Wetlands Board Meeting Packet (PDF)
City of Suffolk · Suffolk City County · meeting of Oct 15, 2026 · Agenda packets
Open the original document More from City of Suffolk
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
SUFFOLK WETLANDS BOARD
AGENDA FOR
OCTOBER 15, 2026
PREPARED BY THE CITY OF SUFFOLK PLANNING DIVISION
CASSIDY MCKELVIE, SUFFOLK WETLANDS BOARD SECRETARY
A MEETING WILL BE HELD AT 6:00 P.M. IN THE
SUFFOLK CITY COUNCIL CHAMBERS OF THE CITY HALL BUILDING
IF YOU CANNOT ATTEND OR NEED SPECIAL ACCOMMODATIONS AT THE
MEETING, PLEASE CALL OR EMAIL THE CITY OF SUFFOLK PLANNING DIVISION
AT 757-514-4060 OR PLANNINGEMAIL@SUFFOLKVA.US
PRIOR TO 12:00 NOON ON WEDNESDAY, OCTOBER 14, 2026
GEOFFREY HINSHELWOOD
CHAIRMAN
AGENDA
SUFFOLK WETLANDS BOARD
October 15, 2026
6:00 P.M.
I. Call to Order
II. Roll Call
III. Approval of Minutes from the February 19, 2026 meeting.
IV. Approval of Minutes from the September 17, 2026 work session meeting.
V. Public Hearing
A. SWB2026-00017 submitted by Benjamin Johnson, applicant and property
owner, for a permit to construct a living shoreline at 1504 White Dogwood Trail
along Chuckatuck Creek; further identified as Tax Map 5*1.
VI. Restoration Hearings - None
VII. Permit Extensions - None
VIII. Old Business - None
IX. New Business - None
X. Compliance and Inspections – None
XI. Adjournment
1
MINUTES
SUFFOLK WETLANDS BOARD
July 16, 2026
6:00 P.M.
The meeting of the Suffolk Wetlands Board was held on Thursday, July 16, 2026, at
6:00 p.m., in the City Council Chambers of the City Hall Building, 442 West
Washington Street, Suffolk, Virginia.
MEMBERS:
Geoffrey Hinshelwood, Chairman
Sidney Hazelwood
Kathy Doerner
Bryan Cattenhead
Ellis Dallas
STAFF:
Cassidy McKelvie, Wetlands Board
Secretary
Margaret Pittenger, Assistant Director of
Planning
Jennifer Wilmoth, Assistant City Attorney
Kirsten Travis, Virginia Marine Resources
Commission
ROLL CALL:
The meeting was called to order by Chairman Hinshelwood. The roll was then called
by Mrs. McKelvie, who informed Chai rman Hinshelwood that a quorum was
present.
APPROVAL OF THE MINUTES:
The minutes of the previous meeting were approved as presented by a voice vote of
5 to 0.
Minutes Suffolk Wetlands Board
July 16, 2026
2
PUBLIC HEARING:
VMRC2023-0895, submitted by David Spencer, applicant and property owner, for
a permit to modify and extend an existing riprap revetment located at 6954 Respass
Beach Road along the James River, further identified as Tax Map 7A(1)*3.
Ms. McKelvie gave a presentation and overview of the project. Staff recommended
approval of VMRC2023-0895 with the prop osed conditions outlined in the staff
report.
The public hearing was opened, and David Kledzik with Marine Engineering spoke
in favor of the application.
Ms. McKelvie informed the Board that preferred method of mitigation for impacted
vegetated tidal wetlands, as of July 2025, is to purchase credits from a tidal wetlands
mitigation bank, instead of replacement onsite as proposed with this application.
Kirsten Travis with the Virginia Mari ne Resources Commission provided further
clarification of the July 2025 regulations change for tidal wetlands mitigation.
Beth Cross with the Nansemond River Preserv ation Alliance spoke in favor of the
application.
The floor was opened for those who were in opposition of the application, and there
was no opposition.
Minutes Suffolk Wetlands Board
July 16, 2026
3
The public hearing was closed.
Following discussion by the board, Board Member Hazelwood made a motion to
approve VMRC2023-0895 with the proposed conditions. The motion was seconded
by Board Member Dallas and was approved by a voice vote of 5 to 0.
NEW BUSINESS:
Ms. McKelvie presented a proposal to change the permit number identification
system for Wetlands Board applications a nd permits. Applications are currently
tracked under the VMRC permit number. The proposed change would identify and
track permit numbers under a SWB number , representing the Suffolk Wetlands
Board. There was no opposition to the proposed change.
ADJOURNMENT:
There being no further business, the meeting was adjourned.
SUFFOLK WETLANDS BOARD
DATE: JULY, 2026
,
MT: Hazelwood
2
ND: Dallas
TO: Approve with Conditions
BOARD MEMBERS
ATTENDANCE
VMRC23-0895
VOTE: 5 - 0
PRESENT ABSENT YES NO
Chairman Geoffrey Hinshelwood X X
Vice-Chairman Darius Davenport X
Sidney Hazelwood X X
Bryan Cattenhead X X
Richard Vroman X
Kathy Doerner X X
Kittrell Eberwine X
Ellis Dallas - Alternate X X
Kaitlyn Price - Alternate X
1
MINUTES
SUFFOLK WETLANDS BOARD
WORK SESSION
September 17, 2026
6:00 P.M.
The meeting of the Suffolk Wetlands Board was held on Thursday, September 17, 2026, at 6:00
p.m., in the City Council Conference Room of the City Hall Build ing, 442 West Washington
Street, Suffolk, Virginia.
MEMBERS:
Geoffrey Hinshelwood, Chairman
Darius Davenport, Vice-Chairman
Sidney Hazelwood
Kittrell Eberwine
Richard Vroman
Kathy Doerner
Bryan Cattenhead
Ellis Dallas
STAFF:
Cassidy McKelvie, Wetlands Board Secretary
Margaret Pittenger, Assistant Director of Planning
Stephanie Pough, Assistant City Attorney
ROLL CALL:
The meeting was called to order by Chairman Hinshelwood. Th e roll was then called by Ms.
McKelvie, who informed Chairman Hinshelwood that a quorum was present.
OPENING REMARKS
Chairman Hinshelwood provided a summary of the Virginia Marine Resources Commission
(VMRC) meeting from August 25, 2026. The VMRC remanded the permit application #23-0895
back to the Suffolk Wetlands Board for recons ideration with updated drawings and an updated
VIMS report. Chairman Hinshelwood further advised the board to attend any trainings relevant to
Minutes Suffolk Wetlands Board
September 17, 2026
2
tidal wetlands and to stay current on state regulation changes.
APPROVAL OF THE MINUTES:
The board was advised by Ms. Pough to defer the vote on the minutes of the July 16, 2026 meeting
until the next meeting of the board, which is tentatively scheduled for October 15, 2026.
OPENING REMARKS:
Chairman Hinshelwood provided a summary of the Virginia Marine Resources Commission
(VMRC) meeting from August 25, 2026. The VMRC remanded the permit application #23-0895
back to the Suffolk Wetlands Board for recons ideration with updated drawings and an updated
VIMS report. Chairman Hinshelwood further advised the board to attend any trainings relevant to
tidal wetlands and to stay current on state regulation changes.
WORK SESSION:
Meeting Procedures - Ms. McKelvie provided an overview of meeting procedures, including the
opening and closing of public hearings, the appropriate time for comments and questions from the
Board, and the types of motions th at can be made for a decision on a public hear ing item. Ms.
McKelvie also explained the importance of speaking into the microphone during public meetings.
Ms. Pough explained the difference between deferring and tabling a vote. Chairman Hinshelwood
asked whether there is a specific timeframe in which the board must decide on a public hearing
item. Ms. Pough stated that she would investigate and an update will be provided to the board.
Draft Bylaws Amendment - Ms. McKelvie provided an overview of the proposed changes to the
Bylaws, generally consisting of the addition of a mission, date ch anges to the procedure for the
Minutes Suffolk Wetlands Board
September 17, 2026
3
election of officers, a date cha nge for when notification should be provided to the board when a
regular meeting is canceled, and wording and restructuring changes for clarity.
Ms. Pough suggested adding “busine ss/working” days to the proced ures outlined in Article III,
Section 1 for the rescheduling of regular meetings that fall on a holiday. Chairman Hinshelwood
requested that the election of officers be held in June instead of July.
Draft Suffolk Wetlands Board Application – Ms. McKelvie provided an overview of the new
proposed application for the Suffolk Wetlands Board for consistency with other applications with
the City of Suffolk Planning Division. Chai rman Hinshelwood, Vice-Chairman Davenport, and
Board Member Hazelwood expressed concern rega rding the removal of the requirements for
Chesapeake Bay Preservation Area (CBPA) compliance.
Ms. Pittenger stated that Staff would discuss with the legal team regarding the appropriate order
of operations for consideration of projects when there are impacts to the jurisdictional areas of
both the Wetlands Board and the Resource Protection Area buffer.
Chairman Hinshelwood requested additional information regard ing the requirements of the
resiliency assessment. Board Member Vroman requested that the schedule requirements be more
detailed.
Regulatory Updates – HB521 and HB237 – Ms. McKelvie provided an overview of House Bill
521 about impacts to nonvegetated wetlands and the “no net loss” policy and House Bill 237 about
marsh migration. Board Members and Staff discussed what potential impact these bills may have
on Wetlands Board regulations in the future.
Virginia Marine Resources Commission – Tidal Wetlands Guidance – Ms. Mckelvie provided
Minutes Suffolk Wetlands Board
September 17, 2026
4
a brief overview of the Tidal Wetlands Guidan ce, focusing on the preference toward living
shoreline designs and the order of preference for mitigation measures to tidal wetland impacts.
The guidelines indicate that tidal wetland impacts should first be avoi ded, then minimized and
mitigated when avoidance is not feasible. Comp ensatory mitigation should be considered first
with the purchase of credits fro m a mitigation bank, then from an in-lieu-of fee program, then
onsite and/or in-kind replacement, then off-site and/or out-of-kind replacement.
CLOSING REMARKS
Chairman Hinshelwood provided a brief overview to the Board of a violation of the Wetlands Act
that was reported and investigated in the Winter of 2025. The Chairman then requested guidance
on what measures the Wetlands Board should take when handling violations.
ADJOURNMENT:
There being no further business, the meeting was adjourned.
CITY OF SUFFOLK
442 W. WASHINGTON STREET, P.O. BOX 1858, SUFFOLK, VIRGINIA 23439-1858
PHONE: (757) 514-4060 FAX: (757) 514-4099
October 15, 2026
Suffolk Wetlands Board
City of Suffolk, Virginia
Dear Board Members:
Attached for your consideration is information pertaining to a Wetlands Board permit, SWB2026-
00017, submitted by Benjamin Johnson, applicant and property owner, for a permit to construct a
living shoreline at 1504 White Dogwood Trail along Chuckatuck Creek; further identified as Tax
Map 5*1.
Information and maps pertaining to this request are attached for your consideration. Please contact
me if you have any questions in advance of the October 15, 2026 meeting.
Respectfully submitted,
Cassidy McKelvie
Cassidy McKelvie
Wetlands Board Secretary
Attachments
DEPARTMENT OF
PLANNING & COMMUNITY DEVELOPMENT
Division of Planning
October 15, 2026 1
STAFF REPORT
DESCRIPTION
PROPOSED PROJECT: The applicant is requesting a Wetlands Board permit, SWB2026-
00017, to construct a living shoreline spanning 520 linear feet between mean low water (MLW)
and mean high water (MHW). The proposed shoreline will consist of five (5) 100-foot sills of
Oyster CatcherTM tables and pillows with five-foot gaps between each sill to allow for water flow
and wildlife movement. The proposed project will be constructed over 4,680 square feet of
nonvegetated tidal wetlands.
This project does not qualify under a general permit due to the approximate two (2) miles of fetch
at the project site.
APPLICANT: Submitted by Benjamin Johnson, applicant and property owner.
LOCATION: The subject property is located at 1504 White Dogwood Trail along Chuckatuck
Creek.
ASSOCIATED STATE AND FEDERAL PERMITS: NAO-2026-01131 and VMRC2026-
1192
PERMIT HISTORY: None.
VIMS REPORT: No report was received for this project from the Virginia Institute of Marine
Science at the time of this Staff Report.
PUBLIC NOTICE: This request has been duly advertised in accordance with the public notice
requirements set forth in Sectio n 28.2-1302 of the Code of Virgin ia, as amended, and with the
applicable provisions of the Unified Development Ordinance. A copy of staff’s report shall be
provided to the applicant.
STAFF ANALYSIS
ISSUE
The applicant is requesting a permit from the Suffolk Wetlands Board to construct a living
shoreline spanning 520 linear feet between mean low water (MLW) and mean high water (MHW)
to prevent future erosion of the shoreline and pr ovide habitat for native wildlife. The proposed
living shoreline will comprise of five (5) 100-foot long sills created with Oyster CatcherTM tables
and pillows, five-foot gaps with baffles in betwee n each sill to allow for water flow and wildlife
movement, and 2,000 plantings of Spartina alterniflora . The specifications for the Oyster
CatcherTM tables and pillows are included in Exhibit E. The proposed project will be constructed
over 4,680 square feet of nonvegetated tidal wetlands.
Each sill will contain five (5) interlocked rows of Oyster Catcher
TM tables, starting at MLW. The
landward-most row of Oyster CatcherTM tables will be collocated with an Oyster CatcherTM pillow.
Three (3) plantable pillows collocated with two (2) Oyster Catcher TM tables will be placed
landward of the gap between each sill as a baffle. All plantable pillows and the nonvegetated tidal
wetlands landward of the sills are proposed to be planted with Spartina alterniflora.
October 15, 2026 2
The approximate width of each sill is nine (9) fe et. The approximate width of each baffle is two
(2) feet. All structures are proposed to be placed between three (3) and te n (10) feet seaward of
existing marsh so that there are no impacts to existing vegetated tidal wetlands. No fill is proposed
with this project.
All work is proposed to be completed by hand. Project mate rials will be stored upland in the
existing parking lot of Johnson & Sons Seafood. Construction access will be taken from the
existing boat ramp at Johnson & Sons Seafood. No impacts to the Resource Protection Area (RPA)
buffer are proposed with this project.
The applicant indicated that they will engage contractors to complete the work once all necessary
permits have been acquired, which is anticipa ted to be completed by early spring 2027. The
installation of the oyster catcher materials and plantings are expected to be completed within two
(2) weeks once permits are acquired and contractors have been engaged.
This project does not qualify under a general permit due to the approximate two (2) miles of fetch
at the project site. The appl icant has provided examples of other living shoreline projects
completed using Oyster Catcher
TM materials. The provided examples are for sites that experience
a similar volume of fetch and were constructed similarly to the proposed project. These example
projects are included in Exhibit F.
CONSIDERATIONS AND CONCLUSIONS
1. Living Shoreline projects are the preferred solution for shoreline erosion issues but can be
sensitive to large fetch volumes . The use of Oyster Catcher TM tables and pillows will
provide structural integrity to the project that will protect the shoreline from further erosion
by abating wave energy. The proposed planting of the nonvegetated areas of the shoreline
will further help stabilize the intertidal zone at the project site.
Additionally, the proposed baffle between each sill will abate wave energy while still
allowing exchange of water, sediment, and wildlife between Chuckatuck Creek and the
marsh. The staggered design of this request may promote sediment accretion that would
counteract the erosion that has already occurred at the project site.
2. This project does not require authorizat ion from the Virginia Marine Resources
Commission (VMRC) as all proposed work is located landward of MLW. Permitting and
approvals from other agencies, including, but not limited to, the Virginia Department of
Environmental Quality and the Army Corps of Engineers, may be required prior to any
land disturbing activities. Ob taining all required permits a nd approvals is proposed as a
condition of approval for the permit.
3. The proposed project will be constructed over 4,680 square feet of nonvegetated tidal
wetlands. All structures are proposed to be placed between 3 and 10 feet seaward of
existing marsh so that there are no impacts to existing vegetated tidal wetlands. No fill is
proposed with this project.
Since the proposed Living Shoreline project will promote sediment accretion, includes
plantings of Spartina alterniflora, and there are no proposed imp acts to tidal vegetation,
this project does not require compensatory mitigation.
October 15, 2026 3
4. The construction laydown yard and access path to the project site will be taken from the
adjoining Johnson & Sons Seaf ood parking lot and boat ramp. These areas consist of
existing impervious areas. As such, no land disturbance or vegetation removal is proposed
within the Resource Protection Area buffer. Therefore, no further approvals are required
under the Chesapeake Bay Preservation Act.
5. Pursuant to Section 34-325 of the Suffolk Code of Ordinances, the Board shall prevent the
despoliation and destruction of wetlands while accommodating necessary economic
development in a manner consistent with wetlands preservation. Section 34-327 of the
Suffolk Code of Ordinances states that a Wetlands Permit may be issued by the Board only
if the applicant demonstrates that:
a) The anticipated public and private benefi t of the proposed activity exceeds its
anticipated public and private detriment.
The public and private benefit of the proposed project is anticipated to be greater
than the detriment. The proposed project will protect the existing shoreline, which
would have a net benefit by reducing the effect of erosion while also promoting the
exchange of water, sediment, and wildlife.
b) The proposed development conforms with the standards prescribed in Code of
Virginia, § 28.2-1308 and guidelines promulgated pursuant to Code of Virginia, §
28.2-1301.
i. Wetlands of primary ecological significance shall not be altered so that
the ecological systems in the wetlands are unreasonably disturbed.
The proposed project includes plantings of Spartina alterniflora that will
be protected by the proposed sills. Five-foot gaps are proposed between
each sill to allow for the continued ecological exchange between
Chuckatuck Creek and tidal wetlands. Therefore, no wetlands, nor their
ecological systems, of primary ecological significance are expected to be
unreasonably disturbed.
ii. Development in Tidewater Virginia, to the maximum extent practical,
shall be concentrated in wetlands of lesser ecological significance, in
vegetated wetlands which have been irreversibly disturbed before July 1,
1972, in nonvegetated wetlands which have been irreversibly disturbed
prior to January 1, 1983, and in areas of Tidewater Virginia outside of
wetlands.
The shoreline at the project site has experienced shoreline and marsh loss
from years of unabated wave energy. This project proposes to reduce
marsh loss and would provide a net benefit to the intertidal zone at the
project site.
c) The proposed activity does not violate the purposes and intent of Chapter 13 Title
28.2 of the Code of Virginia, (§ 28.2-1300 et seq.) and of Article VIII of the Suffolk
Code of Ordinances.
October 15, 2026 4
The intent of these regulations and th e purpose of the Board is to allow for
necessary economic development in a manner consistent with wetlands
preservation. The construction of th e proposed living shor eline project is
considered to support wetland preservation while also deterring further erosion at
the project site.
RECOMMENDATION
It is staff’s opinion that the pr oposed permit for the construction of a living shoreline meets the
requirements established by Section 34-327 of the Su ffolk Code of Ordinances. Therefore, staff
recommends approval of permit application SWB2026-00017 with the following conditions:
1. The Wetlands Permit for this project shall expire on October 15, 2027, after which time
this permit shall be void. Permit coverage may be extended by the Board, at its
discretion, provided that a written request describing the reasons for the extension and the
requested new expiration date is submitted to the Suffolk Planning Division no later than
August 15, 2027.
2. The permittee shall notify the Board no later than 48 hours prior to the commencement of
any work under this permit.
3. The permittee shall comply with all applicab le laws, ordinances, rules, and regulations
affecting the conduct of the project. The gr anting of this permit shall not relieve the
permittee of the responsibility of obtaining any and all other permits or authority required
for the project, including but not limited to approvals from the Department of
Environmental Quality, the Virginia Marine Resources Commission, the Army Corps of
Engineers, and the City of Suffolk.
4. All phases of the project shall conform in all particulars to the permittee’s application for
Wetlands Permit. The duly authorized agents of the Board shall have the right to enter upon
the premises at any reasonable time for the purposes of inspecting the work being done
pursuant to this permit.
5. The permittee shall, to the greatest extent practical, minimize the adverse effects of the
project upon adjacent properties, wetlands, and the natural resources of the
Commonwealth.
6. The permittee shall notify the Board no later than one week following the completion of
all work under this permit.
7. This permit shall not be transferred without the prior written approval of the Board.
8. This permit may be revoked at any time by th e Board upon the failure of the permittee to
comply with any of the terms and conditions hereof.
Attachments
General Location Map
Zoning / Land Use Map
Proposed Permit
October 15, 2026 5
Exhibit A – Wetlands Board Application Checklist JPA Application
Exhibit B – JPA Application
Exhibit C – Site Plan
Exhibit D – Site Photos
Exhibit E – Oyster CatcherTM Specification Sheets
Exhibit F – SANDBAR Oyster CatcherTM Project Examples
Associated State and Federal Permits
(included for tracking ONLY):
NAO-2026-01131
VMRC2026-1192
CITY OF SUFFOLK
WETLANDS BOARD
Wetlands Permit SWB2026-00017
Granted October 15, 2026
Expires October 15, 2027
Pursuant to Chapter 13 of Title 28.2 of the Code of Virginia (1950, as amended) and the
City of Suffolk Wetlands Ordinance, the City of Suffolk Wetlands Board, hereinafter
referred to as the Board, hereby grants unto
Benjamin Johnson, applicant and property owner
herein after referred to as the permittee, pe rmission to undertake the following described
project.
Location: 1504 White Dogwood Trail along Chuckatuck Creek; further identified
as Tax Map 5*1.
Description
of Project: Construction of a living shoreline.
Conditions:
1. The Wetlands Permit for this project shall expire on October 15, 2027, after
which time this permit shall be void. Permit coverage may be extended by the
Board, at its discretion, provided that a written request describing the reasons for
the extension and the requested new expiration date is submitted to the Suffolk
Planning Division no later than August 15, 2027.
2. The permittee shall notify the Board no later than 48 hours prior to the
commencement of any work under this permit.
3. The permittee shall comply with all ap plicable laws, ordinances, rules, and
regulations affecting the conduc t of the project. The gran ting of this permit shall
not relieve the permittee of the responsibility of obtaining any and all other permits
or authority required for the project, including but not limited to approvals from the
Department of Environmental Quality, the Virginia Marine Resources
Commission, the Army Corps of Engineers, and the City of Suffolk.
Associated State and Federal Permits
(included for tracking ONLY):
NAO-2026-01131
VMRC2026-1192
4. All phases of the project sh all conform in all particulars to the permittee’s
application for Wetlands Permit. The duly authorized agents of the Board shall have
the right to enter upon the premises at any reasonable time for the purposes of
inspecting the work being done pursuant to this permit.
5. The permittee shall, to the greatest extent practical, minimize the adverse effects of
the project upon adjacent properties, wetla nds, and the natural resources of the
Commonwealth.
6. The permittee shall notify the Board no later than one week following the
completion of all work under this permit.
7. This permit shall not be transferred without the prior written approval of the Board.
8. This permit may be revoked at any time by the Board upon the failure of the
permittee to comply with any of the terms and conditions hereof.
IN WITNESS WHEREOF, the City of Suffolk Wetlands Board has caused these presents
to be executed on its behalf by
CITY OF SUFFOLK
WETLANDS BOARD
By:__________________________________
(Chairman or designee)
m
US Army Corps
of Engineers ®
Norfolk District
• ~!lW VIRO MENTAL QUALITY
Regulatory Agency Contact Information
Virginia Marine Resources Commission (VMRC)
Habitat Management Division
380 Fenwick Road, Building 96
Fort Monroe, VA 23651
Phone: (757) 247-2200, Fax: (757) 247-8062
Website: http://www.mrc.virginia.gov/hmac/hmoverview.shtm
United States Army Corps of Engineers (USACE)
Norfolk District
803 Front Street, ATTN: CENAO-WR-R
Norfolk, Virginia 23510-1011
Phone: (757) 201-7652, Fax: (757) 201-7678
Website: http://www.nao.usace.army.mil/Missions/Regulatory.aspx
Virginia Department of Environmental Quality (DEQ)
Virginia Water Protection Permit
Program
Post Office Box 1105
Richmond, Virginia 23218
Phone: (804) 698-4000
Website: http://www.deq.virginia.gov/
LOCAL WETLANDS BOARD (LWB) CONTACT
INFORMATION:
Links to LWB information on the Web can be found at
http://ccrm.vims.edu/permits_web/guidance/local_wetlands_boards.html
In addition, the phone numbers listed below can be used to contact the LWB. Please
be advised that these phone numbers are subject to change at any time.
Accomack County (757) 787-5721, Cape Charles (757) 331-3259, Charles City County (804) 829-
9296, Chesapeake (757) 382 -6248, Colonial Heights (804) 520- 9275, Essex County (804) 443-
4951, Fairfax County (703) 324- 1364, Fredericksburg (540) 372 -1179, Gloucester County (804)
693-2744, Hampton (757) 727- 6140, Hopewell (804) 541- 2267, Isle of Wight County (757) 365-
6211, James City County (757) 253-6673, King and Queen County (804) 769-4978, King George
County (540) 775-7111, King William County (804) 769-4927, Lancaster County (804) 462-5220,
Mathews County (804) 725- 5025, Middlesex County (804) 758- 0500, New Kent County (804)
966-9690, Newport News (757) 247 -8437, Norfolk (757) 664 -4368, Northampton County (757)
678-0442, Northumberland County (804) 580-8910, Poquoson (757) 868-3040, Portsmouth (757)
393-8836, Prince William County (703) 792- 6984, Richmond County (804) 333- 3415, Stafford
County (540) 658- 8668, Suffolk (757) 923- 3650, Virginia Beach (757) 427- 8246, Westmoreland
County (804) 493-0120, West Point (804) 843-3330, Williamsburg (757) 220-6130, York County
(757) 890-3538
Application Revised: August 2023
1
Part 1 - General Information (continued)
1. A pplicant’s legal name* and complete mailing address: Contact Information:
Home (____)_____________
Work (____)_____________
Fax (____)_____________
Cell (____)_____________
e-mail __________________
State Corporation Commission Name and ID Number (if applicable) _____________
2. Property owner(s) legal name* and complete address, if different from applicant: Contact Information:
Home (____)_____________
Work (____)_____________
Fax (____)_____________
Cell (____)_____________
e-mail __________________
State Corporation Commission Name and ID Number (if applicable) _____________
3. Authorized agent name * and complete mailing Contact Information:
address (if applicable): Home (____)_____________
Work (____)_____________
Fax (____)_____________
Cell (____)_____________
e-mail __________________
State Corporation Commission Name and ID Number (if applicable) _____________
* I f multiple applicants, property owners, and/or agents, each must be listed and each must sign the applica nt
s
ignature page.
4. P rovide a detailed description of the project in the space below, including the type of project, its
dimensions, materials, and method of construction. Be sure to include how the construction site will
be accessed and whether tree clearing and/or grading will be required, including the total acreage. If
the project requires pilings, please be sure to include the total number, type (e.g. wood, steel, etc),
diameter, and method of installation (e.g. hammer, vibratory, jetted, etc). If additional space is
needed, provide a separate sheet of paper with the project description.
Application Revised: August 2023
6
Part 1 - General Information (continued)
5. Have you obtained a contractor for the project? ___ Yes* ___ No. *If your answer is “Yes”
complete the remainder of this question and submit the Applicant’s and Contractor’s
Acknowledgment Form (enclosed)
Contractor’s name* and complete mailing address: Contact Information:
Home (____)_____________
Work (____)_____________
Fax (____)_____________
Cell (____)_____________
email __________________
State Corporation Commission Name and ID Number (if applicable) _____________________
* If multiple contractors, each must be listed and each must sign the applicant signature page.
6. List the name, address and telephone number of the newspaper having general circulation in the area
of the project. Failure to complete this question may delay local and State processing.
Name and complete mailing address: Telephone number
(____) __________________
7. Give the following project location information:
Street Address (911 address if available)_________________________________________
Lot/Block/Parcel#___________________________________________________________
Subdivision________________________________________________________________
City / County___________________________________ ZIP Code_____________________
Latitude and Longitude at Center Point of Project Site (Decimal Degrees):
________________________ / -________________________ (Example: 36.41600/-76.30733)
If the project is located in a rural area, please provide driving directions giving distances from the
best and nearest visible landmarks or major intersections. Note: if the project is in an undeveloped
subdivision or property, clearly stake and identify property lines and location of the proposed
project. A supplemental map showing how the property is to be subdivided should also be provided.
8. What are the primary and secondary purposes of and the need for the project? For example, the
primary purpose may be “to protect property from erosion due to boat wakes” and the secondary
purpose may be “to provide safer access to a pier.”
Application Revised: August 2023
7
Part 1 - General Information (continued)
9. Proposed use (check one):
___ Single user (private, non-commercial, residential)
___ Multi-user (community, commercial, industrial, government)
10. Describe alternatives considered and the measures that will be taken to avoid and minimize impacts,
to the maximum extent practicable, to wetlands, surface waters, submerged lands, and buffer areas
associated with any disturbance (clearing, grading, excavating) during and after project construction.
Please be advised that unavoidable losses of tidal wetlands and/or aquatic resources may require
compensatory mitigation.
11. Is this application being submitted for after-the-fact authorization for work which has already begun
or been completed? ___Yes ___No. If yes, be sure to clearly depict the portions of the project which
are already complete in the project drawings.
12. Approximate cost of the entire project (materials, labor, etc.): $___________________________
Approximate cost of that portion of the project that is channelward of mean low water:
$____________
13. Completion date of the proposed work:________________________________-_____________
14. Adjacent Property Owner Information: List the name and complete mailing address, including zip
code, of each adjacent property owner to the project. (NOTE: If you own the adjacent lot, provide
the requested information for the first adjacent parcel beyond your property line.) Failure to provide
this information may result in a delay in the processing of your application by VMRC.
Application Revised: August 2023
8
Part 3 – Appendices (continued)
Appendix B: Projects for Shoreline Stabilization in tidal wetlands, tidal waters and dunes/beaches
including riprap revetments and associated backfill, marsh toe stabilization, bulkheads and associated backfill,
breakwaters, beach nourishment, groins, jetties, and living shoreline projects. Answer all questions that apply.
Please provide any reports provided from the Shoreline Erosion Advisory Service or VIMS.
NOTE: It is the policy of the Commonwealth that living shorelines are the preferred alternative for stabilizing
tidal shorelines (Va. Code § 28.2-104.1). Information on non-structural, vegetative alternatives (i.e., Living
Shoreline) for shoreline stabilization is available at
http://ccrm.vims.edu/coastal_zone/living_shorelines/index.html.
1. Describe each revetment, bulkhead, marsh toe, breakwater, groin, jetty, other structure, or living
shoreline project separately in the space below. Include the overall length in linear feet, the amount of
impacts in acres, and volume of associated backfill below mean high water and/or ordinary high water in
cubic yards, as applicable:
2. What is the maximum encroachment channelward of mean high water?_______feet.
Channelward of mean low water?_______feet.
Channelward of the back edge of the dune or beach?_____feet.
3. Please calculate the square footage of encroachment over:
• Vegetated wetlands __________square feet
• Non-vegetated wetlands __________square feet
• Subaqueous bottom __________square feet
• Dune and/or beach __________square feet
4. For bulkheads, is any part of the project maintenance or replacement of a previously authorized, currently
serviceable, existing structure? ____ Yes____ No.
If yes, will the construction of the new bulkhead be no further than two (2) feet channelward of the existing
bulkhead? _____Yes ____No.
If no, please provide an explanation for the purpose and need for the additional encroachment.
Application Revised: August 2023
17
Aerial Image Depicting Proposed Living
Shoreline at Johnson and Sons Seafood,
1504 White Dogwood Trail, Suffolk VA
A
A1
C
C1
B
B1
Note: A-A1 , B-B1 , C-C1 cross sections detailed in Drawings 5,6,7 of 8
Materials Staging Area
Upland Parking Lot
Access Utilizing
Existing Landing as
Foot Access Only, No
Heavy Machinery
JOHNSON AND SONS SILL PROPOSAL
PREPARED FOR THE JAMES RIVER ASSOCIATION
LIVING SHORELINE PROJECT VIEW OVER AERIAL
DRAWING 1 of 8 9/14/2026
0 10 25 50
SCALE BAR 1” = 50’
100’ Resource
Protection Area
NFloodEbbChuckatuck Creek
Proposed Sill: 520 LF in sill length (including four (4) five-foot gaps)
• Construct a single row of Oyster Catcher
Sedimentation Pillows, laid parallel with shoreline,
waterward of the extent of wetlands
• 4 full rows of Oyster Catcher
Tables, plus one 1/2 row of Tables on waterward edge to increase
roughness and wave attenuation
• Per 100’ Section of Sill, 209 Tables and 25 Pillows. Full project length- 1045 Tables and 125
Pillows
• Every 100’, proposed gap baffle (5’) with three (3) plant-able pillows and two (2) Table Pins ( shown on
Drawing 3 of 4)
EDGE OF MARSH
TO UPLANDS
JOHNSON AND SONS SILL PROPOSAL
PREPARED FOR THE JAMES RIVER ASSOCIATION
TOP VIEW–STRUCTURAL DETAIL, 100 LF TYP Section
1:10 Scale
DRAWING 3 of 9 9/14/2026
100’ Section of Sill (TYP)
Scale 1” = 10 LF
(1:10)
N
MHW 2.6
Ebb
Flood
MLW 0.0
AREA TO BE
PLANTED
Chuckatuck Creek
EXTENT OF WETLANDS 3.9’
GAP DETAIL- Five-foot gaps, with baffle section, per every 100 Linear Feet of Sill
• Gap (5LF Wide) with offset baffle section (5’) with three (3) plant-able pillows (Total 12 LF) and two (2)
Tables to serve as Pins (24” base width)
TO UPLANDS
100’ Section of Sill (TYP)
100’ Section of Sill (TYP)
5’ Fish
Gap
JOHNSON AND SONS SILL PROPOSAL
PREPARED FOR THE JAMES RIVER ASSOCIATION
TOP VIEW–Detail, Gap Baffle TYP Section
1:10 Scale
DRAWING 4 of 9 9/14/2026
NChuckatuck Creek
Ebb
Flood
EDGE OF MARSH
MHW 2.6’
MLW 0.0’
3 Plantable Pillows
and Two Tables,
Every Gap (Offset
Baffle)
AREA TO BE
PLANTED
EXTENT OF WETLANDS 3.9’
Scale 1” = 10 LF
(1:10)
To CHUCKATUCK
CREEKTo UPLANDS
Marsh floor/mud bottom
22” Max above
substrate
12”
Pillow
JOHNSON AND SONS MARSH SILL PROPOSAL
PREPARED FOR THE JAMES RIVER ASSOCIATION
CROSS-SECTION VIEW, TYPICAL SILL SECTION, A to A1
DRAWING 5 of 9 9/14/2026 NOT TO SCALE
Approx 9 LF Base Width
Cross Section Depicting TYP Sill Section
One Row of Pillows and 4 ½ Rows of Tables
MHW 2.6
MLW 0.0
EXTENT OF
WETLANDS
3.9’
3’ waterward of
Edge of Marsh
A
A1
To CHUCKATUCK
CREEKTo UPLANDS
Marsh floor/mud bottom
22” Max above
substrate
12”
Pillow
JOHNSON AND SONS MARSH SILL PROPOSAL
PREPARED FOR THE JAMES RIVER ASSOCIATION
CROSS-SECTION VIEW, TYPICAL SILL SECTION, B to B1
DRAWING 6 of 9 9/14/2026 NOT TO SCALE
Approx 9 LF Base Width
Cross Section Depicting TYP Sill Section
One Row of Pillows and 4 ½ Rows of Tables
MHW 2.6
MLW 0.0
EXTENT OF
WETLANDS
3.9’
10’ waterward of
Edge of Marsh
B
B1
TO MLW 0.0To UPLANDS
22” Max above
substrate
JOHNSON AND SONS MARSH SILL PROPOSAL
PREPARED FOR THE JAMES RIVER ASSOCIATION
CROSS-SECTION VIEW, TYPICAL SILL SECTION, C to C1
DRAWING 7 of 9 9/14/2026 NOT TO SCALE
Cross Section Depicting
Gap Baffle Section
“Plant-able
Pillow”
Standard
Table
TYP Sill Section
For reference
Marsh floor/mud bottom
MHW 2.6 Approx 2.0 LF
Base Width
EXTENT OF
WETLANDS
3.9’
C
C1
JOHNSON AND SONS MARSH SILL PROPOSAL
PREPARED FOR THE JAMES RIVER ASSOCIATION
SUPPLEMENTAL DRAWING SHOWING ADJACENT RIPARIAN
PROPERTY OWNERS
DRAWING 8 of 9 9/14/2026
PROJECT LOCATION
1504 White Dogwood Trail
PCWB LLC
ADJACENT RIPARIAN
PROPERTY
1500 White Dogwood Trail
John and Angela Frye
ADJACENT RIPARIAN
PROPERTY
120 Woodfern Lane
James and Maureen Brownfiel
NEbb
Flood
JOHNSON AND SONS MARSH SILL PROPOSAL
PREPARED FOR THE JAMES RIVER ASSOCIATION
SUPPLEMENTAL DRAWING FEMA FLOOD ZONES
9/14/2026PROJECT LOCATION
1504 White Dogwood Trail
PCWB LLC NEbbFlood
Chuckatuck Creek
SUPPLEMENTAL DOCUMENT- ASSESSMENT OF SURGE,SLR, RESILIENCE
"Include an assessment of the impacts of storm surge, sea-level rise, climate change,
and coastal resilience on the subject property as it relates to the proposed shoreline
stabilization methods using NOAA SLOSH and/or AdaptVA”
Based on the Seawell's point tide gauge, this area has experienced 0.61ft of sea level rise
since 2000 and is anticipated to have around an additional 1 foot of sea level rise by 2050.
The intermediate high climate projection shows the water is predicted to be 1.67 feet
higher in 2050 than the water levels in 2000. The site is also in a FEMA designated
flood zone, Zone VE. Under storm surge for hurricanes categories 1-3, the shoreline is
expected to be inundated. For any hurricane with a category 4 strength or higher would, the
storm surge would inundate the land and property above the shoreline. While an oyster
reef, such as the one that will be created by the Oyster Catcher structures, will reduce
these impacts by slowing down waves, it is not anticipated to reduce sea level rise or
prohibit storm surge, but the oyster reef can lessen the impacts by slowing the water
velocity and wave impacts. The benefit of creating a robust oyster reef is that the oysters
reef will grow and adapt overtime and can continue to protect the shoreline from wave and
storm surge impacts into the future.
Oyster Catcher™ Tables
Reef building tables for oyster
habitat creation and living shorelines
Oyster Catcher™ substrate is a composite of two
materials: jute cloth hardened with cements. Our
ability to shape the cloth after soaking in a
cement slurry allows production of a wide
variety of Oyster Catcher™ shapes.
Design and Composition
Dimensions
Our Tables are approximately 2ft L, W, and H.
Average Table weight is 25-30 lbs. They offer
exceptional reef design versatility and can be
interlocked for increased stability even in high
energy environments and during storm
events.
Structural Features
The initial open space of Table reef
frameworks rapidly infills as oysters grow on
and among tables. The surfaces of Oyster
Catcher™ elements are deeply textured
making them highly attractive to oyster larvae
and protective for young oysters. The rough
surface of Table legs acts to lock Tables in
place once the legs are partially sunk into
bottom sediments.
Pricing
The Table price is $130plus shipping and
handling and applicable taxes. (Prices for 2026)
Oyster Catcher™ Pillows
Sediment accumulation pillows for oyster
habitat creation and living shorelines
Oyster Catcher™ substrate is a composite of
two materials: jute cloth hardened with cements.
Our ability to shape the cloth after soaking in a
cement slurry allows production of a wide
variety of Oyster Catcher™ shapes.
Design and Composition
Dimensions
Our Pillows are approximately 4ft wide and 1
foot tall and wide. Average pillow weight is
30-35 lbs. They offer exceptional structure,
sediment accumulation and stability even in
high energy environments and during storm
events.
Structural Features
Pillows are deeply textured making them
highly attractive and protective to oyster
larvae and young oysters. Pillows are paired
with Oyster Catcher™ Tables to produce a
living shoreline that will protect shorelines
from damaging wave energy and trap
sediment behind the sill.
Pricing
The Pillow price is $150 plus shipping and
handling and applicable taxes (prices for 2026)
SANDBAR Oyster Catcher
Marsh Sill/Living Shorelines
A few examples of past projects
involving larger fetch areas
August 2026
Example #1
NC Aquarium at Pine Knoll Shores
Installed early 2025
Over 2 miles in fetch
NC Aquarium Pine Knoll Shores
Example #1 Continued
Image early 2025, depicting
install
NC Aquarium Pine Knoll Shores
Example #1 Continued
Picture- December 2025, 8-9
months months after install
sediment
captured
(no fill was
placed)
August 2026
NC Aquarium Pine Knoll Shores
August 2026
sediment
capture/retention
NC Aquarium Pine Knoll Shores
Example #1 Continued
Image August 2026, about 16
months after install
NC Aquarium Pine Knoll Shores
Example #1 Continued
Picture- Sediment capture and
increasing vegetation
August 2026
NC Aquarium Pine Knoll Shores- Example 1 continued
Example #2
SANDBAR Oyster Lease
Newport River
Installed 2019-2020
Example #2 continued
SANDBAR Oyster Lease
Newport River
Site began as a unvegetated subtidal sandbar
Example #2 continued
SANDBAR Oyster Lease
Newport River
Site began as a unvegetated subtidal sandbar
Example #2 continued
SANDBAR Oyster Lease
Newport River
Site began as a unvegetated subtidal sandbar
Example #3
Homeowner Project
Newport, NC
Installed 2023
Example #3 continued
Homeowner Project
Newport, NC
Installed 2023, Photo 2026
Example #3 continued
Homeowner Project
Newport, NC
Installed 2023, Photo 2026
Example #3 continued
Homeowner Project
Newport, NC
Installed 2023, Photo 2026
Example #4
Wachapreague, VA
Installed 2023
1.5 mi fetch
PHOTO October 2025
August 2026
Example #4
Wachapreague, VA
Installed 2023
Example #4
Wachapreague, VA
Installed 2023, Photo 2026
Example #4
Wachapreague, VA
Installed 2023, Photo 2026
Example #5
Homeowner Project Salvo NC
(OBX)
Pillow-based sill
(No oyster catcher tables on this
project)
Installed 2026
Example #5
Homeowner Project
Salvo NC (OBX)
View of fetch from
shore, 2026
Example #5
Homeowner Project Salvo
NC (OBX)
Installation of
Pillow-based sill at low tide
Example #5
Homeowner Project Salvo
NC (OBX)
Installation of
Pillow-based sill at low tide
Example #5
Homeowner Project
Salvo NC (OBX)
One month after
installation
Pillow-based sill
disappears under
high tide
Example #5
Homeowner Project
Salvo NC (OBX)
One month after
installation
Pillow-based sill
disappears under
high tide
Example #5
Homeowner Project Salvo
NC (OBX)
One month post installation
Sill disappears under high
tide
Example #6
Homeowner Project
Morehead City NC
Installed 2023
Example #6
Homeowner Project
Morehead City NC
Installed 2023
Example #6
Homeowner Project
Morehead City NC
Installed 2023, Photo 2026
Example #6
Homeowner Project
Morehead City NC
Installed 2023, Photo 2026
Source: City of Suffolk website. First collected Oct 6, 2026.