JOHN DOE
12345 MAIN ST
HENRICO, VA 01234
RE: OVERDUE NOTICE OF PUMP-OUT/
INSPECTION REQUIREMENT
Property located at
12345 Main St
Last: Pump Out on 12/14/2018
Dear Property Owner:
This Notice serves to inform you that you are now overdue for demonstrating compliance with the septic
pump-out/inspection requirement. In our letter to you dated 6/30/2023, we explained that, in accordance with
the state’s Chesapeake Bay Preservation Area (CBPA) Designation and Management Regulations (9VAC25-
830), on-site sewage treatment systems (septic systems) located within CBPAs must be either pumped out or
inspected by certified individuals at least once every five years. The Regulations also require localities, including
Henrico County, to administer the program to ensure these systems are pumped out or inspected within the
prescribed time.
Please submit one of the following:
1) documentation that the system was pumped out within the last 5 years;
or
2) documentation that the system was inspected by a certified operator or on-site soil evaluator
within the last 5 years and found to be functioning properly and does not need to be pumped out.
(The certification requirement became effective October 14, 2014. A listing of certified operators
and on-site soil evaluators can be found on the Virginia Department of Professional and
Occupational Regulation website http://www.dpor.virginia.gov/licenselookup/)
Please complete and return the enclosed Verification and Compliance Form and documentation of the
required pump-out or inspection to the address indicated on the form within 90 days of receipt of this
letter. Instances of non-compliance will be forwarded to the County Attorney’s office for enforcement of
the County Code after 90 days. If you have any questions regarding the Septic System Pump-Out / Inspection
Program, please call (804) 501-5846 or e-mail your question to (septic-systems@henrico.gov).
Sincerely,
Catie McCarthy
Environmental Program Specialist
Department of Public Works
Attachments (Verification and Compliance Form)
TERREL C. HUGHES, P.E.
DIRECTOR OF PUBLIC WORKS
COUNTY ENGINEER
(804) 501-4393
COMMONWEALTH OF VIRGINIA
COUNTY OF HENRICO
01/03/2024
Verification and Compliance Form
Property Owners Name: JOHN DOE
Address of Property with Septic System: 12345 MAIN ST
Step 1: VERIFICATION (Please check any that apply. If none apply, move to Step 2.)
This system is an engineered system.
If you checked this block, please stop here and return this form. Once this information is confirmed, this system will be
removed from the Program and the pump-out and inspection requirements will not apply. Engineered septic systems are
subject to different state requirements and records for the maintenance of these systems should be submitted the Virginia
Health Department (VDH). For more information on the requirements associated with your engineered system please
contact VDH at 804-501-4530.
This property is connected to County sewer.
If you checked this block, please stop here and return this form. Once this information is confirmed by Public Utilities, the
property will be removed from the Program and the pump-out and inspection requirements will not apply.
This property uses a pit privy.
If you checked this block, please stop here and return this form. You will be removed from the mailing list.
This system is not located within a Chesapeake Bay Preservation Area.
If you check this block, please stop here and return this form and documentation that the system is located outside a
Chesapeake Bay Preservation Area. Once this information is confirmed, the system will be removed from the Program and
the pump-out and inspection requirements will not apply.
This property is unoccupied.
If you checked this block, please stop here and return this form. You will be sent a follow-up mailing in five years to confirm
if this property is still unoccupied. You do not need to submit a pump-out or inspection record at this time.
This system was installed in the last five years.
If you checked this block, please stop here and return this form indicating the year that the septic system was installed here:
____________. You do not need to submit a pump-out or inspection record at this time. This requirement becomes effective
five years after the date of installation. You will receive a mailing to remind you of this.
Step 2: COMPLIANCE (Please complete either Option #1 or Option #2.)
Option #1: Date of Septic Pump-out: _________________ Name of Hauler: ____________________
OR
Option #2: Date the septic system was inspected by a certified operator or on-site soil evaluator:
Did the inspection determine that the system is functioning properly and does not need to be pumped out?
___Yes ___No
If the system has not been pumped out or inspected, please do promptly and return this form.
Step 3: DOCUMENTATION (Please attach a copy of pump-out or inspection invoice.)
This form must be completed and returned in the enclosed envelope to:
County of Henrico, Department of Public Works
Septic System Pump-Out/Inspection Program
P.O. Box 90775
Henrico VA 23273- 0775
Or emailed to: septic-systems@henrico.gov
Source: Henrico County website. First collected Oct 5, 2026.