RecordWell Data

Stormwater Management Fund(PDF, 501KB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

STORMWATER MANAGEMENT FUND Department of Environmental Services Mission: To implement a comprehensive stormwater management program that: 1) integrates climate mitigation, adaptation, and resilience to reduce the potential for stormwater threats to public health, safety, and property; 2) reduces the impacts of new and existing urban development on Arlington streams, the Potomac River, and the Chesapeake Bay; and, 3) complies with State and federal stormwater, water quality, and floodplain management regulations. STORMWATER PROGRAM OBJECTIVES  Develop, update, and execute a comprehensive stormwater program that incorporates climate mitigation, adaptation, and resilience programs, projects and policies.  Assess re/development activities in a manner consistent with flood mitigation and management, water quality mandates and objectives, and local and state codes and regulations.  Integrate traditional stormwater infrastructure capacity planning with watershed management, maintenance of built and natural stormwater components, environmental protection objectives, and regulatory compliance requirements, including those of the County’s Municipal Separate Storm Sewer System (MS4) permit.  Ongoing strategic, tracking, and measurement practices to inform critical capacity infrastructure, stream restoration and repair, and water quality mitigation projects consistent with the goals and strategies in the Stormwater Master Plan that was adopted as an element of the County’s Comprehensive Plan in September 2014 and other capacity projects identified as part of the program review after the historic flooding in July 2018 and 2019.  Improve preventative maintenance of the County’s stormwater infrastructure assets as well as emergency repair or replacement actions when needed.  Ensure the County’s floodplains are managed in accordance with local, State, and Federal laws and regulations. CORE PROGRAM ACTIONS  Long-term climate adaptation and resiliency planning and risk assessments.  Rigorous floodplain management activities to ensure compliance with state and federal floodplain regulations, accuracy of mapped floodplains, and favorable flood insurance rates for residents.  Long-term infrastructure planning for capacity, sufficiency, and risk management for future demand and conditions.  Re/development assessments and site plan reviews that manage flood vul nerabilities and erosion.  Development of stormwater guidelines and standards and new potential codes and regulations that anticipate and suppress impacts of climate volatility.  Monitoring and measurement of flows and intensity of rainfall, as well as sedimentation, water quality and biological impacts.  Periodically assessing condition of capacity system assets for maintenance planning and budgeting, regulatory compliance, and managing state-of-good-repair.  Administering capital maintenance, emergency response, and complaint operations.  Ensuring regulatory compliance for both County and private sector operations and activities.  Environmental engineering and planning for programs, projects, and policies that m eet the aggressive requirements for the cleanup of the Chesapeake Bay.  Maintaining both the traditional and green infrastructure assets of the Program.  Conducting education and training activities for employees, businesses, developers, and residents.  Monitoring streams; and 467 STORMWATER MANAGEMENT FUND FUND SUMMARY  Tracking, monitoring, and reporting for local, regional, and state/national bodies and agencies. SIGNIFICANT BUDGET CHANGES The FY 2025 adopted expenditure budget for the Stormwater Management Fund is $15,350,293, an eight percent increase from the FY 2024 adopted budget. The FY 2025 adopted budget reflects:  Personnel increases due to the addition of an Environmental Management Specialist for the Land Disturbing Activity (LDA) program ($140,725; 1.0 FTE) , employee salary increases, an increase in the County’s cost for employee health insurance, slightly higher retirement contributions based on current actuarial projections, adjustments to salaries resulting from the finance and admin job family studies ($ 7,648), and adjustments to staff charge outs for oversight of land acquisition properties ($40,000).  Non-personnel increases due to overhead and interdepartmental charges ($183,213), contracted services ($196,631), utility administration data maintenance and software licenses ($135,006 ), maintenance of overland relief and detention vaults ($ 118,000), additional contractual support for the LDA program ($75,000), adjustments to the annual expense for maintenance and replacement of County vehicles ($2,327), and one-time funding for equipment related to the new FTE ($2,500), slightly offset by elimination of FY 2024 one-time funding ($223,500) and funding for the stormwater utility implementation ($500,000).  Debt service increases for issuance of new General Obligation bonds in 2024 ($386,522) for various Stormwater capital projects.  Revenue increases primarily due to stormwater customer revenue ($1,100,478), stormwater fee relief revenues ($290,000), notice of violation fees ($100,000), which is partially offset by reductions to development services fees ($246,572). o The main revenue for this fund has changed from sanitary district tax revenues (based on assessed values of real property) to stormwater utility fee revenues (based on the impervious area of real property). Sanitary district tax revenues were budgeted at $15,102,589 in FY 2024. Stormwater utility fee revenue is budgeted at $ 16,203,067 for FY 2025.  In response to intense rain events and flooding in 2018 and 2019, the County has undertaken a comprehensive review of ways to mitigate flood risks. Design work is already underway for significant investments in watershed -scale solutions in critical a reas that have experienced flooding and are identified in the Stormwater Master Plan. The FY 2023 – FY 2032 Adopted Capital Improvement Plan (CIP) and future CIPs seek to strike the right investment balance between water quality, improved maintenance of assets, education, and capacity improvements. To fund the near-term projected need, the County received approval from voters for a $50.84 million Bond Referenda in November 2020 and $39.76 million Bond Referenda in November 2022 which provided the authority to issue bonds to fund key projects that will be constructed over a number of years. U tility fee rate increases may be required in future years in order to fund the debt service on these bonds. More detail can be found in the FY 2023 – FY 2032 Adopted CIP.  In prior budget years the Stormwater Management Fund was a combined fund for operations, maintenance, and capital projects funded through the Sanitary District Tax of $0.017 per $100 of assessed real property value. Effective January 1, 2024, Arlington County has implemented a Stormwater Utility, which has replaced the tax funding with utility fee funding based on a property’s impervious area. The Calendar Year 2024 utility rate is $258 per Equivalent Residential Unit (ERU). More information can be found on the Stormwater Utility Fee website.  Starting in FY 2024, Stormwater Management Fund is now an enterprise fund. With the change in fund type, there is now a separate fund for operations and maintenance activities and a 468 STORMWATER MANAGEMENT FUND FUND SUMMARY capital projects fund dedicated to the Pay-As-You Go capital program. The capital fund can be found in the “Pay-As-You-Go Capital and Short-Term Financing” section of this budget book. PROGRAM FINANCIAL SUMMARY FY 2023 FY 2024 FY 2025 % Change Actual* Adopted Adopted ‘24 to ‘25 Personnel $5,613,194 $7,136,419 $7,529,044 6% Non-Personnel 4,824,280 5,553,926 5,916,217 7% Debt Service 645,500 1,518,510 1,905,032 25% Pay-As-You-Go Capital Projects 10,613,270 - - - GASB 2,258 - - - Total Expenditures 21,698,502 14,208,855 15,350,293 8% Revenues 19,956,354 16,545,407 17,789,313 8% GASB 11,328 - - - Total Revenues 19,967,682 16,545,407 17,789,313 - Transfer Out to Capital - 2,336,552 3,895,000 67% Transfer In from General Fund - - (290,000) - Total Transfers Out / (In) - $2,336,552 $3,605,000 54% Permanent FTEs 50.50 53.50 54.50 Temporary FTEs - - - Total Authorized FTEs 50.50 53.50 54.50 * FY 2023 actual expenditures and revenues received reflect the first year of implementing new Governmental Accounting Standard Board (GASB) standards for Statement No. 87 on leases and Statement No. 96 for subscription-based software. See the County Government GASB Summary for department details in the front section of the budget book. 469 STORMWATER MANAGEMENT FUND FUND SUMMARY FY 2023 FY 2024 FY 2024 FY 2025 ACTUAL ADOPTED RE-ESTI MATE ADOPTED BALANCE JULY 1 Operating Balance $2,573,624 $4,938,448 $4,573,206 $5,105,744 Capital Balance* 7,622,523 - - - BALANCE JULY 1 10,196,147 4,938,448 4,573,206 5,105,744 REVENUE Sanitary District Tax 14,574,948 15,102,589 7,551,295 - Utility Fee Revenues - - 8,101,534 16,203,067 Stormwater Fee Relief - - 145,000 290,000 Fines & Fees 2,107,939 1,442,818 1,442,818 1,196,246 Miscellaneous Revenues 3,273,467 - 50,000 100,000 GASB 11,328 - - - TOTAL REVENUE 19,967,682 16,545,407 17,290,647 17,789,313 TOTAL REVENUE & BALANCE 30,163,829 21,483,855 21,863,853 22,895,057 EXPENSES Operating and Maintenance 10,437,474 12,690,345 12,631,224 13,445,261 Debt Service 645,500 1,518,510 935,333 1,905,032 GASB 2,258 - - - Pay-As-You-Go Capital Projects 10,613,270 - - - TOTAL EXPENSES 21,698,502 14,208,855 13,566,557 15,350,293 TRANSFERS (IN)/ OUT Transfer Out to Stormwater Capital Fund - 2,336,552 3,336,552 3,895,000 Transfer In from General Fund - - (145,000) (290,000) TOTAL TRANSFERS - 2,336,552 3,191,552 3,605,000 TOTAL EXPENSES AND TRANSFERS 21,698,502 16,545,407 16,758,109 18,955,293 BALANCE JUNE 30 8,465,327 4,938,448 5,105,744 3,939,764 Operating Balance 4,573,206 4,938,448 5,105,744 3,939,764 Capital Balance 3,892,067 - - - TOTAL BALANCE $8,465,273 $4,938,448 $5,105,744 $3,939,764 $2,574,180 $3,129,126 $3,114,548 $3,315,270 *During FY 2023 closeout process, the capital balance was appropriated to the Stormwater Capital Projects fund in FY 2024. STORMWATER MANAGEMENT FUND OPERATING STATEMENT Board-adopted Three-month Operating Reserve (excludes debt service) 470 STORMWATER MANAGEMENT FUND TEN-YEAR HISTORY EXPENDITURE, REVENUE, AND FULL-TIME EQUIVALENT TRENDS  The Stormwater Management Fund was established by the County Board in CY 2008 by adopting a Sanitary District Tax of $0.01 per $100 of assessed real property value. In CY 2010, the Sanitary District tax rate was increased to $0.013 per $100 of assessed real property value. In CY 2021, the Sanitary District tax rate was increased to $0.017 per $100 of assessed real property value.  Effective January 1, 2024, Arlington County has implemented a Stormwater Utility, which has replaced the tax funding with utility fee funding based on a property’s impervious area. The Calendar Year 2024 utility rate is $258 per Equivalent Residential Unit (ERU). More information can be found on the Stormwater Utility Fee website.  Starting in FY 2024, Stormwater Management fund is now an enterprise fund. With the change in fund type, there is a now a separate fund for operations and maintenance activities and a capital projects fund dedicated to the Pay-As-You Go capital program. Prior to FY 2024, all Pay- As-You-Go capital expenses were accounted for in the Stormwater operating fund. The capital fund can be found in the “Pay -As-You-Go Capital and Short -Term Financing” section of this budget book. $ in 000s FY 2016 Actual FY 2017 Actual FY 2018 Actual FY 2019 Actual FY 2020 Actual FY 2021 Actual FY 2022 Actual FY 2023 Actual FY 2024 Adopted Budget FY 2025 Adopted Budget EXP $8,430 $14,999 $13,259 $11,651 $11,975 $13,541 $19,893 $21,699 $14,209 $15,350 REV $9,185 $10,878 $10,438 $10,760 $11,376 $13,761 $16,009 $19,968 $16,545 $17,789 FTEs 37.00 42.00 42.00 44.00 44.00 47.00 47.00 50.50 53.50 54.50 0.00 10.00 20.00 30.00 40.00 50.00 60.00 $0 $2,000 $4,000 $6,000 $8,000 $10,000 $12,000 $14,000 $16,000 $18,000 $20,000 $22,000 FTEs EXP REV 471 STORMWATER MANAGEMENT FUND TEN-YEAR HISTORY Fiscal Year Description FTEs FY 2016  Increased inter-departmental charges for overhead ($20,714).  Increased expenses due to an adjustment to the annual expense for maintenance and replacement of County vehicles ($89,070).  Revenues increased due to a projected increase in real estate assessmen t values ($450,750) and fees from site plan review ($250,000). FY 2017  Added personnel for stormwater management regulations. The five positions ($628,983) were a critical foundational step for stormwater program delivery and compliance. 5.00  Non-personnel increased due to the transfer of the responsibility of new tree planting from DPR to the Stormwater Management Fund ($205,000).  Revenues increased due to a projected increase in real estate assessment values ($329,520) and fees from sedime nt/erosion control plan review ($200,000). FY 2018  Eliminated one-time cost for purchase of a new vehicle in FY 2017 ($24,100).  Non-personnel increased due to the transfer of the responsibility of operating maintenance costs for DES and DPR stormwater facilities to the Stormwater Management Fund ($265,130).  Increased operating supplies ($60,331) and annual expense for maintenance and replacement of County vehicles ($8,776).  Revenues increased due to a projected increase in real estate assessment values ($258,190) and fees from sediment/erosion control plan review ($100,000). FY 2019  Added a position that supports critical Stormwater Infrastructure program priorities, including managing the small drainage projects program ($127,354). 1.00  Transferred an Administrative Assistant position from the General Fund to the Stormwater Management Fund ($62,686). 1.00  Transferred in street sweeping expenses from the DES General Fund to the Stormwater Management Fund ($397,290).  Increased contractual expenses ($91,182), partially offset by a reduction in other operating expenses ($44,473).  Capital program funding decreased due to an increase in the operating budget for personnel and non-personnel expenses ($146,381).  Revenue increased due to the increase in the CY 2018 real estate assessment tax base ($78,500).  Revenue increased due to projected Sediment and Erosion Control plan revenue ($282,500).  Increased Chesapeake Bay Preservation fee revenue ($160,000). 472 STORMWATER MANAGEMENT FUND TEN-YEAR HISTORY Fiscal Year Description FTEs FY 2020  Non-personnel decrease d in operations due to a reduction in residential street sweeping frequency ($135,150), a reduction in inlet cleaning and inspection maintenance ($100,000), and inter -departmental charges for overhead ($70,320); offset by adjustments to the annual expense f or maintenance and replacement of County vehicles ($7,972).  Capital program funding increased due to the reallocation of reductions in operations taken in for street sweeping and inlet cleaning ($235,150) and increased revenue.  Revenue increased due to the increase in the CY 201 9 real estate assessment tax base ($ 405,435), an increase in S ediment and Erosion Control plan revenue ($75,000), and Chesapeake Bay Preservation fee revenue ($50,000). FY 2021  Added two Stormwater Inspectors to meet the County’s mandated MS4 permit obligations and workload ($248,514) and a Senior Program Manager to manage and oversee the maintenance capital and storm drainage improvements ($203,285) . Non-personnel fund ing includes the addition of vehicles for the two new Stormwater Inspectors ($44,000 one-time; $15,310 on-going). 3.00  Added funding for c ontractual increases related to operating maintenance costs for DES and DPR stormwater facilities ($329,752) , inter-departmental charges for overhead ($231,383), County facility parking lot sweeping ($70,000), and tree planting ($4,809).  Added one-time funding for the utility feasibility study ($250,000), inter-departmental charges for overhead ($231,383), County facility parking lot sweeping ($70,000), and tree planting ($4,809).  Capital program funding decreased due to increases in the operating budget for personnel and non-personnel expenses ($996,598).  Revenue increased due to the increase in the CY 2020 real estate assessment tax base ($329,759), inflationary increase of 2.5 percent to fees ($27,938), and a planned increase in Sediment and Erosion Control plan fees to support the addition of the two Stormwater Inspectors ($328,020).  Reduced Chesapeake Bay Preservation revenue ($21,525) and other revenues based on resulting economic conditions from the pandemic ($145,077). FY 2022  The County Board added funding for a one percent merit pay adjustment, a five percent increase in the range, and an increase to the one-time bonus for staff from $500 to approximately $900.  Non-personnel expenses primarily increased due to Bozman Government Center rent expense ($135,000), overhead charges ($240,000) and DES Utilities Fund expenses ($78,985).  Eliminated the Stormwater Wise Program ($120,000).  Debt service expense added to pay for GO bonds issued in FY 2021 to fund Stormwater CIP projects ($661,564). 473 STORMWATER MANAGEMENT FUND TEN-YEAR HISTORY Fiscal Year Description FTEs  Capital program funding increased due to planned FY 2022 capital projects ($2,396,320).  Revenue increased primarily due to the increase in the CY 2021 sanitary district tax rate and apprec iation from real estate assessment growth ($3,323,598). FY 2023  The County Board approved an additional one percent merit pay adjustment for a total increase of 5.25 percent, increased the pay-for-performance budget by an additional 0.5 percent, and increased the pay range movement to five percent. Additional compensation changes approved by the County Board include an optional one-time cash-out of 40 hours of compensation time for those with balances of 80 or more, a one-time increase in shift differential pay from $0.75 to $1.00 per hour for the B shift and from $1. 00 to $1.30 per hour for the C shift, and a one - time increase in language premium from $0.69 to $0.92 per hour.  Personnel increased due to the addition of a civil engineer ($125,000; 1.0 FTE), partial year costs for the additional administrative person nel for the Stormwater Utility ($50,000; 2.5 FTEs), employee salary increases, one-time bonus for staff of approximately $1,000 ($60,000), slightly higher retirement contributions based on current actuarial projections, and adjustments to salaries resulti ng from the administrative job family study ($1,663) and engineering job family study ($110,394). 3.50  Non-personnel increased due to implementation costs for the Stormwater Utility ($350,000), overhead charges ($207,105), and Bozman Government Center rent expense ($12,225).  Debt service expense increase d for GO bonds issued in FY 2021 to fund Stormwater CIP projects ($273,936).  Pay-As-You-Go capital program funding decreased due to the planned mix of funding strategies for the Stormwater capital program ($314,444).  Revenue increased primarily due to the increase in the real estate assessment tax base ($810,176) and the increase in development services fees ($52,750). FY 2024  Added an Engineer II position that will review Civil Engineering Plans and other plans ($135,454). 1.00  Added funding for one-time $2,000 (gross) employee bonuses ($124,884).  Transferred Sewer Maintenance staffs from Utilities Fund ($186,865). 2.00  Increased overhead and interdepartmental charges ($322,010).  Added one-time funding for stormwater grant identification and support consultant ($115,000).  Added funding for flow monitoring and rain gauges at multiple locations throughout the County ($106,000 one-time; $40,000 ongoing).  Increased funding for tree planting ($100,000).  Debt service expense increase d for GO bonds planned for issuance in FY 2023 to fund Stormwater CIP projects ($582,510). 474 STORMWATER MANAGEMENT FUND TEN-YEAR HISTORY Fiscal Year Description FTEs  Pay-As-You-Go capital program funding decreased due to the planned mix of funding strategies for the Stormwater capital program ($1,498,471).  Increased revenue due to the increase in the real estate assessment tax base ($545,461) and due to a 5.2 percent inflationary increase of the developmental services fee ($71,318). FY 2025  Added an Environmental Management Specialist for the Land Disturbing Activity (LDA) program ($140,725). 1.00  Adjusted salaries for the finance and admin job family studies ($7,648), and staff charge outs for oversight of land acquisition properties ($40,000).  Increased overhead and interdepartmental charges ($183,213), contracted services ($196,631), utility administration data maintenance and software licenses ($135,006), maintenance of overland relief and detention vaults ($118,000), and additional contractual support for the LDA program ($75,000).  Eliminated FY 2024 one -time funding ($223,500) and funding for the stormwater utility implementation ($500,000).  Increased d ebt service for issuance of ne w General Obligation bonds in 2024 ($386,522) for various Stormwater capital projects.  Increased stormwater customer revenue ($1,100,478), stormwater fee relief revenues ($290,000), and notice of violation fees ($100,000).  Reduced services fees ($246,572). 475

Source: Arlington County website. First collected Oct 6, 2026.