend approval of the Special Exception
Permit to permit the installation of an accessory shed on the subject property.
Recommended Conditions
Staff does not recommend any conditions be placed on this Special Exception Permit. Any
proposed modifications to the shed footprint will be reviewed by staff for consistency with this
approval and the Entrance Corridor Design Guidelines.
Suggested Motions
1. I move to recommend approval of this application for a Special Exception Permit in the
NX-5 Node Mixed Use district at 1418 Emmet Street to permit the installation of an
accessory shed.
a. [condition(s) proposed by Planning Commission]
OR,
2. I move to recommend denial of this application for a Special Exception Permit in the NX-
5 Node Mixed Use district at 1418 Emmet Street to permit the installation of an
accessory shed.
Attachments
A. Special Exception Request Letter received January 9, 2025
B. Minor Development Plan received October 31, 2024
PL-25-0038
Page 1 of 8
PLANNING COMMISSION REGULAR MEETING
APPLICATION FOR A SPECIAL EXCEPTION PERMIT
APPLICATION NUMBER: PL-25-0038
DATE OF MEETING: March 11th, 2025
DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES STAFF REPORT
Project Planner: Benjamin Koby
Date of Staff Report: February 28, 2025
Applicant: Mike Ball, Element Construction
Applicant’s Representative(s): Mike Ball
Current Property Owner: LUCKYBALL'S JUGGLER TRAINING CAMP LLC
Application Information
Property Street Address: 1114 E High Street (“Subject Property”)
Tax Map & Parcel/Tax Status: 540021000
Total Square Footage/ Acreage Site: Approx. 0.43 acres (18730 square feet)
Comprehensive Plan (General Land Use Plan): Urban Mixed Use Corridor
Current Zoning Classification: CX-5 Corridor Mixed Use 5
Overlay District: Entrance Corridor Overlay District
Applicant’s Request (Summary)
The applicant is requesting a Special Exception Permit (SEP) pursuant to City Code Sections 34-
2.4.3.A.5 (Build-to) and 34-5.2.15, which states a SEP may be granted for physical dimensional
standards. The applicant is proposing to build a structure outside of their front building
setback/build-to requirement. The front setback requirement is between 0’ to 10’ (Ch. 34 Sec.
2.4.3.A.4.) and a required primary street build-to width of 75% minimum (Ch. 34 Sec. 2.4.3.A.5.)
The lot currently does not meet the build-to width requirement and therefore is nonconforming
per the nonconforming build-to width section (Ch. 34 Sec. 5.3.3.C.1.), all new construction on
an interior lot must occupy the build-to zone until the build-to width requirement has been
met. Therefore, the applicant would need to build in the build-to zone and cannot build in the
rear without a SEP. However, the applicant would be able to build a rear addition that would
not need to meet the build-to requirement.
CITY OF CHARLOTTESVILLE
Department of Neighborhood Development Services
City Hall Post Office Box 911
Charlottesville, Virginia 22902
Telephone 434-970-3182
Fax 434-970-3359
www.charlottesville.gov
PL-25-0038
Page 2 of 8
The proposed structure will be a carpentry studio workshop space. The use falls under the
category of a low-impact industrial and manufacturing which is permitted by right in the CX-5
zoning district.
The proposed structure is a 35’x90’ (3150 sf) studio workshop space with 2210 sf for shop
space, 37 sf bathroom, and 770 sf storage area. The workshop will be used for carpentry as a
part of Element Construction.
Vicinity Map
PL-25-0038
Page 3 of 8
Context Map 1
Context Map 2- Zoning Classifications
CX-5
CX-8
PL-25-0038
Page 4 of 8
Context Map 3- Future Land Use Plan, 2021 Comprehensive Plan
Standard of Review
City Council may grant an applicant a Special Exception Permit (SEP), giving consideration to a
number of factors set forth within Zoning Ordinance Section 34-5.2.15.D. If Council finds that a
proposed use or development will have potentially adverse impacts, and if Council identifies
development conditions that could satisfactorily mitigate such impacts, then Council may set
forth reasonable conditions within its SEP approval. The role of the Planning Commission is to
make an advisory recommendation to the City Council, as to (i) whether or not Council should
approve a proposed SEP and if so, (ii) whether there are any reasonable development
conditions that could mitigate potentially adverse impacts of the proposed development.
Section 34-5.2.15.D of the City’s Zoning Ordinance lists a number of factors that Council will
consider in making a decision on a proposed SEP. Following below is staff’s analysis of those
factors, based on the information provided by the applicant. The applicant’s analysis can be
found in Attachment A.
1. Whether the proposed modifications to physical dimensional standards will be
harmonious with existing and approved patterns of development on the same or an
opposing block face or abutting property;
Staff analysis: The majority of properties along this section of E High St are constant
with the setback range of the Subject Property and are nonconforming under the
PL-25-0038
Page 5 of 8
current code. 1100 E High St, which is adjacent to the subject property, is within the
build-to range of 10’ but does not appear to meet the width requirement. Most all other
structures on the block are setback considerably behind the build-to zone and would not
meet the build-to width requirement either. Considering the parcels on the northside of
E High, we do see a pattern of development more in line with the build-to requirements
of the development code. There is a general pattern that has buildings built more
closely to their property lines.
However, the built environment near the subject property on the southern side of E
High Street has a distinct residential look and feel with large front yards and a
residential built form. A strict application of the code would alter the existing pattern of
development that may not be constant with the goals of the comprehensive plan.
Considering the topography of the southside of High Street near the subject property,
the slope of the land would offer some challenges with building a workshop at the scale
the applicant is requesting. The building envelope for the front of the property would
likely not meet the needs of the applicant. Additionally, the proposed use of Light
Industrial, while allowed by right in the district, would not lend itself to a strong
activation of a pedestrian friendly streetscape. Keeping the Light Industrial use behind
the existing structure will maintain the existing, relatively coherent, building pattern in
this section of E High Street.
Entrance Corridor Overlay Review
Section 34-5.2.15 does not require review of SEP applications by the Preservation
Planner (Administrator for Corridor Review per Section 34-5.2.8). The Preservation
Planner has reviewed the applicant’s Minor Development Plan and indicated that the
improvement proposed can be reviewed and approved administratively.
2. Whether the proposed modification supports the goals and strategies of the
Comprehensive Plan;
Relevant guiding principles:
The Future Land Use Map associated with the Comprehensive Plan designates this area
of High Street as an Urban Mixed Use Corridor. That is defined as “higher intensity
mixed use development arranged along corridors between employment, commercial,
and civic hubs of the city.” The built form of the Urban Mixed Use Corridor is so that
developments respond to existing residential, environmental, and historic contexts.
PL-25-0038
Page 6 of 8
Per Comprehensive Plan Chapter 4 Goal 1.2: “Set building setbacks, as appropriate to
the site and context, to increase network connectivity, create a more pedestrian friendly
streetscape, and reduce speeds on high volume roadways across the city.”
Comprehensive Plan Chapter 4 Goal 2.4.-Support the designation of the entire city as an
Urban Development Area (UDA). In accordance with this designation, development in
the city shall incorporate principles of traditional neighborhood design, which may
include, but need not be limited to... (vi) reduction of front and side yard building
setbacks.
The intent section of the build-to standard in the Development Code (Ch. 34 Sec.
2.10.6.A.1.) is to facilitate the creation of a convenient, attractive, and harmonious
community by regulating the placement of buildings along the public realm so that
buildings frame the public realm with a consistent pattern of development.
Staff Analysis:
The intent of the build-to zone requirements of the Development Code, born out of the
goals of the Comprehensive Plan, speaks to the desire to create attractive and
harmonious streets with a consistent pattern of development. The build-to zone aim is
to bring consistency by requiring new developments be placed forward on a property
toward the primary street lot lines. In contrast to Commercial and Mixed Use District,
Residential districts are allowed the option of utilizing the existing range of adjacent
parcels when determining the setback/build-to requirements. On an interior lot in a
residential district, the range of setbacks is determined by the 2 closest existing lots in
either direction along the block face, using no closer than the smallest setback and no
further than the largest setback. If we used this method for the subject property, the
subject property would be compliant with its build to zone.
The CX-5 zoning district does not offer the option to utilize the existing range when
setting setbacks and build-to zones. The built form of the Urban Mixed Use Corridor is
intended to consider the existing residential, environmental, and historic contexts of the
area. While the neighboring uses adjacent to the subject property are not residential
currently, the buildings themselves were residences in the past and still maintain the
same form. Considering the proposed use of the structure and the existing use of the
property, it is more appropriate for the proposed workshop to be located behind the
existing building.
However, it is also clear that the Comprehensive Plan does have aims to ultimately
reduce setbacks in Urban Mixed Use Corridor areas and bring structures forward to
create a cohesive and pedestrian friendly streetscape. Approval of this Special Exception
PL-25-0038
Page 7 of 8
may run counter to that goal for the corridor. If the applicant were to build in
compliance with the build-to requirements of the Code, it will start to create the built
environment along this corridor as envisioned by the Comprehensive Plan.
3. Whether, with conditions, the Special Exception Permit is consistent with the public
necessity, convenience, general welfare, and good zoning practice.
If the Special Exception were to be approved, it would be good practice to tie the use of
the structure to the approval, so it may not be retrofit into a use of another kind
without the approval of Council. The reasoning for adding a condition like this would
ensure that the use would not change to a use that we hadn’t anticipated, nor a use that
we would prefer to be street facing and within the build-to requirement
Public Comments Received
Staff has received no public comments at the publishing of this report.
Staff Recommendation
Based on the proposed use of the structure and the existing street scape, staff recommends the
Planning Commission recommend approval of the Special Exception Permit to the build-to zone
and build-to width requirements in this case.
Recommended Conditions
Staff believes that it is prudent to tie the light industrial use of the workshop space to this
approval, so that the use may not change without Council approval. Also, ensure that the
development remain in-line with the materials associated with the major development plan we
have in review, PL-25-0038.
Suggested Motions
1. I move to recommend approval of this application for a Special Exception Permit in the
CX-5 Corridor Mixed Use 5 zone at 1114 E High Street to permit the construction of a
studio workshop space outside of the build-to requirement.
a. The size, location, and use will be consistent with the materials submitted in
application PL-25-0038 and PL-25-0041 dated February 14th, 2025, and February
27th, 2025, respectively.
b. [condition(s) proposed by Planning Commission]
OR,
2. I move to recommend denial of this application for a Special Exception Permit in the CX-
5 Corridor Mixed Use 5 zone at 1114 E High Street to permit the construction of a studio
workshop outside of the build-to requirement.
PL-25-0038
Page 8 of 8
Attachments
A. Special Exception Request Letter & Relevant Zoning Exhibits
B. Proposed Workshop Location
C. Tree Removal Plan
D. Renderings
1114 E High St
Detached Studio Workshop
1/29/25
To Whom it may Concern,
Our plan is to build a Studio Workshop space in the rear of our property at 1114 E High that will
serve as a carpentry workshop, fitting into the use of Low-impact industrial and manufacturing
(up to 4,000sf), which is by-right according to Use Permissions (page 3-7) in the 2023 Cville
Development Code.
I have been informed by Zoning that our property is currently “non-conforming” because the
existing building is not close enough to the fronting street, and because of the non-conforming
building on the property I cannot build our by-right workshop space. To bring our property up to
current code I need to either 1) demolish the existing structure and build new close to the
street, or 2) build a new building in front of our existing building. Neither of these seem like
great options.
Having served on the Board of Architectural Review for Charlottesville, I found it very surprising
that the new zoning ordinance would be requiring any new development to tear down old
buildings or to build in front of them. The East High streetscape where our office is located has
long been one of my favorite blocks in Charlottesville. It’s a mix of old converted homes and
new offices, nicely positioned back from the street, giving a beautiful pause to the busy
surroundings along this entrance corridor. I find it completely reasonable and in keeping with
Charlottesville’s goals and needs to allow these homes to thrive. The proposed structure
meets a crucial need for small workshop space in the city. It is not visible from the front and
doesn’t affect the entrance corridor, so I see no reason this shouldn’t be approved considering
the goals of the City’s adopted zoning ordinance. I met with representatives from Planning,
Zoning, Fire and other areas and nobody had any issue with this project moving forward.
Thank you for your time and attention to this.
Mike Ball
mike@elementbuild.com
434-825-4196
35x90 Studio
Workshop Space
4’ to Property Line
Proposed Workshop at 1114 E High
1
Tree Removal Plan
None of the trees slated for removal are in
good shape. All are dead, dying, or a hazard.
KEY
2
3
4
5
6
78
Tree 1- Hickory – 17”
Tree 2- Locust – 17” Tree 3- Locust – 11”
Tree 6- Hickory – 9”
Tree 7- Hickory – 24” Tree 8- Ash – 8”
Tree 4 & 5- Locust – 14” , 15”
1
Minutes
PLANNING COMMISSION REGULAR MEETING
December 10, 2024 – 5:30 P.M.
Hybrid Meeting
I. COMMISSION PRE-MEETING (Agenda discussion(s))
Beginning: 5:00 PM
Location: NDS Conference Room
Members Present: Commissioner Schwarz, Commissioner Stolzenberg, Commissioner d’Oronzio,
Commissioner Solla-Yates, Chairman Mitchell, Commissioner Yoder, Commissioner Roettger,
Commissioner Joy
Staff Present: Patrick Cory, Missy Creasy, Kellie Brown, Krisy Hammill, Jeff Werner, Brennen
Duncan, Dannan O’Connell
Chair Mitchell called the meeting to order and noted the changes to the order of the meeting. It was clarified
that the work plan report could take most of the first part of the meeting, but we will have matters from the
public and the consent agenda prior to the public hearing. Chair Mitchell provided the process for addressing
the CIP hearing. There will be an overall motion and the ability for amendments to be made. Votes will occur
on each amendment request and then the overall motion with approved amendments will be voted on. The
Chair encouraged members to remain at high level discussion and provided an example. Commissioner
Schwarz noted that he will be abstaining from any vote or discussion related to affordable housing projects.
Concerning the 2117 Ivy Road consent item agenda, Mr. Alfele provided a clarification to easement language
on the plat for this site. He showed the change that will occur and outlined that this change will not affect the
site plan. Commissioner Joy asked about what happens if the change is not addressed. Mr. Alfele noted there
will be a maintenance agreement so it will need to be addressed.
There were no questions on the Entrance Corridor item.
Commissioner Schwarz had concern about the traffic signal at Rugby/Rose Hill Drive (coming from the
bypass), noting that it was hard to see the signal as it is too high if you are first in line. There is a similar
concern with the light at 10th and Wertland. Mr. Duncan noted that was the first time he had heard these
concerns, and he will take a look at the intersections. There was a brief discussion of the color and materials for
traffic signals.
II. COMMISSION REGULAR MEETING – Meeting called to order by Chairman Mitchell at 5:30
PM
Beginning: 5:30 PM
Location: City Hall Chambers
A.
DEPARTMENT OF NDS
1. NDS Work Plan Presentation
Kellie Brown, NDS Director – I have been in my role as the director for 3 months as of Monday. I have been enjoying
getting up to speed on all the department’s work and getting to know many of you and my colleagues. I wanted to take an
opportunity to check in with you tonight on the department’s work, where we are in our workplan for this year. I will be
sharing an update on our workplan with City Council in January. I thought this could be an opportunity to get some
feedback from you all as we prepare for sharing that information with them in January.
2
Next Slide
In my presentation tonight, I will share a little contextual information before diving into our priorities.
Next Slide – NDS Organization
I wanted to share an overview of our department’s organization. We have made some changes to the organization over the
past several years. Some changes were initiated by Mr. Freas before he moved to the Manager’s Office, in which I have
been able to fully implement with the support of Deputy Director Creasy. Here are some of the key highlights that I
wanted to share: We are a department of 28 staff. We currently have 4 vacancies. We are really divided in our
organization into 2 primary groups. Deputy Director Creasy supervises our building code and property maintenance code
oversight and our zoning administration and our historic preservation planning staff. I supervise the work of our larger
planning team, which is made up of our current planning services led by Matt Alfele, as our Development Services
Planning Manager and our transportation planning group and our support services. We are currently recruiting for a long-
range planning manager that will be a counterpart to Mr. Alfele and oversee the development of small area plans and
long-range policy work in the areas that have been identified through our workplan. Our planning staff is a small group.
Our development services group is made up of 3 planners and our planning manager. Our long-range group is the
planning manager. We will be recruiting for another planner to support that work.
Next Slide – Notable Accomplishments
I wanted to highlight some of our accomplishments from the past year to help frame where we are now and where we are
looking ahead. We have and continue to support a significant amount of development review and building review. There
have been over 1000 permits reviewed in this past year. There have been over 1700 permits issued and over 6000
inspections. That work is primarily supervised in the building code side of the shop. A lot of that work comes from a lot of
the plan review that our planners do. It is a day-to-day responsibility of the department. It is important work. It leads to a
lot of the revitalization of our community, increased housing production. I wanted to highlight here several of our
development approvals from FY24 and the first quarter of FY25, several student housing developments: The VERVE
with 468 units, Aspen Heights, several other housing projects which include affordable housing components. This is work
of all development approvals that have come through and will continue to need our support as they move into the building
and construction phase of those projects.
We also have several accomplishments that are worth noting in other areas of our responsibilities. It is important to
mention that it has still been less than a year since we have adopted a new development code, which is creating a new
framework for how we support reinvestment in our community and help to meet our Comprehensive Plan goals. In terms
of some other accomplishments, we have submitted a grant application for reinvestment on the Downtown Mall through
the Virginia Department of Historic Resources. We are working in our transportation planning group on several initiatives
such as school bike fleets for after school programs, the creation of a regional transit authority, numerous improvements
through Safe Routes to Schools, and the completion of a downtown walking tour guide. There were a couple of things I
wanted to highlight that showed the breadth of the department’s scope. We have done a lot of work in staff development
side. We have a new director and development review planning manager. We are recruiting for a long-range planning
manager, a new property maintenance inspector to support off-grounds student housing, and a new transit planner. We
continue to send staff to conferences and supporting professional development.
Next Slide – Key Workplan Considerations
I wanted to provide a few more framing comments. This is the lens through which we have used to identify our priorities
for the rest of this fiscal year and looking ahead into next year. It is very important that we seek to timely accomplish our
non-discretionary core mission services. With our building code and enforcement, property maintenance code
enforcement, development plan review, and historic preservation zoning enforcement, a lot of that happens in the
background. It is very important work and work that we are attentive to on a day-to-day basis. Prioritizing efforts in
support of health, safety, and the implementation of the new development code is also a key priority. That is before we
think about adding new initiatives. What are the things that we need to do to make sure that we are doing everything we
can in those core areas? It is important that we consistently apply an equity lens to our work and the selection of it.
Something that I try to do whenever faced with a decision about priorities is asking some key questions. Who would
benefit from this decision or this choice? Who might be burdened? Who is missing from the conversation? Who is left out
as a beneficiary? How do we know these things? What data are we using to help us make decisions? That is an important
lens for prioritizing our work and how we do our work. Finally, aligning our workplan commitments with staff capacity
3
and recognizing that we are a small but mighty department in terms of our workforce and making sure we can accomplish
what we identify as our priorities given our existing capacity; being creative and trying to grow our capacity through
professional development and training.
Next Slides – Workplan Priorities
I will start to lay out what we have identified as our main priorities for the rest of this year. I have tried to group them by
theme. These are themes that are present in City Council’s Strategic Plan. Organizational Excellence is one of Council’s
Strategic Plan Priorities. You can see that there are several priorities that we are focused on with regards to organizational
excellence; continuing to maintain the city’s review of all property development and property maintenance with
applicable local and state requirements, working to continue to improve our electronic plan review system, looking
holistically at our development review process, and seeking to identify where there are some opportunities to streamline
and make our review more efficient. We also need to be focused on how we are going to undertake our 5-year Comp Plan
review. We will be required to conduct a review. How should we be setting ourselves up to complete that by 2026? What
are the key areas that we want to be focused on there? We will continue to be focused on the recruitment and onboarding
the new staff that we are bringing on board. We have also identified needs for several other staff in the budget and training
and professional development.
We also have several priorities in transportation. One of the first items that I wanted to highlight is scoping for a
comprehensive transportation plan. This is an item that has emerged, recognizing that the city has several priorities across
several different plan documents. They don’t always ‘speak to each other’ consistently. They don’t always come across in
a way that everyone can understand where we are going. We will be scoping a new comprehensive transportation plan this
year. At the same time, we will be focusing on developing policies in several areas where it does not make sense, or we
cannot wait until we have a comprehensive transportation plan in place. We will be looking at new policies, procedures,
and community engagement around the creation of Safe Streets, traffic calming, lowering the speed limits throughout the
city, continuing to support Move Safely Blue Ridge, and building out our pedestrian facilities and sidewalks. That is
something that we hope that the CIP investment will greatly support that work.
With our regional and CAT planning, I am happy to refer you to Ben Chambers to answer any questions on these items,
biking and bike facilities, continuing neighborhood walking tours, and focusing on micromobility.
In the area of Economic Prosperity, we will continue to support a range of inter-departmental efforts related to revitalizing
the Downtown Mall; currently, bringing forward updates to the café standards for their review and approval. As we
approach the milestone anniversary years celebrating the Mall’s historic district status. We will be focusing on homestays
by improving enforcement and by investing in software. That will help us with tracking. It can be a data point to conduct a
zoning study to help refine our existing regulations to make enforcement easier.
With climate and sustainability, this has been identified, coming out of the development, as an area of additional work. It
is a review of our environmental policies and developing a new policy framework for how we are going to steward our
natural resources within the context of our goals for reinvestment in new housing in the city. With those new policies in
place, what does that mean for some regulatory changes?
Housing will continue to be an important area of focus for us. A lot of this is related to continuing to socialize the
development code in the community. We will begin scoping the scope of work for a small area plan for 10
th & Page. That
is also something identified coming out of the adoption of the development code. Our initial step there will be starting to
pull together an understanding of the existing conditions in that neighborhood and seeking to identify what are the key
issues that can be addressed/should be addressed that a small area plan can help resolve and working with the community
as well as collaborating with them to identify those key planning issues. With the development code, we are going to
continue working to make it more accessible to homeowners, investors, looking to develop more training materials that
can help break down some complicated concepts into more digestible material for whatever the opportunities. Monitoring
and evaluating the code: Where are the issues that remain that present barriers to investment? We are maybe starting to
identify unintended consequences. We will be creating a task force to address how we can start to stabilize a few
properties in the city that represent a limited number of neglected or deteriorated properties and return them to stabilizing
housing opportunities.
4
Next Slide – Development Code Monitoring and Evaluation
Anticipating that there might be some questions on the development code and what we are monitoring, we have already
taken stock of as potential issues to address. We have created 3 ‘buckets’ at this point of areas that potentially need an
amendment or need some further study. The first category is Technical Corrections. Those are things like typos. The
second category is Clarifications where there is a clear intent, but the language does not best reflect that intent. Those are
things like providing better language to allow attached dwellings across zoning, side lot lines. We have also identified
Policy Questions that will be on a longer-term time horizon. There are the types of things where we anticipate needing
some community engagement, conversation with you. This is what we were thinking when we adopted the development
code, but maybe it isn’t what is best for us now that we have had a year to sit with it. Things like re-evaluating height in
feet and stories within the residential districts. Those are the types of things. I wanted to give you an idea of the types of
issues that we are documenting as we become more familiar with the code and speak to perspective applicants daily.
Next Slide – Looking Ahead
I wanted to identify a few items that we do not anticipate addressing in any meaningful way over the next 6 months but
are areas of potential focus looking ahead into the next fiscal year. With commercial uses in residential districts, there is
certainly an opportunity and potential issues. There are issues and opportunities for allowing neighborhood serving retail
within residential areas and what zoning amendments could support that. With the Entrance Corridor Design Guidelines
Study, I am looking at alleys and what we need to do in terms of the ownership of alleys, maintenance of alleys to support
some of this infill development. It would be helpful if the alleys were more accessible. With the Downtown Mall, there
have been some concerns raised that the development code does not provide the clearest guidance for what is the
appropriate height and massing on The Mall. There might be an opportunity in the next year to develop a scope of work
for some study to look at building height and massing on The Mall and come up with a clear vision. What are the right
regulations in the development code to support that.
Commissioner Schwarz – With the small area plan, just a reminder that when this was originally discussed, it had to do
with the intersection of Preston and Grady and the Preston Corridor. We have discovered that the whole neighborhood
itself needs to be studied as a small area plan. Don’t forget that corridor was a reason for the desire for a study.
Ms. Brown – I see that as being something that we need to look at.
Commissioner Yoder – I like the annual review of the development code. It is a great idea to see how it is going and see
what should be adjusted. Has the development code been in place long enough to where we could start to do a trend
analysis on basic metrics like building permits issued, kinds of housing on a monthly basis before the old code and since
the new code?
Ms. Brown – It does take a while for a code that has this magnitude of changes to take effect. We can report on trends.
We are seeing a lot of interest. To date, we are not seeing a significant number of real applications. We have received
several permits for accessory dwellings in areas where we weren’t seeing applications before. Beyond that, people are still
trying to understand what is possible and identifying areas where there are questions about feasibility. That is what we are
tracking. That is something over time we would be interested in reporting out.
Commissioner Stolzenberg – If I could suggest something we could do in the short-term with a more limited scope than
that, the county produces a quarterly and annual report of how many units were made. I think they split it up into their
comp plan areas. We could split it up into our planning neighborhoods. They split it up into single-family
detached/attached, multi-family. Something that simple would be great to see as a product from the city. With five years
of producing that, we could start to see trends.
Commissioner Roettger – I liked it when you mentioned thinking about the climate and resiliency as being folded in. I
like the idea of a dashboard. People who are tracking it can see how long it takes. You can show how many affordable
units. The climate thing was great. In many large organizations, there are all these different departments and getting
funded in different ways. After we had the work session with the county, they had some great goals.
Commissioner Solla-Yates – The members of the school board are also interested in those metrics. They see changes
happening. They know that they change enrollment capacity. Everyone wants more information. A member of the public
5
approached me about heights, which I see on the workplan. In the way that we think about considering context, when we
look at setbacks in our development code, we could consider context in the way we regulate heights as well.
B. COMMISSIONER’S REPORT
Commissioner Stolzenberg – I had 2 meetings. One was the LUPEC last month. We covered Resilient
Together. This morning, I had an MPO Tech meeting. The big things were SS4A (Safe Streets 4 All), which is
underway. There are public sessions coming up I believe next week or later this week. There is that online
survey. We are submitting our third consecutive Raise Grant application for the Rivanna River Bridge
preliminary engineering. Two months earlier, we got a presentation from Bill Boyer at the RWSA about the full
water supply plan. VDOT is starting a few STARS studies to create plans that become smart scale projects. One
is Rt. 29 at the I-64 interchange. Another is at 29 north. The third is in conjunction with the city at Ridge-Main.
That will be getting underway shortly.
Commissioner Schwarz – At last month’s BAR meeting, we had 2 significant projects that we looked at. One
was a hotel at the Artful Lodger site. It was a proposed 6-story hotel. The BAR was fine with the massing. We
did criticize it for the streetscape, the pedestrian experience, the materials, and the detailing. It was a
preliminary discussion. The direction that it was going was that it was not going to be compatible with the
district. They need to figure out ways to make the building materially fit better into the district. We also looked
at a 13-story proposed test-fit building on the Violet Crown Theater site. This was not a designed building. It
was more of a developer saying: ‘How much mass can I put there?’ It was a good discussion. Council allows us
to limit the height of buildings on the Downtown Mall to within 2 stories of the prevailing height on the block.
We are allowed a 25-foot step back. Those are our parameters from the ordinance. Our guidelines say that in
commercial areas at the street front, the height should be within 130 percent of the prevailing average on both
sides of the block. On that block, the prevailing height is 2 stories. Some of the comments were leading towards
making it about 3 or 4 stories. When we are on the Downtown Mall, step back 25 feet, and then go up to 5 or 6
stories. Most of us were fine with allowing as much height as zoning would allow, but further back towards
Water Street. It is not really a Mall building that is 13 stories, but a Water Street building that would be 13
stories. That is significantly cutting back from the buildable mass of what the developer proposed could be.
There are many moving parts there. There are a lot of components that would have to go through the zoning
code, such as 4 stories of parking with no active depth on the base of the building. I believe it is on our agenda
again to continue that discussion.
Commissioner Solla-Yates – The School CIP Committee met. We talked about the Capital Improvements
Plan. We listed a lot of concerns. There was a lot of pride in the successes from the Strategic Investment
Program. Over the years, it has been successful. It has led to a lot of good projects. Things have changed. It is
time for a reassessment. We talked about the lump sum. The money is not going as far as it used to. It is for
things like painting and basic maintenance. Those costs keep going up. Solar was a major topic of concern.
Staff were surprised that we were so concerned about it because we had not funded it. They said that if it was
funded, it would proceed to build the way that roofs have. There needed to be funding to get the project done.
There was general unanimity on that concern. There was general concern that we don’t know where we are
going. We have growth in the south. We don’t have growth in the north. We have capacity in the north. We
don’t have capacity in the south. The School Board wants more information. They want us to communicate
better on land use and education between Planning Commission staff and School Board.
Commissioner d’Oronzio – The Thomas Jefferson Planning District Commission met last week. There was
nothing of excitement to disclose there. There is a lot of work happening on the Path Mobility Management,
which is an assistance program priority pointed at rural people regarding satisfying transformation needs.
People don’t have cars. We are moving forward with several grants in that department. We are going to try to
revisit getting some money to do some engineering on the bike-ped bridge over the Rivanna. Our costs are all
6
over the place. We are being told that we need to nail those down more securely. The HAC met on the 20th. Mr.
Freas gave an update on staff’s thinking on the landbank. They did not like the fundamental underlying
principle that the HAC had suggested, which is that it be an independent body. City management wants to
structure this as an authority with the idea that it could be spun out into an independent body in the future. There
are problems with that that I am going to address with them. I am going to make some suggestions on that. We
need to have the nonprofit stood up at the same time with the same boards. You can move it smoothly and you
have a vehicle to accept donations into a nonprofit. There would be a 7-member board composed 4 at-large, a
planning commissioner, a city councilor, and city manager/deputy city manager. There are going to be some
governance concerns. The argument for doing this is to have the city have a closer hold on oversight over the
tax dollars that go through the bank. I don’t necessarily agree with that. The idea would be to stand both up,
have a sunset of when its authority gets transferred over. It is important to have that entity, at least as a shell,
sitting there. You can’t make a tax-deductible donation to the City of Charlottesville, but you can with the
landbank nonprofit. I have just said ‘yes’ to 11 meetings of CAHF Committee in January and February to
process the applications.
Commissioner Roettger – I was with the Tree Commission last week. They are preparing the State of the
Forest report to present to City Council. There is some interest in hiring a second urban forester that might work
with NDS on private land. They have been working hard on that. I suggested that it would be great to have a
work session together to go over questions about the new code and promoting planting of trees.
Commissioner Yoder – I attended my first meeting of the Citizens Transportation Advisory Committee. There
is some overlap between the committee that Commissioner Stolzenberg is on. One thing that was somewhat
new that would interest the Planning Commission is that the MPO received a Safe Streets & Roads For All
planning grant from the federal government. This program is funded by the bipartisan infrastructure law. It
provides two types of grants: a planning grant or an implementation grant. A locality must have an approved
safety action plan before they can get implementation funds. Completing this plan would allow the city, MPO,
and other localities within the MPO region to apply for federal Safe Streets & Roads For All implementation
money. Locally, the study has been called Move Safely Blue Ridge. They have been doing some public
outreach. There is an online survey out there. They are taking a safe systems approach to identifying high injury
corridors and intersections. They will be planning counter measures to improve those locations. They are
planning to wrap up in the spring of 2025, which is the deadline for the grant program. This is a data driven
process. It is going to help the city and help the region understand where we can invest our safety funds and
make the biggest impact.
C. UNIVERSITY REPORT
Commissioner Joy – Three capital projects were presented to the Board of Visitors. The first project that was
presented was a 1030-parking space parking garage in North Grounds. That design was approved. It greenlights
the construction of that to begin. It is a design-build delivery for that project. It is slated for completion in 2026.
That sits in the northwest corner of Massie and Copeley Road, opposite the parking at John Paul Jones Arena
and north of Palmer Park. The next project was a 750 to 800-bed student housing project. This sits at the
westernmost parcels of the 14-acre Emmet-Ivy Corridor. Part of it abuts the Copeley Bridge. Another portion
runs along Ivy Road. It sits to the west of the Karsh Institute of Democracy. That was presented for design
review. That will go back to the Board in 2025 for its final approval. That is part of a larger discussion that is
currently happening around second-year housing across Grounds. The last project was the schematic design
review for the Center for the Arts. That was a preliminary review. Some of the programmatic highlights for this
include a 1200-seat Performing Arts Center, the UVA Department of Music, art galleries that will show the
combined UVA fine art collection along with traveling exhibits. The project has received generous donations to
help get that project going. Additional state funding is necessary to proceed further in design and construction.
There will be more to report on that as that takes shape with the General Assembly in the new year.
7
D. CHAIR’S REPORT
Chairman Mitchell – No Report
E. MATTERS TO BE PRESENTED BY THE PUBLIC NOT ON THE FORMAL AGENDA
No Public Comments
F. CONSENT AGENDA
1. M
inutes – November 12, 2024
2. Site Plan – 2117 Ivy Road
3. Entrance Corridor – Barracks Road Shopping Center
Motion to Approve – Commissioner d’Oronzio – Second by Commissioner Solla-Yates – Motion passes 7-
0.
III. PLANNING COMMISSION PUBLIC HEARINGS
Continuing: Until all public hearings are complete
Format: (i) Staff Report, (ii) Applicant, (iii) Hearing, (iv) Discussion and Motion
1. Charlottesville Capital Improvement Program FY 2026-2030 - Consideration of the proposed 5-year
Capital Improvement Program in the areas of Affordable Housing, Education, Public Safety & Justice,
Facilities Management, Transportation & Access, Parks & Recreation, and Technology Infrastructure. A
copy of the proposed CIP is available for review at: https://www.charlottesville.gov/budget Report
prepared by Krisy Hammill, Office of Budget and Performance Management.
Commissioner Schwarz – I am working on a couple PHA projects. I need to abstain from any discussion
on affordable housing and voting on affordable housing.
i. Staff Report
Krisy Hammill, Budget Director – This is a public hearing on the CIP. My presentation does not contain any
new information than what I presented to you before.
Next Slide – Overview
This is just an overview. I will give you an overview of the CIP tonight. I have included responses from
feedback that you provided to the City Manager from your meeting in September. We will talk about what is
next. There are resources for further information if you need it.
Next Slide – Summary
The 5-Year Plan includes just under $186 million worth of projects for the city CIP. Looking at, just in terms of
funds allocated in terms of priorities, we will note that education was first, affordable housing was second, and
transportation & access came in third. That is based on an allocation of funds throughout this plan for the
project. For this 5-year plan, we intend to bond about $131 million with the rest being cash from the General
Fund and some contributions from the schools. With prior year budget surpluses, we have those programmed in.
That is the CIP contingency that is listed here in 27 and 29.
Next Slide – Funding the CIP-Revenues
8
With the CIP, it needs to be balanced. With what we plan to spend, we must have a way to pay for it. As noted,
we are using bonds for most of the CIP. In addition to cash from the General Fund, we have a city policy that
requires that we attribute at least 3 percent of the General Fund budget to the CIP as pay-go. We also have an
additional financial policy that says, when we have a surplus, those funds go to the CIP. They are used for one-
time expenses. Just prior to the last 2 fiscal years, where we had an unusual high surplus, we average between 5
and 6 percent pay-go in the CIP on an annual basis.
Next Slide – Education
This is just the breakdown of each of the individual groups. As we discussed at our last meeting, if there is a
highlight, that means that there was a change made from the 5-year plan last year. If there is nothing noted here,
the numbers did not change from the 5-year plan. The only addition is the funding in FY30 if that is applicable.
In this case with the school HVAC, you will see it here and in the facilities groups. We are still working with
staff on those numbers. They did request additional funding above and beyond what is here. We are working to
get some further information on those. That is why these are highlighted in terms of just the recommendation.
They are likely to change between now and the proposed budget.
Next Slide – Facilities Capital Projects
There are no real changes here, except for the HVAC. You will still see that the climate action is listed here at
$1 million a year and ending in 29. That is based on the 5-year commitment that was made with the plan last
year.
Next Slide – Public Safety & Justice
If it is highlighted in green, these mean that the numbers have changed since last year. With the fire and EMS
replacement numbers, we have moved those around. There is a large lead time on that equipment. We calibrated
the timing of those and slightly adjusted the cost. With the police mobile data computers, we adjusted the price.
We replace so many each year to keep from having to replace large numbers all at once. We adjusted for the
cost of those.
Next Slide – Transportation & Access
There are many projects here. One of the big things here is new money to new sidewalks. We have gotten that
money in this year. We had not done that until we were ready to move forward. We had a plan. Mr. Chambers
has been here and presented his sidewalk priority list. We feel that this is a good path forward. The funding
reflects that as well. Small area plans have slightly changed. With street milling and paving, we have just
adjusted that. Over the last few years, there have been some issues in that. That is ramping back up. We like the
funds that are here are reflective of the work that can get accomplished over these 5 years. The ADA Transition
money is new this year. We are still working on the exact plan. This is to show our commitment to moving that
transition plan forward. More plans and discussions will be coming forward to Council on the specifics of how
those will be spent.
Next Slide – Parks & Recreation
The playground funds for renovations is an annual ongoing maintenance account. That got some increased
funding. Some of the tree accounts, at the request of Parks & Rec, were reshuffled to reflect more where the
funds were being spent. We added some money for the Downtown Mall Tree Management Plan. That plan is in
the works or will be in the works. We will be coming back and asking for more funds once that plan produces
some recommendations.
Next Slide – Technology Infrastructure
No new changes here. $40,000 of that is for public education access fees that come to the city and must be used.
We use those for the Channel 10 studio. In addition, the citywide IT strategic infrastructure is money that is set
aside to help address IT needs that come up during the year. Sometimes it helps us supplant new software. That
9
stays the same. The voting equipment was in last year as well. That will all be replaced in 27. This is building
up a balance to do that.
Next Slide – Affordable Housing
No changes here from the 5-year plan. I will note the Carlton Mobile Home Park, which was approved by
Council, is an annual payment to our partners on that project. These are the numbers that have been submitted.
We are still working forward to finalize those numbers. That is what we project right now on an annual basis.
Next Slide – Planning Commission Review
We are back to the questions that you had sent to Council from your meeting. With the things you wanted us to
look at, the next slides are how we address those. I am happy to go back through those. I will pause here to see
if you had any questions.
Commissioner Roettger – Under Transportation & Access, what is the SIA immediate implementation?
James Freas, Deputy City Manager – Last year, in our conversation on the CIP with Council, we did agree to
expand that to be inclusive of implementation in all small area plan areas. Projects identified within or
consistent with a small area plan can be funded by this account.
Commissioner Stolzenberg – I saw that there was an unfunded request for barriers for the Downtown Mall for
events. Would that not be a CIP item? Was there a choice made to not make it one?
Ms. Hammill – With some of those, we are still working through. The list that I sent you were all the requests
we received from departments. Some of those were still in the midst of working through the remaining art
funding. There is an item that will be coming to Council. We have not yet made a decision. It is likely that some
of those items may fall into the CIP. They may fall into an art category as well. We are not yet sure.
Brennen Duncan, City Engineer – We have had a lot of questions about the traffic signal replacement in
different meetings as it relates to the budget. I wanted to go through the history of this. It has been in the works
for 3 or 4 years. Some people may not have known about it or are now just finding out about it.
Next Slide
With most of our inventory, we have 75 traffic signals in the city. They are approaching the end of their useful
life. Most traffic signals are anywhere from 40 to 70/80 years depending on the material, whether it is
galvanized or painted. Most of our signals were put in the late 70s/early 80s. We are in that 40-year range. We
are starting to notice the wear-and-tear on the signals. In 2021, we went to Council and you all to create a fund
to start looking and assessing these. That was where this kind of fund was created. We hired a consultant to
come in. They analyzed and did reports on all 75 of our signals. They did a test on the thickness of the material.
They did visual inspections. That took about a year from 2021 to 2022. We came back with the first round of
that. We have a lot of these that are in bad shape. We had one that had fallen over in this timeframe at Arlington
and Emmet Street. This is most of our signals in the city. Of the 75, roughly 85 percent were deemed to be
structurally deficient. Right now, we are focusing on the top 20.
Next Slide
Our approach going forward, depending on how you want to count it. We have Rugby-Preston and Rugby-
Barracks are listed as 3. That is all one traffic signal because it is all one controller. These are the signals that
we are prioritizing. We have broken this down into a 4-phase approach for different reasons. Just trying to get
this many signals done at one time is difficult. Even if we could do all 20 in the same year, that means that
when the next person comes through and has to replace signals, we have a whole bunch that are all become
needing replacement all at the same time. We are now trying to spread it out slowly. The goal is to get this first
10
batch of 20 done and get on a cadence where we are addressing one a year, two every two years, or something
like that. We will start spacing them out and we are still addressing them. Other than new signals that have gone
in in the city, we have not done any replacements of signals in the city since they have gone in. It is deferred
maintenance. The Publics Work Director say that he did not want to paint the poles anymore. Normally, we do
regular painting every year. That is another reason why we are trying to go away from painted poles towards
more galvanized. It does take time, staff, and resources away from the other duties that they are doing. That is
the current approach.
Next Slide
We have Timmons Engineering under contract for these first 21 intersections. Their notice to proceed was
around January of this year. We are through about 60 percent of the design phase. We have looked at right-of-
way needs, trying to reduce cost and schedule. They have given us pole designs ahead of the whole bid
document. The poles are a long lead time item. If we put it out to bid, the contractor needs to order them. It can
be anywhere from 6 to 12 months for those to be produced and get to the job site. It drags out the project. We
have asked for these designs ahead of the rest of the plan set so we can order those ourselves with our own
money. We are not paying contractor markup. We are going to store them at our site and the contractor will
install them. That contract should go out to bid the end of the year or the first part of January for that first batch
of 5 intersections. We have already begun purchasing cameras, controllers, and signal boxes. When we do have
a contractor on board, they are doing the installation of all the stuff in the field. That is where it is and how it is
going right now. We are anticipating that the plans will be 100 percent finalized. We will go out to bid in the
spring of 2025.
Next Slide
I broke this down more to understand how and why we need the money when we need it. Bidding usually
happens in the Spring for larger construction projects, which does not line up well with our fiscal year with the
money coming July 1. If we are only getting the money in July and then starting to bid stuff in July/August, you
are almost delaying another whole season. We are asking for that money in July to be used in quarter 3/quarter
4 of the following year. It does not line up well. Without doing that, it means that the money is sitting there that
much longer. For FY25, we do have about $4.5 million in the budget right now. The master arm purchase that
we are getting ready to do will take about $500,000 of that. With Phase 1, the estimate right now is about $1.8
million. That will draw us down to about $2.5 million. We are asking for $250,000 for FY26. When we go to
bid in spring of FY26, we have that money, and we are not waiting on July before we can bid again. We don’t
know what the atmosphere is going to be for bidding. We have seen some high bids. This is our first batch of
this. We want to make sure that we have enough there. It will also feed into future year requests like the $2
million for 27 and the $3 million for 28. Those are best guesses right now. As we start getting bids in, and we
go through 1 or 2 of these rounds of bidding out these signals in batches, we will hopefully be able to hone in on
a better number for those. Those may change from year to year. That takes us through the next 5 years. By the
time we get to that 2030 fiscal year budget, we are hoping that these first 20 will be done. We will then be on
more of a $1 million a year, depending on construction costs in 2030. That will hopefully allow us to do 1 or 2
every year. That is where this came from and where it is going. There was no CIP for these large maintenance
items for the traffic signal poles in the history of Charlottesville. We are starting from scratch and trying to
catch up to get back on a cadence that is more manageable.
Commissioner Stolzenberg – Is the problem their end-of-life primarily the poles and the mass arms?
Mr. Duncan – Primarily. We have replaced signal heads. We are in the process of doing a lot of the controllers
to bring those up to date. The large items here are the signal poles themselves.
Commissioner Stolzenberg – Are we replacing the signal heads?
11
Mr. Duncan – We are not only doing the signal poles like these intersection improvements. We are doing
ADA, if there are improvements that need to happen. When we do an intersection, we are doing an intersection,
and it is done with everything that we can possibly do with it.
Commissioner Stolzenberg – Are there VDOT funds that this might be eligible for? A few years ago, we had
the Cville Signals Revenue Sharing item.
Mr. Duncan – The one that was previously on there was done as a revenue share. It was left over from the 29
Solutions project. That was more looking at the technology side of it and not necessarily the signal pole side of
it. This is going beyond that. Usually, there are no VDOT funds for maintenance activities. Replacing signal
poles generally falls under a maintenance activity. We might be able to go after funding for some of it. For the
most part, it is on us to replace the poles themselves.
Commissioner Joy – I was curious if this opportunity of putting in new infrastructure, there has been
discussion around some more advanced coordination of the signaling to deal with the traffic demands. Is that
effort and technology being considered when the new arms and new poles are being installed?
Mr. Duncan – Hopefully by the end of the year, we will have our central system. It is basically the “brain” of
the traffic. We have not had a modern one for several years. That will allow us to do a lot with the kind of
intelligent transportation stuff. The new controllers we are getting are compatible with that. The plan is to
implement a lot of the flashing yellow arrows that you see across Virginia right now. Our old controllers and
old signals couldn’t even do that. Everything we are doing is to modernize and replace the old.
Commissioner Yoder – Some of the signals now don’t detect bikes. When you replace them, are you going to
update the vehicle detection so that they do detect bikes.
Mr. Duncan – Yes. We are doing a redundancy so it will be camera systems and the traditional loops so that
we can do both bikes and pedestrians. It allows us to get a lot more data for use. We will be able to track how
many times people push the pedestrian button. It will give us vehicle counts at the signals without having to hire
someone to go out there and perform the vehicle counts. It is modern infrastructure.
Commissioner Schwarz – You said that you are going to get the “brains” for the system by the end of this
year. Does that mean that work can start before all these signals are replaced?
Mr. Duncan – Yes. We have already put some of the controllers in the city. Not all our signals are old. We
have some newer signals. Even with the old poles, we can still update some of the controllers. We have started
doing that. Once we get the contract finalized, it is about a 9-month implementation to get everything on the
backend installed. We will start seeing the fruits of that in the fall of next year.
Commissioner Stolzenberg – Will we get transit signal priority with the new system?
Mr. Duncan – There will be the availability to do transit priority. We have already started those discussions
with Garland and CAT about where and when and how we are going to do that. The new system will be able to
do it.
Commissioner Stolzenberg – Are there other items of deferred maintenance that you are suddenly going to
drop $20 million on expenditures?
Mr. Duncan – Not that I am aware of.
12
Commissioner Solla-Yates – Can we eliminate some signals, stop signs, etc.?
Mr. Duncan – We will look at them when we do it. A lot of our traffic signals are on corridors that have 8000
to 10,000 vehicles a day. Stop signs don’t work at those. We will look at the possibility of doing roundabouts.
With a lot of our intersections, we have limited right-of-way. We are not trying to do a smart scale project
where we are obtaining right-of-way. We are trying to work as much with these projects in the footprint that we
have available to us. I do not anticipate that many would go away.
Commissioner Solla-Yates – Could we save our poles with ballards?
Mr. Duncan – Possibly. A lot of times we have narrow sidewalks. Putting those in becomes an ADA issue as
well. It is not the standard our current poles have. It is not as robust as the VDOT standard. Our old poles are
just 4-bolt poles. Most of the VDOT poles are 8-bolt poles. They are still an active standard that we can use that
is more of a 6-bolt pole. We are going to go with that so that they will be more robust than our old poles but
hopefully not as large and imposing as most of the VDOT poles that we see.
ii. Public Hearing
Fritz Knave – I had a couple of questions. In the traffic signal category, what sort of things are not going to be
bought/not going to be provisioned that are the interesting/state-of-the-art things that are potentially being
offered in this area? If the systems are so flexible that in the future, you will be able to easily modernize and
extend the capabilities of the system. What sort of things in the CIP are oriented towards climate resilience as
we see increasing changes? What kinds of investments are being anticipated for climate resilience as we go
forward?
iii. Discussion and Motion
Mr. Duncan – A lot of the old technology was server based. You would have it on site. You bought it and that
is what you had. The whole market is moving towards more of a subscription-based service. That is what we are
going with. As new technology comes in, per the supplier that we are going with, we would have that ability to
tap into that. With a lot of the current technology that is out there, we will be able to do that with the system that
we are getting. I don’t think there is anything that we are prohibited from with the system that we are going
with. Is there more? Sure. Does it infringe on civil liberty stuff where you are tracking the Bluetooth of people?
We are not going that route right now. I know that some places do that where it has a Bluetooth reader at every
intersection, and you can get individual devices so you can see how vehicles are moving throughout town. That
technology is out there. We are not using it. We are not planning to use it. That would probably be the only
technology that I know of that we are not planning to use. With the transit signal priority, we are not going to be
implementing it right away. We are making sure that technology is there. We can implement it as something
that we are looking at.
Ms. Hammill – To follow up on the climate question, in the CIP last year, we added, for the first time, $5
million (a million a year for climate action initiatives). This budget has $4 million of that left. In addition, for all
the maintenance items, we are looking at more efficient/more modern ways of doing things to help address the
climate and in areas when we can. Transit is a big initiative.
Commissioner Joy – The City Manager mentioned at the last meeting that a balanced budget is ultimately what
he must deliver. If there are shifts and changes from this, does it come back?
Chairman Mitchell – This is the last time we are going to look at it.
13
Commissioner Roettger – The only possible amendment or recommendation would be having some money set
aside for affordable housing emergencies that come up that are not 5 years in the making.
Motion to Approve CIP – Commissioner Solla-Yates – Second by Commissioner d’Oronzio – With the
following amendments:
Commissioner Solla-Yates – Increase funding for a strategic housing fund as CIP or ongoing
funding for a land bank. Second by Commissioner d’Oronzio. Motion passes 6-0 with 1 abstention
(Commissioner Schwarz).
Commissioner Solla-Yates – Create funding for city schools’ comprehensive facility plan. Second
by Commissioner d’Oronzio. Motion passes 7-0.
Commissioner Solla-Yates – Increase funding for city and schools solar PV program or pursue
other agreements. Second by Commissioner d’Oronzio. Motion passes 7-0.
Commissioner Solla-Yates – Increase funding for schools maintenance lump sum projects. Second
by Commissioner d’Oronio. Motion passes 4-3.
Commissioner Yoder – There are many items here for the school budget. How do the school budget requests
make it into the CIP? Are they making these requests earlier in the process? Why are we bringing this up at the
last minute?
Chairman Mitchell – One of the reasons is that Commissioner Solla-Yates only just went to one meeting.
Commissioner Yoder – Did the schools put in a lot of budget requests that were not approved? Is that a fair
statement?
Ms. Hammill – A lot of the accounts that you see in the CIP are annually funded accounts that this schools CIP
committee works with city staff. They contract with the city to do their contract work to decide how they would
like to spend those funds. The funds that are allocated in the CIP are in addition to the funds that are also
allocated in the General Fund to the schools. We work in conjunction with them. We have added the pre-school
at $30 million and Buford at $90 million. We maintained the level funding in all the other ongoing accounts for
schools as well. It is up to that CIP committee to prioritize the things that they want to see in the CIP and to
move forward appropriately.
Commissioner Yoder – I am uncomfortable with having several amendments on the schools. It seems like it
speaks to something earlier in the process that should have happened that didn’t happen.
Commissioner Stolzenberg – The schools make a budget request of their own. I don’t know that it is our
responsibility to go through every CIP item of theirs. For big items, those are the things on our ‘plate.’
Commissioner d’Oronzio – Are we giving their submission a second ‘bite of the apple?’ Are they feeling that
they are underserved at this point? Are the priorities that they presented x months ago have changed?
Commissioner Solla-Yates – There was excitement of my presence.
Commissioner Solla-Yates – Reduce funding for school improvement priority projects in the out
years not yet programmed. Second by Commissioner d’Oronzio. Motion passes 4-3.
14
Commissioner Stolzenberg – Create a line item for Safe Routes to School improvements at the
requested amount. Second by Commissioner Solla-Yates. Motion passes 7-0.
Commissioner Schwarz – Is that already ‘baked’ into one of these line items in the CIP?
Commissioner Stolzenberg – It does not have a line item. There are new sidewalks line items. That is not
specifically Safe Routes to School. Arguably, Neighborhood Transportation Improvements could be redirected
towards that instead of other neighborhood transportation improvements.
Commissioner Schwarz – These are the small projects they did when we expanded the bus routes?
Commissioner Stolzenberg – Yes. They are trying to harden them from paint and plastic to concrete. They
have 41 projects identified.
A woman was recently killed on Elliott Avenue. The city was able to deploy funds from other accounts for what
I would call urgent transportation improvements to fix that intersection and at other high priority intersections
around the city that it is currently identifying. I understand that out of the surplus of this year funds, the City
Manager plans to ask Council to allocate money into an account.
Commissioner Stolzenberg – Identify sustainable funding for urgent transportation improvements
in out years as a line item. Second by Commissioner d’Oronzio. Motion passes 7-0.
Commissioner Stolzenberg – According to the City Manager presentation, there will be $99 million allocated
for affordable housing in CIP projects alone. As you recall, we passed an Affordable Housing Plan that
recommended $100 million over 10 years. One million a year of that was intended to be for administrative
capacity. OCS (Office of Community Solutions) has scaled up its capacity. Close to $2 million is the tax
abatement program, which has also been scaled up. The remainder was meant for active subsidies like the ones
in the CIP. It is not a bad thing that we have exceeded our goal. My concern is that we still have no defined
process for competitive granting of major CIP, LI HTC subsidy awards. All $99 million is programmed to
specific projects. None have gone through any sort of competitive or application process. I would suggest that
we create a line item for general, large budget affordable housing expenditures. This might be like the one
Commissioner Solla-Yates discussed earlier. I would also suggest that at least Friendship Court Phase 4
bookmarked funding should be put in that category. City Council made a commitment to redevelop Friendship
Court. Everyone who lives in Friendship Court will be housed in new housing as part of Phases 1 through 3.
The PHA has not planned Phase 4. It is entirely conceptual. We don’t know what it is. I don’t see that it is part
of Council’s original commitment to redevelopment. That would be a good start to have them go through a new
process for identifying recipients of these funds.
Chairman Mitchell – I am having trouble figuring out how this is different from Commissioner Solla-Yates’
motion.
Commissioner d’Oronzio – I think that I see the distinction. Commissioner Solla-Yates is looking for a strike
fund. This is something we will have in place. We don’t even have to fund it every year. We have $3 or $4
million sitting in it. It is a strike fund. It is available for that purpose. Looking at Westhaven in 28/29, we have
$5 million out. With these larger scale projects that are planned for, I think a ‘bucket’ that says Affordable
Housing Programs TBD of splitting them out this way. You can have one line item for out year affordable
housing projects. We can figure out how that is allocated.
Commissioner Stolzenberg – We know we are going to give X million in FY30 to affordable housing projects.
What those projects are should go through some sort of process to weigh them against each other.
15
Commissioner d’Oronzio – As we get closer to those dates, the CIP will start to reflect that more precisely as
we get there.
Commissioner Stolzenberg – OCS has started the process by asking that if there is a big thing, go talk to OCS
about it. There is still no process like the CAHF for small housing investments that those expenditures go
through. I would propose that we move late year expenditures into a lump sum account and establish a process
to distribute it.
Would you like 2 motions: one that we should have such an account and one that we should move funding for
more than 3 years out into that account?
Commissioner Roettger – I would not vote on taking the funding out given that they have already made plans
for that funding or at least that tied to Phase 1, 2 without discussion. I would vote for having a new process to
do that in future years after the ones that are already on paper.
Commissioner Stolzenberg – Create a line item for large affordable housing expenditures with a
competitive program for selection for the out years. Look to start funding in FY 2031. Second by
Commissioner d’Oronzio. Motion passes 6-0 with one abstention (Commissioner Schwarz).
Motion to Approve the CIP with the above amendments (bold) passes 6-0 with one abstention
(Commissioner Schwarz).
IV. PLANNING COMMISSION ACTION ITEMS
Continuing: until all public hearings and action items are completed.
The meeting was adjourned at 7:39 PM.
1
Planning Commission Work Session
November 26, 2024 5:00 PM to 7:00 PM
Hybrid Meeting – City Space Conference Room
Commissioners Present: Chairman Mitchell, Commissioner d’Oronzio, Commissioner Solla-Yates,
Commissioner Joy, Commissioner Yoder, Commissioner Stolzenberg, Commissioner Roettger
Staff Present: Patrick Cory, Missy Creasy, Sam Sanders, Remy Trail, James Freas, Krissy Hammill,
Kellie Brown, Rob Hubbard, Ben Chambers, Riaan Anthony, Kristel Riddervold, Brennen Duncan
C
hairman Mitchell called the Planning Commission Work Session to order at 5:01 PM.
Commissioner Stolzenberg attended the work session remotely. Commissioner Stolzenberg is in New York
City visiting family for Thanksgiving. Commissioner Stolzenberg’s remote participation is approved.
1. Closed Meeting
a. Pending Litigation
Motion – Commissioner d’Oronzio – Pursuant to Code of Virginia Section 2.2-3712, I move that the
City Planning Commission close this open meeting and convene a closed meeting for the following
purposes:
1. Pursuant to Code of Virginia Section 2.2- 3711(A) (8) for consultation with the City Attorney
regarding legal matters requiring the provision of legal advice related to the Freedom of Information
Act (FOIA);
2. Pursuant to Code of Virginia Section 2.2- 3711(A) (7) for consultation with the City Attorney
pertaining to actual litigation, where consultation or briefing in open meeting would adversely affect
the litigating posture of the Planning Commission, specifically, White v. Charlottesville. Second by
Commissioner Solla-Yates. Motion passes 6-0.
The Planning Commission work session was recessed from the open public meeting for the Planning
Commission to go into a closed session.
Motion – Commissioner d’Oronzio – I move that this Planning Commission certify by a recorded vote
that to the best of each Planning Commissioner’s knowledge, only public business matters lawfully
exempted from the open meeting requirements of the Virginia Freedom of Information Act and
identified in the motion convening the closed meeting were heard, discussed, or considered in the
closed meeting. Second by Commissioner Solla-Yates. Motion passes 6-0.
The Planning Commission reopened in public open meeting from closed session.
2. Capital Improvement Program
Krisy Hammill, Budget Office – We are going to go through a couple of things. Some of this will be a review
for some of you. Some of it will be new.
First Slide – Overview
This is an overview of what a CIP improvement program is. We will look at the draft of the plan that is
currently under review. We will go through the responses from your memo to the city manager in September.
We will talk about what is next. We will have time for comments and questions. We did get some questions
from some of the commissioners this afternoon. Some of those are quick answers. We will try to answer some
2
of those questions tonight. If there are questions that are more involved, we will provide you with written
responses ahead of the public hearing. We will send those to the entire Planning Commission.
Next Slide – What is a Capital Project?
It is a project that serves an essential public purpose, has a useful life of at least 5 years, it is usually non-
recurring/non-operational, and it is usually an expensive thing. It is something that is $50,000 or more. These
are general guidelines. We will find things that don’t meet all these criteria in our CIP. There is a reason for
those. We will talk about some of those later as we get through the details.
Next Slide – What is a Capital Budget?
A Capital Budget is a multi-year plan. We do one for 5 years. It forecasts the spending of both the revenues that
will pay for that spending and the projects that we intend to undertake over the next 5 years. It should build on
the priorities of the Comprehensive Plan. It is also intended to address repairs and maintenance of our existing
infrastructure; not just the bright new shiny stuff but taking care of the things we already have in place.
Next Slide – Operating vs Capital
When you compare the difference between an operating and a capital budget, an operating budget, generally for
us, is a year that runs from July to June. At the end of that time, we start over with a new budget. It usually
covers day-to-day expenses. A capital budget is a 5-year plan. Those projects run for longer than a year. They
usually entail very large investments.
Next Slide – Why do a 5-year Plan?
The 5-year Plan is essentially intended to provide a framework to ensure that our capital expenditures align with
community input and expectations, the priorities of Council. It is supposed to align with our ability to pay for
those projects. It is a way to plan for our cooperation for regional projects, such as the library and some of the
other things that we have done jointly with Albemarle County and UVA.
Next Slide – CIP Planning Timeline
Departments begin submitting submissions in September. We have been reviewing those and got to the point
where we are now with a proposed 5-year draft. We are bringing this before you tonight to have a work session
on that information. In December, you will be having a public hearing. The Planning Commission will again
make recommendations to the City Manager. In March, the City Manager will incorporate that feedback into the
budget that he will ultimately propose to Council. It will be presented with the operating budget at that time. In
April, Council will take all of that and formally adopt the CIP and the operating budget for FY26.
Next Slide – Evaluation Considerations
There are some things that we look at when we are evaluating projects. Is there a legal mandate involved with
that particular project? Is there a possible health and safety issue? Does the particular project comply with the
City Council Management Strategic Work Plan and the Comprehensive Plan? Does the project meet the goals
of the Comprehensive Plan? That is where you come in. You help us look at that. One of the things that we
started doing a couple of years ago was tying each project to a goal and chapter of the Comp Plan. If you look at
our online budget book for each of the details of the projects, you will see those aligned with where we think
they fit in there.
Next Slide
We also look to see if the project is furthering our climate action goals and commitments. We look to see if the
project is preserving city infrastructure; the things that already exist. We look at the impact on the operational
finances of that project. What are the impacts once the project is complete? Is there an ability to generate
revenue for that project or for the expenses of that project?
3
Next Slide – Areas of Special Consideration
Some of the things that get special consideration is if the project ties to other existing proposed projects. Is there
a demonstrated public support for the project? Is there a possibility to leverage outside funding? Will the project
be done in partnership with one or more organizations? Are we upholding our regional partnerships? Does the
project increase the level of service that we are able to provide?
Commissioner Solla-Yates – I had a question about the 2030 bond issue. It is historically low. It is lower than
the others.
Ms. Hammill – In this 5-year plan, we are basically marching out projects. You will see the prior years (26
through 29) that they have some large commitments that we have already made (Walker for the Pre-k Center).
There are some other bigger projects. The 5
th year is the farthest year out. It is the one we know the least about.
It is our best guess right now. It is typically smaller. It is what we know currently.
Next Slide – Funding the CIP-Revenues
This is a slide for the revenues of this plan. This is how we afford to pay for the plan that we have set forth. In
each case, the revenues that are available should match the total expenses that we plan to spend. We fund the
CIP with cash from the General Fund. We have a policy that says at least 3 percent of our General Fund budget
will go to the CIP as pay-go or cash pay for projects. We have some partnership from the city schools, in which
they provide some money for some of their projects. We have used CIP contingency in a few of the years here.
You will see that with part of our surplus. The policy is that goes to the CIP contingency to be used for
additional cash in the CIP. We are planning to use some of that in 27 and 29. Finally, we sell bonds for the
projects. All those together will help fund the CIP.
Chairman Mitchell – I had a question about the schools. Where do they get the money for their contribution?
Ms. Hammill – In some of the past years, they also received CAREs and federal funds that they passed onto the
city. There also is a gain sharing agreement. When the city provides local funding to the schools, if they close
out a year in which they have not spent all those funds, some of that comes back to the city. They can keep part.
We get part. We have allocated that back to the CIP. They also have some other grants that help with some
HVAC projects. It is basically grants and leftover funds that they did not spend. When we were working on the
Buford Middle School project, they did get a large grant that they were able to apply for that came back to the
CIP and helped pay for part of the Buford project as well.
Commissioner d’Oronzio – We roughly have $133 million. We are saying that we know this number is wrong.
We know it is notional on the bonding. Can you give a sense of what our current debt looks like for these?
Ms. Hammill – I can give you some more specific details. When we talk about our debt, we talk about 2 things.
One is debt capacity, and one is the annual debt service. When we first started talking about the Buford project,
we said that if you try to do a $50 million project, we are going to be out of debt capacity. Since our revenues
have grown, our capacity to bond things has grown with that. As a result, our policy is that we will have an
outstanding debt target of 9 percent with no more than 10 percent. Right now, our projections are, even with this
plan, we are a little over the 7 percent range. Part of that is a function because we have had assessment
increases. Our revenues have done really well. As our General Fund has grown, 9 percent or 10 percent of that
general fund has grown, and our capacity has grown. The problem with that is you must pay for it. Affordability
of the debt has become the issue. With the current plans that we have had, our current debt service, within the
next 5 years, is basically planned to double. We are moving from a debt service payment that is somewhere
around $12 million to about $24 million. Part of that, we have hedged with a fund balance. We have been
building up a fund balance in the debt service fund that we are buying down to try to level off that contribution
from the General Fund. We are now in a situation where we need to put in more money from the General Fund
4
to pay the debt. While we have plenty of capacity, we still must worry about paying that off. For example, we
just sold bonds for the Buford School this year. It was about $51 million. That bond issue alone raised our debt
payment by $1.8 million.
Commissioner d’Oronzio – What kind of pricing are we looking at now as opposed to a year ago?
Ms. Hammill – Interest rates have gone up. This year, we were about 5 basis points higher than the year before.
Our AAA bond rating tremendously helps us to keep our rates low. We did very well in our sale. We thought
we were going to be a little higher than we were. It was not that dramatically different. We are projecting about
3.5 percent for this year. In the future years, we are planning for about 4 percent.
Next Slide – Aaa/AAA Bond Rating
Because we are AAA Bond rated, we can get good financing rates. We are one of 87 cities nationwide that
maintain the AAA from both Moody’s and S&P. There are only 10 cities in the state of Virginia that have this
distinction.
Next Slide – The City’s Bond Rating
A bond rating is an independent review of the city’s credit worthiness and the ability to pay off our debt. They
come in, go through our finances, go through our economic factors, and they sometimes do tours. It helps attract
economic development prospects. We go to market every year. We are talking to the rating agencies on an
annual basis.
Next Slide – Summary
Here is a 5-year summary of what this plan looks like. We are planning to spend a little under $186 million. Of
that, we are planning to bond about $131 million. Just under $51 million will be cash from the General Fund.
This year, the top 3 priorities, in terms of total budget/where the spending will happen, Education is first,
affordable housing is second, and transportation & access is third. That is based on the total expenses that are
planned for this 5-year plan.
Next Slide – Education
We will look at each of the categories for spending. If there is no highlight, that means this is exactly how it was
laid out in the 5-year plan last year. You will see many numbers that are not affected at all. That means they did
not change. In this case with the school HVAC number, you will see this on this slide and the next slide. Staff
did request about a $500,000 increase in this category for facilities. Some of that is being driven by cost of
replacement of those units and those parts for that. We are still working through that plan. This is not a done
deal yet. This is also a conversation with schools. We are still working on that. You will also see that here the
preschool, Walker pre-k program. This is something we added to the budget last year and starts in 27. The final
funds are appropriated in 28. We also started 3 years ago putting in funding for roof replacements as a
replacement program that we had not previously done. I will note that there have been some school name
changes. We do need to update those in this slide but also in our financial system. With the small capital
improvement of $200,000 a year, that is money that the schools contribute to the city for those repairs.
Commissioner Joy – With the line items that have zero funds allocated, they were under consideration? Why
are they still showing up?
Ms. Hammill – First, oversight on my part. Basically, they were projects that were in the plan last year that
were funded. They just don’t have funds for this year. For example, with the school reconfiguration, that project
is well underway. There are no new funds in this 5-year plan. It has been fully funded. For the window
replacement at Summit Elementary, those funds were put in for this current fiscal year. It was fully funded.
5
Next Slide – Facilities Capital Projects
With the HVAC line, we are still working on that. There are no real changes here. You will see the climate
action line drops in here $1 million a year through 29. That was part of our 5-year commitment in terms of
planning for implementation of initiatives throughout our climate action plan. Otherwise, no real changes or
additions here.
Commissioner Solla-Yates – I have a question about the lump sum to facilities of capital projects. It seems to
go up every year. I am guessing it is due to inflation.
Ms. Hammill – That is correct.
Commissioner Stolzenberg – I see there is the school HVAC repair and the city HVAC replacement. Is the
city school’s replacement included in this replacement budget? Do they have their own replacement program?
Ms. Hammill – I would say that is just a nomenclature inconsistency on our part. That account is used for both
repair and replacement in both facilities and schools. These accounts cover both. They act in the same manner.
One is for city facilities, and one is for schools.
Commissioner Solla-Yates – With the climate action initiatives, I had a question from my colleagues on the
school board about solar PV on school roofs as we are doing the roof replacement. My understanding was that
this would go towards that. I am hearing conflicting information. Can you speak to that?
Ms. Hammill – For a long time, we have had funds in the CIP related to solar and what that might look like. It
had built up a balance because it was budgeted at small amounts a year for the purpose of building a balance. A
year or so ago, we dropped that down to $75,000 a year. I think there is a couple hundred thousand now in that
account. We are deploying on some of those funds for the bypass fire station. This climate action initiatives was
a new account. They are working through the Office of Environmental Sustainability that has a work plan for
those funds. Could some of it be used for solar? Maybe. That has not been decided. We do have a source that
we are working with outside of those funds right now.
Commissioner d’Oronzio – Can you tell us where the figure for the JMRL renovations comes from? It seems
to be remarkably precise.
Ms. Hammill – That was the last number they had received through their work. That is the same number we are
working with the county.
Commissioner Stolzenberg – For the PV program, since it is going to zero, should we expect that future PV
installations will be through power purchase agreements? Are we near reaching power purchase agreements or
issuing RFPs for them to put on our recently replaced roofs?
Ms. Hammill – We are exploring all those options now. We have put out an RFP for PPA. We are waiting for
that proposal. We will be working through that with our financial advisor and our bond counsel.
Kristel Riddervold, Office of Sustainability – We are exploring power purchase agreements particularly for
the 2 largest roofs. Charlottesville High School and the middle school are the 2 largest roofs in the municipal
portfolio, which each are multi-million-dollar projects. We have requested a proposal for a power purchase
agreement through a cooperative contract. That is exciting to get moving. The city solar program had a balance.
We are using some of the climate initiative funds to support that to get solar on CATEC. We have several big
solar projects for the first time; more in the works than ever before.
6
Commissioner Stolzenberg – For HVAC replacements, have we been doing like-for-like replacements like
replacing gas furnaces with new gas furnaces? Have we been looking at electrification of potentially replacing
furnaces with heat pumps?
Ms. Riddervold – Each time a new piece of equipment is replaced because it is newer, it is going to be more
efficient. Simultaneously, we are doing an electrification screening to try to identify where in our portfolio do
we have the best candidates for something other than like-for-like if it is not electric.
Next Slide – Public Safety & Justice
Ms. Hammill – You have green highlights. There are some changes in these line items from last year’s 5-year
plan. They are not necessarily new. It is just the amounts that have changed. On the fire and EMS apparatus,
those are mostly timing changes. The supply chain is such that those are taking anywhere from 36 to 40-plus
months to build. You must get in line with orders. Some of that has adjusted the timing but also the cost down
on the fire apparatus. With mobile data terminals for police, part of that is adjusting for cost. That was
previously budgeted. I think it was $75,000 a year. That is meant to be an annual replacement. Because of cost,
that had to be bumped up a little bit to keep us on target so that we are not replacing how many we have all at
once but on a cyclical cycle.
Next Slide – Transportation & Access
The green highlights here note changes. One of the big changes you will note is new sidewalks. There is a
significant increase here. This is based on all the reports and great work that Mr. Chambers has reported to you
and Council. It is based on the priority sidewalk list. In addition, the sidewalk repairs have been increased in the
out years. The small area plans and milling & paving were adjusted. Some of those amounts were adjusted up in
the later years. The one big notable addition here is the ADA Transition Plan. That is the first time you will see
that in the CIP. This is a number that we know is going to be expensive. This is what we think we can afford at
this time. We will be coming forward with more details of that as we progress through that plan. With traffic
signal infrastructure, we have some of those amounts out. Some of those project expenses have been delayed
due to supply issues, which we think are being corrected. We are adjusting the funding request accordingly in
the CIP.
Commissioner Joy – Is the ADA Transition Plan a fund to look at similar to the sidewalks to have a robust
plan of where you could improve access?
Sam Sanders, City Manager – The ADA Transition Plan item is meant to be the city prioritizing a true
demonstration of our commitment to ADA. This has been a challenged subject for us for quite some time. This
is meant to coincide with the delivery of a new transition plan. We have a plan that is dated 2013. We will get a
new plan. We will begin immediate implementation. The thought behind this is that we are expecting a big
number associated with that plan. When it identifies all the different things that need to be dealt with. The total
is a significant number. This is a $2 million commitment per year for the next 5 years. We know that this is a
beginning. The intent is that we are doing what we consider to be a demonstrated best effort. If we are ever
visited by those in more powerful seats and they tend to leave you with settlement agreements, we will
hopefully avoid one if we can demonstrate that we put forth our best effort and we show an annual commitment.
That is the reason for putting a number here. We know that number is going to change, and this number will
continue to change. We have already received a series of recommendations from the team that is doing the final
work that needs to be done. We will use that to break down amongst the team member, who will do what of
those things that would use this $2 million allocation. It is why I am suggesting that, in future years, we will be
going up. As we start to do that work, we will find that we probably do not have enough money to do all the
things that we need to prioritize for right now. We will constantly be revisiting this and working with a
committee on doing that work too.
7
Commissioner Solla-Yates – Is this different from or the same as the other ADA items?
Mr. Sanders – We are going to revisit those too. One of the things that we need to do is add clarity too. Some
of Council’s actions and prior city manager actions was to set up 3 separate accounts that had an ADA focus.
Since we are now adding a 4
th line item, we have had conversations about whether we need to keep all those.
Could we consolidate or do we rename them for what they are for? There is a combination of what the result
will be. I would say that when you see the proposed budget from me, it will be corrected.
Commissioner Stolzenberg – On this slide, we have our transportation items. We have this new concept of
urgent transportation improvements after a woman’s death on Elliott Avenue. There are other locations in the
city that are quite dangerous. I know that BPAC is working on identifying them for future, similar rapid
improvements and hopefully hardening later. Do we have a line item to fund those things? I had heard that some
would come out of the surplus for this year. Do we know how much that is for this year?
Mr. Sanders – That is still in progress. That was a commitment I made to Council as a part of a presentation
that I made to them last month. What I gave staff is direction to put together a list of those urgent items. Ben
Chambers (Transportation Planner) is working with the various public committees. I am working to identify
what amount of money is available. We have a few sources that we can consider pulling that from. I have not
yet set a target because I am preferring to get the list back and determine if we have enough to cover a portion
of that list. We know that there will be at least $500,000 available. I can tell you that I know that we have at
least that much for what is available right now. There is a projected surplus. I will be including more in that
request. That depends on what else is on that list.
Next Slide – Parks & Recreation
Ms. Hammill – We have one new item here: The Downtown Mall Tree Management Plan. This will entail
future funds that will appear in the CIP. This is to get us started. You will also notice that between the evasive
species and the several tree accounts, we have taken some of that funding and realigned it at the request of
Parks & Recreation to more accurately reflect how they need to spend those funds.
Next Slide – Technology Infrastructure
The public access, our studio fees essentially come through your Comcast bill. That must be used for the public
access. The citywide IT technology infrastructure amount is used to help supplement for things that come up
during the year that maybe are not planned. Some of those things that we have used that for include to
supplement some of our procurement software. Last year in the CIP, there was an item for the system upgrade
for the Circuit Court. That was in here. We have used it to replace some cameras. It is meant to help us
supplement for things that are not budgeted. The voting equipment is due to be replaced. We were funding this
account to have enough funds in 27 from when those are due to be replaced.
Next Slide – Affordable Housing
There is nothing new here, except for Carlton Mobile Home Park. This is green. This is an action that Council
already approved. It is new to the CIP this year. This is a cash-funded endeavor. If you were to compare the
cash contribution from the General Fund in last year’s plan versus this year, you will see that there is $1 million
increase in that. That is a direct result of this project.
Commissioner Solla-Yates – With Hearthwood and the affordability issue, can you speak to that?
Ms. Hammill – There has been no request of the city for any of that. We don’t have any information. It would
be like any of these other endeavors if there was an alternative or an option that would come up and come forth
to the city. We could certainly look and examine that. We have been able to do a lot or multiple of these
arrangements over the last couple of years because we had one-time federal money. We have had yearend
8
surpluses. The federal money is drying up. We won’t have those one-time sources. Whatever may or may not
come forth with Hearthwood, we would look at it at that time and evaluate whether we could do it or not.
Commissioner d’Oronzio – With the CSRAP, that number has not changed in 8 years. Is that $900,000
CRHA’s request? Housing costs and rents have gone up in the last 8 years.
Mr. Sanders – With regards to the $900,000, the current iteration is still at $900,000. Renewal of the
agreement, which occurs annually around September, we will be evaluating whether if CRHA is not at capacity,
there is a contemplation of what else we could do with that. That won’t be introduced until around that time. It
is still in there as a placeholder for that amount.
Commissioner d’Oronzio – I assume that these phase 4 redevelopments are essentially notional at that
distance.
Ms. Hammill – It is what has been allocated to date.
Commissioner d’Oronzio – There is a 1-time public housing redevelopment. Is that the last in a string?
Ms. Hammill – That was the last of the $15 million commitment to CRHA.
Commissioner Stolzenberg – Timing-wise for the West Haven Redevelopment and even 501 Cherry Avenue,
it seems like 501 Cherry Avenue is further along than West Haven. 501 Cherry Avenue did not get LI HTC
funded this year. Should we expect that to be pushed out a year because they will have to reapply? Similarly for
West Haven, I don’t know that they are applying for LI HTC this coming year or that they have a plan. Have
they asked for this in this coming year rather than later?
Antoine Williams, Office of Community Solutions – With regards to West Haven, we have not received any
information regarding new requests. That request is as is for right now. I can speak to 501 Cherry Avenue. They
are going to submit a 4 percent application next year around July. At that time, we will know whether we need
to adjust or augment the schedule depending on the outcomes of that application.
Commissioner d’Oronzio – That is within the context of the city commitment as well, that we have that
already signed and reserved. When they go out for LI HTC, they can point to it.
Commissioner Stolzenberg – Do we expect a reduction in the affordability element of that project if they are
only going to get 4 percent? Do we expect them to ask us for more money?
Mr. Williams – That is a bridge we are cognizant of. I cannot speak to it now. I will let you know that in terms
of a contingency, PHA has indicated that they are going to also pursue the new state housing credit program.
That should cover some of the gap. That is a conversation to be had once we get closer to that bridge.
Commissioner Solla-Yates – I had a question about no bondable housing in FY30. Can you talk about it?
Ms. Hammill – The no bondable for housing is not representative of our capacity or anything other than the
complications of tax-exempt debt and these projects. It is either the state code or the city code that gives the city
the authority to provide money to the Housing Authority, in which we could bond projects for that. It does not
give us the authority to bond projects for a nonprofit.
Commissioner Solla-Yates – Could we buy land and lease it to a nonprofit for housing projects?
9
Ms. Hammill – We can do whatever we want. There is nothing that keeps us from making any kind of
arrangement that Council approves. We must weave through the IRS regulations to determine how we pay for
it. One of the things that you have noticed is that the large bulk of our affordable housing projects are cash
funded because they are through nonprofits. There is nothing that would preclude us from doing that I am aware
of. There might some legal thing. If Council approved it, we could do it. We would have to work through the
financing piece at that time. Every detail matters. It is hard to make a blanket statement about whether we could
bond it or not. If it is through a nonprofit, we are not able to do that.
Next Slide – Planning Commission Review
We kicked off the budget season with Council, City Manager, and me on September 16
th. Following up with
that, on your September 24th work session, Ms. Creasy kicked off the CIP with you. You drafted a memo to the
City Manager for some areas that you would like to provide him to consider for his consideration. This is the
list here. We are going to take each one of these and tell you how we think that we have addressed it in the
draft.
Next Slide – Multimodal Transportation
Provide additional funding multimodal transportation, walking, biking, transit, etc. Sidewalk funding needs to
be restored and increased. One of the things that we just talked about is that for this plan, an additional $4.2
million has been added for the construction of new sidewalks that were detailed on the sidewalk’s priority list.
We also have $2 million a year for a total of $10 million that has been added to help remediate ADA barriers.
The city made a large increased investment of over $1.8 million last year or for this year’s FY25 budget to
CAT. We will continue to do that through this budget process.
Next Slide – Community Infrastructure
You wanted funding for community infrastructure to allow for the implementation of the Comp Plan. This
includes utilities and transportation. Each project in the 5-year plan has been linked to the relevant chapters and
goals of the Comp Plan. For FY26, the current draft includes $6.8 million in projects related to transportation
across and throughout the city. The projects related to city-owned utilities are not part of this CIP. They are
Enterprise funds. Those projects are funded through the utility rates and in their own separate fund. They come
to Council as part of the rate setting process in May.
Next Slide – Smart Scale Projects
There was a request for adequate funding to complete the smart scale projects currently funded. The City
Manager with the VDOT District Engineer has confirmed a series of changes to the current VDOT program.
That entailed revising scopes of 2 projects, redistributing previous awarded funds for a series of projects in the
current portfolio. That will help with the significant budget gaps for those programs. That memo and
presentation is going to Council for consideration at the next Council meeting on December 2
nd. The
Commonwealth Transportation Board will consider the request at its meeting in January making it possible for
all those previous grant awards to the city to remain for use within the current portfolio ensuring no additional
project loss. Council will consider the reallocation of those funds resulting from the CTBs action in January or
February. Once we get that notice from VDOT, we will be coming back to Council to move those funds around.
Next Slide – Human Capital for Projects
There was a request to provide for human capital needed to accomplish funded projects. There was an
assessment of staffing needs that was done and completed in 2024, which resulted in 4 additional project
manager positions, which have been filled. The city completed a reorganization within the Public Works
Department that included the addition of a deputy director, the addition of a project manager specializing in
right-of-way acquisition. All project manager teams were merged into a single facilities development team,
which provides project management specialization of all construction projects regardless of the department that
are built by the city.
10
Commissioner Stolzenberg – It sounds like we have adequate staff to manage our portfolio. On the previous
item, we cancelled several projects for a budget shortfall. I previously understood a lack of staffing. If the
problem was the budget shortfall, was there any consideration given to backfilling that budget shortfall so we
could keep 1 of those 2 projects that were cancelled? My understanding, from the presentation given a month
ago, is that the total amount of those 2 projects is around $50 million and the shortfall is about $17 million.
Why did we cancel both rather than cancelling the one and potentially backfilling with a small amount of CIP
funds to get the other one done?
James Freas, Deputy City Manager – The shortfall was $17 million. We discussed the notion of whether the
city would take on that cost. We made the determination that we would rather transfer funds within the VDOT
portfolio program and not bring on an additional $17 million request into the CIP. Only one of those projects
could be canceled and transfer the funds. With the other project, we could not cancel that project and transfer
those funds. With the project at 5
th and Ridge, that project also had a significant shortfall. We could not transfer
funds into it. There were concerns as to whether the design of that project matched up with what we wanted to
do today, the approach that we would take today on that project. With limited ability to make alterations to that
project and maintain the state funding, we ultimately made the decision that we had to cancel that as well. The
decision to cancel projects was due to the shortfall in funding.
Commissioner Stolzenberg – Could you elaborate why only one of the two projects could have funds
transferred? My understanding is that both projects came from the district grant pool and not the high priority
pool. I would think that they would be equivalent.
Brennen Duncan, City Engineer – That one had a combination of funds.
Mr. Freas – The Ridge Street project had a combination of funds. Because it had a combination of funds, it was
not as readily transferrable as the Emmet Street Phase 2 project, which could be.
Commissioner Stolzenberg – Was the thought that some percentage of the funds would be transferrable?
Mr. Freas – At this point, what I am going to offer you is that if you have further questions on it, we are happy
to ‘dig into it’ further. That is where we are right now.
Commissioner Stolzenberg – I guess that I would propose that large budget decisions like that could be made
within the budget cycle and within the process that we have for establishing our budget priorities in the future.
Mr. Freas – I appreciate that comment. On this whole program and everything we are doing here within the
CIP; we certainly look and work to do that within the budget cycle and within processes where we can take
decisions in front of Council and other entities. We were working under a timeline given to us by VDOT when
those decisions were made. We are bringing these decisions back in front of Council for discussion.
Next Slide – Downtown Initiatives
Ms. Hammill – Fund the Downtown initiatives, the tree study, infrastructure, etc. This plan includes three
projects related to the Downtown Mall. One is the infrastructure account, which has been in there for some
time. That is basically a budget that is offset by the café permit fees for the restaurants on The Mall. The
Downtown Mall Active Life Cycle Tree Management account is funded at $100,000 a year to help take care of
pruning and general maintenance of the trees on The Mall. New this year is the Downtown Mall Tree
Management Plan, which is funded at about $315,000. That is to get us started. That will come back again once
the plan is solidified with a request for more funds.
11
Commissioner Solla-Yates – Did we figure out what to do about the fountains? Do we like the chains? Are we
thinking about changing it?
Mr. Freas – The Downtown Tree Management Plan includes recommendations for the fountains. In the Phase
1, which this is the first down payment on Phase 1, includes some recommendations about making alterations,
not to the fountains themselves, but how they operate within the space overall.
Next Slide – Affordable Housing & Homelessness Needs
Ms. Hammill – Continue the commitment to affordable housing and support homelessness needs. This FY26
part of the CIP includes $12.7 million in funding for affordable housing projects with just under $52 million
that is included in the 5-year plan. These are CIP funds. This does not include the tax assistance programs and
other things that are also funded in the operational budget. The City Manager has been leading discussions with
Council on community interventions, which will include some homelessness and other potential uses of ARP.
That is why that is not showing up in the CIP right now.
Commissioner Solla-Yates – I got a question from the public about LGBTQ accessibility to a no-barrier shelter
operated by the Salvation Army. Do we have clarity on that? Is that on our radar?
Ashley Marshall, Deputy City Manager – One of the things that I have been surprised with coming from
another community where I did nonprofit work in unhoused community members and those who are housing
insecure is that this Salvation Army has always had space, even in their high-barrier shelter, specifically for our
LGBTQ neighbors, who may be transitioning so they can have a private, comfortable space. I know that is
unusual for a Salvation Army. Salvation Armys across the country maybe are not all that progressive,
compassionate, and caring. I can tell you, with our friends at PACEM being willing to work with them at the
warm room, that alone gave me comfort coming into this community. Having conversations with our lead in the
Human Rights Commission and Major Mark, we understand that individuals need safe, comfortable places to
have shelter for individuals who maybe don’t share the same faith tradition as the Salvation Army. That is
something that we are very keen to participate in and very focused on, especially with the city that finally got a
100 percent rating from our municipal equity index. That is a fantastic question for our community members to
be concerned with. As we go into this conversation as the city, it is very important that we consider, not only
that, but also individuals who are differently abled. Thinking about beds, bunks, and all those things are going
to be conversations that we have.
Mr. Sanders – Part of the ongoing conversation is the discussions with the Salvation Army. Part of what they
have agreed to do is to make sure that we get access to what are the variations on what they do in the way of
service so we can ensure that we get the best version possible.
Next Slide – What is Next
I started a short series with Council at the last Council meeting that I have labeled Budget Briefs. What I am
doing in that moment is being responsive to them. They have asked for information on the front end of the
budget being proposed so they can understand what to anticipate in the way of a budget presentation so that I
don’t surprise them with the budget announcement being what it is. I created a 3-part series. The first session
was on organizational excellence and equity. I am pulling straight from their strategic outcome areas in the
ways of topics. On Monday night, I will be talking about housing and infrastructure. On December 16
th, the
third session is going to be on public safety and transportation. Not that any of the other strategic outcome areas
are not important, but those are ‘big ticket’ areas/things that are moving very fast. They are going to high dollar
topics. The goal is to make sure that I can provide Council some deep opportunity to see what it is looking like
to try to fit all these things into the budget. I say that to frame your discussion you are going to have. When you
look at the CIP and recommend that things be added at a higher amount, we are at a place we are needing to
offset that. Whatever we want to add in, we need to take something away. Whatever we want to increase, we
12
may have to reduce. I am not saying that to you to stop you from offering any of those. I am pointing out that as
it stands right now, we do not have a balanced budget. It is too early to have one. We don’t have one. This city
being a city that ‘punches above its weight class,’ is why we won’t. That means decisions must be made.
Sometimes there are difficult decisions that must be made.
On the 10
th of December, you will have the public hearing, giving the public a chance to react to what they
learned tonight and what you talk about and what they will also be able to bring forward on the 10th. I will have
a budget forum on the 12th of December. That is the public’s opportunity to come in and talk with me and the
team about budget priorities. It is a chance for me to hear from them. We will frame that conversation a little bit
about what we are seeing in the way of budget drivers for this upcoming session so they can appreciate that and
understand that. They will be left to the room to ask questions about what they just heard and other things that
they might be thinking about. As you are forming your recommendations, the public hearing is a part of that. It
is to give me insight as to what all the expectations are. I am here to help and to do my best to meet as many of
them as possible. I won’t hit all the expectations. I know that because the budget is not infinite. It will not go
everywhere. That proposed CIP becomes a part of the presentation. Ms. Hammill and I will be presenting the
proposed budget March 5
th.
Chairman Mitchell – When do we make our recommendation?
Mr. Sanders – We consider it an open conversation at this point. We are going to be capturing what you talk
about if you decide to talk more tonight. I am taking notes. We will be looking for additional things that you
might say this evening. At the public hearing, we will be capturing that information. It all becomes a test for us
to go back in and say: Do we have a beat on that in this CIP? Are we seeing that in our budget in a different
way? Is it on the ARP list that people don’t know about yet? Is there a decision that needs to be made? That
decision is either mine or Council’s decision. We are framing all these different information points for how we
process that to take it forward.
Next Slide – CIP Resources
Ms. Hammill – This slide will give you a couple of resources. Our budget explorer tool will allow you to look
at the current CIP. One of the things, when we are working through this process, is that we are always looking
from today forward. We have a lot of stuff on the books and in the works. The budget explorer will let you look
at the project, the status of those projects in terms of budget and expenses. The online budget book gives you a
summary of the CIP that we presented tonight. It also has a page for each project with a little more in-depth
detail that you can view. On our city budget webpage, after every work session, we have all the presentations
posted. Any public notices that we post will be found there. Any information related to the budget development
process will be there. The only thing there right now is the CIP budget book and a schedule of all the public
meetings for the FY 26 budget development process that will take us from now through April of next year.
Commissioner Roettger – I don’t see anything that should be moved. It seems all reasonable. I appreciate all
the affordable housing, homelessness, and the money being spent there. Cultivate Charlottesville sent some
disturbing email about how they are falling or that they might have to close. It might be something to
investigate. It would be great to be able help them, if necessary, given their help in the CRHA and other
neighborhoods. If they are going to be helping with the Washington Park garden, that is not in here. I am going
to mention it. It takes a while to tee all these things up. It just came in.
Commissioner Yoder – It is good when the city and Public Works has the internal staff capacity to complete
quick-build projects, we saw this on Elliott Avenue and other places. I have seen city crews building sidewalks.
It is great. Members of the public see that the city is getting something done that positively affects their lives. I
like what I see in the transportation and access budget lines. I hope that some of that can be spent on quick-build
13
projects. So many transportation projects take so long to build and can be so expensive. I hope the city will
invest in some quick wins to keep the ball rolling in a positive direction.
Commissioner d’Oronzio – Since the City Manager has laid out the rules of play for moving money around
and I would not want to make specific recommendations, I am going to ‘dig’ into the budget tool before I make
any specific line-item recommendations.
Commissioner Solla-Yates – The school lump sum account is not indexed to inflation. It is diminishingly
useful. I don’t think it is an emergency. It will become an increasing problem. With the school priority projects,
I love them. They are beautiful. They are currently unformatted for the out years (29 and 30). School solar is a
priority. If we need to pull some of that money away, if it can make school solar happen faster, that may be a
wise decision.
Commissioner Joy – I wanted to say thank you for letting me be a part of this process. I appreciate the
transparency. I will be happy to report back some of the items that were discussed tonight and share some of the
draft CIP with my colleagues. I am appreciative of the attentiveness to the comments that were made. When we
previously discussed the CIP, what was presented tonight was a marked improvement over what was previously
shown.
Chairman Mitchell – This gets better and better every year. Thank you for the way you have organized this. I
love the way you have organized the website. One thing that does worry me Hearthwood. It looms large. I want
us to be certain that we are thinking about that. We don’t want to revisit the mobile home crisis that we faced a
few months ago. Please start thinking about it and begin developing a plan of action. There are 200 people that
live there that are having their rent subsidized. I have no idea what the owners are going to do with that when
the affordability window shuts down next year.
Commissioner Solla-Yates – We have an economic development fund for strategic initiatives, which is helpful
because things come up, and we are ready. We could do something like that with housing. We could have a
fund identified and ready to go when these things come up.
Commissioner Stolzenberg – I am glad to see this year that there is a plan to both fund and build new
sidewalks. I appreciate you putting that in there. If we had been funding it at 2018 of $500,000 a year, we would
have had that fund built up and would not have to be significantly increasing it now. I was a big advocate of our
$10 million affordable housing pledge. We have significantly exceeded that pledge. In this CIP, we are
continuing to. I am concerned for some of these out year projects. We are committing funds before having a
proforma or funding model from these organizations and in some cases not even a concept plan of what to do
from these organizations. For example, Kindlewood Phase 4 does not even have a plan. I can’t say that in FY29
Kindlewood Phase 4 or some plan that we have not seen to date will be a higher priority than a Hearthwood
acquisition or another affordable housing thing. I would like the city to create a proper process for evaluating
these large funding requests. It looks like the Cherry and Ridge smart scale projects from the district grant fund
were $14.84 million. It is about $2.2 million short of that $17 million funding gap. It is disappointing that we
are canceling an additional $20 million project if the alternative might have been putting $2.2 million of
bondable funds into our CIP. It happened outside of the budget cycle. I understand it is going to Council now. It
is not clear to me what that means given that the request to cancel has already been made to VDOT and whether
this upcoming Council discussion has any potential effect on that outcome. We have made a commitment to the
city to commit to better transportation to accommodate the increased density, which will come with increased
tax revenue that we have planned for as part of our Comprehensive Plan and our zoning code. We need to
execute on that plan.
14
Commissioner Roettger – For the affordable housing piece, I was on the CRHA board for several years. We
need to be fair about all the money being distributed and always refining the way that the process works. With
any of those projects, the price is going to go up, which is why I am not that worried about the proforma and the
plans. I know West Haven has some conceptual plans started. Kindlewood has past plans that need to be
updated. I am fine with all that. Setting it out there is great. They are always going to need more.
Commissioner d’Oronzio – I share some of Commissioner Stolzenberg’s concerns. The project is coming. We
know it is coming. If it isn’t coming and it falls by the wayside, we do a CIP every year. We can make those
adjustments as we go.
Adjournment
The meeting was adjourned at 6:57 PM.
Public Comments
There were no public comments submitted during this work session.