RecordWell Data

2023 Progress Update

Fairfax County · Fairfax County · Agendas

Open the original document More from Fairfax County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Implementation of Fairfax County’s Climate Plans 2023 Progress Update Resilient Fairfax, CECAP Implementation Plan, and the Operational Energy Strategy A Fairfax County, VA publication 2 Fairfax County Climate Plan Progress Report 2023 – Front Matter Fairfax County Office of Environmental and Energy Coordination 12000 Government Center Parkway Fairfax, Virginia 22035 OEECinfo@fairfaxcounty.gov https://www.fairfaxcounty.gov/environment-energy-coordination/ Fairfax County is committed to nondiscrimination on the basis of disability in all county programs, services, and activities. Reasonable accommodations will be provided upon request. For information, please call the Office of Environmental and Energy Coordination at 703-324-7136 | TTY 711. El conado de Fairfax está comprometido a no discriminar en función de la incapacidad en todos los programas, servicios y actividades del condado. Se proporcionarán las adaptaciones razonables mediante solicitud. Para obtener información, llame a Office of Environmental and Energy Coordination, 703-324-7136 | TTY 711. The county’s language access policy (PM 02-08) states that “no person will be denied equal access to county services based on his/her inability, or limited ability, to communicate in the English language.” 3 Fairfax County Climate Plan Progress Report 2023 – Front Matter Contents CONTENTS ................................................................................................................................................................................................................................. 3 ACRONYMS ................................................................................................................................................................................................................................ 7 PART I: EXECUTIVE SUMMARY ................................................................................................................................................................................................... 8 BACKGROUND ...................................................................................................................................................................................................................................... 8 The County’s Climate Plans .......................................................................................................................................................................................................... 8 Documents that Preceded the Climate Plans ............................................................................................................................................................................. 11 How the Plans are Being Implemented ...................................................................................................................................................................................... 12 Who is Involved? ........................................................................................................................................................................................................................ 14 SUMMARY OF PROGRESS AT THE “ROLL-UP” LEVEL .................................................................................................................................................................................... 17 OUTCOMES: KEY TARGETS AND METRICS ................................................................................................................................................................................................. 19 Emissions Reduction Metrics for the Population ........................................................................................................................................................................ 19 Emissions Reduction Metrics for County Government Operations ............................................................................................................................................ 21 Resilience Metrics ...................................................................................................................................................................................................................... 23 HIGHLIGHTS FROM 2023 ...................................................................................................................................................................................................................... 25 General Highlights and Awards from 2023 ................................................................................................................................................................................ 25 Highlights: Group 1 Strategies – (Coordination, Funding, and Legislation) ............................................................................................................................... 26 Highlights: Group 2 Strategies – (Development Codes, Policies, and Plans) ............................................................................................................................. 27 Highlights: Group 3 Strategies – (Community Services, Education, Engagement, Incentives) ................................................................................................... 29 Highlights: Group 4 Strategies – (Natural Resources) ................................................................................................................................................................ 32 Highlights: Group 5 Strategies – (Facilities and Operations) ..................................................................................................................................................... 33 Highlights: Group 6 Strategies – (Climate Data and Research) ................................................................................................................................................. 35 PART II: DETAILED PROGRESS UPDATES – FAIRFAX COUNTY CLIMATE PLANS .......................................................................................................................... 36 BACKGROUND AND HOW TO READ THIS DOCUMENT .................................................................................................................................................................................. 36 FIND A KEY PROGRAM ......................................................................................................................................................................................................................... 40 SUMMARY OF PROGRESS ...................................................................................................................................................................................................................... 41 DETAILS: GROUP 1 STRATEGIES – (COORDINATION, FUNDING, LEGISLATION) ................................................................................................................................................. 42 Roll up: Interagency, Regional Coordination, and Capacity Building on Climate ....................................................................................................................... 43 1. Establish a Long-term Interagency Collaboration System for Resilience ..................................................................................................................................................... 43 2. Update the Strategic Plan to Enhance Climate Resilience ........................................................................................................................................................................... 45 3. Complete the Climate Health Plan .............................................................................................................................................................................................................. 45 4. Coordinate Hazard Mitigation and Emergency Management Planning with Climate Resilience Planning ................................................................................................. 46 5. Interagency Collaboration on Emissions and Waste Reduction .................................................................................................................................................................. 46 6. Regional Transportation Coordination for Emissions Reduction ................................................................................................................................................................. 47 7. Regional Transportation Coordination for Resilience .................................................................................................................................................................................. 48 4 Fairfax County Climate Plan Progress Report 2023 – Front Matter 8. Regional Energy and Water Coordination ................................................................................................................................................................................................... 49 9. Build County Staff Capacity on Climate Resilience Planning and Implementation ..................................................................................................................................... 50 10. Staff Training on Emissions Reduction, Efficiency, Waste ......................................................................................................................................................................... 51 Roll-Up: Federal, State, County, and Other Funding Opportunities ........................................................................................................................................... 53 11. County Climate Fund for Resilience ........................................................................................................................................................................................................... 53 12. Green Bank for Emissions Reduction ......................................................................................................................................................................................................... 55 13. Pursue Federal and State Funding Opportunities for Resilience and Emissions Reduction ...................................................................................................................... 56 14. Other Funding ........................................................................................................................................................................................................................................... 58 Roll-up: Adaptation Action Areas ............................................................................................................................................................................................... 58 15. Adaptation Action Areas Implementation ................................................................................................................................................................................................. 58 Roll up: Legislative and State-Level Proposals and Advocacy .................................................................................................................................................... 60 16. State-Level Actions for the Building Code ................................................................................................................................................................................................. 60 17. State-Level Actions for Solar, Renewables, and Energy Efficiency ............................................................................................................................................................ 61 18. State-Level Actions for Natural Resources ................................................................................................................................................................................................ 62 19. State-Level Actions for Transportation ...................................................................................................................................................................................................... 63 20. State-Level Actions for Waste ................................................................................................................................................................................................................... 64 DETAILS: GROUP 2 STRATEGIES – (DEVELOPMENT CODES, POLICIES, AND PLANS) ........................................................................................................................................... 65 Roll-up: Flood Risk Reduction Plan ............................................................................................................................................................................................. 66 21. Pursue and Implement a Flood Risk Reduction Plan for the Fairfax County Community .......................................................................................................................... 66 Roll-up: Comprehensive Plan Amendments for Climate ............................................................................................................................................................ 68 22. Comprehensive Plan Amendments for Resilience ..................................................................................................................................................................................... 68 23.Comprehensive Plan Amendments for Energy Efficiency and Green Buildings ......................................................................................................................................... 69 24. Comprehensive Plan Amendments for Natural Resources ....................................................................................................................................................................... 70 25. Comprehensive Plan Amendments for Transportation ............................................................................................................................................................................. 71 Roll-up: Urban Design Guideline Updates for Climate ............................................................................................................................................................... 73 26. Heat Resilient Urban Design, Development, Upgrades, and Practices ...................................................................................................................................................... 73 Roll-up: County Code and Zoning Ordinance Updates ............................................................................................................................................................... 75 27. Resilience: Zoning Ordinance and Other County Code Amendments ....................................................................................................................................................... 75 28. Emissions Reduction: Zoning Ordinance and Other County Code Amendments ...................................................................................................................................... 77 DETAILS: GROUP 3 STRATEGIES – (COMMUNITY SERVICES, EDUCATION, ENGAGEMENT, INCENTIVES) ................................................................................................................. 80 Roll-up: Incentives for Communities .......................................................................................................................................................................................... 81 29. Incentives for Buildings and Energy Efficiency: County-led Programs ....................................................................................................................................................... 81 30. Incentives for Buildings and Energy Efficiency: Promotion of External Programs ..................................................................................................................................... 82 31. Incentives for Solar and Other Renewables .............................................................................................................................................................................................. 84 32. Incentives for Transportation: Electric Vehicles ........................................................................................................................................................................................ 86 33. Incentives for Transportation: Bicycling and Pedestrian Incentives .......................................................................................................................................................... 87 34. Incentives for Transportation: Transit ....................................................................................................................................................................................................... 88 Roll-up: Aid and Risk-Reduction Services for Communities ........................................................................................................................................................ 89 35. Community Aid and Services to Alleviate Resilience Needs ...................................................................................................................................................................... 89 36. Resilience Hubs ......................................................................................................................................................................................................................................... 93 Roll-up: Education and Workforce Development for Communities ........................................................................................................................................... 95 5 Fairfax County Climate Plan Progress Report 2023 – Front Matter 37. Education on Climate Resilience, General ................................................................................................................................................................................................. 95 38. Education on Emissions Reduction ............................................................................................................................................................................................................ 97 39. Education on Natural Resources (both resilience & emissions reduction) ................................................................................................................................................ 99 40. Workforce Development & Business Start-ups ....................................................................................................................................................................................... 100 Roll-up: Community-led Pilot Programs, Partners, and Champions......................................................................................................................................... 102 41. Green Business Partners and Other Business Engagement ..................................................................................................................................................................... 102 42. Climate Champions and other Community-Led Pilot Programs (other than business sector) ................................................................................................................ 103 DETAILS: GROUP 4 STRATEGIES – (NATURAL RESOURCES) ........................................................................................................................................................................ 105 Roll-up: Consolidated Natural Resource Management Plan .................................................................................................................................................... 106 43. Develop a Consolidated Natural Resource Management Plan ................................................................................................................................................................ 106 Roll-up: Tree Programs ............................................................................................................................................................................................................ 109 44. Tree Planting and Reforestation .............................................................................................................................................................................................................. 109 Roll-up: Surveying and Protection of Natural Areas ................................................................................................................................................................ 111 45. Survey and Protect Areas that Provide Natural Resilience Benefits ........................................................................................................................................................ 111 Roll-up: Nature-based Restorations and Green Infrastructure ................................................................................................................................................ 113 46. Green Infrastructure for Climate Resilience and Co-Benefits .................................................................................................................................................................. 113 47. Stream Restorations ................................................................................................................................................................................................................................ 115 48. Explore Living Shoreline Opportunities ................................................................................................................................................................................................... 116 49. Wetland and Floodplain Restorations ..................................................................................................................................................................................................... 117 50. Regenerative Agriculture ......................................................................................................................................................................................................................... 117 DETAILS: GROUP 5 STRATEGIES – (FACILITIES AND GOVERNMENT OPERATIONS) ........................................................................................................................................... 118 Roll-up: County Facilities: Energy, Water, Green Building, Utilities ......................................................................................................................................... 119 51. Whole Building Energy Audits, Retrofits, and Retro-commissioning ....................................................................................................................................................... 119 52. Equipment Replacement and Upgrades .................................................................................................................................................................................................. 120 53. Optimization and Energy Management Systems .................................................................................................................................................................................... 121 54. Green Buildings for County Facilities ....................................................................................................................................................................................................... 122 55. Streetlight Conversion ............................................................................................................................................................................................................................. 124 56. Solar for County Government ................................................................................................................................................................................................................. 124 57. Other Renewables and Resource Recovered Gas .................................................................................................................................................................................... 127 58. Water Use and Efficiency for County Facilities ........................................................................................................................................................................................ 128 59. Wastewater Management Practices for Climate..................................................................................................................................................................................... 130 60. Utility Cost Management and Coordination with Energy Utilities ........................................................................................................................................................... 130 Roll-up: Resilience for County Government Facilities and External Infrastructure ................................................................................................................... 132 61. Update Capital Improvement Program Process to Include Climate Resilience Considerations .............................................................................................................. 132 62. Enhance Flood Resilience of County Government Buildings and Other Facilities ................................................................................................................................... 134 63. Enhance Energy Resilience for County Facilities ..................................................................................................................................................................................... 135 64. Enhance Heat Resilience for County Facilities and External Infrastructure ............................................................................................................................................. 137 65. Update Procurement Practices for Resilience ......................................................................................................................................................................................... 137 Roll-up: Fleet and Transit ......................................................................................................................................................................................................... 138 66. Electric Fleet Vehicles .............................................................................................................................................................................................................................. 138 67. Charging Infrastructure and Parking........................................................................................................................................................................................................ 140 6 Fairfax County Climate Plan Progress Report 2023 – Front Matter 68. Reduce Travel .......................................................................................................................................................................................................................................... 141 Roll-up: Zero Waste and Sustainable Purchasing and Procurement ........................................................................................................................................ 141 69. Sustainable Procurement ........................................................................................................................................................................................................................ 141 70. Zero Waste and Waste Reduction for County Government Operations ................................................................................................................................................. 144 71. Zero Waste and Waste Reduction for the Community ............................................................................................................................................................................ 146 DETAILS: GROUP 6 STRATEGIES – (DATA AND RESEARCH) ......................................................................................................................................................................... 149 Roll-up: Data and Map Updates .............................................................................................................................................................................................. 150 72. Tracking of Resilience Progress ............................................................................................................................................................................................................... 150 73. Tracking of Emissions Reduction Progress .............................................................................................................................................................................................. 151 74. Data on Natural Resources (Both Resilience and Emissions Reduction) ................................................................................................................................................ 152 75. Data on Flooding and Hazards ................................................................................................................................................................................................................. 153 76. Data on Health ........................................................................................................................................................................................................................................ 154 Roll-up: Climate-Related Research ........................................................................................................................................................................................... 155 77. Climate-Related Research ....................................................................................................................................................................................................................... 155 APPENDICES........................................................................................................................................................................................................................... 157 APPENDIX A: FIND A STRATEGY ............................................................................................................................................................................................................ 157 APPENDIX B: SPREADSHEET VERSION OF PROGRESS TRACKER (GROUPS, ROLL-UPS, STRATEGIES, ACTIONS) ....................................................................................................... 164 7 Fairfax County Climate Plan Progress Report 2023 – Front Matter Acronyms HCD – Housing and Community Development FMD – Facilities Management Department FEET – Fairfax Environmental Engagement Team FEEE – Fairfax Employees for Environmental Excellence FCPS – Fairfax County Public Schools FCPL – Fairfax County Public Library CECAP – Community-wide Energy and Climate Action Plan FCPA – Fairfax County Park Authority FCDOT – Fairfax County Department of Transportation FACS – Faith Alliance for Climate Solutions ECAP – Energy Conservation Assistance Program DVS – Department of Vehicle Services DPWES - Department of Public Works and Environmental Services DPSC - Department of Public Safety Communications DPMM - Department of Procurement and Material Management DPD - Department of Planning and Development DOF - Department of Finance DMB - Department of Management and Budget DFS - Department of Family Services DEMS – Department of Emergency Management and Security DIT – Department of Information Technology DEI – Department of Economic Initiatives CSB – Community Services Board CRS – Community Revitalization Section of DPD CAP – Conservation Assistance Program APA – American Planning Association ZED – Zoning Evaluation Division of DPD ZAD – Zoning Administration Division of DPD VESPN – Virginia Energy and Sustainability Peer Network VEPGA – Virginia Energy Purchasing Governmental Association VAECC – Virginia Energy Efficiency Council UFMD – Urban Forest Management Division of DPWES TRIP – Transportation Resilience Improvement Plan SSDN – Southeast Sustainability Directors Network RF – Resilient Fairfax RCC – Reston Community Center PD – Planning Division of DPD One FFX – One Fairfax OES – Operational Energy Strategy OEEC – Office of Environmental and Energy Coordination NVSWCD – Northern Virginia Soil and Water Conservation District NVRC – Northern Virginia Regional Commission NCS – Neighborhood and Community Services MWCOG – Metropolitan Wahington Council of Governments MCC – Mclean Community Center LDS – Land Development Services HD or FCHD – Fairfax County Health Department 8 Fairfax County Climate Plan Progress Report – Part I: Executive Summary PART I: EXECUTIVE SUMMARY Background The County’s Climate Plans Fairfax County, Virginia is working to address both the cause and the effects of climate change. The Fairfax County Board of Supervisors (BOS) has adopted and/or accepted the three climate plans summarized in the figure below. On the “cause” side, we are doing our part in the global effort to reduce greenhouse gas emissions in the community (see the Community-wide Energy and Climate Action Plan (CECAP)), and in government operations (see the Operational Energy Strategy (OES)). On the “effects” side, we are adapting and building resilience to the impacts that we experience locally such as increasingly extreme heat, severe storms, and flooding (see Resilient Fairfax). This document is a progress report on the implementation of all three climate plans in Fairfax County. Figure 1: Fairfax County's Climate Plans 9 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Figure 2, below, summarizes the major topics that are covered within each climate plan. The Community-wide Energy and Climate Action Plan (CECAP) and the Operational Energy Strategy (OES) are both focused on addressing the cause of climate change by reducing greenhouse gas emissions, so the topics covered in those plans are similar. Both CECAP and OES have strategies to reduce emissions from transportation, buildings, energy supply, and waste. The difference between the two plans is that CECAP focuses on reducing emissions throughout the Fairfax County population, whereas OES focuses on reducing emissions in county government buildings and operations specifically. For example, the “transportation” strategies in CECAP encourage the whole population to bike, walk, take transit, and transition to electric vehicles when possible, while the “transportation” strategies in OES focus on electrifying the county government’s fleet vehicles. The “buildings” strategies in CECAP focus on making homes and businesses throughout the community more energy-efficient, whereas the “buildings” strategies in OES focus on energy efficiency for county government-owned buildings. There are a few topic areas that are different between CECAP and OES. CECAP includes a sector for natural resources, because the tree canopy and other natural resources in Fairfax County help to sequester carbon, absorbing a small percentage of the community’s emissions. The OES includes focus areas for goods and services (sustainable procurement) and utility cost management, helping the county ensure that it is operating in an efficient and sustainable manner. The Resilient Fairfax plan, in contrast, is focused on boosting resilience to the effects of climate change, or addressing vulnerabilities to climatic hazards that we experience locally. The Resilient Fairfax plan applies to both the general population and county government. There are 48 strategies in Resilient Fairfax. These 48 strategies are organized into four pillars, symbolized in Figure 2 below. • Strategies in the “Integrated Action Planning” pillar provide the foundation for long-term success through resilience-related interagency coordination, data, funding, and plan alignment. • Strategies in the “Climate Ready Communities” pillar include resilience-related county services and aid, public education and outreach, and updates to county codes to encourage more climate-ready neighborhoods. • Strategies in the “Resilient Infrastructure and Buildings” pillar include physical upgrades to infrastructure and buildings so that they can better withstand modern and future climatic conditions and hazards. This includes both direct upgrades to infrastructure within county control, such as stormwater pipes, and advocacy for resiliency upgrades to infrastructure that is not within county control, such as the electricity grid or the Metro system. • Strategies in the “Adaptive Environments” pillar focus on protection and restoration of natural resources in the county that naturally provide substantial climate resilience. For example, when our wetlands and shorelines are healthy, they absorb floodwater and storm surge, protecting the neighborhoods behind them. When our forests and trees are healthy and resilient, they reduce the Urban Heat Island effect and absorb stormwater. 10 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Figure 2: Major topics within each climate plan. 11 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Documents that Preceded the Climate Plans The county’s three climate plans were built upon a strong foundation of preceding plans, reports, and declarations in the county. To reduce confusion, the county’s current focus is on the three plans described in the section above. The preceding documents have largely been fulfilled by or folded into the OES, CECAP/CECAP IP, or Resilient Fairfax. The preceding documents that have been folded in include the Environmental Vision, Fairfax Green Initiatives, Joint Environmental Task Force Final Report, Carbon Neutral Counties Declaration and the annual Sustainability Initiatives report . The Sustainable Development Policy for Capital Projects is part of the implementation of the OES. Figure 3: Documents that preceded the climate plans. 12 Fairfax County Climate Plan Progress Report – Part I: Executive Summary How the Plans are Being Implemented The county is responsible for implementing all three climate plans simultaneously. CECAP and the CECAP Implementation Plan were accepted by the Board of Supervisors (BOS) in September 2021 and December 2022, respectively. The Operational Energy Strategy (OES) was adopted by the BOS in July 2021. Resilient Fairfax was adopted by the BOS in November 2022. For greatest efficiency, the county is implementing all three plans in a streamlined and consolidated manner, as illustrated in the figure below. Strategies from all three plans were compiled and then sorted by topic area. Six groups emerged. Strategies in Group 1 relate to general coordination, funding, legislative, and other state-level updates for climate. Strategies in Group 2 focus on climate-related updates to development codes, policies, and plans. Strategies in Group 3 focus on enhancement of community aid, education, engagement, and incentives for climate. Group 4 focuses on natural resource strategies. Group 5 focuses on strategies for county facilities and operations. Group 6 includes strategies for climate-related research and data collection. Figure 4: Interagency Climate Team - Implementation Groups 13 Fairfax County Climate Plan Progress Report – Part I: Executive Summary First, strategies from all three plans were compiled and streamlined. Duplicative strategies were combined, as illustrated below: 11 OES Focus Areas 99 CECAP IP Actions 48 Resilient Fairfax Strategies 158 total “strategies” (including duplicates) 77 streamlined strategies. Next, the 77 strategies were “rolled up” by topic, to enable bigger picture progress tracking. For example, all incentive-related strategies are in the “Incentives” roll-up. The 22 “roll-ups” were further organized into 6 overarching groups, as illustrated in the table below. Table 1: Summary of Strategy Roll-Ups 6 Groups 22 “Roll-ups” 77 Strategies Group 1: Funding, Coordination, and Legislative Action • Interagency & Regional Collaboration, Staff Capacity Building • Federal, State, County, and other Funding Opportunities • Adaptation Action Area Implementation • Legislative and State-level Proposals and Advocacy 20 Strategies Group 2: Development Codes, Plans, and Policies • Flood Risk Reduction • Comprehensive Plan Amendments for Climate • Urban Design Guidelines for Climate • County Code and Zoning Ordinance Updates 8 Strategies Group 3: Community Services, Education, Engagement, and Incentives • Incentives for Communities • Aid and Risk Reduction Services for Communities • Education and Workforce Development for Communities • Community-led Pilot Programs, Partners, and Champions 14 Strategies Group 4: Natural Resources • Consolidated Natural Resource Management Plan • Tree Programs • Surveying and Protection of Natural Areas • Nature-Based Restorations and Green Infrastructure 8 Strategies Group 5: County Facilities and Operations • County Facilities: Energy, Water, Green Buildings, Utilities • Resilience for County Facilities and External Infrastructure • Fleet and Transit Upgrades • Zero Waste and Sustainable Purchasing and Procurement 21 Strategies Group 6: Data and Research • Data and Map Updates • Climate-Related Research 6 strategies 14 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Who is Involved? The Office of Environmental and Energy Coordination (OEEC) coordinates interagency efforts for the implementation of the county’s climate plans. Over 25 agencies and 150 staff are involved in implementation activities. Many actions listed in this progress report are implemented by multiple agencies or by agencies other than OEEC. Figure 5: Interagency Coordination for Climate Plan Implementation 15 Fairfax County Climate Plan Progress Report – Part I: Executive Summary The figure below summarizes how county agencies are represented on the Interagency Climate Team and its topic-focused groups. Many agencies are represented in multiple groups. However, this agency representation is often achieved through different staff members, as appropriate. For example, within FCPA, staff who manage Rec Centers are relevant to Group 3 (Community Services) and Group 5 (Facilities), whereas FCPA staff who manage natural resources are relevant to Group 4 (Natural Resources) and Group 2 (Development Codes). For a full contact list of staff involved, please contact the Office of Environmental and Energy Coordination. Figure 6: Agencies Involved in the Interagency Climate Team and its Groups 16 Fairfax County Climate Plan Progress Report – Part I: Executive Summary In addition to coordination within Fairfax County government through the Interagency Climate Team (shown in the top row in the figure below), there are external stakeholders involved in the implementation of Resilient Fairfax. The external Infrastructure Advisory Group (IAG) is composed of utilities, authorities, and infrastructure managers at the local, state, regional, and federal levels. The purpose of the IAG is to help ensure that resilience upgrades are also being made to external infrastructure outside of county control. The external Community Advisory Group (CAG) is composed of residents of each Supervisor District, along with representatives of advocacy organizations, non-profits, and various Boards, Authorities, and Commissions. The purpose of the CAG is to help ensure that Resilient Fairfax is implemented in a way that is best for the community. The figure below summaries the composition of these groups. For a full list of participants, please contact the Office of Environmental and Energy Coordination (OEEC). Figure 7: Broader Stakeholder Engagement 17 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Summary of Progress at the “Roll-up” Level The figure below shows a bird’s eye view of progress made to date. Progress is shown at the “Roll-Up” level, which is highly condensed and simplified. The figure shows the Groups, Roll-Ups, applicable plans (RF = Resilient Fairfax; CECAP = Community-wide Energy and Climate Action plan; OES = Operational Energy Strategy), and statuses of the Roll-Ups. The figure shows that while progress varies, progress is being made across all topics. For details on each Strategy and Implementation Action within these Roll-Ups, please see Part II of this report: Detailed Progress Updates. Figure 8: Summary of Progress, by Strategy Roll-up 18 Fairfax County Climate Plan Progress Report – Part I: Executive Summary The figure below shows an example of the content that is summarized within a “Roll-Up.” On average, each Roll-Up (or each row in the preceding figure) contains 3-4 Strategies. Those Strategies, in turn, include several Implementation Actions and programs. Progress from each Implementation Action is compiled to calculate the progress of each Strategy and Roll-Up. In the example below, the Roll-up “Incentives for Communities” includes several Strategies that cover topics such as incentives for buildings and energy efficiency, solar, and transportation. One of these strategies, Strategy 29, is “Incentives for Buildings and Energy Efficiency: County Led Programs.” That Strategy, in turn, includes several major programs. For detailed descriptions of the progress of these and other strategies, please see Part II of this report, Detailed Progress Updates. Figure 9: Example of Strategies within a Strategy Roll-Up 19 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Outcomes: Key Targets and Metrics In addition to tracking the progress of strategies and actions, it is essential to track the outcomes of those efforts, or the progress being made towards overarching goals and targets. Emissions Reduction Metrics for the Population Figure 10 below illustrates progress on the outcome metrics for the Community-wide Energy and Climate Action Plan (CECAP), which focuses on emissions reduction for the general population. The outcome metrics from CECAP were set by the community during the CECAP planning process. The ultimate metric is the overall emissions reduction goal, which is to reduce 87% of emissions by 2050. From the 2005 baseline, as of 2020 there has been a 30% reduction in greenhouse gas emissions. This is only slightly behind where the county should be for linear progress. This metric will next be updated by MWCOG with 2023 data. The community also set many of the sector-based goals shown above. These metrics may be replaced and updated during implementation as the county and community reach or exceed these goals, or to reflect more relevant metrics that emerge over time. For the energy sector, CECAP points to the Virginia Clean Economy Act goal of 100% clean energy by 2045. The county does not have direct control over the energy supply grid and energy sources. However, Dominion Energy’s progress towards this goal is tracked by the state. For the buildings sector, CECAP county sets two goals. The first is for all new, eligible buildings to be green buildings. This goal is based on the existing green building policy in the Comprehensive Plan, which applies to developments that go through the entitlement process. This goal has been reached through day-to-day implementation of the green building policy. The Comprehensive Plan policy on green buildings is scheduled to be reviewed, and it is anticipated that this goal will continue to be met. The second buildings-sector goal in CECAP is to retrofit at least 100,000 housing units with energy efficiency improvements by 2030. There had been steady progress toward this goal, with at least 37,633 known housing units already having made energy efficiency improvements through various , state, and utility programs. and increased availability of electric vehicles will increase registrations to meet the 2030 goal. federal tax incentives For the transportation sector, CECAP sets a goal of increasing transit, non-motorized, and telework commuting to 30% of commutes by 2030. This goal was reached early due to a pandemic-related shift to telework. However, with widespread returns to the office, progress is likely to regress. The next MWCOG update to the data will reflect post-pandemic behaviors. CECAP also sets a goal for electric vehicle (EV) registrations (both plug-in hybrid EVs and battery EVs) to increase to 15% by 2030. There has been some progress in this area, but not as much as anticipated; currently 1.9% of registrations are EVs. It is anticipated that CECAP has two goals for the natural resources sector: one related to overall tree canopy in the county, and one related to increasing tree canopy in each census tract. There is steady progress toward the goal of 60% overall tree canopy in the county, with many programs available to increase tree plantings throughout Fairfax County. Currently, 55% of the land area in Fairfax County is covered in tree canopy. There is also steady progress toward the goal of having every census tract in the county reach at least 40% coverage by 2030. Currently, 72% of Census Tracts are meeting this coverage goal. Tree planting efforts are focused on tree plantings in Census Tracts that do not meet this standard, with priority given to Census Tracts with high socioeconomic need. 20 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Finally, in the waste sector, CECAP sets a goal of achieving community Zero Waste by 2040. Zero Waste is defined as diversion of 90% of the waste stream from landfill or incineration. There is steady progress toward this goal; currently, an estimated 48% of waste in the community is recycled or otherwise diverted. It is anticipated that the community will have greater involvement in this effort as part of the Solid Waste Management Plan update, as well as participation in composting and recycling efforts. For highlights of projects that are helping the community reach these goals, please see the Highlights from 2023 section of this Executive Summary. For details on each strategy and implementation action, please see Part II of this report: Detailed Progress Updates. Please see the Climate Action Dashboard for additional information, graphics, and metrics. Figure 10: CECAP Goals and Targets utcomes CECAP missions e u on o the Po ula on inal oalBars ere we are ere we s ould e Due to teleworking during the pandemic, this goal was surpassed, but will likely regress as workers return to the o ce 8 2 . . . , 00 0 0 2 28 . . 2. 2, 0 0 0 20 0 0 0 0 0 80 0 00 ero aste by 20 0 Tree Canopy, by Census Tract Tree Canopy, Overall E Registra ons Transit, Telework, on Motorized Energy E ciency reen Buildings IR I IA CLEA ECO OM ACT: 00 Clean by 20 CARBO E TRALIT : 8 Reduc on by 20 0 Car on neutrality for t e popula on y reduc on Car on eutrality irginia Clean Economy Act clean y Energy upply All new eligi le uildings ave a commitment to green uilding Energy E ciency Retro t at least ousing units wit energy e ciency y Energy E ciency Increase transit non motori ed and telewor commu ng to y ransport Electric ve icle registra ons P E s and BE s to y ransport tree canopy overall in t e County atural Resources of Census racts ave canopy y atural Resources ero waste y waste diverted from t e land ll incinera on aste 21 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Emissions Reduction Metrics for County Government Operations Figure 11 below summarizes progress made on the outcome metrics for the Operational Energy Strategy (OES), which focuses on emissions reduction for county government buildings and operations. Emissions from county government operations make up less than 5% of the total greenhouse gas emissions county-wide. Nevertheless, it is important for the county government to lead by example. OES has an overall greenhouse gas emissions reduction goal of reducing county government emissions by 50% by 2030 and achieving carbon neutrality by 2040. To date, the county has reduced emissions by 20.3%, compared to the 2018 baseline year. This is significant progress. In addition to the overarching emissions reduction goal, OES sets sector-specific goals. For buildings and energy efficiency, OES has a goal of reducing energy use 25% by 2030 and 50% by 2040. To date, the county has reduced its building energy use 8.9%. Please see the County Government Energy Dashboard for more information on performance of buildings. The OES also sets a goal of building all new county government to LEED Gold standards plus 50% energy savings. This goal has been reached because the county enforces the policy for all new eligible county facilities. The policy will continue to be updated to remain up to date with modern standards. For the energy supply sector, OES focuses on switching to renewable energy in county operations. Specifically, the county government has a goal of being powered by at least 25% renewable electricity by 2030 and 50% renewable electricity by 2040. The county is working ardently on solar installations on county government buildings. However, significant progress remains to be made in this area, and progress depends partly on Dominion Energy. The transportation sector for OES is focused on fleet electrification, aiming to achieve a fully electric or non-carbon fleet by 2035. To date, 306 hybrid and electric fleet vehicles have been purchased, making up 2.0% of the total fleet. The waste sector for OES has one goal related to Zero Waste for county operations. There is substantial progress toward this goal. Please see the Zero Waste page for more information. For highlights of projects that are helping the county government reach these goals, please see the Highlights from 2023 section of this Executive Summary. For details on each strategy and implementation action, please see Part II of this report: Detailed Progress Updates. Please see the Climate Action Dashboard for additional information, graphics, and metrics. 22 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Figure 11: Operational Energy Strategy High-Level Metrics 23 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Resilience Metrics While the county participates in the worldwide effort to reduce emissions (addressing the cause of climate change), it is also essential that we build resilience here in Fairfax County (addressing the local effects of climate change). In other words, as the county faces “warmer, wetter, and weirder” conditions, we are working to become more resilient to such conditions. As illustrated in the figure below, resilience efforts can be compared to running on a treadmill that is continually accelerating. Many resilience metrics are seeking resilience improvement while the hazards themselves worsen. Therefore, there may not be such thing as metrics that can show that resilience has been fully “achieved.” Nevertheless, the county’s Resilient Fairfax efforts are crucial to ensure that we do not “fall off the back of the treadmill,” which in this metaphor means permanent loss of life, property, and resources. Resilience means being able to bounce back fully from shocks and stressors without suffering repeated permanent loss. Figure 12: Warmer, Wetter, Weirder 24 Fairfax County Climate Plan Progress Report – Part I: Executive Summary The Resilient Fairfax plan includes 48 strategies and dozens of key performance indicators (KPIs). Some KPIs from the plan have been modified to be more meaningful. A small selection of high-level metrics are summarized in the figure below. For flooding, the good news is that only 0.9% of buildings in Fairfax County are in FEMA 100-Year floodplains, and 99% of those buildings have the required flood insurance. However, outside of the floodplains, there are many more buildings at risk of urban flooding. In terms of heat, 26% of Urban Heat Islands have Cooling Centers within the same Census Tract. An estimated 4% of households that could be eligible for Cooling Assistance are applying for that assistance, so there is room for improvement. For storm resilience, 5.5% of county facilities on the Continuity of Operations list have back-up power, highlighting an opportunity for enhanced energy resilience. For highlights of projects, please see the Highlights from 2023 section. For details on each strategy and implementation action, please see Part II of this report: Detailed Progress Updates. Please see the Climate Action Dashboard for additional information, graphics, and metrics. Figure 13: Resilient Fairfax High Level Metrics 25 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Highlights from 2023 small number of programs that are of particularly strong interest to the Board of Supervisors or the public. Highlights are organized by strategy group. For detailed information on the status of every strategy and action item, please see Part II of this report, “Detailed Progress Updates,” General Highlights and Awards from 2023 In addition to highlights that are sorted by topic in the sub-sections below, there are a few overarching highlights of note from 2023: This section of the Executive Summary provides highlights of key programs and success stories from 2023. The highlights featured here are limited to a OEEC received a national Award for Excellence in Sustainability from the American Planning Association (APA) for the Resilient Fairfax plan. OEEC also received the state-level 2023 Resilient Virginia Community of the Year award for the . Resilient Fairfax plan. OEEC received recognition from the Virginia Energy Efficiency Council’s Energizing Efficiency Campaign Centers and the Streetlighting Project. OEEC’s communications staff published popular newsletters that featured highlights and success stories on a monthly basis. There are many for the South Run and Cub Run Recreation highlights in those newsletters. To see and subscribe to these newsletters please see this webpage: Environmental, Climate, and Energy Newsletter • • • • 26 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Highlights: Group 1 Strategies – (Coordination, Funding, and Legislation) The strategies in “ roup ” provide the foundation for successful climate action through interagency coordination, funding, and legislative and other state-level action. All agencies are involved in the implementation of Group 1 strategies. For detailed descriptions of progress made, please see Part II of this report, “Detailed Progress Updates.” To find an original climate plan strategy’s location within the groups, please see Appendix A: Find a Strategy. This section provides a few key highlights for “ roup ” progress made in 2023. Interagency and Regional Coordination and Capacity Building: There are now over 25 county government agencies and over 0 staff involved in the implementation of the county’s climate plans, led by the Office of Environmental and Energy Coordination (OEEC). These staff are organized into topic-focused implementation groups. OEEC staff have provided regular training for other agencies on climate information, customized for relevance to the applicable agency. Staff are also working to align other county-wide plans, such as the Strategic Plan, Climate Health Plan, Hazard Mitigation Plan, with the adopted climate plans. (For the Comprehensive Plan and other development plans and codes, please see Group 2). Additionally, staff are coordinating with neighboring jurisdictions, authorities, and other levels of government for well-coordinated, broader action. Funding Opportunities: Funding for climate plan implementation is obtained and allocated through several different avenues. First, most strategies in the climate plans are being implemented by existing staff across more than 25 agencies, whose salaries were already accounted for in the county budget. Second, new staff positions and programs have been created where necessary. Third, the OEEC manages the Capital Improvement Program Fund 30015, Environmental and Energy Programs, that supports implementation of CECAP, OES and Resilient Fairfax, the Environmental Improvement Program, the Plastic Bag Tax revenue, and the Energy Conservation Assistance Program to fund qualifying projects that meet established criteria. Fourth, county agencies have applied for several federal and state funding opportunities related to climate plan implementation, with mixed success. State-Level Proposals and Actions: Virginia is a Dillon Rule state, which means that the state (rather than localities) holds authority over many topics. Each legislative session, Fairfax County advocates for environmental considerations by the Virginia General Assembly. In the 2023 General Assembly session and beyond, Fairfax County was involved in efforts to prevent the rollback of environmental and energy programs and policies, including an attempted repeal of the Clean Cars Virginia Bill of 2021 and efforts to withdraw Virginia from the Regional Greenhouse Gas Initiative (RGGI). For details, please see the “Detailed Progress Updates” section of this report. 27 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Highlights: Group 2 Strategies – (Development Codes, Policies, and Plans) The strategies in “ roup 2” focus on climate-related updates to the county’s land development codes, policies, and plans. For detailed descriptions of progress made for each strategy, please see Part II of this report, “Detailed Progress Updates.” This section provides a few key highlights for “ roup 2” progress made in the first year of implementation. Flood Risk Reduction The county continues to reduce flood risk to residents in multiple ways, including physical upgrades to stormwater systems, policy changes, and education and outreach. In terms of physical upgrades, there are hundreds of completed, active, and pending stormwater improvement projects to reduce flooding in especially flood-prone areas. In terms of policy changes, an interagency team is currently conducting flood modeling and analyses to determine how the county’s development rules and design standards may need to be updated so that our neighborhoods are more resilient to intense rainfall. Additionally, in 2023, the Department of Public Works and Environmental Services (DPWES) presented to the BOS for consideration the new Flood Mitigation Assistance Program (FMAP) that will enable property owners to flood-proof their homes and reduce smaller-scale flood risk. Comprehensive Plan Amendments The Board of Supervisors authorized staff to pursue updates to the entire Policy Plan of the Comprehensive Plan, including the Environmental, Transportation, Land Use, Health, Public Facilities, and other sections. The adopted climate plans provide guidance on Comprehensive Plan amendments that would help to reduce emissions and boost resilience in Fairfax County. Staff are in the early stages of those amendments, which will be done in coordination with the public and all applicable boards, authorities, and commissions. Zoning Ordinance and Other County Code Amendments The Landscaping and Screening Zoning Ordinance Amendment, which was adopted by the Board of Supervisors January 23, 2024, includes climate considerations. For example, the amendment increases tree canopy in parking lots, which reduces the Urban Heat Island effect, and encourages the planting of native or environmentally tolerant trees. The Parking Reimagined Zoning Ordinance Amendment, adopted by the Board of Supervisors September 26, 2023 and effective beginning January 1, 2024, includes many climate-friendly provisions such as lower minimum parking requirements for developments in areas of the 28 Fairfax County Climate Plan Progress Report – Part I: Executive Summary county with higher density and more available transit options, new bicycle minimum parking requirements, and expanded options for adjusting parking requirements. The Chesapeake Bay Preservation Ordinance is being updated by staff to account for state- level legislative changes, including tree preservation and sea level rise considerations in Resource Protection Areas. Staff are also drafting proposals to modify the processes and special exception requirements for construction in major floodplains, to reduce flood risk. Staff are conducting research on potential additional amendments to the Zoning Ordinance and other County Codes with relevance to climate. Urban Design Guideline Amendments The county’s Urban Design Guidelines provide detailed guidance on the design of urban areas and streetscapes. Volume I of the Urban Design Guidelines applies to all Commercial Revitalization Districts and Areas, while Volume II provides guidelines for individual locations. The Department of Planning and Development – Community Revitalization Section has launched the process to update Volume I of the Urban Design Guidelines. This update will include climate-related considerations such as cool pavement selection to reduce the Urban Heat Island effect. Richmond Highway Bus Rapid Transit Cost Benefit Analysis An interagency sub-group, led by DPWES and consultants RK&K, conducted a cost benefit analysis of the stormwater and landscape design options for the Richmond Highway Bus Rapid Transit (BRT) project. The project seeks to include high-quality stormwater and landscape design that exceeds minimum requirements, to ensure reduced stormwater runoff, reduced urban heat island impacts, improved tree canopy, improved equity considerations, increased public spaces and comfort, and other ecological services and associated benefits. The group worked to align the Cost Benefit Analysis of the BRT project with the Strategic Plan, Resilient Fairfax, and One Fairfax goals. This project is one prominent example of how interagency implementation of climate plan recommendations can make a measurably positive difference for the community by enabling better design for on-the-ground projects. 29 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Highlights: Group 3 Strategies – (Community Services, Education, Engagement, Incentives) The strategies in “ roup ” focus on climate-related community services, education, engagement, and incentives. For detailed descriptions of progress made for each strategy, please see Part II of this report, “Detailed Progress Updates.” This section provides a few key highlights for “ roup 3” progress made in the first year of implementation. Public Information and Outreach The Office of Environmental and Energy Coordination (OEEC) conducted robust public information and outreach during 2023 through many avenues, including in- person events and meetings, presentations and webinars, social media campaigns, website updates, videos, podcasts, informational campaigns, and production of a suite of new resources and toolkits for residents. Highlights of new or updated resources include the following: • UPDATED: Resources for Residents, including new factsheets and resources in multiple languages, guides for decision making, and video testimonials. • UPDATED: Climate Action Dashboard, with climate data and progress. • NEW: Climate Action Checklists for Residents and mini checklists for Home Energy, Resilience, Transportation, Waste, and Natural Resources. • EXPANDED: Informational campaigns for Solarize VA and Capital Area Solar Switch, Green Business Partners, Charge Up Fairfax, the Energy Conservation Assistance Program, and more. Charge Up Fairfax ChargeUp Fairfax is a program that helps community associations, like homeowners’ associations and condominium associations, access electric vehicle charging for their residents and guests. The program had several key milestones in 2023, including: • The pilot program was launched on March 9, 2023, with five communities. • Staff provided engagement including in-person site visits and direct outreach to over 60 communities, the launch of the ChargeUp Fairfax webpage, a webinar, and promotion through social media, presentations, and published articles. • Five additional communities were accepted into the pilot program on December 1, 2023, for a total of 10 communities in the pilot. • Staff are preparing to launch the program at scale in May 2024. 30 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Green Business Partners The Green Business Partners program recognizes businesses that are actively engaging in or interested in sustainable business practices that advance climate action and help create a carbon neutral economy. The Green Business Partners program had an exciting re-launch in March 2023, kicking off with a robust Green Business Partners forum that included 70 participants and 46 unique businesses. The program now includes 16 “members” and “leaders” and 5 “allies,” for a total of 21 formal Green Business Partners. The Office of Environmental and Energy Coordination (OEEC) boosted outreach and engagement in 2023, through video spotlights (see Freddie Mac Leader Spotlight and River Sea Chocolates Leader Spotlight), webinars, and bimonthly e-newsletters. Climate Champions Pilot and the Energy Conservation Assistance Program The Office of Environmental and Energy Coordination (OEEC) also developed a new climate action program for Places of Worship, in partnership with Faith Alliance for Climate Solutions (FACS). Through this “climate champions” program, 15 places of worship have started or are planning to undertake an energy audit or other climate action. FACS was the recipient of a federal grant to build the program and support new FACS staff, and they held 7 webinars in 2023 with over 100 participants total. In a related effort, OEEC and the Northern Virginia Conservation Assistance Program (NVSWCD) in 2023 launched a significantly upgraded Energy Conservation Assistance Program, expanding the types of organizations that are eligible to apply and the amount of the reimbursement grant available, and adding an equity component to enable higher reimbursements in disadvantaged areas identified by One Fairfax. Energy Efficiency Services and Kits In addition to the Energy Conservation Assistance Program mentioned above, numerous county agencies and partners have provided energy efficiency upgrades and supplies to over 40,000 households since 2016. These services and kits have been supplied through programs such as OEEC’s Home ise Program, Fairfax County Public Library’s Conserve Kits and Thermal Camera Loan Program, Community 31 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Housing Partner’s weatherization services, and Dominion Energy’s energy efficiency programs, among others. Extreme Heat Services The county is making great progress on many services and programs related to extreme heat. Land surface temperatures and urban heat islands have been mapped across the county thanks to a partnership between OEEC and NASA Develop. (See Resilient Fairfax Interactive Map Viewer). This map shows us which neighborhoods remain significantly hotter during the summer due to excess asphalt, densely built buildings, and lack of green space. Additionally, OEEC has compiled both historic temperature trends and future temperature projections. (See “Resilience Metrics Overall” section of the Climate Action Dashboard. The Extreme Heat Stakeholders orkgroup’s efforts have resulted in upgraded Cooling Center services, transportation and accessibility, and supply distribution on extreme heat days, especially for unsheltered residents. There are now 47 official upgraded Cooling Centers. In 2023, 27,000 supplies were distributed from the county’s Cooling Centers. In addition to Cooling Centers, the Department of Family Services (DFS) continues to provide financial and equipment assistance to those without air conditioning through their Cooling Assistance program. 1,452 service requests were approved in 2023. Group 3 of the Interagency Climate Team is continuing coordination to ensure those who need heat-related services know about them, and to ensure that similar services are coordinated and aligned with each other. Moving forward, the group will work on developing heat-related guidance for outdoor workers and outdoor sports, and initiatives for heat-resilient design such as cool roofs and cool pavements. Upgraded official Cooling Centers upplies distri uted from Cooling Centers Air conditioning service requests approved in . 32 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Highlights: Group 4 Strategies – (Natural Resources) The strategies in “ roup ” focus on climate-related natural resources strategies. For detailed descriptions of progress made for each strategy, please see Part II of this report, “Detailed Progress Updates.” This section provides a few key highlights for “ roup ” progress made in the first year of implementation. Tree Planting and Programs The county and its partners have continued the 20+ local tree planting programs, along with invasive removal and management. An estimated 16,000 trees were planted in 2023. As of 2023, the county has 55.4% tree canopy coverage, with a goal of achieving 60% canopy by 2030. Most of the tree canopy growth is due to existing trees growing larger, rather than new trees being planted. To ensure that trees can survive increasingly severe climatic conditions long enough to grow, staff have also conducted extensive research on which tree species are more resilient to climatic hazards and are preparing recommendations. For more tree information, please see Urban Forestry. Wetland, Stream, Floodplain, and Forest Restorations Staff have also continued dozens of restorations through programs including FCPA’s Helping our Land Heal and DP ES’ Stormwater Improvement Projects. In 2023, FCPA approved partial funding to support the restoration of six acres of meadows at Cub Run Stream Valley Park and 12 acres at Laurel Hill Park. DPWES has approximately 92 stormwater improvement projects listed as “active.” Green Infrastructure The county continues to implement green infrastructure for both government facilities and the community. These practices include bioretention, permeable pavement, rainwater harvesting, green roofs, dry wells, and more. The county and its partners also provide National Green Infrastructure Certification Program trainings for contractors. S CD’s CAP program also provides green infrastructure assistance for homeowners. Protecting Areas that Provide Natural Resilience Fairfax County has a long history of protecting natural areas through park land dedications, Resource Protection Areas and floodplain designations, conservation easements, and more. These areas naturally protect our communities by absorbing flooding, storm surge, and reducing heat. The county and its partners are working to continue and expand this sensitive land protection. 33 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Highlights: Group 5 Strategies – (Facilities and Operations) The strategies in “ roup ” focus on climate-related updates to county government facilities and operations. For detailed descriptions of progress made for each strategy, please see Part II of this report, “Detailed Progress Updates.” This section provides a few key highlights for “ roup 5” progress made in the first year of implementation. Green Buildings As of December 2023, 44 county government buildings are LEED certified. Of those, 18 are LEED old. The new oodlawn Fire Station is the county’s first LEED platinum building. See a map of them here. Energy Audits and Retrofits The county continues to make diligent progress improving the energy efficiency of existing county government buildings. Since the OES was published in 2021, 21 energy audits have been completed (8 of those in 2023), and 10 energy retrofits have been completed (2 in 2023). Solar on County Buildings The county has also rapidly accelerated the installation of solar on county government buildings. As of December 2023, there are five county buildings with rooftop solar, and there are 18 additional planned by the end of 2025. Electric and Hybrid Vehicles in the County Fleet The county continues to make progress converting the government fleet of vehicles to electric and hybrid vehicles. As of December 2023, there are a total of 306 low- emissions vehicles in the fleet, including 83 electric vehicles (EVs) and 223 hybrid vehicles. These include two new electric trash trucks in 2023. Due to the size of the fleet, there is still a lot of work to be done; these 306 vehicles make up 2.0% of the county’s total fleet. To enable this fleet conversion, the county has also installed 102 EV charging ports on county government property. 34 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Zero Waste The county continues to make progress towards its goal of Zero Waste by 2030 (90% of waste diverted by 2030). To date, approximately 28% of waste is being diverted. The county, led by DPMM, has launched a Departmental Champions Network, and Action Plans are in progress. The county has also created educational and training resources such as the Champions Toolkit, completed Waste Audits for county and schools facilities, launched the Three Bin Pilot (composting) throughout the Government Center, and kicked off the Zero Waste Party Pack Program for reusable foodware. Additionally, the county has launched a Reusable Packaging Program, including reusable pallet wraps rather than plastic wraps at the Logistics Center. Sustainable Procurement In addition to Zero Waste, the county is embarking on Sustainable Procurement initiatives, to ensure that the supplies and materials that the county purchases are sustainably and ethically sourced. To date, over 100 major suppliers have joined the Corporate Social Responsibility Program. Additionally, a “Scope ” Supply Chain Greenhouse Gas Analysis is in progress and a formal Sustainable Procurement Policy is in development. Resilience of County Buildings and Facilities Historically, environmental initiatives for county facilities have focused on emissions reduction topics such as energy efficiency, solar, and electric vehicles. In addition to reducing emissions, it is critical to focus on resilience, to ensure that county facilities and operations can better withstand increasingly severe climatic hazards such as flooding, severe storms, and extreme heat. Since the adoption of the Resilient Fairfax plan, the county is now beginning to consider resilience for its own facilities. Staff are evaluating and seeking to address climate change related facility vulnerabilities for both existing and planned facilities. In 2024, staff will be determining the best pathways for implementing these resilience-related upgrades. In alignment with Resilient Fairfax, options include updating the Capital Improvement Program (CIP) prioritization process, incorporating resilience into the Sustainable Development Policy, adding resilience considerations to the ESCO process, and/or leveraging infrastructure sustainability rating systems such as Envision that consider both emissions reduction and resilience. 35 Fairfax County Climate Plan Progress Report – Part I: Executive Summary Highlights: Group 6 Strategies – (Climate Data and Research) The strategies in “ roup ” focus on climate-related data, metrics, and research. For detailed descriptions of progress made for each strategy, please see Part II of this report, “Detailed Progress Updates.” This section provides a few key highlights for “ roup ” progress made in the first year of implementation. Interagency Environmental Data Coordination County agencies are systematically working to streamline and improve environmental and climate data tracking and coordination. For the first time, there is an interagency Climate Plan Progress Tracker shared with all agencies that includes all strategies and metrics from all climate plans. For greatest efficiency and alignment, “ roup 6 (Data and Research)” of the Interagency Climate Team has merged with the Strategic Plan’s data group, enabling countywide consistency on metrics and data. Climate Action Dashboard OEEC launched an updated version of the Climate Action Dashboard, which shows climate-related data and metrics for both emissions reduction and resilience. The dashboard features “Emissions Reduction Overall” and “Resilience Overall” pages, along with sector-specific metrics pages for Buildings, Energy Supply, Transportation, Waste, Natural Resources, and Community Services. The sector-specific metrics pages include information for both emissions reduction and resilience as they relate to those sectors. Climate-related Research There are numerous cutting-edge research initiatives newly occurring through partnerships with Fairfax County and universities (such as GMU), regional authorities (such as NVRC and MWCOG), and other entities (such as MARISA). Additionally, there is excellent climate research and data collection that has continued within county agencies. Topics include vector-borne disease research, temperature and weather trends, Digital Twin modeling, flood modeling and precipitation change, urban forestry data, emissions inventories and tracking, urban heat island data, and more. 36 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates PART II: DETAILED PROGRESS UPDATES – FAIRFAX COUNTY CLIMATE PLANS Background and How to Read this Document (CECAP) / is focused on reducing emissions in the Fairfax County community. o The Fairfax County, Virginia, is working to address both the cause and the effects of climate change. The Fairfax County Board of Supervisors (BOS) has adopted and/or accepted three climate plans. • To help address the cause of climate change, Fairfax County is doing our part in the worldwide effort to reduce greenhouse gas emissions. o The Community-wide Energy and Climate Action Plan CECAP Implementation Plan Operational Energy Strategy • To help address the effects of climate change, Fairfax County is adapting and building resilience to the impacts that we experience locally such as increasingly extreme heat, severe storms, and flooding. o The (OES) is focused on reducing emissions in county government operations. Resilient Fairfax plan focuses on boosting resilience for both the community and the county government. OES Resilient Fairfax For greatest efficiency, these three climate plans are being implemented and tracked in a streamlined and consolidated manner. To enable this streamlining, all strategies from CECAP , and , CECAP IP/ Table 2: Legend for this Progress Report were consolidated and organized into 77 strategies, 22 roll-ups, and 6 groups. For additional background information, please see Part I of this report. This section of the report, Part II, provides detailed progress updates for each roll-up, strategy, and implementation item from Fairfax County’s three climate plans. There are a few layers to this progress tracking system, as summarized in the table below. Description Legend / Examples GROUPS: Groups are the highest level of progress tracking. All items are organized into the 6 groups. Group 1 = Coordination, Legislation, and Funding Group 2 = Development Codes, Policies, and Plans Group 3 = Community Services, Education, Engagement, and Incentives Group 4 = Natural Resources Group 5 = Facilities and Operations Group 6 = Data and Research ROLL-UPS: Each Group has a few “Roll- ps,” or high- level topics of focus. These Roll-up Names: There are 22 Roll-ups. Each Roll-up is named to summarize the strategies within. For example, the roll-up “Incentives for Communities” is a collection of incentive-related strategies. 37 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates “Roll- ps” were created by collecting strategies that address the same or similar topics. Roll-ups help with big-picture progress tracking. On average, each Roll-up includes 3-4 Strategies. In rare cases where a strategy is too unique to be rolled up with others, that strategy serves as the sole strategy within the Roll-up. The progress bars of each Roll-up are based on a sum of progress made for all Strategies within that Roll-up. Roll-up Statuses: Each Roll-up is given a qualitative status ranging from “not started” to “complete.” The purpose of this system is to enable consistent progress tracking across Roll-ups that vary widely in type. A legend can be found below. Not Started (0% of Actions complete): No actions in the Roll-up have been started. Early Stages (<25% of Actions complete). Fewer than 25% of actions in the Roll-up have been completed. For example, if the Roll-up includes 5 Strategies, and each of those Strategies has 4 Implementation Actions (20 total IAs in the Roll-up), and only 2 of those IAs have been completed, the Roll-up would show 2/20 = 10%. Started (>25% of Actions complete): At least 25% of actions in the Roll-up are complete, but less than 50%. For example, if the Roll-up includes 5 Strategies, and each of those Strategies has 4 Implementation Actions (20 total IAs), and 6 of those IAs have been completed, the Roll-up would show 6/20 = 30%. Steady Progress (>50% of Actions complete): At least 50% of actions are complete in this Roll-up, but less than 75%. For example, if the Roll-up includes 5 Strategies, and each of those strategies has 4 Implementation Actions (20 total IAs), and 11 of those IAs have been completed, the Roll-up would show 11/20 = 55%. Significant Progress (>75% complete): At least 75% of actions in this Roll-up are complete, but less than 100%. For example, if the Roll-up has 5 Strategies, and each of those Strategies has 4 Implementation Actions (20 total IAs), and 16 of those IAs are complete, the Roll-up would show 16/20 = 80%. Complete (100% of Actions complete): All actions in the Roll-up are complete. STRATEGY: Strategies are the next level of progress tracking. Strategies are from the county’s three climate plans. Strategies usually have multiple Implementation Actions. The status of a strategy is based on the sum of progress of its Implementation Actions. Strategy Numbers and Descriptions: The 77 Strategies are compiled from the three climate plans. Each of these climate plans had their own naming and numbering system. For clarity in this compiled version, there was a need to assign a fresh numbering system, while also maintaining a connection to the original plans. The strategies are numbered 1 through 77. Strategies that were identical or nearly identical between climate plans were merged. References to each plan are included, to clarify the origins of each strategy. Strategy Statuses: Each Strategy is given a qualitative status ranging from “not started” to “complete.” The purpose of this system is to enable consistent progress tracking across Strategies that vary widely in type. A legend can be found below. Not Started (0% of Actions complete): No implementation actions within this strategy have started. 38 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Early Stages (<25% of Actions complete): Some work has started, but collectively, fewer than 25% of Implementation Actions for the Strategy are complete. For example, if the Strategy has 4 Implementation Actions and 0.5 of an Action is complete, the Strategy status would show 0.5/4 = 12%. Started (>25% of Actions complete): At least 25% of Implementation Actions are complete for this strategy, but less than 50%. For example, if the strategy has 4 Implementation Actions, at least 1 of them is complete. Steady Progress (>50% of Actions complete): At least 50% of Implementation Actions are complete for this strategy, but less than 75%. For example, if the strategy has 4 Implementation Actions, at least 2 of them are complete. Significant Progress (>75% complete): At least 75% of Implementation Actions in this strategy are complete, but less than 100%. For example, if the strategy has 4 Implementation Actions, at least 3 of them are complete. Complete (100% of Actions complete): All Implementation Actions in this strategy are complete. For example, if the strategy has 4 Implementation Actions, all 4 of them are complete (or fully active, for a program). IMPLEMENTATION ACTION (IA): Implementation Actions are the smallest scale of progress tracking. Implementation Actions are specific actions that the county is taking to accomplish a Strategy. Most strategies have multiple Implementation Actions. Implementation Action Numbers and Descriptions: There are Implementation Actions for each Strategy. These Implementation Actions are compiled from the three climate plans. Each of these climate plans had their own naming and numbering system. For clarity in this compiled version, there was a need to assign a fresh numbering system, while also maintaining a connection to the original plans. Therefore, the Implementation Actions for each Strategy start with #1. To maintain a reference to the original climate plans and their numbering systems, the original details are linked after each new Action number. For example: • ACTION 1: Resilient Fairfax | IAP.4a: Example action description for action 1. o This example action would have originated from the Resilient Fairfax Plan. The Resilient Fairfax plan organized strategies into four pillars: IAP = Integrated Action Planning. RIB = Resilient Infrastructure and Buildings. CRC = Climate-Ready Communities. AE: Adaptive Environments. • ACTION 2: CECAP Implementation Plan | BEE.16, ES.12, T.21, NR.11, W.17: Example action description for action 2. o This example action would have originated from the CECAP Implementation Plan. The CECAP Implementation Plan had the following categories: BEE= Building Energy and Efficiency; ES = Energy Supply; T = Transportation; NR = Natural Resources; W = Waste. • ACTION 3: OES | Awareness and Engagement: Example action description for action 3. o This example action would have originated from the Operational Energy Strategy (OES). The OES has 11 focus areas: Greenhouse Gas Emissions Reductions, Energy Use and Efficiency, Water Use and Efficiency, Green 39 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Buildings, Renewables, Fleet Electrification, Goods and Services, Waste Management and Recycling, Awareness and Engagement, Utility Cost Management, and Reporting and Collaboration. Implementation Action Statuses Each Implementation Action is given a qualitative status ranging from “not started” to “complete.” The purpose of this system is to enable consistent progress tracking across actions that vary widely in type. A legend can be found below. Not Started (0): The Implementation Action has not started, or work has so far been limited to solely early kickoff meetings or exploratory conversations. Started (0.25): The Implementation Action has started, with all kickoff and initial work completed. This counts as 0.25 of an Implementation Action complete. Steady Progress (0.5): The Implementation Action is well underway. Steady progress is being made but there are still opportunities for expansion, improvement, or completion of critical tasks. This counts as 0.5 of an Implementation Action complete. Significant Progress (0.75): There is significant progress on this Implementation Action, and it is nearing completion. This counts as 0.75 of an Implementation Action complete. Complete/Fully Active (1.0): This action has been completed or is running at full ideal capacity. This counts as 1 Implementation Action complete. The status of strategies & actions should not be misinterpreted as being equivalent to outcome metrics. For example, if the county were to achieve 2 out of 4 Implementation Actions for promotion of solar incentives, that would be 50% of the actions for that strategy, but that would not mean that 50% of the county is now operating on solar energy. For clarity, metrics are tracked separately and can be found in the “ Outcomes: Targets and Metrics” section of the Executive Summary. 40 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Find a Key Program The table below summarizes where to find select key programs that are often of interest to the public. Many additional programs and topics are also covered in the detailed updates below. To find a specific strategy from one of the county’s climate plans, please see Appendix A: Find a Strategy. Table 3: Where to Find Key Programs Key Programs (A-Z) Group Strategy # Carbon Free Fairfax Group 3: Community Services, Education, Engagement, Incentives Strategy 38 Charge Up Fairfax Group 3: Community Services, Education, Engagement, Incentives Strategy 32 C-PACE Group 3: Community Services, Education, Engagement, Incentives Strategy 30 Conserve Kit Program Group 3: Community Services, Education, Engagement, Incentives Strategy 29 Cooling Centers Group 3: Community Services, Education, Engagement, Incentives Strategy 35 Energy Conservation Assistance Program Group 3: Community Services, Education, Engagement, Incentives Strategy 29 Electric Vehicle (EV) Incentives Group 3: Community Services, Education, Engagement, Incentives Strategy 32 Get2Green Group 3: Community Services, Education, Engagement, Incentives Strategies 37, 38 Green Building Recognition Program Group 3: Community Services, Education, Engagement, Incentives Strategy 29 Green Business Partners Group 3: Community Services, Education, Engagement, Incentives Strategy 41 HomeWise Group 3: Community Services, Education, Engagement, Incentives Strategy 29 Legislative Program Group 1: Coordination, Funding, Legislative, State-level action Strategies 16-20 Resilience Hubs Group 3: Community Services, Education, Engagement, Incentives Strategy 36 Solar incentives Group 3: Community Services, Education, Engagement, Incentives Strategy 31 Solar on government buildings Group 5: Government Facilities and Ops Strategy 56 Thermal Camera Loan Program Group 3: Community Services, Education, Engagement, Incentives Strategy 29 Tree Programs Group 4: Natural Resources Strategy 44 41 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Summary of Progress Summary of Progress by Roll-up Only Figure 14: Summary of Progress at the "Roll-up" Level 42 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Details: Group 1 Strategies – (Coordination, Funding, Legislation) Strategies in Group 1 are focused on climate-related coordination, funding, and legislation. In addition to serving as a way to sort strategies, “ roup ” is also one of the six staff working groups of the Interagency Climate Team, which focuses on implementing Group 1 strategies. Due to the nature of the topics of Group 1, all agencies in the Interagency Climate Team are represented in roup . ( roup meetings are “all hands” meetings.) The following agencies are represented on the Interagency Climate Team and Group 1: Community Services Board (CSB); Department of Economic Initiatives (DEI), Department of Emergency Management and Security (DEMS); Department of Family Services (DFS); Department of Information Technology (DIT); Department of Management and Budget (DMB); Department of Planning and Development (DPD)- Planning Division (PD), Zoning Administration Division (ZAD), and Community Revitalization Section (CRS); Department of Procurement and Material Management (DPMM); Department of Public Safety Communications (DPSC); Department of Public Works and Environmental Services (DPWES) – Stormwater (including Urban Forestry), Wastewater, Solid Waste, and Capital Facilities; Department of Vehicle Services (DVS); Economic Development Authority (EDA); Fairfax County Department of Transportation (FCDOT); Fairfax County Health Department (FCHD); Fairfax County Park Authority (FCPA); Fairfax County Public Library (FCPL); Fairfax County Public Schools (FCPS) and Get2Green; Facilities Management Division (FMD); Housing and Community Development (HCD); Land Development Services (LDS); McLean Community Center (MCC); Neighborhood and Community Services (NCS); Northern Virginia Soil and Water Conservation District (NVSWCD); Office of the County Attorney (OCA); Office of Environmental and Energy Coordination (OEEC); One Fairfax/ Chief Equity Officer’s Office; Office of Public Affairs (OPA); and Reston Community Center (RCC). OEEC facilitates the Interagency Climate Team, including Group 1. Strategies in Group 1 are sorted into the following “roll-ups”: • Interagency and Regional Coordination and Capacity Building (including the Strategic Plan) • Federal, State, County, and other Funding Opportunities • Adaptation Action Area Implementation • Legislative and Other State-Level Proposals and Advocacy The section below details progress made and the statuses of each Strategy Roll-up, Strategy, and Implementation Action for Group 1. 43 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status Roll-up Steady Progress 17.5 of 28 Actions Done (63%) Roll up: Interagency, Regional Coordination, and Capacity Building on Climate Strategy Status Strategy1 Groups Completion Resilient Fairfax CECAP IP OES Significant Progress 4.25 of 5 Actions Done (85%) 1. Establish a Long-term Interagency Collaboration System for Resilience 1 2024 for initial actions IAP.4a n/a n/a Resilient Fairfax | IAP.4a: Establish a Long-term Interagency Collaboration System for Resilience Lead: OEEC. Partners: DCC, DEI, DEMS, DFS, DIT, DMB, DPD, DPSC, DPWES, FCDOT, FCPA, FCPL, FCPS, FMD, HCD, FCHD, LDS, NCS, NVR C, NVSWCD, One Fairfax, UFMD. Timeline: Shovel Ready. Cost: $ ($0-$100k). Existing Staff: Yes. Description: Interagency collaboration is foundational to climate resilience planning and implementation and is promoted with Fairfax County by OEEC. OEEC was created to lead interagency environmental coordination, including climate resilience. OEEC also leads the county’s climate-related coordination with regional, state, and federal entities. Throughout development of this Resilient Fairfax plan, the Resilient Fairfax Planning Team, comprised of 20 county departments, coordinated closely with OEEC to inform project delivera bles, including the technical analyses, strategies, and the compiled Resilient Fairfax plan. Continued interagency collaboration during the implementation phase is critical to the success of Resilient Fairfax because climate resilience efforts are interdisciplinary and crosscutting across many departments. This strategy involves the establishment of a system for long-term climate resilience coordination, capacity building, and project alignment across all relevant county departments. The co llaboration system should be structured in a way that is helpful, convenient, and streamlined for participating departments. Action Status Actions Complete (1 Action Done) ACTION 1: Resilient Fairfax | IAP.4a | Identify county departments who should be involved in climate resilience collaboration long -term, led by OEEC. Designate a climate champion within each department. STATUS NOTES: To implement the county’s three climate plans simultaneously, OEEC has created an “Interagency Climate Team” composed of over 150 staff from over 25 county and county-adjacent departments and agencies. These agencies include CSB, DEI, DEMS, DFS, DIT-GIS, DMB, DPD-CRS, DPD-PD, DPD-ZAD, DPMM, DPSC, DPWES-STW, WW, DPWES-SWM, DPWES-CAP, DPWES-BDCD, DPWES-UFMD, DVS, EDA, FCDOT, 1 Strategies with a star were identified as priority strategies in their respective plans. 44 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates FCHD, FCPA, FCPL, FCPS, FMD, HCD, LDS, MCC, NCS, NVRC, NVSWCD, OCA, OEEC, One Fairfax, OPA, and RCC. This Interagency Climate Team is organized into six groups. roup is an “all hands” group, with representatives from all agencies; roup meetings are u sed for discussions that are relevant to all agencies, such as funding and capacity building. Group 2 is focused on updates to development codes, policies, and plans. Group 3 is focused on enhancements to community services, education, engagement, and ince ntives. Group 4 is focused on management and protection of natural resources. Group 5 is focused on county facilities and operations. Group 6 is focused on climate-related data, progress tracking, and research. Complete (1 Action Done) ACTION 2: Resilient Fairfax | IAP.4a | Identify non-county infrastructure management and resilience-related entities who should continue to e involved in t e county’s climate resilience implementation colla oration and data s aring long term. STATUS NOTES: In addition to the team of county staff described above, OEEC facilitates two external advisory groups: an Infrastructure Advisory Group (IAG) and a Community Advisory Group (CAG). The CAG and IAG each have over 25 entities. The CAG has new member s, including the Disability Services Board and Health Care Advisory Board Complete (1 Action Done) ACTION 3: Resilient Fairfax | IAP.4a | Create a clear and user-friendly system for long-term collaboration. This system could include periodic Resilience Work Group meetings, information sharing protocols, a schedule for updates, or other options. STATUS NOTES: A highly organized system has been created for the Interagency Climate Team and its associated groups. To enable shared ownership and leadership of the six groups, OEEC has obtained co-chairs from other agencies. An Interagency Microsoft Teams site has bee n developed with channels, folders, files, meeting recordings, and materials for each group, to enable collaboration between de partments working on the same strategies. Significant Progress (~0.75 of Action Done) ACTION 4: Resilient Fairfax | IAP.4a | Establish a process for clear coordination of interagency resilience projects, policy and plan updates, resilience-related grant opportunities IAP. and capacity uilding. is process s ould include different “levels” of engagement including more regular colla oration etween agencies t at are particularly imperative to t e community’s climate resilience and ave expressed interest in closer collaboration, including but not limited to FCHD, NCS, LDS, FCPA, and DPWES. STATUS NOTES: This action has made significant progress through the Interagency Climate Team and its associated groups. Steady Progress (~0.5 of Action Done) ACTION 5: Resilient Fairfax | IAP.4a | Conduct yearly evaluations of the collaboration system and adjust as needed to improve coordination efforts. STATUS NOTES: OEEC is currently evaluating the collaboration system and seeking opportunities for improvement. 45 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Not Started 0 of 1 Actions Done (0%) 2. Update the Strategic Plan to Enhance Climate Resilience 1 TBD IAP.1b n/a n/a Action Status Actions Scheduled to Start (0) ACTION 1: Resilient Fairfax | IAP.1b | Pursue potential additions to the countywide Strategic Plan to enhance climate resilience during the anticipated regular update cycle. STATUS NOTES: The county’s first-ever countywide Strategic Plan (2021) did include climate resilience strategies. However, there are opportunities for greater specificity. The Department of Management and Budget is updating the Strategic Plan sections one -by-one, as the data dashboards for each are completed. The Environment and Energy section of the Strategic Plan has not yet been scheduled f or an update but is estimated to take place in 2024 or 2025. The Office of Environmental and Energy Coordination is a member of DM B’s Strategic Planning teams, and the two agencies have merged their data meetings to ensure the Strategic Plan is aligned with the county’s climate plans. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 0.25 of 1 Action Done (25%) 3. Complete the Climate Health Plan 1 TBD IAP.1c n/a n/a Action Status Actions Started (~0.25 of Action Done) ACTION 1: Resilient Fairfax | IAP.1c | Complete the Climate Health Plan, including considerations for resident and worker safety in extreme climate conditions such as extreme heat. STATUS NOTES: The Health Department is relaunching its Climate Health Program aimed at developing whole-community preparedness and resilience against the health impacts of climate change, which was paused during the COVID - pandemic emergency response. The program’s goals are to increase awareness and mitigation of health-related climate hazards, to reduce the negative health impacts of climate change on Fairfax Health District residents, and to enhance their ability to prepare for and adapt to these impacts. The program is led by a Climate Health Program Coordinator, hired in July 2023, who participates in Interagency Climate Team meetings for Groups 2 and 3. OEEC and the Health Department are coordinating to align the Climate Health Program with ongoing county efforts including Resilient Fairfax and C ECAP. 46 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Significant Progress 0.75 of 1 Action Done (75%) 4. Coordinate Hazard Mitigation and Emergency Management Planning with Climate Resilience Planning 1 Continuous IAP.1d n/a n/a Action Status Actions Significant Progress (~0.75 of Action Done) ACTION 1: Resilient Fairfax | IAP.1d | Continue coordination between OEEC and DEMS to ensure alignment between hazard mitigation/ emergency management plan updates and climate resilience plan updates. STATUS NOTES: OEEC and DEMS have been coordinating regularly to ensure that plans and initiatives are aligned and updated for climate considerations, such as the extreme temperature centers/ extreme heat guidance, Hazard Mitigation Plan, Emergency Operations Plan, and more. OEEC participated actively in the update of the regional Hazard Mitigation Plan, ensuring that climate change and climat e resilience were included. OEEC also participated in DEMS’ update of the Emergency Operations Plan and has been added as a cooperating agency to ESF-12. Additionally, both OEEC and DEMS participate in regional efforts such as the Military Installation Resilience Review (MIRR) effort led by NVRC. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Significant Progress 3.25 of 4 Actions Done (81%) 5. Interagency Collaboration on Emissions and Waste Reduction 1 Continuous n/a n/a 15 Action Status Actions Complete for 2023 (1 Action Done) ACTION 12: OES | Awareness and Engagement: Target: Hold at least four employee events per year. STATUS NOTES: Fairfax Employees for Environmental Excellence (FEEE), which includes over 90 members from 28 agencies and departments, met this target of at least four employee events in 2023, including the following: 1) a webinar on home energy efficiency and Dominion Energy’s Energy Conservation Program, attended by about 80 county employees; 2) a virtual Earth Day fair, attended by about 40 employe es, which featured presentations from seven county agencies on ways to be more sustainable at home and in th e office; 3) a gardening event, where over 2 This progress report combines and organizes duplicative actions from all three climate plans. Therefore, the numbering of the actions may differ from the numbering in the original plans. For example, “Action ” listed here is “Action ” in the Awareness and Engagement section of the OES. All actions from all plans are accounted for. 47 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates 20 employees weeded and planted native plants at the Herrity Plaza Gardens; 4) a litter cleanup event where employees collect ed 250 pounds of trash at Carney Park; and 5) a litter cleanup event where employees collected 320 pounds of trash at the Meadows o f Centreville. Complete for 2023 (1 Action Done) ACTION 2: OES | Awareness and Engagement: Plan events and special initiatives, such as Earth Day Fairs, the FEEE Litter Challenge and the employee Compost Program. STATUS NOTES: In addition to the events listed in Action 1 above, in 2023, FEEE continued to hold monthly meetings, through which county employees learn about and discuss ways to be more sustainable at work and at home. FEEE also continued to implement its emplo yee composting pilot program at seven government facilities across the county. All FEEE events and special initiatives are open to th e county workforce, regardless of membership. Complete for 2023 (1 Action Done) ACTION 3: OES | Awareness and Engagement: Publicize efficiency, conservation, and sustainability actions in the workplace. Provide content on a regular basis to communications channels like NewsLink, newsletters, and the FEEE FairfaxNet blog available to employees . STATUS NOTES: OEEC and fellow environmental agencies have regularly publicized these actions and provided content in the channels listed above. Started (~0.25 of Action Done) ACTION 4: OES | Awareness and Engagement: Designate champions within departments or facilities who will foster communication and encourage efficiency and conservation. STATUS NOTES: Group 5 (Facilities and Operations) of the Interagency Climate Team includes representatives from 18 agencies. ( Please see the Group 5 section for more detail). One of the intentions of this group is to encourage energy efficiency and conservation in county government facilities, among other initiatives. In addition to Group 5, Fairfax Employees for Environmental Excellence (FEEE) includes e mployees who are passionate about sustainability initiatives, even if their primary role is unrelated to sustainability or county operations. The Ze ro Waste Program also kicked off the Zero Waste Champions in June 2023, which consists of at least one liaison within each county and schools’ department to drive cultural change through coordination, education, and measurement of progress. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Significant Progress 0.75 of 1 Action Done (75%) 6. Regional Transportation Coordination for Emissions Reduction 1 Continuous n/a T.14 n/a Action Status Actions 48 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Significant Progress (~0.75 of Action Done) ACTION 1: CECAP Implementation Plan | T.14: Work with state and regional partners to invest in public transit improvements to increase access through the expansion of current and creation of new public transit routes . STATUS NOTES: FCDOT continually works with state and regional partners including VDOT, MWCOG, DPRT, NVRC, NVTA, WMATA, and others to ensure a well-connected multi-modal transportation system. FCDOT’s website provides additional information on their programs and projects. Additionally, OEEC coordinates regularly with public transit partners through their external Infrastructure Advisory Group (I AG), and through direct coordination with individual transit agencies. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 0.5 of 1 Action Done (50%) 7. Regional Transportation Coordination for Resilience 1 Continuous RIB.2c n/a n/a Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: Resilient Fairfax | RIB.2c: Advocate and Partner with Transportation Agencies to Support Transportation Resilience: Support transportation infrastructure managers such as WMATA, VDOT, FCDOT and others to advocate for climate adaptive measures for transportation infrastructure, including roadways and public transit. Resilience measures may include flood mitigation upgrad es, energy resilience retrofits, shaded transit stops, green bus stops seating, cool pavements, or alternate paving materials. STATUS NOTES: County staff coordinate with transportation infrastructure managers at several levels of government for transportation resilience. For example, staff are participating in M CO ’s Transportation Resilience Improvement Plan (TRIP), which helps to prioritize transportation resilience projects for funding. OEEC has also ensured that rail and transit partners are aware of grant opportunities. OEEC staff have also gathered 911 and VDOT 511 data on roadway closures and swift water rescues to help prioritize transportation improvement projects. VDOT has released a new Resilience Plan for state transportation and is currently studying flood resilience for roadways. Add itionally, OEEC meets periodically with WMATA to advocate and support upgrades to their transportation resilience. However, there is room for improvement through more regular and systematic inclusion of (and participation by) FCDOT, DPWES, and DEMS in this regional resilience coordination. 49 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 3.5 of 6 Actions Done (58%) 8. Regional Energy and Water Coordination All Continuous RIB.2a n/a Pg. 17 Action Status Actions Complete for 2023 (1 Action Done) ACTION 1: Operational Energy Strategy | Reporting and Collaboration | Page 17: Continue to seek opportunities to collaborate regionally on energy and water challenges and to promote resulting achievements. STATUS NOTES: County staff participate in opportunities to collaborate regionally on energy and water challenges and achievements. Examples include the Better Climate Challenge, 50001 Ready, and groups led by MWCOG and NVRC. Complete for 2023 (1 Action Done) ACTION 2: Operational Energy Strategy | Reporting and Collaboration | Page 17: Participate in regional task forces STATUS NOTES: OEEC staff participate in regional groups such as VESPN, VEPGA, SSDN, and numerous regional task forces led by MWCOG and NVRC. Steady Progress (~0.5 of Action Done) ACTION 3: Resilient Fairfax | RIB.2a, 1: Continue coordination with the State Corporation Commission to support statewide and regional efforts to improve energy resilience through distributed energy resources, undergrounding, improved grid reliability, and isl anding capabilities while maintaining energy affordability. STATUS NOTES: (This strategy is for coordination on infrastructure outside of direct county control. For energy resilience for county facilities, please see Strategy 63, which can be found in Group 5). OEEC maintains awareness of SCC activity concerning statewide and regional energy topics. There is opportunity to engage more on energy resilience topics. Significant Progress (~0.75 of Action Done) ACTION 4: Resilient Fairfax | RIB.2a, 2: Continue coordination with energy utilities, including Dominion Energy, NOVEC, Washington Gas, and Columbia Gas, to support consideration of climate hazards in new and/or upgraded energy infrastructure, and to advocate f or continued energy resilience enhancements. Where applicable, advocate for strategies such as undergrounding and energy infrastructure hardening. STATUS NOTES: (This strategy is for coordination on infrastructure outside of direct county control. For energy resilience for county facilities, please see Strategy 63, which can be found in Group 5). OEEC coordinates with Dominion Energy, NOVEC, and Washington Gas, in addition to telecommunications providers to support climate resilience-related upgrades to energy and telecommunications infrastructure. Each of these entities is part of the Infrastructure Advisory Group (IAG). 50 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Started (~0.25 of Action Done) ACTION 5: Resilient Fairfax | RIB.2a, 3: Identify opportunities for implementation of distributed energy resources, such as renewables (i.e.solar), back-up power, and energy storage. Identify priority locations for siting distributed energy resources, with consideration for vulnerable populations, community-serving facilities, emergency operation centers, and other critical facilities. As use of distributed energy matures, monitor the community for opportunities for microgrid applications for greater redundancy. STATUS NOTES: (This strategy is for coordination on infrastructure outside of direct county control. For energy resilience for county facilities, please see Strategy 63, which can be found in Group 5). The county government has limited authority for siting Distributed Energy Resources outside of county property, but remains in contact with those who have such authority. Not Started (0) ACTION 6: Resilient Fairfax | RIB.2a, 4: Evaluate options for development of an Energy Assurance Plan, either at the county or state level, to enhance preparedness for climate hazard events and improve energy resilience. STATUS NOTES: To date, an Energy Assurance Plan has not been a prioritized action item authorized by the Board of Supervisors. Other similar actions are listed here for reference. OTHER RELATED ACTIONS Resilient Fairfax | RIB.1c: Enhance Energy Resilience of County Facilities Please see Strategy 63– Enhance Energy Resilience of County Facilities and Buildings, which can be found in Group 5. OES | Renewables, 4: Geothermal and energy storage Please see Strategy 57 – Other Renewables and Resource Recovered Gas, which can be found in Group 5. Resilient Fairfax | RIB.2c: Advocate and Partner with Transportation Agencies to Support Transportation Resilience Please see Strategy 7 – Regional Transportation Coordination for Resilience, which can be found in Group 1. CECAP Implementation Plan | T.14: Safe Adoption of Batteries for Energy Storage (Building Code) Please see Strategy 16 – State-level Actions for the Building Code, which can be found in Group 1. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 0.5 of 1 Action Done (50%) 9. Build County Staff Capacity on Climate Resilience Planning and Implementation All Continuous IAP.4b n/a n/a Action Status Actions 51 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 1: Resilient Fairfax | IAP.4b: Provide climate resilience and equity trainings as well as climate-oriented continuity of operations assistance to county staff, customized for relevance to their work. Consider staffing needs for implementation of resilience projects. STATUS NOTES: Several interagency staff trainings have been held on climate mitigation and resilience, including customized trainings for the following entities: Land Development Services (LDS), Department of Emergency Management and Security (DEMS), Disability Services Board, Planning Commission, Health and Human Services agencies, Health Care Advisory Board, Fairfax Employees for Environmental Excellence (FEEE), Fairfax Environmental Engagement Team (FEET), ULI Leadership Institute, Leadership Fairfax Ins titute, Health Department, Department of Family Services (DFS), Zoning Evaluation Division (ZED), County Communicators, and One Fairfax. However, there remains an opportunity to train staff on climate resilience in a way that is more customized for their day-to-day work, and to ensure that the takeaways from the training courses are meaningfully incorporated into the operations of other agencies. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 3.75 of 7 Actions Done (54%) 10. Staff Training on Emissions Reduction, Efficiency, Waste All Continuous n/a BEE.19 p. 15, 17 Action Status Actions Complete for 2023 (1 Action Done) ACTION 1: CECAP Implementation Plan | BEE.19: Code Training Academy: Continue to support Code Training Academy and other training opportunities to ensure staff are up to date on new and upcoming technologies and code compliance pertaining to energy effici ency. STATUS NOTES: The county's LDS has a proactive training program "Code Training Academy" which includes the most up -to-date technologies and code compliance pertaining to energy efficiency. The training will be updated with any building code revisions at the state level . Started (~0.25 of Action Done) ACTION 2: OES | Awareness and Engagement, 3: Educate staff responsible for purchasing decisions on the benefits of energy- and water- efficient goods and services. STATUS NOTES: The county, particularly the Department of Procurement and Material Management (DPMM) educates staff responsible for purchasing decisions on sustainability. A Sustainable Procurement policy is currently under development. Complete for 2023 (1 Action Done) ACTION 3: OES | Awareness and Engagement, 4: Sponsor lunch-and-learns on a range of efficiency and conservation topics to enhance employee awareness and to encourage action. STATUS NOTES: Fairfax Employees for Environmental Excellence (FEEE) hosted several learning opportunities in 2023 focused on ways employees could adopt energy efficiency, conservation, and other climate actions at home and at work. In February 2023, it co-hosted a webinar with Dominion Energy titled “Make our Home More Energy Efficient with Dominion Energy’s Energy Conservation Programs.” In April 2023, it hosted a Virtual Earth Day Fair, where representatives from various county agencies presented ways employees could reduce their 52 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates greenhouse gas emissions across the energy, transportation, waste, and natural resource sectors. FEEE also devotes time during its monthly meetings for similar learning opportunities. For example, in May 202 , the county’s ero aste Coordinator presented to the group on Fairfax County’s ero aste Plan and ways employees could take action. Started (~0.25 of Action Done) ACTION 4: OES | Awareness and Engagement, 5: Establish reward and recognition programs to motivate behavior change. STATUS NOTES: FEEE has previously hosted challenges, including a Sustainability Challenge and Litter Challenge, to encourage behavior change among county employees, with the top participants receiving prizes. FEEE is currently exploring ways to encourage energy efficiency and conservation as well as other climate actions, in order to establish relevant reward and recognition programs in 2024. Steady Progress (~0.5 of Action Done) ACTION 5: OES | Awareness and Engagement, 7: Increase employee awareness of opportunities for source reduction, reuse, and recycling. STATUS NOTES: The Zero Waste Program kicked off the Zero Waste Champions in June 2023, which consists of at least one liaison within each county and schools’ department to drive cultural change through coordination, education, and measurement of progress. Started (~0.25 of Action Done) ACTION 6: OES | Awareness and Engagement, 8: Publicize county policies and procedural memoranda that pertain to energy or water use or sustainability in the work environment. STATUS NOTES: The county has established policies and procedures that are largely implemented by those who build and maintain county buildings, to ensure that buildings are meeting the goals of the Operational Energy Strategy. Additionally, FMD has an “Energy Policy” focused on space temperature setpoints. These policies enable all staff to automatically participate in energy and water use savings by using more sustainable facilities. There are few known policies or memoranda that are directed towards the behaviors of general staff in the work environment. However, there is a Procedural Memorandum (No. 02-15) that was sent to Department Heads on March 2023 for Employee Charging of Privately-Owned Electric Vehicles (DVS - PM No. 02-15 Employee Charging of Privately-Owned Electric Vehicles at County-Owned Facilities.pdf - All Documents (sharepoint.com). There are also small examples such as signs in entryways that direct staff to save energy by using rotating doors rather than conventional doors. Steady Progress (~0.5 of Action Done) ACTION 7: OES | Reporting and Collaboration (Page 17), Action 5: Participate in educational conferences and other public events. STATUS NOTES: Staff participate in numerous educational conferences and other public events , both for staff education and for community education. For 2023, these events included but are not limited to the VAEEC Energizing Efficiency Campaign & Leadership Awards, Green Build, Resilient Viginia, APA Virginia, Southeast Sustainability Directors Network Annual Meeting, and others. 53 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status Roll-up Started 5.75 of 15 Actions Done (38%) Roll-Up: Federal, State, County, and Other Funding Opportunities Strategy Status Strategy3 Groups Completion Resilient Fairfax CECAP IP OES Started 1.25 of 5 Actions Done (25%) 11. County Climate Fund for Resilience All 2027 IAP.3a n/a n/a Resilient Fairfax | IAP.3a: Develop a County Climate Fund. Lead: DMB, OEEC. Partners: DEI, DEMS, DPWES, FCPA, NVSWCD, OCA, One Fairfax, UFMD. Timeline: Medium-Term (2-5 years). Cost: $$ ($100k-$500k). Existing Staff: Partial. Description: This strategy seeks to develop a county-level Climate Fund to mobilize financial resources and provide a dedicated funding source for county-led climate adaptation and resilience projects. The proposed Climate Fund would support implementation of Resilient Fairfax strategies and provide an identified funding source to be leveraged as a local match for federal, state, and other resilience related grants. The fund would not be county department specific, but rather available to all county departments who are implementing resilience related projects. The fun d would promote implementation of projects that lessen the impact of climate change on Fairfax County’s communities, with prioritization of more vulnera ble communities. Development of a Climate Fund would need to consider startup capital, funding sources, and fund structure. The Cli mate Fund could leverage public funding to support Resilient Fairfax goals, fostering a more resilient community, economy, and environment. (Please see Resilient Fairfax Plan for more detail). Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: Resilient Fairfax | IAP.3a: Receive authorization to pursue development of a Climate Fund. STATUS NOTES: Please see summary below. 3 Strategies with a star were identified as priority strategies in their respective plans. 54 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 2: Resilient Fairfax | IAP.3a: Conduct research on Climate Fund practices, structures, mechanisms, legal considerations, and other factors, for applicability to Fairfax County. Explore options for development of a county Climate Fund for county investment in climat e adaptation and mitigation projects, with priority consideration for more vulnerable communities. STATUS NOTES: Please see summary below. Started (~0.25 of Action Done) ACTION 3: Resilient Fairfax | IAP.3a: Identify and compile list of potential grant funding opportunities for which the Climate Fund could provide a local match. This action item should be coordinated with Strategy IAP.3b. STATUS NOTES: Please see summary below. Not Started (0) ACTION 4: Resilient Fairfax | IAP.3a: In coordination with the development of AAAs (Strategy CRC.1b) updates to the county CIP process (RIB.1a), and flood risk reduction planning (CRC.3a), identify project needs and level of funding required for project implem entation. Projects nominated for Climate Fund investment may be larger in scope than those funded through the Environmental Improvement Program (EIP). STATUS NOTES: Please see summary below. Not Started (0) ACTION 5: Resilient Fairfax | IAP.3a: Establish ranking criteria that will guide prioritization and selection of resilience projects to be funded through the Climate Fund. Criteria should consider factors including but not limited to: vulnerable populations, risk of clim ate hazard, scale of funding needed, and available grant funds. STATUS NOTES: Please see summary below. STATUS NOTES SUMMARY FOR ALL STRATEGY 11/IAP.3A ACTIONS: Staff have recommended a change in approach for this strategy to the Board of Supervisors. The Green Bank is an ongoing intensive effort with a similar goal of providing a funding source for cli mate initiatives. Therefore, it would be a more efficient use of resources to leverage Green Bank funding for both resilience and emissions reduction activities, rather than creating a separate, similar funding entity for resilience alone. However, there are current legal limitations in the Virginia Code on the use of Green Banks. As written, Green Banks serve the purpose of funding emissions reduction activities, such as energy efficiency a nd renewable energy projects, rather than resilience activities. There are certain resilience activities that may qualify for Gr een Bank funding because they provide emissions reduction co-benefits. Examples of these projects include cool roofs (which can help with both urban heat island reduction and energy efficiency) and solar with battery back -up power (which can provide both power resilience and renewable energy). Other resilience activities, such as flood risk reduction, do not serve any emissions reduction purpose and would be currentl y ineligible for Green Bank funding. The OEEC and OCA have coordinated on this issue and have recommended the following: Staff will continue focusing on the development of a Green Bank. Using existing legislative authority, staff will pursue resilience projects that provide emi ssions-related co- benefits and therefore would be eligible for Green Bank funding. In future years, if it is demonstrated that additional legislative authority is needed to enable Green Bank funding of initiatives such as flood risk reduction, staff will recommend a small legislative cha nge for consideration by the Board of Supervisors Legislative Committee (and subsequently the Virginia General Assembly) to enable Green Banks to fund both emissions reduction and resilience projects. Actions 1, 2, and 3 listed above have been partially completed as pa rt of the Green Bank initiative. Separately from the Green Bank/ County Climate fund initiative, funding has been allocated in the County Budget for v arious 55 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates climate initiatives, including but not limited to the funding shown within Fund 30015. (For the Green Bank for Emissions Reduction, please see Strategy 12 below). Strategy Status Strategy4 Groups Completion Resilient Fairfax CECAP IP OES Started 0.5 of 2 Actions Done (25%) 12. Green Bank for Emissions Reduction All Continuous n/a BEE.6, BEE.8, ES.2, ES.7, T.11 n/a Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: (ESTABLISHMENT OF GREEN BANK)5 CECAP Implementation Plan | BEE.6, ES.7, T.11: Establish and support a clean-energy financing entity (i.e. Green Bank) to increase access to financial capital for adoption of energy efficiency, renewable energ y, and electrification technologies by residents and businesses … for adoption of EVs, EVSE, and other low- and zero-emissions transportation technology by residents and businesses. STATUS NOTES: In August 2022, a feasibility analysis for the creation of a clean energy financing entity (a “Fairfax reen Bank”) was com pleted. Stakeholder engagement has been conducted and is on-going with financial entities, service providers, housing agencies, and neighboring locality staff. Staff brought a draft ordinance to establish the Green Bank to the BOS in July 2023, without resolution as of December 2023. Staff continue to explore opportunities to leverage federal funds from the Inflation Reduction Act and other sources to create a clearinghouse of information on all aspects of clean energy, and leverage public and private funds as a catalyst and accelerator for projects throughout the community. Not Started (0) ACTION 2: (USE OF GREEN BANK)6: CECAP Implementation Plan | BEE.8, ES.2: … taff will continually monitor and researc appropriate places to introduce incentive programs to enhance the construction and renovation of high -efficiency buildings and work to connect uilding owners organi ations or associations wit existing … or new airfax reen Ban incentive programs … . taff will support accelerated electric grid transportation beyond the renewable energy requirements set forth in the VCEA. The county acts with in its authority to support accelerated grid transformation. For example, the implementation of a financing program like th e Fairfax Green Bank may facilitate private sector investments in energy efficiency and renewa le energy at t e local or state level. … . STATUS NOTES: The use of the Green Bank will begin once the Green Bank has been established. 4 Strategies with a star were identified as priority strategies in their respective plans. 5 These items in the CECAP Implementation Plan (BEE.6, ES.7, T.11), as originally written included many topics. Additionally, the text between them was somewhat duplicative. For clarity and streamlined tracking of progress, Green Bank relevant action text from multiple items has been included in the Green Bank section, and other topics are placed in applicable categories. 6 These items in the CECAP Implementation Plan (BEE.8, ES.2) as originally written included many topics. Additionally, the text between them was somewhat duplicative. For clarity and streamlined tracking of progress, Green Bank relevant action text from multiple items has been included in the Green Bank section, and other topics are placed in applicable categories. 56 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 4 of 6 Actions Done (67%) 13. Pursue Federal and State Funding Opportunities for Resilience and Emissions Reduction All 2024 for initial actions IAP.3b ES.2, T.12 p. 12 Action Status Actions Complete (1 Action Done) ACTION 1: Resilient Fairfax | IAP.3b,: Create an updated and consolidated database of all climate resilience-related federal and state funding opportunities, shared with all relevant departments. Example funding opportunities may include but are not limited to : Community Development Block Grant Programs (CDBG), Community Flood Preparedness Fund Grant Program (CFPF), the Flood Mitigation Assistance (FMA) Grant Program, Building Resilient Infrastructure and Communities (BRIC), Hazard Mitigation Assistance (HMA), Infrastructure Investment and Jobs Act, American Rescue Plan, National Coastal Resilience Fund (NCRF), National Coastal Wetlands Conservatio n Grant, Safeguarding Tomorrow Through Ongoing Risk Mitigation (STORM) grants, and Virginia Coastal Zone Management Program, among others. STATUS NOTES: OEEC has compiled grant tracking into a master Tracker for interagency, coordinated tracking and pursuit of climate -related grants (both resilience and emissions reduction): ALL Funding & Grants Tracker.xlsx. Significant Progress (~0.75 of Action Done) ACTION 2: Resilient Fairfax | IAP.3b: Establish a process for coordinated tracking and prioritization of resilience-related grant opportunities, proposals submitted, funding awarded, and projects conducted. The process should include clear identification of lead and sup port agencies for each grant and/or funding opportunity. The lead department for each grant will be determined based on the topic. For example, DPWES will lead stormwater related grants, and FCHD will lead health-related grants. e process s ould identify “ est fit” grant opportunities t at both align with county priorities and likelihood of success. STATUS NOTES: OEEC has established a process for coordinated tracking and prioritization of resilience -related grants, through the Funding Tracker and Interagency Climate Teams. However, there is still opportunity for improvement and more active use of these tools by other agencies. Significant Progress (~0.75 of Action Done) ACTION 3: Resilient Fairfax | IAP.3b: Assess and identify need for dedicated staff to support grant tracking, proposals, and active grant management. STATUS NOTES: Staff have assessed and identified the need for dedicated staff for this purpose, and are pursuing options, including potenti al consultant support. Steady Progress ACTION 4: Resilient Fairfax | IAP.3b, Action 4: Apply for available and appropriate federal and state funding opportunities for resilience . 57 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates (~0.5 of Action Done) STATUS NOTES: Staff of various county agencies have applied for numerous federal and state funding opportunities relating to resilience, wi th mixed success. For example, DPWES was awarded 4 Community Flood Preparedness Fund grants. OEEC applied for a $1 million EPA EJG2G grant for a Resilience Hub, in collaboration with Faith Alliance for Climate Solutions, NVSWCD, Virginia Climate Center (GMU) , and Rising Hope Mission Church. Unfortunately, the county was not awarded this EPA funding. However, staff are pursuing additional opportunities. (This action is for grants relating to resilience. For emissions reduction-related grants, please see other actions below). Started (~0.25 of Action Done) ACTION 5: CECAP Implementation Plan | ES.2 (Federal Funding for Electric Grid): Support accelerated electric grid transformation beyond the renewable energy requirements set forth in the VCEA. … e county will pursue funding opportunities provided y t e Inflation Reduction Act … . STATUS NOTES: Fairfax County is tracking and pursuing federal and state funding opportunities that will accelerate the deployment of clean energy technologies, including several opportunities that have emerged from the Inflation Reduction Act and the Bipartisan Infrastructure Law. In April 2023, the county submitted a Pre-Award Information Sheet to the U.S. Department of Energy to participate in its Energy Efficiency and Conservation Block Grant Program (EECBG). The county is now finalizing its EECBG application, which will allow for the use of over $960,000 in formula funding to develop and install renewable energy technologies and implement energy efficiency and conservation strategies; the county intends to utilize EECBG funding to advance both operational and community -wide greenhouse gas reduction goals. In addition, the county is coordinating with regional and state partners on the EPA’s Climate Pollution Reduction rants Program (CPR ), to develop and implement greenhouse gas emissions reduction strategies, such as measures to accelerate the deployment of clean and renewable energy. MWCOG is coordinating both planning and implementation grants under the CPRG program on behalf of the Washi ngton Metropolitan Statistical Area. County staff are represented on M CO ’s CPR Steering and Technical Committee, formed in ovember 202 . The county is also coordinating with the Virginia Department of Environmental Quality (VDEQ), which is leading CPRG efforts f or the state of Virginia. Significant Progress (~0.75 of Action Done) ACTION 6: CECAP Implementation Plan | T.12 ; Operational Energy Strategy | Fleet Electrification: Apply for grant funding for county fleet vehicles when possible. Explore and take advantage of available grant funding opportunities to lower the cost of EV purchases and the purchase and installation of EV supply equipment (EVSE), along with other alternative transportation initiatives. STATUS NOTES: The county is tracking and applying to numerous federal and state funding programs that support adoption of low- and zero- emission vehicles for both the county fleet and community programs. Examples include the National Electric Vehicle Infrastruc ture (NEVI) Formula Program, the Virginia Electric Vehicle Infrastructure Deployment from VDOT, Discretio nary Grant Program for Charging and Fueling Infrastructure (CFI) from USDOT (the county applied as a sub to MWCOG, but was not awarded), and the Clean School Bus Program (EPA). In November 2022, the OEEC applied for grant funding to support Charge Up Fairfax through the DOE’s ehicle Technologies Office Program ide Funding Opportunity Announcement. Additionally, the Fairfax County Department of Transportation applied for nearly $8.9 million in regional funding from the Northern Virginia Transportation Commission (NVTC) to finance multiple bus routes and bike sharing stations. 58 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Not Started 0 of 2 Actions Done (0%) 14. Other Funding All Continuous IAP.3c, IAP.3d n/a n/a Action Status Actions Not Started (0) ACTION 1: Resilient Fairfax | IAP.3c: Identify funding to support long-term data collection, analysis, and management. STATUS NOTES: This was not a prioritized item for 2023. Discussions with GMU have been held to pursue possible future collaborations that could provide funding opportunities for data collection. Please see Strategy 77 – Climate-related Research, which can be found in Group 6. Not Started (0) ACTION 2: Resilient Fairfax | IAP.3d: Identify additional funding opportunities including regional coordination, public-private partnerships, and cost-share programs to support resilience. STATUS NOTES: This was not a prioritized item for 2023. Roll-up Status Roll-up Started 1 of 4 Actions Done (25%) Roll-up: Adaptation Action Areas Strategy Status Strategy7 Groups Completion Resilient Fairfax CECAP IP OES Started 1 of 4 Actions Done (25%) 15. Adaptation Action Areas Implementation All 2024 CRC.1a n/a n/a 7 Strategies with a star were identified as priority strategies in their respective plans. 59 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Resilient Fairfax | CRC.1a: Develop Adaptation Action Areas Where Resilience Action is Prioritized (Page 57 -58) Lead: OEEC. Partners: DEI, DEMS, DFS, DPD, DPWES, FCDOT, FCHD, FCPA, HCD, LDS, NCS, NVSWCD, OCA, One Fairfax, UFMD. Timeline: Medium-term (2-5 years). Cost: $$ ($100k - $500k). Existing Staff: Partial. Description: Adaptation Action Areas (AAAs) are a land-use planning and policy tool that can be used to guide and prioritize climate adaptation implementation. AAAs may be used to identify, map, and establish locations of greatest need within Fairfax County where the county will take resilience action first. Development of the AAAs will be informed by complete analysis and technical reports, including the Resilient Fairfax Vulnerability and Risk Assessment, the Climate Projections Report, the Audit of Existing Policies, Plans, and Programs, the county’s flood risk reduction efforts, and the NASA Develop Urban Heat Island Effect Study. These reports, along with the best available science, will inform the mapping of AAAs and include consideration for: flood-prone areas, Urban Heat Islands, population vulnerability (such as the One Fairfax Vulnerability Index, as pictured below), a nd low adaptive capacity, among other factors. Development of AAAs provides a comprehensive and cohesive approach for the county to e ffectively implement resilience related policies, programs, and projects. Action Status Actions Significant Progress (~0.75 of Action Done) ACTION 1: Resilient Fairfax | CRC.1a: Identify and map potential AAAs based on climate risk and the One Fairfax Vulnerability Index. AAA considerations could include but are not limited to: flood-prone areas, Urban Heat Islands, population vulnerability, and low adaptive capacity. STATUS NOTES: Much of the mapping needed for AAAs was completed as part of the Resilient Fairfax planning process . OEEC is actively working with IT-GIS staff and One Fairfax staff to refine and finalize the AAA maps. Started (~0.25 of Action Done) ACTION 2: Resilient Fairfax | CRC.1a: Draft options for the incorporation of AAAs. Options could include but are not limited to: using AAAs during the Capital Improvement Program process to prioritize implementation of resilience projects, using AAAs to prioritize funding of Resilient Fairfax implementation, and to prioritize resilience aid and/or incentives, among others. STATUS NOTES: The Interagency Climate Team has been exploring the best way to implement or use AAAs in Fairfax County (e.g., to prioritize infrastructure upgrades, public services, community engagement, as a Zoning Overlay, etc.). Staff have interviewed Norfolk, VA staff to gather insights on their implementation of a Zoning resilience overlay. Not Started (0) ACTION 3: Resilient Fairfax | CRC.1a: Present options for incorporation of AAAs for BOS approval and receive authorization to incorporate AAAs. STATUS NOTES: This stage has not yet been reached. Not Started (0) ACTION 4: Resilient Fairfax | CRC.1a: Prioritize implementation and engagement in AAAs. Consider piloting resilience approaches in AAAs that can be scaled up community wide. STATUS NOTES: This stage has not yet been reached. However, engagement is occurring in prioritized One Fairfax areas, which are very simila r to the AAA locations. 60 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status Roll-up Early Stage 3 of 12 Actions Done (25%) Roll up: Legislative and State-Level Proposals and Advocacy Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 1.25 of 4 Actions Done (31%) 16. State-Level Actions for the Building Code All RIB.2b BEE.2, BEE.23, ES.9 p. 10 Action Status Actions Started (~0.25 of Action Done) ACTION 1: (RESILIENCE UPDATES): Resilient Fairfax | RIB.2b: Continue advocating for updates to the Virginia Statewide Building Code to enhance resilience to climate hazards for new buildings. STATUS NOTES: OEEC staff coordinated in 2023 with LDS Building Code staff to advocate for resiliency enhancements. Building Code updates were discussed in the Group 2 meetings. LDS staff testify at the Virginia hearing for Building Code updates. However, most topics of such testimonies to date have been focused on topics other than resilience. There is a need to better incorporate resilience in the future. Steady Progress (~0.5 of Action Done) ACTION 2: (ENERGY EFFICENCY UPDATES): Operational Energy Strategy | Green Buildings, Action 7: Advocate for strengthened Virginia energy and building code requirements. CECAP Implementation Plan | BEE.2 : The county (through LDS), as well as FACS and the Sierra Club, will continue their efforts to work with the VA Dept of Housing and Community Development (DHCD) and its Board (BHCD) to obta in their endorsement of the IEEC for statewide adoption, which is required prior to t e overnor’s approval. e county will continue its outreac to partners in the building industry for support of IEEC. These include the Northern VA Building Industry Association (NVBIA) , the Home Builders Association of Virginia (HBAV), the Virginia Association of Counties (VACo), and the VA Building and Code Officials Association BC A . … . STATUS NOTES: LDS, OEEC, and other county entities advocate for energy efficiency updates to the building code. LDS continues to work in partnership with the Responsible Energy Codes Alliance and the Energy Efficient Codes Coalition. Both are working for full IE EC adoption in VA. 61 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 3: (AUTHORITY UPDATES) CECAP Implementation Plan | BEE.23: Consider, and, where appropriate, develop and advance legislative proposals to provide Fairfax County with greater authority over building construction, renovations, and operations, particula rly regarding energy codes, energy performance standards, and energy use benchmarking and disclosure requirements. STATUS NOTES: Staff continually monitor the legislative landscape to identify the need and opportunity to advance regulatory changes in pursuit of the county’s building and energy goals. here appropriate, staff develop legislative proposals, including requests for additional delegated authority from the state, for consideration and advancement by the Board of Supervisor’s Legislative Committee . In the 2023 Legislative Program, the County BOS supported modernization of state building codes by adopting the IgCC and full provisions of the IEEC, and the provision of more flexibility for localities to increase energy efficiency and improve resilience to climate change impacts by adopting stronger local standards and implementing energy efficiency and utilization of disclosure/benchmarking. LDS continues to wor k in partnership with the Responsible Energy Codes Alliance and the Energy Efficient Codes Coalition. Bot h are working for full IEEC adoption in VA. Not Started (0) ACTION 4: (BATTERY STORAGE UPDATES): CECAP Implementation Plan | ES.9: Support and facilitate the safe adoption of batteries for energy storage for public and private use, which may include amending building codes to accommodate battery storage. STATUS NOTES: The action requires further study, technological advancement of batteries (particularly sized for residential use), and adoption of new legislation authorizing the county to amend its building codes. While Dominion Energy has a battery pilot project to support the regional grid and goals of the 2018 Grid Transformation and Security Act, the costs for local battery storage are high along with space needed to accommodate the physical size of the battery. The timeframe for this action may occur e arlier depending on revisions to applicable building and energy codes and technological advancements. The county will continue to monitor legislative changes that may facilitate adoption of batteries for energy storage. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 0.75 of 4 Actions Done (19%) 17. State-Level Actions for Solar, Renewables, and Energy Efficiency All Continuous n/a BEE.24, ES.5, ES.16, ES.17, n/a Action Status Actions Started (~0.25 of Action Done) ACTION 1: CECAP Implementation Plan | BEE.24 : Support the use and expansion of state and utility-sponsored programs to implement energy efficiency and conservation projects and improvements, including but not limited to those applicable or available as a result of the Grid Transformation and Security Act of 2018 and the Virginia Clean Economy Act. STATUS NOTES: The Virginia Department of Energy tracks progress on implementation of the Virginia Clean Economy Act related to clean energy and workforce development. The county monitors and supports the expansion of state and utility sponsored programs thro ugh the 62 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates legislative process and participation in relevant organizations like the Virginia Energy Purchasing Governmental Association (VEPGA) and the Virginia Association of Counties. Not Started (0) ACTION 2: CECAP Implementation Plan | ES.5: Promote the development of community solar projects by revising policies and regulations where necessary or providing financial incentives where appropriate. STATUS NOTES: Dominion operates a ‘community solar’ program that is expensive and limited in scope. Current state -enabling legislation (utility regulations) limits other community solar in Virginia (i.e., true Community Solar is currently unavailable in Virgin ia due to utility regulations). The county monitors legislative actions to evaluate further feasibility to promote community solar projects. Started (~0.25 of Action Done) ACTION 3: CECAP Implementation Plan | ES.16: Consider and, where appropriate, develop and advance legislative proposals to provide Fairfax County with greater authority with respect to on-site renewable energy production, such as greater flexibility regarding community solar programs and the authority to incentivize renewable energy generation and battery storage projects. STATUS NOTES: Staff continually monitor the legislative landscape to identify the need and opportunity to advance regulatory changes in pursuit of the county’s CECAP and OES goals. here appropriate, staff develop legislative proposals, including requests for additional delegated authority from the state, for consideration and advancement by the Board of Supervisor’s Legislative Committee. Fairfax County’s 2023 Legislative Program included support for the elimination of caps and other barriers to renewable energy programs, such as shared solar; however, no progress was made in this arena during the 2023 General Assembly session. Started (~0.25 of Action Done) ACTION 4: CECAP Implementation Plan | ES.17: Support the use and expansion of state and utility-sponsored programs to increase the amount of renewable energy in the electric grid, including but not limited to those applicable or available as a result of th e Regional Greenhouse Gas Initiative (RGGI). STATUS NOTES: RGGI is a multi-state regional cap and trade program designed to reduce GHG emissions from the power sector. Revenue from the program is reinvested in local energy efficiency and flood mitigation programs. Since Virginia joined RGGI in 2020, Fairfax County has received over $15.4 million worth of benefits. In July of 2023, the state published its regulation to repeal irginia’s participation in R I by the end of 2023; however, a legal challenge to this regulation, headed by the Southern Environmental Law Center, has been filed in the Circuit Court of Floyd County, Virginia. The Fairfax County BOS has expressed its support that Virginia remains in RGGI. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 0.5 of 1 Actions Done (50%) 18. State-Level Actions for Natural Resources All Continuous n/a NR.14 n/a 63 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: CECAP Implementation Plan | NR.14: Consider, and where appropriate, develop and advance legislative proposals to provide Fairfax County with greater authority to protect green spaces and trees. STATUS NOTES: Staff monitor and analyze state and federal legislation to protect and enhance natural resources and elevate pertinent legislation for Board discussion and action. In instances where legislative changes are needed to advance the county’s natural resource goals, staff identify and develop legislative proposals for consideration by the Board of Supervisor’s Legislative Committee. In the 2023 Legislative Program, the County BOS supported the conservation of open space and environmentally s ensitive areas, to protect vital ecological resources and the environment, enhance natural resilience, provide health and recreational opportunities, and improve quality of life. In addition, the BOS supported increased local flexibility and authority on tree preservation and other critical measures to address the impacts of climate change. In the 2023 General Assembly, the county had a legislative initiative, which was ultimately successful, pertaining to the removal of illegal signs in the right-of-way. HB1587 (Sullivan) provides authority for Fairfax County to use contractors to remove these signs, improving transportation safety and the appearance of green spaces and roads in the county. The county also supported SB1091 (Ebbin), which was passed by the General Assembly and expands the allowable use of grants from a local Stormwater Management Fund to include joint flooding mitigation projects of condominium owners. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 0.5 of 2 Actions Done (25%) 19. State-Level Actions for Transportation All Continuous n/a T.6, T.13 n/a Action Status Actions Started (~0.25 of Action Done) ACTION 1: CECAP Implementation Plan | T.6 : Continue to support Clean Car standards and to pursue opportunities for better fuel economy . STATUS NOTES: The Virginia Department of Environmental Quality (DEQ) implements the Clean Cars Virginia Bill (HB1965) of 2021 that aims to reduce tailpipe pollution through the sale of EVs and other clean vehicle technologies. The legislation directs DEQ to develo p and the State Air Pollution Control Board to adopt a low emissions vehicle (LEV) and zero emissions vehicle (ZEV) program for motor vehicles be ginning with model year 2025. The State Air Pollution Control Board adopted an implementing regulation on December 2, 2021, which will go into effect shortly after January 1, 2024. In the 202 eneral Assembly, several bills were introduced in an attempt to repeal irginia’s participation in the Clean Cars program; however, all bills were ultimately defeated. The Board’s Legislative Committee expressed its opposition to such bills, including HB1378 (Wilt). The county will continue to track progress and explore more opportunities to continuously improve fuel economy. 64 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Started (~0.25 of Action Done) ACTION 2: CECAP Implementation Plan | T.13: Legislation for vehicle electrification incentives: Consider, and where appropriate, develop and advance legislative proposals to provide Fairfax County with greater authority to address transportation and vehicle elec trification matters, including the authority to establish incentives or requirements regarding EV adoption. STATUS NOTES: Staff monitor and analyze state and federal legislation to advance the adoption of EVs and elevate pertinent legislation for Board discussion and action. In instances where legislative changes are needed, staff identify and develop legislative propos als for consideration by the Board of Supervisor’s Legislative Committee. In the 202 Legislative Program, the County BOS supported incen tives, funding, and rebates for new and used EVs as well as incentives and the reduction of barriers for installations of EV chargi ng infrastructure. In the 2023 General Assembly, several bills were introduced that would have expanded EV charging infrastructure throughout Virgi nia, including SB1312 (Boysko), although none were successful. The BOS supported SB1312, which would have all owed any locality by ordinance to require EV stations as part of subdivision or site plan approval for a development containing commercial, industrial, or multifamily residential uses with a density of seven residential dwelling units per acre or greater. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Not Started 0 of 1 Action Done (0%) 20. State-Level Actions for Waste All Continuous n/a W.19 n/a Action Status Actions Not Started (0) CECAP Implementation Plan | W.19: Consider and, where appropriate, develop and advance legislative proposals to provide Fairfax County with greater authority to address waste matters, such as more extensive oversight of private haulers, the authority to establ ish recycling incentives or requirements, and the authority to regulate or ban single-use plastics and other items that contribute to waste and pollution. STATUS NOTES: Staff will monitor and advocate for legislative authority at the local level, and monitor and support state and federal legis lation to improve waste reduction and management. 65 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Details: Group 2 Strategies – (Development Codes, Policies, and Plans) Strategies in Group 2 are focused on climate-related updates to county development codes, policies, and plans such as the Comprehensive Plan, Zoning Ordinance, Public Facilities Manual, and other development-related codes. In addition to serving as a way to sort strategies, “ roup 2” is also one of the six staff working groups of the Interagency Climate Team, with a focus on implementing Group 2 strategies. The following agencies are represented on the Interagency Climate Team - Group 2: Department of Emergency Management and Security (DEMS); Department of Planning and Development (DPD)- Planning Division (PD), Zoning Administration Division (ZAD), and Community Revitalization Section (CRS); Department of Public Works and Environmental Services (DPWES) – Stormwater (including Urban Forestry); Fairfax County Department of Transportation (FCDOT); Fairfax County Health Department (FCHD); Fairfax County Park Authority (FCPA); Housing and Community Development (HCD); Land Development Services (LDS); Northern Virginia Soil and Water Conservation District (NVSWCD); Office of the County Attorney (OCA); Office of Environmental and Energy Coordination (OEEC); and One Fairfax/ Chief Equity Officer’s Office. OEEC and DPD co-facilitate Group 2. The section below details progress made and the statuses of each Strategy Roll-up, Strategy, and Implementation Action for Group 2. 66 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Resilient Fairfax | CRC.3a: Pursue and Implement a Flood-Risk Reduction Plan for the Fairfax County Community. Lead: DPWES, LDS. Partners: DCC, DEMS, DPD, FCPA, OEEC, One Fairfax. Timeline for completion: Medium Term (2-5 years). Cost: $500k-$1 million. Existing staff: Partial. Climate hazards addressed: Precipitation; Coastal Flooding. Description: This strategy aligns with and advances the “Flood Risk Reduction Plan” recently initiated by DPWES. This strategy is focused on reducing flooding risk that threatens the health, safety, and welfar e of county residents in their neighborhoods. (For flooding of county government facilities, please see Strategy 62 – Enhance Flood Resilience of County Government Buildings (RIB.1b)). The Fairfax County community experiences multiple types of flooding, including urban, inland, riverine, and coastal flooding, each of which requ ires a customized approach. Additionally, flood risk reduction requires action for both new and existing development. Any changes m ade to county policies and standards apply only to new development or re-development (See Strategy 61 – Update Capital Improvement Program Process to Include Climate Resilience Considerations (RIB.1a)). For existing neighborhoods with flooding issues, retroactive physical capital improvement projects may be needed. Across all approaches, projected climate conditions and impacts should be factored into flood risk reduction efforts. Action Status Actions Signficant Progress (~0.75 of Action Done) ACTION 1: Resilient Fairfax | CRC.3a, Action 1: Initiate plan. Complete project initiation tasks, including establishment of: an interagency workgroup, flood risk reduction approach, community engagement and equity approach, benchmarking against other jurisdictions, and draft levels of service. STATUS NOTES: Most items in this action have been completed by DPWES. DPWES will be presenting to the Board of Supervisors on these items in Spring 2024. 8 In this instance, the strategy is large enough that it is the only strategy within the “strategy roll-up,” so the status bars are the same for both. 9 Strategies with a star were identified as priority strategies in their respective plans. Roll-up Status8 Roll-up Started 2.5 of 6 Actions Done (42%) Roll-up: Flood Risk Reduction Plan Strategy Status Strategy9 Groups Completion Resilient Fairfax CECAP IP OES Started 2.5 of 6 Actions Done (42%) 21. Pursue and Implement a Flood Risk Reduction Plan for the Fairfax County Community 2 (Lead), 3, 5 2027 CRC.3a, (CRC.2a), (IAP.2c), (IAP.2d), (RIB.1a), (RIB.1b), (AE-all) n/a n/a 67 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 2: Resilient Fairfax | CRC.3a, Action 2: Complete detailed analysis on existing and future flooding levels. Quantify and categorize existing and future flooding issues in the county. For future flooding, utilize the latest accepted climate projections. STATUS NOTES: DPWES has completed an analysis of existing and future flooding levels, both as part of this effort and prior. Existing and future flooding issues have been quantified. Modeling of future flooding is currently ongoing. Future conditions will include analysis of projected climate change. Started (~0.25 of Action Done) ACTION 3: Resilient Fairfax | CRC.3a, Action 3: Complete detailed analysis on existing flood-related policies, standards, and processes, building upon work completed through the Resilient Fairfax Audit and update regularly. Consider a lens of future climate proj ections. STATUS NOTES: OEEC is continuing to coordinate actively with DPWES and LDS on their flood modeling and flood risk reduction, ensuring that our flood modeling considers climatic change. DPWES and LDS are currently leading the interagency effort and a consultant con tract. Not started (0) ACTION 4: Resilient Fairfax | CRC.3a, Action 4: Draft flood risk reduction recommendations, including potential updates to county polices, design standards and guidelines, ordinances, processes, and capital projects (see Strategy CRC.3c). STATUS NOTES: This item will start once the preceding analyses are complete. Steady Progress (~0.5 of Action Done) ACTION 5: Resilient Fairfax | CRC.3a, Action 5: Identify and prioritize capital projects for flood alleviation. The identification of areas in need of flood alleviation capital projects may be facilitated through the Adaptation Action Area process (see Strategy CRC.1a). Th e prioritization of capital projects may be facilitated through a revised Capital Improvement Program (CIP) process (See Strategy RIB.1a). STATUS NOTES: DPWES has been identifying and prioritizing capital projects for flood alleviation for many years prior to Resilient Fairfax and this Flood Risk Reduction Plan. That identification and prioritization of projects has continued and partially fulfills the purpose of this strategy. The action is marked as having achieved two rather than four bars because prioritization of projects that includes consideration of climate change still needs to occur, once the analyses are complete. Steady Progress (~0.5 of Action Done) ACTION 6: Resilient Fairfax | CRC.3a, Action 6: If applicable and approved by the BOS, implement approved updates. STATUS NOTES: DPWES regularly implements flood risk reduction capital projects. For a full list of currently ongoing stormwater improvement projects, please see this link: DPWES Projects | Public Works and Environmental Services (fairfaxcounty.gov) These actions are listed for reference, as they are related to flood risk reduction. OTHER RELATED ACTIONS: Resilient Fairfax | CRC.2a: Provide Community Aid and Services to Alleviate Resilience Needs Please see Strategy 35 – Community Aid and Services to Alleviate Resilience Needs, which can be found in Group 3. Resilient Fairfax | IAP.2c: Create Consolidated Database of Flood-Prone Areas Please see Strategy 75 – Data on Flooding and Hazards, which can be found in Group 6. 68 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Please see their respective Groups for detail. Resilient Fairfax | IAP.2d: Continue to Collect Rainfall Data Please see Strategy 75 – Data on Flooding and Hazards, which can be found in Group 6. Resilient Fairfax | RIB.1a: Update Capital Improvement Program Process to Include Climate Resilience Considerations. Please see Strategy 61 – Update the Capital Improvement Program Process, which can be found in Group 5. Resilient Fairfax | RIB.1b: Enhance Flood Resilience of County Government Buildings and Other Facilities Please see Strategy 62 – Enhance Flood Resilience of County Government Buildings, which can be found in Group 5. Resilient Fairfax | AE: (All Adaptive Environment Strategies) Please see Strategies 43 – 50, which can be found in Group 4. Roll-up Status Roll-up Started 3.75 of 13 Actions Done (29%) Roll-up: Comprehensive Plan Amendments for Climate Strategy Status Strategy10 Groups Completion Resilient Fairfax CECAP IP OES Started 0.5 of 3 Actions Done (17%) 22. Comprehensive Plan Amendments for Resilience 2 (Lead), 4, 6 2027 IAP.1a n/a n/a Resilient Fairfax | IAP.1a: Inventory and Update the Comprehensive Plan to Enhance Resilience. Lead: OEEC, DPD. Partners: DEMS, DOT, DPWES, EDA, FCHD, FCPA, LDS, NCS. Timeline: Long-term (5-8 years from 2022). Cost: $ ($0k-$100k). Existing Staff: Yes. Description: (…) This strategy includes analysis, recommendation formation, and potential updates to Comprehensive Plan elements pertaining to clim ate resilience. This strategy will build upon work completed through the Resilient Fairfax Audit process. Potential updates could pertain to critical public service facilities, land use patterns, floodplains, wetlands and shorelines, Urban Heat Islands, and stronger protection for Resource Protection Areas, among others. All amendment processes require Board of Supervisors authorization. Comprehensive Plan amendments relating to resilience should be coordinated with other Comprehensive Plan amendments, such as those associated with CECAP. 10 Strategies with a star were identified as priority strategies in their respective plans. 69 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Action Status Actions Started (~0.25 of Action Done) ACTION 1: Resilient Fairfax | IAP.1a DPD, in coordination with OEEC and other partner agencies, will develop specific draft recommendations for amended or added text in the Environment Element of the Policy Plan to en ance t e county’s climate resiliency. In drafting these recommendations, DPD will seek input from advisory groups, Boards, Authorities, and Commissions (BACS), the Planning Commission, the public, and other key stakeholders. STATUS NOTES: DPD and its partner agencies, including OEEC, have launched the Comprehensive Plan amendment process to incorporate considerations related to both resilience and emissions reduction. The update of the Comprehensive Plan Public Facilities Policy Plan is nearing completion. Updates to numerous additional sections of the Comprehensive Plan Policy Plan were authorized for amendment processes in December 2022. The Resilient Fairfax Audit of Existing Policies, Plans, and Programs was completed during the Resilient Fairfax planning process, helping to identify gaps. Additionally, OEEC has provided an Environmental Policy Plan mark-up with recommended changes. Started (~0.25 of Action Done) ACTION 2: Resilient Fairfax | IAP.1a As authorized by the Board, staff will develop amendments to the Comprehensive Plan. OEEC will lead outreach efforts associated with any (climate-related) Comprehensive Plan amendments and will assist with technical climate resilience - related details. DPD will lead the Comprehensive Plan amendment processes. STATUS NOTES: The Policy Plan amendment was authorized in December 2022. Since authorization, staff have been conducting research, establishing a timeline, and preparing an outreach plan. Not started (0) ACTION 3: Resilient Fairfax | IAP.1a: DPD, in coordination with partner agencies, will identify specific sections that may have subsequent amendments to en ance t e county’s climate resilience. e future p ased identification will expand upon t e wor completed t hrough the Resilient airfax Audit process. ections “relevant to climate resilience” may include ut are not limited to those related to public facilities, human service facilities, transportation, or other critical facilities, land use that may mitigate Urban Heat Island effect a nd/or flooding, floodplains, wetlands, shorelines, Environmental Quality Corridors, Resource Protection Areas, trees, green infrastructure, and impervious cover. The process will also identify specific county departments and/or other partner agencies responsible for each of the C omprehensive Plan sections. STATUS NOTES: This is a future phase that will be informed by the Policy Plan amendment. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 0.75 of 2 Actions Done (38%) 23.Comprehensive Plan Amendments for Energy Efficiency and Green Buildings 2 (Lead) 2027 n/a BEE.3, NR.10, n/a Action Status Actions 70 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 1: CECAP Implementation Plan | BEE.3: Build and retrofit privately-owned buildings to high-efficiency performance standards and strive for carbon-neutrality and net zero emissions. STATUS NOTES: Entitlement Process: DPD negotiates with developers during the entitlement process to ensure green building standards are being addressed in accordance with the Policy Plan of the Comprehensive Plan for new development, redevelopment, and adaptive reuse proposals. Given this ongoing system, this action is marked as “steady progress” (2 bars), rather than only “started” ( bar). Policy Updates: Consideration of updates to the Policy Plan were authorized in December of 2022 and are ongoing. This amendment process includes the review of the Comprehensive Plan sustainable development policies to enhance the existing emphasis on energy efficiency. Any Policy Plan updates would apply to development proposals requiring a Comprehensive Plan amendment and/or zoning actio n, countywide. Started (~0.25 of Action Done) ACTION 2: CECAP Implementation Plan | NR.10,11: Update t e Compre ensive Plan … in regard to energy efficiency green uildings …. to be in alignment with CECAP and RF climate goals. STATUS NOTES: Prior to CECAP, the county implemented numerous Comprehensive Plan amendments regarding energy efficiency and green buildings, which are actively enforced currently during the development review process. Staff are currently reviewing existing Comprehensive Plan policies in the areas of energy efficiency and green buildings. Once this review is completed, if there are areas where the policies can be strengthened or improved or where climate change can be integrated, these updates will occur as part of the Policy Plan amendment effort. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 1.25 of 4 Actions Done (31%) 24. Comprehensive Plan Amendments for Natural Resources 2 (Lead), 4, 6 2027 n/a NR.5, NR.10 n/a Action Status Actions Signficant Progress (~0.75 of Action Done) ACTION 1: CECAP Implementation Plan | NR.512: Create a cross-disciplinary policy evaluation county staff team to analyze existing programs and policies regarding natural resources and climate change to create a comprehensive climate approach. STATUS NOTES: Interagency Climate Teams Group 2 (Development Codes, Policies, and Plans) and Group 4 (Natural Resources) are designed to serve this purpose, in addition to other interagency stakeholder engagements conducted by DPD. 11 These implementation actions as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 12 This implementation action as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 71 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Started (~0.25 of Action Done) ACTION 2: CECAP Implementation Plan | NR.513 As part of this recommendation, specific policies for tree canopy and site development will be evaluated, in addition to other natural resources-related policies. The specific policies noted for review include such items as the Compre ensive Plan … . pecific recommendations on plan or policy updates (e.g., Comprehensive Plan amendments), will result from this review. … STATUS NOTES: Consideration of updates to the Comprehensive Plan Policy Plan were authorized in December of 2022 and are ongoing. This amendment process includes the natural resource topics listed in this action. Started (~0.25 of Action Done) ACTION 3: CECAP Implementation Plan | NR.10, 14 Update t e Compre ensive Plan … in regard to … sustaina le development and land use, and natural resources, to be in alignment with CECAP and RF climate goals. Staff will review existing Comprehensive Plan policies…in t ese areas … sustaina le development and land use, natural resources, including trees, streams, green spaces, soil. STATUS NOTES: Consideration of updates to the Comprehensive Plan Policy Plan were authorized in December of 2022 and are ongoing. This amendment process includes the land use and natural resource topics listed in this action. Not started (0) ACTION 4: Once this review is completed, if there are areas where the policies can be strengthened or improved or where climate change can be integrated, staff will seek Board authorization to update the policies. STATUS NOTES: These recommendations will be identified as part of the Policy Plan amendment effort. Other similar actions are listed here for reference. OTHER RELATED ACTIONS: Please see Strategy 43 – Consolidated Natural Resource Management Plan for related actions. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 1.25 of 4 Actions Done (31%) 25. Comprehensive Plan Amendments for Transportation 2 (Lead), 4, 5 2027 (RIB.2c) NR.10, T.4, T.16, T.18, T.19 n/a Action Status Actions 13 This implementation action as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 14 These implementation actions as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 72 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Signficant Progress (~0.75 of Action Done) ACTION 1: CECAP Implementation Plan | T.16: Work with state and regional partners to further develop and implement programs to expand, improve, maintain, and promote active transportation infrastructure and options like walking and biking. STATUS NOTES: ActiveFairfax: Fairfax County is updating and combining the Bicycle Master Plan and the Countywide Trails Plan into the ActiveFairfax Transportation Plan. The plan, scheduled to be completed by the fall of 2024, will establish a vision and roadmap for implementation of safe, convenient, and enjoyable streets and trails in Fairfax County. Safe Streets for All: The Safe Streets for All program, adopted by the Board on May 10, 2022, also supports active transportation and is awaiting funding. The program recommendations propose a framework of education, policy, planning, and programmatic and design strategies. Started (~0.25 of Action Done) ACTION 2: CECAP Implementation Plan | NR.10, T.1815: Update t e Compre ensive Plan … in regard to … transportation including E E sustaina le development and land use … to e in alignment wit CECAP and R climate goals . CECAP Implementation Plan | T.4: Evaluate Comprehensive Plan, zoning, and land development ordinances to support, incentivize or require the installation of EV-ready charging infrastructure in new buildings and in the right-of-way (on-street parking). STATUS NOTES: FCDOT has begun the update of the Transportation section of the Policy Plan. The processes to amend the Comprehensive Plan Policy Plan (including Transportation) were authorized in December 2022. Staff are reviewing existing Comprehensive Plan poli cies in areas including electric vehicles, public transportation, sustainable development, and land use to recommend possible amendments, in alignment with the county’s climate plans. Started (~0.25 of Action Done) ACTION 3: CECAP Implementation Plan | T.19: Leverage and strengthen, as need, the Comprehensive Plan environmental policies and related ordinances to minimize the impact of transportation projects on native trees and natural areas (EQCs, RPAs, Occoquan Watershed). STATUS NOTES: The processes to amend the Comprehensive Plan Policy Plan (including Transportation and the Environmental Policy Plan) were authorized in December 2022. Staff are reviewing the Comprehensive Plan policies and related ordinances to determine how best to integrate CECAP and Resilient Fairfax recommendations. All amendments to County Codes, policies, and plans require Board of Supe rvisors authorization. Not started (0) ACTION 4: CECAP Implementation Plan | NR.10, T.18, cont.: Once this review is completed, if there are areas where the policies can be strengthened or improved or where climate change can be integrated, staff will seek Board authorization to update the policie s. STATUS NOTES: This is a future phase which will be informed by the Policy Plan amendment effort. Other similar actions are listed here for reference. OTHER RELATED ACTIONS: Resilient Fairfax | RIB.2c: Advocate and Partner with Transportation Agencies to Support Transportation Resilience Please see Strategy 7 – Regional Transportation Coordination for Resilience, which can be found in Group 1. 15 These implementation actions as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 73 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up 16 Roll-up Started 0.75 of 4 Actions Done (19%) Roll-up: Urban Design Guideline Updates for Climate Strategy Status Strategy17 Groups Completion Resilient Fairfax CECAP IP OES Started 0.75 of 4 Actions Done (19%) 26. Heat Resilient Urban Design, Development, Upgrades, and Practices 2 2026 CRC.3b n/a n/a 16 In this instance, the strategy is large enough that it is the only strategy within the “strategy roll-up,” so the status bars are the same for both. 17 Strategies with a star were identified as priority strategies in their respective plans. Resilient Fairfax | CRC.3b: Encourage Heat-Resilient Design, Development, Upgrades, and Practices. Lead: DPD-CRS (added since the plan was written), LDS, OEEC. Partners: DEMS, DPD, FCDOT, FCHD, FCPA, NCS, OCA, UFMD. Timeline: Medium-Term (2-5 years). Cost: $$ ($100k-$500k). Existing Staff: Partial. Description: Extreme heat is a pressing issue with increasing impacts on both public health and infrastructure. This strategy is focused on encouraging new and existing development to consider heat -mitigation measures, including nature-based solutions, in their design, construction, or redevelopment, and operations and maintenance. Guidance materials, potential incentive programs, and integra tion of heat- related climate risk into development review processes can mitigate the impact of extreme heat to residents, particularly more vulnerable populations. A comprehensive approach can better prepare neighborhoods for more extreme and frequent heat conditions. (Please see Resilient Fairfax Plan pages 67-68 for more detail). Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1 (IDENTIFY COOLING MEASURES): Resilient Fairfax | CRC.3b: Complete detailed analysis to identify a suite of applicable cooling measures for priority eat islands as identified y t e Resilient airfax planning process and A A Develop’s Ur an eat Isla nd assessment. Example cooling measures could include but are not limited to cool roofs and cool pavements, targeted tree canopy, green infrastructure, and green space for evapotranspiration, building and site orientation for heat mitigation, heat -mitigating building materials and efficiency, among others. STATUS NOTES: This action is currently occurring. 74 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Started (~0.25 of Action Done) ACTION 2 (IDENTIFY STANDARDS TO UPDATE): Resilient Fairfax | CRC.3b: Complete detailed analysis of existing standards and processes. Identify opportunities to update existing standards and processes to consider heat mitigation. Examples include heat -specific updates to ur an design guidelines … and guidelines relating to trees and impervious coverage limitations. STATUS NOTES: OEEC has added the Community Revitalization Section (CRS) of the Department of Planning and Development (DPD) to the Interagency Climate Team, for coordination on heat-resilient design. As of Fall 2023, DPD-CRS has launched their process to update Volume I of the Urban Design Guidelines, to include urban heat island reduction strategies such as cooler material recommendations. These strategies are being actively discussed in Group 2 meetings. Scheduled to start (0) ACTION 3 (DEVELOP GUIDELINES): Resilient Fairfax | CRC.3b: Develop design guidelines that are a practical reference for planners, building developers and ot er sta e olders wit influence in design construction of projects in airfax County. … e design guide lines will provide guidance on how to evaluate the building or site/landscape for heat vulnerabilities and offer guidance/considerations on cooling measures and opportunities to enhance resilience. Guidelines should support the use of native plantings when feasible and eff ective. These guidelines can build on the use of Urban Design Guidelines for Commercial Revitalization District and Areas and certain Mixed -use Centers as designated on the Fairfax County Comprehensive Plan including the Tysons Urban Center and the Reston Station Areas. STATUS NOTES: This item is scheduled to start in 2024. Scheduled to start (0) ACTION 4 (FINANCING AND INCENTIVES): Resilient Fairfax | CRC.3b, Action 4: Identify additional financing or incentive options. Highlight and align with existing financing and incentive programs that can be used for heat mitigation retrofits or cooling measures, such as C-PACE (see Strategy CRC.1d) or potential green infrastructure incentive programs (see Strategy AE.2a). STATUS NOTES: This is a future item. Other similar actions are listed here for reference. OTHER RELATED ACTIONS: CECAP Implementation Plan | NR.8: Promote green infrastructure in development projects. Please see Strategy 46 - Green Infrastructure, which can be found in Group 4. 75 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status Roll-up Started 6.75 of 14 Actions Done (48%) Roll-up: County Code and Zoning Ordinance Updates Strategy Status Strategy18 Groups Completion Resilient Fairfax CECAP IP OES Started 2.25 of 7 Actions Done (32%) 27. Resilience: Zoning Ordinance and Other County Code Amendments 2 (Lead), 4, 5, 6 2027 CRC.3c, CRC.3d BEE.5, (NR.8), (NR.5) N/A Resilient Fairfax | CRC.3c: Pursue Amendments to the Zoning Ordinance and Other County Code Chapters to Enhance Community Resilience. Lead: DPD, DPWES, LDS, OEEC. Partners: DCC, DEMS, FCHD, FCPA, NCS, OCA, UFMD. Timeline: Long-term (5-8 years). Cost: $$ ($100k - $500k). Existing Staff: Partial. Description: There are several County Codes that guide development and land use in Fairfax County, including the Zoning Ordinance, Stormwa ter Management Ordinance, Chesapeake Bay Preservation Ordinance, Tree Conservation Ordinance, and the Subdivision Ordinance, among others. Incorporating resilience into these County Codes helps ensure that new development can withstand a changing climate. This strategy pursues potential amendm ents to the Zoning Ordinance and other County Code Chapters to enhance climate resilience. The strategy will build upon opportunities identified in the Resilient Fairfax Audit. This strategy connects to other strategies in the Implementation Roadmap, such as potential updates to the Comprehensive Plan (IAP.1a), the Countywide Strategy Plan (IAP.1b), the Flood Risk Reduction Plan (CRC.3a), Heat Resilient Design Guidelines (CRC.3b) , the Public Facilities Manual (CRC.3d), the Capital Improvement Program (RIB.1a), and the potential Consolidated Natural Resources Management Plan (AE.1a). Amendments to County Code associated with Resilient Fairfax will be aligned with other ongoing, scheduled, considered, and planned amendments. (Please see Resilient Fairfax Plan pages 67-68). Resilient Fairfax | CRC.3d: Update the Public Facilities Manual. Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: Resilient Fairfax | CRC.3c: OEEC will identify regulatory document sections that are relevant to climate hazard resilience and identify opportunities to address resiliency. Topics may include but are not limited to limitations on impervious coverage an d pavement, parking requirements “Par ing Reimagined” density and open space tidal flooding set ac s stormwater and floodplain regulations environmental site assessments, landscaping requirements (including trees), land use definitions for resilience -related uses, and energy production and storage. Amendments will be aligned with amendments from related initiatives such as the Flood Risk Reduction Plan (CRC.3a), CECAP, and Fairfax Green Initiatives. 18 Strategies with a star were identified as priority strategies in their respective plans. 76 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates STATUS NOTES: OEEC has preliminarily identified document sections that are relevant to climate resilience, including the topics listed in the text above, and is conducting research on those items, in coordination with appropriate agencies including DPD , DPWES, and LDS. Started (~0.25 of Action Done) ACTION 2: Resilient Fairfax | CRC.3c: Lead and partner agencies, in coordination with OEEC, will aid in the analysis of identified regulatory changes. Specifically, LDS will aid any amendments related to site plans, parking, floodplain requirements, and landscaping a nd screening provisions. DPWES will aid in any amendments relating to floodplains and flood mitigation. The Urban Forest Management Division will aid in any amendments relating to trees. STATUS NOTES: This action has been started for certain amendments relating to climate resilience. For example, an interagency effort led by DPWES and LDS for the Flood Risk Reduction Plan is currently evaluating options for design standard updates, including consid eration of climate-related changes to precipitation. Additionally, LDS is leading amendments to the Chesapeake Bay Preservation Ordinance relating to sea level rise and adaptation to climate change in Resource Protection Areas (RPAs), in accordance with legislation from the Virginia General Assembly. Further, LDS is leading updates to the Floodplain Ordinance. Started (~0.25 of Action Done) ACTION 3: Resilient Fairfax | CRC.3c: Lead and partner agencies, in coordination with OEEC, will bring any proposed amendment topics to t e Board for consideration. If supported t e amendments will e added to t e agency’s wor program. STATUS NOTES: This item has been started for certain amendments relating to climate resilience. For example, the topic of climate is included in the Zoning Administration Division’s work program and is part of ongoing amendment topic work by DPWES and LDS. Started (~0.25 of Action Done) ACTION 4: Resilient Fairfax | CRC.3c: As authorized by the Board, develop amendments to the relevant documents. All proposed amendments will be drafted and revised in coordination with applicable stakeholder groups, Boards, Authorities, and Commissio ns (BACS), and the public. STATUS NOTES: This item has been started for certain amendments relating to climate resilience. For example, the Landscaping and Screening Amendment, led by the Zoning Administration Division (ZAD), included climate resilience topics. This amendment was drafted and revised in coordination with applicable stakeholder groups, BACs, and the public. Other amendments, such as those relating to flood risk reduction, are currently ongoing. Started (~0.25 of Action Done) ACTION 5: Resilient Fairfax | CRC.3c: Agencies will proceed through the amendment process, to include outreach, draft amendments, and public hearings. STATUS NOTES: This item has been started for certain amendments relating to climate resilience. For example, DPD-ZAD led an interagency effort for the Zoning Ordinance Amendment for Landscaping and Screening. Other amendments, such as those relating to flood risk reduction, are currently ongoing. ACTION 6: Resilient Fairfax | CRC.3d: Pursue updates to the Public Facilities Manual to consider climate projections and enhance resilience. This strategy may occur concurrently with the County Code and plan amendments depending on the breadth and scope. Please see Strategy CRC.3c (Strategy 27 in this Progress Report). 77 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Started (~0.25 of Action Done) STATUS NOTES: This item has been started. For example, an interagency team is currently in documenting tree species that are more resilient to climatic hazards and shifts in climate zones, for possible incorporation into the “Environmental Tolerances” of the Tree t ables in the Public Facilities Manual. Steady Progress (~0.5 of Action Done) ACTION 7: CECAP Implementation Plan| BEE.5: Incorporate biophilic and regenerative design principles such as green roofs into the construction or renovation of buildings to improve occupant health and comfort and provide co -benefits including improved air quality, stormwater management, and reductions to heat island effect areas. STATUS NOTES: Stormwater Management: This action is partially implemented through the existing stormwater management program and land development process. Green roofs are permitted as an option to meet stormwater management requirements as part of the si te development/ redevelopment process. Entitlement Process: The county continues to work with developers through the entitlement process to adopt green infrastructure as part of development and redevelopment. Public Facilities Manual: Additional biophilic and regenerative design principles may be considered in future years as updates to the (Public Facilities Manual) are pursued. Other similar actions are listed here for reference. OTHER RELATED ACTIONS: CECAP Implementation Plan | NR.8: Promote green infrastructure in development projects. Please see Strategy 46 - Green Infrastructure, which can be found in Group 4. CECAP Implementation Plan | NR.5: Create a cross-disciplinary policy evaluation county staff team to analyze existing programs and policies regarding natural resources and climate change to create a comprehensive climate approach. Please see Strategy 43 - Consolidated Natural Resource Management Plan, which can be found in Group 4. Please also see Strategy 24- Comprehensive Plan Amendments for Natural Resources, which can be found in Group 2. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 4.5 of 7 Actions Done (64%) 28. Emissions Reduction: Zoning Ordinance and Other County Code Amendments 2 Continuous n/a BEE.4, (ES.11), NR.10, T.3, T.4, T.5, T.17, T.18 Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: CECAP Implementation Plan | BEE.4: Encourage adaptive reuse of existing buildings, particularly vacant buildings. STATUS NOTES: Adaptive Reuse Program: The county’s Adaptive Reuse Program promotes the reuse of existing buildings (constructed prior to 2000) by providing incentives, guidance, and a reduced review timeframe. LDS will work to further develop the program in the future to incentivize high-performance energy efficiency of building reuse and electrification. Economic Incentive Program (EIP): The BOS adopted the 78 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates EIP in 2020 to encourage redevelopment in six designated Economic Incentive Areas. The 10 -year real estate tax break has resulted in several building renovations and adaptive reuse. DPD staff continue to promote the EIP and explore more opportunities for renov ation/adaptive reuse of existing buildings. Started (~0.25 of Action Done) ACTION 2: CECAP Implementation Plan | NR.10, T.18: Update t e… oning rdinance and associated codes and policies… in regard to energy efficiency/green buildings, transportation including EVSE, sustainable development and land use, and natural resources, to be in alignment with CECAP and RF climate goals. STATUS NOTES: Prior to CECAP, the county implemented numerous County Codes about the topics listed above. Staff are reviewing the Zoning Ordinance and all county policies related to development in these areas: energy efficiency and green buildings, electric vehi cles and public transportation, sustainable development and land use, natural resources, including trees, streams, gree n spaces, soil. Once this review is completed, if there are areas where the policies can be strengthened or improved or where clima te change can be integrated, staff will seek Board authorization to update the policies and/or the Zoning Ordinance . Signficant Progress (~0.75 of Action Done) ACTION 3: CECAP Implementation Plan | T.3: Streamline existing permitting and inspection processes for EV infrastructure and consider fee reductions or waivers. STATUS NOTES: In September 2022, the Board of Supervisors adopted a policy to temporarily waive the fees associated with the installation of electric vehicle charging stations (EVCS). The updated policy and additional information on installing EVCS are available on the LDS EVCS permits website. (For spreading the word on this and other EV incentives, please see Strategy 32, which can be found in Group 3). Steady Progress (~0.5 of Action Done) ACTION 4: CECAP Implementation Plan | T.4: Evaluate … oning and land development ordinances to support incentivi e or require t e installation of EV-ready charging infrastructure in new buildings and in the right-of-way (on-street parking). STATUS NOTES: The Zoning Ordinance was updated in 2021 to include revisions to further support the installation of EVCS. All amendments to County Codes, policies, and plans require Board of Supervisors authorization. The Parking Reimagined project includes provisions for EVCS in private and public developments. This Zoning Ordinance amendment was adopted by the Board of Supervisors in September 2023 and goes into effect as of January 1, 2024. Steady Progress (~0.5 of Action Done) ACTION 5: CECAP Implementation Plan | T.5: Implement equity requirements for EV parking design, including those regarding accessibility. STATUS NOTES: Accessibility is required by the county’s current parking design standards and regulations related to the Americans with Disabilities Act. Additional requirements to support EV charging are included in the Parking Reimagined initiative. Complete/ Fully Active (1 Action Done) ACTION 6: CECAP Implementation Plan | T.17: Promote bicycle usage by installing more bike racks and bike sharing facilities in commercial areas and transit stations. STATUS NOTES: The county requires and includes bicycle parking for commercial areas and transit stations. ( For promotion of bike share incentives, please see Strategy 33, which can be found in Group 3). 79 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Complete/ Fully Active (1 Action Done) ACTION 7: CECAP Implementation Plan | ES.11: Maintain and extend county practices that reduce costs related to solar installation, such as the permit fee waiver and the solar energy equipment tax exemption. (For promotion of solar incentives, please Strategy 31, which can be found in Group 3). STATUS NOTES: The county has an existing solar permit fee waiver, solar energy equipment tax exemption, and Zoning flexibility for solar panel height. Other similar actions are listed here for reference. OTHER RELATED ACTIONS: CECAP Implementation Plan | NR.8: Promote green infrastructure in development projects. Please see Strategy 46 – Green Infrastructure, which can be found in Group 4. Resilient Fairfax | RIB.2b: Advocate for Resilience Updates to the Building Code; CECAP Implementation Plan | BEE.2: Support and advocate for the strengthening of building energy codes in local development projects; CECAP Implementation Plan | BEE.23: Legislation for greater authority over energy codes; CECAP Implementation Plan | ES.9: Support and facilitate the safe adoption of batteries for energy storage for public and private use, which may include amending building codes to accommodate battery storage. Please see Strategy 16 – State-level Actions for the Building Code, which can be found in Group 1. CECAP Implementation Plan | NR.14: Legislation for green space protection: Please see Strategy 14 – State-level Actions for Natural Resources – which can be found in Group 1. 80 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Details: Group 3 Strategies – (Community Services, Education, Engagement, Incentives) Strategies in Group 3 are focused on climate-related community services, education, engagement, and incentives. In addition to serving as a way to sort strategies, “ roup ” is also one of the six staff working groups of the Interagency Climate Team, with a focus on implementing Group 3 strategies. The following agencies are represented in Group 3: Community Services Board (CSB); Department of Economic Initiatives (DEI), Department of Emergency Management and Security (DEMS); Department of Family Services (DFS); Department of Management and Budget (DMB); Department of Public Safety Communications (DPSC); Department of Public Works and Environmental Services (DPWES) – Stormwater (including Urban Forestry), Wastewater, Solid Waste; Economic Development Authority (EDA); Fairfax County Department of Transportation (FCDOT); Fairfax County Health Department (FCHD); Fairfax County Park Authority (FCPA); Fairfax County Public Library (FCPL); Fairfax County Public Schools (FCPS) and Get2Green; Housing and Community Development (HCD); McLean Community Center (MCC); Neighborhood and Community Services (NCS); Northern Virginia Soil and Water Conservation District (NVSWCD); Office of Environmental and Energy Coordination (OEEC); One Fairfax/ Chief Equity Officer’s Office; Office of Public Affairs (OPA); and Reston Community Center (RCC). OEEC and FCPS Get2Green co-facilitate Group 3. The section below details progress made and the statuses of each Strategy Roll-up, Strategy, and Implementation Action for Group 3. 81 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status Roll-up Steady Progress 12 of 23 Actions Done (52%) Roll-up: Incentives for Communities Strategy Status Strategy19 Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 3 of 5 Actions Done (60%) 29. Incentives for Buildings and Energy Efficiency: County-led Programs 3 Continuous n/a BEE.1, BEE.3, BEE.11, n/a Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: (GREEN BUILDING RECOGNITION PROGRAM): CECAP Implementation Plan | BEE.3 STATUS NOTES: LDS has created a Green Building Priority Plan Review process to incentivize high energy efficient and performing buildings. LDS provides an annual report on the number of green buildings and solar permits issued in the Environmental Outlook report. There are potential opportunities to expand awareness of this program and ensure it is achieving the intended purpose of incentivizing green buildings that would have otherwise been standard construction. Significant Progress (~0.75 of Action Done) ACTION 2: (CONSERVE ENERGY KIT PROGRAM): CECAP Implementation Plan| BEE.1 STATUS NOTES: Fairfax County libraries launched the Conserve Kit in 2022 which provides county residents with basic tools and supplies to help address energy efficiency in their homes. As of November 2023, there have been 583 total check-outs of Conserve Kits from the library since the program started (365 to date in 2023). There is potential to expand awareness of this program. Significant Progress ACTION 3: (THERMAL CAMERA LOAN PROGRAM): CECAP Implementation Plan| BEE.1 STATUS NOTES: Fairfax County libraries launched the Thermal Camera Loan Program in 2017 for both Android and Apple smartphones, to enable community members to visually see the areas of their home that need better weatherization. As of November 2023, thermal cameras have been checked out by 3,548 residents (511 to date in 2023). There is potential to expand awareness of this program. 19 Strategies with a star were identified as priority strategies in their respective plans. 82 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates (~0.75 of Action Done) Steady Progress (~0.5 of Action Done) ACTION 4: (HOMEWISE): CECAP Implementation Plan | BEE.11 STATUS NOTES: The county’s HomeWise program focuses on educating and empowering residents to make changes that reduce energy use, water use, and associated costs in their homes. The program tables at community events and offers educational sessions by request. Attendees at events or educational sessions are provided with free home efficiency kits and are offered hands-on demonstrations of how to install the items in the kits. The kits contain window weatherstripping, door sweeps, LED light bulbs, faucet aerators, and socket sealers. As of November 2023, HomeWise has handed out 864 kits (341 in 2023 to date). HomeWise was originally envisioned as a program to provide hands-on small- scale upgrades to low and moderate-income residences for energy and water efficiency. However, the Covid-19 pandemic caused the program to pivot to focus more on educational community outreach and kit distribution. Given the presence of multiple similar programs, it may be logical to adjust the program in the future. Steady Progress (~0.5 of Action Done) ACTION 5: (ENERGY CONSERVATION ASSISTANCE PROGRAM): CECAP Implementation Plan | BEE.11 STATUS NOTES: Fairfax County OEEC and the Northern Virginia Soil and Water Conservation District (NVSWCD) in 2023 teamed up to expand S CD’s existing Energy Conservation Assistance Program. This program provides an increase in the cost-share reimbursement grants and expanded list of eligible projects to incentivize community-based organizations to include HOAs, COAs, non-profit organizations and places of worship implement projects to increase energy efficiency and resiliency of buildings and their use of renewable energy. Other similar actions are listed here for reference. OTHER RELATED ACTIONS: CECAP Implementation Plan | BEE.6, BEE.8, ES.2, ES.7, T.11: (GREEN BANK): Please see Strategy 12 – Green Bank for Emissions Reduction, which can be found in Group 1. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 2.5 of 6 Actions Done (42%) 30. Incentives for Buildings and Energy Efficiency: Promotion of External Programs 3 (Lead), 2, 5 Continuous CRC.1d, BEE.7, BEE.8, BEE.9, BEE.10, BEE.11, BEE.13, ES.8 Action Status Actions 83 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Complete/ Fully Active (1 Action Done) ACTION 1 (C-PACE ESTABLISHMENT): CECAP Implementation Plan | BEE.7, ES.8: Support Property Assessed Clean Energy (PACE) financing programs that assist property owners in upgrading their buildings with renewable energy systems in addition to energy efficie ncy and water management systems. STATUS NOTES: The Fairfax County Commercial Property Assessed Clean Energy (C -PACE) program was launched in 2020 following ordinance adoption in 2019 by the BOS. The C-PACE program is designed to provide private funding to commercial building owners in Fairfax County for energy-saving, water-saving, and resilience projects. In June 2023, the BOS amended the C-PACE ordinance to allow the county to opt into the statewide C-PACE program. The amendment also added a two-year lookback clause to allow the financing of eligible projects that were completed up to two years ago. Started (~0.25 of Action Done) ACTION 2 (C-PACE OUTREACH): Resilient Fairfax | CRC.1d ; CECAP Implementation Plan | BEE.820: Enhance Commercial Property Assessed Clean Energy (C-PACE) Program Outreach and Technical Assistance. STATUS NOTES: C-PACE is administered and marketed by the Virginia PACE Authority. County staff have been coordinating with Virginia PACE to pursue the most effective marketing and awareness strategies for C-PACE, including outreach to bankers and lenders to ensure C -PACE is among the financial incentives offered by them. Staff will continually monitor and research appropriate places to connect bui lding owners, organizations, or associations to C-PACE. Started (~0.25 of Action Done) ACTION 3: (PROMOTE ESCO AND EAAS PROVIDERS): CECAP Implementation Plan | BEE.9: Encourage and facilitate the provision of energy efficiency products and services by energy service companies (ESCOs), energy -as-a-service (EaaS) providers, and others to reduce costs to customers. STATUS NOTES: OEEC staff have begun to promote ESCOs and EaaS providers through the Climate Champions – Non-profit/ Faith sector pilot with Faith Alliance for Climate Solutions. Through the initiative, places of worship are encouraged and incentivized to use ESCO and other energy audit and retrofit services to enhance energy efficiency. (This item is about incentives. For education and outreach beyond incentive promotion, please see Strategies 37 - 42). Started (~0.25 of Action Done) ACTION 4: (PROMOTE LEAP AND CHP): CECAP Implementation Plan | BEE.11: Develop and fund energy audit or assessment programs to identify opportunities to reduce energy use and to provide incentives to implement energy efficiency and electrification recommendations. … Promote external energy efficiency opportunities suc as programs t roug LEAP Local Energy Alliance Program and Community Housing Partners (CHP). STATUS NOTES: The county has begun promoting external energy efficiency opportunities such as programs through LEAP (Local Energy Alliance Program) and Community Housing Partners (CHP). LEAP and CHP Energy Solutions are providers of Dominion Energy’s Income and Age Quality (IAQ) Home Improvement and EnergyShare weatherization programs. (For education and outreach beyond incentive promotion, please see Strategies 37 - 42). 20 This item in the CECAP Implementation Plan as originally written included many topics. For clearer tracking of progress, the text relevant to C-PACE is listed here, and items relevant to other programs are listed in their respective programs. 84 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 5: (PROMOTE UTILITY-LED PROGRAMS): CECAP Implementation Plan | BEE.10: Promote and leverage ratepayer-funded utility programs that provide energy efficiency incentives to residents and businesses. CECAP Implementation Plan | BEE.11: Develop and fund energy audit or assessment programs to identify opportunities to reduce energy use and to provide incentives to implement ene rgy efficiency and electrification recommendations. CECAP Implementation Plan | BEE.13: Use demand management practices to reduce demand for electricity or natural gas during peak periods. STATUS NOTES: Staff promote ratepayer-funded utility programs through education and outreach programs like Carbon -Free Fairfax. Example incentive programs offered by Dominion Energy include Smart Cooling and Control Your Heating and Cooling, Office Energy Efficiency Program, and Smart Savings by Washington Gas. These programs from utilities include programs for demand-side management (DSM) for both residential and commercial customers to reward customers for reducing their energy use (e.g., Smart Thermostat ). These include specific energy efficiency programs for income and age qualifying customers. (For education and outreach beyond incentive promotion, please see Strategies 37 - 42). Started (~0.25 of Action Done) ACTION 6: (PROMOTE FEDERAL INCENTIVES): CECAP Implementation Plan | BEE.8: Establish incentive programs as permitted by existing authority regarding the construction of high-efficiency buildings and the renovation of existing buildings, including the implementation of energy efficiency and electrification measures. STATUS NOTES: County staff are actively monitoring incentives that may become available with funding through federal grants such as the Inflation Reduction Act, or incentive programs in other localities that are proving effective. Staff will continually monitor and research appropriate places to introduce incentive programs to enhance the construction and renovation of high -efficiency buildings and work to connect building owners, organizations, or associations with incentive programs. (For education and outreach beyond incentive promotion, please see Strategies 37 - 42). Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 2.25 of 4 Actions (56%) 31. Incentives for Solar and Other Renewables 3 (Lead), 2, 5 Continuous n/a ES.2, ES.4, (ES.5), ES.6, ES.10, ES.11, Action Status Actions ACTION 1 (SOLAR PERMIT FEE WAIVER & TAX EXEMPTION): CECAP Implementation Plan | ES.11: Maintain and extend county practices that reduce costs related to solar installation, such as the permit fee waiver and the solar energy equipment tax exemption . 85 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Fully Active (1 Action Done) STATUS NOTES: The county currently waives permit fees for solar installation and provides solar energy equipment tax exemptions at the local level. Significant Progress (~0.75 of Action Done) ACTION 2: (GROUP PURCHASE SOLAR PROGRAMS): CECAP Implementation Plan | ES.4: Encourage and facilitate group purchases of renewable energy systems to home and businesses to reduce the costs of those systems to the customer . STATUS NOTES: Fairfax County continues to promote Local Energy Alliance Program (LEAP)’s annual Solarize campaign that provides access to preapproved solar installers who install solar systems at a bulk discount for homes, non-profits, or businesses. To date, the Solarize program has resulted in the installation of solar panels at 425 homes in Fairfax County. Additionally, Fairfax County promotes Solar United Neighbors, a national nonprofit that offers the opportunity for competitive pricing on solar panels and the new Capital Area Solar Switch co-op provides residents with information, technical assistance, and direct access to qualified installers. To date, Capital Area Solar Switch has facilitated the installation of solar panels for 10 homes in Fairfax County. The establishment of a VPPA in 2023-2024 by the county may further facilitate group purchases of renewable energy. (For education and outreach about solar beyond incentive promotion, please see Strategies 37 - 42). Started (~0.25 of Action Done) ACTION 3: (PROMOTE SOLAR RECs): CECAP Implementation Plan | ES.6: Encourage the purchase and use of renewable energy certificates (RECs) as a method to incentivize the installation of renewable electricity-generating systems in the private sector. STATUS NOTES: OEEC published a news article on RECS in August 2023: Renewable Energy Credits 101: Green Energy for Renters and Homeowners | Office of Environmental and Energy Coordination (fairfaxcounty.gov). Additionally, OEEC discusses RECS with Green Business Partners. (For education and outreach beyond incentive promotion, please see Strategies 37 - 42). Started (~0.25 of Action Done) ACTION 4: (PROMOTE FEDERAL SOLAR INCENTIVES): CECAP Implementation Plan | ES.2 : Support accelerated electric grid transformation beyond the renewable energy requirements set forth in the VCEA. CECAP Implementation Plan | ES.10: Support continuation of federal tax credits for solar installations and support proposed state tax credits. STATUS NOTES: The county acts within its authority to support accelerated grid transformation. The county continues to support and promote tax credits for solar installations, including those associated with the federal Inflation Reduction Act of 2022. (For education and outreach beyond incentive promotion, please see Strategies 37 - 42). Other similar actions are listed here for reference. OTHER RELATED ACTIONS: CECAP Implementation Plan | ES.5: Legislative authority for community solar. Please see Strategy 17 – State-level Actions for Solar, Renewables, and Energy Efficiency, which can be found in Group 1. CECAP Implementation Plan | BEE.6, BEE.8, ES.2, ES.7, T.11: Green Bank. Please see Strategy 12 – Green Bank for Emissions Reduction, which can be found in Group 1. (Actions Relating to Education and Outreach on Climate) Please see Strategies 37-42. 86 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Strategy Status Strategy21 Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 2 of 4 Actions Done (50%) 32. Incentives for Transportation: Electric Vehicles 3 (Lead), 5 Continuous n/a T.1, T.2, T.3, (T.13). BEE.10, n/a Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: (CHARGE UP FAIRFAX): CECAP Implementation Plan | T.2: Encourage EV adoption by partnering with homeowner and condominium associations to facilitate and provide incentives for the installation of shared EV charging stations. STATUS NOTES: On March 9, 2023, after a period of detailed research, contractor and procurement logistics, and program development, OEEC launched the Charge Up Fairfax pilot program. Charge Up Fairfax helps community associations, like homeowner associations, condominium associations, and cluster communities, access charging for electric vehicles (EVs). The program supports community associations in identifying and overcoming challenges, both technical and financial, to on-site EV charging for residents and their guests. As of January 2024, OEEC is working with 10 communities in the pilot program and plans to launch the program fully in spring 2024. The county has promoted Charge Up in several avenues including the county’s Consumer Connection program, an on-demand Charge Up Fairfax Webinar, OEEC’s newsletter, social media, direct outreach to over 60 communities, distributed promo kits to all supervisor offices, through media inquiries, a published article, and several earned media stories. Steady Progress (~0.5 of Action Done) ACTION 2: (EV PERMITTING): CECAP Implementation Plan | T.3: Streamline existing permitting and inspection processes for EV infrastructure and consider fee reductions or waivers. STATUS NOTES: In September 2022, the Board of Supervisors adopted a policy to temporarily waive the fees associated with the installation of electric vehicle charging stations (EVCS). The updated policy and additional information on installing EVCS are available on the LDS EVCS permits website. The BOS is considering whether to extend this policy. (Group 3 spreads the word on this incentive. For policy updates to the incentive itself, please see Strategy 28 – Emissions Reduction: Zoning Ordinance and Other County Code Updates, which can be found in Group 2. ). Steady Progress (~0.5 of Action Done) ACTION 3: (PROMOTE UTILITY PROGRAMS FOR EVs): CECAP Implementation Plan | BEE.1022: Promote and leverage ratepayer-funded utility programs … . STATUS NOTES: Dominion Energy has incentive programs for residential and non-residential EV charging stations. Fairfax County promotes these and other utility-led incentive programs. (For education and outreach about EVs beyond incentive promotion, please see Strategy 38 – Education on Emissions Reduction). 21 Strategies with a star were identified as priority strategies in their respective plans. 22 This implementation actions as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 87 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 4: (PROMOTE TAX INCENTIVES FOR EVS): CECAP Implementation Plan | T.123: Continue and expand public outreach regarding … federal and state tax incentives regarding EVs and EVSE (…). STATUS NOTES: OEEC’s Carbon Free Fairfax program provides resources, webinars, and campaigns promoting EV adoption including information on tax incentives. (For education and outreach about EVs beyond incentive promotion, please see Strategy 38 – Education on Emissions Reduction). Other similar actions are listed here for reference. OTHER RELATED ACTIONS: CECAP Implementation Plan | T.13: Legislative authority for EV incentives. Please see Strategy 19 – State-level actions for Transportation, which can be found in Group 1. CECAP Implementation Plan | BEE.6, BEE.8, ES.2, ES.7, T.11: Green Bank Please see Strategy 12 – Green Bank for Emissions Reduction, which can be found in Group 1. CECAP Implementation Plan | T.3, T.4, T.5, T.18, : (Various permitting processes and policies for EVs) Please see Strategy 28 – Emissions Reduction: Zoning Ordinance and Other County Code Updates, which can be found in Group 2 . CECAP Implementation Plan | T.1: Public outreach and engagement regarding transportation topics, including federal and state tax incentives regarding EVs and EVSE (…) Please see Strategy 38 – Education on Emissions Reduction. Strategy Status Strategy24 Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 1 of 2 Actions Done (50%) 33. Incentives for Transportation: Bicycling and Pedestrian Incentives 3 (Lead), 2, 5 Continuous n/a T.1, T.17, Action Status Actions Significant Progress ACTION 1: (BIKE RACKS AND BIKE SHARING): CECAP Implementation Plan | T.17: Promote bicycle usage by installing more bike racks and bike sharing facilities in commercial areas and transit stations. STATUS NOTES: The county promotes, requires, and includes bicycle parking for commercial areas and transit stations. FCDOT implements bicycle parking through the rezoning process and during site planning. A link to the interactive map of bike rack locations in Fairfax County is 23 This implementation actions as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 24 Strategies with a star were identified as priority strategies in their respective plans. 88 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates (~0.75 of Action Done) also available on their website. Secure bike rooms are available at several Metrorail Stations and Park & Ride locations , and FCDOT offers periodic promotional membership discounts. FCDOT has installed Capital Bikeshare throughout the county with 77 stations curre ntly in Merrifield, Reston, and Tysons. In 2024, more than a dozen new stations will be installed around the Franconia/Springfield, Innovation, and Huntington Metro Stations. (This action is about incentives. For education and outreach about active transportation, please see Strategy 38 – Education on Emissions Reduction). Started (~0.25 of Action Done) ACTION 2: CECAP Implementation Plan | T.125: Continue and expand public outreach regarding (...) biking, walking, and micromobility options. STATUS NOTES: FCDOT continues to promote all commuter options including biking and walking to residents and employers within Fairfax County via outreach and education on the County’s transit routes as well as its bikeways and trails system. These options are promoted as primary commute options or as viable first-last mile modes to support their primary choices of commuting. There are opportunities to expand awareness of these incentives. (This action is about incentives. For education and outreach about active transportation, please see Strategy 38 – Education on Emissions Reduction). Strategy Status Strategy26 Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 1.25 of 2 Actions Done (63%) 34. Incentives for Transportation: Transit 3 (Lead), 5 Continuous n/a T.1, T.15 n/a Action Status Actions Significant Progress (~0.75 of Action Done) ACTION 1: REDUCED FARES: CECAP Implementation Plan | T.15: Create reduced or no-fare programs for disadvantaged categories (e.g., low- income, seniors, and students, as well as 3-, 5-, or 12-month transit passes at discounted prices to incentivize public transit ridership. STATUS NOTES: The Fairfax Connector transit system provides discounts to seniors, people with disabilities, and free service to high school and middle school students. In April 2023, Fairfax Connector launched a board-approved pilot half-fare program for low household income passengers that is paid for with grant funding awarded by the Virginia Department of Rail and Public Transportation (DRPT) . FCDOT is working with NCS and OPEH to help ensure the program reaches low-income County residents. TOPS card users automatically qualify. The pilot program is slated to end on July 31, 2026. Information on Fairfax Connector current fares and policies are available on their website. FCDOT staff 25 This implementation actions as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 26 Strategies with a star were identified as priority strategies in their respective plans. 89 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates presented to the Board’s Transportation Committee in September 2022 in regard to free bus fares for all riders. The Board will continue to study this issue and determine what may be appropriate for the county. Steady Progress (~0.5 of Action Done) ACTION 2: PROMOTION OF TRANSIT INCENTIVES: CECAP Implementation Plan | T.127: Continue and expand public outreach and engagement regarding … incentives regarding … public transit and commuter options and services (…). STATUS NOTES: FCDOT continually promotes public transit and commuter options within the County and provides incentives through implementation of transit and commuter benefits programs through its employer outreach efforts. Since 20 , FCDOT’s “SmartBenefits® Plu$50” [read: Plus 0] incentive program has been used to encourage businesses to establish transit subsidies by providing a pre -loaded $50 SmarTrip® card as an incentive to each of their staff that registers for that company’s program. Additionally, OEEC has a sustainable transportation page that promotes the county’s public transit and commuter service progr ams here: Sustainable Transportation | Office of Environmental and Energy Coordination (fairfaxcounty.gov). (This item is about incentives. For education and outreach beyond incentive promotion, please see Strategy 38 – Education on Emissions Reduction). Roll-up Status Roll-up Started 6.25 of 13 Actions Done (48%) Roll-up: Aid and Risk-Reduction Services for Communities Strategy Status Strategy28 Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 4.25 of 7 Actions Done (64%) 35. Community Aid and Services to Alleviate Resilience Needs 3 Continuous CRC.2a, CRC.2d n/a n/a Resilient Fairfax | CRC.2a: Provide Community Aid and Services to Alleviate Resilience Needs Lead: OEEC (Facilitator). Partners: CSB, DEMS, DFS, DHCD, DPWES, FCHD, FCPA, FCPS, NCS, NVSWCD, One Fairfax. Timeline: Ongoing. Cost: $$ ($100k - $500k). Existing Staff: Partial. Description: Vulnerable populations will be disproportionately impacted by climate change. There are many existing county resources 27 This implementation action as originally written covered multiple topics. For clearer progress tracking, each topic has been extracted and placed in its applicable strategy group. 28 Strategies with a star were identified as priority strategies in their respective plans. 90 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates that can help. However, many residents are unaware of these resources, do not know how to request services, or are hesitant t o access aid. Populations experiencing homelessness may be especially exposed and in need of aid. This strategy focuses on communit y engagement to better connect residents to existing resilience-related support and resources, and to continue the identification of unmet needs. Meaningful engagement should center on trad itionally under-served populations, expanding the work of Equity Impact Plans and One Fairfax. This strategy includes identification of community -based partners and community-specific needs, identification of pressing needs, and enhancing and streamlining access to aid from multiple county departmen ts. This strategy will support improved preparedness and resilience of the county’s more vulnerable populations. (For education and guidance, please see strategy CRC.2b). (Please see Resilient Fairfax Plan pages 61-62 for more detail). Action Status Actions29 Significant Progress (~0.75 of Action Done) ACTION 1 (ESTABLISH WORKING GROUP): Resilient Fairfax | CRC.2a: Launch an implementation group responsible for this program. The group should leverage partners from the Resilient Fairfax planning process, and should include county agencies, community -based organizations, and community leaders who hold existing trust with vulnerable populations in Fairfax County. STATUS NOTES: This action item is fulfilled in two ways. For county agencies, Group 3 of the Interagency Climate team is composed of all agencies who provide relevant services and aid to the population. In addition to Group 3, there is an external Community Advi sory Group (CAG) that is composed of residents of each Supervisor District, non-profit organizations, advocacy organizations, and other community leaders. This action item is listed as “significant progress” ( bars) rather than “complete/active” ( bars) because there is still room f or improvement in maximizing the potential of these groups. Steady Progress (~0.5 of Action Done) ACTION 2 (ESTABLISH INCLUSIVE ENGAGEMENT PROGRAM): Resilient Fairfax | CRC.2a: Work collaboratively to develop a climate resilience community engagement program, using the county's Inclusive Community Engagement Framework (ICEF).Identify how best to connect neighborhoods, residents, outdoor workers, and other vulnerable groups with e xisting county aid and resources. Work with community leaders, CSB, NCS, DFS, DEMS, FCHD, OPEH, NCS, and others to help ensure that awareness of available county aid is equitably reaching communities of color and low-income, older adult, unhoused, disabled, outdoor workers, and other under-served residents. STATUS NOTES: The Resilient Fairfax planning and implementation processes have both involved intensive community engagement (e.g., the Community Advisory Group) with a foundation in equitable engagement, in alignment with One Fairfax. Additionally, the Extreme Heat Stakeholders orkgroup’s engagement of community members experiencing homelessness was centered on equitable engagement. There are continued opportunities for this engagement, and creation of a formal engagement program using the ICEF. Significant Progress (~0.75 of Action Done) ACTION 3 (IDENTIFY TOP FLOODING-RELATED NEEDS): Resilient Fairfax | CRC.2a: Building upon the results of the Vulnerability and Risk Assessment and concurrent county initiatives such as the Flood Risk Reduction Plan (Strategy CRC.3a), identify specific, pres sing climate- related needs of t e county’s vulnera le neig or oods suc a s areas of recurrent flooding. STATUS NOTES: The county’s top flooding vulnerabilities, locations of most severe flooding, causes of flooding issues, and change in flooding due to climate change are well documented through multiple analyses, including analyses done by DPWES and those associated with Resilient Fairfax (see Resilient Fairfax Vulnerability and Risk Assessment, Resilient Fairfax Interactive Map Viewer, ANALYZING FLOOD RISK IN FAIRFAX 29 The actions listed here have been edited slightly from their original version in the Resilient Fairfax plan for greater clarity. No content has been removed. 91 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates COUNTY (arcgis.com). Currently, an interagency team led by DPWES and LDS are modeling precipitation change in climate, (which includes climate projection data from Resilient Fairfax and MARISA), and what that means for stormwater design and policy. (This action is about assessing community needs. For the Flood Risk Reduction Plan and related land use policies, please see Strategy 21, which can be found in Group 2.) Significant Progress (~0.75 of Action Done) ACTION 4 (IDENTIFY TOP HEAT-RELATED NEEDS): Resilient Fairfax | CRC.2a: Building upon the results of the Vulnerability and Risk Assessment and concurrent county initiatives such as the Heat Emergency Workgroup, identify specific, pressing climate-related needs of the county’s vulnera le neig or oods suc as areas of extreme eat exposure. STATUS NOTES: The Resilient Fairfax Vulnerability and Risk Assessment, NASA Develop Urban Heat Island Analysis, Resilient Fairfax Interactive Map Viewer, and stakeholder engagement conducted during the Resilient Fairfax planning process identified specific heat -related needs, projections, and areas of top heat exposure in Fairfax County. Building upon this work, an extreme heat stakeholder’s workgroup, composed of county staff, homeless service providers, faith community leaders and advocates, conducted a survey of unsheltered residents about their needs during extreme heat conditions. The workgroup developed reco mmendations to enhance the county’s response in four areas: communications and outreach, transportation, county infrastructure and response, and supplies and distribution. (This action is about identification of needs. For information about meeting those needs, please see the action below). Significant Progress (~0.75 of Action Done) ACTION 5 (ACCESS TO HEAT-RELATED SERVICES): Resilient Fairfax | CRC.2a: Streamline and facilitate access to existing climate hazard-related resources and assistance from numerous departments such as: air conditioning assistance during extreme temperatures (DFS), en ergy efficiency and other building improvements for enhanced resiliency (HCD, OEEC), cooling centers and other sites that serve as places to stay cool (NCS, DEMS), and/or health and human services that can also enhance resilience to climate hazard effects (CSB, DFS, FCHD, NCS). Produce easy-to-understand, multi-lingual guides to help residents understand what aid is available and how to access it. Provide centralized physical and virtual locations for climate hazard related resources. Resilience hubs (Strategy CRC.1b) could potentially s erve this purpose. STATUS NOTES: OEEC is working with Interagency Climate Team Group 3 (Community Services , Education, Engagement, and Incentives) to streamline and facilitate access to existing extreme heat-related services. Air conditioning assistance (DFS Energy Assistance): DFS received 1,450 applications for Cooling Assistance in 2023. Cooling Centers: Protocols and services for Cooling Centers were significantly enhanced in 2023. In the Spring of 2023, a robust public outreach campaign was launched to encourage unshelt ered residents to sign up for Fairfax Alerts and inform them about available county resources. One of the communications and outreach strategies was to designate 47 facil ities as cooling centers. Free transportation was provided to cooling centers and supplies were distributed at these centers for residents in need. A cooling center finder application was developed to include a searchable, interactive mapping application to locate public facilities available for anyone to visit during extreme heat emergency days. A short video was created to help individuals use the application to locate cooling centers within Fairfax County. Information about the cooling centers were included in a NewsCenter article, Webpage, flyers in eight languages, as well as Fairfax Alerts. More than 27,000 total supplies were distributed at 62 county cooling centers and community partner sites. Additionally, Cooling Centers now include flyers letting community members know about other services, including those offered by DFS. Multi-lingual guides of services: There existing flyers with information on extreme heat resources and on DFS programs. An ongoing Group 3 task is to create a guide to all heat-related services in an easy-to-understand format. 92 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 6 (HEAT WARNING SYSTEM): Resilient Fairfax | CRC.2d: Expand Heat Warning System: Promote early warning system to warn community members of upcoming heat events. Explore tiered warning system approach for heat. Promote and leverage existing Fai rfax Alerts, National Weather Service, and other warning systems. STATUS NOTES: Surveys of community members, including those experiencing homelessness, have confirmed that the vast majority own cellular phones and receive heat emergency warnings. In addition to National Weather Service warnings, Fairfax Alerts provides warnings to community members. However, there are currently discussions in the climate, weather, and emergency preparedness communities about the need to better message the severe danger of extreme heat. One proposal (worldwide) is to potentially name extreme heat events in a similar way that hurricanes are named, given the higher mortality rate of extreme heat events. Started (~0.25 of Action Done)) ACTION 7 (ACCESS TO FLOODING & STORM-RELATED SERVICES): Resilient Fairfax | CRC.2a: Streamline and facilitate access to existing climate hazard-related resources and assistance from numerous departments such as: flood mitigation assistance (DPWES), energy resilience for frequent power outages, relocation for repetitive loss properties (DPWES), and/or health and human services that can also enhance resilience to climate hazard effects (CSB, DFS, FCHD, NCS). Produce easy-to-understand, multi-lingual guides to help residents understand what aid is available and how to access it. Provide centralized physical and virtual locations for climate hazard related resources. Resilience hubs (Strategy CRC.1b) could potentially serve this purpose. STATUS NOTES: Several county agencies currently provide and promote flooding and storm -related services. However, many of these services and presentations are on a request-only basis. There is a lower-than-ideal level of awareness among residents of the services that are available, especially among socioeconomically vulnerable residents. There are opportunities to expand promotion and awareness of these services. Interagency Climate Team – Group 3 is collaborating across agencies to expand this awareness of and access to flooding and storm -related services. (This action is about services for residents. For information about the Flood Risk Reduction Plan and related land use policies, please see Strategy 21, which can be found in Group 2.) 93 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Strategy Status Strategy30 Groups Completion Resilient Fairfax CECAP IP OES Started 2 of 6 Actions Done (33%) 36. Resilience Hubs 3, 5 2027 CRC.1b n/a n/a Resilient Fairfax | CRC.1b: Pursue Development of a Network of Resilience Hubs in Climate -Vulnerable Areas of the County Lead: OEEC. Partners: DEMS, DFS, DPD, DPSC, DPWES, FCHD, FCPA, FCPA, FMD, GIS, HCD, LDS, NCS, OCA, One Fairfax. Timeline: Medium-term (2-5 years). Cost: $$$ ($500k - $1 million). Existing Staff: Partial. Description: Resilience hubs are community-serving facilities (often existing facilities) that distribute and centralize information and resources, connect residents to county assistance, support residents’ resilience to climate events , and build community capacity and connection. These facilities are sometimes upgraded to enhance their physical resilience to climatic effects, to ensure continuity of service during climate hazards. Resilience hubs are typically located in existing facilities that are trusted by community members, such as recreati on centers, community centers, libraries, non-profit facilities, or faith centers. On a day-to-day basis, hubs function as a space for community gathering or events, location for training, and as a centralized place for community members to seek resources. Resilience hubs are most effective when there is strong partnershi p between the local government (the county) and community organizations and/or networks; resilience hubs should be commu nity-led and community-serving. This strategy will explore options for development of a network of resilience hubs in the areas of Fairfax County, with a prioritization for are as with the greatest need and that are most vulnerable to climate change impacts. Resilience hubs should not be confused with “shelter” facilities, which follow specific emergency management protocols and plans. Resilience hubs help to build greater community connections and enhanced capacity to adapt and respond to climate related events. (Please see Resilient Fairfax Plan pages 59-60 for more detail). Action Status Actions Significant Progress (~0.75 of Action Done) ACTION 1 (IDENTIFY AREAS OF GREATEST NEED): Resilient Fairfax | CRC.1b: Identify areas of the county where there is the greatest need and greatest benefit for resilience hubs. Utilize data sources such as Resilient Fairfax, One Fairfax data, Adaptation Action Are as, and others to determine these locations. STATUS NOTES: Locations in Fairfax County with greatest need and benefit for Resilience Hubs have been mapped based on heat vulnerability, flood vulnerability, and socioeconomic vulnerability. An interagency team is working to finalize the maps. Steady Progress (~0.5 of Action Done) ACTION 2: (INVENTORY FACILITIES): Resilient Fairfax | CRC.1b: Inventory existing network of centers that could serve as "resilience hubs." Prioritize trusted locations within community, such as community centers (NCS), recreation centers (FCPA), places of worship, and non-profit facilities that provide essential services to t e community. Coordinate wit DEMs' identification of places to stay cool and EEC’s E C (Energy Service Company) work. 30 Strategies with a star were identified as priority strategies in their respective plans. 94 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates STATUS NOTES: OEEC has compiled a list of potential Resilience Hub sites based on numerous criteria and is coordinating Resilience Hub considerations with Capital Facilities and ESCO work, along with other initiatives, such as Cooling Center initiatives and the “Solar Sanctuaries” initiative led by faith communities. Started (~0.25 of Action Done) ACTION 3: (SITE ANALYSES): Resilient Fairfax | CRC.1b: Compile site information to support evaluation of location for resilience hub. Consider building condition, location, transportation and access, site capacity, key climate hazards impacting that community , planned and/or required retrofits, typical operations and staffing, and other needs as identified by the community. STATUS NOTES: This action item was initiated in support of OEEC’s EPA grant application for Resilience Hub funding, which was denied. OEEC is pursuing alternative methods of implementation, such as through the ESCO process. The ESCO process also involves intensive si te analyses. Started (~0.25 of Action Done) ACTION 4: (OUTREACH): Resilient Fairfax | CRC.1b: Conduct outreach to community organizations, nonprofits, faith groups, or other community serving groups in identified areas (CRC.2a) to begin county-community collaboration on the visioning of a resilience hub network in the community. STATUS NOTES: OEEC is in close collaboration with faith communities on the Resilience Hub/ Solar Sanctuaries initiative, particularly through partnership with Faith Alliance for Climate Solutions. Numerous faith communities have been identified as potential Resilience Hubs/ Solar Sanctuaries. Started (~0.25 of Action Done) ACTION 5 (PILOT SITE): Resilient Fairfax | CRC.1b: Identify a pilot resilience hub location and work with facility managers and community partners to build out community resilience offerings. STATUS NOTES: In 2023, the Office of Environmental and Energy Coordination (OEEC) and partners Northern Virginia Soil and Water Conservation District, Virginia Climate Center (GMU), Faith Alliance for Climate Solutions, and Rising Hope Mission Church applied for a $1 million EPA grant to pursue three pilot Resilience Hubs in Fairfax County. As part of the application process, significant analyses and preparation were conducted. Unfortunately, Fairfax County was not awarded EPA funding. As of late 2023, staff are now exploring alternative sources of funding for a pilot resilience hub. Several different entities have expressed interest or a willingness to be part of a Resilience Hub pilot, including FCPA’s Rec Centers, Faith Alliance for Climate Solutions member facilities, or facilities that are being upgraded anyway as part of the ESCO process. Not Started (0) ACTION 6 (NETWORK OF HUBS): Resilient Fairfax | CRC.1b: Evaluate potential network of resilience hubs, with priority consideration to identified areas in CRC.2a and in collaboration with community partners. Consider staffing and funding needs for resilience h ub implementation. As appropriate, explore establishing working groups for each resilience hub location. STATUS NOTES: This is a future item. 95 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status Roll-up Started 6.75 of 17 Actions Done (40%) Roll-up: Education and Workforce Development for Communities Strategy Status Strategy31 Groups Completion Resilient Fairfax CECAP IP OES Started 2.75 of 7 Actions Done (39%) 37. Education on Climate Resilience, General 3 2027 CRC.2b n/a n/a Resilient Fairfax | CRC.2b: Launch a Climate Resilience Education and Guidance Program Lead: OEEC. Partners: DCC, DEMS, DFS, DPWES, FCPA, FCPS, FCHD, HCD, LDS, NCS, NVRC, NVSWCD, One Fairfax. Timeline: Medium-Term (2-5 years). Cost: $$ ($100k - $500k). Existing Staff: Partial. Description: To be successful, climate adaptation and resilience strategies require local community awareness, understanding, buy-in, and participation. Climate resilience education for the community should include guidance documents and resources for var ious climate-related topics such as emergency preparedness, flood mitigation, natural resource resilience, and energy resilience, among others. Education may include resources on introductory concepts of climate change, such as background on climate science and impacts on public hea lth and safety. All educational materials will be customized for the intended audience, and their needs, to ensure materials are translated, relatable, relevant, u nderstandable, and accessible (Please see Resilient Fairfax Plan pages 63-64 for more detail). Action Status Actions Significant Progress (~0.75 of Action Done) ACTION 1: (ENGAGE KEY PARTNERS): Resilient Fairfax | CRC.2b: Identify and engage key partners for a climate resilience education campaign, including local schools (Get2Green), community-based and environmental organizations, county departments, libraries, homeowners' associations, and other partners with existing community education programs such as OPA, FCPA, NCS, DEMS, DPWES, and NVSWCD. Engage with community leaders and residents to increase understanding and tailor educational materials to specific community needs. STATUS NOTES: For internal county agency coordination, Group 3 of the Interagency Climate Team serves this purpose, among other community-focused tasks. The Fairfax Environmental Engagement Team (FEET) also serves this purpose. Group 3 and FEET are coordinated with one another, with FEET serving as a de facto “sub-group” of roup . For coordination with external entities such as non-profits and community groups, the external Community Advisory Group (CAG) serves this purpose. 31 Strategies with a star were identified as priority strategies in their respective plans. 96 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 2 (CLIMATE 101 EDUCATIONAL MATERIALS): Resilient Fairfax | CRC.2b: Develop and deliver Climate Change 101 educational materials to Fairfax County staff and residents to provide background on climate science, climate hazards, climate mitigation , climate adaptation and resilience, and climate impacts on public health and sa fety. STATUS NOTES: OEEC and partner county agencies have provided a range of climate-related educational materials through multiple avenues including trainings, newsletters, handouts, webpages, social media, tabling events, and more Specific examples produced in 2023 include the following: • (For training of county staff on resilience, please see Strategy 9, which can be found in Group 1). • OEEC’s monthly newsletters (Environmental, Climate, and Energy updates) , which has over 1,000 subscribers. • OEEC’s Personal Climate Action presentation for both staff and residents. • OEEC’s Climate Action Checklist for Residents, a user-friendly checklist of actions that community members can take to enhance their resilience and reduce their emissions, complete with links to resources and incentives for each action. • OEEC’s Climate Action Dashboard, which includes data and educational content on resilience, such as temperature trends, flooding information, storm data, resilience-related maps, vulnerability information, and natural resource resilience facts, among other topics. • OEEC and Channel 16’s video about Resilient Fairfax • OEEC and Channel ’s podcast episode about Resilient Fairfax Leveraging Group 3 of the Interagency Climate Team and an existing interagency education-focused group Fairfax Environmental Education Team (FEET), OEEC is currently coordinating various agencies for improved coordination on climate-related education. Steady Progress (~0.5 of Action Done) ACTION 3: (COMMUNITY MEETINGS): Resilient Fairfax | CRC.2b: Host a series of interagency, informational meetings in accessible neighborhood locations throughout the county. Leveraging existing programs and resources from DEMS, DPWES, and other agencies . STATUS NOTES: OEEC hosted dozens of community meetings during the Resilient Fairfax planning process and has continued to provide educational presentations to a range of community groups about climate resilience. Webinars and Lunch-and-Learns, hosted by various county agencies. Examples include OEEC and DEMS’ ebinar on Extreme Heat Resilience in June 202 and DP ES and DEMS’ Flood Awareness Lunch and Learn: Understanding Your Flood Risk in March 2023. Steady Progress (~0.5 of Action Done) ACTION 4: (FLOOD RESILIENCE GUIDANCE): Resilient Fairfax | CRC.2b: Develop and promote existing guidance for flood safety and resilience measures, such as elevating structures or equipment, wetproofing, dry proofing, flood insurance, and small -scale green infrastructure for property owners and operators/landlords. Any assistance will be in alignment with applicable laws and policy. STATUS NOTES: DPWES has existing guidance that covers some of these items . Please see Flood Information | Public Works and Environmental Services (fairfaxcounty.gov). The Interagency Climate Team is working to create consolidated flooding-related resilience guidance, inclusive of information from all relevant agencies. 97 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Started (~0.25 of Action Done) ACTION 5 (HEAT RESILIENCE GUIDANCE): Resilient Fairfax | CRC.2b: Develop and promote guidance on heat safety, such as safe thresholds for outdoor workers, outdoor activities, and youth sports, guidance for those experiencing homelessness during extreme heat, and heat resilience retrofits, such as cool roofs, cool pavements, trees, building orientation and design, and energy efficiency. STATUS NOTES: DEMS has existing guidance that covers some of these items, such as general safety tips during extreme heat. OEEC has started compiling heat resilience guidance to cover the other items listed in the action above. Started (~0.25 of Action Done) ACTION 6 (WIND, STORM, AND ENERGY RESILIENCE GUIDANCE): Resilient Fairfax | CRC.2b: Develop and promote existing guidance for severe storm, wind, and energy resilience (power outage prevention) retrofits, such as solar plus storage, back -up power, infrastructure hardening, tree trimming to prevent tree falls on power lines, and pre-storm actions. STATUS NOTES: DEMS has existing guidance that covers some of these items, such as general storm preparedness. OEEC has started compiling storm resilience guidance to cover the other items listed in the action above. Scheduled to Start (0) ACTION 7: (AGRICULTURAL RESILIENCE GUIDANCE): Resilient Fairfax | CRC.2b: Connect local farmers and landowners to education and funding opportunities for regenerative and resilient agricultural practices. STATUS NOTES: OEEC is coordinating with NVSWCD, who have an existing working group focused on climate resilience for agriculture and food systems in Fairfax County. (For regenerative agriculture, please see Group 4). Strategy Status Strategy32 Groups Completion Resilient Fairfax CECAP IP OES Steady Progress 2.75 of 5 Actions Done (55%) 38. Education on Emissions Reduction 3 Continuous n/a BEE.1, ES.1, ES.2, T.1, W.2, W.3 n/a Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: (CARBON FREE FAIRFAX): CECAP Implementation Plan| BEE.1, ES.1: Develop and implement a broad- ased community … education campaign to reduce greenhouse gas emissions (i.e., take climate action). STATUS NOTES: Carbon Free Fairfax: Carbon-Free Fairfax is the public education and outreach component to advance CECAP goals and strategies across all sectors. OEEC has developed resources and events under the Carbon-Free Fairfax umbrella, including information on energy audits, actions to reduce energy use at home, going solar, switching to an electric vehicle, and adopting other sustainable forms of 32 Strategies with a star were identified as priority strategies in their respective plans. 98 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates transportation. These education campaigns have included webinars, informational materials in multiple languages, checklists, social media campaigns, and videos. Significant Progress (~0.75 of Action Done) ACTION 2: (GET 2 GREEN): CECAP Implementation Plan| BEE.1, ES.1: Develop and implement a broad- ased community … education campaign to reduce greenhouse gas emissions (i.e., take climate action). … Fairfax County Public Schools Get2Green Program: Continue and expand equitable access to environmental stewardship opportunities for FCPS students and staff with the goal of reducing envi ronmental impact and developing students as ethical and global citizens. STATUS NOTES: Get2Green: The Fairfax County Public Schools Get2Green Program was formed in 2009 and its website https://get2green.fcps.edu launched in 2016. It is the environmental stewardship program for public schools. In 2023, the program was significantly expanded, with the addition of 1 Educational Specialist, 1 School Support Specialist, and 4 Resource Teachers on the Get2Green team. In addition to team expansion, there are over 270 Get2Green Leaders in all 200 schools across the division. Each school was permitted to choose between 1-3 Leaders that will be compensated for their time. Each school is required to complete an audit of environmental stewardship within their school building or campus. As a result of the audit data the Leaders and students will design an act ion plan that will take place in the spring semester. The Leaders must complete professional development, covering a range of topics from winter crops to energy and waste reduction. Get2Green staff are coordinating with other county agencies through Interagency Climate Team groups. There may be an opportunity to leverage other community resources to enhance program operation (e.g., Eco -Schools, Eco-Teams). Steady Progress (~0.5 of Action Done) ACTION 3 (TRANSPORTATION EDUCATION): CECAP Implementation Plan | T.1: Continue and expand public outreach and engagement regarding transportation topics, including federal and state tax incentives regarding EVs and EVSE, public transit and commuter options and services, and biking, walking, and micro-mobility options. STATUS NOTES: Fairfax County Department of Transportation (FCDOT) provides numerous education and outreach activities to promote public transportation and alternative commuting options. FCDOT also engages the community in developing plans and implementing progr ams. FCDOT is leading the Active Fairfax Plan, focused on improving and expanding the pedestrian and bike networks throughout the coun ty. Extensive public outreach is a major component of this planning effort. OEEC’s Carbon Free Fairfax program promotes alternati ve and public transportation through website content and information materials in multiple languages. In addition, it provides resources, webinars and information promoting EV adoption highlighting the available incentives. (This item is about education. For incentives, please see Strategy 32). Steady Progress (~0.5 of Action Done) ACTION 4 (RENEWABLE ENERGY EDUCATION): CECAP Implementation Plan | ES.2 : Support accelerated electric grid transformation beyond the renewable energy requirements set forth in the VCEA. The county will … support renewa le energy installations t roug … expanded education and outreach. STATUS NOTES: Fairfax County continues to promote the Local Energy Alliance Program (LEAP’s) annual Solarize Virginia campaign that provides access to preapproved solar installers who install solar systems at a bulk discount for homeowners, nonprofits, or business owners. Additionally, the county promoted Solar nited eighbors’ Capital Area Solar Switch program which also offers residents infor mation, technical assistance, and direct access to qualified solar installers. OEEC co-hosted an informational webinar for each program in summer 2023 and produced a series of videos addressing common myths about solar energy and featuring testimonials from Fairfax County residents who have gone solar. OEEC also created informational resources on solar energy in multiple languages. (This item is about education. For incentives, please see Strategy 31, Actions 1-4). 99 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Steady Progress (~0.5 of Action Done) ACTION 5 (WASTE EDUCATION): CECAP Implementation Plan | W.2: Continue the development and delivery of community outreach and education for 5Rs (Refuse, Reduce, Reuse, Repurpose, Recycle), as well as potential avenues for county support of individual actions regarding 5Rs, including targeted languages. CECAP Implementation Plan | W.3: Continue and expand a broad-based community outreach and education campaign (on waste reduction). STATUS NOTES: DPWES staff have continued their waste reduction education and outreach activities with an emphasis on messaging that is consistent with CECAP implementation and will evaluate opportunities to expand education in target languages. Other similar actions are listed here for reference. OTHER RELATED ACTIONS: Operational Energy Strategy | Reporting and Collaboration: Action 2: Maintain and update county webpages highlighting accomplishments in emissions reductions, energy efficiency, and conservation. Please see Strategy 73 – Tracking of Emissions Reduction Progress, which can be found in Group 6. (Actions Relating to Incentives for Energy Efficiency, Renewable Energy and Transportation) Please see Strategies 29-34. Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 0.5 of 2 Actions Done (25%) 39. Education on Natural Resources (both resilience & emissions reduction) 3 Continuous n/a NR.1, NR.2, BEE.5 n/a Action Status Actions Steady Progress (~0.5 of Action Done) ACTION 1: EDUCATION ON CLIMATE BENEFITS OF GREEN SPACES AND TREES: CECAP Implementation Plan| NR.1: Continue development and delivery of pu lic outreac education campaigns on t e enefits of green spaces and trees “ R ” expanding program to m ore advanced topics. CECAP Implementation Plan| NR.2: Continue and expand a broad-based community outreach and education campaign to reduce greenhouse gas emissions. STATUS NOTES: The many education programs from NVSWCD, DPWES-Urban Forestry, Fairfax County Park Authority (ParkTakes and Nature Center Programs), and other community outreach programs have continued. There are opportunities for interagency collaboration to add more climate-specific content to natural resource education. Scheduled to Start (0) ACTION 2: EDUCATION ON REGENERATIVE DESIGN: CECAP Implementation Plan| BEE.5: Incorporate biophilic and regenerative design principles such as green roofs into the construction or renovation of buildings to improve occupant health and comfort and pr ovide co- benefits including improved air quality, stormwater management, and reductio ns to heat island effect areas (education component). 100 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates STATUS NOTES: The DCEX of Planning and Development has reached out to Terreform, a national firm focused on biophilic and regenerative design principles, to explore education opportunities. (This action is about education. For green infrastructure implementation, please see Strategy 46 (Green Infrastructure), in Group 4 (Natural Resources). Strategy Status Strategy Groups Completion Resilient Fairfax CECAP IP OES Started 0.75 of 3 Actions Done (25%) 40. Workforce Development & Business Start-ups 3 (Lead), 5 Continuous CRC.2c BEE.15, BEE.18 n/a Action Status Actions Started (~0.25 of Action Done) ACTION 1: Support Resilience-Related Workforce Development: Resilient Fairfax | CRC.2c: Pursue workforce development initiatives to develop resilience-related construction and contracting skillsets, such as pervious paver installation, solar -plus-storage installation, green infrastructure installation, and other skillsets. STATUS NOTES: Fairfax County, in partnership with the Water Environment Federation (WEF), DC Water and other national jurisdictions, crafte d the National Green Infrastructure Certification Program (NGICP). The program targets maintenance personnel who work specifically on green infrastructure and sets national certification standards for the construction, inspection, and maintenance of GI. The NGICP t argets the following types of GI facilities: bioretention, permeable pavement, rainwater harvesting, rooftop stormwater management, dry wells, and wetlands. There are opportunities to expand workforce development opportunities in other resilience -related topics such as solar-plus-storage, cool roofs, cool pavements, wind-resilient structures, and more. Started (~0.25 of Action Done) ACTION 2: Support Energy and Electrification Workforce Development: CECAP Implementation Plan | BEE.18 : To expand the skilled workforce needed to provide energy and electrification services locally, support the establishment or strengthening of job tr aining programs through community colleges, non-profit organizations, trade unions, or apprenticeships. STATUS NOTES: The county has conducted some initial research on the institutions and organizations that address workforce needs, including i n energy-related fields, and explored ways to partner with them. DEI and DFS (Department of Family Services) are spearheading a new Work- Based Learning program, which will explore opportunities for skill-building, potentially in the green economy. The EDA is a partner in this effort. Further, the EDA supports the CECAP Implementation Plan through eNewsletters to the business community , a jobs board site, workinnorthernvirginia.com, providing career opportunities, including renewable energy; and by recruiting clean energy relate d businesses to Fairfax County. Additional opportunities to address training gaps and how to best address them to expand the workforce to provide energy and electrification services locally will be explored with EDA and other non-profits or trade unions in future years. 101 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Started (~0.25 of Action Done) ACTION 3: SUPPORT CLEAN ENERGY BUSINESS INCUBATION: CECAP Implementation Plan | BEE.15 : Partner with local educational institutions, such as George Mason University, and neighboring jurisdictions to cultivate and support innovative, incubator o r start-up businesses that provide services in the clean energy sector. STATUS NOTES: (For Green Business Partners, please see Strategy 41). The Fairfax County Innovation Challenge Carbon Neutral Pitch and Pilot occurred in October 2022 with Smart City Works (501(c)(3)). Applicants were urged to propose products or services that either improve energy efficiency, increase the use of renewable electricity, or advance the use of electric vehicles. The winner, a firm providing a web-based estimation of clean energy options for any building identified by an address, is being considered by OEEC for implementation as a pilot project in Fairfax County. If determined suitable, the firm’s product may be piloted in 2024. The county also initiated the first electric/autonomous vehicle (AV) for public use in Virginia. The AV Relay launched in October 2020 and ended in 2023. This was an extensive cooperative effort with other government agencies: Virginia Tech Research Council (VTRC), the Department of Rail and Public Transit (DRPT), and VDOT, as well as private businesses: Dominion Energy and Easy Mile. DEI and OEEC will continue outreach efforts with local educational institutions (GMU, NOVA, FCPS, etc.) to cultivate and support innovative incubator and start-ups in the clean-energy sector. Examples include reaching out to the GMU Institute for a Sustainable Earth: https://ise.gmu.edu/researchthemes/#climate and FCPS’s Innovators' Fund, aimed at connecting the business community with student-led innovative ideas. 102 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status Roll-up Started 2.5 of 7 Actions Done (36%) Roll-up: Community-led Pilot Programs, Partners, and Champions Strategy Status Strategy33 Groups Completion Resilient Fairfax CECAP IP OES Started 1.5 of 4 Actions Done (38%) 41. Green Business Partners and Other Business Engagement 3 (Lead) Continuous n/a BEE.12, BEE.14, BEE.16, ES.12, NR.11, T.21, W.17 n/a Action Status Actions Complete (1 Action Done) ACTION 1 (RE-ESTABLISH GREEEN BUSINESS PARTNERS): CECAP Implementation Plan | BEE.14 : Develop … partnerships between the county and its business communities to encourage and facilitate climate-oriented business practices and mentorships. STATUS NOTES: The county substantially revitalized the Green Business Partners Program with a new webpage, application, program structure and benefits in 2023 to encourage and elevate sustainable businesses in the county. The program launch included a Green Business Partners Forum in March 2023 with 70 participants, 46 unique business and 23 other organizations to include local government, non-profits, and academia. The Forum was extensively marketed to ensure strong participation, and included involvement f rom DEI, EDA, Smart City Works, and business leaders such as B.F. Saul Company Hospitality Group, Hilton, Mars, River-Sea Chocolates, Freddie Mac, and Cox Communications. Started (~0.25 of Action Done) ACTION 2 (IDENTIFY AND CELEBRATE BUSINESS INDUSTRY CLIMATE CHAMPIONS): CECAP Implementation Plan | BEE.16, ES.12, T.21, NR.11, W.17: Identify and recogni e … usiness Climate Champions that accelerate implementation of actions to meet CECAP goals. (…) Identify and cele rate local … usinesses w o ta e meaningful climate action and inspire t ose around t em to do t e same. … Initiate structured discussions in roundta le format meetings wit … usinesses. … STATUS NOTES: Leaders in the Green Business Partners Program are recognized as climate champions within the Fairfax County business community. There is a total membership of 18 businesses (8 Leaders and 10 Members) and 5 Allies as of 12/31/2023 representing a diverse mix of business size and sectors. Staff recommended a change in approach where the Climate Champions Pilot with the hospitality industry will be a part of the Green Business Partners Program. OEEC is collaborating with Channel 16 to produce Leader Spotlight videos that will be showcased on the GBP website; 2 videos are complete and another in production. OEEC is collaborating with the hospitality industry, including Visit Fairfax, 33 Strategies with a star were identified as priority strategies in their respective plans. 103 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates to explore opportunities for an industry-specific pilot in 2024 as part of the Climate Champions (See BEE.17) and will begin work in earnest in the 3rd quarter for FY24. Started (~0.25 of Action Done) ACTION 3 (EXPAND & SUSTAIN GREEN BUSINESS PARTNERS): CECAP Implementation Plan | BEE.14 : … sustain partners ips etween t e county and its business communities to encourage and facilitate climate-oriented business practices and mentorships. STATUS NOTES: This action tracks the membership of the Green Business Partners and activities to expand and sustain membership. Since launching the program on 3/31/2023, The membership total for the Green Business Partner Program since launching on 3/3 1/2023, 18 Members and Leaders have joined the program in addition to gaining 5 Allies. Implementation of program benefits include: educational resources, a membership-only webpage, two webinars (30 participants, excludes webinar support staff), bi-monthly e-newsletter, on-line membership directory, and production of 2 completed Leader Spotlight Videos and 1 in production in collaboration with Channel 16. Staff are seeking consultant support to further grow membership and develop program benefits to also include the Climate Champions Hospitality Sector Pilot. Not Started (0) ACTION 4 (ENCOURAGE ENERGY EFFICIENCY THROUGH GREEN BUSINESS PARTNERS): CECAP Implementation Plan| BEE.12: Encourage building commissioning, recommissioning, and retro-commissioning to ensure that buildings operate as designed and with optimal energy efficiency. … Explore opportunities to educate t e … private sector … . For example, LDS may publish information in their technical bulletins, while OEEC will include outreach and education in the future through the re -launched 2023 Green Business Partners (GBP) (BEE.14). The GBP provides an opportunity to connect with existing industry organizations. (e.g., Building Owners and Managers Association (BOMA), Apt. and Office Building Association of Metropolitan Washington, NAIOP, etc.). STATUS NOTES: Exploration of this action is targeted for 2025-2030. Strategy Status Strategy34 Groups Completion Resilient Fairfax CECAP IP OES Started 1 of 3 Actions Done (33%) 42. Climate Champions and other Community-Led Pilot Programs (other than business sector) 3 (Lead) Continuous n/a BEE.16, BEE.17, ES.2, ES.12, ES.13, NR.11, NR.12, T.20, T.21, W.16, W.17 n/a Action Status Actions Started ACTION 1: (INDIVIDUAL CLIMATE CHAMPIONS): CECAP Implementation Plan | BEE.16, ES.12, T.21, NR.11, W.17: Identify and recogni e … individual … Climate C ampions t at accelerate implementation of actions to meet CECAP goals. Guided by community-led actions, the county will identify and cele rate local leaders individuals … w o ta e meaningful climate action and inspire t ose aroun d them to do the same. … Recommendations may include a pilot program (see BEE.17), development of program adoption guidance, promotion, or 34 Strategies with a star were identified as priority strategies in their respective plans. 104 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates (~0.25 of Action Done) marketing campaigns to facilitate broader adoption of climate actions. The county may catalyze and facilitate implementation where appropriate to further the community and business champion-led efforts. STATUS NOTES: Individual climate champions have been recognized in 2023 through a series of videos highlighting residents who have taken actions such as installing solar panels or purchasing electric vehicles. Additionally, OEEC has provided a Climate Action Checklist for resid ents, to encourage residents to commit to becoming individual “Climate Champions” by taking actions on the list. The list includes resources and links to incentives to help residents achieve the actions. Individuals are also recognized for their climate action and environmental stewardship through the annual Environmental Excellence Awards which are administered by the Environmental Quality Advisory Council with assistance from OEEC. Started (~0.25 of Action Done) ACTION 2: (ORGANIZATIONAL CLIMATE CHAMPIONS): CECAP Implementation Plan | BEE.16, ES.12, T.21, NR.11, W.17: Identify and recognize … organization Climate Champions that accelerate implementation of actions to meet CECAP goals. Guided by community-led actions, the county will identify and celebrate local … organizations who take meaningful climate action and inspire those around them to do the same. The county will initiate structured discussions in roundtable format meetings with community -based environmental groups … to identify climate champions to begin to connect with and identify climate champions. Roundtable participants may self -identify climate actions and behaviors within their sector and how to advance a climate-neutral Fairfax County within the … non-profit organizations. … Recommendations may include a pilot program (see BEE.17), development of program adoption guidance, promotion, or marketing campaigns to facilitate broader adoption of climate actions. The county may catalyze and facilitate implementation where appr opriate to further the community … champion-led efforts. STATUS NOTES: In 2023, organizational Climate Champions focused on the non-profit pilot with Faith Alliance for Climate Solutions that has a milestone of securing commitments from places of worship to complete or state interest in comple ting an energy audit. HOAs are another category of organizational climate champions that may be recognized through the ECAP or Charge-Up Fairfax Program (see Strategy 31, Action 1). Through the Climate Champions Non-profit Pilot, FACS and OEEC (through the ECAP) has identified over 20 places of worship planning or interested to take climate action through the Pilot/ECAP/Dominion Energy programs. A non-profit roundtable is deferred until 2024 to coordinate with other county efforts such as the Inter-Agency Community Service, Aid, Engagement, Incentives team, county agencies and non- profits working Bailey’s Crossroad, WISH). Steady Progress (~0.5 of Action Done) ACTION 3: (COMMUNITY-LED PILOT PROGRAMS): CECAP Implementation Plan | BEE.17, ES.13, NR.12, T.20, W.16, : Support community-led pilot programs to accelerate implementation of climate action in support of CECAP goals and increase investments in renewable energy, energy efficiency … natural resource protection and management activities … ero waste and waste reduction a nd management activities … and reduce greenhouse gas emissions overall. Organizations in Fairfax County may bring forward community-led pilot programs to accelerate implementation of CECAP goals and ideally support multiple climate and energy sectors (energy efficiency, energ y supply, transportation, waste, and natural resources). The county may collaborate on pilot programs in support of implementa tion efforts. CECAP Implementation Plan | ES.2 : Support accelerated electric grid transformation beyond the renewable energy requirements set forth in the VCEA. or example … wit Climate C ampions and climate-action pilots. The county will pursue funding opportunities provided by the Inflation Reduction Act to support renewa le energy installations t roug … partners ips wit pilot programs … . STATUS NOTES: Two community-led pilot programs were initiated in 2023. OEEC has been working in close partnership with Faith Alliance for Climate Solutions (FACS) on a climate champions pilot for the faith -based/ non-profit sector. This partnership with FACS focused on two of their 105 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates five climate campaigns (i.e., Solar Sanctuaries, Creation Care Kitchens), while FACS is pursing development of their other campaigns to address EVs and greening sacred spaces, and food waste (se Action3 above for additional details). A second pilot program with the Hospitality sector was initiated in Q2 FY24 with work starting in earnest with consultant support in early 2024. Other similar actions are listed here for reference. OTHER RELATED ACTIONS: For Business Climate Champions, please see Strategy 41 – Green Business Partners. Details: Group 4 Strategies – (Natural Resources) Strategies in Group 4 are focused on climate-related natural resources topics. In addition to serving as a way to sort strategies, “ roup ” is also one of the six staff working groups of the Interagency Climate Team, with a focus on implementing Group 4 strategies. The following agencies are represented on the Interagency Climate Team - Group 4: Department of Planning and Development (DPD)- Planning Division (PD), Zoning Administration Division (ZAD), and Community Revitalization Section (CRS); Department of Public Works and Environmental Services (DPWES) Stormwater (including Urban Forestry); Fairfax County Park Authority (FCPA); Fairfax County Public Schools (FCPS) and Get2Green; Land Development Services (LDS); Northern Virginia Soil and Water Conservation District (NVSWCD); Office of Environmental and Energy Coordination (OEEC); and One Fairfax/ Chief Equity Officer’s Office. OEEC and FCPA co-facilitate Group 4. The section below details progress made and the statuses of each Strategy Roll-up, Strategy, and Implementation Action for Group 4. 106 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status35 Roll-up Early Stages 0.5 of 5 Actions Done (10%) Roll-up: Consolidated Natural Resource Management Plan Strategy Status Bar36 Strategy37 Groups Completion Resilient Fairfax CECAP IP OES Early Stages 0.5 of 5 Actions Done (10%) 43. Develop a Consolidated Natural Resource Management Plan 4 (Lead), 2, 2030 AE.1a NR.5 n/a Resilient Fairfax | AE.1a: Develop a Consolidated Natural Resources Management Plan A consolidated natural resources management plan will allow the county to more comprehensively plan for and manage its numero us natural resources, including tree canopies and forests, parkland and conserved land, stream corridors and valleys, water bodies, shorelines, wetlands, green infrastructure, critical habitats, and other natural resources. Currently, these natural resources are managed and planned in numerous separate proces ses, policies, and programs, which renders it difficult for the county to manage our natural resources as an interconnected, integrated, and overarching system. Climate change impacts, such as changing precipitation patterns and increasing temperatures, will affect ecological systems’ integrity and ability to provide ecosystem services. A comprehensive natural resources management plan will enable the county to plan with a systems -level approach, include climate change projections into planning and management decisions, and identify needed measures to improve ecosystem resilience. T his strategy will fold together the county’s existing natural resource management related plans, including those managed by DPD, FCPA, NVSWCD, DPWES Urban Forestry Division, and o ther applicable departments. The natural resources management plan should cover all of Fairfax’s natural assets, consider climate change impacts to the resources and biodiversity, include invasive species management and consideration of climate-resilient species, identify measures to mitigate risk, and develop management actions to increase resource resilience. The natural resources management plan will provide clear guidance to county staff that manage n atural resource assets. Guidance from the natural resources management plan should be integrated into applicable county plans and ordinances to facilitate implementation. Action Status Actions 35 In this instance, there is only one strategy” within the “strategy roll-up,” so the status bars are the same for both. 36 Strategy and Action statuses should not be misinterpreted as outcome metrics. For example, achieving 1 out of 3 tree-related actions from the climate plans does not mean that the county has 33% tree canopy coverage. For clarity, strategy progress and metric progress are tracked separately. For outcome metrics, please see the “Outcomes: Key Targets and Metrics” section of this report. 37 Strategies with a star were identified as priority strategies in their respective plans. 107 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Started (~0.25 of Action Done) ACTION 1: (WORKING GROUP): Resilient Fairfax | AE.1a: Following authorization by applicable Boards (Board of Supervisors, Park Authority Board, and NVSWCD Board), create a working group inclusive of all county departments and entities that oversee and manage the existing natural resource plans and/or enforce related natural resource policies and ordinances. CECAP Implementation Plan | NR.5: Create a cross- disciplinary Policy Evaluation county staff team to analyze existing programs and policies regarding natural resources and cl imate change to create a comprehensive climate approach. STATUS NOTES: Interagency Climate Team – Group 4 (Natural Resources) is the working group that has been created to work on the Consolidated Natural Resources Management Plan, among other tasks. A sub-group is being formed to focus on the CNRMP specifically. Group 4 is composed of the following agencies: OEEC, DPD-PD, DPD-ZAD, DPWES, DPWES-STW, DPWES-UFMD, FCPA, FCPS, LDS, NVSWCD, One Fairfax. OEEC and FCPA co-chair Group 4. Authorization by applicable boards for this specific strategy has not yet been obtained. However, the BOS adopted the Resilient Fairfax Plan and accepted the CECAP Implementation Plan, whi ch each contain a strategy for the Consolidated Natural Resources Management Plan. Started (~0.25 of Action Done) ACTION 2: (IDENTIFICATION OF PLANS AND POLICIES) Resilient Fairfax | AE.1a: Building upon the Resilient Fairfax Audit and VRA, identify A. applicable existing natural resource-related plans that should be consolidated into and updated through a Consolidated Natural Resources Management Plan, B. related natural resource policies and ordinances that need to be aligned with such plans, such as the Che sapeake Bay Preservation Ordinance, the Tree Conservation Ordinance, Wetlands Zoning Ordinance, and o thers, and C. new plan sections that should potentially be added, such as a Shoreline Management Plan. CECAP Implementation Plan | NR.5: (… As part of this recommendation, specific policies for tree canopy and site development will be evaluated, in addition to other natural resources -related policies. The specific policies noted for review include such items as the Comprehensive Plan, the Zon ing Ordinance, the Tree Ordinance, the Public Facilities Manual, and other transportation and natural resources plans. STATUS NOTES: Fairfax County has many natural resources-related policies and programs that are currently being updated through interagency coordination, such as stormwater planning efforts, street tree incentives, changes to the landscaping and screening zoning re quirements, and other similar projects. The upcoming review of the Environment Element of the Policy Plan is also focused on this topic. However, the county has not yet undertaken a consolidated alignment of all natural resource related policies and plans to align these efforts, and to add a climate focus. The Resilient Fairfax Audit of Existing Policies, Plans, and Programs serves as a starting point for this identification of p olicies and plans that would be involved. Agencies in Group 4 have identified additional natural resource policies and plans. Plans and policies that would need to be aligned in a Consolidated Natural Resource Management Planning process include but are not limited to: the Chesapeake Bay Preservation Ordinance, the Comprehensive Plan, Natural Resource Management Plans from FCPA, the Public Facilities Manual, the PROSA Strategy from FCPA, transportation plans, the Tree Conservation Ordinance, Urban Design Guidelines, Wetlands Zoning Ordinance, relevant sections of the Zoning Ordinance, Scheduled to Start ACTION 3 (WORK PLAN): Resilient Fairfax | AE.1a: Create a work plan for creation of the Consolidated Natural Resource Management Plan, including schedule, tasks, responsibilities (including leads for each section), coordination system, and budget. CECAP Implementation Plan | NR.5: … In the first half of 2023, OEEC will work with other lead agencies to determine a scope for this Policy Evaluation staff team , determine members of the team, and set a meeting schedule and deliverables. 108 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates (Less than 0.25 of Action Done) STATUS NOTES: In 2023, OEEC is working with other lead agencies to determine a scope for this Policy Evaluation staff team. Group 4 has discussed approaches to the CNRMP, and as of November 2023, are taking a poll to decide between two overarching approaches. Not started (Less than 0.25 of Action Done) ACTION 4 (DRAFT CNRMP): Develop a draft consolidated Natural Resource Management Plan that folds together existing county natural resource management plans, incorporates climate change projections and consideration for climate change impacts, and identifi es measures needed to protect and enhance ecosystem resilience. Align this plan with related County Code updates (CRC.3c), plan updates (IAP.1a, IAP.1b, IAP.1c), Adaptation Action Areas (CRC.1a), the Flood Risk Reduction Plan (CRC.3a), and other natural res ource strategies (AE.1b-d, AE.2a-f). Specific policies for tree canopy and site development will be evaluated, in addition to other natural resources -related policies.38 STATUS NOTES: This is a future stage. Not started (Less than 0.25 of Action Done) ACTION 5 (FINAL CNRMP): Lead and partner agencies will bring the draft plan forward through the public hearing process, including outreach and public hearings prior to Board consideration of adoption. Relevant entities such as the Wetlands Board, the Chesapeake Ba y Exception Review Committee, the Tree Commission, EQAC, and others will be consulted. STATUS NOTES: This is a future stage. 38 The italicized text in this action item is from the CECAP Implementation Plan (NR.5), while the rest of the text is from Resilient Fairfax AE.1a. To reduce duplicative tracking of nearly identical actions, they are consolidated here. 109 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates Roll-up Status 39 Roll-Up Started 1.0 of 3 Actions Done (33%) Roll-up: Tree Programs Strategy Status Bar40 Strategy41 Groups Completion Resilient Fairfax CECAP IP OES Started 1.0 of 3 Actions Done (33%) 44. Tree Planting and Reforestation 4 Continuous CRC.1c, AE.1d, AE.2c (NR.1), NR.3, NR.4, (NR.7) N/A Action Status Actions Steady Progress (~0.50 of Action Done) ACTION 1: Resilient Fairfax | CRC.1c: Expand Targeted Tree Plantings: Build upon existing Urban Forest Management Division tree planting efforts to expand targeted tree plantings. Prioritize neighborhoods with high vulnerability as determined by One Fairfax, the Vulnerability and Risk Assessment, and Adaptation Action Area mapping (CRC.1a). Resilient Fairfax | AE.2c: Support Continued Urban Reforestation: Aid with Urban Heat Island effect and flooding impacts through urban reforestation projects, expanding upon existing initiatives by the Urban Forestry Management Division. Explore tree planting programs that plant, maintain, and replace loss of mature trees in residential neighborhoods, using the One Fairfax lens. CECAP Implementation Plan | NR.3: Promote and coordinate tree planting events on public and private properties, including financial assistance. STATUS NOTES: The county is making steady progress on this action. The Urban Forest Management Division has been working in partnership with Casey Trees to plant trees in areas that are prioritized according to equity data from One Fairfax. A pilot project was completed to plant trees along the Route 1 corridor. Additionally, the Tree Preservation and Planting Fund (TPPF) supports efforts to preserve, manage, and plant new trees. The fund can be used by governmental and non-profit entities for urban forestry projects on public properties or commonly owned space. More broadly, there are over 20 tree planting programs in Fairfax County, led by both county agencies and non-profits. According to the Tree Commission Survey on Tree Plantings, 16,000 trees were planted in 2023. Additionally, FCPA has continued to implement the Invasive Management Area (IMA) Program, a community-based program designed to reduce invasive plants in county parks. Approximately 20,000 to 39 In this instance, the strategy is large enough that it is the only strategy within the “strategy roll-up,” so the status bars are the same for both. 40 Strategy and Action statuses should not be misinterpreted as outcome metrics. For example, achieving 1 out of 3 tree-related actions from the climate plans does not mean that the county has 33% tree canopy coverage. For clarity, strategy progress and metric progress are tracked separately. For outcome metrics, please see the “Outcomes: Key Targets and Metrics” section of this report. 41 Strategies with a star were identified as priority strategies in their respective plans. 110 Fairfax County Climate Plan Progress Report – Part II: Detailed Progress Updates 22.000 trained volunteers have contributed between ,000 and 80,000 hours of service annually since the program’s inception in 200 , improving over 1,000 acres of parkland. Started (~0.25 of Action Done) ACTION 2: CECAP Implementation Plan | NR.4: Create a new program to partner with HOAs and nonprofit organizations to promote tree planting and native plants. STATUS NOTES: There are several existing programs that promote tree planting in the county. Fairfax County is exploring ways to fill the gaps and streamline these programs for the greatest tree planting success. The Urban Forest Management Division (UFMD) is targeting tree planting in vulnerable areas following a successful pilot project to plant trees along the Route 1 corridor. Started (~0.25 of Action Done) ACTION 3: Resilient Fairfax | AE.1d: Integrate Climate Ch

Text truncated. Open the original for the full document.

Source: Fairfax County website. First collected Oct 5, 2026.