City Council - School Board Joint Work Session - Special Meeting — Other
City of Charlottesville · Charlottesville City County · City Council · meeting of Aug 12, 2026 · Other
Open the original document More from City of Charlottesville
This document is no longer listed on City of Charlottesville's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
School Facilities
in the City of Charlottesville
Charlottesville City Council and School Board Joint Work Session
August 12, 2026
School Capital Projects
History and Background
Capital Maintenance vs. Capital Improvements
Capital maintenance:
● adds permanent value
● prolongs the useful life of the asset
● keeps an asset in its normal, working condition
Capital improvements:
● add permanent value
● prolong the useful life of the asset
● adapt building for new uses and/or standards (academic, safety/security, environmental, etc).
CHS classroom in October 1974.
1971-74
Construction
of CHS
$6.9M
2023-26
Expansion/
renovation
of CMS
$91.8M
50 Year Overview: Major Capital Improvements in CCS
Source: VDOE School Construction Cost Data Reports
2013-2014
Buford and
CHS Science
Spaces
$3.3M
2018-26
Priority
Improvement
Projects
$1M1.25M
CCS School Modernizations
Priority Improvement Projects
to visibly impact learning
environments:
● Started in 2016 with the
Facilities Improvement
Planning Committee (FIPC)
● Started with focus on
elementary - oldest
buildings
● Scope limited by summer
time frame & budget
constraints
● COVID slowed progress
● Started at ~$1M per project
○ now -$1.4M per with
construction inflation at
~40% cumulative since
2018
School Focus Area Year Completed
Summit (Clark) Classrooms 2018-19
Jackson-Via Classrooms &
Multi-Purpose Room Floor
2018-19
Sunrise (Burnley-Moran) Media Center 2021
Tall Oaks (Johnson) Roof Terrace 2024
Greenbrier Media Center 2023
Charlottesville High School* Restrooms (B Commons) 2025
Trailblazer (Venable) Intervention Spaces 2026
Pre-FIPC (2015)
● Science classrooms at CHS & labs + classrooms at Buford
2015 to present
● Security vestibules
○ All schools except Greenbrier & Summit
■ Summit planned for 2027
● Solar - CATEC completed, CHS in progress
○ CMS to follow
● Athletics:
○ Turf football field (and 2026 replacement)
○ Stadium field house renovation
○ Baseball facility upgrades (in partnership with the Tom Sox)
○ Softball facility upgrades
○ Curtis Elder Track & Field Complex at CHS
Other Notable Improvement Projects
● 2019: City School Board commits to reconfiguration
● 2022: City Council allocates $68.8M for renovation and expansion of CMS
● 2023: With rising construction costs…
○ School division receives a $17.6M School Construction Assistance
Program (SCAP) grant from the state
○ City Council allocates additional $5.4M to CMS
● August 2025: CMS Phase 1 (new academic building & gym) complete
● Spring 2026: Council allocates $30M to convert Walker into
preschooler-friendly Cville Early Learning Center (CELC)
● June 2026: City/Schools recommend CELC “Option C.” Est’d cost: $51.4M.
○ Retains ‘swing space’ for future construction needs at other school sites
● August 2026: CMS Phase 2 (renovation of old Buford) is complete
● 2027-2029: Planned renovation/construction of CELC
Road to Reconfiguration
Charlottesville Middle School (2026)
Linchpin of school reconfiguration
CMS Grand Opening Ceremony is this Friday 8/14 at 1:30pm
Age Age Projected
as of 2017 as of 2026 as of 2029
Charlottesville High School 1974 43 52 55
Charlottesville Middle School 1966 51 0 3
Greenbrier Elementary 1962 55 64 67
Jackson-Via Elementary 1970 47 56 59
Summit Elementary 1931 86 95 98
Sunrise Elementary 1954 63 72 75
Tall Oaks Elementary 1954 63 72 75
Trailblazer Elementary 1925 92 101 104
Charlottesville Early Learning Center 1965 52 61 0
AVERAGE BUILDING AGE 61.33 63.67 59.56
Age of Schools
Addressing a portfolio of
1930’s, 1950’s & 1960’s era
education facilities to
meet current standards is
a BIG lift (as old buildings
continue getting older).
The $1M~$2M projects have helped
& CMS is a BIG step forward…
Current State of School
Facilities
“Aging But Sound”?
● New CMS has our community asking: What unacceptable conditions have we grown
accustomed to in other buildings?
6th-8th grade 9th-12th grade
Staff perspective
on school facilities
● Greenbrier
● CHS
● Jackson-Via
VIDEO
Looking to the Future:
Buildings that Raise
Expectations for Students
4,376
Student enrollment (2025-26)
About Our Students
52.4%
Economically disadvantaged
(2024-25)
39.4% White
25.4% Black
13.8% Hispanic
13.5% Multiple Races
7.8% Asian
700+
English language learners speaking
45 different languages (2025-26)
(2024-25)
67%
Enrolled in higher education within 16
months of graduating (2021-22)
CCS Strategic Plan
Virginia Department of Education:
3E Readiness Framework
In 2024, the Virginia Board of Education adopted
a new accountability structure, the School
Performance and Support Framework, that
included the 3E Readiness Framework as the high
school readiness indicator. The 3E Readiness
Framework, designed in coordination with
employers, higher education leaders, parents,
and K-12 educators, measures student
engagement in Enrollment, Employment, and
Enlistment, and (3E) outcome-based
experiences that build upon middle school
exploration and ensure that students have
concrete experiences and course attainment for
a “warm hand off” to sustainable pathways in
postsecondary life – whether in postsecondary
enrollment or training, careers, or in the military.
Q: How can we better equip all students with a plan
for the future?
A: Secondary-school educational programs that
reflect their interests and prepare them for
high-wage jobs
Scheduling Limitations at CHS
- Currently, there are 20 sections that have
to rotate throughout the school building
because there are not enough available
classrooms for those courses to be taught
in one dedicated space.
- Because the building is driving the master
schedule instead of student needs, we are
limited in the diversity of our offerings. This
hinders our ability to ensure all students
have diverse options to meet the VDOE
requirements for 3E.
Opportunity Gaps
The following course offerings and academic pathways are offered at other Virginia public
high schools, but cannot be considered at Charlottesville High School due to space
constraints.
● Biotech Foundations
● Biomedical Innovations
● Real Estate
● Military Science (ROTC)
● Geospatial Technology
● Horticulture, Floriculture, Floral Design, Greenhouse Production, and Forestry
Management
● Turf Grass Management and Landscaping
● Architectural Drawing and Design
● Agricultural Fabrication and Emerging Technology
● Dance
● Early Childhood Education
● Welding, Energy & Power
● Intro to Hospitality & Tourism
● Pharmacy Tech
● HVAC, Plumbing
If you want to
go fast, go
alone. If you
want to go
far, go
together.
Ms. Cianna Washburg
teaching at CMS
Credit: Lincoln Barbour