County Board Agenda Item
Meeting of November 14, 2026
County Manager:
County Attorney:
Staff: Richard Stephenson, Emily Hughes, & Danielle Bush, DMF
ARLINGTON COUNTY, VIRGINIA
DATE: October 15, 2026
SUBJECT: County Manager's Presentation of the Financial Results and Close-out for the Fiscal
Year (FY) ending June 30, 2026.
C. M. RECOMMENDATION:
1. Adopt the FY 2026 County government appropriation resolution shown on Attachment
1A.
2. Allocate remaining balances from FY 2026 to legally restricted and priority areas
identified by the County Board as shown on Attachment 1B.
3. Amend the FY 2027 County Operating Budget by approving the appropriations in
Attachment 2.
ISSUES: The County Board is being asked how should the remaining one-time funds from FY
2026 be allocated.
SUMMARY: Financial information presented here reflects the preliminary work of the
County’s external auditors (Clifton Larsen Allen LLP). Consistent with prior years, the County’s
Annual Comprehensive Financial Report (ACFR) will not be available until December.
Consistent with the financial updates provided to the County Board in April 2026, the County
ended the fiscal year with little discretionary savings. After meeting legal restrictions, County
Board financial reserve policies and revenue-sharing with Arlington Public Schools, the funding
available for discretionary allocation totals $13.6 million, or 1.1% of the revised FY 2026
County General Fund budget, excluding Arlington Public Schools. This is an increase from FY
2025 when available funds totaled $1.8 million, or 0.2% of the General Fund. The available
funding results from a combination of final tax revenues slightly above budget and expense
savings.
Best practices in financial management and retention of the County’s triple-AAA bond ratings
require that the County end each year with a surplus (revenues more than expenditures). The
County’s historically conservative budgeting practices, along with appropriately sized and
flexible contingents (such as the Stabilization Reserve and the County Manager’s Operating
Contingent) have allowed us to accommodate unanticipated events – such as extreme weather
events, contractual cost increases, and state / federal budget cuts – without having to go back to
the community for mid-year service reductions.
Total discretionary funding is $13.6 million at the conclusion of FY 2026. The main sources
contributing to the discretionary funds will be discussed later in this report. Since the County
Board adopted the FY 2027 budget in April 2026, external and unanticipated budget pressures
have surfaced, which were not accounted for in the adopted budget. These include:
• Continued increases in electricity and fuel,
• Public assistance oversight and non-profit needs in response to H.R. 1,
• Unanticipated public safety costs related to the events around the Country’s
sesquicentennial
These recommendations are detailed in Attachment 2D and later in this report.
In addition to the appropriation actions included in this report, two additional actions are
recommended by the County Manager:
1) Replenish $1,150,000 to the Self-Insurance reserve for funding utilized in FY 2026 to
offset projected healthcare costs in excess of the budget. This allocation replenishes half
of the funding utilized. The adopted County Board policy states that this reserve will be
replenished within two years.
2) Allocate $9.8 million for consideration in the FY 2028 budget process.
Allocation of the $9.8 million for consideration in the FY 2028 budget is essential, as the County
continues to face expense growth that outpaces revenue growth. Recent year trends of significant
growth in compensation and healthcare are continuing, and new pressures have arisen such as
substantial growth in fuel and electricity rates and growing conversion of technology costs from
capital expenditures to operating. The County also continues to experience program growth in
housing and mental health programs and will need to consider how to fund some programs that
have had only one-time funding.
DISCUSSION: Financial information presented here will be finalized when the County’s
external audit is complete and the County’s Annual Comprehensive Financial Report will be
available in December. Expenditures, revenues, and recommended actions are discussed on the
following pages.
The County ended FY 2026 with a balanced budget. At the end of FY 2026, the County’s
General Fund balance is anticipated to be $326.0 million, a decrease of $34.7 million from the
end of FY 2025.
General Fund balance comes from three sources:
1) Amounts carried over from year-to-year for reserves and other County Board policy
designations (e.g., Schools revenue sharing and AHIF) and subsequently reaffirmed by
the County Board;
2) Revenues in excess of projections; and
3) Expenditures that are under budget.
Allocation of Fund Balance
The most significant portion of General Fund balance falls into the first category of funds carried
over year-to-year: approximately $312.4 million, or 95.8% of $326.0 million, is for required
reserves, restricted funding, allocations already approved by Board action, or for continuing
projects that happen to straddle fiscal years.
Carryover for Reserves & Restricted Funding ($312.4 million): Funding which remained from
FY 2026 which will carry over to their restricted and assigned areas includes:
• Reserves: $134.2 million
o Operating Reserve to maintain the required minimum of 5.5% of General Fund
operating budget per policy and needed to maintain the County’s triple-AAA
bond ratings: $93.5 million, an increase of $0.6 million.
o Self-Insurance Reserve: $10.3 million to remain in compliance with the County’s
Financial Policy, which requires the “equivalent to approximately one to two
months’ claim payments based on a five-year rolling average” and that any draw
on the reserve be “replenished within the subsequent two (2) fiscal years.”
Therefore, $1.15 million is included in close-out to replenish half of the funding
used from the reserve during FY 2026 for health insurance cost overages.
Additionally, $2.6 million is being added to the reserve to remain within the
rolling average of claims costs.
o Stabilization Reserve ($30.4 million): $22.1 million to maintain the required
minimum of 1.3% of General Fund operating budget per policy; any use of this
portion of the reserve would require repayment within two years. An additional
$8.3 million is remaining from the FY 2026 County Board set-aside, which does
not require repayment.
• Restricted & Non-Spendable Funding: $31.9 million
o Seized Asset funds: $2.9 million
o Grants, Transit, & Restricted funds: $5.4 million
o Fiduciary accounts (funds held in trust or for dedicated uses): $16.3 million
o PAYG: $1.7 million in revenue received from easement or property transfers
restricted by practice and capital transfer reconciliation for field fund (restricted
by policy) and e-summons revenue (restricted by state code).
o Legally restricted and Non-Spendable: $5.6 million
▪ $3.6 million to a non-spendable account for requirements under the
Governmental Accounting Standards Board (GASB) 87 and 96 for the
recognition of leases and subscription-based technology.
▪ $2.0 million to restricted non-spendable items identified in the FY 2026
year-end audit process. This includes prepaid expenditures for annual
subscriptions paid in advance.
• Schools: $18.6 million – Schools’ carryover is a combination of School expenditure
savings ($15.2 million), and School’s portion of tax revenue per the Principles of
Revenue Sharing ($3.7 million), partially offset by School’s contribution to the General
Fund Operating Reserve ($0.3 million).
• Affordable Housing Investment Fund (AHIF): $90.3 million – A combination of
previously allocated project funds ($18.5 million) and unallocated funds for anticipated
projects ($71.8 million). Some examples of projects with previously allocated funding
include Barcroft debt service, Goodwill 4% and 9%, and Crystal House #3 and #6.
Unallocated funds are envisioned to support anticipated CAF pipeline needs and
preserving existing CAFs. In addition to the $90.3 million carried over in the General
Fund, an additional $5.5 million in federal HOME funds dedicated to AHIF will be
carried over in the Community Development Fund.
• Prior County Board Appropriations and Allocations: $37.4 million – The County Board
has taken a number of actions as a part of the adopted FY 2027 budget or where the funds
are already dedicated (e.g., short-term financing) or the project has been previously
funded by the County Board as a multi-year effort (e.g., planning projects). These items
include the following:
o Debt service for a number of technology and equipment purchases approved as
part of prior budgets and CIP ($18.6 million). Examples of items funded with
short-term financing include PC replacement, server and network replacement,
and public safety technology.
o Funding for items already appropriated as part of the FY 2027 Adopted Budget
($8.6 million) such as funding Housing Grants ($1.4 million), County
Manager/County Attorney contingent ($2.0 million), OPEB ($1.9 million),
economic development incentive grants ($0.6 million), Sheriff Office funding
($0.4 million), and a number of other miscellaneous projects. See page 625 of the
FY 2027 Adopted Budget for a full list.
o Incomplete & Multi-Year Projects ($10.1 million): This allocation funds specific
projects whose schedule covers multiple fiscal years – particularly community
planning processes. In some cases, these projects have already encumbered funds
or the funding has been spent since July 1. This allocation will ensure that these
multi-year projects are completed. Examples include the historic resources
inventory, low residential study, the youth well-being plan, after school programs,
environmental and childcare initiatives, and completion of training for a Fire
recruit class. See Attachment 2D for additional details.
After allocating FY 2026 fund balance to reserves, restricted, and previously approved
allocations of monies available; $13.6 million remains for Board consideration. As mentioned
previously, the County Manager recommends setting aside most of this funding ($9.8 million)
for consideration during the FY 2028 budget.
The County Manager recommends allocating a portion of the $13.6 million ($3.8 million) to
several high-priority areas in FY 2027:
a. $900,000 for anticipated fuel cost increases in FY 2027 based on current costs for
gasoline and diesel fuel.
b. $800,000 for additional funding to the County Manager & County Attorney
contingents for ongoing litigation involving the federal government.
c. $509,000 for unanticipated public safety costs due to federal events surrounding
July 4, 2026, and for local holiday events.
d. $508,000 to DHS for public assistance staffing support, Arlington Food
Assistance Center (AFAC) and Arlington Free Clinic assistance
e. $387,196 for additional Police funding to support hiring seven officers for the
spring 2027 recruit class.
f. $370,000 for additional housing grants costs.
g. $190,000 for staffing support in the County Attorney’s Office.
h. $121,000 to address salary compression for employees in customer service classes
primarily in the Department of Human Services.
i. $33,493 for support to the Northern Virginia Emergency Response System
(NVERS) for support to the Fire Department.
j. $17,000 for the Circuit Court Judiciary for alcohol monitoring and electronic
monitoring.
Expenditures
General Fund FY 2026 expenditures, including transfers to other funds and $654.1 million to
Schools, totaled $1,743.6 million. County Operating Department expenses totaled $804.5 million
for FY 2026, an amount which includes $3.9 million in GASB (under GASB 72, 84, 87, and 96)
required adjustments. Excluding these reporting adjustments, there was $31.2 million which was
not spent by operating departments. This amount includes unspent grant funding which must be
carried over to the next fiscal year ($16.0 million) and monies provided by the County Board for
prior years’ one-time projects that are legally restricted ($2.9 million). Adjusting for grant funds
and restricted funding, the County departments ended the fiscal year with $11.7 million in
expenditure savings or approximately 1.4% of FY 2026 department operating budgets. For
comparison, in FY 2025, the County ended the fiscal year with $0.6 million in expenditure
savings or approximately 0.1% of the FY 2025 department operating budgets after adjusting for
grant funds and restricted/incomplete projects.
After accounting for GASB adjustments related to leases, four departments exceeded their
budget appropriation:
• Sheriff (-$2.2 million): The over-expenditure was primarily due to unused leave payouts
related to retirements or separations, additional costs for inmate medical care, and
overtime costs required in the detention facility for minimum staffing requirements,
partially offset by savings from staff vacancies.
• Technology Services (-$245,015): The over-expenditure was primarily due to unused
leave payouts and overtime costs related to retirements or separations.
• Fire (-$20,392): The over-expenditure was primarily due to overtime costs required to
meet minimum staffing requirements and unused leave payouts related to retirements or
separations.
• Management & Finance (-$77,005): The over-expenditure in personnel is due to unused
leave payouts related to retirements or separations.
Across County departments, a small level of savings is anticipated each year. There are always
unexpected vacancies or program delays. The difficulty is predicting where these vacancies and
delays will occur. As each fiscal year progresses, budgets are monitored, and adjustments are
made to reflect the unpredictability of expenditures.
Revenues
In March 2026, the County Board was presented with updated revenue projections for fiscal year
2026 as a part of the Mid-Year/3rd Quarter Review. When the FY 2026 budget was developed
and adopted, the full extent of the economic impacts associated with a new federal
administration and related policy changes was not yet fully known. As the fiscal year progressed,
the regional economic impacts of the federal workforce reductions, uncertainty surrounding
federal contract funding, inflationary pressures, and changes in travel and consumer spending
materialized and were reflected in revenue collection trends.
The March 2026 revenue update accounted for new economic data and actual revenue collection
trends. On the tax side, Transient Occupancy (Hotel) Tax and Meals Tax revenues were adjusted
down by $5.0 million and $3.0 million respectively to reflect slower growth due to reduced
travel to the area and slower consumer spending owing to increased economic uncertainty and
inflationary pressures. Additionally, an increase in funding was included due to lower real estate
tax refunds ($2.0 million), a decrease to personal property tax revenues to reflect slower than
anticipated growth in vehicle assessed values ($1.9 million), and various other adjustments to
both the tax and non-tax revenue side based on current revenue trends.
By fiscal year end, actual General Fund revenues, excluding fund balance, were $1.70 billion,
compared with a revised budget of $1.67 billion reported at the March 2026 revenue and
economic update.
Of this total, final tax revenues were 1.0 percent, or $13.8 million, higher than the revised Mid-
Year / 3rd Quarter projections. In summary:
• Real estate tax revenue was 0.7 percent, or $6.3 million, above revised projections.
• BPOL taxes exceeded projections by 5.6 percent, or $5.4 million, due to continued
strength of business gross receipts.
• Personal property receipts were 0.03 percent, or $0.05 million above revised projections.
• Sales tax came in 1.1 percent, or $0.6 million, above the revised projection
• Meals tax came in 1.7 percent, or $1.1 million, above the revised projection
• Transient Occupancy tax came in 2.2 percent, or $0.5 million, above the revised
projection
• Recordation tax came in 2.5 percent, or $0.1 million above the revised budget.
• Bank stock tax came in 3.6 percent, or $0.2 million above the revised budget
• All other miscellaneous taxes were down 1.5 percent, or $0.5 million; primarily driven by
car rental tax (3.2% or $0.3 million), Utility tax (0.7% or $0.1 million), and
communication tax (2.4% or $0.1 million).
The following tables show budgeted revenues, revised projections, and FY 2026 actual revenue
receipts.
FY 2026 Revised Budget to Actual Tax Revenues
Budgeted
Revenue
(Adopted in
April 2025)
Revised
Projection
(March 2026)
Actual
Revenue
$ Change
(March 2026
to Actual)
% Change
(March 2026
to Actual)
Real Estate1 $939,214,670 $941,214,670 $947,496,283 $6,281,613 0.7%
Personal
Property 150,132,147 148,232,147 148,282,532 50,385 0.03%
BPOL 96,242,581 96,242,581 101,648,622 5,406,041 5.6%
Sales 56,500,000 56,500,000 57,125,027 625,027 1.1%
Transient 29,000,000 24,000,000 24,523,584 523,584 2.2%
Meals Tax 67,000,000 64,000,000 65,108,370 1,108,370 1.7%
Recordation
Tax 5,500,000 5,700,000 5,844,575 144,575 2.5%
Bank Stock
Tax 6,000,000 6,000,000 6,214,564 214,564 3.6%
Other Taxes 33,705,000 33,305,000 32,808,657 (496,343) (1.5%)
Tax Totals $1,383,294,398 $1,375,194,398 $1,389,052,214 $13,857,816 1.0%
1 Real Estate Actuals do not include $7,141,100 in one-time funds that were received in FY 2026 as a result of the
CY 2026 real estate tax rate increase of $2.0 cents; these funds were included in the FY 2027 Adopted Budget and
will be carried over.
FY 2026 Revised Budget to Actual Non-Tax Revenues
Budgeted
Revenue
(adopted in
April 2025)
Revised
Projection
(March 2026)
Actual
Revenue
$ Change
(March 2026
to Actual)
% Change
(March 2026
to Actual)
License,
Permits, Fees $22,799,006 $21,989,850 $22,153,952 $164,102 0.7%
Use of Money
and Property 41,210,117 39,523,396 38,419,725 (1,103,671) (2.8%)
Outside Charges
for Service 78,377,863 78,949,522 81,026,105 2,076,584 2.6%
Miscellaneous
Revenue 2,377,930 3,800,000 6,447,005 2,647,005 69.7%
Affordable
Housing
Investment Fund
(AHIF)
- - 21,393,974 21,393,974 -
State Revenue 94,111,076 107,631,931 98,851,364 (8,780,567) (8.2%)
Federal Revenue 25,914,099 28,442,599 28,224,761 (217,838) (0.8%)
Transfers &
Other 10,483,705 10,648,626 7,936,917 (2,711,709) (25.5%)
GASB - - 7,306,000 7,306,000 -
Non-Tax Totals $275,273,796 $290,985,924 $311,759,802 $20,773,879 7.1%
License, Permits, Fees – Revenues came in slightly above the revised budget, primarily due to
land use permits and fees, as well as revenues from fines and forfeitures. However, revenues
remained below the originally adopted budget. At Mid-Year/3rd Quarter in March, revenue
projections were reduced by a combined $0.8 million, primarily reflecting lower anticipated
permitting activity in DES and CPHD, partially offset by higher projected revenues from photo
speed and red-light violations.
Interest Revenue – Interest income from General and Bond funds came in below the revised third
quarter revenue projections. Interest revenues are expected to continue to decline in the coming
years due to lower portfolio balances being maintained for the General Fund.
Outside Charges for Service – Exceeded budget primarily due to ambulance transport fees, DPR
parks and recreation charges, DES solid waste disposal and recycling fees, partially offset by
DPR fee reductions being over budget.
Miscellaneous Revenue – Exceeded budget primarily due to unbudgeted contributions for
Affordable Housing Investment Fund (AHIF) (separated out in the table above), which consist of
both developer contributions and loan repayments. Even though these funds are not budgeted,
due to the uncertainty of their timing, they are factored into long-term AHIF project planning.
Additionally, miscellaneous revenues exceeded projections due to repayment of expenses related
to Key Bridge Marriott ($1.5 million) and sale of right-of-way revenues.
State and Federal Revenues – Came in under budget primarily due to unspent grant funds that
will be carried over into FY 2027. These revenues are generally received on a reimbursement
basis, unspent funds are carried forward and reimbursements are received as eligible
expenditures are incurred. Therefore, this variance does not represent a loss of funds.
Transfers & Other Revenue – Actuals came in under budget primarily due to a budgeted transfer
from the IDA for the Ballston Skating Facility that was not needed. The Ballston Skating Facility
Fund is a trust account with expenses fully funded by a third party per the loan agreement with
the Industrial Development Authority (IDA). When revenues generated by the third party exceed
the debt service obligation for the year, no transfer in from the IDA is required.
PUBLIC ENGAGEMENT: The County Board will consider the County Manager’s
recommendations for adoption after a public hearing is held at the November County Board
meeting. Additionally, the public is invited to give feedback on staff’s recommendations by
emailing: DMF@arlingtonva.us.
FISCAL IMPACT: When the County Board makes final allocation and appropriation decisions
at the November 2026 board meeting on the FY 2026 Close-out package, the Board will ratify
final appropriations for FY 2026 fulfilling all County obligations and use of one-time funds to
meet critical priorities.
ATTACHMENT 1A
GENERAL FUND:
COUNTY BOARD......................................................…................. 2,649,207
COUNTY MANAGER..................................................................... 8,099,288
MANAGEMENT AND FINANCE.................................................... 12,465,065
HUMAN RESOURCES………………............................................… 10,813,425
TECHNOLOGY SERVICES…………………………………………… 32,344,779
COUNTY ATTORNEY.................................................................... 4,230,593
CIRCUIT COURT - JUDICIARY..................................................... 1,456,288
CIRCUIT COURT........................................................................... 4,992,223
GENERAL DISTRICT COURT....................................................... 407,383
JUVENILE AND DOMESTIC RELATIONS COURT...…................. 9,042,954
COMMONWEALTH'S ATTORNEY........................…..................... 7,699,358
OFFICE OF THE MAGISTRATE……………………………………… 23,465
OFFICE OF THE PUBLIC DEFENDER..……………………………… 615,158
SHERIFF........................…………………...…………….................. 58,383,564
COMMISSIONER OF REVENUE................................................... 6,713,603
TREASURER................................................................................. 8,820,504
ELECTORAL BOARD.................................................................... 1,824,624
POLICE.................................................…..................................... 95,651,920
EMERGENCY MANAGEMENT……………………………………… 15,881,676
FIRE............................................................................................... 85,909,653
ENVIRONMENTAL SERVICES.........…......................................... 126,436,435
HUMAN SERVICES...........................................…........................ 207,483,926
LIBRARIES.....................................................…............................ 18,837,159
ECONOMIC DEVELOPMENT.......................…............................. 9,427,840
COMMUNITY PLANNING, HOUSING & DEVELOPMENT............ 12,841,925
PARKS AND RECREATION.......................................................... 61,469,705
NON-DEPARTMENTAL................................................................. 119,196,313
DEBT SERVICE............................................................................. 81,205,097
REGIONAL CONTRIBUTIONS...................................................... 8,692,112
METRO........................................….............................................. 50,246,178
TOTAL GENERAL GOVERNMENT APPROPRIATION................................. $1,063,861,419
OTHER OPERATING FUNDS:
BALLSTON QUARTER CDA…………………………………………… 2,867,465
TRAVEL AND TOURISM PROMOTION FUND……………………… 1,242,438
BALLSTON BUSINESS IMPROVEMENT DISTRICT……………… 1,191,691
ROSSLYN BUSINESS IMPROVEMENT DISTRICT………………… 4,235,080
NATIONAL LANDING BUSINESS IMPROVEMENT DISTRICT…… 4,993,594
HOUSING AND COMMUNITY DEVELOPMENT .......................... 9,048,325
HOUSING CHOICE VOUCHER FUND.......................................... 31,416,508
COLUMBIA PIKE TIF..................................................................... 2,651,953
IDA - BALLSTON SKATING FACILITY (341)………………………… 2,378,404
IDA SIGNATURE (341)………………………………………………… 27,923
UTILITIES...................................................................................... 117,427,147
STORMWATER............................................................................. 20,923,855
DEVELOPMENT FUND ……………………………………………… 25,133,195
AUTOMOTIVE EQUIPMENT......................................................... 25,550,476
PRINTING...................................................................................... 1,675,186
BALLSTON GARAGE.................................................................... 3,256,409
BALLSTON GARAGE - 8TH LEVEL………………………………… 317,281
WTE MONITORING GROUP (743)…………………………………… 108,312
OPEB BENEFITS (751)………………………………………………… 15,852,488
TOTAL OTHER OPERATING FUNDS........................................................... $270,297,731
BE IT RESOLVED BY THE COUNTY BOARD OF ARLINGTON COUNTY, VIRGINIA, THAT THE FOLLOWING
APPROPRIATIONS ARE HEREBY ADOPTED FOR THE FISCAL YEAR 2026 AND THAT ANY SURPLUS FOR GENERAL
COUNTY PURPOSES REMAINING AT THE END OF THE FISCAL YEAR SHALL RETURN TO THE GENERAL FUND OF
THE COUNTY.
FY 2026 APPROPRIATION RESOLUTION
10
ATTACHMENT 1A
GENERAL CAPITAL PROJECTS FUND:
DEPARTMENT OF MANAGEMENT AND FINANCE……………… 303,949
CABLE TV……………….………………….………...………………… 1,390,030
TECHNOLOGY SERVICES........................................................... 12,085,952
ELECTORAL BOARD…………………………………………………… 2,000,000
PUBLIC SAFETY………………………………………………………… 13,735,841
ENVIRONMENTAL SERVICES:
Government Facilities................................................................ 14,919,271
Facilities Maintenance................................................................ 20,318,480
Transportation............................................................................ 45,891,301
Ballston Public Parking Garage…………………………………… 1,932,679
HUMAN SERVICES…………………………………………………… 2,063,916
ECONOMIC DEVELOPMENT / CULTURAL AFFAIRS…………… 518,385
COLUMBIA PIKE REDEVELOPMENT……………………………… -
PARKS & RECREATION ……………………………………...…...... 40,592,092
COMMUNITY PLANNING, HSG & DEVELOPMENT.……............. 1,075,507
REGIONALS & NON-DEPARTMENTAL........................................ 6,701,693
TOTAL GENERAL CAPITAL PROJECTS FUND........................................... $163,529,096
NON-GENERAL CAPITAL & BOND FUNDS:
STREET AND HIGHWAY BOND................................................... 25,279,833
COMMUNITY CONSERVATION BOND.......…….......................... 9,760,156
GOVERNMENT FACILITY BOND.................................................. 113,230,791
UTILITIES CONSTRUCTION......................................................... 47,732,012
STORMWATER CAPITAL FUND……………………………………… 15,848,954
STORMWATER MANAGEMENT BOND FUND…………………… 34,748,569
PARKS AND RECREATION BOND..……...................................... 63,346,913
TRANSPORTATION - HB2313 - LOCAL FUNDS (FUND 330)…… 68,335,805
TRANSPORTATION CAPITAL FUND (FUND 331)………………… 323,432,675
TRANSIT FACILITIES BOND (METRO)........................................ 52,389,976
TAX INCREMENT FUND (CC-PY-PENTAGON CITY)……………… 33,982,036
IDA BONDS……………………………………………………………… 2,796,776
WATER DISTRIBUTION BOND..................................................... 15,954,257
WASTE WATER TREATMENT BOND……………………………… 61,411,934
TOTAL NON-GENERAL FUND CAPITAL...................................................... $868,250,687
TOTAL CAPITAL FUNDS.............................................................................. $1,031,779,783
11
Attachment 1B
FY 2026 into FY 2027 Carryover Appropriations and Allocations
1. Allocate $134,158,673 to County Reserves
a. $93,479,812 to the General Fund Operating Reserve, including $92,839,223 in
existing reserves and $640,589 in additional funding to maintain the County
Board’s policy of funding the General Fund Operating Reserve at a minimum of
five and one-half percent of the General Fund budget in FY 2027, which is
important to maintaining the County’s triple Aaa bond ratings;
b. $10,291,825 to the County’s Self-Insurance Reserve, including $6,561,904 in
existing reserves and $2,579,921 in additional funding to maintain the County
Board’s policy of funding the Self-Insurance reserve at a level equivalent to
approximately one to two months’ claim payments based on a five-year rolling
average. In addition, $1,150,000 is being added to replenish half the amount
utilized in the FY 2026 budget to offset the cost of healthcare;
c. $30,387,036 to the Stabilization Reserve, including $30,235,624 in existing
reserves, $151,412 in additional funding to maintain the County Board policy of
funding the Stabilization Reserve at a minimum of 1.3 percent a minimum of one
percent of the FY 2027 adopted General Fund budget.
2. Allocate $21,858,477 from the FY 2026 General Fund fund balance to legally restricted
and non-spendable accounts.
a. Allocate $16,287,209 to restricted accounts for funds required to be reported due
to GASB requirement 84 which specifies specific criteria for identifying activities
that should be reported as fiduciary activities. The adoption of GASB 84 caused
some funds, historically called Trust and Agency accounts, to be included in fund
balance.
b. Allocate $3,552,760 to a non-spendable account for GASB 87 & 96 for the
recognition of certain lease assets and liabilities for leases, including those that
previously were classified as operating leases and recognized as income by
lessors and expenditures by lessees and for subscription-based software.
c. Allocate $2,018,508 to restricted non-spendable items identified in the FY 2026
year-end audit process.
3. Allocate and appropriate $10,089,273 from the FY 2026 General Fund fund balance to
legally restricted and required projects.
a. Allocate and appropriate $8,351,304 as detailed in attachment 2D, including
seized asset funds ($2,881,299), grant and fee revenue ($2,899,421), and other
sources of restricted funding ($2,570,584).
b. Allocate and appropriate $1,737,969 to Pay-As-You-Go capital (313) as a transfer
to capital from the General Fund (101.9011007) for revenue received from
easement or property transfers and capital transfer reconciliation.
4. Allocate $18,635,853 and appropriate $17,545,455 to the Schools, reflecting expenditure
savings generated by the Schools ($15,215,885) and higher taxes received for FY 2026
($3,719,764), which is partially offset by school’s contribution to the General Fund
12
Operating Reserve ($299,796). $1,090,398 in additional tax revenue was already
appropriated in the FY 2027 adopted budget.
5. Allocate $90,307,155 and appropriate $90,285,988 to affordable housing programs
reflecting the unexpended Affordable Housing Investment Funds (AHIF) in FY 2026 and
the amount already appropriated by the County Board in April 2026 as part of the
FY 2027 Adopted Budget.
6. Allocate $37,370,216 and appropriate $28,745,775 from the FY 2026 General Fund fund
balance to items based on prior board actions and policies:
a. Allocate $8,624,441 already appropriated by the County Board as part of the
FY 2027 adopted budget. Funding includes one-time monies for FY 2027
expenses such as funding Housing Grants ($1.4 million), County Manager/County
Attorney contingent ($2.0 million), OPEB ($1.9 million), economic development
incentive grants ($0.6 million), Sheriff Office funding ($0.4 million), and a
number of other miscellaneous projects. See page 625 of the FY 2027 Adopted
Budget for a full list.
b. Allocate $18,636,694 in debt service balances that have been committed as part of
prior year CIPs but not yet spent, and appropriate to Non-Departmental
(101.9011003).
c. Allocate and appropriate $10,109,081 for carryover for incomplete projects that
span multiple fiscal years such as the climate action fund, childcare grant
initiative, after school programming, household solid waste rebates, Fire recruit
class costs, and a number of projects initiated and continuing in FY 2027 as
detailed in attachment 2D.
7. Allocate and appropriate $3,835,689 to fund the County Manager’s recommendations as
outlined in the Board report and attachment 2D including:
a. $900,000 for anticipated fuel cost increases based on current costs for gasoline
and diesel fuel.
b. $800,000 for additional funding to the County Manager & County Attorney
contingents for ongoing litigation involving the federal government.
c. $509,000 for unanticipated public safety costs due to the federal events
surrounding various 4
th of July events and for local holiday events.
d. $508,000 to DHS for public assistance staffing support, AFAC and Arlington
Free Clinic assistance
e. $387,196 for additional funding in Police to support the hiring of seven officers
for the spring 2027 recruit class.
f. $370,000 for additional housing grant costs.
g. $190,000 for staffing support in the County Attorney’s Office.
h. $121,000 to address salary compression for employees in customer service classes
primarily in the Department of Human Services.
i. $33,493 for support to the Northern Virginia Emergency Response System
(NVERS) for support to the Fire Department.
j. $17,000 for the Circuit Court Judiciary for alcohol monitoring and electronic
monitoring.
13
8. Allocate $9,759,708 for consideration through the FY 2028 budget process.
14
Attachment 2
FY 2027 County Budget Appropriations
FY 2026 CLOSEOUT ADJUSTMENTS AFFECTING FY 2027
APPROPRIATION LEVELS
A. RECOMMENDATION: Re-appropriate in FY 2026, County purchase orders,
incomplete projects, carryover capital and operating projects, and revenues to be
received from federal, state, and other sources as summarized in Attachments 2A, 2B,
2C, and 2D.
EXPLANATION: Attachments 2A, 2B, 2C and 2D also summarize and detail
appropriations, expenditures, incomplete projects and other projects or programs
recommended for funding in FY 2027. This action also identifies those
appropriations of federal, state, and other revenues approved by the County Board in
FY 2026 that had not been received or expended as of the close of FY 2026.
Incomplete projects were, for the most part, funded in FY 2026 but unable to be
completed by the close of the fiscal year.
B. RECOMMENDATION: Increase the FY 2027 General Capital Projects Fund (313)
appropriation by $7,983,147 to reflect non-grant revenues received during FY 2026
but not previously appropriated.
EXPLANATION: During FY 2026, revenues of $7,983,147 were received for one-
time uses as well as various on-going projects where the County was eligible for
reimbursement by developers and other public or private parties as listed below.
The developer contributions ($4,270,850) include site plan payments for:
• Rosslyn Gateway Park ($3,000,000)
• Fort Myer Drive ($1,250,000)
• Parking Meter project ($20,850)
Cable revenue supports the County’s cable access equipment and transmissions
(-$20,520).
The miscellaneous revenue ($1,035,386) is for several projects including:
• Funds received as part of DPR partnership and cost sharing agreements to
repair and replace synthetic turf fields:
o Kenmore Synthetic Turf Field ($600,000)
o Long Bridge Synthetic Turf Field ($105,000)
o Funds received for insurance claims and refunds ($330,386)
Other capital project areas include:
15
• Interest income received $1,705,595
• Utility undergrounding contributions ($991,836) in the transportation program
for upcoming projects.
Developer Contributions
Cable TV Receipts
Interest
Miscellaneous
Utility Undergrounding
$4,270,850
(20,520)
1,705,595
1,035,386
991,836
Total $7,983,147
C. RECOMMENDATION: Increase the FY 2027 Transportation Capital Fund (330)
appropriation by $2,020,543 to reflect higher than budgeted non-grant revenue
receipts during FY 2026.
EXPLANATION: Actual transportation non-grant revenue received is higher than
budgeted in FY 2026 by $2,020,543. There was an increase in the NVTA local share
received ($603,328), non-grant user fee revenues for Capital Bikeshare ($595,910),
interest income ($632,125), and a vendor billing refund from a traffic signal project
($189,180).
D. RECOMMENDATION: Decrease the FY 2027 Transportation Capital Fund (331)
appropriation by $2,061,744 due primarily to lower than budgeted non-grant revenue
receipts during FY 2026 ($2,424,575) partially offset by increases in other non-tax
revenue sources ($362,831).
EXPLANATION: The decrease is due to lower than budgeted real estate revenue
($2,424,575), partly offset by refunds received from FHWA and the National Park
Service for project-related work ($343,977), and $18,854 in miscellaneous revenue.
E. RECOMMENDATION: Decrease the FY 2027 Crystal City, Potomac Yard and
Pentagon City TIF (335) appropriation by $665,031 to reflect lower than budgeted
non-grant revenue receipts during FY 2026.
EXPLANATION: The decrease to the Crystal City TIF is due to lower than
budgeted real estate revenue receipts during FY 2026 ($665,031).
F. RECOMMENDATION: Decrease the FY 2027 County Utilities Construction Fund
(519) appropriation by $8,511,679 to reflect actual revenue received less than
budgeted during FY 2026.
EXPLANATION: During FY 2026, the County Utility Pay-As-You-Go
Construction Fund (519) received $8,511,679 (27%) less revenue than the budget of
$31,538,918. Included is revenue from infrastructure availability fees (IAFs), interest
earnings and miscellaneous revenue, and Inter-Jurisdictional (IJ) partner revenue.
Inter-jurisdictional partners pay a pro-rata share of capital maintenance and capital
16
projects at the Water Pollution Control Plant, as well as their pro-rata share of
sanitary sewer conveyance capital maintenance. The budget for this revenue is based
upon a planned amount of capital projects being undertaken during the fiscal year. In
FY 2026, executed capital projects for IJ partner revenue fell below the budgeted
amounts, primarily due to delays in the Re-Gen suite of projects.
The FY 2026 revenue related to Utility (PAYG) projects is broken out as follows:
Inter-Jurisdictional Contribution-Plant Capital ($7,809,682)
Infrastructure Availability Fees (1,289,411)
Interest & Miscellaneous Revenue 587,414
Total ($8,511,679)
G. RECOMMENDATION: Appropriate $3,632,872 to the Water Bond Fund (525) and
transfer and appropriate $2,453,560 to the Water Pollution Control Plant Bond Fund
(530) to reflect bond premium received during the issuance of bonds in FY 2026.
EXPLANATION: During FY 2026, the Water Bond Fund (525) received
$3,632,872 of bond premium during the sale of 2026 General Obligation Public
Improvement Bonds. In June, $10,375,000 of bonds were issued for Washington
Aqueduct capital. These funds will be split between the Water Bond Fund (525) and
the Water Pollution Control Plant Bond Fund (530).
H. RECOMMENDATION: Allocate $1,033,802 from the Stormwater (532) fund as a
temporary year-end bridge loan to the Development (570) fund.
EXPLANATION: Similar to FY 2025, at the end of FY 2026, the CPHD
Development fund experienced a residual deficit due to lower revenue growth in prior
fiscal years and increased operational costs. This fiscal situation has been outlined to
the County Board through the budget process, and the Board has continued to raise
fees over the last three fiscal years to return this fund to positive cashflows. As
required of governmental funds, the cash balance is being shored up with this
temporary loan. The Stormwater fund is providing a temporary loan in the amount of
$1,033,802. This temporary loan is for the end of FY 2026 and is paid back at the
beginning of FY 2027.
I. RECOMMENDATION: Decrease the FY 2026 Stormwater Pay-As-You-Go
(PAYG) Capital Fund (533) appropriation by $191,795 to reflect actual revenue
received less than budgeted during FY 2026.
EXPLANATION: During FY 2026, the Stormwater PAYG Capital Fund (533)
received $191,795 less revenue than the adopted budget of $250,000.
J. RECOMMENDATION: Increase the FY 2027 Stormwater Bond Fund (534)
appropriation by $2,977,654, to reflect bond premium received during the issuance of
bonds and the additional transfer of capital in FY 2026.
17
EXPLANATION: During FY 2026, the Stormwater Bond Fund (534) received
$977,653 of bond premium during the sale of 2026 General Obligation Bonds in
which $8,800,000 of bonds were issued for various Stormwater Capital Projects. In
addition, $2,000,000 million was transferred to the Stormwater Bond Fund from the
Stormwater Operating Fund (532) to offset the cost of debt issuance.
18
MISCELLANEOUS FY 2027 SUPPLEMENTAL BUDGET
ADJUSTMENTS:
K. RECOMMENDATION: Appropriate $12,574 to the Rosslyn Business
Improvement District (204) from additional revenue received in FY 2026.
EXPLANATION: The Rosslyn Business Improvement District fund has earned
interest eligible for drawdown from fund balance. The appropriated funds will be held
in a contingent account within the BID fund to address unanticipated program or
administrative expenses.
L. RECOMMENDATION: Appropriate $12,121 from the Virginia Department of
Criminal Justice Services (DCJS) (101.461101) to the Commonwealth Attorney’s
Office (101.2501001) for the Victim Witness Grant Program.
EXPLANATION: DCJS provides annual ongoing grant funds to local
victim/witness programs to provide direct services, information, and assistance
required by Virginia’s Crime Victim and Witness Rights Act. After the County’s
FY 2027 budget was adopted, DCJS published the final FY 2027 awards which
included $287,881 to the Commonwealth Attorney’s Office – an increase of $12,121
from the County’s FY 2027 adopted budget. This appropriation aligns the County’s
FY 2027 adopted grant budget with the grantor’s FY 2027 award.
M. RECOMMENDATION: Authorize the addition of 0.20 FTE to increase an AED
Small Business Specialist position from 0.8 FTE to 1.0 FTE in the Department of
Economic Development BizLaunch Division.
EXPLANATION: Increasing the AED Small Business Specialist position to a full-
time 1.0 FTE to address the increased demand for bilingual business assistance,
outreach, and educational services for Arlington’s Spanish-speaking entrepreneurs
and small business owners. The Economic Development Department will use existing
budgeted resources to fund the increased hours.
N. RECOMMENDATION: Authorize the unfreezing of a 1.0 FTE Public Art Manager
position from the Strategic Investment Group (101.8104002) and reclass it to a 1.0
FTE Division Director, Marketing and Brand position in the Department of Economic
Development Director’s Office (101.8101001).
EXPLANATION: This position is funded by reallocating existing marketing non-
personnel funding of $233,788 and will coordinate marketing across the department’s
divisions and serve as the central marketing authority, managing enterprise marketing
strategy, brand architecture and governance, integrated demand generation, national
and global visibility, and strategic events.
19
O. RECOMMENDATION: Authorize a permanent 1.0 Benefits Analyst FTE in the
Human Resources Department of the Employee Services Division for Benefits and
Wellness services.
EXPLANATION: The Human Resources Department’s Employee Services Division
administers benefits and wellness services to Arlington County employees and
retirees. This Benefits Analyst position will enhance the Division’s capacity to
provide cost and data analysis, support program administration, and deliver ongoing
customer-focused services to County employees and retirees in response to growing
service demands. The position will be funded with existing budgeted resources.
P. RECOMMENDATION: Accept and appropriate $5,360 from the Virginia
Department of Motor Vehicles (VADMV) (101.471201) to the Sheriff’s Office
(101.2801001) and authorize the County Manager, or his designee, to execute the
associated grant agreements.
EXPLANATION: The Sheriff’s Office has been awarded $5,360 in Highway Safety
Grant funding by the VADMV to support the implementation of highway safety
projects. VADMV grant funds are made available for projects that have a goal of
improving highway safety through a reduction of speed-related fatalities and serious
speed related injuries. These funds will be used to cover overtime expenses associated
with selective speed enforcement in identified high crash areas within the County.
The grant does require matching funding of $2,680 for fuel and vehicle maintenance,
which are included as part of the FY 2027 operating budget.
Q. RECOMMENDATION: Reclassify 3.0 vacant permanent FTEs ($339,098, 3.0
FTEs) to temporary status in the Department of Parks and Recreation in the
Gymnastics Program.
EXPLANATION: This technical adjustment realigns available resources to support
the gymnastics program, provide greater scheduling flexibility, align staffing with
industry standards, and improve cost recovery. The action is budget neutral, utilizing
existing personnel funding ($268,042) to cover all related costs.
R. RECOMMENDATION: Accept and appropriate $62,500 from the Southeast
Sustainability Directors Network (101.451601) to the Non-departmental
account(101.9011002) to support the Arlington and Alexandria intervention in the
Dominion Energy/NextEra Energy merger proceeding.
EXPLANATION: The Southeast Sustainability Directors Network (SSDN) is
providing $125,000 in financial support to the Arlington/Alexandria joint effort in the
Dominion/NextEra merger proceeding. The funding is being split evenly with
Alexandria.
S. RECOMMENDATION: Appropriate $321,279 in Compensation Board revenue
(101.436100) to Clerk of Circuit Court ($26,518 in 101.2201001), Commissioner of
Revenue ($12,021 in 101.1601001), Commonwealth Attorney ($37,557 in
20
101.2501002), Sheriff ($229,064 in 101.2801001), and Treasurer ($16,119 in
101.1701001), for the 2.0% bonus for constitutional officers and employees approved
by the 2026 Session of the General Assembly.
EXPLANATION: The 2026 General Assembly approved funding and language to
provide for a 2.0% bonus for constitutional officers and their full-time employees on
July 1 to be reimbursable by the Compensation Board, provided that the locality uses
the funds for that purpose. The County paid these bonuses in September and has
received reimbursement from the Compensation Board.
T. RECOMMENDATION: Appropriate
$515,000 in Interest on Tax Refunds revenue
(101.410000) to Non-Departmental (101.9011002) as a technical adjustment to reflect
the portion of interest on refunds refunded to the taxpayer.
EXPLANATION: This technical budgetary adjustment follows an update in
accounting procedures where previously, the refund of interest to the taxpayer was
recorded as a reduction in revenue; moving forward, it will be recorded as an
expenditure. This net zero technical adjustment ensures accurate financial reporting.
U. RECOMMENDATION: Accept and appropriate $105,298 in additional Virginia
Aid to Localities revenues (101.463401.SOF.F2FPR) to the Fire Department
(101.3202001).
EXPLANATION: The Virginia Aid to Localities Program awarded Arlington a total
of $1,440,965. The final award is $105,298 above the budgeted amount in the FY
2027 Adopted Budget. Aid to Localities funding can be used for a variety of
department needs including personal protective equipment, training, fire prevention,
and supplies.
V. RECOMMENDATION: Accept and appropriate $25,000 in ambulance revenues
(101.442104) to the Fire Department (101.3204003) as a technical adjustment to
reflect the portion of ambulance revenues remitted to Falls Church Volunteer Fire
Department.
EXPLANATION: This technical budgetary adjustment follows an update in
accounting procedures where previously, the payment to Falls Church Volunteer Fire
Department was recorded as a reduction in revenue; moving forward, it will be
recorded as an expenditure. This net zero technical adjustment ensures accurate
financial reporting by the Fire Department.
W. RECOMMENDATION: (1) Accept and appropriate $53,625 from the Virginia
Department of Emergency Management (101.471201) to the Fire Department
(101.3203002) for grant-funded swift water team supplies; (2) approve the attached
FY 2027 (attachment 3) grant agreement with VDEM; and (3) authorize the County
Manager, or the County Manager's designee, to execute the Grant Agreement on
behalf of the County Board.
21
EXPLANATION: The Fire Department’s Swift Water Team was awarded the
Virginia Department of Emergency Management’s 2025 State Homeland Security
Grant for the replacement of personal protective equipment, dry suits, gear, and solar
power system for the rescue team. The period of performance for this grant runs
through June 30, 2027.
X. RECOMMENDATION: (1) Accept and appropriate $5,000 in one-time funding
from Virginia Housing (101.451301) for the Capacity Building Training grant to the
Department of Community Planning, Housing and Development, Housing Division
(101.8205001) for Fiscal Year 2027; (2) approve the attached FY 2027 Capacity
Building Training Grant Agreement with Virginia Housing (Attachment 3), subject to
approval as to final form by the County Attorney; and (3) authorize the County
Manager, or the County Manager's designee, to execute the Grant Agreement on
behalf of the County Board.
EXPLANATION: Virginia Housing awarded a one-time $5,000 grant to the CPHD
Housing Division to support staff training and professional development, including
attendance at housing-related conferences, workshops, and educational programs that
advance the County’s housing goals and initiatives.
Y. RECOMMENDATION: Accept and appropriate an additional $100,000 in ongoing
grant funding from the Virginia Department of Behavioral Health and Developmental
Services (DBHDS) (101.461101) to the Department of Human Services (DHS)
Regional Older Adult Facilities Mental Health Support Team (RAFT) (101.5032003)
program. Authorize the creation of a Human Services Specialist 1.00 FTE limited
term, utilizing available RAFT carryover funds.
EXPLANATION: The Virginia’s Department of Behavioral Health and
Developmental Services (DBHDS) RAFT is a grant-funded program serving
individuals 65 and older who have a diagnosis of serious mental illness or dementia
and a history of psychiatric hospitalization or are at risk of hospitalization. The
program supports efforts to reduce the number of clients at state psychiatric hospitals
and provides training and resources to individuals and their families. The objective of
these efforts is to promote individuals living in the least restrictive environment
possible, in a location that is close to home and family. The additional ongoing
funding and approved limited-term position will support the program’s capacity to
provide specialized behavioral health services to support this vulnerable population.
Z. RECOMMENDATION: Approve the conversion of five (5) limited term grant
funded full-time equivalents (FTEs) funded by Regional Older Adult Facilities
Mental Health Support Team (RAFT) (101.5032003), to permanent grant funded
FTEs.
EXPLANATION: The five (5) FTEs were established as limited term grant funded
positions. The Department of Human Services (DHS) funding from the Virginia
Department of Behavioral Health and Developmental Services (DBHDS) for the
RAFT program is now ongoing annual funding which warrants the FTEs to be
22
converted from limited term grant funded to permanent grant funded for the life of the
grant.
AA. RECOMMENDATION: De-appropriate $50,833 from the Opioid Abatement
Authority Individual Distribution and Gold Standard Distribution grant award
(101.461101) to the Department of Human Services (101.5020000).
EXPLANATION: The Opioid Abatement Authority awarded Arlington a grant in
the amount of $104,797 for Fiscal Year 2027. The final award is $50,833 below the
amount budgeted for the FY 2027 adopted budget. Funding is designated for a 1.0
Behavioral Health Therapist FTE supporting the Office-Based Opioid Treatment
Program.
BB. RECOMMENDATION: Appropriate $41,617 from the Opioid Settlement Direct
Distribution fund (199.9013003.TAG: NOPS) to the Department of Human Services
(DHS) (101.5020000) for personnel expenses for the Behavioral Health Therapist
supporting the County’s Office-Based Opioid Treatment Program (OBOT).
EXPLANATION: DHS was awarded a FY 2027 Opioid Abatement Authority grant
for a 1.0 Behavioral Health Therapist FTE to support the OBOT program expanding
its reach to more participants providing more access to critical medication assisted
treatment and therapy. The FY 2027 grant award and FY 2026 carryover funding do
not cover the estimated personnel expense. The County Board previously approved
the use of the Opioid Settlement Reserve for the addition of the Behavioral Health
Therapist, and the appropriation will be for the personnel expenses the grant and
carryover funding do not cover.
CC. RECOMMENDATION: Eliminate a vacant 1.0 Behavioral Health Therapist
(Licensed) limited term grant funded (101.5023004) FTE in the Behavioral
Healthcare Division.
EXPLANATION: The Behavioral Health Therapist (Licensed) was a limited term
STEP-VA Same Day Access grant funded FTE. Grant funding was exhausted in
FY 2026.
DD. RECOMMENDATION: Accept and appropriate $480,566 in ongoing grant funds
(101.461101) from the Department of Behavioral Health and Developmental
Services (DBHDS) to the Department of Human Services (101.5025005) for the
Arlington County Jail-based Restoration Program.
EXPLANATION: DHS accepted the initial award in March 2026. At that time,
DBHDS indicated that the funds are ongoing contingent on approval from the
General Assembly and therefore were not appropriated in the FY 2027 budget. The
Arlington County Jail-based Restoration Program is implemented in partnership with
the Sheriff’s Office and will restore defendants’ competency to remain in jail rather
than being admitted to a state hospital. The grant funds 2.0 Behavioral Health
23
Therapist FTEs that work in the Arlington County Detention Facility as part of the
existing DHS team.
EE. RECOMMENDATION: Approve the conversion of two (2) limited term STEP-VA
Marcus Alert grant funded (101.5023006) FTEs to permanent grant funded FTEs.
EXPLANATION: The two (2) FTEs were established as limited term grant funded
positions. The Department of Human Services funding from the Virginia Department
of Behavioral Health and Developmental Services (DBHDS) for the STEP-VA
Marcus Alert Program is ongoing annual funding which warrants the two (2) FTEs to
be converted from limited term grant funded to permanent grant funded for the life of
the grant.
FF. RECOMMENDATION: Accept and appropriate an additional $27,189 from the
Child Advocacy Center (CAC) Program grant funds (101.461101) from the Virginia
Department of Social Services (VDSS) to the Department of Human Services
(101.5062004).
EXPLANATION: The Child and Advocacy Center (CAC) Program, through the
Virginia Department of Social Services (VDSS), awarded Arlington a grant in the
amount of $314,787 for Fiscal Year 2027. The final award is $27,189 above the
amount budgeted in the FY 2027 Adopted budget. CAC funding is designated for
program costs such as staff, training for licensed mental health therapists, assessment/
therapy supplies, a recording system for forensic interviews, and CACVA
membership dues. Grants are awarded every year for a one-year period, and unspent
funds cannot be carried over to the following fiscal year.
GG. RECOMMENDATION: Accept and appropriate an additional $338,025 from the
Workforce Innovation and Opportunity Act (WIOA) Program grant funds
(101.471201) from the Virginia Community College System (VCCS) to the
Department of Human Services (101.5013004).
EXPLANATION: The Workforce Innovation and Opportunity Act (WIOA)
Program, through the Virginia Community College System (VCCS), awarded
Arlington a grant in the amount of $1,126,314 for the Program Year 2026 (Fiscal
Year 2027). The final award is $338,025 above the amount budgeted in the
FY 2027 Adopted budget. WIOA funding is for the Arlington and Alexandria
American Job Centers. Grants are awarded every year for a two-year period and
unspent funds carryover to the following fiscal year. Funding is designated for
program activities including staff, client training, supportive services, and
administration.
HH. RECOMMENDATION: Eliminate a vacant 1.0 Employment Service Specialist
limited term grant funded FTE (101.5013002) in the Economic Independence
Division.
24
EXPLANATION: The Employment Service Specialist was limited term FTE funded
by the Community Development Block Grant from the US Department of Housing
and Urban Development. Grant funding was exhausted in FY 2026.
II. RECOMMENDATION: Approve the conversion of $150,284 in non-personnel
local funding (101.5034006) to create a permanent 1.00 Public Health Nurse FTE in
the Department of Aging and Disability Services Division.
EXPLANATION: The Department Human Services seeks to repurpose unobligated
local funds to create a 1.0 Public Health Nurse FTE to provide care coordination and
medically tailored case management services for residents at Culpepper Garden,
many of whom were impacted by the assisted living closure, as well as those
returning from hospitalizations. The impact will be improved health outcomes for
vulnerable populations, enhanced coordination between medical and social service
systems, and earlier interventions to reduce risk.
JJ. RECOMMENDATION: Accept and appropriate an additional $30,481 in STEP-VA
Psychiatric Rehabilitation Services funds (101.5025000.461101) from the Virginia
Department of Behavioral Health and Developmental Services (DBHDS) to the
Department of Human Services (101.5025000).
EXPLANATION: The STEP-VA Psychiatric Rehabilitation Services program,
through DBHDS, awarded Arlington a grant in the amount of $82,476 for Fiscal Year
2027. The final award is $30,481 above the amount budgeted in the FY 2027 Adopted
budget.
KK. RECOMMENDATION: Decrease the appropriation in Fund 313 (313.3102010) by
$26,162 due to the closeout of a Department of Public Safety Communications and
Emergency Management grant (313.461101).
EXPLANATION: The Virginia Department of Emergency Management (VDEM)
awarded Arlington County $1,000,000 in Emergency Operation Center technology
enhancement grant in FY 2025 to be used in conjunction with appropriated capital
funds for the buildout of the Arlington County Emergency Operations Center and
Situational Awareness and Intelligence Center. The grant met all performance goals
and objectives, spending $973,838 of the grant award, leaving a balance of $26,162 at
grant closeout. The grant's period of performance ended in May 2026.
LL. RECOMMENDATION: Accept and Appropriate $1,000,000 in one-time grant
funds from the Virginia Department of Emergency Management (313.461101) to the
Department of Public Safety Communications and Emergency Management Capital
Funds (313.3102010).
EXPLANATION: The Virginia Department of Emergency Management (VDEM)
awarded Arlington County $1,000,000 for the development and implementation of a
regional Alternate Emergency Communications Center (AECC). The funding will
support the establishment of a resilient, interoperable backup emergency
25
communications capability in partnership with regional public safety agencies and the
City of Alexandria
MM. RECO
MMENDATION: Decrease the FY 2027 General Capital Projects Fund
(313) appropriation by $1,530,389 to reflect de-appropriation of grant and other
revenues.
EXP
LANATION: The decrease reflects leftover grant funding on two completed
projects ($1,090,098 to 313.4024002.Z0DMD and $62,606 to 313.4024002.ZDC12)
as well as the remaining balance that had been appropriated for the City of
Alexandria’s contribution to the West Glebe Road bridge which was completed under
budget ($377,685 to 313.4024002.ZBMWG).
NN. RECO
MMENDATION: Appropriate $2,642,000 in Department of Parks and
Recreation partnership funds for use in the Kenmore Middle School Synthetic Turf
Field Conversion (313.7091004.ZKENS.DPRPR)
EXP
LANATION: The FY 2025 – 2034 Capital Improvement Plan included outside
funding totaling $4,442,000 for the conversion of The Kenmore Middle School fields
to synthetic turf. Of that amount, $2,000,000 has been received and appropriated in
prior fiscal years. An additional $2,442,000 in outside funding is needed to include
Arlington Public School cost sharing ($2,442,000) and another $200,000 in outside
fundraising.
OO. RECO
MMENDATION: Appropriate $5,180,207 in bond premium to the PAYG
capital budget (313) associated with the 2026 bond sale.
EXP
LANATION: In the spring of 2026 the County received $6,180,207 in bond
proceeds from the sale of bonds issued for a variety of County capital projects. At
adoption of the CIP, the County Board approved and appropriated $1.0 million in
additional County projects. The remaining portion of bond premium was not
included in final Board action and needs to appropriated for FY 2027. Of the total
bond premium received, $1.18 million remains unallocated and remains available
for future capital needs.
PP. RECO
MMENDATION: Decrease the FY 2027 Transportation Capital Fund (330)
appropriation by $1,379,870 to reflect de-appropriation of grant funding.
EXP
LANATION: The decrease is due to project delays on aging grants and the
availability of newer grant funding to continue planned project work ($1,042,304 to
330.4024003.ZMA06, $101,708 to 330.4024003.ZMA11, and $235,858 to
330.4024003.ZMA63).
QQ. RECO
MMENDATION: Transfer and appropriate $1,250,000 from PAYG Capital
fund (313) to the Capital Transportation fund (331) to move received developer
contributions in PAYG Capital to the Transportation Capital fund where the project is
being executed.
26
EXPLANATION: The Fort Myer Drive Tunnel Removal and Multimodal Street
Improvements project underway in the Transportation Capital fund (331) is partly
funded by developer contributions. This recommendation includes transferring and
appropriating $1,250,000 from project code 313.ZRBFM to 331.ZRBFM.
RR. RECOMMENDATION: Decrease the FY 2027 Transportation Capital Fund (331)
appropriation by $16,288,679 to reflect de-appropriation of grant funding.
EXPLANATION: The decrease is due to a variety of factors related to transit
projects: (1) Transitway Extension to Potomac Yard project on indefinite hold
($8,417,000 to 331.4024003.ZMA08), (2) Ballston West Entrance aging grant
replaced by newer and larger grant funding ($4,500,000 to 331.4024003.ZMA41), (3)
Transitway Extension to Pentagon City project scope reduction ($2,884,495 to
331.4024003.ZMA13), (4) Remaining funds related to bus purchases ($361,777 to
331.4024003.ZMA19), and (5) aging grant and availability of newer grant funding to
continue work to improve bus shelters ($125,407 to 331.4024003.ZMA12).
SS. RECOMMENDATION: Decrease the FY 2027 Crystal City, Potomac Yard and
Pentagon City TIF (335) appropriation by $283,308 to reflect de-appropriation of
grant funding.
EXPLANATION: The Army-Navy Complete Streets project was completed under
the planned project cost. Remaining grant funds are being de-appropriated from the
capital budget program ($283,308 to 335.4024002.ZCP01).
TT. RECOMMENDATION: Appropriate $1,070,000 from the Ballston 8th Level
(540.481192) to the Ballston 1-7th Enterprise Fund (540.599201) to fund the capital
repairs in the garage as identified in the FY 2027 – FY 2036 Adopted CIP.
EXPLANATION: The CIP included $3.5 million in needed capital repairs in
FY 2027 related to structural concrete repairs and garage infrastructure. The repairs
are planned to be funded from balances from the Ballston Public Parking Garage
Fund ($2,430,000) and the Ballston Public Parking Garage 8th Level Fund
($1,070,000). This action will transfer the $1,070,000 from the Ballston Public
Parking Garage 8th Level to the Ballston Public Parking Garage Fund as a loan to
fund these repairs.
UU. RECOMMENDATION: Reclassify 6.0 filled overstrength FTEs ($642,210, 6.0
FTEs) to permanent status in the Department of Community Planning Housing and
Development in the Inspection Services (570.8203001) and Zoning Divisions
(570.8206001 and 570.8206002).
EXPLANATION: This technical adjustment realigns available resources to support
the Inspection Services and Zoning’s long-term staffing needs and operational
requirements. The action is budget neutral, utilizing existing non-personnel funding
($642,210) that will be transferred to personnel to cover all related costs. The six
27
positions are two Permit Processing Specialists assigned to ISD -Permit
Administration, three Administrative Technicians assigned to the Permit Arlington
Center, and one Zoning Technician assigned to the Zoning - Plan Review Team.
28
GENERAL FUND OPERATING (101)
REVISED
APPROPRIATION EXPENDITURES
EXPENDITURES
(OVER)/UNDER
REVISED
APPROPRIATION
FINAL
APPROPRIATION
County Board 2,711,460 2,649,207 62,253 2,649,207
County Manager 8,353,119 8,099,288 253,831 8,099,288
Management and Finance 12,388,060 12,465,065 (77,005) 12,465,065
Human Resources 11,228,427 10,813,425 415,002 10,813,425
Technology Services 31,775,926 32,344,779 (568,853) 32,344,779
County Attorney 4,653,161 4,230,593 422,568 4,230,593
Circuit Court - Judiciary 1,474,304 1,456,288 18,016 1,456,288
Circuit Court 5,040,288 4,992,223 48,065 4,992,223
General District Court 443,557 407,383 36,174 407,383
Juvenile & Domestic Relations Court 9,890,307 9,042,954 847,353 9,042,954
Commonwealth Attorney 8,112,088 7,699,358 412,730 7,699,358
Office of the Magistrate 30,832 23,465 7,367 23,465
Office of the Public Defender 712,571 615,158 97,413 615,158
Sheriff 56,036,991 58,383,564 (2,346,573) 58,383,564
Commissioner of Revenue 7,264,929 6,713,603 551,326 6,713,603
Treasurer 9,153,049 8,820,504 332,545 8,820,504
Electoral Board 2,149,515 1,824,624 324,891 1,824,624
Police 97,256,596 95,651,920 1,604,676 95,651,920
Office of Emergency Management 15,793,361 15,881,676 (88,315) 15,881,676
Fire 85,620,679 85,909,653 (288,974) 85,909,653
Environmental Services 135,682,171 126,436,435 9,245,736 126,436,435
Human Services 216,352,768 207,483,926 8,868,842 207,483,926
Libraries 19,073,340 18,837,159 236,181 18,837,159
Economic Development 10,319,187 9,427,840 891,347 9,427,840
Community Planning, Housing & Development 13,457,765 12,841,925 615,840 12,841,925
Parks and Recreation 66,211,592 61,469,705 4,741,887 61,469,705
Subtotal, Operating Departments 831,186,043 804,521,719 26,664,324 804,
521,719
Non-Departmental 213,692,475 119,196,313 94,496,162 119,196,313
Debt Service 88,195,000 81,205,097 6,989,903 81,205,097
Regionals 9,256,630 8,692,112 564,518 8,692,112
Metro 50,246,178 50,246,178 - 50,246,178
Total General Government 1,192,576,326 1,063,861,419 128,714,907 1,063,861,419
GENERAL FUND TRANSFERS:
Donations (199/799) 3,930,113 3,263,751 666,363 3,263,751
Travel and Tourism Promotion Fund (202) - - - -
General Capital Projects (313) 19,651,125 19,651,125 - 19,651,125
Utilities Fund (519) 100, 000 104,918 (4,918) 104,918
Stormwater Fund (532) 255,000 336,564 (81,564) 336,564
Development Fund (570) 1,734,821 1,734,821 - 1,734,821
Auto Fund (609) 339,035 339,035 - 339,035
Printing (611) 297,312 297,312 - 297,312
Other Post Employment Benefits (751) - - - -
Schools Operating (880) 669,269,341 575,755,890 93,513,451 575,755,890
Schools Community Activities (882) - 7,189,049 (7,189,049) 7,189,049
Schools Construction (886) - 6,738,901 (6,738,901) 6,738,901
Schools Debt Service Fund (888) - 60,548,120 (60,548,120) 60,548,120
Schools Comprehensive Services Act Fund (889) - 3,821,496 (3,821,496) 3,821,496
Total Interfund Transfers 695,576,747 679,780,982 15,795,765 679,780,982
Total General Fund Exp and Interfund Transfers 1,888,153,073 1,743,642,400 144,510,673 1,743,642,400
FY 2026 GENERAL FUND SUMMARY - EXPENDITURES, ENCUMBRANCES & REVISED APPROPRIATION
ATTACHMENT 2A
29
Attachment 2B
REVISED EXPENDITURES/ FINAL
APPROPRIATION TRANSFERS APPROPRIATION
BALLSTON QUARTER CDA (201) 3,683,134 2,867,465 2,867,465
TRAVEL AND TOURISM PROMOTION FUND (202) 1,476,202 1,242,438 1,242,438
BALLSTON BUSINESS IMPROVEMENT DISTRICT (203) 1,217,155 1,191,691 1,191,691
ROSSLYN BUSINESS IMPROVEMENT DISTRICT (204) 4,335,823 4,235,080 4,235,080
NATIONAL LANDING BUSINESS IMPROVEMENT DIST. (205) 5,022,575 4,993,594 4,993,594
HOUSING AND COMMUNITY DEVELOPMENT FUND (206) 15,869,127 9,048,325 9,048,325
HOUSING CHOICE VOUCHER (208) 33,369,929 31,416,508 31,416,508
COLUMBIA PIKE TIF (336) 2,309,890 2,651,953 2,651,953
IDA - BALLSTON SKATING FACILITY (341) - 2,378,404 2,378,404
IDA SIGNATURE (342) - 27,923 27,923
UTILITIES OPERATING FUND (503) 116,425,847 117,427,147 117,427,147
STORMWATER OPERATING FUND (532) 20,092,865 20,923,855 20,923,855
BALLSTON GARAGE (540) 4,525,547 3,256,409 3,256,409
BALLSTON GARAGE - 8th LEVEL (548) 1,030,391 317,281 317,281
CPHD DEVELOPMENT FUND (570) 27,539,309 25,133,195 25,133,195
AUTOMOTIVE EQUIPMENT FUND (609) 28,705,433 25,550,476 25,550,476
PRINTING (611) 1,691,986 1,675,186 1,675,186
WTE MONITORING GROUP (743) - 108,312 108,312
OPEB BENEFITS (751) 15,852,488 15,852,488
TOTAL OTHER FUNDS 267,295,213 270,297,731 270,297,731
FY 2026 OTHER OPERATING FUNDS - EXPENDITURES/TRANSFERS, ENCUMBRANCES & REVISED APPROPRIATIONS
30
Attachment 2B
Other County Funds Summary
The table on the prior page indicates the budget and actual expenditures in FY 2026 for each of
the non-General Fund, non-capital other operating funds. The majority of these funds are legally
or policy-restricted in use, or expenditures are limited to the amount of revenues received
without any General Fund tax support unless otherwise authorized. Several of these funds
support activities and projects that cross fiscal years and have balances that are carried over to
fund these multi-year efforts.
Most other County funds were within budget, with the following exceptions:
Utilities Fund – FY 2026 expenditures in the Utilities Fund were $1.0 million more than
budgeted. Overages were primarily in the following areas: $2.3 million at Water Sewer
Street Bureau largely due to higher water system maintenance costs ($1.6 million), and
$1.1 million for purchased water from the Washington Aqueduct. Cost savings were
realized in other areas to offset the overages: $1.2 million at the Water Pollution Control
Bureau in personnel savings and electricity, $0.4 million in savings for Water-Sewer
Engineering for utility markings, and $0.9 million in savings in debt service due to the
delay of FY 2025 debt issuance into FY 2026.
Utilities Fund revenues were $5.2 million (4%) higher than budgeted. Customer revenues
are the primary driver of higher than budgeted revenues ($4.1 million). Additional
revenues were received from Inter-Jurisdictional (IJ) Partner revenues ($0.4 million). The
IJ Partners pay a pro-rata share of operating expenses for wastewater treatment based on
their flow to the Plant. Both Plant expenses and flows at the Plant varied from budgeted
levels resulting in a budgetary difference.
Stormwater Management Fund – FY 2026 operating and maintenance expenditures in the
Stormwater Management Fund were $0.8 million higher than budgeted primarily due to
the larger transfer to capital than budgeted ($2 million) to offset the cost of debt issuance
to reduce the debt service in FY 2027 and beyond, mitigating a higher rate increase,
offset by savings in personnel ($0.4 million), debt service savings ($0.3 million), and
other non-personnel savings ($0.4 million). Stormwater Management Fund operating
revenues were $1.5 million (8%) higher than budgeted primarily due to interest revenue,
fee revenue, and one-time revenue due to the CY 2026 rate increase adopted as part of
the FY 2027 budget.
The Stormwater Management Fund ended FY 2026 with a balance of $6.6 million,
including $3.5 million for the 90-day operating reserve. Excess fund balance above the
reserve may be used to mitigate future rate increases or other priority needs of the
Stormwater Management Program.
WTE Monitoring Group Fund, OPEB Benefits Fund, IDA – Ballston Skating Facility
Fund, and IDA Signature Fund – FY 2026 expenses were incurred in these funds but not
budgeted. WTE and OPEB are both trusts with expenses covered by the trusts. Both the
31
Ballston Skating Facility Fund and the IDA Signature Fund are trust accounts with
expenses fully funded by third parties per their loan agreements with the IDA.
Columbia Pike TIF – FY 2026 expenditures were $0.3 million over budget, as more
revenue than budgeted was received during FY 2026. In line with the FY 2026 adopted
budget, the entire balance of funding available was utilized to offset the debt service costs
of preserving affordable housing units at Barcroft Apartments.
All other funds came in under budget. The following highlights significant under expenditures.
Ballston Quarter CDA – FY 2026 expenses were $0.8 million less than budgeted due to
$1.4 million lower meals and real estate tax increment disbursements to the trustee,
partially offset by $0.6 million of unbudgeted special assessment transfers made to the
trustee.
Housing and Community Development Fund – FY 2026 expenditures were $6.8 million
less than budgeted due to unspent entitlement funds, program income funds, and HOME-
ARP funds ($2.6 million). The remaining funds will be carried over into FY 2027.
Housing Choice Voucher – FY 2026 expenditures were $2.0 million less than budgeted
due to unspent grant income and fund balance reserves for rental assistance and
administrative funding. These funds, which are provided by the U.S. Department of
Housing and Urban Development, will be carried forward into future years and applied to
the current year’s housing subsidy and operational needs. Rental assistance and
administrative funding reserves are maintained to ensure the long-term financial health of
the program by providing staff the means to address unforeseen changes in the County’s
rental market or associated operational needs.
Ballston Garage (Levels 1-8) – The Ballston Garage funds ended FY 2025 with
expenditures $2.0 million less than budgeted due to the delay of several large capital
projects scheduled for the garage. It is anticipated that these projects and associated
expense will begin in FY 2027 and FY 2028.
CPHD Development Fund – FY 2026 expenditures were $2.4 million less than budgeted
due to personnel savings attributed to vacancies, as well as savings in contracted services,
operating equipment, and lower than budgeted Indirect Costs. Revenue came in $5.4
million over adopted budget primarily due to an increase in permitting and associated
fees to a 100% cost recovery model.
Automotive Equipment Fund – FY 2026 expenditures in the Automotive Equipment
Fund were $3.2 million less than budgeted. This was primarily due to delays in
replacement vehicles, such as school buses, fire apparatus, and heavy equipment, that
were ordered in FY 2026 but were not received and paid for during the fiscal year.
32
CAPITAL FUNDS
APPROPRIATIONS, EXPENDITURES AND CARRYOVER FOR FISCAL YEAR ENDING JUNE 30, 2026
GENERAL CAPITAL PROGRAM REVISED FINAL TOTAL GASB TOTAL
(FUND 313) APPROPRIATION (1) ADJUSTMENTS (2/4APPROPRIATIONS EXPENDITURES ADJUSTMENTS (3) CARRYOVER
Department of Management & Finance & HR (1202001, 1205001) 303,949 - 303,949 302,736 - 1,213
CABLE TV & Telecommunications (1401001) 1,390,030 - 1,390,030 973,063 - 416,967
DTS (1401002,1404002,1405001) 12,085,952 - 12,085,952 8,178,696 (102,345) 3,804,911
Electoral Board (1801001) 2,000,000 - 2,000,000 665,950 - 1,334,050
Sheriff (2804001) 851,825 - 851,825 462,375 - 389,450
Police (3011003) 1,958,805 - 1,958,805 920,610 - 1,038,195
DPSCEM (3101010,3102010) 9,753,376 - 9,753,376 6,288,486 - 3,464,890
Fire (3202001,3203001,3203002) 1,171,835 - 1,171,835 794,310 - 377,525
DES - Ballston Public Parking Garage (4023051) 1,932,679 - 1,932,679 - - 1,932,679
DES - Transportation (4021002 - 4022003 & 4024001 - 4024003) 45,891,301 - 45,891,301 10,882,977 - 35,008,324
DES - Other - 0 (11) - 11
DES - Government Facilities (4034001) 14,919,271 - 14,919,271 2,224,490 - 12,694,781
DES - Facilities Maintenance (4034002) 19,918,480 400,000 20,318,480 5,379,117 - 14,939,363
DHS - Residential Services and Information Services (5000000's) 2,063,916 - 2,063,916 726,166 - 1,337,750
AED - Public Art (8105003,8105004) 518,385 - 518,385 157,430 - 360,955
CPHD - Neighborhood Conservation (8204001) 1,075,507 - 1,075,507 711,587 - 363,920
DPR (7091001 - 7091006) 40,592,092 - 40,592,092 4,670,245 - 35,921,847
Regionals / Non-Department (9011002,9011005,9011007) 6,701,693 - 6,701,693 1,960,300 - 4,741,393
TOTAL GENERAL CAPITAL PROGRAM 163,129,096 400,000 163,529,096 45,298,527 (102,345) 118,128,224
COUNTY BOND, IDA AND UTILITY FUND REVISED FINAL TOTAL GASB TOTAL
CAPITAL PROJECTS (FUND 314-340, 519-530) APPROPRIATION ADJUSTMENTS (2/4APPROPRIATIONS EXPENDITURES ADJUSTMENTS CARRYOVER
STREET AND HIGHWAY (FUND 314) 25,182,781 97,052 25,279,833 12,591,889 - 12,687,944
COMMUNITY CONSERVATION (FUND 316) 9,496,481 263,675 9,760,156 1,535,984 - 8,224,172
GOVERNMENT FACILITY (FUND 317) - -
DTS (1401001,1401002) 2,725,835 - 2,725,835 982,188 (249,772) 1,493,875
DPSCEM (3102010) - - - - 0
DES - Transportation (4024001, 4024002) 177,250 - 177,250 177,888 - (638)
DES - Government Facilities (4034001) 70,920,716 (800,000) 70,120,716 13,183,350 - 56,937,366
DES - Government Facilities (4034002) 38,576,840 (350,000) 38,226,840 6,632,653 - 31,594,187
DES - Other - - - 2,208 - (2,208)
DPR - Parks (7091001 - 7091006) - - - - -
Regionals / Non-Department (9011002,9011005,9011007) 1,044,812 935,338 1,980,150 985,582 - 994,568
FUND 317 Total 113,445,453 (214,662) 113,230,791 21,963,869 (249,772) 91,017,150
PARKS AND RECREATION ( FUND 324) 62,625,271 721,642 63,346,913 6,132,132 - 57,214,781
TRANSPORTATION (FUND 330) 68,335,805 - 68,335,805 15,912,950 - 52,422,855
TRANSPORTATION CAPITAL FUND - C&I (FUND 331) 323,432,675 - 323,432,675 106,810,911 - 216,621,764
METRO (FUND 333) 52,104,358 285,618 52,389,976 7,967,440 - 44,422,536
CRYSTAL CITY/POTOMAC YARD/PENTAGON CITY TIF (FUND 335) 33,982,036 - 33,982,036 10,320,233 - 23,661,803
IDA BONDS (FUND 340) 11,673,872 (8,877,096) 2,796,776 798,275 - 1,998,501
UTILITIES - CONSTRUCTION (FUND 519) 47,732,012 - 47,732,012 24,085,679 - 23,646,333
WATER DISTRIBUTION (FUND 525) 15,954,257 - 15,954,257 8,928,129 - 7,026,128
WASTE TREATMENT PLANT (FUND 530) 61,411,934 - 61,411,934 13,609,879 - 47,802,055
STORMWATER MANAGEMENT FUND (FUND 533) 15,848,954 - 15,848,954 4,799,238 - 11,049,716
STORMWATER MANAGEMENT BOND FUND (FUND 534) 34,748,569 - 34,748,569 8,849,786 - 25,898,783
TOTAL COUNTY BOND, IDA & UTILITIES CAPITAL 875,974,458 (7,723,771) 868,250,687 244,306,394 (249,772) 623,694,521
EXPLANATORY COMMENTS:
(1) Revised appropriation is current year budget (Paygo) + carryover from previous fiscal year+supplemental appropriations (such as bond sale, interest earned, etc) during the year
(3) Any net increases due to GASB rules 86 or 97 are reduced from the actual expenditures.
(2) Adjustments are funding changes within a fund. No changes can be made between funds without supplemental County Board action. Interest revenue earned in bond funds is added back in this
column.
ATTACHMENT 2C
33
Attachment 2C
Capital Program Area Funds Summary
The tables on the prior pages indicate the budget, expenditures, and balances as of the
end of Fiscal Year 2026 for each of the capital funds.
Public and Government Facilities Capital Program Area
Work completed in the Facilities Capital Program Area in FY 2026 includes 3700 Four-
Mile Run Window Replacement, Walter Reed Community Center Fire System
Replacement and Courts Police ATS Replacement, and Courthouse 4th and 12th Floor
Upgrades. Substantially completed projects include Fires Station 8, AED-Art Park Install,
and Relocation of Cultural Affairs.
Sources of funding for Facilities capital projects include Government Facility Bond and
Pay-As-You-Go (PAYG) funding. Combined balances from these funding sources that
are carried into FY 2027 total $115.9 million. The carryover funds will be used to
continue relocating the Situational Awareness Intelligence Unit consolidation, Oakland
Street Warehouse renovations, Courthouse 4th Floor Upgrades, and Quincy Property
building 1 & 3 improvements..
Funding will also be used to continue or begin the following projects: Madison
Community Center Refresh , and Central Library Plaza Repairs along with other various
ongoing maintenance capital projects.
Local Parks and Recreation Capital Program Area
Parks and Recreation Capital Program Area completed construction of Arlington Junction
Park and the pickleball court project at Walter Reed Community Center and Park.
Additionally, the program had a significant number of projects in design in FY 2026,
including: Arlington Boathouse, Arlington Hall West Park, Bailey’s Branch Park
Playground, Doctor’s Run Playground, Douglas Park, Drew Park, Gunston Park, Jennie
Dean Park, Lacey Woods Park, Monroe Park, Rosslyn Gateway, Three Urban Parks,
Woodmont Park, Rosslyn Gateway, as well as projects under construction at Bluemont
Tennis Courts and Lacey Woods Park.
The Synthetic Turf Program (in PAYG) continues to keep up with needs by addressing
the replacement of synthetic turf fields as each field reaches the end of its warranty life
cycle. The synthetic turf futsal court surfacing at Tyrol Hills Park was completed in
FY 2026. The replacement of the synthetic turf fields at Greenbrier Park (Yorktown High
School) and the replacement of the lower field at Thomas Jefferson Community Center
were completed in spring 2026.
The Trail and Bridge Modernization Program continues to address a combination of full
replacement of trails and milling and repaving to extend the useful life on the County’s
34
existing multipurpose trails. For Fiscal Year 2026, the Program milled and repaved
approximately 14,300 linear feet of trail within the County including two miles of the
Custis Trail and major improvements to the Bluemont Junction Trail.
No bridge construction was completed during FY 2026. Instead, four bridge replacements
were approved for construction and bid out for replacement. Construction plans for the
replacement of three bridges in Rock Spring Park were approved in May 2025. In
addition, construction plans for the replacement of the bridge in Alcova Heights Park
were approved in June 2025. This latter bridge replacement will remove an existing aging
bridge that has steps at both ends of the bridge making it inaccessible per Americans with
Disabilities Act regulations. Construction of the Alcova Heights Park bridge is
anticipated for fall 2026 while the construction of the Rock Spring Park bridges is
anticipated for spring 2027.
Sources of funding for Park’s capital projects include Parks General Obligation Bonds,
PAYG, Short-Term Financing, developer or partnership funding, and Crystal City TIF.
Combined balances from these funding sources, excluding CC TIF, that are carried into
FY 2027 total approximately $96.84 million. Carryover balances are set aside for Parks
Land Acquisition and Public Space Program, Field Fund, Trail and Bridge Modernization
Program, and Parks Maintenance Capital and Parks Master Plan projects in various stages
of design or construction.
Arlington Neighborhoods Program and Economic Development Capital Program Areas
In FY 2026, Arlington Neighborhoods Program Area completed three street improvement
projects at a total cost of $1.36 million, and one park project at a total cost of $451k.The
Arlington Neighborhoods Program active projects portfolio consists of 16 projects, most
of which will be either in construction or preparing for construction in FY 2027. Five of
the current projects are expected to be completed by the end of FY 2027.
Information Technology and Equipment Capital Program Area
This category includes enterprise-wide information technology, public safety, and other
department specific equipment and technologies. Specific projects that have had
significant FY 2026 expenditures include:
Call Premise Equipment ($387k), Customer Assessment and Payment Portal Refreshment
($680k), DHS Customer Service/Case Manager/Homeless Management Information
System Upgrade ($601k), Computer replacement ($3.03 million), Computer Aided
Dispatch ($2.2 million), Courthouse Magnetometer ($238k), Day Care Center & In-home
Child Care Licensing System ($126k), Data Center Consolidation ($1.28 million), E-gov
Cloud Migration (523k), Electronic Records Management System Modernization project
($438k), Emergency Operating Center Upgrades ($842k), Fire Breathing Apparatus
($483k), Fire Thermal Imaging Cameras ($219k), Justice Center Security Upgrades
($144k), Network refreshment ($1.5 million), Server refreshment ($175k), Oracle System
Upgrade ($232k), Public Safety Radios ($2.7 million), Public Safety Radio System
Upgrade ($127k), Public Safety Servers ($728k), Real Estate Assessment System
Upgrade ($479k), and the Telephone System Replacement Project ($743k). Sources of
35
funding include cable television revenue, short-term financing, PAYG funding, and
Government Facility bonds. Combined balances to be carried into FY 2026 total $10.9
million.
Stormwater Management Capital Program Area
Sources of funding for Stormwater capital projects include Stormwater bond fund and the
Stormwater Capital Projects Fund balances. Combined balances from these funding
sources that are carried into FY 2027 total $24.8 million.
In FY 2026, major accomplishments were the acquisition of six properties for overland
relief ($7.0 million), and substantial completion of Grandma’s Creek Outfall
rehabilitation ($0.4 million). The program area also completed substantial capital
maintenance ($2.2 million), including terra cotta and corrugated metal pipe upgrades,
stormwater frames and covers, pipe relining and replacement and manhole rehabilitation.
The balances that are being carried forward into FY 2027 will be used on capital projects
in accordance with the County's adopted FY 2027 – FY 2036 CIP. The 2014 Stormwater
Master Plan provides a long-term framework for effective stormwater management.
Funding for Stormwater Management Capital projects also includes federal and state
sources from which the program will seek reimbursement, which were appropriated in
prior years as they were approved and accepted by the County Board. Total federal
funding sources that are carried into FY 2027 total $5.3 million from the Virginia
Department of Transportation (VDOT) for the Dumbarton Culvert Replacement ($5.0
million) and the U.S. Department of Housing and Urban Development (HUD) for
utilization of Community Project Funding for Integrated Gray-Green Infrastructure for
Public Streets for South Walter Reed Green Streets ($0.2 million), and pass-through
federal funding through the National Fish and Wildlife Foundation for Barcroft Green
Streets ($0.1 million). State funding sources total $2.3 million from the State and Local
Assistance Fund (SLAF) for Gulf Branch Stream Restoration ($1.0 million), and
Department of Conservation and Recreation’s Community Flood Preparedness Funds for
various projects ($1.3 million).
Utilities Capital
Sources of funding for Utilities capital projects include Water, Sewer, and Waste
Treatment Plant bond funds, and the Utilities Construction Fund. Combined balances
from these funding sources that are carried into FY 2027 total $73.6 million.
In FY 2026, major accomplishments include the substantial completion of the North
Lexington Street from 9th Street North to Wilson Boulevard water and sewer main
replacement ($1.6 million). As a result of the Plant’s Solids Master Plan adopted by the
County Board in July 2018 to update the solids handling processes, construction of early
work (Phase 2) of Re-Gen began in FY 2026, and planning and design continued for
Phase 3 (Re-Gen phases two and three ($14.0 million). Additionally, many segments of
water mains were replaced or rehabilitated ($3.2 million), other water mains were cleaned
and lined ($0.9 million), sewer mains were rehabilitated to reduce infiltration and inflow
36
(I&I) ($2.5 million), and other sewer mains were replaced and rehabilitated ($0.6
million).
The balances that are being carried into FY 2027 will be used on water main
replacements ($4.3 million), large diameter sewer rehabilitations ($3.0 million), sewer
main replacements and force main rehabilitation ($1.4 million), pump station
improvements ($1.9 million), and water reliability and redundancy ($2.7 million). At the
Plant, balances will primarily support the Re-Gen suite of projects ($50.3 million).
Capital projects at the Washington Aqueduct ($8.2 million) will also be partially funded
in FY 2026 from capital balances. The total balances carried into FY 2027 include a
$0.75 million Community Project Funding grant originally appropriated in FY 2024 from
the U.S. Department of Housing and Urban Development (HUD) to prevent sanitary
sewer structural failures, infiltration, and inflow in the Columbia Pike/Sparrow Pond
section of the Four Mile Run Interceptor.
Transportation Capital
In FY 2026, major accomplishments included completion of a number of projects:
• Columbia Pike – substantial completion of S. Quinn Street to S. Courthouse Road
(Segment C)
• Columbia Pike – substantial completion of S. Courthouse Road to S. Garfield
Street (Segment D)
• Army Navy Drive Complete Street
• South Eads Street Complete Street Phase 1 (Army-Navy Drive to 12th Street S)
and Phase 2 (12th Street S to 15th Street S)
• South Irving Street Complete Street from 6th Street South to 7th Street South
• Transitway Extension to Pentagon City
• Purchase and placement in service of four Battery Electric Buses (BEBs)
• Installation of BEB charging equipment at new ART Operations and Maintenance
facility
• Various bus stop improvements throughout the County
• Numerous quick build Street Safety Improvement projects throughout the County:
o Rebuild of 19 traffic signals; 10 out of 19 rebuilds were funded through
developers and other projects
o 1 new signalized intersection built
o 10 traffic signal battery backup systems installed
o 9 intersections rewired
o Signals cabinet upgrades at 9 locations
o In the Streetlights program, the first-generation LEDs are being replaced
with newer LED luminaires. In FY 2026, 810 such luminaires were
replaced and staff are actively working to replace the rest.
Local funding sources for Transportation Capital projects include the Commercial &
Industrial Tax (TCF-C&I), TCF-NVTA Local funds, Metro & Transportation Bond
funds, Crystal City/Potomac Yard/Pentagon City Tax Increment Funds (TIF), PAYG, and
developer contributions. Combined balances from these funding sources that are carried
into FY 2027 total $140 million and will be primarily used for the following categories:
37
• Crystal City/Pentagon City/Potomac Yard Street Program’s balance of $19.5
million is programmed to fund various projects including the 15th Street
South/Clark-Bell Realignment; addition of protected bike lanes along Army-Navy
Drive; multimodal improvements on Long Bridge Drive; safety and accessibility
improvements along Crystal Drive; the Crystal City to DCA Multimodal
Connection; 18
th Street South realignment Clark-Bell to Crystal Drive; and
improvements along 23rd Street South US 1 to Crystal Drive.
• Rosslyn-Ballston Arterial Street Improvement Program’s balance of $21.7 million
will be used for multimodal improvements along Wilson Boulevard, Meade Street
Multimodal Improvements, Fort Myer Drive sidewalk improvements, N. Lynn
Street Bike Lane Improvements; intersection improvements at Fairfax Drive and
North Kirkwood Road and at North Rhodes Street and Wilson Boulevard; and the
Fort Myer Drive Multimodal Street Improvements and tunnel removal.
• Other Complete Streets Program balances of $20.8 million will be used for
Neighborhood Complete Streets Program projects ($3.6 million) and for various
improvements outside major corridors such as Walter Reed Drive (6
th Street
South to Columbia Pike), Military Road/ Nelly Custis Drive intersection, South
Carlin Springs Road, South George Mason Drive, Sycamore Street near the East
Falls Church Metro, and various plans and studies, including completion of the
update to the Master Transportation Plan.
• The WalkArlington and BikeArlington program balances total $5.2 million. This
funding will be used to improve the Arlington Boulevard Trail along Fairfax
Drive in Rosslyn, make various small-scale safety improvements at intersections
along the Rosslyn-Ballston corridor, as well as to complete the NEPA
documentation for the Arlington Memorial Trail project.
• The Transportation Engineering and Operations program balance of $10.1 million
will be used for traffic signal projects ($2.8 million) on various intersections and
streets including Route 1 and 27
th Street South in Crystal City, Langston
Boulevard, and Washington Boulevard and at the East Falls Church Metro; $2.4
million for the Street Safety Improvement program; $1.9 million for
improvements in the streetlight program for various locations in the County; $1.6
million for Intelligent Transportation System program improvements; and $0.8
million to maintain signals and ITS equipment.
• Transit program’s balance of $40.9 million will continue funding major projects,
including Crystal City Metrorail Station East Entrance, Ballston-MU Metrorail
Station West Entrance, Bus Bay Expansion at East Falls Church Metrorail
Station, Court House Elevator, ART Fleet Equipment and Replacement, ART
Farebox Upgrades, and Microtransit implementation.
• Bridge Renovation and Maintenance funds of $9.5 million will be used to fund
the replacement of Arlington Ridge / Mount Vernon Road bridge as well as for
maintenance capital work on bridges throughout Arlington County.
• The capital reserve carryover is $3.8 million.
Funding for Transportation Capital projects also includes federal, state, and regional
sources from which the program seeks reimbursement. These include FY 2025 carryover
38
balances as well as various new federal, state, and regional funds that were appropriated
during FY 2026 as they were approved and accepted by the County Board. Combined
federal, state, and regional funding sources that are carried into FY 2027 total $196
million and will be used for the following categories.
• $125.6 million of state and regional funding will continue to advance major
Transit projects, including, the Ballston-MU Metrorail Station West Entrance,
East Falls Church Metrorail Station Bus Bay Expansion, Transit ITS, Transit
Signal Priority, ART Fleet Equipment and Replacement, ART Fare Box upgrades,
and Microtransit implementation.
• Crystal City, Pentagon City, Potomac Yard Streets Program available federal,
state, and regional funding of $22.8 million will fund the Crystal City to DCA
Multimodal Connection and the 15
th Street South/Clark-Bell Realignment.
• State and regional Funding of $21.1 million for the Rosslyn-Ballston Arterial
Street Improvement Program will fund Core of Rosslyn projects, including the
North Lynn Street Bike Lane Improvements, the Wilson Boulevard multimodal
improvements, Fort Myer Drive sidewalks, as well as design for the Fort Myer
Drive Tunnel Removal and Multimodal Street Improvement project.
• Federal and state funding of $13.0 million will be used to rebuild the Arlington
Ridge / Mount Vernon Road bridge.
• Complete Streets federal and state funds of $5.7 million will fund various
improvements outside major corridors.
• Federal and state funding of $3.0 million will be used to improve the south side of
Arlington Boulevard Trail from George Mason Drive to east of Glebe Road.
• Federal, state, and regional funding of $2.2 million will fund various
Transportation Engineering and Operations projects including signal optimization
and signal upgrades in East Falls Church.
Several grants are being de-obligated. The de-appropriation relates to grants that have
expired or reflect remaining balances on completed projects or projects that have been
put on hold. Some of the major projects for which grants are being de-appropriated
include Transitway Extension to Potomac Yard, Ballston Metrorail Station West
Entrance (grant replaced by a newer, larger grant), Transitway Extension to Pentagon
City (project completed), ART Fleet Equipment and Replacement (remaining balances
after bus purchase), and demand-based parking (project completed).
39
ATTACHMENT 2D
FUND / DEPARTMENT / PROJECT EXPENDITURES REVENUES NET CARRY FTEs
General Fund:
Arlington Economic Development
Grant: Virginia Innovation Partnership Corporation (VIPC) 150,000 150,000 -
BizLaunch Strengthening Outcomes, Advancing Results Small
Business Assistance 61,497 - 61,497
National Landing BID ReLaunch 7,569 - 7,569
subtotal 219,066 150,000 69,066 -
Commonwealth Attorney's Office
Grant: DOJ 2nd Chance Act Pay Success Program 141,111 141,111 -
Seized Assets 42,815 - 42,815
subtotal 183,926 141,111 42,815 -
Circuit Court Judiciary
Fuel 5,900 - 5,900
Secure Continuous Remote Alcohol Monitoring for Indigent
Defendants 29,823 - 29,823
subtotal 35,723 - 35,723 -
Clerk of the Circuit Court
Compression Study - Customer Service 4,000 - 4,000
subtotal 4,000 - 4,000 -
County Attorney's Office
Attorney II Full-Time Equivalent (FTE) 190,000 - 190,000 1.0
subtotal 190,000 - 190,000 1.0
County Board Office
Independent Police Auditor Support 39,830 - 39,830
subtotal 39,830 - 39,830 -
County Manager's Office
Human Rights - Training & Testing 44,844 - 44,844
Green Valley Neighborhood Partnership Grants 80,000 - 80,000
Compression Study - Customer Service 4,999 - 4,999
subtotal 129,843 - 129,843 -
Department of Environmental Services
Grant: Transit 16M (now Route A40) Service Enhancement 2,822,463 2,822,463 -
Grant: Transit - ART Route 75 Bus Services Enhancements 313,091 313,091 -
Grant: Transit - ART Route 87 Bus Services Enhancements 384,955 384,955 -
Grant: Transportation Resources for Arlington County (TRAC) -
Congestion Mitigation and Air Quality and Regional Surface
Transportation Program funding for project #72526-12 159,410 159,410 -
Grant:TRAC - Shared Mobility Devices 158,191 - 158,191
TRAC - Transportation Demand Management Revenue 1,272,128 - 1,272,128
TRAC - Commuter Store Fee Revenue 775,412 - 775,412
Solid Waste Bureau: Education and Outreach 53,762 - 53,762
Household Solid Waste Rate: One-time Refund - (1,000,000) 1,000,000
Fuel 193,800 - 193,800
subtotal 6,133,212 2,679,919 3,453,293 -
Department of Human Services
Adverse Childhood Expereinces Prevention 207,848 - 207,848
Parenting Coaching 18,481 - 18,481
Housing Grants 370,000 - 370,000
Public Assistance Bureau Staffing 519,000 304,000 215,000 4.0
Arlington Food Assistance Center 156,000 - 156,000
Arlington Free Clinic 137,000 - 137,000
Compression Study - Customer Service 83,000 - 83,000
Grant: BHD - Opioid Settlement Fund (H9516) 9,216 9,216 -
Grant: CFSD - Virginia Tobacco Settlement Fund (H6TSF) 85,888 85,888 -
Grant: EID - Continuum of Care (CoC) Project Planning (H1COC) 146,568 146,568 -
Grant: EID - Workforce Investment Act (H1WIA) 368,980 368,980 -
FY 2026 CARRYOVER FUNDING ALLOCATIONS
40
ATTACHMENT 2D
FUND / DEPARTMENT / PROJECT EXPENDITURES REVENUES NET CARRY FTEs
Grant: EID - Facilitating Career Pivots into High-Demand
Occupations (H1FCP) 88,675 88,675 -
Grant: EID - Workforce Innovation Opportunity Act Talent
Investment (H1TIG) 60,000 60,000 -
Grant: EID - Community Solutions: Built for Zero (H1CSG) 52,124 52,124 -
Grant: EID - Kaiser Permanente Continuum of Care (H1KPG) 9,216 9,216 -
Grant: PHD - Public Health Infrastructure (H5ICA) 56,663 56,663 -
Grant: DO - State Restricted Mental Health (MH) (H9101) 417,586 417,586 -
Grant: DO - State Restricted Substance Use Disorder (H9501) 65,323 65,323 -
Grant: BHD - MH Not Guilty by Reason of Insanity (SOF H9102) 2,407 2,407 -
Grant: BHD - MH Law Reform (H9106) 14,721 14,721 -
Grant: BHD - VA State Pharmacy (SOF H9107) 695,574 695,574 -
Grant: BHD - Community Services Board (CSB) MH Docket Pilot
(H9110) 25,597 25,597 -
Grant: BHD - CSB MH Expand Telepsychiatry Capacity (H9112) 3,648 3,648 -
Grant: BHD - STEP-VA Ancillary Services (H9116) 84,759 84,759 -
Grant: BHD - CSB MH STEP-VA Psychiatric Rehabilitation
Services (H9117) 21,441 21,441 -
Grant: BHD - CSB MH CIT Assessment Sites (H9127) 83,753 83,753 -
Grant: BHD - Permanent Supportive Housing (H9128) 93,020 93,020 -
Grant: BHD - MH Forensic Discharge Planning (SOF H9129) 139,249 139,249 -
Grant: BHD - STEP-VA Veterans (H9130) 117,161 117,161 -
Grant: BHD - CSB MH STEP-VA Outpatient (H9133) 48,645 48,645 -
Grant: BHD - STEP-VA Marcus Alert (H9154) 214,683 214,683 -
Grant: BHD - Supplemental Workforce Grant (H9155) 259,825 259,825 -
Grant: BHD - Virginia CIT Funding (H9156) 1,863 1,863 -
Grant: BHD - Supportive Employment Services (H9158) 93,112 93,112 -
Grant: BHD - CSB CIT Coalition (H9159) 33,235 33,235 -
Grant: BHD - CSB Jail Based Restoration (H9161) 13,470 13,470 -
Grant: BHD - CSB Clarendon House Redesign (H9162) 134,667 134,667 -
Grant: BHD - CSB Forensic Discharge Planning (H9163) 17,800 17,800 -
Grant: BHD - Medication Assisted Treatment (SOF H9504) 117,639 117,639 -
Grant: BHD - CSB - SUD SARPOS (H9505) 4,740 4,740 -
Grant: BHD - CSB SUD DD Training/SUD Youth Services/COVID
(H9520) 10,624 10,624 -
Grant: DO - STEP-VA Ancillary Services (H9116) 359,268 359,268 -
Grant: DO - CCS Sunset (SOF H9149) 137,078 - 137,078
Grant: CFSD - CSB MH Child & Adolescent Services Initiative
(H9123) 214,537 214,537 -
Grant: CFSD - STEP- VA Family Support (FSP) (H9131) 178,324 178,324 -
Grant: CFSD - Substance Abuse Prevention One-time Funding
(H9507) 3,429 3,429 -
Grant: CFSD - Substance Abuse Prevention Span Funding
(H9157) 1,296 1,296 -
Grant: CFSD - State Opioid Response (H9515) 20,000 20,000 -
Grant: CFSD - Mental Health Crisis Response & Child Psychiatry
(H9132) 435,034 435,034 -
Grant: CFSD - MH State Children's Services (H9122) 14,718 14,718 -
Grant: EID - Permanent Supportive Housing (H9128) 3,037,669 3,037,669 -
Grant: DO - State Restricted DD Funding (H9401) 82,365 82,365 -
Grant: ADSD - STEP-VA Outpatient (H9118) 193,127 37,833 155,294
Grant: ADSD - RAFT Dementia Services Grant (H9104) 543,158 - 543,158
Grant: ADSD - RAFT Dementia Services Grant - One-time funds
(H9104) 66,243 66,243 -
Grant: ADSD - RAFT Geriatrics Services Grant (H9103) 105,743 105,743 -
Grant: ADSD - DD Support Coordinators (H9405) 40,025 40,025 -
Grant: ADSD - RAFT Expansion Funds (H9134) 150,000 150,000 -
Grant: BHD - STEP-VA Same Day Access (H9114) (141,840) - (141,840)
subtotal 10,523,375 8,642,356 1,881,019 4.0
Department of Community Planning, Housing & Development
Local Historic District Study 50,000 - 50,000
Historic Resources Inventory Study - Phase 2 50,000 - 50,000
Historic Preservation Grants (Fraber/Green Valley) 33,816 - 33,816
subtotal 133,816 - 133,816
Department of Management & Finance
Internal Audit Su
pport Services 117,600 - 117,600
subtotal 117,600 - 117,600 -
41
ATTACHMENT 2D
FUND / DEPARTMENT / PROJECT EXPENDITURES REVENUES NET CARRY FTEs
Department of Parks & Recreation
Grant: Office of Juvenile Justice and Delinquency Prevention -
Studio Start-up 44,462 44,462 -
After School Programs 315,360 - 315,360
Fuel 81,400 - 81,400
subtotal 441,222 44,462 396,760 -
Office of the Public Defender
Virginia Indigent Defense Commission (VIDC) Re-Entry 53,575 - 53,575
State Salary Supplement 41,310 - 41,310
subtotal 94,885 - 94,885 -
DPSCEM
Jul
y 4th Support Costs 77,000 - 77,000
subtotal 77,000 - 77,000 -
Fire Department
Recruit Class Carryover 1,544,848 - 1,544,848
Grant: Fire Programs 679,135 679,135 -
July 4th Overtime 50,000 - 50,000
Northern Virginia Emergency Response System (NVERS): First
Due and Trap Wire 33,493 - 33,493
Fuel 274,700 - 274,700
subtotal 2,582,176 679,135 1,903,041 -
Police Department
Grant: VA DCJS Unmanned Aircraft Trade and Replace 25,000 25,000 -
Grant: VA DMV 2026 Alcohol 12,716 12,716 -
Grant: VA DMV 2026 Pedestrian/Bicycle 5,534 5,534 -
Grant: VA DMV 2026 Traffic Services 430 430 -
Seized Assets 2,838,485 - 2,838,485
Technology and Equipment 32,508 - 32,508
Holiday Overtime and Support Costs 382,000 - 382,000
Spring 2027 Recruit Class 387,196 - 387,196 7.0
Compression Study - Customer Service 7,000 - 7,000
Fuel 317,600 - 317,600
subtotal 4,008,469 43,680 3,964,789 7.0
Sheriff's Office
Fuel 26,600 - 26,600
Com
pression Study - Customer Service 8,000 - 8,000
subtotal 34,600 - 34,600 -
Office of the Commissioner of Revenue
Com
pression Study - Customer Service 2,000 - 2,000
subtotal 2,000 - 2,000 -
Office of the Treasurer
Com
pression Study - Customer Service 3,000 - 3,000
subtotal 3,000 - 3,000 -
Human Resources Department
Com
pression Study - Customer Service 9,000 - 9,000
subtotal 9,000 - 9,000 -
Non-Departmental
E-Summons - Fine Revenue to PAYG 5,117 - 5,117
Field Fund Reconciliation to PAYG
(70,963) - (70,963)
Digital Equity Infrastructure (JBG Dark Fiber) to PAYG 1,625,000 - 1,625,000
Digital Equity Grants and Program Funding 945,584 - 945,584
Collective Bargaining Support 150,000 - 150,000
Child Care Initiative Grants 2,140,092 - 2,140,092
After School Programming Grants 275,000 - 275,000
RACE to Rebuilding Grants 82,241 - 82,241
After School Programs 491,478 - 491,478
Child and Youth Well Being Plan 241,150 - 241,150
42
ATTACHMENT 2D
FUND / DEPARTMENT / PROJECT EXPENDITURES REVENUES NET CARRY FTEs
Climate Action Plan & Engagement 495,424 - 495,424
Climate Action Fund Carryover 1,706,843 - 1,706,843
Climate Action Fund (to PAYG): Oakland St and Madison 488,877 - 488,877
Low Density Residential Study 65,499 - 65,499
County Manager and County Attorney Contingent Funding 800,000 - 800,000
subtotal 9,441,342 - 9,441,342 -
Regionals
Regionals: Northern Virginia Justice Academy 206,806 - 206,806
subtotal 206,806 - 206,806 -
GENERAL FUND TOTAL 34,610,891 12,380,663 22,230,228 12.0
BALLSTON QUARTER TIF 1,183,327 1,183,327 -
HOUSING CHOICE VOUCHER FUND TOTAL 4,112,278 4,112,278 -
GENERAL PROJECTS CAPITAL FUND (PAYG)
E-Summons - Fine Revenue 5,117 5,117 -
Field Fund Reconciliation
(70,963) (70,963) -
Digital Equity Infrastructure (JBG Dark Fiber) 1,625,000 1,625,000 -
Climate Action Fund Carryover: Oakland St and Madison 488,877 488,877 -
PAYG FUND TOTAL 2,048,031 2,048,031 -
AUTOMOTIVE EQUIPMENT FUND
Vehicle re
placement: schools (carryover) 1,817,880 1,817,880 -
Vehicle replacement: county (carryover) 4,252,641 4,252,641 -
AUTOMOTIVE EQUIPMENT FUND TOTAL 6, 070,521 6,070,521 -
BALLSTON GARAGE
Levels 1-7 Carryover 230,000 230,000 -
Level 8 Carryover 370,000 370,000 -
BALLSTON GARAGE TOTAL 600,000 600,000 -
TOTAL OTHER FUNDS: 14, 014,157 14,014,157 - -
GRAND TOTAL ALL FUNDS:
48,625,048 26,394,820 22,230,228 12.0
43
The Department of Homeland Security Standard Terms aAttachment 3 2018
Page 1 of 3
SUBAWARD AGREEMENT Page 1 of 3
1. SUBRECIPIENT NAME AND ADDRESS: 4a. SUBAWARD ID NUMBER:
4b. Federal Award ID:
5. SUBAWARD DATE:
6. PROJECT PERIOD:
BUDGET PERIOD: to
7. TOTAL AMOUNT OF THIS SUBAWARD:
2. SUBRECIPIENT UEI Number: 8. FEDERAL AMOUNT OF THIS SUBAWARD:
SUBRECIPIENT EIN:
9. SUBRECIPIENT NON-FEDERAL COST SHARE
REQUIREMENT:
10. INDIRECT COST RATE (If applicable):
PASS-THROUGH ENTITY: Virginia Department of Emergency Management
3. SUBAWARD NAME:
CFDA:
U.S. Department of Homeland Security (DHS)
Federal Emergency Management Agency (FEMA)
11. STANDARD TERMS AND CONDITIONS & SPECIAL CONDITIONS
The above subaward is approved subject to the 2025 Department of Homeland Security (DHS) Standard Terms and
Conditions and VDEM Special
Conditions found here: DHS Terms and Conditions 2025
12. APPROPRIATION AUTHORITY FOR GRANT
The project is supported under the
Department of Homeland Security Appropriations Act, 2025 (Public Law No . 119-4).
13. METHOD OF PAYMENT
Commonwealth of Virginia Cardinal Accounting System
AGENCY APPROVAL SUBRECIPIENT ACCEPTANCE
14. TYPED NAME AND TITLE OF APPROVING VDEM OFFICIAL 16. TYPED NAME AND TITLE OF AUTHORIZED OFFICIAL
Robert Coates
Chief Financial Officer
15. SIGNATURE OF APPROVING VDEM OFFICIAL 17. SIGNATURE OF AUTHORIZED SUBRECIPIENT OFFICIAL
18. DATE:
Virginia Department of
Emergency Management
9711 Farrar Court, Suite 200
North C
hesterfield, VA 23236
to
44
The Department of Homeland Security Standard Terms and Conditions 2018
Page 2 of 3
SUBAWARD AGREEMENT Page 2 of 3
Subaward Name:
Subaward Date:
SPECIAL CONDITIONS
1. The Subrecipient shall comply with the Uniform Administrative Requirements, Cost Principles, and Audit
Requirements for Federal Awards located at 2 CFR Part 200, and adopted by DHS at 2 CFR Part 3002 and the
U.S. Department of Homeland Security Grant Program (HSGP) Notice of Funding Opportunity (NOFO).
2. The Subrecipient agrees to permit the pass-through entity and auditors to have access to its records and financial
statements as necessary for the pass-through entity to meet the requirements of the Uniform Administrative
Requirements, Cost Principles, and Audit Requirements for Federal Awards located at 2 CFR Part 200.
3. The Subrecipient understands and agrees that it cannot use any federal funds, either directly or indirectly, in
support of the enactment, repeal, modification or adoption of any law, regulation or policy, at any level of
government, without the express prior written approval of FEMA.
4. The Subrecipient shall comply with the indirect costs provisions of 2 CFR§ 200.414. With the exception of
subrecipients who have never received a negotiated indirect cost rate as described in 2 C.F.R. § 200.414(f),
subrecipients must have an approved indirect cost rate agreement with their cognizant federal agency to charge
indirect costs to this subaward.
5. In the event VDEM determines that changes are necessary to the award document after an award has been
made, including changes to period of performance or terms and conditions, the Subrecipient will be notified of the
changes in writing. Once notification has been made, any subsequent request for funds will indicate Subrecipient
acceptance of the changes to the award.
6. Subrecipients proposing projects that have the potential to impact the environment, including but not limited to
construction of communication towers, modification or renovation of existing buildings, structures and facilities, or
new construction including replacement of facilities, must participate in the FEMA Environmental Planning and
Historic Preservation (EHP) review process.
Subrecipients must comply with all conditions placed on the project
as the result of the EHP review. Any change to the approved project scope of work will require re-evaluation for
compliance with these EHP requirements. If ground disturbing activities occur during project implementation, the
Subrecipient must ensure monitoring of ground disturbance, and if any potential archeological resources are
discovered, the Subrecipient will immediately cease construction in that area and notify FEMA and the State
Historic Preservation Office. Any construction activities that have been initiated without the necessary EHP review
and approval will result in a non-compliance finding and will not be eligible for FEMA funding.
7. The Subrecipient agrees that federal funds under this award will be used to supplement, not supplant, state or
local funds for emergency preparedness.
Virginia Department of
Emergency Management
9711 Farrar
Court, Suite 200
North Chesterfield, VA 23236
45
The Department of Homeland Security Standard Terms and Conditions 2018
Page 3 of 3
SUBAWARD AGREEMENT Page 3 of 3
Subaward Name:
Subaward Date:
8. The Subrecipient agrees that all publications created with funding under this grant shall prominently contain the
following statement: "This document was prepared under a grant from FEMA’s Grant Programs Directorate, U.S.
Department of Homeland Security. Points of view or opinions expressed in this document are those of the authors
and do not necessarily represent the official position or policies of FEMA’s Grant Programs Directorate or the
U.S. Department of Homeland Security."
9. The Subrecipient agrees that, when practicable, any equipment purchased with grant funding shall be
prominently marked as follows: “Purchased with funds provided by the U.S. Department of Homeland Security.”
10. The Subrecipient agrees to cooperate with any assessments, national evaluation efforts, or information or data
collection requests, including, but limited to, the provision of any information required for the assessment or
evaluation of any activities within this project.
11. The Subrecipient must submit a Quarterly Progress Report for every quarter of the period of performance,
including partial calendar quarters, as well as for periods where no grant activity occurs. Reports are due within
fifteen (15) days following the end of the quarter. A Final Progress Report is due thirty (30) days after the end
date of the performance period. Failure to provide this information may result in VDEM withholding grant funds
from further obligation and expenditure and prevent future awards to the Subrecipient.
12. National Incident Management System (NIMS) Implementation Compliance
In ac
cordance with HSPD-5, the adoption of the NIMS is a requirement to receive federal preparedness
assistance through grants, contracts, and other activities. No federal funds will be released to the primary
grantee and any other entity participating and benefiting in this project if this requirement has not been met. In
the event of a Corrective Action Plan submitted, VDEM/SAA will determine if the Subrecipient has made
sufficient progress to disburse funds.
13. All conferences and workshops using federal preparedness funds must pertain to the project being funded. The
Subrecipient agrees to submit a Trip Report when using federal funds to attend a conference or workshop.
Failure to do so will result in a delay of payment until received.
14. The Subrecipient agrees that under program guidelines, travel expenses are allowable for approved training,
planning, administrative, and exercise activities following local, state, and federal guidelines. Prior to traveling for
these activities outside of contiguous United States (OCONUS) as well as to Canada and Mexico, preapproval is
required by the state and FEMA through the SAA office.
Pl
ease reference 2 CFR 200.403, in regard to reasonableness when considering requests for travel of this type.
Where applicable, you should also reference the following regarding travel: the Western Hemisphere Travel
Initiative (https://www.dhs.gov/files/programs/gc_1200693579776.shtm).
Virginia Department of
Emergency Management
9711 F
arrar Court, Suite 200
North Chesterfield, VA 23236
46
Updated: June 2026
Grant Award Notification (GAN)
1. Contact Information Arlington County Government
2100 Clarendon Blvd., Suite 700
Arlington VA 22201
Mark Schwartz, countymanager@arlingtonva.us
2. Virginia Housing Contact Katrina Booker, katrina.booker@virginiahousing.com
3. Grant ID & Title NCS7298-FY27 Capacity Building Training
4. Funding Opportunity 3844-Capacity Building Training Grant
5. Grant Agreement Type Award
6. Grant Award Type New
7. Grant Award Amount $5,000.00 Original Award
Current Award
$5,000.00 Total Award
8. Period of Performance 8/1/2026-7/31/2027 Reporting period continues 30 days following
performance period
9. Grant Authority Virginia Housing
10. FAIN NA
11. Award Date 8/26/2026
12. Fund Source Virginia Housing
13. Indirect Cost Rate N/A%
14. Special Terms &
Conditions
This award is further subject to the attached Grant Agreement and Funding Opportunity
15. Program-Specific
Instructions
Madelyn Peay
Madelyn Peay
Managing Director of Community Outreach
Date: 10/28/2026
Updated: June 2026
VIRGINIA HOUSING DEVELOPMENT AUTHORITY
FY27 Capacity Building Training Grant Agreement
This Grant Agreement is entered into as of 10/26/2026, by and between the Virginia Housing Development Authority
“Virginia Housing” (Grantor) and Arlington County Government (Grantee).
ARTICLE I – GENERAL
Grantee is the recipient of a FY27 Capacity Building Training Grant in the amount of $5,000.00. This Grant Agreement sets forth
the terms and conditions under which Virginia Housing will provide grant funds to the Grantee. Grantee agrees to carry out its
eligible activities under this Grant Agreement. Virginia Housing shall be the first and primary point of contact on all matters of a
technical nature. Grantee shall submit all reports and other materials following instructions provided by Virginia Housing.
Written instructions provided to the Grantee by Virginia Housing will supplement the Statement of Work described in this Grant
Agreement.
This Grant Agreement is governed by, and Grantee shall comply with, the Program Handbook, and Notice of Funding
Opportunity (each, if applicable), the Grantee’s approved application and workplan on file in the Grants Management System
(collectively, the “Approved Scope”), and any attachments or addenda to this Agreement.
ARTICLE II - DEFINITIONS
Grants Management System (GMS): Virginia Housing’s official system of record for grant administration. The system will be
utilized to apply for grant funds and other administrative tasks including approved budget, reporting, and claims.
Approved Scope: The Grantee’s approved application and workplan on file in the Grants Management System (GMS), including
any subsequently approved change requests or amendments. If there is a conflict between the Approved Scope and this
Agreement (including any addenda), this Agreement controls.
Program Handbook: The program-specific guidance document, if applicable, incorporated by reference into this Agreement.
Unless otherwise stated in the GAN or an addendum, Grantee must comply with the version in effect on the Award Date.
Funding Opportunity (FO): The solicitation or notice describing program eligibility, scope, restrictions, and requirements, if
applicable, incorporated by reference into this Agreement. If there is a conflict between the FO and this Agreement (includin g
any addenda), this Agreement controls.
Grant Funds: Funds disbursed by Virginia Housing under this Agreement, subject to the terms and conditions herein, including
allowable uses, reporting, and recapture.
Period of Performance: The start and end dates during which Grant Funds may be obligated and expended, as stated in Article
III, and as amended by any executed change order or amendment.
Eligible Activity: An activity that is both allowable and reimbursable under this Grant Agreement as described in section IV.A.1.
Updated: June 2026
Generally Accepted Accounting Principles (GAAP): A common set of accounting principles, standards and procedures that
agencies must follow when they compile their financial statements.
ARTICLE III – PERIOD OF PERFORMANCE
This Agreement shall be effective upon signature by both Parties and shall apply, nunc pro tunc, to August 1, 2026, and shall
remain in effect through the Period of Performance stated herein, unless terminated earlier in accordance with Article IX. In
accordance with the Grant Award Notification (GAN), Allowable Costs incurred by Grantee on or after August 1, 2026 shall be
eligible for reimbursement.
ARTICLE IV – STATEMENT OF WORK
A. Grant Activities:
1. Scope of Services . The services proposed by the Grantee in the application approved by Virginia Housing and
stored within the system of record, represent the scope of services under the Grant. Grantee shall use grant
funds solely for eligible activities described in the Pr ogram Handbook and Funding Opportunity, if applicable,
or the Approved Scope (approved application and workplan on file in Grants Management System (GMS)).
2. For Strategic Initiatives, the Strategic Initiative Request and Workplan approved by Virginia Housing are
incorporated by reference and together constitute the Approved Scope.
B. Requirements:
1. Application. Grantee must complete its application in its entirety in order to receive the grant funds described
herein, the satisfaction of which is in the sole reasonable discretion of Virginia Housing. Receipt of a Virginia
Housing grant offer in no way implies that the applicant or applicable project(s) will receive Virginia Housing
financing or receive preferential treatment in any application for financing.
2. Programmatic Requirements. Grantee must comply with the most current programmatic requirements found
in the Program Handbook, as may be revised from time to time. Virginia Housing will use reasonable efforts to
provide written notice at least 30 days before any material revisions become effective.
3. Virginia Housing-funded Program Evaluation. Grantee is required to coordinate and cooperate with Virginia
Housing staff in research and evaluative studies related to the Grant Funds.
4. Mandatory Meetings/Trainings. See Article VIII (Compliance) for attendance requirements and consequences.
5. Public Event/Press Distribution. Grantee agrees to alert Virginia Housing/Grant Officer of any public event or
press distribution that is tied to the grant award. Any use of Virginia Housing Logos must be requested in a
timely manner prior to use and all marketing materials must be approved by Virginia Housing prior to use.
ARTICLE V – PRICE
A. Maximum Grant Amount. Grantee shall be paid according to the terms of this Grant Agreement for all work required,
performed, and accepted under this Grant Agreement in an amount not to exceed the amount shown in Article I of this
Updated: June 2026
Grant Agreement.
B. Cost Reimbursement. Grantee must submit claims based on actual expenses.
1. Allowable Expenses. Virginia Housing shall pay Grantee, up to the Maximum Grant Amount as stated in Article
I of this Grant Agreement. Grantee is prohibited from using any part of this Grant to satisfy a delinquent debt.
Allowable Costs are costs incurred in the performance of this Grant Agreement that are determined by Virginia
Housing to be allowable, allocable, and reasonable in accordance with the:
• Provisions of this Grant Agreement, and
• Virginia Housing’s Program Handbook
2. Indirect Cost Rates . Unless the Grantee has an existing Negotiated Indirect Cost Rate Agreement (NICRA),
Grantee may elect to use a ten percent (10%) de minimis indirect cost rate. Indirect costs may only be charged
against salary unless otherwise stated in the NICRA. Grantee must provide a current NICRA or statement on
letterhead confirming use of the ten percent (10%) de minimis rate.
Indirect costs are only allowable when expressly authorized in the Program Handbook or included in the
approved grant budget. If the Program Handbook specifies an administrative fee in lieu of indirect costs, or
otherwise prohibits indirect costs, those program specific rules control. Indirect costs must be included in the
budget and may not exceed the eligible award amount.
3. Period of Availability of Funds . Grantee may charge to the Grant only Allowable Costs resulting from
obligations incurred during the Period of Performance.
4. Profits. No fee, profit, or other increment above allowable costs shall be paid to the Grantee.
5. Grantees with Multiple Sources of Funding. Grantee shall not be reimbursed by Virginia Housing under this
Grant Agreement for time spent providing services that are directly or indirectly reimbursed from any other
source, including fees. Grantee shall include in its claim this Grant Agreement only the portion of those services
for which the Grantee does not receive reimbursement from any other funding source. For oversight purposes,
Virginia Housing reserves the right to request from Grantee, and other stakeholders if applicable, grant
reporting data and information related to program, including non -Virginia Housing sources of funding.
C. Burden of Proof. The burden of proof for services rendered rests with the Grantee. All supporting records are subject
to inspection and audit by Virginia Housing at any time during the Period of Performance and for a period of five (5) years
after the expiration of the Grant period.
D. Restrictions on Use of the Grant Award. The Grant funds awarded under this Grant Agreement shall be used in
accordance with the terms of this Grant Agreement, the Funding Opportunity, Application, Program Handbook, and
applicable laws and regulations.
ARTICLE VI – REPORTING AND PAYMENTS
A. Claims. A claim for reimbursement of funds, as applicable, is due to Virginia Housing via the Grants Management System
as follows:
1. Claim Schedule
Claims are due to Virginia Housing thirty days following the end of a quarter, via the Grants Management System.
Agencies are required to submit claims on a quarterly basis from the day the grantee’s period of performance
begins. For example, period of performance begins July 1. Reports are due October 30th, January 30th, April 30th,
Updated: June 2026
and July 30th.
2. Itemized Accounting of Actual Costs
a) Proof of payment must be kept on file for compliance review;
b) The amount requested cannot exceed the currently approved budget; and
c) Virginia Housing will not accept/process claims after the end of the reporting period
B. Reports.
1. Status reports, as applicable, are due to Virginia Housing thirty (30) days following the end of a quarter, via the
Grants Management System. Agencies are required to submit reports on a quarterly basis from the day the
grantee’s period of performance begins. For example, period of performance begins July 1. Reports are due
October 30th, January 30th, April 30th, and July 30th.
C. Programmatic Reporting Requirements . Virginia Housing may withhold payment to Grantee if, in the reasonable
judgment of Virginia Housing, any programmatic reporting requirements have not been satisfied or are not being
satisfied; provided that Virginia Housing shall provide Grantee with written notice of any deficiency and a reasonable
opportunity, not less than fifteen (15) days, to cure such deficiency before withholding payment.
1. Payments to Grantee. Grant Funds will be provided to Grantee after evaluation of the required deliverables of
the grant.
2. Billing Methodology. Grantee must clearly explain the methodology employed to calculate reimbursement.
3. Documentation of Expenses. Grantee must maintain source documentation of direct costs, such as
invoices, receipts, cancelled checks to support all invoices for payment. This information must be made
available to Virginia Housing upon request and maintained for a period of at least five (5) years after the
expiration of the Grant period or date of last payment, whichever occurs later, or such longer period as required
by the Virginia Public Records Act (Va. Code § 42.1 -76 et seq.) and applicable Library of Virginia records
retention schedules. Grantee must be able to demonstrate and document the actual cost of service provision.
The amount billed to the grant cannot exceed the actual cost of providing the service.
4. Standards for Financial Management Systems. Grantee shall maintain and operate financial management
systems that meet or exceed the GAAP requirements for funds control and accountability.
5. Withholding of Funds . Virginia Housing may withhold payment to a Grantee if any project objective, term or
condition of this Grant Agreement is not being satisfied, including reporting requirements. This includes but is
not limited to the failure of Grantee to produce the deliverables of the grant in a manner reasonably deemed
sufficient by Virginia Housing. Virginia Housing may also withhold payment to Grantee if Grantee is suspended
or terminated from any other Virginia Housing program, or from any local, state or federal government grant
program for reasons related to the misuse of grant funds. Virginia Housing shall reimburse Allowable Costs
properly incurred by Grantee prior to any withholding, suspension, or termination.
6. Overdue Reports. No payment request shall be approved for a Grantee who has an overdue or incomplete
report until a complete report has been submitted and approved by Virginia Housing.
7. Funds Recapture. Virginia Housing may recapture any Grant Funds disbursed to Grantee that remain unspent
at the end of the Period of Performance or that were not expended in accordance with this Agreement.
Grantee’s obligation to repay any such funds shall be limited to the amount of Grant Funds actually disbursed
to Grantee. Grantee is required to cooperate with recapture requests, including any reasonable paperwork
Updated: June 2026
requests. Virginia Housing may utilize recaptured funds in other ways authorized by Virginia Housing.
ARTICLE VII – SECURITY OF CONFIDENTIAL INFORMATION
A. Security. Grantee shall secure all personal information regarding program participants and stakeholders, whether
such information is generated by the Grantee itself or received from outside sources, in accordance with applicable law.
Grantee shall not disclose such information to anyone other than Virginia Housing or other parties authorized by
applicable law or with the consent of the individual whose information is disclosed.
B. Confidentiality. Grantee must ensure its systems protect the confidentiality of personal and financial information
collected or received in connection with the Grant, regardless of whether the information is collected electronically or on
paper, and in accordance with applicable law. Any disclosure of such information requires authorization under applicable
law or the express permission of the individual whose information is to be shared.
ARTICLE VIII – COMPLIANCE
A. Virginia Housing Oversight. Grantee must cooperate with all Virginia Housing oversight activities, requests for access
to facilities, requests for access to the agency’s files, and requests for information, including, but not limited to, financial
records. If Grantee, including those agencies that provide legal services, has other obligations that require information
to be kept confidential, Grantee must take measures to ensure that Virginia Housing has access to files and information
for audit and oversight purposes that demonstrates to the satisfaction of Virginia Housing that the Grantee is in
compliance with requirements of this Grant Agreement. Upon written request from Virginia Housing, Grantee agrees
to provide Virginia Housing with any of the above-referenced documents and/or allow access to such documents within
fifteen (15) days of said notice. Grantee will be notified at least fifteen (15) days prior to reviews.
B. Reviews/Audits. Virginia Housing may conduct a review of the Grantee program operations to ensure proper
accountability and compliance with program requirements and achievement of performance goals. Using the findings
of the review, Virginia Housing may determine whether to continue participation unconditionally or conditionally.
Additionally, the findings of a review may serve as a basis for determining future grant funding. The Gr antee will be
notified at least fifteen (15) days prior to reviews.
1. Whenever possible, Virginia Housing and/or third parties acting on behalf of Virginia Housing will give Grantee
fifteen (15) days’ notice before conducting an on -site review. However, in situations where a specific concern
warrants immediate action, Virginia Housing and/or third parties acting on behalf of Virginia Housing reserve
the right to give less than fifteen (15) days’ notice.
2. Virginia Housing and/or third parties acting on behalf of Virginia Housing shall have the right to request, and
Grantee hereby agrees to comply with all reasonable requests by Virginia Housing, copies of financial audits
conducted during the Agreement period.
C. Virginia Housing-funded Program Evaluation. Grantee is required to coordinate and cooperate with Virginia Housing
staff in research and evaluative studies related to the Grant Funds.
D. Record-Keeping Requirements . Grantee agrees to retain all financial records, supporting documentation, statistical
records, and all other records pertinent to this Agreement for a period of five (5) years, or such longer period as required
by the Virginia Public Records Act and applicable Library of Virginia records retention schedules. The only exceptions
are the following:
1. If any litigation, claim or audit is started before expiration of the five (5) year period, the records shall be
Updated: June 2026
retained until the litigation, claims or audit findings involving the records have been resolved and final action
taken.
2. Records for real property and equipment acquired shall be retained for five (5) years after final disposition.
3. Note that Grantee may also be subject to record retention requirements under other applicable laws and
regulations.
4. Grantee may use any record -keeping system provided that the chosen system results in a complete and
accurate set of records that are retained per the requirements in this agreement. The resulting records must
enable easy monitoring by Virginia Housing when conducting a performance review of the Grantee’s activities.
E. Virginia Housing Mandatory Meetings/Training. Grantee is required to attend all mandatory meetings/trainings, as
determined by Virginia Housing with reasonable advance notice. Failure to attend mandatory meetings/trainings
without good cause shown may, at Virginia Housing’s discretion, be considered in evaluating future grant applications.
F. Disclose Investigations . Grantee is required to report to Virginia Housing within (15) days if subject to unresolved
findings as a result of government audit or investigations.
G. Assurances. Grantee assures that it, its program branches, and affiliates will:
1. Administer services in accordance with all applicable federal, state, and local laws, rules, regulations, and
ordinances which are incorporated by reference into this Agreement.
2. Pursue its mission without any conflict of interest by Grantee, its paid and volunteer staff, or board members
that may compromise the Grantee’s ability to further its mission in accordance with Virginia Housing’s
requirements under this Agreement.
H. Certifications. Grantee certifies that:
• It is acting on its own behalf and is not under the influence, control, or direction of any outside party seeking to
derive a profit or gain from its clients.
• It meets the applicable accessibility requirements of Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. §
794), 24 CFR Parts 8 and 9, and the Americans with Disabilities Act (42 U.S.C. § 12101 et seq.) and its facilities
provide accessibility features for persons with disabilities and elderly persons, or it will arrange to meet with
such persons at an alternative accessible location or format.
• Neither the Grantee nor any employee, board member, or partner is suspended, debarred, or otherwise
restricted under any federal or state program.
• To the knowledge of Grantee, neither the Grantee nor any of its officers or employees performing work under
this Grant has been convicted of offenses involving fraud, embezzlement, misuse of public funds, or a criminal
offense that reflects upon the responsibility, integrity, or ability of the Grantee to participate in grant activities.
An “offense” includes any criminal offense that can be prosecuted at a local, state, or federal level.
• To the knowledge of Grantee, the Grantee is not subject to unresolved findings resulting from HUD or other
government audits or investigations relating to the administration of grant funds, except as disclosed to Virginia
Housing in writing.
• It is authorized to do business in all states where it proposes to provide services under this Grant.
• It will not permit discrimination against clients on the basis of their gender, race, religion, color, familial status,
national origin, ancestry, creed, pregnancy, marital or parental status, sexual orientation, or physical, mental,
emotional or learning disability.
• It will comply with quality control, compliance, and evaluation of the programs for five (5) years following the
Updated: June 2026
completion of the performance period or when funds in the performance pool are fully utilized, whichever is
last.
• No staff, board member, or partner of the Grantee stands to benefit financially from this Grant Agreement.
• It has documentation to support the representations made regarding capacity and past successful
performance.
ARTICLE IX – DEFAULT, REMEDY, SUSPENSION AND TERMINATION
A. Virginia Housing reserves the right, upon written notification to Grantee, to suspend or terminate this Agreement with
any Grantee who fails to comply with the terms and conditions of the Agreement, subject to the notice and cure
provisions of Section B below, up to and including:
1. Any material failure by Grantee to comply with the terms and conditions of this Agreement;
2. Any failure by Grantee to comply with a statute, regulation, or other requirement;
3. Failure by Grantee to spend funds in accordance with requirements;
4. Grantee fails to return funds subject to recapture to Virginia Housing within the required timeframe;
5. Grantee becomes the subject of a federal, state, or local investigation, whether criminal, civil or otherwise, that is directly
related to the Grantee’s performance under this Agreement or its use of Grant Funds;
6. Grantee becomes financially unstable; becomes insolvent, defunct, or commences bankruptcy proceedings;
7. Any director, officer or manager of Grantee engages in fraud, willful misconduct, gross negligence or
misappropriates any funds;
8. Acts or omissions made by the Grantee and/or third parties acting on behalf of Grantee, in the reasonable
determination of Virginia Housing, may cause Virginia Housing significant reputational harm; and/or
9. Any misrepresentation which, if known by Virginia Housing, would have resulted in funds not being disbursed.
B. If noncompliance occurs, Grantee agrees to notify Virginia Housing. If Virginia Housing becomes aware of an issue,
Virginia Housing shall provide a reasonable opportunity to respond or to take corrective action as appropriate. Virginia
Housing reserves the right to suspend disbursements to Grantee during this corrective action period, commensurate
with the seriousness of the noncompliance. If Grantee fails to resolve noncompliance within the specified period,
Virginia Housing reserves the right to demand immediate repayment of improperly spent funds or bar the Grantee from
future funding opportunities. Virginia Housing further reserves the right to place additional conditions on the
continuance of the Agreement if appropriate.
C. Suspension. If Grantee is unable to address the noncompliance to the satisfaction of Virginia Housing within the
timeframe specified, Grantee shall be placed in “Suspended” status until the time that the noncompliance is addressed
to the satisfaction of Virginia Housing, but no longer than six months from the date of the notice of suspension. During
the suspension period, payments shall be discontinued and/or withheld until the noncompliance is addressed to the
satisfaction of Virginia Housing. Virginia Housing reserves the right to extend “Suspended” status for a reasonable
period beyond six months under special circumstances as defined by Virginia Housing.
D. Default and Termination. If Grantee fails to resolve the noncompliance to the satisfaction of Virginia Housing within six
Updated: June 2026
months of the date of the notice of suspension, or within any extended timeframe previously approved, Virginia
Housing may take one or more of the following actions:
1. Suspend or withhold payments.
2. Recover misspent or unspent funds.
3. De-obligate awarded but undisbursed funds.
4. Terminate the Agreement for cause.
5. Impose additional conditions or remedies permitted by law.
Upon termination of the Agreement, all unspent funds (as determined by Virginia Housing) shall revert immediately to
Virginia Housing, either in the form of recapture or de -obligation.
E. Virginia Housing reserves the right to cancel this grant agreement at any time upon thirty (30) days’ prior written notice
to be provided to the Grantee. Virginia Housing may propose amendments to this Agreement at any time; provided
that no amendment shall be effective unless agreed to in writing by both Parties. Upon termination of the Agreement,
all unspent funds (as determined by Virginia Housing) shall revert immediately to Virginia Housing, either in the form
of recapture or de-obligation.
ARTICLE X – AUDIT REQUIREMENTS
A. Independent Audit. Grantee may be required to receive an independent audit, at its own expense, no more than twelve
(12) months before the execution of this Grant Agreement. If Grantee is unable to meet this requirement, Virginia
Housing reserves the right to require an independent audit at the Grantee’s expense.
B. Audit Confirmation. Audit confirmation requests should be mailed directly to accounts payable at:
Virginia Housing Accounts Payable
601 S. Belvidere Street
Richmond, VA 23220
C. Auditing. Grantee agrees to cooperate fully with Virginia Housing, its agents, authorized representatives, and third -
party contractors as they perform evaluation, monitoring, quality control, audit, audit-related activities and compliance
reviews.
ARTICLE XI - MARKETING
By accepting the grant described herein, Grantee authorizes Virginia Housing to use Grantee's name in connection with certain
promotional materials that Virginia Housing may disseminate to the public; provided that any use of Grantee’s logo or trademark
shall require the prior written consent of Grantee, which shall not be unreasonably withheld. Should Grantee desire to inform
Virginia Housing of specific projects accomplished as a result of the grant, Grantee should contact Virginia Housing at the
following email address: marketing@virginiahousing.com .
ARTICLE XII – DISPUTE RESOLUTION
In the event of any dispute arising under or relating to this Agreement, the Parties shall first attempt to resolve the dispute
Updated: June 2026
through good-faith negotiation. If the dispute cannot be resolved through negotiation within thirty (30) days, either Party may
pursue any remedies available at law or in equity. This Agreement shall be governed by and construed in accordance with the
laws of the Commonwealth of Virginia, without regard to its conflict of laws principles. Any legal action arising under this
Agreement shall be brought in the Circuit Court of Richmond, Virginia.
ARTICLE XIII – MISCELLANEOUS PROVISIONS
A. Appropriation. Grantee’s obligations under this Agreement are subject to acceptance of the Grant and appropriation
of the Grant Funds and any related expenditure authority by the Arlington County Board. Nothing in this Agreement
shall be construed to obligate Grantee to expend any funds not lawfully appropriated for such purpose.
Madely Bn .PeaySovereign Immunity; No Indemnification. Nothing in this Agreement shall be construed as a waiver of the sovereign
immunity of Grantee or of its officers, employees, or agents. Grantee does not agree to indemnify, defend, or hold
harmless Virginia Housing or any third party, and each Party shall be responsible for its own acts and omissions to the
extent provided by Virginia law.
C. 10V/2ir8g/i2n0ia26Freedom of Information Act. Virginia Housing acknowledges that Grantee is a public body subject to the
Virginia Freedom of Information Act (Va. Code § 2.2 -3700 et seq.). Notwithstanding any other provision of this
Agreement, Grantee may disclose records and information as required by the Virginia Freedom of Information Act,
subpoena, court order, or other applicable law, and may withhold records only as permitted by an applicable exemption.
D. Public Records. Grantee shall retain and dispose of records in accordance with the Virginia Public Records Act (Va. Code
§ 42.1-76 et seq.). Records copied or reviewed by Virginia Housing or its agents remain public records of Grantee.
E. Notices. All notices under this Agreement shall be in writing and delivered by hand, nationally recognized overnight
courier, or email with confirmation of receipt. Notices to Grantee shall be sent to the County Manager, 2100 Clarendon
Blvd., Suite 700, Arlington, Virginia 22201, with a copy to the County Attorney, 2100 Clarendon Blvd., Suite 403,
Arlington, Virginia 22201. Notices to Virginia Housing shall be sent to the Virginia Housing contact identified in the Grant
Award Notification.
F. Conflict; Severability. In the event of any conflict between this Article XIII and any other provision of this Agreement,
the Program Handbook, the Funding Opportunity, or the Approved Scope, this Article XIII shall control. If any provision
of this Agreement is held invalid or unenforceable, the remaining provisions shall continue in full force and effect.
Updated: June 2026
Authority to Execute. The individual signing this Agreement on behalf of Grantee represents and warrants that they are duly
authorized to bind Grantee. Virginia Housing may rely conclusively on this representation. Grantee shall provide reasonable
evidence of authority upon request, including a certificate of incumbency, board resolution, or officer attestation.
IN WITNESS WHEREOF , each Party has caused this FY27 Capacity Building Training Grant Agreement to be executed by an
individual who represents and warrants they are duly authorized to bind the Party. No alterations to the official version of the
FY27 Capacity Building Training Grant Agreement delivered by Virginia Housing to Grantee have been accepted unless such
change is acknowledged by Virginia Housing through a signature on the page of the Grant Agreement containing such change.
Virginia Housing Development Authority Grantee
Madelyn Peay
Managing Director of Community Outreach
Date:
Name:
Title:
Date: