Planning Commission Meeting Agenda
June 23, 2026
100 5th Street Northeast
City Space Conference Room
Charlottesville, Virginia 22902
Carl Schwarz, Chair
Danny Yoder, Vice Chair
Ross Harness
Hosea Mitchell
Betsy Roettger
Lyle Solla-Yates
Josh Carp
Michael Joy
I. Commission Work Session
Beginning: 5:00 p.m. Location: (Cityspace, 100 5th Street NE, Charlottesville, VA 22902)
1. Development Code Listening Session with Local Builders and Developers
II. Future Meeting Schedule/Adjournment
Tuesday, July 14 - 5:30 PM - Regular Meeting
Individuals with disabilities who require assistance or special arrangements to participate in the
public meeting may call the ADA Coordinator at (434) 970-3185 or submit a request via email
to ada@charlottesville.gov. The City of Charlottesville requests that you provide a 48 hour notice
so that proper arrangements may be made.
Planning Commission pre-meeting and regular meetings are held in person and by Zoom webinar.
The webinar is broadcast on Comcast Channel 10 and on all the City's streaming platforms
including: Facebook, Twitter, and www.charlottesville.gov/streaming. Public hearings and other
matters from the public will be heard via the Zoom webinar which requires advanced registration
here: www.charlottesville.gov/zoom . You may also participate via telephone and a number is
provided with the Zoom registration or by contacting staff at 434-970-3182 to ask for the dial in
number for each meeting. Written comments may be submitted via email to
planningcommission@charlottesville.gov.
Page 1 of 27
Page 1 of 2
TO: Charlottesville Planning Commission
FROM: Matthew Alfele, Development Planning Manager
DATE: June 23, 2026
SUBJECT: Development Code Listening Session with local Builders and Developers
Staff continues to advance this year’s Development Code Clean-up effort, an annual practice
intended to correct technical errors, improve clarity, provide refinements, and ensure that the
Development Code remains a reliable tool for both applicants and reviewers. This work is focused
squarely on small, technical refinements that help streamline Development Review, reinforce the
Code’s adopted intent, and support a more predictable and accessible review process.
As you will recall, the 2025 Clean-up cycle resulted in substantial progress: the Planning Commission
recommended, and City Council ultimately adopted 83 amendments to the Development Code in
February 2026. These amendments took effect at the end of March 2026 in parallel with updates to
development review procedures. Together, these changes strengthened consistency between the
Code and review processes and enhanced the overall clarity of the regulatory framework. Throughout
that cycle, however, community members—as well as some Commissioners and Councilors—often
focused on large policy questions that were beyond the scope of the Clean-up effort. This created
confusion about the intent of the project and, in some cases, led to expectations that broader
directional changes would be considered.
To support clearer communication and a more focused process in 2026, staff has moved away from
the tiered system used last year. Instead, all items under consideration this cycle are presented
simply as Clean-up recommendations. Larger policy issues that arise through staff’s daily interaction
with applicants, builders, and community members will continue to be documented and tracked;
however, they will not be advanced as part of this annual Clean-up effort. As always, major policy
updates fall under the purview of the Long Range Planning division and the broader workplan
established by the NDS Director. In addition, staff is working to better communicate this year’s effort
by providing a dedicated space on the Department’s website along with other outreach efforts
including a Development Code Initiative Connect Charlottesville page.
The Planning Commission expressed a strong desire to hear directly from local builders and
developers as part of this year’s effort, particularly regarding how the Code is functioning in practice
and where small adjustments may be warranted. Staff shares this interest and recognizes that
builders, developers, and design professionals bring invaluable on-the-ground experience that can
CITY OF CHARLOTTESVILLE
Department of Neighborhood Development Services
City Hall Post Office Box 911
Charlottesville, Virginia 22902
Telephone 434-970-3182
Fax 434-970-3359
www.charlottesville.gov
Page 2 of 27
Page 2 of 2
help identify areas where the Code may benefit from improved clarity, consistency, or usability. Staff
also hopes to understand what aspects of the Code are working well so that those strengths can be
preserved.
This evening’s Work Session is structured to facilitate that discussion. Staff will begin with a brief
recap of the 2025 effort and an overview of the 2026 Clean-up process and its defined scope. An
open comment period will follow, during which builders and developers may share their experiences
using the Code and highlight areas where small, technical corrections may improve the efficiency or
predictability of Development Review. Speakers are encouraged, in particular, to describe their role in
the development process and how they interact with the Development Code; to share specific
examples of unclear or inconsistent provisions that could be improved through Clean-up edits; and to
identify elements of the Code that are functioning well and should remain unchanged.
Following public comments, the Planning Commission will have time to discuss the feedback received
and help staff identify themes appropriate for this year’s Clean-up cycle. As with prior cycles, staff will
incorporate relevant technical input into draft Clean-up language to be presented at future Work
Sessions. Broader issues that fall outside the scope of Clean-up will be documented for continued
tracking and possible consideration by Long Range Planning as part of future policy work. As with last
years effort, the goal to have this cycle close with adoption by City Council in early 2027 and
implementation of the changes by the end of March 2027.
Staff has prepared three questions Planning Commission may use to facilitate feedback during the
listening session:
• Please begin by sharing your role in the development process and how you interact with the
Development Code in your work.
• What parts of the Code create confusion or slowdowns, and what small, technical
adjustments could improve clarity or predictability?
• What elements of the Code are currently working well and should remain unchanged during
this Clean-up cycle?
Participation Options: Interested parties unable to attend in person may participate virtually via the
provided link.
Zoom Registration
Written comments are also welcome and can be submitted to:
PlanningCommission@charlottesville.gov
Attachments and Links:
• City's Development Review Webpage and Current Development Code
• Development Code Initiative Connect Charlottesville Page
• Code Amendment Working Document Updated June 12, 2026
• Executive Summary of Code Amendment Issues as of June 12, 2026
Page 3 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 1 of 16
This is a working document and is ONLY INTENDED to log of Development Code issues and proposed amendments to the City’s 2023 Development Code (Chapter 34). The outline is divided
into three categories to help distinguish different issues and is not intended as a priority list.
Clarifications & Technical Fixes (A)
This category includes grammatical edits and minor changes. Public engagement should be limited to Public Hearings at Planning Commission and City Council. This will also include updates to the Development Code
required to stay in compliance with State enabling legislation changes.
Refinements (B)
This category includes edits and/or changes to sections of the code that will better reflect the intent statement of each section. Public engagement should be limited to Public Hearings at Planning Commission and City
Council. This sections also include changes to supporting documents such as the Neighborhood Development Services (NDS) Fee Schedule.
Policy Changes or Major Amendments (C)
This category includes edits, additions, and/or removal of language that could change the intent of the code and/or change established policy. These changes require dedicated study and analysis. Public engagement should
involve community outreach and inclusion through Long Range Planning.
Additional Categories
The additional categories that fall after “C” are intended to capture comments and suggestions from other sources. The “source” is indicated in the title of each section.
Key Point of Housing Keeping. Once an issue is assigned a number, i.e. A.1 or B.11 it should not be moved. When new issues are added or more spaces is needed on a
Tier ALWAYS ADD THE NEW ROW TO THE END OF THE TIER. If an issue is moved or removed from a tier, only strike through the issue and do not delete the row.
Example: Planning Commission wants to move “Existing structure preservation bonus does not specify a timeframe to qualify as an existing structure.” From Tier 3 to
Tier 2. The issue is being “crossed out” on C.8 and added to B.70 (as that was the next open row in Tier 2.
Clarifications & Technical Fixes (A)
Number Page Code
Section
Current Language/Issue Suggested Language/Change Respons
ible Staff
Date
Adopted by
CC
A.1 5-41 5.2.10.A.1 The Tree Removal Permit does not distinguish between a stand alone permit to remove a tree and
tree removal related to a larger site development (going through Development Review). This is
causing two applications for Development Plans and FSP .
Add a “b. Trees being removed as part of a project required to go
through Development Review.”
A.2 Private Streets do not clearly indicate they must be on dedicated property and not easements over
underling private property. This is creating issues as the code uses a lot of “street side lot line”
which does not work well with easements.
2/10/26: Move to Tier 1 (needs to be addressed with the 2026 updates). Moved from B.11
Stuff suggests updating the definition of Street under section 7 to
clearly state a street (public or private) is an independent parcel or
ROW.
Street: A street is a public or private way that provides a principal
means of access to abutting property and includes the roadway
and associated streetscape elements. Streets shall meet the
following criteria:
• Public Street: A street located entirely within a publicly
dedicated and accepted right-of-way, under the ownership
and maintenance of a governmental entity and design per
the City’s Standards and Design Manual.
Page 4 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 2 of 16
Private Street: A street located on a separate, recorded lot or tract
that is not part of any abutting property. Private streets shall not
be established solely by easement across private property and
must comply with the City’s Standards and Design Manual and be
bonded to the same standards as a Public Street during
construction. Ownership and maintenance shall be the
responsibility of a private entity such as a homeowners’
association or other legally binding documents.
A.3 Yard designation details
This could be a Tier 1 as the change might only involve including “primary building”.
2/10/26: PC moved to Tier 1. Moved from C.4.
This section refers to primary structures, but we should consider
changing to primary buildings. If structures, a raised deck (etc.)
would qualify and we should work through implications.
A.4 The Street Typology Map needs revision. The Local designation is not in the legend, and the green
marking on the Mall needs to be removed as it is not a category on the map.
2/10/26: PC moved from C.9.
Map quality is also substandard. Not a code change, but we need a
better map.
A.5 5-9 5.1.6.B.2 Add Special Exception Permits The Administrator reviews and provides a recommendation on
Special Exception Permits per 5.1.1.
A.6 4-20 4.4.5.D.9.c Add “RN-” districts RN- districts were left out of several sections of the code where R-
districts are referenced
A.7 6-13 6.7.1.A.2.a.iv Remove “Provision of expertise and technical assistance to the Planning Commission.” The Planning Commission no longer has authority over
subdivisions per changes to state code.
A.8 Review any new state regulations post July 1st.
A.9 2.10.6 Build-
To
When permitted by the Zoning District, a project utilizing the Existing Structure. Preservation
Bonus for density will be deemed to comply with the Build-To requirements.
Update “utilizing” to “eligible”.
A.10
A.11
Refinements (B)
Number Page Code
Section
Current Language or Problem Suggested Language or Issue in Question Respons
ible Staff
Date
Adopted by
CC
B.1 Sight
Distance
NA B.6 on the 2025 list (did not move forward).
Nothing in the new code provides details on a sight distance triangle.
May 27, 2025, Planning Commission Work Session: This needs more study as PC would not want
VDOT regs as it would create too large of a triangle.
9/9/2025: Due to timing this will be moved to the 2026 list.
2/10/26: No Comments from Planning Commission
Could use the section from the 2003 Code (Sec. 34-1121. - Sight
distance—Required sight triangle.) Collaboration with the City
Traffic Engineer before any change is made.
B.2 2-98 2.10.1.D B.10 on the 2025 list (did not move forward).
Yard designation details graphics.
2/10/26: No Comments from PC
The text bases yard on street-facing facades, which are within 50-ft
of the lot line. It uses "the primary building's street-facing facade"
but it is not clear if it is the primary building or the primary facade
and how that is defined. So, the text reads that the yard is between
lot line and any facade which meets the street-facing facade
standard, or any facade within 15-ft of a street-facing facade. This
is inconsistent with the graphic.
B.3 4-24 4.5.1.C.3 B.20 on the 2025 list (did not move forward). Reverse order and reconsider categories.
Page 5 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 3 of 16
Provides “linking” requirements before “direct” requirements, but this should be reversed to
match 4.5.1.C.2. Also not clear why we need a Type 1 and direct when they are one and the same
and vice versa.
10/7/2025: This amendment is not ready to move forward and will be placed on the 2026 list.
2/10/26: No Comments from PC
B.4 7-15 7.2 B.22 on the 2025 list (did not move forward).
Grade, finished.
9/9/2025: This needs additional study and will be moved to the 2026 list.
2/10/26: PC would like to know how the terrain of the City is taken into account. Is the issue
related to graphics within the code, or is it a larger issue related to terrain?
Additional clarifying language is needed. Is the intent to measure
at building footprint?
B.5 5-58 5.2.16.C.4 B.23 on the 2025 list (did not move forward).
City Council Decision details
“The City Council will conduct a public meeting on the application. The City Council may hold a joint
public meeting with the Planning Commission.”
8/12/2025: Staff note. Add this to next year’s (2026) review. Change Critical Slopes Planning
Commission and City Council action to match that of Special Exception Permit and/or what comes
out of the Long Range Planning Environmental study.
2/10/26: PC would like staff to have more administrative authority but also wants to see the
results of the Long Range Planning Environmental study to see what is says regarding Critical
Slopes.
This language matches items such as SUPs which require a public
hearing, but not items like SEPs which require a public meeting
same as the Critical Slope SEP .
B.6 5-37 5.2.9 B.37 on the 2025 list (did not move forward).
Changes to the Development Code Process to allow more types of development to go straight to
Building Permit review
9/9/25 (more information will be provided after we meet with different departments and get
additional feedback).
2/10/26: PC is supportive and wants to see what comes out of the Missing Middle Round Table
discussions.
We are looking at two options. 1 would keep our current policy of
allowing one and two units to go straight to Building permit review
(codifying it). The other option (which is the one we are moving
forward) would allow development within the R districts (provided
certain standards are met) to go straight to Building Permit review
B.7 2-85 to
2-87
2.9.3.B B.39 on the 2025 list (did not move forward).
Individually Protected Properties are represented as both a chart and a overlay on the official
Zoning map. This creates issues as any change (adding an IPP or removing and IPP) requires both a
Zoning Map amendment and a Zoning Text amendment
2/10/26: No Comments from PC
Staff recommends removing the chart and only using the overlay
on the official Zoning Map.
B.8 4-27 4.5.2.C.1 B.41 on the 2025 list (did not move forward).
Required Bicycle Parking. The code is requiring Hotels to be treated as Commercial which is in turn
requires a unreasonable amount of bicycle parking.
2/10/26: Important issue to PC, but no guidance yet.
Staff reached out to Code Studio to make sure we were reading the
code section correctly and they responded in an email on
November 6, 2025 with: “Great question, under the current code
language, you are interpreting this correctly that a lodging use is a
commercial use and would be calculated as you have outlined.
This could be an opportunity for administrative relief, or a potential
text amendment where lodging uses get listed as a new line on the
bicycle parking table with lesser requirements. This could be per SF
or per room, for example, in Raleigh, NC we specified long-term
bike parking as 1 space per 20 rooms (4 min) and short-term bike
parking as 1 space per 40 rooms (4 min).Happy to brainstorm more
as needed, Christy”
B.9 Food truck courts (places in the City where multiple food trucks could gather. This came out of a
conversation that under the current Temporary Use section only one food truck is permitted per
lot. This is an issue, but it also prevents something like a food court for food trucks.
An idea to address this is 1. Amend the temporary sections, and 2.
Look into the idea of an Alternant Form section for Food Truck
Courts.
Page 6 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 4 of 16
2/10/26: This is important to PC and something they want to be involved in (subcommittee)
B.10 2-108 2.10.4.C Outdoor Amenity Space. The requirements for outdoor amenity space is just a flat percentage and
does not take into account the quality of the space.
2/10/26: Not a priority to PC.
Could allow for less percentage if the amenity space is active
instead of passive. This is used in other localities and would take
some research.
B.11 7-21 7.2 Private Streets do not clearly indicate they must be on dedicated property and not easements over
underling private property. This is creating issues as the code uses a lot of “street side lot line”
which does not work well with easements.
2/10/26: Move to Tier 1 (needs to be addressed with the 2026 updates). Moved to A.2
Stuff suggests updating the definition of Street under section 7 to
clearly state a street (public or private) is an independent parcel or
ROW.
Street: A street is a public or private way that provides a principal
means of access to abutting property and includes the roadway
and associated streetscape elements. Streets shall meet the
following criteria:
• Public Street: A street located entirely within a publicly
dedicated and accepted right-of-way, under the ownership
and maintenance of a governmental entity and design per
the City’s Standards and Design Manual.
• Private Street: A street located on a separate, recorded lot
or tract that is not part of any abutting property. Private
streets shall not be established solely by easement across
private property and must comply with the City’s
Standards and Design Manual and be bonded to the same
standards as a Public Street during construction.
Ownership and maintenance shall be the responsibility of
a private entity such as a homeowners’ association or
other legally binding documents.
B.12 2-9, 2-
13, and
3-4
2.2.2.A.B.1,
2.2.4.B.1, and
3.2.2
(3/13/2026) In the R districts (R-A and R-B) height is only restricted for Buildings with “units”. There
is no stated height for nonresidential uses and there are some nonresidential uses allowed in these
districts (Religious assemble and Day care,
B.13 4-11 4.3.2.B.2 Mid-block pedestrian pathways
2/10/26: PC would like to see more study. moved from Tier 3 (from C.7)
This section is set up on the assumption there is only 1 primary
street frontage, which is often not the case. Needs revision/study.
B.14 5-54 5.2.15.A A Special Exception Permits may be granted for physical dimensional standards described in the
following Division... needs revision to account for the determination that parking location and
other potential locations are permitted modifications allowed under SEP.
May 27, 2025, Planning Commission Work Session: PC did not feel removing or adjusting the SEP is
appropriate at this time.
The other issue is that Special Exception Permits are only for “physical dimensional standards” and
not the regulation for the standard. The example being a SEP could be requested to change the
dimensional standards of a bike parking space, but it could not be used to reduce the number of
spaces required.
2/10/26: PC moved this to Tier 2 (Moved from C.11).
Also consider removal of 5.2.15.A.2.a (Div 2.10 Rules for Zoning
Districts) per input from Freas on requiring a ZMA instead.
Staff would recommend changing 5.2.15.A.1 to state “The City
Council may grant a modification of any physical dimensional or
numerical standard of this Development Code by Special Exception
Permit.”
B.15 7-10 7.1.2.E.3.b Sublot access
2/10/26: PC moved to Tier 2 (C.15).
Add clarifying language that easement may be through other
zoning lots.
B.16 2-133 2.10.10B.2 Active Depth Applicability
Planning Commission has expressed an interest to reexamine active depth. They would like to have
a better definition and look at where active depth is needed and where it is not needed. An
example would be the current requirement on the mall that active depth is the full height of the
building along the façade.
This section prevents structured parking as a standalone use, but
the structured parking section (4.5.5.C.7) provides screening
requirements which may imply the standalone use is okay.
Language on 2-133 is contradictory regarding ground floor. The
section states Active Depth is for the portion of the building use to
Page 7 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 5 of 16
2/10/26: This is a priority to PC and they moved to Tier 2. They would like to look at the required
depth, definition, should it be in the residential districts at all, should it be on all stories of a
building. This is their #1 priority for Tier 2. This is something for the subcommittee and could move
back to Tier 3 if it proves to be too complicated and needs community engagement. Gagrages
need to be part of this study too (from C. 18) Moved from C.16.
meet the minimum build to width requirement. But that
requirement is only for ground stories of a building.
B.17 2.10.5 and
2.10.6
Setbacks and Build-to. Planning Commission would like to do a deeper dive into the current
regulations related to Build-to and Setbacks.
2/10/26: This is number 2 priority to PC and something for the subcommittee to look into. Moved
to Tier 3. Moved from C.22.
The new Development Code relies heavily on Build-to
requirements. This is very different from our old code, and it is
creating a lot of issues. It would be a big lift to redo the code to
remove Build-to regulations, but it might be worth studying where
there can be relief from the regulations. In 2025 we updated
sections of the code to allow relief for developments taking
advantage of the existing structure bonus. There might be an
opportunity to look at other such reliefs (buildings that are IPPs or
Contributing structures in the Design Districts).
B.18 2-132 2.10.10.A.5 2.10.10.A.5: Building Width Exception. “The depth of the open space must be at least equal to the
width of the open space or 30’, whichever is less.” I propose reducing that minimum depth to 25’.
A building built over a parking garage is 60’ wide (1’+18’+22’+18’+1’). If you have a double-loaded
corridor building above the parking garage, a 30’ deep open space will cut into the corridor. The
depth should be no deeper than an apartment depth.
2/10/26: PC wants this on Tier 2. Moved from D.5.
B.19
B.20
B.21
Policy Changes or Major Amendments (C)
Number Page Code
Section
Current Language Staff Notes
*Community Engagement and analysis will be required.
C.1 2-9
(etc.)
2.2.2.B.1
(etc.)
11/12/25: PC Work Session moved this back to Tier 3 as there needs to be a deeper dive into what
a Building is and if it is the Lot or the Building that needs to have more than one unit in it to get the
bonus height.
2/10/26: This could be a deeper conversation with PC.
Building height is for the number of units within the building. If you have one building and it
has more than one unit within the building, you get the additional height. If you have multiple
units on a site, but they are each in their own individual unit, you do not get the additional
height. This is problematic for R-A, R-B, and R-C.
C.2 2.10.10
Massing
11/12/25: PC Work Session moved this back to Tier 3 as there needs to be a deeper dive into what
a Building is and if it is the Lot or the Building that needs to have more than one unit in it to get the
bonus height.
Resolved 2025 with B.5 Accessory Uses/Structures and Nonconformity Build-to
2/10/26: Staff explained to PC that this was resolved with B.5 for buildings that cross a property
line (duplexes and townhomes), but not resolved for multiple buildings on one lot (building a large
SFD in the backyard of an existing SFD and getting the height bonus).
Building is not clearly defined when it comes to “Height” and “Massing”. The example is: If I
have seven townhomes along a primary street in the R-B, the massing and height is all
dependent on where the property lines are for each unit. If it is seven townhomes with no
property line at the shared wall (all seven are on one lot in a condo) the “building’ can only be
60’ long on the primary street, but it is a building with seven units in it and can be 3 stories
(and 40’). But, if there are property lines running through the shared walls, each unit is a
building and can, individually, be 60’ long, but only 2.5 stories (35’). From the outside they
would present very differently but the only difference is where the invisible property line is.
Staff believes this was resolved with the B.5 amendment as it added the definition of Primary
Building: “Building, Primary- The building or buildings occupied or designated for the
primary/principal use on a lot or site.” By adding “site” a building can now cross a property line
(duplex or townhouse) and be considered one “building” on a site for the purpose of bonus
height.
C.3 2-40 2.5.6.A.6 Will eventually reference Type B and D (in Category 1 as well).
Resolved 2025 with A.16
See Downtown Mall Management Plan for recommendations on transitions.
Page 8 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 6 of 16
C.4 2-97 2.10.1.D Yard designation details
This could be a Tier 1 as the change might only involve including “primary building”.
2/10/26: PC moved to Tier 1 (A.3)
This section refers to primary structures, but we should consider changing to primary buildings.
If structures, a raised deck (etc.) would qualify and we should work through implications.
C.5 2-104 2.10.2.B.3.c Lots having vehicular access from any street other than a primary street, or not having vehicular
access at all, must meet the minimum width required for lots with other vehicular access specified
by the zoning district.
2/10/26: More information is needed, but this could be a Tier 1.
Assuming this is meant to describe the "side/rear access" width in the districts, should this say:
"...from any side street, alley, easement, or other right-of-way not designated a primary
street..."? This seems confusing because it only says "from a street or no access" which leaves
out everything I listed out.
C.6 Various Various Structure, accessory structure, etc.
Resolved 2025 with B.5 Accessory Uses/Structures and Nonconformity Build-to
Deeper dive on structure, accessory structure, and associated requirements. Consistency
issues, as well as intent (interior non-conforming lots vs corner non-conforming lots).
C.7 4-11 4.3.2.B.2 Mid-block pedestrian pathways
2/10/26: PC moved to Tier 2 (Moved to B.13).
This section is set up on the assumption there is only 1 primary street frontage, which is often
not the case. Needs revision/study.
C.8 4-5 4.2.1 Existing structure preservation bonus does not specify a timeframe to qualify as an existing
structure.
Moved to Tier 1 (A.70) by Planning Commission at the work session on May 27, 2025
Moved to Tier 2 (B. 42) by Planning Commission at the Work Session on November 12, 2025
Resolved 2025 with B.42
CodeStudio has verbally stated that this is for structures pre-dating the code, but that is not
specified here. As written, someone can build a structure and then immediately use it to get
the bonus as an existing structure.
C.9 NA 4.4 The Street Typology Map needs revision. The Local designation is not in the legend, and the green
marking on the Mall needs to be removed as it is not a category on the map.
2/10/26: PC moved to Tier 1 (A.4) (Not really a code amendment).
Map quality is also substandard.
C.10 4-27 4.5.2.B.2 Projects with 1 to 4 dwelling units are not required to provide short-term or long-term bicycle
parking.
2/10/26: Not a priority to PC.
Consider whether this should be applied per lot or per project. Tie to discussion of definition of
project. Do we want project with 4 or fewer dwelling units to be exempt from short and long
term bicycle parking?
C.11 5-54 5.2.15.A A Special Exception Permits may be granted for physical dimensional standards described in the
following Division... needs revision to account for the determination that parking location and
other potential locations are permitted modifications allowed under SEP .
May 27, 2025, Planning Commission Work Session: PC did not feel removing or adjusting the SEP is
appropriate at this time.
The other issue is that Special Exception Permits are only for “physical dimensional standards” and
not the regulation for the standard. The example being a SEP could be requested to change the
dimensional standards of a bike parking space, but it could not be used to reduce the number of
spaces required.
2/10/26: PC moved this to Tier 2 (Moved to B.14).
Also consider removal of 5.2.15.A.2.a (Div 2.10 Rules for Zoning Districts) per input from Freas
on requiring a ZMA instead.
Staff would recommend changing 5.2.15.A.1 to state “The City Council may grant a
modification of any physical dimensional or numerical standard of this Development Code by
Special Exception Permit.”
C.12 7-19 7.2 Project Any activity, including subdivisions, new construction, additions, site modifications, façade
modifications, changes of use, renovations, and maintenance and repair, on a parcel that is
controlled by this Development Code.
Staff determined that this is not an issue due to section 7.1.1.K.1.d Tenses and Plurals
2/10/26: Not an issue for PC.
Language implies this is only upon one parcel. Discuss intention and revision.
C.13 7-8 7.1.2.C.4 Site Modification
2/10/26: PC would like staff to look at this more, it is a little confusing and might not be an issue.
If you read this with what a "site" is under E on page 7-9, a Site Modification is only a change to
the land and not what is on it. We need something more like our old Site Plan Amendment.
Site: A single lot or group of connected lots owned or functionally controlled by the same
person or entity, assembled for the purpose of development.
Lot: A parcel, tract, or area of land established by a plat or other means as permitted by law,
which is to be used, developed, or built upon.
Site Modification: Any modification of an existing site that affects less than 50% of the existing
site area, up to 25,000 square feet of affected site area.
Page 9 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 7 of 16
Staff recommends changing the definition of a Site to “A single lot, group of connected lots , or
improvements, owned or functionally controlled by the same person or entity, assembled for
the purpose of development.” Additional study is suggested.
C.14 7-9 7.1.2.E.2 Defining a lot
Staff determined that this is not an issue due to section 7.1.1.K.1.d Tenses and Plurals
2/10/26: Not an issue for PC.
This and the definition of parcel should be considered together.
Parcel. A contiguous portion of land that is assigned a unique identification number by the
Office of the Assessor. (7-19)
Lot: A parcel, tract, or area of land established by a plat or other means as permitted by law,
which is to be used, developed, or built upon. (7-9)
C.15 7-10 7.1.2.E.3.b Sublot access
2/10/26: PC moved to Tier 2 (B.15).
Add clarifying language that easement may be through other zoning lots.
C.16 2-133 2.10.10B.2 Active Depth Applicability
Planning Commission has expressed an interest to reexamine active depth. They would like to have
a better definition and look at where active depth is needed and where it is not needed. An
example would be the current requirement on the mall that active depth is the full height of the
building along the façade.
2/10/26: This is a priority to PC and they moved to Tier 2. They would like to look at the required
depth, definition, should it be in the residential districts at all, should it be on all stories of a
building. This is their #1 priority for Tier 2. This is something for the subcommittee and could move
back to Tier 3 if it proves to be too complicated and needs community engagement. Moved to
B.16.
This section prevents structured parking as a standalone use, but the structured parking
section (4.5.5.C.7) provides screening requirements which may imply the standalone use is
okay. Language on 2-133 is contradictory regarding ground floor. The section states Active
Depth is for the portion of the building use to meet the minimum build to width requirement.
But that requirement is only for ground stories of a building.
C.17 2-148 2.10.13 Entrances
2/10/26: Keep here and look at in the future.
Update to match previous determinations or better clarify.
C.18 4-43 4.5.7.C Active depth vs. garage. Link to active depth.
2/10/26: This is linked to Active Depth (B.16)
Further study needed.
C.19 4-103 4.12 Nothing in the Lighting section addresses athletic field lighting. The maximum fixture height is 15’
and that would not work for ball fields.
2/10/26: This is not a priority to PC at this time but should be looked at latter.
C.20 4-32 4.5.3.D.2 This section contradicts 4.5.1.C.a.i.d which calls for all pedestrian paths to be physically separated
from the motor vehicle use.
2/10/26: Not an issue or priority for PC. They do not see small scale development having
pedestrian and vehicular traffic overlapping. Look at in the future.
C.21 4-80 4.10.1.B.1 Critical Slope regulations are redundant given current VESMP regulations for larger developments,
which require engineered erosion and stormwater plans to be approved for land disturbance
greater than 6,000 square feet.
This is being studied as part of the Comprehensive Environmental Study and Update by NDS Long-
range Planning Division as part of the Department’s 2025/2026 Work Plan.
Add language: “Critical slope requirements apply to project sites not subject to Erosion and
Stormwater Management (ESM) Plans that include any portion of sloped area that has all of
the following criteria:”
C.22 2.10.5 and
2.10.6
Setbacks and Build-to. Planning Commission would like to do a deeper dive into the current
regulations related to Build-to and Setbacks.
2/10/26: This is number 2 priority to PC and something for the subcommittee to look into. Moved
to Tier 3 (B.17)
The new Development Code relies heavily on Build-to requirements. This is very different from
our old code, and it is creating a lot of issues. It would be a big lift to redo the code to remove
Build-to regulations, but it might be worth studying where there can be relief from the
regulations. In 2025 we updated sections of the code to allow relief for developments taking
advantage of the existing structure bonus. There might be an opportunity to look at other such
reliefs (buildings that are IPPs or Contributing structures in the Design Districts).
C.23 Build-to width is creating a lot of issues. Utility requirements is a big issue as it takes away from
what can be done with sublots.
(October 14, PC work session)
2/10/26: This is creating a lot of issues, and we need to find a way to allow administrative relief. PC
moved to Tier 3 (Moved from G.14).
Page 10 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 8 of 16
C.24 The 6' Min/Max determination for ground story is too limiting for the topography in this area
leading to a need to break larger buildings into many modules which is very inefficient from a
construction perspective
Revert to the previous ground story definition of 50% of the floor above/below grade to define
ground story or provide administrative alleviation for larger sites on hills
Dan Bracey – Two Street Studio October 2025
2/10/26: PC believes the terrain of the City needs to be taken into consideration. Not a priority
now, but moved to Tier 3 (Moved from G.18).
C.25 2/10/26: PC would like to do a deep study of “Nonconformity” (such as lots, uses, and buildings).
To see what can really be achieved with our current built environment. Not a priority now, but in
the future.
C.26
C.27
C.28
C.29
Architectural Design Control
ADC.1
ADC.2
ADC.3
ADC.4
ADC.5
ADC.6
ADC.7
ADC.8
ADC.9
ADC.10
ADC.11
ADC.12
ADC.13
Planning Commission
Number Page Section Notes Staff Notes
D.1. 4-18 4.4.5.A.3 Before the code was approved, I had asked James what happens if you can’t fit the required greenscape and walk zones in
the right of way, and my understanding was that the building setbacks would be moved back to allow for them to be
installed. For example, if you have a maximum setback of 10’, and due to site constraints, the streetscape can’t fit, that
maximum setback would be moved back enough to allow it to fit. That’s how I interpret section 4.4.5.A.3. “When there is
not enough room in the public right of way for the required streetscape, the clear walk zone and greenscape zone must be
provided on-site as a permanent public access easement.” Are we enforcing this? In preliminary discussions with applicants
to the BAR, we’ve had some say they spoke to staff and are unable to provide the required street trees because of the
maximum setbacks.
After reviewing with staff and the code. This interpretation is correct
and has been utilized by Planning staff. Other types of easements
such as utilities is not contemplated in the code but is being
addressed with this batch of amendments.
D.2. Doors swinging over the ROW. The building code actually prohibits this, but there have been instances where it has been
excused by our code officials because there’s not life safety issue. Can we add to the zoning code that doors should not swing
over the public sidewalk?
2/10/26: PC Chair would like this not to happen, but not a priority to the PC. No movement at this time.
Page 11 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 9 of 16
D.3. Definition of an entry: I think you all are on this after the apartment project at 1609 Gordon Ave. Does an entrance have to
open to an active space? Should it be allowed to go to a garage, internal courtyard, or exterior stair? We should add some
clarity to the code on this.
2.10.13 Entrances (page 2-148) The Street-Facing Entry Spacing
states “A maximum distance between street-facing doors providing
access from the public realm to the interior of a building.” For this
project (RX-5) the code requires an “Entry Feature” and “A street
facing entry every 40’ or 60’ depending on the type of street. This
section of the code is very confusing and convoluted. It would need a
lot of thought and work.
D.4. Active Depth – this seems to keep coming up as preventing buildings from providing internal parking. Is it too deep? Do we
need to consider some exceptions or methods for providing internal parking?
D.5. 2-132 2.10.10.A.5 2.10.10.A.5: Building Width Exception. “The depth of the open space must be at least equal to the width of the open space
or 30’, whichever is less.” I propose reducing that minimum depth to 25’. A building built over a parking garage is 60’ wide
(1’+18’+22’+18’+1’). If you have a double-loaded corridor building above the parking garage, a 30’ deep open space will cut
into the corridor. The depth should be no deeper than an apartment depth.
2/10/26: PC wants this on Tier 2. Moved to B.18.
D.6. Ground floor definitions seem to keep tripping people up on sloping sites. Are ours too strict?
D.7. 4-31 4.5.3.D.1.a.vii Driveway widths – there seem to be no regulations for driveway widths for single family and duplex lots. 4.5.3.D.1.vii seems
to show maximum widths, but I understand that staff interprets the code as there being no maximum width for single family
or duplex parcels.
Staff does enforce this requirement. The issue can arise from the
fact that “parking” space are not defined for any lot with less than
6 spaces.
D.8. Fences vs guardrails (I assume you all are already on this).
D.9. Existing buildings under BAR review – what changes are allowed: There seems to be a debate about the level to which
contributing buildings in ADCDs are subject to the zoning code. Under the nonconformities section 5.3.3.B.2:
“If the nonconforming structure to be expanded is also a contributing structure in an ADC District or HC District, or an
Individually Protected Property, then that structure is not required to meet any development standard that would require
modification of the structure itself, and the Board of Architectural Review must approve a Certificate of Appropriateness for
the proposed expansion.”
I read that section as saying that if you add onto a contributing structure, the existing structure doesn’t need to be modified
to meet the zoning code. In a couple of cases, it appears that staff has interpreted that as saying that the existing building
can also be modified in ways that are counter to the zoning code. This could be making it less compliant with transparency
requirements by removing windows or removing required entry features for instance. Can we clarify exactly what is allowed
to happen when a non-conforming contributing structure is modified and/or added onto?
D.10. See B.1: Side lot line (min) 4’
(R-A, RN-A, R-B, and R-C). This section is preventing single-family attached style housing on abutting Zoning lots.
May 27, 2025, PC work session: PC does not like the Alternate Form approach and finds that it could be cumbersome. Staff
will keep this in mind but is still focused on the Alternate Form as the best solution.
D.11. See A.70: Existing structure preservation bonus does not specify a timeframe to qualify as an existing structure.
Moved by PC to Tire 2 (from Tire 3) at the May 27, 2025 Work Session. They want to use CodeStudio date of the code
adoption as the preservation date.
D.12. See B.6: Nothing in the new code provides details on a sight distance triangle.
May 27, 2025 Planning Commission Work Session: This needs more study as PC would not want VDOT regs as it would create
too large of a triangle.
D.13. See B.4: Lots with 1 dwelling unit do not have to provide street-facing entries.
May 27, 2025, Planning Commission Work Session: PC does not see this as an issue and suggests something more in line with
a street facing feature and not a entry.
Staff originally placed this on the list to highlight that “lots” with
only one dwelling do not need a street-facing entry. This is
regardless of Zoning District and a little ambiguous. Is this stating
that a lot with a commercial building AND one dwelling unit would
not need a street-facing entry? Staff may suggest:
Page 12 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 10 of 16
“Lots in the R-A, RN-A, R-B, and R-C Zoning Districts do not have to
provide street-facing entries on a single unit residential dwelling
provided no additional dwellings or uses are provided.”
D.14. See B.13: Vehicle Access.
May 27, 2025, Planning Commission Work Session: PC does not see an issue with what is in the Development Code, and it
should not be changed to satisfy PWE or Fire.
D.15. See B.15: This section is only about Unit Bonus allowances in residential districts, but R-C also has a Height Bonus which is
not detailed.
May 27, 2025, Planning Commission Work Session: PC did not think the 50% AMI should apply and that this section is not in
line with the intent of the code.
D.16. See B.27: Canopy set at 10 years
May 27, 2025, Planning Commission Work Session: PC brought this up, but only acknowledged it was an issue with no more
explanation.
D.17. See C.11: A Special Exception Permits may be granted for physical dimensional standards described in the following
Division... needs revision to account for the determination that parking location and other potential locations are permitted
modifications allowed under SEP .
May 27, 2025, Planning Commission Work Session: PC did not feel removing or adjusting the SEP is appropriate at this time.
D.18. See B.14: Fence. A constructed vertical barrier of wood, masonry, wire, metal, or other manufactured material, or
combination of materials erected to enclose, screen, or separate areas. A fence differs from a wall in not having a solid
foundation along its entire length.
May 27, 2025, Planning Commission Work Session: PC thinks we could exclude guardrails or measure fence from floor
surface and allow 42-inch everywhere (should satisfy ABC). Also guardrail on a wall is exempt, use for elevated surfaces as
well (café example, elevated deck). B.17- confusing. There seems to be some standard that needs to apply. B.21- Fence type
x, think its about storage fencing? Or is this supposed to be landscape/transition requirement instead?
D.19. See B.17: Where existing streetscapes are determined to be in good condition by the Administrator, they may be used to
comply with clear walk zone and greenscape zone requirements provided they comply with all standards in this Division.
May 27, 2025, Planning Commission Work Session: PC found this language to be confusing and believes there needs to be a
standard.
D.20. See B.21: Fence Type X
May 27, 2025, Planning Commission Work Session: PC is not sure what this is for, fencing for storage, or for landscaping and
transition requirements.
D.21. See B.26: No building located on a lot may be wider than the maximum building width allowed by the zoning district.
May 27, 2025, Planning Commission Work Session: PC recommended requiring the owner to rezone the lots into one zoning
designation.
D.22. See B.5: At the November 12, 2026 PC work session, the PC wanted to add this (allowing more primary buildings on a lot
without first bringing it up to conformity in regards to Build-to) to a the list to look at in the future.
D.23. 11/12/25 PC Work Session: PC would like to look into this more as active space and active depth created a lot of conversation
(with a lot of it around the term “hall”). For now PC is okay with staff language, but they would like to revisit the concept and
where is should be used. (B.24)
D.24. 1/12/26: PC Chair would like to look into more opportunities to find existing structures “in compliance” when it comes to
build-to and setbacks. This came out of B.38 which states “When permitted by the Zoning District, a project eligible for the
Existing Structure Preservation Bonus for density will be deemed to comply with the Building Setback requirements.” And
“When permitted by the Zoning District, a project utilizing the Existing Structure. Preservation Bonus for density will be
deemed to comply with the Build-To requirements.” The Chair would like to see this expanded to the Design Control Districts.
D.25.
D.26.
D.27.
Page 13 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 11 of 16
D.28.
D.29.
D.30.
D.31.
Tree Commission
Number Page Section Notes Staff Notes
E.1. Incentives for Tree Preservation - Reevaluate the city's current incentive structure for tree preservation to reward developers
who retain healthy, large trees on-site and to ensure that preservation of mature trees is seen not as an obstacle but as a
shared value and goal. The current incentive structure—where existing trees are allowed to contribute 1.50-4x canopy area
toward meeting minimum canopy requirements—is not effective at promoting overall tree canopy cover in the city. Consider,
for example, an incentive structure to reduce or waive stormwater fees as an incentive to preserve mature trees.
E.2. Bonds for Existing Plantings - Expand circumstances for when a bond is required to cover existing trees indicated for
preservation in site plans for 1 year after the completion of construction (see the cities of Falls Church, Fairfax, and Vienna for
precedents).
E.3. Tree Preservation Plans - Further define the existing preservation plan requirements to include tree canopies, trunks, critical
root zones, and tree protection measures drawn to scale (reference “Best Management Practices for Tree Preservation,
Transplanting, Removal, and Replacement”). Support a second Urban Forester position focused on plan review and
enforcement of preservation plans.
E.4.
E.5.
E.6.
E.7.
EV Charging Plan
Number Page Section Notes Staff Notes
F.1 What: The City can make several changes to the current zoning ordinance to streamline the EV charger permitting process. It
can permit chargers as an allowable accessory use to parking lots in all zoning districts for both private and public charging.
Why: Public charging stations are accessory use in most instances. However, land use and zoning codes often do not
reference or properly categorize EVSE. Subjecting EV charger applications to a conditional or special use permit process
requiring additional approvals can add significant staff time to projects and create delays. Explicit directives can increase
efficiency to the process by which new EV charging infrastructure can be approved. Providing this information to the public
will not only clarify whether a type of charger can be installed but also show that the City supports public EV charging.
How: The City can amend Charlottesville Development Code Div. 3.5. Accessory Uses and Structures to establish
requirements concerning the siting of EV charging systems for Level 1 and Level 2 charging. The City can codify in the zoning
ordinance that EV charging stations are allowed by right in parking lots as an accessory use across residential, commercial,
industrial, and other major zoning categories. For DCFC installations, the City may wish to adopt specific provisions, explicitly
detailing when EV charging is considered a primary use.
The City may require that EV charging in City historic districts, architectural control districts (Figure 41), and entrance
corridors be conditional on a Certificate of Appropriateness to ensure that infrastructure additions, landscaping, and related
elements will complement the existing area. Providing specific guidance about what types of charging installations the City
permits in these zones and any project criteria will aid installation projects and preserve the character of protected areas.
See the CV Charging Plan and look at the City of Fairfax Link to
what they are doing
F.2
F.3
F.4
Page 14 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 12 of 16
Builders and Developers
Number Page Section Notes Staff Notes
G.1 2-101 2.10.1.F Kevin Riddle: On a project at Cabell Avenue, we encountered a question about ground story interpretation. (See the attached
PDF for a graphic.)
A question arose about which building level should be classified as the ground level. The doors at the top of the metal stairs
are too far above grade— over 6 feet— to count as the ground story. So I determined the level below— accessed from the
terrace at the 994’ elevation— should be the ground story. Our architecture and civil engineering team debated this. Some
people read the Code to say that the lowest allowable floor elevation in RX-5 is 0’ above existing grade. I argued that it
should be interpreted as 0’ above finished grade, based on the language in Division 2.10.1.F.1.a and 2.10.1.F.1.b. (page 2-
101). I think the confusion arose in part because the supporting graphic in this section refers to existing grade. It’s in a very
small font, but it’s there, and it appears to conflict with the superseding language in the Code’s text.
(As an aside, I realize that the use of finished grade to define ground story could conceivably allow a strange— and typically
undesirable— scenario where finished grade at building face is very far below the adjacent right-of-way. I think, however,
such a scenario is exceedingly unlikely, because almost no owner would gain anything by creating this condition… and the
obvious downside of using existing grade at building face to define ground story in a hilly town like ours would be the far
more common scenario of a parcel where grade rises from the street: if an owner modified existing grade down to make a
front door accessible to a disabled resident, the ground floor would be out of compliance— more than 0’ below existing
grade. To instead locate the ground floor elevation at 0’ or higher above existing grade would create the need to ramp up to
the front door, which in many situations would be a significant burden, especially where a building face is very close to the
sidewalk. Allowing residents to define ground stories based on modified— ie, finished— grades seems entirely reasonable.)
Long story short, I assume the Code should be edited so the notes on the Ground Story graphic read finished grade.
Dannan O’Connell was part of this discussion, if you want to check in with him for his take.
(by email)
Staff believes this is a Tier 1 (grammatical issue and can be address
with the current round of amendments or in the future). Staff
believes the code is clear that words outweighs graphical
information per section XXX
G.2 2-132K 2.10.10.A.5 Kevin Riddle: We’ve studied several projects recently where new development is being considered on a parcel— or parcels--
that make up an entire block. In these cases, a single building may have streets on four sides, and all four sides are longer
than the building width maximum. In such a case, should one open space exception (page 2-132) be allowed on each street
face of the building rather just one exception for the entire building? With only one exception per building, as the Code
currently prescribes, an owner would have to separate one building into multiple buildings. While there may be upsides to
multiple buildings, it’s not obvious that a single building with nice fenestration, massing, materials, etc… would be worse than
multiple buildings… and wouldn’t multiple open space exceptions safeguard against a perception of a building looking too
massive?
(by email)
Staff does not believe this is an issue and the intent of the code is
to require developers to shrink their developments or to provide
new streets or other elements to breakup large projects. More
consideration may we warranted, but this would need to be a Tier
3 discussion.
G.3 Bicycle parking regulations need to be looked at. Currently the code calls form a lot of bicycle parking in areas that are not
bike friendly
(October 14, PC work session)
G.4 BAR is an issue and does not work with by-right. Active depth is an issue as although parking is not required, it is needed due
to financing. Administrative Modification need to be made larger (more than 10%). If you want more housing it needs to be
easy as posable and very standard. Developers need to know what they can do. Take away BAR authority and make as much
as possible not go to PC or CC.
(October 14, PC work session)
G.5 The code is too complicated. We need to think more about what lots are left in the City for development. Stormwater
regulations ae an issue and the affordability regulations need to be looked at on a yearly basis so they can be adjusted based
on real world changes.
(October 14, PC work session)
Page 15 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 13 of 16
G.6 Max coverage regulations and max heights are an issue. Although parking is not required it is an issue for small lots as people
(Habitat) will have cars. Think about bringing back allowing front facing garages.
(October 14, PC work session)
2/10/26: More study is needed, but not at this time. Max coverage is an issue.
staff believes the max height issue will be resolved with the current
round of amendments).
G.7 From a Historic Preservation perspective, make existing buildings in the Historic District conforming. This would help with
preventing teardowns.
(October 14, PC work session)
This could be something to look at. Staff is already proposing that if
someone is using the “existing structure preservation” allowance,
things like build-to and setbacks are “conforming”. This could be
looked at for something broader in the Historic districts.
G.8 Changing the zoning along West Main to CX-3. Remove the pay for affordable housing and provide affordable within student
housing buildings.
(October 14, PC work session)
G.9 Up the amount of disturbed area for stormwater from 6,000 to 10,000. Change the major SD. Change the inclusionary
requirements. What we have is not working.
(October 14, PC work session)
2/10/26: This is being studied as part of Long Range Planning Environmental Study.
Under the current code we do not have major and minor SDs. We
only have SDs and staff is recommending a new application for
Sublots.
G.10 Look at adjusting the required AMI for affordable units and base it off the Zoning district and not uniformly across the City.
(October 14, PC work session)
G.11 Reevaluate the “activities” sections (i.e. New Construction, Addition, Site Modification…) to allow small changes to a site
without going through full Development Review.
(October 14, PC work session)
Staff is already proposing a process that will allow small changes
(below the threshold of Minor Site Plans) to be exempt from
Development Review through a code amendment to 34-5.2.9
G.12 The Building Code needs to be changed. When you do over 2 units it is now commercial and not residential. The Zoning code
is no longer the issue, and it is the Building Code.
(October 14, PC work session)
G.13 We are a hilly City and that is not reflected in the code. 40’ requirement for entrances is an issue. Build-to requirement is for
partial blooks and not a development that is taking up the full block.
(October 14, PC work session)
G.14 Build-to width is creating a lot of issues. Utility requirements is a big issue as it takes away from what can be done with
sublots.
(October 14, PC work session)
2/10/26: This is creating a lot of issues, and we need to find a way to allow administrative relief. PC moved to Tier 3 (C.23).
G.15 1.1.6.C Effect
of Prior Code
1.1.7
Severability
In light of the issues with the ongoing lawsuit it seems like changing this section of the code to have a better fall back plan
would be prudent. I recognize that the ab initio judgement would not have been alleviated by an improved version of this
section, but it could help with issues in the future.
Allow the prior code to exist as a fall back and/or provide an expedited path to a special use permit for projects that are
under review and are impacted by judgements. If code readoption is required consider adopting on a district by district basis
rather than all at once
Dan Bracey – Two Street Studio October 2025
G.16 2.10.6 /
2.10.7
Build-to &
setbacks
Interactions with minimum primary street build-to widths and transition setbacks create undevelopable lots. For example in a
NX lot which has an 85% primary street minimum build to width that has a Type B 15' transition that overlaps with the build
to width, the minimum buildable site must have at least 100' of primary street frontage.
Provide build-to width alleviation for sites where transition setback zones overlap with build-to width zones
Dan Bracey – Two Street Studio October 2025
G.17 2.10.6.5.c.ii
Ped. outdoor
amenity
space
Meeting the 85% lot line or facade perimeter rule for pedestrian outdoor amenity space is very difficult on sites where the
sidewalk and streetscape zone are within the lot boundary.
Clarify or designate that the inner line of the required permanent public access easement for streetscape zones will be
treated as the street lot line for zoning calculations.
Dan Bracey – Two Street Studio October 2025
Page 16 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 14 of 16
G.18 2.10.9.4.a.
Ground story
definition
The 6' Min/Max determination for ground story is too limiting for the topography in this area leading to a need to break
larger buildings into many modules which is very inefficient from a construction perspective
Revert to the previous ground story definition of 50% of the floor above/below grade to define ground story or provide
administrative alleviation for larger sites on hills
Dan Bracey – Two Street Studio October 2025
2/10/26: PC believes the terrain of the City needs to be taken into consideration. Not a priority now, but moved to Tier 3
(C.24).
G.19 2.10.10.A.3.b
Building
width
The intent of this section is to "promote fine-grained patterns of development and prevent long (should read "wide")
buildings that are out of context...by breaking wide buildings into multiple, clearly distinguished building widths. The
allowance for buildings to abut, but not share structure or components makes building cost and environmentally efficient
multifamily buildings on large sites very difficult.
175' (RX-3/NX) accommodates only 5-6 units per street facing facade, severely limiting multifamily buildings on some large
sites. 10-12 units per 275' street facing facade in RX-5 and CX is an improvement, but still very limiting on some lots.
Eliminate or increase the width restriction in higher density zonings, provide a path for administrative waiver, or provide a
path for longer buildings with mandated distinct facades
Dan Bracey – Two Street Studio October 2025
G.20 2.10.10.A.5
Open Space
Exception
Active depth requirements still apply to the facade that is pushed back to meet the open space requirement which creates an
issue in a multifamily building with a typical podium or deck wrap plan. Pushing the facade back ~30' would typically expose
either a corridor or a parking structure.
Do not apply the active depth requirements to the facade that is pushed back when using the open space exception.
Dan Bracey – Two Street Studio October 2025
G.21 2.10.10.B.2
Active depth
and parking
Residential corridors and parking spaces do not meet the requirements of active depth. This makes typical podium or deck
wrap residential layouts very difficult to achieve on most lots that are big enough to support that style of high density
multifamily development.
Provide guidelines for allowable screening systems for parking areas within active depth zones, do not apply active depth to
all stories of primary frontages, or only apply active depth on the primary street frontage.
Dan Bracey – Two Street Studio October 2025
G.22 2.10.11
Ground Story
Height
Required ground story heights in mixed use buildings should be determined based on the predominant use of the building,
e.g. a single commercial frontage in a predominantly residential building should not be required to have a taller ground floor
height.
Change 2.10.11.A.2(b) to define ground story height based on the predominant use of a building.
Dan Bracey – Two Street Studio October 2025
G.23 2.10.11.B
Finished floor
elevation
0' minimum finished floor elevations are extremely limiting on many sites that have significant grade changes or require
vehicular access to garages on the same grade as the residential floors.
Provide negative finish floor elevations for all districts
Dan Bracey – Two Street Studio October 2025
G.24 2.10.13
Entry
requirements
The issues relating to setbacks, streetscape requirements, build-to, and finished floor elevation make it difficult or impossible
to provide access to entries on sites with grade changes along primary facades since there is not enough space to provide the
stairs and/or ramps required to access those entries while meeting build-to width requirements.
Provide alleviation or alternate for additional entries on sites where this is an issue.
Dan Bracey – Two Street Studio October 2025
G.25 3.5.1.b.1
amenity
bldgs as
accessory us
Residential development amenity buildings currently meet the definitions for administrative determination of accessory use,
but are not defined as such
Include residential amenity buildings in the Permitted Use Table
Dan Bracey – Two Street Studio October 2025
Page 17 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 15 of 16
G.26 4.2.2.C.1.b.iii
distribution
of affordable
units
In multi-building residential projects, the requirement to evenly distribute affordable dwelling units throughout a project, i.e.
throughout multiple buildings vs centralized in one building, eliminates the ability to utilize funding sources specific to low
income/affordable housing
Allow projects that fit this case to concentrate units in one building, perhaps with stricter equivalency requirements or with
administrative approval.
Dan Bracey – Two Street Studio October 2025
G.27 4.4.5-A (1) /
4.4.5-A (3)
Setbacks,
streetscape,
& build-to
Interactions with primary and side street setbacks and streetscape requirements create situations where build-to
requirements cannot be met. Required streetscape zones occur within the property lines making it impossible or difficult to
meet 15' (RX) and 10' (CX/NX) maximum primary street setbacks.
Clarify or designate that the inner line of the required permanent public access easement for streetscape zones will be
treated as the street lot line for zoning calculations.
Dan Bracey – Two Street Studio October 2025
G.28 4.5.5.B.2
parking
structure
requirements
This states that a parking structure must meet the standards of this Section, however the section includes requirements for
continuous curbs, interior islands every 10 spaces, perimeter landscaping, and landscaping on islands and medians which are
not generally feasible in parking structures.
This is presumably an error that requires a formatting change to this section as parking structures should not and can not be
built with these features.
Dan Bracey – Two Street Studio October 2025
G.29 4.8.2.C.1.c
0' max wall
heights
Retaining walls in yards may not exceed the maximum fence/wall height for the district. Many districts have a 0' maximum
wall height which would make it difficult or impossible to develop sites that are above the grade of the sidewalk.
Provide exception for this case, restrict retaining walls separately from fences and walls, or do not have 0' maximum wall
heights.
Dan Bracey – Two Street Studio October 2025
G.30 1. The less certainty, the less development. 2. Not all sites are equal. 3. We only know what we know until we know more. 4.
Time kill deals. 5. Lawsuits are terrible for business. 6. Incentives work. 7. Markets always win out.
Reference Jeff Levien Letter dated October 21, 2025
G.31 Would like to see the idea of expanding Sublots to all Zoning Districts not just R and RN districts.
Nicole Scro (in different meetings through 2025)
G.32
G.33
G.34
G.35
G.36
G.37
G.38
G.39
G.40
G.41
G.42
G.43
G.44
G.45
G.46
G.47
G.48
Page 18 of 27
Development Code Proposed Amendments Working and Tracking Document 2026 Current as of June 12, 2026
Page 16 of 16
G.49
G.50
Page 19 of 27
Executive Summary of Code Amendment
Issues
Clarifications & Technical Fixes
• Tree Removal Permit Distinction: Code does not differentiate between standalone
removal permits vs. Development project permits. Remove the required permit for
Development type projects.
• Private Streets Definition: Clarify requirement that private streets be on separate lots
rather than easements.
• Yard Designation Terminology: Replace inconsistent “primary structure/building”
language.
• Missing/Outdated Code References: Add missing Special Exception references, update
RN references, remove outdated subdivision authority language.
• Implementation of New State required regulations.
Refinements
• Sight Distance Triangle Requirements: Reintroduce clear standards for consistent
review outcomes.
• Yard Designation Graphics vs. Text: Reconcile discrepancies between diagrams and
written standards.
• Pedestrian Access Requirements: Reorder and clarify definitions of linking vs. direct
access.
• Finished Grade Clarity: Clarify how and where grade is measured.
• Minor Residential Review Streamlining: Expand by‑right Building Permit pathways for
more development types.
• Individually Protected Properties Documentation: Remove chart and rely on map only.
• Bicycle Parking for Hotels: Create separate category with reasonable counts.
• Food Truck Courts: Expand beyond single‑truck temporary rules.
• Outdoor Amenity Space Quality: Allow reduced percentage for higher‑quality active
spaces.
• Special Exception Permits Scope: Allow modifications to numeric standards, not just
dimensional.
• Active Depth Requirements: Reevaluate restrictions that impact feasibility.
Page 20 of 27
• Setbacks and Build-to standards: Deep dive into current standards and possible
alternatives to setback and build-to requirements.
Page 21 of 27
Neighborhood Development Services
Department
2026 Code Clean-Up Cycle
Local Builders and Developers
Listening Session with Planning
Commission
June 23, 2026
Page 22 of 27
What We Did Last Year (2025 Cycle)
• Completed 83 amendments to the Development Code
• Corrected technical errors and improved clarity throughout the Code
• Updated procedures to align with adopted review processes (took effect
March 2026)
• Strengthened consistency between the Code and Development Review
• Received extensive feedback from community members, builders, and
officials — including issues beyond the scope of Clean‑Up, which highlighted
the need for clearer communication of process boundaries
Page 23 of 27
Goal of the 2026 Clean‑Up
• Focus on small, technical refinements — not major policy issues
• Capture State mandated changes
• Improve clarity, consistency, and predictability in Development Review
Ensure the Code remains a reliable, user‑friendly tool for applicants and
reviewers
• Better communicate the purpose and scope of the Clean‑Up effort —
including dedicated web resources for transparency (Code Clean-Up
Webpage)
• Continue tracking larger policy topics outside the Clean‑Up process
Page 24 of 27
Purpose of Tonight’s Work Session
• Hear directly from builders and developers about how the Code functions
in practice
• Identify unclear or inconsistent provisions causing slowdowns in review
• Understand what is working well and should not be changed
• Gather technical feedback appropriate for the 2026 Clean‑Up cycle
• Document bigger-picture issues for Long Range Planning to evaluate
separately
Page 25 of 27
Listening Session Questions
• Please begin by sharing your role in the development process and how
you interact with the Development Code in your work.
• What parts of the Code create confusion or slowdowns, and what small,
technical adjustments could improve clarity or predictability?
• What elements of the Code are currently working well and should remain
unchanged during this Clean-up cycle?
Page 26 of 27
Thank You
And remember to please visit
The City's Development Code Clean-Up
page for more information
Page 27 of 27