CPHD DEVELOPMENT FUND
Department of Community Planning, Housing and
Development
Our Mission: To set the standard for excellence in public service by providing consistent quality
and timely permitting, plan review, and inspection services both in building construction and
zoning.
DEVELOPMENT FUND SUMMARY
The fee-supported units that comprise the CPHD Development Fund are the Zoning Division: Policy,
Research, and Information Management ; Counter Services ; Zoning Enforcement ; Zoning Plan
Review; and Board of Zoning Appeals; and the following sections of the Inspection Services Division:
Construction Permit Administration Services , Construction Field Inspection Services, and
Construction Plan Review Services.
SIGNIFICANT BUDGET CHANGES
The FY 202 5 adopted expenditure budget for the CPHD Development Fund is $ 29,078,292, a five
percent increase over the FY 2024 adopted budget. The FY 2025 adopted budget reflects:
Personnel increases due to employee salary increases, an increase in the County’s cost for
employee health insurance, and slightly higher retirement contributions based on current
actuarial projections.
Non-personnel increases primarily due to adjustments to the annual expense for maintenance
and replacement of County vehicles ($28,230), an increase in indirect costs related to General
Fund operational support ($141,226), an increase in costs associated with Permit Arlington
operations ($30,514), and funds added for contractual increases associated with the elevator
inspection contract ($600,000). These increases are partially offset by a decrease in Bozman
Government Center rent expenses ($1,674).
Revenue increases due to changes in fees from the outcomes of the fee study ($4,619,987)
and additional revenue from the addition of an automation enhancement surcharge to the
Department of Environmental Services (DES) Development Services fees ($830,000) that will
be used to fund current and future technology operation and enhancement costs. These
increases are partially offset by a reduction in projected permit activity ($4,415,095).
CPHD is monitoring the changing commercial development environment. With the rise in
interest rates through FY 2024 and the ongoing commercial office vacancy rates, it is uncertain
how commercial developers may adjust their development time horizons for large commercial
space. Large projects are often planned and developed over a number of years so the impact
on activity may occur over a longer period of time.
527
DEVELOPMENT FUND
FUND SUMMARY
FINANCIAL SUMMARY
FY 2023 FY 2024 FY 2025 % Change
Actual Adopted Adopted '24 to '25
Personnel $15,983,233 $18,677,649 $19,175,848 3%
Non-Personnel 8,838,836 9,104,148 9,902,444 9%
Total Expenditures 24,822,069 27,781,797 29,078,292 5%
Fees 17,385,022 24,263,095 25,297,987 4%
Total Revenues $17,385,022 $24,263,095 $25,297,987 4%
Permanent FTEs 123.00 128.00 128.00
Temporary FTEs 9.00 8.00 8.00
Total Authorized FTEs 132.00 136.00 136.00
Expenses & Revenues by Line of Business
FY 2023 FY 2024 FY 2025 FY 2025 FY 2025
Actual
Expense
Adopted
Expense
Adopted
Expense
% Change
‘24 to '25
Adopted
Revenue
Change in
Fund Balance
Policy, Research and Information Mgmt. $1,575,316 $1,520,947 $1,612,259 6% $2,627,888 $1,015,629
Counter Services 673,584 1,355,978 1,372,305 1% - (1,372,305)
Zoning Enforcement 933,415 1,062,856 1,099,604 3% - (1,099,604)
Zoning Plan Review 923,506 1,392,778 1,407,182 1% - (1,407,182)
Board of Zoning Appeals 224,971 421,719 420,451 - - (420,451)
Construction Permit Admin. Services 11,839,910 13,004,155 12,853,325 -1% 12,356,933 (496,392)
Construction Field Inspection Services 5,208,962 4,796,493 5,708,344 19% 5,708,344 -
Construction Plan Review Services 3,442,405 4,226,871 4,604,822 9% 4,604,822 -
Total $24,822,069 $27,781,797 $29,078,292 5% $25,297,987 ($3,780,305)
Authorized FTEs by Line of Business
FY 2024 FTEs
FY 2025
Permanent FTEs
FY 2025
Temporary FTEs
FY 2025 Total
FTEs
Adopted* Adopted Adopted Adopted
Policy, Research and Information Management 9.00 8.00 - 8.00
Counter Services 12.00 9.00 3.00 12.00
Zoning Enforcement 8.00 8.00 - 8.00
Zoning Plan Review 11.00 10.00 1.00 11.00
Board of Zoning Appeals 3.00 3.00 - 3.00
Construction Permit Admin. Services 35.00 32.00 3.00 35.00
Construction Field Inspection Services 34.00 33.00 1.00 34.00
Construction Plan Review Services 24.00 25.00 - 25.00
Total 136.00 128.00 8.00 136.00
* FY 2024 Adopted FTE count includes temporary FTEs in Policy, Research, and Information Management (1.00),
Counter Services (3.00), Zoning Plan Review (1.00), Construction Permit Admin. Services (2.00), and Construction Field
Inspection Services (1.00)
528
DEVELOPMENT FUND
FUND SUMMARY
CPHD Development Fund
Fund Statement
FY 2023 FY 2024 FY 2024 FY 2025
Actual Adopted Re-estimate Adopted
ADJUSTED BALANCE, JULY 1
Contingent Fund Reserve $6,996,856 $7,223,132 $3,368,320 -
Capital Reserve 3,808,511 805,128 - -
TOTAL BALANCE 10,805,367 8,028,260 3,368,320 ($1,270,156)
REVENUE
Fees 17,385,022 24,263,095 18,800,000 25,297,987
Transfer in from General Fund - - 2,000,000 -
TOTAL REVENUE 17,385,022 24,263,095 20,800,000 25,297,987
TOTAL REVENUE & BALANCE 28,190,389 32,291,355 24,168,320 24,027,831
EXPENSES
Personnel 15,983,233 18,677,649 17,027,237 19,175,848
Non-personnel 8,838,836 9,104,148 8,411,239 9,902,444
TOTAL EXPENSES 24,822,069 27,781,797 25,438,476 29,078,292
BALANCE, JUNE 30 3,368,320 4,509,558 (1,270,156) (5,050,461)
Contingent Fund Reserve 3,368,320 4,509,558 - -
Capital Reserve - - - -
TOTAL BALANCE $3,368,320 $4,509,558 ($1,270,156) ($5,050,461)
Beginning in FY 2013, the CPHD Development Fund established a Contingent Reserve, which
targets a 30 percent balance of the total fiscal year’s operating budget; this amount is
equivalent to three to four months of annual operating expenditures.
I n FY 2023, as development activity slowed and expenses continued to rise, the Development
Fund utilized reserve funds to offset lower revenue receipts. During the close -out process of
FY 2023, the County Board allocated $2.0 million in funding from the General Fund to assist
with an anticipated decrease in revenue in the Development Fund in FY 2024.
For FY 2025, the development activity – and the resulting revenue in the Development Fund
– is uncertain. However, as interest rates have stabilized and may begin to decline the outlook
for increased activity is improving. In addition, the fee adjustments in FY 2025 will help to
align the price of the services with the actual cost of the service and re -establish financial
stability in the dynamic development environment. The Development Fund will continue to be
under fiscal stress, continue to implement cost saving measures as appropriate, and may
require additional General Fund support.
T he Capital Reserve is a funding source for planned and unanticipated needs that exceed the
amount available in the annual operating budget. The multi-year technology and one -time
projects that have utilized the Capital Reserve monies are implementation of the Permit
Arlington initiative, which includes replacement of the enterprise-wide permitting system and
business process re-engineering; website improvements; and the creation of a customer
service center. In the future , the Capital Reserve will be replenished to address any future
technology needs.
529
CPHD DEVELOPMENT FUND
TEN-YEAR HISTORY
EXPENDITURE, REVENUE, AND FULL-TIME EQUIVALENT TRENDS
* Beginning in FY 2022, actual expenditures and revenues received reflect the implementation of Governmental
Accounting Standard Board (GASB) standards for Statement No. 87 on leases and Statement No. 96 for
subscription-based software. See the County Government GASB Summary for department details in the front
section of the budget book.
$ in 000s
FY 2016
Actual
FY 2017
Actual
FY 2018
Actual
FY 2019
Actual
FY 2020
Actual
FY 2021
Actual
FY 2022
Actual*
FY 2023
Actual
FY 2024
Adopted
Budget
FY 2025
Adopted
Budget
EXP $15,984 $17,663 $17,936 $18,191 $19,945 $21,122 $36,894 $24,822 $27,782 $29,078
REV $15,095 $16,014 $19,226 $18,547 $18,265 $18,294 $34,719 $17,385 $24,263 $25,298
Change in
Fund
Balance
-$889 -$1,649 $1,290 $356 -$1,680 -$2,828 -$2,175 -$7,437 -$3,519 -$3,780
FTEs 93.00 97.00 104.00 106.00 113.00 113.00 116.00 132.00 136.00 136.00
0
20
40
60
80
100
120
140
160
-$10,000
-$5,000
$0
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000 FTEs EXP REV Change in Fund Balance
530
CPHD DEVELOPMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
FY 2016 Transferred a Business Systems Analyst from the CPHD General Fund
($72,739).
0.50
Added a Plan Reviewer ($84,711), Records Technician ($74,079), and a
Zoning Planner ($79,382).
3.00
Added $83,000 for Zoning related expense in the Office of the County
Attorney for an Assistant County Attorney.
Non-personnel expenses increased for consulting expenses ($18,297) and
for the ongoing costs of records management and scanning ($225,000).
Revenue increased due to projected increase in permitting activity
($1,202,541). There are no fee increases for FY 2016.
FY 2017 Expenses increased due to One -Stop Arlington including implementation
of a new business permitting system, project management, system
support, space reconfiguration, and the addition of four limited term
positions ($3,986,042).
4.00
Non-personnel increased for adjustments to rent costs associated with the
tenth-floor office space ($30,193).
FY 2018 Added an Associate Planner position to serve as the Assistant Counter
Services Manager in Zoning Administration ($124,686).
1.00
Added a Principal Planner to serve as the Zoning Administrative Supervisor
in Zoning Administration ($141,730).
1.00
Added positions related to One Stop Arlington including: Production
Support Manager ($148,500), GIS Systems Administrator ($155,997), two
Help Desk support positions for the second half of FY 2018 ($141,730).
Changes include a conversion of a limited term Assistant Permit Processing
Manager position to a full-time position.
4.00
Transferred a Communications Specialist II ($147,770) from the Business
Operations Division t o the Permits Administration Division in the
Development Fund.
1.00
Non-personnel decreased due to the removal of one-time costs associated
with the implementation of the business permitting system as part of the
One-Stop Arlington Initiative ($949,250), and adjustments to the annual
expense for maintenance and replacement of County vehicles ($13,928).
The decrease is partially offset by non-personnel increases for adjustments
to rent costs associated with the 10
th floor office space ($63,832) and
indirect costs related to General fund operational support ($62,134).
Revenue increased due to the creation of a new permit type for Accessory
Homestay home occupation at a rate of $60 per application ($29,452) and
increased utilization of fund balance to cove r projected expenses
($282,662).
531
CPHD DEVELOPMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
FY 2019 Transferred in a position from the Department of Human Services for the
creation of Program Manager position in the Construction Permit
Administration section to support the One Stop Arlington initiative
($173,478).
1.00
Added a Mechanical Code Inspector position in Construction Field
Inspection Services ($82,954).
1.00
Added a Permit Processing Specialist in the Inspection Services Division
($71,481).
1.00
Transferred out an Assistant Permit Administration Manager to the
Department of Environmental Services ($106,037).
(1.00)
Personnel expenses also reflect an adjustment to account for savings due
to staff vacancies and turnover ($254,493).
Non-personnel increased due to the increase of one-time costs associated
with the implementation of the enterprise permitting system as part of the
One-Stop Arlington initiative ($ 810,284), increases to overhead costs
related to General Fund operational support ($391,087), and
non-personnel funds added for the Mechanical Code Inspector and Permit
Processing Specialist positions ($26,900). The increase is partially o ffset
by adjustments to rent costs associated with the 10 th floor office space
($131,479) and adjustments to the annual expense for maintenance and
replacement of County vehicles ($49,523).
Revenue increased primarily due to the application of an Employment Cost
Index increase of 2.5 percent to all existing fees ($309,252) and increasing
the existing Automation Enhancement Surcharge from five to 10 percent
based upon the successful implementation of the first phase of the
One-Stop Arlington on-line permitting system ($316,983).
FY 2020 Eliminated a Deputy Building Official ($198,829). (1.00)
Added positions due to an anticipated increase in development activity and
ancillary development activity associated with Amazon, including:
o Zoning Plan Reviewer in the Zoning Division ($90,000) and
o Fire Protection Engineer in the Construction Plan Review
Services Division ($125,000).
1.00
1.00
Transferred in three Code Enforcement positions from the CPHD General
Fund to the Construction Permit Administration Services Division
($401,395).
3.00
Added a Business System Analyst in the Construction Permit
Administration Services Division ($101,131).
1.00
Added a Permit Processing Specialist in the Construction Perm it
Administration Services Division ($75,322).
1.00
Added a Fire Inspector in the Construction Field Inspection Services
Division ($116,896).
1.00
Personnel increased due to adjustments to overstrength positions
associated with Permit Arlington ($84,492).
532
CPHD DEVELOPMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
Added non-personnel funding for a Future Development Contingency Fund
that will allow for flexibility in planning and development capacities related
to Amazon ($300,000).
Added overhead costs related to General Fund operational support
($170,529), operating expenses associated with new position adds
($29,000), and increased rent associated with the 10th floor office space
($16,798).
Reduced non-personnel budget for Permit Arlington ($148,626).
Reduced the annual expense for maintenance and replacement of County
vehicles ($7,428).
As part of FY 2019 closeout, the County Board approved the addition of an
Associate Planner ($127,589) and a Customer Experience Manager
($100,375) in the Zoning Division.
2.00
FY 2021 Transferred out three permit positions to DES General Fund and o ther
adjustments associated with Permit Arlington ($265,798).
(3.00)
Added a Receptionist position, which was partially funded by the DES
General Fund ($59,114).
1.00
Non-personnel increased due to the increase in overhead costs related to
General Fund operational support ($291,563), the addition of one -time
funds to support the Board of Zoning Appeals (BZA) ($100,000), partially
offset by a decrease associated with Permit Arlington ($17,120).
FY 2022 The County Board added funding for a one-percent merit pay adjustment,
a five percent increase in the range, and an increase to the one-time bonus
for staff from $500 to approximately $900.
Added an Associate Planner in the Board of Zoning Appeals section
($118,869).
1.00
Added a Zoning Technician in the Zoning Counter Services Section
($85,841).
1.00
Transferred in an Administrative Technician I from the CPHD General Fund
($68,988).
1.00
Increased the charge out to the Fire Department and County Attorney’s
Office in the General Fund to align budget with current staff salaries
($50,682).
Added funding for increased salaries resulting from job family studies for
Engineers ($401,433).
Adjusted personnel associated with the Permit Arlington project
($228,128).
Removed salaries for positions added in the FY 2021 budget before the
COVID-19 pandemic but held vacant and removed in FY 2022 ($720,379).
It should be noted that the FTEs were removed from the adopted FY 2021
budget,
but the funding allocation remained if the County’s financial
condition improved in the fiscal year.
533
CPHD DEVELOPMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
Removed a contingent set -aside for Amazon development in FY 2020
($300,000).
Removed one-time funds added in the FY 2021 budget to support the
Board of Zoning Appeals (BZA) ($100,000).
Reduced printer expenses ($16,098).
Reduced non-personnel budget for the Permit Arlington project
($218,440).
Increased rent expenses associated with the tenth floor ($93,716).
Revenue decreases due to projected permit activity ($6,510,627), partially
offset by the addition of new fees for Zoning electrical, plumbing, and
verification permits ($61,820).
In FY 2021 closeout, funding was added for a one percent merit pay
adjustment and a one-time bonus for staff of $450.
FY 2023 The County Board approved an additional one percent merit pay
adjustment for a total increase of 5.25 percent, increased the
pay-for-performance budget by an additional 0.5 percent, and increased
the pay range movement to five percent. Additional compensation changes
approved by the County Board include an optional one-time cash-out of 40
hours of compensation time for those with balances of 80 or more, a
one-time increase in shift differential pay from $0.75 to $1.00 per hour for
the B shift and from $1.0 0 to $1.30 per hour for the C shift, and a
one-time increase in language premium from $0.69 to $0.92 per hour.
Increased the expense for personnel charge outs to the Fire Department
and the County Attorney’s Office in the General Fund to align budget w ith
current staff salaries ($21,942).
Added funding for increased salaries resulting from Administrative job
family studies ($16,173).
Added funds for a one-time bonus for staff of $1,600 gross ($140,000).
Eliminated a Technology Manager position ($229,447). (1.00)
Added the staffing below in response to a significant rise in complexity
and volume of construction projects and permitting activity that has
put a significant strain on the review and approval timeframes of
permits in the Dep artments of Community Planning, Housing and
Development (CPHD) and Environmental Services (DES). The
addition of these positions will allow for the maintenance and in some
areas an enhancement of service delivery in the permitting process.
o Administrative Specialist ($90,685, 1.00 FTE): Policy,
Research, and Information Management
o Administrative Assistant ($84,984, 1.00 FTE): Construction
Permit Administration Services
o Code Enforcement Inspector ($103,113, 1.00 FTE):
Construction Permit Administration Services
534
CPHD DEVELOPMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
o Electrical Inspector ($90,685, 1.00 FTE): Construction Field
Inspection Services
o Fire Inspector ($96,781, 1.00 FTE): Construction Field
Inspection Services
o Building Inspector ($90,685, 1.00 FTE): Construction Field
Inspection Services
o The addition of a Construction Management Specialist and a
Permit Processing Specialist in the Department of
Environmental Services General Fund that is charged to the
CPHD Development Fund ($199,889)
8.00
In addition to the permanent positions noted above, the nine positions
below have been added on a temporary basis to provide flexibility to
expand or contract staffing as needed based on future permitting activity
and revenue changes.
o Administrative Technician ($90,685, 1.00 FTE): Policy,
Research, and Information Management
o Two Customer Experience Staff Receptionists ($131,716, 2.00
FTEs): Counter Services
o Zoning Technician ($90,685, 1.00 FTE): Counter Services
o Permit Processing Specialist ($78,286, 1.00 FTE): Construction
Permit Administration Services
o Code Enforcement Inspector ($103,113, 1.00 FTE):
Construction Permit Administration Services
o Plumbing Inspector ($90,685, 1.00 FTE): Construction Field
Inspection Services
o Commercial Building Plan Reviewer ($121,438, 1.00 FT E):
Construction Plan Review Services
o Zoning Technician ($90,685, 1.00 FTE): Zoning Plan Review
9.00
Increased indirect costs related to General Fund operational support
($262,570).
Increased rent expenses for the tenth floor ($40,110).
Decreased non-personnel costs associated with the Permit Arlington
project ($202,710).
Increased revenue due to projected permit activity ($1,785,653) and an
inflationary increase of four percent to fees ($868,000).
At closeout of FY 2023, the County Board allocated $2.0 million in funding
from the General Fund to assist with an anticipated decrease in revenue in
the Development Fund in FY 2024.
FY 2024 Added one-time $2,000 (gross) employee bonuses ($310,101).
Increased salaries resulting from Administrative job family stud y
($28,288).
535
CPHD DEVELOPMENT FUND
TEN-YEAR HISTORY
Fiscal
Year Description FTEs
Increased the expense for personnel charge outs to the Fire Department
and the County Attorney’s Office in the General Fund to align budget with
current staff salaries ($26,650).
Transferred in a Community Codes Inspector III position from the General
Fund ($133,001).
1.00
Converted four temporary positions to permanent positions, three of which
were previously unbudgeted ($440,091).
o Construction Plans Examiners II (3.00 FTEs), Construction Plan
Review Services
o Zoning Inspector (1.00 FTE), Zoning Enforcement
4.00
Decreased non -personnel costs associated with the Permit Arlington
Project ($1,517,476).
Removed one-time funds for a transfer out to Fund 609 for electric vehicle
costs in FY 2023 ($6,704) and decreased electric vehicle purchase funds
($1,815).
Increased indirect costs related to General Fund operation al support
($1,023,023).
Adjusted rent for vehicle parking at Bozman Government Center ($41,148)
and rent for the tenth floor ($33,829).
Revenue increased due to an inflationary increase of 5.2 percent to
development fees ($1,128,400), an increase of indirect costs of six percent
to Inspection Services fees ($961,375), a nd the establishment of a 21
percent indirect costs surcharge to Zoning fees ($473,320); offset by a
reduction in projected permit activity fees ($868,000).
FY 2025 Adjustments to the annual expenses for maintenance and replacement of
County vehicles ($28,230).
Increased indirect costs related to General Fund operational support
($141,226), and an increase in costs associated with Permit Arlington
operations ($30,514); partially offset by a decrease in Bozman
Government Center rent expenses ($1,674).
Funding added for contractual increases associated with the elevator
inspection contract ($600,000).
Revenue increased due to changes in fees from the outcomes of the fee
study ($4,619,987) and additional revenue from the addition of an
automation enhancement surcharge to the Department of Environmental
Services (DES) Development Services fees ($830,000); partially offset by
a reduction in projected permit activity ($4,415,095).
536