Economic Development Authority — Agenda Minutes
Chesterfield County · Chesterfield County · Economic Development Authority · meeting of Jul 16, 2026 · Other
Open the original document More from Chesterfield County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 1 | 9
Members Attending:
Terri Cofer Beirne Danielle Fitz Hugh Faizan Habib*
Robert Vaughn John Hughes
John V. Cogbill, III Jesse Calloway
Members Absent:
None
Others Attending:
John O'Neill, Hunton Andrews Kurth, LLP*
Brendan Staley, Hunton Andrews Kurth, LLP
Mike Chernau, Senior County Attorney
Tim Davey, Timmons Group
Garrett Hart, Chesterfield Economic Development
Matt McLaren, Chesterfield Economic Development
Debbie Baicy, Chesterfield Account Department
Samantha Furnish, Chesterfield Economic Development
Laura Harden, Cherry Bekaert
Brooke Peterson, Cherry Bekaert
Kyle Woods, Big Bad Media
Eleanor Shaw, The Richmonder
Alexis Innis, Resident
*Attended Via Teams
Terri Cofer Beirne called the meeting to order at 3:03 pm and noted that a quorum was present for
the Economic Development Authority meeting on July 16, 2026.
Officer Elections:
Officer elections are held each year in July during the Authority meeting. All positions are up for
election, each with a one-year term, except for the Chair, who may serve three consecutive one-
year terms.
John Hughes proposed the following slate of officers for this fiscal year:
Danielle Fitz-Hugh Chair
Robert Vaughn Vice-Chair
Faizan Habib Treasurer
Jesse Calloway Secretary
John Hughes Assistant Secretary
John Hughes motioned to approve the proposed officer positions. Robert Vaughn seconded, and all
members present voted in the affirmative.
Danielle Fitz Hugh assumed the role of Chair and presided over the meeting.
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 2 | 9
Audit Process
Laura Harden and Brooke Peterson, with Cherry Bekaert, attended the EDA meeting virtually to
discuss the 2026 audit process. They shared a PowerPoint presentation on audit and financial
planning, emphasizing the importance of effective communication, transparency, and public
participation in managing development projects. They discussed the quality reviewer's role in
ensuring the audit's accuracy and the auditor's responsibilities for ensuring compliance with
standards and regulations. In closing, they highlighted the importance of governance and oversight
in financial management, emphasizing the need for management and the Authority to collaborate
to maintain high ethical standards and prevent fraud. Laura provided an overview of upcoming
GASB auditing changes, including GASB 103, 104, and 105, and their expected impacts.
Approval of the Minutes:
Danielle Fitz Hugh requested that the Authority approve the minutes of the June 18, 2026, meeting.
Robert Vaughn motioned to approve the meeting minutes as written. John Cogbill seconded, and
all members present voted in the affirmative.
Financial Statements Update:
Debbie Baicy provided the June financial report, highlighting cash reserves and project funding.
Springline at District 60 Update:
Garrett Hart provided an update on Springline development, reporting that significant construction
progress is now visible throughout the site. He noted that installation of the hotel's exterior façade
has begun, with the first sections of the building's exterior skin now in place. Site preparation and
earthwork are underway for the second hotel, with vertical construction expected to begin soon.
Work is also advancing on the next apartment building within the development.
Authority members discussed the hotel construction progress and asked about the building's
remaining height. Staff explained that the structure is currently around the eighth floor and that
additional floors remain to be completed. The rooftop amenities were also highlighted, including a
two-story balcony and a rooftop infinity-edge pool.
In response to a question about the project's schedule, staff said the luxury hotel remains on track
to open in spring 2028, noting that substantial interior work will be required after the building's
structure is complete.
Tim Davey reported that Virginia Business magazine will recognize the Springline development at
an upcoming statewide awards event, adding to the project's growing list of local and regional
accolades.
Meadowville Technology Park Update:
Tim Davey provided an update on activity within Meadowville Technology Park, noting that
development remains active as property owners continue advancing their projects. He highlighted
significant progress at the LEGO facility, noting the dramatic transformation of the site as
construction continues. He also noted continued progress on nearby residential development.
Tim reviewed the status of the two major infrastructure projects currently underway. The first
project, the Henricus Access Road, includes construction of a new roadway and utility
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 3 | 9
infrastructure extending from the traffic circle around the future LEGO expansion sites. While work
has begun to accommodate LEGO's construction schedule, the immediate focus has been on
completing earthwork and utility installation rather than finishing the roadway, as the road will not
be needed for some time.
The second project includes the widening of Meadowville Technology Parkway between the
interstate interchange and the traffic circle. This work is being completed as part of the
commitments associated with the LEGO project and is funded in part through state assistance. Tim
said that both major infrastructure projects remain on schedule and within budget, with substantial
completion anticipated later this year.
In response to a question regarding interest in the available properties in Meadowville Technology
Park, staff reported that a purchase and sale agreement is currently in place for the 16-acre parcel
and that at least two companies are actively evaluating the 50-acre site.
Upper Magnolia Green Update:
Tim Davey provided an update on the Upper Magnolia site readiness initiative, reviewing the
progress of the four state grant awards that have supported development of the property.
He reported that the first grant, which funded the design of the site's water, sewer, and roadway
infrastructure and the graded development pad to achieve Tier 4 site readiness, is nearing
completion. The design work will be complete by the end of the calendar year or early 2027.
Although project timelines have required updates to certain permits obtained early in the process,
staff has successfully managed the project budget without requesting additional state funding by
reallocating resources within the existing grant. Tim noted that the Commonwealth has recognized
the project as a model for effective management of its site readiness program.
He also reviewed the second grant, a $13.5 million award that funded the realignment of Duval
Road and associated utility improvements. These infrastructure investments were designed to
improve access to the site and enhance its marketability. He noted that the roadway improvements
are being coordinated with other county transportation projects and that significant progress is
visible throughout the area. The project remains on schedule and within budget.
The third grant, a $10.5 million award received last year, is dedicated to construction of the first two
lanes of the Western Area Arterial Connector Road. In addition, the project received approximately
$35 million through the Transportation Partnership Opportunity Fund (TPOF), allowing the County
to advance additional construction phases. A contractor has been selected and is prepared to
begin clearing and grubbing activities. Staff anticipate mobilizing construction in August to align
work funded by both grants, resulting in two major state-funded infrastructure projects being under
construction simultaneously.
Garrett said staff have maintained regular communication with nearby property owners throughout
construction activities. As staff acquired easements and implemented temporary road closures
along Duval Road, they conducted door-to-door outreach and provided advance notice of detours
and alternate access routes to affected residents. He noted that impacts have been limited to a
small number of property owners.
Garrett also provided an update on related county transportation projects, reporting that the north-
south roadway is nearing completion, with paving substantially complete and the bridge expected
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 4 | 9
to be finished soon. Once completed, the roadway will connect the loop road to Duval Road, and
the two new traffic circles will also be completed. The remaining roadway work will consist
primarily of the Duval Road realignment serving the 10-acre development pad.
Garrett explained that the projects being discussed are supporting the three new schools and the
Upper Magnolia Industrial Park. He noted that while approved data center developments are
located nearby, the infrastructure updates presented were not directly related to those projects.
Other Updates:
Revenue Bond Resolution
Brendan Staley presented a resolution authorizing the issuance of Economic Development
Authority revenue bonds on behalf of Chesterfield County. He noted that the Board of Supervisors
had previously approved moving forward with the financing and requested that the Authority issue
the bonds.
Brendan outlined the anticipated financing schedule, explaining that the County's general
obligation bonds for school projects will close at the end of the month. Subject to the Authority's
approval of the Resolution, the Economic Development Authority bonds would then proceed
through the preparation and publication of the official statement, pricing of the bonds, and a
targeted closing in mid-August.
He explained that the Resolution approves the overall financing plan and authorizes county and
Authority officials to work together in preparing the official statement used to market the bonds.
The Resolution also authorizes the appropriate officers to execute the necessary documents to
complete the financing transaction.
Terri Cofer Beirne moved to approve the Resolution authorizing the issuance of Economic
Development Authority revenue bonds on behalf of Chesterfield County. Jesse Calloway seconded,
and all members present voted.
Respectfully submitted,
Samantha Furnish
Recording Secretary
Next Meeting: August 20, 2026, at 3 pm
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 5 | 9
RESOLUTION OF THE ECONOMIC DEVELOPMENT AUTHORITY OF
THE COUNTY OF CHESTERFIELD APPROVING A PLAN TO FINANCE
PUBLIC FACILITIES PROJECTS THROUGH THE ISSUANCE OF
REVENUE BONDS IN AN AGGREGATE PRINCIPAL AMOUNT NOT TO
EXCEED $50,000,000
WHEREAS, the Economic Development Authority of the County of Chesterfield (the
"Authority"), pursuant to the Industrial Development and Revenue Bond Act, Chapter 49, Title
15.2, Code of Virginia of 1950, as amended (the "IDA Act"), under which it was created, is
authorized to exercise all the powers set forth in the IDA Act, which include, among other things,
the power to make loans to, among others, a county in furtherance of the purposes of the IDA Act,
to finance or refinance facilities for use by, among others, a county, to issue its revenue bonds,
notes and other obligations from time to time for such purposes and to pledge all or any part of its
revenues and receipts derived from payments received by the Authority in connection with its
loans or from any other source, as security for the payment of the principal of and premium, if any,
and interest on any such obligations;
WHEREAS, the Board of Supervisors (the "Board of Supervisors") of the County of
Chesterfield, Virginia (the "County"), desires to undertake, in conjunction with the Authority, the
financing of the costs of capital improvements for governmental purposes, including but not
limited to (a) improving, equipping, renovating and expanding various governmental buildings
and facilities and (b) undertaking major maintenance for school buildings and facilities
(collectively, the "2026B Project");
WHEREAS, on June 24, 2026, the Board of Supervisors adopted a resolution requesting
the Authority issue a series of public facility revenue bonds (as hereinafter described, the "Bonds")
and loan the proceeds thereof to the County to finance the 2026B Project and to pay the related
costs of issuance;
WHEREAS, the Bonds will be secured by payments appropriated from time to time by
the Board of Supervisors and payable to the Authority in accordance with the terms of the
Financing Agreement (as hereinafter defined);
WHEREAS, the County administration has recommended that Hunton Andrews Kurth
LLP, Richmond, Virginia, be approved as bond counsel; and
WHEREAS, there have been made available drafts of the following documents
(collectively, the "Documents") proposed to be executed in connection with the issuance and sale
of the Bonds:
A Third Supplemental Agreement of Trust (including the form of the Bonds as an exhibit),
supplementing an Agreement of Trust dated as of August 1, 2019, as previously
supplemented (collectively, the "Trust Agreement"), all between the Authority and
U.S. Bank Trust Company, National Association, as trustee (the "Trustee"),
pursuant to which the Bonds are to be issued;
A Second Supplemental Financing Agreement (the "Supplemental Financing
Agreement"), supplementing a Financing Agreement dated as of August 1, 2019
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 6 | 9
(collectively, the "Financing Agreement"), all between the Authority and the
County, pursuant to which the Authority will loan the proceeds of the Bonds to the
County and the County will undertake, subject to appropriation, to make payments
to the Authority in amounts sufficient to pay the principal of and premium, if any,
and interest on the Bonds and certain other related costs;
A Preliminary Official Statement of the Authority relating to the public offering of the
Bonds (the "Preliminary Official Statement"); and
A Notice of Sale (attached as an appendix to the Preliminary Official Statement) (the
"Notice of Sale") (applicable only if the Bonds are sold through a competitive sale);
NOW, THEREFORE, BE IT RESOLVED BY THE ECONOMIC DEVELOPMENT
AUTHORITY OF THE COUNTY OF CHESTERFIELD:
The Authority hereby finds that the undertaking of the 2026B Project will be in the best
interests of the County and its citizens and hereby authorizes the Authority, in collaboration with
the County, to undertake the following plan of finance to accomplish the same. The Authority will
issue the Bonds in an aggregate principal amount not to exceed $50,000,000. The Authority will
loan the proceeds of the Bonds to the County to finance the 2026B Project and to pay the related
costs of issuance. Pursuant to the Financing Agreement, the County will undertake to make certain
Basic Payments and Additional Payments (each as defined in the Financing Agreement) to the
Authority in amounts sufficient to amortize the Bonds, to pay the fees or expenses of the Authority
and the Trustee and to pay certain other related costs. The obligation of the Authority to pay
principal of and premium, if any, and interest on the Bonds will be limited to the Basic Payments
and certain Additional Payments received from the County. The Bonds will be secured by an
assignment of the Basic Payments and certain Additional Payments due under the Financing
Agreement, all for the benefit of the holders of the Bonds. The undertaking by the County to make
Basic Payments and Additional Payments will be subject to the appropriation by the Board of
Supervisors from time to time of sufficient amounts for such purposes. The plan of finance for the
2026B Project shall contain such additional requirements and provisions as may be approved by
the County Administrator (such term as used herein to include the County Administrator and any
acting or interim County Administrator and the Deputy County Administrator for Finance and
Administration) and the Chair or Vice-Chair of the Authority.
The Bonds shall be designated "Public Facility Revenue Bonds (County Projects), Series
2026B" or such other designation as the County Administrator may determine. Subject to Section
3, the Authority hereby authorizes the issuance of the Bonds pursuant to the Trust Agreement,
provided that (a) the principal amount shall not exceed $50,000,000, (b) the "true" or "Canadian"
interest cost of the Bonds shall not exceed 6.00% (taking into account any original issue discount
or premium), (c) the Bonds shall mature or be subject to mandatory sinking fund redemption in
annual installments ending no later than December 31, 2056, (d) the Bonds shall be sold to the
underwriter(s) thereof at a price not less than 95% of the aggregate principal amount thereof
(without taking into account any original issue discount or premium), and (e) the Bonds shall be
subject to optional redemption, if at all, at a premium not to exceed 2.00% of the principal amount
thereof. The Chair and Vice-Chair of the Authority, either of whom may act, are also authorized
to approve, in collaboration with the County Administrator, a lesser principal amount for the
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 7 | 9
Bonds, a maturity schedule (including serial maturities and term maturities for the Bonds) and the
redemption provisions of the Bonds, all as such officer shall determine to be in the best interests
of the Authority and the County.
The Authority approves the following terms of the sale of the Bonds:
The Bonds shall be sold through a competitive sale or a negotiated sale, as requested
by the County Administrator.
If the County Administrator determines that the Bonds shall be sold by competitive
sale, the County Administrator is authorized, on behalf of the Authority, to receive public
bids for the Bonds and award the Bonds to the bidder(s) providing the lowest "true" or
"Canadian" interest cost, subject to the limitations set forth in Section 2. Following a
competitive sale, the County Administrator shall file a certificate with the Authority and
the Board of Supervisors setting forth the final terms of the Bonds. The actions of the
County Administrator in selling the Bonds by competitive sale shall be conclusive, and no
further action with respect to the sale and issuance of the Bonds shall be necessary on the
part of the Authority.
If the Bonds are sold by competitive bid, the County Administrator is authorized
and directed, on behalf of the Authority and in collaboration with Davenport & Company
LLC, the County's financial advisor (the "Financial Advisor"), to take all proper steps to
advertise the Bonds for sale substantially in accordance with the form of the Notice of Sale,
which is hereby approved; provided that the County Administrator, on behalf of the
Authority and in collaboration with the Financial Advisor, may make such changes in the
Notice of Sale not inconsistent with this Resolution as he may consider to be in the best
interests of the County and the Authority.
If the County Administrator determines that the Bonds shall be sold by negotiated
sale, the County Administrator is authorized, on behalf of the Authority and in
collaboration with the Financial Advisor, to choose one or more investment banks or firms
to serve as underwriter(s) for the Bonds and to execute and deliver to the underwriter(s) a
bond purchase agreement (the "Bond Purchase Agreement") in the form approved by the
County Administrator and the County Attorney, in consultation with the County's bond
counsel and the Financial Advisor. The Chair and Vice-Chair of the Authority, either of
whom may act, are authorized to execute and deliver the final Bond Purchase Agreement
reflecting such final pricing terms and other completions, omissions, insertions and
changes as such officers shall agree to make. No further action with respect to the sale and
issuance of the Bonds shall be necessary on the part of the Authority.
The Chair and Vice-Chair of the Authority, either of whom may act, are hereby authorized
and directed to execute the Documents (excluding the Preliminary Official Statement and the
Notice of Sale), which shall be in substantially the forms circulated prior to this meeting. Such
forms of the Documents are hereby approved, with such completions, omissions, insertions and
changes not inconsistent with this Resolution as may be approved by the officer executing such
Documents, whose execution and delivery thereof shall constitute conclusive evidence of such
officer's approval of any such completions, omissions, insertions and changes.
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 8 | 9
The Authority authorizes distribution of the Preliminary Official Statement to prospective
purchasers of the Bonds in a form deemed to be "final" (within the meaning of Rule 15c2-12 of
the Securities and Exchange Commission (the "Rule")) as of its date, except for the omission of
certain pricing and other information permitted to be omitted pursuant to the Rule and with such
completions, omissions, insertions and changes not inconsistent with this Resolution as may be
approved by the Chair or Vice-Chair of the Authority, in collaboration with the County and the
Financial Advisor. Such distribution shall constitute conclusive evidence of the approval of the
Chair or Vice-Chair as to any such completions, omissions, insertions and changes and that the
Authority has deemed the Preliminary Official Statement to be "final" (within the meaning of the
Rule) as of its date.
The Chair and Vice-Chair of the Authority, either of whom may act, are hereby authorized
and directed to approve such completions, omissions, insertions and other changes to the
Preliminary Official Statement as are necessary to reflect the terms of the sale of the Bonds and
the details thereof and as are appropriate to complete it as an official statement in final form (the
"Official Statement") and to execute and deliver the Official Statement when the same has been
approved by the County. The County Administrator is hereby authorized on behalf of the Authority
to distribute the Official Statement to the underwriter(s) of the Bonds. Execution of the Official
Statement by the Chair or Vice-Chair shall constitute conclusive evidence of such officer's
approval of any such completions, omissions, insertions and changes and that the Official
Statement has been deemed "final" by the Authority as of its date within the meaning of the Rule.
The Chair and Vice-Chair of the Authority, either of whom may act, are hereby authorized
and directed to execute the Bonds by manual or facsimile signature, the Secretary and Assistant
Secretary, either of whom may act, are hereby authorized and directed to affix the seal of the
Authority to or print a facsimile thereof on the Bonds and to attest the same by manual or facsimile
signature, and the officers of the Authority are hereby authorized and directed to deliver the Bonds
to the Trustee for authentication and delivery to the underwriter(s) thereof upon payment therefor.
All costs and expenses incurred in connection with the financing of the 2026B Project and
the issuance of the Bonds, including the Authority's fees and expenses and the fees and expenses
of bond counsel, counsel for the Authority and the Financial Advisor for the sale of the Bonds,
shall be paid from the proceeds of the Bonds or other legally available funds of the County. If for
any reason the Bonds are not issued, it is understood that all such fees and expenses shall be paid
by the County from its legally available funds and that the Authority shall have no responsibility
therefor.
The officers of the Authority are hereby authorized and directed to execute, deliver and file
all certificates and documents and to take all such further action as they may consider necessary
or desirable in connection with the issuance and sale of the Bonds, including without limitation (a)
executing and delivering a certificate setting forth the expected use and investment of the proceeds
of the Bonds to show that such expected use and investment will not violate the provisions of
Section 148 of the Internal Revenue Code of 1986, as amended, and regulations thereunder,
applicable to "arbitrage bonds," (b) making any elections, at the request of the County, that such
officers deem desirable regarding any provision requiring rebate to the United States of "arbitrage
profits" earned on investment of proceeds of the Bonds, (c) providing for the County to pay any
Economic Development Authority of Chesterfield County
Meeting Minutes
July 16, 2026
P a g e 9 | 9
such rebate amount and (d) filing Internal Revenue Service Form 8038-G. The foregoing shall be
subject to the advice, approval and direction of bond counsel.
The Authority consents to the recommendation by the County that Hunton Andrews Kurth
LLP serve as bond counsel for the issuance and sale of the Bonds.
Any authorization herein to execute a document shall include authorization to deliver it to
the other parties thereto.
All other acts of the officers of the Authority that are in conformity with the purposes and
intent of this Resolution and in furtherance of the issuance and sale of the Bonds and the financing
of the 2026B Project are hereby approved and ratified.
This Resolution shall take effect immediately.
Source: Chesterfield County website. First collected Oct 5, 2026.