Parks and Recreation Presentation(PDF, 4MB)
Arlington County · Arlington County · meeting of Jun 11, 2024 · Budget documents
Open the original document More from Arlington County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Proposed Capital
Improvement Plan (CIP)
FY 2025 – FY 2034
Submission of a 10-Year Plan for
Department of Parks and
Recreation
Overview: Department of Parks and Recreation
Continuation of existing projects
and commitments.
Keeping up with program
replacement cycles (State of Good
Repair).
Adherence to Public Spaces
Master Plan.
Equity of distribution of projects.
Major near-term projects in DPR’s
proposed 2025 – 2034 CIP:
• Arlington Boathouse
• Crystal City Parks and Public Space
• Drew Park
• Kenmore Field Conversion
• Rosslyn Gateway Park
• Three Urban Parks
Condition of Assets
147 Parks totaling 942 acres;
126 acres of Natural
Resource Conservation areas
82 Playgrounds and 6 Spray
Playgrounds
76 Basketball Courts and 12
Half Courts
90 Tennis Courts, 11
Pickleball Multi-Use Courts
and 5 Practice Courts
54 Rectangular Athletic
Fields -- 15 Lighted, 15
synthetic
43 Diamond Athletic Fields --
19 Lighted, 2 synthetic
19 Combination Athletic
Fields -- 3 Lighted
7 Community Gardens
48 Picnic Shelters
9 Dog Parks
55 Miles of Multi-use Trails
(35 paved / 20 natural)
70 Bridges and Low-Water
Fords
25 Restroom Structures
Picnic Tables, Benches, Grills,
Kiosks, Drinking Fountains,
Park Signs, Fences
250k+ trees in parks, 69%
canopy cover (as of 2016
study)
Amphitheater, Skate Park,
Other Amenities
Condition of Assets
Asset Tool Refresh: Assessment of all parks
completed fall 2023.
Synthetic Fields: Field conditions and GMAX impact
testing ratings assessed on an on-going basis.
Trails: Pavement Condition Index (PCI) assessment
performed every 4-5 years; last completed in 2022.
Bridges: Inventory condition assessment updates
completed in 2023.
Parks and Playgrounds Synthetic Fields Multi-Use Trails Pedestrian Bridges
• $39.8M invested through
Maintenance Capital and
Parks Master Plan
programs from FY 2020 –
FY 2024.
• 20+ year life cycle.
• 30 new or fully renovated
parks in the last 15 years.
• Implemented an Equity
Factor to use in Selection
of Park Projects for CIP
funding.
• $8.9M invested in eight
Synthetic Field Replacements
and one Conversion Project
from FY 2020 – FY 2024.
• 8-year life cycle is typical.
• Conversion of Kenmore
Middle School field included
in 10-Ye a r C I P.
• $6.4M invested in the Trail
and Bridge Program from FY
2020 – FY 2024.
• 20+ year life cycle.
• Trail pavement condition
assessment to be completed
every four years. Next
assessment planned for 2026.
• 4.62 miles of trails replaced
since 2022 trail pavement
condition assessment.
• Incorporated into program in
FY 2021.
• Three bridges replaced since
2019.
• S. Nelson Street bridge
repainted and decking boards
replaced in 2024.
• 50+ year life cycle.
Condition of Assets
Program Funding Summary
19%
59%
11%
7% 4%
By Program
Parks Maintenance Capital ($59.065M)
Parks Master Plans ($181.565M)
Synthetic Field Program ($34.065M)
Trail and Bridge Modernization Program ($20.25M)
Land Acquisition ($13.805M)
64%11%
7%
5%5% 4% 4%
By Source
New Bond Issue ($197.42M)
Developer Contribution ($34.605M)
PAYG ($21.345M)
Short Term Finance ($16.558M)
Other Funding ($13.952M)
Tax Increment Financing (TIF) ($13.57M)
Previously Approved Funding ($11.3M)
Program Accomplishments
Towers Park Tuckahoe Playground Surfacing Marcey Road Park
Fort Scott Park Alcova Heights Park Madison Manor Park
Program Accomplishments
Washington-Liberty High School Barcroft Park Wakefield High School
Gunston “Bubble”
Rocky Run Park
Mapping
Program
Investments
Visit New Interactive Map
• Wide geographic distribution of
DPR projects.
• Used in conjunction with DPR
Park Condition and Equity
Assessment.
• Park Condition and Equity
Assessment will influence
yearly symmetry of geographic
distribution.
Doctors Run Park Arlington Hall West Park Pooled Park Projects
Total budget: $2,080,000
(Bond)
Parks Maintenance Capital (FY25)
Construction funds for the
replacement of the children's
playground and stone dust
volleyball court, site circulation, site
furnishings, landscaping and
stormwater management
improvements.
(This follows design funded in FY24)
Total budget: $2,450,000
(PAYG & Existing Balances)
Parks Maintenance Capital (FY25/FY26)
Design and construction for the
replacement of the children's
playground, site circulation, site
furnishings, landscaping and
stormwater management
improvements.
Total budget: $800,000
(PAYG)
Parks Maintenance Capital (FY25)
Improvements to be made at multiple
parks for work that is too big for
operational maintenance but too
small to warrant a single unique
Maintenance Capital project.
FY 2025-2034 CIP Project Slides
Bon Air Picnic Shelter & Playground Cherrydale Park Playground Douglas Park, Phase 2
Total budget: $1,900,000
(Bond)
Parks Maintenance Capital (FY26)
Design and construction for the
replacement of the picnic shelter
and playground at the rear of the
park.
Total budget: $3,822,000
(PAYG & Bond)
Parks Maintenance Capital (FY26/FY27)
Design and construction for the
replacement of the playground,
retaining walls, site access, site
circulation, site furnishings,
landscaping and stormwater
management improvements.
Total budget: $2,948,000
(PAYG & Bond)
Parks Maintenance Capital (FY26/FY27)
Design and construction for the
replacement of the playground, one
pedestrian bridge, earthwork, site
circulation, site furnishings,
landscaping and storm water
management facilities.
FY 2025-2034 CIP Project Slides
Crystal City Parks and Public
Spaces - Metro Market Square
Crystal City Parks and Public
Spaces - Center Park
Crystal City Parks and Public Spaces -
15th Street Park
Total budget: $9,065,000
(TIF & Developer)
Master Plan (FY25-FY27)
Located on 18th Street South and
Crystal Drive at the site of the future
Metro station east entrance. The
Square will be a retail-oriented,
flexible urban public space.
Total budget: $7,890,000
(TIF & Developer)
Master Plan (FY26-FY28)
Center Park is proposed to be a
new, two-acre centrally located
park, programmed for casual and
social uses, such as exhibitions,
concerts and festivals and as the
principal gathering space for the
community.
Total budget: $5,980,000
(TIF)
Master Plan (FY28-FY30)
This is proposed to be a garden park.
In addition, the Crystal City Sector
Plan identifies opportunities for paved
walkways and seating areas with
benches providing neighborhood
residents and workers a quiet place to
relax.
FY 2025-2034 CIP Project Slides
Gateway Park Three Urban Parks Drew Park
Total budget: $31,085,000
(Bond & outside funds)
Master Plan (FY25-FY27)
This park will serve as a prominent
gateway into the County. The goal
of the renovation to this park will
create a flexible place to
accommodate a variety of park
uses that enhance the overall park
experience for Rosslyn's growing
population.
Total budget: $8,055,000
(Bond)
Master Plan (FY26)
Maury Park, Herselle Milliken Park
and Gum Ball Park are three small
parks located in the Virginia Square
Planning Area and in the Ashton
Heights Civic Association. This
funding is for construction for these
parks (design funded in FY24).
Total budget: $2,240,000
(Bond & PAYG)
Master Plan (FY26-FY28)
Over the last 15 years, the County
acquired several parcels adjacent to
this site. This CIP includes developing a
final park master plan, final site design
and construction of the new park.
FY 2025-2034 CIP Project Slides
New Park at 26th & Old Dominion Arlington Boathouse Kenmore Middle School Field
Total budget: $4,855,000
(Bond)
Master Plan (FY28-FY30)
This project includes master plan,
design and construction of an
approximately one-acre park
County owned land. The site has
potential for active and passive
recreation activities.
Total budget: $28,080,000
(Bond & outside funds)
Master Plan (FY28, FY34)
The CIP includes funding for the
design and construction phases of
the upper and lower sites to satisfy
the terms of the executed
Programmatic Agreement signed in
2019.
Total budget: $9,842,000
(Bond, APS & outside funding)
Synthetic Turf Program (FY25)
This project is for the conversion from
grass to synthetic turf at Kenmore
Middle School. (Outside fundraising
efforts estimated at $2m, with the
balance of the cost shared between
Arlington Public Schools at 30% and
DPR at 70%)
FY 2025-2034 CIP Project Slides
PARKS & RECREATION – PARKS MASTER PLANS (Out-Year Projects)
Project Name Total Budget Comp Plan or Strategic
Initiative
Project Description
Quincy Park $38,420,000
(Bond &
Outside Funds)
Master Plan
FY30-FY34
Master planning and design for replacement of diamond and rectangular fields,
tennis and basketball courts, and picnic shelter. Inclusion of a new parking
solutions may also be considered.
Penrose Square,
Phase 2
$4,760,000
(Bond)
Master Plan
FY31,FY34
Implementation of Phase 2 of the Penrose Square Park Master Plan, to extend the
features from the previous phase into the western portion of the public square.
Short Bridge Park $5,690,000
(Bond)
Master Plan
FY31
Construction which will include an interpretive plaza, playground, dog run,
overlook, casual use lawn area, walkways, public art, site furnishings, and
significant landscaping and stormwater management facilities.
Shirlington Park $5,345,000
(Bond)
Master Plan
FY32-FY33
Enhancement of primary park entry points and existing pedestrian bridge,
creation of natural pathways along stream edge, plaza areas, storm water
improvements, etc.
Fairfax Drive Public
Spaces
$13,985,000
(Bond)
Master Plan
FY32-FY34
Create a more flexible, pedestrian-oriented urban park that will enhance the
physical character and utility of this area.
Langston Boulevard
Public Space
$2,020,000
(Bond)
Master Plan
FY34
Planning, design and construction of currently unspecified future public space(s)
project on Langston Boulevard.
Virginia Highlands &
Nearby Public
Spaces
$1,485,000
(Bond)
Master Plan
FY34
Develop park master plans for three sites located in the Pentagon City area,
including the existing Virginia Highlands Park, a new park at 20th St. S. and S. Ives
St. and a new parcel at the former Dominion Substation site.
FY 2025-2034 CIP Project Slides
PARKS & RECREATION – PARKS MASTER PLAN PROGRAMS
Project Name Total Budget Comp Plan or Strategic Initiative Project Description
Emerging Uses Program $5,035,000
(Bond)
Master Plan
FY25-FY34
• Allows DPR to respond to emerging recreational
and casual use activities in parks and recreation.
• The need to accommodate new trends in
recreation, such as pickleball, mountain biking,
skateboarding, and others, is rooted in
recommendations within the 2019 Public Spaces
Master Plan (PSMP).
Natural Resiliency Program $5,555,000
(Bond)
Master Plan
FY25-FY34
• Allows DPR to study and implement projects that
manage stormwater and preserve and expand
Arlington's natural capital.
• Projects in this program could also provide
recreational opportunities and amenities in
concert with addressing or creating flood
capacity.
Parks Athletic Courts
Program
$2,020,000
(Bond)
Master Plan
FY25-FY34
• New program to allow DPR to maintain existing
and expand its sports courts, such as tennis,
pickleball, futsal, and others.
• This program will go into effect after the Public
Spaces Master Plan (PSMP) update that is
proposed for FY2025.
FY 2025-2034 CIP Project Slides
PARKS & RECREATION ADDITIONAL CAPITAL PROGRAMS
Project Name Total Budget Comp Plan or Strategic Initiative Project Description
Trail & Pedestrian Bridge
Work
$20,250,000
(Bond & existing
balances)
Trail & Bridge Modernization
Program
(FY25-FY34)
• Annual replacement of pedestrian trail segments.
• Conducting an update to trail pavement
condition assessment.
• Replaces an average of two pedestrian bridges
annually until FY 2031.
Synthetic Turf
Replacements
$21,199,000
(Short-Term Finance and
Outside Funds)
Synthetic Turf Program
(FY27-FY34)
• Allows for on-cycle replacement of the County’s
inventory of 17 synthetic fields (15 rectangle / 2
diamond)
• 8 to 10-year useful life cycle
• Replacements at Greenbrier/Yorktown, Thomas
Jefferson, and Long Bridge identified in annual
capital budget process for FY25 and FY26.
• Funds for conversion of fields at Kenmore in FY25
Land Acquisition $13,805,000
(Bond)
Land Acquisition Program
(FY25-FY34)
• Allows for strategic acquisition of real property for
parks and public spaces as opportunities arise.
• PSMP recommends 30 acres of new public space
be added by 2029.
FY 2025-2034 CIP Project Slides
PARKS & RECREATION – SYNTHETIC TURF PROGRAM REPLACEMENT SCHEDULE
FY 2025-2034 CIP Project Slides
SYNTHETIC ATHLETIC FIELDS Year of Last
Replacement FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034
1 Long Bridge Park #1 2019 1,270,000
2 Long Bridge Park #4 2019 1,067,000
3 Gunston Park Community Field 2020 1,185,000
4 Barcroft Park Baseball Field #6 2019 1,947,000
5 Gunston Park Diamond Field 2019 1,105,000
6 Virginia Highlands Park Community Field 2021 989,000
7 Thomas Jefferson Park Upper Field 2022 1,006,000
8 Barcroft Park Community Field 2022 626,000
9 Rocky Run Park Community Field 2022 343,000
10 Gunston Park Bubble 2023 379,000
11 Wakefield High School Stadium 2023 1,255,000
12 Washington-Liberty High School Stadium 2024 1,505,000
13 Williamsburg Middle School #1 2024 1,162,000
14 Williamsburg Middle School #2 2024 950,000
15 Greenbrier Park Stadium 2016 1,164,000 1,485,000
16 Thomas Jefferson Park Lower Field 2017 819,000 1,045,000
17/18 Kenmore Middle School #1/#2 (Conversion) 2025 9,842,000 2,180,000
19 Long Bridge Park #3 2018 1,041,000 1,322,000
20 Rosslyn Highlands Park + EST-2025 378,000
Total Costs 11,825,000 1,041,000 2,337,000 3,132,000 2,094,000 1,975,000 1,634,000 3,617,000 4,710,000 1,700,000
PARKS & RECREATION – TRAIL AND BRIDGE PROGRAM REPLACEMENT SCHEDULE
FY 2025-2034 CIP Project Slides
TRAIL AND BRIDGE PROJECTS FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034
Bridge Design Douglas Park #1
Glencarlyn Park
Douglas Park #2
Douglas Park #3
Upper Pimmit Run
Park
---
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridge Construction ---
Rock Spring Park #1
Rock Spring Park #2
Rock Spring Park #3
Alcova Heights
Park
Bluemont Park #1
Bluemont Park #2
Douglas Park #1
Glencarlyn Park
Douglas Park #2
Douglas Park #3
Upper Pimmit Run
Park
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridges Selected
Based on FY 2027
Assessment
Bridge/Ford Repair Bon Air Park Lubber Run Park Glencarlyn Park
Projects Selected
Based on FY 2027
Assessment
Projects Selected
Based on FY 2027
Assessment
Projects Selected
Based on FY 2027
Assessment
Projects Selected
Based on FY 2027
Assessment
Projects Selected
Based on FY 2027
Assessment
Projects Selected
Based on FY 2027
Assessment
Projects Selected
Based on FY 2027
Assessment
Low-Water Ford Design --- Glencarlyn Park
#1
Glencarlyn Park
#2
Glencarlyn Park
#3
Glencarlyn Park
#4 Gulf Branch
Fords Selected
Based on FY 2027
Assessment
Fords Selected
Based on FY 2027
Assessment
Fords Selected
Based on FY 2027
Assessment
Fords Selected
Based on FY 2027
Assessment
Low-Water Ford
Construction --- Barcroft Park --- Glencarlyn Park
#1
Glencarlyn Park
#2
Glencarlyn Park
#3
Glencarlyn Park
#4
Fords Selected
Based on FY 2027
Assessment
Fords Selected
Based on FY 2027
Assessment
Fords Selected
Based on FY 2027
Assessment
Trail Milling and Paving
Lower Four Mile
Run Trail + Four
Mile Run Trail
segments in
Glencarlyn Park +
Bluemont Park
segments +
Lubber Run Trail
Four Mile Run Trail in
Barcroft Park +
Virginia Highlands
Park Trail + Fillmore
Trail
Custis Trail
segments +
Barcroft Park Trail
or as determined
by FY2027 trail
pavement
condition
assessment
Custis Trail
segments +
Arlington Blvd. Trail
segments or as
determined by
FY2027 trail
pavement
condition
assessment
Custis Trail
segments +
Washington Blvd.
Trail or as
determined by
FY2027 trail
pavement
condition
assessment
To be
determined by
FY2027 trail
pavement
condition
assessment
To be
determined by
FY2031 trail
pavement
condition
assessment
To be
determined by
FY2031 trail
pavement
condition
assessment
To be
determined by
FY2031 trail
pavement
condition
assessment
To be
determined by
FY2031 trail
pavement
condition
assessment
Trail Pavement Condition
Assessment --- --- X --- --- --- X --- --- ---
Bridge/Ford Inspections --- --- X --- --- --- --- --- --- ---
VDOT Bridge Inspections Gateway Park --- Gateway Park --- Gateway Park --- Gateway Park --- Gateway Park ---
Parks Land Acquisition Program Overview
• 2019 Public Space Master Plan (PSMP) Priority Action 1: Add at
least 30 acres of new public space over the next 10 years.
• Since 2019 the County has added 14.24 acres of new County
owned land.
• Since 2019 the County has added 9.30 acres of permanent
public easement access.
• Since 2019 the County has added a total of 23.54 acres of new
publicly accessible land.
• The largest County owned acquisition is the 7.5 acres of
former VDOT land between North Glebe Road and along a
tributary to Pimmit Run.
• The largest permanent public easement access is 3.69
acres of Gateway Park.
PARKS & RECREATION – LAND ACQUISITION PROGRAM
Parks Land Acquisitions (Since 2019 PSMP)
County Owned Land
Fort Scott Park Purchase 0.32 acres August 2019
Arlington Junction Park Dedicated for Park Use 0.60 acres October 2019
Jennie Dean Park Conveyance 1.65 acres November 2019
Three Oaks Park Conveyance 0.14 acres January 2020
27th Street ROW Abandonment 0.18 acres December 2020
Chestnut Hills Park Multiple (Reduces the Park Acreage) -0.09 acres May 2020
Greenbrier Park Multiple (Reduces the Park Acreage) -0.14 acres March 2021
Rosslyn Highlands Park Easement (Reduces the Park Acreage) -0.49 acres February 2021
18th Street S Conveyance 0.23 acres March 2021
Short Bridge Park Conveyance 2.32 acres June 2021
Zachary Taylor Park (Terborgh Estate) Conveyance 0.92 acres August 2022
Jennie Dean Park Purchase 0.15 acres August 2023
VDOT Purchase Purchase 7.50 acres October 2023
Lang Street Garden (1128 28th St. S.) Purchase 0.28 acres January 2024
Lang Street Garden (1126 28th St. S.) Purchase 0.31 acres January 2024
Lang Street Garden (2814 S. Arlington Ridge Road) Purchase 0.29 acres January 2024
Drew Park Purchase 0.07 acres February 2024
County Owned Total: 14.24 acres
Public Access Easements or Similar
Harris Teeter Public Space (950 S George Mason Dr) Public Plaza and Access Easement 0.43 acres February 2020
Short Bridge Park Public Use and Access Easement 0.30 acres September 2021
Gateway Park Land Use Permit 3.69 acres December 2021
Met Park Public Park, Use and Access Easement 2.47 acres January 2023
Water Park Public Use and Access Easement 1.38 acres November 2023
Center Park Public Park Easement 1.03 acres January 2024
Easements Total: 9.30 acres
TOTAL ACREAGE FOR COUNTY OWNED + EASEMENTS Total Land Acquisition: 23.54 acres
Who
Benefits
Who is
burdened?
Who is
missing?
How do
we know
What
do/did we
do?
Achieving Racial Equity
Asset Management Study evaluated the condition of every item within
the park system which was then used to create a Park or Item Condition
Assessment Rating.
An Equity Factor is derived from a ranking of the following factors from
census data for each Arlington census tract:
o Greatest Ethnic Diversity
o Greatest Household Density
o Greatest Number of Children
o Lowest Average Income
The above Equity Factor is added to the Park Condition Rating to
create a park or item Assessment.
The result of this is that Arlington County neighborhoods with the
Greatest Ethnic Diversity
and the Greatest Household Density and the
Greatest Youth Population and the Lowest Income Levels with parks in
the poorest condition should be a priority to receive funding where
improvements are needed.
Achieving Racial Equity – Master Plan Projects
Park Name Park Condition Rating Equity Factor Total Park Condition +
Equity Assessment
HERSELLE MILLIKEN PARK 61 75 136
SHIRLINGTON PARK 76 53 129
QUINCY PARK 58 66 124
MAURY PARK 58 57 115
VIRGINIA HIGHLANDS PARK AND NEARBY PUBLIC SPACES 52 53 105
DREW PARK 65 40 105
GATEWAY PARK 31 54 85
GUMBALL PARK 35 35 70
FAIRFAX DRIVE PUBLIC SPACES --- 71 ---
NEW PARK AT 26
TH
STREET NORTH AND OLD DOMINION DRIVE --- 71 ---
ARLINGTON BOATHOUSE --- 54 ---
SHORT BRIDGE PARK --- 50 ---
PENROSE SQUARE, PHASE 2 --- 43 ---
CRYSTAL CITY METRO MARKET SQUARE --- 42 ---
CRYSTAL CITY CENTER PARK --- 42 ---
CRYSTAL CITY 15TH STREET PARK --- 42 ---
LANGSTON BOULEVARD PUBLIC SPACES --- Various ---
Program Summary
Program Summary
Summary & Conclusion
$308.75M programmed in the next ten years with $24.535M requested in the
2024 bond referenda.
The fluidity of the development market continues to be a challenge in fine-
tuning the capital program, particularly in Crystal City.
Construction of the Boathouse to meet 2029 deadline established between the
County and NPS for the riverfront portion of the project.
Meet commitment of private development funds for renovation of Gateway
Park.
Continuation of programs created last CIP in response to heightened public
input to capital requests:
o Emerging Uses Program
o Natural Resiliency Program
Establishment of Parks Athletic Courts Program.
Reinvestment in Land Acquisition Program.
Proposed Capital
Improvement Plan (CIP)
FY 2025 – FY 2034
Submission of a 10-Year Plan for
Department of Parks and
Recreation
Source: Arlington County website. First collected Oct 6, 2026.