Fire Operations Committee Regular Meeting Agenda Packet (PDF)
Loudoun County · Loudoun County · meeting of Mar 16, 2016 · Agenda packets
Open the original document More from Loudoun County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Agenda
Fire Operations Committee
March 16, 2016
DTCI Large Conference Room
801 Sycolin Road, First Floor
1900 Hours
1. Call to order
2. Roll Call
3. Approve February Meeting Minutes
4. Chairman’s Report
5. LCFR Department Report (Nally)
a. NOVA Manuals
b. Significant Incident Review
6. LCFR Training Report (Brazier)
7. Sub-committee Reports
a. Equipment Standards Committee (Stephens)
b. Communications Committee (Quijano)
c. Health and Safety Committee (Quijano)
d. Training Committee (Graham)
8. IAFF (Murphy/Stonesifer)
9. Old Business
a. Dispatch Algorithm Committee (Stephens)
b. Rules of Order
c. ATL Funding
10. New Business
a. Volunteer Physicals (Draft SWP)
11. Committee Delegate Comments
12. Announcements
a. Next Fire Operations Committee Meeting: April 20, 2016
b. Next Executive Committee Meeting: March 29, 2016
3
LOUDOUN COUNTY
FIRE OPERATIONS COMMITTEE
Committee Meeting
17 February 2016
1900 hours
DTCI Large Conference Room, 801 Sycolin Road
The February meeting of the Loudoun County Fire Operations Committee was held on
Wednesday, February 17, 2016. FOC Chairman Cook presided and called the meeting to
order at 7:06 p.m. The following attended:
Co. 1/20 Jim Cook
Co. 2 Buddy Colby
Co. 4 Absent
Co. 5 Absent
Co. 6 Miguel Quijano
Co. 7 Absent
Co. 8 Absent
Co. 9 Chris Meier
Co. 10 Robert Honec
Co. 11/18/24 David Short
Co. 12 Absent
LCFFA Jasen Dodson
LCFR: AC Johnson, DC Nally, Captain Scott Brazier and
Christine Langley-Obaugh
Guest: Gary Myers
Public Comments
No public comments.
Approval of Previous Meeting Minutes
A motion was made by Company 9 to approve the January minutes. The motion was
seconded by Company 10. The motion passed and the minutes were approved.
Chaplain’s By-Laws, Procedural Manual and SWP
Gary Myers, Chair of the Chaplain’s Committee, presented regarding the Chaplain’s
By-laws, Procedural Manual and SWP. Gary stated that the materials have gone
before the EMSOC and AOC and several suggestions were made. Regarding page 5,
qualifications for Chaplains, an amendment was made as follows: “must be ordained
as clergy, leader of a recognized religion or a layperson with a letter of good standing
within their religious denomination to work as a Chaplain in the community”. On
Fire Operations Committee Meeting Minutes
February 17, 2016
Page 2 of 9
page 10 regarding transportation, an amendment was made as follows: “sponsoring
agency leadership” will replace “Chief”.
Chair Cook made a motion to accept as written. The motion was seconded by
Company 2. A discussion occurred. Chief Nally asked questions regarding the
Chaplain’s Committee and the SWP. Gary Myers relayed information regarding
membership into the Chaplain’s Program with the goal to have one Chaplain in each
station.
Chair Cook called for a vote on the motion. The motion carried, 8-0-0-5.
Chair’s Report
None
LCFR Department Report -Deputy Chief Michael Nally
COG Senior Operations Chiefs
• Thursday, February 4
th Teleconference
o No agenda submitted or minutes disseminated.
o Roundtable discussion during conference call.
NOVA Senior Operations Chiefs
• Thursday, February 4th Teleconference
o See attached minutes.
Apparatus
CURRENT PROJECTS:
• Drop-in number program
o GO has been released and no reported issues
• Utility 619
o Is in service and was very useful during the blizzard
• Brush 626
o Was placed in service just prior to the Blizzard.
• Hazmat Support 619
o PO cut
o Pre-Construction meeting complete
o Waiting for start date
o Hope for a late spring early summer delivery date
• 2 Tankers (Middleburg & Kirkpatrick)
o PO cut
o Pre-Construction meeting complete
o Waiting for start date.
o Hope for a late spring early summer delivery date
Fire Operations Committee Meeting Minutes
February 17, 2016
Page 3 of 9
FUTURE PROJECTS:
• Kirkpatrick Engine
o In the planning stage and should have a PO cut Summer 16’
o Delivery in late Winter 17’
• Kirkpatrick Ambulance and replacement of 40053, 40054, 40055
o In the planning stage and should have a PO cut April 16’
o Delivery in late Winter 17’
• Replacement of Hazmat 619
o When the committee is performing the post paint inspection on the
Hazmat Support, we will start the planning process.
o PO should be cut by July 16’
o Delivery in late Spring 17’
Volunteer Battalion Chief Program
January 2016
24 of 31 nights were covered by VBC’s (77%)
Short- 5
Shultz- 4
Starling- 4
Stephens- 4
Graham- 3
Davis- 2
Firmin- 2
Cook - 0
Buchanan- 0
LCFR- 7
County Meter Program
Based on the information provided last month, this section will be discontinued.
Significant Incident Reports
• 12-22-15 111 S. 29th Street – Purcellville (Inc. #201528636)
o Structure fire – Chief Dryden (Purcellville Fire) *SIR is pending
• 12-29-15 37146 Mountville Road – Philomont (Inc. #201529205)
o House fire – Chief Dryden (Purcellville Fire) *SIR is pending
• 01-13-16 24566 James Monroe Hwy – Aldie (Inc. #201601874
o Barn Collapse – BC Menzenwerth *SIR is pending
• 01-24-16 41266 Cotter Ct – Lucketts (Inc. #201601979)
o House Fire – BC Kelley
• 01-30-16 42787 Klondike Ct – Brambleton (Inc. #201602677)
Fire Operations Committee Meeting Minutes
February 17, 2016
Page 4 of 9
o House Fire – BC Martin
• 02-01-16 18179 Lincoln Rd. – Purcellville (Inc. #
o House Fire – BC Pisauro *SIR is pending
Chamber of Commerce Valor Awards
The Valor Awards will be held April 7th. Chief Nally distributed envelopes today to BC’s
which will go to Valor Award Recipients in Sterling Fire, Sterling Rescue and
Purcellville. Please distribute the invitations so members can RSVP.
LCFR Training Report – Captain Scott Brazier (January Information included)
Fall 2015 Fire Fighter I & II
• Registration for the Fall 2015 Basic Firefighter I & II Course closed on September 4,
2015. Class began on September 14, 2015, with a roster of 26.
• There are currently 24 students who continue with the program to date.
• FF I and II Written and Practical testing has been completed. Two students need to re-test
their FF II written test which is scheduled for Tuesday, February 16th. This will be the
first re-test for each student.
• Mayday class began on February 8th and will conclude on February 14th.
• Graduation night is being held at the Cornerstone Church on Thursday, February 18th
and Family Day is scheduled for February 20th which will mark the end of the Fall
certification program.
• Lt. Boyd Morris is the Course Coordinator and Lead Instructor. He can be reached at
boyd.morris@loudoun.gov
• Lt. Michael Smith is the Co-Course Coordinator and also a lead Instructor. He can be
reached at robert.m.smith@loudoun.gov
Spring 2016 Fire Fighter I & II
• Registration for the Spring 2016 Basic Firefighter I & II Course was opened on
January 6, and closes on March 1, 2016.
• 24 applications have been submitted as of February 11th. 8 applications are fully
complete and qualified while16 applications still need documentation to be
submitted.
• March 5, 2016 is the first day of the Spring Fire School
Monroe Tech.
• MTC Fire and EMS Classes resumed on August 31, 2015.
• The Fire Fighter Certification Program:
o There are nine students enrolled and eligible for certification in this class.
o Students have completed HMO and EMR and have moved into the fire
certification program as of January 4, 2016. They are currently studying ladders
and hose. As Module I skills testing is scheduled for April 14, Ms. Sokol is
Fire Operations Committee Meeting Minutes
February 17, 2016
Page 5 of 9
encouraging stations to work with their MTC students during duty crews and
training sessions to help perfect ladder, SCBA, hose, search, and rope skills.
• The EMT Certification Program:
o There are currently eight students who continue with this program, of which 7
are eligible for certification.
o Students have completed Trauma and have successfully finished Module III
as of February 1. Students are progressing into Medical Assessment.
• Program Information:
o LCPS Instructor Sandy Sokol is MTC’s Course Coordinator and Lead
Instructor. She can be reached at sandra.sokol@lcps.org
Ongoing/Completed/Cancelled Courses
-Fall 2015 FF I & II Basic Certification School-Ongoing
-NFPA 472-Hazardous Materials Operations-February 2016 Class-Ongoing
-LCFR Ice Rescue Technician-Ongoing
-Fire Instructor-Level II-LCFR-Ongoing
-Fire Instructor-Level II-Purcellville-Ongoing
-NFPA 1021-Fire Officer Level I-Completed
-ICS-300-FS601-Nov 7-8, 2105-Completed
-ICS-400- FS601 December 19-20, 2015-Completed
-NFPA 472-Hazardous Materials Operations-November 2015 Class-Completed
-NFA Leadership I-Completed
-VDFP LPG Emergencies **Pilot Program**-Completed
-EVOC I, II, III- Hamilton VRS- November 22-23, 2015-Completed
-VDFP HTR-Intro. to Technical Rescue-Module II-Completed
-LCFR NOVA Manual Review-Completed
-Swift Water/Ice Rescue Awareness-Completed
-LCFR Injury Reporting-January 23, 2016-Postponed Due to Blizzard
Classes Being Offered
Fire Behavior/Flashover Recognition
Ongoing- Contact BC Gottholm
Bernard.gottholm@loudoun.gov
Fire Behavior/Flashover Recognition
February 27, 2016
Regis. closes February 19, 2016
NFPA 1403 Compliance Officer
February 27, 2016
Regis. closes February 12, 2016
Fire Officer- Level II February 27-April 9, 2016
Regis. closes February 19, 2016
NFPA 1002 EVOC I, II, III February 27-28, 2016
Regis. closes February 22, 2016
Spring 2016 Firefighter I & II
Basic Certification Course
March 5-August 13, 2016
Regis. closes March 1, 2016
VDFP HTR- Confined Space Level I
April 9-10, 2016
Regis. closes March 25, 2016
NFPA 472-Hazardous Materials Operations
April 30-May 21, 2016
Regis. Closes April 15, 2016
Fire Operations Committee Meeting Minutes
February 17, 2016
Page 6 of 9
In addition, as of this afternoon, Captain Brazier reported that a Fire Officer III class will
start April 23rd and will run for five consecutive Saturdays. Registration will close on April
8th. An additional class will be held in June.
Training Center MISC
**Sexual Harassment Prevention for Supervisors/Officers—To register for this class, please provide
your name, station #, email address, rank/title, and a brief statement requesting this course in an
email to lauren.hartman@loudoun.gov. You will receive instructions from Lauren as to how to
access this online course.
-------------------------------------------------------------------------------------------------------------------------
**Check the VDFP Website (www.vafire.com) for current information and a listing of classes
being offered in other jurisdictions such as: No classes to report that will benefit Loudoun
County at this time.
Upcoming Events from Around the State
2016 Virginia Fire Rescue Conference Virginia Beach February 24-28, 2016
An Evening with Chief Goldfeder Winchester March 11, 2016
Fireground Survival Program-(Goldfeder) Winchester March 12, 2016
2016 Spring Regional School Albemarle High School March 19 & 20, 2016
2016 NFA In-State Training Salem April 5 & 6, 2016
2016 NFA In-State Training Norfolk April 12 & 13, 2016
22nd Annual Caroline Co. Regional School Milford April 16 & 17, 2016
Rockingham Regional Fire School Harrisonburg April 23 & 24, 2016
VA Dept. of Forestry Statewide Farmville May 25-28, 2016
Wildfire Academy
--------------------------------------------------------------------------------------------------
Committee Reports
• Equipment Standards Committee: Chief Stephens
Captain Davis will be taking over as Chair of this Committee.
• Communications Committee: Chief Quijano
Chief Quijano stated that Communications Committee met on Tuesday. A
meeting will be held on Saturday regarding all the different inputs. The training
plan for Alpine and Orion are still in the development phase.
• Health & Safety Committee: Chief Quijano
The next meeting will be held in March.
• Training Committee: Chief Graham
Fire Operations Committee Meeting Minutes
February 17, 2016
Page 7 of 9
Chair Cook advised that he heard from Chief Tobia and due to several conflicts,
Chief Graham has stepped down from the Training Committee. Chair Cook has
spoken to some about filling this position as a representative is needed. Chair
Cook asked for recommendations from the FOC.
Chair Cook asserted that beginning with Spring Fire School, Chief’s will be
updated monthly on a student’s progress.
Chief Johnson stated that he will most likely make a formal recommendation to
the Executive Committee in the future regarding members of the training
committee, specifically to include the training officer representatives from
individual stations.
• IAFF: Scott Stonesifer
Nothing to report.
Old Business
Dispatch Algorithm Committee:
The Executive Committee agreed to form this committee. Chair Cook relayed that
the committee will have one representative from EMSOC, FOC, and LCFR and
one or two system wide members. Chair Cook stated that the FOC will need to
select a representative. It should be noted that most likely Chief Parker will get
with each individual company to discuss possible in-house changes as well. Chris
Kordek was nominated to be the representative for the FOC. Chair Cook also
mentioned that Chief Stephens is also interested. Chief Cook proposed that he put
forward to the EC, Chief Stephens as the FOC representative with Kordek as the
at-large representative.
Chief Johnson reminded the FOC that the committee will be bound by the NOVA
Manuals. Chief Johnson also reiterated that currently, the opportunity for changes
are limited. Chief Johnson stated that the Standards of Coverage Workgroup that
was formed with Chief Salazar and Dr. Morgan will look at EMS Algorithms.
There is a potential for overlapping according to Chief Johnson, however, we will
all need to work together.
New Business
Rules of Order:
Chief Cook stated that the recommendation from the Executive Committee was
for the FOC to also establish Rules of Order. Chair Cook would like to take the
FOC Rules of Order to the March EC Meeting. Chair Cook instructed all to read
through the Rules of Order and provide feedback so that a draft Rules of Order for
the FOC can be reviewed and approved in March.
ATL Funding:
Chair Cook stated that Company 2 and Company 11 are the only two companies
that have given Mary Maguire all documentation required to be able to release the
Fire Operations Committee Meeting Minutes
February 17, 2016
Page 8 of 9
2015 funds. The funds are awaiting distribution, however, information must be
received by Mary prior to the delivery of funds. A meeting was held with Mary
Maguire last week and every Treasurer has been contacted at least three times.
Chair Cook reiterated the importance of having Company Treasurers provide this
information in a timely fashion.
Chaplain By-Laws, Procedural Manual and SWP:
See above
Equipment Standards Committee:
Captain Davis has approached Chief Cook as they are getting ready to spec three
tankers and there are exceptions on those tankers. Captain Davis does not feel
comfortable as a LCFR employee asking himself, as Chair of the Committee,
about exceptions on the tankers. Captain Davis specifically inquired regarding
voting and appeals process. Chairman Cook polled the FOC regarding whether or
not an appeals process would be necessary. An appeals process may actually
appear in another place according to Chief Stephens.
Heavy Rescue Service Delivery Workgroup:
Chief Johnson stated that part of the Strategic Plan, specifically goal 6B, was to
identify and address gaps in heavy rescue service delivery. Chief Johnson
reminded the FOC that action was taken, in that, a rescue was placed in service
full time and it was moved from Company 13 to Company 20. Chief Johnson
stated that the Operations Chief was to establish a working group to define the
expectations, roles and outcomes for heavy rescue incident types and system
differences. The Heavy Rescue Group will also identify the tools and training
required to successfully perform the heavy rescue mission. The Heavy Rescue
Group will identify the most strategic of heavy rescues to meet response time
objectives and will forward deployment recommendations to the Operations
Chief. The Heavy Rescue Group will formulate draft policies for the heavy rescue
program and will forward same to the Operations Chief.
Chief Johnson stated that the workgroup will be comprised of one member of the
EC, one FOC representative, one EMSOC representative and four at-large
members (two career and two volunteers). Chief Johnson stated that this passed at
the EC level.
Chief Cook and Chief Johnson agreed that the workgroup will help establish
standards for heavy rescues and provide guidance.
Chief Cook offered himself as well as Miguel for recommendations for this
workgroup from the FOC. No objections to this recommendation were offered.
Council Delegate Comments:
Chief Cook raised the issue of certification review. He will be reaching out to
Chiefs in the near future.
Fire Operations Committee Meeting Minutes
February 17, 2016
Page 9 of 9
Company 10: An email was received regarding face pieces and fit testing.
Discussion ensued. The County may continue to show members in the system
even though the members are no longer in the system. Chief Johnson stated it is
important to clarify if there is an issue regarding the records.
Chief Johnson relayed that they are close to determining whether or not a change
will occur from Centrelearn to Target Solutions. Centrelearn will continue to be
used until June or July. Target Solutions will most likely give us a better distance
learning platform. Chief Johnson stated there is a fire side to Target Solutions that
will allow for station training as well as regional training. Chief Johnson said in
addition, there was also a record management component. Lastly, Chief Johnson
stated that there is an increase in cost, but the possibilities with Target Solutions
are endless.
The next Executive Committee meeting is February 23, 2016 at 7:00 p.m. and the next Fire
Operations Committee meeting is March 16, 2016 at 7:00 p.m.
Respectfully submitted,
Christine Langley-Obaugh, M.Ed., CVA
Executive Liaison
5
Form 017 Page 1 of 3
Revised: 04/15/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander B. Dryden
Officer completing SIR (if different from above) Click here to enter text.
Incident date 12/29/2015 Incident number 201529205
Dispatch time 1907 Box area 0857K
Incident location 37146 Mountville Rd.
Type of incident as dispatched Structure Fire
Actual type of incident (if different from above) Click here to enter text.
Number of Alarms: ☐Initial Alarm Only ☐Second Alarm or Greater ☒Level I RIT
☐Level II RIT ☐Level III RIT ☒ Tanker Task Force
☐ Other Click here to enter text.
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc): Click here to enter
text.
Casualties
Civilian Fire Service Other
Injuries 0 0 0
Fatalities 0 0 0
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $Click here to enter text. $Click here to enter text. $Click here to enter text.
Damages $Click here to enter text. $Click here to enter text. $50,000
Incident Times
First unit on scene E608B - 1916 Hrs.
Additional alarms/resources
requested K Task Force/RIT 1 - 1917 Hrs
Fire/Incident Under Control 1949
Last unit cleared scene 2158
Form 017 Page 2 of 3
Revised: 04/15/2015
Understaffed/Unavailable/Add-on Units
E1105 Failed to Respond
BC603 Added on
LA608 Added on
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Completed
I (identify the flow path) – Completed
C (cool the space) – Completed
E (extinguish the fire) – Completed
R (rescue) – Not Applicable
S (salvage) – Completed
Click here to enter text.
Narrative of Operations
Units were dispatched for a Structure Fire at 37146 Mountville Rd. E608B arrived on the scene to
find smoke showing. Upon the officers 360 lap the report was altered to smoke in the basement
and floor number 1 and asked for the RIT Level 1 and Tanker Task force
Safety Officer Comments
Click here to enter text.
Additional Comments
E608B AOS, performed their 360 lap and advanced a hand line to side Charlie where the crew was
able to knock the fire down from outside the barco style cellar doors. They requested the second
line to be deployed to the first floor from the front door.
E607 AOS, deployed the second line from E608B to the front, as requested, where they found a
small amount of fire burning through the floor in the kitchen.
E603 AOS, worked to secure the utilities and assisted E608B
E604 AOS, assumed the roll of RIT on side Alpha. As the incident was downgraded and the
IDLH was mitigated, this crew was utilized in the rotation of crews performing salvage and
overhaul.
C602 & BC602 AOS and managed command together.
BC603 AOS and was given the Charlie division which supervised all interior operations
Form 017 Page 3 of 3
Revised: 04/15/2015
E602 established the primary water supply at the designated site, 36687 Mountville Road. There
was a delay in the set up of this site due to the extended travel time to access the fill site location.
RS617 AOS worked on Ventilation and scene lighting
TL619 AOS laddered the building and assisted in the overhaul operation.
TL602 AOS
M603, LA608, & EMS601 Established and managed the Rehab group
M607 AOS as part of the RIT level 1 dispatch and was assigned to the Rehab group as the
transport unit.
E605B AOS as part of the RIT level 1dispatch. By the time they arrived the IDLH had been
mitigated and this crew was rotated into the salvage and over haul operation.
This residence was located on a narrow section of Mountville Rd. There was no good place to
establish a dump site. With the information provided by E608B with their on scene report, I
decided not to establish a dumpsite operation and operate solely from a nurse operation. We were
able to extinguish the fire with the tank water from E608B.
With the absence of E1105 who was to be the secondary water supply pumper, RE602 requested
to alter from its assignment as part of the RIT level 1 dispatch and be the 2nd water fill site supply
Engine. Initially I agreed to allow this. However, in the future I need to keep units performing
their dispatched assignments. There was really no reason to have the secondary fill site established
when there was more than enough water on the scene as well as a primary source already
established.
Attachments
☐Pictures
☐Diagrams
☐Other Click here to enter text.
xxx
Form 017 Page 1 of 10
Revised: xx/xx/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander Michael Pisauro, Battalion Chief
Officer completing SIR (if different from above) Click here to enter text.
Incident date 2/1/2016 Incident number 201602837
Dispatch time 21:34 hours Box area 0217K
Incident location 18179 Lincoln Road,
Purcellville
Type of incident as dispatched House Fire
Actual type of incident (if different from above) Click here to enter text.
Number of Alarms: ☒Initial Alarm Only ☐Second Alarm or Greater ☒Level I RIT
☐Level II RIT ☐Level III RIT ☒ Tanker Task Force
☐ Other Click here to enter text.
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc.): AU608, M613C
Casualties
Civilian Fire Service Other
Injuries N/A N/A N/A
Fatalities N/A N/A N/A
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $Click here to enter text. $Click here to enter text. $Click here to enter text.
Damages $304,000.00 $Click here to enter text. $304,000.00
Incident Times
First unit on scene BC602 at 21:39 hours
Additional alarms/resources
requested
Tanker Task Force & Level I RIT
at 21:39 hours
Fire/Incident Under Control 00:47 hours
Last unit cleared scene TL602 at 02:21 hours
Form 017 Page 2 of 10
Revised: xx/xx/2015
Understaffed/Unavailable/Add-on Units
Add On Units: C600, C600B, BC613, FM609 & U602
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Completed
I (identify the flow path) – Not Applicable
C (cool the space) – Completed
E (extinguish the fire) – Completed
R (rescue) – Not Applicable
S (salvage) – Not Applicable
1st Alarm units dispatched at 21:34 hours: E602, E605B, E604, E608B, K601, TL602, T620,
R617, K602, K680, K604, A614B, BC602, C602, EM601, and FM610
SO600 was operating on another incident and went en route to the fire at 21:43 hours
Tanker Task Force dispatched at 21:39 hours: E601, K608, K612, K626 & AC601
Level I RIT dispatched at 21:39 hours: E612, R620, A617B & AL614
Narrative of Operations
At 2134 hours 1st alarm units were dispatched for a report of a house on fire at 18179 Lincoln
Road. The ECC reported that the caller stated that there were flames out of the front two windows.
BC602 arrived on scene at 2139 hours and found a two story wood frame single family dwelling
with fire showing from the first and second floors on side Alpha along with fire from the first floor
on side Delta. Upon arrival, BC602 was able to view all sides of the building except side Charlie.
C602 arrived right behind BC602 and immediately went to view side Charlie. Once on side
Charlie, C602 observed fire throughout the first floor with extension to the second. BC602
established “Lincoln Road Command” and immediately requested a Tanker Task Force along with
a Level I RIT assignment.
Engine 602 (1st due): While en route, E602 identified the primary water supply site to be a 15,000
gallon underground tank at 18048 Lincoln Road (Lincoln Elementary school) with the secondary
site being a dry hydrant at 18717 Lincoln Road. Crews were not able to utilize the underground
tank at the elementary school since it was out of service. Also while en route, C602 changed the
primary water supply site to a hydrant at the intersection of A Street and Maple Avenue. E602
arrived on scene and positioned past the building leaving room for the first due truck company.
The OIC was able to split his crew and stretch two initial hand lines. The first to the Alpha/Delta
corner to control the fire blowing out into the front yard from windows on both the Alpha & Delta
sides. E602’s X-ray crew stretched a second line to side Charlie also for fire attack. After knocking
down the exterior fire, the OIC from E602 forced entry through the front entrance on side Alpha
which was a partially burned off door. The door was removed from its hinges and the initial line
Form 017 Page 3 of 10
Revised: xx/xx/2015
was pushed into the first floor. While attempting to stop the fire spread to the first floor, the crew
initiated a primary search of the immediate area. E602’s OIC was eventually designated as the
Division Alpha supervisor and along with the rest of the crew performed multiple tasks to include
extinguishment & overhaul for the duration of the incident.
Engine 605B (2nd due): This unit arrived on the South side of the fire scene and along with E608,
K680 & K608 they were able to supply water to E602 throughout most of incident. The two
tankers shuttled water back and forth allowing this set up to actually nurse E602. Initially, the IC
was under the impression that this unit would arrive from the North side (Purcellville Town side)
of the incident and was preparing for a reverse hose lay. The remainder of the crew was assigned
to work under Division Charlie for most of the incident performing fire attack overhaul duties.
Engine 604 (3rd due): Upon arrival the OIC became the water supply supervisor. AC601 and the
rest of E604’s crew also assisted with this task. Once on scene, the OIC quickly recognized there
would be an issue with getting water down the street to the fire. The road was very narrow and
there were not many options to set up a dump site. This was initially hampered by companies
arriving on the scene along with some abandoned apparatus that was left parked on Lincoln Road.
E604’s crew had to reposition the abandoned apparatus and get them off of Lincoln Road in
preparation for the water supply. The water supply supervisor requested a water supply channel
through the IC and initially set up E604 & K601 for a 1,700 foot split lay to the elementary school.
This water supply site was initially thought to be an actual hydrant. Once this site was identified as
a less than desirable source, the water supply supervisor had E601 hook up to a hydrant at A Street
& Maple Avenue. Tankers 601, 604, 612 & 626 were filled at this site and shuttled water to the
fire ground for the duration of the fire.
Engine 608B (4th due): Initially operated as a four person RIT company. Performed a recon lap
and identified several fire ground hazards upon their arrival. Once the Level I RIT companies
arrived, E608B’s OIC became the RIT Group Supervisor. As the incident escalated, the IC was
able to break up the RIT Group and utilize two companies working together as RIT (E612 &
R620) with one in each Division. E608B was redeployed later to assist with fire attack and
overhaul duties.
Tanker 601 (5th due): Reported to the water supply supervisor to assist with establishing a viable
water supply operation. Was also utilized in the tanker shuttle.
Tower 602 (1st truck): Positioned on side Alpha. The crew assisted with fire attack, performed
horizontal/vertical ventilation and overhaul.
Truck 620 (2nd truck): Assigned to work under the Division Alpha supervisor initially. Crew
placed multiple portable ladders, provided horizontal ventilation and assisted with fire attack on
the second floor.
Rescue 617 (1st rescue): Assigned to work under the Division Charlie supervisor. Crew assisted
E605 with fire attack in the rear.
Tanker 602 (1st tanker): Nurse tanker operations at the scene.
Form 017 Page 4 of 10
Revised: xx/xx/2015
Tanker 680 (2nd tanker): Shuttled water on the South side of incident providing a second water
supply to the fire ground.
Tanker 604 (3rd tanker): Shuttled water on the North side of the incident to the fire ground.
EM601 & A614B: Set up and maintained rehab throughout incident. After rehab was set up,
EM601 assisted with getting a transport unit in a better position in case of an injury on the fire
ground. M613C brought to the scene to assist with this. EM601 also assisted at the command post.
Battalion Chief 602 (1st due command officer): Handled the incident command duties
throughout the incident. BC613 assisted as the IC’s aide along with an extra firefighter from K604.
Chief 602 (2nd due command officer): Operated as the Division Charlie supervisor for the
duration of the incident.
Safety Officer 600 (incident safety officer): Monitored crew safety and identified all hazards
throughout the incident.
Tanker task Force- E601, K608, K612, K626 & AC601: E601 established a water supply at a
hydrant at A Street & Maple Avenue. K612 & K626 filled at this site and shuttled water to the fire
ground. K608 came in from the South side of the incident and was able to get water off of a
hydrant in Hamilton. K608 dumped its water into E605B who acted as a secondary supply for
E602. AC601 assisted the water supply supervisor with the supply/shuttle north of the incident.
Level I RIT- E612, R620, A617B & AL614: E612 & R620 were absorbed into the RIT Group
and utilized in this capacity for most of the incident. EMS units staged/positioned for transport.
Investigative Units: FM610, FM609, FM612, FM605, FM600 & FM611
Radio Channels Utilized/Monitored: 6 Hotel-TAC 21: fire ground operations, 6 Golf-CMD20:
command channel, 6 India-TAC22: water supply operations & 6 Oscar- Safety2 monitored at the
command post.
Safety Officer Comments
During the report from side Charlie, C602 identified and communicated numerous hazards.
Providing such thorough information of conditions is much more helpful than simply announcing
“side Charlie is clear.”
Form 017 Page 5 of 10
Revised: xx/xx/2015
Self-deployment of an interior crew was an issue. During an instance when command had
restricted entry into the building to units entering through side Alpha, a crew entered the 2nd floor
via a ladder on side Bravo. The safety officer had previously entered the structure to survey safe
areas so units could operate inside. Due to hoarding conditions and the amount of void space fires,
the IC elected to only allow a single crew to operate in the main stairwell leading to the second
floor in an attempt to gain access to the attic space.
Crews deciding to enter a building on their own accord sets the stage for a myriad of negative
outcomes and is contrary to sound accountability practices:
If the IC has no knowledge of self-deployed crews entering a structure, not only are you
putting you and your (self-deployed/freelancing) crew at risk, but you are also putting
other companies on the fire ground at risk should your company become compromised.
The area the crew was working in was “deemed not safe” and should have been treated as
such. To add to this point, the structure has significant fire/water damage and was known
to be unoccupied.
All windows were open and accessible with hand lines from the ground or the aerial
device.
Opposing hand lines were a great concern with the crew advancing from the stairwell to
the second floor.
An aerial master stream was placed into service on the Alpha side and directed into an area where
an interior crew was working from side Charlie. Generally, the IC will coordinate and approve the
use of master streams. A general announcement will be made before flowing water so that all
personnel working inside and outside of the building can maintain situational awareness and avoid
being struck by the stream.
Crews must ensure proper eye protection is in place before performing overhaul operations. The
same applies to crews utilizing chainsaws on the fire ground. Bourke eye shields affixed to the
brim of the helmet do not replace approved eye protection.
SCBA use is imperative for protecting the respiratory system from hazardous toxins. SCBA should
be used even during exterior firefighting operations especially when crews are working in heavy or
blowing smoke conditions. Working in close proximity to the fire poses the same risks as working
on the interior of the structure.
Additional Safety Concerns
The medium sized deck on side Charlie had the potential to become an issue. At one point, there
were thirteen people on the deck at one time. Add the weight of every individual’s PPE, charged
hose lines and portable ladders, the deck could have easily become compromised. This can be even
more dangerous if the deck is built very high off the ground.
Full facial hair can prove to be hazardous when utilizing SCBA. Personnel with full facial hair that
attempt to enter an IDLH should be replaced with another member. This is to ensure individual
and crew safety.
Form 017 Page 6 of 10
Revised: xx/xx/2015
This particular home was not being used as a primary residence. The homeowner was actually
using it as a means of storage. Not long after attempting to attack the fire from the interior
stairwell, the IC deemed the structure to be unsafe and treated it as a vacant building. The extreme
hoarding conditions on the first and second floors, the presence of large appliances that were
blocking exterior doors and holes in the combination crawl space/basement helped to support this
decision. Aside from the obvious, crews must also keep in mind the amount of time that the
building has been exposed to the fire and the copious amount of water that we poured into the
building during the fire attack will also have a negative impact on the structural integrity. The IC
and command staff agreed that operating in a defensive manner would be the safest option.
Risk a little to save a little, risk a lot to save a lot…….
Form 017 Page 7 of 10
Revised: xx/xx/2015
Additional Comments
Pros
The water supply supervisor (E604 OIC) along with AC601 did an excellent job setting up a
sustainable supply for the duration of the incident. An estimated 54,000 gallons of water was
supplied to the operation. After identifying an issue with the initial water source, the water supply
supervisor was able to reposition the 3rd & 5th due engine companies along with the tanker task
force units and shuttle water from a fire hydrant. The water supply operation uninterrupted for the
duration of the incident.
The driver/operators from E605B, K605 & K608 did an outstanding job by providing a secondary
water supply just south of the incident. These units approached the scene from the opposite
direction of the initial water supply site and had to adjust their tactics due to the limited access on
Lincoln Road. The tanker drivers worked tirelessly throughout the incident by shuttling water from
a fire hydrant back in the Town of Hamilton. E605B’s driver supplied that water to E602 and acted
like a modified nursing operation.
Officers were quick to notice the hoarding conditions inside the house which quickly changed the
tactics of the operation.
Multiple ladders were placed on all sides of the building.
Crews were quick to recognize the electrical hazard at the Alpha/Delta corner of the house. This
area was marked early on and crews avoided the immediate area until the power company
controlled the hazard.
Good call on getting ground lights to the rear of the building so crews could avoid the abundance
of trip hazards in the rear yard.
The RIT Group Supervisor and the Level I RIT companies decided early on to evenly spread out
their resources so they could effectively monitor all operations on sides Alpha & Charlie.
Cons
When ventilating windows personnel should clear the ENTIRE window. All of the glass, screens,
sash, curtains, blinds, etc. This will not only improve ventilation, the opening may serve as a
means of emergency egress for another member operating inside the structure.
The IC must be notified prior to master streams being placed in service. This is so a general
announcement can be made to all personnel on the fire ground. This is very important when
transitioning from an offensive to a defensive operation. Personnel must be given an ample amount
of time to prepare and avoid getting injured.
Form 017 Page 8 of 10
Revised: xx/xx/2015
Apparatus positioning on Lincoln was less than desirable. If a particular piece of apparatus is not
being utilized at the incident scene but the crew is, the unit has to be “abandoned,” Officers and
drivers must make every effort to ensure their unit is parked in a location that is not going to have
a negative effect on the operation. Personnel involved in the water supply operation had to
reposition several pieces of abandoned apparatus out of the way of the operation.
Radio traffic was not the best. We have been using the 4 C’s of communication for quite some
time now. Everyone should be communicating the same way over the radio no matter what the
incident type may be. If a catastrophic event occurs and we experience a breakdown in
communication, there may be a delay in providing assistance to personnel on the incident scene.
Personnel should be familiar with all tools/equipment carried on their apparatus, how they are
utilized and when. Officers/division supervisors should not have to stop what they are doing and
go to a remote location to help teach personnel how to complete a specific task.
Vertical ventilation should have occurred much earlier in the incident.
Personnel should not attempt to ascend/descend an aerial device while it is in motion.
Freelancing is very dangerous and will not be tolerated in any situation. Crews must carry out their
orders/assignment unless: they cannot possibly complete the job they were assigned to do, another
company has already performed their job or has taken their assignment, their job/assignment is not
needed or it is too unsafe for them to complete their assignment. The safety officer, division
supervisors and the IC had to correct several issues on the fire ground that were directly related to
freelancing. Future incidents will not be tolerated and personnel could be removed from the
incident scene by the IC if they are not able to follow orders.
First in companies encountered a heavy body of fire that was quickly spreading throughout a
balloon frame style home that was built in the 1700’s. The presence of hoarding conditions and the
overall unsafe condition of the home proved to be a challenge for the initial crews attempting to
operate on the interior of the building. Hoarding conditions are present in Loudoun County but
unfortunately we do not encounter them frequently under fire conditions. Crews were able to
attack the fire from several different vantage points and safely extinguish it without incident. This
incident required a lot of hard work from the exterior of the home. Overhaul and extinguishment
took place over ground ladders, through windows and via an elevated platform.
Good learning experience for many involved in the operation.
Form 017 Page 9 of 10
Revised: xx/xx/2015
Attachments
☒Pictures
☐Diagrams
☐Other
Xx
Ggxfg
Form 017 Page 10 of 10
Revised: xx/xx/2015
Form 017 Page 1 of 3
Revised: 04/15/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander Jason Collins, Battalion Chief
Officer completing SIR (if different from above) Click here to enter text.
Incident date 2/28/2016 Incident number 201604796
Dispatch time 0443 Box area 1912
Incident location 25395 Pleasant Valley Rd
Type of incident as dispatched Structure Fire
Actual type of incident (if different from above) Click here to enter text.
Number of Alarms: ☐Initial Alarm Only ☒Second Alarm or Greater ☒Level I RIT
☐Level II RIT ☐Level III RIT ☐ Tanker Task Force
☐ Other Click here to enter text.
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc): Level 1 RIT (INC#
201604797): E421, TL436, and M415 / Second Alarm: E438, E417, E607, T438, M609, CN606,
AU608, and SU 609
Casualties
Civilian Fire Service Other
Injuries Click here to enter text. Click here to enter text. Click here to enter text.
Fatalities Click here to enter text. Click here to enter text. Click here to enter text.
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $Click here to enter text. $Click here to enter text. $Click here to enter text.
Damages $100,000.00 $900,000.00 $1,000,000.00
Incident Times
First unit on scene 0452 (E619 & TL619)
Additional alarms/resources
requested
0512 (Level 1 RIT)
0527 (Second Alarm)
Fire/Incident Under Control 0529
Last unit cleared scene 1136
Form 017 Page 2 of 3
Revised: 04/15/2015
Understaffed/Unavailable/Add-on Units
Click here to enter text.
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Completed
I (identify the flow path) – Completed
C (cool the space) – Not Applicable
E (extinguish the fire) – Completed
R (rescue) – Completed
S (salvage) – Completed
At 0443, E415, TL619 and LCSO were dispatched for a fire alarm with a burglar alarm in an
approx. 400’ x 100’ Type-2, Tilt-Slab Construction Warehouse with numerous suites. E619 was
clearing from another fire alarm and responded on the call, placing E415 in service. Units were
advised to stage by ECC prior to arrival until LCSO answered the burglar alarm. E619 and TL619
arrived and staged. ECC advised that LCSO on scene advising smoke in the building and filling
the box.
Narrative of Operations
While approaching the scene, E619 was met by LCSO deputies on side Charlie. Deputies stated
that there was a sprinkler activation and smoke in the building. While approaching the scene,
E619 noticed water coming from one of the roll up doors on side Charlie and access issues. Along
with TL619, E619 positioned on side Alpha of the building with their own water supply.
Following up a size-up, E619 stretched a line and TL619 forced entry into Suite 145 initially
thinking the fire was located in this unit. Moderate smoke conditions were present but no fire.
Upon searching the unit, TL619 exited the rear door on side Charlie. TL619 observed smoke now
pushing from the top of four rollup doors of the Delta 1 exposure. Line was backed out and crews
forced entry into Suite 150, the D1 exposure. Immediately, E619, TL619, and now E680
(positioned on the Alpha/Delta corner), encountered heavy smoke conditions and a large number
of vehicles, parked closely together which made it extremely difficult to advance the line into the
building towards the seat of the fire. Access to the structure and ventilation from side Charlie was
coordinated with interior crews and the Charlie Division (E415, TL302, RS421, and BC403).
Even though some of the smoke started to clear, a thermal imaging camera was used to locate the
seat of the fire through “cold smoke” conditions created by the sprinkler activation. At one point
crews were less than 10’ away from three automobiles that were fairly well involved but only
realized it because they could see the flames through the TIC. Fire was extinguished by E415
from side Charlie and a prolonged ventilation effort commenced due to size of the area needing
ventilating. E436 (iRIT) lapped the structure and established a staging area. M619 established
and coordinated rehab efforts. BC601 assisted with incident command by monitoring the
command channel and tracking resources. EM601 ensured rehab was established and an
additional EMS unit was available/ready for transport if needed. SO600 took numerous laps
around the structure, provided IC with updates, and interior air monitoring. E421, TL436, and
Form 017 Page 3 of 3
Revised: 04/15/2015
M415 dispatched on the Level 1 RIT. E421 and TL436 assigned with E436 as the RIT Group.
M415 used as the on-scene transport unit if needed. E438 pulled from 2nd Alarm resources and
used on side Charlie as crews rotated through rehab. AU608 and SU609 assisted with rehab
providing air and refreshments.
Safety Officer Comments
Crews were diligent remaining on air until readings were within normal limits. Division
supervisors and the Fairfax Safety Officer (Side C) aided with ensuring crews were compliant.
Rehab was established early and crews rotated without incident. Rescue wipes were provided at
rehab. Just a reminder that all personnel should wipe off their face/necks after completing interior
operations.
Lighting to all sides of the structure should occur as soon as feasible during low light conditions to
reduce the risk of injuries.
Ice became a hazard and was identified and communicated to the members on the scene.
Just a reminder to decon yourself, your gear and apparatus after the call.
There were no injuries or damage to equipment reported.
Additional Comments
Locating and attacking the fire was difficult due to the large amount of vehicles stored inside the
building. The business was vehicle buying service and stored their inventory inside the structure.
The crews on the initial alarm worked their tails off trying to open up and get to the seat of the fire.
Crews practiced good fire ground discipline and worked well within the framework of ICS.
Staging area for 2nd Alarm established on Pleasant Valley Rd.
One big negative – the FDC was not supplied with sprinkler activation.
After everyone initially cleared, FMO requested RS607 to the scene and assist with their spreaders
during their investigation.
Attachments
☐Pictures
☐Diagrams
☐Other Click here to enter text.
xxx
Form 017 Page 1 of 3
Revised: 04/15/2015
SIGNIFICANT INCIDENT REPORT
Incident Commander Micah Joel Kiger, Battalion Chief
Officer completing SIR (if different from above) Click here to enter text.
Incident date 2/29/2016 Incident number 201604873
Dispatch time 06:48am Box area 0624
Incident location 21048 Starflower Way-AB
Type of incident as dispatched Investigation – Structural Damage
Actual type of incident (if different from above) Click here to enter text.
Number of Alarms: ☐Initial Alarm Only ☐Second Alarm or Greater ☐Level I RIT
☐Level II RIT ☐Level III RIT ☐ Tanker Task Force
☒ Other Special upgrade with Rescue Squads
Dispatched/Additional Units (Level I RIT, 2nd Alarm, Tanker Task Force, etc): Upgraded response
of R620, R680 (FS06), BC600, SO600, FM610, Loudoun County Building and Development,
Wrecker Service, and LCSO. Crew from T620 respond with additional shoring materials in
support of R620’s request for additional lumber needs.
Casualties
Civilian Fire Service Other
Injuries 1 0 N/A
Fatalities 0 0 N/A
Property Loss (determined in conjunction with the FMO)
Building Contents Total
Value $Unknown $Unknown $Unknown
Damages $Unknown $Unknown $Unknown
Incident Times
First unit on scene E606B
Additional alarms/resources
requested R620, R680, M606B
Fire/Incident Under Control N/A
Last unit cleared scene 11:49am
Form 017 Page 2 of 3
Revised: 04/15/2015
Understaffed/Unavailable/Add-on Units
N/A
Initial Evaluation
S (size up) – Completed
L (locate the fire) – Not Applicable
I (identify the flow path) – Not Applicable
C (cool the space) – Not Applicable
E (extinguish the fire) – Not Applicable
R (rescue) – Not Applicable
S (salvage) – Not Applicable
At 06:46am, E606B was alerted to respond to 21048 Starflower Way-AB for the report of a
vehicle into a wall with structural damage. Upon arrival, E606B found a 2-story single family
dwelling with a front-loading attached garage that had been struck by a pick-up truck.
Narrative of Operations
E606B completes size-up, requests R680 (FS06), R620, movement to an operations channel, and
establishes Starflower Way Command. Situation report to BC601 while enroute indicates that a
pickup truck has struck a load bearing wall, the truck is teetering on the foundation, and that there
is substantial structural damage. Driver is out of vehicle and denying injury. BC601 recommends
response from FMO. R680 arrives on the scene, investigates 2nd floor of structure, reports spongy
conditions near damaged area, withdrawals from 2nd floor. BC601 arrives on scene, completes
face-to-face with IC, and assumes command of incident. Crews secure utilities to entire structure.
R620 arrives on scene, receives briefing from E606/R680 officers, and assumes Rescue Group
Supervisor. IAP developed and decisions made to include: place temporary pneumatic shores in
garage to support floor joists to 2nd floor, build two (2) T-shores [one to support brick veneer and
one to support header for garage door], remove vehicle from structure, and construct two (2)
permanent two 2-post vertical shores to support floor joists for the removal of temporary
pneumatic shoring. Crews build and place shoring, vehicle removed from structure, and final
placement of the two 2-post vertical shores accomplished without incident.
Safety Officer Comments
Personnel did a great job coordinating their operations and working together, safely.
It is important to remember that eye protection is a must when hammering nails, using
grinding wheels, and cutting materials with circular saws.
Yellow caution tape was used to create barriers for work zones. Despite early recognition
of potential hazard/collapse areas, we were well into the incident before actual exclusionary
zones were established, communicated, and enforced.
As discussed with the IC after-the-fact, rehab of personnel was considered, but due to the
nature of work and non-emergent status of the incident, personnel were able to hydrate as
appropriate. This incident occurred before 7am and the time that most crews formally sit
Form 017 Page 3 of 3
Revised: 04/15/2015
down for a crew briefing and breakfast. The Office of Health and Safety are examining
options for quick snacks to be available for situations such as this one where we have
personnel engaged in operations across ‘meal times’ where no canteen services have been
requested.
Additional Comments
Crews did an exceptional job working together to safely mitigate the hazards created by the
damaged load bearing wall. While this incident was considered non-emergent since no immediate
life-threatening situation was present upon FD arrival, shoring operations were continued in
support of customer service in an effort to help minimize additional structural damage.
Attachments
☒Pictures
☐Diagrams
☐Other Click here to enter text.
xxx
21048 Starflower Way-AB
Investigation for Structural Damage
Side Alpha
Side Bravo & Alpha-Bravo Corner
Side Bravo
Temporary Pneumatic Shore Placement
Pneumatic Shore Placement (from side Alpha) and placement of vertical
shore for garage door frame.
Vertical Shore Placement for Garage Door Frame and Brick
Veneer Being Placed.
Cut Station and Assembly Area.
Interior View (looking toward Side Alpha)
View of Pneumatic Shore Placement and Installation of Two-Piece Vertical Shores.
Interior view of Two-Piece Vertical Shores.
Final Placement of Vertical Shores to support garage door frame, brick veneer, and joists to 2nd floor.
6
Loudoun County Fire & Rescue
Training Division
1 6600 Courage Court, Leesburg, VA 20175
P hone 703-737-8400 Fax 703-777-0235
FIRE OPERATIONS COMMITTEE REPORT
March 9, 2016
Spring 2016 Firefighter I & II
- The Spring 2016 Firefighter I & II Certification Class is now underway and began on March 5, 2016.
-Class registration consists of 28 students.
-Basic class formalities have been completed and students have moved into PPE, SCBA, and firefighter safety.
The Physical Abilities Test (PAT) will be conducted on March 12 and the Consumption Test is scheduled for
March 19.
-Lt. Michael Smith is the Course Coordinator and Lead Instructor. He can be reached at
robert.m.smith@loudoun.gov
-Lt. Boyd Morris is the Co-Course Coordinator and also a Lead Instructor. He can be reached at
boyd.morris@loudoun.gov
Monroe Tech.
-MTC Fire and EMS Classes resumed on August 31, 2015.
-The Fire Fighter Certification Program:
-There are 9 students enrolled of which 8 are eligible for certification in this class. There is 1 student still trying
to re-gain affiliation to a fire company.
-Students have completed fire attack, ladders, hose, forcible entry, ropes and knots, and ventilation. They are
currently scheduling to sit for the EMR National Registry Certification test. Future classes will be on building
construction and fire behavior.
-The Module I written test is scheduled for April 12. As Module I skills testing is scheduled for April 14, Ms.
Sokol is encouraging stations to work with their MTC students during duty crews and training sessions to help
perfect ladder, SCBA, hose, search, and rope skills.
-
The EMT Certification Program:
- There are currently eight students who continue with this program, of which 7 are eligible for certification.
- Students are currently in Medical Assessment and are making up material due to the recent snow days. EMT
hospital rotations are scheduled from March 20 to April 15.
-The Module III Trauma test was given on February 11, and all students were successful in passing. The
Module IV Medical test is scheduled for April 26.
6
-
Program Information:
-Spring Break is March 20-26, 2016. This is also the time when EMT hospital rotations will take place
allowing students to have a time off to participate.
-Applications are being accepted for the MTC 2016/2017 school year. Current applications submitted so far
equal 15 applicants for the EMT program, and 7 applicants for the fire program. The application period closes
on April 15, 2016.
-LCPS Instructor Sandy Sokol is MTC’s Course Coordinator and Lead Instructor. She can be reached at
sandra.sokol@lcps.org
Ongoing/Completed/Cancelled Courses
-Fall 2015 FF I & II Basic Certification School-Completed
-NFPA 472-Hazardous Materials Operations-February 2016 Class-Completed
-Fire Instructor-Level II-LCFR-Completed
-LCFR Ice Rescue Technician-Completed
-NFPA 1403 Compliance Officer-Completed
-Fire Behavior/Flashover Recognition-February 27-Completed
-NFPA 1002 EVOC I, II, III-February-Completed
-Spring 2016 FF I & II Basic Certification School-Ongoing
-Fire Officer-Level II (Hybrid)-Ongoing
-Fire Instructor-Level II-Purcellville-Ongoing
-LCFR Injury Reporting-January 23, 2016-In the Process of Re-scheduling with LCFR HR
Classes Being Offered
Fire Behavior/Flashover Recognition Ongoing-Contact BC Gottholm
bernard.gottholm@loudoun.gov
VDFP HTR-Confined Space-Level I April 9-10, 2016
Regis. closes March 25, 2016
NFPA 472-Hazardous Materials Operations
May 2016 Class
April 30-May 21, 2016
Regis. closes April 15, 2016
NFPA 1021-Fire Officer-Level III April 23-May 21, 2016
Regis. closes April 8, 2016
VDFP HTR-Introduction to Technical Rescue-Module II May 3-8, 2016
Regis. closes April 22, 2016
6
LCFR Ignitor/1403 Awareness May 7, 2016
Regis. closes April 29, 2016
** Captains Choice Training Seminar- Sponsored by Leesburg Volunteer Fire Company
Terrorism Overview for First Responders- Tuesday, March 22, 2016
FS601-215 Loudoun Street, Leesburg VA
Register at trainingseminars@leesburgfire.org
by Friday, March 18, 2016
Training Center MISC:
**Sexual Harassment Prevention for Supervisors/Officers—To r egister for this class, please provide your
name, station #, email address, rank/title, and a brief statement requesting this course in an email to
lauren.hartman@loudoun.gov. You will receive instructions from Lauren as to how to access this online
course.
--------------------------------------------------------------------------------------------------------------------------------------
***Check the VDFP Website (www.vafire.com) for current information and a listing of classes being offered
in other jurisdictions such as:
-Fairfax County Fire & Rescue Department
4600 West Ox Road, Fairfax, VA
Fire Officer Level I-March 28-April 10, 2016
Registration Closes March 27, 2016 through the VDFP website. www.vafire.com
-Currently the Training section of the VDFP website under “view courses” is currently not active and shows an
error page when the link is selected. Chief Baker from VDFP Division 7 Office said that this is supposed to be
a temporary issue but no date has been given yet for repair.
Upcoming Events from Around the State
2016 Spring Regional School Albemarle High School March 19 & 20, 2016
2016 NFA In-State Training Salem April 5 & 6, 2016
2016 NFA In-State Training Norfolk April 12 & 13, 2016
22nd Annual Caroline County Regional School Milford April 16 & 17, 2016
Rockingham Regional Fire School Harrisonburg April 23 & 24, 2016
VA Dept. of Forestry Statewide Wildfire Academy Farmville May 25-28, 2016
-----------------------------------------------------------------------------------------------------------------
Questions! Please contact: Scott Brazier, Captain
6
Office-703-737-8872
scott.brazier@loudoun.gov
7d
LCCFRS – Training Committee
Meeting Minutes of March 1, 2016
Meeting convened March 1, 2016 at 1900 Hours
Attendees
Committee Chair LCFREM – Field Reps
Bernard Gottholm-LCFR Present Troy Gittings-LCFR Excused
Marc Nicholson-LCFR Excused
Fire Operations Committee
Reps
LCFREM – Training Division
Reps
Jim Fazekus-Co 1/20 Excused Scott Brazier-LCFR Present
Scott Radcliffe – Co 2 Present Bill Toon-LCFR Present
EMS Operations Committee
Reps
Guests
Cheryl Aycock – Co 4 Present Randall Shank-LCFR Present
Tony Mino – Co 13 Present
Meeting minutes approved for February
Agenda
• Status of policies: Current Enrollment SWP will be main topic of discussion of
tonight’s meeting.
Training – Scott Brazier
• Information about registration numbers, registration closing dates, and events
surrounding the Spring 2016 Basic Firefighter I & II Certification Course.
• Update on current situation on how the SWP has affected both the HazMat Ops
and Spring 2016 Fire School registration and attendance rosters.
• Information to update committee on current VDFP Administrative Guidelines and
Procedures regarding HazMat Operations and Fire School.
Fire OPS – Scott Radcliffe
• Nothing to report
EMS OPS – Cheryl Aycock and Tony Mino
• Nothing to report
LCFR Field –
• No Report
7d
Old Business
-Discussion about the enrollment SWP being disregarded after all committees
had voted to approve said policy. (Training Committee thru EXCOMM).
-Discussion on current situation of how the SWP has affected both the HazMat
Ops and Spring 2016 Fire School registration and attendance rosters. As
registration periods are closing, students who do not meet pre-requisites for
classes are permitted to still attend that class which violates the SWP
directive.
-Training Committee feels disregarded and insignificant after a great amount
of work was put into developing and getting the SWP approved only to have it
disregarded after only one issue has arisen from it.
-Discussion on how to solve the issue at hand:
-Aycock-Recommended leaving the SWP unchanged but draft a System
Wide Informational Bulletin to allow a 6 month “adjustment period”. This
allows flexibility in registration until the new 2016/2017 Annual Training
Calendar to be adjusted to comply with the SWP.
-Recommended that the Training Calendar be adjusted to allow for two
HMO classes to be completed prior to a Basic Fire School and provide a
30 day period between HMO and Fire School to alleviate registration
issues.
-Committee members voted and approved to move forward with these
recommendations.
- Discussion by DC Shank about book re-imbursements for “out of County”
students who attend classes in Loudoun. A draft of this proposal has been
created and sent up the chain for approval. (November 2015)
New Business
• Introduction of DC Shank as new head of Training Division.
• Discussion about how to increase system participation in the Training
Committee. Recommendations:
-Ask the FOC to spread the word to Chief’s, Presidents, and
Training Officers so that they may attend the meetings.
-BC Gottholm to send monthly meeting reminders to his mailing
list one week prior to the meeting date to encourage system
members to attend. Email will include the date and time of the
meeting as well as the agenda.
• Dr. Toon-Discussion about three suppression companies in the system who have
over 100 members each who do not have CPR Instructors. Would like to work
with these companies to train their own in-house CPR instructors. This would
help to alleviate the strain of the suppression companies borrowing instructors
from the neighboring rescue companies and would also help ease the student
saturation level during PRIDE training. Dr. Toon will reach out to the FOC to
7d
schedule time to speak with the fire chiefs in order to foster participation for this
idea.
Meeting adjourned at 1950 hours.
Next meeting-Tuesday, April 5, 2016, at 1900 hours.
10a
LOUDOUN COUNTY COMBINED FIRE AND RESCUE
SYSTEM
SYSTEM-WIDE PROCEDURE (SWP)
TITLE Volunteer Physicals
SECTION
SWP#
ISSUED
REVISED
APPROVED System Chief ___________________________________________________
W. Keith Brower, Jr.
PURPOSE
The purpose of this system-wide policy is to define and describe the process for qualified
volunteer members of the Combined Fire and Rescue System to obtain a physical.
Loudoun County mandates pre-placement (Candidate) physicals for all operational volunteer Fire
and Rescue members who join the County after July 1, 2011. The County also provides, at no
cost to incumbent operational volunteer members, an annual physical in accordance with
applicable standards commensurate with the volunteer members’ scope of practice (EMS-only or
cross-trained/dual role Fire and EMS). Incumbent operational volunteers are strongly encouraged
to participate in the annual physical program1.
SCOPE
This policy applies to volunteer Loudoun County Combined Fire and Rescue System (LC-CFRS)
operational personnel.
DEFINITIONS
Candidate – An individual who is seeking to become an operational member of a Volunteer
Fire/Rescue Company located in Loudoun County, recognized in Chapter 258 of the Codified
Ordinances of the County. For the purpose of this Policy, a Candidate may also be an
incumbent member seeking eligibility to obtain initial training and certification as a firefighter.
Incumbent – An individual who is an existing (currently active) operational member of a
Volunteer Fire/Rescue Company located in Loudoun County, recogniz ed in Chapter 258 of
the Codified Ordinances of the County.
Interim – A report provided by Occupational Health requiring a Candidate or Incumbent to take
action before a determination can be m ade on the individual’s clearance to participate in
1 This SWP replaces FRG 3.1.2 and 3.1.3
10a
operational activities.
NFPA Physical – The National Fire Protection Association (NFPA) 1582 Standard on
Comprehensive Occupational Medical Program for Fire Departments2
OSHA Physical – The U.S. Department of Labor Occupational Safety & Health Administration
(Respiratory Protection) regulations. See also 29 CFR 1910.134
Occupational Health – The County’s contracted agent to provide professional medical expertise
in the area of occupational health as they relate to emergency services.
Operational Member – An operational member is one who is authorized to perform essential fire
suppression and rescue (EMS) duties as a member of a Fire or Rescue Company recognized under
Chapter 258 of the Codified Ordinances of Loudoun County. Administrative members who
provide support services to operational members are excluded.
Physical –An NFPA or OSHA medical examination performed by the County Occupational
Health provider.
POLICY
A.
All Candidates shall satisfactorily complete a physical a dministered and interpreted by
Occupational Health.
B. Occupational Health shall serve as the responsible agency in determining medical
clearance to participate as an operational member of the Combined Fire and Rescue
System.
C. All Incumbent members are eligible for annual physicals administered by Occupational Health.
D. Incumbent members previously cleared under the OSHA standard must complete an
NFPA 1582 physical as a C andidate to be eligible for initial firefighter training and
certification.
E. Participants in the Volunteer Battalion Chief Program are required to successfully
complete an annual physical (NFPA 1582) (effective 07/01/2016)
F. Part-Time Instructors who work and conduct training involving IDLH
environments at the Robert O.R. Dube ′ Fire Rescue Academy are required to
successfully complete an annual physical (NFPA 1582).
G. Sample components of the NFPA & OSHA physical are herein provided in APPENDIX I.
NOTE: The list below is informational only. The contract between the County of Loudoun
and the Occupational Health provider will serve as the determining guide for the component
parts of specific physicals.
2 The LC-CFRS currently references the 2013 Ed. of NFPA 1982
10a
PROCEDURE
I. Candidate Physicals
A. Candidate physicals are performed during the affiliation process and will deter mine the
prospective volunteers’ eligibility as an operational member.
B. The ranking administrative officer (or designee) of a Volunteer Company will communicate
with the Volunteer Programs Section via electronic mail to vol_health@loudoun.gov to
schedule an NFPA or OSHA physical. The email from the Company leadership will serve as
authorization from the Company of the candidate’s intent to affiliate with the C ompany. The
email will provide the candidate’s name, contact information and the Company’s determination
of the type of physical being requested (OSHA or NFPA).
C. Volunteer Programs will send the Candidate instructions and access to the online physical
schedule program to set up their physical at a time suitable to their schedule.
D. Candidates seeking clearance under NFPA 1582 will be evaluated under Chapter 6 of the
Standard.
E. Candidates will receive the results of the physical and the Volunteer Programs Manager will
receive a disposition as follows :
1. The individual is cleared to perform both firefighter and rescue duties
2. The individual is cleared to perform rescue duties only
3. The individual has the following restrictions (these will be described in detail by the
physician)
4. The individual is not cleared to perform firefighter or rescue duties
5. The Individual is required to foll ow up with personal physician/specialist to obtain
clearance
F. Volunteer Programs will forward the disposition to the Candidate and the ranking
administrative officer (or designee) of a Volunteer Company. . The only information
provided by Occupational Health will be a determination of eligibility.
G. Results will also designate the level of Respirator clearance authorized for the individual in
accordance with the County’s Respiratory Protection Program.
H. An interim report may be issued that requires the candidate to take action before a final
determination can be made by Occupational Health. An interim may require the individual to
seek additional medical testing not covered by the County. Individuals are responsible to
ensure Occupational Health receives proper documentation in the time requested. Failure to
provide documentation will result in a “not cleared” determination.
I. Candidates who are not cleared may re-apply through their Company leadership one year from
the date of their last-completed exam. A second failure will result in a two year delay before a
third and final attempt can be requested. Candidates who are not cleared for operational
participation may affiliate as an administrative member at their Company’s discretion but may
not participate in operational activities of the System.
II. Incumbent Physicals
A. Incumbent members may request an annual physical at any time by electronic mail to the
Office of Health and Safety (OHS) at
OHS@loudoun.gov. Incumbent firefighters will be
evaluated using Chapter 7 of NFPA 1582. Incumbent EMS-only providers will be evaluated
using the OSHA standard.
10a
B. Affiliation and status will be verified by Volunteer Programs Staff and the Incumbent will be
sent access to the online physical schedule program to set up their physical for a time suitable
to their schedule.
C. Incumbent members may also request to be placed on the annual physical cycle by
notifying OHS@loudoun.gov. Thereafter, participating incumbents will receive an email
two months in advance of their birth month with access to the online portal to schedule their
physical.
D. The disposition will be forwarded from Occupational Health to OHS. OHS will forward the
results to the individual. The only information provided by Occupational Health will be
a determination of eligibility.
E. Incumbents will receive the results of the physical and OHS will receive a disposition as
follows :
1. The individual is cleared to perform both firefighter and rescue duties
2. The individual is cleared to perform rescue duties only
3. The individual has the following restrictions (these will be described in detail by
the physician)
4. The individual is not cleared to perform firefighter or rescue duties
5. The Individual is required to follow up with personal physician/specialist to obtain
clearance.
F. Incumbents may be issued an Interim report. An Interim report requires the incumbent to
take action before a determination can be made by Occupational Health. An interim may
require the incumbent to seek additional medical testing not covered by th e County.
Incumbents are responsible to ensure Occupational Health receives proper documentation in
the time requested. Incumbents can request of Occupational Health and extension to their
interim; those will be evaluated by Occupational Health and only granted when medically
acceptable to do so. Failure to provide documentation will result in a “ not cleared ”
determination.
G. Incumbent members who are issue d an Interim may remain operational members of the
System unless otherwise noted on the Interim report.
H. Incumbent members who complete an annual physical and receive a “Not Cleared” report
shall be removed from operationa l duties (including exertional training) . Affected System
leaders will be notified of a “Not Cleared” status. Incumbent members restricted from
participating in operational activities will remain operationally inactive until the
Occupational Health provider clears the individual to return to operational duties.
I. Incumbent members who, in the course of their employment with Loudoun County, fail a
physical required in the course of their employment will be restricted from participating as
an operational volunteer until medical issues are resolved and clearance provided by
Occupational Health.
10a
APPENDIX I
Components of Physicals
NFPA OSHA Physical Components Notes
X X Audiometry Mandatory
X X Body Fat / Body Composition Mandatory
X X CBC W / Differential Mandatory
X X Vision Mandatory
X X Flexibility / Strength Mandatory
X X
Hepatitis B Surface Antibody /
Titer Mandatory
X X Chem Profile Mandatory
X X Urine Dip Mandatory
X X Physical Exam Mandatory
X X Spirometry Mandatory
X Stress Test Mandatory
X X Quantiferon Test Mandatory
X X Respirator Clearance Mandatory
X PSA- Prostate Specific Antigen Men only, Age and Risk factors considered.
X X Hepatitis B Vaccine - Series of 3 supplemental - needed based on titer result
X Mammography Screening Female only
X X Tetanus
supplemental - based on CDC
recommendation
X X Chest X-ray 2 View
Baseline at preplacement, supplemental -
every 3 years
X X Hepatitis C Confirm RIBA
supplemental - only if Hep C antibody is
positive
X X Urinalysis (Micro) supplemental - only if urine dip is abnormal
X X
EKG Resting w /interpretation if
no stress test
Mandatory OSHA
Periodic for NFPA- based on age
X X Hepatitis C Antibody Only Candidate
X X PPD
supplemental - Quantiferon comes back
positive