City Council Work Session and Regular Meeting — Agenda Packet
City of Lynchburg · Lynchburg City County · City Council · meeting of Feb 8, 2022 · Agenda packets
Open the original document More from City of Lynchburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
February 8, 2022
WORK SESSION AGENDA
City Council Work Session – 4:00 p.m.
2nd Floor Training Room | City Hall, 900 Church Street, Lynchburg, VA 24504
I. Welcome MaryJane Dolan, Mayor
II. Work Session Agenda Overview Wynter C. Benda, City Manager
III. Work Session Agenda Items Wynter C. Benda, City Manager
1) FY 2023 – 2027 Capital Improvement Plan Overview 4:05 p.m. – 4:35 p.m.
2) Personal Property Tax Discussion 4:35 p.m. – 5:30 p.m.
3) Continued Discussion on Redistricting 5:30 p.m. – 6:25 p.m.
4) Roll Call 6:25 p.m. – 6:30 p.m.
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: February 8, 2022 AGENDA ITEM #: 1
REGULAR: WORK SESSION: X CLOSED SESSION (Confidential):
ACTION: INFORMATION: X
ITEM TITLE: Fiscal Year 2023 to 2027 Capital Improvement Plan (CIP) Presentation
RECOMMENDATION: Receive this presentation as an informational item.
SUMMARY: The Fiscal Year 2023 to 2027 Capital Improvement Plan (CIP) has been under development for
the last several months. During this presentation, City staff will provide an overview of the development process,
brief City Council on significant changes from th e previously adopted CIP, provide an overview of the plan of
finance, and outline next steps in the review and approval process.
City Council members are requested to review the document in full and submit questions and projects requested
for specific review. City staff will address these questions at the February 22, 2022 City Council work session.
PRIOR ACTION(S):
n/a
FISCAL IMPACT:
As noted.
CONTACT(S): Reid Wodicka, Deputy City Manager – 455-3990
Donna Witt, Chief Financial Officer – 455-3968
ATTACHMENT(S):
• Draft Fiscal Year 2023 to 2027 Capital Improvement Program
• Presentation
REVIEWED BY: raw
024A
Capital Improvement Program Table of Contents
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
FY 2023 - 2027 CAPITAL IMPROVEMENT PROGRAM ................................................................................................................ 1
CAPITAL IMPROVEMENTS PLAN PRIORITIZATION STRATEGIES ...................................................................................................... 3
G
ENERAL FUND (CITY CAPITAL PROJECTS FUND)
Summary of Appropriations .............................................................................................................................. 15
Financing Plan ................................................................................................................................................... 16
BUILDINGS
Project Detail Summary .................................................................................................................................... 17
Circuit and General District Court Improvements ............................................................................................. 18
Concord Turnpike Landfill Cap Rehabilitation ................................................................................................... 19
Crossroads Lot - Deck Addition.......................................................................................................................... 20
Downtown Parking Deck Facility ....................................................................................................................... 21
Lynchburg City Stadium Baseball Lighting Upgrade .......................................................................................... 22
Lynchburg City Stadium Remodel for Major League Baseball Compliance ....................................................... 23
Major Building Repairs and Improvements/Multiple Projects .......................................................................... 24
Project Detail .......................................................................................................................................... 25
Parking Lot Repairs and Improvements/Multiple Projects ............................................................................... 29
Project Detail .......................................................................................................................................... 30
Police Department Headquarters ...................................................................................................................... 31
Public Library Renovation/Reimagination ......................................................................................................... 32
Roof Replacement/Multiple Projects ................................................................................................................ 33
Project Detail .......................................................................................................................................... 34
Transfer Station for Refuse ............................................................................................................................... 35
TRANSPORTATION
Project Detail Summary ..................................................................................................................................... 36
Public Transit Improvements and Bus Replacements ....................................................................................... 37
Project Detail ....................................................................................................................................... 38
5th Street Improvements, Phase IV .................................................................................................................. 39
Bedford Avenue Bridge ..................................................................................................................................... 40
Breezewood Drive Widening ............................................................................................................................. 41
Bridge Maintenance .......................................................................................................................................... 42
Campbell Avenue Intersection and Signal Reconstruction................................................................................ 43
College Lake Overlook ....................................................................................................................................... 44
Culvert Replacement Program .......................................................................................................................... 45
Florida Avenue Sidewalk ................................................................................................................................... 46
General Street Improvements ........................................................................................................................... 47
Grace Street Realignment at 12th and Madison ............................................................................................... 48
Graves Mill Road at Route 501 S Ramp Modifications ...................................................................................... 49
Hill Street/Moormans Road Improvements ...................................................................................................... 50
Hollins Mill Road Bridge Replacement with Bikeway Improvements ............................................................... 51
Lakeside Drive Bridge over Blackwater Creek ................................................................................................... 52
Lakeside Drive Improvements ........................................................................................................................... 53
Link Road/Boonsboro Road Intersection Improvements .................................................................................. 54
Lynchburg Center for Industry - Phase I ............................................................................................................ 55
Lynchburg Expressway/Candlers Mountain Road Interchange Improve ments ................................................ 56
Capital Improvement Program Table of Contents
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
TRANSPORTATION (CONTINUED)
McConville Road Realignment to Lakeside Drive ............................................................................................. 57
Memorial Avenue Fuel Site ............................................................................................................................... 58
Public Works Infrastructure Improvements ...................................................................................................... 59
Retaining Wall Replacement/Repair Program ................................................................................................... 60
Rivermont Avenue at Bedford Avenue Intersection Improvements ................................................................. 61
Rivermont Avenue Bridge Repair ...................................................................................................................... 62
Route 501/221 One-Way Pairs .......................................................................................................................... 63
Storm Drainage System Repairs/Replacements ................................................................................................ 64
Street Overlay Program ..................................................................................................................................... 65
Timberlake Road Bridge, East Bound Lanes ...................................................................................................... 66
Timberlake Road Bridge, West Bound Lanes ..................................................................................................... 67
Traffic Signal Repair and Replacement .............................................................................................................. 68
Wards Ferry Road at CVCC Campus Drive Roundabout .................................................................................... 69
Wards Ferry Road/Atlanta Avenue Turn Lanes ................................................................................................. 70
Wards Ferry Road/Simons Run Pedestrian Accommodations .......................................................................... 71
TRANSPORTATION – PLANNED PROJECTS BEYOND FY 2027 ......................................................................................... 72
ECONOMIC DEVELOPMENT
Project Detail Summary ..................................................................................................................................... 73
Downtown Development .................................................................................................................................. 74
Project Detail .......................................................................................................................................... 75
Future Streetscape Improvements Downtown ................................................................................................. 76
Ivy Creek Innovation Park - Site C Development ............................................................................................... 77
Ivy Creek Innovation Park - Sites A & B Development ....................................................................................... 78
Riverfront Park Improvements .......................................................................................................................... 79
Street and Utility Extensions to Promote Economic Development ................................................................... 80
Streetscape Improvements Downtown, Phase II .............................................................................................. 81
PARKS AND RECREATION
Project Detail Summary ..................................................................................................................................... 82
Allen-Morrison Site Assessment/Design ........................................................................................................... 83
Athletic Field Maintenance ............................................................................................................................... 84
Project Detail .......................................................................................................................................... 85
City Stadium - Visitors' Side Improvements ...................................................................................................... 86
City Stadium Football Field Turf Replacement .................................................................................................. 87
Community Park Investment Fund .................................................................................................................... 88
Downstream Swinging Bridge ........................................................................................................................... 89
General Park Maintenance ................................................................................................................................ 90
Project Detail .......................................................................................................................................... 91
General Park Security Improvements ................................................................................................................ 92
Heritage Park Improvements ............................................................................................................................ 93
Ivy Creek Bridge (Structure #4) Replacement ................................................................................................... 94
Ivy Creek Park to Peaks View Park Trail Extension ............................................................................................ 95
Jackson Heights Art Studio Renovation ............................................................................................................. 96
Langhorne Road East Bridge .............................................................................................................................. 97
Lynchburg Community Market Renovations ..................................................................................................... 98
Capital Improvement Program Table of Contents
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
PARKS AND RECREATION (CONTINUED)
Miller Park Pool Assessment/Replacement....................................................................................................... 99
New Dog Park .................................................................................................................................................... 100
Parks and Recreation Needs Assessment Implementation ............................................................................... 101
Project Detail .......................................................................................................................................... 102
Parks & Trails Paving and Lighting ..................................................................................................................... 103
Project Detail .......................................................................................................................................... 104
Parks Tree Replacement Program ..................................................................................................................... 105
Sustainable Infrastructure Program .................................................................................................................. 106
Project Detail .......................................................................................................................................... 107
Templeton Senior Center Renovations ............................................................................................................. 108
MISCELLANEOUS
Project Detail Summary ..................................................................................................................................... 109
5th Street Statue and MLK Bridge ..................................................................................................................... 110
College Lake Dam Removal ............................................................................................................................... 111
Computer Aided Dispatch Replacement ........................................................................................................... 112
Pedestrian Waste Receptacle Replacement ..................................................................................................... 113
Radio Replacement ........................................................................................................................................... 114
RESERVES
Project Detail Summary ..................................................................................................................................... 115
Lynchburg City Stadium Capital Maintenance Reserve ..................................................................................... 116
Snow, Street, and Bridge Reserve ..................................................................................................................... 117
SCHOOLS
Summary of Appropriations .............................................................................................................................. 118
Financing Plan .................................................................................................................................................... 119
Project Detail Summary ..................................................................................................................................... 120
Athletic Complexes ............................................................................................................................................ 121
Project Detail .......................................................................................................................................... 122
Dearington ES Modular Classroom Replacement.............................................................................................. 123
Elementary Gym Addition A .............................................................................................................................. 124
Elementary Gym Addition B .............................................................................................................................. 125
Elementary Gym Addition C .............................................................................................................................. 126
Linkhorne ES Renovation & Gym Addition ........................................................................................................ 127
Mechanical/Electrical ........................................................................................................................................ 128
Project Detail .......................................................................................................................................... 129
Paving & Fencing ............................................................................................................................................... 130
Playground Equipment Replacement ................................................................................................................ 131
Plumbing/Restroom Renovation ....................................................................................................................... 132
Project Detail .......................................................................................................................................... 133
Reserve for Future Expenditure Needs (Fac. Study) ......................................................................................... 134
Reserve for Future Maintenance Needs ............................................................................................................ 135
Roof Replacement/Repair ................................................................................................................................. 136
Project Detail .......................................................................................................................................... 137
Sandusky ES Replacement ................................................................................................................................. 138
Capital Improvement Program General Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
15
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Resources
Federa l : Gra nts 25,320,363 2,884,102 4,787,603 16,737,225 54,344,281
Federa l : Tra ns porta ti on Al terna ti ves 653,879 0 0 0 0
Federa l : Sta te of Good Repa i r 0 10,000,000 0 0 0
Federa l : ARPA - Revenue Repl a cement 24,609,000 0 0 0 0
Other: Dona ted from Pri va te Ci ti zens 125,000 0 0 0 0
Loca l : Li ne of Credi t 28,692,967 17,688,913 37,464,750 30,301,658 39 ,240,001
Loca l : Pa y-As -You-Go 11,122,908 6,434,493 6,018,950 5,737,969 6,855, 599
Sta te: Gra nts 327,200 360,513 598,450 17,969 122,599
Sta te: Hi ghwa y Ma i ntena nce (VDOT) 3,265,000 3,383,000 3,426,000 3,4 70,000 3,514,000
Sta te: Revenue Sha ri ng 0 0 1,264,750 3,756,658 5,000,001
Sta te: VCWRLF 10,000,000 0 0 0 0
TOTAL ESTIMATED RESOURCES $104,116,317 $40,751,021 $53,560,504 $60, 021,479 $109,076,481
CAPITAL PROJECTS
Bui l di ngs 44,234,538 7,875,980 11,657,500 16,165,000 16,568,000
Tra ns porta ti on 28,970,110 19,971,913 24,950,500 31,271,790 84,757,49 3
Publ i c Tra ns i t 3,272,002 3,605,128 5,984,504 179,689 1,225,988
Economi c Devel opment 8,761,459 5,455,000 3,470,000 6,600,000 2,570,0 00
Pa rks a nd Recrea ti on 5,243,000 1,663,000 6,948,000 5,255,000 3,505,0 00
Mi s cel l a neous 13,285,208 1,830,000 200,000 200,000 200,000
Res erves 350,000 350,000 350,000 350,000 250,000
TOTAL PROPOSED CAPITAL PROJECTS $104,116,317 $40,751,021 $53,560,5 04 $60,021,479 $109,076,481
GENERAL FUND (CITY CAPITAL PROJECTS FUND) SUMMARY OF APPROPRIAT IONS - This summary demonstrates project
app ropriations for each Fiscal Year alon g with the ex pected sources of fundin g.
Capital Improvement Program General Fund
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
16
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Resources
Federa l : Gra nts 1,368,080 7,567,703 15,716,030 7,290,187 2,212,461
Federa l : Tra ns porta ti on Al terna ti ves 56,000 80,000 240,000 277,879 0
Federa l : Sta te of Good Repa i r 0 1,000,000 1,500,000 4,000,000 3,500, 000
Federa l : ARPA - Revenue Repl a cement 24,609,000 0 0 0 0
Other: Dona ted from Pri va te Ci ti zens 135,658 0 0 0 0
Loca l : Li ne of Credi t 23,437,832 36,076,371 44,783,334 35,661,914 27 ,826,027
Loca l : Pa y-As -You-Go 11,051,397 6,376,818 6,394,316 6,127,834 7,182, 058
Sta te: Gra nts 3,696,010 752,838 964,504 429,834 214,058
Sta te: Hi ghwa y Ma i ntena nce (VDOT) 3,265,000 3,383,000 3,563,303 3,4 70,000 3,514,000
Sta te: Revenue Sha ri ng 5,380,000 4,580,000 1,800,000 3,472,444 3,736 ,027
Sta te: VCWRLF 0 6,900,000 3,100,000 0 0
TOTAL ESTIMATED RESOURCES $72,998,977 $66,716,730 $78,061,487 $60,7 30,092 $48,184,631
CAPITAL PROJECTS
Bui l di ngs 23,131,999 22,184,018 19,157,500 13,665,000 13,568,000
Tra ns porta ti on 23,205,000 25,993,000 30,267,615 30,383,752 25,716,05 4
Publ i c Tra ns i t 1,460,100 3,028,379 9,645,038 4,298,340 2,140,577
Economi c Devel opment 10,727,679 5,455,000 3,470,000 6,600,000 2,570, 000
Pa rks a nd Recrea ti on 5,345,658 1,663,000 6,948,000 5,233,000 3,740,0 00
Mi s cel l a neous 8,778,541 8,043,333 8,223,334 200,000 200,000
Res erves 350,000 350,000 350,000 350,000 250,000
TOTAL PROPOSED CAPITAL PROJECTS $72,998,977 $66,716,730 $78,061,48 7 $60,730,092 $48,184,631
GENERAL FUND (CITY CAPITAL PROJECTS FUND) SUMMARY OF CASH FLOWS - This summary demonstrates project cash
flows for each Fiscal Year alon g with the ex pected sources of fundin g.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
17
Five Year Proposed Appropriations to be Financed by the City
Project Title
Appropriations
Through
06/30/2022
Budget FY
2023
FY 2024 - 2027
Planned
Five-Year
Estimated Net
cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Buildings
Circuit a nd Genera l Dis trict Court Improvements 0 0 8,250,000 8,250,000 0 8,250,000
Concord Turnpike Landfill Cap Rehabilitation 30,000 400,000 0 400,000 0 430,000
Crossroads Lot - Deck Addition 0 25,000 2,750,000 2,775,000 0 2,775,000
Downtown Parking Deck Facility 0 0 13,550,000 13,550,000 0 13,550,000
Lynchburg City Stadium Baseball Lighting Upgrade 0 600,000 0 600,000 0 600,000
Lynchburg City Stadium Remodel for MLB Compliance 0 650,000 0 650,000 0 650,000
Major Building Repairs and Improvements/Multiple Projects Continuing 2,998,500 13,527,500 16,526,000 Continuing Continuing
Parking Lot Repairs and Improvements/Multiple Projects Continuing 375,000 810,000 1,185,000 Continuing Continuing
Police Department Headquarters 5,700,693 38,208,038 0 38,208,038 0 43,908,731
Public Library Renovation/Reimagination 1,092,710 0 7,000,000 7,000,000 0 8,092,710
Roof Replacement/Multiple Projects Continuing 678,000 1,778,980 2,456,980 Continuing Continuing
Transfer Station for Refuse 0 300,000 4,600,000 4,900,000 0 4,900,000
Total Proposed FY 2023 - 2027 CIP $6,823,403 $44,234,538 $52,266,480 $96,501,018 $0 $83,156,441
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
18
Service Area Department Location
Buildings Public Works Circuit and General District Courts
Project Title Project Number Project Type
Circuit and General District Court
Improvements
To Be Assigned New
Department Priority
Project supports essential services
Project Description
Make improvements to the court facilities as outlined in the report given by Atelier 11 Architecture and
Architects Design Group on January 11, 2017. Improvements include security, ADA accessibility and
proper operational space for judges and court proceedings.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Gaynelle Hart, Director of Public Works
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2027 In 2016 an architecture consultant did an assessment of the two court
facilities. The courts were identified as having extensive needs and were
originally scheduled to receive funding for renovations after the
construction of the new police headquarters.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2025
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $8,250,000
FY 2024 - FY 2027 Planned 8,250,000 Interest 2,284,067
Remaining Need 0 Total $10,534,067
Total Project Cost $8,250,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $526,703
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 750,000 0 0 $750,000
Construction 0 0 0 7,500,000 0 $7,500,000
Total $0 $0 $750,000 $7,500,000 $0 $8,250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 750,000 5,000,000 2,500,000 $8,250,00 0
Total $0 $0 $750,000 $5,000,000 $2,500,000 $8,250,000
Operating Budget Impact
No additional costs associated with this project.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
19
Service Area Department Location
Buildings Public Works 2525 Concord Turnpike
Project Title Project Number Project Type
Concord Turnpike Landfill Cap Rehabilitation B0172 New
Department Priority
Project has legal or regulatory mandate
Project Description
A portion of the closed landfill located at 2525 Concord Turnpike is the fiscal and maintenance
responsibility of the City. The Regional Services Authority manages the entire closed site and oversees the
required maintenance services. The cap on the closed landfill is settling resulting in drainage issues.
While repairing the cap, repairs should be made to the gas collection system.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Gaynelle Hart, Director of Public Works
Projected Start Date Q1 FY 2022 Why Now
Projected Completion Date Q4 FY 2023 If the cap is not repaired in a timely manner it may cause further
maintenance issues; the methane gas collection system is in a similar
state. The closed landfill is still a regulated facility (DEQ) and needs to
be maintained to the appropriate standard.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2022
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $30,000 Project Total De bt Expenditures
Budget FY 2023 400,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $430,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 400,000 0 0 0 0 $400,000
Total $400,000 $0 $0 $0 $0 $400,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 400,000 0 0 0 0 $400,000
Total $400,000 $0 $0 $0 $0 $400,000
Operating Budget Impact
No additional costs associated with this project.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
20
Service Area Department Location
Buildings Public Works Corner of Main and Commerce
Project Title Project Number Project Type
Crossroads Lot - Deck Addition To Be Assigned New
Department Priority
Project contributes to the generation of new revenue; Project supports essential services
Project Description
Add a level to the Crossroads Lot to increase parking capacity in the lot.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2023 Why Now
Projected Completion Date Q4 FY 2025 Revitalization and growth in downtown are creating a need to have
added parking capacity. Based on recent growth in the area of the
Downtown Entryway as well as anticipated future reduction in parking
availability in the Community Market Lot as recommended by the
Downtown 2040 Master Plan, increasing parking capacity in the
Crossroads Lot is needed for future public parking demand and use.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2024
Construction Q4 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 25,000 Principal $2,775,000
FY 2024 - FY 2027 Planned 2,750,000 Interest 768,277
Remaining Need 0 Total $3,543,277
Total Project Cost $2,775,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $177,164
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 25,000 275,000 0 0 0 $300,000
Construction 0 0 2,475,000 0 0 $2,475,000
Total $25,000 $275,000 $2,475,000 $0 $0 $2,775,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 25,000 275,000 2,475,000 0 0 $2,775,000
Total $25,000 $275,000 $2,475,000 $0 $0 $2,775,000
Operating Budget Impact
Maintaining a parking deck will require additional staff time; utilities costs will increase as well.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
21
Service Area Department Location
Buildings Public Works Downtown Area
Project Title Project Number Project Type
Downtown Parking Deck Facility To Be Assigned New
Department Priority
Project contributes to the generation of new revenue; Project supports essential services
Project Description
Construct a new parking deck facility in the downtown business district.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2028 The existing structure continues to decline and is aging beyond
reasonable ongoing maintenance. Revitalization and growth in
downtown are creating a need to have added parking capacity.
Additionally, the Downtown 2040 Master Plan recommends developing
a new mixed-use parking garage as a long-term strategy to increase
parking and boost economic development.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2026
Construction Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $13,550,000
FY 2024 - FY 2027 Planned 13,550,000 Interest 3,751,406
Remaining Need 0 Total $17,301,406
Total Project Cost $13,550,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $865,070
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 250,000 1,800,000 0 $2,050,000
Construction 0 0 0 0 11,500,000 $11,500,000
Total $0 $0 $250,000 $1,800,000 $11,500,000 $13,550,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 250,000 1,800,000 6,000,000 $8,050,00 0
Total $0 $0 $250,000 $1,800,000 $6,000,000 $8,050,000
Operating Budget Impact
Maintaining a parking deck will require additional staff time; utilities costs will increase as well.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
22
Service Area Department Location
Buildings Public Works City Stadium, Calvin Falwell Field
Project Title Project Number Project Type
Lynchburg City Stadium Baseball Lighting
Upgrade
To Be Assigned New
Department Priority
Project has legal or regulatory mandate; Project contributes to the generation of new revenue
Project Description
A recent audit by Major League Baseball (MLB) has revealed the field lighting at the Stadium is not in
compliance with current MLB standards. Compliance with these standards is necessary in order for the
Hillcats to continue to play as a sanctioned MLB Minor League Team at City Stadium.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Clay Simmons, Deputy Director of Public Works
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2023 Stadiums are expected to be in compliance with the new MLB lighting
requirements by the 2024 baseball season.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2023
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 600,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $600,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 5 0 , 0 0 0 0 0 0 0 $ 5 0 , 0 0 0
Construction 550,000 0 0 0 0 $550,000
Total $600,000 $0 $0 $0 $0 $600,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: ARPA - Revenue Replacement 600,000 0 0 0 0 $600,000
Total $600,000 $0 $0 $0 $0 $600,000
Operating Budget Impact
Installation of LED lighting will create a minimal impact on the operating budget.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
23
Service Area Department Location
Buildings Public Works City Stadium, Calvin Falwell Field
Project Title Project Number Project Type
Lynchburg City Stadium Remodel for Major
League Baseball Compliance
To Be Assigned New
Department Priority
Project has legal or regulatory mandate; Project contributes to the generation of new revenue
Project Description
A recent audit by Major League Baseball (MLB) has revealed the facilities at the Stadium are not in
compliance with recently updated MLB standards. Compliance with these standards is necessary in order
for the Hillcats to continue to play as a sanctioned MLB Minor League Team at City Stadium.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Clay Simmons, Deputy Director of Public Works
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2023 Stadiums are expected to be in compliance with the new MLB facility
standards by the 2024 baseball season.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2023
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 650,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $650,000
Local Funding Percentage 53.8% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 5 0 , 0 0 0 0 0 0 0 $ 5 0 , 0 0 0
Construction 600,000 0 0 0 0 $600,000
Total $650,000 $0 $0 $0 $0 $650,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 350,000 0 0 0 0 $350,000
Federal: ARPA - Revenue Replacement 300,000 0 0 0 0 $300,000
Total $650,000 $0 $0 $0 $0 $650,000
Operating Budget Impact
With no change to the square footage of space, no operating budget impact is expected.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
24
Service Area Department Location
Buildings Public Works Various
Project Title Project Number Project Type
Major Building Repairs and
Improvements/Multiple Projects
Multiple Maintenance
Department Priority
Project supports essential services
Project Description
Annual program for repair and improvements to City owned buildings. A detailed sub-project list is
attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Andy Chamberland/Clay Simmons
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Funds are used for the upkeep of existing City buildings and assets as
they age and require maintenance and repairs.
In FY 2018, a consultant performed a condition assessment of all City
owned buildings. Results of the assessment provided staff with
information to prioritize needs and develop a schedule to address
maintenance and replacement of building systems and components.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total De bt Expenditures
Budget FY 2023 2,998,500 Principal $5,935,000
FY 2024 - FY 2027 Planned 13,527,500 Interest 1,643,144
Remaining Need Continuing Total $7,578,144
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $378,907
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 267,000 526,500 405,500 305,000 545,000 $2,049,000
Construction 2,731,500 2,343,500 2,937,000 2, 415,000 4,050,000 $14,477,000
Total $2,998,500 $2,870,000 $3,342,500 $2,720,000 $4,595,000 $16,526,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 2,998,500 2,090,000 1,527,500 1,420,000 2, 555,000 $10,591,000
Local: Line of Credit 0 780,000 1,815,000 1,300,000 2,040,000 $ 5,935,000
Total $2,998,500 $2,870,000 $3,342,500 $2,720,000 $4,595,000 $16,526,000
Operating Budget Impact
Addressing maintenance issues reduces the need for on-going temporary repairs.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
25
Major Building Repairs and Improvements/Multiple Projects
Fiscal
Year Project Sub-Project
Consultant
Engineering Construction Annual Total
Ci rcui t Court Add gra te over wi ndow wel l s $0 $15,000 $15,000
Ci rcui t Court Pi pi ng repa i r/repl a cement 50,000 500,000 550,000
Ci rcui t Court Repl a ce a udi ovi s ua l s ys tem 10,000 120,000 130,000
Ci rcui t Court Repl a ce el ectri ca l pa nel s 25,000 75,000 100,000
C ity Baseball Stadium Replac e outfield wall panels 0 7 9 ,0 0 0 7 9 ,0 0 0
Ci ty Ha l l Cool i ng tower refurbi s hment 25,000 200,000 225,000
C ity Hall C ar pet r eplac ement (split ov er multiple y ear s) 0 3 5 ,0 0 0 35,000
City Hall Refurbish Exterior Doors - 9th and 10th Streets 7,000 6 3,000 70,000
C ity Hall Wallpaper peeling/r emov e/skim and paint (split ov er m ul ti pl e yea rs ) 0 20,000 20,000
Ci ty Wi de Ca rpet a nd pa i nt (a nnua l a l l oca ti on) 0 75,000 75,000
City Wide Emergency and unscheduled building repairs (annual all oca ti on) 40,000 510,000 550,000
Ci ty Wi de Ga tewa y/Wa yfi ndi ng repl a cements 0 25,000 25,000
Ci ty Wi de Mul ti -bui l di ng - ma jor ba ckfl ow preventers 5,000 25,000 3 0,000
City Wide Yard hydrants needing backflow (12 total, split over 5 yea rs ) 0 12,000 12,000
Fi re Admi n Spa ce a na l ys i s des i gn - Fi re Chi ef's Offi ce 25,000 50,0 00 75,000
Fire Station 1 Separate gear locker room from living quarter spa ce 25,000 50,000 75,000
Fire Station 2 Install new gutters with gutter guards, remove do wns pouts 0 10,000 10,000
Fire Station 3 Appa ra tus ba y doors 0 65,000 65,000
Huma n Servi ces Bui l di ng Moderni za ti on el eva tor #2 0 252,500 252,500
M iller P ar k P ool Bac kflow pr ev enter and booster pump 5 ,0 0 0 5 0 ,0 0 0 5 5,000
Old C our thouse M useum Ac c essibility impr ov ements (design) 2 5 ,0 0 0 0 25,000
P ar ks Replac e split r ail fenc ing with c hain-link 0 1 5 ,0 0 0 1 5 ,0 0 0
Parks Upgrades to equipment and amenities 0 50,000 50,000
Peaks View Park Lighting - pathway and parking lot lighting upg ra des /repl a cement 25,000 150,000 175,000
Point of Honor Handrail replacements, cornice/wood repairs, maso nry repa i rs 0 65,000 65,000
Public Health HVAC - 4 condensing units on roof with 2 air handl ers 0 50,000 50,000
Publ i c Sa fety HVAC condens er uni t for the chi l l er 0 170,000 170,000
2023 Sub-Totals $267,000 $2,731,500 $2,998,500
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
26
Major Building Repairs and Improvements/Multiple Projects
Fiscal
Year Project Sub-Project
Consultant
Engineering Construction Annual Total
925 Church Street Bui l di ng Interi or a nd exteri or renova ti ons $50, 000 $0 $50,000
Armory Redo ba throoms 7,500 0 7,500
Ar mor y /C ity M ar ket Replac e piping, separ ate sewer and stor m water, grea s e i nterceptor 8,000 0 8,000
Arms trong School Refi ni s h gymna s i um fl oor 0 15,000 15,000
Avi a ry Repl a ce hea ti ng a nd a i r condi ti oni ng s ys tem 2,500 22,500 25, 000
Cemetery Pa i nt on doors a nd wood tri m 0 20,000 20,000
Ci rcui t Court Repl a ce wi ndows 25,000 200,000 225,000
Circuit Court Upgrade/repair heating and air conditioning system control s 30,000 370,000 400,000
C ity Hall C ar pet r eplac ement (split ov er multiple y ear s) 0 3 5 ,0 0 0 35,000
C ity Hall Wallpaper peeling/r emov e/skim and paint (split ov er m ul ti pl e yea rs ) 0 20,000 20,000
Ci ty Wi de Ca rpet a nd pa i nt (a nnua l a l l oca ti on) 0 75,000 75,000
City Wide Emergency and unscheduled building repairs (annual all oca ti on) 40,000 510,000 550,000
Ci ty Wi de Ga tewa y/Wa yfi ndi ng repl a cements 0 25,000 25,000
Ci ty Wi de Mul ti -bui l di ng - ma jor ba ckfl ow preventers 5,000 25,000 3 0,000
City Wide Yard hydrants needing backflow (12 total, split over 5 yea rs ) 0 12,000 12,000
Expres s wa y Repa i r a nd s ta i n pri va cy fence 0 100,000 100,000
Fi re Sta ti on 1 Exteri or encl os ure repa i r 20,000 60,000 80,000
Fire Station 1 Upgrade range hood, commercial hood with suppress ion and shunt 10,000 60,000 70,000
Fire Station 2 Upgrade range hood, hybrid hood with suppression and shunt trip 10,000 60,000 70,000
Fi re Sta ti on 5 Ki tchen ca bi nets repl a ced 0 30,000 30,000
Fire Station 5 Repair concrete apron at back of building 3,500 31, 500 35,000
Fire Station 5 Upgrade Range Hood, hybrid hood with suppression and shunt trip 10,000 60,000 70,000
Fir e Station 9 - NEW Spac e analy sis and design for new fac ility 300,000 0 300,000
Huma n Servi ces Bui l di ng Moderni za ti on el eva tor #3 0 252,500 252,500
Ja cks on Hei ghts Wi ndow repl a cement 5,000 75,000 80,000
L andfill Gar age Sheds ov er ic e mac hines and equipment 0 2 0 ,0 0 0 2 0 ,000
Old Courthouse Museum Accessibility improvements (construction) 0 150,000 150,000
P ar ks Replac e split r ail fenc ing with c hain-link 0 1 5 ,0 0 0 1 5 ,0 0 0
Parks Upgrades to equipment and amenities 0 50,000 50,000
Public Safety HVAC - 3 split units to be replaced (2 ton, 5 ton a nd 15 ton uni ts ) 0 50,000 50,000
2024 Sub-Totals $526,500 $2,343,500 $2,870,000
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
27
Major Building Repairs and Improvements/Multiple Projects
Fiscal
Year Project Sub-Project
Consultant
Engineering Construction Annual Total
925 Church Street Bui l di ng Interi or a nd exteri or renova ti ons $0 $4 00,000 $400,000
Armory Redo ba throoms 0 67,500 67,500
Armory/Ci ty Ma rket Combi ned HVAC repl a cement 100,000 850,000 950,0 00
Ar mor y /C ity M ar ket Replac e piping, separ ate sewer and stor m water, grea s e i nterceptor 25,000 300,000 325,000
Aviary HVAC - upstairs unit to be resized and upgraded 0 35,000 3 5,000
Ci ty Cemetery Ba ckfl ow a nd s epa ra te i rri ga ti on l i nes 12,500 112,5 00 125,000
Ci ty Ha l l HVAC, AHU a nd control s repl a cement (Des i gn) 100,000 0 100 ,000
Ci ty Wi de Ca rpet a nd pa i nt (a nnua l a l l oca ti on) 0 75,000 75,000
City Wide Emergency and unscheduled building repairs (annual all oca ti on) 40,000 510,000 550,000
Ci ty Wi de Ga tewa y/Wa yfi ndi ng repl a cements 0 25,000 25,000
Ci ty Wi de Mul ti -bui l di ng - ma jor ba ckfl ow preventers 5,000 25,000 3 0,000
Expres s wa y Repa i r a nd s ta i n pri va cy fence 0 50,000 50,000
Fi re Admi n El etri ca l pa nel upgra de on ri ght-s i de 15,000 50,000 65, 000
Fi re Sta ti on 1 Fi re Al a rm Sys tem 5,000 40,000 45,000
Fi re Sta ti on 2 Fi re Al a rm Sys tem 5,000 30,000 35,000
Gar nett Str eet Building Demol i ti on - engi neeri ng 25,000 0 25,000
Ivy Creek Pa rk Repl a ce pi er 10,000 50,000 60,000
Ol d Courthous e Mus eum Res troom renova ti ons (des i gn) 35,000 0 35,000
Opportunity House #2 Bathroom renovation/replace plumbing 8,000 72 ,000 80,000
P ar ks Replac e split r ail fenc ing with c hain-link 0 1 5 ,0 0 0 1 5 ,0 0 0
Parks Upgrades to equipment and amenities 0 50,000 50,000
Police Impound Building Reroof and reskin building 20,000 180,000 200,000
2025 Sub-Totals $405,500 $2,937,000 $3,342,500
Buildings and Grounds Building Backflow preventers for fire prot ecti on $5,000 $50,000 $55,000
Ci ty Ha l l Ba ckfl ow preventers for fi re protecti on 5,000 60,000 65, 000
C ity Hall C ar pet r eplac ement (split ov er multiple y ear s) 0 3 5 ,0 0 0 35,000
City Hall HVAC, AHU and controls replacement (Construction) 0 1,0 00,000 1,000,000
C ity Hall Wallpaper peeling/r emov e/skim and paint (split ov er mul ti pl e 0 20,000 20,000
Ci ty Wi de Ca rpet a nd pa i nt (a nnua l a l l oca ti on) 0 75,000 75,000
City Wide Emergency and unscheduled building repairs (annual all oca ti on) 40,000 510,000 550,000
Ci ty Wi de Ga tewa y/Wa yfi ndi ng repl a cements 0 25,000 25,000
Ci ty Wi de Mul ti -bui l di ng - ma jor ba ckfl ow preventers 5,000 25,000 3 0,000
Expres s wa y Repa i r a nd s ta i n pri va cy fence 0 50,000 50,000
Fi re Admi n New fl oors throughout l i vi ng qua rters 0 50,000 50,000
Fi re Sta ti on 4 Fi re Al a rm Sys tem 5,000 30,000 35,000
Fi re Sta ti on 5 Fi re Al a rm Sys tem 5,000 30,000 35,000
Fi re Sta ti on 5 HVAC Repl a cement 20,000 80,000 100,000
Fi re Sta ti on 6 Pa i nt throughout, Pl a s ter Repa i r 0 30,000 30,000
Fi re Sta ti on 8 Fi re Al a rm Sys tem 5,000 30,000 35,000
Ol d Courthous e Mus eum Res troom renova ti ons (cons tructi on) 0 120,00 0 120,000
P ar ks Replac e split r ail fenc ing with c hain-link 0 1 5 ,0 0 0 1 5 ,0 0 0
Parks Upgrades to equipment and amenities 0 50,000 50,000
Pea ks Vi ew Pa rk Sta i n a nd trea t wooden bri dges 0 30,000 30,000
Perci va l 's Is l a nd Bri dge Sta i n a nd trea t wooden bri dge 15,000 100, 000 115,000
Publ i c Works Compl ex Ma s ter pl a n i mpl ementa ti on (Des i gn) 200,000 0 200,000
2026 Sub-Totals $305,000 $2,415,000 $2,720,000
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
28
Major Building Repairs and Improvements/Multiple Projects
Fiscal
Year Project Sub-Project
Consultant
Engineering Construction Annual Total
Ci ty Wi de Bui l di ng condi ti on rea s s es s ment $450,000 $0 $450,000
Ci ty Wi de Ca rpet a nd pa i nt (a nnua l a l l oca ti on) 0 75,000 75,000
City Wide Emergency and unscheduled building repairs (annual all oca ti on) 40,000 560,000 600,000
Ci ty Wi de Ga tewa y/Wa yfi ndi ng repl a cements 0 25,000 25,000
Ci ty Wi de Mul ti -bui l di ng - ma jor ba ckfl ow preventers 5,000 25,000 3 0,000
Fi re Sta ti on 1 Ins ta l l fa ns i n a ppa ra tus a rea 0 10,000 10,000
Fire Station 1 Update bathroom fixtures, counters, and showers 0 3 0,000 30,000
Fi re Sta ti on 2 HVAC repl a cement 0 40,000 40,000
Fi re Sta ti on 2 Ins ta l l fa ns i n Appa ra tus Area 0 10,000 10,000
Fi re Sta ti on 4 New fl oors throughout l i vi ng qua rters 0 35,000 35,00 0
Fi re Sta ti on 5 Ki tchen ca bi nets repl a ced 0 30,000 30,000
Fi re Sta ti on 5 New fl oors throughout l i vi ng qua rters 0 25,000 25,00 0
Fire Station 8 Upgrade range hood, hybrid hood with suppression and shunt trip 10,000 60,000 70,000
Fire Stattion 4 Upgrade range hood, hybrid hood with suppression and shunt trip 10,000 60,000 70,000
Old Courthouse Museum Hustings Courtroom floor and acoustic upgr a des (des i gn) 30,000 0 30,000
P ar ks Replac e split r ail fenc ing with c hain-link 0 1 5 ,0 0 0 1 5 ,0 0 0
Parks Upgrades to equipment and amenities 0 50,000 50,000
Public Works Complex Master plan implementation (Construction) 0 3 ,000,000 3,000,000
2027 Sub-Totals $545,000 $4,050,000 $4,595,000
Grand Totals $2,049,000 $14,477,000 $16,526,000
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
29
Service Area Department Location
Buildings Public Works Various
Project Title Project Number Project Type
Parking Lot Repairs and Improvements/Multiple
Projects
Multiple Maintenance
Department Priority
Project supports essential services
Project Description
Annual program for repair and improvements to City owned parking lots. A detailed sub-project list is
attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Andy Chamberland/Clay Simmons
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Funds are used for the upkeep of existing City parking lots as they age
and require maintenance and repairs. Annually, funds are allotted to
address minor paving and lighting needs. Some lots require a wider
scope to address maintenance issues; this work is scheduled in future
years based on parking lot usage.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 375,000 Principal $0
FY 2024 - FY 2027 Planned 810,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 15,000 15,000 10,000 0 0 $40,000
Construction 360,000 260,000 175,000 175,000 175,000 $1,145,000
Total $375,000 $275,000 $185,000 $175,000 $175,000 $1,185,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 375,000 275,000 185,000 175,000 175,000 $1 ,185,000
Total $375,000 $275,000 $185,000 $175,000 $175,000 $1,185,000
Operating Budget Impact
Addressing maintenance issues reduces the need for on-going temporary repairs.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
30
Parking Lot Repairs and Improvements/Multiple Projects
Fiscal
Year Project Sub-Project
Consultant
Engineering Construction Annual Total
Ci ty Wi de Li ghti ng a nd pa vi ng $0 $75,000 $75,000
Court Street Lot Ma i ntena nce of l ot; l i ghti ng upgra des 15,000 185, 000 200,000
Ri verfront Pa rk Lot Li ghti ng i mprovements 0 100,000 100,000
2023 Sub-Totals $15,000 $360,000 $375,000
501 Ma i n Street Pa rki ng Deck Improvements /ma i ntena nce of l ot $15,000 $185,000 $200,000
Ci ty Wi de Li ghti ng a nd pa vi ng 0 75,000 75,000
2024 Sub-Totals $15,000 $260,000 $275,000
Ci ty Wi de Li ghti ng a nd pa vi ng $0 $75,000 $75,000
Mi d-town Pa rki ng Deck El ectri c Vehi cl e Cha rgi ng Sta ti on 10,000 100 ,000 110,000
2025 Sub-Totals $10,000 $175,000 $185,000
Ci ty Wi de Li ghti ng a nd pa vi ng $0 $75,000 $75,000
Ci ty Wi de Pa y s ta ti on repl a cement a t va ri ous l ots 0 100,000 100,000
2026 Sub-Totals $0 $175,000 $175,000
Ci ty Wi de Li ghti ng a nd pa vi ng $0 $75,000 $75,000
Ci ty Wi de Pa y s ta ti on repl a cement a t va ri ous l ots 0 100,000 100,000
2027 Sub-Totals $0 $175,000 $175,000
Grand Totals $40,000 $1,145,000 $1,185,000
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
31
Service Area Department Location
Buildings Public Works TBD
Project Title Project Number Project Type
Police Department Headquarters B0171 New
Department Priority
Project supports essential services
Project Description
Construct a new police headquarters to house all functions of the Police Department in a modern facility.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Andy Chamberland/Clay Simmons
Projected Start Date Q3 FY 2018 Why Now
Projected Completion Date Q4 FY 2024 As of June 2020, $5.7 million has been appropriated to this project for
demolition at the proposed site as well as design of a new facility. The
demolition is complete. In April 2020 a firm was selected and is working
with staff to finalize pre-design services.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2022
Construction Q1 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $5,700,693 Project Total Debt Expenditures
Budget FY 2023 38,208,038 Principal $26,058,038
FY 2024 - FY 2027 Planned 0 Interest 7,214,339
Remaining Need 0 Total $33,272,377
Total Project Cost $43,908,731
Local Funding Percentage 59.3% Estimated Annual Debt Service $1,663,619
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 38,208,038 0 0 0 0 $38,208,038
Total $38,208,038 $0 $0 $0 $0 $38,208,038
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 14,308,038 7,500,000 0 0 $21,808,038
Federal: ARPA - Revenue Replacement 16,400,000 0 0 0 0 $16,400, 000
Total $16,400,000 $14,308,038 $7,500,000 $0 $0 $38,208,038
Operating Budget Impact
The new facility will require annual additional grounds and building maintenance, as well as custodial services, utilities, and stormwater (~$83,000).
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
32
Service Area Department Location
Buildings Public Works Public Library
Project Title Project Number Project Type
Public Library Renovation/Reimagination BM201 Maintenance
Department Priority
Project supports essential services
Project Description
Construct improvements to the existing main library to better adapt to the changing needs of the library
system. Changes will accommodate future uses, differing technologies, and remedy deficiencies in the
current structure and finishes.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Clay Simmons, Deputy Director of Public Works
Projected Start Date Q3 FY 2018 Why Now
Projected Completion Date Q4 FY 2026 Library systems across the nation are seeing changes in the needs and
demands of their patrons. The Public Library moved into its current
location in 1984 with very little change to the building since that time.
These planned renovations are imperative for the Library to continue to
be current, responsive, and relevant.
A consultant was hired in FY 2018 to develop a conceptual design
"reimagining" the Public Library. The City funding allocated in FY 2024
would move the project forward to finalize design and begin
construction. The extent of the scope of this project is dependent upon
fundraising efforts currently underway by the Friends of the Public
Library.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2023
Construction Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $1,092,710 Project Total Debt Expenditures
Budget FY 2023 0 Principal $7,705,499
FY 2024 - FY 2027 Planned 7,000,000 Interest 2,133,318
Remaining Need 0 Total $9,838,817
Total Project Cost $8,092,710
Local Funding Percentage 100.0% Estimated Annual Debt Service $491,941
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 0 3,500,000 0 3,500,000 0 $7,000,000
Total $0 $3,500,000 $0 $3,500,000 $0 $7,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 705,499 3,500,000 0 3,500,000 0 $7,705,49 9
Total $705,499 $3,500,000 $0 $3,500,000 $0 $7,705,499
Operating Budget Impact
As the services provided by the Library evolves costs to operate and maintain the facility, equipment, and technologies are expected to increase.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
33
Service Area Department Location
Buildings Public Works Various
Project Title Project Number Project Type
Roof Replacement/Multiple Projects Multiple Maintenance
Department Priority
Project supports essential services
Project Description
Annual program for repair and replacement of roofs. A detailed sub-project list is attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Andy Chamberland/Clay Simmons
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Funds are used for the upkeep of the roofs of existing City buildings and
assets as they age and require maintenance and repairs.
In FY 2018, a consultant performed a condition assessment of all City
owned buildings. Results of the assessment provided staff with
information to prioritize needs and develop a schedule to address
maintenance and replacement of roof systems and components.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 678,000 Principal $0
FY 2024 - FY 2027 Planned 1,778,980 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 43,500 4,535 30,000 20,000 8,000 $106,035
Construction 634,500 351,445 625,000 450,000 290,000 $2,350,945
Total $678,000 $355,980 $655,000 $470,000 $298,000 $2,456,980
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 678,000 355,980 655,000 470,000 298,000 $2 ,456,980
Total $678,000 $355,980 $655,000 $470,000 $298,000 $2,456,980
Operating Budget Impact
Addressing maintenance issues reduces the need for on-going temporary repairs.
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
34
Roof Replacement/Multiple Projects
Fiscal
Year Project Sub-Project
Consultant
Engineering Construction Annual Total
Arms trong School Gymna s i um roof repl a cement $8,000 $90,000 $98,000
Ci ty Ha l l Repa i r fl a s hi ng, dra i ns , a nd pa ra pet 17,500 157,500 175,0 00
Ci ty Wi de Emergency roof repa i rs 0 150,000 150,000
City Wide Inspections and maintenance 0 75,000 75,000
Publ i c Hea l th Center Repl a ce roof 18,000 162,000 180,000
2023 Sub-Totals $43,500 $634,500 $678,000
Ci ty Ha l l Repl a ce roof $4,535 $86,445 $90,980
Ci ty Wi de Emergency roof repa i rs 0 150,000 150,000
City Wide Inspections and maintenance 0 75,000 75,000
Fi re Sta ti on 4 Repa i r roof a nd re-coa t 0 40,000 40,000
2024 Sub-Totals $4,535 $351,445 $355,980
2600 Concord Turnpi ke (P&R s tora ge) Repl a ce roof $0 $65,000 $65,000
Al l en Morri s on Bui l di ng Repl a ce roof 20,000 230,000 250,000
City Stadium - Baseball side Replace rubber roof 10,000 105,000 115,000
Ci ty Wi de Emergency roof repa i rs 0 150,000 150,000
City Wide Inspections and maintenance 0 75,000 75,000
2025 Sub-Totals $30,000 $625,000 $655,000
Bus i nes s Incuba tor Repl a ce roof $20,000 $180,000 $200,000
Ci ty Wi de Emergency roof repa i rs 0 150,000 150,000
City Wide Inspections and maintenance 0 75,000 75,000
Fa i rvi ew Recrea ti on Center Repl a ce roof 0 45,000 45,000
2026 Sub-Totals $20,000 $450,000 $470,000
Ci ty Wi de Emergency roof repa i rs $0 $150,000 $150,000
City Wide Inspections and maintenance 0 75,000 75,000
Refus e Repl a ce roof 8,000 65,000 73,000
2027 Sub-Totals $8,000 $290,000 $298,000
Grand Totals $106,035 $2,350,945 $2,456,980
Capital Improvement Program General Fund - Buildings
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
35
Service Area Department Location
Buildings Public Works TBD
Project Title Project Number Project Type
Transfer Station for Refuse To Be Assigned New
Department Priority
Project supports essential services
Project Description
Design and build a refuse transfer station for City refuse operations to accept residential trash, brush, and
bulk before hauling to a permitted landfill. The new facility could possibly serve as the citizen
convenience center.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Gaynelle Hart, Director of Public Works
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2025 A transfer station located within the city should be considered now for
the following reasons: reduced travel time and on-site wait times to/at
the Region 2000 Service Authority landfill resulting in reduced labor and
fuel costs, reduced travel time creating capacity to serve more trash
customers as the city population grows, reduced damage and repairs to
refuse vehicles that result from navigating the road to the landfill face,
increased capacity to respond to emergencies that result in debris, and
the flexibility to respond to regional and national solid waste changes
and trends.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2024
Construction Q4 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 300,000 Principal $4,900,000
FY 2024 - FY 2027 Planned 4,600,000 Interest 1,356,597
Remaining Need 0 Total $6,256,597
Total Project Cost $4,900,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $312,830
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 300,000 600,000 0 0 0 $900,000
Construction 0 0 4,000,000 0 0 $4,000,000
Total $300,000 $600,000 $4,000,000 $0 $0 $4,900,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 300,000 600,000 4,000,000 0 0 $4,900,000
Total $300,000 $600,000 $4,000,000 $0 $0 $4,900,000
Operating Budget Impact
Annual operating costs are estimated at $300,000.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
36
Five Year Proposed Appropriations to be Financed by the City
Project Title
Appropriations
Through
06/30/2022 Budget FY 2023
FY 2024 - 2027
Planned
Five-Year
Estimated Net
cost
Estimated Cost
Beyond
Program Period
Total
Accumulated
Project Cost
Transportation
Public Transit Improvements and Bus Replacements 12,748,146 3,27 2,002 10,995,309 14,267,311 1,854,567 28,870,024
5th Street Improvements, Phase IV 7,814,495 0 0 0 0 7,81 4,495
Bedford Avenue Bridge 10,355 0 10,000,000 10,000,000 0 10,010,355
Breezewood Drive Widening 00 8 , 0 4 5,368 8,045,368 0 8,045,368
Bridge Maintenance Continuing 400, 000 1,960,000 2,360,000 Continuing Continuing
Campbell Avenue Intersection and Signal Reconstruction 0 0 2,500,000 2,500,000 0 2,500,000
College Lake Overlook 0 0 825,000 825,000 0 825,000
Culvert Repla cement Progra m Continuing 600, 000 1,380,000 1,980,000 Continuing Continuing
Florida Avenue Sidewa lk 4,316,087 75,000 5,933,913 6,008,913 0 10,325,000
General Street Improvements Continuing 850, 000 3,470,000 4,320,000 Continuing Continuing
Grace Street Realignment at 12th and Madison 0 0 4,40 0,000 4,400,000 0 4,400,000
Graves Mill Road at Route 501 S Ramp Modifications 0 0 5,100,000 5,100,000 0 5,100,000
Hill Street/Moormans Road Improvements 400,000 0 4,500,000 4,500,000 1,000,000 5,900,000
Hollins Mill Road Bridge Replacement with Bikeway Improvements 0 0 3,92 5,876 3,925,876 6,046,616 9,972,492
Lakeside Drive Bridge over Blackwater Creek 28,500,000 0 0 0 0 28,500,000
Lakeside Drive Improvements 0 0 3,42 7,682 3,427,682 0 3,427,682
Link Road/Boonsboro Road Intersection Improvements 0 0 2,48 5,896 2,485,896 0 2,485,896
Lynchburg Center for Industry - Phase I 0 817,349 0 817,349 0 817,349
Lynchburg Expressway/Candlers Mt. Road Intchg Improvements 0 6,001,246 58,655,957 64,657,203 0 64, 657,203
McConville Roa d Rea lignment to La kes ide Drive 00 6 0 0 , 000 600,000 2,800,000 3,400,000
Memorial Avenue Fuel Site 0 0 650,000 650,000 0 650,000
Public Works Infrastructure Improvements Continuing 230, 000 1,093,000 1,323,000 Continuing Continuing
Retaining Wall Replacement/Repair Program Continuing 400, 000 850,000 1,250,000 Continuing Continuing
Rivermont Avenue at Bedford Avenue Intersection Improvements 485,000 0 0 0 0 485,000
Rivermont Avenue Bridge Repair 7,500,000 0 0 0 0 7,500,000
Route 501/221 One-Wa y Pa irs 11,836,522 16,7 01,515 0 16,701,515 0 28,538,037
Storm Drainage System Repairs/Replacements Continuing 135, 000 740,000 875,000 Continuing Continuing
Street Overla y Progra m Continuing 2,500,000 10,000,000 12,500,000 Continuing Continuing
Timberlake Road Bridge, East Bound Lanes 00 7 , 8 0 0,000 7,800,000 0 7,800,000
Timberlake Road Bridge, West Bound Lanes 0 0 7,800,000 7,800,000 0 7,800,000
Traffic Signal Repair and Replacement Continuing 260,000 1,100,000 1,360,000 Continuing Continuing
Wards Ferry Road at CVCC Campus Drive Roundabout 00 1 1 , 3 01,008 11,301,008 0 11,301,008
Wards Ferry Road/Atlanta Avenue Turn Lanes 0 0 2,157,996 2,157,996 0 2,157,996
Wards Ferry Road/Simons Run Pedestrian Accommodations 0 0 250,000 250,000 0 250,000
Total Proposed FY 2023 - 2027 CIP $73,610,605 $32, 242,112 $171,947,005 $204,189,117 $11,701,183 $263,532,905
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
37
Service Area Department Location
Public Transit Greater Lynchburg Transit Company (GLTC) 419 Bradl ey Drive
Project Title Project Number Project Type
Public Transit Improvements and Bus
Replacements
T0256 New
Department Priority
Project has State and/or Federal funding; Project supports essential services; Project represents
additional essential services
Project Description
The Public Transit capital budget includes costs for maintenance and replacement of buses, expansion of
the bus fleet, and bus shelter pads and has previously required a 10% city match. A detailed sub-project
list is attached.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1: Provide safe, efficient, effective, and well-planned transportation systems
and facilities that enhance economic development and redevelopment opportunities while preserving
the integrity and character of the affected neighborhoods, historic districts, downtown and natural
resources.
Project Manager
Josh Moore, General Manager
Projected Start Date Continuing Why Now
Projected Completion Date Continuing These projects are submitted to ensure the public transit system
continues to maintain its infrastructure and work toward improvements
to amenities and services for the consumers who utilize the service.
Projected Schedule
Activity Projected Date
Bus Fleet Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $12,748,146 Project Tota l Debt Expenditures
Budget FY 2023 3,272,002 Principal $0
FY 2024 - FY 2027 Planned 10,995,309 Interest 0
Remaining Need 1,854,567 Total $0
Total Project Cost $28,870,024
Local Funding Percentage 10.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Bus Fleet 3,272,002 3,605,128 5,984,504 179,689 1,225,988 $14,267,311
Total $3,272,002 $3,605,128 $5,984,504 $179,689 $1,225,988 $14,267,311
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: Grants 1,168,080 2,422,703 7,716,030 3,438,672 1,712,4 61 $16,457,946
State: Grants 146,010 302,838 964,504 429,834 214,058 $2,057,24 4
Local: Pay-As-You-Go 146,010 302,838 964,504 429,834 214,058 $2 ,057,244
Total $1,460,100 $3,028,379 $9,645,038 $4,298,340 $2,140,577 $20,572,434
Operating Budget Impact
Failure to upgrade equipment will increase operating and maintenance costs.
Five Year Cash Flow Projections: Cash flow is contingent upon grant execution for State and Federal funds. This can at times be a lengthy process and
could cause inaccuracy in our projections for cash flows.
Source of Project Funding: The Federal and State percentages rates may change moving forward as there has been restructuring of eligible funds
available to GLTC for capital expenditures. We do not anticipate the Local share to exceed 10%.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
38
Public Transit Improvement and Bus Replacements
Fiscal Year Project Bus Fleet Annual Total
Hea vy Duty Tra ns i t Bus Repl a cements (4) $2,573,689 $2,573,689
Support Vehicle Replacements (9) 389,563 389,563
Bus Shel ters 127,000 127,000
Wa rds Roa d Tra ns fer Improvements 148,000 148,000
IT Technol ogy Repl a cement 33,750 33,750
2023 Sub-Totals $3,272,002 $3,272,002
Hea vy Duty Tra ns i t Bus Repl a cement (3) $2,007,477 $2,007,477
Li ght Duty Pa ra -tra ns i t Bus Repl a cement (7) 1,277,486 1,277,486
Support Vehicle Replacement (4) 180,065 180,065
IT Technol ogy Repl a cement 140,100 140,100
2024 Sub-Totals $3,605,128 $3,605,128
Hea vy Duty Tra ns i t Bus Repl a cement (8) $5,567,404 $5,567,404
Kemper Sta ti on Bus Ba y Expa ns i on 223,000 223,000
Bus Stop Shel ters 61,000 61,000
IT Technol ogy Repl a cement 133,100 133,100
2025 Sub-Totals $5,984,504 $5,984,504
Support Vehicle Replacement (1) $48,689 $48,689
IT Technol ogy Repl a cement 131,000 131,000
2026 Sub-Totals $179,689 $179,689
Li ght Duty Pa ra -tra ns i t Bus Repl a cement (6) $1,094,988 $1,094,988
IT Technol ogy Repl a cement 131,000 131,000
2027 Sub-Totals $1,225,988 $1,225,988
Grand Totals $14,267,311 $14,267,311
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
39
Service Area Department Location
Transportation Public Works 5th Street from Taylor St. to Pie rce St.
Project Title Project Number Project Type
5th Street Improvements, Phase IV T0329 New
Department Priority
Project has legal or regulatory mandate; Project supports essential services; Project has State and/or
Federal funding
Project Description
Reconstruct roadway to remove concrete pavement base to eliminate joints and reconstruct sidewalks
for safety and compliance with Americans with Disabilities Act accessibility; includes streetscapes.
Relationship to Comprehensive Plan
The Fifth Street Master Plan was adopted by City Council on May 23, 2006 as part of the City's
Comprehensive Plan 2002 - 2020. Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the
cost-effective operation and maintenance of streets, including pavement, bikeways, sidewalks,
streetscapes and stormwater management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q2 FY 2020 Why Now
Projected Completion Date Q2 FY 2025 The underlying substructure of the roadway is jointed concrete
pavement that continues to move and cause cracks and bumps in the
asphalt overlay. In order to eliminate the current issues and prevent
deterioration of the road sub base, this concrete needs to be removed
and the entire road rebuilt including sidewalks and retaining walls. This
work completes the final phase of Fifth Street improvement.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2021
Construction Q2 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $7,814,495 Project Total Debt Expenditures
Budget FY 2023 0 Principal $4,117,880
FY 2024 - FY 2027 Planned 0 Interest 1,140,062
Remaining Need 0 Total $5,257,942
Total Project Cost $7,814,495
Local Funding Percentage 52.8% Estimated Annual Debt Service $262,897
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 80,000 2,030,000 1,100,000 0 0 $3,210,000
State: Revenue Sharing 80,000 2,030,000 1,100,000 0 0 $3,210,00 0
State: Highway Maintenance (VDOT) 0 0 137,303 0 0 $137,303
Local: Pay-As-You-Go 0 0 9,312 0 0 $9,312
Total $160,000 $4,060,000 $2,346,615 $0 $0 $6,566,615
Operating Budget Impact
Additional annual expenses for grounds, maintenance, and stormwater (~$10,000).
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
40
Service Area Department Location
Transportation Public Works Bedford Avenue at Norfolk Southern
Rail
Project Title Project Number Project Type
Bedford Avenue Bridge TB054 New
Department Priority
Project has legal or regulatory mandate; Project supports essential services; Project has State and/or
Federal funding
Project Description
Replace deteriorating structure over Norfolk Southern Railway.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q4 FY 2027 The City’s Comprehensive Bridge Condition Report ranks this bridge as
the most immediate need as it has a “Poor” condition rating. The
abutments are deteriorated and the bridge deck has spalling concrete
and exposed reinforcing steel.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2025
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $10,355 Project Total De bt Expenditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 10,000,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $10,010,355
Local Funding Percentage .1% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 1,500,000 0 0 0 $1,500,000
Construction 0 8,500,000 0 0 0 $8,500,000
Total $0 $10,000,000 $0 $0 $0 $10,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: State of Good Repair 0 1,000,000 1,500,000 4,000,000 3 ,500,000 $10,000,000
Total $0 $1,000,000 $1,500,000 $4,000,000 $3,500,000 $10,000,000
Operating Budget Impact
None anticipated at this time.
An application will be submitted to VDOT for State of Good Repair Program funds for FY 2024.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
41
Service Area Department Location
Transportation Public Works Breezewood Drive
Project Title Project Number Project Type
Breezewood Drive Widening T0331 New
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Widen and improve road and pedestrian features from the end of the Virginia Department of
Transportation's (VDOT's) 2007 project to the end of the cul-de-sac.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q2 FY 2025 Why Now
Projected Completion Date Q2 FY 2028 Project was cancelled after funds ran out from the 2007 VDOT project.
Roadway has seen increased vehicle and pedestrian traffic due to
private development in the immediate vicinity and safety improvements
for pedestrians and vehicles are needed. An application was submitted
for Revenue Sharing Funds.
Projected Schedule
Activity Projected Date
Land Acquisition/Right-of-Way Q2 FY 2026
Consultant Engineering Q2 FY 2026
Construction Q2 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $4,022,684
FY 2024 - FY 2027 Planned 8,045,368 Interest 1,113,706
Remaining Need 0 Total $5,136,390
Total Project Cost $8,045,368
Local Funding Percentage 50.0% Estimated Annual Debt Service $256,820
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Land Acquisition/Right-of-Way 0 0 200,000 0 0 $200,000
Consultant Engineering 0 0 1,100,000 0 0 $1,100,000
Construction 0 0 0 3,654,046 2,891,322 $6,545,368
Contingency 0 0 200,000 0 0 $200,000
Total $0 $0 $1,500,000 $3,654,046 $2,891,322 $8,045,368
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 450,000 1,827,023 1,445,661 $3,722,68 4
State: Revenue Sharing 0 0 450,000 1,827,023 1,445,661 $3,722,6 84
Total $0 $0 $900,000 $3,654,046 $2,891,322 $7,445,368
Operating Budget Impact
Additional annual expenses for tree maintenance and stormwater (~$10,000).
An application was submitted to VDOT for Revenue Share Program funds for FY 2022 - VDOT awarded for FY 2025 and FY 2026. An additional application
was submitted to VDOT for Revenue Share funds for FY 2027.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
42
Service Area Department Location
Transportation Public Works Various
Project Title Project Number Project Type
Bridge Maintenance TB038 Maintenance
Department Priority
Project has legal or regulatory mandate; Project has State and/or Federal funding; Project supports
essential services
Project Description
Annual cleaning of seventy-nine bridges and culverts; repairs to expansion joints; annual consultant
bridge and safety inspection; and other maintenance.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Bridge inspections must be performed every year; on-going
maintenance increases an asset’s useful life span and reduces the need
for major repairs.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 400,000 Principal $0
FY 2024 - FY 2027 Planned 1,960,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 70,000 90,000 100,000 110,000 120,000 $490,000
Construction 330,000 370,000 380,000 390,000 400,000 $1,870,000
Total $400,000 $460,000 $480,000 $500,000 $520,000 $2,360,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
State: Highway Maintenance (VDOT) 400,000 460,000 480,000 500,0 00 520,000 $2,360,000
Total $400,000 $460,000 $480,000 $500,000 $520,000 $2,360,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
43
Service Area Department Location
Transportation Public Works Campbell Ave. - Fort Ave. to 12th St.
Project Title Project Number Project Type
Campbell Avenue Intersection and Signal
Reconstruction
T0332 New
Department Priority
Project supports essential services
Project Description
Fort Avenue and 12th Street Signal Replacements on Campbell Avenue with pedestrian features; road
rebuild.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q4 FY 2026 Signals work in synchronization and both are beyond their useful life
span as they are over 40 years old. The roadway is concrete pavement
that needs replacing due to deterioration and pot holes. Improvements
to pedestrian crossing features will be added for safety.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2024
Construction Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $2,500,000
FY 2024 - FY 2027 Planned 2,500,000 Interest 692,141
Remaining Need 0 Total $3,192,141
Total Project Cost $2,500,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $159,607
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 250,000 0 0 0 $250,000
Construction 0 2,250,000 0 0 0 $2,250,000
Total $0 $2,500,000 $0 $0 $0 $2,500,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 500,000 1,000,000 1,000,000 0 $2,500,00 0
Total $0 $500,000 $1,000,000 $1,000,000 $0 $2,500,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
44
Service Area Department Location
Transportation Public Works College Lake
Project Title Project Number Project Type
College Lake Overlook To Be Assigned New
Department Priority
Project required to support important but not essential services
Project Description
Modify existing arch bridge for use as an overlook to wetlands created from College Lake. Also ties into
Creekside Trail.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2027 After constructing the new bridge on Lakeside Drive over Blackwater
Creek, this bridge needs to be saved and turned into an overlook upon
the Wetlands project completion. This will preserve one of only two
arch bridges within the City.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2026
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $825,000
FY 2024 - FY 2027 Planned 825,000 Interest 228,407
Remaining Need 0 Total $1,053,407
Total Project Cost $825,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $52,670
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 75,000 0 0 $75,000
Construction 0 0 0 750,000 0 $750,000
Total $0 $0 $75,000 $750,000 $0 $825,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 75,000 650,000 100,000 $825,000
Total $0 $0 $75,000 $650,000 $100,000 $825,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
45
Service Area Department Location
Transportation Public Works Various
Project Title Project Number Project Type
Culvert Replacement Program T0258 Maintenance
Department Priority
Project supports essential services
Project Description
Managed program to replace and maintain over 100 City culverts. Upcoming culvert replacements
include Mayfield Drive (2), Lakeview Drive and Gorman Drive.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Dee-Dee Conner, P.E., Principal Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing City staff performs a bi-annual Culvert Condition Report to prioritize
needs to maintain the street integrity by designing and replacing failing
culverts in alternating years.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 600,000 Principal $1,980,000
FY 2024 - FY 2027 Planned 1,380,000 Interest 548,176
Remaining Need Continuing Total $2,528,176
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $126,409
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 65,000 0 65,000 0 $130,000
Construction 600,000 0 600,000 0 650,000 $1,850,000
Total $600,000 $65,000 $600,000 $65,000 $650,000 $1,980,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 600,000 65,000 600,000 65,000 650,000 $1, 980,000
Total $600,000 $65,000 $600,000 $65,000 $650,000 $1,980,000
Operating Budget Impact
Maintenance costs will be reduced.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
46
Service Area Department Location
Transportation Public Works Flori da Ave. from Grace St. to
Greenfield Dr.
Project Title Project Number Project Type
Florida Avenue Sidewalk T0324 New
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Install sidewalk along Florida Avenue from Grace Street to Greenfield Drive. This project will require
elevated walkways and wall structures, a new drainage system, signals, a replacement guardrail, and curb
and gutter. This project will require substantial coordination; potentially significant alterations to the
railroad trestle.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2020 Why Now
Projected Completion Date Q4 FY 2026 City Council requested sidewalk improvements to improve the safety of
the pedestrians that currently traverse the roadway and cross under the
railroad bridge without a safe area to do so. The pedestrians are forced
to walk much of the area in the roadway due to obstructions like no
shoulders and rock outcroppings. Project also supports the future
improvements to the James Crossings apartments.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2023
Construction Q3 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $4,316,087 Project Total Debt Expenditures
Budget FY 2023 75,000 Principal $8,075,000
FY 2024 - FY 2027 Planned 5,933,913 Interest 2,235,617
Remaining Need 0 Total $10,310,617
Total Project Cost $10,325,000
Local Funding Percentage 78.2% Estimated Annual Debt Service $515,531
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 75,000 1,133,913 4,800,000 0 0 $6,008,913
Total $75,000 $1,133,913 $4,800,000 $0 $0 $6,008,913
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 800,000 1,800,000 3,600,000 1,475,000 0 $ 7,675,000
State: Revenue Sharing 800,000 1,050,000 0 0 0 $1,850,000
Total $1,600,000 $2,850,000 $3,600,000 $1,475,000 $0 $9,525,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
47
Service Area Department Location
Transportation Public Works Various
Project Title Project Number Project Type
General Street Improvements TG019 Maintenance
Department Priority
Project supports essential services
Project Description
Curb, gutter and sidewalk petitions; annual contractual improvements; subdivisions and storm sewer
improvements; street improvements and signalization.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Improvements in the transportation system due to safety considerations
and existing deficiencies; reimbursements to developers.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 850,000 Principal $575,000
FY 2024 - FY 2027 Planned 3,470,000 Interest 159,193
Remaining Need Continuing Total $734,193
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $36,710
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 40,000 30,000 60,000 60,000 60,000 $250,000
Construction 810,000 740,000 840,000 840,000 840,000 $4,070,000
Total $850,000 $770,000 $900,000 $900,000 $900,000 $4,320,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 850,000 770,000 575,000 900,000 650,000 $3 ,745,000
Local: Line of Credit 0 0 325,000 0 250,000 $575,000
Total $850,000 $770,000 $900,000 $900,000 $900,000 $4,320,000
Operating Budget Impact
Possible increase in lane mileage, subsequently increasing maintenance costs and State Highway reimbursement. Possible increase in curb and gutter,
number of signals, and square yards of sidewalk, resulting in increased maintenance.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
48
Service Area Department Location
Transportation Public Works Gra ce St. at 12th and Madison
Project Title Project Number Project Type
Grace Street Realignment at 12th and Madison To Be Assigned Ne w
Department Priority
Project required to support important but not essential services
Project Description
Realignment of Grace Street away from failing embankment to protect pedestrians and vehicles.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2027 Why Now
Projected Completion Date Q4 FY 2028 Bank continues to slough off (dirt falls off) onto sidewalk and into Grace
Street, creating hazards.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2027
Construction Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $4,400,000
FY 2024 - FY 2027 Planned 4,400,000 Interest 1,218,169
Remaining Need 0 Total $5,618,169
Total Project Cost $4,400,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $280,908
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 0 0 600,000 $600,000
Construction 0 0 0 0 3,800,000 $3,800,000
Total $0 $0 $0 $0 $4,400,000 $4,400,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 0 800,000 $800,000
Total $0 $0 $0 $0 $800,000 $800,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
49
Service Area Department Location
Transportation Public Works Graves Mill Road at Route 501 South
Project Title Project Number Project Type
Graves Mill Road at Route 501 S Ramp
Modifications
To Be Assigned New
Department Priority
Project supports essential services
Project Description
Widen the on-ramp to accommodate 2 lanes of traffic entering onto 501 South.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q2 FY 2026 Traffic on Graves Mill Road backs up significantly due to motorists
wanting to proceed south on 501. This lane addition will increase
capacity of ramp as a short-term fix until the interchange can be rebuilt.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2024
Land Acquisition/Right-of-Way Q2 FY 2025
Construction Q2 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $5,100,000
FY 2024 - FY 2027 Planned 5,100,000 Interest 1,411,968
Remaining Need 0 Total $6,511,968
Total Project Cost $5,100,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $325,598
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Land Acquisition/Right-of-Way 0 400,000 0 0 0 $400,000
Consultant Engineering 0 600,000 0 0 0 $600,000
Construction 0 0 4,100,000 0 0 $4,100,000
Total $0 $1,000,000 $4,100,000 $0 $0 $5,100,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 800,000 2,300,000 2,000,000 0 $5,100,00 0
Total $0 $800,000 $2,300,000 $2,000,000 $0 $5,100,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
50
Service Area Department Location
Transportation Public Works Hill Street at Moormans Road
Project Title Project Number Project Type
Hill Street/Moormans Road Improvements T0317 New
Department Priority
Project supports essential services
Project Description
Realign road to remove offset intersections.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2019 Why Now
Projected Completion Date Q2 FY 2028 Over the past five years, there has been increased congestion and 19
crashes in the area.
Projected Schedule
Activity Projected Date
Land Acquisition/Right-of-Way Q4 FY 2026
Consultant Engineering Q4 FY 2026
Construction Q2 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $400,000 Project Total D ebt Expenditures
Budget FY 2023 0 Principal $5,500,000
FY 2024 - FY 2027 Planned 4,500,000 Interest 1,522,711
Remaining Need 1,000,000 Total $7,022,711
Total Project Cost $5,900,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $351,136
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Land Acquisition/Right-of-Way 0 0 0 400,000 0 $400,000
Consultant Engineering 0 0 0 450,000 0 $450,000
Construction 0 0 0 0 3,650,000 $3,650,000
Total $0 $0 $0 $850,000 $3,650,000 $4,500,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 850,000 3,650,000 $4,500,000
Total $0 $0 $0 $850,000 $3,650,000 $4,500,000
Operating Budget Impact
Additional annual expenses for tree maintenance and stormwater (~$7,000).
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
51
Service Area Department Location
Transportation Public Works Hollins Mill Road Bridge
Project Title Project Number Project Type
Hollins Mill Road Bridge Replacement with
Bikeway Improvements
To Be Assigned New
Department Priority
Project contributes to the generation of new revenue; Project supports essential services; Project has
State and/or Federal funding
Project Description
Replacement and enhancement of the bridge on Hollins Mill Road at Hollins Mill Park. There is a low
water bridge underneath the Hollins Mill Bridge connecting the Blackwater Creek Bikeway with the Point
of Honor Trail that constantly requires maintenance to remain safely accessible to pedestrians and
bicyclists. This project will replace the bridge and provide bike and pedestrian enhancements when the
low water bridge is not available. Additional funding for the project will need to be applied for in future
grant funding cycles.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2027 Why Now
Projected Completion Date Q2 FY 2030 This project is needed on two fronts: 1) The bridge requires
maintenance, and replacement takes care of the maintenance items. 2)
Pedestrians and bicyclists are forced to cross the road and bridge in the
travel lane without any pedestrian features when the low water crossing
is covered with water, which occurs on a regular basis.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2028
Construction Q2 FY 2030
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $4,986,246
FY 2024 - FY 2027 Planned 3,925,876 Interest 1,380,475
Remaining Need 6,046,616 Total $6,366,721
Total Project Cost $9,972,492
Local Funding Percentage 50.0% Estimated Annual Debt Service $318,336
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 0 0 1,000,000 $1,000,000
Construction 0 0 0 0 2,925,876 $2,925,876
Total $0 $0 $0 $0 $3,925,876 $3,925,876
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 0 150,000 $150,000
State: Revenue Sharing 0 0 0 0 150,000 $150,000
Total $0 $0 $0 $0 $300,000 $300,000
Operating Budget Impact
Reduces maintenance costs by removal of the low water crossing.
An additional Revenue Share application will be applied for in FY 2024 for the $6,046,616 in FY 2028.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
52
Service Area Department Location
Transportation Public Works Co llege Lake/Lakeside Drive
Project Title Project Number Project Type
Lakeside Drive Bridge over Blackwater Creek TB052 New
Department Priority
Project has legal or regulatory mandate
Project Description
The City is responsible for the long-term management of the College Lake Dam and meeting all applicable
State Dam Safety Regulations. To meet these regulations, the Dam must be removed and replaced with a
bridge, associated utilities, roadwork, and a roundabout at the intersection with Old Forest Road
adjacent to the University of Lynchburg.
Relationship to Comprehensive Plan
Chapter 3, Page 36, Goal PU-2.2: Design and operate stormwater improvements to minimize risks to
people and property from flooding. Achievement of this component of that goal is mandated by the
Virginia Department of Conservation and Recreation Dam Safety Regulations and Dam Safety Act, Article
2, Chapter 6, Title 10.1 of the Code of Virginia.
Project Manager
Dee-Dee Conner, P.E., Principal Engineer
Projected Start Date Q2 FY 2013 Why Now
Projected Completion Date Q4 FY 2024 Required by the Virginia Department of Conservation and Recreation
due to a change in regulations. Project/progress toward Dam removal
must be underway by March 2020. Bridge construction must precede
Dam removal and the Lake Bed restoration project.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2024
Construction Q4 FY 2024
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $28,500,000 Project Tota l Debt Expenditures
Budget FY 2023 0 Principal $28,500,000
FY 2024 - FY 2027 Planned 0 Interest 7,890,412
Remaining Need 0 Total $36,390,412
Total Project Cost $28,500,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $1,819,521
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 5,000,000 1,500,000 0 0 0 $6,500,000
Total $5,000,000 $1,500,000 $0 $0 $0 $6,500,000
Operating Budget Impact
Slight increase in annual cost for inspections and routine maintenance. Current staffing levels are sufficient for these activities.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
53
Service Area Department Location
Transportation Public Works Lakeside Drive at the Plaza
Project Title Project Number Project Type
Lakeside Drive Improvements To Be Assigned New
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Widen Lakeside Drive from the entrance to the Plaza to Murrell Road; install sidewalks and street trees.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2027 This project completes the next section of the Midtown Connector,
which is a corridor to improve transportation from the Lynchburg
Expressway to the 501/221 intersection. This section of the corridor is
routinely blocked due to large delivery trucks parked at the back loading
docks of the businesses in the Plaza. This will correct the inconvenience
and safety concerns to the traveling public.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2026
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $1,713,841
FY 2024 - FY 2027 Planned 3,427,682 Interest 474,488
Remaining Need 0 Total $2,188,329
Total Project Cost $3,427,682
Local Funding Percentage 50.0% Estimated Annual Debt Service $109,416
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 0 503,000 0 $503,000
Construction 0 0 0 1,468,278 1,456,404 $2,924,682
Total $0 $0 $0 $1,971,278 $1,456,404 $3,427,682
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 856,921 856,920 $1,713,841
State: Revenue Sharing 0 0 0 856,921 856,920 $1,713,841
Total $0 $0 $0 $1,713,842 $1,713,840 $3,427,682
Operating Budget Impact
Additional annual expenses for tree maintenance and stormwater (~$5,000).
An application was submitted to VDOT for Revenue Share Program funds for FY 2022 - VDOT awarded for FY 2026. An additional application was
submitted to VDOT for Revenue Share funds for FY 2027.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
54
Service Area Department Location
Transportation Public Works Link Road at Boonsboro Road
Project Title Project Number Project Type
Link Road/Boonsboro Road Intersection
Improvements
To Be Assigned New
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Install a right turn lane from Link Road onto Boonsboro Road to improve the flow of traffic and add
pedestrian features at the intersection.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2025 Why Now
Projected Completion Date Q4 FY 2027 Traffic back-ups along Link Road are a frequent occurrence. Staff has
had many requests from citizens to create a safe pedestrian crossing and
to add a turn lane so vehicles making left turns do not block the ability
for right turns on red.
Projected Schedule
Activity Projected Date
Land Acquisition/Right-of-Way Q3 FY 2026
Consultant Engineering Q3 FY 2026
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $1,242,948
FY 2024 - FY 2027 Planned 2,485,896 Interest 344,118
Remaining Need 0 Total $1,587,066
Total Project Cost $2,485,896
Local Funding Percentage 50.0% Estimated Annual Debt Service $79,353
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Land Acquisition/Right-of-Way 0 0 100,000 0 0 $100,000
Consultant Engineering 0 0 370,000 0 0 $370,000
Construction 0 0 52,700 1,054,322 908,874 $2,015,896
Total $0 $0 $522,700 $1,054,322 $908,874 $2,485,896
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 200,000 588,500 454,448 $1,242,948
State: Revenue Sharing 0 0 200,000 588,500 454,448 $1,242,948
Total $0 $0 $400,000 $1,177,000 $908,896 $2,485,896
Operating Budget Impact
Slight increase due to pedestrian signals.
An application was submitted to VDOT for Revenue Share Program funds for FY 2022 - VDOT awarded for FY 2025 and FY 2026. An additional application
was submitted to VDOT for Revenue Share funds for FY 2027.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
55
Service Area Department Location
Transportation Public Works Lyn chburg Center for Industry
Project Title Project Number Project Type
Lynchburg Center for Industry - Phase I To Be Assigned New
Department Priority
Project has State and/or Federal funding; Project supports essential services
Project Description
Complete one side of sidewalk at the Lynchburg Center for Industry located off of Graves Mill Road. This
project is submitted in partnership with Economic Development. Additional funding will need to be
applied for in future grant funding cycles.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2023 Why Now
Projected Completion Date Q3 FY 2026 A need exists for sidewalks to allow business employees to walk without
being in travel lanes of the street. This will also reduce costs for future
business expansion.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2024
Construction Q3 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 817,349 Principal $163,470
FY 2024 - FY 2027 Planned 0 Interest 45,258
Remaining Need 0 Total $208,728
Total Project Cost $817,349
Local Funding Percentage 20.0% Estimated Annual Debt Service $10,436
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 170,000 0 0 0 0 $170,000
Construction 647,349 0 0 0 0 $647,349
Total $817,349 $0 $0 $0 $0 $817,349
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: Transportation Alternatives 56,000 80,000 240,000 277, 879 0 $653,879
Local: Line of Credit 14,000 20,000 60,000 69,470 0 $163,470
Total $70,000 $100,000 $300,000 $347,349 $0 $817,349
Operating Budget Impact
Minimal with addition of sidewalks.
An application was submitted to VDOT for Transportation Alternative Program funds in FY 2021.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
56
Service Area Department Location
Transportation Public Works Exp ressway and Candlers Mountain
Road Interchange
Project Title Project Number Project Type
Lynchburg Expressway/Candlers Mountain
Road Interchange Improvements
To Be Assigned New
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Safety and Ramp Improvements; Bridge Replacement. VDOT will administer this project but the City has
to be the applicant, but no money should be appropriated.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer / VDOT
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q2 FY 2029 Bridge requires replacement and interchange reconfiguration. Project
will be a Federal State of Good Repair and Federal SMARTSCALE funded
project and must be included in the local CIP.
No local funding is required.
Projected Schedule
Activity Projected Date
Land Acquisition/Right-of-Way Q3 FY 2027
Consultant Engineering Q3 FY 2026
Construction Q2 FY 2029
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 6,001,246 Principal $0
FY 2024 - FY 2027 Planned 58,655,957 Interest 0
Remaining Need 0 Total $0
Total Project Cost $64,657,203
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Land Acquisition/Right-of-Way 0 0 0 5,292,466 0 $5,292,466
Consultant Engineering 6,001,246 0 0 0 0 $6,001,246
Construction 0 0 0 0 53,363,491 $53,363,491
Total $6,001,246 $0 $0 $5,292,466 $53,363,491 $64,657,203
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
0 0 0 0 0 $ 0
Total $0 $0 $0 $0 $0 $0
Operating Budget Impact
Additional annual expenses for grounds and tree maintenance, as well as stormwater (~$20,000).
Federal State of Good Repair Program funds and Federal SMARTSCALE Program funds applications were submitted in FY 2021. This project will be
administered by VDOT, but the City has to apply for the Federal grants; thus, it is technically a City of Lynchburg project, but no dollars will flow through
the City's books.
No appropriation is required, as no dollars will flow through the City's books.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
57
Service Area Department Location
Transportation Public Works McConville Road to Lakeside Drive
Project Title Project Number Project Type
McConville Road Realignment to Lakeside Drive To Be Assigned N ew
Department Priority
Project supports essential services
Project Description
Create new connection of McConville Road and remove Wyndale Drive connection to Lakeside Drive to
separate traffic signals for better efficiency.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2027 Why Now
Projected Completion Date Q2 FY 2029 There have been 28 crashes over the past 6 years. By moving one signal
to the new location, the signals would be spread out and would be
coordinated to have better travel flow on Lakeside Drive and less
congestion which would improve safety.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2027
Land Acquisition/Right-of-Way Q2 FY 2028
Construction Q2 FY 2029
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $3,400,000
FY 2024 - FY 2027 Planned 600,000 Interest 941,312
Remaining Need 2,800,000 Total $4,341,312
Total Project Cost $3,400,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $217,066
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 0 0 300,000 $300,000
Land Acquisition/Right-of-Way 0 0 0 0 300,000 $300,000
Total $0 $0 $0 $0 $600,000 $600,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 0 450,000 $450,000
Total $0 $0 $0 $0 $450,000 $450,000
Operating Budget Impact
Slight increase offset by VDOT increased Highway Maintenance dollars.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
58
Service Area Department Location
Transportation Fleet Memorial Avenue Fuel Site
Project Title Project Number Project Type
Memorial Avenue Fuel Site To Be Assigned New
Department Priority
Project supports essential services
Project Description
Replacement of underground storage tanks, associated piping, dispensers, sumps, island, canopy
(potentially), and all monitoring, alarm and control systems, and required software at the Memorial
Avenue Fuel Site.
Relationship to Comprehensive Plan
PU-1.3 Continue to maintain the existing City-owned infrastructure systems, through replacement or
rehabilitation when required. PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Chuck Cramer
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q4 FY 2025 Existing equipment and infrastructure are aging, have a limited service
life, and are no longer compatible with current technology. This poses a
potential threat to the services provided by the City, as well as the
environment should tanks and/or piping fail.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2024
Construction Q1 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $600,000
FY 2024 - FY 2027 Planned 650,000 Interest 166,114
Remaining Need 0 Total $766,114
Total Project Cost $650,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $38,306
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 50,000 0 0 0 $50,000
Construction 0 0 600,000 0 0 $600,000
Total $0 $50,000 $600,000 $0 $0 $650,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 0 50,000 0 0 0 $50,000
Local: Line of Credit 0 0 600,000 0 0 $600,000
Total $0 $50,000 $600,000 $0 $0 $650,000
Operating Budget Impact
Potential increases in software licensing & support; costs unknown
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
59
Service Area Department Location
Transportation Public Works Various
Project Title Project Number Project Type
Public Works Infrastructure Improvements T0259 Maintenance
Department Priority
Project supports essential services
Project Description
Curb, gutter, sidewalk, and transportation maintenance. Program is designed to maintain the City's
street infrastructure.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing The City has aging infrastructure and this funding allows city-wide
improvements to be made to maintain safe and functional streets and
sidewalks.
Projected Schedule
Activity Projected Date
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 230,000 Principal $0
FY 2024 - FY 2027 Planned 1,093,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 230,000 253,000 266,000 280,000 294,000 $1,323,000
Total $230,000 $253,000 $266,000 $280,000 $294,000 $1,323,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
State: Highway Maintenance (VDOT) 230,000 253,000 266,000 280,0 00 294,000 $1,323,000
Total $230,000 $253,000 $266,000 $280,000 $294,000 $1,323,000
Operating Budget Impact
Maintenance and operating costs will be reduced by timely replacement of curbs, gutters, and sidewalks; also allows the City to respond to changing
conditions throughout the city.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
60
Service Area Department Location
Transportation Public Works Various
Project Title Project Number Project Type
Retaining Wall Replacement/Repair Program T0260 Maintenance
Department Priority
Project supports essential services
Project Description
Existing retaining walls located throughout the city require replacement or repair as an ongoing program
in order to maintain safe public spaces. Design and construction are typically performed in alternating
fiscal years. Upcoming walls to be repaired include Grace Street wall, Eighth Street wall and Giles Street
wall.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Dee-Dee Conner, P.E., Principal Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing The City maintains walls within the right of way that are deteriorating
and many need repairs as failure would impact the safety and stability of
the streets and sidewalks. This is a city-wide process of designing and
then replacing failing walls in alternating years.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 400,000 Principal $0
FY 2024 - FY 2027 Planned 850,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 0 50,000 0 $50,000
Construction 400,000 0 400,000 0 400,000 $1,200,000
Total $400,000 $0 $400,000 $50,000 $400,000 $1,250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 400,000 0 400,000 50,000 400,000 $1,250,00 0
Total $400,000 $0 $400,000 $50,000 $400,000 $1,250,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
61
Service Area Department Location
Transportation Public Works River mont Ave. at Bedford Ave.
Project Title Project Number Project Type
Rivermont Avenue at Bedford Avenue
Intersection Improvements
T0349 New
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Safety improvements to the intersection - conduct a study to determine the best solution and construct
improvements.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2021 Why Now
Projected Completion Date Q4 FY 2024 The project has been awarded SMARTSCALE funds to construct
directional left turning islands at the intersection. Due to the high
number of angle collisions in combination with the low volumes on
Bedford Avenue, it is recommended to restrict the Bedford Avenue
movements to right-turn only by installing median and channelization to
only allow left turns from northbound and southbound Rivermont
Avenue.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2022
Construction Q4 FY 2024
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $485,000 Project Total D ebt Expenditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $485,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: Grants 200,000 145,000 0 0 0 $345,000
Total $200,000 $145,000 $0 $0 $0 $345,000
Operating Budget Impact
None anticipated at this time.
SMARTSCALE Program funds awarded in FY 2021.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
62
Service Area Department Location
Transportation Public Works River mont Avenue over Blackwater
Creek
Project Title Project Number Project Type
Rivermont Avenue Bridge Repair T0274 New
Department Priority
Project has legal or regulatory mandate; Project supports essential services
Project Description
Rehabilitate structure over Blackwater Creek by completing items not incorporated in the last project in
2008. The paint system has failed and requires other minor repair work to preserve the structure into
the future.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2022 Why Now
Projected Completion Date Q4 FY 2023 The City’s Comprehensive Bridge Condition Report ranks this bridge as
immediate need as the asset requires maintenance to preserve its life
into the future. The paint system has deteriorated and the bridge deck
has cracking concrete that will allow water to reach the reinforcing steel
and cause greater repairs in the future if not addressed now.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2022
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $7,500,000 Project Total Debt Expenditures
Budget FY 2023 0 Principal $7,500,000
FY 2024 - FY 2027 Planned 0 Interest 2,076,424
Remaining Need 0 Total $9,576,424
Total Project Cost $7,500,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $478,821
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
0 0 0 0 0 $0
Total $0 $0 $0 $0 $0 $0
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 5,800,000 1,700,000 0 0 0 $7,500,000
Total $5,800,000 $1,700,000 $0 $0 $0 $7,500,000
Operating Budget Impact
None anticipated.
No new appropriations are needed at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
63
Service Area Department Location
Transportation Public Works Route 501/Route 221 Intersection
Project Title Project Number Project Type
Route 501/221 One-Way Pairs T0272 New
Department Priority
Project has legal or regulatory mandate; Project supports essential services; Project has State and/or
Federal funding
Project Description
Design of road improvements needed for marketing of excess right-of-way for economic development
purposes and to improve function and safety of the intersection/area.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2014 Why Now
Projected Completion Date Q4 FY 2026 Federal SMARTSCALE project that has been approved as the area’s
highest priority project according to City Council, Metropolitan Planning
Organization (MPO), and citizen complaints. Funds have been awarded
and environmental permitting has finished, with design underway.
Project also supports economic development in the area.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2023
Construction Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $11,836,522 Project Tota l Debt Expenditures
Budget FY 2023 16,701,515 Principal $4,671,224
FY 2024 - FY 2027 Planned 0 Interest 1,293,259
Remaining Need 0 Total $5,964,484
Total Project Cost $28,538,037
Local Funding Percentage 20.9% Estimated Annual Debt Service $298,224
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 16,701,515 0 0 0 0 $16,701,515
Total $16,701,515 $0 $0 $0 $0 $16,701,515
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 2,500,000 1,500,000 0 0 0 $4,000,000
State: Revenue Sharing 2,500,000 1,500,000 0 0 0 $4,000,000
Federal: Grants 0 5,000,000 8,000,000 3,701,515 0 $16,701,515
Total $5,000,000 $8,000,000 $8,000,000 $3,701,515 $0 $24,701,515
Operating Budget Impact
Additional annual expenses for grounds and tree maintenance, snow removal, and stormwater (~$75,000). Additional capital expenditure of $250,000 is
needed for a dump truck / snow plow for snow removal and other maintenance.
14.65 acres of land with a value of $10 million used for Right-of-Way was transferred to the City by VDOT (not shown in project funding). Total project
cost = $38,538,037.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
64
Service Area Department Location
Transportation Public Works Various
Project Title Project Number Project Type
Storm Drainage System Repairs/Replacements T0261 Maintenance
Department Priority
Project has legal or regulatory mandate; Project has State and/or Federal funding
Project Description
Continuing program for major repairs, replacements and upgrades to a deteriorating storm drainage
system within city streets.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing These funds are used to maintain and replace the older county system
that used corrugated metal pipes with a 30-year life span and are
corroding to the point the structural integrity of the pipes, and therefore
the roadways, are compromised. Project funds are also used to meet
current standards for storm drainage flows across the City that are
undersized; these funds are used city-wide.
Projected Schedule
Activity Projected Date
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 135,000 Principal $0
FY 2024 - FY 2027 Planned 740,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 135,000 170,000 180,000 190,000 200,000 $875,000
Total $135,000 $170,000 $180,000 $190,000 $200,000 $875,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
State: Highway Maintenance (VDOT) 135,000 170,000 180,000 190,0 00 200,000 $875,000
Total $135,000 $170,000 $180,000 $190,000 $200,000 $875,000
Operating Budget Impact
Reduction in repairs to old system.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
65
Service Area Department Location
Transportation Public Works Various
Project Title Project Number Project Type
Street Overlay Program T0262 Maintenance
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Program is designed to overlay and maintain city streets in a safe and acceptable condition for general
public use.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Chris Vaughn, Project Manager
Projected Start Date Continuing Why Now
Projected Completion Date Continuing The Pavement Condition Index (PCI) is constantly declining due to the
age of the pavement; these funds help to keep the Index at the
recommended levels.
Projected Schedule
Activity Projected Date
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 2,500,000 Principal $0
FY 2024 - FY 2027 Planned 10,000,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 2,500,000 2,500,000 2,500,000 2, 500,000 2,500,000 $12,500,000
Total $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $12,500,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
State: Highway Maintenance (VDOT) 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 $12,500,000
Total $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $12,500,000
Operating Budget Impact
Maintenance and operating costs will be reduced by monitoring the Pavement Condition Index (PCI) of streets and planning work accordingly.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
66
Service Area Department Location
Transportation Public Works Timbe rlake Road over Route 501
Project Title Project Number Project Type
Timberlake Road Bridge, East Bound Lanes To Be Assigned Mainte nance
Department Priority
Project has legal or regulatory mandate; Project supports essential services
Project Description
Maintenance improvements to Timberlake Road Bridge - East Bound lanes.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2028 The City’s Comprehensive Bridge Condition Report prioritizes this bridge
for deck and substructure repairs or replacement.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2026
Construction Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $7,800,000
FY 2024 - FY 2027 Planned 7,800,000 Interest 2,159,481
Remaining Need 0 Total $9,959,481
Total Project Cost $7,800,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $497,974
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 0 800,000 0 $800,000
Construction 0 0 0 0 7,000,000 $7,000,000
Total $0 $0 $0 $800,000 $7,000,000 $7,800,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 800,000 3,500,000 $4,300,000
Total $0 $0 $0 $800,000 $3,500,000 $4,300,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
67
Service Area Department Location
Transportation Public Works Timbe rlake Road over Route 501
Project Title Project Number Project Type
Timberlake Road Bridge, West Bound Lanes TB053 Maintenance
Department Priority
Project has legal or regulatory mandate; Project supports essential services
Project Description
Maintenance improvements to Timberlake Road Bridge - West Bound lanes.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q4 FY 2026 The City’s Comprehensive Bridge Condition Report prioritizes this bridge
for deck and substructure repairs.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2024
Construction Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $7,800,000
FY 2024 - FY 2027 Planned 7,800,000 Interest 2,159,481
Remaining Need 0 Total $9,959,481
Total Project Cost $7,800,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $497,974
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 800,000 0 0 0 $800,000
Construction 0 0 7,000,000 0 0 $7,000,000
Total $0 $800,000 $7,000,000 $0 $0 $7,800,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 800,000 3,500,000 3,500,000 0 $7,800,00 0
Total $0 $800,000 $3,500,000 $3,500,000 $0 $7,800,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
68
Service Area Department Location
Transportation Public Works Various
Project Title Project Number Project Type
Traffic Signal Repair and Replacement T0263 Maintenance
Department Priority
Project has legal or regulatory mandate; Project supports essential services
Project Description
Replace or upgrade existing sub-standard traffic signals throughout the city by converting from span-wire
to mast arms to improve operation and maintenance. Priority list includes the intersections of Memorial
and Oakley, Fort and Park, and Fenwick and Fort.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1, Objective T-1.5: Manage access to promote safety and convenience along
streets and on abutting properties for all modes of transportation.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Continuing Why Now
Projected Completion Date Continuing On-going program to bring traffic signals to current standards by
replacing span-wire with mast arms. Many signals have outlived their
useful life and maintenance costs are rising while reliability is declining.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 260,000 Principal $1,360,000
FY 2024 - FY 2027 Planned 1,100,000 Interest 376,525
Remaining Need Continuing Total $1,736,525
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $86,826
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 50,000 50,000 50,000 50,000 50,000 $250,000
Construction 210,000 220,000 220,000 230,000 230,000 $1,110,000
Total $260,000 $270,000 $270,000 $280,000 $280,000 $1,360,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 260,000 27 0,000 270,000 280,000 280,000 $ 1,360,000
Total $260,000 $270,000 $270,000 $280,000 $280,000 $1,360,000
Operating Budget Impact
Reduction in electricity costs and staff maintenance time through a more energy efficient signal.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
69
Service Area Department Location
Transportation Public Works Wards Ferry Road at CVCC Campus
Drive
Project Title Project Number Project Type
Wards Ferry Road at CVCC Campus Drive
Roundabout
To Be Assigned New
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Construct a roundabout at the intersection of Wards Ferry Road and CVCC Campus Drive.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q3 FY 2030 Due to increased traffic in the area, exiting from CVCC Campus Drive and
Harvard Street has become problematic and improvements are
necessary. There have been 31 crashes between 2013 and 2020.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2028
Land Acquisition/Right-of-Way Q3 FY 2029
Construction Q3 FY 2030
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 11,301,008 Interest 0
Remaining Need 0 Total $0
Total Project Cost $11,301,008
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 0 1,382,061 0 $1,382,061
Land Acquisition/Right-of-Way 0 0 0 2,216,496 0 $2,216,496
Construction 0 0 0 7,702,451 0 $7,702,451
Total $0 $0 $0 $11,301,008 $0 $11,301,008
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: Grants 0 0 0 150,000 500,000 $650,000
Total $0 $0 $0 $150,000 $500,000 $650,000
Operating Budget Impact
Additional annual expenses for landscaping maintenance (~$1,000).
An application was submitted to VDOT for SMARTSCALE Program funds in FY 2021.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
70
Service Area Department Location
Transportation Public Works Wards Ferry Road at Atlanta Ave.
Project Title Project Number Project Type
Wards Ferry Road/Atlanta Avenue Turn Lanes To Be Assigned New
Department Priority
Project supports essential services; Project has State and/or Federal funding
Project Description
Widen Wards Ferry Road; install turn lanes onto Atlanta Avenue.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q3 FY 2025 Why Now
Projected Completion Date Q4 FY 2027 As part of the Wards Ferry Road Corridor Study, this project was
designated as high priority to reduce rear-end crashes on Wards Ferry
Road and provide better traffic flow for Wards Ferry Road.
Projected Schedule
Activity Projected Date
Land Acquisition/Right-of-Way Q3 FY 2026
Consultant Engineering Q3 FY 2026
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $1,078,998
FY 2024 - FY 2027 Planned 2,157,996 Interest 298,728
Remaining Need 0 Total $1,377,726
Total Project Cost $2,157,996
Local Funding Percentage 50.0% Estimated Annual Debt Service $68,886
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Land Acquisition/Right-of-Way 0 0 180,000 0 0 $180,000
Consultant Engineering 0 0 320,000 0 0 $320,000
Construction 0 0 6,800 833,670 817,526 $1,657,996
Total $0 $0 $506,800 $833,670 $817,526 $2,157,996
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 50,000 200,000 828,998 $1,078,998
State: Revenue Sharing 0 0 50,000 200,000 828,998 $1,078,998
Total $0 $0 $100,000 $400,000 $1,657,996 $2,157,996
Operating Budget Impact
None anticipated at this time.
An application was submitted to VDOT for Revenue Share Program funds for FY 2022 - VDOT awarded for FY 2025 and FY 2026. An additional application
was submitted to VDOT for Revenue Share funds for FY 2027.
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
71
Service Area Department Location
Transportation Public Works War ds Ferry Road at Simons Run
Project Title Project Number Project Type
Wards Ferry Road/Simons Run Pedestrian
Accommodations
To Be Assigned New
Department Priority
Project supports essential services
Project Description
Improved pedestrian accommodations at intersection.
Relationship to Comprehensive Plan
Chapter 3, Page 30, Goal T-1.4: Prioritize improvements to the transportation system based on safety
considerations; existing deficiencies; multimodal and environmental considerations; opportunities to
improve street connectivity; physical, economic and policy constraints; contributions to the
neighborhood character; impact on historical and environmental resources; required right-of-way; target
levels of service; public safety access; regional connectivity; and system continuity.
Project Manager
Lee Newland, P.E., City Engineer
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q1 FY 2026 Project is recommended in the Wards Ferry Road Corridor Study. It
includes installation of pedestrian signals and crosswalks to tie the two
commercial retail centers together. It is also included as part of the
Wards Road Pedestrian Improvement Study. This would complete all of
the recommendations for Wards Ferry Road except for the full length
sidewalk.
Projected Schedule
Activity Projected Date
Consultant Engineering Q3 FY 2025
Construction Q1 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $250,000
FY 2024 - FY 2027 Planned 250,000 Interest 69,214
Remaining Need 0 Total $319,214
Total Project Cost $250,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $15,961
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 25,000 0 0 $25,000
Construction 0 0 225,000 0 0 $225,000
Total $0 $0 $250,000 $0 $0 $250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 50,000 200,000 0 $250,000
Total $0 $0 $50,000 $200,000 $0 $250,000
Operating Budget Impact
Additional annual expenses for electricity and pedestrian equipment maintenance (~$2,000).
Capital Improvement Program General Fund - Transportation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
72
Planned Projects Beyond FY 2027
Project Planned Total Project Cost
Atlanta Ave Multi-Use Path $3,700,000
D Street and Rivermont Avenue Intersection Improvements 7,200,00 0
Forest Brook Road Realignment, Phase I 6,600,000
Forest Brook Road Realignment, Phase II 7,850,000
Graves Mill Road/Expressway Interchange Improvements 26,000,000
Lakeside Drive/Murrell Road Roundabout 6, 750,000
Leesville Road Improvements 9,300,000
Liberty Mountain Drive Realignment 5,750,000
Lynchburg Expressway/Grace Street Interchange Improvements 2,250 ,000
Lynchburg Expressway/Odd Fellows Road Interchange Improvements 7 ,750,000
Main Street/Church Street/Rivermont Avenue Alignment Improvemen ts 12,000,000
Nationwide Drive Roundabout 7, 000,000
Roundabout at VES Road and Rivermont Avenue 13, 250,000
Timberlake Road Improvements 22,500,000
Tyreanna Improvements 11,000,000
Vassar Street at Langhorne Road Intersection Improvements 8,600, 000
Wards Ferry Road Bike/Pedestrian Improvements 7,600,000
Wards Road Improvements 40,000,000
Total $205,100,000
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
73
Five Year Proposed Appropriations to be Financed by the City
Project Title
Appropriations
Through
06/30/2022
Budget FY
2023
FY 2024 - 2027
Planned
Five-Year
Estimated Net
cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Economic Development
Downtown Development Continuing 480,000 4,405,000 4,885,000 Continuing Continuing
Future Streetscape Improvements Downtown 0 680,000 11,220,000 11,900,000 32,700,000 44,600,000
Ivy Creek Innova tion Pa rk - Site C Development 0 0 470,000 470,000 0 470,000
Ivy Creek Innova tion Pa rk - Sites A & B Development 0 1,300,000 1,050,000 2,350,000 0 2,350,000
Riverfront Pa rk Improvements 0 4,000,000 0 4,000,000 0 4,000,000
Street and Utility Extensions to Promote Economic Development Continuing 250,000 950,000 1,200,000 Continuing Continuing
Streetscape Improvements Downtown, Phase II 5,502,891 2,051,459 0 2,051,459 0 7,554,350
Total Proposed FY 2023 - 2027 CIP $5,502,891 $8,761,459 $18,095,000 $26,856,459 $32,700,000 $58,974,35 0
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
74
Service Area Department Location
Economic Development Public Works Downtown Development
Project Title Project Number Project Type
Downtown Development ED005 New
Department Priority
Project contributes to the generation of new revenue
Project Description
Beginning in FY 2002, City Council committed to invest $1.0 million per year for downtown development.
While the majority of this commitment is fulfilled through the Main Street Renewal and Streetscape
Improvements projects, additional complementary projects identified in the Downtown 2040 Master
Plan are planned as well; a detail sheet is attached.
Relationship to Comprehensive Plan
Chapter 8, Page 8.5, Goal 3, Objective 3.A: Concentrate on improving and expanding retail businesses,
street-level activities, and streetscape environments.
Chapter 3, Page 20, Goal AP-2: Maintain a strong mixed use downtown that is a focus for civic, business,
residential, entertainment, art, culture, and recreational activities. Celebrate and strengthen connections
to James River.
Project Manager
Cheree Taylor, Construction Manager
Projected Start Date Continuing Why Now
Projected Completion Date Continuing City Council adopted the Downtown 2040 Master Plan in November
2018; moving forward with these projects reflect the implementation of
the Plan's recommendations.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 480,000 Principal $3,350,000
FY 2024 - FY 2027 Planned 4,405,000 Interest 927,469
Remaining Need Continuing Total $4,277,469
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $213,873
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 130,000 100,000 0 300,000 0 $530,000
Construction 350,000 355,000 1,000,000 1,050,000 1,600,000 $4,355,000
Total $480,000 $455,000 $1,000,000 $1,350,000 $1,600,000 $4,885,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 480,000 455,000 250,000 250,000 100,000 $1 ,535,000
Local: Line of Credit 0 0 750,000 1,100,000 1,500,000 $3,350,00 0
Total $480,000 $455,000 $1,000,000 $1,350,000 $1,600,000 $4,885,000
Operating Budget Impact
As space is developed and/or modified the cost of maintenance increases.
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
75
Downtown Development
Fiscal
Year Project
Consultant
Engineering Construction Annual Total
6th Street Steps $100,000 $0 $100,000
Bluffwalk Power Supply 20,000 0 20,000
Centra l i zed Compa ctors (5 uni ts , mul ti -yea r project) 10,000 0 10,0 00
Ma i ntena nce of Downtown Enha ncements 0 100,000 100,000
Ri vermont Ave. Bi ke/Pedes tri a n Improvements 0 250,000 250,000
2023 Sub-Totals $130,000 $350,000 $480,000
Bluffwalk Power Supply $0 $180,000 $180,000
Centra l i zed Compa ctors (5 uni ts , mul ti -yea r project) 0 75,000 75,0 00
John Lynch Bri dge Pedes tri a n Improvements 100,000 0 100,000
Ma i ntena nce of Downtown Enha ncements 0 100,000 100,000
2024 Sub-Totals $100,000 $355,000 $455,000
Centra l i zed Compa ctors (5 uni ts , mul ti -yea r project) $0 $150,000 $ 150,000
John Lynch Bri dge Pedes tri a n Improvements 0 750,000 750,000
Ma i ntena nce of Downtown Enha ncements 0 100,000 100,000
2025 Sub-Totals $0 $1,000,000 $1,000,000
6th Street Steps /Ri verfront Tra i l Connecti on $0 $800,000 $800,000
Centra l i zed Compa ctors (5 uni ts , mul ti -yea r project) 0 150,000 150 ,000
Cl a y Street Res ervoi r 300,000 0 300,000
Ma i ntena nce of Downtown Enha ncements 0 100,000 100,000
2026 Sub-Totals $300,000 $1,050,000 $1, 350,000
Cl a y Street Res ervoi r $0 $1,500,000 $1,500,000
Ma i ntena nce of Downtown Enha ncements 0 100,000 100,000
2027 Sub-Totals $0 $1,600,000 $1,600,000
Grand Totals $530,000 $4,355,000 $4,885,000
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
76
Service Area Department Location
Economic Development Public Works Downtown
Project Title Project Number Project Type
Future Streetscape Improvements Downtown To Be Assigned New
Department Priority
Project contributes to the generation of new revenue; Project supports essential services; Project has a
component in the Water Capital Projects Fund
Project Description
This project will enhance the downtown streetscapes in coordination with the downtown Water Main
Replacement project.
Relationship to Comprehensive Plan
Chapter 3, Page 20, Goal AP-2: Maintain a strong, mixed use downtown that is a focus for civic, business,
residential, entertainment, art, culture, and recreational activities. Celebrate and strengthen connections
to the James River.
Project Manager
Cheree Taylor, Construction Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2037 Project continues improving economic viability and reliability of utilities
long-term. Downtown growth is a reflection of the successful
revitalization of the area by increasing residents and businesses.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2028
Construction Q4 FY 2037
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 680,000 Principal $44,600,000
FY 2024 - FY 2027 Planned 11,220,000 Interest 12,347,802
Remaining Need 32,700,000 Total $56,947,802
Total Project Cost $44,600,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $2,847,390
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 680,000 0 700,000 0 720,000 $2,100,000
Construction 0 4,600,000 0 4,800,000 0 $9,400,000
Contingency 0 200,000 0 200,000 0 $400,000
Total $680,000 $4,800,000 $700,000 $5,000,000 $720,000 $11,900,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 680,000 4, 800,000 700,000 5,000,000 720,0 00 $11,900,000
Total $680,000 $4,800,000 $700,000 $5,000,000 $720,000 $11,900,000
Operating Budget Impact
Additional annual expenses for grounds and tree maintenance, as well as trash collection (~$105,000).
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
77
Service Area Department Location
Economic Development Economic Development Ivy Creek Innovation Pa rk
Project Title Project Number Project Type
Ivy Creek Innovation Park - Site C Development To Be Assigned New
Department Priority
Project contributes to the generation of new revenue
Project Description
This project will result in opening of a site for industrial development in the Ivy Creek Innovation Park,
adjacent to Wiggington Road. This property has the potential to accommodate a building of
approximately 250,000 square feet, two 30,000 buildings, and a smaller 13,000 square foot building.
Relationship to Comprehensive Plan
Chapter 3, Page 23, Goal ED-2: Lead and coordinate existing efforts regarding business development,
encouragement of entrepreneurship, and recruitment strategies.
Project Manager
Marjette Upshur, Director of Economic Development
Projected Start Date Q1 FY 2024 Why Now
Projected Completion Date Q4 FY 2024 The City has experienced significant growth in recent years and there is
a lack of development-ready industrial sites. These sites are needed for
both the expansion of existing businesses and for business attraction.
During FY 2021, City staff partnered with a consultant to identify
potential future industrial sites. Preliminary figures are drawn from this
work.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2024
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $470,000
FY 2024 - FY 2027 Planned 470,000 Interest 130,123
Remaining Need 0 Total $600,123
Total Project Cost $470,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $30,006
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 470,000 0 0 $470,000
Total $0 $0 $470,000 $0 $0 $470,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 470,000 0 0 $470,000
Total $0 $0 $470,000 $0 $0 $470,000
Operating Budget Impact
This project has the potential to generate considerable revenue for the City, depending on the tenant.
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
78
Service Area Department Location
Economic Development Economic Development Ivy Creek Innovation Pa rk
Project Title Project Number Project Type
Ivy Creek Innovation Park - Sites A & B
Development
To Be Assigned New
Department Priority
Project contributes to the generation of new revenue
Project Description
This project will result in opening two sites for industrial development in the Ivy Creek Innovation Park.
Both sites are located at the end of Jefferson Ridge Parkway and must be accessed from Lynchpin Lane.
This project will include basic site infrastructure, construction permitting and design, and will allow the
site to be marketed for potential industrial use and job creation. Together Sites A and B are 64 acres. Site
A can accommodate a building of up to 600,000 square feet. Site B can accommodate one building of up
to 50,000 square feet and another of 20,000 square feet.
Relationship to Comprehensive Plan
Chapter 3, Page 23, Goal ED-2: Lead and coordinate existing efforts regarding business development,
encouragement of entrepreneurship, and recruitment strategies.
Project Manager
Marjette Upshur, Director of Economic Development
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q2 FY 2024 The City has experienced significant growth in recent years and there is
a lack of development-ready industrial sites. These sites are needed for
both the expansion of existing businesses and for business attraction.
During FY 2021, City staff partnered with a consultant to identify
potential future industrial sites. Preliminary figures are drawn from this
work.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2023
Construction Q3 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 1,300,000 Principal $1,050,000
FY 2024 - FY 2027 Planned 1,050,000 Interest 290,699
Remaining Need 0 Total $1,340,699
Total Project Cost $2,350,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $67,035
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 250,000 0 0 0 0 $250,000
Construction 1,050,000 0 1,050,000 0 0 $2,100,000
Total $1,300,000 $0 $1,050,000 $0 $0 $2,350,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 1,300,000 0 0 0 0 $1,300,000
Local: Line of Credit 0 0 1,050,000 0 0 $1,050,000
Total $1,300,000 $0 $1,050,000 $0 $0 $2,350,000
Operating Budget Impact
This project has the potential to generate considerable revenue for the City, depending on the tenant.
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
79
Service Area Department Location
Economic Development Public Works Riverfront Park
Project Title Project Number Project Type
Riverfront Park Improvements To Be Assigned New
Department Priority
Project contributes to the generation of new revenue
Project Description
This project would complete most of the design elements of the Riverfront Park recommended in the
Downtown 2040 Master Plan. These elements include a restroom, playground, permanent stage, trail
relocation, trees, amenities, and shade structures.
Relationship to Comprehensive Plan
Chapter 8, Page 8.5, Goal 3, Objective 3.A: Concentrate on improving and expanding retail businesses,
street-level activities, and streetscape environments.
Chapter 3, Page 20, Goal AP-2: Maintain a strong mixed use downtown that is a focus for civic, business,
residential, entertainment, art, culture, and recreational activities. Celebrate and strengthen connections
to James River.
Project Manager
Clay Simmons, Deputy Director of Public Works
Projected Start Date Q2 FY 2022 Why Now
Projected Completion Date Q4 FY 2023 Some funds were previously appropriated for various individual projects
in several different City departments and not-for-profits. Moving
forward this project consolidates all existing funding sources and new
monies available through ARPA. The project will complete most of the
elements recommended in the Downtown 2040 Master Plan including
restrooms for the playground and a permanent stage to make it easier
for event organizers to host events after COVID. The park will also
provide a nice amenity for downtown residents.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2022
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 4,000,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $4,000,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 4,000,000 0 0 0 0 $4,000,000
Total $4,000,000 $0 $0 $0 $0 $4,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Other: Donated from Private Citizens 125,000 0 0 0 0 $125,000
Federal: ARPA - Revenue Replacement 3,875,000 0 0 0 0 $3,875,000
Total $4,000,000 $0 $0 $0 $0 $4,000,000
Operating Budget Impact
Anticipated annual increase of approximately $100,000 - custodial ($35,000), building facility maintenance ($45,000), grounds maintenance ($15,000),
and playground maintenance ($5,000).
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
80
Service Area Department Location
Economic Development Economic Development Various
Project Title Project Number Project Type
Street and Utility Extensions to Promote
Economic Development
EX000 New
Department Priority
Project supports essential services; Project contributes to the generation of new revenue
Project Description
Plans for and/or construction of streets, water and sewer lines, and/or other amenity improvements to
drive revenue and support private investment and site development throughout the City.
Relationship to Comprehensive Plan
Chapter 3, Page 24, ED-3.1 Review and amend existing or implement new City policies to maximize
economic development potential.
Project Manager
Marjette Upshur, Director of Economic Development and Tourism
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Project funds are used for infrastructure needs that may be barriers to
business expansion and benefit community wide goals.
Projected Schedule
Activity Projected Date
Contributions Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 250,000 Principal $0
FY 2024 - FY 2027 Planned 950,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Contributions 250,000 200,000 250,000 250,000 250,000 $1,200,000
Total $250,000 $200,000 $250,000 $250,000 $250,000 $1,200,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 250,000 200,000 250,000 250,000 250,000 $1 ,200,000
Total $250,000 $200,000 $250,000 $250,000 $250,000 $1,200,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund – Economic Development
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
81
Service Area Department Location
Economic Development Public Works Commerce Street
Project Title Project Number Project Type
Streetscape Improvements Downtown, Phase II ED006 New
Department Priority
Project contributes to the generation of new revenue; Project supports essential services; Project has a
component in the Water Capital Projects Fund
Project Description
This project will enhance the downtown streetscapes in coordination with the downtown water main
replacement project.
Relationship to Comprehensive Plan
Chapter 3, Page 20, Goal AP-2: Maintain a strong, mixed use downtown that is a focus for civic, business,
residential, entertainment, art, culture, and recreational activities. Celebrate and strengthen connections
to the James River.
Project Manager
Cheree Taylor, Construction Manager
Projected Start Date Q1 FY 2018 Why Now
Projected Completion Date Q4 FY 2023 Project continues improving economic viability and reliability of utilities
long-term. Downtown growth is a reflection of the successful
revitalization of the area by increasing residents and businesses. This is
the current project on Commerce Street.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2021
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $5,502,891 Project Total Debt Expenditures
Budget FY 2023 2,051,459 Principal $5,103,460
FY 2024 - FY 2027 Planned 0 Interest 1,412,926
Remaining Need 0 Total $6,516,387
Total Project Cost $7,554,350
Local Funding Percentage 67.8% Estimated Annual Debt Service $325,819
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 2,051,459 0 0 0 0 $2,051,459
Total $2,051,459 $0 $0 $0 $0 $2,051,459
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 2,000,000 0 0 0 0 $2,000,000
State: Revenue Sharing 2,000,000 0 0 0 0 $2,000,000
Local: Pay-As-You-Go 17,679 0 0 0 0 $17,679
Total $4,017,679 $0 $0 $0 $0 $4,017,679
Operating Budget Impact
Additional expenses for maintenance, landscaping, trash collection, and street furniture (~$30,000).
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
82
Five Year Proposed Appropriations to be Financed by the City
Project Title
Appropriations
Through
06/30/2022
Budget FY
2023
FY 2024 - 2027
Planned
Five-Year
Estimated Net
cost
Estimated
Cost Beyond
Program
Period
Total
Accumulated
Project Cost
Parks and Recreation
Allen-Morrison Site Assessment/Design 0 0 250,000 250,000 0 250,000
Athletic Field Maintenance Continuing 250,000 1,100,000 1,350,000 Continuing Continuing
City Stadium - Visitors' Side Improvements 0 0 575,000 575,000 0 575,000
City Stadium Football Field Turf Replacement 0 0 1,650,000 1,650,000 0 1,650,000
Community Park Investment Fund Continuing 50,000 150,000 200,000 Continuing Continuing
Downstream Swinging Bridge 262,667 250,000 0 250,000 0 512,667
General Park Maintenance Continuing 125,000 550,000 675,000 Continuing Continuing
Genera l Pa rk Security Improvements 0 0 400,000 400,000 0 400,000
Heritage Park Improvements 0 325,000 200,000 525,000 500,000 1,025,000
Ivy Creek Bridge (Structure #4) Repla cement 275,534 250,000 0 250,000 0 525,534
Ivy Creek Pa rk to Pea ks View Pa rk Tra il Extens ion 0 2,000,000 0 2,000,000 0 2,000,000
Ja cks on Heights Art Studio Renova tion 0 0 50,000 50,000 500,000 550,000
La nghorne Roa d Ea s t Bridge 272,667 250,000 0 250,000 0 522,667
Lynchburg Community Market Renovations 82,500 840,000 3,765,000 4,605,000 0 4,687,500
Miller Park Pool Assessment/Replacement 0 50,000 5,940,000 5,990,000 0 5,990,000
New Dog Pa rk 10,658 200,000 0 200,000 0 210,658
Pa rks a nd Recrea tion Needs As s es s ment Implementa tion 0 250,000 1,000,000 1,250,000 2,250,000 3,500,000
Pa rks & Tra ils Pa ving a nd Lighting Continuing 278,000 1,156,000 1,434,000 Continuing Continuing
Pa rks Tree Repla cement Progra m Continuing 50,000 210,000 260,000 Continuing Continuing
Sustainable Infrastructure Program Continuing 75,000 325,000 400,000 Continuing Continuing
Templeton Senior Center Renovations 0 0 50,000 50,000 400,000 450,000
Total Proposed FY 2023 - 2027 CIP $904,026 $5,243,000 $17,371,000 $22,614,000 $3,650,000 $22,849,026
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
83
Service Area Department Location
Parks and Recreation Parks and Recreation Rutherford Street
Project Title Project Number Project Type
Allen-Morrison Site Assessment/Design To Be Assigned New
Department Priority
Project required to support important but not essential services
Project Description
Allen-Morrison is a site the City received and has already done much site remediation from its past use. A
conceptual plan has already been done to develop the site into a new city park. This funding is to expand
and update the master plan and begin the implementation of developing the site.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR-2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2026 Increasing the number of usable parks has been proven to increase the
health of our citizens. "Park deserts" are defined as areas that do not
have a park or recreational area within 10 minutes of walking distance
from them. Our department is following its mission to make outdoor
recreation as accessible as possible to all the City's citizens. This is why
we want to start what will be a long term development of this additional
park for the citizens' use.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q3 FY 2026
Contingency Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 250,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $250,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Architectural Services (Contractual) 0 0 0 200,000 0 $200,000
Contingency 0 0 0 50,000 0 $50,000
Total $0 $0 $0 $250,000 $0 $250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 0 0 0 250,000 0 $250,000
Total $0 $0 $0 $250,000 $0 $250,000
Operating Budget Impact
None anticipated.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
84
Service Area Department Location
Parks and Recreation Parks and Recreation Various
Project Title Project Number Project Type
Athletic Field Maintenance P0152 Maintenance
Department Priority
Project required to support important but not essential services; Project contributes to the generation of
new revenue
Project Description
Improvements to City-wide athletic fields and amenities. A detailed project list is attached.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR-2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Jason Burger, Park Maintenance Supervisor
Projected Start Date Continuing Why Now
Projected Completion Date Continuing This project funds many preventative maintenance repairs and upgrades
to existing athletic fields and courts. Athletic fields require regular
maintenance, due to extremely heavy use, to be maintained in safe and
playable conditions. Failure to perform this work will result in more
expensive repairs later or possible injuries to their users.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Fencing, Lighting, and Signs Continuing
Contingency Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 250,000 Principal $150,000
FY 2024 - FY 2027 Planned 1,100,000 Interest 41,528
Remaining Need Continuing Total $191,528
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $9,576
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 0 25,000 10,000 20,000 $55,000
Construction 125,500 180,000 190,000 245,000 225,000 $965,500
Fencing, Lighting, and Signs 95,850 20,000 0 0 0 $115,850
Contingency 28,650 50,000 35,000 45,000 55,000 $213,650
Total $250,000 $250,000 $250,000 $300,000 $300,000 $1,350,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 250,000 250,000 100,000 300,000 300,000 $1 ,200,000
Local: Line of Credit 0 0 150,000 0 0 $150,000
Total $250,000 $250,000 $250,000 $300,000 $300,000 $1,350,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
85
Athletic Field Maintenance
Fiscal
Year Project Name
Consultant
Engineering Construction
Fencing,
Lighting, and
Signs Contingency Annual Total
Sandusky Park restroom stockade $0 $11,000 $0 $1,000 $12,000
Hutchers on E.S. ba s eba l l fi el d i mprovements 0 18,000 5,850 2,650 26, 500
Seedi ng, a era ti on a nd genera l fi el d ma i ntena nce 0 20,000 0 6,500 26, 500
Her itage P ar k athletic field lights installation 0 7 6 ,5 0 0 9 0 ,0 0 0 1 8 ,500 185,000
2023 Sub-Totals $0 $125,500 $95,850 $28,650 $250,000
Mi l l er Pa rk - Ha ppy Lee Fi el d fence repl a cement $0 $65,000 $0 $15,0 00 $80,000
M iller P ar k - baseball fields r egr ading 0 6 0 ,0 0 0 0 2 0 ,0 0 0 8 0 ,0 0 0
Pea ks Vi ew Pa rk - Ardemore entra nce fenci ng 0 0 20,000 5,000 25,000
Seedi ng, a era ti on a nd genera l fi el d ma i ntena nce 0 55,000 0 10,000 65 ,000
2024 Sub-Totals $0 $180,000 $20,000 $50,000 $250,000
Pea ks Vi ew Pa rk fi el d 10, gra di ng a nd dra i na ge repa i r $25,000 $150,000 $0 $15,000 $190,000
Seedi ng, a era ti on a nd genera l fi el d ma i ntena nce 0 40,000 0 20,000 60 ,000
2025 Sub-Totals $25,000 $190,000 $0 $35,000 $250,000
Sa ndus ky Pa rk a thl eti c fi el d s tora ge $10,000 $100,000 $0 $10,000 $12 0,000
Pea ks Vi ew Pa rk - dug outs upgra des 0 45,000 0 5,000 50,000
Seedi ng, a era ti on a nd genera l fi el d ma i ntena nce 0 100,000 0 30,000 1 30,000
2026 Sub-Totals $10,000 $245,000 $0 $45,000 $300,000
Pea ks Vi ew Pa rk - fi el ds 1-4, i nfi el d regra di ng $0 $75,000 $0 $25,0 00 $100,000
Heri ta ge Pa rk - new a meni ti es 20,000 100,000 0 20,000 140,000
Seedi ng, a era ti on a nd genera l fi el d ma i ntena nce 0 50,000 0 10,000 60 ,000
2027 Sub-Totals $20,000 $225,000 $0 $55,000 $300,000
Grand Totals $55,000 $965,500 $115,850 $213,650 $1,350,000
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
86
Service Area Department Location
Parks and Recreation Parks and Re creation City Stadium (Football)
Project Title Project Number Project Type
City Stadium - Visitors' Side Improvements To Be Assigned New
Department Priority
Project required to support important but not essential services; Project contributes to the generation of
new revenue
Project Description
Renovation of the Visitor's side of City Stadium to include seating, bathrooms, press box, and more. This
is the final phase of the City Stadium renovation project. Currently projected for design in FY 2026 and
construction improvements in FY 2027.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR-2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2027 This funding will complete the City Stadium renovation project. The
improvements and repairs are greatly needed for the visitor side of the
stadium due to it being out-of-date and in need of repairs and updates.
Importance of this project is increasing as we continue to market it as a
venue not only for city events but also outside event organizers and
sporting organizations. These outside events include, but are not
limited to, high school and college sporting events. The quality of our
facilities is a factor in earning successful bids for these new and on-going
events.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q4 FY 2027
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 575,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $575,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Architectural Services (Contractual) 0 0 0 75,000 50,000 $125,000
Construction 0 0 0 0 450,000 $450,000
Total $0 $0 $0 $75,000 $500,000 $575,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 0 0 0 75,000 500,000 $575,000
Total $0 $0 $0 $75,000 $500,000 $575,000
Operating Budget Impact
None anticipated.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
87
Service Area Department Location
Parks and Recreation Parks and Re creation Lynchburg City Stadium (Football
Complex)
Project Title Project Number Project Type
City Stadium Football Field Turf Replacement To Be Assigned Ne w
Department Priority
Project required to support important but not essential services; Project contributes to the generation of
new revenue
Project Description
Total replacement of the existing synthetic turf, rubber and sand infill, shock pad, minor shaping or
grading of the existing stone base, and markings for football, soccer, men's and women's lacrosse.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Q3 FY 2024 Why Now
Projected Completion Date Q1 FY 2025 The turf playing surface has an estimated life of 8-10 years. The
installing contractor recently estimated we could get up to 12 years of
life. 2027 will be the 11th year of play on the field.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2025
Contingency Q1 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $1,650,000
FY 2024 - FY 2027 Planned 1,650,000 Interest 456,813
Remaining Need 0 Total $2,106,813
Total Project Cost $1,650,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $105,341
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 0 0 0 0 1,500,000 $1,500,000
Contingency 0 0 0 0 150,000 $150,000
Total $0 $0 $0 $0 $1,650,000 $1,650,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 0 1,650,000 $1,650,000
Total $0 $0 $0 $0 $1,650,000 $1,650,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
88
Service Area Department Location
Parks and Recreation Parks and Recreation Various
Project Title Project Number Project Type
Community Park Investment Fund P0123 New
Department Priority
Project contributes to the generation of new revenue; Project required to support important but not
essential services
Project Description
Funding to be used in combination with community funds to improve parks, centers and trails throughout
the City.
Relationship to Comprehensive Plan
Chapter 13, Page 7, Goal 4.B: Explore alternate funding methods for Parks and Recreation.
Project Manager
Jennifer Jones, Director of Parks and Recreation
Projected Start Date Continuing Why Now
Projected Completion Date Continuing This program has been popular over the past years and has helped fund
several large projects in our parks system over that time.
Projected Schedule
Activity Projected Date
Construction Continuing
Miscellaneous Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 50,000 Principal $0
FY 2024 - FY 2027 Planned 150,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 40,000 0 40,000 40,000 40,000 $160,000
Miscellaneous 10,000 0 10,000 10,000 10,000 $40,000
Total $50,000 $0 $50,000 $50,000 $50,000 $200,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 50,000 0 50,000 50,000 50,000 $200,000
Total $50,000 $0 $50,000 $50,000 $50,000 $200,000
Operating Budget Impact
To be determined on a project-to-project basis.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
89
Service Area Department Location
Parks and Recreation Parks and Re creation Blackwater Creek Natura l Area
Project Title Project Number Project Type
Downstream Swinging Bridge P0164 New
Department Priority
Project required to support important but not essential services
Project Description
Replace the swinging bridge furthest downstream that spans Blackwater Creek. This bridge, along with
four others, was destroyed in the flooding in August, 2018. Funding would be used to construct a new
bridge with up-to-date forestry-service design that is intended to survive higher floods.
Relationship to Comprehensive Plan
Chapter 3, Page 29, Goal PR-3 Recreation. Provide access to parks, trails, and recreation facilities and
programs; and Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate
existing facilities to meet the City’s needs.
Project Manager
Susannah Smith, Construction Coordinator
Projected Start Date Q1 FY 2021 Why Now
Projected Completion Date Q4 FY 2023 Four of the bridges along the Creekside Trail were destroyed in the
flooding of August, 2018. The loss of these bridges has reduced the
amount of trail access available to the public. This request is for
additional funding due to the original construction bid quotes being
much higher than projected.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2023
Construction Q4 FY 2023
Contingency Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $262,667 Project Total D ebt Expenditures
Budget FY 2023 250,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $512,667
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 250,000 0 0 0 0 $250,000
Total $250,000 $0 $0 $0 $0 $250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 250,000 0 0 0 0 $250,000
Total $250,000 $0 $0 $0 $0 $250,000
Operating Budget Impact
None anticipated.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
90
Service Area Department Location
Parks and Recreation Park s and Recreation Various
Project Title Project Number Project Type
General Park Maintenance P0153 Maintenance
Department Priority
Project required to support important but not essential services
Project Description
Improvements and renovations to park playgrounds, signage, fencing and other amenities and features.
A detailed project list is attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Continuing Why Now
Projected Completion Date Continuing This project funds many preventative maintenance repairs and upgrades
to existing playground equipment and other park amenities. This
maintenance and repair work will help alleviate unsafe situations in our
parks as well as prevent more-expensive repairs or replacements in the
future.
Projected Schedule
Activity Projected Date
Construction Continuing
Fencing, Lighting, and Signs Continuing
Contingency Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 125,000 Principal $0
FY 2024 - FY 2027 Planned 550,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 94,000 61,000 105,000 101,000 130,000 $491,000
Fencing, Lighting, and Signs 15,700 49,000 10,000 28,000 10,000 $112,700
Contingency 15,300 15,000 10,000 21,000 10,000 $71,300
Total $125,000 $125,000 $125,000 $150,000 $150,000 $675,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 125,000 125,000 125,000 150,000 150,000 $6 75,000
Total $125,000 $125,000 $125,000 $150,000 $150,000 $675,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
91
General Park Maintenance
Fiscal
Year Project Name Construction
Fencing,
Lighting, and
Signs Contingency Annual Total
C ollege Hill basketball c our t r esur fac ing $20,000 $0 $0 $20,000
Ri vers i de Pa rk s ta ti c pl a y 54,000 2,700 6,300 63,000
Genera l s i gna ge, fenci ng a nd a meni ti es 10,000 13,000 4,000 27,000
Ska tepa rk ma i ntena nce a nd i mprovements 10,000 0 5,000 15,000
2023 Sub-Totals $94,000 $15,700 $15,300 $125,000
Younger Pa rk ba s ketba l l court res urfa ci ng $20,000 $0 $0 $20,000
Ivy Creek Park playground replacement 20,000 36,000 6,000 62,000
Genera l s i gna ge, fenci ng a nd a meni ti es 11,000 13,000 4,000 28,000
Ska tepa rk ma i ntena nce a nd i mprovements 10,000 0 5,000 15,000
2024 Sub-Totals $61,000 $49,000 $15,000 $125,000
M iller P ar k - lar ge play gr ound r eplac ement$95,000 $0 $0 $95,000
Genera l s i gna ge, fenci ng a nd a meni ti es 0 10,000 5,000 15,000
Ska tepa rk ma i ntena nce a nd i mprovements 10,000 0 5,000 15,000
2025 Sub-Totals $105,000 $10,000 $10,000 $125,000
Fa i rvi ew Pa rk ba s ketba l l court res urfa ci ng $40,000 $0 $0 $40,000
Va l l ey Vi ew pl a yl ot i mprovements 40,000 15,000 7,000 62,000
Genera l s i gna ge, fenci ng a nd a meni ti es 11,000 8,000 4,000 23,000
Ska tepa rk ma i ntena nce a nd i mprovements 10,000 5,000 10,000 25,000
2026 Sub-Totals $101,000 $28,000 $21,000 $150,000
Yoder Center playground replacement $90,000 $0 $5,000 $95,000
Daniels Hill C enter basketball c our t r esur fac ing 4 0 ,0 0 0 0 0 4 0 ,0 0 0
Genera l s i gna ge, fenci ng a nd a meni ti es 0 10,000 0 10,000
Ska tepa rk ma i ntena nce a nd i mprovements 0 0 5,000 5,000
2027 Sub-Totals $130,000 $10,000 $10,000 $150,000
Grand Totals $491,000 $112,700 $71,300 $675,000
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
92
Service Area Department Location
Parks and Recreation Parks and Recreation Various
Project Title Project Number Project Type
General Park Security Improvements To Be Assigned New
Department Priority
Project required to support important but not essential services
Project Description
Improvements to Parks & Facilities including site lighting, cameras, and other security measures to
increase safety for citizens. These projects will follow recommended improvements called for by LPD
Security Assessments which are currently underway starting with Miller Park.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR-2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2027 Funding is needed for improvements including better lighting and
security to foster better safety throughout the City Parks System. Parks
and Recreation has been consulting with the Community Action Team at
LPD to develop Security Plans park by park, this project funding will help
start implementing the needed improvements.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2027
Construction Q4 FY 2027
Fencing, Lighting, and Signs Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 400,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $400,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 0 20,000 20,000 20,000 20,000 $80,000
Construction 0 60,000 60,000 60,000 60,000 $240,000
Fencing, Lighting, and Signs 0 20,000 20,000 20,000 20,000 $80,000
Total $0 $100,000 $100,000 $100,000 $100,000 $400,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 0 100,000 100,000 100,000 100,000 $400,000
Total $0 $100,000 $100,000 $100,000 $100,000 $400,000
Operating Budget Impact
Annual maintenance and operating costs will be determined on a project-to-project basis.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
93
Service Area Department Location
Parks and Recreation Parks a nd Recreation Heritage Park
Project Title Project Number Project Type
Heritage Park Improvements To Be Assigned New
Department Priority
Project required to support important but not essential services
Project Description
This project is to fund a park master plan and its implementation via new upgrades mainly of the City
School's "side of the park." This project shall include park features such as playground, pavilion, and
walking loop which the current park is missing. Currently projecting to start the master planning in FY
2023 to prepare for staged construction in FYs 2023, 2024, 2028, and 2029.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR-2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2028 This section of the City has been historically underserved and has limited
park space.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2028
Construction Q4 FY 2028
Contingency Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 325,000 Principal $250,000
FY 2024 - FY 2027 Planned 200,000 Interest 69,214
Remaining Need 500,000 Total $319,214
Total Project Cost $1,025,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $15,961
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 7 5 , 0 0 0 0 0 0 0 $ 7 5 , 0 0 0
Construction 250,000 200,000 0 0 0 $450,000
Total $325,000 $200,000 $0 $0 $0 $525,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 75,000 200,000 0 0 0 $275,000
Local: Line of Credit 250,000 0 0 0 0 $250,000
Total $325,000 $200,000 $0 $0 $0 $525,000
Operating Budget Impact
Annual maintenance needs and costs will be determined during design development.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
94
Service Area Department Location
Parks and Recreation Parks and Re creation Blackwater Creek Natura l Area
Project Title Project Number Project Type
Ivy Creek Bridge (Structure #4) Replacement P0154 New
Department Priority
Project required to support important but not essential services
Project Description
Replace the trail bridge spanning Ivy Creek. This bridge, along with four others, was destroyed in the
flooding in August, 2018. Funding would be used to construct a new bridge with up-to-date forestry-
service design that is intended to survive higher floods.
Relationship to Comprehensive Plan
Chapter 3, Page 29, Goal PR-3 Recreation. Provide access to parks, trails, and recreation facilities and
programs; and Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate
existing facilities to meet the City’s needs.
Project Manager
Susannah Smith, Construction Coordinator
Projected Start Date Q1 FY 2021 Why Now
Projected Completion Date Q4 FY 2023 Four of the bridges along the Creekside Trail were destroyed in the
flooding of August, 2018. The loss of these bridges has reduced the
amount of trail access available to the public. This request is for
additional funding due to the original construction bid quotes being
much higher than projected.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2023
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $275,534 Project Total D ebt Expenditures
Budget FY 2023 250,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $525,534
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 250,000 0 0 0 0 $250,000
Total $250,000 $0 $0 $0 $0 $250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 275,000 0 0 0 0 $275,000
Total $275,000 $0 $0 $0 $0 $275,000
Operating Budget Impact
None anticipated.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
95
Service Area Department Location
Parks and Recreation Parks and Re creation/Public Works Ivy Creek Park
Project Title Project Number Project Type
Ivy Creek Park to Peaks View Park Trail
Extension
To Be Assigned New
Department Priority
Project required to support important but not essential services
Project Description
Connection of Ivy Creek Park and Peaks View Park via a paved trail extension similar in standard to the
current Blackwater Creek Trail. The plan has already been completed, so this project funding will be used
for engineering and construction of the new trail between the two parks.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR-2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
To Be Determined
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2023 The project is another step in City's expansion plans for the paved trail
system going all the way around the City. It has already been planned
for routing and initial engineering.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2023
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 2,000,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $2,000,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 200,000 0 0 0 0 $200,000
Construction 1,800,000 0 0 0 0 $1,800,000
Total $2,000,000 $0 $0 $0 $0 $2,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: ARPA - Revenue Replacement 2,000,000 0 0 0 0 $2,000,00 0
Total $2,000,000 $0 $0 $0 $0 $2,000,000
Operating Budget Impact
Trail section will require additional daily and annual maintenance similar to other trails in the City.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
96
Service Area Department Location
Parks and Recreation Parks and Re creation Jackson Heights Art Stu dio
Project Title Project Number Project Type
Jackson Heights Art Studio Renovation To Be Assigned New
Department Priority
Project required to support important but not essential services; Project contributes to the generation of
new revenue
Project Description
Jackson Heights Art Studio Renovation project funding is for professional design, updates to existing
facilities, and expansion of additional square footage either through an addition to existing building or
separate new building's construction. Currently projecting to start the design / engineering planning in FY
2027 to prepare for construction in FY 2028.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Q1 FY 2027 Why Now
Projected Completion Date Q4 FY 2028 Jackson Heights Art Studio is an aging historical school house which
needs maintenance and updates which go beyond current maintenance
scope and budgets. Also, due to expanding art programs at Parks and
Recreation, additional square footage is needed to house them.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q4 FY 2028
Construction Q4 FY 2028
Contingency Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 50,000 Interest 0
Remaining Need 500,000 Total $0
Total Project Cost $550,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Architectural Services (Contractual) 0 0 0 0 50,000 $50,000
Total $0 $0 $0 $0 $50,000 $50,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 0 0 0 0 35,000 $35,000
Total $0 $0 $0 $0 $35,000 $35,000
Operating Budget Impact
To be determined during design development phase of project.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
97
Service Area Department Location
Parks and Recreation Parks and Recreation Blackwater Creek Natura l Area
Project Title Project Number Project Type
Langhorne Road East Bridge P0165 New
Department Priority
Project required to support important but not essential services
Project Description
Replace the Langhorne Road East Bridge spanning Blackwater Creek. This bridge, along with four others,
was destroyed in the flooding in August, 2018. Funding would be used to construct a new bridge with up-
to-date forestry-service design that is intended to survive higher floods.
Relationship to Comprehensive Plan
Chapter 3, Page 29, Goal PR-3 Recreation. Provide access to parks, trails, and recreation facilities and
programs; and Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate
existing facilities to meet the City’s needs.
Project Manager
Susannah Smith, Construction Coordinator
Projected Start Date Q1 FY 2021 Why Now
Projected Completion Date Q4 FY 2023 Four of the bridges along the Creekside Trail were destroyed in the
flooding of August, 2018. The loss of these bridges has reduced the
amount of trail access available to the public. This request is for
additional funding due to the original construction bid quotes being
much higher than projected.
Projected Schedule
Activity Projected Date
Consultant Engineering Q4 FY 2023
Construction Q4 FY 2023
Contingency Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $272,667 Project Total D ebt Expenditures
Budget FY 2023 250,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $522,667
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 250,000 0 0 0 0 $250,000
Total $250,000 $0 $0 $0 $0 $250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 250,000 0 0 0 0 $250,000
Total $250,000 $0 $0 $0 $0 $250,000
Operating Budget Impact
None anticipated.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
98
Service Area Department Location
Parks and Recreation Parks and Recreation Lynchburg Community Mar ket
Project Title Project Number Project Type
Lynchburg Community Market Renovations P0172 Maintenance
Department Priority
Project required to support important but not essential services; Project contributes to the generation of
new revenue
Project Description
Secure the architecture and engineering designs to include cost estimates to implement the indoor
recommendations that include eliminating the existing interior rows that are parallel with Main Street.
Implement large stand-alone kiosks that are self-sufficient and boarder perimeter of centralized seating
area.
Relationship to Comprehensive Plan
Chapter 3, Page 15, LU-2.6 Promote the economic vitality of commercial corridors and efficient use of
employment areas through:
• Coordination of public and private sector investment that continue to enhance their function and
attractiveness; and
• Protection of the areas from encroachment of uses that would inhibit their efficient use.
Chapter 3, Page 15, LU-2.7 Support the revitalization of existing development and new neighborhood-
oriented mixed use development in locations where such uses will promote stability and improvement.
Chapter 3, Page 15, LU-2.8 Establish appropriate access management strategies and internal circulation
patterns along commercial corridors to improve public safety and the long-term viability of these
corridors.
Project Manager
Ricky Kowalewski, Community Market Manager
Projected Start Date Q1 FY 2022 Why Now
Projected Completion Date Q4 FY 2026 Projects in the Downtown 2040 Master Plan were prioritized in January
of 2020 and implementing the Wendell Plan (Lynchburg Community
Market Renovation) was an identified top priority. Implementation of
indoor recommendations was a short term strategy to be implemented
in 1-5 years, while Community Market renovation including completion
of the plaza design and coordination with Downtown Streetscape
Project was to be implemented in 6-10 years.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q4 FY 2024
Construction Q4 FY 2026
Contingency Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $82,500 Project Total De bt Expenditures
Budget FY 2023 840,000 Principal $4,605,000
FY 2024 - FY 2027 Planned 3,765,000 Interest 1,274,924
Remaining Need 0 Total $5,879,924
Total Project Cost $4,687,500
Local Funding Percentage 100.0% Estimated Annual Debt Service $293,996
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Architectural Services (Contractual) 0 150,000 0 0 0 $150,000
Construction 700,000 0 0 3,000,000 0 $3,700,000
Contingency 140,000 15,000 0 600,000 0 $755,000
Total $840,000 $165,000 $0 $3,600,000 $0 $4,605,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 840,000 165,000 0 3,600,000 0 $4,605,000
Total $840,000 $165,000 $0 $3,600,000 $0 $4,605,000
Operating Budget Impact
Additional maintenance and operating costs to be determined once project design is finalized.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
99
Service Area Department Location
Parks and Recreation Park s and Recreation Miller Park
Project Title Project Number Project Type
Miller Park Pool Assessment/Replacement P0160 New
Department Priority
Project contributes to the generation of new revenue; Project required to support important but not
essential services
Project Description
Development of a needs assessment (2024), design, and construction (2025) for replacing the Miller Park
Pool, the City's only pool open to the general public. The current facility is a 428,000-gallon, Olympic-size
outdoor pool. A needs assessment will be completed in FY 2024 to determine the design of the
replacement facility with plans to construct the new facility in FY 2025.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
To Be Determined
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2025 The Miller Park Pool complex will be 38 years old in FY 2024 and has had
several significant repairs performed over the past decade. The initial
assessment will be done to determine the community's current aquatic
needs and the most-cost-effective manner to meet those needs moving
forward.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q1 FY 2024
Construction Q4 FY 2025
Contingency Q4 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 50,000 Principal $5,940,000
FY 2024 - FY 2027 Planned 5,940,000 Interest 1,644,528
Remaining Need 0 Total $7,584,528
Total Project Cost $5,990,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $379,226
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Architectural Services (Contractual) 50,000 140,000 635,000 0 0 $825,000
Construction 0 0 4,340,000 0 0 $4,340,000
Contingency 0 30,000 795,000 0 0 $825,000
Total $50,000 $170,000 $5,770,000 $0 $0 $5,990,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 50,000 0 0 0 0 $50,000
Local: Line of Credit 0 170,000 5,770,000 0 0 $5,940,000
Total $50,000 $170,000 $5,770,000 $0 $0 $5,990,000
Operating Budget Impact
Unknown at this time. This will be easier to project once the Needs Assessment has been completed in FY 2023.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
100
Service Area Department Location
Parks and Recreation Parks and Recreation TBD
Project Title Project Number Project Type
New Dog Park P0171 New
Department Priority
Project required to support important but not essential services
Project Description
Design and construction of a dog park in a new location that will replace the existing dog park at
Blackwater Creek Athletic Area. The project includes assessment of proposed sites, design of the new
park, and construction and installation of needed elements such as fencing, water fountains, and
sidewalks.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2023 The existing dog park at Blackwater Creek Athletic Area has sustained
severe flooding with the rising waters of the Blackwater Creek due to
increased development in the city over time. The new dog park will be in
a new location at a different park less susceptible to damage from
natural events such as flooding.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q4 FY 2023
Construction Q4 FY 2023
Contingency Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $10,658 Project Total De bt Expenditures
Budget FY 2023 200,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $210,658
Local Funding Percentage 94.9% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Architectural Services (Contractual) 2 0 , 0 0 0 0 0 0 0 $ 2 0 , 0 0 0
Construction 160,000 0 0 0 0 $160,000
Contingency 2 0 , 0 0 0 0 0 0 0 $ 2 0 , 0 0 0
Total $200,000 $0 $0 $0 $0 $200,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 200,000 0 0 0 0 $200,000
Other: Donated from Private Citizens 10,658 0 0 0 0 $10,658
Total $210,658 $0 $0 $0 $0 $210,658
Operating Budget Impact
Additional maintenance and operating costs to be determined once the park design is completed.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
101
Service Area Department Location
Parks and Recreation Parks and Recreation Various
Project Title Project Number Project Type
Parks and Recreation Needs Assessment
Implementation
To Be Assigned New
Department Priority
Project required to support important but not essential services
Project Description
Improvements and/or construction of parks and trails across the City of Lynchburg Park System for the
implementation of the Parks and Recreation needs assessment started in 2021. These projects could
range from improvements such as pavilions, trail extension, pocket parks in "Park Deserts," and much
more.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Continuing Why Now
Projected Completion Date Continuing The Parks and Recreation Needs Assessment started in 2021 with final
recommendations for City Council by the beginning of 2022. This plan
includes a 10 year CIP plan for which these project funds are needed to
implement the smaller projects or phases of larger projects. The precise
location and timeline for these future projects will be determined based
on the Needs Study.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Goals, Signs, and Lighting Continuing
Contingency Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 250,000 Principal $0
FY 2024 - FY 2027 Planned 1,000,000 Interest 0
Remaining Need 2,250,000 Total $0
Total Project Cost $3,500,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 90,000 10,000 70,000 40,000 40,000 $250,000
Construction 50,000 135,000 100,000 125,000 125,000 $535,000
Goals, Signs, and Lighting 65,000 75,000 45,000 45,000 45,000 $275,000
Contingency 45,000 30,000 35,000 40,000 40,000 $190,000
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 250,000 250,000 250,000 250,000 500,000 $1 ,500,000
Total $250,000 $250,000 $250,000 $250,000 $500,000 $1,500,000
Operating Budget Impact
To be determined
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
102
Parks and Recreation Needs Assessment Implementation
Fiscal
Year Project Name
Consultant
Engineering Construction
Goals, Signs,
and Lighting Contingency Annual Total
Bl uewa y Ma s ter Pl a n $75,000 $0 $0 $25,000 $100,000
M iller P ar k Hor se Shoe P it Renov ation 1 0 ,0 0 0 2 5 ,0 0 0 4 0 ,0 0 0 1 0 ,0 0 0 8 5,000
Heri ta ge Pa rk Ma s ter Pl a n 5,000 25,000 25,000 10,000 65,000
2023 Sub-Totals $90,000 $50,000 $65,000 $45,000 $250,000
Bl uewa y Cons tructi on $0 $100,000 $20,000 $20,000 $140,000
M iller P ar k Sec ur ity Impr ov ements 1 0 ,0 0 0 3 5 ,0 0 0 5 5 ,0 0 0 1 0 ,0 0 0110,000
2024 Sub-Totals $10,000 $135,000 $75,000 $30,000 $250,000
Pa rk Li ghti ng Improvements $10,000 $10,000 $35,000 $10,000 $65,000
Ea rthen Tra i l Improvements 10,000 90,000 10,000 15,000 125,000
Perci va l 's Is l e "Go Na ti ve" cons ul t/pl a n 50,000 0 0 10,000 60,000
2025 Sub-Totals $70,000 $100,000 $45,000 $35,000 $250,000
New tra i l Expa ns i on $20,000 $75,000 $10,000 $20,000 $125,000
Exi s ti ng pa rk - Improvement 20,000 50,000 35,000 20,000 125,000
2026 Sub-Totals $40,000 $125,000 $45,000 $40,000 $250,000
New tra i l Expa ns i on $20,000 $75,000 $10,000 $20,000 $125,000
Exi s ti ng pa rk - Improvement 20,000 50,000 35,000 20,000 125,000
2027 Sub-Totals $40,000 $125,000 $45,000 $40,000 $250,000
Grand Totals $250,000 $535,000 $275,000 $190,000 $1,250,000
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
103
Service Area Department Location
Parks and Recreation Parks and Recreation Various
Project Title Project Number Project Type
Parks & Trails Paving and Lighting P0156 Maintenance
Department Priority
Project required to support important but not essential services; Project contributes to the generation of
new revenue
Project Description
Renovation of park athletic courts, trails, walks, steps, parking lots, and lighting. A detailed project list is
attached.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Continuing Why Now
Projected Completion Date Continuing This project funds many preventative maintenance repairs and upgrades
to existing trails, athletic courts, and parking lots. This maintenance and
repair work are needed to extend asset lives and prevent more-
expensive repairs or replacements in the future.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Goals, Signs, and Lighting Continuing
Contingency Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 278,000 Principal $0
FY 2024 - FY 2027 Planned 1,156,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 25,200 14,850 0 30,000 0 $70,050
Construction 189,000 198,000 268,000 95,000 273,000 $1,023,000
Goals, Signs, and Lighting 36,000 37,350 0 150,000 0 $223,350
Contingency 27,800 27,800 10,000 25,000 27,000 $117,600
Total $278,000 $278,000 $278,000 $300,000 $300,000 $1,434,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 345,000 278,000 278,000 278,000 300,000 $1,479,0 00
Total $345,000 $278,000 $278,000 $278,000 $300,000 $1,479,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
104
Parks & Trails Paving and Lighting
Fiscal
Year Project Name
Consultant
Engineering Construction
Goals, Signs,
and Lighting Contingency Annual Total
Pea ks Vi ew Pa rk Fi el ds 8 & 9 Li ghts $25,200 $189,000 $36,000 $27,80 0 $278,000
2023 Sub-Totals $25,200 $189,000 $36,000 $27,800 $278,000
Pea ks Vi ew Pa rk Upper Wi ggi ngton Pa rki ng Lot $4,050 $54,000 $18,00 0 $8,450 $84,500
Pea ks Vi ew Pa rk Lower Wi ggi ngton Pa rki ng Lot 10,800 72,000 11,700 1 0,500 105,000
Pea ks Vi ew Pa rk Interi or Tra i l s 0 72,000 7,650 8,850 88,500
2024 Sub-Totals $14,850 $198,000 $37,350 $27,800 $278,000
Ri vers i de Pa rk Entra nce Roa d $0 $20,000 $0 $4,000 $24,000
Ri vers i de Pa rk Interi or Pa th 0 30,000 0 6,000 36,000
Bi kewa y Tra i l Pa tchi ng/Overl a y 0 218,000 0 0 218,000
2025 Sub-Totals $0 $268,000 $0 $10, 000 $278,000
Pea ks Vi ew Pa rk Li ghti ng As s es s ment/Upgra de $25,000 $75,000 $100,000 $25,000 $225,000
Mi s cel l a neous Li ghti ng & El ectri ca l Improvements 5,000 20,000 50,000 0 75,000
2026 Sub-Totals $30,000 $95,000 $150,000 $25,000 $300,000
Nei ghborhood Centers pa rki ng l ot res urfa ci ng $0 $120,000 $0 $12,000 $132,000
M iller P ar k pathway s impr ov ements 0 9 8 ,0 0 0 0 0 9 8 ,0 0 0
Mi s cel l a neous Li ghti ng & El ectri ca l Improvements 0 55,000 0 15,000 7 0,000
2027 Sub-Totals $0 $273,000 $0 $27, 000 $300,000
Grand Totals $70,050 $1,023,000 $223,350 $117,600 $1,434,000
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
105
Service Area Department Location
Parks and Recreation Parks and Recreation Various
Project Title Project Number Project Type
Parks Tree Replacement Program P0173 Maintenance
Department Priority
Project required to support important but not essential services
Project Description
This project is to have a general fund to yearly replace trees throughout our parks systems which are in
decline of tree canopy coverage. Tree planting needs will be assessed regularly with the help of Public
Work's arborist to create plans on where new plants will serve the City the best.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR-1-8 Develop resource management plans for all natural areas within the park and
trails system.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Continuing Why Now
Projected Completion Date Continuing Canopy coverage is very important for natural cooling to fight "heat
island effect" in urban areas, storm water management, air quality, etc.
Projected Schedule
Activity Projected Date
Miscellaneous Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 50,000 Principal $0
FY 2024 - FY 2027 Planned 210,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Miscellaneous 50,000 50,000 50,000 55,000 55,000 $260,000
Total $50,000 $50,000 $50,000 $55,000 $55,000 $260,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 50,000 50,000 50,000 55,000 55,000 $260,00 0
Total $50,000 $50,000 $50,000 $55,000 $55,000 $260,000
Operating Budget Impact
None anticipated.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
106
Service Area Department Location
Parks and Recreation Parks and Recreation Various
Project Title Project Number Project Type
Sustainable Infrastructure Program P0175 New
Department Priority
Project required to support important but not essential services
Project Description
This project involves increasing the environment sustainability of new and existing park properties and
facilities throughout the city. This shall include but not limited to installation of renewable-energy
solutions (such as solar), water-quality enhancers (such as rain gardens), and educational installations on
sustainability.
Relationship to Comprehensive Plan
Chapter 3, Page 29, PR-2.5 Fully utilize parks, trails and facilities to meet the recreational needs of city
residents, placing emphasis on underserved populations.
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing facilities to
meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Continuing Why Now
Projected Completion Date Continuing With this funding, we will be able to retrofit existing properties and
increase our environmental sustainability across our parks systems and
facilities. This funding will help our city increase its efforts protecting our
natural resources for generations to come. This is especially important in
a city that has so many natural resources that need protection. At the
same time, these improvements and projects should result in decreased
operating costs, such as utility bills.
Projected Schedule
Activity Projected Date
Consultant Engineering Continuing
Construction Continuing
Fencing, Lighting, and Signs Continuing
Contingency Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 75,000 Principal $0
FY 2024 - FY 2027 Planned 325,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 5,000 5,000 5,000 5,000 5,000 $25,000
Construction 50,000 20,000 50,000 55,000 35,000 $210,000
Fencing, Lighting, and Signs 5,000 35,000 5,000 5,000 40,000 $90,000
Contingency 15,000 15,000 15,000 10,000 20,000 $75,000
Total $75,000 $75,000 $75,000 $75,000 $100,000 $400,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 75,000 75,000 75,000 75,000 100,000 $400,0 00
Total $75,000 $75,000 $75,000 $75,000 $100,000 $400,000
Operating Budget Impact
To be determined.
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
107
Sustainable Infrastructure Program
Fiscal
Year Project Name
Consultant
Engineering Construction
Fencing,
Lighting, and
Signs Contingency Annual Total
Sus ta i na bl e ga rden ma i ntena nce a nd upgra des $0 $10,000 $0 $5,000 $15 ,000
M iller P ar k - solar c onv er sion for two pic nic shelter s 5 ,0 0 0 4 0 ,000 5,000 10,000 60,000
2023 Sub-Totals $5,000 $50,000 $5,000 $15,000 $75,000
Sus ta i na bl e ga rden ma i ntena nce a nd upgra des $0 $10,000 $0 $5,000 $15 ,000
M iller P ar k - solar /LED walk lighting upgr ade 5 ,0 0 0 1 0 ,0 0 0 3 5 ,0 0 0 10,000 60,000
2024 Sub-Totals $5,000 $20,000 $35,000 $15,000 $75,000
Sus ta i na bl e ga rden ma i ntena nce a nd upgra des $0 $10,000 $0 $5,000 $15 ,000
Educ ational gar dens installation - multiple loc ations 5 ,0 0 0 4 0 ,0 00 5,000 10,000 60,000
2025 Sub-Totals $5,000 $50,000 $5,000 $15,000 $75,000
Sus ta i na bl e ga rden ma i ntena nce a nd upgra des $0 $15,000 $0 $5,000 $20 ,000
Pea ks Vi ew Pa rk - l ow mow/wi l dfl ower pl a nti ngs 5,000 40,000 5,000 5 ,000 55,000
2026 Sub-Totals $5,000 $55,000 $5,000 $10,000 $75,000
Sus ta i na bl e ga rden ma i ntena nce a nd upgra des $0 $15,000 $0 $5,000 $20 ,000
Pea ks Vi ew Pa rk - s ol a r/LED l i ghti ng upgra des 5,000 20,000 40,000 1 5,000 80,000
2027 Sub-Totals $5,000 $35,000 $40,000 $20,000 $100,000
Grand Totals $25,000 $210,000 $90,000 $75,000 $400,000
Capital Improvement Program General Fund – Parks and Recreation
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
108
Service Area Department Location
Parks and Recreation Parks and Recreation Templeton Sr Center
Project Title Project Number Project Type
Templeton Senior Center Renovations To Be Assigned New
Department Priority
Project required to support important but not essential services; Project contributes to the generation of
new revenue
Project Description
Interior and exterior renovation and repairs which are much needed due to the aging building and heavy
use. Currently projecting to start the design / engineering planning in FY 2026 to prepare for construction
in FY 2028.
Relationship to Comprehensive Plan
Chapter 3, Page 37, PFS-1.1 Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Chris Higgins, Park Service Manager
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2028 Templeton Senior Center currently needs renovations and repairs that
are well beyond maintenance activities and budgets. This funding will
provide both design and construction funding for these updates and
repairs.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q4 FY 2028
Construction Q4 FY 2028
Contingency Q4 FY 2028
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 50,000 Interest 0
Remaining Need 400,000 Total $0
Total Project Cost $450,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Architectural Services (Contractual) 0 0 0 50,000 0 $50,000
Total $0 $0 $0 $50,000 $0 $50,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 0 0 0 50,000 0 $50,000
Total $0 $0 $0 $50,000 $0 $50,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
109
Five Year Proposed Appropriations to be Financed by the City
Project Title
Appropriations
Through
06/30/2022 Budget FY 2023
FY 2024 - 2027
Planned
Five-Year
Estimated Net
cost
Estimated Cost
Beyond
Program Period
Total
Accumulated
Project Cost
Miscellaneous
5th Street Statue and MLK Bridge 05 6 4 , 000 0 564,000 0 564,000
College Lake Dam Removal 10,000,000 10,0 00,000 0 10,000,000 0 20,000,000
Computer Aided Dispatch Replacement 1,730,000 1,64 0,000 1,630,000 3,270,000 0 5,000,000
Pedestrian Waste Receptacle Replacement 08 7 0 , 000 0 870,000 0 870,000
Ra dio Repla cement 626,324 211, 208 800,000 1,011,208 200,000 1,837,532
Total Proposed FY 2023 - 2027 CIP $12,356,324 $13,285,208 $2,430,000 $15,715,208 $200,000 $28,271,532
Capital Improvement Program General Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
110
Service Area Department Location
Miscellaneous Public Works 5th Street at MLK Bridge and
Roundabout at Federal Street
Project Title Project Number Project Type
5th Street Statue and MLK Bridge To Be Assigned New
Department Priority
Project required to support important but not essential services; Project has State and/or Federal funding
Project Description
Honoring African American History in Lynchburg: Construct the Thornhill Statue and Remembrance Wall
in the roundabout at 5th and Federal Streets; improvements to the Martin Luther King, Jr. Bridge.
Relationship to Comprehensive Plan
The Fifth Street Master Plan was adopted by City Council on May 23, 2006 as part of the City's
Comprehensive Plan 2002 - 2020. Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the
cost-effective operation and maintenance of streets, including pavement, bikeways, sidewalks,
streetscapes and stormwater management improvements.
Project Manager
Gaynelle Hart, Public Works Director
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2023 The Fifth Street Phase IV project is scheduled to start in 2022, which will
complete the multi-phased infrastructure improvements to the 5th
Street corridor. On December 14, 2021, City Council received a report on
the recommendations from the African American Cultural Committee on
how to honor the contributions African Americans have made in our
City. With construction nearing completion, it makes sense to
implement the additional enhancements at this time.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2023
Construction Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 564,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $564,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Consultant Engineering 5 6 , 0 0 0 0 0 0 0 $ 5 6 , 0 0 0
Construction 508,000 0 0 0 0 $508,000
Total $564,000 $0 $0 $0 $0 $564,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: ARPA - Revenue Replacement 564,000 0 0 0 0 $564,000
Total $564,000 $0 $0 $0 $0 $564,000
Operating Budget Impact
None anticipated
Capital Improvement Program General Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
111
Service Area Department Location
Miscellaneous Water Resources College Lake/Lakeside Drive
Project Title Project Number Project Type
College Lake Dam Removal ME018 New
Department Priority
Project has legal or regulatory mandate
Project Description
The College Lake Dam Removal project will provide for the removal of the College Lake Dam, including
reestablishment of the Blackwater Creek stream channel and ecological restoration of the former
lakebed area. This project will also update the limits of the FEMA 100-year floodplain and remove the
inundation zone associated with the dam.
Relationship to Comprehensive Plan
Chapter 3, Page 27, Goal NS-1.4: Promote responsible management and development of lands adjacent
to important natural resources that provide a pleasant, healthy and safe environment for human
activities; Chapter 3, Page 36, Goal PU-2: Stormwater Management. Manage stormwater to protect
residents, property and the environmental integrity of local/regional waterways and ecosystems; Chapter
3, Page 36, Goal PU-3: Improved Water Quality. Improve water quality in the City's streams and James
River.
Project Manager
Erin Hawkins, Water Quality Manager
Projected Start Date Q2 FY 2020 Why Now
Projected Completion Date Q4 FY 2025 This project has a regulatory requirement for meeting the dam safety
requirements. The current dam does not meet the dam safety
requirements to pass the Probable Maximum Flood and is also
susceptible to failure during an overtopping event.
Projected Schedule
Activity Projected Date
Consultant Engineering Q2 FY 2020
Construction Q1 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $10,000,000 Project Tota l Debt Expenditures
Budget FY 2023 10,000,000 Principal $5,000,000
FY 2024 - FY 2027 Planned 0 Interest 1,384,283
Remaining Need 0 Total $6,384,283
Total Project Cost $20,000,000
Local Funding Percentage 25.0% Estimated Annual Debt Service $319,214
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 10,000,000 0 0 0 0 $10,000,000
Total $10,000,000 $0 $0 $0 $0 $10,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
State: Grants 3,550,000 450,000 0 0 0 $4,000,000
Local: Line of Credit 3,550,000 450,000 0 0 0 $4,000,000
State: VCWRLF 0 6,900,000 3,100,000 0 0 $10,000,000
Total $7,100,000 $7,800,000 $3,100,000 $0 $0 $18,000,000
Operating Budget Impact
Operating expenses for maintenance of the Emergency Action Plan, ongoing lake level monitoring and controlling water flow will be eliminated.
Capital Improvement Program General Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
112
Service Area Department Location
Miscellaneous Emergency Services 3621 Candlers Mountain Rd
Project Title Project Number Project Type
Computer Aided Dispatch Replacement To Be Assigned New
Department Priority
Project supports essential services
Project Description
Our computer aided dispatch system is a call management system that provides information to the police
and fire departments regarding calls for service. The current system has been in place for over 20 years
and is interconnected with many other systems within the City. Because of recent changes with the
vendor it has become clear that we will need to change software and hardware in the near future. This
project will also include the replacement of numerous other connected servers, PCs, tablets and software
within the Police and Fire Departments that are currently connected to the computer aided dispatch
system.
Relationship to Comprehensive Plan
Not Applicable
Project Manager
Melissa Foster, Director of Emergency Services
Projected Start Date Q2 FY 2021 Why Now
Projected Completion Date Q4 FY 2024 The level of service that we are receiving from the vendor is slowly
declining. There is concern that the vendor may begin trying to migrate
customers to one of their other systems that may not meet the needs of
public safety departments.
Projected Schedule
Activity Projected Date
Consultant Engineering Q1 FY 2022
Request for Proposal Q1 FY 2023
Equipment Q4 FY 2024
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $1,730,000 Project Total Debt Expenditures
Budget FY 2023 1,640,000 Principal $5,000,000
FY 2024 - FY 2027 Planned 1,630,000 Interest 1,384,283
Remaining Need 0 Total $6,384,283
Total Project Cost $5,000,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $319,214
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Request for Proposal 1 0 , 0 0 0 0 0 0 0 $ 1 0 , 0 0 0
Equipment 1,630,000 1,630,000 0 0 0 $3,260,000
Total $1,640,000 $1,630,000 $0 $0 $0 $3,270,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 33,333 43,333 4,923,334 0 0 $5,000,000
Total $33,333 $43,333 $4,923,334 $0 $0 $5,000,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
113
Service Area Department Location
Miscellaneous Public Works City Wide
Project Title Project Number Project Type
Pedestrian Waste Receptacle Replacement To Be Assigned New
Department Priority
Project has State and/or Federal funding; Project supports essential services
Project Description
Replace 100+ pedestrian trash cans with smart, solar-powered, sensor-equipped waste stations that
communicate real-time status to streamline waste management operations. These trash cans will notify
the refuse division when they need servicing, which will increase the efficiency of the operation and
reduce overflowing pedestrian cans. Also, the design of the can inhibits the disposal of large amounts of
trash; therefore, discouraging the disposal of household and other waste that should not be placed in
pedestrian cans.
Relationship to Comprehensive Plan
Chapter 3, Page 31, Goal T-1.7: Commit adequate resources for the cost-effective operation and
maintenance of streets, including pavement, bikeways, sidewalks, streetscapes and stormwater
management improvements.
Chapter 8, Page 8.5, Goal 3, Objective 3.A: Concentrate on improving and expanding retail businesses,
street-level activities, and streetscape environments.
Project Manager
Gaynelle Hart, Public Works Director
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2023 The Department of Public Works presented a plan to the Deputy City
Manager to improve the City's appearance by reducing weeds and litter
city-wide. One of the recommendations is to replace the standard
pedestrian can with a smart waste receptacle. The new state of the art
trash cans will reduce illegal dumping of household trash in the city's
pedestrian cans and reduce labor by notifying Public Works when they
need servicing.
Projected Schedule
Activity Projected Date
Equipment Q4 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 870,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $870,000
Local Funding Percentage 0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Equipment 870,000 0 0 0 0 $870,000
Total $870,000 $0 $0 $0 $0 $870,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Federal: ARPA - Revenue Replacement 870,000 0 0 0 0 $870,000
Total $870,000 $0 $0 $0 $0 $870,000
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund – Miscellaneous
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
114
Service Area Department Location
Miscellaneous Emergency Services 3621 Candlers Mountain Rd
Project Title Project Number Project Type
Radio Replacement ME017 Maintenance
Department Priority
Project supports essential services
Project Description
Replacing aging mobile and portable radios currently used by non-enterprise City departments.
Relationship to Comprehensive Plan
Not Applicable
Project Manager
Melissa Foster, Director of Emergency Services
Projected Start Date Q1 FY 2019 Why Now
Projected Completion Date Continuing Radios are reaching "end of parts" status which means it will be more
difficult to have equipment repaired and it will become unusable.
Projected Schedule
Activity Projected Date
Equipment Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $626,324 Project Total D ebt Expenditures
Budget FY 2023 211,208 Principal $0
FY 2024 - FY 2027 Planned 800,000 Interest 0
Remaining Need 200,000 Total $0
Total Project Cost $1,837,532
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Equipment 211,208 200,000 200,000 200,000 200,000 $1,011,208
Total $211,208 $200,000 $200,000 $200,000 $200,000 $1,011,208
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 211,208 200,000 200,000 200,000 200,000 $1 ,011,208
Total $211,208 $200,000 $200,000 $200,000 $200,000 $1,011,208
Operating Budget Impact
None anticipated at this time.
Capital Improvement Program General Fund - Reserves
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
115
Five Year Proposed Appropriations to be Financed by the City
Project Title
Appropriations
Through
06/30/2022
Budget FY
2023
FY 2024 -
2027 Planned
Five-Year
Estimated Net
cost
Estimated Cost
Beyond
Program Period
Total
Accumulated
Project Cost
Reserves
Lynchburg City Stadium Capital Maintenance Reserve 600,000 100,000 300,000 400,000 0 1,000,000
Snow, Street, a nd Bridge Res erve Continuing 250,000 1,000,000 1,250,000 Continuing Continuing
Total Proposed FY 2023 - 2027 CIP $600,000 $350,000 $1,300,000 $1,650,000 $0 $1,000,000
Capital Improvement Program General Fund - Reserves
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
116
Service Area Department Location
Reserves Public Works Lynchburg City Stadium, Calvin
Falwell Field
Project Title Project Number Project Type
Lynchburg City Stadium Capital Maintenance
Reserve
BMR01 Maintenance
Department Priority
Project contributes to the generation of new revenue
Project Description
Reserves for capital maintenance expenditures at the City Baseball Stadium as outlined in the Baseball
Stadium Franchise Agreement. Funds will be used for mutually agreed upon expenditures of a capital
nature such as repair, replacement, maintenance, and improvements of the Stadium structural elements
and associated equipment.
The reserve was established with the FY 2017 Adopted budget. Per the franchise agreement the reserve
must be maintained for 10 years and increased by $50,000 to $100,000 each year.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS-1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City’s needs.
Project Manager
Gaynelle Hart, Director of Public Works
Projected Start Date Q1 FY 2017 Why Now
Projected Completion Date Q4 FY 2026 Per the Franchise Agreement the City is required to add $50,000 to
$100,000 to the Stadium Maintenance Reserve each year through FY
2026.
As of October 2021, $382,000 of this funding has been used to perform
improvements at the Stadium that meet the guidelines of the
Agreement.
Projected Schedule
Activity Projected Date
Maintenance Q4 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $600,000 Project Total D ebt Expenditures
Budget FY 2023 100,000 Principal $0
FY 2024 - FY 2027 Planned 300,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $1,000,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Maintenance 100,000 100,000 100,000 100,000 0 $400,000
Total $100,000 $100,000 $100,000 $100,000 $0 $400,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 100,000 100,000 100,000 100,000 0 $400,000
Total $100,000 $100,000 $100,000 $100,000 $0 $400,000
Operating Budget Impact
Annual funding to be used for capital expenditures which have been mutually agreed upon by the City and the Lynchburg Baseball Corporation.
Capital Improvement Program General Fund - Reserves
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
117
Service Area Department Location
Reserves Public Works N/A
Project Title Project Number Project Type
Snow, Street, and Bridge Reserve TR004 Maintenance
Department Priority
Project supports essential services
Project Description
Reserves for unexpected maintenance expenditures related to snow removal. Remaining funds at the
end of the fiscal year will be used to fund street and bridge maintenance.
Relationship to Comprehensive Plan
Chapter 3, page 30, Goal T-1: Provide safe, efficient, effective, and well-planned transportation systems
and facilities that enhance economic development and redevelopment opportunities while preserving
the integrity and character of the affected neighborhoods, historic districts, downtown and natural
resources.
Project Manager
Gaynelle Hart, Director of Public Works
Projected Start Date Continuing Why Now
Projected Completion Date Continuing The City maintains this reserve to assist with annual snow removal
expenses.
Projected Schedule
Activity Projected Date
Snow Removal/Maintenance Continuing
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 Continuing Project Total Debt Expenditures
Budget FY 2023 250,000 Principal $0
FY 2024 - FY 2027 Planned 1,000,000 Interest 0
Remaining Need Continuing Total $0
Total Project Cost Continuing
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Snow Removal/Maintenance 250,000 250,000 250,000 250,000 250,000 $1,250,000
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 250,000 250,000 250,000 250,000 250,000 $1 ,250,000
Total $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000
Operating Budget Impact
Due to the unpredictability of winter weather, these funds allow the City to budget a moderate amount in the General Fund Operating Budget with the
understanding the Reserve is available for overages.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
118
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Resources
Loca l : Li ne of Credi t 0 0 2,650,000 3,110,000 33,000,000
Loca l : Pa y-As -You-Go 0 2,501,000 1,970,000 1,485,000 2,020,000
Local: Return of Fund Balance 1, 947,403 0 0 0 0
TOTAL ESTIMATED RESOURCES $1,947,403 $2,501,000 $4,620,000 $4,595,0 00 $35,020,000
CAPITAL PROJECTS
School s 1,947,403 2,501,000 4,620,000 4,595,000 35,020,000
TOTAL PROPOSED CAPITAL PROJECTS $1,947,403 $2,501,000 $4,620,000 $4 ,595,000 $35,020,000
SCHOOLS FUND (CITY CAPITAL PROJECTS FUND) SUMMARY OF APPROPRIAT IONS - This summary demonstrates project
app ropriations for each Fiscal Year alon g with the ex pected sources of fundin g.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
119
FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Resources
Loca l : Li ne of Credi t 0 0 2,650,000 3,110,000 21,300,000
Loca l : Pa y-As -You-Go 0 2,501,000 1,970,000 1,485,000 2,020,000
Local: Return of Fund Balance 1, 947,403 0 0 0 0
TOTAL ESTIMATED RESOURCES $1,947,403 $2,501,000 $4,620,000 $4,595,0 00 $23,320,000
CAPITAL PROJECTS
School s 1,947,403 2,501,000 4,620,000 4,595,000 23,320,000
TOTAL PROPOSED CAPITAL PROJECTS $1,947,403 $2,501,000 $4,620,000 $4 ,595,000 $23,320,000
SCHOOLS FUND (CITY CAPITAL PROJECTS FUND) SUMMARY OF CASH FLOWS - This summary demonstrates project cash
flows for each Fiscal Year alon g with the ex pected sources of fundin g.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
120
Five Year Proposed Appropriations to be Financed by the City
Project Title
Appropriations
Through
06/30/2022
Budget FY
2023
FY 2024 - 2027
Planned
Five-Year
Estimated Net
cost
Estimated Cost
Beyond
Program Period
Total
Accumulated
Project Cost
Schools
Athletic Complexes 0 150,000 1,600,000 1,750,000 0 1,75 0,000
Dearington ES Modular Classroom Replacement 0 182,000 0 182,000 0 182,000
Elementary Gym Addition A 0 0 1,300,000 1,300,000 0 1,300,000
Elementary Gym Addition B 0 0 1,350,000 1,350,000 0 1,35 0,000
Elementary Gym Addition C 0 0 1,410,000 1,410,000 0 1,41 0,000
Linkhorne ES Renova tion & Gym Addition 0 0 1,300,000 1,300,000 27,100,000 28,400,000
Mechanical/Electrical 0 0 1,007,000 1,007,000 1,353,000 2,360,000
Paving & Fencing 0 200,000 800,000 1,000,000 1,00 0,000 2,000,000
Playground Equipment Replacement 0 100,000 200,000 300,000 200, 000 500,000
Plumbing/Restroom Renovation 0 35,000 185,000 220,000 150, 000 370,000
Reserve for Future Expenditure Needs (Fac. Study) 0 726,403 400,000 1,126,403 0 1,126,403
Reserve for Future Maintenance Needs 0 250,000 400,000 650,000 500, 000 1,150,000
Roof Replacement/Repair 0 304,000 3,384,000 3,688,000 4,61 0,000 8,298,000
Sandusky ES Replacement 0 0 33,400,000 33,400,000 0 33,4 00,000
Total Proposed FY 2023 - 2027 CIP $0 $1,947,403 $46,736,000 $48,683,403 $34,913,000 $83,596,403
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
121
Service Area Department Location
Schools Schools Multiple
Project Title Project Number Project Type
Athletic Complexes Multiple Maintenance
Department Priority
Project supports essential services
Project Description
This project involves repairs and replacement at various school athletic complexes.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q4 FY 2026 Periodic upgrades are needed to the athletic facilities in order to keep
them safe and provide healthy places for students and the community.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 150,000 Principal $0
FY 2024 - FY 2027 Planned 1,600,000 Interest 0
Remaining Need 0 Total $0
Total Project Cost $1,750,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 150,000 900,000 0 700,000 0 $1,750,000
Total $150,000 $900,000 $0 $700,000 $0 $1,750,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Return of Fund Balance 150,000 0 0 0 0 $150,000
Local: Pay-As-You-Go 0 900,000 0 700,000 0 $1,600,000
Total $150,000 $900,000 $0 $700,000 $0 $1,750,000
Operating Budget Impact
Reduced cost of maintenance and upkeep of existing facilities.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
122
Athletic Complexes
Fiscal
Year Project Name Sub-Project Construction Annual Total
2023 Dunba r MS Tra ck Res urfa ce $150,000 $150,000
2023 Sub-Totals $150,000 $150,000
EC Gl a s s HS Tra ck Renova ti on $300,000 $300,000
Heri ta ge HS Ba s eba l l Turf Repl a cement 600,000 600,000
2024 Sub-Totals $900,000 $900,000
$0
2025 Sub-Totals $0 $0
Heri ta ge HS Footba l l Turf Repl a cement $700,000 $700,000
2026 Sub-Totals $700,000 $700,000
$0
2027 Sub-Totals $0 $0
Grand Totals $1,750,000 $1,750,000
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
123
Service Area Department Location
Schools Schools Dearington ES
Project Title Project Number Project Type
Dearington ES Modular Classroom Replacement To Be Assigned New
Department Priority
Project supports essential services
Project Description
Replace 30+ year old unit with new.
Relationship to Comprehensive Plan
LCS Strategic Plan, Goal 3 - Fiscal Responsibility
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Q1 FY 2024 Unit is well beyond its useful life and needs replacement.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 182,000 Principal $0
FY 2024 - FY 2027 Planned 0 Interest 0
Remaining Need 0 Total $0
Total Project Cost $182,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 182,000 0 0 0 0 $182,000
Total $182,000 $0 $0 $0 $0 $182,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Return of Fund Balance 182,000 0 0 0 0 $182,000
Total $182,000 $0 $0 $0 $0 $182,000
Operating Budget Impact
Replace energy inefficient unit with energy efficient unit.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
124
Service Area Department Location
Schools Schools Elementary School
Project Title Project Number Project Type
Elementary Gym Addition A To Be Assigned New
Department Priority
Project supports essential services
Project Description
Construction of a new gym addition at an elementary school.
Relationship to Comprehensive Plan
LCS Strategic Plan, Goal 3 - Fiscal Responsibility
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2025 The movement education program at the elementary level requires
suitable activities daily for the students. The gym addition will allow
these activities even in inclement weather.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $1,300,000
FY 2024 - FY 2027 Planned 1,300,000 Interest 359,914
Remaining Need 0 Total $1,659,914
Total Project Cost $1,300,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $82,996
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 0 0 1,300,000 0 0 $1,300,000
Total $0 $0 $1,300,000 $0 $0 $1,300,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 1,300,000 0 0 $1,300,000
Total $0 $0 $1,300,000 $0 $0 $1,300,000
Operating Budget Impact
Additional building square footage will incur utility and maintenance costs.
Decision on which Elementary School Gym is being withheld until review of Facility Study
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
125
Service Area Department Location
Schools Schools Elementary School
Project Title Project Number Project Type
Elementary Gym Addition B To Be Assigned New
Department Priority
Project supports essential services
Project Description
Construction of a new gym addition at an elementary school.
Relationship to Comprehensive Plan
LCS Strategic Plan, Goal 3 - Fiscal Responsibility
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2025 Why Now
Projected Completion Date Q4 FY 2025 The movement education program at the elementary level requires
suitable activities daily for the students. The gym addition will allow
these activities even in inclement weather.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2025
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $1,350,000
FY 2024 - FY 2027 Planned 1,350,000 Interest 373,756
Remaining Need 0 Total $1,723,756
Total Project Cost $1,350,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $86,188
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 0 0 1,350,000 0 0 $1,350,000
Total $0 $0 $1,350,000 $0 $0 $1,350,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 1,350,000 0 0 $1,350,000
Total $0 $0 $1,350,000 $0 $0 $1,350,000
Operating Budget Impact
Additional building square footage will incur utility and maintenance costs.
Decision on which Elementary School Gym is being withheld until review of Facility Study
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
126
Service Area Department Location
Schools Schools Elementary School
Project Title Project Number Project Type
Elementary Gym Addition C To Be Assigned New
Department Priority
Project supports essential services
Project Description
Construction of a new gym addition at an elementary school.
Relationship to Comprehensive Plan
LCS Strategic Plan, Goal 3 - Fiscal Responsibility
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2026 The movement education program at the elementary level requires
suitable activities daily for the students. The gym addition will allow
these activities even in inclement weather.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $1,410,000
FY 2024 - FY 2027 Planned 1,410,000 Interest 390,368
Remaining Need 0 Total $1,800,368
Total Project Cost $1,410,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $90,018
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 0 0 0 1,410,000 0 $1,410,000
Total $0 $0 $0 $1,410,000 $0 $1,410,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 1,410,000 0 $1,410,000
Total $0 $0 $0 $1,410,000 $0 $1,410,000
Operating Budget Impact
Additional building square footage will incur utility and maintenance costs.
Decision on which Elementary School Gym is being withheld until review of Facility Study
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
127
Service Area Department Location
Schools Schools Linkhorne ES
Project Title Project Number Project Type
Linkhorne ES Renovation & Gym Addition To Be Assigned New
Department Priority
Project supports essential services
Project Description
Renovation of existing elementary school building, including MEP systems, and surfaces. Construction of
a new gym building with classrooms.
Relationship to Comprehensive Plan
LCS Strategic Plan, Goal 3 - Fiscal Responsibility
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2027 Why Now
Projected Completion Date Q4 FY 2028 All of the mechanical, electrical and plumbing systems have outlived
their usefulness and need replacement. The building is at the end of its
life cycle and needs renovation for its continued use.
Projected Schedule
Activity Projected Date
Architectural Services (Contractual) Q1 FY 2027
Construction Q4 FY 2027
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $1,300,000
FY 2024 - FY 2027 Planned 1,300,000 Interest 359,914
Remaining Need 27,100,000 Total $1,659,914
Total Project Cost $28,400,000
Local Funding Percentage 4.6% Estimated Annual Debt Service $82,996
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Architectural Services (Contractual) 0 0 0 0 1,300,000 $1,300,000
Total $0 $0 $0 $0 $1,300,000 $1,300,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Line of Credit 0 0 0 0 1,300,000 $1,300,000
Total $0 $0 $0 $0 $1,300,000 $1,300,000
Operating Budget Impact
Better energy efficiency. Old energy inefficient systems to be replaced with energy efficient systems.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
128
Service Area Department Location
Schools Schools Multiple
Project Title Project Number Project Type
Mechanical/Electrical Multiple Maintenance
Department Priority
Project supports essential services
Project Description
This project involves the replacement of mechanical and electrical systems that are at the end of their
estimated useful life and need replacement.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2026 Why Now
Projected Completion Date Q4 FY 2027 Maintenance that is needed to operate facility.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2026
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 0 Principal $0
FY 2024 - FY 2027 Planned 1,007,000 Interest 0
Remaining Need 1,353,000 Total $0
Total Project Cost $2,360,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 0 0 0 350,000 657,000 $1,007,000
Total $0 $0 $0 $350,000 $657,000 $1,007,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Pay-As-You-Go 0 0 0 350,000 657,000 $1,007,000
Total $0 $0 $0 $350,000 $657,000 $1,007,000
Operating Budget Impact
Reduced cost of maintenance and upkeep of existing facilities.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
129
Mechanical/Electrical
Fiscal
Year Project Name Sub-Project Construction Annual Total
2023 Sub-Totals $0 $0
2024 Sub-Totals $0 $0
2025 Sub-Totals $0 $0
Dunbar MS Central Bldg. Ch iller Replac ement $350,000 $350,000
2026 Sub-Totals $350,000 $350,000
Bedfor d Hills ES HVAC Replac ement $657,000 $657,000
2027 Sub-Totals $657,000 $657,000
Grand Totals $1,007,000 $1,007,000
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
130
Service Area Department Location
Schools Schools Multiple
Project Title Project Number Project Type
Paving & Fencing Multiple Maintenance
Department Priority
Project supports essential services
Project Description
This project involves the replacement of unserviceable paving and fencing.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Continuing Maintenance that is needed to operate facility efficiently and maintain
safe campuses.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 200,000 Principal $0
FY 2024 - FY 2027 Planned 800,000 Interest 0
Remaining Need 1,000,000 Total $0
Total Project Cost $2,000,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 200,000 200,000 200,000 200,000 200,000 $1,000,000
Total $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Return of Fund Balance 200,000 0 0 0 0 $200,000
Local: Pay-As-You-Go 0 200,000 200,000 200,000 200,000 $800,000
Total $200,000 $200,000 $200,000 $200,000 $200,000 $1,000,000
Operating Budget Impact
Reduced cost of maintenance and upkeep of existing facilities.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
131
Service Area Department Location
Schools Schools Multiple
Project Title Project Number Project Type
Playground Equipment Replacement Multiple Maintenance
Department Priority
Project supports essential services
Project Description
This project involves the replacement of unserviceable playground equipment.
Relationship to Comprehensive Plan
Chapter 3, Page 37, Goal PFS 1.1: Plan and develop new facilities and/or maintain/renovate existing
facilities to meet the City's needs.
Project Manager
Richard Thompson, Construction Project Manager
Projected Start Date Q1 FY 2023 Why Now
Projected Completion Date Continuing Maintenance that is needed to operate facility and ensure a safe
recreation area for students and community.
Projected Schedule
Activity Projected Date
Construction Q1 FY 2023
Financial Summary
Total Project Cost Estimated Debt Service
Prior Appropriations as of 12/31/2021 $0 Project Total Debt Ex penditures
Budget FY 2023 100,000 Principal $0
FY 2024 - FY 2027 Planned 200,000 Interest 0
Remaining Need 200,000 Total $0
Total Project Cost $500,000
Local Funding Percentage 100.0% Estimated Annual Debt Service $0
Five Year Proposed Appropriations by Activity
Activity Budget FY 2023
Planned FY
2024
Planned FY
2025
Planned FY
2026
Planned FY
2027
Program Period
Estimate
Construction 100,000 0 100,000 0 100,000 $300,000
Total $100,000 $0 $100,000 $0 $100,000 $300,000
Five Year Proposed Expenditure Cash Flow Projections
Funding Source FY 2023 FY 2024 FY 2025 FY 2026 FY 2027
Program Period
Total
Local: Return of Fund Balance 100,000 0 0 0 0 $100,000
Local: Pay-As-You-Go 0 0 100,000 0 100,000 $200,000
Total $100,000 $0 $100,000 $0 $100,000 $300,000
Operating Budget Impact
Reduced cost of maintenance and upkeep of existing facilities.
Capital Improvement Program General Fund - Schools
City of Lynchburg, Virginia, Capital Improvement Program FY 2023-2027
132
Service Area Department Location
Schools Schools Multiple
Project Title Project Number Project Type
Plumbing/Restroom Renovation Multiple Maintenance
Department Priority
Project supp
Text truncated. Open the original for the full document.