RecordWell Data

Utilities Presentation(PDF, 5MB)

Arlington County · Arlington County · meeting of Jun 25, 2024 · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Utilities Utilities Overview 2 Guiding Principles • System resiliency & redundancy • Reinvestment in infrastructure Guiding Plans and Commitments • Water Distribution System Master Plan (2014) • Water Supply Resiliency Report (2023) • Sanitary Sewer Collection System Plan (2024) • Water Pollution Control Plant Solids Master Plan (2018) • Investments at Washington Aqueduct & DC Water’s Blue Plains Advanced Wastewater Treatment Plant Asset Goals for System Renewal 3 525 mi of water mains Target: • Annually replace 1.5-2.0% of non-transmission distribution system Water Distribution • 18% (94 miles) new mains installed since 2000 • 13% (69 miles) cleaned & lined Water Assets by Age 4 *Targeted replacement schedule of 1.6% of the small diameter system per year Nearly half of the distribution system is 75+ years old Concrete, 3.5% Unknown, 2% Other & plastic, 0.50% Cast Iron, 60% Ductile Iron, 34% Water Mains by Material 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% Over 90 years old 75 to 89 years old 50 to 74 years old 25 to 49 years old Less than 25 years old % of System Small Diameter (< 12") Water Main Age Asset Goals for System Renewal 5 459 mi of sanitary sewer Target: • All programs combined target 3% reline / rehab system annually Sanitary Sewer System • 71% eligible small diameter has been relined • 112 miles will be relined during the next 10 years. Distribution of CIP Investments 6 Washington Aqueduct Blue Plains Advanced WWTP Finished water reliability & interconnects Visit the interactive CIP map on the County’s website Projects are guided by system plans: • Maintaining and upgrading system assets across the County to ensure operability and resilience of the water systems, sanitary sewer collection and treatment systems. • Important for public health for citizens and businesses. Completed Project Highlights 7 33" Spout Run Deep Sewer Relining and Rehabilitation 12” water main under N. Rhodes/ Queen St Bridge over Route 50 in Fort Myer Heights Preliminary Treatment Building Bar Screens/Odor Control Upgrades Fund Balance $27,980 3% Utilities PAYG $164,050 19% Bonds $523,700 59% Developer Fees $104,095 12% Other Funding $60,060 7% Utilities CIP Programs & Funding Sources ($000s) $880M over 10 years Program Totals Funding Sources W-S Maintenance Capital $388,020 44% Water Distribution $168,980 19% Sanitary Sewer Improvements $3,435 1% Plant Capital Sustainment $319,450 36% 8 FY 2025-2034 CIP – W-S Maintenance Capital Water Main Replacements Program Washington Aqueduct Capital Sewer Manhole Rehabilitation Total budget: $78.8M Comp Plan or Strategic initiative: Water Distribution Master Plan Community benefits: • Service reliability • Non-revenue water loss reduction • Improved water quality Related Projects: • Water Main Cleaning & Lining Total budget: $145.8M Comp Plan or Strategic initiative: Water Resiliency and Redundancy Community benefits: • Public health necessity to provide clean drinking water. Related Projects: • Finished Water Reliability & Interconnections • Regional Source Water Resiliency Total budget: $11.2M Comp Plan or Strategic initiative: Sanitary Sewer Collection System Plan Community benefits: • Reduction of inflow & infiltration • Restore structural integrity • Extend service life by 50 years Related Projects: • Sewer - Infiltration/Inflow • Large Diameter Sewer Rehabilitation 9 Sewer - Large Diameter Main Rehabilitation Federal Grants Projects for Large Diameter Sewer Comprehensive Plan Goal: Maintenance of sewage collection system 10 Technology Enhancements: Advanced Metering Infrastructure (AMI) Pilot 11 Total budget: $12.9M FY24 – FY26 Pilot Program • Initially pilot 100 commercial and residential accounts • If successful, move to transitioning ~3,400 commercial and multi- family accounts (comprises 75% of County’s water consumption) Transition Residential over 4 years: FY28 – FY31 Multi-year program to transition the County from Automated Meter Reading to AMI • Real-time monitoring and reporting of water usage • Ability to proactively detect leaks • Water loss reduction • Reduced carbon footprint by reducing vehicle miles traveled (VMT) Benefits WATER & SEWER Project Name Total 10-Year Budget ($000s) Project Description Water-Main Cleaning and Lining Program 17,850 Rehabilitates small diameter (8-inch and below) pre-1960s cast iron water mains to restore flow capacity and improve water quality. In conjunction with the water main replacement program, this project will improve the overall condition of the County's water main assets. Water-Large Diameter Main & Valve Rehabilitation 11,155 Rehabilitates large diameter (20-36-inch) water mains that are over 50 years old, as well as the rehabilitation or replacement of 16-inch or larger valves and pressure regulating valves. Water-Tank Rehabilitation 3,705 Water tanks are inspected every five years. Painting and other maintenance work are programmed accordingly based on results. Water-Small Diameter Valve Rehabilitation & Replacements 3,335 Rehabilitates and/or replaces small diameter water valves throughout the County, as identified through the Valve Inspection and Exercise Program. Water-Large Meter Vault Rehabilitation & Replacements 2,230 Ensures that large commercial meters, responsible for about 75% of the system’s revenue, are kept in good working condition. Large meter vault inspections and condition assessments are being conducted in conjunction with the large meter replacements to identify vaults requiring rehabilitation or replacement. Water-Pump Station Rehabilitation 565 Maintenance capital and rehabilitation of various water pump stations throughout the County to keep the equipment and facilities properly functioning. FY 2025-2034 CIP – W-S Maintenance Capital 12 WATER & SEWER Project Name Total 10-Year Budget ($000s) Project Description Sewer-Main Replacement Program 31,950 Replaces smaller diameter sewer mains when lining sewer mains is not viable or recommended. Sewer-Infiltration & Inflow 27,500 Rehabilitates the small diameter (less than 15-inch) sanitary sewer system to eliminate infiltration and inflow, the intrusion of rain, ground, or surface water into the County's sanitary sewer system. Sewer-Force Mains 3,615 Rehabilitates and/or replaces the County's force main systems, which are necessary to convey sewage for much of the northern third of the County, which are at a lower elevation than the rest of the County. Trades Center Equipment & Improvements 1,035 Funding is related to relocating staff at the Trades Center from trailers that are beyond their useful life to permanent facilities. Water Sewer Frames & Covers 11,155 Involves adjusting the elevation of water valve or manhole frames, either by raising or lowering, to align with the adjacent grade, pavement, curb, etc. in conjunction with the annual street paving program. FY 2025-2034 CIP – W-S Maintenance Capital 13 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total 1. Sewer-Infiltration & Inflow $3,000 $3,105 $3,210 $3,315 $3,315 $3,420 $3,420 $3,525 $585 $605 $27,500 2. Sewer-Large Diameter Main Rehabilitation 2,780 2,185 4,140 2,550 3,090 2,340 100 4,220 1,040 2,050 24,495 3. Water-Large Diameter Main & Valve Rehabilitation 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 4. Water-Large Meter Vault Rehabilitation & Replacements 200 205 215 220 220 230 230 235 235 240 2,230 5. Manhole Rehabilitation 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 6. Water-Pump Station Rehabilitation - 105 - 110 - 115 - 115 - 120 565 7. Sewer-Force Mains 2,100 155 160 165 165 170 170 175 175 180 3,615 8. Sewer-Main Replacement Program 2,000 2,590 3,210 3,315 3,315 3,420 3,420 3,525 3,525 3,630 31,950 9. Water-Small Diameter Valve Rehabilitation & Replacements 300 310 320 330 330 340 340 350 350 365 3,335 10. Technology Enhancements 725 1,365 60 2,630 2,735 2,935 3,050 65 65 65 13,695 11. Trades Center Equipment & Improvements - 1,035 - - - - - - - - 1,035 12. Washington Aqueduct Capital 7,800 8,075 8,345 8,620 8,620 8,890 8,890 67,915 9,165 9,440 145,760 13. Water-Main Cleaning and Lining Program 1,600 1,655 1,710 1,770 1,770 1,825 1,825 1,880 1,880 1,935 17,850 14. Water-Main Replacement Program 7,000 6,725 6,955 7,180 7,735 7,980 8,550 8,810 8,810 9,075 78,820 15. Water/Sewer Frames/Covers 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155 16. Water-Tank Rehabilitation 100 - 105 2,320 830 115 - 115 - 120 3,705 Total Proposed $30,605 $30,615 $31,640 $35,840 $35,440 $35,200 $33,415 $94,455 $29,355 $31,455 $388,020 W-S Maintenance Capital Summary: $388M 14 Water Pump Station Improvements Finished Water Reliability & Interconnections Regional Source Water Resiliency Total budget: $3.8M Comp Plan or Strategic initiative: Water Resiliency and Redundancy Community benefits: • Redundancy • Reliability during power outages Related Projects: • Lee PS MCC & Generator • Ethan Allen Generator • Minor Hill Generator Total budget: $94.8M Comp Plan or Strategic initiative: Water Supply Resiliency Report Community benefits: • Resiliency and redundancy • Ensures availability of drinking water during emergencies • FY23-FY27 Planning & Design • FY28-FY31 Construction • Formerly called “Source Water Reliability & Interconnections” Total budget: $60.5M Comp Plan or Strategic initiative: Potomac Secondary Source Feasibility Study Community benefits: • Regional effort for off-river storage, including federal funding • Mitigates severe water shortages due to environmental impacts and/or source contamination • Placeholder funding in FY34 • Formerly called “New River Crossing” FY 2025-2034 CIP – Water Distribution 15 RENAMED RENAMED WATER & SEWER Project Name Total 10-Year Budget ($000s) Project Description Water-Improvements for Development 5,570 This program addresses opportunities to enhance the water distribution system in conjunction with nearby developments, focusing on improving water quality, redundancy, and transmission capacity. Projects include water main looping, work to abandon existing mains and the completion of loops in prior developments. Transmission Mains Resiliency 4,205 This program provides redundant water mains to back up existing transmission capacity. FY 2025-2034 CIP – Water Distribution Projects 16 RENAMED FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total 1. Finished Water Reliability & Interconnections $500 $2,070 $2,140 $11,050 $22,100 $22,800 $34,200 - - - $94,860 2. Water-Improvements for Development 500 520 535 550 550 570 570 585 585 605 5,570 3. Water-Pump Station Improvements 2,250 110 265 830 - 125 - 130 - 135 3,845 4. Regional Source Water Resiliency - - - - - - - - - 60,500 60,500 5. Transmission Mains Resiliency 150 310 3,745 - - - - - - - 4,205 Total Proposed $3,400 $3,010 $6,685 $12,430 $22,650 $23,495 $34,770 $715 $585 $61,240 $168,980 Water Distribution Summary: $169M 17 RENAMED RENAMED RENAMED Sanitary Sewer Improvements Summary: $3.4M Sewer - Improvements for Development Program • Provides funding for small segments of new sewer main installation and other work directly associated with development. • Provides for extension of sewer improvements along the remainder of a block where the developer is only responsible for work immediately on the frontage of the site. • FY 2025 includes funding for new sewer main on North Lexington Street from 9th Street North to Wilson Boulevard. ($000s) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total Improvements for Development $900 $260 $265 $275 $275 $285 $285 $295 $295 $300 $3,435 18 Activated Sludge Effluent Pump Station #1 (ASE1) Asset Management System Replacement Maintenance Capital – Fiberglass Reinforced Plastic Tank Replacement Total budget: $11.7M Community benefits: • More efficient pumping infrastructure to handle a wide range of flows at the WPCP • FY25 Condition Assessment • FY26 Design • FY27-FY29 Construction Total budget: $2.3M Community benefits: • Current software dates to 1990s and does not have modern functionality • New software will help more proactively maintain the WPCP’s assets in a state of good repair • FY24-FY26 Implementation Total budget: $3.3M Community benefits: • Replaces five failing chemical storage tanks • Increased efficiency of chemical usage for wastewater treatment • Additional tank replacements are planned for future years FY 2025-2034 CIP – WPCP Capital Sustainment 19 NEW Re-Gen: Phases 2 & 3 • Significant investment and long-term sustainability in the Plant handling processes • Addresses potential future regulatory changes while reducing community impacts • Contract with Design-Build team executed in early 2024. • Full design begins Summer 2024 • Guaranteed Maximum Price (GMP) approval for construction expected to be presented to the Board in late 2025 • External stakeholder engagement to inform the community and gather feedback 20 Total budget: $226.0M Estimated Completion: End of CY 2029 Comp Plan or Strategic Initiative: Solids Master Plan Sustainability & Community Benefits Increase energy & operational efficiency of all buildings Increase local energy supply and distribution efficiency in Arlington using District Energy Increase locally generated energy supply through use of renewable energy options Refine and expand transportation infrastructure and operations enhancements Integrate CEP goals into all County activities Advocate and support personal action through behavior change and effective education Energy positive Less truck traffic Less chemical usage Lime deliveries eliminated Less fossil fuel Offsets 81,000 MMBtu per year Fewer greenhouse gas emissions 4,290 metric tons per year reduced Re-Gen Supports 4 of the 6 Arlington Community Energy Plan Goals: Stakeholder Tour 2022 Outreach at Rock-N- Recycle 2023 21 More resilient infrastructureBiosolids hauling cut in half35% more energy produced than consumed WATER & SEWER Project Name Total 10-Year Budget ($000s) Project Description WPCP Maintenance Capital 22,310 Funding covers a wide variety of one-to-one capital replacements and capital maintenance associated with the Water Pollution Control Plant's assets, including items such as HVAC overhauls, major equipment rehabilitation or replacements, and capital repairs to process structures such as tanks or pipes. Includes Improvements to Eads St Property Blue Plains Capital Improvements 19,155 DC Water's Blue Plains Advanced Wastewater Treatment Plant processes a portion of Arlington County's sewage after transmission through Fairfax County mains. Secondary Clarifiers 18,210 Rehabilitation and/or replacement of three secondary clarifiers will restore the tanks to full working condition. WPCP Technology Enhancements 10,120 This program includes a comprehensive suite of projects to address needed upgrades to the WPCP's Process Control System (PCS) and associated technology infrastructure. USACE Coastal Storm Resiliency 5,900 The project will study a potential floodwall that would be constructed along the northern bank of Four Mile Run between the Four Mile Run bike trail and the WPCP. Grit System Upgrades 2,705 This project will evaluate and rehabilitate/ improve the grit collection and disposal system in the Preliminary Treatment Building to improve removal of the abrasive material and protect downstream equipment. Formerly called Primary Clarifier Upgrades Odor Control 1,100 Due to the location of the WPCP, it is necessary to tightly control and limit odors by collecting and treating odorous air. FY 2025-2034 CIP WPCP Capital Sustainment 22 NEW NEW ($000s) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total 1. Activated Sludge Effluent Pump Station #1 $800 $1,550 $2,675 $4,970 $1,655 - - - - - $11,650 2. Asset Management System Replacement 1,000 1,035 265 - - - - - - - 2,300 3. Blue Plains Capital Improvements 1,210 1,705 1,825 2,775 3,010 2,605 2,130 1,455 885 1,555 19,155 4. Grit System Upgrades 300 595 1,175 635 - - - - - - 2,705 5. Improvements to Eads St Property - 10 - 10 - 10 - 10 - 10 50 6. Odor Control - - - 550 550 - - - - - 1,100 7. Re-Gen Phase II 10,600 4,865 - - - - - - - - 15,465 8. Re-Gen Phase III 17,200 58,030 62,925 50,575 21,755 - - -- - - 210,485 9. Secondary Clarifiers - - - - - - 1,140 5,170 7,755 4,145 18,210 10. USACE Coastal Storm Resiliency 200 - - - - - 5,700 - - - 5,900 11. WPCP Maintenance Capital 2,000 2,070 2,140 2,210 2,210 2,280 2,280 2,350 2,350 2,420 22,310 12. WPCP Technology Enhancements 3,500 2,070 535 550 550 570 570 585 585 605 10,120 Total Proposed $36,810 $71,930 $71,540 $62,275 $29,730 $5,465 $11,820 $9,570 $11,575 $8,735 $319,450 WPCP Capital Sustainment Summary: $319.5M 23 NEW NEW NEW ($000s) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total Water-Sewer Maintenance 30,605 30,615 31,640 35,840 35,440 35,200 33,415 94,455 29,355 31,455 388,020 Sanitary Sewer Improvements 900 260 265 275 275 285 285 295 295 300 3,435 Water Distribution 3,400 3,010 6,685 12,430 22,650 23,495 34,770 715 585 61,240 168,980 Water Pollution Control Plant 36,810 71,930 71,540 62,275 29,730 5,465 11,820 9,570 11,575 8,735 319,450 Sub-Total 71,715 105,815 110,130 110,820 88,095 64,445 80,290 105,035 41,810 101,730 879,885 Implementation Adjustment (20%) (14,340) (21,160) (22,030) (22,160) (17,620) (12,890) (16,060) (21,010) (8,360) (20,350) (175,980) Total Recommendation 57,375 84,655 88,100 88,660 70,475 51,555 64,230 84,025 33,450 81,380 703,905 Utilities Program Summary: $703.9M 24 ($000s) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total New Funding Developer Contributions 7,900 9,385 9,665 10,270 10,265 10,875 10,875 11,420 11,415 12,025 104,095 PAYG 7,993 13,202 19,470 18,050 22,355 19,790 19,930 16,365 12,830 14,065 164,050 New Bond Issue 3,400 10,820 17,665 33,795 50,545 32,890 48,535 74,355 15,550 73,785 361,340 Other Funding 9,040 13,050 13,495 10,940 4,930 890 2,050 1,795 2,225 1,645 60,060 Subtotal New Funding 28,333 46,457 60,295 73,055 88,095 64,445 81,390 103,935 42,020 101,520 689,545 Previously Approved Funding Authorized but Unissued Bonds 23,640 52,205 52,225 34,290 - - - - - - 162,360 Issued but Unspent Bonds - - - - - - - - - - - Other Previously Approved Funds 20,242 7,738 - - - - - - - - 27,980 Subtotal Previously Approved Funding 43,882 59,943 52,225 34,290 - - - - - - 190,340 Total Funding Sources 72,215 106,400 112,520 107,345 88,095 64,445 81,390 103,935 42,020 101,520 879,885 Implementation Adjustment (20%) (14,340) (21,160) (22,030) (22,160) (17,620) (12,890) (16,060) (21,010) (8,360) (20,350) (175,980) Total Recommendation 57,875 85,240 90,490 85,185 70,475 51,555 65,330 82,925 33,660 81,170 $703,905 Program Summary 25 - 5,000 10,000 15,000 20,000 25,000 30,000 35,000 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 Debt Service ($000s) Fiscal Year Existing GO Debt New Sewer Debt New Water Debt Existing VRA Debt 26 Projected Utilities Fund Annual Debt Service Utilities Rate 6-Year Forecast FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 W-S Projected Rate Increase from prior year* 4.8% ~5.5% 2-4% 2-4% 2-4% 2-4% Annual increase to average homeowner using 48 Thousand Gallons (TG) $38 ~$45 $20-40 $20-40 $20-40 $20-40 27 * Rates are annually adopted by the County Board during the operating budget process. These are notional projections based on current economic conditions. Rate drivers include water consumption/ sales, personnel costs, chemicals, electricity, direct/ indirect/ overhead service charges, infrastructure investments, and alignment with financial policies. Bond Referenda ($000s) Funding Source FY 2024 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Total Nov 2022 Approved Referendum* $13,850 24,788 50,439 48,812 37,989 1,482 177,360 Nov 2024 Referendum (Proposed)** --- 3,400 10,820 14,220 Total Planned Debt*** 13,850 28,188 61,259 48,812 37,898 1,482 $191,580 * Aligns uses according to November 2022 bond referenda ($149.5M Re-Gen, $17.9M water (including Aqueduct)) ** Dependent upon Aqueduct federal borrowing authority implementation & timing. Unknown if will be available starting in FY 2025. *** Excludes Implementation adjustment 28 2024 Utilities Bond Referendum ($000s) Utilities CIP Category Projects/ Programs Amount W-S Maintenance Capital Washington Aqueduct, Water Main Replacements $12,430 Water Distribution Finished Water Reliability & Improvements 505 WPCP Capital Sustainment Activated Sludge Effluent Pump Station #1 (ASE1) 1,285 29 Total 2024 Proposed Bond Referendum = $14,220 Summary & Conclusion Utilities’ CIP requests align with Manager’s priorities: • Environmental & Resiliency goals • Maintaining State of Good Repair (SGR) • Regional Commitments • Sustainable funding aligned with financial policies Challenges: • Regulatory changes • Pricing and supply chain volatility • Extended delivery times • Schedule impacts due to skilled labor shortages • Resources to add new assets, as well as maintain aging assets while operating current systems 30 Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Utilities

Source: Arlington County website. First collected Oct 6, 2026.