Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Department of Parks and Recreation Overview: Department of Parks and Recreation  Continuation of existing projects and commitments.  Keeping up with program replacement cycles (State of Good Repair).  Adherence to Public Spaces Master Plan.  Equity of distribution of projects. Major near-term projects in DPR’s proposed 2025 – 2034 CIP: • Arlington Boathouse • Crystal City Parks and Public Space • Drew Park • Kenmore Field Conversion • Rosslyn Gateway Park • Three Urban Parks Condition of Assets 147 Parks totaling 942 acres; 126 acres of Natural Resource Conservation areas 82 Playgrounds and 6 Spray Playgrounds 76 Basketball Courts and 12 Half Courts 90 Tennis Courts, 11 Pickleball Multi-Use Courts and 5 Practice Courts 54 Rectangular Athletic Fields -- 15 Lighted, 15 synthetic 43 Diamond Athletic Fields -- 19 Lighted, 2 synthetic 19 Combination Athletic Fields -- 3 Lighted 7 Community Gardens 48 Picnic Shelters 9 Dog Parks 55 Miles of Multi-use Trails (35 paved / 20 natural) 70 Bridges and Low-Water Fords 25 Restroom Structures Picnic Tables, Benches, Grills, Kiosks, Drinking Fountains, Park Signs, Fences 250k+ trees in parks, 69% canopy cover (as of 2016 study) Amphitheater, Skate Park, Other Amenities Condition of Assets Asset Tool Refresh: Assessment of all parks completed fall 2023. Synthetic Fields: Field conditions and GMAX impact testing ratings assessed on an on-going basis. Trails: Pavement Condition Index (PCI) assessment performed every 4-5 years; last completed in 2022. Bridges: Inventory condition assessment updates completed in 2023. Parks and Playgrounds Synthetic Fields Multi-Use Trails Pedestrian Bridges • $39.8M invested through Maintenance Capital and Parks Master Plan programs from FY 2020 – FY 2024. • 20+ year life cycle. • 30 new or fully renovated parks in the last 15 years. • Implemented an Equity Factor to use in Selection of Park Projects for CIP funding. • $8.9M invested in eight Synthetic Field Replacements and one Conversion Project from FY 2020 – FY 2024. • 8-year life cycle is typical. • Conversion of Kenmore Middle School field included in 10-Ye a r C I P. • $6.4M invested in the Trail and Bridge Program from FY 2020 – FY 2024. • 20+ year life cycle. • Trail pavement condition assessment to be completed every four years. Next assessment planned for 2026. • 4.62 miles of trails replaced since 2022 trail pavement condition assessment. • Incorporated into program in FY 2021. • Three bridges replaced since 2019. • S. Nelson Street bridge repainted and decking boards replaced in 2024. • 50+ year life cycle. Condition of Assets Program Funding Summary 19% 59% 11% 7% 4% By Program Parks Maintenance Capital ($59.065M) Parks Master Plans ($181.565M) Synthetic Field Program ($34.065M) Trail and Bridge Modernization Program ($20.25M) Land Acquisition ($13.805M) 64%11% 7% 5%5% 4% 4% By Source New Bond Issue ($197.42M) Developer Contribution ($34.605M) PAYG ($21.345M) Short Term Finance ($16.558M) Other Funding ($13.952M) Tax Increment Financing (TIF) ($13.57M) Previously Approved Funding ($11.3M) Program Accomplishments Towers Park Tuckahoe Playground Surfacing Marcey Road Park Fort Scott Park Alcova Heights Park Madison Manor Park Program Accomplishments Washington-Liberty High School Barcroft Park Wakefield High School Gunston “Bubble” Rocky Run Park Mapping Program Investments Visit New Interactive Map • Wide geographic distribution of DPR projects. • Used in conjunction with DPR Park Condition and Equity Assessment. • Park Condition and Equity Assessment will influence yearly symmetry of geographic distribution. Doctors Run Park Arlington Hall West Park Pooled Park Projects Total budget: $2,080,000 (Bond) Parks Maintenance Capital (FY25) Construction funds for the replacement of the children's playground and stone dust volleyball court, site circulation, site furnishings, landscaping and stormwater management improvements. (This follows design funded in FY24) Total budget: $2,450,000 (PAYG & Existing Balances) Parks Maintenance Capital (FY25/FY26) Design and construction for the replacement of the children's playground, site circulation, site furnishings, landscaping and stormwater management improvements. Total budget: $800,000 (PAYG) Parks Maintenance Capital (FY25) Improvements to be made at multiple parks for work that is too big for operational maintenance but too small to warrant a single unique Maintenance Capital project. FY 2025-2034 CIP Project Slides Bon Air Picnic Shelter & Playground Cherrydale Park Playground Douglas Park, Phase 2 Total budget: $1,900,000 (Bond) Parks Maintenance Capital (FY26) Design and construction for the replacement of the picnic shelter and playground at the rear of the park. Total budget: $3,822,000 (PAYG & Bond) Parks Maintenance Capital (FY26/FY27) Design and construction for the replacement of the playground, retaining walls, site access, site circulation, site furnishings, landscaping and stormwater management improvements. Total budget: $2,948,000 (PAYG & Bond) Parks Maintenance Capital (FY26/FY27) Design and construction for the replacement of the playground, one pedestrian bridge, earthwork, site circulation, site furnishings, landscaping and storm water management facilities. FY 2025-2034 CIP Project Slides Crystal City Parks and Public Spaces - Metro Market Square Crystal City Parks and Public Spaces - Center Park Crystal City Parks and Public Spaces - 15th Street Park Total budget: $9,065,000 (TIF & Developer) Master Plan (FY25-FY27) Located on 18th Street South and Crystal Drive at the site of the future Metro station east entrance. The Square will be a retail-oriented, flexible urban public space. Total budget: $7,890,000 (TIF & Developer) Master Plan (FY26-FY28) Center Park is proposed to be a new, two-acre centrally located park, programmed for casual and social uses, such as exhibitions, concerts and festivals and as the principal gathering space for the community. Total budget: $5,980,000 (TIF) Master Plan (FY28-FY30) This is proposed to be a garden park. In addition, the Crystal City Sector Plan identifies opportunities for paved walkways and seating areas with benches providing neighborhood residents and workers a quiet place to relax. FY 2025-2034 CIP Project Slides Gateway Park Three Urban Parks Drew Park Total budget: $31,085,000 (Bond & outside funds) Master Plan (FY25-FY27) This park will serve as a prominent gateway into the County. The goal of the renovation to this park will create a flexible place to accommodate a variety of park uses that enhance the overall park experience for Rosslyn's growing population. Total budget: $8,055,000 (Bond) Master Plan (FY26) Maury Park, Herselle Milliken Park and Gum Ball Park are three small parks located in the Virginia Square Planning Area and in the Ashton Heights Civic Association. This funding is for construction for these parks (design funded in FY24). Total budget: $2,240,000 (Bond & PAYG) Master Plan (FY26-FY28) Over the last 15 years, the County acquired several parcels adjacent to this site. This CIP includes developing a final park master plan, final site design and construction of the new park. FY 2025-2034 CIP Project Slides New Park at 26th & Old Dominion Arlington Boathouse Kenmore Middle School Field Total budget: $4,855,000 (Bond) Master Plan (FY28-FY30) This project includes master plan, design and construction of an approximately one-acre park County owned land. The site has potential for active and passive recreation activities. Total budget: $28,080,000 (Bond & outside funds) Master Plan (FY28, FY34) The CIP includes funding for the design and construction phases of the upper and lower sites to satisfy the terms of the executed Programmatic Agreement signed in 2019. Total budget: $9,842,000 (Bond, APS & outside funding) Synthetic Turf Program (FY25) This project is for the conversion from grass to synthetic turf at Kenmore Middle School. (Outside fundraising efforts estimated at $2m, with the balance of the cost shared between Arlington Public Schools at 30% and DPR at 70%) FY 2025-2034 CIP Project Slides PARKS & RECREATION – PARKS MASTER PLANS (Out-Year Projects) Project Name Total Budget Comp Plan or Strategic Initiative Project Description Quincy Park $38,420,000 (Bond & Outside Funds) Master Plan FY30-FY34 Master planning and design for replacement of diamond and rectangular fields, tennis and basketball courts, and picnic shelter. Inclusion of a new parking solutions may also be considered. Penrose Square, Phase 2 $4,760,000 (Bond) Master Plan FY31,FY34 Implementation of Phase 2 of the Penrose Square Park Master Plan, to extend the features from the previous phase into the western portion of the public square. Short Bridge Park $5,690,000 (Bond) Master Plan FY31 Construction which will include an interpretive plaza, playground, dog run, overlook, casual use lawn area, walkways, public art, site furnishings, and significant landscaping and stormwater management facilities. Shirlington Park $5,345,000 (Bond) Master Plan FY32-FY33 Enhancement of primary park entry points and existing pedestrian bridge, creation of natural pathways along stream edge, plaza areas, storm water improvements, etc. Fairfax Drive Public Spaces $13,985,000 (Bond) Master Plan FY32-FY34 Create a more flexible, pedestrian-oriented urban park that will enhance the physical character and utility of this area. Langston Boulevard Public Space $2,020,000 (Bond) Master Plan FY34 Planning, design and construction of currently unspecified future public space(s) project on Langston Boulevard. Virginia Highlands & Nearby Public Spaces $1,485,000 (Bond) Master Plan FY34 Develop park master plans for three sites located in the Pentagon City area, including the existing Virginia Highlands Park, a new park at 20th St. S. and S. Ives St. and a new parcel at the former Dominion Substation site. FY 2025-2034 CIP Project Slides PARKS & RECREATION – PARKS MASTER PLAN PROGRAMS Project Name Total Budget Comp Plan or Strategic Initiative Project Description Emerging Uses Program $5,035,000 (Bond) Master Plan FY25-FY34 • Allows DPR to respond to emerging recreational and casual use activities in parks and recreation. • The need to accommodate new trends in recreation, such as pickleball, mountain biking, skateboarding, and others, is rooted in recommendations within the 2019 Public Spaces Master Plan (PSMP). Natural Resiliency Program $5,555,000 (Bond) Master Plan FY25-FY34 • Allows DPR to study and implement projects that manage stormwater and preserve and expand Arlington's natural capital. • Projects in this program could also provide recreational opportunities and amenities in concert with addressing or creating flood capacity. Parks Athletic Courts Program $2,020,000 (Bond) Master Plan FY25-FY34 • New program to allow DPR to maintain existing and expand its sports courts, such as tennis, pickleball, futsal, and others. • This program will go into effect after the Public Spaces Master Plan (PSMP) update that is proposed for FY2025. FY 2025-2034 CIP Project Slides PARKS & RECREATION ADDITIONAL CAPITAL PROGRAMS Project Name Total Budget Comp Plan or Strategic Initiative Project Description Trail & Pedestrian Bridge Work $20,250,000 (Bond & existing balances) Trail & Bridge Modernization Program (FY25-FY34) • Annual replacement of pedestrian trail segments. • Conducting an update to trail pavement condition assessment. • Replaces an average of two pedestrian bridges annually until FY 2031. Synthetic Turf Replacements $21,199,000 (Short-Term Finance and Outside Funds) Synthetic Turf Program (FY27-FY34) • Allows for on-cycle replacement of the County’s inventory of 17 synthetic fields (15 rectangle / 2 diamond) • 8 to 10-year useful life cycle • Replacements at Greenbrier/Yorktown, Thomas Jefferson, and Long Bridge identified in annual capital budget process for FY25 and FY26. • Funds for conversion of fields at Kenmore in FY25 Land Acquisition $13,805,000 (Bond) Land Acquisition Program (FY25-FY34) • Allows for strategic acquisition of real property for parks and public spaces as opportunities arise. • PSMP recommends 30 acres of new public space be added by 2029. FY 2025-2034 CIP Project Slides PARKS & RECREATION – SYNTHETIC TURF PROGRAM REPLACEMENT SCHEDULE FY 2025-2034 CIP Project Slides SYNTHETIC ATHLETIC FIELDS Year of Last Replacement FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034 1 Long Bridge Park #1 2019 1,270,000 2 Long Bridge Park #4 2019 1,067,000 3 Gunston Park Community Field 2020 1,185,000 4 Barcroft Park Baseball Field #6 2019 1,947,000 5 Gunston Park Diamond Field 2019 1,105,000 6 Virginia Highlands Park Community Field 2021 989,000 7 Thomas Jefferson Park Upper Field 2022 1,006,000 8 Barcroft Park Community Field 2022 626,000 9 Rocky Run Park Community Field 2022 343,000 10 Gunston Park Bubble 2023 379,000 11 Wakefield High School Stadium 2023 1,255,000 12 Washington-Liberty High School Stadium 2024 1,505,000 13 Williamsburg Middle School #1 2024 1,162,000 14 Williamsburg Middle School #2 2024 950,000 15 Greenbrier Park Stadium 2016 1,164,000 1,485,000 16 Thomas Jefferson Park Lower Field 2017 819,000 1,045,000 17/18 Kenmore Middle School #1/#2 (Conversion) 2025 9,842,000 2,180,000 19 Long Bridge Park #3 2018 1,041,000 1,322,000 20 Rosslyn Highlands Park + EST-2025 378,000 Total Costs 11,825,000 1,041,000 2,337,000 3,132,000 2,094,000 1,975,000 1,634,000 3,617,000 4,710,000 1,700,000 PARKS & RECREATION – TRAIL AND BRIDGE PROGRAM REPLACEMENT SCHEDULE FY 2025-2034 CIP Project Slides TRAIL AND BRIDGE PROJECTS FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034 Bridge Design Douglas Park #1 Glencarlyn Park Douglas Park #2 Douglas Park #3 Upper Pimmit Run Park --- Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridge Construction --- Rock Spring Park #1 Rock Spring Park #2 Rock Spring Park #3 Alcova Heights Park Bluemont Park #1 Bluemont Park #2 Douglas Park #1 Glencarlyn Park Douglas Park #2 Douglas Park #3 Upper Pimmit Run Park Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridges Selected Based on FY 2027 Assessment Bridge/Ford Repair Bon Air Park Lubber Run Park Glencarlyn Park Projects Selected Based on FY 2027 Assessment Projects Selected Based on FY 2027 Assessment Projects Selected Based on FY 2027 Assessment Projects Selected Based on FY 2027 Assessment Projects Selected Based on FY 2027 Assessment Projects Selected Based on FY 2027 Assessment Projects Selected Based on FY 2027 Assessment Low-Water Ford Design --- Glencarlyn Park #1 Glencarlyn Park #2 Glencarlyn Park #3 Glencarlyn Park #4 Gulf Branch Fords Selected Based on FY 2027 Assessment Fords Selected Based on FY 2027 Assessment Fords Selected Based on FY 2027 Assessment Fords Selected Based on FY 2027 Assessment Low-Water Ford Construction --- Barcroft Park --- Glencarlyn Park #1 Glencarlyn Park #2 Glencarlyn Park #3 Glencarlyn Park #4 Fords Selected Based on FY 2027 Assessment Fords Selected Based on FY 2027 Assessment Fords Selected Based on FY 2027 Assessment Trail Milling and Paving Lower Four Mile Run Trail + Four Mile Run Trail segments in Glencarlyn Park + Bluemont Park segments + Lubber Run Trail Four Mile Run Trail in Barcroft Park + Virginia Highlands Park Trail + Fillmore Trail Custis Trail segments + Barcroft Park Trail or as determined by FY2027 trail pavement condition assessment Custis Trail segments + Arlington Blvd. Trail segments or as determined by FY2027 trail pavement condition assessment Custis Trail segments + Washington Blvd. Trail or as determined by FY2027 trail pavement condition assessment To be determined by FY2027 trail pavement condition assessment To be determined by FY2031 trail pavement condition assessment To be determined by FY2031 trail pavement condition assessment To be determined by FY2031 trail pavement condition assessment To be determined by FY2031 trail pavement condition assessment Trail Pavement Condition Assessment --- --- X --- --- --- X --- --- --- Bridge/Ford Inspections --- --- X --- --- --- --- --- --- --- VDOT Bridge Inspections Gateway Park --- Gateway Park --- Gateway Park --- Gateway Park --- Gateway Park --- Parks Land Acquisition Program Overview • 2019 Public Space Master Plan (PSMP) Priority Action 1: Add at least 30 acres of new public space over the next 10 years. • Since 2019 the County has added 14.24 acres of new County owned land. • Since 2019 the County has added 9.30 acres of permanent public easement access. • Since 2019 the County has added a total of 23.54 acres of new publicly accessible land. • The largest County owned acquisition is the 7.5 acres of former VDOT land between North Glebe Road and along a tributary to Pimmit Run. • The largest permanent public easement access is 3.69 acres of Gateway Park. PARKS & RECREATION – LAND ACQUISITION PROGRAM Parks Land Acquisitions (Since 2019 PSMP) County Owned Land Fort Scott Park Purchase 0.32 acres August 2019 Arlington Junction Park Dedicated for Park Use 0.60 acres October 2019 Jennie Dean Park Conveyance 1.65 acres November 2019 Three Oaks Park Conveyance 0.14 acres January 2020 27th Street ROW Abandonment 0.18 acres December 2020 Chestnut Hills Park Multiple (Reduces the Park Acreage) -0.09 acres May 2020 Greenbrier Park Multiple (Reduces the Park Acreage) -0.14 acres March 2021 Rosslyn Highlands Park Easement (Reduces the Park Acreage) -0.49 acres February 2021 18th Street S Conveyance 0.23 acres March 2021 Short Bridge Park Conveyance 2.32 acres June 2021 Zachary Taylor Park (Terborgh Estate) Conveyance 0.92 acres August 2022 Jennie Dean Park Purchase 0.15 acres August 2023 VDOT Purchase Purchase 7.50 acres October 2023 Lang Street Garden (1128 28th St. S.) Purchase 0.28 acres January 2024 Lang Street Garden (1126 28th St. S.) Purchase 0.31 acres January 2024 Lang Street Garden (2814 S. Arlington Ridge Road) Purchase 0.29 acres January 2024 Drew Park Purchase 0.07 acres February 2024 County Owned Total: 14.24 acres Public Access Easements or Similar Harris Teeter Public Space (950 S George Mason Dr) Public Plaza and Access Easement 0.43 acres February 2020 Short Bridge Park Public Use and Access Easement 0.30 acres September 2021 Gateway Park Land Use Permit 3.69 acres December 2021 Met Park Public Park, Use and Access Easement 2.47 acres January 2023 Water Park Public Use and Access Easement 1.38 acres November 2023 Center Park Public Park Easement 1.03 acres January 2024 Easements Total: 9.30 acres TOTAL ACREAGE FOR COUNTY OWNED + EASEMENTS Total Land Acquisition: 23.54 acres Who Benefits Who is burdened? Who is missing? How do we know What do/did we do? Achieving Racial Equity  Asset Management Study evaluated the condition of every item within the park system which was then used to create a Park or Item Condition Assessment Rating.  An Equity Factor is derived from a ranking of the following factors from census data for each Arlington census tract: o Greatest Ethnic Diversity o Greatest Household Density o Greatest Number of Children o Lowest Average Income  The above Equity Factor is added to the Park Condition Rating to create a park or item Assessment.  The result of this is that Arlington County neighborhoods with the Greatest Ethnic Diversity and the Greatest Household Density and the Greatest Youth Population and the Lowest Income Levels with parks in the poorest condition should be a priority to receive funding where improvements are needed. Achieving Racial Equity – Master Plan Projects Park Name Park Condition Rating Equity Factor Total Park Condition + Equity Assessment HERSELLE MILLIKEN PARK 61 75 136 SHIRLINGTON PARK 76 53 129 QUINCY PARK 58 66 124 MAURY PARK 58 57 115 VIRGINIA HIGHLANDS PARK AND NEARBY PUBLIC SPACES 52 53 105 DREW PARK 65 40 105 GATEWAY PARK 31 54 85 GUMBALL PARK 35 35 70 FAIRFAX DRIVE PUBLIC SPACES --- 71 --- NEW PARK AT 26 TH STREET NORTH AND OLD DOMINION DRIVE --- 71 --- ARLINGTON BOATHOUSE --- 54 --- SHORT BRIDGE PARK --- 50 --- PENROSE SQUARE, PHASE 2 --- 43 --- CRYSTAL CITY METRO MARKET SQUARE --- 42 --- CRYSTAL CITY CENTER PARK --- 42 --- CRYSTAL CITY 15TH STREET PARK --- 42 --- LANGSTON BOULEVARD PUBLIC SPACES --- Various --- Program Summary Program Summary Summary & Conclusion  $308.75M programmed in the next ten years with $24.535M requested in the 2024 bond referenda.  The fluidity of the development market continues to be a challenge in fine- tuning the capital program, particularly in Crystal City.  Construction of the Boathouse to meet 2029 deadline established between the County and NPS for the riverfront portion of the project.  Meet commitment of private development funds for renovation of Gateway Park.  Continuation of programs created last CIP in response to heightened public input to capital requests: o Emerging Uses Program o Natural Resiliency Program  Establishment of Parks Athletic Courts Program.  Reinvestment in Land Acquisition Program. Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Department of Parks and Recreation

Source: Arlington County website. First collected Oct 6, 2026.