Fire Operations Committee Regular Meeting Agenda Packet (PDF)
Loudoun County · Loudoun County · meeting of Jul 20, 2016 · Agenda packets
Open the original document More from Loudoun County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Agenda
Fire Operations Committee
July 20, 2016
DTCI Large Conference Room
801 Sycolin Road, First Floor
1900 Hours
1. Call to order
2. Roll Call
3. Approve June Meeting Minutes
4. Chairman’s Report
5. LCFR Department Report (Nally)
a. NOVA Manuals
b. Significant Incident Review
6. LCFR Training Report (Brazier)
7. Sub-committee Reports
a. Equipment Standards Committee (Stephens)
b. Communications Committee (Quijano)
c. Health and Safety Committee (Quijano)
d. Training Committee (Radcliffe)
e. Dispatch Algorithm Committee (Stephens)
8. IAFF (Mader)
9. Old Business
10. New Business
a. Social Media and Use of Personal Electronic Devices SWP (Discussion)
b. Fire and EMS Training Enrollment and Wait Lists SWP (Action)
c. Updating Command Officer FRG and Conversion to SWP
d. Volunteer Command Officer List (Provide to FOC Chair ASAP)
11. Committee Member Comments
12. System Comments
13. Announcements:
a. Next Fire Operations Committee Meeting: August 17, 2016
b. Next Executive Committee Meeting: July 26, 2016
3
LOUDOUN COUNTY
FIRE OPERATIONS COMMITTEE
Committee Meeting
15 June 2016
1900 hours
DTCI Large Conference Room, 801 Sycolin Road
The June meeting of the Loudoun County Fire Operations Committee was held on
Wednesday, June 15, 2016. FOC Chairman Cook presided and called the meeting to
order at 7:03 p.m. The following attended:
Co. 1/20 Jim Cook
Co. 2 Bob Dryden/Scott Radcliffe/Buddy Colby
Co. 4 Eric Carroll
Co. 5 Absent
Co. 6 Miguel Quijano
Co. 7 Russell Furr
Co. 8 Rick Pearsall
Co. 9 Chris Meier
Co. 10 Bobby Isaacs/Robert Honec
Co. 11/18/24 David Short
Co. 12 Rob Berka
Co. 17 Absent
LCFFA Jeremy Mader
LCFR: AC Johnson, DC Nally, Captain Scott Brazier and
Christine Langley-Obaugh
Public Comments
No public comments.
Approval of Previous Meeting Minutes
A motion was made to approve the May minutes. The motion was seconded and
passed with two changes.
Chair’s Report
Chief Cook stated that there will be a work session with the Executive Committee this
coming weekend to discuss the new CAD. In addition, a presentation on records
management will be conducted by Captain Lamb.
Fire Operations Committee Meeting Minutes
June 15, 2016
Page 2 of 8
Active Directory accounts and training were also discussed.
Chief Cook stated station visits will most likely occur beginning July 1st. An email will
be forthcoming regarding dates.
LCFR Department Report -Deputy Chief Michael Nally
COG & NOVA Senior Operations Chiefs Committee
COG Senior Operations Chiefs
• Thursday, June 2, 2016 Teleconference
NOVA Senior Operations Chiefs
• Thursday, June 2, 2016 - Teleconference
Apparatus
Current Projects:
• Hazmat Support 619
o PO cut
o Pre-Construction meeting complete
o Waiting for start date.
o Hope for a late summer delivery date
• 2 Tankers (Middleburg & Kirkpatrick)
o PO cut
o Pre-Construction meeting complete
o Waiting for start date.
o Hope for a late summer delivery date
• Drop-In Number Project
o All County-owned heavy apparatus now have drop-in numbers.
• New Ambulance (A623)
o Replacement of 40055
o Finalizing contract with Fesco
o Incorporates some design changes to patient care compartment after
input from numerous current providers/end-users
o Expected delivery by late Fall
Future Projects:
• Kirkpatrick Engine
o In the planning stage and should have a PO cut Summer 2016
o Delivery in late Winter 2017
• Kirkpatrick Ambulance and replacement of 40053, 40054
o Will determine time-line after 40055 works its way through
construction/build process
• Replacement of Hazmat 619
Fire Operations Committee Meeting Minutes
June 15, 2016
Page 3 of 8
o When the committee is performing the post-paint inspection on the
Hazmat Support, we will start the planning process for the replacement of
HM619.
o PO should be cut by Fall2016
o Delivery in late Fall 2017
Miscellaneous:
• Annual Testing
o Ladder Testing & Hose Testing ( September 12th-16th )
o Pump Testing (Work in progress )
o Cot Testing (August 23rd and 24th )
o Amkus Testing (10/3, 10/4, 10/5)
Volunteer Battalion Chief Program
April 2016 - 23 of 30 nights were covered by VBC’s (76.66%)
Graham- 5
Cook - 4
Davis- 4
Shultz- 4
Short- 3
Starling- 3
Stephens- 3
Buchanan- 0
Firmin- 0
LCFR- 7
May 2016 - 25 of 31nights were covered by VBC’s (80.65%)
Graham- 3
Short- 3
Davis- 5
Firmin- 3
Cook - 2
Shultz- 4
Starling- 5
Buchanan- 0
Stephens- 0
LCFR- 6
Significant Incident Reports
Several pending review for dissemination.
Fire Operations Committee Meeting Minutes
June 15, 2016
Page 4 of 8
LCFR Training Report – Captain Scott Brazier
2016-1 Firefighter I & II
- The Spring 2016 Firefighter I & II Certification Class began on March 5, 2016, with 28
students.
-Currently, 25 students remain in class. One dropped due to injuries, and two have
now dropped due to family/work obligations.
- Students are studying vehicle extrication, scene size-up, search and rescue, forcible entry, fire
attack and suppression, ladders, ropes and knots, and ventilation.
- All students were successful at the completion of their Module II testing on May 21, 2016.
-Fire Behavior and Flashover training will be conducted on June 11, 2016.-
-Live Fire Burn #1 is scheduled for June 25, 2016.
-Lt. Michael Smith is the Course Coordinator and Lead Instructor. He can be reached at
robert.m.smith@loudoun.gov
-Lt. Boyd Morris is the Co-Course Coordinator and also a Lead Instructor. He can be reached at
boyd.morris@loudoun.gov
Monroe Tech.
-MTC Fire and EMS Classes resumed on August 31, 2015.
-Fire Fighter Certification Program:
-There are 9 students enrolled and all are eligible for certification in this class.
- All students were successful in their written and practical exams at the completion of their State
FF I testing held on May 27th. FF II State testing was held on June 7th. Results are pending.
-MTC’s Fire I & II students are scheduled to attend the Mayday! Firefighter Down! class with
Class 16-1 during the summer which will begin on August 1, 2016.
*Due to a change in MTC FF I & II curriculum which is mandated by the Virginia Department
of Education, stations will see the return of the skills sign off books that will need to be signed
off as each student completes skills training while at their stations. Originally, the MTC FF I &
II curriculum consisted of 360 hours to complete certification (to include EMR and HMO). The
Va. Dept. of Ed. has increased that hourly requirement to 560 for students to earn certified high
school credits. Since there aren’t enough hours in the school year to reach this 560 hour
objective (unless we removed the EMR program), skills books that can be signed off at the
station level will qualify as time in training toward the 560 hour requirement for each student. At
the end of the school year, these skills books that have been signed off at the stations will be used
as verification to the Department of Education that student training hours were completed.
-EMT Certification Program:
- There are currently eight students who continue with this program, of which 7 are eligible for
certification.
Fire Operations Committee Meeting Minutes
June 15, 2016
Page 5 of 8
- The Module 5 (County Final) written exam was administered on May 20, and practical’s
were administered on May 24, 2016. All seven eligible students were successful in the testing
session.
-State testing is scheduled for June 22, 2016 at the Monroe Tech School Building at their
Pierson-Vue Testing Center.
- Program Information:
Both classes have ended for the summer----Graduation was held on June 8!
Congratulations to the MTC students for honoring the program with another
successful year!
-Current applications submitted and approved so far equal 20 for the EMT program, and 11
for the fire program. Students are working on affiliation and physicals to qualify for the
program.
-Ms. Sokol will be sending out a reminder letter to each fire chief that is sponsoring an MTC
student for the 2016/2017 school year. This letter will be sent during the first week of
August asking for verification of affiliation of the students who have registered for the class.
As you know, affiliation is the key to staying enrolled in the MTC program. Sandy also
sends heartfelt thanks to the stations for supporting the students and the program over the last
school year!
- LCPS Instructor Sandy Sokol is MTC’s Course Coordinator and Lead Instructor. She can
be reached at sandra.sokol@lcps.org
Ongoing/Completed/Cancelled Courses
-FF I & II Basic Certification School-Class 16-1-Ongoing
-LCFR Swift Water Rescue-Technician-Ongoing
-VDFP HTR-Rope Rescue-Level I-Ongoing
-NFPA 1021-Fire Officer-Level III-Completed
-VDFP Fire Officer II (Hybrid)-Purcellville VFC-Completed
-NFPA 472-Hazardous Materials Operations-May 2016 Class-Completed
-Effective Meeting and Presentation Skills-FMO-Lisa Braun-Completed
-NFA-Leadership II-Cancelled-Low Enrollment
Classes Being Offered
Fire Behavior/Flashover Recognition
Ongoing- Contact BC Gottholm
Bernard.gottholm@loudoun.gov
NFA- Decision Making for Initial Company
Operations (DMICO)
June 14-15, 2016
Regis. closes June 6, 2016
VDFP- EVOC I, II & III
Hamilton Stations 605/617
June 18-19, 2016
http://bit.ly/1QJNjUD
EVOC Train the Trainer Update Class
Registration is through the VDFP website
www.vafire.com
June 22, 2016
Regis. closes June 20, 2016
NFPA 1021-Fire Officer-Level III June 25-August 27, 2016
Fire Operations Committee Meeting Minutes
June 15, 2016
Page 6 of 8
Purcellville VFC Regis. through VDFP website
NFPA 472 Hazardous Materials Operations-July
July 6-July 30, 2016
Regis. closes June 24th
NFPA 1002-Driver/Operator Pumper July 9-August 6, 2016
Regis. closes July 1, 2016
VDFP Heavy Technical Rescue-Level II July 23-24, 2016
Regis. closes July 8, 2016
VDFP Heavy Technical Rescue-Introduction to
Technical Rescue-Module II (Weekday Class)
August 8-10, 2016
Regis. closes July 29, 2016
Communicating with Your Community
FMO-Lisa Braun
August 27, 2016
Regis. closes August 16, 2016
Training Center MISC
**Sexual Harassment Prevention for Supervisors/Officers—To register for this class, please
provide your name, station #, email address, rank/title, and a brief statement requesting this
course in an email to katie.clark@loudoun.gov. You will receive instructions from Katie as to
how to access this online course.
-------------------------------------------------------------------------------------------------------------------------
**Check the VDFP Website (www.vafire.com) for current information and a listing of classes
being offered in other jurisdictions such as: No classes to report during this period.
-Fire Officer IV: July 23-August 15, 2016-Fairfax County Fire Training Academy-Register thru
VDFP….
Upcoming Events from Around the State
Structural Collapse Technicians Course Virginia Beach October 15-22, 2016
The 19th Annual Virginia Fallen Firefighters and Emergency Medical Services Memorial
Service will be held on Saturday, June 4, 2016 at the Richmond International Raceway
Complex’s Main Exhibition Hall.
--------------------------------------------------------------------------------------------------
Committee Reports
• Equipment Standards Committee: Chief Stephens
Nothing to report
• Communications Committee: Chief Quijano
Per Chief Quijano, the Communications Committee Meeting was cancelled.
Fire Operations Committee Meeting Minutes
June 15, 2016
Page 7 of 8
• Health & Safety Committee: Chief Quijano
Nothing to report, however, please ensure you are distributing informational
bulletins.
• Training Committee: Captain Radcliffe
Captain Radcliffe stated that the Training Committee finalized the Training
Enrollment and Wait Lists SWP. A brief overview regarding the percentage
method was provided. Discussion ensued.
• Dispatch Algorithm Committee
No report.
• IAFF: Jeremy Mader
Firefighter Breighton Englehart was involved in a serious motor vehicle crash
while off duty in Pennsylvania. A go fund me account has been established. An
update on Firefighter Englehart was provided.
Old Business
Social Media Draft SWP and Use of Personal Electronic Devices Draft SWP:
Chief Cook advised that we may have the revision available by the next meeting.
Rules of Order:
The Rules of Order have been completed.
New Business
Ballistic Vests:
Chief Johnson stated that the Draft SWP has been provided for action. According to
Chief Johnson, vests were obtained on a grant through NVERS. Chief Johnson stated
that the vests have a five year shelf life. An informational bulletin was distributed and
describes where the vests will be located. Chief Johnson stated the vests will not be
worn on routine calls, but will be utilized strictly for RTF. Chief Johnson stated
helmets are being considered.
Chief Johnson stated the EMSOC passed the SWP with a few minor wording
changes. The wording changes were revealed and discussed.
Fire Operations Committee Meeting Minutes
June 15, 2016
Page 8 of 8
Chief Quijano made a motion to accept the Ballistic Vests SWP. Chief Cook
seconded the motion. Chief Cook stated that this SWP ties right into the Active
Shooter policy. Discussion ensued. The motion passed 10-0-0-2.
After the Fire Brochure:
Chief Cook advised that Chief Hale has the After the Fire Brochures should anyone
request them for dissemination to those that have had a fire (post-fire). Chief Nally
provided brochures for review.
Committee Member Comments:
Chief Johnson stated Dr. Toon’s resignation will be effective June 24
th.
Regarding bio hazard pick-ups, the pick-ups are supposed to occur within four days,
however, this has not been occurring. Chief Johnson informed the FOC that the contract
is actually under Department of General Services. Chief Johnson advised that Chief
Salazar has provided the phone number and email address for the company via email.
Chief Johnson stated to please advise if any issues arise.
Chief Johnson stated effective July 1
st, OEM is moving out of Fire and Rescue officially.
Chief Johnson further stated the Department name will be Loudoun County Fire and
Rescue. Chief Johnson explained that Kevin Johnson will report directly to the County
Administrator.
Company 8 thanked everyone for their prayers for the Lickey family.
August 21
st: 60th Anniversary Celebration for Philomont
HIPAA Videos: Discussion regarding the possibility of new HIPAA training.
The next Executive Committee meeting is June 28, 2016 at 7:00 p.m. and the next Fire
Operations Committee meeting is July 20, 2016 at 7:00 p.m.
Respectfully submitted,
Christine Langley-Obaugh, M.Ed., CVA
Executive Liaison
5
Form 017 Page 1 of 8
Revised: 04/15/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander LT McGann (E619) /BC Warner (BC403)/ BC Anderson (BC603)
Officer completing SIR (if different from above) Click here to enter text.
Incident date 5/16/2016 Incident number 201611078
Dispatch time 1401 Box area 1940
Incident location 25403 Vacation PL
Type of incident as dispatched HF- House Fire
Actual type of incident (if different from above) Click here to enter text.
Number of Alarms: ☒Initial Alarm Only ☐Second Alarm or Greater ☒Level I RIT
☐Level II RIT ☐Level III RIT ☐ Tanker Task Force
☐ Other Click here to enter text.
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc): Level 1 RIT :
E421, TL436, M609. Additional units requested: E415, E611, T438, M607
Casualties
Civilian Fire Service Other
Injuries Click here to enter text. 1 Click here to enter text.
Fatalities Click here to enter text. Click here to enter text. Click here to enter text.
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $Click here to enter text. $Click here to enter text. $Click here to enter text.
Damages $430,000 $320,000 $750,000
Incident Times
First unit on scene 1406
Additional alarms/resources
requested
LVL 1 RIT 1407. Additional
resources 1420
Fire/Incident Under Control 1438
Last unit cleared scene 1712
Form 017 Page 2 of 8
Revised: 04/15/2015
Understaffed/Unavailable/Add-on Units
E404 Unavailable
E436 Unavailable
E438 Unavailable
SU609 (Canteen)
SO402 add-on
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Completed
I (identify the flow path) – Completed
C (cool the space) – Completed
E (extinguish the fire) – Completed
R (rescue) – Not Applicable
S (salvage) – Completed
Click here to enter text.
Narrative of Operations
E619 AOS to find a single family dwelling with smoke showing from the eaves of Side Alpha, Bravo and
Delta. E619 had secured their own water. Upon completing a 360 of the structure, E619 confirmed there
was active fire on Side Charlie of the structure on the exterior and requested the Level 1 RIT; assigned
TL619 x-ray crew as two out and established Vacation Place Command. Directed bucket FF to pull initial
attack line to the rear of the structure to extinguish the exterior fire. Upon consultation with TL619 OIC,
Command confirmed that they would be going in through Side Alpha of the structure. Command had
E609B meet up with TL619 to pull a handline to the 2nd floor for fire extinguishment. Prior to heading to
the 2nd floor, TL619 crew confirmed there was no fire on first floor and completed a primary
search. TL619 and E609B then made their way to second floor where they encountered extremely poor
visibility, but no heat. There was fire located throughout the attic in multiple rooms. TL619 began
opening the ceiling at the top of the foyer for E609B’s crews to begin extinguishment. Both units then
made their way to the master bedroom and began to pull ceiling and begin fire attack. The OIC on E609B
assumed Division 2 and requested a second line be pulled to the second floor to assist with the fire attack.
Two windows were removed on the second floor one in the front and one in the rear to increase visibility.
A primary search was completed on the second floor. E607 upon arrival could not access a position on side
Charlie. E607 positioned at the first cross street prior to the dispatched address. Command assigned the
crew from E607 to the second floor of the structure to assist with fire extinguishment and overhaul as
needed. E607’s driver did a face-to-face with E619’s driver to see if the secondary water source was
completed. E619’s driver did not need any assistance from E607 and E607’s driver geared up and met up
with the rest of E607’s crew on the second floor. BC403 arrived on scene and assumed Command.
During this time Medic 619 was assisting with deploying hoselines and assisting with fire control on the
exposures and exterior fire from the soffits on the fire building. TL302 secured utilities and worked on
overhaul. Upon arrival BC601 was assigned Charlie Division and BC603 assisted at the Command Post
preparing for transition of Command. BC403 transitioned Command to BC603. The bulk of the fire was
knocked and crews continued to work on hot spots. Salvage and overhaul was completed. One firefighter
injury occurred and was transported BLS by M607 to Stone Springs.
Form 017 Page 3 of 8
Revised: 04/15/2015
Safety Officer Comments
Reminder to utilize wheel chocks for apparatus
With warmer weather personnel need to be attentive to themselves and other crew members
ensuring that a prolonged work cycle is avoid (once incident stabilization has been
achieved). Rehab is essential in the process of personnel safety.
Consider keeping the additional personnel from last arriving units to assist with the de-
escalation of the incident (packing hose and ladders) so initial crews can get rehab.
Conducted interior atmospheric monitoring and interior safety during salvage and overhaul
operations.
Fairfax SO was first arriving, initial exterior safety was conducted. Completed a face to
face, he remained as exterior safety and SO600 became interior safety officer.
Crews conducted salvage and overhaul in a safe manner, kept crew integrity and remained
on SCBA until cleared.
Additional Comments
E619 officer performed extremely well in the command role until the arrival of BC403. (BC603 at
HQ and BC601 at sta. 22). All crews did a great job of keeping the fire from spreading to the
exposures and limiting the majority of fire damage to the attic and parts of the 2nd floor.
BC403 was thankful of the assistance at the Command Post from LT Jacobs (EMS601 ride-along).
He stated all crews did a great job. He also indicated minor confusion during the initial part of the
incident as there was a request from one of the officers for an additional EMS unit. BC403 was
unaware M619 was assisting with fire operations. This may be a difference in jurisdiction
operations.
M609 as part of the Level 1 RIT became Rehab. This was in part due to the additional EMS unit
not dispatched to replace M619.
Transition of command worked very well.
If initial arriving apparatus are unable take a NOVA position such as side Charlie, ensure
Command is notified. Later arriving apparatus should be looking for position access to side
Charlie, if possible.
TL619 crew assisted the homeowner with retrieving personal belongings before leaving the scene.
Neighborhood was canvased and post incident safety materials were handed out.
The Support Unit from station 9 provided beverages for the crews. Thank you.
Form 017 Page 4 of 8
Revised: 04/15/2015
Attachments
☒Pictures
☐Diagrams
☐Other Click here to enter text.
Form 017 Page 5 of 8
Revised: 04/15/2015
xxx
Form 017 Page 6 of 8
Revised: 04/15/2015
Form 017 Page 7 of 8
Revised: 04/15/2015
Form 017 Page 8 of 8
Revised: 04/15/2015
Form 017 Page 1 of 3
Revised: 04/15/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander Sean Scott, Battalion Chief
Officer completing SIR (if different from above) Daniel Neal, Captain
Incident date 5/16/2016 Incident number 201611068
Dispatch time 12:41 hours Box area 05-32
Incident location 115 Ivandale Street –
Hamilton
Type of incident as dispatched House Fire
Actual type of incident (if different from above) House Fire
Number of Alarms: ☒Initial Alarm Only ☐Second Alarm or Greater ☒Level I RIT
☐Level II RIT ☐Level III RIT ☐ Tanker Task Force
☐ Other Click here to enter text.
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc): No Additional
Units Requested.
Casualties
Civilian Fire Service Other
Injuries 0 0 0
Fatalities 0 0 0
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $233,180 $0 $Click here to enter text.
Damages $20,000 $0 $20,000
Incident Times
First unit on scene 12:45 hours
Additional alarms/resources
requested 12:47 hours
Fire/Incident Under Control 12:51 hours
Last unit cleared scene 14:42 hours
Form 017 Page 2 of 3
Revised: 04/15/2015
Understaffed/Unavailable/Add-on Units
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Completed
I (identify the flow path) – Not Applicable
C (cool the space) – Completed
E (extinguish the fire) – Completed
R (rescue) – Not Applicable
S (salvage) – Not Completed
Click here to enter text.
Narrative of Operations
Engine 605B, Engine 602, Engine 604, Engine 620, Tower 602, Truck 620, Rescue 620, Medic
617C, Battalion 602, Battalion 601, EMS 601, Safety 600, and FM610 were dispatched to a house
fire. The initial caller stated they could “see lots of flames” and “everyone has evacuated.” Engine
605B laid out from 60 Ivandale Drive for approximately 800 feet to position past the structure.
Engine 605B sized-up a two-story single family dwelling (Type V) with heavy smoke from Side
Charlie. Engine 605B performed a 360 of the structure to find fire on the exterior of the structure
on Side Charlie. The fire had extended up the siding on the exterior of the home. Engine 605B
performed an exterior attack on Side Charlie with an 1 ¾” handline while Engine 602 established a
water supply. Engine 605B established “Ivandale Command” and designated Tower 602 “X-Ray
Crew” as the “Two-Out” crew. Battalion 602 requested a Level 1 RIT Response. Tower 602
positioned on Side Alpha of the structure. The “X-Ray Crew” began to place ground ladders
around the structure. A firefighter and technician were physically confronted by the affected
dwelling’s occupant who did not want his home further damaged. The occupant interfered with the
laddering of the structure. After a brief confrontation, the occupant removed himself from the area.
Engine 620 established a secondary water supply as Engine 605 knocked down the fire on the
exterior. E612 established the RIT Group on Side Alpha as additional units entered the structure
and checked for fire extension. Battalion 602 arrived on the scene (after an extended response from
Fire Station 610) and assumed “Ivandale Command”. Significant smoke conditions were found on
the second floor, but only a small amount of charring was found in the attic. The power was
secured and ventilation conducted. Safety 600 metered the structure and personnel were then
permitted to operate without SCBA. Overhaul was paused until the Fire Marshal’s Office (FMO)
completed some investigation. The power was secured. The FMO continued their investigation as
overhaul was completed. Personnel who operated in the IDLH were rehabbed and returned to
service. Units were released. There were no injuries to civilians or emergency personnel. The
FMO determined that the fire was accidental, due to failure to extinguish a portable fire pit before
storing.
Form 017 Page 3 of 3
Revised: 04/15/2015
Safety Officer Comments
Overall, personnel ensured personal protective equipment (PPE) was worn correctly.
During the de-escalation of the incident, the removal of ground ladders was performed by a
single firefighter. To prevent injuries, more than one firefighter should perform these tasks.
Typically, aerial apparatus should position to avoid overhead obstructions. On this incident,
numerous power lines and tree branches prevented any positioning in which the aerials could
be deployed.
Roadways around the incident scene should be closed as soon as possible for crew safety.
Safety appropriately conducted interior atmospheric monitoring and interior safety monitoring
during salvage and overhaul operations.
Crews conducted salvage and overhaul in a safe manner. Personnel maintained crew integrity
and remained on SCBA until the area was cleared.
Additional Comments
Several lessons learned were identified from this incident.
1. The first engine provided a calm and intelligible size-up of the structure and conditions. Units
should remember to request a Level 1 RIT with a working fire and announce their “Two-Out”.
2. During the size-up, remember to identify the presence (or absence) of a basement.
3. Ladder truck positioning was appropriate on Side Alpha of the structure. The presence of an
array of tree branches and power lines obstructed the use of the aerials. Ground ladders were
sufficient for the size of the structure.
4. Personnel handled the confrontation with the citizen in a safe and professional manner. When
physically confronted, personnel used an equal amount of force to protect themselves and each
other without escalating the incident. Personnel immediately alerted an officer (and an FM)
when the incident confrontation occurred.
Attachments
☐Pictures
☐Diagrams
☐Other Click here to enter text.
xxx
Form 017 Page 1 of 4
Revised: 04/15/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander Sean C Scott, Battalion Chief
Officer completing SIR (if different from above) Click here to enter text.
Incident date 6/9/2016 Incident number 201613164
Dispatch time 21:55 Box area 1204K
Incident location 11867 Ropp Lane
Type of incident as dispatched House Fire
Actual type of incident (if different from above) Click here to enter text.
Number of Alarms: ☐Initial Alarm Only ☐Second Alarm or Greater ☐Level I RIT
☐Level II RIT ☐Level III RIT ☒ Tanker Task Force
☐ Other Click here to enter text.
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc): Tanker Task Force,
1 additional transport unit (A614), SU609
Casualties
Civilian Fire Service Other
Injuries Click here to enter text. Click here to enter text. Click here to enter text.
Fatalities Click here to enter text. Click here to enter text. Click here to enter text.
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $Click here to enter text. $Click here to enter text. $Click here to enter text.
Damages $375,000 $Click here to enter text. $375,000
Incident Times
First unit on scene 22:06
Additional alarms/resources
requested 22:05
Fire/Incident Under Control 22:50
Last unit cleared scene 02:32
Form 017 Page 2 of 4
Revised: 04/15/2015
Understaffed/Unavailable/Add-on Units
Understaffed: E928, E905 Unavailable: R920, A914 Add-on Units: B612, C905, BC901, C903B,
CN612
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Completed
I (identify the flow path) – Completed
C (cool the space) – Not Applicable
E (extinguish the fire) – Completed
R (rescue) – Not Applicable
S (salvage) – Not Applicable
Information provided by the ECC to responding units indicated a caller reporting an “abandoned”
home next door with fire from the roof. E612 advised they would be laying out from half way up
the driveway and requested the next in to complete the lay, also advising that it would be a
working fire. Based on this information BC602 requested a Tanker Task Force. E612 AOS with a
single story “vacant” home with fire through the roof and stated that it would be an exterior
operation.
Narrative of Operations
E612: Established Ropp Lane command and positioned in the driveway on side Delta of the
structure. The initial line off was a 1 ¾” hand line with crews entering into a garage door on side
Delta. BC602 directed units back out of the structure due to fire involvement and the declaration
of a defensive operation. The deck gun was placed in service and trained on the roof area of the
home. The Blitz Fire was also deployed to side Alpha of the structure and placed into operation
once a consistent water supply was established. Additional hand lines were deployed from E612
to side Alpha and Charlie.
K612: Dropped their tank at the end of the driveway and proceeded up to nurse E612.
E928: Completed the split lay from Ropp Lane up the driveway and began to supply E612. This
unit was understaffed.
E610: Positioned at the end of the driveway and set up as the dumpsite engine. Recognizing that
E928 did not have a clappered siamese, they utilized theirs to allow tankers to begin supplying to
the fire ground while the dumpsite was set up. The remaining crew deployed to the fire ground and
was assigned to side Charlie initially and then redeployed to interior operations during the
transition.
T905: Positioned their apparatus out of the way on Ropp Lane and proceeded to the scene with
manpower and equipment. The unit was initially assigned to man the Blitz Fire on side Alpha and
later deployed interior with a hand line once we were able to transition. The officer was assigned
as the Fire Attack Group.
E920: Assumed the RIT function once the decision was made to transition units in for mop up.
E605: Relieved T905 and assisted with interior operations following the transition.
Q914: Assigned to Charlie division placing ladders in the area of the walkout basement and
Form 017 Page 3 of 4
Revised: 04/15/2015
conducted overhaul/mop up operations from the exterior.
R903: Initially held in staging and then utilized for overhaul operations.
BC602: Took a lap of the structure and identified a small walkout basement on the Alpha Bravo
quadrant of the structure. Command was assumed via mobile on side Alpha of the structure.
EMS601: After checking in with M612, assisted command with aide functions.
SO600: Assumed the Safety Officer responsibility and continually provided feedback to command
to include atmospheric monitoring during mop up operations.
M612: Positioned out of the way and performed rehab at the scene. An additional transport unit
was requested to stand by.
CN602: Was assigned as the RWS officer with all operations placed on 6E-TAC12. BC602
monitored.
C905: Assigned as Alpha division supervisor.
C914: Assigned as Charlie division supervisor along.
FM610 FM609: The FMO integrated into operations and began investigation into the origin and
cause which was ultimately ruled as accidental electrical ignition.
Water Supply/Tanker Task Force: CN602, K610, EK920, E680, K905, K602, K605, BC601
Safety Officer Comments
Negatives:
-Declared a defensive operation, personnel operating on the scene exhibited an eagerness to
advance inside the structure and were reminded to back away at times. A reminder that crew
discipline needs to be exercised periodically on the scene.
- When experiencing limited access to the scene and traveling to the scene on foot, crews need to
ensure they are equipped appropriately for their assignment once at the location. Shortage/lack of
water to rehydrate crews was recognized and personnel were directed to have to walk back to the
main road to secure these supplies.
-During exterior overhaul, had to instruct personnel to utilize eye protection while performing this
task.
Positives:
-Crews wore their structural gear correctly and appropriately.
-When directed to rehab, crews did well to ensure they went through and completed their rehab
and hydration.
-Scene lighting was utilized as best as possible (due to apparatus limitations) on the scene. This
assisted in identifying the uneven topography on Side Charlie.
-On scene communication between crews and command was performed well. Several face to face
communications occurred. This was seen during the transition from defensive to offensive
operations and rehab.
Additional Comments
- Due to the narrowness of the driveway and nearly 2000’ lay all additional arriving units were
required to walk in with their equipment.
Form 017 Page 4 of 4
Revised: 04/15/2015
- BC602 was in command by mobile on side Alpha of the structure. Though no confusion was
experienced, BC602 failed to don the “Incident Command” vest.
- The incident was initially deemed to be an abandoned/vacant structure and a defensive operation
and thus a Level 1 RIT was not requested. As the incident transitioned, consideration was made to
request the Level 1 RIT but due to the depletion of resources and those already on scene we were
able to maintain adequate RIT staffing levels.
Water Supply:
-The 5th due engine did not take the fill site assignment. Eventually, E602 on the Tanker Task
Force took the 5th due responsibilities.
-No secondary fill site was established until E920 was sent to a nearby pond which due to
the proximity of the fire could potentially have been utilized without the need for a tanker shuttle.
This has since been amended and was an issue with the individual map.
-A mutual aid unit did not have the necessary appliances to make the connection to the dry
hydrant. This was discussed with one of the members and is being remedied.
-Vehicle positioning along the ingress and egress routes of these incidents is critical to the overall
success of water supply operations. Heavy apparatus had to be repositioned and some command
vehicles were left without keys which needed to be relocated.
Attachments
☐Pictures
☐Diagrams
☐Other Click here to enter text.
xxx
Form 017 Page 1 of 4
Revised: 04/15/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander Daniel J. Neal, Battalion Chief
Officer completing SIR (if different from above) Click here to enter text.
Incident date 6/10/2016 Incident number 201613216
Dispatch time 13:22 hours Box area 24-33
Incident location 45346 Gable Square - Kincora
Type of incident as dispatched Auto Accident causing an Inside Gas Leak
Actual type of incident (if different from above) Click here to enter text.
Number of Alarms: ☐Initial Alarm Only ☐Second Alarm or Greater ☐Level I RIT
☐Level II RIT ☐Level III RIT ☐ Tanker Task Force
☒ Other Entrapment Assignment
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc): Additional engine
company, EMS transport unit, and canteen requested
Casualties
Civilian Fire Service Other
Injuries 1 0 0
Fatalities 0 0 0
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $0 $0 $Unknown
Damages $0 $0 $0
Incident Times
First unit on scene 13:26 hours
Additional alarms/resources
requested 13:29 hours
Fire/Incident Under Control 15:00 hours
Last unit cleared scene 15:25 hours
Form 017 Page 2 of 4
Revised: 04/15/2015
Understaffed/Unavailable/Add-on Units
No units were understaffed, unavailable, or add-on units.
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Completed
I (identify the flow path) – Not Applicable
C (cool the space) – Not Applicable
E (extinguish the fire) – Not Applicable
R (rescue) – Not Applicable
S (salvage) – Not Applicable
Click here to enter text.
Narrative of Operations
E624, M635, R615, EM601, BC601, and SO600 were dispatched to an auto accident with
entrapment. Updated dispatch information reported that no one was trapped, however one vehicle
struck the deck and gas meter of a townhouse. E624 arrived on scene to find a two vehicle
collision without entrapment. There were two patients for “check-out”. One vehicle was positioned
under a deck and on top of a gas meter. There was an active gas leak. E624 established “Davis
Drive Command” and requested an additional engine company to assist with the gas leak. E611
responded, took position on Side Alpha, established a water supply, and deployed a hand line.
R615 and E611 began to meter the affected townhome, the Bravo-1 exposure, and two separate
townhouses on the Delta side. LCSO evacuated the residences within a 50 meter radius of the
incident and controlled access to the incident. OEM602 began to coordinate between LCSO and
Fire/EMS resources. Unable to shut-off gas at the meter, R615 began looking for a “street shut-
off”. BC601 arrived on the scene, obtained a briefing from E624, and assumed command.
After evaluation, one patient requested transport. M635 began treatment and a second EMS unit
was requested. A625C responded and transported the patient, while M635 remained on scene.
Canteen 611 was requested to the scene.
E611 regularly checked the exposures and only found readings inside the affected structure’s
basement (45346 Gable Square). A fan was placed at the front door of the structure to preclude gas
build-up. Washington Gas arrived on scene and began operations to secure the leak. E624’s crew
deployed a hose line for protection of the Washington Gas personnel. Washington Gas secured the
leak and the affected structure and exposures were metered again. Building and Development was
requested to assess the damage to one of the deck supports.
As units began to pick-up to return to service, a tow truck arrived to remove the vehicle on top of
the gas meter. As the vehicle was removed, another active leak developed. Units quickly re-
established a perimeter and deployed a hose line. Washington Gas secured the leak a second time.
Form 017 Page 3 of 4
Revised: 04/15/2015
Command was terminated and units returned to service.
Safety Officer Comments
E624 appropriately established hot, warm and cold zones after doing an initial size up of the
scene.
Units continued to monitor the scene due to the moderate and changing wind conditions.
Proper PPE was donned during the incident.
M635 did a great job of setting up a Rehab area and ensuring units were staying hydrated prior
to the arrival of Canteen 611.
Additional Comments
Several lessons learned were identified from this incident.
1. Command initially positioned on Side Alpha of the affected unit when all other units were
operating on Side Charlie. Command eventually positioned on Side Charlie.
2. Size-up by the initial units and the command officer did not specifically announce the type of
structure affected (i.e. townhouse).
3. The address of the affected townhouse was not identified until the arrival of the command
officer.
4. Passport drop-off was not identified by Command. Command should also have announced a
“visual PAR” at 20 minute intervals.
5. E611 should have been deployed to obtain a water supply for E624.
6. Units should consider requesting a utility line locator company (i.e. Utiliquest) when location
of underground utility lines is difficult (or digging may be anticipated).
7. OEM served as a valuable coordinator (between LCSO and Fire) to manage road closures and
evacuations.
8. During normal business hours, Building and Development is requested directly through ECC –
not through the on-duty FM.
Attachments
☒Pictures
☐Diagrams
☐Other Click here to enter text.
Form 017 Page 4 of 4
Revised: 04/15/2015
Unit positioning for the latter half of the
incident.
Command Board use to diagram exposures.
Vehicle into deck and damaged gas meter.
xxx
Form 017 Page 1 of 4
Revised: 04/15/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander Daniel J. Neal, Battalion Chief
Officer completing SIR (if different from above) Click here to enter text.
Incident date 6/12/2016 Incident number 201613406
Dispatch time 14:48 hours Box area 23-71
Incident location 42455 Mount Hope Road –
Ashburn
Type of incident as dispatched Water Rescue
Actual type of incident (if different from above) Click here to enter text.
Number of Alarms: ☒Initial Alarm Only ☐Second Alarm or Greater ☐Level I RIT
☐Level II RIT ☐Level III RIT ☐ Tanker Task Force
☐ Other Click here to enter text.
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc): No Additional
Units Requested.
Casualties
Civilian Fire Service Other
Injuries 0 0 0
Fatalities 0 0 0
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $0 $0 $Click here to enter text.
Damages $0 $0 $0
Incident Times
First unit on scene 14:53 hours
Additional alarms/resources
requested Click here to enter text.
Fire/Incident Under Control 15:16 hours
Last unit cleared scene 16:11 hours
Form 017 Page 2 of 4
Revised: 04/15/2015
Understaffed/Unavailable/Add-on Units
Z615 added on to the incident (at 15:08 hours) to support Z625 who responded (at 14:58 hours).
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Completed
I (identify the flow path) – Not Applicable
C (cool the space) – Not Applicable
E (extinguish the fire) – Not Applicable
R (rescue) – Completed
S (salvage) – Completed
Click here to enter text.
Narrative of Operations
E609B, E623, EM601, M609, A623B, BC601, BC603, R620, SO600, T620, TL606, Z613, Z615,
M623, A623B, R615, Z625, C600B, Z615, and BC614 were dispatched to a water rescue. Initial
911 call described three males in the water after their canoe overturned. Further information
described that the males were attempting to self-rescue, but were struggling against increasing
wind conditions. Initial units arrived on scene and began to collect information from witnesses.
BC601 arrived on scene and established “Mount Hope Command”. The command post was
positioned in the parking area with a view of the reservoir. Since the parking area provided limited
mobility, Command directed all additional responding units to stage in the Mount Hope Church
parking lot.
The victims were located several hundred yards west of the Mount Hope Road access. Although
the victims were being assisted by several kayakers, they were not wearing personal flotation
devices when their canoe overturned. One of these kayakers (an off-duty Fairfax County
Firefighter) called 911 from his cellular phone. ECC was able to “ping” this cellphone to
determine an exact location of the victims.
BC603 responded to the Reservoir Road access point. This location was much closer to the
victims. BC603 was assigned “Reservoir Road Division” with E609B, M623, Z613, R620, and
EMS601. With the closer proximity to the victims, this was identified as the best location from
which to facilitate the rescue.
R620 and Z613 arrived on scene at the Reservoir Road Division and rapidly deployed into the
water. Z613 deployed into the water 22 minutes after the initial 911 call. Within three minutes,
Z613 rescued all three victims. The victims were brought to shore and evaluated by M623. No
EMS care or transport was required. Command was terminated and the operations channel (6-Lima
TAC-31) was released. Fire and EMS resources were returned to service.
Form 017 Page 3 of 4
Revised: 04/15/2015
Safety Officer Comments
Despite the large number of responders and terrain, there were no injuries.
In still water, it may not be necessary to have all responders wearing personal flotation devices.
It may only be necessary to have the crew designated to assist with victim recovery from the
boat don PPE (i.e. responders who may enter the edge of the water).
Additional Comments
Several lessons learned were identified from this incident.
1. Units responding to water rescues at the Beaverdam Reservoir should automatically consider
responding to via different access roads. Utilizing two separate access points (Mount Hope
Road, Reservoir Road) allowed closer access to the emergency regardless of victim location.
2. Considering the limited access to the water and the small parking areas around the Beaverdam
Reservoir, staging non-essential and large apparatus is essential.
3. Establishing two separate divisions and dividing resources allowed either division to effect the
rescue once victim location was identified.
4. A second command officer is essential when establishing a division, especially when the
division is geographically remote from command.
5. ECC’s ability to utilize cellular locating (i.e. “pinging”) is under-utilized to locate victims in
remote locations.
6. The safety officer is a valuable resource on water rescue incidents. This individual can ensure
appropriate PFD use, supervise safe launching and recovery of boats, and verify proper boat
staffing (i.e. boat operator, swift water technician) prior to deployment.
7. Water rescue resources should ensure proper staffing prior to responding. There was confusion
whether one boat responded with appropriate resources.
8. Personnel operating towed resources (i.e. boats) should be proficient in backing and
positioning in tight areas.
Attachments
☒Pictures
☐Diagrams
☐Other Click here to enter text.
Form 017 Page 4 of 4
Revised: 04/15/2015
Map of 911 caller’s ping location by ECC to
help locate the victims.
Z613 approaching shore immediately after
the rescue.
Z613 approaching shore with the rescued
victims.
Z613 at shore with the rescued victims.
xxx
Loudoun County Fire & Rescue
Training Division
16600 Courage Court, Leesburg, VA 20175
Phone 703-737-8400 Fax 703-777-0235
FIRE OPERATIONS COMMITTEE REPORT
June 9 thru July 15, 2016
2016-1 Firefighter I & II
-The Spring 2016 Firefighter I & II Certification Class began on March 5, 2016, with 28 students and currently,
25 students remain in class.
-Live Fire Burn #1 was completed on June 25, 2016.
- Live Fire Burn #2 is scheduled for July 16, 2016, followed by the FF I State written and practical testing on
July 18 & 20.
- Live Fire Burn #3 is scheduled for July 23, 2016.
-At the completion of the Module 3 test, student report cards were sent out to the Chief’s by Lt. Smith.
-Lt. Michael Smith is the Course Coordinator and Lead Instructor. He can be reached at
robert.m.smith@loudoun.gov
-Lt. Boyd Morris is the Co-Course Coordinator and also a Lead Instructor. He can be reached at
boyd.morris@loudoun.gov
2016-2 Firefighter I & II
-Registration for Class 16-2 is open (posted on July 30) and registration closes on
August 26, 2016 for a September 17, 2016 class start date.
Monroe Tech.
-The Fire Fighter Certification Program:
-No classes for the summer.
-The EMT Certification Program:
-No classes for the summer.
- Program Information:
-Both classes have ended for the summer.
-LCPS Instructor Sandy Sokol is MTC’s Course Coordinator and Lead Instructor. She can be reached at
sandra.sokol@lcps.org
6
Ongoing/Completed/Cancelled Courses
-FF I & II Basic Certification School-Class 16-1-Ongoing
-NFPA 1021-Fire Officer-Level III-Purcellville VFC-Ongoing
-VDFP HTR-Rope Rescue-Level I-Completed
-LCFR Swift Water Rescue-Technician-Completed
-NFA-Decision Making for Initial Company Operations (DMICO)-Completed
-VDFP-EVOC I, II, & III-Hamilton Stations 605/617-Completed
-EVOC Train the Trainer Update Class-VDFP-Completed
-NFPA 472-Hazardous Materials Operations-July 2016 Class-Ongoing
-NFPA 1002-Driver/Operator-Pumper-Ongoing
-NFA-Leadership II-Cancelled, then re-issued for August 13-14, 2016 (See listing in “Classes Being Offered”)
-VDFP HTR-Vehicle Rescue-Level I-Cancelled due to Low Enrollment
Classes Being Offered
Fire Behavior/Flashover Recognition Ongoing-Contact BC Gottholm
bernard.gottholm@loudoun.gov
VDFP Heavy Technical Rescue-Vehicle Rescue-Level I July 23-24, 2016
Regis. closes July 8, 2016
VDFP Heavy Technical Rescue-Introduction to Technical
Rescue-Module II (Weekday Class)
August 8-10, 2016
Regis. closes July 29, 2016
NFA Leadership II
(Re-issued from previous cancellation)
August 13-14, 2016
Regis. closes August 8, 2016
VDFP/LCFR Rural Water Supply August 20-21, 2016
Regis. closes August 12, 2016
NFA Incident Safety Officer
(Short Registration Period due to Instructor Availability!)
August 20-21, 2016
Regis. closes August 15, 2016
Response to Aviation Accidents for First Responders August 22, 24, 27, 2016
Regis. closes August 12, 2016
LCFR NOVA Manual Review
Held at SVFC 618
August 25, 2016
Regis. closes August 12, 2016
Communicating with Your Community
FMO-Lisa Braun
August 27, 2016
Regis. closes August 16, 2016
NFPA 472-Hazardous Materials Operations-September Class September 1-24, 2016
Regis. closes August 19, 2016
Firefighter I & II Basic Certification School (Class16-2) Sept 17, 2016 -March 4, 2017
Regis. closes August 26, 2016
NFA Leadership III September 24-25, 2016
Regis. closes Sept. 16, 2016
LCFR Ignitor/1403 Awareness September 24, 2016
Regis. closes Sept. 16, 2016
VDFP HTR-Rope Rescue-Level I Sept. 24, 25, Oct. 1, 2, 2016
Regis. closes September 9, 2016
VDFP Fire Officer III Currently on hold! See note
below in “Training Center
Misc.”
Training Center MISC:
**Sexual Harassment Prevention for Supervisors/Officers—To register for this class, please provide your
name, station #, email address, rank/title, and a brief statement requesting this course in an email to
katie.clark@loudoun.gov. You will receive instructions from Katie as to how to access this online course.
**VDFP FIRE OFFICER III**- Anticipated for August 2016, however, this is currently being discussed as to
how to manage the class. VDFP has refused to fund this class after we had submitted an application
requesting a funded class. They replied that we have had too many Fire Officer III classes in Loudoun County
already (two thru LCFR and one in Purcellville). Internally, we have not been able to secure enough
instructors on our own to run an unfunded class at the academy.
--------------------------------------------------------------------------------------------------------------------------------------
***Check the VDFP Website (www.vafire.com) for current information and a listing of classes being offered
in other jurisdictions such as: No Classes to report during this period.
-Fire Officer IV-July 23-August 15, 2016-Fairfax County Fire Training Academy-Register thru VDFP…..
Upcoming Events from Around the State
-Structural Collapse Technician Course Virginia Beach October 15-22 2016
-----------------------------------------------------------------------------------------------------------------
Questions! Please contact: Scott Brazier, Captain
Office-703-737-8872
scott.brazier@loudoun.gov
7d
LCCFRS – Training Committee
Meeting Minutes July 5, 2016
Meeting convened July 5th at 1900
Attendees
Committee Chair LCFREM – Field Reps
Bernard Gottholm Present Troy Gittings Present
Fire Operations Committee
Reps
LCFREM – Training Division
Reps
Jim Fazekas – Co 1/20 Present Scott Brazier Present
Scott Radcliffe – Co 2 Present Michelle Beatty Present
EMS Operations Committee
Reps
Guests
Cheryl Aycock – Co 4 Present
Tony Mino – Co 13 Present
Meeting minutes approved for June
Agenda
• New Buisness
Training – Scott Brazier
• No Report
Fire OPS – Jim Fazekas and Scott Radcliffe
• No Report
EMS OPS – Cheryl Aycock and Tony Mino
• No Report
LCFR Field – Troy Gittings
• No Report
Old Business
• No Report
New Business
• SWP brought up to the Executive committee
o Chiefs appraised the training committee on the work they have provided
for the policy
o Only had a couple of questions addressed by Chief Gottholm
o SWP was tabled till July so the committees could review it one last time
• Discussion on the next issue the committee wants to address.
7d
o Chief Gottholm requested the Committee send him suggestions for the
next item to work on
o Cheryl suggested we get a list from the training staff on what needs to be
addressed
o Discussion about working on training center expectations and code of
conduct.
o All suggestions be sent to Fazekas he will keep track of them
• IB sent out to replace the one field position on the committee
Meeting adjourned at 2000
Next meeting Tuesday August 2, 2016
10a
Subject: Social Media Policy Page 1 of 7
SWP: Issued: [month][day], 2016
LOUDOUN COUNTY COMBINED FIRE AND RESCUE SYSTEM
SYSTEM-WIDE PROCEDURE (SWP)
TITLE Social Media and Use of Personal Electronic Devices Policy
SECTION
SWP#
ISSUED
REVISED
APPROVED System Chief ___________________________________________________
W. Keith Brower, Jr.
Scope:
All Loudoun County Combined Fire and Rescue System (LC-CFRS) members
Purpose:
The purpose of this policy is to provide guidance to LC -CFRS members by identifying the
appropriate use of social media by System personnel, and acknowledge that the inappropriate use
of social media may lead to actual harm and disruption to the System. This may include, but is not
limited to, negatively impacting the public’s perception of the organization and its willingness to
render services to them. For example, if a member of the LC -CFRS makes negative stereotypic
comments on social media about a prot ected class, religious group, or race of people, citizens in
such groups may avoid calling 9 -1-1 due to that member’s posted beliefs. Engaging in social
media and social networking activities is a form of speech. Nothing in this policy is intended to
unlawfully restrict a member’s right to discuss, as a private citizen, matters of public concern.
Another purpose of this policy is to provide guidance to LC -CFRS members on the personal use
of digital devices (including, but not limited to: mobile phones, sm artphones, tablets, personal
computers and digital cameras) while on duty in the following ways:
• Acknowledging that the inappropriate use of personal digital devices may lead to actual
harm and disruption to the LC-CFRS, such as negatively impacting the public’s perception
of the organization;
• Acknowledging that the inappropriate use of personal digital devices may delay or
otherwise adversely impact a member’s ability to focus on incident priorities; and
• Acknowledging that the inappropriate use of personal digital devices may inhibit a
member’s ability to protect patient information and jeopardize the integrity of ongoing
investigations. Photos, video, or recordings of any type while on- scene that are
inadvertently released publicly, including on personal social media accounts, potentially
violate privacy and/or confidentiality laws.
Nothing contained in this SWP is intended to abridge LCFR Fire Marshal Office (FMO) personnel
from conducting any investigatory action commensurate with their position.
10a
Subject: Social Media Policy Page 2 of 7
SWP: Issued: [month][day], 2016
Definitions:
• Social media: an internet or mobile -based means of mass communication allowing for
interaction amongst users, moving information between a news source, an individual
and/or a broader community in the form of interaction and dia log. Social media websites
are either publicly accessible or accessible to invited guests, in order to create, view or
update the content. Social media sites include, but are not limited to, Facebook, Twitter,
Instagram, Snapchat, YouTube, Pinter est, LinkedIn, Flickr, Google+; as well as blogs,
commenting on online media sites, and other similar communication platforms or channels.
• Loudoun County Combined Fire Rescue System: The "Combined System" or "LC -
CFRS" includes every volunteer fire -fighting and EMS organization (also referred to as
Company) recognized pursuant to Chapter 258 of the Codified Ordinances of Loudoun
County (Chapter 258) and authorized by the Board of Supervisors to operate as a fire -
fighting and/or EMS organization within the geographic boundaries of Loudoun County,
or any of its incorporated towns, as well as Loudoun County Fire and Rescue (LCFR) and
all of its employees.
• Personal Electronic Device: Includes, but is not limited to: mobile phones, smartphones,
tablets, personal computers , digital cameras , personal body cameras, personal dash
cameras, personal helmet cameras, and GoPros
©.
• Spokesperson for the System : Any System member who is authorized to make a
statement on behalf of the System Chief in his/her capacity as a member of the System, or
in such a way that it may reasonably be attributed to the System, Any such authorization
must be given by the Incident Commander, System Chief, or designee.
• Hate speech: Speech that identifies, in a negative manner, a person or group of people on
the basis of attributes including race, ethnic origin, national origin, skin color, gender
(including status as pregnant or nursing), religion, disability, gender identification, age, or
sexual orientation, including a level of intolerance or hostility that is incompatible with a
commitment to serve all members of the community.
Procedure:
A. Social Media
1. All organizations listed in Chapter 258 are permitted to establish and maintain official
social media communication platforms for their respective organization.
2. Each organization which chooses to establish and/or maintain an official social media
presence shall establish Company level policies and procedures governing the use and
administration thereof which shall not be inconsistent with the intent of this SWP.
3. Under the direction of the System Chief, the official social media platforms of Loudoun
County Fire and Rescue (LCFR) are the official LC-CFRS Social Media platforms for
System-Wide operational activities.
4. Each organiz ation is permitted to have its own Public Information Officer (PIO) .
Company-level PIOs may speak on behalf of their respective organization for all matters
pertaining to the non-operational corporate functioning of that organization (e.g. matters
10a
Subject: Social Media Policy Page 3 of 7
SWP: Issued: [month][day], 2016
relating to fundraising, community events, public outreach, public education, annual
recognition banquets, etc).
5. System-wide and Operational requests for information shall be directed to the System
PIO. Examples of the types of inquiries to be handled by the System PIO are those
relating to all emergency and non- emergency calls dispatched by Loudoun County; all
potential violations of the System- Wide Code of Conduct; all financial matters
pertaining to county funding; and all personnel matters until such time as they are vetted
by the System Chief). Likewise, any request for public records in the possession of the
System shall be directed to the System PIO for appropriate response under the Virginia
Freedom of Information Act (“FOIA”).
6. Each organization is permitted to have its own designated photographer(s). Procedures
relating to the security, maintenance and posting of images captured by C ompany
photographers are outlined below.
7. The following individuals are authorized to access and/or utilize LC-CFRS social media
platforms during operational incidents to speak on behalf on the Combined System: the
System Chief and designee(s), Staff Duty Officers, Incident Commanders (or designee),
and the LC-CFRS Public Information Officer (PIO) (or designee).
8. To keep System members and the public safe, and to ensure that all personnel remain
situationally aware while engaged in incident operations, t he use of social media
platforms by System members (other than those listed in #7) is prohibited during
emergency response which begins at the time of initial dispatch and continues through
the time the unit is placed in service as available and has cleared the scene. This does
not include being dispatched in an available status (i.e. station transfer).
9. LC-CFRS organizations and their members who operate official and/or personal social
media platforms shall not engage in speech on personal and/or organizational social
media platforms that is false, deceptive, libelous, slanderous, intentionally misleading ,
or causes harm to others, including speech that constitutes hate speech, or is harassing
in nature; nor shall members discuss or post on a social media site protected or
confidential matters of the System, including:
a. Investigations (to include, but not limited to: criminal investigations, fire, explosive
and environmental investigations, accident or collision investigations);
b. Patient Protected Health Information (as defined in the Health Insurance Portability
and Accountability Act “HIPAA”);
c. Personnel matters including investigations and disciplinary actions;
d. Protected controlled unclassified information, provided by federal, state, or local
government partners, for System situational awareness (often labeled FOR
OFFICIAL USE ONLY or FOR LAW ENFORCEMENT USE ONLY);
e. Information not required to be released to the public under a FOIA exemption.
10a
Subject: Social Media Policy Page 4 of 7
SWP: Issued: [month][day], 2016
f. Policies and Procedures of the LC-CFRS that are not for public dissemination (e.g.
Station and Personnel Safety and Security; Response to Active Violence Incidents)
g. NOVA Operational Manuals
h. Public records not required to be released under FOIA.
10. System members’ use of personal and/or System organizational social media sites shall
be in accordance with all applicable System –Wide policies and procedures regarding
confidentiality, harassment, and the System-wide code of conduct.
11. No member of the System will, while speaking as a private citizen on a matter of public
concern, do so in such a manner as to cause actual harm or disruption to System
operations (e.g. engaging in hate speech by posting comments on social media platforms
that have the real or perceived effect of blunting an individuals’ likelihood of accessing
emergency services when needed).
12. Supervisors of System members shall not require any System member to accept a
request to join their social media circle.
a. Example: A Chief/Company Officer cannot require a subordinate member to join
the Chief’s/Company Officer’s social media account; nor can he or she require the
member to grant him or her access to the member’s social media account.
b. Example: A System organization cannot require prospective or incumbent members
to provide them access to their social media platform(s).
13. When social media impersonation of a System member is discovered, notification shall
be made to the member’s chain -of–command and reported to the Chief of System as
soon as practical, due to potential negative impact on the reputation of the System.
a. Example: a social media platform is created using the System Chief’s name when
the System Chief has no such account.
b. Example: A member of the System has his or her social media account hacked or
hijacked.
14. The LCFR name and associated logos (including the title of the LC-CFRS) are not to be
sold without permission of the System Chief, or designee.
15. All System members are responsible for protecting confidential information. System
members seeking clarification regarding protected information or experiencing
difficulty with that responsibility can seek free, confidential assistance through:
a. Their direct supervisor, following chain-of command;
b. The Employee Assistance Program
B. Use of Personal Electronic Devices
1. The use of personal electronic devices while on an emergency call is permitted for
legitimate business purposes (mission related applications) . Examples include mapping,
accessing medical protocols, and research that supports incident operations. Additionally,
personnel may use their personal electronic devices for communication with a hospital,
poison control center, emergency communications center(s), emergency point(s) of contact
10a
Subject: Social Media Policy Page 5 of 7
SWP: Issued: [month][day], 2016
for the incident, hazardous material (HAZMAT) reference entity, Federal, state, and/or
local governmen t support. Personal calls of an urgent or emergent natur e are also
permitted, provided they do not interfere with a System member’s performance of duties.
2. The use of personal electronic devices outside of emergency calls shall be governed by a
member’s Company/Department policy, however all information captured by a personal
electronic device while on duty may be subject to release under FOIA if determined to be
a public record.
3. State laws concerning the use of electronic devices while operating a vehicle apply to all
LC-CFRS members.
4. Images, photos, videos, and/or audio recordings that are obtained intentionally or
accidentally (including images that are of poor quality) by a System member (including
Company photographers) while on a call or performing fire or rescue functions on an
incident scene shall become the property of the County and shall not be released,
distributed, posted, and/or published in any form without the prior approval of the System
Chief. Approval from the System Chief may be obtained through the following steps:
a. All images shall be forwarded to the System Chief’s PIO
1 immediately after the
incident in which there was a collection of photographic/ videographic media and/or
audio recordings (This can be done electronically or by electronic mail). The name
and contact information of the individual who obtained the media must be provided.
The email address is DEPT-FRSERV-FREMPIO@loudoun.gov
and the mailing
address is:
Loudoun County Fire and Rescue
Attn: Public Information Officer
PO Box 7100
Leesburg, VA 20175
b. All requests to publish or release submitted records should contain the specific Venue
for which a System member is r equesting the image, video or audio to be posted or
shared (e.g. station website, personal website, training program, etc.).
c. Once the photographic/videographic media and/or audio recordings have been
submitted for review:
i. The images, video, and/or audio shall be deleted from the a pplicable electronic
equipment from which it was created.
ii. Digital memory cards/DVD’s/videotapes shall also have all images, video, and/or
audio deleted from the device. If the type of media will not allow the
1 The LCFR FMO may review images submitted for investigatory purposes and system members who submit
images may be contacted by an LCFR Fire Marshal.
10a
Subject: Social Media Policy Page 6 of 7
SWP: Issued: [month][day], 2016
images/video/audio to be removed, the media shall be f orwarded to the System
Chiefs’ PIO.
d. Once received, the PIO will review the media and make a recommendation to the
System Chief regarding approval/disapproval.
i. The System Chief, or designee, will approve/disapprove all requests for the
release of images, video and/or audio recordings.
ii. Upon the System Chief’s approval/disapproval, the PIO will inform the
individual member in writing (email) of his/her decision and any restrictions
attendant thereto. Permitted images/audio/video will be returned to the requestor.
5. LC-CFRS members authorized to capture photographs, images, videos, and/or audio inside
a controlled area of incident operations (areas not accessible to the general public) shall
include: the Incident Commander (or designee(s)), Staff Duty Officer(s), System Chief (or
designee), LC-CFRS Public Information Officer (PIO), LC-CFRS Safety Officer, Loudoun
County Fire Marshal or Assistant (s) and/or law enforcement agency(ies) , or other
investigatory agency or department as permitted under law.
6. Images, photos, videos, and/or audio captured outside of the controlled area of incident
operations (areas accessible to the public) by off -duty personnel and/or designated
photographers are beyond the scope of this SWP.
7. No images may be capt ured that contain information that is considered to be Protected
Health Information (PHI) under HIPAA. For example, photographs of patients taken by
EMS providers if the patient can be identified, whether directly or through their features,
or indirectly through unique clothing, tattoos or other marking on the patient’s body,
license plate, or the nature of the particular injury or motor vehicle collision or event.
Similarly, a photograph of a medical record, medications, ECG, or other documentation
that can be linked to a specific patient are prohibited. Finally, meta-data contained within
an image that could identify a patient is also included.
8. No images, video, and/or audio may be shared, transferred or reproduced, unless required
for patient care purposes and then only to the medical professionals involved in the care of
that patient; as required by law, or for law enforcement activity. Images captured in the
provision of EMS must be attached to the patient’s permanent medical record.
9. No images, video, and/or audio captured by on- duty personnel may be sold or used for
private or commercial purposes outside of the System under any circumstances.
10. Off-duty LC-CFRS members shall not use their affiliation to gain access to controlled areas
of incident ope rations (areas not accessible to the general public) for the purposes of
capturing images, photos, videos, and/or audio of incident operations.
11. Use of per sonal helmet, personal body cameras and personal dash cameras (e.g. GoPro)
are prohibited.
10a
Subject: Social Media Policy Page 7 of 7
SWP: Issued: [month][day], 2016
C. Violations of this SWP may result in disciplinary action, up to and including dismissal as an
operational member of the System, as determined by the System Chief in accordance with
Chapter 258.
10b
Subject: Fire and EMS Training Enrollment and Wait Lists Page 1 of 8
SWP: 801.1 Issued: xx xx, 2016
LOUDOUN COUNTY COMBINED FIRE AND RESCUE SYSTEM
SYSTEM-WIDE PROCEDURE (SWP)
TITLE Fire and EMS Training Enrollment and Waiting Lists (Draft 2.0)
SECTION Training
SWP# 801.1
ISSUED Xx/xx/2016
REVISED
APPROVED System Chief ___________________________________________________
W. Keith Brower, Jr.
PURPOSE
To establish a procedure for ensuring maximum enrollment in the fire and EMS training classes
offered at the Oliver Robert Dubé Fire and Rescue Training Academy.
SCOPE
This policy applies to all Members of the Loudoun County Combined Fire and Rescue System
(LC-CFRS).
DEFINITIONS
Member – Any individual who has been duly affiliated with any firefighting or EMS organization
recognized by the Board of Supervisors under Chapter 258 of the Codified Ordinances of
Loudoun County, including the Department of Fire, Rescue and Emergency Management
(DRFEM).
Sponsoring Organization - Any Fire or Rescue Company or Department including Department of
Fire, Rescue, and Emergency Management (DFREM), from which a member applies for
enrollment in a class. For the purposes of the SWP, when the term "sponsoring organization"
is applied to a LC-CRFS volunteer fire or rescue company it means "each named volunteer
organization." Volunteer organizations with more than one station affiliation (i.e., Co 1/20, Co
11/18/24, Co 15/25/35, Co 6/22) equate to "one volunteer company," therefore a single
“sponsoring organization.”
Exception List – Administered by the Training Division during the application period in order to
track applicants with a prerequisite variance. These applicants will have an opportunity to
participate in the enrollment process provided that applicable conditions of this SWP are met.
Wait list – The list of applicants who are not seated in a class where the number of applicants
exceeds the maximum number of students allowed. Applicants who are not seated will be
10b
Subject: Fire and EMS Training Enrollment and Wait Lists Page 2 of 8
SWP: 801.1 Issued: xx xx, 2016
placed on this list and must agree to applicable terms and conditions. These “wait-listed”
students may then be seated in the class as enrolled students drop out. This list is administered
by the Training Division.
Business Day – For the purpose of the SWP, business days are Monday thru Friday (excluding
holidays) and Close of Business (COB) occurs at 1700.
POLICY
Members will register for courses at the Oliver Robert Dubé Fire and Rescue Training Academy
as outlined in this SWP.
PROCEDURE
I. Firefighter I & II, EMR, EMT and HazMat Operations Training
A. The LC-CFRS Training Committee hereby establishes a procedure for timely notification to
fire and rescue system members seeking registration for Firefighter I & II, HazMat
Operations, EMR and EMT classes
1 offered by the Training Division. This policy also
establishes procedures for enrollment and class placement, for a waiting list in classes
where the number of applicants exceeds the maximum allowable and for the addition of a
second class in the event of high demand.
B. Maximum class sizes will be dictated by the Commonwealth or nationally recognized
credentialing agencies such as the Virginia Department of Fire Programs (VDFP)
and the
Virginia Office of Emergency Medical Services (VOEMS). Class sizes may only be exceeded if
the credentialing agency grants a variance.
C. Minimum class sizes will be determined by the credentialing agency (i.e. VDFP, VOEMS).
D. Training Advisories (TA) will be distributed a minimum of sixty (60) calendar days prior to
the posted application closing date. Normally the application closing date will be at least
thirty (30) business days before the first day of class. Some classes such as hybrid classes
however may require an application closing date of more than thirty (30) business days.
Any deviation from the nominal closing date/class start timelines will be announced in the
TA.
E. No Training Requests (TR) will be accepted after the posted application closing date unless
the class is not filled to capacity. No applicants will be added to the class after the first class
session.
_________________________
1 Section I also applies to EMR and EMT recertification classes.
10b
Subject: Fire and EMS Training Enrollment and Wait Lists Page 3 of 8
SWP: 801.1 Issued: xx xx, 2016
F. Incomplete TR’s2 will be returned for resubmittal. No priority will be given to students
resubmitting a TR. Once the completed TR is received, the applicant will be eligible for the
class placement process provided that the provisions of Paragraph E are met. The date and
time that the completed TR is received by the Training Division will be used to determine
the applicants position in the placement process.
G. Applicants who are currently enrolled but have not completed a prerequisite class may
petition the Deputy Chief of Training for a variance to allow admission into a class.
Enrollment would be conditional upon successful completion of all prerequisite class’s3 on
or before the first day of the requested class. After receipt of this request, one of the
following two actions will be taken:
1. The Deputy Chief of Training denies the variance – Applicant is not accepted into the class
and receives an explanation for the rejected application.
2. The Deputy Chief of Training approves the variance - Applicant will be placed on the
exception list.
a. If there are remaining seats available at the end of the placement process, the
applicant will be seated in the class.
b. If no seats are available at the end of the placement process, the applicant may
volunteer for the wait list program provided the wait list is not full.
c. Applicant shall be informed of and agree to, all conditions of the variance prior to
acceptance into the class.
H. Training requests must have the endorsement of the sponsoring organization’s Chief Officer
or designee.
I. Classes will be filled utilizing the following method:
4
1. At the close of the application period, all applications will be sorted by sponsoring
organization and grouped in order of time and date that they were received.
2. If there are more applications than seats, a numeric formula shall be used to fill seats.
The maximum number of seats for the class shall be divided by the number of applicants.
The answer shall be represented as a percentage of permissible applications. That
percentage will then be multiplied by the number of applicants from each sponsoring
organization to determine how many students from each will be accepted. This will
ensure that at least one student from each organization is accepted into the class.
Applications from each sponsoring organization shall be chosen in order of time and date
each complete TR is received by the training division.
_________________________
2 A “completed TR” is one which includes all required information and supporting documentation (prerequisites).
3 Paragraph G applies only to a prerequisite class in which the applicant is currently enrolled (i.e., Enrolled in
HAZMAT Ops which will end 4 days prior to the start of Firefighter I & II) and not “self-study” curriculum (i.e.,
online NIMS 700 course)
4 See Appendix I for details
10b
Subject: Fire and EMS Training Enrollment and Wait Lists Page 4 of 8
SWP: 801.1 Issued: xx xx, 2016
3. When calculating each percentage, the numbers should be rounded up when applicable.
In the event that there is an overage or underage, the applicant with the next latest date
and time will be removed or added.
a. Example – There are 23 applicants for a class with a maximum of 20 seats. 20 divided
by 23 equals .867 or 87%, therefore each sponsoring organization will be permitted to
send 87% of its applicants to the class.
J. Within five (5) business days of the application closing date, the Course Coordinator will
notify each sponsoring organization’s Chief Officer or designee, of the number of their
applicants who have been accepted. The FCHIEF / RCHIEF and VOLTRN email groups will be
utilized for LC-CFRS sponsoring organizations. If there are more applicants than available
seats, each Chief Officer or designee will have two (2) business days to prioritize which of
their applicants will attend the class. If no priority is received after two (2) business days,
their members will be admitted on a first come, first served basis, utilizing the date and
time the completed TR was received by the Training Division.
K. Within twelve (12) business days of the application closing date, the Course Coordinator will
send an email to all applicants who submitted a completed TR for the course. That
notification will indicate one of the following three courses of action:
1. The applicant is accepted into the class – The notification will provide the course
information such as start date, location, time, etc.
2. The applicant has been placed on the wait-list for the class - The notification will provide
course information such as start date, location, times, class attendance during the wait-
list period, and an explanation of the wait-list process (i.e., how/when an applicant will be
taken from the wait-list and enrolled in the class).
3. The applicant is not accepted in the class – The notification will include an explanation for
the rejected application.
L. For classes where the number of applicants exceeds the maximum class size, the Course
Coordinator will establish a wait list. The following policy applies to the wait-list process:
1. Within twelve (12) business days of the application closing date applicants not seated in
the class will be notified that they have been placed on the wait list.
2. Applicants will have two (2) business days to decline placement on the wait list.
3. No more than ten (10) applicants may be placed on a waiting list.
4. For applicants who are placed on the wait list, their order on the wait list will be
determined by the date and time that their completed TR was received by the training
division. The Course Coordinator will communicate with the applicant their position on
the wait list.
5. All applicants on the wait list must agree to all terms and conditions associated with being
on the wait list as communicated by the Course Coordinator.
6. Fire classes will allow wait-listed students to sit for the first day of class. Any wait-listed
student not seated at that time will be dropped from the class and the list terminated.
10b
Subject: Fire and EMS Training Enrollment and Wait Lists Page 5 of 8
SWP: 801.1 Issued: xx xx, 2016
7. EMS classes will allow wait-listed students to attend class until the first module test. Any
wait-listed student not seated before the first module test will be dropped from the class
and the list terminated.
M. For classes where the number of applicants exceeds the maximum class size and there are
more than ten (10) students applying for the wait list, the Deputy Chief of Training will
determine the feasibility of opening a second class. This decision will be made within five (5)
business days of the close of the enrollment period of the original class5. The Deputy Chief
of Training will take one of the following two actions regarding this decision:
1. The Deputy Chief of Training determines that a second class is not feasible - A maximum
of ten (10) applicants will be placed on a waiting list for the original class as per Paragraph
L.
2. The Deputy Chief of Training determines that a second class will be feasible - Enrollment
for this additional class will be open to all members. Enrollment will be conducted as
described in Section I with the following exceptions:
a. Enrolling applicants may need to submit a second TR specific to the new class.
b. Applicants will be provided a minimum of ten (10) business days to enroll in the second
class.
c. Classes will be filled utilizing the method directed in Paragraph I. Reapplying applicants
who were not seated in the first class will not receive priority. Each sponsoring
organizations Chief Officer or designee will be responsible for prioritizing which of their
applicants will attend the class as described in Paragraph J.
d. Due to the fact that this is an unplanned class hosted for the purpose of meeting
immediate demand, other exceptions may apply. All exceptions to Section I will be
defined in the TA.
II. Virginia Department of Fire Programs (VDFP) and All Other Sponsored Classes
A. The LC-CFRS Training Committee hereby establishes a procedure for timely notification to
fire and rescue system members seeking registration for Virginia Department of Fire
Programs (VDFP) and all other sponsored classes not covered previously in Section I, which
are offered by the Training Division6. This policy also establishes procedures for enrollment,
for a waiting list in classes where the number of applicants exceeds the maximum allowable
and for the addition of a second class in the event of high demand.
B. Maximum class sizes will be dictated by the Commonwealth or nationally recognized
credentialing agencies such as the Virginia Department of Fire Programs (VDFP) and the
_________________________
5The provisions of Paragraph M do not in any way preclude the Deputy Chief of Training or Training Division from
taking other, more effective actions to increase class size in order to accommodate demand (i.e. adding additional
instructors to a class, module scheduling changes).
6 The enrollment process for classes not offered by the Training Division but conducted at the Training Academy
will be controlled by the agency which sponsors the class. (i.e. Applicants must apply on-line at the VDFP web site
and receive notifications from VDFP; not the Training Division, for an Instructor III class held at the Training
Academy.)
10b
Subject: Fire and EMS Training Enrollment and Wait Lists Page 6 of 8
SWP: 801.1 Issued: xx xx, 2016
Virginia Office of Emergency Medical Services (VOEMS). Class sizes may only be exceeded if
the credentialing agency grants a variance.
C. Minimum class sizes will be determined by the credentialing agency (i.e. VDFP, VOEMS).
D. Training Advisories (TA) will be distributed a minimum of sixty (60) calendar days prior to
the posted application closing date. Normally the application closing date will be thirty (30)
business days before the first day of class. Some classes such as hybrid classes however
may require an application closing date of more than thirty (30) business days. In these
cases, the deviation from the nominal closing date/ class start timelines will be announced
in the TA.
E. No Training Requests (TR) will be accepted after the posted application closing date unless a
variance is granted by the credentialing agency. If applicable - No applicants will be added
to the class after the first class session.
F. Incomplete TR’s
7 will be returned for resubmittal. No priority is given to students
resubmitting a TR. Once the completed TR is received, the applicant will be eligible for the
class placement process provided that the provisions of Paragraph E are met. The date and
time that the completed TR is received by the Training Division will be used to determine
the applicants position in the placement process.
G. Applicants who are currently enrolled in but have not completed a prerequisite class, may
petition the Deputy Chief of Training for a variance to allow admission to a class. When
applicable, the Deputy Chief of Training will coordinate this request with the credentialing
agency. Enrollment would be conditional upon successful completion of all prerequisite
class’s
8 on or before the first day of the requested class. After receipt of this request, the
following action will be taken:
1. The Deputy Chief of Training or credentialing agency denies the variance – Applicant is not
accepted into the class and receives an explanation for the rejected application.
2. The Deputy Chief of Training or credentialing agency approves the variance - Applicant will
be placed on the exception list.
a. If there are remaining seats available at the end of the placement process, the applicant
will be placed in the class.
b. If no seats are available at the end of the placement process, the applicant may
volunteer for the wait list program provided the wait list is not full.
c. Applicant shall be informed of and agree to, all conditions of the variance prior to
acceptance into the class.
_________________________
7 A “completed TR” is one which includes all required information and supporting documentation (prerequisites).
8 Paragraph G applies only to a prerequisite class in which the applicant is currently enrolled (i.e., Enrolled in
Instructor I which will end 4 days prior to the start of Officer I) and not “self-study” curriculum (i.e., online NIMS
700 course)
10b
Subject: Fire and EMS Training Enrollment and Wait Lists Page 7 of 8
SWP: 801.1 Issued: xx xx, 2016
H. Training request must have the endorsement of the sponsoring organization’s Chief Officer
or designee.
I. Classes will be filled utilizing the following method:
1. Each sponsoring organization will have the opportunity to fill one (1) seat in the class.
2. Any sponsoring organization not filling a seat (e.g., by not submitting a completed TR) on
or before the class closing date will forfeit their seat.
3. Remaining seats not filled as specified above, will be filled on a first come, first served
basis, utilizing the date and time the completed TR is received by the Training Division.
J. Within five (5) business days of the application closing date, the Course Coordinator will
notify each sponsoring organization’s Chief Officer or designee, of the number of their
applicants who have been accepted. The FCHIEF / RCHIEF and VOLTRN email groups shall be
utilized for LC-CFRS sponsoring organizations. If there are more applicants than available
seats, each Chief Officer or designee will have two (2) business days to prioritize which of
their applicants will attend the class. If no priority is received after two (2) business days,
their applicants will be admitted on a first come, first served basis, utilizing the date and
time the completed TR was received by the Training Division.
K. Within twelve (12) business days of the application closing date, the Course Coordinator will
send an email to all applicants who submitted a completed TR for the course. That
notification will indicate one of the following three courses of action:
1. The applicant is accepted into the class – The notification will provide the course
information such as start date, location, time, etc.
2. The applicant has been placed on the wait-list for the class - The notification will provide
the course information such as start date, location, times, class attendance during the
wait-list period, and an explanation of the wait-list process (i.e., how/when will an
applicant be taken from the wait-list and enrolled in the class).
3. The applicant is not accepted in the class – The notification will include an explanation for
the rejected application.
L. For classes where the number of applicants exceeds the maximum number of students
allowed and where permitted by the credentialing agency, the Course Coordinator will
establish a wait list. The following policy applies to the wait-list process:
1. Within twelve (12) business days of the application closing date applicants not seated in
the class will be notified that they have been placed on the wait list.
2. Applicants will have two (2) business days to decline placement on the wait list.
3. The maximum number of applicants to be placed on a waiting list shall be ten (10) unless
otherwise defined by the credentialing agency.
4. For applicants who volunteer to be placed on the wait list, their order on the wait list will
be determined by the order that the Training Division received their completed TR. The
Course Coordinator will communicate with the applicant their position on the wait list.
10b
Subject: Fire and EMS Training Enrollment and Wait Lists Page 8 of 8
SWP: 801.1 Issued: xx xx, 2016
5. Any applicant who volunteers to be placed on the wait list must agree to all terms and
conditions associated with being on the wait list as communicated by the Course
Coordinator.
6. Unless otherwise specified by the credentialing agency, the wait list will allow students to
sit for the first day of class. Any wait-listed student not seated at that time will be dropped
from the class and the list terminated.
M. For classes where the number of applicants exceeds the maximum number of students and
there are more than ten (10) students applying for the wait list, the Deputy Chief of Training
will determine the feasibility of opening a second class. This decision will be made within
five (5) business days of the close of the enrollment period of the original class
9. The Deputy
Chief of Training will take one of the two following actions regarding this decision:
1. The Deputy Chief of Training determines that a second class is not feasible - A maximum
of ten (10) applicants will be placed on a waiting list for the original class as per Paragraph
L.
2. The Deputy Chief of Training determines that a second class will be feasible - Enrollment
for this additional class will be open to all members. Enrollment will be conducted as
described in Section II with the following exceptions:
a. Enrolling applicants may need to submit a second TR specific to the new class.
b. Applicants will be provided a minimum of ten (10) business days to enroll in the second
class.
c. Classes will be filled utilizing the method directed in Paragraph I. Reapplying applicants
who were not seated in the first class will not receive priority. Each sponsoring
organizations Chief Officer or designee will be responsible for prioritizing which of their
applicants will attend the class as described in Paragraph J.
d. Due to the fact that this is an unplanned class hosted for the purpose of meeting
immediate demand, other exceptions may apply. All exceptions to Section II will be
defined in the TA.
Approved for compliance with Emergency Medical Services delivery
_____________________________________________________
John I. Morgan, M.D., LC-CFRS Medical Director
_________________________
9 The provisions of Paragraph M do not in any way preclude the Deputy Chief of Training or Training Division from
taking other, more effective actions to increase class size in order to accommodate demand (i.e. adding additional
instructors to a class, module scheduling changes).
Appendix I
SWP 801.1 Fire and EMS Training Enrollment and Waiting Lists
1 | Page
PERCENTAGE METHOD
EXAMPLE A - FIREFIGHTER 1 & 2 CLASS WITH 41 APPLICANTS FOR 30 SEATS
Co. 9 Co. 10 Co.11 Co. 12 Co. 13 Co. 15 Co. 17
PFF 1/1 1300 PFF 1/1 1300 PFF 1/1 1300 PFF 1/6 1300 PFF 1/6 1300 PFF 1/8 1300 PFF 1/8 1300
PFF 1/3 1200 PFF 1/1 1300 PFF 1/6 1300 PFF 1/8 1300
PFF 1/1 1300 PFF 1/6 1300 PFF 1/8 1300
PFF 1/2 1200 PFF 1/8 1300
PFF 1/4 0200
PFF 1/5 1900
PFF
2 X 73% 1 X 73% 7 X 73% 3 X 73% 1 X 73% 4 X 73% 1 X 73%
1 1 5 2 1 3 1
30 divided by 41 = .7317 or 73%
73% multiplied by the number of applicants from each sponsoring organization provides the total admitted to class from each
Note –The time and date that the TR was received shall be used to determine order of students accepted from each company. In the event that the
calculations provide more or less students than the class maximum, date and time shall be used to add or remove one applicant.
Co. 1 Co.2 Co. 4 Co. 5 Co. 6 Co. 7 Co. 8
PFF 1/1 1300 PFF 1/1 1300 PFF 1/3 1300 PFF 1/1 1300 PFF 1/1 1300 PFF 1/9 1300 PFF 1/1 1300
PFF 1/2 1400 PFF 1/3 0900 PFF 1/11 1300 PFF 1/14 1100 PFF 1/1 1300
PFF 1/11 1300 PFF 1/14 1300 PFF 1/1 1300
PFF 1/17 1300 PFF 1/18 1300 PFF 1/1 1300
PFF 1/19 1800 PFF 1/1 1300
PFF 1/1 1300
PFF 1/6 1300
5 X 73% 4 X 73% 2 X 73% 2 X 73% 7 X 73% 1 X 73% 1 X 73%
4 3 1 1 5 1 1
Appendix I
SWP 801.1 Fire and EMS Training Enrollment and Waiting Lists
2 | Page
PERCENTAGE METHOD
EXAMPLE B - HAZ MAT OPS CLASS WITH 34 APPLICANTS FOR 20 SEATS
Co. 9 Co.11 Co. 12 Co. 13 Co. 17 Out of County
PFF 1/04 1300 PFF 1/01 1300 PFF 1/01 1300 PFF 1/01 1300 PFF 1/1 1300 PFF 1/01 1300
PFF 1/08 1300 PFF 1/1 1400 PFF 1/09 0800 PFF 1/01 1300 PFF 1/02 1800
PFF 1/11 1500 PFF 1/03 1330 PFF 1/6 0700
PFF 1/21 1300 PFF 1/09 1300
PFF 1/23 1400
2 X 59% 5 X 59% 2 X 59% 3 X 59% 1 X 59% 4 X 59%
1 3 1 2 1 2
20 divided by 34 = .5882 or 59%
59% multiplied by the number of applicants from each sponsoring organization gives us the total admitted to class from each organization
Note –The time and date that the TR was received shall be used to determine order of students accepted from each company. In the event that the
calculations provide more or less students than the class maximum, date and time shall be used to add or remove one applicant.
Co. 1 Co.2 Co. 4 Co. 5 Co. 6 Co. 7
PFF 1/1 1300 PFF 1/1 1300 PFF 01/09 1300 PFF 01/10 1300 PFF 1/1 1300 PFF 1/03 1200
PFF 01/31 1300 PFF 1/27 0700 PFF 01/21 1900 PFF 1/01 1300 PFF 1/4 1300
PFF 01/31 1400 PFF 1/01 1300
PFF 1/01 1400
PFF 1/01 1500
PFF 1/04 1300
PFF 1/07 1300
3 X 59% 2 X 59% 1 X 59% 2 X 59% 7 X 59% 2 X 59%
2 1 1 1 4 1
LOUDOUN COUNTY COMBINED FIRE AND RESCUE SYSTEM
SYSTEM-WIDE PROCEDURE (SWP)
TITLE Fire and EMS Training Enrollment and Waiting Lists (Percentage Method Draft
Version 2.0)
SECTION Training
SWP# 801.1
ISSUED Xx/xx/2016
REVISED
APPROVED System Chief ___________________________________________________
W. Keith Brower, Jr.
Original Intent
PURPOSE
To establish a procedure for ensuring
maximum enrollment in the fire and EMS
training classes offered at the Oliver Robert
Dubé Fire and Rescue Training Academy.
The goal of the LC-CFRS Training Division is to
enroll, teach and certify as many students as
possible while maintaining the highest
standards of the fire service
Original Intent
SCOPE
This policy applies to all Members of the
Loudoun County Combined Fire and Rescue
System (LC-CFRS).
Original Intent
DEFINITIONS
Member – Any individual who has been duly
affiliated with any firefighting or EMS
organization recognized by the Board of
Supervisors under Chapter 258 of the
Codified Ordinances of Loudoun County,
including the Department of Fire, Rescue and
Emergency Management.
Original Intent
Exception List – Administered by the Training
Division during the application period in
order to track applicants with a prerequisite
variance. These applicants will have an
opportunity to participate in the enrollment
process provided that applicable conditions
of this SWP are met.
Wait list – The list of applicants who are not
seated in a class where the number of
applicants exceeds the maximum number of
students allowed. Applicants who are not
seated will be placed on this list and must
agree to applicable terms and conditions.
These “wait-listed” students may then be
seated in the class as enrolled students drop
out. This list is administered by the Training
Division.
Business Day – For the purpose of the SWP,
business days are Monday thru Friday
(excluding holidays) and Close of Business
(COB) occurs at 1700.
Applicants who are waiting for prerequisite
certifications may obtain permission to enroll
in the class as long as that certificate is
obtained prior to class start. The exception
list is maintained for the purpose of tracking
during the enrollment period. After the
enrollment period ends, so does this list
The Wait list is established after the
enrollment ends with more applicants’ than
seats. It is comprised of applicants who did
not make the cut to get into class. These
students will be allowed into class if a
currently enrolled student drops out.
This SWP uses business days to define time
frames and deadlines. This is noted in order
to avoid having applicants submit late and
miss the class.
Original Intent
POLICY
Members will register for courses at the
Oliver Robert Dubé Fire and Rescue Training
Academy as outlined in this SWP.
Original Intent
PROCEDURE
I. Firefighter I & II, EMR, EMT and Haz
Mat Operations Training
This SWP has two sections –
The first deals specifically with courses
which are Loudoun County specific.
The second pertains to all VDFP
sponsored classes
The reason for the delineation is Loudoun
Specific classes do not follow all of the same
guidelines as VDFP and there is the ability to
tailor these procedures to better fit our
needs.
Original Intent
A. The LC-CFRS Training Committee hereby
establishes a procedure for timely
notification to fire and rescue system
members seeking registration for
Firefighter I & II, HazMat Operations, EMR
and EMT classes1 offered by the Training
Division. This policy also establishes
procedures for enrollment and class
placement, for a waiting list in classes
where the number of applicants exceeds
the maximum allowable and for the
addition of a second class in the event of
high demand.
A. Section I only applies to these specific
classes as well as EMR and EMT recertification
classes.
Original Intent
B. Maximum class sizes will be dictated by
the Commonwealth or nationally
recognized credentialing agencies such as
the Virginia Department of Fire Programs
(VDFP) and the Virginia Office of
Emergency Medical Services (VOEMS).
Class sizes may only be exceeded if the
credentialing agency grants a variance.
B. All classes must conform to the guidelines
set forth by the agency that is responsible for
the course. There may be situations where
these guidelines may be changed in order to
best suit the needs of the LC-CFRS
Original Intent
C. Minimum class sizes will be determined
by the credentialing agency (i.e. VDFP,
VOEMS).
C. All classes must conform to the guidelines
set forth by the agency that is responsible for
the course. There may be situations where
these guidelines may be changed in order to
best suit the needs of the LC-CFRS
Original Intent
1 Section I also applies to EMR and EMT recertification classes.
D. Training Advisories (TA) will be
distributed a minimum of sixty (60)
calendar days prior to the posted
application closing date. Normally the
application closing date will be at least
thirty (30) business days before the first
day of class. Some classes such as hybrid
classes however may require an
application closing date of more than
thirty (30) business days. Any deviation
from the nominal closing date/class start
timelines will be announced in the TA.
D. 60 days notification provides the greatest
amount of time for applicants to schedule
time for the class and then enroll. It has been
determined that this is the maximum amount
of time that the Training Division can allow
due to the great number of variables involved
with course scheduling, and instructor
teaching assignments. Any notification of
specific class information greater than 60
days is not feasible.
30 days notification of acceptance allows the
student ample time to prepare for the class
Original Intent
E. No Training Requests (TR) will be
accepted after the posted application
closing date unless the class is not filled
to capacity. No applicants will be added
to the class after the first class session.
E. After the enrollment period is closed, If
there is room, applicants may be added up to
the end of the first class with permission from
the training division. The goal is to provide
the opportunity to as many students as
possible. This is allowed since the first day is
generally just orientation and paperwork.
After that, the student will not be able to
make up enough class time to pass the
course.
Original Intent
F. Incomplete TR’s2 will be returned for
resubmittal. No priority will be given to
students resubmitting a TR. Once the
completed TR is received, the applicant
will be eligible for the class placement
process provided that the provisions of
Paragraph E are met. The date and time
that the completed TR is received by the
Training Division will be used to
determine the applicants position in the
placement process.
F. Applicants must fill out the TR correctly and
submit all required documentation to be
considered for the class. Having to return
incomplete TR’s is time consuming for the
training division.
Date and time of the COMPLETED TR is used
to seat applicants. This also removes the
temptation to submit a partial application for
the purpose of reserving a seat and then
sending the completed application at a later
date.
2 A “completed TR” is one which includes all required information and supporting documentation (prerequisites).
Original Intent
G. Applicants who are currently enrolled but
have not completed a prerequisite class
may petition the Deputy Chief of Training
for a variance to allow admission into a
class. Enrollment would be conditional
upon successful completion of all
prerequisite class’s3 on or before the first
day of the requested class. After receipt
of this request, one of the following two
actions will be taken:
1. The Deputy Chief of Training denies the
variance – Applicant is not accepted
into the class and receives an
explanation for the rejected
application.
2. The Deputy Chief of Training approves
the variance - Applicant will be placed
on the exception list.
a. If there are remaining seats available
at the end of the placement process,
the applicant will be seated in the
class.
b. If no seats are available at the end of
the placement process, the applicant
may volunteer for the wait list
program provided the wait list is not
full.
G. Even though the training division has
taken great steps to schedule classes that do
not conflict, there is still a chance that this
could happen, particularly in the case of
students taking an out of county prerequisite
class prior to a county class or waiting for a
certificate in the mail. The student will have
the opportunity to get permission to enroll in
the county class pending successful
completion of the prerequisite class or
obtains the certificate. A chief officer or
designee from the student’s company will
petition the Deputy Chief of Training on
behalf of the student. This does not relieve
the applicant from having to complete self-
study type prerequisite certifications such as
an on-line NIMS course.
1.
2. Each request will be reviewed for feasibility
and if approved, the applicant will agreed to
the conditions set forth. Since this application
is predicated on obtaining a certification and
is not guaranteed, the applicant is placed last
so that no other qualified student loses a seat
in the event that the certification is not
obtained.
a.
b. Applicants on the exception list who are
not seated will be transferred to the wait list
if it is not already full.
The exception list is terminated when its
applicants are placed in class, placed on the
wait list or dropped from the process.
3 Paragraph G applies only to a prerequisite class in which the applicant is currently enrolled (i.e., Enrolled in
HAZMAT Ops which will end 4 days prior to the start of Firefighter I & II) and not “self-study” curriculum (i.e.,
online NIMS 700 course)
3. Applicant shall be informed of and
agree to, all conditions of the variance
prior to acceptance into the class.
3. Applicants must understand that the
exception list does not guarantee a seat and
that if the certification is not obtained by the
first day of class, they are dropped from the
enrollment process.
Original Intent
H. Training requests must have the
endorsement of the sponsoring
organization’s4 Chief Officer or designee.
H. Ensures that each company is responsible
for sending the qualified applicants that they
want. Prioritization of students may be
added in the endorsement by the company
officer
I. Classes will be filled utilizing the following
method:5
1. At the close of the application period,
all applications will be sorted by
sponsoring organization and grouped in
order of time and date that they were
received.
2. If there are more applications than
seats, a numeric formula shall be used
to fill seats. The maximum number of
seats for the class shall be divided by
the number of applicants. The answer
shall be represented as a percentage of
permissible applications. That
percentage will then be multiplied by
the number of applicants from each
sponsoring organization to determine
how many students from each will be
accepted. This will ensure that at least
one student from each organization is
accepted into the class. Applications
from each sponsoring organization shall
be chosen in order of time and date
each complete TR is received by the
training division.
I. Percentage Method
1. Each applicants will be grouped with their
company or department in order of the date
and time the completed TR was received.
2. A percentage is obtained by dividing the
maximum number of seats by the number of
applicants. This is the percentage of
applicants from each organization that will
be accepted into the class. This method
allows for a more equitable distribution of
students and prevents one or two companies
from monopolizing the enrollment.
4 For the purposes of the SWP, the term "sponsoring organization" means "each named volunteer organization."
Volunteer organizations with more than one station affiliation (i.e., Co 1/20, Co 11/18/24, Co 15/25/35, Co 6/22)
equate to "one volunteer company."
5 See Appendix I for details
3. When calculating each percentage, the
numbers should be rounded up when
applicable. In the event that there is an
overage or underage, the applicant
with the next latest date and time will
be removed or added.
a. Example – There are 23 applicants
for a class with a maximum of 20
seats. 20 divided by 23 equals .867 or
87%, therefore each sponsoring
organization will be permitted to send
87% of its applicants to the class.
3. Date and time of the TR (first come first
served) will be used to solve any conflicts or
issues with the math.
Original Intent
J. Within five (5) business days of the
application closing date, the Course
Coordinator will notify each sponsoring
organizations Chief Officer or designee,
of the number of their applicants who
have been accepted. The FCHIEF / RCHIEF
and VOLTRN email groups will be utilized
for LC-CFRS sponsoring organizations. If
there are more applicants than available
seats, each Chief Officer or designee will
have two (2) business days to prioritize
which of their applicants will attend the
class. If no priority is received after two
(2) business days, their members will be
admitted on a first come, first served
basis, utilizing the date and time the
completed TR was received by the
Training Division.
J. Notification is done to inform the
companies of which / how many of their
applicants were accepted into class.
Companies will also be notified at this time if
there will be a second class to accommodate
high demand.
If there are more students than seats, this
allows each company the opportunity to
decide which students they want in the class.
In the case of a second class, it will be the
responsibility of each company to prioritize
its applicants who were not seated in the first
class.
If no changes are received, the Training
Division will place students first come first
served from each company.
Original Intent
K. Within twelve (12) business days of the
application closing date, the Course
Coordinator will send an email to all
applicants who submitted a completed
TR for the course. That notification will
indicate one of the following three
courses of action:
K. This is an increase from the original 5 days.
It takes into account a maximum of 5 days to
notify the companies, 2 days to receive a
response and 5 days to formulate the final
class roster and send to all students.
Currently it rarely takes the full 5 days after
closing to make all notifications so it is
1. The applicant is accepted into the class
– The notification will provide the
course information such as start date,
location, time, etc.
2. The applicant has been placed on the
wait-list for the class - The notification
will provide course information such as
start date, location, times, class
attendance during the wait-list period,
and an explanation of the wait-list
process (i.e., how/when an applicant
will be taken from the wait-list and
enrolled in the class).
3. The applicant is not accepted in the
class – The notification will include an
explanation for the rejected
application.
anticipated that this process will not usually
take 8 days.
Sub sections 1, 2 and 3 pertain to the class
acceptance process and follow procedures
already in use.
3. No change from current policy
Original Intent
L. For classes where the number of
applicants exceeds the maximum class
size, the Course Coordinator will establish
a wait list. The following policy applies to
the wait-list process:
1. Within twelve (12) business days of the
application closing date applicants not
seated in the class will be notified that
they have been placed on the wait list.
2. Applicants will have two (2) business
days to decline placement on the wait
list.
3. No more than ten (10) applicants may
be placed on a waiting list.
L. The Wait List process has been used
periodically and provides an orderly and
productive process for backfilling vacancies
as students drop out during the period of
time between the close of the application
period to the class start.
1 The Wait list is voluntary; applicants are
automatically enrolled but may choose to opt
out.
2. The purpose of two days opt out
notification is to allow the training division to
formulate a final wait list and notify all
effected applicants in a timely manner. A
student may drop out at any time but it is
desirable to have them do it as soon as
possible to avoid having to constantly update
the list.
3. Instead of allowing the course coordinator
discretion on the maximum number of wait-
listed students, the number was set at 10.
This will provide a standard for each class.
4. For applicants who are placed on the
wait list, their order on the wait list will
be determined by the date and time
that their completed TR was received
by the training division. The Course
Coordinator will communicate with the
applicant their position on the wait list.
5. All applicants on the wait list must
agree to all terms and conditions
associated with being on the wait list as
communicated by the Course
Coordinator.
6. Fire classes will allow wait-listed
students to sit for the first day of class.
Any wait-listed student not seated at
that time will be dropped from the class
and the list terminated.
7. EMS classes will allow wait-listed
students to attend class until the first
module test. Any wait-listed student
not seated before the first module test
will be dropped from the class and the
list terminated.
Also, by mandating 10 students max, it sets
the foundation for determination if a second
class is needed to satisfy high demand.
4.First come first served for list position
5. Students must agree to the terms including
acknowledgment that entry into the class is
not guaranteed.
6. Fire classes only wait list until the first day
of class. If no one drops out prior to the first
class, the wait list is over.
7. EMS classes can wait list until the first
module test
Original Intent
M. For classes where the number of
applicants exceeds the maximum class
size and there are more than ten (10)
students applying for the wait list, the
Deputy Chief of Training will determine
the feasibility of opening a second class.
This decision will be made within five (5)
business days of the close of the
M. The addition of a second class when
demand is high is not an uncommon event
and this section simply defines that process.
For classes where more than 10 applicants
aren’t seated, the Deputy Chief of Training
will make the decision whether or not to open
a second class. Factors that may be
considered but not limited to include:
Number of applicants not seated
Instructor availability
Scheduling conflicts
enrollment period of the original class6.
The Deputy Chief of Training will take one
of the following two actions regarding
this decision:
1. The Deputy Chief of Training
determines that a second class is not
feasible - A maximum of ten (10)
applicants will be placed on a waiting
list for the original class as per
Paragraph L.
2. The Deputy Chief of Training
determines that a second class will be
feasible - Enrollment for this additional
class will be open to all members.
Enrollment will be conducted as
described in Section I with the following
exceptions:
a. Enrolling applicants may need to
submit a second TR specific to the
new class.
b. Applicants will be provided a
minimum of ten (10) business days
to enroll in the second class.
c. Classes will be filled utilizing the
method directed in Paragraph I.
Reapplying applicants who were not
seated in the first class will not
receive priority. Each sponsoring
organizations Chief Officer or
designee will be responsible for
prioritizing which of their applicants
1.
2. The second class will be open to all
members and will usually be scheduled so as
to begin as soon as possible with minimum
delay from the original class. Enrollment in
the second class will follow the guidelines as
set forth except for a few exceptions due to
the nature of squeezing in an unplanned
class. All exceptions will be noted in the TA.
a. Applicants may have to submit a new TR
including evidence of prerequisite
completion, in order to provide an updated
request for the new class. For some classes,
the training division may be able to transfer
applicants from the first class to the second
without having them reapply.
b. Since this is an extra class and may need to
be scheduled quickly, a minimum of 10 days
is specified.
c. It will be up to each Company, not the
training division, to prioritize applicants.
d. Due to the fact that implementing an extra
class is workload intensive and scheduling is
complicated, there will need to be exceptions
6The provisions of Paragraph M do not in any way preclude the Deputy Chief of Training or Training Division from
taking other, more effective actions to increase class size in order to accommodate demand (i.e. adding additional
instructors to a class, module scheduling changes).
will attend the class as described in
Paragraph J.
d. Due to the fact that this is an
unplanned class hosted for the
purpose of meeting immediate
demand, other exceptions may
apply. All exceptions to Section I will
be defined in the TA.
to the normal enrollment process. The TA will
make clear all exceptions.
Original Intent
II. Virginia Department of Fire Programs
(VDFP) and All Other Sponsored Classes
This second section pertains to all VDFP
sponsored classes as well as any classes
which are not covered by Section 1
The reason for the delineation is Loudoun
Specific classes do not follow all of the same
guidelines as VDFP and there is the ability to
tailor these procedures to better fit our needs
Original Intent
A. The LC-CFRS Training Committee hereby
establishes a procedure for timely
notification to fire and rescue system
members seeking registration for Virginia
Department of Fire Programs (VDFP) and
all other sponsored classes not covered
previously in Section I, which are offered
by the Training Division7. This policy also
establishes procedures for enrollment,
for a waiting list in classes where the
number of applicants exceeds the
maximum allowable and for the addition
A. Same as in Section I except that there will
be classes held at the training academy that
are not offered by the training division and
sponsored by an outside agency. Enrollment
for these classes will be handled entirely by
that outside agency.
7 The enrollment process for classes not offered by the Training Division but conducted at the Training Academy
will be controlled by the agency which sponsors the class. (i.e. Applicants must apply on-line at the VDFP web site
and receive notifications from VDFP; not the Training Division, for an Instructor III class held at the Training
Academy.)
of a second class in the event of high
demand.
Original Intent
B. Maximum class sizes will be dictated by
the Commonwealth or nationally
recognized credentialing agencies such as
the Virginia Department of Fire Programs
(VDFP) and the Virginia Office of
Emergency Medical Services (VOEMS).
Class sizes may only be exceeded if the
credentialing agency grants a variance.
C. Minimum class sizes will be determined
by the credentialing agency (i.e. VDFP,
VOEMS).
B. and C. – The Training Division shall comply
with all class guidelines and mandates
required by the credentialing agency. In cases
where it would be advantageous for the LC-
CFRS to deviate from those guidelines and
mandates, the Training Division must first
receive approval from the credentialing
agency.
Original Intent
D. Training Advisories (TA) will be
distributed a minimum of sixty (60)
calendar days prior to the posted
application closing date. Normally the
application closing date will be thirty (30)
business days before the first day of class.
Some classes such as hybrid classes
however may require an application
closing date of more than thirty (30)
business days. In these cases, the
deviation from the nominal closing date/
class start timelines will be announced in
the TA.
D. Same as in Section I
Original Intent
E. No Training Requests (TR) will be
accepted after the posted application
closing date unless a variance is granted
by the credentialing agency. If applicable
- No applicants will be added to the class
after the first class session.
E. Provides the Training Division with the
ability to continue to request deviations from
certain requirements when advantageous for
training
Original Intent
F. Incomplete TR’s8 will be returned for
resubmittal. No priority is given to
students resubmitting a TR. Once the
completed TR is received, the applicant
will be eligible for the class placement
process provided that the provisions of
Paragraph E are met. The date and time
that the completed TR is received by the
Training Division will be used to
determine the applicants position in the
placement process.
F. Same as in Section I
Original Intent
G. Applicants who are currently enrolled in
but have not completed a prerequisite
class, may petition the Deputy Chief of
Training for a variance to allow admission
to a class. When applicable, the Deputy
Chief of Training will coordinate this
request with the credentialing agency.
Enrollment would be conditional upon
successful completion of all prerequisite
class’s9 on or before the first day of the
requested class. After receipt of this
request, the following action will be
taken:
1. The Deputy Chief of Training or
credentialing agency denies the
variance – Applicant is not accepted
into the class and receives an
explanation for the rejected application.
2. The Deputy Chief of Training or
credentialing agency approves the
variance - Applicant will be placed on
the exception list.
G. Same intent as in the previous Section G
however now the Deputy Chief of Training
must request approval from the credentialing
agency.
1. The Deputy Chief of Training forwards the
reason for the credentialing agency denial to
the applicant.
2. The Deputy Chief of Training forwards the
credentialing agency approval to the
applicant along with specific conditions of the
variance
a., b., 3. – Same as section I
8 A “completed TR” is one which includes all required information and supporting documentation (prerequisites).
9 Paragraph G applies only to a prerequisite class in which the applicant is currently enrolled (i.e., Enrolled in
Instructor I which will end 4 days prior to the start of Officer I) and not “self -study” curriculum (i.e., online NIMS
700 course)
a. If there are remaining seats available
at the end of the placement process,
the applicant will be placed in the
class.
b. If no seats are available at the end of
the placement process, the applicant
may volunteer for the wait list
program provided the wait list is not
full.
3. Applicant shall be informed of and
agree to, all conditions of the variance
prior to acceptance into the class.
Original Intent
H. Training request must have the
endorsement of the sponsoring
organization’s Chief Officer or designee.
I. Classes will be filled utilizing the following
method:
1. Each sponsoring organization will have
the opportunity to fill one (1) seat in the
class.
2. Any sponsoring organization not filling a
seat (e.g., by not submitting a
completed TR) on or before the class
closing date will forfeit their seat.
3. Remaining seats not filled as specified
above, will be filled on a first come, first
served basis, utilizing the date and time
the completed TR is received by the
Training Division.
H. Same as in Section I
I. The method of First Come first Serve is a
VDFP requirement and shall be used in
Section II regardless of which enrollment
method is selected in Section I.
1. Guarantees that all companies that
submit an application get at least one seat.
2. Same as in Section I
3. Same as in Section I
Original Intent
J. Within five (5) business days of the
application closing date, the Course
Coordinator will notify each sponsoring
organizations Chief Officer or designee, of
the number of their applicants who have
J. Same as in Section I
been accepted. The FCHIEF / RCHIEF and
VOLTRN email groups shall be utilized for
LC-CFRS sponsoring organizations. If there
are more applicants than available seats,
each Chief Officer or designee will have
two (2) business days to prioritize which
of their applicants will attend the class. If
no priority is received after two (2)
business days, their applicants will be
admitted on a first come, first served
basis, utilizing the date and time the
completed TR was received by the
Training Division.
Original Intent
K. Within twelve (12) business days of the
application closing date, the Course
Coordinator will send an email to all
applicants who submitted a completed TR
for the course. That notification will
indicate one of the following three
courses of action:
1. The applicant is accepted into the class
– The notification will provide the
course information such as start date,
location, time, etc.
2. The applicant has been placed on the
wait-list for the class - The notification
will provide the course information
such as start date, location, times, class
attendance during the wait-list period,
and an explanation of the wait-list
process (i.e., how/when will an
applicant be taken from the wait-list
and enrolled in the class).
3. The applicant is not accepted in the
class – The notification will include an
explanation for the rejected application.
K. Same as in Section I
1. Same as in Section I
2. Only applicable to classes in which the
credentialing agency allows students into a
class after the enrollment period has ended.
A variance may be needed in some cases.
3. Same as in Section I
Original Intent
L. For classes where the number of
applicants exceeds the maximum number
of students allowed and where permitted
by the credentialing agency, the Course
Coordinator will establish a wait list. The
following policy applies to the wait-list
process:
1. Within twelve (12) business days of the
application closing date applicants not
seated in the class will be notified that
they have been placed on the wait list.
2. Applicants will have two (2) business
days to decline placement on the wait
list.
3. The maximum number of applicants to
be placed on a waiting list shall be ten
(10) unless otherwise defined by the
credentialing agency.
4. For applicants who volunteer to be
placed on the wait list, their order on
the wait list will be determined by the
order that the Training Division received
their completed TR. The Course
Coordinator will communicate with the
applicant their position on the wait list.
5. Any applicant who volunteers to be
placed on the wait list must agree to all
terms and conditions associated with
being on the wait list as communicated
by the Course Coordinator.
6. Unless otherwise specified by the
credentialing agency, the wait list will
allow students to sit for the first day of
class. Any wait-listed student not seated
L. Only applicable to classes in which the
credentialing agency allows students into a
class after the enrollment period has ended.
A variance may be needed in some cases.
1. Same as in Section I
2. Same as in Section I
3. Same as in Section I
4. Same as in Section I
5. Same as in Section I
6. Same as in Section I except that the
credentialing agency may will make the final
determination about wait listing
at that time will be dropped from the
class and the list terminated.
Original Intent
M. For classes where the number of
applicants exceeds the maximum number
of students and there are more than ten
(10) students applying for the wait list,
the Deputy Chief of Training will
determine the feasibility of opening a
second class. This decision will be made
within five (5) business days of the close
of the enrollment period of the original
class10. The Deputy Chief of Training will
take one of the two following actions
regarding this decision:
1. The Deputy Chief of Training
determines that a second class is not
feasible - A maximum of ten (10)
applicants will be placed on a waiting
list for the original class as per
Paragraph L.
2. The Deputy Chief of Training
determines that a second class will be
feasible - Enrollment for this additional
class will be open to all members.
Enrollment will be conducted as
described in Section II with the
following exceptions:
a. Enrolling applicants may need to
submit a second TR specific to the
new class.
b. Applicants will be provided a
minimum of ten (10) business days to
enroll in the second class.
c. Classes will be filled utilizing the
method directed in Paragraph I.
Reapplying applicants who were not
seated in the first class will not
M. Same as in Section I
1. Same as in Section I
2. Same as in Section I
a. Same as in Section I
b. Same as in Section I
c. Same as in Section I
10 The provisions of Paragraph M do not in any way preclude the Deputy Chief of Training or Training Division
from taking other, more effective actions to increase class size in order to accommodate demand (i.e. adding
additional instructors to a class, module scheduling changes).
receive priority. Each sponsoring
organizations Chief Officer or
designee will be responsible for
prioritizing which of their applicants
will attend the class as described in
Paragraph J.
d. Due to the fact that this is an
unplanned class hosted for the
purpose of meeting immediate
demand, other exceptions may
apply. All exceptions to Section II will
be defined in the TA.
d. Same as in Section I
Approved for compliance with Emergency Medical Services delivery
_____________________________________________________
John I. Morgan, M.D., LC-CFRS Medical Director
Source: Loudoun County website. First collected Oct 5, 2026.