STORMWATER MANAGEMENT FUND
Department of Environmental Services
Mission: To implement a comprehensive stormwater management program that: 1) integrates
climate mitigation, adaptation, and resilience to reduce the potential for stormwater threats to public
health, safety, and property; 2) reduces the impacts of new and existing urban development on
Arlington streams, the Potomac River, and the Chesapeake Bay; and, 3) complies with State and
federal stormwater, water quality, and floodplain management regulations.
STORMWATER PROGRAM OBJECTIVES
Develop, update, and execute a comprehensive stormwater program that incorporates climate
mitigation, adaptation, and resilience programs, projects and policies.
Assess re/development activities in a manner consistent with flood mitigation and management,
water quality mandates and objectives, and local and state codes and regulations.
Integrate traditional stormwater infrastructure capacity planning with watershed management,
maintenance of built and natural stormwater components, environmental protection objectives,
and regulatory compliance requirements, including those of the County’s Municipal Separate
Storm Sewer System (MS4) permit.
Ongoing strategic, tracking, and measurement practices to inform critical capacity
infrastructure, stream restoration and repair, and water quality mitigation projects consistent
with the goals and strategies in the Stormwater Master Plan that was adopted as an element
of the County’s Comprehensive Plan in September 2014 and other capacity projects identified
as part of the program review after the historic flooding in July 2018 and 2019.
Improve preventative maintenance of the County’s stormwater infrastructure assets as well as
emergency repair or replacement actions when needed.
Ensure the County’s floodplains are managed in accordance with local, State, and Federal laws
and regulations.
CORE PROGRAM ACTIONS
Long-term climate adaptation and resiliency planning and risk assessments.
Rigorous floodplain management activities to ensure compliance with state and federal
floodplain regulations, accuracy of mapped floodplains, and favorable flood insurance rates for
residents.
Long-term infrastructure planning for capacity, sufficiency, and risk management for future
demand and conditions.
Re/development assessments and site plan reviews that manage flood vul nerabilities and
erosion.
Development of stormwater guidelines and standards and new potential codes and regulations
that anticipate and suppress impacts of climate volatility.
Monitoring and measurement of flows and intensity of rainfall, as well as sedimentation, water
quality and biological impacts.
Periodically assessing condition of capacity system assets for maintenance planning and
budgeting, regulatory compliance, and managing state-of-good-repair.
Administering capital maintenance, emergency response, and complaint operations.
Ensuring regulatory compliance for both County and private sector operations and activities.
Environmental engineering and planning for programs, projects, and policies that m eet the
aggressive requirements for the cleanup of the Chesapeake Bay.
Maintaining both the traditional and green infrastructure assets of the Program.
Conducting education and training activities for employees, businesses, developers, and
residents.
Monitoring streams; and
467
STORMWATER MANAGEMENT FUND
FUND SUMMARY
Tracking, monitoring, and reporting for local, regional, and state/national bodies and agencies.
SIGNIFICANT BUDGET CHANGES
The FY 2025 adopted expenditure budget for the Stormwater Management Fund is $15,350,293, an
eight percent increase from the FY 2024 adopted budget. The FY 2025 adopted budget reflects:
Personnel increases due to the addition of an Environmental Management Specialist for the Land
Disturbing Activity (LDA) program ($140,725; 1.0 FTE) , employee salary increases, an increase
in the County’s cost for employee health insurance, slightly higher retirement contributions based
on current actuarial projections, adjustments to salaries resulting from the finance and admin job
family studies ($ 7,648), and adjustments to staff charge outs for oversight of land acquisition
properties ($40,000).
Non-personnel increases due to overhead and interdepartmental charges ($183,213), contracted
services ($196,631), utility administration data maintenance and software licenses ($135,006 ),
maintenance of overland relief and detention vaults ($ 118,000), additional contractual support
for the LDA program ($75,000), adjustments to the annual expense for maintenance and
replacement of County vehicles ($2,327), and one-time funding for equipment related to the new
FTE ($2,500), slightly offset by elimination of FY 2024 one-time funding ($223,500) and funding
for the stormwater utility implementation ($500,000).
Debt service increases for issuance of new General Obligation bonds in 2024 ($386,522) for
various Stormwater capital projects.
Revenue increases primarily due to stormwater customer revenue ($1,100,478), stormwater fee
relief revenues ($290,000), notice of violation fees ($100,000), which is partially offset by
reductions to development services fees ($246,572).
o The main revenue for this fund has changed from sanitary district tax revenues (based
on assessed values of real property) to stormwater utility fee revenues (based on the
impervious area of real property). Sanitary district tax revenues were budgeted at
$15,102,589 in FY 2024. Stormwater utility fee revenue is budgeted at $ 16,203,067
for FY 2025.
In response to intense rain events and flooding in 2018 and 2019, the County has undertaken a
comprehensive review of ways to mitigate flood risks. Design work is already underway for
significant investments in watershed -scale solutions in critical a reas that have experienced
flooding and are identified in the Stormwater Master Plan. The FY 2023 – FY 2032 Adopted Capital
Improvement Plan (CIP) and future CIPs seek to strike the right investment balance between
water quality, improved maintenance of assets, education, and capacity improvements. To fund
the near-term projected need, the County received approval from voters for a $50.84 million
Bond Referenda in November 2020 and $39.76 million Bond Referenda in November 2022 which
provided the authority to issue bonds to fund key projects that will be constructed over a number
of years. U tility fee rate increases may be required in future years in order to fund the debt
service on these bonds. More detail can be found in the FY 2023 – FY 2032 Adopted CIP.
In prior budget years the Stormwater Management Fund was a combined fund for operations,
maintenance, and capital projects funded through the Sanitary District Tax of $0.017 per $100
of assessed real property value. Effective January 1, 2024, Arlington County has implemented a
Stormwater Utility, which has replaced the tax funding with utility fee funding based on a
property’s impervious area. The Calendar Year 2024 utility rate is $258 per Equivalent Residential
Unit (ERU). More information can be found on the Stormwater Utility Fee website.
Starting in FY 2024, Stormwater Management Fund is now an enterprise fund. With the change
in fund type, there is now a separate fund for operations and maintenance activities and a
468
STORMWATER MANAGEMENT FUND
FUND SUMMARY
capital projects fund dedicated to the Pay-As-You Go capital program. The capital fund can be
found in the “Pay-As-You-Go Capital and Short-Term Financing” section of this budget book.
PROGRAM FINANCIAL SUMMARY
FY 2023 FY 2024 FY 2025 % Change
Actual* Adopted Adopted ‘24 to ‘25
Personnel $5,613,194 $7,136,419 $7,529,044 6%
Non-Personnel 4,824,280 5,553,926 5,916,217 7%
Debt Service 645,500 1,518,510 1,905,032 25%
Pay-As-You-Go Capital Projects 10,613,270 - - -
GASB 2,258 - - -
Total Expenditures 21,698,502 14,208,855 15,350,293 8%
Revenues 19,956,354 16,545,407 17,789,313 8%
GASB 11,328 - - -
Total Revenues 19,967,682 16,545,407 17,789,313 -
Transfer Out to Capital - 2,336,552 3,895,000 67%
Transfer In from General Fund - - (290,000) -
Total Transfers Out / (In) - $2,336,552 $3,605,000 54%
Permanent FTEs 50.50 53.50 54.50
Temporary FTEs - - -
Total Authorized FTEs 50.50 53.50 54.50
* FY 2023 actual expenditures and revenues received reflect the first year of implementing new Governmental
Accounting Standard Board (GASB) standards for Statement No. 87 on leases and Statement No. 96 for
subscription-based software. See the County Government GASB Summary for department details in the front
section of the budget book.
469
STORMWATER MANAGEMENT FUND
FUND SUMMARY
FY 2023 FY 2024 FY 2024 FY 2025
ACTUAL ADOPTED RE-ESTI MATE ADOPTED
BALANCE JULY 1
Operating Balance $2,573,624 $4,938,448 $4,573,206 $5,105,744
Capital Balance* 7,622,523 - - -
BALANCE JULY 1 10,196,147 4,938,448 4,573,206 5,105,744
REVENUE
Sanitary District Tax 14,574,948 15,102,589 7,551,295 -
Utility Fee Revenues - - 8,101,534 16,203,067
Stormwater Fee Relief - - 145,000 290,000
Fines & Fees 2,107,939 1,442,818 1,442,818 1,196,246
Miscellaneous Revenues 3,273,467 - 50,000 100,000
GASB 11,328 - - -
TOTAL REVENUE 19,967,682 16,545,407 17,290,647 17,789,313
TOTAL REVENUE & BALANCE 30,163,829 21,483,855 21,863,853 22,895,057
EXPENSES
Operating and Maintenance 10,437,474 12,690,345 12,631,224 13,445,261
Debt Service 645,500 1,518,510 935,333 1,905,032
GASB 2,258 - - -
Pay-As-You-Go Capital Projects 10,613,270 - - -
TOTAL EXPENSES 21,698,502 14,208,855 13,566,557 15,350,293
TRANSFERS (IN)/ OUT
Transfer Out to Stormwater Capital Fund - 2,336,552 3,336,552 3,895,000
Transfer In from General Fund - - (145,000) (290,000)
TOTAL TRANSFERS - 2,336,552 3,191,552 3,605,000
TOTAL EXPENSES AND TRANSFERS 21,698,502 16,545,407 16,758,109 18,955,293
BALANCE JUNE 30 8,465,327 4,938,448 5,105,744 3,939,764
Operating Balance 4,573,206 4,938,448 5,105,744 3,939,764
Capital Balance 3,892,067 - - -
TOTAL BALANCE $8,465,273 $4,938,448 $5,105,744 $3,939,764
$2,574,180 $3,129,126 $3,114,548 $3,315,270
*During FY 2023 closeout process, the capital balance was appropriated to the Stormwater Capital Projects fund in FY 2024.
STORMWATER MANAGEMENT FUND
OPERATING STATEMENT
Board-adopted Three-month Operating Reserve (excludes
debt service)
470
STORMWATER MANAGEMENT FUND
TEN-YEAR HISTORY
EXPENDITURE, REVENUE, AND FULL-TIME EQUIVALENT TRENDS
The Stormwater Management Fund was established by the County Board in CY 2008 by adopting
a Sanitary District Tax of $0.01 per $100 of assessed real property value. In CY 2010, the
Sanitary District tax rate was increased to $0.013 per $100 of assessed real property value. In
CY 2021, the Sanitary District tax rate was increased to $0.017 per $100 of assessed real
property value.
Effective January 1, 2024, Arlington County has implemented a Stormwater Utility, which has
replaced the tax funding with utility fee funding based on a property’s impervious area. The
Calendar Year 2024 utility rate is $258 per Equivalent Residential Unit (ERU). More information
can be found on the Stormwater Utility Fee website.
Starting in FY 2024, Stormwater Management fund is now an enterprise fund. With the change
in fund type, there is a now a separate fund for operations and maintenance activities and a
capital projects fund dedicated to the Pay-As-You Go capital program. Prior to FY 2024, all Pay-
As-You-Go capital expenses were accounted for in the Stormwater operating fund. The capital
fund can be found in the “Pay -As-You-Go Capital and Short -Term Financing” section of this
budget book.
$ in 000s
FY 2016
Actual
FY 2017
Actual
FY 2018
Actual
FY 2019
Actual
FY 2020
Actual
FY 2021
Actual
FY 2022
Actual
FY 2023
Actual
FY 2024
Adopted
Budget
FY 2025
Adopted
Budget
EXP $8,430 $14,999 $13,259 $11,651 $11,975 $13,541 $19,893 $21,699 $14,209 $15,350
REV $9,185 $10,878 $10,438 $10,760 $11,376 $13,761 $16,009 $19,968 $16,545 $17,789
FTEs 37.00 42.00 42.00 44.00 44.00 47.00 47.00 50.50 53.50 54.50
0.00
10.00
20.00
30.00
40.00
50.00
60.00
$0
$2,000
$4,000
$6,000
$8,000
$10,000
$12,000
$14,000
$16,000
$18,000
$20,000
$22,000 FTEs EXP REV
471
STORMWATER MANAGEMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
FY 2016 Increased inter-departmental charges for overhead ($20,714).
Increased expenses due to an adjustment to the annual expense for
maintenance and replacement of County vehicles ($89,070).
Revenues increased due to a projected increase in real estate assessmen t
values ($450,750) and fees from site plan review ($250,000).
FY 2017 Added personnel for stormwater management regulations. The five
positions ($628,983) were a critical foundational step for stormwater
program delivery and compliance.
5.00
Non-personnel increased due to the transfer of the responsibility of new
tree planting from DPR to the Stormwater Management Fund ($205,000).
Revenues increased due to a projected increase in real estate assessment
values ($329,520) and fees from sedime nt/erosion control plan review
($200,000).
FY 2018 Eliminated one-time cost for purchase of a new vehicle in FY 2017
($24,100).
Non-personnel increased due to the transfer of the responsibility of
operating maintenance costs for DES and DPR stormwater facilities to the
Stormwater Management Fund ($265,130).
Increased operating supplies ($60,331) and annual expense for
maintenance and replacement of County vehicles ($8,776).
Revenues increased due to a projected increase in real estate assessment
values ($258,190) and fees from sediment/erosion control plan review
($100,000).
FY 2019 Added a position that supports critical Stormwater Infrastructure program
priorities, including managing the small drainage projects program
($127,354).
1.00
Transferred an Administrative Assistant position from the General Fund to
the Stormwater Management Fund ($62,686).
1.00
Transferred in street sweeping expenses from the DES General Fund to the
Stormwater Management Fund ($397,290).
Increased contractual expenses ($91,182), partially offset by a reduction
in other operating expenses ($44,473).
Capital program funding decreased due to an increase in the operating
budget for personnel and non-personnel expenses ($146,381).
Revenue increased due to the increase in the CY 2018 real estate
assessment tax base ($78,500).
Revenue increased due to projected Sediment and Erosion Control plan
revenue ($282,500).
Increased Chesapeake Bay Preservation fee revenue ($160,000).
472
STORMWATER MANAGEMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
FY 2020 Non-personnel decrease d in operations due to a reduction in residential
street sweeping frequency ($135,150), a reduction in inlet cleaning and
inspection maintenance ($100,000), and inter -departmental charges for
overhead ($70,320); offset by adjustments to the annual expense f or
maintenance and replacement of County vehicles ($7,972).
Capital program funding increased due to the reallocation of reductions in
operations taken in for street sweeping and inlet cleaning ($235,150) and
increased revenue.
Revenue increased due to the increase in the CY 201 9 real estate
assessment tax base ($ 405,435), an increase in S ediment and Erosion
Control plan revenue ($75,000), and Chesapeake Bay Preservation fee
revenue ($50,000).
FY 2021 Added two Stormwater Inspectors to meet the County’s mandated MS4
permit obligations and workload ($248,514) and a Senior Program
Manager to manage and oversee the maintenance capital and storm
drainage improvements ($203,285) . Non-personnel fund ing includes the
addition of vehicles for the two new Stormwater Inspectors ($44,000
one-time; $15,310 on-going).
3.00
Added funding for c ontractual increases related to operating maintenance
costs for DES and DPR stormwater facilities ($329,752) ,
inter-departmental charges for overhead ($231,383), County facility
parking lot sweeping ($70,000), and tree planting ($4,809).
Added one-time funding for the utility feasibility study ($250,000),
inter-departmental charges for overhead ($231,383), County facility
parking lot sweeping ($70,000), and tree planting ($4,809).
Capital program funding decreased due to increases in the operating
budget for personnel and non-personnel expenses ($996,598).
Revenue increased due to the increase in the CY 2020 real estate
assessment tax base ($329,759), inflationary increase of 2.5 percent to
fees ($27,938), and a planned increase in Sediment and Erosion Control
plan fees to support the addition of the two Stormwater Inspectors
($328,020).
Reduced Chesapeake Bay Preservation revenue ($21,525) and other
revenues based on resulting economic conditions from the pandemic
($145,077).
FY 2022 The County Board added funding for a one percent merit pay adjustment,
a five percent increase in the range, and an increase to the one-time bonus
for staff from $500 to approximately $900.
Non-personnel expenses primarily increased due to Bozman Government
Center rent expense ($135,000), overhead charges ($240,000) and DES
Utilities Fund expenses ($78,985).
Eliminated the Stormwater Wise Program ($120,000).
Debt service expense added to pay for GO bonds issued in FY 2021 to fund
Stormwater CIP projects ($661,564).
473
STORMWATER MANAGEMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
Capital program funding increased due to planned FY 2022 capital projects
($2,396,320).
Revenue increased primarily due to the increase in the CY 2021 sanitary
district tax rate and apprec iation from real estate assessment growth
($3,323,598).
FY 2023 The County Board approved an additional one percent merit pay
adjustment for a total increase of 5.25 percent, increased the
pay-for-performance budget by an additional 0.5 percent, and increased
the pay range movement to five percent. Additional compensation changes
approved by the County Board include an optional one-time cash-out of 40
hours of compensation time for those with balances of 80 or more, a
one-time increase in shift differential pay from $0.75 to $1.00 per hour for
the B shift and from $1. 00 to $1.30 per hour for the C shift, and a one -
time increase in language premium from $0.69 to $0.92 per hour.
Personnel increased due to the addition of a civil engineer ($125,000;
1.0 FTE), partial year costs for the additional administrative person nel for
the Stormwater Utility ($50,000; 2.5 FTEs), employee salary increases,
one-time bonus for staff of approximately $1,000 ($60,000), slightly higher
retirement contributions based on current actuarial projections, and
adjustments to salaries resulti ng from the administrative job family study
($1,663) and engineering job family study ($110,394).
3.50
Non-personnel increased due to implementation costs for the Stormwater
Utility ($350,000), overhead charges ($207,105), and Bozman
Government Center rent expense ($12,225).
Debt service expense increase d for GO bonds issued in FY 2021 to fund
Stormwater CIP projects ($273,936).
Pay-As-You-Go capital program funding decreased due to the planned mix
of funding strategies for the Stormwater capital program ($314,444).
Revenue increased primarily due to the increase in the real estate
assessment tax base ($810,176) and the increase in development services
fees ($52,750).
FY 2024 Added an Engineer II position that will review Civil Engineering Plans and
other plans ($135,454).
1.00
Added funding for one-time $2,000 (gross) employee bonuses ($124,884).
Transferred Sewer Maintenance staffs from Utilities Fund ($186,865). 2.00
Increased overhead and interdepartmental charges ($322,010).
Added one-time funding for stormwater grant identification and support
consultant ($115,000).
Added funding for flow monitoring and rain gauges at multiple locations
throughout the County ($106,000 one-time; $40,000 ongoing).
Increased funding for tree planting ($100,000).
Debt service expense increase d for GO bonds planned for issuance in
FY 2023 to fund Stormwater CIP projects ($582,510).
474
STORMWATER MANAGEMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
Pay-As-You-Go capital program funding decreased due to the planned mix
of funding strategies for the Stormwater capital program ($1,498,471).
Increased revenue due to the increase in the real estate assessment tax
base ($545,461) and due to a 5.2 percent inflationary increase of the
developmental services fee ($71,318).
FY 2025 Added an Environmental Management Specialist for the Land Disturbing
Activity (LDA) program ($140,725).
1.00
Adjusted salaries for the finance and admin job family studies ($7,648),
and staff charge outs for oversight of land acquisition properties ($40,000).
Increased overhead and interdepartmental charges ($183,213), contracted
services ($196,631), utility administration data maintenance and software
licenses ($135,006), maintenance of overland relief and detention vaults
($118,000), and additional contractual support for the LDA program
($75,000).
Eliminated FY 2024 one -time funding ($223,500) and funding for the
stormwater utility implementation ($500,000).
Increased d ebt service for issuance of ne w General Obligation bonds in
2024 ($386,522) for various Stormwater capital projects.
Increased stormwater customer revenue ($1,100,478), stormwater fee
relief revenues ($290,000), and notice of violation fees ($100,000).
Reduced services fees ($246,572).
475