RecordWell Data

Stormwater Presentation(PDF, 7MB)

Arlington County · Arlington County · meeting of Jun 25, 2024 · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Stormwater & Utilities Programs Infrastructure Capacity vs. Planned Development Water and Sanitary Sewer (Collection & Treatment) Systems have sufficient capacity capable of handling growth. • Master planning in 1970s thru 1990s resulted in capacity based on forecasted demand which is more than sufficient for expected growth thru 2040 • Increasing population offset by declining household consumption due to conservation practices, decreasing household size, and efficient fixtures • Successful implementation of Infiltration & Inflow (I&I) program mitigates need for treatment capacity expansion Condition and function of County’s natural and engineered stormwater systems is driven mostly by existing impervious surfaces and land use. • Impervious surface growth very incremental in nature (<1% annually) relative to existing high levels of impervious areas already in place (45%). • County’s stormwater regulatory programs for land development focus on mitigating some of these incremental impacts. • Also impacts from unregulated activities which fall below regulatory and zoning thresholds. Priority area for future study (e.g., low residential). ~20 MGD of drinking water consumed daily (54%) ~37 million gallons per day (MGD) available drinking water Max Capacity: 40 Million Gallons per day (MGD) ~22 MGD treated (55%) Drinking Water Wastewater Treatment Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Stormwater Stormwater Overview 4 Guiding Principles • Systems adaptation & resiliency • Environmental management & improvement • Risk mitigation Guiding Plans and Commitments • Stormwater Master Plan (2014) • Storm Sewer Capacity Study • County-wide stream assessment • Watershed retrofit assessment • Risk Assessment & Management Plan (2024) • Chesapeake Bay Preservation Plan (2023) • Virginia DEQ MS4 permitting/Chesapeake Bay TMDL • National Flood Insurance Program (NFIP) (FEMA) Stormwater Program Elements Stormwater System • Modeling, assessment, plan reviews • Capacity projects • Local drainage projects • System repairs • Channel maintenance • Routine maintenance Streams & Water Quality • Stream resilience and repair, outfall repair, pond projects, green streets • MS4 permit (regulatory TMDLs), pollution prevention, training and outreach, monitoring • LDA and RPA program implementation • Routine maintenance 5 System Snapshot 6 18,452 structures Includes: 8940 catch basins 6780 manholes 1251 grate inlets 707 yard inlets 774 end sections & end walls 45% of County covered by impervious area 270 miles of pipes 32 miles of streams 243 public SWMFs *included in ‘structures’ total 8,017 private SWMFs SWMF = Storm Water Management Facilities CIP Impacts on the Programs 7 Stormwater Infrastructure  Resiliency across critical government/civic assets  Increased system capacity and reduced flood risk  Improved life-cycle repairs to aged infrastructure  Insurability, market, and property stability  Risk mitigation and management  Cross-leveraging capacity/ capital maintenance projects with water quality benefits Streams & Water Quality  Increased resiliency of stream system and co-located infrastructure  Local water quality protection and improvement  Expansion of green infrastructure in urban spaces to mitigate stormwater and heat impacts  Achievement of MS4 permit and Chesapeake Bay pollution reduction targets  Cross-leveraging water quality projects with capacity benefits Flood Risk Reduction Priority Areas 8 The five Critical Watersheds with the highest flood damage calls since June 2006: • Torreyson Run/Westover • Crossman Run • Little Pimmit East and West • Lubber Run • Spout Run Visit the interactive CIP map on the County’s website Major Projects Completed 9 Ballston Wetland Cardinal School Detention Vault – Construction Four Mile Run Dredging Headwaters of Donaldson Run Tributary B Cardinal School Detention Vault – Complete Capacity Improvements, $242,185 , 73% Streams & Water Quality, $41,205 , 12% Maintenance Capital, $50,865 , 15% Stormwater Programs & Funding Sources ($000s) $334,255 over 10 years Program Totals Stormwater Utility Fee, $42,410 , 13% Interest Income, $2,700 , 1% Bonds, $279,645 , 83% Grants, $9,500 , 3% *Notional grants of $5.75M included within Grants 10 Funding Sources Spout Run Watershed Capacity Columbia Pike/ South Greenbrier St. Torreyson Run Watershed Total budget: $70.0 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Establishment of overland relief pathway to reduce risk of repetitive flooding Total budget: $17.2 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Floodwalls, additional inlets, pipe upgrades, and detention to mitigate repetitive flooding • FY24 Design • FY25 Construction Total budget: $17.7 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Floodwalls, road realignment, pipe upgrades, additional detention to mitigate repetitive flooding FY 2025-2034 CIP – Capacity Infrastructure 11 Voluntary Property Acquisition Program • Some properties are at a higher risk of flooding due to their location in former floodplains (low topography areas) • Program introduced in 2022, letters sent to some property owners – Real Estate Bureau maintains contact with owners • Overall, six properties have been acquired (four in Spout Run, one in Crossman Run and one in Torreyson Run). • Properties will be used for overland relief flow paths, access to existing infrastructure, or space for future infrastructure or stormwater facilities Demolition of 4437 18th St. N Rendering of Overland Relief 12 Land Acquisition Update • 4423 18th St. N. • 4433 18th St. N. • 4437 18th St. N. • 5840 18th St. N. • 4434 19th St. N. • 6415 24th St. N. Six acquisitions to date: 13 Lubber Run Watershed Capacity Crossman Run Watershed Capacity Langston Blvd. Culvert @ N. Sycamore Street Total budget: $70.0 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Establishment of overland relief pathway to reduce risk of repetitive flooding Total budget: $36.6 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Additional inlets, pipe upgrades, and detention to mitigate repetitive flooding Total budget: $0.4 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Pipe upgrades to mitigate repetitive flooding (requires coordination with VDOT) • FY25 Construction FY 2025-2034 CIP – Capacity Infrastructure 14 STORMWATER Project Name Total 10-Year Budget ($000s) Project Description Flood Risk Reduction Program 14,250 Implements the capacity and flood risk reduction project priorities identified in the 2014 Stormwater Master Plan for areas which have experienced repeated flooding. 33rd Street North to Williamsburg Capacity 4,720 Watershed-scale project in the Little Pimmit Run watershed to increase capacity by connecting previously constructed storm drain improvements from the cul-de-sac at 33rd St N to Williamsburg Blvd. Lower Long Branch Flood Risk Reduction Project 3,470 Reduces risk of flooding along Lower Long Branch from South Glebe Road to 26th Street South, including Troy Park. Williamsburg at North Underwood Capacity 3,105 Reduces the hydraulic grade line in Williamsburg Boulevard and increase capacity of the storm drain system to address area flooding. North Thomas Street 2,255 Increases capacity of the storm drain system along North Thomas Street to mitigate flooding during severe storms. Stohman's Run Watershed Capacity Improvements 2,075 Increases capacity of the storm drainage system in Stohman's Run watershed along 39th Street North where there is no overland relief. Miscellaneous Expansion/ Capacity Projects 1,670 Design and construction of pipe extensions needed to address localized drainage problems. Capacity Project Feasibility Studies 1,660 Planning and feasibility studies provide an integrated approach to proper scoping of potential projects. Flood Resiliency Design & Construction Guidelines 150 Addresses both residential and commercial design and construction measures, techniques, policies and mechanisms. Includes active engagement with the public and key stakeholders in real estate, architecture, construction, appraisals and insurance. FY 2025-2034 CIP Capacity Infrastructure 15 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total 1. 33rd Street North to Williamsburg Capacity - 160 1,115 1,175 1,010 1,260 - - - - 4,720 2. Capacity Project Feasibility Studies 150 155 160 165 165 170 170 175 175 175 1,660 3. Columbia Pike at South Greenbrier Street 1,000 1,190 820 8,980 5,200 - - - - - 17,190 4. Crossman Run Watershed Capacity Improvements - 3,420 3,140 1,600 15,425 12,990 - - - - 36,575 5. Flood Resiliency Design & Construction Guidelines 150 - - - - - - - - - 150 6. Flood Risk Reduction Program 1,500 1,590 1,995 2,205 1,070 1,100 1,130 1,190 1,220 1,250 14,250 7. Langston Boulevard Culvert at North Sycamore 440 - - - - - - - - - 440 8. Lower Long Branch Flood Risk Reduction Project - - - - - 645 665 700 720 740 3,470 9. Lubber Run Watershed Capacity Improvements 1,500 3,610 3,075 1,260 6,455 6,560 6,240 14,870 13,385 10,005 66,960 10. Miscellaneous Expansion/ Capacity Projects - 310 - 325 - 335 - 345 - 355 1,670 11. North Thomas Street 255 875 1,125 - - - - - - - 2,255 12. Spout Run Watershed Capacity Improvements 7,900 8,130 8,630 8,340 7,630 7,805 6,920 5,815 4,490 4,305 69,965 13. Stohman's Run Watershed Capacity Improvements 250 515 1,310 - - - - - - - 2,075 14. Torreyson Run Watershed Capacity Improvements 1,725 4,140 4,860 5,340 1,635 - - - - - 17,700 15. Williamsburg at North Underwood Capacity - 155 865 960 1,125 - - - - - 3,105 Total Recommendation 14,870 24,250 27,095 30,350 39,715 30,865 15,125 23,095 19,990 16,830 242,185 Capacity Infrastructure Summary: $242M 16 Dumbarton Culvert - Upstream Dumbarton Culvert - Downstream Military Road Culvert Total budget: $5.09 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Prevents road from being flooded and damaged Related Projects: • Waterline upgrades in Dumbarton St. Total budget: $4 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Prevents road from being flooded and damaged Related Projects: • Water main upgrades in Dumbarton St. Total budget: $3.12 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Prevents road from being flooded and damaged Related Projects: • Gulf Branch stream resiliency FY 2025-2034 CIP – Maintenance Capital 17 Storm Drainage Pipes and Structures Condition of Assets 18 Inspected on a 20-year cycle (5% inspected/year) Approx. 10% of inspected assets scheduled for maintenance 3-5 years of maintenance work currently scheduled Future years will increase rate of scheduled maintenance work STORMWATER Project Name Total 10-Year Budget ($000s) Project Description Stormwater Mains Rehabilitation & Replacement 26,965 Rehabilitation and replacement of existing storm drainage pipes within the system. Manhole & Catch Basin Rehabilitation 2,760 Rehabilitation and replacement of manholes and catch basins that have been damaged or are in need of maintenance. This is completed through lining and/or structural rebuilds when necessary. Stormwater Frames and Covers 2,760 Program funds the required adjustments to stormwater structure frames and covers in conjunction with annual paving operations, raising or lowering a casting or precast top from its existing elevation to align with the adjacent grade, pavement, curb, etc. Terra Cotta/ Corrugated Metal Pipe Upgrades 2,410 Replacement of existing, poor condition terra cotta (TC) and corrugated metal pipe (CMP) with reinforced concrete pipe or other modern pipe materials, which have longer life spans. Detention Vaults & Overland Relief Maintenance 1,100 Underground detention facilities and overland relief paths require continued capital maintenance efforts to ensure they remain effective. Floodplain Channel & Split Stream Maintenance 1,100 Floodplain channels must be maintained in order to ensure efficiency of the existing conveyance system. Four Mile Run Flood Control Project Maintenance 1,005 Routine capital maintenance of the Four Mile Run Flood Control Project area, as required by U.S. Army Corps of Engineers. Sidewalk Underdrains 555 Installs underdrains on sidewalks, which are necessary in some locations to prevent unsafe conditions on sidewalks and reduces hazards to pedestrians. FY 2025-2034 CIP Maintenance Capital 19 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total 1. Detention Vaults & Overland Relief Maintenance 100 105 105 110 110 110 110 115 115 120 1,100 2. Dumbarton Street Culvert- Downstream 3,000 1,545 - - - - - - - - 4,545 3. Dumbarton Street Culvert- Upstream 3,000 1,545 - - - - - - - - 4,545 4. Floodplain Channel & Split Stream Maintenance 100 105 105 110 110 110 110 115 115 120 1,100 5. Four Mile Run Flood Control Project Maintenance 500 50 55 55 55 55 55 60 60 60 1,005 6. Manhole & Catch Basin Rehabilitation 250 260 265 275 275 280 280 290 290 295 2,760 7. Military Road Culvert at Gulf Branch 2,090 1,030 - - - - - - - - 3,120 8. Sidewalk Underdrains 50 50 55 55 55 55 55 60 60 60 555 9. Stormwater Frames and Covers 250 260 265 275 275 280 280 290 290 295 2,760 10. Stormwater Mains Rehabilitation & Replacement 1,000 1,545 2,120 2,455 2,725 3,080 3,250 3,450 3,565 3,775 26,965 11. Terra Cotta/ Corrugated Metal Pipe Upgrades 205 215 225 240 240 250 250 260 260 265 2,410 Total Recommendation 10,545 6,710 3,195 3,575 3,845 4,220 4,390 4,640 4,755 4,990 50,865 Maintenance Capital Summary: $51M 20 • Stormwater Master Plan: 2014 Baseline Stream Condition Assessment • > 6 miles of streams with severe erosion • Approx. 40 stormwater outfalls in failing condition • Erosion and damage continue and create new needs • Since the 2014 Baseline Assessment: • Approx. 1 mile of stream erosion fixed and 13 outfalls • 1 stream project in design; 13 outfall projects in planning/design • Priority outfalls assessed/updated in 2020 to inform CIP programming • Priority stream reaches to be assessed/updated during the next 5 years Condition of Assets – Streams & Water Quality 21 2014 Stream Condition Assessment Erosion severity map Erosion is widely distributed overall, with intensity in steeper terrain in Potomac gorge watersheds. • Completed since 2014 • Completed before 2014 • Gulf Branch in design • Emergency Four Mile Run repair • Four Mile Run tidal restoration project (for reference) Projects • • • • Erosion Severity Better Worse 2014 Stream Condition Assessment Outfall condition map • Most damage also in steeper terrain in Potomac gorge watersheds • 13 completed projects concentrated in this area; most co-located with stream projects • CIP projects will also target other areas of damage (blue arrows) Good condition – No action needed Fair condition – Low priority for repair Poor condition – High priority for repair Donaldson Run Tributary B Sampling of benefits • Repair failed streambanks and adjacent trails • Protect 30” water main serving 20,000 residents • Repair multiple failed outfalls • Protect near stream trees • Plant more native vegetation • Contribute to MS4 permit compliance Gulf Branch Stream Resiliency Concord Mews Watershed Retrofit Upper Long Branch Outfall Total CIP budget: $3.1 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Sanitary and nature center infrastructure protection, environmental improvement • FY25 Final Design • FY26 Construction Total CIP budget: $1.8 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Asset failure rehabilitation, environmental improvement, reduce street flooding • FY24-FY25 Design • FY26 Construction Total CIP budget: $0.8 M Comp Plan or Strategic initiative: Stormwater Master Plan Community benefits: • Infrastructure rehabilitation, erosion mitigation, environmental improvement • FY24-25 Design • FY25-26 Construction FY 2025-2034 CIP – Streams & Water Quality 25 NEW MS4 permit compliance – 2nd permit • On track for 40% reductions required by end of 2nd cycle (FY 2026) • Additional compliance helps mitigate fiscal impact of reaching 100% in 3rd cycle (FY 2028) 26 2nd Permit target 2006-2009 Historical BMPs Septic Conversions Watershed Retrofit LDA Program Stream Restoration Ponds & Wetlands Street Sweeping MS4 permit TMDL (Total Maximum Daily Load) reductions required for: • TSS (Total Suspended Solids) • TP (Total Phosphorus) • TN (Total Nitrogen) MS4 permit compliance – projected 3rd permit • Two CIP projects key to achieving 100% targets for TSS and TP • Sparrow Pond (in construction) • Gulf Branch (90% design) • Additional compliance from outfall repair, pond projects, and LDA program • Credits from Plant required for 100% nitrogen goal Projected new deadline for 100% 27 1st permit target 2nd permit target 3rd permit target ProjectedActual STORMWATER Project Name Total 10-Year Budget ($000s) Project Description Outfall Rehabilitation Program 14,030 Outfall rehabilitation and repair projects are necessary to protect other public and private infrastructure and increase the resiliency of the integrated stream and stormwater network. Stream Resiliency Program 13,810 Repair eroding and acutely degraded stream channels and protect critical infrastructure such as sanitary sewer mains. Green Streets & Infrastructure Program 4,190 Re-construction and enhancement of existing stormwater ponds to improve water quality performance and "green streets" streetscape bioretention. The projects within this program help offset the continued increase in impervious cover in our community. Water Quality Project Feasibility & Concept Design 1,660 Planning and feasibility studies provide an integrated approach to proper scoping of potential projects. Washington Boulevard Pond Retrofit 950 Improves Washington Boulevard Pond, an existing dry detention pond, to enhance performance. Gulf Branch and South Walter Reed Green Streets 750 Four streetscape green infrastructure projects will be installed in the Gulf Branch Watershed downstream of Military Road. Two additional projects will be installed on S. Walter Reed Dr. in coordination with street improvements. Quebec Street Outfall Rehabilitation 450 Rehabilitate the outfall and address slope erosion on Quebec Street adjacent to the Dover Run Pumping Station. Sparrow Pond Watershed Retrofit 450 Re-construction of an existing wet pond due to eroded sediment filling the pond. Re-vegetation will help to restore the pond's function and address concerns about public safety and flood storage. FY 2025-2034 CIP Streams & Water Quality 28 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total 1. Concord Mews Pond Retrofit 250 1,545 - - - - - - - - 1,795 2. Green Streets & Infrastructure Program 375 235 425 435 435 445 445 460 460 475 4,190 3. Gulf Branch and South Walter Reed Green Streets 540 - 210 - - - - - - - 750 4 Gulf Branch Stream Resiliency 800 2,320 - - - - - - - - 3,120 5. Quebec Street Outfall Rehabilitation 450 - - - - - - - - - 450 6. Outfall Rehabilitation Program 925 1,725 1,305 875 1,475 1,510 1,510 1,555 1,555 1,595 14,030 7. Sparrow Pond Watershed Retrofit 450 - - - - - - - - - 450 8. Stream Resiliency Program 250 260 2,915 275 3,000 280 3,080 290 3,165 295 13,810 9. Washington Boulevard Pond Retrofit - 155 795 - - - - - - - 950 10. Water Quality Project Feasibility & Concept Design 150 155 160 165 165 170 170 175 175 175 1,660 Total Recommendation 4,190 6,395 5,810 1,750 5,075 2,405 5,205 2,480 5,355 2,540 41,205 Streams & Water Quality Summary: $41M 29 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total Capacity Improvements 14,870 24,250 27,095 30,350 39,715 30,865 15,125 23,095 19,990 16,830 242,185 Streams & Water Quality 4,190 6,395 5,600 1,750 5,285 2,405 5,205 2,480 5,355 2,540 41,205 Maintenance Capital 10,545 6,710 3,195 3,575 3,845 4,220 4,390 4,640 4,755 4,990 50,865 Sub-Total 29,605 37,355 35,890 35,675 48,845 37,490 24,720 30,215 30,100 24,360 334,255 Implementation Adjustment (20%) (5,920) (7,470) (7,180) (7,135) (9,770) (7,495) (4,945) (6,045) (6,020) (4,875) (66,855) Total Recommendation 23,685 29,885 28,710 28,540 39,075 29,995 19,775 24,170 24,080 19,485 267,400 Program Summary: $267M 30 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total New Funding Federal Funding 3,540 - - 4,000 210 - - - - - 7,750 State Funding - - 1,750 - - - - - - - 1,750 Stormwater Utility Fee Revenue 3,835 3,910 3,435 3,945 3,840 4,500 4,295 4,865 4,615 5,170 42,410 New Bond Issue - 155 23,825 27,480 44,545 32,740 20,175 25,100 25,235 18,940 218,195 Other Funding 450 250 250 250 250 250 250 250 250 250 2,700 Subtotal New Funding 7,825 4,315 29,260 35,675 48,845 37,490 24,720 30,215 30,100 24,360 272,805 Previously Approved Funding Authorized but Unissued Bonds 21,780 33,040 6,630 61,450 Subtotal Previously Approved Funding 21,780 33,040 6,630 61,450 Total Funding Sources 29,605 37,355 35,890 35,675 48,845 37,490 24,720 30,215 30,100 24,360 334,255 Implementation Adjustment (20%) (5,920) (7,470) (7,180) (7,135) (9,770) (7,495) (4,945) (6,045) (6,020) (4,875) (66,855) Total Recommendation 23,685 29,885 28,710 28,540 39,075 29,995 19,775 24,170 24,080 19,485 267,400 Funding Summary 31 November 2024 Bond Referendum is not needed due to existing unissued balances on 2020 & 2022 Bond Referenda 32 Stormwater Utility Rate Regional Comparison (Average Household) In CY 2024, burden shifts from Real Estate Assessment-based stormwater tax to an Impervious Area-based Stormwater Utility Fee. Fee will continue to increase to support the debt service/bonds issued in support of CIP. $- $50 $100 $150 $200 $250 $300 $350 FY2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Adopted Annual cost ($) Fairfax County is the only jurisdiction still assessing a tax rate to fund stormwater. Fairfax City transitioned to a utility in FY2023 Arlington$258 $287 District of Columbia $324 Alexandria $162 Fairfax County Fairfax City $242 $52 PW County $291 Falls Church Transitions from Tax to Utility Fee for CY24 Projected Debt & Rate Impact $- $100 $200 $300 $400 $500 $600 $700 $- $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 Stormwater Rate ($/ERU) Annual Debt Service ($000s) Fiscal Year Projected Future Debt Existing 2021 GO Debt Projected Utility Rate ($/ERU) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 Projected Annual Rate per ERU $258 $271 $311 $356 $389 $445 $494 $529 $556 $577 Projected Annual Debt Service ($000s) 1,905 2,925 4,585 6,090 7,410 9,660 11,290 12,275 13,500 13,505 Debt Coverage Ratio (req. 1.25) 2.41 1.65 1.42 1.44 1.38 1.36 1.38 1.40 1.34 1.38 33 Summary & Conclusion Work in Progress: o Flood Resilient Design and Construction Guidelines o Investment in capital maintenance / systems maintenance (SGR) o Long-term: Need to consider zoning overlays for climate-facing design and construction Challenges: o Timing/ adjacency with voluntary property acquisition program o Public expectations and urgency vs. public tolerance of significant disruption o Space constraints o Lack of easements to access conveyance system o Policy decisions that are integral to design and execution o Impacts of continuing climate change 34 Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Stormwater

Source: Arlington County website. First collected Oct 6, 2026.