City Council Work Session and Regular Meeting — Agenda Packet
City of Lynchburg · Lynchburg City County · City Council · meeting of Jan 12, 2021 · Agenda packets
Open the original document More from City of Lynchburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
LYNCHBURG CITY COUNCIL PHYSICAL DEVELOPMENT COMMITTEE
Tuesday, January 12, 2021
8:00 a.m.
Information Items:
Recent/Pending Contract Awards: N/A
- Presented by Lee Newland
Priority Projects Update: Attached
- Presented by Lee Newland
General Business:
1. Advantage Court ROW Vacation:
- Presented by Victoria Glasgow
2. Chiles Circle ROW Vacation:
- Presented by Victoria Glasgow
Roll Call:
Pc: City Council
Reid Wodicka, Interim City Manager
Kent White, Interim Deputy City Manager/Director of Community Development
John Hughes, Assistant City Manager
Gaynelle Hart, Director of Public Works
Next Meeting: February 9, 2021
Projects of Interest Phase
Phase
Completion
Sch
BudNotes
Main Street Renewal Project Construction November 2021 Construction Underway
Lakeside Drive Bridge Over Blackwater - Design-Build
Design /
Construction June 2023 Construction Underway
CSO - Wastewater Treatment Plant Project Construction January 2021 On-Going
Link Road Bridge Construction September 2021 Construction Underway
One Way Pairs @ 501/221 Design December 2021 Reviewing 60% Plans - Discussing Scheduling a Public Meeting
Downtown Watermain Replacement & Streetscape 2 Design May 2021 Design @ 90%. Design Being Completed
Police Department Headquarters Pre-Design September 2020
Complete - Currently Reviewing Budget Estimates, Conceptual Designs
& Other Design Options
Fifth Street Phase 4 Design October 2021 Design Plans Underway
Schedule - Green ● 0-5% Behind Budget - Green ● 0-10% Over
Yellow ● 5-10% Behind Yellow ● 10-20% Over
Red ● > 10% Behind Red ● > 20% Over
V V VDOT Managed V V VDOT Managed
Lynchburg Capital Projects Greater Than $1 Million (General Fund)
January 12, 2021
LEGEND
1
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: January 12, 2021 – Physical Development Committee AGENDA ITEM #:
CONSENT: REGULAR: X WORK SESSION: CLOSED SESSION:
ACTION: X INFORMATION: (Confidential)
ITEM TITLE: Vacate Advantage Court
KEY ELEMENTS:
_ _Economic Development ___Excellent Government _X_Natural and Built Environment _ Safe Community _X _Vibrant Community
RECOMMENDATION: Approval of the right-of-way vacation of Advantage Court.
SUMMARY: Ed Willman, on behalf of O Mayflower, LLC, is petitioning to vacate the Advantage Court right-of-
way located off of Chiles Circle. The right-of-way vacation would facilitate the future development of the
adjacent property for industrial use. The total area of the proposed vacation is approximately nine hundred
seventy-nine thousandths (0.979) of an acre.
The area to be vacated includes an unpaved gravel drive. The vacation would not impact vehicle or pedestrian
access along Advantage Court or Chiles Circle.
PRIOR ACTION(S): November 3, 2020: The Technical Review Committee (TRC) reviewed the petition.
FISCAL IMPACT: Based on the zoning of the adjacent lots and property frontage, the value of the
property is anticipated to be approximately $9,790.
CONTACT(S): Victoria Glasgow, Neighborhood Planning Coordinator – 455-3900
Tom Martin, City Planner – 455-3900
ATTACHMENT(S):
o Ordinance
o Application
o Plat
o Title Work
REVIEWED BY: klw
UNCODIFIED ORDINANCE:
AN ORDINANCE VACATING RIGHT-OF-WAY KNOWN AS ADVANTAGE COURT.
WHEREAS, Ed Willman, on behalf of O Mayflower, LLC, is petitioning to vacate right-of-way known as
Advantage Court; and
WHEREAS, City Council finds that no public inconvenience will result from vacating the right of way; and
WHEREAS, City Council determined that the City has no need for the portion of public right-of-way in question
and the City’s continued ownership of such public right-of-way is not necessary or required to serve the best
interest of the City;
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Lynchburg, on its own motion, and in
accordance with the provisions of Section 15.2-2006 of the Code of Virginia, 1950, as amended, and Sections
35-71 through 35-77 of the City Code, 1981, as amended, the following described right of way be, and the
same hereby is, discontinued and vacated, namely:
BEGINNING AT THE POINT OF BEGINNING, A 1/2” REBAR SET AT THE INTERSECTION OF THE
SOUTHERLY RIGHT-OF-WAY LINE OF CHILES CIRCLE AND THE WESTERLY RIGHT-OF-WAY LINE OF
ADVANTAGE COURT; THENCE S 53°43'43" E A DISTANCE OF 150.14' TO A STAKE FOUND; THENCE
WITH A CURVE TURNING TO THE LEFT WITH A RADIUS OF 50.03', WITH AN ARC LENGTH OF 81.02',
WITH A CHORD LENGTH OF 72.45', WITH A CHORD BEARING OF S 79°53'36" W, WITH A DELTA ANGLE
OF 92°46'53",TO A POINT; THENCE WITH A COMPOUND CURVE TURNING TO THE LEFT WITH A
RADIUS OF 696.82', WITH AN ARC LENGTH OF 137.72', WITH A CHORD LENGTH OF 137.50', WITH A
CHORD BEARING OF S 27°51'13" W, WITH A DELTA ANGLE OF 11°19'27",TO A POINT; THENCE WITH A
COMPOUND CURVE TURNING TO THE LEFT WITH A RADIUS OF 700.00', WITH AN ARC LENGTH OF
116.61', WITH A CHORD LENGTH OF 116.47', WITH A CHORD BEARING OF S 17°27'29" W, WITH A
DELTA ANGLE OF 09°32'40",TO A POINT; THENCE S 12°41'10" W A DISTANCE OF 217.71' TO A POINT;
THENCE S 12°41'10" W A DISTANCE OF 34.23' TO A POINT; THENCE WITH A CURVE TURNING TO THE
RIGHT WITH A RADIUS OF 70.00', WITH AN ARC LENGTH OF 322.39', WITH A CHORD LENGTH OF
104.14', WITH A CHORD BEARING OF N 35°22'24" W, WITH A DELTA ANGLE OF 263°52'52",TO A POINT;
THENCE S 82°34'46" E A DISTANCE OF 2.09' TO A POINT; THENCE WITH A CURVE TURNING TO THE
LEFT WITH A RADIUS OF 27.50', WITH AN ARC LENGTH OF 41.08', WITH A CHORD LENGTH OF 37.36',
WITH A CHORD BEARING OF N 55°28'53" E, WITH A DELTA ANGLE OF 85°34'52",TO A POINT; THENCE
N 12°41'10" E A DISTANCE OF 154.73' TO A POINT; THENCE WITH A CURVE TURNING TO THE RIGHT
WITH A RADIUS OF 750.00', WITH AN ARC LENGTH OF 279.32', WITH A CHORD LENGTH OF 277.71',
WITH A CHORD BEARING OF N 23°21'19" E, WITH A DELTA ANGLE OF 21°20'18",TO A POINT; THENCE
WITH A REVERSE CURVE TURNING TO THE LEFT WITH A RADIUS OF 50.00', WITH AN ARC LENGTH
OF 76.57', WITH A CHORD LENGTH OF 69.30', WITH A CHORD BEARING OF N 09°50'45" W, WITH A
DELTA ANGLE OF 87°44'25",TO A 1/2” REBAR SET; WHICH IS THE POINT OF BEGINNING, SAID
PARCEL TO CONTAIN 0.979 ACRES, MORE OR LESS.
Provided, however, that any easement to locate, relocate, repair, replace, maintain and perpetually operate all
utilities currently located therein or needed by the City in the future is hereby reserved unto the City of
Lynchburg and the construction of a permanent structure over any utility line without the prior written approval
of the City is prohibited.
BE IT FURTHER ORDAINED that the Clerk of Council is hereby authorized and directed to deliver a duly
certified copy of this ordinance to the Clerk of the Circuit Court for the City of Lynchburg so that said certified
copy of this ordinance may be recorded as deeds are recorded and indexed in the name of the City of
Lynchburg, and the City Manager is hereby authorized to sign any documents that may be needed to complete
the vacation of the right-of-way.
Adopted:
Certified: _____________________________
Clerk of Council
SURVEYORS ENGINEERS SOIL EVALUATORS
434.610.43346200 FORT AVENUE | LYNCHBURG, VA 24502
www.accupointsurveying.com DBE# 723629
10/14/2020
Ms. Victoria Glasgow
City Planning and Community Development
900 Church Street
Lynchburg, VA 24504
Dear Ms. Glasgow and to whomever it may concern,
Accupoint Surveying & Design undertook investigation of the title to an undeveloped and unimproved portion of
Advantage Court, as It is the desire of our client, O’Mayflower, LLC to vacate the public interest in this land.
A survey and dedication was filed and accepted in the clerk’s office of the circuit court of the City of Lynchburg
entitled “Division of Property of CES Enterprises, Inc., by Hurt and Proffitt dated February 14, 2008” at Instrument
number 080001820 and in Plat Cabinet 9, slide 159 and 160 [Exhibit A]. This survey establishes and clearly
dedicates that portion of land within the right-of-way of Advantage Court as a street for public use.
Please consider the following legislation. The General Assembly amended the 1888 Subdivision Act in 1928 to
transfer in fee simple to the Commonwealth of Virginia that portion of land within the city limits set apart by
subdivision plat for streets for public use.
The current law under Virginia Code §15.2-2265 establishes that “the recordation of such [subdivision] plat shall
operate to transfer, in fee simple, to the respective counties and municipalities in which the land lies such portion
of the premises platted as is on such plat set apart for streets, alleys or other public use. ”
In my opinion that the action of these case laws vest fee simple title to the land lying in the right-of-way of
Advantage Court into the City of Lynchburg. Upon vacation of this right-of-way, Virginia Code § 15.2-2274
establishes reversion rights with respect to subdivision streets after sale of a lot to vest title to the abutting
landowners to the centerline of the street, upholding the rule of common law.
As O’Mayflower LLC owns all adjacent property to the right-of-way of Advantage Court, it is my opinion that title to
that land lying within the right-of-way of Advantage Court would vest solely in O’Mayflower LLC upon vacation.
Thank you for your consideration of this matter.
Elizabeth M Davis
Virginia Certified Title Examiner
Accupoint Surveying & Design, LLC
1
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: January 12, 2021 – Physical Development Committee AGENDA ITEM #:
CONSENT: REGULAR: X WORK SESSION: CLOSED SESSION:
ACTION: X INFORMATION: (Confidential)
ITEM TITLE: Vacate a portion of Chiles Circle
KEY ELEMENTS:
_ _Economic Development ___Excellent Government _X_Natural and Built Environment _ Safe Community _X _Vibrant Community
RECOMMENDATION: Approval of the right-of-way vacation of a portion of Chiles Circle
SUMMARY: Ed Willman, on behalf of O Mayflower, LLC, is petitioning to vacate a portion of Chiles Circle
right-of-way, located off of Carroll Avenue and Chiles Circle. The right-of-way vacation would facilitate the
future development of the adjacent property for industrial use. The total area of the proposed vacation is
approximately two hundred eighty-seven thousandths (0.287) of an acre.
The area to be vacated includes an unpaved gravel drive. The vacation would not impact vehicle or pedestrian
access along Chiles Circle or Carroll Avenue.
PRIOR ACTION(S): November 3, 2020: The Technical Review Committee (TRC) reviewed the petition.
FISCAL IMPACT: Based on the zoning of the adjacent lots and property frontage, the value of the
property is anticipated to be approximately $4,856.
CONTACT(S): Victoria Glasgow, Neighborhood Planning Coordinator – 455-3900
Tom Martin, City Planner – 455-3900
ATTACHMENT(S):
o Ordinance
o Application
o Plat
o Title Work
REVIEWED BY: klw
UNCODIFIED ORDINANCE:
AN ORDINANCE VACATING A PORTION OF RIGHT-OF-WAY KNOWN AS CHILES CIRCLE.
WHEREAS, Ed Willman, on behalf of O Mayflower, LLC, is petitioning to vacate a portion of right-of-way
known as Chiles Circle; and
WHEREAS, City Council finds that no public inconvenience will result from vacating the right of way; and
WHEREAS, City Council determined that the City has no need for the portion of public right-of-way in question
and the City’s continued ownership of such public right-of-way is not necessary or required to serve the best
interest of the City;
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Lynchburg, on its own motion, and in
accordance with the provisions of Section 15.2-2006 of the Code of Virginia, 1950, as amended, and Sections
35-71 through 35-77 of the City Code, 1981, as amended, the following described right of way be, and the
same hereby is, discontinued and vacated, namely:
LEGAL DESCRIPTION PARCEL “A”
COMMENCE AT A DRILL HOLE FOUND IN PAVEMENT AT THE INTERSECTION OF THE WESTERLY
RIGHT-OF-WAY LINE OF CARROLL AVENUE AND THE SOUTHERLY RIGHT-OF-WAY LINE OF CHILES
CIRCLE, THENCE N 06°44'26" W AND PASSING A DRILL HOLE SET IN THE PAVEMENT AT 46.00’ A
TOTAL DISTANCE OF 61.00' TO A POINT; THENCE S 83°54'01" W A DISTANCE OF 221.29' TO A POINT;
THENCE WITH A CURVE TURNING TO THE RIGHT WITH A RADIUS OF 20.00', WITH AN ARC LENGTH
OF 14.85', WITH A CHORD LENGTH OF 14.51', WITH A CHORD BEARING OF N 74°49'59" W, WITH A
DELTA ANGLE OF 42°32'00" TO A POINT; THENCE N 53°33'59" W A DISTANCE OF 7.19' TO A POINT;
POB “1”; THE POINT OF BEGINNING OF PARCEL “A”;THENCE S 36°26'01" W A DISTANCE OF 15.00' TO
A POINT; THENCE N 53°33'59" W A DISTANCE OF 250.55' TO A POINT; THENCE N 36°26'01" E A
DISTANCE OF 15.00' TO A POINT; THENCE S 53°33'59" E A DISTANCE OF 250.55' TO A POINT; WHICH
IS THE POINT OF BEGINNING, SAID PARCEL “A” TO CONTAIN 0.0863 ACRES, MORE OR LESS.
LEGAL DESCRIPTION PARCEL “B”
COMMENCE AT A DRILL HOLE FOUND IN PAVEMENT AT THE INTERSECTION OF THE WESTERLY
RIGHT-OF-WAY LINE OF CARROLL AVENUE AND THE SOUTHERLY RIGHT-OF-WAY LINE OF CHILES
CIRCLE, THENCE N 06°44'26" W AND PASSING A DRILL HOLE SET IN THE PAVEMENT AT 46.00’ A
TOTAL DISTANCE OF 61.00' TO A POINT; THENCE S 83°54'01" W A DISTANCE OF 221.29' TO A POINT;
THENCE WITH A CURVE TURNING TO THE RIGHT WITH A RADIUS OF 20.00', WITH AN ARC LENGTH
OF 14.85', WITH A CHORD LENGTH OF 14.51', WITH A CHORD BEARING OF N 74°49'59" W, WITH A
DELTA ANGLE OF 42°32'00" TO A POINT; THENCE N 53°33'59" W A DISTANCE OF 7.19' TO A POINT;
POB “1”; THE POINT OF BEGINNING OF PARCEL “B”; THENCE N 53°33'59" W A DISTANCE OF 89.71' TO
A POINT; THENCE WITH A CURVE TURNING TO THE LEFT WITH A RADIUS OF 255.00', WITH AN ARC
LENGTH OF 80.72', WITH A CHORD LENGTH OF 80.39', WITH A CHORD BEARING OF S 61°25'12" E,
WITH A DELTA ANGLE OF 18°08'15",TO A POINT; THENCE S 06°05'59" E A DISTANCE OF 14.91' TO A
POINT; WHICH IS THE POINT OF BEGINNING,
SAID PARCEL “B” TO CONTAIN 0.0074 ACRES, MORE OR LESS.
LEGAL DESCRIPTION PARCEL “C”
COMMENCE AT A DRILL HOLE FOUND IN PAVEMENT AT THE INTERSECTION OF THE WESTERLY
RIGHT-OF-WAY LINE OF CARROLL AVENUE AND THE SOUTHERLY RIGHT-OF-WAY LINE OF CHILES
CIRCLE, THENCE N 06°44'26" W AND PASSING A DRILL HOLE SET IN THE PAVEMENT AT 46.00’ A
TOTAL DISTANCE OF 61.00' TO A POINT; THENCE S 83°54'01" W A DISTANCE OF 221.29' TO A POINT;
THENCE WITH A CURVE TURNING TO THE RIGHT WITH A RADIUS OF 20.00', WITH AN ARC LENGTH
OF 14.85', WITH A CHORD LENGTH OF 14.51', WITH A CHORD BEARING OF N 74°49'59" W, WITH A
DELTA ANGLE OF 42°32'00" TO A POINT; THENCE N 53°33'59" W A DISTANCE OF 7.19' TO A POINT;
POB “1”; THE POINT OF BEGINNING OF PARCEL “C”; THENCE N 06°05'59" W A DISTANCE OF 14.91' TO
A POINT; THENCE WITH A CURVE TURNING TO THE LEFT WITH A RADIUS OF 255.00', WITH AN ARC
LENGTH OF 110.58', WITH A CHORD LENGTH OF 109.72', WITH A CHORD BEARING OF S 82°54'44" E,
WITH A DELTA ANGLE OF 24°50'49",TO A POINT; THENCE S 83°54'01" W A DISTANCE OF 88.00' TO A
POINT; THENCE WITH A CURVE TURNING TO THE RIGHT WITH A RADIUS OF 20.00', WITH AN ARC
LENGTH OF 14.85', WITH A CHORD LENGTH OF 14.51', WITH A CHORD BEARING OF N 74°49'59" W,
WITH A DELTA ANGLE OF 42°32'00",TO A POINT THENCE N 53°33'59" W A DISTANCE OF 7.19' TO A
POINT; WHICH IS THE POINT OF BEGINNING, SAID PARCEL “C” TO CONTAIN 0.019 ACRES, MORE OR
LESS.
PARCEL “D” LEGAL DESCRIPTION
BEGIN AT THE POINT OF BEGINNING, POB “2”; A DRILL HOLE SET AT THE INTERSECTION OF THE
WESTERLY RIGHT-OF-WAY OF CARROLL AVENUE AND THE CENTERLINE OF CHILES CIRCLE;
THENCE S 83°54'01" W A DISTANCE OF 221.46' TO A 1/2” REBAR SET; THENCE WITH A CURVE
TURNING TO TH RIGHT WITH A RADIUS OF 35.00', WITH AN ARC LENGTH OF 25.98', WITH A CHORD
LENGTH OF 25.39', WITH A CHORD BEARING OF N 74°49'59" W, WITH A DELTA ANGLE OF 42°32'00",TO
A 1/2” REBAR SET; THENCE N 53°33'59" W A DISTANCE OF 7.19' TO A POINT; THENCE N 36°26'01" E A
DISTANCE OF 15.00' TO A POINT; THENCE S 53°33'59" E A DISTANCE OF 7.19' TO A POINT; THENCE
WITH A CURVE TURNING TO THE LEFT WITH A RADIUS OF 20.00', WITH AN ARC LENGTH OF 14.85',
WITH A CHORD LENGTH OF 14.51', WITH A CHORD BEARING OF S 74°49'59" E, WITH A DELTA ANGLE
OF 42°32'00", TO A POINT; THENCE N 83°54'01" E A DISTANCE OF 221.29' TO A POINT; THENCE S
06°44'26" E A DISTANCE OF 15.00' TO A DRILL HOLE SET; WHICH IS THE POINT OF BEGINNING, SAID
PARCEL “D” TO CONTAIN 0.086 ACRES, MORE OR LESS.
PARCEL “E” LEGAL DESCRIPTION
BEGIN AT THE POINT OF BEGINNING, POB “2”; A DRILL HOLE SET AT THE INTERSECTION OF THE
WESTERLY RIGHT-OF-WAY OF CARROLL AVENUE AND THE CENTERLINE OF CHILES CIRCLE;
THENCE S 06°44'26" E A DISTANCE OF 15.00' TO A POINT; THENCE S 83°54'01" W A DISTANCE OF
221.63' TO A POINT; THENCE WITH A CURVE TURNING TO THE RIGHT WITH A RADIUS OF 50.00',
WITH AN ARC LENGTH OF 37.12', WITH A CHORD LENGTH OF 36.27', WITH A CHORD BEARING OF N
74°49'59" W, WITH A DELTA ANGLE OF 42°32'00",TO A POINT; THENCE N 53°33'59" W A DISTANCE OF
257.75' TO A POINT; THENCE N 36°26'01" E A DISTANCE OF 15.00' TO A POINT; THENCE S 53°33'59" E
A DISTANCE OF 257.75' TO A 1/2” REBAR SET; THENCE WITH A CURVE TURNING TO THE LEFT WITH
A RADIUS OF 35.00', WITH AN ARC LENGTH OF 25.98', WITH A CHORD LENGTH OF 25.39', WITH A
CHORD BEARING OF S 74°49'59" E, WITH A DELTA ANGLE OF 42°32'00", TO A 1/2” REBAR SET;
THENCE N 83°54'01" E A DISTANCE OF 221.46' TO A DRILL HOLE SET; WHICH IS THE POINT OF
BEGINNING, SAID PARCEL “E” TO CONTAIN 0.176 ACRES, MORE OR LESS.
PARCEL “F” LEGAL DESCRIPTION
BEGIN AT THE POINT OF BEGINNING, POB “3”; A DRILL HOLE FOUND IN PAVEMENT AT THE
INTERSECTION OF THE WESTERLY RIGHT-OF-WAY LINE OF CARROLL AVENUE AND THE
SOUTHERLY RIGHT-OF-WAY LINE OF CHILES CIRCLE, THENCE WITH A CURVE TURNING TO THE
LEFT WITH A RADIUS OF 25.00', WITH AN ARC LENGTH OF 39.27', WITH A CHORD LENGTH OF 35.36',
WITH A CHORD BEARING OF N 51°44'23" W, WITH A DELTA ANGLE OF 89°59'47" TO A POINT; THENCE
S 83°15'34" W A DISTANCE OF 182.84' TO A POINT; THENCE WITH A CURVE TURNING TO THE RIGHT
WITH A RADIUS OF 100.00', WITH AN ARC LENGTH OF 75.09', WITH A CHORD LENGTH OF 73.34', WITH
A CHORD BEARING OF N 75°13'42" W, WITH A DELTA ANGLE OF 43°01'29" TO A POINT; THENCE N
53°41'45" W A DISTANCE OF 89.09' TO A POINT; THENCE N 53°43'43" W A DISTANCE OF 150.14' TO A
1/2” REBAR SET; THENCE N 36°26'01" E A DISTANCE OF 11.30' TO A 1/2” REBAR SET; THENCE S
53°33'59" E A DISTANCE OF 257.75' TO A POINT; THENCE WITH A CURVE TURNING TO THE LEFT
WITH A RADIUS OF 50.00', WITH AN ARC LENGTH OF 37.12', WITH A CHORD LENGTH OF 36.27', WITH
A CHORD BEARING OF S 74°49'59" E, WITH A DELTA ANGLE OF 42°32'00" TO A POINT; THENCE N
83°54'01" E A DISTANCE OF 221.63' TO A POINT;THENCE S 06°44'26" E A DISTANCE OF 31.00' TO A
DRILL HOLE FOUND; WHICH IS THE POINT OF BEGINNING, HAVING AN AREA OF 0.111 ACRES, MORE
OR LESS.
Provided, however, that any easement to locate, relocate, repair, replace, maintain and perpetually operate all
utilities currently located therein or needed by the City in the future is hereby reserved unto the City of
Lynchburg and the construction of a permanent structure over any utility line without the prior written approval
of the City is prohibited.
BE IT FURTHER ORDAINED that the Clerk of Council is hereby authorized and directed to deliver a duly
certified copy of this ordinance to the Clerk of the Circuit Court for the City of Lynchburg so that said certified
copy of this ordinance may be recorded as deeds are recorded and indexed in the name of the City of
Lynchburg, and the City Manager is hereby authorized to sign any documents that may be needed to complete
the vacation of the right-of-way.
Adopted:
Certified: _____________________________
Clerk of Council
SURVEYORS ENGINEERS SOIL EVALUATORS
434.610.43346200 FORT AVENUE | LYNCHBURG, VA 24502
www.accupointsurveying.com DBE# 723629
10/1/2020
Ms. Victoria Glasgow
City Planning and Community Development
900 Church Street
Lynchburg, VA 24504
Dear Ms. Glasgow and to whomever it may concern,
Accupoint Surveying & Design undertook investigation of the title to an undeveloped and unimproved portion of
Chiles Circle lying between Carroll Avenue and Advantage Court. It is the desire of O’ Mayflower, LLC and R&B
Associates of Lynchburg, LLC to vacate the public interest in this portion of land, henceforward described as the
“subject property.”
The current public right‐of‐way of Chiles Circle, or the subject property, came into existence by three separate
dedications for public use as a street. I undertook research and consideration of the circumstances surrounding
each right‐of‐way dedication, as well as current case law and law at the time of dedication on an individual basis.
Please review the chronological summary of progressive dedication for public use as a street of the subject
property. The original subdivision plat entitled “Subdivision of E.N. Chiles Property by Adrian Overstreet, S. C. S.,”,
[Exhibit A] clearly establishes a 30’ road currently known as Chiles Circle for the public’s right to access the lots
within the E.N. Chiles Property subdivision as well as the state road on the face of the survey, currently known as
Carroll Avenue.
At the time of dedication in 1945, this portion of the subject property lay within the bounds of Campbell County.
As such, the first Subdivision Act of 1888 provides that the recording of a plat operates to create an easement for
public use, thus the fee interest in the lands lies with the subdivider, his heirs or assigns. However, upon vacation
of this right‐of‐way, Virginia Code §15.2‐2274 establish reversionary rights with respect to subdivision streets after
sale of a lot, vesting title to the abutting landowners to the centerline of the street, upholding the long standing
rule of common law.
Virginia Code § 15.2‐2272 establishes that in circumstances where lots have been sold in the subdivision, and the
vacation of the portion of a subdivision street right‐of‐way does not impede or alter the access for any other lot
owners, than the governing body may vacate the plat in writing, provided they obtain the signatures of the lot
owners immediately adjoining or contiguous to the vacated area, regardless of whether the plat was recorded
under the current statutory scheme.
It is clear from a thorough examination of the public land records the remaining lots within the original E.N. Chiles
Subdivision retain direct physical access to publicly maintained roads, and this vacation would not infringe upon
any other party’s rights of access.
SURVEYORS ENGINEERS SOIL EVALUATORS
434.610.43346200 FORT AVENUE | LYNCHBURG, VA 24502
www.accupointsurveying.com DBE# 723629
It is my opinion that should the City of Lynchburg exercise the right to vacate the public’s interest in that portion of
the subject property lying within the original 30’ dedication of Chiles Circle, fee simple title shall vest in the
abutting landowners to the centerline of the street, under common law practice.
The subject property and adjacent parcels were annexed to the City of Lynchburg in 1958, and the following right‐
of‐way acquisitions which occurred after the annexation fall under separate legislation. The survey entitled “Plat
showing Division of Property of CEP Enterprises, Inc.,” by Hurt and Proffitt [Exhibit B] dedicates additional right‐of‐
way directly to the City of Lynchburg to widen the southerly border of Chiles Circle.
The deed and accompanying survey entitled “Plat Showing City of Lynchburg Right‐of‐Way Acquisition for Part of
Property of R & B Associates of Lynchburg, LLC, City of Lynchburg, Virginia,” [Exhibit C] dedicates additional right‐
of‐way to widen Chiles Circle’s northerly border.
There is little question that each of these conveyances vest title directly to the City of Lynchburg, one by express
platted dedication and the other by deed and survey. In each case, it is my opinion the vacation of the
aforementioned rights‐of‐way vest fee‐simple title to lands within to the abutting landowners.
As R&B Associates of Lynchburg, LLC owns all the adjacent parcels to the north of the subject property, and O
Mayflower LLC owns all the adjacent property to the south of the subject parcel, I believe upon vacation of the
public interest the title to the land withing the right‐of‐way of Chiles Circle shall pass in fee to each abutting owner,
to the centerline of the original street conveyance.
Thank you for your attention to this matter. Please let me know if there are any questions.
Elizabeth Davis
Virginia Certified Title Examiner
Accupoint Surveying & Design, LLC
REVISED
January 12, 2021
1
GENERAL POLICY REGARDING PUBLIC PARTICIPATION AT CITY COUNCIL MEETINGS
Each speaker shall clearly state his or her name and locality of residence.
The City Council agenda is divided into four sections.
CONSENT AGENDA: This section includes routine items. All items may be approved by one vote.
PUBLIC HEARINGS: This section includes all public hearings as required by law or as Council may direct.
Procedure:
• Staff will make a presentation.
• For zoning petitions, the applicant or his or her representative shall have ten (10) minutes to make a presentation.
• Comments will then be solicited from those in favor.
• Comments will then be solicited from those in opposition.
During the public hearing, there shall be a time limit of three (3) minutes for each individual speaker. If the speaker represents a
group, there shall be a time limit of five (5) minutes. A speaker representing a group shall identify that group at the beginning of
his or her remarks. A group may have only one spokesperson. After public comments have been received, for zoning petitions,
the applicant or the representative of the applicant, at his or her discretion, may respond with a rebuttal. There shall be a five (5)-
minute time limit for rebuttal. Upon the conclusion of public comments or the applicant’s rebuttal, the public hearing will be closed
and the matter referred to Council for deliberation.
PUBLIC COMMENT: Public comment shall be for the purpose of allowing members of the public to present any matter, which, in
their opinion, deserves the attention of the Council. They shall not serve as a forum for debate with the Council. Individuals may
speak up to three (3) minutes; or group spokesperson up to five (5) minutes. Once Council has heard a presentation from a
citizen or organization on a particular subject, the citizen or organization may not make another presentation on the same subject
within three (3) months of the first presentation, except by a majority vote of the members of Council present and voting.
GENERAL BUSINESS: This section includes items of a general nature to be considered by Council.
City Council may make exceptions to these rules at its discretion. Prior to a meeting, any questions which citizens may have
regarding any item on the agenda may be addressed to City Council or the City Administration. The following numbers are
provided for the convenience of the citizens:
CITY COUNCIL 455-3995 MAYOR 455-3995 CITY MANAGER 455-3990
A reasonable charge may be made for copying and other activities related to responding to long and involved inquiries.
CITIZENS OFTEN EXPRESS CONFLICTING AND DIVERSE POSITIONS REGARDING SPECIFIC ISSUES UNDER
CONSIDERATION. TO ENCOURAGE CITIZEN PARTICIPATION AND TO AVOID INTIMIDATION TO PERSONS WHO MAY
EXPRESS SOMETIMES UNPOPULAR OPINIONS, APPLAUSE, CHEERS, OR JEERS FROM THE AUDIENCE ARE NOT
PERMITTED. WHEN APPEARING BEFORE CITY COUNCIL, CITIZENS MAY NOT ENGAGE IN BEHAVIOR THAT
INTIMIDATES OR INSULTS OTHERS, ENGAGE IN DISRUPTIVE BEHAVIOR, USE PROFANITY OR VULGAR LANGUAGE,
PROMOTE PRIVATE BUSINESS VENTURES OR CAMPAIGN FOR PUBLIC OFFICE.
* PREVIOUSLY DISCUSSED AND/OR CONSIDERED BY CITY COUNCIL
Physical Development Committee – 8:00 a.m. – Council Chamber
A G E N D A
City Council Meeting of January 12, 2021
Council Chamber | City Hall, 900 Church Street, Lynchburg, VA 24504
4:00 P.M.
WORK SESSION
#1. Receive an update on the revenue collections received in several key City revenue sources.
#2. Discuss the proposed amendments to the Telecommunications Ordinance.
#3. Roll Call
7:30 P.M.
City Council Agenda Items
COUNCILMEMBER FARALDI WILL GIVE THE INVOCATION
REVISED
January 12, 2021
2
R E C O G N I T I O N
❖ Proclamation – Holocaust Education Month
C O N S E N T A G E N D A
#4. Consideration of adopting minutes from the December 8, 2020 Meeting
P U B L I C H E A R I N G
#5. Consideration of adopting a resolution requesting an exemption to the Utility Disconnection
Moratorium.
#R-21-___
#6. Consideration of adopting a resolution granting a Conditional Use Permit to Jefferson House, LLC
to allow the construction of a five story, sixty-five unit apartment building for seniors.
#R-21-___
#7. Consideration of adopting a resolution approving the goals for the Community Development Block
Grant and HOME programs goals for FY 2022 Annual Action Plan.
#R-21-___
#8. Consideration of adopting a resolution authorizing the City Manager to sell 97 Page Street.
#R-21-___
#9. Consideration of adopting a resolution requesting the General Assembly to revise the City
Charter to remove limits on City Council salaries.
#R-21-___
P U B L I C C O M M E N T
#10. Hear from a citizen regarding a concern (Gary Taylor).
G E N E R A L B U S I N E S S
#11. Consideration of re-adopting the Continuity of Governance Ordinance and associated Council
procedures.
#O-21-___
#12. Consideration of adopting a resolution supporting Virginia Housing Loan Funding for Miller’s Rest,
Phase II.
#R-21-___
#13. Consideration of a closed meeting to discuss appointments for vacancies to the following Boards
and Commissions: Economic Development Authority, Horizon Behavioral Health, and City
Employees Appeal Board pursuant to Section 2.2-3711(A.)(1) of the Code of Virginia, 1950, as
amended.
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: January 12, 2021 AGENDA ITEM #: 1
CONSENT: REGULAR: WORK SESSION: X CLOSED SESSION:
ACTION: INFORMATION: X (Confidential)
ITEM TITLE: FY 2021 Monthly Revenue Update
KEY ELEMENTS:
___Economic Development _X_Excellent Government ___Natural and Built Environment ___Safe Community _ _Vibrant Community
RECOMMENDATION: Receive an update on the revenue collections received in several key City revenue
sources.
SUMMARY: Several key Adopted FY 2021 revenue sources were reduced to reflect the anticipated economic
impacts due to the COVID-19 pandemic; revenue collections are updated through December 31, 2020.
PRIOR ACTION(S): Rebalancing the Proposed FY 2021 General Fund Budget Due to Economic Impact of
COVID-19, City Council, April 28, 2020.
FISCAL IMPACT: As noted.
CONTACT(S): Donna Witt, Chief Financial Officer, 455-3968
ATTACHMENT(S): FY 2021 Monthly Revenue Update
REVIEWED BY: raw
009A
City Council
January 12, 2021
FY 2021 Adopted General Fund Monthly
Revenue Update
COVID-19 FY 2021 Adopted Revenue
Monthly Update
2 Note: Actual collections revised as of December 31, 2020.
Local Sales and Use Tax
Adopted
FY 2021
Actual
Collections
FY 2021
Variance to
Adopted
Budget
FY 2021
Local Sales and Use Tax $15,454,579 $7,439,316 ($8,015,263)
July 1,119,330 1,503,837 384,507
August 1,025,719 1,396,989 371,270
September 1,252,153 1,531,422 279,269
October 1,251,875 1,498,945 247,070
(Sales and Use Tax for November due by January 15th) November *Not Final* 1,361,561 1,508,123 146,562
(Sales and Use Tax for December due by February 15th) December 1,585,420 0 (1,585,420)
(Sales and Use Tax for January due by March 15th) January 1,160,079 0 (1,160,079)
(Sales and Use Tax for February due by April 15th) February 1,196,836 0 (1,196,836)
(Sales and Use Tax for March due by May 15th) March 1,432,681 0 (1,432,681)
(Sales and Use Tax for April due by June 15th) April 1,331,840 0 (1,331,840)
(Sales and Use Tax for May due by July 15th) May 1,447,319 0 (1,447,319)
(Sales and Use Tax for June due by August 15th) June 1,289,766 0 (1,289,766)
COVID-19 FY 2021 Adopted Revenue
Monthly Update (continued)
3 Note: Actual collections revised as of December 31, 2020.
Meals Tax
Adopted
FY 2021
Actual
Collections
FY 2021
Variance to
Adopted
Budget
FY 2021
Meals Tax $14,932,599 $5,866,341 ($9,066,258)
July 970,231 1,090,332 120,101
August 1,081,853 1,186,360 104,507
September 1,161,186 1,203,439 42,253
October 1,357,034 1,283,797 (73,237)
November 1,230,200 1,102,413 (127,787)
(Meals Tax for December due by January 20th) December 1,286,319 0 (1,286,319)
(Meals Tax for January due by February 20th) January 1,181,440 0 (1,181,440)
(Meals Tax for February due by March 20th) February 1,237,691 0 (1,237,691)
(Meals Tax for March due by April 20th) March 1,425,976 0 (1,425,976)
(Meals Tax for April due by May 20th) April 1,352,984 0 (1,352,984)
(Meals Tax for May due by June 20th) May 1,397,503 0 (1,397,503)
(Meals Tax for June due by July 20th) June 1,250,182 0 (1,250,182)
COVID-19 FY 2021 Adopted Revenue
Monthly Update (continued)
4 Note: Actual collections revised as of December 31, 2020.
Lodging Tax
Adopted
FY 2021
Actual
Collections
FY 2021
Variance to
Adopted
Budget
FY 2021
Lodging Tax $2,725,636 $1,012,025 ($1,713,611)
July 147,156 155,637 8,481
August 177,753 213,511 35,758
September 208,246 257,411 49,165
October 314,431 226,390 (88,041)
November 218,220 159,076 (59,144)
(Lodging Tax for December due by January 20th) December 156,330 0 (156,330)
(Lodging Tax for January due by February 20th) January 211,325 0 (211,325)
(Lodging Tax for February due by March 20th) February 208,445 0 (208,445)
(Lodging Tax for March due by April 20th) March 279,608 0 (279,608)
(Lodging Tax for April due by May 20th) April 233,875 0 (233,875)
(Lodging Tax for May due by June 20th) May 300,480 0 (300,480)
(Lodging Tax for June due by July 20th) June 269,767 0 (269,767)
COVID-19 FY 2021 Adopted Revenue
Monthly Update (continued)
5 Note: Actual collections revised as of December 31, 2020.
Amusement Tax
Adopted
FY 2021
Actual
Collections
FY 2021
Variance to
Adopted
Budget
FY 2021
Amusement Tax $795,190 $89,338 ($705,852)
July 34,581 13,970 (20,611)
August 28,321 19,248 (9,073)
September 28,994 19,538 (9,456)
October 73,504 18,752 (54,752)
November 80,858 17,830 (63,028)
(Amusement Tax for December due by January 20th) December 81,843 0 (81,843)
(Amusement Tax for January due by February 20th) January 88,585 0 (88,585)
(Amusement Tax for February due by March 20th) February 62,931 0 (62,931)
(Amusement Tax for March due by April 20th) March 86,769 0 (86,769)
(Amusement Tax for April due by May 20th) April 92,490 0 (92,490)
(Amusement Tax for May due by June 20th) May 63,944 0 (63,944)
(Amusement Tax for June due by July 20th) June 72,370 0 (72,370)
Questions,
Comments,
Observations
6
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: January 12, 2021 AGENDA ITEM #: 2
CONSENT: REGULAR: WORK SESSION: X CLOSED SESSION:
ACTION: X INFORMATION: (Confidential)
ITEM TITLE: Zoning Ordinance Amendments – Section 35.2-61.2 (d) Flag Poles, Light Poles & Utility Poles
Repeal Sections 35.2-73.1 through 35.273.20 related to Telecommunication Towers and replace with Sections
35.2-73.1 through 35.2-73.26, Telecommunications Ordinance
KEY ELEMENTS:
_X _Economic Development __Excellent Government _X_Natural and Built Environment _ Safe Community _X _Vibrant Community
RECOMMENDATION: Conduct work session on Zoning Ordinance Amendments related to
telecommunication facilities.
SUMMARY: The City’s Zoning Ordinance sections related to Telecommunication Facilities were last updated
in December 1997 with minor amendments in January 2020. Amendments to Virginia Code in 2017 - 2020
and federal law regarding telecommunications facilities requires the City to update the Ordinance in order to be
compliant with the new regulations.
PRIOR ACTION(S):
November 11, 2020: Planning Commission work session on Zoning Ordinance Amendments.
December 9, 2020: The Planning Division recommended approval of the Zoning Ordinance
Amendments.
The Planning Commission recommended approval (7-0) of the Zoning Ordinance
Amendments.
FISCAL IMPACT: N/A
CONTACT(S): Tom Martin, City Planner – 455-3900
J. Patrick Taves, Greehan, Taves & Pandak, PLLC – (703) 378-5770
ATTACHMENT(S):
• City Council Presentation – January 12, 2021
• Telecommunications Fact Sheet
• Planning Commission Minutes – December 9, 2020
• Planning Commission Packet – December 9, 2020
o Planning Commission Report
o Zoning Ordinance Amendment – Section 35.2-61.2 (d) Flag Poles, Light Poles & Utility Poles
(Proposed)
o Zoning Ordinance Amendment – Sections 35.2-73.1 through 35.2-73.26, Telecommunications
Ordinance (Proposed)
o Power Point Presentation – December 9, 2020
o Planning Commission Memorandum – November 11, 2020
o Power Point Presentation – November 11, 2020
• Planning Commission Sign in Sheet – December 9, 2020
• Telecommunications Legal Notice
• Existing Telecommunications Ordinance
REVIEWED BY: raw
001A
Telecommunications Ordinance
J. Patrick Taves
Greehan, Taves & Pandak, PLLC
Tom Martin, AICP , City Planner
City Council
Work Session
January 12, 2021
Purpose and Outline
Purpose: Discuss the proposed Telecommunications
Ordinance
Outline:
1. State and Federal mandates
2. Types of facilities – Small Cell, AREP, Standard Process
Projects
3. Timelines for review
4. Where permitted - Height
5. Setbacks
2
Proposed regulations depend on the size of the facility.
Three Types of Cell Facilities:
• SMALL CELL FACILITIES: no more than 6 cu. ft. of
volume for each antenna and no more than 28 cu. ft.
of volume for all other wireless equipment
• ADMINISTRATIVE REVIEW ELIGIBLE PROJECTS
(“AREPs”): not more than 50 ft. in height or co-
location on any existing structure of a facility that is
not a small cell facility
• STANDARD PROCESS PROJECTS: any project that is
not an AREP
3
Different Rules for Each Type of Facility.
• Deadlines for Completeness of Applications---applications
can be “deemed complete”
• Fee Limitations
• Deadlines for Decisions---applications can be “deemed
approved”
• Limited Grounds for Disapprovals
• Different Rules for Different Facilities
4
Small Cell Facilities in the City’s Rights-of-Way
and on City Property
• Regulated by the City’s Small Cell Facility Ordinance (City Code
Sections 35-28, 25-28.1, 35-28.2, 35-28.3, 35-28.4, 35-28.5, 35-28.6,
and 35-28.7).
• The New Telecommunications Ordinance provisions do not apply
to these facilities.
5
Small Cell Facilities---Limited Reasons for Disapproval
City can disapprove on existing structures for only four reasons:
1. Material potential interference with existing or future facilities
designed and planned for a specific location or reserved for
public safety communications
2. Safety of the public or other critical public service needs
3. Aesthetic impact, but only on publicly owned or publicly
controlled property---but if the City owns the property or the
structure, then the City’s Small Cell Facility Ordinance controls
4. Conflict with a historic distri ct ordinance, but only if that
property is not eligible for a specified federal review process 6
Permitted Uses:
• All Small Cell Facilities in all districts---CUPs cannot be required
• All AREPs in all districts (50 feet or less in height)---CUPs cannot be required
• Any wireless facility or structure in the B-1 District 100 feet or less
• Any wireless facility or structure in the B-3, B-5, IN-2, I-1, I-2, and I-3 Districts 150 feet
or less
• Any base station for a lawfully existing wireless facility or structure meeting
specified requirements
• Any co-location on an existing structure meeting specified requirements
7
Conditional Use Permits Can Only Be
Required For Standard Process Projects:
• Standard Process Projects between 50 and 150 feet in height in the R-C, R-1, R-2, R-3,
R-4, IN-1, and B-4 Districts
• Standard Process Projects that exceed 100 feet in height in the B-1 District, but no
greater than 150 feet
• Standard Process Projects that exceed 150 feet in height in the B-3, B-5, IN-2, I-1, I-2,
and I-3 Districts
• Standard process project base stations meeting specified requirements
• Any co-location on an existing structure that increases the height of the facility, but
any height increase is limited to no more than 15 feet
• Any other standard process project
8
Standards for CUP’s – Standard Process Projects Only:
• Substantial conformance with the Comprehensive Plan
• No significant adverse impact on use and enjoyment of nearby properties
• No significant negative impact on property values
• No material potential interference with pre-existing facilities or for future planned
facilities planned or designed for a specific location or any reserved for future public
safety facilities*
• No significant adverse impact on public safety or public service needs*
• No available and existing wireless support structures nearby
• Not in conflict with the City historic district ordinance*
• Satisfies all other applicable requirements
9
Setbacks for Similar Structures:
• Virginia law provides that the City cannot impose a setback or fall zone requirement
that is larger than the setback or fall zone requirement “that is imposed on other types
of similar structures of a similar size, including utility poles.
• As a result, we propose establishing setbacks for wireless support structures that
provide the same setbacks for wireless support structures as are applied to light
poles, utility poles, and flag poles of a similar size.
10
Separate Amendment for Setbacks for Similar Structures:
• No setback for flag poles, light poles or utility poles (“poles”) that are less than 35’ in
height.
• Poles greater than 35’ in height set back at a 1:1 in R-C, R-1, R-2, R-3. R-4, IN-1 or B-4
Districts.
• Poles greater than 35’ in height in B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District and adjacent
to R-C, R-1, R-2, R-3, IN-1 or B-4 District set back at 1:1
• Poles in the B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District between 35’ and 50’ must meet
underlying district setback
• Poles in the B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District greater than 50’ set back at least ½
the height of the pole.
11
Discussion:
Discussion
12
TELECOMMUNICATIONS ORDINANCE
FACT SHEET
1. Why is the City of Lynchburg proposing to amend the Telecommunications Ordinance?
The Telecommunications Ordinance was last updated in December 1997 with minor revisions in
January 2000. Amendments to the Virginia Code in 2017, 2018 & 2020 and Federal Law has
resulted in the need for the City to revise the Ordinance to be consistent with State & Federal
Law.
2. What does the City’s Comprehensive Plan state about Telecommunications Facilities?
The City’s Comprehensive Plan 2013-2030 recognizes that in order for the City to continue in its
role as the economic engine for the region it must keep pace with changes in technology and
telecommunications and that in order to attract businesses it must capitalize on comprehensive
telecommunication services. (p.9, 83)
3. Who drafted the proposed Ordinance Revisions?
City staff drafted the proposed revisions in conjunction with J. Patrick Taves, Greehan, Taves &
Pandak, PLLC, Fairfax, Virginia. Mr. Taves has 40+ years experience representing local
governments in complex comprehensive plan, zoning and other land use issues.
4. Who has reviewed the proposed Ordinance Revisions?
The draft ordinance was forwarded to over twenty-six representatives of the
telecommunications industry in August 2020. Comments received were minor in nature and
have been incorporated into the draft ordinance.
The Planning Commission conducted a work session on the proposed ordinance revisions on
November 11, 2020. The Planning Commission conducted a public hearing on the proposed
ordinance revisions and recommend approval (7-0) on December 9, 2020.
The City Council will conduct a work session on the proposed amendments on January 12, 2021
with an anticipated public hearing on February 9, 2021.
5. Why are setbacks proposed for flag poles, light poles, and utility poles?
State and Federal law requires that telecommunication facilities be treated equally as similar
structures. If setbacks are not established for flag poles, light poles and utility poles then the
Zoning Ordinance can not require setbacks for telecommunication facilities.
6. How is the proposed Ordinance different from the existing ordinance?
The proposed Ordinance classifies telecommunication facilities in one of three ways and sets
review timeframes for each type as required by State and Federal Law:
a. Small Cell Facilities – Permitted in all Zoning Districts
(i) each antenna is or could fit within an imaginary enclosure of no more than six (6) cubic feet
and
(ii) all other wireless equipment associated with the facility has a cumulative volume of no more
than twenty-eight (28) cubic feet.
Small cell facilities proposed within City right-of-way or on City property are regulated by
separate City Code and the proposed amendments would not apply to these facilities.
Small Cell Facility
b. Administrative Review-Eligible Project (AREP’s) – Permitted in all Zoning Districts
(i) a new structure that is not more than fifty (50) feet above the ground level or not more
than ten (10) feet above the tallest existing utility pole within five hundred (500) feet.
(ii) not located in a local, state or federal historic district
(iii) designed to support small cell facilities
(iv) the colocation on any existing structure that is not a small cell facility
c. Standard Process Project – Permitted or Conditional Use Permit
(i) Any project that is not an administrative review eligible project.
PERMITED USES BY DISTRICT & SETBACKS
The permitted uses in each Zoning District are similar to the existing Ordinance in terms of
height with the primary change being related to setbacks when telecommunication facilities are
not located adjacent to a Residential District, Institutional 1 District or B-4, Urban Commercial
District (Downtown).
Current Zoning Ordinance Section 35.2-73.5 (a) 1 states: “All towers and any
telecommunications facilities in any business and industrial zoning districts shall be set back on
all sides a distance equal to the underlying building setback requirement in the applicable zoning
district. All towers in residential zoning districts shall be set back on all sides a distance equal to
the tower height. In addition, in order to preserve the aesthetics of residential areas and to
maintain property values, whenever a tower is located in a residential district, the tower shall be
located a distance at least equal to twice the height of the tower from any adjacent property
lines. When a tower is located in a commercial district or industrial district, the tower shall be
located a distance at least equal to twice the height of the tower from any residential district.”
The proposed Ordinance would no longer require setbacks of twice the height of the tower or
“fall zones” due to State & Federal Law that requires telecommunication facilities to be treated
equally as similar structures.
R-C, R-1, R-2, R-3, R-4, IN-1 & B-4 Districts
Fifty (50) feet or less – Permitted by right
Greater than fifty (50) feet, but no greater than one hundred fifty (150) feet – CUP Required
Setback – Minimum height of the structure
Setback – Structure less than thirty-five (35) feet – 0
B-1 District
One hundred (100) feet or less – Permitted by Right
Greater than one hundred (100) feet but no greater than one hundred fifty (150) feet – CUP
Required
Setback – structure less than fifty (50) feet – minimum setback of the B-1 District
Setback – structure greater than fifty (50) feet – minimum of ½ the height of the structure
Setback – structure adjacent to R-C, R-1, R-2, R-3, R-4, IN-1 or B-4 – minimum height of
the structure
Setback – Structure less than thirty-five (35) feet – 0
B-3, B-5, IN-2, I-1, I-2 & I-3 Districts
One hundred fifty (150) feet or less – Permitted by Right
Greater than one hundred fifty (150) feet – CUP Required
Setback – structure less than fifty (50) feet – minimum setback of the District
Setback – structure greater than fifty (50) feet – minimum of ½ the height of the structure
Setback – structure adjacent to R-C, R-1, R-2, R-3, R-4, IN-1 or B-4 – minimum height of
the structure
Setback – Structure less than thirty-five (35) feet - 0
For more information contact Tom Martin, AICP, City Planner at (434) 455-3909 or
tom.martin@lynchburgva.gov.
1
MINUTES OF THE DECEMBER 9, 2020 PLANNING COMMISSION MEETING (MINUTES HAVE
NOT BEEN APPROVED):
Consideration of amending Section 35.2-61.2 of the City of Lynchburg Zoning Ordinance
Additional Height Regulations, by adding section (d) Flag Poles, Light Poles and Utility Poles.
Consideration of proposed amendments to the City of Lynchburg Zoning Ordinance that seek
to repeal Zoning Ordinance Chapters 35.2-73.1 through 35.2-73.20 of the City of Lynchburg
Zoning Ordinance related to Telecommunication Towers. Simultaneous with the repeal of the
foregoing chapters, the proposed amendments also propose consideration of the adoption of
new Zoning Ordinance Chapters 35.2-73.1 through 35.2-73.26 pertaining to
Telecommunications Facilities. The proposed amendments shall be referred to herein as the
“Telecommunications Facilities Ordinance.”
Ms. Rachel Frischeisen, Planner II, introduced Mr. J. Patrick Taves, of Greehan, Taves & Pandak,
PLLC. He has been working on this item with Mr. Tom Martin, City Planner.
Mr. Taves addressed the Commission. There are four (4) items to discuss. These include setbacks for
flag poles, light poles, and utility poles, the adoption of the new telecommunications ordinance, the
repeal of the existing telecommunications ordinance, a nd the approval types for each zoning district.
Rather than amending the existing ordinance piece by piece, it will be replaced entirely by the new one.
The reason for proposing these changes in this manner is that it has been almost twenty (20) years sinc e
the current ordinance was put in place. Over that time there have been many changes in State and
Federal law relating to these provisions. To put it plainly, the current ordinance is woefully out of date.
For example, the current law in Virginia talks ab out small cell facilities, administrative review eligible
projects (AREPs), and standard process projects but those are terms that don’t exist in the current
ordinance. The proposed ordinance incorporates those provisions and lays out the requirements in
respect to those provisions. Requirements for timeliness of review depending on the type of facility are
similar to the concept of a “shot clock”. If the City does not meet the deadlines laid out by State and
Federal law, and in the proposed ordinance, the application may be deemed complete, even if it is not, or
may be deemed approved, even if it should not be. The smallest types of facilities are the micro wireless
facilities, and they are a subset of the small cell facilities. If they are twenty -four (24) inches in length,
fifteen (15) inches in width, twelve (12) inches in height, or smaller, and have no exterior antenna
greater than eleven (11) inches then no approval is required and there are no requirements that can
apply. Small cell facilities have so me regulations applicable to them but not a lot. The administrative
review eligible projects (AREPs) are subject to administrative review but not public hearings. The
standard process projects are the largest facilities and may require a Conditional Use Pe rmit. The Virginia
Code provisions on this subject are generally anti -local government. For example an application can be
deemed complete even if it is not or can be deemed approved even if it shouldn’t be. There is limited
discretion for the City for faci lities under fifty (50) feet in height. There are limitations on fees that the
City can impose regardless of the City’s expenses. There are limited grounds for disapproval. If the City
wants to disapprove a facility, it needs to provide a written statement as to why. Usually when acts are
taken by local government bodies they do not have to explain their reasoning. In the case of disapproval,
the City also has to release, in writing, a substantial record of evidence within thirty (30) days of the
decision. Overall, there are a lot of “hoops to jump through” in order to disapprove one of these facilities.
This ordinance does not apply to small cell facilities in the right -of-way or on City property because the
City has franchise agreements with respect to tho se types of facilities. Small cell facilities can only be
disapproved for four reasons. These reasons include material potential interference with existing or future
facilities designed and planned for a specific location or reserved for public safety comm unication, safety
of the public or other critical public service needs, aesthetic impact, but only on publicly owned or publicly
controlled property, and conflict with a historic district ordinance. The provisions for disapproval of small
cell facilities a re very narrow. Any other issues or complaints do not matter. The way the proposed
ordinance has been structured is to first include the provisions required by State and Federal law. The
2
City has very little flexibility in regards to those. The provisions include the small cell facilities, the
administrative review eligible projects (AREPs), and standard process projects. The facility is listed first
and then all of the provisions that apply to that type of facility. There is some redundancy because a lot
of the requirements are similar or the same for the administrative review eligible projects (AREPs) and
the standard process projects. This layout makes it easier for the City, the residents, and any cell
company who may be evaluating what requirements they need to meet, how quickly they need to
respond, or what the flexibility is in regards to a type of facility. Small cell facilities are listed first, then
administrative review eligible projects (AREPs), and finally standard process projects. Following tha t is
permitted uses in each district and Conditional Use Permit requirements. This is where the City has more
flexibility. The State and Federal requirements do not dictate what is allowed in each zoning district. This
is only in regards to standard process projects though, which are over fifty (50) feet in height. A standard
process project may require a Conditional Use Permit whereas small cell facilities and administrative
review eligible projects (AREPs) cannot. The proposed ordinance is similar to the existing ordinance in
terms of permitted uses and Conditional Use Permit requirements in each district. If a standard process
project does not fall under a permitted use it may require a Conditional Use Permit. The districts fall into
two (2) groupings. The first is the lower density districts which include the R -C, R-1, R-2, R-3, R-4, IN-1,
and B-4 districts. The B-1 district is separate and the standard process project facility is permitted in this
district if it is less than one hundred (100) feet. The s econd grouping is the higher density districts which
include the B -3, B-5, IN -2, I -1, I-2, and I -3 districts. This grouping is where there are allowances for
larger facilities. Colocation, when a facility is added to an existing structure, is encouraged. T his allows
for less general disruption and is more desirable than a standalone pole. If a Conditional Use Permit is
required, standards can be applied. The most important standard is the one with respect to substantial
conformance with the Comprehensive Pl an. That is where the City has a lot of flexibility and discretion.
The Comprehensive Plan is drafted before there is an application or specific issue. It is where foresight
comes into play. The proposed changes do not amend the Comprehensive Plan but agai n, one of the
standards is substantial conformance with the Comprehensive Plan. Addressing whether or not there are
sufficient standards and projection for the future in the Comprehensive Plan may be needed. The statute
requires that the City not have a se tback or fall zone that exceeds the setback or fall zone established for
similar structures. Flag poles, light poles, and utility poles are similar structures to wireless
telecommunication facilities in height and appearance. There are no existing setback requirements for
flag poles, light poles, or utility poles. The standards have to be established. It is proposed that
structures that are thirty-five (35) feet in height or less have no setback requirements. The lower density
districts require the height o f the structure, if greater than thirty -five (35) feet as the setback. If the
property the facility or pole is on is next to a lower density district, the setback must be from the lower
density district, wherever that may be. In the higher density district s for structures between thirty -five
(35) and fifty (50) feet the minimum setback is the requirement and that is already built into the
ordinance. If it is greater than fifty (50) feet, the setback is one half the height of the structure. The
proposed setb acks will set standards for flag poles, light poles, utility poles, and telecommunication
facilities. As a reminder there are four (4) items for the Commission’s consideration. The first is the
adoption of the regulation of setbacks for the flag poles, lig ht poles, and utility poles. Once that is
established, setbacks for telecommunication facilities can be established. The second would be the
adoption of the new telecommunications ordinance. Once that is adopted, the existing ordinance can be
repealed, which is the third item. The fourth item is the revisions of the approval types for the various
districts. That will automatically happen though when and if the telecommunications ordinance is
adopted.
Chair Rogers asked if there was anyone present who wished to speak in favor of the petition. When
no one stepped forward he asked if there was anyone present who wished to speak in opposition to the
petition. When no one stepped forward again he closed the public hearing.
Chair Rogers stated that the presentation was informative. The proposed changes seem necessary.
3
Mr. Taves noted that the proposed ordinance regarding the provisions dictated by State and Federal
law are necessary but the following portion regarding the provisions for permitted and condi tional use
offers more flexibility. Those provisions regarding permitted uses and Conditional Use Permit uses are
modelled after the current City ordinance.
Commissioner Marion stated that Mr. Taves seems well informed. She then asked if the proposed
ordinance has been tested in other localities.
Mr. Taves responded that for this particular ordinance, provisions regarding small cell facilities,
administrative review eligible projects (AREPs), and standard process projects are in State code. He is
comfortable with and recommends the adoption of this ordinance so the City can come into the 21st
century with respect to wireless telecommunication facilities. Historically, there has been a tendency for
local governments to abuse the zoning purview with respect to these types of facilities. People generally
don’t like the idea of them but “by the same token” this is the 21st century and people expect the
delivery of service. Again, he recommends strongly the adoption of this ordinance so the City can be in
compliance with State code. He noted that he has dealt with telecommunication facilities for twenty -five
(25) to thirty (30) years and has litigated many cases. During the review process, the proposed ordinance
was sent to telecommunication companies, the users and beneficiaries of this ordinance, for feedback.
Only very minor questions came back and there is no opposition at the present hearing.
Commissioner Bowden stated that it is an evolving process. This is the beginning of that evolution
and will establis h a framework to work with moving forward. What can be planned for at this point is
covered.
Mr. Taves shared agreement. There is little flexibility regarding what the State or Federal law
dictates. The rest, regarding whether or not to permit something, whether or not to require a Conditional
Use Permit, what the standard should be, is always an evolving process. That is why he recommends
evaluating the Comprehensive Plan. At this point though, he feels that this is the best proposal.
Commissioner Bowden noted that in the application of this ordinance the places that might provide
the most pushback are going to be the “edges of Lynchburg”. There are already telecommunication
facilities Downtown and they can be placed on existing buildin gs. The “edges” though may be more rural
and may not have received that type of development yet. Those places are more likely to involve
installation of towers and discuss aesthetics. Establishing standards now will allow for protection down
the road.
Mr. Taves shared agreement.
Commissioner Bowden stated that the proposed setbacks make sense. That will probably be needed
in relatively developed areas. He also noted that he can’t imagine anything else to do given the limited
maneuverability to disapprove the facilities.
Mr. Taves responded that the State and Federal law do not mandate which districts must allow
standard process projects to be permitted or by Conditional Use Permit. Different localities have different
zoning districts. They have already done that with respect to small cell facilities and administrative review
eligible projects (AREPs) though since those cannot require a Conditional Use Permit and must be
approved if they meet the application requirements for the type of facility in questio n. He then
recommended that as time goes by, in two (2) or three (3) years, this should be reviewed to see how
these provisions have worked. If necessary, the City can adopt new provisions. The proposed changes
should be implemented and evaluated from there.
Commissioner Perault added that the Comprehensive Plan should also be revisited once these
provisions have “had time to settle”. There’s no rush to change the Comprehensive Plan now if changes
4
will be required in a few years. This should be implemente d now and reviewed in a few years in
conjunction with necessary changes to the Comprehensive Plan.
Commissioner Bowden shared agreement and noted that the Comprehensive Plan should be
consistent with what the City wants to accomplish.
Commissioner Marion recalled that in a previous meeting concerning a cell tower, discussion of the
tower went on for a long time because numerous neighbors came to complain. She then asked if the
proposed changes would limit that due to lack of ability of the City to disapprove.
Mr. Taves responded that he would have to disagree. He worked on that project (Langhorne Road)
for the City and drafted a denial motion for that. That project was a large monopole and a standard
process project. It wasn’t an administrative review eligible project (AREP) or a small cell facility. It was a
facility to which the City could lawfully apply Conditional Use Permit requirements. That is where the City
has flexibility. The proposed ordinance does not increase the ability of the City to disa pprove small cell
facilities or administrative review eligible projects (AREPs) though. The standards for Conditional Use
Permits include having no significant adverse impact on use and enjoyment of nearby properties and no
negative impact on property valu es. Those points were used in the denial of that project. If the
Comprehensive Plan is amended, more tools can be added to evaluate such proposals in order to assure
that such decisions are not made “in the heat of the moment.”
Chair Rogers stated that he feels that the Commission still has tools and the ability to help lead
planning the community. He noted that these proposed changes discuss facilities like the small cell
facilities and the administrative review eligible projects (AREPs) that they prob ably haven’t seen much of
yet but will see more of in the future. There are blank areas in the City that don’t yet have service. The
increase in these types of facilities will be a good thing because they are limited in their impacts and
appearance in comparison to standard process projects. These facilities are vital infrastructure especially
as fewer people use landlines and the need for such facilities may be a matter of public safety at times.
Discussion on how to proceed with a motion ensued.
Mr. Taves suggested that the motion include the verbiage “as advertised” which would incorporate
the comprehensive information included in the legal notice. He then referenced the following specifically
from the legal notice: “In accordance with the adoption of t he proposed amendments, the “Approval
Type” for “wireless telecommunications transmission” that is stated in each exhibit/chart for each
applicable zoning district (for example, please see Exhibit IV -1 for the R -C District) shall be revised in
order to state the “Approval Type” (“C” for “Conditional Use Permit” and/or “P” for “Permitted”) for each
zoning district consistent with the terms of the proposed amendments.” Thus, if under the proposed
amendments a wireless telecommunications facility may be allowed with a Conditional Use Permit (“C”) or
may be Permitted (“P”), depending on the circumstances, then the “Approval Type” in the exhibit/chart
for each district shall be stated as follows: “P/C”. If such facilities are only allowed by Conditional Use
Permit, a “C” will be inserted in the applicable exhibit, and if such facilities are only Permitted, a “P” will
be inserted in the applicable exhibit.”
Commissioner Bowden made the following motion, seconded by Commissioner Johnson, and
approved by the following vote:
“Based on the preceding Findings of Fact, the Planning Commission recommends to
City Council approval of amending the Zoning Ordinance by adopting Section 35.2 -
61.2 (d) Flag Poles, Light Poles & Utility Poles and approval of repealing Sections,
35.2-73.1 through 35.2-73.20 related to Telecommunication Towers and replacing
with Sections 35.2-73.1 through 35.2-73.26, Telecommunications Ordinance as
5
referenced in the attached legal notice that was advertised prior to the public
hearing.”
AYES: Bowden, Johnson, Light, Lowe, Marion, Perault, and Rogers 7
NOES: 0
ABSTENTIONS: 0
ABSENT: 0
The Department of Community Development
City Hall, Lynchburg, VA 24504 434-455-3900
To: Planning Commission
From: Planning Division
Date: December 9, 2020
Re: Zoning Ordinance Amendments:
Section 35.2-61.2 (d) Flag Pole s, Light Poles & Utility Poles
Repeal Sections, 35.2-73.1 through 35.2-73.20 related to Telecommunication Towers
and replace with Sections 35.2-73.1 through 35.2-73.26, Telecommunications
Ordinance
I. PETITIONER
City of Lynchburg, 900 Church Street, Lynchburg, Virginia 24504
Representative(s): J. Patrick Taves, Greehan, Taves & Pandak, PLLC, Tom Martin, AICP,
City Planner
Property Owner:
N/A
II. LOCATION
The Zoning Ordinance amendments would apply to any telecommunication facility in the R-C, R-
1, R-2, R-3, R-4, B-1, B-3, B-4, IN-1, IN-2, I-1, I-2 or I-3 Districts
III. PURPOSE
The purpose of the amendments is to bring the City’s Zoning Ordinance into compliance with
State & Federal Law.
IV. SUMMARY
The City’s Comprehensive Plan 2013-2030 recognizes that in order for the City to continue in
its role as the economic engine for the region it must keep pace with changes in technology
and telecommunications and that in order to attract businesses it must capitalize on
comprehensive telecommunication services. (
p.9, 83)
The City’s Telecommunications Ordinance was last updated in December 1997 with minor
revisions in January 2000.
Amendments to the Virginia Code in 2017, 2018 & 2020 regarding telecommunication
facilities established new terminology and rules.
Federal Law on telecommunication facilities is evolving.
The Telecommunication Ordinance would establish three type of facilities: Small Cell
Facilities, Administrative Review-Eligible Projects (AREP’s) and Standard Process Projects
The Telecommunications Ordinance would establish review procedures for each type of
telecommunication facility.
Setbacks for similar structures such as flag poles, light poles and utility poles must be
established to be compliant with State & Federal Law.
Small Cell Facilities located in the City’s right-of-way or on City property regulated by
separate City Code and proposed amendments do not apply to these facilities.
Planning Commission: Zoning Ordinance Amendments – December 9, 2020 2
The Planning Division recommends approval of the Zoning Ordinance Amendments.
V. FINDINGS OF FACT
1. Comprehensive Plan. The City’s Comprehensive Plan 2013-2030 recognizes that in order for
the City to continue in its role as the economic engine for the region it must keep pace with
changes in technology and telecommunications and that in order to attract businesses it must
capitalize on comprehensive telecommunication services. (p.9, 83)
The purpose and intent of the proposed amendments is to facilitate the provision of
telecommunication services, recognizing that telecommunication facilities are a necessary part
of communication networks while protecting property from adverse impacts.
2. Zoning. The Telecommunications Ordinance was last updated in December 1997 with minor
revisions in January 2000.
3. Proffers: N/A
4. Board of Zoning Appeals (BZA). N/A
5. Surrounding Area. N/A
6. Site Description. N/A
7. Proposed Use of Property. N/A
8. Traffic, Parking and Public Transit. N/A
9. Stormwater Management. N/A
10. Emergency Services: The Telecommunication Ordinance would require technical evidence
from a radio frequency engineer that proposed facilities would not interfere with pre-existing or
future communication facilities for Public Safety Radio Services.
11. Impact. The proposed Zoning Ordinance Amendments would establish regulations for
telecommunication facilities in the City of Lynchburg.
Small Cell Facilities – Permitted in all Zoning Districts
(i) each antenna is or could fit in an imaginary enclosure of no more than six (6) cubic feet
and
(ii) all other wireless equipment associated with the facility has a cumulative volume of no
more than twenty-eight (28) cubic feet.
Administrative Review-Eligible Project (AREP’s) – Permitted in all Zoning Districts
(i) a new structure that is not more than fifty (50) feet above the ground level or not more
than ten (10) feet above the tallest existing utility pole within five hundred (500) feet.
(ii) not located in a local, state or federal historic district
(iii) designed to support small cell facilities
(iv) the colocation on any existing structure that is not a small cell facility
Planning Commission: Zoning Ordinance Amendments – December 9, 2020 3
Standard Process Project – Permitted or Conditional Use Permit
(i) any project that is not an administrative review eligible project
PERMITED USES BY DISTRICT & SETBACKS
R-C, R-1, R-2, R-3, R-4, IN-1 & B-4 Districts
Fifty (50) feet or less – Permitted by right
Greater than fifty (50) feet, but no greater than one hundred fifty (150) feet – CUP Required
Setback – Minimum height of the structure
Setback – Structure less than thirty-five (35) feet - 0
B-1 District
One hundred (100) feet or less – Permitted by Right
Greater than one hundred (100) feet but no greater than one hundred fifty (150) feet – CUP
Required
Setback – structure less than fifty (50) feet – minimum setback of the B-1 District
Setback – structure greater than fifty (50) feet – minimum of ½ the height of the structure
Setback – structure adjacent to R-C, R-1, R-2, R-3, R-4, IN-1 or B-4 – minimum height of the
structure
Setback – Structure less than thirty-five (35) feet - 0
B-3, B-5, IN-2, I-1, I-2 & I-3 Districts
One hundred fifty (150) feet or less – Permitted by Right
Greater than one hundred fifty (150) feet – CUP Required
Setback – structure less than fifty (50) feet – minimum setback of the District
Setback – structure greater than fifty (50) feet – minimum of ½ the height of the structure
Setback – structure adjacent to R-C, R-1, R-2, R-3, R-4, IN-1 or B-4 – minimum height of the
structure
Setback – Structure less than thirty-five (35) feet - 0
12. Technical Review Committee. N/A
VI. PLANNING DIVISION RECOMMENDATION
Based on the preceding Findings of Fact, the Planning Commission
recommends to City Council approval of amending the Zoning Ordinance
by adopting Section 35.2-61.2 (d) Flag Poles, Light Poles & Utility Poles
and approval of repealing Sections, 35.2-73.1 through 35.2-73.20 related to
Telecommunication Towers and replacing with Sections 35.2-73.1 through
35.2-73.26, Telecommunications Ordinance
Planning Commission: Zoning Ordinance Amendments – December 9, 2020 4
This matter is respectfully offered for your consideration.
William T. Martin, AICP
City Planner
pc: Dr. Reid Wodicka, Interim City Manager
Mr. Kent L. White, Interim Deputy City Manager
Mr. Walter C. Erwin, City Attorney
Mr. J. Lee Newland, City Engineer
Ms. Cynthia Kozerow, Lynchburg Police Department
Battalion Chief Thomas Goode, Fire Marshal
Mr. Doug Saunders, Building Official
Mr. Kevin Henry, Zoning Administrator
Mr. J. Patrick Taves, Gr eehan, Taves & Pandak, PLLC
VII. ATTACHMENTS
1. Zoning Ordinance Amendment - Section 35.2-61.2 (d) Flag Poles, Light Poles & Utility
Poles
2. Zoning Ordinance Amendment - Sections 35.2-73.1 through 35.2-73.26,
Telecommunications Ordinance
3. Power Point Presentation – December 9, 2020
4. Planning Commission Memorandum – November 11, 2020
5. Power Point Presentation – November 11, 2020
35.2‐6
(a) M
1. B
o
a.
b.
c.
2. Ex
a.
b.
c.
61.2 Addition
Measurement
uilding Heigh
pposite the m
The highest
roof
The deck lin
The mean h
and ridge o
xceptions to
Buildings w
(35) feet or
ground surf
Large Corne
the height o
midpoint of
Through Lo
from the cr
provided th
extend bac
(see followi
nal Height Re
of Height
ht. Building he
middle of the
t point of roo
ne of a mansa
height level b
of a gable, hip
Measuremen
with Large Set
r more, buildi
face along the
er Lots. On co
of the buildin
f the building
ots. For lots ex
rown of eithe
hat the maxim
k from the rig
ing illustratio
egulations
eight is the ve
front of the b
f surface of a
ard roof
etween eave
or gambrel r
nt of Building
tbacks. Wher
ng height sha
e front of the
orner lots exc
g may be me
g facing the ap
xtending thro
r street at the
mum height th
ght‐of‐way of
n).
ertical distanc
building to:
a flat
s
roof
g Height
e a building is
all be measure
e building.
ceeding twent
asured from
pplicable stre
ough from str
e midpoint of
hat would be
f such street n
ce measured
s set back fro
ed from the a
ty thousand (
the crown of
eet.
reet to street,
f the building
permitted ba
not less than
from the cro
om the street
average eleva
(20,000) squa
f either street
, the height m
facing the ap
ased on the lo
one hundred
wn of the str
line thirty‐fiv
ation of finish
are feet in are
t at the
may be measu
pplicable stre
ower street s
fifty (150) fe
eet
ve
hed
ea,
ured
et,
hall
eet
d.
Properties
district abu
at the horiz
shall apply t
property lin
twenty (20)
Abutting R‐1
tting propert
zontal midpoi
to any portio
ne (see follow
) feet in heigh
, R‐2 or R‐3 D
ty zoned R‐1,
nt of the buil
n of the build
wing illustratio
ht at the front
Districts. For l
R‐2 or R‐3, he
ding wall faci
ding located w
on). In no cas
t building line
lots in any R‐4
eight shall be
ing each abut
within one‐hu
e shall a build
e.
4, B‐3, B‐5, IN
e measured fr
tting resident
undred‐feet (1
ding be requi
N‐1, I‐ 1, I‐2 or
rom natural g
tial property a
100) feet of t
red to be less
r I‐3
rade
and
he
s than
(b) He
1. Th
ro
oc
an
m
ap
lig
pr
a.
b.
c.
2.
3.
(c) Tal
ap
ho
pro
the
(se
eight Excepti
he height limi
oof line: flag p
ccupancy, chi
nd television a
echanical app
ppurtenances
ghting rods an
rovided that:
Such a feat
intended to
with the ro
The total ar
fifteen (15)
Such featur
and related
material as
Parapet w
a
on which th
No sign, na
upon or att
district heig
ll Buildings in
partment build
ospital, may b
ovided that t
e street, lot o
ee following i
ons for Certa
tations shall
poles, church
mneys, ventil
antennas for
purtenances (
s, plumbing ve
nd telecomm
ure shall be e
o serve, but in
of.
rea covered b
percent of th
res as water t
d appurtenanc
the main wa
alls may exten
hey rest.
me plate, dis
tached to any
ght limitation
n the R‐4, B‐1
dings, public
e erected to
he portion of
or required se
llustration).
ain Structures
not apply to t
spires/steepl
lators, skyligh
the use of re
(including, bu
ents, exhaust
unications co
erected only t
n no case mor
by such featur
he area of the
tanks, cooling
ces, shall be e
lls of the buil
nd not more t
play or adver
y chimney, tow
s.
1, B‐3 and IN‐
or semi‐publi
not more tha
f such building
etback line, on
s
the following
les, belfries, c
hts, water tan
sidents of dw
ut not limited
t vents, HVAC
onnections) us
to a height ne
re than fiftee
res shall not e
e plane of roo
g towers and b
enclosed with
ding on whic
than five (5) f
rtising device
wer, tank or o
1 Districts. In
ic buildings su
an one hundre
g more than f
ne (1) foot fo
g features pro
cupolas and d
nks, bulkhead
welling units in
to solar ener
C equipment,
sually carried
ecessary to ac
n (15) feet ab
exceed in hor
of upon which
bulkheads, bu
hin walls cons
h they are loc
feet above th
of any kind w
other structu
n the R‐4, B‐1,
uch as a relig
ed twenty‐fiv
forty (40) fee
r each one (1
ojecting above
domes not use
ds or similar fe
n apartments
rgy panels an
electrical con
d above the ro
ccomplish the
bove its lowes
rizontal cross‐
h they are loc
ut not solar e
structed of th
cated.
e limiting hei
whatsoever sh
re which exte
, B‐3 and IN‐1
ious institutio
ve (125) feet i
et in height sh
1) foot of such
e the
ed for human
eatures, radio
s, and necessa
d related
nnections,
oof level
e purpose it is
st point of co
‐ sectional ar
cated.
energy panels
he same
ght of the bu
hall be inscrib
ends above th
1 districts,
on, school, lib
in height;
hall set back f
h additional h
n
o
ary
s
ontact
ea
s
uilding
bed
he
brary,
from
height
(d) Flag poles, Light Poles and Utility Poles
1. There shall be no setback requirement for any Flag Pole, Light Pole or Utility Pole that is
thirty‐five (35) feet or less in height.
2. Any Flag Pole, Light Pole, or Utility Pole greater than thirty‐five (35) in height in the R‐C, R‐
1, R‐2, R‐3, R‐4, IN‐1 or B‐4 District shall be required to set back a distance from all
property lines at least the height of the pole.
3. Any Flag Pole, Light Pole, or Utility Pole greater than thirty‐five (35) in height in the B‐1, B‐
3, B‐5, IN‐2, I‐1, I‐2 or I‐3 District that is on a parcel adjacent to any parcel that is zoned R‐
C, R‐1, R‐2, R‐3, R‐4, IN‐1 or B‐4 shall be set back a distance at least the height of the pole
from the R‐C, R‐1, R‐2, R‐3, R‐4, IN‐1 or B‐4 District.
4. Any Flag Pole, Light Pole, or Utility Pole in the B‐1, B‐3, B‐5, IN‐2, I‐1, I‐2 or I‐3 District that
is greater than thirty‐five (35) feet in height but less than fifty (50) feet in height shall be
required to set back a distance from all property lines at least the minimum applicable
setback for the district in which it is located.
5. Any Flag Pole, Light Pole, or Utility Pole in the B‐1, B‐3, B‐5, IN‐2, I‐1, I‐2 or I‐3 District that
is a height greater than fifty (50) feet shall be required to set back a distance from all
property lines at least one‐half the height of the pole.
6. Setback requirements for Flag Poles, Light Poles, and Utility Poles shall be measured from
the base of the pole to the property lines of the parcel on which the pole is located.
1
1
Updated to 2
October 30, 3
2020 4
ORDINANCE NO. ____-________ 5
6
7
AN ORDINANCE REPEALING CHAPTER 35.2-73, WHICH COMPRISES §§ 35.2-73.1 8
THROUGH 35.2-73.20, AND ADOPTING A NEW CHAPTER 35.2-73, WHICH 9
COMPRISES §§ 35.2-73.1 THROU GH 35.2-73.26, PERTAINING TO 10
TELECOMMUNICATIONS FACILITIES. 11
BE IT ORDAINED, by the City Council of the City of Lynchburg, Virginia, that 12
Chapter 35.2-73 of the Code of the City of Lynchburg, Virginia, is hereby adopted as 13
follows: 14
§ 35.2–73 TELECOMMUNICATIONS FACILITIES 15
§ 35.2–73.1 Purpose and Intent. 16
The purpose and intent of this chapter is to create and implement regulations and requirements for 17
the placement, construction, modification, and removal of wireless support structures, wireless 18
facilities, and base stations in order to protect the health, safety, and welfare of the public, while at 19
the same time not unreasonably interfering with the development of a competitive wireless 20
telecommunications marketplace in the City. Specifically, the purposes of this chapter are: 21
(a) To facilitate the provision of wireless telecommunications services to the residents 22
and businesses of the City in an orderly fashion; 23
(b) To recognize and acknowledge that wireless telecommunications facilities, 24
including their support structures and related equipment, have become a necessary 25
part of today’s personal and commercial communications networks; 26
(c) To regulate the location of wireless suppor t structures, wireless facilities, and base 27
stations in the City; 28
(d) To protect residential, commercial, and industrial areas and land uses from any 29
significant potential adverse impact that may result from the establishment and 30
operation of wireless support structures, wireless facilities and base stations; 31
2
(e) To implement the provisions of the City’s Comprehensive Plan with respect to the 1
establishment of wireless support structures, wireless facilities, and base stations in 2
the City; 3
(f) To minimize, when possible, the adve rse visual impact of wireless support 4
structures, wireless facilities, and base stations through careful design, siting, 5
landscaping, and innovative camouflaging techniques to enhance the ability of such, 6
support structures, facilities, and base stations to be compatible with residential, 7
commercial, and industrial uses; 8
(g) To promote and encourage the co -location on and around wireless support 9
structures of multiple wireless facilities and base stations in order to reduce, when 10
possible, the need for additional such structures and facilities; 11
(h) To promote and encourage the locati on of wireless support structures, wireless 12
facilities, and base stations in commercial and industrial areas, rather than 13
residential areas; 14
(i) To ensure that wireless support structures, wireless facilities, and base stations are 15
compatible with other land uses in the vicinity; 16
(j) To allow wireless support structures, wire less facilities, and base stations as a 17
matter of right, where appropriate, and with minimal administrative requirements 18
when the size, design, and location of such support structures, facilities, and base 19
stations does not result in any significant adverse impacts to other uses or any 20
significant adverse impact to the property values of nearby properties; 21
(k) To provide greater scrutiny of request s for wireless support structures, wireless 22
facilities, and base stations when their size, design, and location may result in 23
greater impacts on surrounding land uses and property values in order to assure that 24
adverse impacts of such structures, facilities, and base stations and any adverse 25
impact on the values of nearby properties are mitigated and minimized; 26
(l) To encourage the providers of wirele ss telecommunications services to utilize 27
smaller wireless support structures, wireless facilities, and base stations in order to 28
reduce the overall impact of any single wireless support structure or facility on the 29
surrounding area; 30
(m) To reduce the need for larger and ta ller wireless support structures, wireless 31
facilities, and base stations through the encouragement of co-location on any new 32
structures as well as the installation, where feasible, of such facilities onto existing 33
structures; 34
3
(n) To avoid potential damage to the use a nd enjoyment of property caused by wireless 1
support structures, wireless facilities, and base stations by ensuring that such 2
structures, facilities, and stations are soundly, safely, and carefully designed; 3
constructed, modified, and maintained, and, when no longer structurally sound, 4
removed; and 5
(o) To require the removal of wireless support structures, wireless facilities, and base 6
stations that are no longer used to support wireless facilities and no longer retain 7
any other legitimate purposes. 8
§ 35.2–73.2 Definitions. 9
As used in this Ordinance, unless the context requires a different meaning: 10
“Administrative review-eligible project” means a project that provides for: 11
1. The installation or construction of a new stru cture that is not more than 50 feet above 12
ground level, provided that the structure with attached wireless facilities is (i) not more than 10 13
feet above the tallest existing utility pole located within 500 feet of the new structure within the 14
same public right-of-way or within the existing line of utility poles; (ii) not located within the 15
boundaries of a local, state, or federal historic district; (iii) not located inside the jurisdictional 16
boundaries of a locality having expended a total amount equal to or greater than 35 percent of its 17
general fund operating revenue, as shown in the most recent comprehensive annual financial 18
report, on undergrounding projects since 1980; and (iv) designed to support small cell facilities; 19
or 20
2. The co-location on any existing structure of a wireless facility that is not a small cell 21
facility; 22
3. The term “administrative review-eligible project” shall include eligible facilities requests 23
as that term is defined by federal law in 47 Code of Federal Regulations 1.6100. 24
“Antenna” means communications equipment that transmits or receives electromagnetic radio 25
signals used in the provision of any type of wireless communications services. 26
“Base station” means a station that includes a structure that currently supports or houses an 27
antenna, transceiver, coaxial cables, power cables, or associated equipment at a specific site that 28
is authorized to communicate with mobile stations, generally consisting of radio transceivers, 29
antennas, coaxial cables, power supplies, and other associated electronics. 30
“City” means the City of Lynchburg, Virginia. 31
4
“Co-locate” means to install, mount, maintain, modify, operate, or replace a wireless facility on, 1
under, within, or adjacent to a base station, building, existing structure, utility pole, or wireless 2
support structure. “Co-location” has a corresponding meaning. 3
“Department” means the Virginia Department of Transportation. 4
“Existing structure” means any structure that is installed or approved for installation at the time 5
a wireless services provider or wireless infrastructure provider provides notice to the City or the 6
Department of an agreement with the owner of the structure to co-locate equipment on that 7
structure. “Existing structure” includes any structure that is currently supporting, designed to 8
support, or capable of supporting the attachment of wireless facilities, including towers, 9
buildings, utility poles, light poles, flag poles, signs, and water towers. 10
“Micro-wireless facility” means a small cell facility that is not larger in dimension than 24 inches 11
in length, 15 inches in width, and 12 inches in height and that has an exterior antenna, if any, not 12
longer than 11 inches. 13
“New structure” means a wireless support structure that has not been installed or constructed, or 14
approved for installation or construction, at the time a wireless services provider or wireless 15
infrastructure provider applies to the City for any required zoning approval. 16
“New wireless support structure” has the same meaning as “new structure.” 17
“Project” means (i) the installation or construction by a wireless services provider or wireless 18
infrastructure provider of a new structure or (ii) the co-location on any existing structure of a 19
wireless facility that is not a small cell facility. “Project” does not include the installation of a 20
small cell facility by a wireless services provider or wireless infrastructure provider on an 21
existing structure to which the provisions of Code Virginia § 15.2-2316.4 apply. 22
“Small cell facility” means a wireless facility that meets both of the following qualifications: 23
(i) each antenna is located inside an enclosure of no more than six cubic feet in volume, or, in the 24
case of an antenna that has exposed elements, the antenna and all of its exposed elements could 25
fit within an imaginary enclosure of no more than six cubic feet; and 26
(ii) all other wireless equipment associated with the facility has a cumulative volume of 27
no more than 28 cubic feet, or such higher limit as is established by the Federal Communications 28
Commission. 29
The following types of associated equipment are not included in the calculation of 30
equipment volume: electric meter, concealment, telecommunications demarcation boxes, back-31
5
up power systems, grounding equipment, power transfer switches, cut-off switches, and vertical 1
cable runs for the connection of power and other services. 2
“Standard process project” means any project that is not an administrative review-eligible 3
project. 4
“Utility pole” means a structure owned, operated, or owned and operated by a public utility, local 5
government, or the Commonwealth that is designed specifically for and used to carry lines, 6
cables, or wires for communications, cable television, or electricity. 7
“Water tower” means a water storage tank, or a standpipe or an elevated tank situated on a 8
support structure, originally constructed for use as a reservoir or facility to store or deliver water. 9
“Wireless facility” means equipment at a fixed location that enables wireless communications 10
between user equipment and a communications network, including (i) equipment associated with 11
wireless services, such as private, broadcast, and public safety services, as well as unlicensed 12
wireless services and fixed wireless services, such as microwave backhaul, and (ii) radio 13
transceivers, antennas, coaxial, or fiber optic cable, regular and backup power supplies, and 14
comparable equipment, regardless of technological configuration. 15
“Wireless infrastructure provider” means any person that builds or installs transmission 16
equipment, wireless facilities, or wireless support structures, but that is not a wireless services 17
provider. 18
“Wireless services” means (i) “personal wireless services as defined in 47 U.S.C. § 332(C)(7)(i); 19
“personal wireless service facilities” as defined in 47 U.S.C. § 332(C)(7)(ii); including 20
commercial mobile services as defined in 47 U.S.C. § 332(d), provided to personal mobile 21
communications devices through wireless facilities, and (iii) any other fixed or mobile wireless 22
service, using licensed or unlicensed spectrum, provided using wireless facilities. 23
“Wireless services provider” means a provider of wireless services. 24
“Wireless support structure” means a freestanding structure, such as a monopole, tower, either 25
guyed or self-supporting, or suitable existing structure or alternative structure designed to 26
support or is capable of supporting wireless facilities. “Wireless support structure” does not 27
include any telephone or electrical utility pole or any tower used for the distribution or 28
transmission of electrical service. 29
§ 35.2–73.3 Applicability. 30
The provisions of this chapter shall apply to all land within the jurisdictional boundaries of the 31
City of Lynchburg, provided, however, that the provisions of this chapter shall not apply to any 32
6
small cell facility within the City’s right-of-way or on any City-owned property. Small cell 1
facilities within the City’s right-of-way or on any City-owned property are regulated by §§ 35–2
28, 35–28.1, 35–28.2, 35–28.3, 35–28.4, 35–28.5, 35–28.6, and 35–28.7 of the City Code. 3
4
§ 35.2–73.4 Small Cell Facilities. 5
A. Review of Applications for Small Cell Facilities. No conditional use permit or 6
its equivalent shall be required in the City for a small cell facility to be installed on an existing 7
structure if a wireless services provider or wireless infrastructure provider has: (1) permission 8
from the owner to co-locate equipment on that structure; and (2) has notified the City that such 9
permission exists. A permit for the installation of a small cell facility shall be required before a 10
small cell facility may be installed on an existing structure. 11
B. Application Requirements for Small Cell Facilities. Applications filed by 12
a wireless services provider or wireless infrastructure provider for administrative review of a 13
small cell facility on an existing structure shall include the following: 14
1. A valid electronic mail address for the applicant. 15
2. Written proof that the owner of the existing structure has given the applicant 16
consent to install the small cell facility as proposed. 17
3. The name, address, telephone number, and electronic mail address of the 18
applicant. If the applicant is not the owner of the parcel(s) of land on which the wireless 19
support structure, wireless facility, and/or base station is proposed to be located, then the 20
applicant shall provide written consent of the owner, and the name, address, telephone 21
number, and the electronic mail address of the owner. 22
4. The valuation map number and address of the parcel of land on which the wireless 23
support structure, wireless facility, and/or base station is proposed to be located. 24
5. A plan, drawn to scale, depicting the location and elevation of any small cell 25
facility that is the subject of the application, with engineering drawings showing the actual 26
size of the small cell facility and each component thereof, from which the City can 27
reasonably determine whether the proposed facility meets the definition of a small cell 28
facility. 29
6. Drawings showing where and how the small cell facility is proposed to be 30
attached to the existing structure. 31
7
7. Written, technical evidence from a radio frequency engineer that the proposed 1
facilities meet the standards set forth in this Ordinance, including, but not limited to, the 2
requirements set forth in § 35.2–73.13 (Interference With Public Safety Radio Services) 3
and will not materially interfere with other pre-existing communications facilities or with 4
future communications facilities that have already been designed and planned for a 5
specific location or that have been reserved for future public safety communications 6
facilities. 7
8. Evidence relating to any other factors the applicant believes are relevant to the 8
City’s consideration of whether the applicant’s proposed small cell facility should be 9
approved. 10
9. Payment of an application processing fee of $100.00 each for up to five small cell 11
facilities on a permit application, and payment of a fee of $50 for each additional small cell 12
facility on that permit application. 13
C. Multiple Requests on a Single Application for Small Cell Facilities. Applications 14
filed by a wireless services provider or wireless infrastructure provider for a small cell facility to 15
be co-located on an existing structure may include multiple such permit requests on a single 16
application. 17
D. Notification of Incomplete Applic ation for Small Cell Facilities. If an 18
incomplete initial or resubmitted application is filed for a small cell facility to be installed on an 19
existing structure, then the City shall notify the applicant by electronic mail that the application 20
is incomplete and shall specify any missing information and documents in accordance with the 21
following: 22
1. for an initial application, the City shall notify the applicant by electronic 23
mail within ten (10) calendar days after receipt of a valid electronic mail address and the 24
application that the application is incomplete and shall specify in that notification any 25
missing information and documents; otherwise, the application shall be deemed 26
complete; and 27
2. for a resubmitted application for a sm all cell facility to be installed on an 28
existing structure, the City shall notify the applicant by electronic mail within ten (10) 29
calendar days after the application is resubmitted whether the application is incomplete 30
and shall specify in that notification any missing information and documents; otherwise, 31
the application shall be deemed complete. 32
E. Deadline for Approval or Disapproval of Small Cell Facilities. The City shall 33
approve or disapprove any application filed by a wireless services provider or wireless 34
infrastructure provider proposing a small cell facility to be installed on an existing structure in 35
accordance with the following: 36
8
1. any such application shall be approv ed or disapproved in writing within 1
sixty (60) calendar days after receipt of the complete application; 2
2. if the applicant files an incomplete initial or resubmitted application and 3
the City notifies the applicant of its incompleteness in accordance with the applicable 4
timeframes set forth in subsection D above (Notification of Incomplete Application for 5
Small Cell Facilities), then the time within which the City must approve or disapprove 6
such an initial application shall be tolled for the period from the date of the submission of 7
the initial incomplete application to the date on which the applicant files a complete 8
application; 9
3. if the applicant files an incomp lete resubmitted application, the time 10
within which the City must approve or disapprove a resubmitted application shall also be 11
tolled for the period from the date of submission of the resubmitted incomplete 12
application to the date on which the applicant resubmits a complete application; 13
4. the initial sixty (60) calendar-day period for the City to approve or 14
disapprove an application for a small cell facility proposed to be installed on an existing 15
structure may be extended by the City in writing for a period not to exceed an additional 16
30 days; 17
5. any such application for a small cell f acility proposed to be installed on an 18
existing structure shall be deemed approved if the City fails to act within the timeframes 19
set forth in this section; 20
6. any disapproval of an application fo r a small cell facility on an existing 21
structures shall be in writing and accompanied by an explanation for the disapproval; and 22
7. approval of a permit for any such sm all cell facility application shall not 23
be unreasonably conditioned, withheld, or delayed. 24
F. Grounds for Disapproval of Small Cell Facilities. The City may disapprove an 25
application filed by a wireless services provider or wireless infrastructure provider proposing the 26
installation of a small cell facility on an existing structure for any of the following reasons: 27
1. Material potential interference with other pre-existing communications 28
facilities or with future communications facilities that have already been designed and 29
planned for a specific location or that have been reserved for future public safety 30
communications facilities; 31
2. The safety of the public or ot her critical public service needs; 32
9
3. Only in the case of an installati on on or in publicly owned or publicly 1
controlled property, excluding privately owned structures where the applicant has an 2
agreement for attachment to the structure, aesthetic impact or the absence of all required 3
approvals from all departments, authorities, and agencies with jurisdiction over such 4
property; 5
4. Conflict with a City ordinance adopted pursuant to § 15.2-2306, or 6
pursuant to local charter on a historic property that is not eligible for the review process 7
established under 54 U.S.C § 306108. 8
G. Small Cell Facilities on New Structur es. Any application for the installation 9
of a small cell facility on a new structure shall require any approval that may be required by this 10
chapter for that new structure as either an administrative review-eligible project or a standard 11
process project. 12
§ 35.2–73.5 Administrative Review-Eligible Projects. 13
A. Review of Administrative Review -Eligible Projects. Administrative 14
review-eligible projects shall not require that a conditional use permit or its equivalent be 15
obtained for the installation or construction of such a project; but administrative review shall be 16
required for the issuance of any zoning approval, or an acknowledgment that zoning approval is 17
not required, for such a project. 18
B. Application Requirements for Admi nistrative Review-Eligible Projects.19
Applications for wireless support structures, wi reless facilities, and/or base stations that 20
comprise administrative review-eligible projects shall require the following: 21
1. The name, address, telephone number, and electronic mail address of the 22
applicant. If the applicant is not the owner of the land on which the wireless support 23
structure, wireless facility, and/or base station is proposed to be located, then the 24
applicant shall provide written consent of the owner, and the name, address, telephone 25
number, and the electronic mail address of the owner. If the land on which the proposed 26
wireless support structure, wireless facility, or base station is proposed to be located is, in 27
whole or in part, within the City’s right-of-way, then the applicant shall be required to 28
secure written consent from the City for the proposed wireless support structure, wireless 29
facility, or base station to be located within the City’s right-of-way prior to filing such 30
application and shall include such written consent as part of any such application. 31
2. An affirmative written statement signed by the applicant and the owner 32
that the applicant and the owner are aware of and agree to comply with the provisions of 33
this Zoning Ordinance set forth in § 35.2-73.24 (Abandonment) regarding removal and 34
dismantlement of all wireless support structures, wireless facilities, base stations, and 35
10
related equipment in the event such a structure, facility, base station, or related equipment 1
is no longer in use. 2
3. The valuation map number and address of the parcel of land on which the 3
wireless support structure, wireless facility, and/or base station is proposed to be located. 4
4. Written, technical evidence from a radio frequency engineer that the 5
proposed facilities meet the standards set forth in this Ordinance, including, but not 6
limited to, the requirements set forth in § 35.2–73.13 (Interference With Public Safety 7
Radio Services), and will not materially interfere with other pre-existing communications 8
facilities or with future communications facilities that have already been designed and 9
planned for a specific location or that have been reserved for future public safety 10
communications facilities. 11
5. Written, technical evidence from an el ectrical engineer that the proposed 12
site of the wireless support structure, wireless facility, and/or base station does not pose a 13
risk of explosion, fire, or other danger due to its proximity to volatile, flammable, 14
explosive, or hazardous materials such as propane, gasoline, natural gas, or corrosive or 15
other dangerous chemicals. 16
6. A site plan, as required by § 35.2-14.2 (Site Plans) of this Ordinance. 17
7. A map showing the location and height of every utility pole within 500 18
feet of and within the same public right-of-way or within the existing line of utility poles 19
as the proposed wireless support structure or wireless facility. 20
8. In the case of an administrative review-eligible project proposing a new 21
structure, a detailed explanation of how the proposed new structure is designed to support 22
small cell facilities. 23
9. A copy of any approval granted by a federal agency, including any 24
conditions imposed by that agency, regarding the proposed wireless support structure, 25
wireless facility, and/or base station, provided, however, that this requirement shall not 26
apply to applications for small cell facilities. 27
10. Evidence relating to any other factors th e applicant believes are relevant to 28
the City’s consideration of whether the applicant’s proposed small cell facility should be 29
approved. 30
11. The applicable application fee fo r the proposed administrative review-31
eligible project. 32
11
12. Evidence that the applicant has gi ven written notice to all adjacent 1
landowners regarding the applicant’s intent to file the application at least 15 days before 2
the filing of any application to locate a new structure on the subject property. 3
C. Fee Limitations for Administrative Review-Eligible Projects. When an 4
application for an administrative review-eligible project is filed, the following provisions 5
shall apply to the fee that must be paid by the applicant: 6
1. The fee must be reasonable. 7
2. The fee charged by the City sha ll not include direct payment or 8
reimbursement of third-party fees charged on a contingency basis or a result-based 9
arrangement. 10
3. The City shall not charge market-b ased or value-based fees for the 11
processing of any such application. 12
4. Upon request, the City shall, within a reasonable amount of time after such 13
request, provide the applicant with the cost basis for any fee charged by the City for an 14
administrative review-eligible project. 15
D. Assessment of Fees for Administra tive Review-Eligible Projects. Each 16
application for a wireless support structure, wireless facility, or base station that constitutes an 17
administrative review-eligible project shall be accompanied by payment of a $500 fee for the 18
processing of the application 19
E. Processing Applications for Admini strative Review-Eligible Projects. The 20
following provisions set forth the process that shall apply to any application for an administrative 21
review-eligible project: 22
1. Prior to accepting any application for an administrative review-eligible 23
project, the City shall first determine that the application includes the applicant’s 24
electronic mail address. In the event the application does not include the applicant’s 25
electronic mail address, the City shall not accept it for filing 26
2. If the application is in complete, but includes an electronic mail address for 27
the applicant, then within ten (10) business days after actual receipt of the application, the 28
City shall accept the application and notify the applicant by electronic mail that the 29
application is incomplete and shall specify any additional information, documents and 30
materials required to complete the application. 31
12
3. If the application is incomplete and does not include an electronic mail 1
address for the applicant when it was filed, the City shall use reasonable means to contact 2
the applicant and request the applicant’s electronic mail address. Within ten (10) days 3
after actual receipt of the applicant’s electronic mail address, the City shall notify the 4
applicant by electronic mail that the application is incomplete and shall specify any 5
additional information, documents and materials required to complete the application. 6
4. If an incomplete initial or resubmitted application is filed for an 7
administrative review-eligible project, then the City shall notify the applicant by 8
electronic mail that the application is incomplete and shall specify any missing 9
information and documents and materials in accordance with the following: 10
(a) for an initial application, the City shall notify the applicant by 11
electronic mail within ten (10) business days after the application is submitted 12
whether the application is incomplete and shall specify in that notification any 13
missing information, documents and materials; otherwise, the application will be 14
deemed complete; and 15
(b) for a resubmitted application, th e City shall notify the applicant by 16
electronic mail within ten (10) days after the application is resubmitted whether 17
the application is incomplete and shall specify in that notification any missing 18
information, documents and materials; otherwise, the application will be deemed 19
complete. 20
5. If the City fails to timely provide th e applicant with notice that the initial 21
application or a resubmitted application is incomplete in accordance with the foregoing 22
provisions, as applicable, the application shall be deemed complete. 23
6. Except as provided for in subsection 7 below, the City shall approve or 24
disapprove a complete application in accordance with the following: 25
(a) For a new structure, within 150 days after receipt of the completed 26
application minus any days that expired from the date of filing of the application to the 27
date any notice of incompleteness was given to the applicant by the City; 28
(b) For the modification of an ex isting wireless support structure or 29
base station that involves the co-location of new transmission equipment, the removal of 30
transmission equipment, or the replacement of transmission equipment, but does not 31
substantially change, as that term is defined by federal law, the physical dimensions of 32
such support structure or base station, within 60 days after receipt of the application 33
provided, however, that this period shall be tolled during any time after which the 34
applicant has been informed that the application is not complete and is provided with the 35
13
grounds for its incompleteness by the City, and when the applicant files all requested 1
information and items necessary to make the application complete; 2
(c) For the co-location on an existi ng support structure of any wireless 3
facility that is not a small cell facility and substantially changes, as that term is defined by 4
federal law, the physical dimensions of such support structure or any related base station, 5
within the lesser of 90 days after receipt by the City of the completed application, minus 6
any days that expired from the date of filing of the application to the date any notice of 7
incompleteness was given to the applicant by the City; and 8
(d) For any wireless facility that is not a small cell facility on a new 9
structure, within the lesser of 150 days after receipt of a completed application, minus 10
any days that expired from the date of filing of the application to the date any notice of 11
incompleteness was given to the applicant by the City . 12
7. Any period specified in subsection 6(a) , 6(b), 6(c), or 6(d) above within 13
which the City must approve or disapprove an application may be extended by written 14
agreement of the applicant and the City. 15
8. A complete application for an admini strative review-eligible project shall 16
be deemed approved if the City fails to approve or disapprove such application within the 17
applicable period specified in subsection 6(a), 6(b), 6(c), or 6(d) above or within any 18
agreed extension thereof pursuant to subsection 7 above. 19
9. If the City disapproves an applicatio n for an administrative review-eligible 20
project: 21
(a) the City shall provide the applic ant with a written statement listing 22
all of the reasons for the disapproval; and 23
(b) if the City is aware of any modi fications to the project as described 24
in the application that if made would permit the City to approve the proposed 25
project, the City shall identify them in the written statement provided under 26
subsection 9(a) above. The City’s subsequent disapproval of an application for a 27
project that incorporates the modifications identified in such a written statement 28
may be used by the applicant as evidence that the City’s subsequent disapproval 29
was arbitrary or capricious in any appeal of the City’s subsequent disapproval. 30
10. If an application for an admini strative review-eligible project is 31
disapproved, the City’s disapproval shall: 32
14
(a) not unreasonably discriminate between the applicant and other 1
wireless services providers, wireless infrastructure providers, providers of telecommunications 2
services, and other providers of functionally equivalent services; and 3
(b) be supported by substantial r ecord evidence contained in a written 4
record publicly released within 30 days following the disapproval. 5
F. Limitations on Disapprovals of Ad ministrative Review-Eligible Projects.6
Whenever the City receives, considers, a nd processes a complete application for an 7
administrative review-eligible project, it shall not disapprove any such application on the basis 8
of: 9
(a) the applicant’s business decisi on with respect to its designed 10
service, customer demand, or quality of service to or from a particular site; 11
(b) the applicant’s specific need for the project, including the 12
applicant’s desire to provide additional wireless coverage or capacity; or 13
(c) the wireless facility technology selected by the applicant for use at 14
the project. 15
G. Disapproval Considerations for Ad ministrative Review-Eligible Projects.16
Nothing in this Ordinance shall be constr ued to prohibit the City from disapproving an 17
application for an administrative review-eligible project: 18
1. On the basis of the fact that th e proposed height of any wireless support 19
structure, wireless facility, or wireless support structure with attached wireless facilities exceeds 20
50 feet above ground level, provided that the City follows a local ordinance or regulation that 21
does not unreasonably discriminate between the applicant and other wireless services providers, 22
wireless infrastructure providers, providers of telecommunications services , and other providers 23
of functionally equivalent services; or 24
2. That proposes to locate a new structure, or to co-locate a wireless facility 25
in an area where all cable and public utility facilities are required to be placed 26
underground by a date certain or encouraged to be undergrounded as part of a 27
transportation improvement project or rezoning proceeding as set forth in objectives 28
contained in a comprehensive plan, if: 29
(a) The undergrounding requirement or comprehensive plan objective 30
existed at least three months prior to the submission of the application; 31
15
(b) The City allows the co-locati on of wireless facilities on existing 1
utility poles, government-owned structures with the government’s consent, 2
existing wireless support structures, or a building within that area; 3
(c) The City allows the replacement of existing utility poles and 4
wireless support structures with poles or support structures of the same size or 5
similar within that area; and 6
(d) The disapproval of the application does not unreasonably 7
discriminate between the applicant and other wireless services providers, wireless 8
infrastructure providers, providers of telecommunications services, and other 9
providers of functionally equivalent services, and other providers of functionally 10
equivalent services. 11
H. Disapproval Limitation If Administra tive Review-Eligible Project Does not 12
Substantially Change Physical Dimensions. The City may not deny, and shall approve, within 13
sixty (60) days, any administrative review-eligible project which requests any modification of an 14
existing base station or wireless support structure that does not substantially change, as that term 15
is defined by federal law, the physical dimensions of such support structure or base station and 16
that involves the co-location of new transmission equipment, the removal of transmission 17
equipment, or the replacement of transmission equipment. 18
I. Disapproval Allowed If Written Notice Not Provided to Adjacent Property 19
Owners. The City may disapprove an application for an administrative review-eligible project if 20
the applicant has not given written notice to all adjacent property owners at least 15 days before 21
the applicant applies to locate a new structure on the subject property. 22
§ 35.2–73.6 Standard Process Projects. 23
A. Review of Standard Process Proj ects. Standard process projects may 24
require the approval of a conditional use permit and/or a site plan.for the installation or 25
construction of such a project, and City staff review may also be required for the issuance of any 26
zoning permit, or an acknowledgment that zoning approval is not required, for a standard process 27
project. 28
B. Application Requirements for Standa rd Process Projects. Applications for 29
wireless support structures, wireless facilities, and/or base stations that constitute standard 30
process projects shall include the following: 31
1. The name, address, telephone number, and electronic mail address of the 32
applicant. If the applicant is not the owner of the land on which the wireless support 33
structure, wireless facility, and/or base station is proposed to be located, then the 34
applicant shall provide written consent of the owner, and the name, address, telephone 35
16
number, and the electronic mail address of the owner. If the land on which the proposed 1
wireless support structure, wireless facility, or base station is proposed to be located is, in 2
whole or in part, within the City’s right-of-way, then the applicant shall be required to 3
secure written consent from the City for the proposed wireless support structure, wireless 4
facility, or base station to be located within the City’s right-of-way prior to filing such 5
application and shall include such written consent as part of any such application. 6
2. An affirmative written statement signed by the applicant and the owner 7
that the applicant and the owner are aware of and agree to comply with the provisions of 8
this Zoning Ordinance set forth in § 35.2-73.24 (Abandonment) regarding removal and 9
dismantlement of all wireless support structures, wireless facilities, base stations, and 10
related equipment in the event such a structure, facility, base station, or related equipment 11
is no longer in use. 12
3. The valuation map number and address of the parcel of land on which the 13
wireless support structure, wireless facility, and/or base station is proposed to be located. 14
4. The names, addresses, and telephone numbers of the owners of and a map 15
showing the location and height of all wireless support structures or potential wireless 16
support structures taller than fifty (50) feet that are within a one (1) mile radius of the 17
proposed new site for a wireless support structure, wireless facility, and/or base station, 18
including City-owned property. 19
5. Written documentation that the applicant has made diligent, but 20
unsuccessful, efforts to secure the permission to co-locate the applicant’s proposed 21
wireless facility on an existing or proposed wireless support structure owned by others, 22
including the City, within a one-mile radius of the proposed wireless support structure, 23
wireless facility, and/or base station. 24
6. Written, technical evidence from a radio frequency engineer that the 25
proposed wireless support structure, wireless facility, base station, or project cannot be 26
installed or co-located on another existing or proposed wireless support structure within a 27
one (1) mile radius of the proposed site for a wireless support structure, wireless facility, 28
or base station and must be located at the proposed site in order to meet the coverage 29
requirements for applicant’s wireless telecommunications system. 30
7. Written, technical evidence from a st ructural engineer that the proposed 31
wireless support structure can support the wireless facilities and base stations of other 32
carriers for the purposes of co-location. 33
8. Written, technical evidence from a radio frequency engineer that the 34
proposed facilities meet the standards set forth in this Ordinance, including, but not 35
limited to, the requirements set forth in § 35.2–73.13 (Interference With Public Safety 36
17
Radio Services), and will not materially interfere with other pre-existing communications 1
facilities or with future communications facilities that have already been designed and 2
planned for a specific location or that have been reserved for future public safety 3
communications facilities. 4
9. Written, technical evidence from an el ectrical engineer that the proposed 5
site of the wireless support structure, wireless facility, and/or base station does not pose a 6
risk of explosion, fire, or other danger due to its proximity to volatile, flammable, 7
explosive, or hazardous materials such as propane, gasoline, natural gas, or corrosive or 8
other dangerous chemicals. 9
10. A map of the City and the first half-mile of all bordering communities 10
showing the design of the applicant’s entire existing or proposed telecommunications 11
network. Such map shall, at a minimum, indicate the general location of all proposed or 12
existing sites of the applicant’s wireless support structures, wireless facilities, base 13
stations, and related equipment, the dimensions of the sites, specifications relating to the 14
facilities, and signal area coverage. 15
11. Color photo simulations showing th e proposed site of the proposed 16
wireless support structure, wireless facility, base station, or project with a photo-realistic 17
representation of the proposed structure and facility as they would appear viewed from at 18
least four (4) substantially different vantage points on the eight (8) closest residential 19
properties or adjacent roadways.. 20
12. Any initial application fee requi red by § 35.2–73.6(D) (Fees for Standard 21
Process Projects). 22
13. A site plan, including a depiction of the lot lines, setbacks, existing 23
structures and other improvements on the property, the location of adjacent and nearby 24
structures, the proposed location of the proposed wireless support structure, wireless 25
facility, and base station that are the subject of the application, separation distances, 26
proposed height of any new structure, screening and landscaping, existing and proposed, 27
access, parking, security, zoning district(s) for the subject property and all adjacent 28
properties, and any floodplain on the subject property. 29
14. A copy of any approval granted by a federal agency, including any 30
conditions imposed by that agency, regarding the proposed wireless support structure, 31
wireless facility, and/or base station. 32
15. Evidence relating to any other factors th e applicant believes are relevant to 33
the City’s consideration of whether the applicant’s proposed standard process project 34
should be approved. 35
18
16. Written documentation regarding whet her and how the location of the 1
proposed wireless support structure and/or wireless facility in relation to existing 2
structures, trees, and other visual buffers, minimizes, to the greatest extent reasonably 3
practicable under the circumstances, any significant negative adverse impact. 4
17. Witten documentation regarding whether and how the location of the 5
wireless support structure and/or wireless facility will not have a significant detrimental 6
impact on the property values of adjacent and nearby properties. 7
18. Written documentation regarding any ot her factors the applicant believes 8
are relevant to the City’s consideration of whether the applicant’s proposed standard 9
process project should be approved. 10
19. Evidence that the applicant has gi ven written notice to all adjacent 11
landowners regarding the applicant’s intent to file the application at least 15 days before 12
the filing of any application to locate a new structure on the subject property 13
C. Fee Limitations for Standard Proce ss Projects. When an application for a 14
standard process project is filed, the following provisions shall apply to the fee that must 15
be paid by the applicant: 16
1. The fee must be reasonable. 17
2. The fee charged by the City sha ll not include direct payment or 18
reimbursement of third-party fees charged on a contingency basis or a result-based 19
arrangement. 20
3. The fee charged by the City shall not exceed the actual direct costs to 21
process the application, including permits and inspection. 22
4. The City shall not charge market-b ased or value-based fees for the 23
processing of any such application. 24
5. Upon request, the City shall, within a reasonable amount of time after such 25
request, provide the applicant with the cost basis for any fee charged by the City for a 26
standard process project. 27
D. Fees for Standard Process Projects. Each application for a wireless support 28
structure, wireless facility, or base station that constitutes a standard process project shall be 29
accompanied by payment of the following fees for the processing of the application: 30
19
1. For an application for a standard pro cess project that requires the approval 1
of a conditional use permit and a site plan, the initial fee shall be $900. 2
2. For an application for a standard pro cess project that requires the approval 3
of a site plan, but not a conditional use permit, the initial fee shall be $500. 4
3. The City reserves the right to employ an outside consultant to assist in the 5
review of any application for a standard process project. In the event the City employs an 6
outside consultant to review an application for a standard process project, the applicant 7
shall reimburse the City for the reasonable expenses related to such review as an 8
additional application fee, provided, however, that the fee limitations set forth in § 35.2–9
73.6(C) (Fee Limitations for Standard Process Projects) shall apply to the calculation of 10
any such additional fee. 11
4. For any standard process project that requires the approval of a conditional 12
use permit, the applicant shall be responsible for the payment of any costs for any legal 13
notices that may be required for the conditional use permit. 14
E. Processing Applications for Sta ndard Process Projects. The following 15
provisions set forth the process that shall apply to any application for a standard process project: 16
1. Prior to accepting any application for a wireless support structure, a 17
wireless facility, or a base station, that constitutes a standard process project, the City 18
shall first determine that the application includes the applicant’s electronic mail address. 19
In the event the application does not include the applicant’s electronic mail address, the 20
City shall not accept it for filing 21
2. If the application is in complete, but includes an electronic mail address for 22
the applicant, then within ten (10) business days after actual receipt of the application, the 23
City shall notify the applicant by electronic mail if the application is incomplete and shall 24
specify in that notification any additional information, documents, and materials required 25
to complete the application. 26
3. If the application is incomplete and does not include a valid electronic 27
mail address for the applicant when it was filed, the City shall use reasonable means to 28
contact the applicant and request the applicant’s valid electronic mail address. Within ten 29
(10) days after actual receipt of a valid electronic mail address for the applicant, the City 30
shall notify the applicant by electronic mail that the application is incomplete and shall 31
specify any additional information, documents, and materials required to complete the 32
application. 33
4. If an incomplete initial or resubmitte d application is filed for a standard 34
process project, then the City shall notify the applicant by electronic mail that the 35
20
application is incomplete and shall specify any missing information, documents, and 1
materials in accordance with the following: 2
(a) for an initial application, the City shall notify the applicant by 3
electronic mail within ten (10) business days after the application is submitted 4
whether the application is incomplete and shall specify in that notification any 5
missing information, documents, and materials; otherwise, the application will be 6
deemed complete; and 7
(b) for a resubmitted application, th e City shall notify the applicant by 8
electronic mail within ten (10) days after the application is resubmitted whether 9
the application is incomplete and shall specify in that notification any missing 10
information, documents and materials; otherwise, the application will be deemed 11
complete. 12
5. If the City fails to timely provide th e applicant with notice that the initial 13
application or a resubmitted application is incomplete in accordance with the foregoing 14
provisions, as applicable, the application shall be deemed complete. 15
6. Except as provided for in subsection 7 below, the City shall approve or 16
disapprove a complete application for a standard process project in accordance with the 17
following: 18
(a) For a new structure, within th e lesser of 150 days after receipt of 19
the completed application minus any days that expired from the date of filing of the 20
application to the date any notice of incompleteness was given to the applicant by the 21
City ; 22
(b) For the modification of an ex isting wireless support structure or 23
base station that involves the co-location of new transmission equipment, the removal of 24
transmission equipment, or the replacement of transmission equipment, but does not 25
substantially change, as that term is defined by federal law, the physical dimensions of 26
such support structure or base station, within 60 days after receipt of the application 27
provided, however, that this period shall be tolled during any time after which the 28
applicant has been informed that the application is not complete and is provided with the 29
grounds for its incompleteness by the City, and when the applicant files all requested 30
information and items necessary to make the application complete; 31
(c) For the co-location on an existi ng wireless support structure of any 32
wireless facility that is not a small cell facility and substantially changes, as that term is 33
defined by federal law, the physical dimensions of such support structure or any related 34
base station, within the lesser of 90 days after receipt by the City of the completed 35
21
application minus any days that expired from the date of filing of the application to the 1
date any notice of incompleteness was given to the applicant by the City; and 2
(d) For any standard process project that is not a small cell facility on 3
a new structure, within the lesser of 150 days after receipt of a completed application 4
minus any days that expired from the date of filing of the application to the date any 5
notice of incompleteness was given to the applicant by the City . 6
7. Any period specified in subsection 6(a) , 6(b), 6(c), or 6(d) above within 7
which the City must approve or disapprove an application may be extended by written 8
agreement of the applicant and the City. 9
8. A complete application for a standa rd process project shall be deemed 10
approved if the City fails to approve or disapprove such application within the applicable 11
period specified in subsection 6(a), 6(b), 6(c), or 6(d) above or any agreed extension 12
thereof pursuant to subsection 7 above. 13
9. If the City disapproves an applica tion for a standard process project: 14
(a) the City shall provide the applic ant with a written statement listing 15
all of the reasons for the disapproval; and 16
(b) if the City is aware of any modi fications to the project as described 17
in the application that if made would permit the City to approve the proposed 18
project, the City shall identify them in the written statement provided under 19
subsection 6(a) above. The City’s subsequent disapproval of an application for a 20
project that incorporates the modifications identified in such a written statement 21
may be used by the applicant as evidence that the City’s subsequent disapproval 22
was arbitrary or capricious in any appeal of the City’s subsequent disapproval. 23
10. If an application for a standard pr ocess project is disapproved, the City’s 24
disapproval shall: 25
(a) not unreasonably discriminate between the applicant and other 26
wireless services providers, wireless infrastructure providers, providers of telecommunications 27
services, and other providers of functionally equivalent services; and. 28
(b) be supported by substantial r ecord evidence contained in a written 29
record publicly released within 30 days following the disapproval. 30
22
F. Limitations on Disapprovals of Standa rd Process Projects. Whenever the City 1
receives, considers, and processes a complete application for a standard process project, it shall 2
not disapprove any such application on the basis of: 3
(a) the applicant’s business deci sion with respect to its designed 4
service, customer demand, or quality of service to or from a particular site; 5
(b) the applicant’s specific need for the project, including the 6
applicant’s desire to provide additional wireless coverage or capacity; or 7
(c) the wireless facility technology selected by the applicant for use at 8
the project. 9
G. Disapproval Considerations for Standa rd Process Projects. Nothing in this 10
Ordinance shall be construed to prohibit the City from disapproving an application for a standard 11
process project: 12
1. On the basis of the fact that th e proposed height of any wireless support 13
structure, wireless facility, or wireless support structure with attached wireless facilities exceeds 14
50 feet above ground level, provided that the City follows a local ordinance or regulation that 15
does not unreasonably discriminate between the applicant and other wireless services providers, 16
wireless infrastructure providers, providers of telecommunications services , and other providers 17
of functionally equivalent services; or 18
2. That proposes to locate a new structure, or to co-locate a wireless facility 19
in an area where all cable and public utility facilities are required to be placed 20
underground by a date certain or encouraged to be undergrounded as part of a 21
transportation improvement project or rezoning proceeding as set forth in objectives 22
contained in a comprehensive plan, if: 23
(a) The undergrounding requirement or comprehensive plan objective 24
existed at least three months prior to the submission of the application; 25
(b) The City allows the co-locati on of wireless facilities on existing 26
utility poles, government-owned structures with the government’s consent, 27
existing wireless support structures, or a building within that area; 28
(c) The City allows the replacement of existing utility poles and 29
wireless support structures with poles or support structures of the same size or 30
similar within that area; and 31
23
(d) The disapproval of the application does not unreasonably 1
discriminate between the applicant and other wireless services providers, wireless 2
infrastructure providers, providers of telecommunications services, and other 3
providers of functionally equivalent services, and other providers of functionally 4
equivalent services. 5
H. Disapproval Limitation If Standard Pr ocess Project Does not Substantially 6
Change Physical Dimensions. The City may not deny, and shall approve, within sixty (60) days, 7
any standard process project which requests any modification of an existing base station or 8
wireless support structure that does not substantially change, as that term is defined by federal 9
law, the physical dimensions of such support structure or base station and that involves the co-10
location of new transmission equipment, the removal of transmission equipment, or the 11
replacement of transmission equipment. 12
I. Disapproval Allowed If Written Notice Not Provided to Adjacent Property 13
Owners. The City may disapprove an application for a standard process project if the applicant 14
has not given written notice to all adjacent property owners at least 15 days before the applicant 15
applies to locate a new structure on the subject property. 16
§ 35.2–73.7 Permitted Uses. 17
A. The following uses shall be permitted by right as follows: 18
1. Small cell facilities in all zoning districts. 19
2. Administrative review-eligible pr ojects in all zoning districts. 20
3. Any wireless support structure and/ or wireless facility that does not 21
exceed one hundred (100) feet in height in the B–1 District. 22
4. Any wireless support structure and/ or wireless facility that does not 23
exceed one hundred and fifty (150) feet in height in the B–3, B–5, IN–2, 24
I–1, I–2, or I–3 Districts. 25
5. Any base station associated with a lawfully existing wireless support 26
structure and/or wireless facility, provided, however, that: 27
(a) the base station shall be lo cated inside the wireless support 28
structure; or 29
(b) the base station shall be located on the ground within 50 feet of the 30
base of the wireless support structure; or 31
24
(c) the base station is not visible at ground level from off-site; and 1
(d) the size of the base station sha ll not exceed seventy-two (72) cubic 2
feet in size and/or six (6) feet in height; and 3
(e) all applicable setbacks shall be complied with. 4
6. The co-location of a wireless faci lity on a lawfully existing wireless 5
support structure in any zoning district, provided, however, that: 6
(a) the height of any such wireless support structure, wireless facility, 7
or wireless support structure with wireless facility attached, shall not increase as a result 8
of the co-location; and 9
(b) all applicable setbacks must be complied with. 10
B. Existing wireless support structures and wi reless facilities shall be exempt from 11
the maximum height restrictions of the districts in which they are located to the extent such 12
structures and facilities lawfully existed on the date of adoption of this Ordinance. 13
§ 35.2-73.8 Conditional Use Permit Required. 14
A. The following uses require the approval of a conditional use permit by the City 15
Council: 16
1. In the R–C, R–1, R–2, R–3, R–4, IN–1, or B–4 Districts, any standard 17
process project that is between fifty (50) and one hundred and fifty (150) feet in height, 18
provided, however, that no new wireless support structure and/or wireless facility in such 19
districts shall exceed 150 feet in height; 20
2. In the B–1 District, any standard pr ocess project in which a new wireless 21
support structure and/or wireless facility exceeds one hundred (100) feet in height; 22
provided, however, that the maximum height for any wireless facility and/or wireless 23
support structure in the B–1 District shall be 150 feet; 24
3. In the B–3, B–5, IN–2, I–1, I–2, or I –3 Districts, any standard process 25
project in which a new wireless support structure and/or wireless facility exceeds one 26
hundred fifty (150) feet in height; 27
4. Any base station that is a standard process project and exceeds seventy-28
two cubic feet above ground and/or six feet in height; 29
25
5. Any base station associated with a lawfully existing wireless support 1
structure and/or wireless facility that is a standard process project, is not located inside 2
the wireless support structure, is visible at ground level from off-site, and/or is not 3
located within 50 feet of the base of the wireless support structure; 4
6. The co-location of a wireless faci lity on a lawfully existing wireless 5
support structure in any zoning district that, after the proposed co-location, would result 6
in an increase in height of the wireless support structure and/or wireless facility, 7
provided, however, that no such structure and/or facility shall be allowed to increase 8
more than fifteen (15) feet in height as a result of the approval of such a conditional use 9
permit; and 10
7. Any other project that constitu tes a standard process project. 11
B. Whenever a conditional use permit is requi red for a proposed wireless structure or 12
wireless facility, any application for such a conditional use permit shall be made to the City 13
Planner in the manner provided in Article 2 of this Zoning Ordinance. In districts for which a 14
conditional use permit is required, the City Council shall make its decision to approve or deny 15
such permit in writing and in a manner consistent with applicable state and federal law. 16
C. Any wireless support structure, wirele ss facility, or base station that is not 17
permitted by right or upon the approval of a conditional use permit under this Ordinance shall be 18
considered to be in violation of this Ordinance. 19
D. No new wireless support structure and/or wireless facility for which a conditional 20
use permit is approved shall exceed a maximum height of one hundred fifty (150) feet in 21
the R–C, R–1, R–2, R–3, R–4, IN–1, or B–4 Districts. 22
35.2-73.9 Setbacks. 23
A. There shall be no setback requirement for any wireless support structure and/or 24
wireless facility that is thirty-five (35) feet or less in height. 25
B. Any wireless support structur e and/or wireless facility greater than thirty-five (35) 26
feet in height in the R–C, R–1, R–2, R–3, R–4, IN–1, or B–4 Districts shall be required to set 27
back a distance from all property lines at least the height of such structure and/or facility. 28
C. Any wireless support structur e and/or wireless facility greater than thirty-five (35) 29
feet in height in the B–1, B–3, B–5, IN–2, I–1, I–2, or I–3 Districts that is on a parcel adjacent to 30
any parcel that is zoned R–C, R–1, R–2, R–3, R–4, IN–1, or B–4 shall be set back a distance at 31
least the height of such structure and/or facility from the R–C, R–1, R–2, R–3, R–4, IN–1, or B–32
4 District. 33
26
D. Any wireless support stru cture and/or wireless facility in the B–1, B–3, B–5, IN–1
2, I–1, I–2, or I–3 Districts that is greater than thirty-five (35) feet in height but less than fifty 2
(50) feet in height shall be required to set back a distance from all property lines at least the 3
minimum applicable setback for the district in which it is located. 4
E. Any wireless support structure and/or wireless facility in the B–1, B–3, B–5, IN–5
2, I–1, I–2, or I–3 Districts that is a height greater than fifty (50) feet shall be required to set 6
back a distance from all property lines at least one-half the height of such structure and/or 7
facility. 8
F. Setback requirements for wireless suppor t structures and/or wireless facilities 9
shall be measured from the base of the structure and/or facility to the property lines of the parcel 10
on which the structure and/or facility is located. 11
§35.2-73.10 Standards for Conditional Use Permits for Standard Process Projects. 12
In order to approve a conditional use permit for a standard process project, the City 13
Council must find that the application for such project satisfies all of the following standards: 14
1. The proposed use is in substantial conformance with the provisions of the 15
City’s Comprehensive Plan. 16
2. The proposed use will not result in any significant adverse impact on the 17
use and enjoyment of nearby properties. 18
3. The proposed use will not have any significant negative impact on the 19
value of nearby properties. 20
4. The proposed use will not cause any material potential interference with 21
other pre-existing communications facilities or with future communications facilities that 22
have already been planned or designed for a specific location or that have been reserved 23
for future public safety communications facilities. 24
5. The proposed use will not result in any significant adverse impact on 25
public safety or other critical public service needs. 26
6. The proposed use must be compatible with the character of the area in 27
which it is proposed to be located. 28
7. There are no existing wireless suppo rt structures within a reasonable 29
distance from the proposed wireless support structure, wireless facility, and/or base 30
27
station that are available to be used for co-location at reasonable terms and conditions 1
without imposing technical limitations on the applicant. 2
8. The proposed use shall not conflict with any City ordinance adopted 3
pursuant to Code of Virginia § 15.2-2306, or pursuant to local charter on a historic 4
property that is not eligible for the review process established under 54 U.S.C. § 306108. 5
9. The proposed use satisfies all other applicable requirements set forth in 6
this chapter with respect to the location, size, design, and construction of wireless support 7
structures, wireless facilities, and base stations. 8
§35.2-73.11 Use of City-Owned Property for Wireless Facilities. 9
The City may authorize the use of City prope rty for wireless facilities in appropriately 10
zoned districts in accordance with the procedures of the City charter and code. The City shall 11
have no obligation whatsoever to allow the use of City property for such purposes and any such 12
approval by the City shall be subject to the discretion of the City Council. 13
§35.2–73.12 Co-Location Availability. 14
An application for a standard process project may be disapproved by the City on 15
the basis of the availability of the existence of one or more wireless support structures within a 16
reasonable distance that could be used for co-location at reasonable terms and conditions without 17
imposing technical limitations on the applicant. 18
§ 35.2–73.13 Interference With Public Safety Radio Services. 19
In order to ensure that the City’s public safety radio services will be free from 20
harmful or destructive interference, all applicants requesting a permit to establish or install a 21
wireless support structure or wireless facility shall: 22
A. Demonstrate compliance with good engineering practices; 23
B. Not cause material potential interference to the City’s existing 24
public safety radio services or to future communications facilities 25
that have already been designed and planned for a specific location 26
or that have been reserved for future public safety communications 27
facilities; and 28
C. Comply with all FCC regulations regarding susceptibility to radio 29
frequency interference, frequency coordination requirements, 30
general technical standards for power, antenna bandwidth 31
28
limitations, frequency stability, transmitter measurements, 1
operating requirements, and any and all other federal statutory and 2
regulatory requirements relating to radio frequency interference 3
(RFI), provided, however, that this subparagraph (C) shall not 4
apply to applications for small cell facilities. 5
§ 35.2-73.14 Structural Requirements. 6
All wireless support structures and wireless facilities must be designed and certified by a 7
structural engineer licensed in the Commonwealth of Virginia to be structurally sound 8
and, at a minimum, in conformance with the Virginia Uniform Statewide Building Code 9
and any other applicable standards set forth in this chapter. 10
§ 35.2-73.15 Method of Determining Height of A Wireless Support Structure. 11
Measurement of the height of a wireless s upport structure for the purpose of determining 12
compliance with all requirements of this chapter shall include the wireless support structure itself 13
and any wireless facilities associated with the wireless support structure, and any other support 14
features installed thereon which extend over the top of the structure itself. Structure height shall 15
be measured from grade. 16
§ 35.2-73.16 Illumination. 17
Wireless support structures whose princi pal use is the facilitation of wireless 18
telecommunications shall not be artificially lighted except as may be required by the FAA. 19
§ 35.2–73.17 Exterior Finish. 20
Wireless support structures and wireless facilities not requiring painting or marking by 21
the FAA shall be painted a neutral color. A galvanized finish is considered a neutral color. 22
§ 35.2–73.18 Landscaping. 23
All landscaping on parcels containing wireless support structures, wireless facilities, 24
and/or base stations shall be designed to screen the structure, facilities, base station, and related 25
equipment to a height of at least six (6) feet from grade. This requirement may be waived at the 26
discretion of the planning division if the base of the structure, facilities, base station, and related 27
equipment to be screened is not located in and is not visible from any commercial or residential 28
district or from any public street. All required landscaping shall be continually maintained in a 29
healthy and attractive manner. 30
31
29
§ 35.2-73.19 Security. 1
All wireless support structures and wireless facilities shall be reasonably posted and 2
secured to prevent against trespass. 3
§ 35.2–73.20 Access. 4
All parcels upon which wireless support structures are located must provide access during 5
normal business hours to at least one (1) paved vehicular parking space on site. 6
§ 35.2–73.21 Maintenance. 7
A. The owners and operators of all wire less support structures, wireless facilities, 8
base stations, and related equipment shall at all times employ ordinary and reasonable care in 9
maintaining such structures, facilities, base stations, and equipment and shall install and maintain 10
in use nothing less than commonly accepted methods and devices for the prevention of failures 11
and accidents which are likely to cause damage, injuries, or nuisances to the public, provided, 12
however, that no zoning approval of the City shall be required for routine maintenance of any 13
existing wireless support structure or wireless facility. 14
B. The owners and operators of all wire less support structures, wireless facilities, 15
and base stations shall at all times employ ordinary and reasonable care and shall install and 16
maintain such wireless support structures, wireless facilities, base stations, and equipment in 17
substantial compliance with the requirements of the national electric safety code and all federal, 18
state, and local regulations and in such manner that will not interfere with the use and enjoyment 19
of other property. 20
C. All wireless support struct ures, wireless facilities, base stations, and related 21
equipment shall at all times be kept and maintained in good condition, order, and repair so that 22
the same shall not menace or endanger the life or property of any person. 23
D. All wireless support struct ures, wireless facilities, base stations, and related 24
equipment shall be maintained in compliance with any applicable radio frequency emission 25
standards of the FCC. 26
E. In the event the use of any wireless support structure, wireless facility, base 27
station, and related equipment is discontinued by the owner or operator thereof, or in the event 28
the owner or operator thereof files notice with the FCC or any other federal agency of its interest 29
in ceasing to operate any wireless support structure, wireless facility, base station, and related 30
equipment, said owner or operator shall, within thirty (30) days, provide written notice to the 31
City of its intent to discontinue such use and the date when such use shall be discontinued. If the 32
facility in question, or any part thereof, is located within the City’s right-of-way, then the owner 33
30
or operator shall submit the foregoing written notice to the Department of Public Works. If the 1
facility in question, or any part thereof, is located outside the City’s right-of-way, then the owner 2
or operator shall submit the foregoing written notice to the Department of Community 3
Development. 4
§ 35.2–73.22 Stealth. 5
The City encourages, but doe s not require, the installation of small cell facilities and 6
administrative review-eligible projects that employ stealth designs and blend into the 7
environments in which they are proposed to be located. All standard process projects proposing 8
wireless support structures and wireless facilities shall be of stealth design. For purposes of this 9
section, the term “stealth design” refers to a wireless support structure and wireless facility that is 10
designed in such a way as to effectively blend into the environment in which that structure is 11
proposed to be located. Examples of stealth designs include, but are not limited to, a wireless 12
support structure in a wooded area that is designed to look like a tree, a wireless facility that is 13
encased in a flagpole, a wireless support structure on a church property that is designed to look 14
like a bell tower or church steeple, and a wireless support structure in an agricultural area that is 15
designed to look like a farm silo. 16
§ 35.2-73.23 Existing Wireless Support Structures. 17
A. An existing wireless support structur e may be modified or demolished and rebuilt 18
to accommodate the co-location of additional wireless facilities and base stations as follows: 19
1. Application for a permit for any wirele ss facility or base station, other than 20
a small cell facility, located, in whole or in part, within the City’s right-of-way shall be made to 21
the Department of Public Works. 22
2. Application for a permit for any wirele ss facility or base station located, in 23
whole or in part, outside the City’s right-of-way shall be made to the Department of Community 24
Development. 25
3. The total height of the new or modi fied wireless support structure and any 26
wireless facilities installed thereon shall not exceed the height of the existing wireless 27
support structure or the maximum height allowed for wireless support structures 28
permitted by right in the applicable zoning district under this ordinance whichever is 29
greater. 30
B. The City may not deny and shall approve any request to modify the physical 31
dimensions of an existing wireless tower or base station if that request does not substantially 32
increase the physical dimensions of such tower or base station and involves: 33
31
(1) co-location of new transmission equipment; 1
(2) removal of transmission equipment; or 2
(3) replacement of transmission equipment. 3
§ 35.2–73.24 Abandonment. 4
If the City receives notice pursuant to § 35.2-73.21(E), or if any wireless support structure, 5
wireless facility, base station, and/or related equipment shall cease to be used for a period of 6
one hundred eighty (180) consecutive days, then for wireless support structures, wireless 7
facilities, base stations and/or related equipment inside the City’s right-of-way, the 8
Department of Public Works shall notify the owner and/or operator of such structure, 9
facility, base station, and related equipment, with a copy to the applicant therefor, that the 10
site will be subject to a determination by the Department of Public Works that such site has 11
been abandoned. In the event such structure, facility, base station, and related equipment is 12
located outside the City’s right-of-way, then the foregoing notification and determination 13
shall be made by the Department of Community Development. The owner, operator, and/or 14
applicant shall have thirty (30) days from receipt of said notice to show, by a preponderance 15
of the evidence, that the support structure, wireless facility, base station, and/or related 16
equipment has been in use or under repair during the period. If the owner, operator, and/or 17
applicant fails to show that the support structure, wireless facility, base station, and/or 18
related equipment has been in use or under repair during the period, the Department of 19
Public Works, or Department of Community Development, whichever applies, ashall issue a 20
final determination of abandonment for the site. Upon issuance of the City’s final 21
determination, the owner, operator, and/or applicant shall, within seventy-five (75) days, 22
dismantle and remove the support structure, wireless facility, base station, and related 23
equipment. If the owner, operator, and/or applicant fails to remove the abandoned support 24
structure, wireless facility, base station, and related equipment within seventy-five (75) days 25
after the City’s final determination of abandonment, the City and/or its agents may, at its 26
option, enter upon the property and dismantle, remove, and lawfully dispose of the support 27
structure, wireless facility, base station, and related equipment that has been determined by 28
the City to have been abandoned. The City may place a lien on the property of the owner 29
from which the abandoned support structure, wireless facility, base station, or related 30
equipment was removed in the amount of the City’s expenses in dismantling, removing, and 31
lawfully disposing of such support structure, wireless facility, base station, and related 32
equipment. The City also may recover from the owner, operator, and/or applicant the costs 33
of dismantling, removing, and lawfully disposing of the support structure, wireless facility, 34
base station, and related equipment from the owner. For purposes of this section, removal 35
includes all physical improvements associated with the support structure, wireless facility, 36
base station, and related equipment, including foundation and tower grounding. 37
§ 35.2–73.25 Miscellaneous Provisions. 38
32
A. Voluntary Conditions Allowed. Nothing in this Ordinance shall prohibit an 1
applicant from voluntarily submitting, and the City from accepting, any 2
conditions that otherwise address potential visual or aesthetic effects resulting 3
from the placement of any new structure or wireless facility, including small cell 4
facility. 5
B. Micro-Wireless Facilities Exemption. Nothing in this Ordinance shall be 6
construed to require any permitting requirements and fees imposed by the City for 7
the installation, placement, maintenance, or replacement of micro-wireless 8
facilities that are suspended on cables or lines that are strung between existing 9
utility poles in compliance with national safety codes, because the installation, 10
placement, maintenance, or replacement of such facilities are exempt from any 11
City-imposed permitting requirements and fees. 12
C. Limitations on Review of Administrativ e Review-Eligible Projects and Standard 13
Process Projects. Whenever the City receives, considers, and processes an 14
application for an administrative review-eligible project or a standard process 15
project, it shall not: 16
1. Discriminate or create a preference on the basis of the ownership by the 17
City, of any property, structure, base station, or wireless support structure 18
when promulgating rules or procedures for siting wireless facilities or for 19
evaluating applications; 20
2. Impose any unreasonable requirement s or obligations regarding the 21
presentation or appearance of a project, including unreasonable 22
requirements relating to (i) the kinds of materials used or (ii) the 23
arranging, screening, or landscaping of wireless facilities or wireless 24
structures; 25
3. Impose any requirement that an appli cant purchase, subscribe to, use, or 26
employ facilities, networks, or services owned, provided, or operated by 27
the City, in whole or in part, by the City or by any other entity in which 28
the City has a competitive, economic, financial, governance, or other 29
interest; 30
4. Condition or require the approval of an application solely on the basis of 31
the applicant’s agreement to allow any wireless facilities provided or 32
operated, in whole or in part, by the City, or by any other entity, to be 33
placed at or co-located with the applicant’s project; 34
33
5. Impose a setback or fall zone requiremen t for a project that is larger than a 1
setback or fall zone area that is imposed on other types of similar 2
structures of a similar size, including utility poles; 3
6. Limit the duration of the approval of an application, except the City may 4
require that construction of the approved project shall commence within 5
two years after final approval and be diligently pursued to completion; and 6
7. Require an applicant to perform servi ces unrelated to the project described 7
in the application, including restoration work on any surface not disturbed 8
by the applicant’s project. 9
D. Nothing in this chapter shall prohibit the City from disapproving an application 10
submitted under a standard process project on the basis of availability of existing 11
wireless support structures within a reasonable distance that could be used for co-12
location at reasonable terms and conditions without imposing technical limitations 13
on the applicant. 14
E. No zoning approval shall be required for (i) routine maintenance or (ii) the 15
replacement of wireless facilities or wireless support structures within a six-foot 16
perimeter with wireless facilities or wireless support structures that are 17
substantially similar or smaller; provided, however, that the City may require a 18
permit to work within the right-of-way for the activities described in clause (i) or 19
(ii), if applicable. 20
F. Nothing in this chapter shall prohibit the City from limiting the number of new 21
structures or the number of wireless facilities that can be installed in a specific 22
location. 23
G. Nothing in this chapter shall be cons trued to require an applicant to provide 24
proprietary, confidential, or other business information to justify the need for a 25
project, including propagation maps and telecommunications traffic studies, or 26
information reviewed by a federal agency as part of the approval process for the 27
same structure and wireless facility 28
H. All information submitted with an applica tion that is a trade secret or proprietary 29
shall be clearly marked as such when submitted to the City. The City shall not 30
disclose publicly, or to any third party, any such proprietary information unless 31
compelled to do so by federal, state, or local law. 32
§ 35.2–73.26 Reservation of Rights. 33
34
The City reserves the right to impose any other reasonable conditions it determines are necessary 1
for the proper placement, construction, or modification of wireless support structures, wireless 2
facilities, or base stations and/or to impose any other reasonable conditions on the issuance of a 3
conditional use permit for the placement or construction of, or modification to, a wireless support 4
structure, wireless facility, or base station, provided, however, that the imposition of any such 5
conditions must be in conformance with federal and state law and the provisions of this chapter. 6
This ordinance shall become effective upon adoption. 7
8
PLANNING COMMISSION PUBLIC HEARING: xxxx xx, 2020 9
CITY COUNCIL PUBLIC HEARING: _________________ 10
11
ENACTED: ______________________ 12
13
ATTEST: 14
15
______________________________ 16
City Clerk 17
18
19
Telecommunications Ordinance
J. Patrick Taves
Greehan, Taves & Pandak, PLLC
Tom Martin, AICP City Planner
Planning Commission
Public Hearing
December 9, 2020
Purpose and Outline
Purpose: Discuss the proposed Telecommunications
Ordinance
Outline:
1. State and Federal mandates
2. Types of facilities – Small Cell, AREP, Standard Process
Projects
3. Timelines for review
4. Where permitted - Height
5. Setbacks
2
Proposed regulations depend on the size of the facility.
Three Types of Cell Facilities:
• SMALL CELL FACILITIES: no more than 6 cu. ft. of
volume for each antenna and no more than 28 cu. ft.
of volume for all other wireless equipment
• ADMINISTRATIVE REVIEW ELIGIBLE PROJECTS
(“AREPs”): not more than 50 ft. in height or co-
location on any existing structure of a facility that is
not a small cell facility
• STANDARD PROCESS PROJECTS: any project that is
not an AREP
3
Different Rules for Each Type of Facility.
• Deadlines for Completeness of Applications---applications
can be “deemed complete”
• Fee Limitations
• Deadlines for Decisions---applications can be “deemed
approved”
• Limited Grounds for Disapprovals
• Different Rules for Different Facilities
4
Small Cell Facilities in the City’s Rights-of-Way
and on City Property
• Regulated by the City’s Small Cell Facility Ordinance (City Code
Sections 35-28, 25-28.1, 35-28.2, 35-28.3, 35-28.4, 35-28.5, 35-28.6,
and 35-28.7).
• The New Telecommunications Ordinance provisions do not apply
to these facilities.
5
Small Cell Facilities---Limited Reasons for Disapproval
City can disapprove on existing structures for only four reasons:
1. Material potential interference with existing or future facilities
designed and planned for a specific location or reserved for
public safety communications
2. Safety of the public or other critical public service needs
3. Aesthetic impact, but only on publicly owned or publicly
controlled property---but if the City owns the property or the
structure, then the City’s Small Cell Facility Ordinance controls
4. Conflict with a historic distri ct ordinance, but only if that
property is not eligible for a specified federal review process 6
Permitted Uses:
• All Small Cell Facilities in all districts---CUPs cannot be required
• All AREPs in all districts (50 feet or less in height)---CUPs cannot be required
• Any wireless facility or structure in the B-1 District 100 feet or less
• Any wireless facility or structure in the B-3, B-5, IN-2, I-1, I-2, and I-3 Districts 150 feet
or less
• Any base station for a lawfully existing wireless facility or structure meeting
specified requirements
• Any co-location on an existing structure meeting specified requirements
7
Conditional Use Permits Can Only Be
Required For Standard Process Projects:
• Standard Process Projects between 50 and 150 feet in height in the R-C, R-1, R-2, R-3,
R-4, IN-1, and B-4 Districts
• Standard Process Projects that exceed 100 feet in height in the B-1 District, but no
greater than 150 feet
• Standard Process Projects that exceed 150 feet in height in the B-3, B-5, IN-2, I-1, I-2,
and I-3 Districts
• Standard process project base stations meeting specified requirements
• Any co-location on an existing structure that increases the height of the facility, but
any height increase is limited to no more than 15 feet
• Any other standard process project
8
Standards for CUP’s – Standard Process Projects Only:
• Substantial conformance with the Comprehensive Plan
• No significant adverse impact on use and enjoyment of nearby properties
• No significant negative impact on property values
• No material potential interference with pre-existing facilities or for future planned
facilities planned or designed for a specific location or any reserved for future public
safety facilities*
• No significant adverse impact on public safety or public service needs*
• No available and existing wireless support structures nearby
• Not in conflict with the City historic district ordinance*
• Satisfies all other applicable requirements
9
Setbacks for Similar Structures:
• Virginia law provides that the City cannot impose a setback or fall zone requirement
that is larger than the setback or fall zone requirement “that is imposed on other types
of similar structures of a similar size, including utility poles.
• As a result, we propose establishing setbacks for wireless support structures that
provide the same setbacks for wireless support structures as are applied to light
poles, utility poles, and flag poles of a similar size.
10
Separate Amendment for Setbacks for Similar Structures:
• No setback for flag poles, light poles or utility poles (“poles”) that are less than 35’ in
height.
• Poles greater than 35’ in height set back at a 1:1 in R-C, R-1, R-2, R-3. R-4, IN-1 or B-4
Districts.
• Poles greater than 35’ in height in B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District and adjacent
to R-C, R-1, R-2, R-3, IN-1 or B-4 District set back at 1:1
• Poles in the B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District between 35’ and 50’ must meet
underlying district setback
• Poles in the B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District greater than 50’ set back at least ½
the height of the pole.
11
Discussion:
Discussion
12
To: Planning Commission
From: Tom Martin, AICP, City Planner
CC: Reid Woodicka, Interim City Manager, Ke nt White, Interim Deputy City Manager, Walter
Erwin, City Attorney, Kevin Henry, Zoning Administrator
Date: November 11, 2020
Re: Telecommunications Ordinance Revisions – Work Session
The City’s Telecommunications Ordinance was last updated December 1997 with minor
amendments in January 2000. The current ordinance is no longer compliant with State or
Federal Laws.
The proposed Telecommunications Ordinance was drafted with the assistance of J. Patrick
Taves, Greehan, Taves & Pandek, PLLC. Mr. Taves will be in attendance at the November 11,
2020 Planning Commission work session to discuss the proposed amendments to the
Telecommunications Ordinance.
If you have questions, please contact me at (434) 455-3909 or tom.martin@lynchburgva.gov.
Attachments:
Telecommunications Ordinance Slides
Draft Telecommunications Ordinance
Draft Revisions to Section 35.2-61.2
Telecommunications Ordinance
J. Patrick Taves
Greehan, Taves & Pandak, PLLC
Tom Martin, AICP City Planner
Planning Commission
Work Session
November 11, 2020
Purpose and Outline
Purpose: Discuss required updates to the
Telecommunications Ordinance
Outline:
1. Reasons for updates
2. Types of facilities – Small Cell, AREP, Standard Process
Projects
3. Timelines for review
4. Where permitted - Height
5. Setbacks
2
Why does the City need a new Telecommunications Ordinance?
• Last overhaul of the City’s Telecommunications Ordinance was
in December 1997 with minor amendments in January 2000
• Amendments to the Virginia Code in 2017, 2018, and 2020
regarding telecom facilities---new terminology and rules.
• Federal law on telecom facilities is evolving.
3
What are some of the changes that are needed?
Three Types of Cell Facilities:
• Small cell facilities
• Administrative review-eligible projects (“AREPs”)
• Standard process projects
4
Other Changes
• Deadlines for Completeness of Applications
• Fee Limitations
• Deadlines for Decisions
• Different Rules for Different Facilities
5
Small Cell Facilities**:
• “. . . A wireless facility that meets both of the following
qualifications: (i) each antenna is located inside an
enclosure of no more than six cubic feet in volume, or, in
the case of an antenna that has exposed elements, the
antenna and all its exposed elements could fit within an
imaginary enclosure of no more than six cubic feet and (ii)
all other wireless equipment associated with the facility
that has a cumulative volume of no more than 28 cubic
feet, or such higher limit as is established by the Federal
Communications Commission.
6
Small Cell Facilities May be Larger Than You Think:
Associated equipment does not include:
• electric meter
• concealment
• telecommunications demarcation boxes
• back-up power systems
• grounding equipment
• power transfer switches
• cut-off switches
• vertical cable runs for the connection of power and other
services
So it could really be more than 28 cubic feet!
7
** Really Small Facilities are Exempt:
Micro-wireless facility: “means a small cell facility that is not larger
in dimension than 24 inches in length, 15 inches in width, and 12
inches in height and that has an exterior antenna, if any, not longer
than 11 inches.”
Va. Code Section 15.2-2316.4(C) provides that micro-wireless
facilities are exempt from locality-imposed permitting requirements
and fees if “suspended on cables or lines that are strung between
existing utility poles” in compliance with national safety codes.
8
Small Cell Facilities in the City’s Rights-of-Way
and on City Property
• Regulated by the City’s Small Cell Facility Ordinance (City Code
Sections 35-28, 25-28.1, 35-28.2, 35-28.3, 35-28.4, 35-28.5, 35-28.6,
and 35-28.7.
• The New Telecommunications Ordinance provisions do not apply
to these facilities.
9
Small Cell Facility Requirements, Part 1:
• CUPs cannot be required
• Application can be deemed complete if City acts late
• Fee limitations
• City has 60 days to approve or disapprove
• City can unilaterally extend by 30 days in writing
• Any disapproval must be in writing and state the reasons
• Application deemed approved if City acts late
10
Small Cell Facility Requirements, Part 2:
City can disapprove on existing structures for only four reasons:
1. Material potential interference with existing or future facilities
designed and planned for a specific location or reserved for
public safety communications
2. Safety of the public or other critical public service needs
3. Aesthetic impact, but only on publicly owned or publicly
controlled property---but if the City owns the structure, then the
City’s Small Cell Facility Ordinance controls
4. Conflict with a historic distri ct ordinance, but only if that
property is not eligible for a specified federal review process 11
Administrative Review-Eligible Projects (“AREPs):
“a project that provides for:
1. The installation or construction of a new structure that is not
more than 50 feet above the ground level, provided that the
structure with attached wireless facilities is (i) not more than
10 feet above the tallest existing utility pole located within 500
feet of the new structure within the same public right-of-way
or within the existing line of utility poles; (ii) not located
inside the jurisdictional boundaries of a local, state, or federal
historic district; . . . (iv) designed to support small cell
facilities; or
2. The co-location on any existing structure of a wireless facility
that is not a small cell facility.”
12
AREPs, Part 1:
• CUPs cannot be required
• Application can be deemed complete if City acts late (10 days)
• Fee limits:
-shall not exceed $500
-must be reasonable
-no market-based or value-based fees
-no direct payment or reimbursement of 3rd party fees
• City can extend by 30 days in writing with applicant’s agreement
• Any disapproval must be in writing and state the reasons
13
AREPs, Part 2:
• 150 days to act on an application for a new structure
• 60 days to act on an application for a modification, a co-location,
removal or replacement of equipment if application does not
substantially change the physical dimensions of the structure
• 90 days to act on the co-location on an existing structure of any
wireless facility that is not a small cell facility and substantially
changes the physical dimensions
• 150 days to act on any wireless facility that is not a small cell facility
on a new structure
• Applications are deemed approved if the City does not act timely
14
AREPs, Part 3:
• Disapproval of AREPs not allowed on the basis of:
-applicant’s decision re: its designed service, customer
demand, or quality of service
-applicant’s specific need for the project
-the wireless technology involved
• If an AREP is disapproved, the City must:
-provide a written statement stating all reasons
-state in writing any modifications that would permit the City to
approve the project
-not unreasonably discriminate between providers
-publicly release within 30 days substantial record evidence in
writing that supports the action
15
AREPs, Part 4:
• If the AREP requests:
a. the modification of an existing wireless support structure; or
b. co-location of new transmission equipment; or
c. removal or replacement of transmission equipment; and
• that request does not substantially change the physical
dimensions, then the City may not deny it and shall approve it
within 60 days
• What does “SUBSTANTIAL CHANGE” mean?
- For a new antenna array outside the R-O-W, the FCC says it is
not a “substantial change” if there is no more than 20 feet of
separation from the top of the nearest existing antenna to the
bottom of the proposed new antenna 16
AREPs, Part 5:
• Disapprovals---Disapproval of AREPs are allowed:
-if the proposed height exceeds 50 feet and the City follows a
local ordinance that does not unreasonably discriminate between
providers
• Aesthetics---Nothing prohibits an applicant from voluntarily
submitting, and the City from accepting, any conditions that
address potential visual or aesthetic effects resulting from the
placement of a new structure or facility
• 2020 Bone to Localities---The City can disapprove an AREP if the
applicant has failed to give written notice to all adjacent property
owners within at least 15 days before filing the application (this
provision also applies to Standard Process Projects)
17
Standard Process Projects:
• “. . . Any project that is not an administrative review-eligible
project.”
18
Standard Process Projects, Part 1:
• CUPs can be required
• Fee limits:
-must be reasonable
-cannot exceed City’s actual direct costs
-no market-based or value-based fees
-no direct payment or 3rd party fees
• Application deemed complete if City acts late
• Can be disapproved on the basis of availability of an existing
wireless support structure within a reasonable distance
• Any disapproval must be in writing and state the reasons 19
Standard Process Projects, Part 2:
THESE ARE THE SAME AS THE REQUIREMENTS FOR AREPS:
• 150 days to act on an application for a new structure
• 60 days to act on an application for a modification, a co-location, removal or
replacement of equipment if application does not substantially change the physical
dimensions of the structure
• 90 days to act on the co-location on an existing structure of any wireless facility that
is not a small cell facility and substantially changes the physical dimensions
• applications are deemed approved if the City does not act timely
• the Applicant can agree to extend deadline, but City cannot extend unilaterally
20
Standard Process Projects, Part 3:
SAME REQUIREMENTS AS FOR AREPS:
• Disapproval of Standard Process Projects not allowed on the basis of:
-applicant’s decision re: its designed service, customer demand, or quality of service
-applicant’s specific need for the project
-the wireless technology involved
• If a Standard Process Project is disapproved, the City must:
-provide a written statement stating all reasons
-state in writing any modifications that would permit the City to approve the project
-not unreasonably discriminate between providers
-publicly release within 30 days substantial record evidence in writing that supports
the action
21
Standard Process Projects, Part 4:
SAME REQUIREMENTS AS FOR AREPS:
• If the Standard Process Project requests:
a. the modification of an existing wireless support structure; or
b. co-location of new transmission equipment; or
c. removal or replacement of transmission equipment; and
• that request does not substantially change the physical dimensions, then the City
may not deny it and shall approve it within 60 days
22
Standard Process Projects, Part 5:
• “SUBSTANTIAL CHANGE” here means the same as for AREPs:
-For a new antenna array outside the R-O-W, the FCC says it is not a “substantial
change” if there is no more than 20 feet of separation from the top of the nearest
existing antenna to the bottom of the proposed new antenna
• APPLICANTS AUTOMATICALLY GET AT LEAST 20 EXTRA FEET OF HEIGHT
• Disapprovals---Disapproval of AREPs are allowed:
-if the proposed height exceeds 50 feet and the City follows a local ordinance that
does not unreasonably discriminate between providers
• 2020 Bone to Localities also applies
23
Permitted Uses:
• All Small Cell Facilities in all districts
• All AREPs in all districts (50 feet or less in height)
• Any wireless facility or structure in the B-1 District 100 feet or less
• Any wireless facility or structure in the B-3, B-5, IN-2, I-1, I-2, and I-3 Districts 150 feet
or less
• Any base station for a lawfully existing wireless facility or structure meeting
specified requirements
• Any co-location on an existing structure meeting specified requirements
24
Conditional Use Permits Required:
• Standard Process Projects between 50 and 150 feet in height in the R-C, R-1, R-2, R-3,
R-4, IN-1, and B-4 Districts
• Standard Process Projects that exceed 100 feet in height in the B-1 District, but no
greater than 150 feet
• Standard Process Projects that exceed 150 feet in height in the B-3, B-5, IN-2, I-1, I-2,
and I-3 Districts
• Standard process project base stations meeting specified requirements
• Any co-location on an existing structure that increases the height of the facility, but
any height increase is limited to no more than 15 feet
• Any other standard process project
25
Setbacks:
• In the R-C, R-1, R-2, R-3, R-4, IN-1, and B-4 Districts: minimum setback is the height of
the structure
• In the B-1, B-3, B-5, IN-2, I-1, I-2, and I-3 Districts: if parcel adjacent to any parcel
zoned R-C, R-1, R-2, R-3, R-4, IN-1, or B-4, the minimum setback is the height of the
structure
• In the B-1, B-3, B-5, IN-2, I-1, I-2, and I-3 Districts: if structure is 50 feet or less in
height, the setback is the minimum setback for the applicable district
• In the B-1, B-3, B-5, IN-2, I-1, I-2, and I-3 Districts: if structure is 50 feet or more in
height, the minimum setback is ½ the height of the structure
26
Standards for CUP’s – Standard Process Projects Only:
• Substantial conformance with the Comprehensive Plan
• No significant adverse impact on use and enjoyment of nearby properties
• No significant negative impact on property values
• No material potential interference with pre-existing facilities or for future planned
facilities planned or designed for a specific location or any reserved for future public
safety facilities
• No significant adverse impact on public safety or public service needs
• No available and existing wireless support structures nearby
• Not in conflict with the City historic district ordinance
• Satisfies all other applicable requirements
27
Setbacks for Similar Structures:
• Virginia law provides that the City cannot impose a setback or fall zone requirement
that is larger than the setback or fall zone requirement “that is imposed on other types
of similar structures of a similar size, including utility poles.
• As a result, we propose establishing setbacks for wireless support structures that
provide the same setbacks for wireless support structures as are applied to light
poles, utility poles, and flag poles of a similar size.
28
Setbacks for Similar Structures:
• No setback for flag poles, light poles or utility poles (“poles”) that are less than 35’ in
height.
• Poles greater than 35’ in height set back at a 1:1 in R-C, R-1, R-2, R-3. R-4, IN-1 or B-4
Districts.
• Poles greater than 35’ in height in B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District and adjacent
to R-C, R-1, R-2, R-3, IN-1 or B-4 District set back at 1:1
• Poles in the B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District between 35’ and 50’ must meet
underlying district setback
• Poles in the B-1, B-3, B-5, IN-2, I-1, I-2 or I-3 District greater than 50’ set back at least ½
the height of the pole.
• Measured from base of pole to the property line 29
Discussion:
Discussion
30
Legal Notice Page 1
The Lynchburg Planning Commission will hold a public hearing for citizen comment on December 9,
2020, at 4:00 p.m., in the Council Chamber, first floor, City Hall, 900 Church Street, on the following
matters:
Petition of Jefferson House LLC for a conditional use permit at 1818 Langhorne Square to allow the
construction of sixty‐five senior housing units in a B‐3, Community Business District.
City Council is tentatively scheduled to hear this petition on January 12, 2021, at 7:30 p.m., in City
Council Chamber, first floor, City Hall, 900 Church Street.
Consideration of amending Section 35.2‐61.2 of the City of Lynchburg Zoning Ordinance Additional
Height Regulations, by adding section (d) Flag Poles, Light Poles and Utility Poles. The proposed
amendment would:
(1) establish that there shall be no setback requirement for any flag pole, light pole or utility pole that is
thirty‐five (35) feet or less in height;
(2) provide that any flag pole, light pole or utility pole greater than thirty‐five (35) feet in height and
located in the R‐C, Conservation District, R‐1, Low Density Residential District, R‐2, Low‐Medium Density
Residential District, R‐3, Medium Density Residential District, R‐4, High Density Residential District, IN‐1,
Institutional 1 District or B‐4, Urban Commercial District shall be required to set back a distance from all
property lines at least the height of the pole;
(3) provide that any flag pole, light pole or utility pole greater than thirty‐five (35) feet in height and
located in the B‐1, Limited Business District, B‐3, Community Business District, B‐5, General Business
District, IN‐2, Institutional 2 District, I‐1, Restricted Industrial District, I‐2, Light Industrial District or I‐3,
Heavy Industrial District, that is adjacent to any parcel that is zoned R‐C, R‐1, R‐2, R‐3, R‐4, IN‐1, or B‐4
shall be required to set back a distance at least the height of the pole from any land zoned R‐C, R‐1, R‐2,
R‐3, R‐4, IN‐1, or B‐4;
(4) provide that any flag pole, light pole or utility pole located in the B‐1, B‐3, B‐5, IN‐2, I‐1, I‐2, or I‐3
District that is greater than thirty‐five (35) feet in height but less than fifty (50) feet in height shall be
required to set back a distance from all property lines at least the minimum applicable setback for the
district in which it is located;
(5) provide that any flag pole, light pole or utility pole in the B‐1, B‐3, B‐5, IN‐2, I‐1, I‐2, or I‐3, that is
greater than fifty (50) feet in height shall be required to set back a distance from all property lines at
least one‐half (1/2) the height of the pole; and
(6) provide that setbacks for flag poles, light poles and utility poles shall be measured from the base of
the pole to the property lines of the parcel on which the pole is located.
Consideration of proposed amendments to the City of Lynchburg Zoning Ordinance that seek to repeal
Zoning Ordinance Chapters 35.2‐73.1 through 35.2‐73.20 of the City of Lynchburg Zoning Ordinance
related to Telecommunication Towers. Simultaneous with the repeal of the foregoing chapters, the
Legal Notice Page 2
proposed amendments also propose consideration of the adoption of new Zoning Ordinance Chapters
35.2‐73.1 through 35.2‐73.26 pertaining to Telecommunications Facilities. The proposed amendments
shall be referred to herein as the “Telecommunications Facilities Ordinance.”
The purpose and intent of the proposed amendments is to facilitate the provision of telecommunication
services, recognize that telecommunication facilities are a necessary part of communication networks,
regulate the location of telecommunication facilities, protect property from significant adverse impact,
implement the provisions of the City’s Comprehensive Plan while being in compliance with State &
Federal Law, minimize, where possible, adverse visual impact of telecommunications facilities, promote
co‐location of such facilities, promote and encourage the location of telecommunications facilities in
commercial and industrial areas, ensure that telecommunications facilities are compatible with other
land uses in the vicinity, allow telecommunications facilities as a matter of right, where appropriate,
provide greater scrutiny of requests for telecommunications facilities when their size, design, and
location may result in greater impacts on surrounding uses, encourage the utilization of smaller
telecommunications facilities in order to reduce their impact on the surrounding area, reduce the need
for larger and taller telecommunications facilities through the co‐location of such facilities on new
structures and, where feasible, on existing structures, avoid potential damage to the use and enjoyment
of property by ensuring that telecommunication facilities are soundly, safely, and carefully designed,
constructed, and maintained and, where no longer structurally sound, removed, and require the
removal of telecommunications facilities when they are no longer used to support telecommunications
facilities and no longer retain any other legitimate purposes.
The provisions of the proposed Telecommunications Facilities Ordinance shall be applicable to all land
within the boundaries of the City of Lynchburg, however, the proposed Ordinance amendments shall
not apply to any “small cell facility” within the City’s right‐of‐way or on any City‐owned property which
are regulated by separate provisions in the City Code.
The proposed Telecommunications Facilities Ordinance will classify facilities into three categories and
provide application submission, processing, timing, and fee requirements for: Small Cell Facilities,
Administrative Review‐Eligible Projects and Standard Process Projects.
A Small Cell Facility is proposed to be defined in the same way a “small cell facility” is defined in Virginia
Code § 15.2‐2316.3. A small cell facility is one that satisfies both of the following qualifications: each
antenna is located inside an enclosure of no more than six cubic feet of volume or, if the antenna has
exposed elements, the antenna and all exposed elements could fit within an imaginary enclosure of no
more than six cubic feet; and all other wireless equipment has a cumulative volume of no more than 28
cubic feet, or such higher limit as may be established by the Federal Communications Commission.
Small cell facilities are proposed to be permitted by right in all Zoning Districts.
Administrative Review–Eligible Projects are proposed to be defined in the same way “administrative
review‐eligible projects” are defined in Virginia Code § 15.2‐2316.3, which provides, that such projects
include 1. The installation or construction of a new structure that is not more than 50 feet above
ground level, provided that the structure with attached wireless facilities is (i) not more than 10 feet
Legal Notice Page 3
above the tallest existing utility pole located within 500 feet of the new structure within the same public
right‐of‐way or within the existing line of utility poles; (ii) not located within the boundaries of a local,
state, or federal historic district; (iii) not located inside the jurisdictional boundaries of a locality having
expended a total amount equal to or greater than 35 percent of its general fund operating revenue, as
shown in the most recent comprehensive annual financial report, on undergrounding projects since
1980; and (iv) designed to support small cell facilities; or 2. The co‐location on any existing structure of
a wireless facility that is not a small cell facility.
The proposed amendments also provide that the term “administrative review‐eligible project” shall also
include eligible facilities requests as that term is defined by federal law in 47 Code of Federal
Regulations 1.6100.
Administrative Review‐Eligible Projects are proposed to be permitted by right in all Zoning Districts.
Standard Process Projects are proposed to be defined in the same way “standard process projects” are
defined in Virginia Code § 15.2‐2316.3, which states that such projects include any project that is not an
administrative review‐eligible project.
A Standard Process Project which proposes a wireless facility or structure in the B‐1, Limited Business
District, that is one hundred feet or less, or a wireless facility or structure in the B‐3, Community
Business District, B‐5, General Business District, IN‐2, Institutional 2 District, I‐1, Restricted Industrial
District, I‐2, Light Industrial District or I‐3, Heavy Industrial District, that is one hundred fifty (150) feet or
less is proposed to be a use permitted by right in those districts.
A Standard Process Project which proposes a wireless facility or structure between fifty (50) feet and
one hundred fifty feet in height in the R‐C, Conservation District, R‐1, Low Density Residential District, R‐
2, Low‐Medium Density Residential District, R‐3, Medium Density Residential District , R‐4, High Density
Residential District, IN‐1, Institutional 1 District or B‐4, Urban Commercial District, or a wireless facility
or structure exceeding one hundred feet but no greater than one hundred fifty (150) feet in the B‐1,
Limited Business District, or a Standard Process Project that exceeds one hundred fifty (150) feet in the
B‐3, Community Business District, B‐5, General Business District, IN‐2, Institutional 2 District, I‐1,
Restricted Industrial District, I‐2, Light Industrial District or I‐3, Heavy Industrial District is proposed to
require approval of a conditional use permit by the City Council.
In accordance with the adoption of the proposed amendments, the “Approval Type” for “wireless
telecommunications transmission” that is stated in each exhibit/chart for each applicable zoning district
(for example, please see Exhibit IV‐1 for the R‐C District) shall be revised in order to state the “Approval
Type” (“C” for “Conditional Use Permit” and/or “P” for “Permitted”) for each zoning district consistent
with the terms of the proposed amendments.” Thus, if under the proposed amendments a wireless
telecommunications facility may be allowed with a Conditional Use Permit (“C”) or may be Permitted
(“P”), depending on the circumstances, then the “Approval Type” in the exhibit/chart for each district
shall be stated as follows: “P/C”. If such facilities are only allowed by Conditional Use Permit, a “C” will
be inserted in the applicable exhibit, and if such facilities are only Permitted, a “P” will be inserted in the
applicable exhibit.
Legal Notice Page 4
Setbacks for wireless facilities and structures are proposed as follows:
Wireless facilities and structures that are less than thirty‐five (35) feet in height would require no
setback in all Zoning Districts.
Wireless facilities and structures greater than thirty‐five (35) feet in height and located in the R‐C,
Conservation District, R‐1, Low Density Residential District, R‐2, Low‐Medium Density Residential
District, R‐3, Medium Density Residential District, R‐4, High Density Residential District, IN‐1,
Institutional 1 District, or the B‐4, Urban Commercial District, are proposed to be required to set back at
least one (1) foot for each one (1) foot in height from all property lines.
Wireless facilities and structures between thirty‐five (35) feet and fifty (50) feet in height and located in
the B‐1, Limited Business District, B‐3, Community Business District, B‐5, General Business District, IN‐2,
Institutional 2 District, I‐1, Restricted Industrial District, I‐2, Light Industrial District or I‐3, Heavy
Industrial District are proposed to be required to meet the underlying district setback.
Wireless facilities and structures greater than fifty (50) feet in height and located in the B‐1, Limited
Business District, B‐3, Community Business District, B‐5, General Business District, IN‐2, Institutional 2
District, I‐1, Restricted Industrial District, I‐2, Light Industrial District or I‐3, Heavy Industrial District, are
proposed to be required to set back one‐half (1/2) the height of the tower from all property lines.
Setbacks are proposed to be measured from the base of the structure to the property line.
The proposed amendments also include requirements and terms applicable to the use of City‐owned
property for wireless facilities, interference with public safety radio services, structural requirements for
telecommunications facilities, the method of determining the height of a wireless support structure,
illumination of telecommunications facilities, the exterior finish of telecommunications facilities, the
landscaping on parcels containing telecommunications facilities, security of telecommunications
facilities, access to parcels containing telecommunications facilities, maintenance of
telecommunications facilities, the City’s preference for telecommunications facilities with a stealth
design, the modification, demolition, and rebuilding of telecommunications facilities, abandonment of
telecommunications facilities and removal requirements applicable thereto, the allowance of voluntary
conditions, the exemption of micro‐wireless facilities from the proposed amendments, and a reservation
of rights of the City with respect to telecommunications facilities.
The proposed amendments are tentatively scheduled to go to a City Council work session on January 12,
2021 and to a City Council public hearing on February 9, 2021 at 7:30 p.m., in City Council Chamber, first
floor, City Hall, 900 Church Street.
A copy of all draft ordinances, Future Land Use Map amendments, rezoning, conditional use permit
petitions or any other matter advertised by this legal notice may be viewed in the Department of
Community Development, Planning Division, second floor, City Hall, 900 Church Street between the
hours of 8:30 a.m. to 5:00 p.m. or on the internet at www.lynchburgva.gov. At the conclusion of the
Legal Notice Page 5
public hearing, the Planning Commission/Council will consider adopting each item advertised by this
legal notice. For additional information, contact the Planning Division at 455‐3900.
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 287
6. If at any time evidence is provided that the lot or parcel is being used other than in
compliance with these regulations, the property owner may be cited for violation of
this zoning ordinance.
7. Copies of the business license and all applicable permits shall be kept in the food
truck, trailer or cart at all times.
Section 72 Updates: Ord. No. O-17-013, 2-14-17
Telecommunications Towers 35.2-73
35.2-73.1 Findings
(a) The City has the authority to regulate the placement, construction, and modification of
towers, antennas support structures, and telecommunications facilities.
(b) The federal communications act of 1934 as amended by the telecommunications act of
1996 ("the act") grants the federal communications commission ("FCC") exclusive
jurisdiction over:
1. The regulation of the environmental effects of radio frequency emissions from
telecommunications facilities.
2. The regulation of radio signal interference among users of the radio frequency
spectrum.
(c) The City's regulation of towers and telecommunications facilities cannot have the effect
of prohibiting any person from providing wireless telecommunications services in
violation of the act.
35.2-73.2 Purposes.
The general purpose of this article is to regulate the placement, construction, and modification
of towers and telecommunications facilities in order to protect the health, safety, and welfare of
the public, while at the same time not unreasonably interfering with the development of the
competitive wireless telecommunications marketplace in Lynchburg. Specifically, the purposes
of this article are:
(a) To facilitate the provision of wireless telecommunications services to the residents and
businesses of the City in an orderly fashion;
(b) To regulate the location of towers and telecommunications facilities in the City;
(c) To protect residential areas and land uses from potential adverse impact of towers and
telecommunications facilities;
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 288
(d) To minimize adverse visual impact of towers and telecommunications facilities through
careful design, siting, landscaping, and innovative camouflaging techniques;
(e) To promote and encourage shared use/collocation of towers and antenna support
structures as a primary option rather than construction of additional single-use towers;
(f) To avoid potential damage to property caused by towers and telecommunications
facilities by ensuring that such structures are soundly and carefully designed,
constructed, modified, maintained, and removed when no longer used or determined to
be structurally unsound;
(g) To ensure that towers and telecommunications facilities are compatible with
surrounding land uses;
(h) To promote the location of towers in industrial and business, rather than residential
areas.
35.2-73.3 Development and approval of towers.
(a) A tower and associated telecommunications facilities shall be a permitted use of land in
business and industrial districts (B-1 through B3, B-5, and I-1 through I-3). A conditional
use permit from the City Council shall be required for applicants seeking to locate
towers, regardless of height, and related telecommunications facilities, in business
districts zoned as B-4 and B-6 and in conservation and residential districts designated R-
C through R-5. No structure, regardless of design or material, shall be permitted in any
residential district as a telecommunications facility, except small equipment cabinets
located on the tower or on the ground immediately adjacent to a telecommunications
facility, provided they do not exceed seventy-two cubic feet above ground, and six feet
in height. If another company collocates its antenna on the same tower, each company
is permitted to have a small equipment cabinet of this size. Any proposal exceeding
these parameters shall be subject to review by the City Council as part of a conditional
use permit application. Application shall be made to the City Planner in the manner
provided in Article II of this Zoning Ordinance. In districts for which a conditional use
permit is required, the City Council shall make its decision to grant or deny such permit
in writing and in a manner consistent with applicable state and federal law.
(b) Existing towers are exempt from the maximum height restrictions of the districts where
located. New towers shall not exceed a maximum height of fifty (50) feet in any
residential district, one hundred (100) feet in a B-1 district, or one hundred fifty (150)
feet in any other commercial or industrial district, unless the City Council approves a
conditional use permit authorizing a maximum height in excess of these limits
(c) The City may authorize the use of City property in appropriately zoned districts in
accordance with the procedures of the City charter and code. The City shall have no
obligation whatsoever to use City property for such purposes.
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 289
(d) No new tower shall be built, constructed, or erected in the City unless such tower,
including the ground area for associated telecommunications facilities, is capable of
supporting another person's operating telecommunications facilities comparable in
weight, size, and surface area to the applicant's telecommunications facilities. For
purposes of this section, the "applicant's facilities" shall mean those installed within six
months of completion of tower construction. These provisions are encouraged for, but
need not apply to, towers no greater than 50 feet in height.
(e) An application to develop a tower shall include:
1. The name, address, and telephone number of the applicant. If the applicant is not
the owner of the parcel of land upon which the tower is situated, the written
consent of the owner, and the name, address, telephone number of the owner, shall
be evidenced in the application. The application shall also contain an affirmative
statement indicating that both the owner and applicant are aware of and agree to
comply with the provisions in section 35.2-73.19 of this Zoning Ordinance regarding
abandonment.
2. The legal description, valuation map number, and address of the parcel of land upon
which the tower is situated.
3. The names, addresses, and telephone numbers of all tower owners with towers or
usable antenna support structures within a one (1) mile radius of the proposed new
tower site, including City-owned property.
4. Written documentation that the applicant made diligent, but unsuccessful, efforts
for permission to install or collocate the applicant's telecommunications facilities on
City-owned towers or usable antenna support structures located within a one (1)
mile radius of the proposed tower site.
5. Written documentation that the applicant made diligent, but unsuccessful, efforts
to install or collocate the applicant's telecommunications facilities on existing or
proposed towers, and their ground area, or usable support structures owned by
other persons located within a one (1) mile radius of the proposed tower site.
6. Written, technical evidence from a radio frequency engineer that the proposed
tower or telecommunications facilities cannot be installed or collocated on another
person's tower or usable antenna support structure located within a one (1) mile
radius of the proposed tower site and must be located at the proposed site in order
to meet the coverage requirements of the applicant's wireless communications
system.
7. Written, technical evidence from a structural engineer that the proposed structure
meets the standards set forth in this code, including but not limited to the
requirements set forth in sections Article I35.2-73.3(d) and 35.2-73.6.
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 290
8. Written, technical evidence from a radio frequency engineer that the proposed
facilities meet the standards set forth in this code, including, but not limited to, the
requirements set forth in section 35.2-73.4.
9. Written, technical evidence from an electrical engineer that the proposed site of the
tower or telecommunications facilities does not pose a risk of explosion, fire, or
other danger due to its proximity to volatile, flammable, explosive, or hazardous
materials such as LP gas, propane, gasoline, natural gas, or corrosive or other
dangerous chemicals.
10. A map of the City and the first half-mile of all bordering communities showing the
design of the applicant's entire existing or proposed wireless telecommunications
network. Such map shall, at minimum, indicate the general location of all proposed
or existing tower and antenna sites, their dimensions, specifications, and signal area
coverage.
11. Color photo simulations showing the proposed site of the tower with a photo-
realistic representation of the proposed tower as it would appear viewed from the
closest residential property or properties and from adjacent roadways.
12. An application fee that represents the site plan fee and conditional use fee
otherwise required. The City reserves the right to employ an outside consultant to
review any application. The applicant shall reimburse the City for the reasonable
expenses related to such review as an additional application fee.
13. A site plan, including a description of the lot lines, setbacks, location of adjacent
structures, proposed location of the tower, separation distances, proposed tower
height, landscaping, screening, access, parking, and security.
14. An acknowledgment that the applicant currently complies and will continue to
comply with all FCC standards, including reporting requirements regarding radio
frequency emissions.
15. When seeking approval of a telecommunication tower or facility, the applicant shall
furnish written documentation that:
a. The proposed communication tower is reasonably necessary to serve an
adjacent residential area or areas;
b. Any variance (or conditional use permit) sought is the minimum necessary to
address the need for the variance (or conditional use permit), subsequent to
exploring all reasonable siting alternatives;
c. The location of the communication tower in relation to the existing structures,
trees and other visual buffers shall minimize, to the greatest extent reasonably
practicable under the circumstances, any impact on affected residentially zoned
property;
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 291
d. The location of the communication tower will not have a significant detrimental
impact on adjacent property values; and
e. Any other factors that the applicant deems to be relevant to the City's
consideration of a tower or facility siting.
f. All information submitted with an application that is trade secret information or
is for other reasons proprietary shall be clearly marked as such when submitted
with an application. The City shall not disclose publicly, or to any third party,
proprietary information unless compelled to do so by federal, state, or local law.
35.2-73.4 Interference with Public Safety Radio Services
In order to ensure that the City's public safety radio services will be free from harmful or
destructive interference, all applicants requesting a permit to site a tower or
telecommunications facilities must:
(a) Demonstrate compliance with good engineering practices;
(b) Provide the City a copy of all intermodulation studies submitted to the FCC;
(c) Not induce harmful or destructive interference to the City's public safety radio services;
(d) Comply with FCC regulations regarding susceptibility to radio frequency interference,
frequency coordination requirements, general technical standards for power, antenna,
bandwidth limitations, frequency stability, transmitter measurements, operating
requirements, and any and all other federal statutory and regulatory requirements
relating to radio frequency interference (RFI); and
(e) In the case of co-location of telecommunications facilities either in the same location or
on the same tower as the City's, comply with FCC emissions requirements and not
radiate any RFI or any electromagnetic interference (EMI) that may interfere with the
City's public safety radio services.
35.2-73.5 Setbacks and Fall Zones
(a) Setbacks
1. All towers and any telecommunications facilities in any business and industrial
zoning districts shall be set back on all sides a distance equal to the underlying
building setback requirement in the applicable zoning district. All towers in
residential zoning districts shall be set back on all sides a distance equal to the tower
height. In addition, in order to preserve the aesthetics of residential areas and to
maintain property values, whenever a tower is located in a residential district, the
tower shall be located a distance at least equal to twice the height of the tower
from any adjacent property lines. When a tower is located in a commercial district
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 292
or industrial district, the tower shall be located a distance at least equal to twice the
height of the tower from any residential district.
2. Setback requirements for towers shall be measured from the base of the tower to
the property line of the parcel on which it is located.
(b) Fall Zones
1. Every tower shall be designed to fall within the boundaries of the parcel on which
the tower is located. The applicant shall submit written certification and supporting
documentation from a structural engineer that a tower proposed for a residential
area will fall within the specified fall zone. In the case of towers located in
commercial or industrial areas that are specified and certified by a structural
engineer to be collapsible or incapable of failure, the Zoning Administrator may
reduce the fall zone accordingly.
2. In those instances, in which there is a conflict between the required setback and the
required fall zone, the greater distance shall apply.
35.2-73.6 Structural Requirements
All towers must be designed and certified by a structural engineer to be structurally sound and,
at minimum, in conformance with the statewide uniform building code, and any other standards
outlined in this article.
35.2-73.7 Separation or Buffer Requirements
(a) Towers shall be separated from all residentially zoned lands and all residences
(irrespective of zoning classification) by a minimum distance equal to one hundred
percent (100%) of the height of the proposed tower.
(b) Tower separation distances for the purpose of compliance with this article shall be
measured from the base of a tower to the closest point of a designated area. The
minimum tower separation distance shall be calculated and applied irrespective of City
and county jurisdictional boundaries.
35.2-73.8 Method of Determining Tower Height
Measurement of tower height for the purpose of determining compliance with all requirements
of this article shall include the tower structure itself, the base pad, and any other
telecommunications facilities attached thereto which extend over the top of the tower structure
itself. Tower height shall be measured from grade.
35.2-73.9 Illumination
Towers shall not be artificially lighted except as required by the federal aviation administration
("FAA"). Upon commencement of construction of a tower, in cases where there are residential
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 293
uses located within a distance equal to the height of the tower from the tower, and when
required by federal law, dual mode lighting shall be requested from the FAA.
35.2-73.10 Exterior Finish
Towers not requiring FAA painting or marking shall be painted a neutral color (galvanized finish
is considered a neutral color).
35.2-73.11 Landscaping
All landscaping on parcels containing towers, antenna support structures, or
telecommunications facilities shall be designed to screen the tower, antenna support structure,
and telecommunications facilities to a height of at least six (6) feet from grade. This requirement
may be waived at the discretion of the inspections division if the base of the tower and facilities
to be screened are not located in and not visible from any business or residential districts or
visible from public streets. All landscaping must be continually maintained in a healthy and
attractive manner.
35.2-73.12 Security
All towers must be reasonably posted and secured to protect against trespass.
35.2-73.13 Access
All parcels upon which towers are located must provide access during normal business hours to
at least one (1) paved vehicular parking space(s) on site.
35.2-73.14 Certifications and Inspections
(a) All towers shall be certified by an engineer to be structurally sound and in conformance
with the requirements of the City building code and all other construction standards set
forth by the City code and federal and state law. For new monopole towers, such
certification shall be submitted with an application pursuant to section 35.2-73.3(e) and
every five (5) years thereafter; for existing monopole towers, such certification shall be
submitted within sixty (60) days of the effective date of this article and then every five
(5) years thereafter; for new lattice or guyed towers, such certification shall be
submitted with an application pursuant to section 35.2-73.3(e) and every two (2) years
thereafter; and for existing lattice or guyed towers, such certification shall be submitted
within sixty (60) days of the effective date of this article and then every two (2) years
thereafter. The tower owner may be required by the City to submit more frequent
certifications should there be reason to believe that the structural and electrical
integrity of the tower is jeopardized.
(b) The City and its agents shall have authority to enter onto the property upon which a
tower is located, between the inspections and certifications required above, to inspect
the tower for the purpose of determining whether it complies with the statewide
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 294
building code and all other construction standards provided by the City code and federal
and state law.
(c) (The City reserves the right to conduct such reasonable and necessary inspections, upon
reasonable notice to the tower owner. All expenses by the City related to such
inspections shall be borne by the tower owner if any unresolved defects exist.
(d) The tower or telecommunication facilities owner shall certify to the City on an annual
basis that it is in compliance with all of the requirements of this article, including the
requirements set forth in Sec. 35.2-73.15.
35.2-73.15 Maintenance
(a) Tower owners shall at all times employ ordinary and reasonable care and shall install
and maintain in use nothing less than commonly accepted methods and devices for
preventing failures and accidents which are likely to cause damage, injuries, or
nuisances to the public.
(b) Tower owners shall install and maintain towers, telecommunications facilities, wires,
cables, fixtures, and other equipment in substantial compliance with the requirements
of the national electric safety code and all FCC, state, and local regulations, and in such
manner that will not interfere with the use of other property.
(c) All towers, telecommunications facilities, and antenna support structures shall at all
times be kept and maintained in good condition, order, and repair so that the same shall
not menace or endanger the life or property of any person.
(d) All telecommunication facilities shall maintain compliance with current radio frequency
emission standards of the FCC.
(e) In the event the use of a tower is discontinued by the tower owner, or in the event a
tower owner files notice to the FCC of its interest to cease operating the tower owner
shall provide written notice to the City of its intent to discontinue use and the date
when the use shall be discontinued.
35.2-73.16 Stealth
All towers and telecommunications facilities in business and residential districts shall be of
stealth design.
35.2-73.17 Telecommunications Facilities on Antenna Support Structures
(a) Any telecommunications facilities which are not attached to a tower may be permitted
as an accessory use to any antenna support structure at least thirty (30) feet tall,
regardless of the zoning restrictions applicable to the zoning district where the structure
is located. Telecommunications facilities are prohibited on all other structures.
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 295
(b) The owner of such structure or telecommunication facilities shall, by written
certification, graphic representation, and detailed plans to the technical review
committee verify that:
1. The antenna support structure and telecommunications facilities comply with the
statewide building code;
2. Any telecommunications facilities and their appurtenances, located upon the roof of
an antenna support structure, are set back a distance at least equal to the height of
the telecommunications facilities. However, this setback requirement shall not
apply to telecommunications facilities and their appurtenances, located above the
roof of an antenna support structure, if such facilities are appropriately screened
from view through the use of screening techniques that are compatible with the
surrounding built environment and approved by the City. Setback requirements
shall not apply to stealth antennas which are mounted to the exterior of antenna
support structures below the roof, but which do not protrude more than twenty-
four (24) inches from the side of such an antenna support structure; and
3. All applicable standards of this article are being met.
35.2-73.18 Existing Towers
(a) An existing tower may be modified or demolished and rebuilt to accommodate
collocation of additional telecommunications facilities as follows:
1. Application for a permit shall be made to the division of inspections which shall have
the authority to issue a permit without further approval by the City Council.
2. The total height of the modified tower and telecommunications facilities attached
thereto shall not exceed the lesser of the height of the existing tower or the
maximum height for towers allowed under this article.
3. A tower which is being rebuilt to accommodate the collocation of additional
telecommunications facilities may be relocated on the same parcel subject to the
setback requirements of this article. However, if it is impossible for the tower to be
rebuilt in compliance with the setback requirements of this article, such set back
requirements shall require approval of a variance from the Board of Zoning Appeals
to allow the tower to be rebuilt in its exact previous location.
35.2-73.19 Abandonment
(a) If the City receives notice pursuant to section 35.2-73.15, or if any tower shall cease to
be used for a period of three hundred sixty-five (365) consecutive days, the division of
inspection shall notify the owner, with a copy to the applicant, that the site will be
subject to a determination by the division of inspection that such site has been
abandoned. The owner shall have thirty (30) days from receipt of said notice to show by
a preponderance of the evidence that the tower has been in use or under repair during
City of Lynchburg Zoning Ordinance Article VII: Specific Land Use Standards
Adopted February 23, 2016 Page 296
the period. If the owner fails to show that the tower has been in use or under repair
during the period, the division of inspection shall issue a final determination of
abandonment for the site. Upon issuance of the final determination of abandonment,
the owner shall, within seventy-five (75) days, dismantle and remove the tower. If an
owner fails to remove an abandoned tower within seventy-five (75) days of the final
determination of abandonment, the City may dismantle and remove the tower and
recover the costs of the same from the owner or by accessing the bond set forth below.
For the purposes of this section, removal includes all physical improvements associated
with towers, including foundation and tower grounding.
(b) To secure the obligation set forth above, the owner shall post a bond or provide a letter
of credit in an amount to be determined by the City's risk manager based on the
anticipated cost of removal of the tower.
35.2-73.20 Reservation of Rights
The City reserves the right to impose any other reasonable conditions it determines are
necessary for the proper placement, construction, or modification of towers or facilities, and/or
to impose any other reasonable conditions on the issuance of a conditional use permit for
placement, construction, or modification of a tower or facilities.
REVISED
December 8, 2020
AGENDA ITEM #: 4
1
// A regular meeting of the Council of the City of Lynchburg was held on the 8th day of December, 2020,
at 4:00 P.M. in the Council Chamber, City Hall, MaryJane Dolan, President, presiding. The following
Members were present:
Present: MaryJane Dolan, Beau Wright, Jeff S. Helgeson, J. Randy Nelson, Treney Tweedy,
Sterling A. Wilder, Chris Faraldi 7
Absent: 0
// In the matter of Agenda Item #1, Ms. Kristen Nolan and Ms. Sarah Quarantotto, the Director of Housing
Services and the Executive Director of Miriam’s House, respectively, presented the Central Virginia’s
Continuum of Care’s (CVCoC) Strategic Plan to End Homelessness. Miriam’s House serves as a lead
agency for the Continuum of Care. It is in this capacity that Miriam’s House is a liaison between local
homeless response efforts, and local, state, and federal government entities. The CVCoC’s mission
statement outlined in the strategic plan is to ensure that homelessness is rare, brief, and non-recurring.
Its vision is for all individuals and families experiencing homelessness in the City of Lynchburg and
surrounding counties to have a permanent, safe, decent, and affordable place to call home by the year
2024. The CVCoC is funded through federal, state, and local grants totaling $964,720. The way the
mission is carried out is through the homeless response system, comprised of shelters, prevention
programs, rapid re-housing, and supportive housing that all come together to work cohesively to make
sure that there are no gaps in service, that everyone receives the help that they need, and that everyone
receives the appropriate level of intervention.
Councilmember Tweedy commented on the fact that seniors are posing a serious increase in
homelessness since they are unable to grow their income. Ms. Quarantotto said that nationally those
numbers are rising, however an analysis was recently conducted on the local level and there were no
alarming findings yet. She agreed that as housing costs increase and seniors’ retirement income does
not, it is a looming crisis.
Mayor Dolan noted that in the survey over half of the responses indicated that the individuals did
not have a job and she wanted to know how workforce is being addressed. Ms. Nolen stated that the
REVISED
December 8, 2020
AGENDA ITEM #: 4
2
CVCoC has increased its partnership with Virginia Career Works, and are attempting to better
communicate with frontline staff (caseworkers) on those resources.
Councilmember Faraldi asked how the pandemic is affecting the workforce aspect. Ms. Nolen
responded that one of the big issues they’re facing is obtaining proper identification. Getting an
appointment at the DMV is really hard due to the pandemic, and having proper identification to fill out an I-
9 Form is the first step to applying for a job. It has also been a challenge to find jobs that are available
along the bus line. Although there are less people who have become homeless, the CVCoC has had to
help people with rent assistance for a much longer time period than normal because getting a job or
keeping a job has been really difficult during the COVID-19 pandemic.
// In the matter of Finance, Agenda Item #2, Council received a report on the FY 2020 Comprehensive
Annual Financial Report from the City’s external auditing firm. Mr. Chris Banta with Brown Edwards, LLC
was in attendance and presented the results of the audit. He stated that when doing an audit, it is
important to understand how the organization serves the citizenry and how it pays its vendors. Those are
called internal controls and understanding that is the backbone of the process. Also, understanding how
the organization adapted to the pandemic in regards to remote work and serving the citizens is also
important because that could have enhanced risks from an auditor’s standpoint. The City and School
finance did adapt well to the remote processing and had no enhanced risks.
Mr. Banta presented the highlights of the CAFR. An audit opinion gives an opinion on the
financial statements. An unmodified opinion, or clean opinion, states that the auditor believes the financial
statements are materially correct. That’s the highest level of assurance an auditor can give to a set of
audited financials, and the City received an unmodified opinion.
The next report was a General Fund Budget to Actual Statement. The City’s general fund
underspent the expenditures for the year so it is in compliance with the legally adopted budget. Mr. Banta
explained that there is a footnote within the statement referencing the impacts of the COVID-19 pandemic
and that is to simply let the user know, as they’re digesting this document, they need to keep in mind that
REVISED
December 8, 2020
AGENDA ITEM #: 4
3
there was a global pandemic going on and that had wide-ranging implications on operations and
financials for local governments.
The next phase of the audit was to craft the Yellow Book opinion which takes a deeper dive in
assessing the internal controls and processes. If there are any significant deficiencies or material
weaknesses, not just in problems found but in problems based on the design of the operations, it would
have to be reported in the CAFR. There were no significant deficiencies or material weaknesses to report.
The next opinion is called a Passenger Facility Charge Audit Report. Since the City operates a
commercial airport, it charges what is called a Passenger Facility Charge, an additional fee with a
purchase of an airline ticket. There are certain compliance requirements that auditors have to test as a
result of charging these fees. This looks at how those fees are being used and reports on any significant
findings; there were no significant finding for the City.
Last is the Federal Single Audit Report. The City expended about 40 million dollars of federal
awards this year in coronavirus relief funding. Mr. Banta stated that staff is anticipating this will be subject
to audit. The Office of Management and Budget issues the compliance supplements that guides staff and
tells them exactly what to look at; however, that guidance has not been released yet. Therefore, this
portion of the audit is on hold but will be submitted by its deadline of March 31 st. The state deadline for
issuing the CAFR is December 15th. Mr. Banta stated that the CAFR will be issued with just the
Passenger Facility Charge, the report on the financials, and the yellow book government report. Then an
update will be issued with the federal award report at a later time.
// In the matter of Budget, Agenda Item #3, Ms. Donna Witt, Chief Financial Officer, presented Council
with an update on the revenue collections received in several key City revenue sources. Ms. Witt
explained that these numbers are through October which means that we are starting to look at the 2nd
Quarter. The 1st Quarter came in stronger than what staff anticipated, however staff thought the economy
would be more back to normal by the 2nd Quarter, but unfortunately, that is not the case overall.
Fortunately, Sales Tax is about $233,000 above budget. This continues to come in very strong;
the revenues are up about 6.7% compared to last year’s numbers and up just about 4% compared to last
REVISED
December 8, 2020
AGENDA ITEM #: 4
4
month. This is based primarily on online sales, grocery sales, and home improvement sales. Ms. Witt
anticipates these numbers will remain strong.
Unfortunately, Meals Tax, for the first time, is below what was anticipated in the budget.
Restaurants are just not as open, or back to normal, as staff thought they would be. Ms. Witt anticipates
that these collections will not rebound and a decline will be continual probably through the rest of the 2nd
Quarter, and possibly in to the 3rd Quarter.
Lodging Tax, poses the same situation as Meals Tax. Staff is seeing about an $88,000 difference
from what was collected to what we anticipated in the budget. Ms. Witt explained that she again expects a
decline through at least the rest of the 2nd Quarter.
The Amusement Tax sector is really still very much closed; very little is open for people to
participate with in order for the City to collect Amusement Tax. Ms. Witt anticipates that the mere $18,000
- $19,000 being collected is going to continue for at least the 2nd Quarter and possibly in to the 3rd and 4th
Quarter.
// In the matter of Water Resources, Agenda Item #4, Council received an update on the Utility
Disconnect Moratorium and considered adopting Resolution #R-20-092 related to the COVID-19
Municipal Utility Relief Program and associated CARES funding.
Mr. Tim Mitchell, Director of Water Resources presented Council with a summary of the
recommendation. On November 19, 2020, as a result of recent State Budget Amendments, the City
received a memorandum from the Virginia Department of Housing and Community Development (DHCD)
regarding the COVID-19 Municipal Utility Relief Program (Relief Program). The memorandum explained
the process for municipal utilities to apply for CARES funds for the Relief Program. The applications were
due on November 30, 2020 and only included utility and locality identification and the total arrearages for
60 and 30 days which were $397,121 and $619,181, respectively, at the time of the application. The
funds will be distributed to all water, sewer, gas, and electric utilities that applied for the funding on a pro-
rata basis and are considered pass-through funds since they will be applied directly to qualifying
customer accounts. $344,014.82 was awarded to the City.
REVISED
December 8, 2020
AGENDA ITEM #: 4
5
The General Assembly 2020 Special Session Budget Bill HB5005 Item 4-14 requires that
notification be sent to all customers by January 17, 2020 with arrearages over 30 days with information
about the disconnect moratorium and repayment plan options. The City can qualify for an exemption from
the Utility Disconnect Moratorium to resume utility cut-offs of delinquent accounts, but certain criteria must
be first met. These include, arrearages must exceed 1% of the total annual operating revenue;
documents must be available to the public; and City Council must conduct a public hearing and affirm the
1% exceedance and the intent to resume cut-offs.
Mr. Mitchell outlined the staff recommendations to Council which included adopting a resolution
waiving Councils normal fiscal policies and accepting the COVID-19 Relief Funds. Councilmember
Helgeson asked for clarification about the statement, wanting to know exactly what fiscal responsibilities
are being waived. Ms. Donna Witt, Chief Financial Officer, clarified that Council’s normal financial
procedures require appropriations of funds to have two readings; however that is a City code not a State
code. This means that Council has the ability to waive the need for a second reading and appropriate
these funds with one reading. There is a very short window to work with citizens to get information out
about these funds to pay their bill. If Council waited to have a second reading at the next Council meeting
in January 12, 2021, the window to receive these funds would be missed.
Mr. Mitchell continued with the following staff recommendations: within the next two weeks notify
customers with arrearages of the repayment plan and relief fund availability and requir ements; conduct a
Public Hearing on January 12, 2021 for consideration approving the 1% Exemption from the moratorium
and resumption of utility disconnections on a date to be established; if it is determined that utility
disconnections will resume, immediately notify customers again with arrearages of the available
resources, assistance, and repayment plan options and when cut-offs will resume.
Vice Mayor Wright made a motion to approve Resolution #R-20-092, seconded by
Councilmember Tweedy. With no further discussion from Council, the following vote was recorded:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
REVISED
December 8, 2020
AGENDA ITEM #: 4
6
// In the matter of Roll Call, Agenda Item #5, Councilmember Faraldi had no items. Councilmember Wilder
thanked the community for all of the work they are doing during this crisis. Councilmember Tweedy asked
that all citizens be diligent and adhere to guidelines that will make us all safe. Councilmembers Nelson
and Helgeson had not items. Vice Mayor Wright recently went to an unveiling of a marker at the Juvenile
Court for Lucy Harrison Baber who is a Lynchburg native and longtime resident who advocated for
Juvenile Justice Reform in Virginia and helped establish the juvenile justice system that we have here in
Lynchburg. Mayor Dolan had the following roll call items:
• Mustaches for Kids (M4K) Lynchburg just completed our annual fundraiser and raised
$318,713 in 30 days for local children’s charities. Since the inception of this organization in
2014, this brings the total amount raised for local non-profits to over $1,000,000.
• “Since the onslaught of the COVID-19 pandemic, I have seen this community come together
in so many different ways to support one another - whether it was following safety guidelines
and wearing masks, supporting local businesses, checking on elderly neighbors or donating
to those who were in need. I have been so proud to witness just how great this community
continues to be and how, in times of adversity, we come together and grow stronger!
This evening, I would like to take just a moment to recognize a special group of people. I
don’t think anyone has seen their lives change quite as much as the lives of our healthcare
workers. On a daily basis, these individuals have been on the frontline risking their lives and
working long, exhausting hours to take care of our friends and loved ones struck down with
COVID-19.
On behalf of this community, I want to thank not only the doctors and nurses, but every
technician and CNA, every aide and housekeeper, every senior care and doctor’s office
worker -thank you for what you are doing! We want you to know we appreciate your sacrifice,
dedication and service. What you are doing is so very important, and we owe you a great
debt of gratitude.
If my fellow Council Members would be so kind, I’d like us to stand and give our healthcare
REVISED
December 8, 2020
AGENDA ITEM #: 4
7
workers a standing ovation of thanks. God bless you!”
Vice Mayor Wright asked the City Attorney what the potential for citation was due to having more
people in the room than the current allowable 25 people under State law. City Attorney Mr. Walter Erwin
clarified that there is an exemption in the Governor’s executive order for government operations. He
continued by stating that if there are more people in the room than is allowed, the City runs the risk of the
Health Department sending a notice saying we are in violation. However the governor’s order is vague, as
in is a meeting of a governing body a government operation. Vice Mayor Wright asked that his fellow
Councilmembers concede to keeping the number of individuals in Council Chamber for the 7:30 p.m.
meeting to 25 people. Councilmember Helgeson stated that Council meetings are open public meetings
which are required under the Virginia Freedom of Information Act. He further commented that Council
does not get to arbitrarily decide which citizens get to attend the meeting and who does not and he would
not be agreeing.
Vice Mayor Wright made a formal motion to restrict Council Chamber to 25 persons with overflow
seating in a different location within City Hall. Councilmember Tweedy seconded the motion stating she
has concerns and errs on the side of safety and compliance.
Councilmember Faraldi asked Vice Mayor Wright who he envisioned would enforce these orders.
He specifically wanted to know if local law enforcement would be asked to enforce the attendee
restrictions. Vice Mayor Wright retorted that the logistics could be worked out, but the idea of limiting the
number of people allowed in one space is to keep people safe and comply with the State law.
Councilmember Faraldi stated that he could walk in to any restaurant, and if there were 35 – 40 people in
the restaurant, remaining socially distanced, that business would be considered complying with state
mandates. He commented that the proposal to limit Council Chamber to 25 people when it could hold, by
his count, around 40 people and allow for social distancing, seemed inconsistent with this executive
order. Further, he stated that adding any agenda item, especially an item that would greatly impact the
community, within seven days of the Council meeting violates Council’s Rules of Procedure. Lastly, he
stated that he cannot in good conscious infringe on the rights of the constituency that he represents to
REVISED
December 8, 2020
AGENDA ITEM #: 4
8
view and engage with their government in-person. He also noted the importance for citizens who are at-
risk, to stay at home, but for these reasons, he will not be supporting the motion.
Councilmember Nelson stated that he appreciates both sides of the argument, however, on the
agenda for the 7:30 p.m. meeting are two public hearings, one for a zoning issue and the other an appeal.
The citizens have a right to come and petition at the public hearings. That is a government operation. He
stated that Council should not skirt the right of citizens to a fundamental constitutional liberty on the basis
of whether we would fall under the exemption under the governor’s mandate.
Mayor Dolan stated that she would agree to limit the number of people in Council Chamber to 25
people with an overflow room for viewing if there were more time to notify the public of this stance. For
that reason she will not support the motion.
With no further discussion, the following vote was recorded:
Ayes: Wright, Tweedy 2
Noes: Dolan, Helgeson, Nelson, Wilder, Faraldi 5
Interim City Manager Dr. Reid Wodicka had an item for Council’s consideration. In the recently
adopted Legislative Agenda, there is a request to the General Assembly to remove certain provisions
from the City’s Charter, specifically related to City Council’s pay. In order to request that, Council either
needs to hold a public hearing on the subject, or conduct a referendum on the subject to reopen the
Charter. Dr. Wodicka recommends holding a public hearing, but needs Council’s permission to advertise
and schedule a public hearing for the first January meeting. Council reached a consensus, giving staff the
ability to do so.
// The meeting was recessed at 5:42 p.m.
// City Council reconvened the meeting at 7:30 p.m. The following members were present:
Present: MaryJane Dolan, Beau Wright, Jeff S. Helgeson, J. Randy Nelson, Treney Tweedy,
Sterling A. Wilder, Chris Faraldi 7
REVISED
December 8, 2020
AGENDA ITEM #: 4
9
Absent: 0
Councilmember Wilder gave the Invocation, followed by the Pledge of Allegiance.
// In the matter of Recognitions, Mayor Dolan made the following acknowledgements:
• She congratulated the graduates of the CO.STARTERS Fall 2020 program: Andrea Plunkett,
Kenneth Payne, Thomas Morris, Kathryn Lewis, Heather Knopp, Vanessa Kaszubowski, Diana
Ferrell, Skyler Donaldson, Molly Corbet.
• The International Economic Development Council awarded the City of Lynchburg an Excellence
in Economic Development Silver Award for the 2019 Annual Report, produced by the Office of the
Economic Development & Tourism.
• The Office of Economic Development & Tourism received the VIRGO award for Destination Event
of the Year for the 2019 State Games of America.
• Ms. Marjette Upshur, Director of Economic Development & Tourism , provided Council with a copy
of the Economic Development 2020 Annual Report and played a short video of the highlights of
the report.
// In the matter of Consent Agenda Item #6, copies of the minutes of the November 10, 2020 meeting
have been previously furnished to Council, and on motion of Councilmember Wilder, seconded by
Councilmember Faraldi, Council by the following recorded vote approved the minutes as presented:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// In the matter of the Fire Department, Consent Agenda #7, Resolution #R-20-093 amending the FY
2021 General Fund Personnel budget and appropriating $193,936 with resources from the Fire Medic
Unit Reserve to fund six Advanced Life Support Firefighters for the Fire Department , received a second
reading. On motion of Councilmember Wilder, seconded by Councilmember Faraldi, Council by the
following recorded vote approved the motion to adopt Resolution #R-20-093:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
REVISED
December 8, 2020
AGENDA ITEM #: 4
10
Noes: 0
// In the matter of Community Development – Rezoning, Agenda Item #8, a public hearing was held to
discuss adopting Ordinance #O-20-027 approving the rezoning petition of Meanwhile Back on the Farm
to rezone approximately three and sixty-one hundredths (3.61) acres at 2627 Old Forest Road, 2624 &
2700 Confederate Avenue.
Ms. Rachel Frischeisen, Planner II, provided Council with a brief summary of the request.
Meanwhile Back on the Farm is a business petitioning to rezone approximately three and sixty-one
hundredths (3.61) acres at 2627 Old Forest Road, 2624 and 2700 Confederate Avenue from B -3C,
Community Business District (Conditional) to B-3C, Community Business District (Conditional) to amend
a previously approved concept plan. The approved concept plan was proffered during a rezoning in 2014
and showed a restaurant use in the existing manor house and a three-thousand (3,000) square foot event
space. The proposed concept plan shows a retail use in the manor house and a four-thousand (4,000)
square foot event space. In summary, the concept plan is very similar to the rezoning from 2014. The use
should not have a significant impact on the surrounding neighborhood given the nature of the activities
that this business will be conducting. Additionally, the sites designation as a local historic district which
provides another layer of protection for this neighborhood since the HPC will need to review the changes
and ensure that the nature of the character is maintained. The approval of the petition will also allow for
the reuse of a historic site. The Planning Commission held a public hearing on November 11, 2020 and
recommended approval of the petition.
Mr. Bobby Harris, co-owner of Meanwhile Back on the Farm was in attendance and made a
presentation. He stated that they would like to expand the business at the Locus Thicket, utilizing the
manor house for retail, bag making, and event space for workshops. The historic nature and beauty of
Locus Thicket is a key factor that drew them to the property. It is a perfect match for their business and is
their intention to preserve, improve, and be good stewards of the property.
Mr. Vance Driskill, the owner of 2610 and 2613 Confederate Avenue, the property neighboring
the development, was in attendance to speak in opposition of the petition. Although he is excited to have
REVISED
December 8, 2020
AGENDA ITEM #: 4
11
this business as a neighbor, he is concerned about the headlights from vehicles that would beam directly
into his home. He has no concern of daytime operations; it is at dusk that concerns him. Mr. Driskill has
talked to the business owner addressing his concerns and they have ensured him that they would take
care of the issues. Mr. Driskill’s also has a concern with what is outlined in the proffers doesn’t give the
City enough bite to make the owner adhere to these promises should there be a need.
Mr. Harris rebutted, stating that he would take care of the light issue. This is addressed in the
concept plan.
There was no one else to speak either in favor or opposition, either in-person, or with emails or
voicemails from citizens, so the public hearing was closed and the matter rested with Council.
Councilmember Helgeson thanked both Mr. Driskill and Mr. Harris for being good neighbors and
made the motion to approve the ordinance. He asked staff what action has to be taken in order to ensure
the proper shielding is erected. Ms. Frischeisen stated that the zoning ordinance requires that when
commercial property that backs-up to a single family residence, as in this instance, there would be a 20
foot evergreen buffer required, staggered in-between any building or parking lot and a residence.
Councilmember Faraldi seconded the motion stating that as the representative for Ward IV, he is
glad something is being done to the property since it has been sitting for a while.
Councilmember Wilder asked staff if there were any additional traffic concerns. They did not have
to do a traffic study based on the projections the developer provided not meeting the City’s threshold for
requiring a traffic study.
With no other discussion from Council, the following vote was recorded approving Ordinance #O-
20-027:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
REVISED
December 8, 2020
AGENDA ITEM #: 4
12
// In the matter of Community Development, Agenda Item #9, a public hearing was held to consider
adopting Resolution #R-20-094 to either uphold or reverse the decision of Historic Preservation
Commission to deny a Certificate of Appropriateness at 2144 Rivermont Avenue.
Mr. Chris McSwain, Chair of the Historic Preservation Commission provided Council with a brief
request of the summary. Mr. Martin Donovan is appealing the decision of the HPC that denied his COA
request to erect a black aluminum fence at 2144 Rivermont Avenue. The HPC reviewed the petition on
September 21, 2020 and found that there was insufficient information to make a determination. The
Commission postponed the item and requested that the petitioner “provide the Commission a visual of
what the 6’ fence looks like, show where the fence is located in relation to the house, property lines, and
street. The petitioner did not provide the materials by the October 19th, 2020 meeting. The Commission
was unable to decide based upon what was originally provided and denied the petition due to lack of
information. The City’s Zoning Ordinance, Section 35.2-13.11, Appeals to City Council, states: “On any
such appeal, the final decision of the HPC … shall be stayed pending the outcome of the appeal to City
Council, except that the filing of such appeal shall not stay the decision of the HPC if such dec ision
denies the right to raze or demolish a historic landmark, building or structure. The City Council shall
conduct a full and impartial public hearing on the matter and apply the same criteria as the HPC before
rendering any decision. The City Council may affirm, reverse or modify the decision of the HPC, in whole
or in part. The decision of City Council, subject to the provisions of Section 35.2-13.12, shall be final. If
approved, a certificate of appropriateness, signed by the Clerk of the City Council, shall be issued to the
applicant.”
Mr. Donovan was in attendance and provided Council with background information on his project.
There was a dilapidated fence on his lot previously which he removed with the intent of replacing it with a
newer fence. Due to traveling for work, he was unable to attend the HPC meetings, leading the
commissioners to deny his request. Mr. Donovan asked Council to consider reversing the decision of the
HPC so that he may erect his fence which will protect his dogs from traffic, as well as, the neighborhood
children from the pool in his backyard.
REVISED
December 8, 2020
AGENDA ITEM #: 4
13
Councilmember Helgeson made the motion to reverse the decision of the Historic Preservation
Commission stating that this is aligns with historic preservation in his opinion. Councilmember Faraldi
seconded the motion.
Councilmember Wilder asked Mr. McSwain if Mr. Donovan has properly addressed the HPC’s
concerns. Mr. McSwain said he could not speak for the whole commission, but explained that he feels
they never received proper clarification as to where the fence would lie. Councilmember Wilder said that
he would be supporting the motion because Mr. Donovan did a very good job with the revitalization of the
property already and he feels comfortable with what he will do with this next step.
Councilmember Nelson asked Mr. McSwain if there was something about this that would violate
some of the protocols or qualifications set forth by the HPC that the commission would normally requi re.
Mr. McSwain stated that in his opinion, he does not see any issues with the details provided today, but
asked Ms. Victoria Glasgow, Planner I, if she could clarify the guidelines in regards to the height of the
fence. Ms. Glasgow stated that they will have to adhere to the zoning ordinance requirements, which she
did not have on hand.
With no other discussion from Council, the following vote was recorded approving Resolution #R -
20-094:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// In the matter of Public Comment, Agenda Item #10, Mr. Andrew Glover presented to Council a proposal
on community engagement. Currently stated in City Council’s Rules of Procedures, any Lynchburg citizen
is allowed to address Council at its regularly scheduled meeting by contacting the Clerk of Council by
noon the Wednesday before the Council meeting. Mr. Glover requested that City Council amend their
rules of procedure postponing the deadline for citizens to register for Public Comment in response to
agenda items, and have it moved 24 hours before the Council meeting. This would allow citizens to
review the items on the agenda and decide what they would like to speak about.
REVISED
December 8, 2020
AGENDA ITEM #: 4
14
// In the matter of Lynchburg Redevelopment Housing Authority (LRHA), Agenda Item #11, Council
considered adopting Resolution #R-20-095 re-authorizing the issuance by the LRHA tax-exempt revenue
bonds for the acquisition and rehabilitation of James Crossing Apartments.
Mr. Walter Erwin, City Attorney, provided a brief summary of the request on behalf of Mr. Richard
L. Hurlbert, Jr., Bond Counsel, and Mr. Herschel Keller, Attorney of LRHA, who were both unable to be in
attendance. On December 10, 2019, City Council authorized the issuance of tax exempt revenue bonds
by the Lynchburg Redevelopment and Housing Authority for the acquisition and rehabilitation of the
James Crossing Apartments, located at 808 Greenfield Drive; there have been no changes to the project.
Due to the impacts of COVID-19, this issuance has not been completed and must be re-authorized by
City Council. The Housing Authority conducted the requisite public hearing on November 19, 2020 and
recommended approval. Although the bonds will be issued through the Lynchburg Redevelopment and
Housing Authority and the City has no obligations to pay these bonds, however; regulations require that
Lynchburg City Council adopt a resolution supporting the transaction.
Councilmember Helgeson asked Mr. Erwin to clarify that Mr. Hurlbert and Mr. Keller weren’t
getting cold feet since they were not in attendance. Mr. Erwin assured Council that they are very eager for
the project to continue, but other obligations kept them away from tonight’s Council meeting.
Councilmember Tweedy stated that she sits on the LRHA board and they are still in favor of the
project. LRHA met with the owners prior to the approval and they were very cooperative and responsive
to the housing authority with development of programs and understanding of what the expectations for
this property are.
Councilmember Wilder stated that he is encouraged by the development and some of the plans
they have. He commented on the need to continue revitalizing that community and give them support and
services.
Councilmember Nelson stated that City Council approved this a year ago and the circumstances
have not gotten any better; in fact the needs may be greater.
REVISED
December 8, 2020
AGENDA ITEM #: 4
15
Councilmember Helgeson made the motion, seconded by Councilmember Nelson, to
approve the resolution. With no other discussion from Council, the following vote was recorded approving
Resolution #R-20-095:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// In the matter of Planning, Agenda Item #12, Council considered approving a resolut ion abandoning a
portion of Top Ridge Drive from the City’s Street System. Mr. Lee Newland, City Engineer, presented
Council with a brief summary of the request. The Virginia Department of Transportation (VDOT) has
requested that the City of Lynchburg formally abandon a section of Top Ridge Drive (Frontage Road FR-
794) from the city’s street system. This section of roadway was removed to accommodate the
construction of the Odd Fellows Interchange on and off ramps. This is simply an administrative “clean-up”
item for VDOT since this section of roadway no longer exists. If City Council approves the abandonment
of this street section, the Commonwealth Transportation Board will take action on this item at a future
meeting.
Councilmember Helgeson asked for clarification on how much of the roadway would be
abandoned. Mr. Newland stated that it was just for the interchange that no longer exists and not for the
entire length of Top Ridge.
Vice Mayor Wright made the motion to approve the resolution, seconded by Councilmember
Wilder. With no other discussion from Council, the following vote was recorde d approving Resolution #R-
20-096:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// In the matter of City Manager’s Office, Agenda Item #13, Council considered adopting Resolution #R-
20-097 adding Juneteenth and Veterans Day as permanent City holidays. Dr. Reid Wodicka, Interim City
Manager, presented Council with a brief summary of the request. The City’s personnel policies identify a
REVISED
December 8, 2020
AGENDA ITEM #: 4
16
number of holidays for which City offices are closed. In reviewing the City’s holidays compared with many
of our surrounding counties as well as the Commonwealth of Virginia, the City provides considerably
fewer paid holidays. For example, the state recognizes 15.5 holidays, while the City recognizes just 10.
Last year, members of City Council suggested adding Juneteenth to the list of holidays. City Council did
so, but just for calendar year 2020. Given the importance of this holiday to everyone in our community,
this holiday should be added to the permanent list. Additionally, Veterans Day has not traditionally been
recognized by the City and, given the number of employees who are veterans, plus the impo rtant role that
veterans play in our community, staff recommends adding this holiday as well.
With the addition of holidays, there was a concern about overtime costs. If these two holidays are
added, staff will increase the amount of time that employees carryover from year-to-year from 80 hours to
96 hours. This will decrease the amount of payouts from the City and can be done administratively and
does not require Council action.
Councilmember Wilder stated that he is in support of adding both holidays to the City’s register
and made the motion to approve the resolution. Vice Mayor Wright seconded the motion and briefly read
an email sent from a citizen on why he supports observing Juneteenth. With no other discussion from
Council, the following vote was recorded approving Resolution #R-20-097:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// In the matter of Appointments, Agenda Item #14, Council considered adopting Resolution #R-20-098
appointing Ms. Alicia L. Finney, Interim Clerk of Council, as the new Clerk of Council for the City of
Lynchburg, Virginia, effective December 9, 2020.
Vice Mayor Wright made the motion to approve the resolution, seconded by Councilmember
Faraldi. With no other discussion from Council, the following vote was recorded approving Resolution #R-
20-098:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
REVISED
December 8, 2020
AGENDA ITEM #: 4
17
Noes: 0
// On motion of Councilmember Helgeson, seconded by Councilmember Wilder, Council, by the following
recorded vote, elected to hold a closed meeting to discuss the disposition of certain real property
identified as 97 Page Street, Lynchburg, Virginia, including, if any, improvements thereon; and to discuss
the appointment of members to the Economic Development Authority, Historic Preservation Committee,
Parking Authority, Social Services Advisory Board, Transit Board, Community Development Advisory
Committee, Towing Advisory Committee, Planning Commission, Airport Commission, an d Horizon Board
of Directors, pursuant to Section 2.2-3711(A)(3) and Section 2.2-3711(A)(1) of the Code of Virginia, 1950,
as amended.
State law requires City Council to disclose the name of the person who is being considered for
appointment to Horizon’s Board of Directors. City Council will consider appointing Mr. Chris Faraldi as the
Council representative to this board.
With no discussion from Council, the following vote was recorded:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// The meeting was re-opened to the public.
// Councilmember Helgeson made the following motion:
WHEREAS, the Council of the City of Lynchburg has convened a closed meeting on this date, pursuant
to an affirmative recorded vote and in accordance with the provisions of The Virginia Freedom of
Information Act; and
WHEREAS, Section 2.2 3712 of the Code of Virginia requires a certification by City Council that
such closed meeting was conducted in conformity with Virginia law;
NOW, THEREFORE, BE IT RESOLVED that the Council of the City of Lynchburg certifies that, to
the best of each member's knowledge, (i) only public business matters lawfully exempted from open
REVISED
December 8, 2020
AGENDA ITEM #: 4
18
meeting requirements by Virginia law were discussed in the closed meeting to which this certification
resolution applies, and (ii) only such public business matters as were identified in the motion convening
the closed meeting were heard, discussed or considered by Council.
The motion was seconded by Councilmember Faraldi, and Council, by the following recorded
vote, adopted the motion:
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// On motion of Councilmember Helgeson, seconded by Councilmember Nelson, Council by the following
recorded vote appointed the following members to the respective boards and commissions:
Economic Development Authority: no appointments were made at this time.
Historic Preservation Committee: Ms. Tracey Langseth – unexpired term ending June 30, 2022
Parking Authority: Mr. Charles Warner – unexpired term ending October 31, 2023
Social Services Advisory Board: Ms. Denise Dempsey – term ending September 30, 2024; Mr. Jeffrey
Krantz – term ending September 30, 2024
Transit Company Board of Directors: Dr. Les Reed – unexpired term ending October 31, 2022
Lynchburg Regional Airport Commission: Mr. Jones Stanley – term ending December 31, 2023; Mr. John
(Dennis) Marcinik – term ending December 31, 2023
Planning Commission: Ms. Nancy Marion – term ending December 31, 2023
Towing Advisory Board: Mr. Timothy Clements – term ending December 31, 2023; Mr. Charles Cramer –
term ending December 31, 2023; Mr. James Hall – term ending December 31, 2023
Community Development Advisory Committee: Mr. Leonard “Rad” Briley – term ending December 31,
2021; Ms. Mandze Dyke – term ending December 31, 2021; Ms. Valerie Harris – term ending December
31, 2021; Mr. John Hughes, III – term ending December 31, 2021; Ms. Susan Murray – term ending
REVISED
December 8, 2020
AGENDA ITEM #: 4
19
December 31, 2021; Mr. Sterling Wilder – term ending December 31, 2021; Mr. Beau Wright – term
ending December 31, 2021
Horizon Board of Directors: Councilmember Chris Faraldi – term ending December 31, 2023.
Ayes: Dolan, Wright, Helgeson, Nelson, Tweedy, Wilder, Faraldi 7
Noes: 0
// The meeting was adjourned at 9:15 p.m.
____________________________
Interim Clerk of Council
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: January 12, 2021
CONSENT: REGULAR: X WORK SESSION:
ACTION: X INFORMATION:
AGENDA ITEM #: 5
CLOSED SESSION:
(Confidential)
ITEM TITLE: Utility Disconnection Moratorium Exemption
KEY ELEMENTS:
___Economic Development _X_Excellent Government ___Natural and Built Environment ___Safe Community _ _Vibrant Community
RECOMMENDATION: Review the attached analysis showing that the accounts receivable arrearages exceed
one percent of Water and Sewer Funds’ annual operating revenues, conduct a Public Hearing regarding
exemption to the Utility Disconnection Moratorium due to arrearages exceeding one percent of annual
operating revenues, and adopt the attached resolution verifying that the arrearages exceed one percent of the
annual operating revenues and the intent to resume disconnection of water service for non-payment.
SUMMARY: Due to COVID-19, beginning in March, 2020, the Department of Water Resources voluntarily
suspended disconnection of water service for delinquent accounts. During the 2020 Special Session I, the
General Assembly approved Appropriations Act Amendments, Item 4-14, which included specific procedures
and requirements for utility services related to the corona-virus declared state of emergency including:
provisions related to customer assistance grants; utility disconnection moratorium requirements; customer
repayment plans; and provisions for exemption to the disconnection moratorium.
Municipal utilities may seek an exemption to the disconnection moratorium provided that they provide the
accounts receivable arrearages exceeding one percent of the total annual operating revenues, make the
accounting analysis showing the one percent exceedance available for public inspection, conduct a public
hearing, and obtain verification from the governing body that arrearages exceed one percent and affirming the
intention to resume utility disconnections for non-payment.
Upon verification, City staff recommends the resumption of utility disconnections beginning in February, 2021.
In conjunction with the resumption of utility disconnections, repayment plans will also be offered to customers.
Customers participating in repayment plans will not be cut-off as long as they remain current with their plan.
Additionally, customers with arrearages may apply up until January 22, 2021 for funds from the COVID-19
Municipal Utility Relief Program to be applied to their outstanding water and sewer balances. Customers are
encouraged to take advantage of both of these programs to help avoid disconnection for delinquent accounts.
PRIOR ACTION(S): December 8, 2020, Adoption of the COVID-19 Municipal Utility Relief Program Resolution
FISCAL IMPACT: As noted in the attached analysis.
CONTACT(S): Tim Mitchell, Director of Water Resources, 455-4252
Donna Witt, Chief Financial Officer, 455-3968
ATTACHMENT(S): Resolution
Accounting Records Analysis - showing one-percent exceedance
REVIEWED BY: raw
006A
RESOLUTION:
A RESOLUTION VERIFYING AND APPROVING UTILITY ACCOUNTS RECEIVABLE
ARREARAGES ARE IN EXCESS OF ONE PERCENT OF ANNUAL OPERATING REVENUES
WHEREAS, during the 2020 Special Session I (Appropriation Act Amendments, Item 4 -14) the
Virginia General Assembly approved specific procedures and requirements for utility service
applicable in the coronavirus -related declared state of emergency, including provisions related
to customer assistance grants, utility shutoffs for nonpayment, and customer utility debt
repayment plans; and
WHEREAS, the City of Lynchburg is well -positioned to implement these new procedures and
requirements because City of Lynchburg has always worked to assist customers in a fiscally
responsible manner to pay utility; and
WHEREAS, the City of Lynchburg’s Department of Water Resources revenue sources are from
charges for services provided, which are generally based on rates necessary to recover the full
cost of operations without reserve for forgiveness of payment due for such services; and
WHEREAS, the City of Lynchburg’s Department of Water Resources employs industry-standard
collection process for unpaid bills including disconnection of water service in appropriate cases,
which historically has proven effective in minimizing losses; and
WHEREAS, the City of Lynchburg’s Department of Water Resources self -imposed a
moratorium on disconnection of water service for unpaid bills in response to the coronavirus
pandemic; and
WHEREAS, during the disconnection moratorium period to date, cust omers generally have not
availed themselves financial assistance opportunities and instead have accumulated increasing
debt; and
WHEREAS, a significant number of accounts have increasing overdue balances such that
customers may find their repayment respon sibility difficult to manage without undertaking an
effort now to begin paying down balances over time through a reasonable repayment plan; and
WHEREAS, the City of Lynchburg’s Department of Water Resources determined and
documented in a written analysis from accounting records that account receivable arrearages
exceed one percent of annual operating revenues and also provided such analysis to Lynchburg
City Council as the Utility’s governing body;
WHEREAS, the City of Lynchburg’s Department of Water Resources contemporaneously made
the associated working papers verifying such facts available for public inspection; now therefore
be it
NOW THEREFORE BE IT RESOLVED BY the Lynchburg City Council that it has re viewed
the calculations of account receivable arrearages and verifies that the arrearages exceed one
percent of annual operating revenues and; be it
BE IT FURTHER RESOLVED, that the City of Lynchburg’s Department of Water Resources
resume normal collection procedures including disconnection of water service where necessary
to achieve customer response, while also continuing normal procedures to avoid disconnecting
water service for customers that request and implement repayment plans to bring accounts
current over time.
Adopted:
Certified: ____________________________
Clerk of Council
Accounting Records Analysis
ARREARAGE CALCULATION FOR WATER AND SEWER RECEIVABLES AS OF 11/30/2020
0-30 31-60 61-90 91-120 Over 120 Totals
Total Water Accounts Receivable 764,581.71 83,551.66 45,436.18 29,076.37 121,730.24 1,044,376.16
Total Sewer Accounts Receivable 1,535,826.70 174,081.25 59,600.30 40,861.97 173,066.60 1,983,436.82
2,300,408.41 257,632.91 105,036.48 69,938.34 294,796.84 3,027,812.98
Total Arrearage (Over 30 Days) 257,632.91 105,036.48 69,938.34 294,796.84 727,404.57
FY20 Revenues
Water 16,305,505.52
Sewer 24,748,364.44
Total FY20 Revenues 41,053,869.96
Arrearage Ratio to FY20 Revenues 1.77%
1
LYNCHBURG CITY COUNCIL
Agenda Item Summary
MEETING DATE: January 12, 2021
CONSENT: REGULAR: X WORK SESSION:
AGENDA ITEM #: 6
CLOSED SESSION:
ACTION: X INFORMATION: (Confidential)
ITEM TITLE: Conditional Use Permit (CUP) – Jefferson House LLC – 1818 Langhorne Square
KEY ELEMENTS:
_X _Economic Development ___Excellent Government _X_Natural and Built Environment _ Safe Community _X _Vibrant Community
RECOMMENDATION: Approval of the CUP petition to allow the construction of a five (5) story, sixty-five unit
apartment building for seniors.
SUMMARY: Jefferson House LLC, is petitioning for a CUP at 1818 Langhorne Square to allow the
construction of a sixty-five (65) unit apartment complex in a B-3, Community Business District. The units would
be deed restricted as affordable units for the elderly.
If approved, a total of one hundred sixty-six (166) units would exist with only sixty-seven (67) parking spaces
proposed for the two (2) buildings. The Zoning Ordinance typically provides for one (1) parking space per one
(1) residential unit but allows the City Planner to reduce the number of the spaces where mass transit is
available and if the applicant provides credible information documenting that the use will require fewer spaces.
The petitioner has provided that there are currently forty-two (42) parking spots serving the existing one
hundred one (101) residential units. Only twenty-five (25) residents have cars and the other parking spaces are
utilized by staff that comes in the morning and at night. The maximum usage of parking has averaged thirty-
two (32) spaces and most of the usage is by home health aides and the three (3) staff members. Based upon
the availability of mass transit, parking need demonstrated by the petitioner and the restriction to senior
housing, staff believes parking will not be an issue. The Planning Commission also discussed how the project
could potentially improve stormwater conveyance on the site.
PRIOR ACTION(S):
December 9, 2020: The Planning Division recommended approval of the CUP petition.
The Planning Commission recommended approval (7-0) of the CUP petition.
FISCAL IMPACT: N/A
CONTACT(S): Tom Martin, City Planner – 455-3900
ATTACHMENT(S):
Resolution
Planning Commission Minutes – December 9, 2020
Planning Commission Packet – December 9, 2020
o Planning Commission Report
o Zoning Map with Adjoining Owners
o Future Land Use Map
o Watershed Map
o Planimetric and Topographic Map
o Concept Plan
o Narrative
o Parking Narrative
o Property Photograph
o Speaker Signup Sheet
REVIEWED BY: klw
003A
RESOLUTION
A RESOLUTION GRANTING A CONDITIONAL USE PERMIT TO JEFFERSON HOUSE LLC AT 1818
LANGHORNE SQUARE TO ALLOW THE CONSTRUCTION OF A SIXTY-FIVE (65) UNIT APARTMENT
BUILDING TO BE USED AS SENIOR HOUSING IN A B-3, COMMUNITY BUSINESS DISTRICT.
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF LYNCHBURG, that the petition of Jefferson House
LLC to allow the construction of a sixty-five (65) unit apartment building to be used as senior housing is hereby
approved subject to the following condition:
1. The site shall be developed in substantial compliance with the concept plan “Conditional Use Permit for
Jefferson House” dated November 2, 2020 and revised.
Adopted:
Certified: ____________________________
Clerk of Council
1
MINUTES OF THE DECEMBER 9, 2020 PLANNING COMMISSION MEETING (MINUTES HAVE
NOT BEEN APPROVED):
Petition of Jefferson House LLC for a conditional use permit at 1818 Langhorne Square to
allow the construction of sixty-five (65) senior housing units in a B-3, Community Business
District.
Ms. Rachel Frischeisen, Planner II, provided the following summary to the Commission. The area is
approximately one and forty -nine hundredths (1.49) acres located at 1818 Langhorne Square. If the
Conditional Use Permit (CUP) is approved it will be subdivided fr om the larger two and thirty -three
hundredths (2.33) acre parcel. The purpose of the Conditional Use Permit is to allow the construction of a
five (5) story, ten thousand eight hundred and eighty -three (10,833) squ are foot building containing
sixty-five (65) Senior Affordable Units. The City’s Comprehensive Plan 2013 -2030 and Future Land Use
Map (FLUM) recommends a “Mixed Use” for the area. Multi -household structures are permitted in the B -
3, Community Business Dist rict upon approval of a Conditional Use Permit by City Council. The existing
building contains one hundred and one (101) senior units. Again, if the Conditional Use Permit is
approved the existing parcel will be subdivided and a five (5) story, sixty-five (65) unit apartment building
will be constructed on site. The proposed units will be deed restricted to seniors that are rent burdened.
The existing facility would also be improved. The approval of the Conditional Use Permit to allow the
construction of af fordable senior housing units should have little impact on the area and is consistent
with both the City’s Comprehensive Plan 2013 -2030 and the Midtown Area Master Plan. The primary
concern with the proposed development is that of parking. A total of one h undred sixty-six (166) units
would exist with only sixty-seven (67) parking spaces proposed for the two (2) buildings. This is less than
half of the normally required one (1) parking space per one (1) residential unit required by the Zoning
Ordinance. Howe ver, based upon the availability of mass transit, parking need demonstrated by the
petitioner and the restriction of senior housing, parking should not become an issue. The location of the
senior housing within walking distance to medical offices and retai l uses should fit well into the area. The
Technical Review Committee (TRC) reviewed the petition on November 17, 2020. Comments were minor
in nature. Planning staff recommends approval of the petition with the condition outlined in the report.
Chair Rogers asked who was present to speak on behalf of the petition.
Mr. Joe Eddy, President of JE Properties, addressed the Commission. JE Properties is a Boston based
company with a few other affiliates. The company works mostly with affordable hou sing. They came
across this property a couple of years ago and it was a mess. Before they bought it, it was in default with
Virginia Housing (VHDA). There were a lot of capital needs like a roof problem, leaks, and an infestation.
They bought it and have b een fixing it up. Part of the acquisition plan is to build additional units to
improve the economics of the project. It will be done as a low income tax credit project. They will apply
to VHDA for the tax credits in March but the tax credits are not guaranteed. If they do get the tax credits,
they will be approved in July and begin the project the following March. If they do not get the tax credits
they will reapply for them the next year. This is an awesome location for senior housing. It is near a
hospital. They put in a sidewalk and are right in front of a bus stop. They plan to install a bench or
something similar there for the residents. Only about twenty -five (25) of the residents have cars. Another
twenty-five (25) or so use the bus daily. They feel t hat this is a great project that fits well with the City’s
plans.
Chair Rogers asked if there was anyone present who wished to speak in favor of the petition. When
no one stepped forward he asked if there was anyone present who wished to speak in oppositi on of the
petition. When no one stepped forward he closed the public hearing.
Commissioner Johnson asked for clarification concerning the parking situation.
2
Mr. Eddy responded that there are currently forty -two (42) parking spots and one hundred one (10 1)
units. Only twenty-five (25) residents have cars. The other parking spaces are utilized by staff that comes
in the morning and at night. The max usage of parking has been about thirty -two (32) spaces and most
of the usage is by home health aides and the three (3) staff members.
Commissioner Marion asked if the proposed pedestrian connectors are at grade.
Mr. Eddy responded that they are.
Commissioner Perault stated that there is a steep drop off from the parking lot and that the footprint
goes out pretty far into the ravine. An underground detention storage area is also shown. He asked how
far out it actually goes into the ravine area.
Mr. Patrick Proffitt, of Hurt & Proffitt, responded that the grades and how to handle stormwater were
reviewed when preparing this project. It gets close to the ravine of the natural channel, but does not
actually get into it. The building is back off of it somewhat but the parking area extends a little bit
further. That will be stopped vertically with retaining walls . Construction will not get into the water
course. It already has a piping system dumping into it and it goes a little bit further into a natural channel
that is off of the property.
Chair Rogers noted that the gradient helps with the underground detention. It fits within that with
the retaining wall.
Mr. Proffitt responded that they will bring that up to the bottom of that detention structure and
include that as part of the fill. It works out nicely with the fill and the wall. There is a second m odular
system proposed for the left-hand side of the property as well. For the stormwater quality, the owner has
been advised to purchase credits.
Chair Rogers stated that will be an improvement.
Mr. Proffitt shared agreement.
Commissioner Perault stated that the footprint is not much larger than what is there now and there is
nothing in place. It could be better off after the fact.
Mr. Proffitt responded that is a good point. There is a lot of impervious there now.
Commissioner Perault stated that this petition is good fit for the area, serves a need, and is not a
radical petition. It is not a rezoning, just a Conditional Use Permit.
Commissioner Bowden stated that this type of housing was needed a few years ago. This petition
also utilizes a building that is in rough shape and fixes it up. He is in support of this petition.
Chair Rogers stated that this is a great project that addresses the community’s needs. He is also in
support of this petition.
Commissioner Bowden made the following motion, seconded by Commissioner Marion, and approved
by the following vote:
“Based on the preceding Findings of Fact, the Planning Commission recommends to
City Council approval of the petition of Jefferson House LLC for a Conditional Use
Permit at 1818 Langhorne Square subject to the following condition:
3
1. The property shall be developed in substantial compliance with the concept plan
“Conditional Use Permit for Jefferson House” dated “Revised November 24, 2020”
AYES: Bowden, Johnson, Light, Lowe, Marion, Perault, and Rogers 7
NOES: 0
ABSTENTIONS: 0
ABSENT: 0
The Department of Community Development
City Hall, Lynchburg, VA 24504 434-455-3900
To: Planning Commission
From: Planning Division
Date: December 9, 2020
Re: Conditional Use Permit (CUP) – Jefferson House LLC – 1818 Langhorne Square
I. PETITIONER
Jefferson House LLC, 150 Mount Vernon Street, Suite 500, Dorchester, MA 02125
Representative: Patrick Proffitt, PE, Hurt & Proffitt, Inc., 2524 Langhorne Road, Lynchburg,
VA 24501
Property Owner:
Jefferson House LLC, 150 Mount Vernon Street, Suite 500, Dorchester, MA 02125
II. LOCATION
The area is approximately one and forty-nine hundredths (1.49) acres located at 1818
Langhorne Square. If the CUP is approved it would be subdivided form the larger two and
thirty-three hundredths (2.33) acre parcel.
III. PURPOSE
The purpose of the CUP is to allow the construction of a five (5) story, ten thousand eight
hundred and eighty-three (10,833) square foot building containing sixty-five (65) Senior
Affordable Units.
IV. SUMMARY
The City’s Comprehensive Plan 2013-2030, Future Land Use Map (FLUM) recommends a
“Mixed Use” for the area.
The proposed sixty-five (65) units would be deed restricted as affordable units for the
elderly.
The petitioner is requesting a reduction in the amount of required off-street parking due to
the availability of mass transit in the area. This reduction is allowed by Zoning Ordinance
Section 35.2-62.4(e).
Multi-household structures are permitted in the B-3, Community Business District upon
approval of a Conditional Use Permit by City Council.
The Planning Division recommends approval of the Conditional Use Permit.
V. FINDINGS OF FACT
1. Comprehensive Plan. The Future Land Use Map (FLUM) recommends a Mixed Use for the
area. These areas do not fit into any single use category as they are planned for a mix of uses
carefully designed so as to mitigate any potential land use conflicts. The mixed-use areas
generally consist of large undeveloped or greenfield areas that are intended to be developed for
a balanced mix of residential, neighborhood commercial, civic uses, parks and open spaces. The
mix of uses in these areas is intended to be determined at the time of development review and
Planning Commission: CUP – Jefferson House LLC, 1818 Langhorne Sq. – December 9, 2020
2
approval. The adopted area plans should be consulted for a more fine-grained discussion of the
mix of uses planned for the Midtown/Plaza area and the Tyreeanna mixed use area. (p. 76)
The property is designated as being part of a “Village Center” in the Midtown Area Master Plan
adopted by City Council on October 11, 2005: These important village centers should contain
a variety of uses in a compact area, easily accessible by surrounding residential neighborhoods.
Each center should continue to evolve as centerpieces of Midtown life.
(p. 4.3)
The property is also directly adjacent to the “M edical Arts District” as designated by the
Midtown Area Master Plan. The Medical Arts District will mark the location of medical
services located in Midtown to serve greater Lynchburg. The district is designed to attract all
services related to the medical field, in hopes of creating a compact cluster of medical facilities.
Maintaining functional links is important to encourage and allow for a pedestrian environment
and campus type atmosphere for the district. As a great economic engine for the City, the
centerpiece of the Medical Arts District is Lynchburg General Hospital. The district should
operate as a unique center by providing a mix of uses to serve this prosperous medical
community.
(p. 4.6)
2. Zoning. The subject property was annexed into the City in 1926. The existing B-3,
Community Business District was established in 1978.
3. Board of Zoning Appeals (BZA). The Zoning Administrator has determined that no
variances are needed for the development of the property as proposed.
4. Surrounding Area. There have been several items requiring City Council approval in the
immediate area:
On August 12, 1980, City Council approved the request of Gary Case to rezone 2104
Langhorne Road from B-1, Limited Business District to B-3C, Community Business
District (Conditional) to allow the development of a restaurant.
On April 13, 1982, City Council approved the request of Alexander Partnership to
rezone 2104 Langhorne Road from B-3, Community Business District (Conditional) to
B-3C, Community Business District (Conditional) to amend previously approved
proffers.
On May 11, 1982, City Council approved the rezoning petition of Alexander
Partnership to rezone 2104 Langhorne Road from B-3C, Community Business District
(Conditional) to B-1, Limited Business District to allow the construction of a medical
office building.
On June 14, 1983, City Council approved the CUP petition of Holy Cross School at
2125 Langhorne Road to allow a classroom addition.
On November 13, 1984, City Council approved the CUP petition of Hold Cross School
at 2125 Langhorne Road to allow the construction of an amphitheater and tennis
courts.
On August 13, 1985, City Council approved the CUP petition of Lynchburg General
Hospital at 1901 Tate Springs Road to allow the construction of a building expansion,
helistop and childcare center playground.
On November 10, 1987, City Council approved the CUP petition of Hold Cross School
at 2125 Langhorne Road to allow the use of an existing building as a religious retreat.
Planning Commission: CUP – Jefferson House
LLC, 1818 Langhorne Sq. – December 9, 2020
3
On June 14, 1988, City Council approved
the rezoning petition of David Marks and
Jane Blickenstaff to rezone 2091-2099
Langhorne Road from R-4, High Density
Residential District to B-1C, Limited Business District (Conditional) to allow legal,
medical and office space.
On September 12, 1989, City Council approved
the rezoning petition of Howard Terry
to rezone 2092 Langhorne Road and 46 Clifton Street from R-3, Medium Density
Residential District to B-1C, Limited Business District (Conditional) to allow the
construction of a two (2) story office building.
On April 14, 1992, City Council approved the CUP petition of Centra Health Inc. at
1901 Tate Springs Road to allow the expansion of the Hospital.
On February 9, 1993, City Council approved
the CUP petition of Hold Cross School at
2125 Langhorne Road to allow the installation of a modular classroom.
On October 12, 1993, City Council approved
the rezoning petition of Giles, Cox and
Associates to rezone 2102 Langhorne Road
from R-4, High Density Residential District
to B-1C, Limited Business District (Conditional) to allow the construction of office
buildings.
On November 11, 1993, City Council approved
the CUP petition of Charles Grant at
2130 Langhorne Road to allow the addition of two
(2) garage bays to an existing service
station.
On June 11, 1996, City Council approved the rezoning petition of Beach Medical to
rezone 2092 Langhorne Road from B-1C,
Limited Business District (Conditional) to B-
3C, Community Business District (Conditional) to allow an office with equipment sales,
service and rental.
On June 10, 1997, City Council approved
the rezoning petition of Rehabilitation
Associates of Central Virginia to rezone 44 Clifton Street from B-1C, Limited Business
District (Conditional) to B-1C, Limited
Business District (Conditional) to amend
previously approved proffers.
On December 14, 1999, City Council approved the rezoning petition of Avante at
Lynchburg to rezone 2081 Langhorne Road from R-4, High Density Residential District
to B-1C, Limited Business District (Conditional) to allow commercial access and future
expansion of a nursing home.
On June 12, 2001, City Council approved the CUP petition of Central Health, Inc. at
1901 Tate Springs Road to allow the construction of a Cath Lab Addition.
On November 12, 2002, City Council approved the CUP petition of Hold Cross School
at 2125 Langhorne Road to allow the construction of building additions and parking.
On June 8, 2004, City Council approved the CUP petition of Centra Health, Inc. at
1901 Tate Springs Road to allow the construction of a bed tower addition.
On October 11, 2005, City Council adopted the Midtown Area Master Plan.
On January 12, 2010, City Council approved
the CUP petition of Hold Cross School at
2125 Langhorne Road to allow a consolidated sign plan.
5.
Site Description.
The property currently contains a six (6) story brick building constructed
in 1973. City Assessor records indicate it contains seventy-three thousand two hundred and
twelve (73,212) square feet. The existing building contains one hundred and one (101) Senior
Planning Commission: CUP – Jefferson House
LLC, 1818 Langhorne Sq. – December 9, 2020
4
units. On May 26, 1981, the Board of Zoning
Appeals, BZA approved a variance allowing the
construction of up to one hundred seventy-four
(174) apartment units. Only one hundred and
one (101) of those units were constructed and
the City’s Zoning Administrator has determined
that the variance would no longer allow the construction of additional units, necessitating the
need for the CUP.
6.
Proposed Use of Property.
If the CUP is approved the existing parcel would be subdivided
and a five (5) story, sixty-five (65) unit apartment building would be constructed on site. The
proposed units would be deed restricted to seniors that are rent burdened. The existing facility
would also be improved.
7.
Traffic, Parking and Public Transit.
The petitioner has requested a reduction to the off-
street parking requirements based upon mass-transit being available to the property and
demonstrated parking need. The proposed concept plan indicates a total of sixty-seven (67)
parking spaces that would be shared between the two properties.
The property is served by Greater Lynchburg
Transit Company (GLTC) Route 1A with a stop
in front of 1818 Langhorne Square. As required for a mass transit parking reduction, the
submitted concept plan indicates sidewalks connecting both buildings to the bus stop and the
addition of a bench at the stop.
8.
Stormwater Management.
The petitioner has indicated that stormwater management is
proposed to be addressed by the use of underground detention and the purchase of off-site
nutrient credits.
9.
Emergency Services:
The City Fire Marshal and Police Department had no concerns
regarding the CUP petition.
10.
Impact.
The approval of the CUP to allow the construction of rent based housing for seniors
should have little impact on the area and is in keeping with the
City’s Comprehensive Plan 2013-
2030
and the more detailed
Midtown Area Master Plan
. The primary concern with the proposed
development is that of parking. A total of one
hundred sixty-six (166) units would exist with
only sixty-seven (67) parking spaces proposed. This is less than half of the normally required
one (1) parking space per one (1) residential unit required by the
Zoning Ordinance
. Based upon
the availability of mass transit, parking need demonstrated by the petitioner and the restriction
of senior housing, parking should not become an issue. The location of the senior housing
within walking distance to medical offices and retail uses should fit well into the area.
11.
Technical Review Committee.
The Technical Review Committee (TRC) reviewed the
petition on November 17, 2020. Comments have or
will be addressed prior to final site plan
approval.
VI. PLANNING DIVISION RECOMMENDATION
Based on the preceding Findings of
Fact, the Planning Commission
recommends to City Council approval
of the petition of Jefferson House
LLC for a Conditional Use Permit at 18
18 Langhorne Square subject to the
following condition:
1.
The property shall be developed in substantial compliance with the
concept plan “Conditional Use Pe
rmit for Jefferson House” dated
“Revised November 24, 2020”
This matter is respectfully offered for your consideration.
Planning Commission: CUP – Jefferson House LLC, 1818 Langhorne Sq. – December 9, 2020
5
William T. Martin, AICP
City Planner
pc: Dr. Reid Wodicka, Interim City Manager
Mr. Kent L. White, Interim Deputy City Manager
Mr. Walter C. Erwin, City Attorney
Mr. J. Lee Newland, City Engineer
Ms. Cynthia Kozerow, Lynchburg Police Department
Battalion Chief Thomas Goode, Fire Marshal
Mr. Doug Saunders, Building Official
Mr. Kevin Henry, Zoning Administrator
Mr. Joseph Eddy, Petitioner
Mr. Patrick Proffitt, Representative
VII. ATTACHMENTS
1. Zoning Map with Adjoining Property Owners
2. Future Land Use Map
Text truncated. Open the original for the full document.