Inspection Surcharge Fee Notice July 1 2026-UA
Henrico County · Henrico County · meeting of Jul 1, 2026 · Notices
Open the original document More from Henrico County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Department of Building Construction and Inspections
Henrico County, Virginia
TO: Interested Parties
FROM: Henrico County Building Official
SUBJECT: Inspection Surcharge Fee
DATE: July 1, 2026
Effective October 1, 2013, the permit fee ordinance adopted by the Henrico County Board of
Supervisors established an inspection surcharge fee of $75.00 for each inspection of new one- and
two-family dwellings that exceeds the average total number of inspections for such structures with
permits issued during the previous fiscal year. The following information explains the application
of the inspection surcharge fee.
The inspections that are counted toward assessment of the surcharge include all permits
issued for construction of the dwelling (i.e. building, plumbing, mechanical, electrical, and
fire protection). The inspection surcharge fee will be assessed after completion of all final
inspections and prior to issuance of the permanent Certificate of Occupancy.
The average total number of inspections for one- and two-family dwellings is calculated
on July 1st of the current calendar year (the end of the County’s fiscal year). The average
total number of inspections for one- and two-family dwellings as of July 1, 2026, without
a fire suppression system is 33. The average total number of inspections for one- and two-
family dwellings as of July 1, 2026, with a fire suppression system is 41. For one- and two-
family dwellings with an elevator, the average total number of inspections for each elevator
is 1. Effective July 1, 2026, any new one- and two-family dwelling without a fire
suppression system that requires more than 33 inspections for issuance of the certificate of
occupancy will be assessed the inspection surcharge fee of $75 for each additional
inspection. If a fire suppression system is installed, the $75 inspection surcharge will be
assessed when more than 41 inspections have been performed. For any new one- and two-
family dwelling with an elevator, the inspection surcharge fee of $75 is assessed after the
inspection totals exceed 34 for dwellings without a fire suppression system and 42 for
dwellings with a fire suppression system. These total average number of inspections will
be used until June 30, 2027, and the new average number of inspections will be recalculated
on July 1, 2027.
The inspection history for each permit can be viewed online at Build Henrico.
Any inspection that is performed by an employee of the Department of Building
Construction and Inspections that is posted as a pass, fail, or partial result will count toward
the inspection total. Any inspection that is performed by a registered design professional
and is posted as a “RDP” result will count toward the inspection total.
All work is required to be ready for inspection prior to scheduling the inspection request.
Honoring requests for morning or afternoon inspection times are discretionary based on
daily workload and staff assignments. The result for any inspection that is cancelled after
7 a.m. of the day the inspection is scheduled to be made will be posted as a “Fail” and will
be included in the inspection total. Inspections cancelled prior to 7 a.m. of the day the
inspection is scheduled to be made will not be included in the inspection total. Inspection
cancellations shall be made via telephone call to our inspection request system at 804-501-
7770 or online at Build Henrico. Cancellations left as messages on staff voicemail will not
be accepted.
Only inspection results for the Department of Building Construction and Inspections will
be counted toward the total number of inspections for each permit. Inspection results
entered by Planning, Public Works, Public Utilities, the Division of Fire or other agencies
will not be included in the inspections total.
The inspection surcharge fee shall be paid prior to issuance of the final Certificate of
Occupancy. Customers will be notified through the Customer Portal, by telephone and/or
email if the total number of inspections exceeds the annual average and the fee amount that
is due. The Certificate of Occupancy will not be issued until the fee is paid. Payment can
be made by cash, check, echeck, or credit/debit card. Cash or check payments must be paid
in person. Echeck payments must be processed in the Customer Portal. Credit/Debit card
payments may be processed through the Customer Portal or in person at the Building
Inspections Office. The Building Inspections Office is located on the 2 nd floor of the
Administration Building at the Western Government Center.
Please call 804-501-4360 if you have any questions regarding the inspection surcharge fee.
H. Bolman Bowles, PE, CBO
Building Official
Source: Henrico County website. First collected Oct 5, 2026.