CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY
TAX INCREMENT FINANCING AREA
Our Mission: To provide a supplemental financial mechanism for the revitalization of Crystal City,
Potomac Yard, and Pentagon City streets, transit, and public open spaces
Crystal City, Potomac Yard, and Pentagon City together serve as one of Arlington’s largest
commercial office, retail, and hotel districts and include over 17,000 housing units. This area is
experiencing a rapid transition with intensive commercial and residential development. With
Amazon’s selection of Arlington’s Pentagon City and Crystal City neighborhoods for its second
headquarters in November 2018, the pace of commercial redevelopment has accelerated. In 2023,
Amazon opened the first phase of new construction for the company’s headquarters, 2.15 million
square feet of commercial development in Pentagon City. The second phase received approvals to
add an additional 3.35 million square feet of new commercial development, including a 350-foot tall
architecturally iconic flagship building, The Helix. Over 1,000 new multifamily residential units have
been added to the Crystal City, Potomac Yard, and Pentagon City area over the past three years and
there are nearly 6,000 additional housing units in the development pipeline. To learn more about
the Amazon agreement, visit the website at:
https://www.arlingtonva.us/Government/Topics/Amazon/Amazon-in-Arlington-Resources.
The Crystal City Sector Plan (2010) and the Pentagon City Se ctor Plan (2022) established a vision
for supporting the revitalization for two neighborhoods of this important district. The Plans envisioned
public infrastructure improvements in streets, transit, and public open spaces to support construction
and reconstruction of office, retail, and residential spaces in Crystal City. The near-term infrastructure
improvements include realignment of streets and intersections in Crystal City, as well as investments
in existing parks. Longer term improvements include additional improvements in Crystal City, as well
as infrastructure projects that implement the Pentagon City Sector Plan. As Crystal City, Potomac
Yard, and Pentagon City undergo large -scale redevelopment, timely investments in public
infrastructure are important.
In October 2010, the Arlington County Board established a tax increment financing area to support
implementation of infrastructure improvements outlined in the Crystal City Sector Plan. This source
may also be used for infrastructure that will support Potomac Yard and Pentagon City. Tax increment
financing (TIF) is a mechanism used to support development and redevelopment by capturing the
projected increase in property tax revenues in the area and investing those funds in improvements
in that area. U nlike a special district, it is not an additional or new tax; rather, it redirects and
segregates the increased property tax revenues that would normally flow to the General Fund so that
it can be used for a specified purpose. The amount of the tax increment revenue was determined by
setting a baseline assessed value of all property in the area on January 1, 2011, tracking the
incremental increase in assessed values relative to the base year in each subsequent year and
segregating the incremental value in a separate fund.
The County Board policy that established the TIF requires the County Manager to revisit the
percentage of incremental revenues going to the TIF each budget cycle and at other key milestones
during the infrastructure planning process. The current TIF increment is 25 percent, which was last
adjusted during the FY 2019 budget process. This increment provides the funding stream necessary
to deliver the CIP commitments in the TIF area using a combination of TIF and other local and outside
funding sources.
489
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA
FUND SUMMARY
SIGNIFICANT BUDGET CHANGES
The FY 2025 adopted expenditure budget for the Crystal City, Potomac Yard, and Pentagon City Tax
Increment Financing Area is $6,506,510, based on current year revenues. The complete spend down
plan reflects utilization of current year revenues and fund balance as capital projects are rarely
completed in a single year and require carryover of funds to be fully executed. The complete FY 2025
execution plan compared to the revised FY 2024 plan is shown in the fund statement. The FY 2025
adopted budget reflects:
Revenues increase ($2,126,650) based on changes to the real estate assessment tax base in
CY 2024 compared to CY 2023.
PROGRAM FINANCIAL SUMMARY
FY 2023 FY 2024 FY 2025 % Change
Actual Adopted Adopted 2 4 to '25
Capital Projects $6,076,290 $4,379,860 $6,506,510 49%
6,076,290 4,379,860 6,506,510 49%
7,949,883 $4,379,860 $6,506,510 49%
$1,873,593 - - -
6.50 6.50 6.50
Total Expenditures
Total Revenues
Change in Fund Balance
Total Authorized FTEs
* A total of 47.5 FTEs support the transportation capital program of which 41 FTEs are funded by
Transportation Capital Fund (TCF) and 6.5 FTEs are funded by Crystal City Tax Increment Fund
(TIF).
The baseline CY 2011 real estate assessment tax base for the TIF is $9.8 billion.
Revenue will be used to supplement other funding sources, examples of which include grant
funds, commercial real estate revenue, and bonds. The majority of capital transportation projects
are funded from multiple sources.
This table reflects the FY 2025 adopted spending plan of current year revenues and does not
show the use of fund balance for the total projected FY 2025 expenditures. See the Fund
Statement for the execution plan.
FY 2025 MAJOR PROJECTS
The TIF funds will be used for the Crystal City, Pentagon City, Potomac Yard Streets program and
the Crystal City Metrorail Station East Entrance, which are focused on the implementation of the
board-adopted Crystal City Sector Plan.
The goals of these programs are to re -connect the Crystal City street grid, allow for increased
accessibility and mobility by all forms of travel, and create opportunities for new
development. Specific projects are as follows:
Crystal City, Pentagon City, Potomac Yard Streets:
o Crystal City to Ronald Reagan Washington National Airport (DCA) Multimodal Connection: This
project will create a context -sensitive multimodal connection between Crystal City and
National Airport designed to meet the needs of a broad range of pedest rians, bicyclists, and
490
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA
FUND SUMMARY
micro-mobility users of all ages and abilities. The National Environment Policy Act ( NEPA)
process is nearing completion and preliminary engineering work is underway.
o Eads Street Bicycle and Pedestrian Improvements: The South Eads Street Complete Street
project will implement multimodal improvements along the entire corridor from Army Navy
Drive to Four Mile Run. This project will be delivered in small- scale project phases along the
corridor. Improvements include protected bike lane s, bus stop, sidewalk and crosswalk
improvements, and other enhancements to existing facilities. The first phase (Army Navy Dr.
to 12th St. S.) is being coordinated with the Penn Place development and an adjacent
Department of Parks and Recreation project; it is expected to start construction in FY 2025.
Design has also been completed for the second phase (12th St. S. to 15th St. S.) and
construction is expected to commence in FY 2025 (this phase is funded with TCF).
o Crystal Drive Safety and Accessibility Improvements: The funds allocated to this program
implement various improvements across the TIF district, including upgrades to crosswalks
and curb ramps, landscape upgrades, bike facility upgrades, signage and striping
modifications, and streetlighting. The projects focus on spot locations outside existing,
discrete projects and private development that are making similar improvements.
Construction work for the signal and intersection improvements at 15th Street S. and S. Fern
Street continues into FY 20 25 due to long lead times on signal equipment. Design for
improvements at 15th Street S. and S. Joyce Street began in FY 2024 and are anticipated to
be constructed in FY 2025.
o Long Bridge Drive Pedestrian and Bike Connection: This project focuses on creat ing an
enhanced bike/pedestrian facility along Long Bridge Drive to connect the terminus of the
Virginia Passenger Rail Authority’s future bike/ped crossing of the Potomac River of the Long
Bridge Rail Project to the Crystal City bike network. This facility will also connect to VDOT's
adjacent Boundary Channel Drive ped/bike improvements and to the Mount Vernon Trail. The
project is being coordinated with DPR due to the bridge terminus landing behind the Long
Bridge Aquatic Center. Design development began in FY 2024 is expected to continue through
FY 2027.
Crystal City Metrorail Station East Entrance: This project will design and build a new entrance to
the east end of the Crystal City Metro station to provide better access from Crystal Drive, the
existing and future Crystal City VRE station, and the Transitway. The County executed a
comprehensive design -build agreement with Clark Construction in 2023. Design is well
underway.
Additionally, TIF funds will be used for the following Crystal City Open Spaces projects:
23rd Street S. and S. Eads Street Park: This project will provide permanent improvements to this
small urban public space. The existing infrastructure is aging and in need of upgrades for the
space to continue to be a welcome respite for casual use in the Crys tal City area. The public
engagement for this project is currently underway.
Metro Market Square: This project is an important public space located on 18th Street S. and
Crystal Drive at the site of the future Crystal City Metro station east entrance. The Square is
intended to be a retail-oriented, flexible urban public space. The public engagement for the Master
Plan for Metro Market Square is scheduled to begin in Fall 2024.
491
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA
FUND SUMMARY
Notes:
1. Most capital projects span multiple years from design to construction completion.
2. Ending fund balances reflect that funding for capital projects is carried forward each fiscal
year. Balances fluctuate, reflecting forecasted vs. actual project execution.
3. Balances equivalent to a minimum of ten percent of annual budgeted TIF revenues are held
in a reserve in accordance with the County Board’s financial and debt policies.
FY 2023 FY 2024 FY 2024 FY 2025
ACTUAL ADOPTEDRE-ESTIMATE ADOPTED
ADJUSTED BALANCE, JULY 1
Construction Reserve $22,700,930 $21,531,870 $24,474,524 $26,824,322
Reserve 400,000 400,000 500,000 600,000
TOTAL BALANCE 23,100,930 21,931,870 24,974,524 27,424,322
REVENUES
Tax Increment Area 4,553,418 4,379,860 5,665,790 6,506,510
Developer Contributions - - - -
Grant Revenues 3,396,465 7,429,800 5,066,000 7,334,400
TOTAL REVENUES 7,949,883 11,809,660 10,731,790 13,840,910
TOTAL REVENUE & BALANCE 31,050,813 33,741,530 35,706,314 41,265,232
EXPENSES
Capital Projects - Current Year 6,076,289 11,809,660 8,282,000 13,840,910
Capital Projects - Carry-Over - - - 14,039,890
TOTAL EXPENSE 6,076,289 11,809,660 8,282,000 27,880,800
BALANCE, JUNE 30
Construction Reserve 24,474,524 21,531,870 26,824,322 12,684,423
Reserve 500,000 400,000 600,000 700,000
TOTAL BALANCE $24,974,524 $21,931,870 $27,424,322 $13,384,423
CRYSTAL CITY, POTOMAC YARD,
AND PENTAGON CITY TAX INCREMENT FINANCING AREA
FUND STATEMENT
492
CRYSTAL CITY, POTOMAC YARD & PENTAGON CITY TAX INCREMENT FINANCING AREA
TEN-YEAR HISTORY
EXPENDITURE, REVENUE AND FULL-TIME EQUIVALENT TRENDS
$ in 000s
F
Y
2
FY 2016
Actual
FY 2017
Actual
FY 2018
Actual
FY 2019
Actual
FY 2020
Actual
FY 2021
Actual
FY 2022
Actual
FY 2023
Actual
FY 2024
Adopted
Budget
FY 2025
Adopted
Budget
EXP $1,243 $1,920 $1,816 $4,479 $5,770 $5,888 $5,837 $6,076 $4,380 $6,507
REV $4,196 $7,516 $5,560 $6,370 $5,857 $5,743 $5,548 $7,950 $4,380 $6,507
FTEs 7.50 7.50 6.50 6.50 7.00 7.00 7.00 6.50 6.50 6.50
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
$0
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
$9,000 FTEs EXP REV
493
CRYSTAL CITY, POTOMAC YARD & PENTAGON CITY TAX INCREMENT FINANCING AREA
TEN-YEAR HISTORY
Fiscal
Year
Description FTEs
FY 2016
Revenue projections in the tax district decreased due to decreases in real
estate tax assessments in CY 2015 compared to CY 2014.
FY 2017 Revenues and expenditures increased based on the tax district increase
due to increases in real estate assessments in CY 201 6 compared to
CY 2015.
FY 2018
Revenues increased based on the in crease in real estate assessments in
CY 2017 compared to CY 2016, offset by a reduction in the TIF increment
from 33 percent to 30 percent.
FTEs decrease by 1.0 FTE to reflect the transfer of a position in the Real
Estate Bureau to the Transportation Capital Fund.
(1.00)
FY 2019 Revenues and expenses decreased based on lower real estate assessments
in CY 2018 compared to CY 2017, and also a reduction in the TIF increment
from 30 percent to 25 percent.
FY 2021 Revenues decreased based on real estate assessments ($204,790) in
CY 2020 compared to CY 2019.
FY 2022 Revenues decrease d based on real estate assessments ($ 1,443,381) in
CY 2021 compared to CY 2020.
FY 2023 The County Board approved an additional one percent merit pay
adjustment for a total increase of 5.25 percent, increased the pay-for-
performance budget by an additional 0.5 percent, and increased the pay
range movement to five percent. Additional compensation changes
approved by the County Board include an optional one-time cash-out of 40
hours of compensation time for those with balances of 80 or more, a one-
time increase in shift differential pay from $0.75 to $1.00 per hour for the
B shift and from $1.00 to $1.30 per hour for the C shift, and a one -time
increase in language premium from $0.69 to $0.92 per hour.
Revenues increased based on real estate assessments ($ 296,930) in
CY 2022 compared to CY 2021.
Authorized FTEs decreased due to a technical adjustment to align positions
with actual staffing levels.
The authorized FTEs for FY 2023 were reduced by 0.5 as a technical
adjustment to realign staffing levels. The FY 2023 Adopted Budget includes
a total of 47.5 FTEs to support the transportation capital program. 41.0
FTEs are funded by Transportation Capital Fund and 6.5 FTEs are funded
by the Crystal City Tax Increment Fund.
(0.50)
494
CRYSTAL CITY, POTOMAC YARD & PENTAGON CITY TAX INCREMENT FINANCING AREA
TEN-YEAR HISTORY
Fiscal
Year
Description FTEs
FY 2024 Revenue decreased ($220,300) based on changes to the real estate
assessment tax base in CY 2023 compared to CY 2022.
FY 2025 Revenue increase d ($2,126,650) based on changes to the real estate
assessment tax base in CY 2024 compared to CY 2023.
495