Virtual Town and Gown Meeting
Tuesday, August 4, 2020
Noon – 1:30 p.m.
Zoom Webinar – An email with your unique panelist link will be sent on August 3, 2020. For technical
assistance, please contact Alicia Finney, Interim Clerk of Council (alicia.finney@lynchburgva.gov, 434-
455-3981).
Note: Please feel free to enjoy your lunch during the meeting
I. Welcome Council member Randy Nelson, Chair
a. Introductions
II. Reports from College, University and Lynchburg Facilitated by Council member Nelson
Lynchburg City Schools
City School Presidents/Designees
a. Central Virginia Community College
b. Liberty University
c. Lynchburg City Schools
d. Randolph College
e. Sweet Briar College
f. University of Lynchburg
g. Virginia University of Lynchburg
III. Updates from the City of Lynchburg
a. Construction Projects Reid Wodicka, Deputy City Manager (tentative)
b. Other…
IV. For the Good of the Order…
V. Next Meeting: Early December
CAPITAL PROJECTS UPDATE
City of Lynchburg
Town and Gown Committee
August 4, 2020
1
Overview
• Purpose: Review the City’s recently completed, current, and
planned construction projects that will be of interest to our
Town and Gown partners
• Outline
• Recently Completed Projects
• Upcoming Projects
• Smaller upcoming interesting projects
• In application
• In design
2
Recently Completed Projects
• Improvements to bike lanes on Rivermont Avenue
• Downtown Utility and Streetscape Phase 1
• Main Street Renewal complete within a year
• Wards Ferry Road/Logans Lane/Leesville Road Improvements
• Liberty Mountain Drive Phase 3
• Oddfellows Road Phase 3 (B2)
3
Projects of Interest
• Smaller Upcoming Interesting Projects
• Campbell Avenue Signalization and minor pedestrian improvements - 2024
• Bedford Avenue Bridge Replacement – 2023
• Liberty Mountain Drive Realignment (at Candlers Mountain Road) – 2024
• 5th Street Phase 4 – 2022
• Small walkability projects on Rivermont Avenue - ongoing
• Under Construction
• Bridge from Linkhorne Middle School to Entrance to Blackwater Creek Trail
• Riverside Park Overlook
• In application
• Wards Ferry Road at CVCC Campus Roundabout - 2027
• Candlers Mountain Road Expressway Interchange - 2027
• In design
• Kemper Street Sidewalk – Fall 2021
• 501/221 Intersection Project - 2022
• Lakeside Drive Bridge/College Lake Restoration Project - 2020
4
Blackwater Creek Trail
Extension
• Extends the trail
approximately one mile
• Connects with the
Linkhorne Middle School
parking lot
• Expands our wonderful
trail system
• Expected completion in
October 2020
5
Overlook at
Riverside Park
• Rehabilitation Project
• Great recreational
amenity
• First wedding is
scheduled for later in
August
6
Wards Ferry Road at
CVCC Campus Drive
Roundabout
• If approved:
• Install a roundabout at
this busy intersection
• Tie into existing sidewalk
on CVCC campus and
along Wards Ferry Road
• FY 2027
CVCC Campus
7
Candlers Mountain
Road/Expressway
Interchange
• If approved:
• Reconstruct this challenging
interchange
• Replace the Candlers Mountain
Road Bridge
• FY 2027
8
Kemper Street Sidewalk
• Add sidewalk along Kemper
Street between Campbell
Avenue and terminus near the
new interchange
• VUL community and neighbors
will have better pedestrian
access to the midtown corridor
and downtown
• Complete Fall 2021
9
501/221 Intersection
• Construction of one-way
pairs to improve traffic
flow
• Anticipated construction
is from Fall 2022 and
continuing for two years
10
Lakeside Drive Bridge/College Lake
Restoration
• Precipitated by the inadequacy of the dam spillway, which was
highlighted by the August 2, 2018 flood event
• Project is divided into two divisions, each with its own design
team:
• Lakeside Drive Bridge Construction and Roundabout Installation
• College Lake Dam Removal and Restoration
• Construction of the road improvements/bridge begin in Fall
2020
• Removal of the dam begins as soon as we can divert traffic
from Lakeside Drive (Fall 2022?) with potentially 2 years of
construction
11
Construction to begin Fall 2020, totally complete June 2023
12
Dam Removal and Lakebed Restoration
• The dam is a significant public safety issue; removal represents a
monumental environmental challenge
• Extremely complicated engineering task
• Condition of the lakebed and upstream tributaries
• Size of the watershed
• Closest to University of Lynchburg, but has the potential to be
impactful for environmental education for every educational
institution in the City
• This project has the potential to be a global example urban wetland
restoration
• City staff remains highly committed our original vision of an urban wetland
learning laboratory
• All of our design and construction takes that vision into account
• Full realization of that vision will take some time
• As design continues, we look forward to sharing the Wetland
Learning Laboratory Concept Designs
• Phenomenal partnership with U of L faculty on this project
13
LYH Liberty
Wyndhurst
Cornerstone
Forest
501/221
14
15
16
17
Preliminary Engineering Design – Not for Publication
Thank you
• Questions or comments?
18