Community Facilities &
Revitalization
Planning Commission Work Session
June 16, 2026
This is the third installment of your Comprehensive Plan work sessions
In April, we updated you all on the Land Use Plan
And in May, you heard about Community Engagement efforts and Affordable
Housing
Today we’ll be presenting on the Community Facilities and Revitalization chapters
of the Plan.
1
Community Facilities
2
Overview
This Chapter
• Guides the provision of community facilities
• Strives for efficient, equitable, safe, and accessible delivery of
public services
• Identifies levels of service and locational guidance
• Guides substantial accord determinations for new facilities
• Key to developing the county’s Capital Improvement Program
(CIP).
The Community Facilities Plan
• Guides the provision of community facilities needed to serve existing and
projected service demands.
• Strives for efficient, equitable, safe, and accessible delivery of public services.
• Identifies levels of service and locational guidance to assist in the provision of
improvements.
• Guides substantial accord determinations for new facilities as required by the
Code of Virginia.
• Key to developing the county’s Capital Improvement Program (CIP), which is of
course our five-year fiscal programming document for public facility provision
and annual demand reporting.
3
Overview
Community Demand Modeling
• Using data to inform predictive modeling
• StratIS
• The Plan does not address funding, debt capacity, or other
financial concerns or issues
• Provides guidelines for new community facilities
Community demand modeling:
• Leverages data to inform the predictive modeling approach that’s been
established for several major capital categories such as Schools, Fire & EMS,
Parks and Libraries
• Uses of StratIS – the county’s enterprise data programs for community demand
modelling
• While the Plan does not address funding, debt capacity, or other financial
concerns or issues, it does provide guidelines for new community facilities.
Note: StratIS collects robust datasets and leverages cloud-based technologies to deliver dynamic tools for trending,
predictive analysis, modeling, and reporting. Through the StratIS platform, data is managed to support accurate reporting,
offering a single source of information and preventing duplication of efforts throughout the organization.
It should be noted that the levels of service identified in this chapter generally apply to locations outside of the Rural
Residential/Agricultural and Residential Agricultural areas. These rural areas currently do not have, and are not planned to
have, the same levels of service as the more developed and developing areas of the county. However, the Plan does
recognize that existing rural public facilities should have parity with newer facilities in more developed areas of the
county, where appropriate.
4
Existing Plan Sections
• General Community Facility Guidelines
• Fire & Emergency Medical Services
• Police Services
• Sheriff’s Office Services
• Libraries
• Public Schools
• Parks & Recreation
• General Services
• Community Services Board/Mental Health Support Services
• Here are the sections included in the current Plan – The updated Plan
document will continue to address these facilities
• Discussions are ongoing with Admin about adding a Courts section as well –
something previous iterations of the Plan did NOT include
• That section would potentially be included in the Draft once finalized
5
Community Facility Needs
Current Needs
• Aligned with the CIP (FY2027 – 2031)
Future Needs
• Looking further into the future on community facility needs
based on projected growth
In 2022 we updated the Public Facilities Plan – we renamed it the “Community
Facilities Plan.” At that time, it was decided that the Plan should align to the CIP ,
instead of including a much longer-range outlook of community facilities needs as
the county builds out, as the pre-2022 Plan contained.
With this update, the Plan would continue to align with the CIP , therefore you will
see those “current” needs reflected in the document text, and on our maps.
We do plan to provide the lists of future facilities not in the current CIP , but these
would not show up on the maps, because in most cases sites have not yet been
acquired, and locations could shift as future needs evolve
For the purposes of this presentation, we have broken down the info on the next
slides by current needs, which are those in the CIP , vs future needs, which are
those longer-range items which we do not currently address in the Plan, and are
not in the CIP .
One additional item to note is that we’re looking to discontinue specifying most
square-footage & acreage requirements for facilities. These specs are no longer
critical to many of our department's facilities planning.
6
Fire & Emergency Medical Services
Current Needs
• Renovate/expand Clover Hill Station on current site
• Renovate/expand Dutch Gap Station on current site
• Replace Ettrick Station on new site
Now, we’ll talk about some of the changes proposed to the Plan.
We’ll begin with our Fire and EMS department
Here are the current needs – once again, these are tied to the current CIP
• Renovate/Replace Clover Hill Station: the current station requires additional
space and renovation of major building systems and interior spaces to
adequately support personnel.
• Renovate/Replace Dutch Gap Station: the current station requires additional
space and renovation of major building systems and interior spaces to
adequately support personnel.
• Ettrick Fire & Rescue station is currently in Site Plan review, with construction
coming soon
7
We are updating the map in the Plan document to reflect those CIP-aligned
facilities from the last slide:
Note:
• Clover Hill, Dutch Gap and Ettrick are shown as mentioned on the last slide
• A Hallsley (Roseland) area station, was previously shown on the map, but it’s
been deleted from the map as it’s not in the CIP – it is still a future need and
would be in Midlothian if we utilize the Old Hundred E.S. site
• Chester Station is under construction, so it has been updated to existing
• Finally, Matoaca Station has been changed to existing – the former station
further to the south has been deleted
8
Fire & Emergency Medical Services
Future Needs
Renovate/Replace:
• Buford Road Station
• Manchester Station
• Airport Station
• Dale Station
• Bon Air Station
• Bensley Station
• Fire & EMS Administration Building
• Phillips Station
• Renovate/replace Eanes-Pittmann Public Safety Training Center
• Enon Training Center: build new education, support, storage, and
locker facilities
• Five Forks Station: new facility near Courthouse Road & Route 288
New Facilities:
• Highlands Station near Nash & Woodpecker Roads
• Old Hundred Station near Old Hundred & Brightwalton Roads
• Genito/Mt. Hermon Station near Genito & Mt. Hermon Roads
• Skinquarter/Grange Hall Station near Route 360 & Skinquarter
Road
• Salem Church Station near Salem Church & Centralia Roads
• Joint (with Police) Public Safety Boat Storage Facility
• Lucks Lane Station near Lucks Lane & Walton Bluff Parkway
• North Salisbury Station near Winterfield Road & Salisbury Drive
• Hopkins/Kingsland Station near Hopkins & Kingsland Roads
• Branders Bridge Station near planned arterial roads west of
Branders Bridge Rd and south/east of Bradley Bridge Rd
As for Future Needs – Fire has quite a few. Again, we plan to list these longer-range
needs, but you will not see them mapped in the Plan!
Notes:
• Renovate/Replace Buford Road Station: the current station requires additional space and renovation of major building systems and interior spaces to
adequately support personnel.
• Renovate/Replace Manchester Station: the current station requires additional space and renovation of major building systems a nd interior spaces to
adequately support personnel.
• Skinquarter / Grange Hall Fire Station: new fire station along the Rt. 360 in the area of Skinquarter Road to support the response time and ERF due to the
continued growth of the county towards the west.
• Salem Church Station: new facility in the vicinity of Salem Church Road and Centralia Road. Addresses coverage gap and demand issues and supports
enhanced response times and ERF coverage necessary due to continued development.
• Renovate/Replace Airport Station: the current station requires renovation of major building systems and interior spaces to ad equately support personnel.
• Renovate/Replace Dale Station: the current station requires renovation of major building systems and interior spaces to adequ ately support personnel.
• Renovate/Replace Bon Air Station: the current station requires additional space and renovation of major building systems and interior spaces to adequately
support personnel.
• Joint Public Safety Boat Storage Facility: Construct a storage facility to house the police boat and fire/rescue boat on the James River for rapid deployment and
protection from weather. Location has been selected at the Dutch Gap boat landing, and a feasibility study has been complete d.
• Lucks Lane Station: new facility in the vicinity of Lucks Lane and Walton Bluff Parkway. Addresses coverage gaps.
• North Salisbury Station: new facility in the vicinity of Winterfield Road and Salisbury Drive. Addresses coverage gap and dem and issues.
• Hopkins/Kingsland Station: new facility in the vicinity of Hopkins Road and Kingsland Road. Addresses coverage gap and demand issues.
• Branders Bridge Station: new facility near the intersection of north/south and east/west planned arterial roads west of Brand ers Bridge Road and south/east of
Bradley Bridge Road. Addresses coverage gap and demand issues.
• Renovate/Replace Bensley Station: the current station requires renovation of major building systems and interior spaces to ad equately support personnel.
• Renovate/Replace Fire & EMS Administration Building: current facility requires additional space and interior renovation to me et growing service demands and
adequately support personnel.
• Renovate/Replace Phillips Station: the current station requires renovation of major building systems and interior spaces to a dequately support personnel.
9
Police Services
Current Needs
Replacement of Existing Facilities:
• Replace Chester District Station with new Appomattox Police
Station near Route 1/Ruffin Mill Road
• Replace Hull Street Station with new Swift Creek Police Station
near Route 360/Magnolia Green Parkway
New Facilities:
• James River Police Station serving new district in Western Route
60 area (Westchester area)
Let’s move on to Police. The Police department intends to move away from their
past use of leased spaces, in favor of county-owned sites
We have two replacements and one new station for a new beat, that being the
James River station in the Midlothian district
Note:
• The new Appomattox station will replace the current leased space on the east
side of Chester
• Swift Creek Police Station, near Magnolia Green
• For new facilities, we have the James River station in the Western Route 60
area, which will serve a new district
• Note that the new Falling Creek station at Springline, which will replace the
previously leased station near N. Providence, Buford and Route 60, is currently
under construction
10
Once again, the CIP items are mapped
• One change to the map since 2022 is Falling Creek station – it is well underway,
so it’s been updated to existing
Notes:
The James River, Appomattox and Swift Creek stations are mapped per the CIP
• Appomattox was previously called the Chester station – a site has been
selected for a replacement facility
• James River was formerly named Westchester Area Police Station in the
last Plan update, and then
• Swift Creek was formerly labelled as Hull Street Police Station in the last
Plan update
11
Police Services
Future Needs
Renovate:
• Expand the police property building
New Facilities:
• Facility to house K-9 and special operations units
• Special operations and tactical equipment storage near Routes 10/288
• Enon Station serving new district near Routes 10/295
• Matoaca Station serving new district near Woodpecker & Matoaca Roads
• Joint (with Fire/EMS) public safety boat storage facility on the James River
between I-295 and Bermuda Hundred area
For future needs, we have a potential expansion of the Police Property building
here on campus
Regarding new facilities, Police desire:
• A new facility to house K-9 and special operations units – the K-9 facility may be
able to be located on the new Appomattox station near Chester
• A new Spec ops and tactical equipment storage near Routes 10/288
• A new Enon Station serving a new district near Routes 10/295
• A new Matoaca Station serving new district near Woodpecker & Matoaca
Roads, and
• A Joint Police & Fire/EMS public safety boat storage facility on the James River
between I-295 and Bermuda Hundred area
12
Libraries
Current Needs
Renovate/Replace:
• Replace Enon Library on new site.
• Renovate/Expand Ettrick-Matoaca Library on current site.
New Facilities:
• Construct new Western Route 360 Area Library next to Deep
Creek Elementary School site
We have three facilities listed regarding current needs in the CIP:
• The new Enon Library will be replaced using a new site near Davis Middle
School
• Ettrick Matoaca is to be expanded on the current site, and;
• The new Western Route 360 area library is to be located next to the new Deep
Creek Elementary School
13
Here is the updated map with the 3 facilities mentioned on the last slide
Notes:
• The Western 360 Area Library has been moved north to the site near the
Western Area Elementary School
• Clover Hill is shown as an existing facility as it was not added to the latest CIP –
this is actually in Matoaca, not Clover Hill, because it’s on the south side of Rt.
360
• LaPrade was also shown as existing as it was recently renovated – this facility is
in Clover Hill
14
Libraries
Future Needs
Renovate/Replace:
• Renovate multiple branch locations including Meadowdale & Bon Air
• Expand/renovate or replace Clover Hill on current site
• Expand LaPrade on current site
New Facilities:
• Construct South Bellwood Library near Kingsdale, Chester and
Hopkins Roads
• Construct new Tomahawk Creek Library near Genito/Otterdale Roads
For future needs:
• Multiple branch locations including Meadowdale & Bon Air are in need of
renovation
• An Expansion, renovation or replacement of Clover Hill Library is needed on the
current site
• While LaPrade was recently renovated, further expansion is anticipated for this
busy branch
For new facilities we have
• A South Bellwood Library near Kingsdale, Chester and Hopkins Roads, and
• A Tomahawk Creek Library near Genito/Otterdale Roads
15
Public Schools
Current Needs
Renovate/Replace:
• Grange Hall Elementary School
• L.C. Bird High School (gymnasium expansion)
• Matoaca Middle School
• Midlothian Middle School
• Thomas Dale High School (main campus)
New Facilities:
• Dale District Elementary School/Early Childhood Learning Center
• Old Hundred area Elementary School
We have needs to renovate or replace
• Grange Hall – the county has a site for this
• L.C. Bird is to undergo a gym expansion
• Matoaca and Midlothian Middle Schools would both be replaced, and
• The Thomas Dale main campus would also be renovated or replaced
We have two new facilities serving new school districts:
• A new Dale District ES, in which a site at Daniel Park is being evaluated
• We also have the need for a second Old Hundred Area E.S. - however we are not
showing this one on the map as a site has not yet been acquired
16
Here is the updated map showing Schools’ current needs, as aligned with the CIP
Notes:
Map changes since the 2022 update are:
• A.M. Davis and Bensley Elementary Schools have been constructed so they are
no longer shown here
• The western area E.S. has been removed as it’s already well underway
• Falling Creek M.S. and the Western Area M.S. (known as Deep Creek M.S.) have
been constructed so they are no longer shown
For new additions to the map, we have:
• A new Old Hundred area E.S. and a new Dale District E.S. will be constructed on
entirely new sites
• Old Hundred is not shown on this map because a site has yet to be
acquired – but will be mentioned in the text of the document as a current
CIP need
• LC Bird HS is a smaller project related to a gym expansion
• Grange Hall ES, Midlothian Middle and Thomas Dale HS remain on the map
17
The existing facilities maps are proposed to be updated – Two elementary schools
have been added to the map
Notes:
• We have added the new Deep Creek E.S. in the Matoaca district as it’s under
construction and will be open to operations next year
• The replaced Bensley will also open this summer so that has been added to the
map
18
• For middle schools, we’ve added the recently constructed Deep Creek Middle
out west
19
Regarding high schools, we’ve added West Ridge High School, which will open
this year
20
Public Schools
Future Needs
Renovate/Replace:
• Bon Air Elementary School
• C.C. Wells Elementary School
• Chalkley Elementary School
• J.G. Hening Elementary School
• Hopkins Elementary School
• Monacan High School
• Swift Creek Middle School
• We have multiple renovations or replacements needed for Elementary Schools
such as:
• Bon Air
• Wells
• Chalkley
• Hening
• Hopkins
• Monacan High School and Swift Creek Middle school are also noted
• No new facilities serving new school districts are anticipated in the long-term
• Once again, these future needs would Not be mapped
21
Parks & Recreation
Current Needs:
Renovate/Replace
• Midlothian High School Athletic Complex (diamond fields)
New Facilities:
• James River Boat Launch (Dutch Gap Park) near Rivers
Bend/Dutch Gap
• Over the last few years Parks had quite a few projects in the CIP , many of which
are currently underway or soon to commence construction
• We only have two current CIP project, which are renovation of the Midlothian
High School diamond fields, and a new James River Boat Launch at Dutch Gap
Park
22
The revised map was updated to show two current projects
Notes:
The boat launch project was also included on the map in the 2022 Plan update, so it remains here
The last CIP contained a whole slew of park facilities which are now in design, so they are no longer shown on the map -
these are:
• Falling Creek Waterfront Park
• Ficke Park (also known as Conifer Road Park)
• Horner Park, and,
• Point of Rocks Park
Two other projects from the previous CIP:
• Major improvements to River City Sportsplex, in Clover Hill, are soon to be complete, and
• Construction is about to commence on Winterpock Park, so these two parks are no longer shown on the map
23
The existing facilities map is being updated with additions, removals and updates
to names of some facilities - some as simple as adding the word “historic” to the
name, as well as consolidation of some park facilities.
• You will see this list in the Plan document but organized so that where we have
consolidations, we will list the main name and include all the sub-areas.
• For example, “LOWER FALLING CREEK PARK” will note that it consists
of:
• GATES MILL PARK
• FALLING CREEK IRONWORKS PARK
• FALLING CREEK LINEAR PARK, and
• FALLING CREEK PARK
We have only one recently developed park to add to the map – which is Roxshire
Park in Midlothian.
24
Parks & Recreation
Future Needs:
Renovate/Replace:
• Park Development and Enhancements at Stonebridge
Recreation Center
• Athletic Complex Improvements across multiple schools
• James River HS
• Meadowbrook HS
• Manchester HS &
• Courts renovations at middle schools
• Chesterfield Courthouse Park – (Fairgrounds site)
We have some future needs as shown here, including:
• Additional facilities associated with Stonebridge Rec Center,
• Multiple athletic complex renovations at Middle & High Schools, and
• Major improvements to the Fairgrounds Site – which is also proposed to be
renamed to Chesterfield Courthouse Park
25
General Services
Current Needs
Renovate/Replace:
• Airport runway extension
• Airport improvements (rehab of hangars & runway, installation of
obstruction lights)
• Child Advocacy Center (CAC)
• Fleet Facilities Enhancements at Utilities Fuel Site
New Facilities:
• None
Needs are:
• Airport runway extension
• Airport improvements (rehab of hangars & runway, installation of obstruction
lights
• Relocation of the Child Advocacy Center (CAC) from a leased site to a county-
owned site, and
• Fleet Facilities Enhancements at the Utilities Fuel Site
Discussions are continuing regarding telecom to see if we need any additional
changes – ZOMod codified portions of our policies and we are continuing to
ensure that the section is up to date with state and federal regulations.
Otherwise, no new facilities are proposed at this time
26
General Services
Future Needs
Renovate/Replace:
• Expand school bus parking facilities
New Facilities:
• Additional fueling facilities
• Complete installation of Electric Vehicle (EV) charging stations
• Satellite preventative maintenance facilities
Future Needs are:
• The much anticipated Airport runway extension
• Airport improvements (rehab of hangars & runway, installation of obstruction
lights
• Child Advocacy Center (CAC) is taking over the former Virginia Credit Union
(VACU) building – eliminated current leased space
• Fleet Facilities Enhancements at Utilities Fuel Site
Discussions are continuing regarding telecom to see if we need any additional
changes – ZOMod codified portions of our policies and the state and feds
constantly update regulations so we will ensure that the section is up to date.
Otherwise, no new facilities are proposed at this time
27
Community Services Board/Mental Health
Support Services
Current Needs
Renovate/Replace:
• Renovate and expand the Rogers Building
Future Needs
• New Community Resource Center on Route 1 corridor
• Explore and develop leased space opportunities
• Consider partnering with other departments
• Continue partnerships with public, private, and non-profit agencies
Finally, we end with the Community Services Board/Mental Health Support
Services
• One current need is to Renovate and expand the Rogers Building – right here on
campus.
Additional needs are:
• A Community Resource Center in Route 1 area north of Route 288.
• Explore and develop leased space opportunities high demand areas.
• Consider partnering with other departments in the Community Resource
Center or consider spaces within Recreation Centers and/or Libraries.
• Continue partnerships with other public, private, and non-profit agencies to
provide needed programs, services, and facilities.
That concludes the Community Facilities portion – are there any questions from
the Commission thus far?
I’ll then yield the floor to Joanne Wieworka and Rich Billingsly to cover the
Revitalization section
28
Revitalization
Unlike several other chapters in this Comprehensive Plan update cycle, the
Revitalization Chapter required more substantial attention—even though it is still not a
full overhaul. The original chapter was developed before the County created the
Community Enhancement Department, which now leads most revitalization efforts.
Because of that, the chapter didn’t reflect the County’s current organizational
structure, tools, or approach.
29
Revitalization
Update chapter to:
• Remove outdated information, programs, and strategies.
• Improve alignment with Community Enhancement priorities and Adopted
Consolidated Plan Strategy.
Summary of Updates
• Consolidate Goals/Themes/Desired Outcomes
• Replace Revitalization Indicators with Identified Target Areas in
Consolidated Plan
• Update Recommended Revitalization Approach
• Update Past Efforts and Success Stories
• Remove Redundant Implementation Matrix
Remove outdated information, programs, and strategies.
This chapter has not been updated since before the Community Enhancement Department
was created.
Much of the content referenced programs or strategies that either no longer exist or have
changed over time.
This cleanup also helps reduce confusion for those who may be look to this chapter for
guidance on what the County is actually doing today and plans to do in the future.
Improve alignment with Community Enhancement priorities and the adopted
Consolidated Plan Strategy.
Since the chapter was originally written, the County’s approach to revitalization has become
more structured through the creation of the Community Enhancement Department and
through adopted Consolidated Plan strategy.
These two elements now work together to define where revitalization resources are most
needed, how funding is allocated, and what strategies are most effective.
Updating the chapter ensures strong alignment with these priorities so that our
Comprehensive Plan accurately reflects the County’s real working framework.
Summary of Updates
Consolidate Goals, Themes, and Desired Outcomes.
30
The existing chapter had multiple overlapping goal statements, themes and desired outcomes
that were sometimes repetitive, we are proposing to consolidate these into a list of desired
outcomes for the chapter that will match the structure of other chapters throughout the comp
plan.
Update Past Efforts and Success Stories.
The chapter previously highlighted older projects and efforts, we have updated this section to
highlight more recent accomplishments that showcase the County’s evolving revitalization
approach.
These updates help demonstrate how revitalization has progressed and how new strategies are
producing results.
Replace Revitalization Indicators with Identified Target Areas from the Consolidated Plan.
This chapter used a set of revitalization indicators to identify “Revitalization Areas”, we are
proposing to replace the old revitalization indicators with the specific target areas identified
through the Consolidated Plan process, which were developed in 2025 between CE and
Planning.
Update Recommended Revitalization Approach.
Because the County’s organizational structure and tools have changed, the chapter’s
recommended approach needed to be modernized.
We revised this section to reflect how revitalization actually occurs now—through a
combination of proactive code enforcement, community partnerships, reinvestment incentives,
corridor strategies, and alignment with HUD resources as well as identified potential future
efforts the county could take.
Remove Redundant Implementation Matrix.
The original chapter included its own implementation matrix, that other chapters do not include.
The rest of implementation lives in the stand-alone Implementation Chapter. Removing it
simplifies the document and ensures consistency across the Comprehensive Plan.
30
Chapter Desired Outcomes
Revitalization efforts seek to:
• Strengthen partnerships with residents, neighborhoods and community organizations in
revitalization.
• Maintain clean, thriving, and active neighborhoods, business districts, and public spaces.
• Ensure convenient, equitable access to housing, jobs, goods, services, recreation, and
public facilities.
• Increase overall neighborhood desirability and increase community resilience.
• Preserve and enhance the quality of life in established and aging communities.
• Support investments and programs that strengthen social connections and community.
• Encourage private investment that creates economic opportunity for residents
• Guide development in a well planned, efficient, and sustainable manner.
We streamlined these into a concise set of Desired Outcomes clear, high-level
statements that match the format used throughout the rest of the Comprehensive
Plan.
This helps improve readability and ensures revitalization goals integrate more cleanly
with countywide planning goals.
The desired outcomes for Revitalization efforts seek to:
• Partner with the community.
• Keep neighborhoods clean and vibrant.
• Improve access to daily needs.
• Strengthen neighborhood resilience.
• Support aging communities.
• Build social connections.
• Attract beneficial private investment.
• Promote sustainable, well-planned growth.
31
Approach
Aligning Revitalization Strategy with Community Enhancement Objectives
• Targeted investment
• Real estate and housing development
• Strategic code enforcement
• Volunteerism and community ownership
• Improvement of public spaces
Not necessarily about more money, but trying to line up the order in which we are
already spending money.
Becoming aware of needs from all the eyes and ears we have.
Can the sum of the parts be more than they are now?
32
Revitalization Implementation
Countywide Efforts
Quality development and property maintenance and preservation across all
neighborhoods.
• Countywide home repair programs (income-based eligibility)
• Keep Chesterfield Beautiful
• Illegal and Non-Conforming Sign Removal
• Community Cleanups
• Strategic Repurposing of Surplus County Property
33
Revitalization Implementation
Revitalization Tools
A coordinated approach focused on public investment, community partnerships, proactive
property maintenance, and targeted development incentives.
• Targeted investment
• CDBG, HOME and County funds
• Community Partnerships
• Collaboration with nonprofit organizations, community associations, and volunteers
• Proactive Property Maintenance
• Targeted code enforcement efforts aligned with available home repair resources
• Blight abatement
• Targeted Development Incentives
• Road cash proffer exemption (currently only in CDBG target areas)
• Expedited plan approval to be considered
Targeted investment
CDBG, HOME and County funds
Home repair programs
Funding for new affordable housing, including strategic use of federal
funds and other sources (LIHTC, etc.)
Resources dedicated to blight abatement.
Community Partnerships
Collaboration with nonprofit organizations, community associations, and
volunteers
Partnership with the Community Land Trust (CLT)
Community Cleanups
Proactive Property Maintenance
Targeted code enforcement efforts aligned with available home repair
resources
Blight abatement
Targeted Development Incentives
Incentives for development within CDBG target areas, including exemption
from road cash proffer policy
Additional benefits such as expediated plan removal to be considered.
34
Revitalization Implementation
• Develop the internal process to enable key county departments to
proactively align and direct existing and future actions to support
neighborhood revitalization initiatives
• Department specific leads
• Annual, multi-dept summit
• Planned projects and budget coordination
• Assessment of progress
• Pipeline of key locations and priorities
• Focusing of funding and resources
• Direct connection to external partners
35
Recent Success
• Bermuda Estates
• Commercial Zoning Enforcement
• Blighted Properties
• Ettrick Landing
• Conservation Park Land
• Volunteerism and Community Cleanups
36
Bermuda Estates
37
Commercial Zoning Enforcement
38
Commercial Zoning Enforcement
39
Blighted Properties
40
Blighted Properties
41
Ettrick Landing
42
Conservation Park Land
43
Community Clean-Ups
44
• Community
engagement and
public review of
draft
AUGUST SEPTEMBER
• Community
engagement
• CPC work session
on PlanMod
• Set CPC public
hearing
• CPC public
hearing on
PlanMod
OCTOBER
• BOS work session
on PlanMod
• Set BOS public
hearing
NOVEMBER
• BOS public
hearing on
PlanMod
DECEMBER
PlanMod Timeline
45