City of Chesapeake · Chesapeake City County · meeting of Jul 27, 2026 · Minutes
Open the original document More from City of Chesapeake
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Chesapeake
StormwaterCommitteeMeeting
July27,2026
ChesapeakeCityHall,HumanResourcesTrainingRoom
1.CalltoOrder:Themeetingwascalledtoorderat6:00PMwithnoobjection
(Waters)
2.RollCall:RollwascalledbyCaseyMagruder.
CommitteeMembersinAttendance:
BrennenWaters(Chair)
KevinWalker(Co-Chair)
MichaelBattle
MiltonJohnston
MichaelPoyner
TheresaHarris
VicNicholls
MarkiellaMoore
AudreyDoan(Alternate)
CaseyMagruder(PWEnvironmentalProgramManager)
JamesLomogda(OperationsAdministrator)
ReynaldoHernandez(PWStormwaterEngineerIV)
MatthewMorse(CAO)
AbsentCommitteeMembers:
RichardBunton
—
Excused
RyanShrader(Alternate)
OtherCityStaffinAttendance:
CarrieLatham
—
(AdministrativeCoordinator)
-
minutes
CitizensinAttendance:
NA
3.MeetingMinutes
Therewasaquorum,andtheJune2026meetingminuteswereapproved.
Waters/Walker/Battle
4.CitizenComments
—
N/A
5. Operations Update /OPS Report
James Lomogda (Operations Administrator) gave the Operations Update for the month
ofJune 2026 stating that there were four hundred and thirteen (413) work orders received,
three hundred and forty-two (342) fields completed, and two hundred and nine (209) still
open.
The Field Completed Work Orders Service Goal Days Chart James showed green in most
categories apart from Vegetation Control and Shoulder Work.
** Michael Poyner: Is vegetation control handled by cutting, trimming or poisoning?
** James: Bucket trucks are used and some chemicals on asphalt using a spray flow
line, if it’s dry enough.
The current chemical used is Pro-Cutter Pro. This chemical contains no copper
sulfate. Staff who use poisons must be certified to spray and to mix.
Michael Poyner: When work orders are backed up, do you pull staff from other
areas within the department to assist?
James: Cross training occurs almost daily in the division. The position that is being
used ranges from Equipment Operators I-III, located at all 3 Public Works Yards.
(Greenbrier, Hickory, Deep Creek)
James then showed the CCTV List; There were twenty-seven (27) Work Orders including
fourteen (14) Cave In work orders. James explained the process of how a cave-in is
created.
James next showed before and after project pictures:
1. 116 Hall Drive
*“* James: Ops crews repaired erosion around six pipes along the roadside
ditch.
2. 1105 S. Military Hwy,
“* James: A citizen reported a “bump” in the road. Crews milled & patched
two
—
2 x 7 sections.
*“* Member: How long had the bump had been there?
o,
“* James: About a month.
3. 101 Howard Road
Side ditch clean and clear.
600’Total
Milton Johnston: How do we determine if a drain is a “Public” or “Private.
James: For ditches, the GIS Data Base and/or Asset Management program
are used.
If itis deemed “Public Water”, the city should maintain the ditch.
Private drainage is the Citizen’sresponsibility.
o,
,
“We
‘J*
re%
+,~~
,~“
Stormwater Committee Meeting
7/27/2026
6.EngineeringUpdate
ReystatedthattheSWEngineeringgrouphasbeenworkingonaBRICapplication
whichwasinitiallyduetoVDEMinMarch2026.VDEMhasbeenreviewing
applicationsandrequestingadditionalinformationoverthepastfewmonths.Aftera
lotofback-and-forthquestions/responses,VDEMindicatedtouson7/22thatthey
submittedtheIndianCreekRoadapplicationtoFEMA.
“¢IndianCreekRoadInfrastructureImprovementswouldbea75/25%costshare
(75%Federaland25%City)
“+AsafollowuptoMr.Bunton’squestionduringtheJunemeetingaboutClearing
Cooper’sDitchalongwithHillwell(ACOE)
—
arethereanyupdates?Reystated
thattheyhavecompleted60%oftheplans.
“¢MarkiellaMoore:MentionedthattheBattlefieldBlvd.Elevationprojectwas
dismissedduringaCityCouncilmeeting.
«*TheIndianCreekRoadcostisapproximately$4million,resultingin$1million
forCity’sresponsibility(75/25%costshare)
.EnvironmentalReport
CaseyMagrudergavetheEnvironmentalReportforJune2026,sayingthatJunehad
twenty-four(24)complaints;algae,pooldischarges,randomdumping,andtherewere
onehundredfifty-six(156)BMPinspections
205SingleFamilySitesOpen
357SingleFamilyRoutineInspections
149CommercialSitesOpen
335CommercialRoutineInspections
6NoticestoComply
0StopWorkOrders
Casey:DaveMergen’sgroupremainsdownthreeInspectors.
?,“~
SCJ%
ro%
},~
O
o
1
°,%
8.Unfinished/NewBusiness
RE:UnfinishedBusiness
“+Mr.Morse:Explainedthatthereisanappealsprocessforthecommittee,and
sharedwhattheprocessis,shouldacitizenwanttofileanappeal.Mr.Morse
alsostatedthattherehavenotbeenmanyappeals;however,ifacitizenwants
tofileanappeal,theyhave30daystodoso.
oCaseyMagruder:TheStormwaterCommitteefollowsstatelaws.
Mr.Morsestatedthatifthecitizenisstillnothappywiththeoutcomeoftheir
appealwiththeStormwaterCommittee,thenextstepwouldbeforthecitizen
tofileanappealwithCircuitCourt.
¢¢Mr.Johnstonaskedaboutdenialsfordevelopmentappealsprocess.
oMr.Morsestatedthatanappealfordevelopmentshouldbehandled
throughtheDevelopmentandPermitsdepartment.
StormwaterCommitteeMeeting
7/27/2026
RE: New Business
“+ Brennen Waters: Viewed a Gracie Park post on social media from last
week’srainstorm showing the intense flooding. Mr. Waters said the flooding
went down; however, wanted to know if the City was aware of the issue.
James: Stated that he was on vacation when the rain occurred; however,
he’s aware of the flooding that Mr. Waters was speaking about. He said
there’s a pump Station there at the end of Peach Street that has a high-
water line of 2-3 feet. The Outfall goes under the railroad tracks to a junk
yard on the Norfolk side. In years past, Chesapeake attempted to work with
the City of Norfolk to remove the trash that was found at the end of this drain
but was unsuccessful. Public Utilities may be looking at lifting. James
stated that Chesapeake was not going to give up, we just need to revisit it
again.
The meeting was adjourned at 6:55 PM.
The next meeting is scheduled for August 24, 2026.