PAY-AS-YOU-GO
CAPITAL
AND
SHORT-TERM
FINANCING
551
This page intentionally left blank
552
PAY-AS-YOU-GO CAPITAL
GENERAL CAPITAL PROJECTS FUND
The FY 202 5 Adopted Capital Program budget is $ 75.8 million. The program areas shown
below include all capital fund sources. The chart below details the dollar amount allocated by
program.
Local Parks and
Recreation
Programs,
$3.4 , 4%
Information
Technology,
$16.1 , 21%
Public
Safety,
$4.3 , 6%
Public and
Government
Facilities,
$5.1 , 7%
Energy
Management,
$1.1 , 1%
Regional
Partnerships and
Contingencies,
$6.6 , 9%
Water and Sewer
Infrastructure PAYG,
$23.3 , 31%
Economic
Development,
$0.9 , 1%
Arlington
Neighborhoods
Program,
$2.7 , 4%
Stormwater
PAYG,
$7.9 , 10%
Transportation ,
$4.3 , 6%
FY 2025 CAPITAL BUDGET ALLOCATION BY
PROGRAM
($'S IN MILLIONS)
553
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
The Adopted FY 2025 capital program budget is broken out by funding source below. The
capital program is funded by Pay -As-You-Go (PAYG), General Obligation (GO) Bonds,
Short-term Financing, bond premium funds, grants, and other outside funding. Detail about
the fund sources and associated projects can be found in the following pages.
Pay-as-you-go,
$29.9 , 39%
Utilities Pay-
as-you-go,
$23.3 , 31%
Stormwater
Pay-as-you-go,
$7.9 , 10%
*APS Cost-
Share,
$0.8 , 1%
Authorized
Unissued
Go Bonds,
$2.3 , 3%
Issued
Unspent
GO Bonds,
$2.5 , 3%
Short-term
Financing,
$9.2 , 12%
FY 2025 CAPITAL BUDGET FUNDING
SOURCE
($'S IN MILLIONS)
554
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
FY 2023
ACTUAL
FY 2024
ADOPTED
FY 2024
RE-ESTIMATE
FY 2025
ADOPTED
Adjusted Balance, July 1 $105,282,402 $90,087, 215 $102,059,079 $88,972,079
REVENUES:
Commonwealth of Virginia 2, 740,840 - - -
Federal Government 637,476 - - -
Charges for Services 1,737,822 - - -
Miscellaneous Revenue 11,988,541 1,087,000 1,087,000 828,000
Line of credit proceeds 11,124,718 12,209,000 12,209,000 9,200,000
Proceeds for bond premium 9,891,865 12,000,000 12,000,000 -
Total Revenues 38,121,262 25 ,296,000 25,296,000 10,028,000
Transfer in 14,503,093 11 ,025,000 11,025,000 22,438,000
Transfer out - - - -
Use of prior year revenue* - 1,857,080 1,857,080 6,200,466
Total Revenues and
Transfers 52,624,355 38,178,080 38 ,178,080 38,666,466
Expenditures:
Capital projects current year 55,847,678 36,321,000 36,321,000 32,466,000
Capital projects carry over - 14,944,080 14,944,080 5,712,080
Total Expenditures 55,847,678 51 ,265,080 51,265,080 38,178,080
Balance, June 30 $102,059,079 $77,000, 215 $88,972,079 $89,460,465
GENERAL CAPITAL PROJECTS FUND
FUND STATEMENT
* The amount under Use of Prior year revenue is already in the beginning fund balance.
555
This page intentionally left blank
556
PAY-AS-YOU-GO CAPITAL
GENERAL CAPITAL PROJECTS FUND
WHAT IS A CAPITAL PROJECT?
Capital projects include the design, construction, renovation, or maintenance of capital assets.
Capital assets are County -owned infrastructure that are of significant value, such as bridges,
community centers, technology systems, water, sewer and stormwater infrastructure or parks, to
name a few. County projects are funded from a variety of sources, including tax-supported Pay-As-
You-Go ( PAYG) funds, financed dollars such as general obligation (GO ) bonds and short -term
financed funds and, various other grants, fees, and dedicated funding sources.
TYPES OF CAPITAL PROJECTS
Capital projects fall into one of two major categories: maintenance capital (MC) projects and general
capital projects . The m aintenance capital program serves to prolong the useful life of major
investments, while minimizing the need for repeated asset repair emergencies. Although MC funds
are not contingency funds, they provide versatility in al lowing the County to respond to unforeseen
emergencies. The County regularly conducts condition assessments of capital assets to establish an
inventory of capital needs and associated prioritization plans. Maintenance capital activities differ
from operating maintenance activities described elsewhere in this document in that maintenance
capital activities are normally larger scale in terms of cost, size, nature, and frequency of
maintenance activity.
General capital projects, on the other hand, are all other capital projects and includes new projects
or renovations and expansions of projects , such as when the County constructs a new community
center or rebuilds and reconfigures a street intersection. This distinction between maintenance and
general capital projects is helpful because the two types have different goals. Maintenance capital
projects protect the County’s past investments in capital assets and ensure that Arlington residents
get the maximum use out of those assets. General capital projects aim to meet emerging community
needs by creating new capital assets or modifying existing assets to such a degree that the work
cannot be considered maintenance capital.
Beyond this distinction between maintenance and general, the County further categorizes capital
projects into Program Areas which correspond to the teams of County staff that execute the projects.
The capital projects discussed in the following pages are organized into the following Program Areas:
Regional Partnerships
Transportation
Facilities
Parks and Recreation
Technology
Public Safety
Arlington Neighborhoods Program
Arlington Economic Development/ Public Art
Capital Administration/Contingent
557
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
HOW THE COUNTY PAYS FOR CAPITAL PROJECTS
Capital budget development is included in both the annual operating budget process and the biennial
capital improvement plan (CIP). The annual budget process approves and allocates funding for
capital projects using current year ongoing revenue, one-time funding, state and federal grant funds,
cost-share, short -term finance dollars, previously approved bond funding and various dedicated
funds. The CIP includes a projected ten year spend plan of all of the aforementioned sources, various
fees, and the approval of new GO bonds. Due to these multiple funding sources and the multi -year
nature of project execution, not all of the County’s planned spending on capital projects appears in
any one year of the operating budget. The CIP document shows the multiple year execution of
projects.
The County typically uses PAYG and short-term financing to fund assets with useful lives of 10 years
or less. Financed dollars, whether short- or long-term, are set on repayment schedules (debt service)
concurrent with the expected useful lives of the financed assets. For example, short-term financing
is often used for replacement of technology and equipment assets with expected useful lives from
three to seven years. Long-term financing (e.g., GO bonds) is used primarily for the County’s large
capital infrastructure investments, such as buildings or roads, with expected useful lives of 10 or
more years. Refer to the Debt Service section of this document and the A dopted Capital
Improvement Plan for more detailed information on the County’s long-term capital financing strategy.
OVERVIEW OF FY 2025 CAPITAL PROGRAM
The adopted General Capital Projects Fund budget or Pay -As-You-Go (PAYG) for FY 2025 is $29.9
million. Funding for this program comes from a variety of sources including a transfer in of one-time
funds for use as part of the FY 2025 – 2034 Capital Improvement Plan ($4.0 million), a transfer in
of one-time funds for land acquisition ($1 .5 million ), a transfer in of one -time funds for various
projects ($1.15M), a transfer in of ongoing funds from the General Fund ($6.0 million), bond premium
balances ($3.2 million), and other carryover and/or reallocated balances ($14.0 million).
The maintenance capital program serves to prolong the useful life of investments, while minimizing
the need for repeated asset repair emergencies in the operating budget. This adopted budget focuses
on replacing assets at the end of their useful lives, assets that are obsolete and assets presenting a
potential safety concern. Because projects are often multi-year in nature, appropriations rather than
actual expenditures are presented.
In addition to the PAYG dollars in the General Capital Projects budget , there are PAYG investments
in other funds and operations including:
The Utilities Fund FY 2025 Adopted PAYG budget of $ 23.3 million includes funding for
Wastewater Treatment Plant capital maintenance and improvements to the Washington
Aqueduct, which supplies the County with 100 percent of its drinking water.
The Stormwater Utilities Fund FY 2025 Adopted PAYG budget of $7.94 million includes funding
for improvements to infrastructure and regulatory requirements in the stormwater system.
558
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
3,832 3,832 4,000 6,000 6,000
9,761 14,193
21,497 19,969 23,850
23,422
26,065
27,000 29,075 23,300
7,935
$-
$20,000
$40,000
$60,000
$80,000
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
PAY-AS-YOU-GO APPROPRIATION HISTORY
FY 2021 - FY 2025
($ in 000's)
County Capital Fund (Ongoing)
County Capital Fund (One-Time/Fund Balance)
Utilities Capital Fund
Stormwater Capital Fund
559
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
FY 2025 PAYG CAPITAL EXPENDITURES BY PROGRAM AREA
Ongoing
Funds
One-Time/
Reallocated
Balances
Bond
Premium
Funds
APS Cost-
Share
FY 2025
Adopted
Total
Regional Partnerships $857,762 - - - $857,762
Transportation Maintenance Capital 1,830,000 $1,000,000 - - 2,830,000
Transportation Complete Streets 73,000 1,378,000 - - 1,451,000
Facilities Maintenance Capital 350,000 1,500,000 $1,150,000 - 3,000,000
Facilities Design and Construction - 525,000 1,355,000 - 1,880,000
Energy Management 1,050,000 75,000 - - 1,125,000
Parks Maintenance Capital 175,000 590,000 - - 765,000
Synthetic Turf - 1,155,000 - $828,000 1,983,000
Information Technology 1,141,000 6,790,000 - - 7,931,000
Public Safety - 1,242,000 220,000 - 1,462,000
Arlington Neighborhoods Program 200,000 - 500,000 - 700,000
Public Art 48,500 42,000 - - 90,500
Capital Contingency/Admin 274,738 5,500,000 - - 5,774,738
$6,000,000 $19,797,000 $3,225,000 $828,000 $29,850,000
1) Numbers may not add due to rounding.
PAYG and BOND PREMIUM FUNDED PROJECTS
2) Total funding is a combination of one-time dollars from reallocated project balances as well as bond premium from the
County bond sale that is restricted in use to capital projects.
3) Total does not include projects that are self-funded in the amount of $390,000. The revenue will be
received in FY 2024 for FY 2025 project execution.
PROGRAM CATEGORY
Total Projects
Regional Partnerships $857,762
Arlington County is a member of several regional organizations which provide services to Arling ton
residents and visitors. The Regional Partnerships program funds the County’s annual contributions
to support these organizations’ capital needs. This funding is separate from the County’s annual
operating contribution to these organizations, which is discussed in the Regionals narrative in this
document. The amount the County contributes every year for capital needs is determined by each
organization’s allocation formula.
Northern Virginia Criminal Justice Academy $126,675
The Northern Virginia Criminal Justice Academy (NVCJA) provides law enforcement training and
is comprised of seventeen participate police and sheriff agencies from Northern Virginia and the
District of Columbia. In 2006, the principal members agreed to fund the construction of the
Emergency Vehicle Operations Center (EVOC). The initial payments began in FY 2007 and will
continue through FY 2026. The FY 2025 budget reflects Arlington’s estimate of the contribution
required towards the annual debt payments of the EVOC.
Northern Virginia Regional Park Authority $731,087
The Northern Virginia Regional Park Authority (NVRPA) is a multi-jurisdictional agency comprised
of Arlington County, Fairfax County, Loudoun County, and the Cities of Alexandria, Falls Church,
and Fairfax which owns and operates over 10,000 acres of parklands with 21 major parks,
including Potomac Overlook, Upton Hill, and the W&OD Regional Parks in Arlington.
560
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
Transportation Program $4,281,000
Transportation – Maintenance Capital $2,830,000
The Transportation Maintenance Capital program in the Department of Environmental Services (DES)
maintains transportation infrastructure by repaving streets and bike lanes, maintaining ped estrian
and vehicular bridges, maintaining sidewalks, signals, signal infrastructure, and Intelligent
Transportation Systems (ITS), maintaining and replacing street and trail lights, maintaining and
replacing parking meters, and maintaining and replacing bus shelters.
Bridge Maintenance $221,000
This is an ongoing program that provides funds to continue inspection, maintenance, and
rehabilitation of 36 vehicular and pedestrian bridges in Arlington County to assure an adequate
level of safety. Twenty -five of the bridges are included in the Federal Highway Administration
(FHWA) National Bridge Inventory (NBI), which establishes standards for inspection and
maintenance of public highway bridges. All NBI bridges are required to be inspected and reported
on at least biennially and the County has adopted this standard for all 36 bridges. The program
goal is to maintain the Bridge Condition Rating (BCR), a nationally used rating, in a range between
6 and 7, defined as satisfactory to good. During FY 2025, the program is anticipating undertaking
repairs and maintenance of the following bridges: culvert under South Glebe Road at Water
Pollution Control Plant and Barcroft Neighborhood/Glencarlyn Park Pedestrian Bridge.
Additionally, we will perform spring power washing and cleaning of the eleven largest vehicu lar
bridges and allocating some funds for emergency repairs after large storm events and traffic
accidents.
In addition to PAYG funding, this program typically receives bond funding during the CIP.
Parking Meters $-
The goal of this program is to modernize and maintain the County's parking -meter equipment,
including research into and deployment of new equipment types and technologies that will allow
for efficient management of public curb space. The County currently has about 1,407 parking
meters that require replacement, or component replacement, after ten years of useful life. As
part of the program, data is collected and analyzed from parking-meter equipment and from non-
metered curb space. This analysis supports decision making about curbside ma nagement, such
as the allocation of curb space for various uses, and other regulations, such as time limits for
parking.
Other funding is available to continue executing the program from existing fund balances.
Paving Program $1,300,000
The County currently maintains 1,058 lane miles of roadway by a combination of mill and overlay,
full depth rebuilding, micro -surfacing, and slurry sealing. The County utilizes a Pavement
Condition Index (PCI) to assess the road conditions. The County has established a desired
average PCI range of 75-80 (with 100 representing the best possible) and has raised overall PCI
to 83 in 2023 from an average PCI of 67 in 2014. The PAYG funds along with anticipated GO bond
funds will maintain the PCI level as long as changes in winter weather, contracting costs, and oil
prices do not negatively impact the anticipated paving program. The program operates on a 15 -
year paving cycle, on average, with about 60 lane miles mill & overlay per year to maintain the
desired average PCI. Arterials are repaved more often due to the traffic volumes and type of
vehicles using them, while neighborhood streets get slurry seal treatment every seven to ten
years to extend their life rather than re-paving them as often. With the improvement in average
PCI to 83, the County will be placing more emphasis on re-builds for streets with low PCI.
561
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
In addition to PAYG funding, this program typically receives bond funding during the CIP.
Sidewalk, Curb, Gutter Proactive Zone Maintenance $309,000
The program, newly created in the Adopted CIP FY 2023 - FY 2032, funds proactive and
comprehensive inspection and maintenance of County -maintained, curb, gutter and sidewalks.
The County is divided into 20 concrete zones, and the program's goal is to address two zo nes a
year, for a 10 -year maintenance interval. Zone maintenance is informed by a sidewalk survey
completed in 2021 along with project manager observations.
In addition to PAYG funding, this program typically receives bond funding during the CIP.
Signals and ITS Maintenance $1,000,000
This combined program covers three main areas of asset management associated with traffic
signals and intelligent transportation systems (ITS): 1) structural integrity, 2) preventative signal
repairs, and 3) device replacements. The program’s goal is to improve the infrastructure, safety,
and operations of the various traffic control devices throughout the County, including meeting
current Federal and County requirements for structural design and for accessibility.
PAYG funds will be used to support ongoing structural inspections of poles and inspections of
overhead infrastructure. This initiative will allow for more accurate lifecycle planning and provide
information on the structural integrity of the poles. Furthermore, th ese aerial inspections will
identify potential safety risks that can be remedied to ensure a state of good repair and extend
life. For example, signals may need to be re-wired with new cable installed and controller cabinets
may need to be replaced. PAYG also pays for safety and accessibility improvements at signalized
intersections such as ADA ramp construction and accessible push button installation; and
upgrades to system components such as controllers, detection, backup power, LED signal
replacement, and emergency vehicle pre-emption.
Finally, many ITS devices were installed in the last 10 years and will become obsolete and require
replacement for improved functionality or upgraded communication capabilities. The items are
generally components used at an intersection or standalone roadside assemblies. Examples
include detection systems, battery backup, accessible pushbutton stations, CCTV upgrades from
analog to digital, rectangular rapid flashing beacons (RRFBs), and speed indicators . These are
specialized devices that are typically expensive to procure and require specialty contractors to
install.
In addition to PAYG funding, this program typically receives bond funding during the CIP.
Street Lighting Management $-
This program will rebuild and upgrade aging streetlights and resolve ownership issues between
the County and Dominion Energy that adversely affect performance and maintenance. County
streets are lit with about 18,900 streetlights, of which about 7,700 are owned by the County and
11,200 are owned by Dominion Energy (DE, formerly Dominion Virginia Power). PAYG is used to
proactively replace conduits and conductors on aging lighting systems as outlined by the
Streetlight Managem ent Plan (SMP). This effort updates the aging underground infrastructure
and improves service reliability as underground repair work typically creates the longest outages
of streetlights. PAYG is also used to upgrade some existing LED fixtures to newer mod els with
improved functionality as they fail and require replacement. An example of this is the change
from a radio- based communication node to a cellular based control node. The control systems
are used to allow for remote monitoring of errors and for dimming.
562
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
Other funding is available to continue executing the program, including $640,000 from the
Transportation Capital Fund (TCF) and Crystal City, Potomac Yard and Pentagon City Tax
Increment (CCTIF). In addition, this program typically receives bond funding during the CIP.
Trail Light Maintenance $-
The program includes minor repair and maintenance of approximately 350 trail lights across
approximately ten miles of trails. The repair and maintenance include bulb change, splicing of
wires, fuse replacement, repairing and cleaning of globes, and repairi ng poles that may be
damaged. Any major repairs on off-road trails are carried out by Parks and Recreation under the
Trail Modernization Program.
Other funding is available to continue executing the program from existing fund balances .
Complete Streets Programs $1,451,000
The Complete Streets Program provides mobility and accessibility improvements throughout the
County and connections to the rest of the region. This is achieved by providing a high-quality transit
system, a robust bicycle and pedestrian network, provisions for Shared Mobility Devices (SMDs), and
additional transportation demand management approaches. The program also maintains and
develops systems to manage and analyze transportation assets, including physical assets (e.g.,
signs) and transportation data assets (for example, collected observed traffic data and crash data).
Bike Arlington $50,000
The BIKE Arlington program makes physical enhancements to Arlington's transportation
infrastructure, including trails and streets, to improve conditions for bicycling. The program's goal
is to increase the number of riders and bicycle trips by making bicycling a more attractive travel
choice through completing the bicycle network, tracking usage of bicycle facilities through the
counter program, and installing wayfinding. PAYG funds cellular data for the bike counter
program, as well as repairs to signage or other bicycle infrastructure.
Other funding is available to continue executing the program, including $860,000 from TCF.
Neighborhood Complete Streets $-
The Neighborhood Complete Streets (NCS) program implements projects on non-arterial streets
with a focus on safety and accessibility. The goal of the NCS program is to develop streets that
are safe and accessible for all modes through projects that improve walking/bicycling
connectivity. PAYG funds are used for pilot projects or other tactical improvements that are not
eligible for other sources.
Other funding is available to continue executing the program, including $2,680,000 from TCF. In
addition, this program typically receives bond funding during the CIP.
Street Safety Improvements $1,378,000
The Street Safety Improvement (SSI) program supports the Vision Zero goal the Arlington County
Board adopted in July 2019 (and the Vision Zero Action Plan adopted in May 2021) to eliminate
all transportation fatalities and severe injuries. It implements sa fety improvements at
intersections and streets for pedestrians, shared mobility device (SMD) users, bicyclists, transit
riders, or motorists as determined through a comprehensive investigation, including crash
analysis. Improvements include signage, paveme nt markings, and other types of delineation to
achieve greater separation and awareness of pedestrians and bicyclists. Minor changes to the
curb may also be included. Locations demonstrating high crash rates are prioritized. Initiatives
being advanced wi th PAYG funding include but are not limited to 1) slow school zones, which
include measures to support slower speeds, 2) increased in -house survey, design, and
563
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
construction management support for quick build projects, 3) pedestrian crossing enhancements,
including the implementation of Rectangular Rapid Flashing Beacons (RRFBs), and 4) speed
reductions strategies to decrease the risk of a critical crash. As part of the adopted budget, an
additional $513,000 is included to fund five to six addition SSI quick build projects and $500,000
is included to cover costs associated with street intersection work necessary to implement the
Police’s Departments Speed Camera Program.
Other funding is available to continue executing the program, including $916,000 from T CF. In
addition, this program typically receives bond funding during the CIP.
Transportation Asset Management $23,000
Transportation assets include deployed assets such as signals and signs installed in the
right-of-way, inventory assets housed in wareh ouses, and traffic data assets. This program
developed and maintains a management system that not only keeps records but also makes data
more accessible and analytical. This includes the development and continuous update of a central
traffic database that houses both historic and recent transportation data, including but not limited
to characteristics of streets, traffic volume counts, speeds, crashes, and street classification. The
database is updated as new information becomes available and currently has the following
capabilities: open data accessibility to staff and public; integration with the County work order
and asset management system (Cartegraph); integration with County’s Geographic Information
System (GIS); trend analysis; safety analysis; report and map generation; and system
performance monitoring. This program also helps track and manage assets by integrating with
the current inventory system associated with the County’s warehouse storage facility. With the
implementation of Vision Zero, more functionality is being explored and added to the system.
Other funding is available to continue executing the program, including $50,000 from TCF.
WALKArlington $-
The WalkArlington program makes physical enhancements to Arlington's sidewalk and street
infrastructure. The objectives of the program include: improving pedestrian safety, completing
the planned pedestrian network, and making the pedestrian network fully accessible for all users.
PAYG funds are used to implement tactical measures that aren’t eligible for other sources.
Other funding is available to continue executing the program, including $2,727,000 from TCF. In
addition, this program typically receives bond funding during the CIP.
Facilities Maintenance Capital Program $3,000,000
The Facilities maintenance program operates approximately 90 County-owned public facilities,
including office buildings, fire stations, support, maintenance and logistic facilities , recreation
centers, courts, and more. The Facilities Maintenance Capital program is a collection of major facility
maintenance projects designed to keep County facilities operating in a safe, efficient, and reliable
manner. This program and the Facilities Design and Construction program are integrated to maintain
and improve the portfolio of County facilities based on the life cycle of assets.
Argus House Window Replacement $600,000
The Argus House is a community-based group home for at-risk boys ages 13-17 and is operated
24/7. The existing windows are single pan e and original to the building. Replacement parts are
no longer available to repair the operating mechanisms. The window replacement will increase
energy efficiency, extend the life of the HVAC system, quiet outside noise and help enhance the
customer experience within the facility.
Court Square West (CSW) Electrical Switchgear Replacement $1,500,000
564
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
The switchgear at Court S quare West (CSW) has exceeded its useful life. The switchgear is the
initial component that receives power from the utility, provides a safeguard to isolate power
within the facility, and is a centralized collection of breakers and fuses.
Detention Center Air Compressor $250,000
The existing air compressors servicing the Detention Facility are original and have exceeded their
useful life. These units provide compressed air for multiple critical mechanical systems within the
facility. Corrective repairs have been performed but the system continues to fail and malfunction.
Emergency Communications Center UPS Upgrades $350,000
This project will replace and reconfigure the existing uninterruptible power supply (UPS) system
and controls to provide redundant back -up power to the Emergency Communications Center
(ECC) alternative site. The existing UPS unit does not provide redundant support to the ECC and
is the single point supplying power to the system, making it susceptible to disruption. The updated
system will share the electrical loads across multiple UPS units.
Fire Station 9 (Walter Reed)-Apparatus Bay Circulation System $300,000
This project will install an air circulation system in the fire station apparatus bay. Currently, the
apparatus bay does not have a system to circulate and promote air movement within the space.
The system is essential for reducing temperatures in the apparatus bay, which will prevent
overheating of critical materials and medicines stored in the Fire Department’s Response Units
and increase staff comfort and health.
Energy Management $1,125,000
The Energy Management Program invests funds in various energy efficient capital improvements that
advance the goals of the Community Energy Plan (CEP).
County Facility Renewable Energy Installation $300,000
Arlington's Community Energy Plan (CEP) is a long -term vision for transforming how the
County generates, uses and distributes energy. Funding will support potential upfront capital
expenses for structural analysis and electrical panel upgrades. The three county facilities selected
are the Central Library, the Equipment Bureau and the Quincy site.
Electric Vehicle (EV) Chargers - Internal Accessibility $250,000
This project will install additional EV charging stations throughout County facilities to support the
conversion of the County fleet to electric vehicles (CEP 2019 Government Activities and Clean
Transportation). This effort closely tracks the Equipment Bureau’s EV purchasi ng/replacement
plan. The locations identified are Barcroft Community Center, Barcroft Garage, Lubber Run
Community Center and the Walter Reed Community Center.
Electric Vehicle Chargers - Public Accessibility
$100,000
This project will fund electric vehicle charging infrastructure for high-visibility and high-circulation
public-use County government sites. This project supports key objectives of the County Board
adopted Community Energy Plan, including, among others, policy 4.4 to - promote and encourage
electric vehicles in the private and commercial sectors including supporting convenient charging
stations throughout Arlington. The locations identified are Barcroft Community Center, Barcroft
Garage, Lubber Run Community Center and the Walter Reed Community Center.
Energy Performance Upgrades – County Buildings $475,000
This program, in partnership with the Facilities Management Bureau and Arlington Initiative to
Rethink Energy (AIRE), is to implement energy efficiency and decarbonization measures at
County facilities with a focus on energy and climate performance. In FY 2025 the funding will be
565
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
used to implement lighting retrofits at the Courts Police Building. The project will convert
fluorescent lighting to LED in approximately 75 percent of the building with the remaining
completed in future years. Since this is a 24/7 operational facility, it will have the greatest impact
on energy efficiency.
Facilities Design and Construction Program $1,880,000
The Facilities Design and Construction Program maintains and modernizes current County facilities
and plans for the County’s future facility needs. The program is integrated with the Facilities
Maintenance Capital program in planning for periodic renovations and eventual replacement of
obsolete facilities at the appropriate points in the life cycle.
Commonwealth’s Attorney Office (CWA) Expansion/ $500,000
Alcohol Safety Action Program (ASAP) Relocation:
The project will reallocate 1,700 square feet from ASAP to CWA, creating space for an additional
three offices and eight workstations for the CWA office. This expanded area will accommodate
the new personnel hired by the CWA.
County Board Office Space Redesign $25,000
This project will provide design funds to rearrange and enhance the County Board Office. These
improvements will ensure that seven personnel have access to natural light in their workstations,
enhancing their working environment.
Oakland Street Police Warehouse Renovation $1,355,000
The Oakland Street Police Warehouse requires a complete upgrade to improve operational
efficiency. The Project will be completed in two phases. The scope of phase I will be the demolition
of the loading dock, ramp, and interior walls, followed by the installation of a new ramp/driveway
and two overhead doors. Phase II will focus on the repair of the building envelope (selected
structural wall repair, new doors, HVAC, roof, insulation and windows). The plumbing system will
be brought to code compliance and a new restroom will be installed.
566
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
Parks Maintenance Capital and Synthetic Turf Programs TOTAL PAYG: $2,748,000
County Funds: $1,920,000
APS Cost Share Funds: $828,000
The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing
facilities by replacing inefficient and outdated infrastructure and preventing premature failure. The
program funds the replacement or major renovation of park and recreation facility assets, including
athletic fields and courts, field and court lighting, playgrounds, picnic shelters, restrooms, parking,
and other miscellaneous park and recreation facilities. The program also addresses accessibility,
safety, and storm water improvements that are complementary to renovating the facilities.
To meet the growing demand for athletic fields to serve a wide variety of athletic programs and drop-
in use, the County has invested significantly in the development of synthetic turf fields. The Synthetic
Turf Program is largely focused on replacing existing synthetic turf fields that are approaching the
end of their useful life. The other component of the Synthetic Turf Program is the conversion of
athletic fields with existing grass turf to synthetic turf.
Capital Asset Manager $175,000
This funding is for the staff position that manages the Parks Capital Asset Program.
Field Fund $290,000
The Parks Field Fund is supported by an annual fee assessed on official affiliated youth and adult
sports teams playing on Arlington County rectangular and diamond field s. In FY 2023, the field
fund fee was increased, and the fees restructured. Work to be identified may include supporting
the replacement and construction of synthetic turf fields and enhancements to existing fields such
as improved irrigation, site amenities or accelerated sod replacement. The FY 2025 PAYG budget
reflects the projected annual revenue from FY 2024 generated fees.
Greenbrier Park/Yorktown High School Stadium Field Replacement $1,164,000
This project is for the design and construction for the replacement of the synthetic turf surfacing
on the stadium athletic field. Costs include design development, replacement of the synthetic turf
and infill, repairs to the base layer and under- drain system, replacement of field amenities , and
construction administration. The project cost -share between the County and Arlington Public
Schools (APS) is 50/50 ($582,000 Arlington County/$582,000 APS for total project cost of
$1,164,000).
Public Spaces Master Plan (PSMP) Update $300,000
The PSMP is recommended to be updated every five years (see Action Step 1.2.4). This funding
is for consultant support for the needs assessment, including a statistically valid survey as well
as an update of the Level of Services (including benchmarking, trends analysis, standard review,
mapping).
Thomas Jefferson Middle School Synthetic Field Replacement $819,000
This project is for the design and construction for the replacement of the synthetic turf surfacing
on the lower athletic field. Costs include design development, replacement of the synthetic turf
and infill, repairs to the base layer and under-drain system, replacement of field amenities, and
construction administration. The project cost-share between the County and APS for this project
is 70/30 ($573,000 Arlington County/$246,000 APS for total project cost of $819,000).
567
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
Technology $7,931,000
The technology section includes both enterprise -wide and program specific projects. The projects
are funded mostly between PAYG and short-term financed dollars. The total technology program is
$16.1 million with $8.16 million being funded through other sources. See the project list for additional
funded projects.
Bozman Data Center Migration $1,100,000
This is the first phase of a multi-phase project to update and consolidate the County's data centers
utilization and continue to m igrate, as appropriate, the County's on -premise data to a cloud -
based environment. Phase I, includes the reduction and relocation of the Bozman Data Center.
The total project cost is $1,850,000 With $750,000 funded from GO bond funds.
County Audio Visual Equipment Replacement $300,000
This program covers the replacement and improvement of damaged or broken technology
equipment throughout County conference rooms. These funds will be used to replace
equipment in court rooms and conference rooms throughout the County as needed.
Hosted Legacy Application Cloud Migration $625,000
This project will migrate government applications to the public cloud. The scope of work includes
a readiness assessment, preparation of the cloud environment, testing, migration of applications,
and post- implementation evaluation. This approach will be applied to subsequent phases of
migrations. The migration process offers several benefits, including enhanced security and
ransomware prevention, cost savings on infrastructure setup and maintenance, and the ability to
easily scale up or down as business needs change. Cloud migration enables the County to
establish a modern and unified digital services experience for residents and businesses, as well
as added flexibility to respond to changing business needs.
Revenue and Collection System (ACE/CAPP) Upgrade $750,000
This project will upgrade the Revenue and Collection System, also known as ACE and CAPP. ACE
is the back -office application used by the Commissioner of Revenue and Treasurer’s Offices to
perform their daily activities, such as business tax assessments, billing, collection of taxes and
fees, and enforcement. CAPP is the public-facing portal used by Arlington taxpayers, individuals,
and businesses for paying bills, filing tax returns, and managing their County accounts. This
project represents a comprehensive upgrade of the software, aimed at maintaining contemporary
standards for support and maintenance. It focuses on enhancing functionality and optimizing the
system's hosting, thereby improving uptime, security, and scalability. Key enhancements include
more intuitive navigation and a refined graphical design, elevating the user experience for both
constituents and staff. Additionally, the forthcoming version is set to introduce a digital assistant
(chatbot) for constituents engaging with CAPP, along with several features designed to boost staff
efficiency. The full cost of the project is $4,500,000 with $3,750,000 funded from short -term
financing and $750k being funded through PAYG.
Social Solutions/Efforts To Outcomes/Homeless Management $990,000
Information System Replacement
This project covers the replacement of the current system to manage the Economic Independence
Division (EID) Customer Service Center - Customer Service/Case Management functionality and
replace the current Homeless Management Information System (HMIS) that was acquired in
2011. DHS uses the case management function to track clients in all the divisions where the
client receives services. This allows the client to flow through DHS services efficiently by only
providing personal information at the entry point instead of multiple times. The HMIS portion is
a Housing and Urban Development mandated platform that tracks the homeless population. All
568
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
non-profits in Arlington County that serve the homeless use the system to document their
homeless clients and the services the client receives. HMIS supports the Continuum of Care
(CoC), domestic violence and Homelessness Prevention and Rapid Rehousing Program (HPRP).
Workforce Device Modernization $2,166,000
This program provides funding for the cyclical replacement of workforce devices, including laptops
and desktops utilized by the County. The goal of the program is to maintain a 70% laptop to 30%
desktop device mix within the County. This program, formerly known as PC Replacement, is
responsible for managing the replacement of approximately 2,695 laptops and 946 desktop
devices on a rolling replacement.
Voting Machines $2,000,000
The project covers the replacement of the Arlington Electoral Board voting system. This system
includes 110 precinct based digital scanners for paper ballots, 60 ADA ballot marking machines,
a high-speed scanner, and proprietary software and hardware needed to conduct an election. The
current system was purchased in 2015 and 2016. Voting systems are expected to last 10 years.
Public Safety $1,462,000
The public safety section includes key system and asset replacements on a reasonable life cycle. The
projects are funded between both PAYG funds and short -term financed dollars. The total public
safety program is $ 4.4 million, with $ 2.94 million included in short -term financing. See the
short-term finance section for project details.
Fire Bomb Squad X-Ray Systems $240,000
Mobile x-ray devices provide ACFD’s Bomb Squad Team with the ability to take multiple x -rays
remotely, reducing the time on target and improving hazardous detection. ACFD’s current devices
are 10 -15 years old and use outdated technology, leaving them vulnerable to breaking or
malfunctioning. Replacement will reduce risk to the bomb technicians and improve the team’s
ability to h andle suspicious items and situations. Going forward, these devices should be on a
seven-year replacement cycle.
Fire Breathing Apparatus Compressors $372,000
A self-contained breathing apparatus, or SCBA, is a device worn by first responders to provide
breathable air in an "Immediately Dangerous to Life or Health" atmosphere (IDLH). This project
will replace the four compressors the Department maintains to refill the SCBAs with breathable
air. The compressors are deployed across the County to provide q uick and efficient refilling and
capacity. These new models will also provide electronic records which are required for
accreditation. The full cost of the project is $460,000 with $88,000 funded from short- term
financing and $372k being funded through PAYG.
Police Electronic Summons System $100,000
In FY 2015, the County began assessing a $5.00 fee as part of the costs for each criminal or
traffic case in the district or circuit courts to purchase and implement an electronic summons
system. With an electronic summons system, citation data will be automatically scanned and
electronically entered at the point of activity, improving efficiency and accuracy in the processing
of issued citations for Courts and Police personnel. Once the citation is complete, the transaction
data would be sent electronically to the Court’s case management systems, allowing violators to
prepay their fines promptly and aid the Courts in managing their dockets while tracking their
caseloads. The costs of the system include the software and hosting costs, peripheral equipment
569
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
such as handheld devices and portable printers, installation, training, and sy stem maintenance.
The FY 2025 PAYG budget reflects the projected annual revenue from fees earned in FY 2024.
Public Safety VM Ware/Servers $350,000
This project funds the re placement of Public Safety servers and VMWare (virtual ware) licensing
to continue the consolidation and optimization of the multiple server footprint within different
areas of public safety. This is an ongoing effort as the applications used by Public Safety
evolve. Virtual machines allow the creation of many servers without the purchase of a lot of
individual system hardware. Over the next 10 years, these platforms will continue to change
and evolve as some systems move to Cloud environments and others stay on site. The useful
life of the equipment is five years.
Sheriff Body Scanner Warranty Extension $100,000
This project will extend the warranty for the existing body scanner used in the Detention Facility.
The Full Body Screening Security Station is a critical tool to enhance the capabilities of Arlington
County Sheriff's Office (ACSO) personnel in the screen ing and detection of contraband.
Identifying contraband substances quickly increases inmate and staff safety . Use of the system
provides a greater level of privacy to inmates by eliminating the need for strip searches. The
system also serves as a deterrent for those contemplating smuggling contraband into the
Arlington County Detention Facility. With the warranty extension, the useful life of the equipment
is 10 years.
Sheriff Courthouse Magnetometer/X-Ray Machine $300,000
This project will replace the magnetometer/X -ray machine that is used in the Courts Building.
Staff in the Sheriff’s Department (ACSO) use the device to screen all visitors to the building for
potentially threatening items and assist in maintaining security in the Courthouse. The useful life
of the equipment is seven years.
A
rlington Neighborhoods Program $700,000
This ongoing program funds a diverse set of infrastructure construction projects across the
community. Since the 1960s, Arlington residents and civic associatio ns have collaborated with the
County to identify and plan infrastructure projects in their own neighborhoods. These projects have
included everything from streetlight installation to street intersection reconfiguration to tree and
landscape restoration to new curb, gutter and sidewalk. The program budget required for Arlington
Neighborhoods Program staff totals $700,000.
Arlington Economic Development (AED) Public Art $90,500
Arlington is home to nearly eighty permanent public art projects that need to be maintained. These
projects are commissioned by the County to be integrated into various capital improvement projects,
commissioned by developers as part of the site plan process, and initiated by communities. AED is
also responsible for the care and maintenance of various public spaces.
Lubber Run Amphitheater Seat Renovation $42,000
This project will replace the amphitheater seating with new recycled plastic lumber bleacher
seating. The existing benches are damaged and have missing covers.
Public Art-Civic Facilities $48,500
This project is to maintain the County’s public artworks. Projects that have been identified are
the Bon Air Rose Garden Mosaic, James Hunter Park Wayfinding Signs, Memory Bricks at Hall’s
570
PAY-AS-YOU-GO
GENERAL CAPITAL PROJECTS FUND
Hill/High View Park and damaged Public Art Signs. Without addressing these maintenance needs,
these artworks and signage are at risk of irreparable damage.
Capital Administration/Contingent $5,774,738
The FY 2025 adopted budget includes $4.0M in one-time funds for use in the FY 2025 – 2034 Capital
Improvement Plan and $1.5 million for land acquisition. An additional $274,738 continues funding
for administrative support of capital projects tracking, reporting and procurement in the Department
of Management and Finance.
571
This page intentionally left blank
572
GENERAL OBLIGATION (GO) BONDS
GENERAL CAPITAL PROJECTS FUND
WHAT ARE BONDS?
Municipal b onds are debt securities the County sells to generate funding for capital
investments that will then be paid back over time. When investors purchase County bonds, it
is a debt that the County will repay in one or more years with interest. The County’s regular
payments to bond investors are called “debt service.” The bond funding of capital investments
operates under the principle of “inter -generational equity .” Debt service is sprea d over
multiple years in line with the useful life of an asset. This allows those residents who may
benefit from the project over time to pay for it. There are many different types of bonds,
which are primarily distinguished by the security backing them. The County primarily issues
General Obligation (GO) bonds and subject-to-appropriation bonds. GO bonds are backed by
the full faith and credit of the County, which is the strongest backing a municipal bond can
have. Subject-to-appropriation bonds are secured by an annual appropriation of revenues
sufficient to pay debt service. Due to this lack of the full faith and credit pledge, they typically
carry a lower credit rating.
HOW DOES THE COUNTY ISSUE BONDS?
In Arlington County, the primary type of bond s issued are General Obligation (GO) bonds.
These bonds carry the County’s full faith and credit pledge and require that r esidents must
first approve one or more bond referenda authorizing the issuance of GO bonds. These bonds
are issued for capital projects as identified in the County’s Capital Improvement Plan (CIP).
The County seeks approval for referenda as part of regular elections, generally in November
of even numbered years. If residents approve one or more bond referenda, then the County
will include one or more projects approved under each referendum in a future sale of GO
bonds based on each project’s cashflow needs . The specific amounts of the bonds to be sold
for each capital project are determined as part of the County’s CIP. Typically, the County’s
CIP has a 10-year “planning horizon,” which includes an adopted capital budget for the first
year and nine forecasted future planning years. In FY 2023, the County adopted a ten-year
CIP covering fiscal years 2023-2032, and six different b ond referenda were approved by
voters in November 2022.
GO BONDS AND THE CAPITAL IMPROVEMENT PLAN
The CIP is a planning document that identifies the capital needs of t he community over a
ten-year period. GO bond financing is one component of the overall funding plan in the CIP
and is generally used to finance capital projects with average useful lives of more than 10
years, matching or exceeding the average maturity of the bonds issued. Full detail of the CIP
can be found at https://www.arlingtonva.us/Government/Programs/Budget-Finance/CIP.
Prior to FY 2020, GO bond funding was appropriated at the time of bond issuance, typically
in the spring of each fiscal year. Consistent with other capital funds, the appropriation of
general obligation (GO) bond funded projects is now included as part of the operating budget.
As individual projects approved in the CIP advance and become more defined, the timing of
when the County sells its bonds to investors may shift from the adopted CIP to align with
changes to the timing or cashflow needs of the project. The bond dollars identified on the
573
GENERAL OBLIGATION (GO) BONDS
GENERAL CAPITAL PROJECTS FUND
following page s have been approved in previous CIP’s and will be issued in FY 2025 for
execution of the projects.
FY 2025 General Obligation Program Costs
Debt service on bonds to be issued in FY 2025 to finance the projects on the following pages
will not begin until FY 2026 and will be included in that year’s operating budget. The adopted
FY 2025 debt service budget includes debt service on bonds issued or planned to be issued
through FY 2024. The bonds and associated debt service adhere to the County’s financial and
debt management policies.
Fund Program Area General Obligation (GO)
Bond Funding
316 Arlington Neighborhoods 2,000,000
317 Government Facilities 250,000
317 Information Technology 1,900,000
324 Local Parks & Recreation 605,000
Total FY 2025 GO Bond Funding $4,755,000
Arlington Neighborhoods Program $2,000,000
This ongoing program funds a diverse set of infrastructure construction projects across the
community. Since the 1960’s, Arlington residents and civic associations have collaborated
with the County to identify and plan infrastructure projects in their own neighborhoods. These
projects have included everything from streetlight i nstallation to street intersection
reconfiguration to tree and landscape restoration to new curb, gutter and sidewalk. The
program requires $2 million in authorized, unissued GO bond balances to fund the following
three capital projects.
▪ Bailey’s Branch Park $200,000
This is a park improvement project in collaboration with the Department of Pa rks and
Recreation, which includes stormwater management, new and or improved park access,
new park amenities for the community, and invasive plant removal.
▪ N. Monroe Street (from 17th St N to 3612 19th St N) $1,400,000
This is a street improvement project for an accessible sidewalk on the west side of the
street and includes above ground utility relocation and full-depth asphalt in the street.
574
GENERAL OBLIGATION (GO) BONDS
GENERAL CAPITAL PROJECTS FUND
▪ Thrifton Hill Park $400,000
This is a park improvement project, which includes multiple (new and improved) park
access points, new park amenities for the community, and invasive plant removal.
Technology $1,900,000
The technology section includes both enterprise -wide and program specific projects. The
projects are funded mostly between GO bonds, PA YG, and short -term finance . The total
technology program is $16.1 million with $8.16 million being funded through other sources.
See the project list for additional funded projects.
▪ Bozman Data Center Migration $750,000
This is the first phase of a multi-phase project to update and consolidate the County's data
center utilization and continue to migrate, as appropriate, the County's on -premise data
to a cloud -based environment. Phase I, includes the reduction and relocati on of the
Bozman Data Center. The total project cost is $1,850,000 With $ 1,100,000 funded from
PAYG funds and $750,000 in existing program GO bond balances.
▪ Connect Arlington $1,150,000
Connect Arlington (CA) is the County's extensive Fiber Optic Network, spanning
approximately 70 route miles and linking over 90 structures. This network is divided
roughly equally between County facilities and County Schools (APS). The network plays a
pivotal role in supporting adv anced traffic signals, video surveillance, and specific utility
services. The allocated funding is aimed at expanding and updating the County's fiber
infrastructure. This includes underground fiber installation for APS locations and
completing the integration of any disconnected segments in the fiber ring.
Arlington Hall West Park Playground Replacement $605,000
This project covers the design and construction for the replacement of the playground, site
circulation, site furnishings, landscaping and stormwater management improvements. This is
one of the older playgrounds in the County and replacement parts are no longer available
from the playground manufacturer. Portions of the playground are currently closed. This
project is being funded through existing Parks Maintenance Capital program bond balances.
Lee Community Center Study $250,000
This project will study options for the Lee Community Center, which is partially utilized for a
single art program use which will be relocated in calendar year 2 025. The building was
constructed and altered at a time before modern accessibility standards were adopted and
does not allow for compliant, internally accessible movement between the various built areas.
Additionally, the facility has remaining asbestos containing materials, an HVAC system past
its useful life, non-compliant restrooms, aging windows , and a non-compliant elevator. The
study will provide a conceptual cost estimate for work needed to reopen the existing building
or portions of the building to public use standards, or alternatives for other uses, with no
increase to the existing footprint of 12,000 square feet (SF).
575
This page intentionally left blank
576
SHORT-TERM FINANCING
FY 2025 short-term financed projects will replace aged and critical technology infrastructure including
public safety equipment and enterprise technology. The FY 2025 debt service budget of $9.2 million
is included in the General Fund Non -Department budget for short- term financing. This annual debt
service budget level covers the financing costs (principal and interest) of the projects included below.
SHORT-TERM FINANCE PROGRAM FUNDING
Capital Auto Fund Total Funding
Network Refreshment $1,732,000 - $1,732,000
Revenue and Collection
(ACE/CAPP) Upgrade 3,750,000
-
3,750,000
Server & Storage Hardware 780,000 - 780,000
Subtotal -
Technology Services 6,262,000
-
6,262,000
Fire Breathing Apparatus –
Compressors 88,000
-
88,000
Police & Sheriff Portable Radios 2,850,000 - 2,850,000
Subtotal - Public Safety 2,938,000 - 2,938,000
TOTAL Project Costs $9,200,000
-
$9,200,000
Enterprise Technology and Equipment $6,262,000
Funding for the FY 202 5 Enterprise Technology and Equipment program is for maintenance capital
as well as hardware and application refreshment. Maintenance capital is for the ongoing replacement
of aging computers, servers, networks and other equipment. The hardware and application
refreshment category is to support and refresh software and management systems that provide the
tools, capabilities, and processes that enable the County workforce to meet internal and external
demands. The program includes $4.9 million in PAYG funds.
Network Refreshment $1,732,000
This annual program covers the replacement and refreshment of end -of-life equipment that is
responsible for providing network and wireless connectivity. For FY 2025, the budget primarily
allocates funds for upgrading the County's network infrastructure. This upgrade encompasses
refreshing the network core, distribution sites, and single-mode fiber. The plan involves replacing
network equipment across all County site locations, which is crucial to maintain and enhance
connectivity. This improved network will support the County's, Schools', and Public Safety's
comprehensive requirements for voice, data, and video communication.
Revenue and Collection System (ACE/CAPP) Upgrade $3,750,000
This project will upgrade the Revenue and Collection System, also known as ACE and CAPP. ACE
is the back -office application used by the Commissioner of Revenue and Treasurer’s Offices to
perform their daily activities, such as business tax assessments, bil ling, collection of taxes and
fees, and enforcement. CAPP is the public-facing portal used by Arlington taxpayers, individuals,
and businesses for paying bills, filing tax returns, and managing their County accounts. This
project represents a comprehensive upgrade of our software, aimed at maintaining contemporary
577
SHORT-TERM FINANCING
standards for support and maintenance. It focuses on enhancing functionality and optimizing the
system's hosting, thereby improving uptime, security, and scalability. Key enhancements include
more intuitive navigation and a refined graphical design, elevating the user experience for both
constituents and staff. Additionally, the forthcoming version is set to introduce a digital assistant
(chatbot) for constituents engaging with CAPP, along with several features designed to boost staff
efficiency. The full cost of the project is $4,500,000 with $3,750,000 funded from short- term
financing and $750k being funded through PAYG.
Server & Storage Hardware $780,000
This program covers the general sustainment and replacement of physical server hardware and
data storage for the County. A major refreshment of these systems was completed in Fiscal Years
2021 and 2022, and the Department of Technology Services (DTS) is now operating in three data
centers. The useful life of servers is generally five to seven years. While the County is
implementing a Cloud Smart Strategy, it is expected that its data storage requirements will
continue to expand, regardless of whether data is stored on -site or in the cloud. If the Cloud
Smart Strategy leads to a reduction in the need for on -premise storage space, this could result
in adjustments to the County's on-premise server hardware and storage requirements.
Public Safety $2,938,000
The Public Safety program funds will be used to fund key projects that will keep existing information
technology systems and fire apparatus refreshed or replaced on a reasonable life cycle so that the
systems remain useful, operable, and responsive to public safety needs. The program includes $1.4
million in PAYG funds.
Police & Sheriff Portable Radios $2,850,000
Police and Sheriff portable radios are installed in County vehicles and provide two -way
communication between the Emergency Communication Center and public safety vehicles. In
addition, these portable radios also allow for two- way communication with the Emergency
Communications Center and all public safety agencies throughout the National Capital Region.
This project covers replacement of 1,415 portable and mobile radios over a three -year period.
This is the second year of the project. The full cost of the first year of the project was $2.85
million and an additional $2.85 million i s needed in FY 2026 to replace all Police and Sheriff
portable radios. The useful life of the equipment is seven to 10 years.
Fire Breathing Apparatus Compressors $88,000
A self-contained breathing apparatus, or SCBA, is a device worn by first responders to provide
breathable air in an "Immediately Dangerous to Life or Health" atmosphere (IDLH). This project
will replace the four compressors the Department maintains to refill the SCBAs with breathable
air. The compressors are deployed across the County to provide quick and efficient refilling and
capacity. These new models will also provide electronic records which are required for
accreditation. The full cost of the project is $460,000 with $88,000 funded from short- term
financing and $372,000 being funded through PAYG.
578
CAPITAL PROGRAM PROJECT LISTS
GENERAL CAPITAL PROJECTS FUND
Project Description PAYG Bo nd Premium GO Bonds Total Budget
Bridge Maintenance $221,000 - - $221,000
*Parking Meters - - - -
Paving, Markings & Slurry Seal 1,300,000 - - 1,300,000
Sidewalk, Curb, Gutter Proactive Zone Maintenance 309,000 - - 309,000
Signals and ITS Maintenance 1,000,000 - - 1,000,000
*Street Lighting Management - - - -
*Trail Light Maintenance - - - -
*Bike Arlington 50,000 - - 50,000
*Neighborhood Complete Streets - - - -
Street Safety Improvements 1,378,000 - - 1,378,000
Transportation Asset Management 23,000 - - 23,000
*WALKArlington - - - -
Total Projects $4,281,000 - - $4, 281,000
*These projects are funded with other fund sources such as fund balance, Transportation Capital Fund (TCF) or grant dollars.
Transportation Capital Program
FY 2025 Capital Program Project List
Paving - Slurry Seal - Slurry Seal extends the life of pavement on residential streets at a much lower per
s
quare yard cost .
Paving - Microsurfacing - Microsurfacing extends the life of pavement for arterial streets at a lower per
s
quare yard cost.
Paving -Hot Mix Overlay - Paving has been increased to 75 lane miles annually. This includes about three
la
ne miles of streets without curb and gutter.
Maintenance Capital
Complete Streets
579
CAPITAL PROGRAM PROJECT LISTS
GENERAL CAPITAL PROJECTS FUND
Project Description PAYG Bond Premium GO Bonds Total Budget
Argus House Window Replacement - $600,000 - $600,000
Court Square West Electrical Switchgear Replacement $1,500,000 - 1,500,000
Detention Center Air Compressor Replacement - 250,000 - 250,000
Emergency Communications Center UPS Upgrades 350,000 - - 350,000
Fire Station 9 (Walter Reed) - Apparatus Bay Circulation
System - 300,000 - 300,000
Facilities Design & Construction
Commonwealth's Attorneys Office /Alcohol Safety Action
Program Space Adjustments 500,000 - - 500,000
County Board Office Design Study 25,000 - - 25,000
Lee Community Center Study - - $250,000 250,000
Oakland Street Police Warehouse Renovation - 1,355,000 - 1,355,000
Energy Management
County Facility Renewable Energy Installation 300,000 - - 300,000
Electric Vehicle Chargers - Internal Accessibility 250,000 - - 250,000
Electric Vehicle Chargers - Public Accessibility 100,000 - - 100,000
Energy Performance Upgrades-County Buildings 475,000 - - 475,000
Total Projects $3,500,000 $2,505,000 $250,000 $6,255,000
Facilities Capital Program
FY 2025 Capital Program Project List
Facilities Maintenance Capital
580
CAPITAL PROGRAM PROJECT LISTS
GENERAL CAPITAL PROJECTS FUND
Project Description PAYG Bond Premium GO Bonds Other/APS Total Budget
Arlington Hall West Park Playground Replacement - Design &
Construction - - $605, 000 $605,000
Capital Asset Manager $175,000 - - 175,000
Field Fund (covered by field fees) 290,000 - - 290,000
Public Spaces Master Plan Updates 300,000 - - 300,000
*Greenbrier Park/Yorktown High School Stadium Field Replacement 582,000 - - $582,000 1,164,000
**Thomas Jefferson Middle School Synthetic Field Replacement 573,000 - - 246,000 819,000
Total Projects $1,920,000 - $605,000 $828, 000 $3,353,000
Parks Capital Program
FY 2025 Capital Program Project List
Parks Maintenance Capital
Synthetic Fields Program
*Total project cost is $1,164,000 of which Arlington Public School (APS) will pay $582,000 in accordance with the cost-sharing agreement (50% ACG / 50% APS).
**Total project cost is $819,000 of which APS will pay $246,000 in accordance with the cost-sharing agreement (70% ACG / 30% APS).
581
CAPITAL PROGRAM PROJECT LISTS
GENERAL CAPITAL PROJECTS FUND
Project Description PAYG Bond Premium GO Bonds Short-term
Financing Total Budget
DTS - Enterprise Technology Services
Bozman Data Center Migration $1,100,000 - $750,000 - $1,850,000
County AV Equipment Replacement 300,000 - - - 300,000
ConnectArlington - - 1,150,000 - 1,150,000
Hosted Legacy Application Cloud Migration Project (Year 3 of
4) 625,000 - - - 625,000
Network Equipment & Power Systems - - - $1,732,000 1,732,000
Revenue and Collection System (ACE/CAPP) Upgrade (Year
1 of 2) 750,000 - - 3,750,000 4,500,000
Servers & Hardware - - - 780,000 780,000
Workforce Device Refreshment (formerly PC Replacement) 2,166,000 - - - 2,166,000
Department of Technology
Services Total 4,941,000 - 1,900,000 6,262,000 13,103,000
Human Services (DHS)
Social Solutions/Efforts to Outcomes / Homeless Management
Information System Replacement
990,000 - - - 990,000
Department of Human Services Total 990,000 - - - 990,000
Electoral Board
Voting Machines 2,000,000 - - - 2,000,000
Electoral Office Total 2,000,000 - - - 2,000,000
Fire - Bomb Squad X-Ray Systems 240,000 - - - 240,000
Fire - Breathing Apparatus - Compressors 152,000 $220,000 - 88,000 460,000
Police-E-Summons System (covered by court fees) 100,000 - - - 100,000
Police & Sheriff Public Safety Radios - - 2,850,000 2,850,000
Public Safety VMWare/Servers 350,000 - - - 350,000
Sheriff - Body Scanner Warranty Extension 100,000 - - - 100,000
Sheriff - Courthouse Magnetometer/X-Ray Machine 300,000 - - - 300,000
Public Safety Total 1,242,000 220,000 - 2,938,000 4,400,000
Total Projects $9,173,000 $220,000 $1,900,000 $9,200,000 $20,493,000
Information Technology Capital Program
FY 2025 Capital Program Project List
Public Safety
582
CAPITAL PROGRAM PROJECT LISTS
GENERAL CAPITAL PROJECTS FUND
Project Description PAYG GO Bonds Total Budget
ANP Project Management $700,000 - $700,000
Bailey's Branch Park - Park Improvement
Project
- $200,000 200,000
North Monroe St. - 17th - 19th St - Street
Improvement Project
- 1,400,000 1,400,000
Thrifton Hill Park - Park Improvement Project - 400,000 400,000
Total Projects $700,000 $2,000,000 $2,700,000
Arlington Neighborhoods Capital Program
FY 2025 Capital Program Project List
Project Description PAYG Total Budget
Lubber Run Amphitheater Seat Renovation $42,000 $42,000
Public Arts Civic Facilities 48,500 48,500
Total Projects $90,500 $90,500
Economic Development & Public Art Capital Program
FY 2025 Capital Program Project List
Project Description PAYG Total Budget
FY 2025 - 2034 Capital Improvement Plan (CIP) Funds $4,000,000 $4,000,000
Capital Administration & Contingent 274,738 274,738
Land Acquisition 1,500,000 1,500,000
Northern Virginia Criminal Justice Academy (NVCJA) - Debt
Service 126,675 126,675
Regionals - NOVA Parks (NVRPA) 731,087 731,087
Total Projects $6,632,500 $6,632,500
Regional Contributions & Contingents
FY 2025 Capital Program Project List
583
This page intentionally left blank
584
PAY-AS-YOU-GO CAPITAL
UTILITY CAPITAL PROJECTS FUND
Our Mission: To provide and maintain a water distribution system, a sewage collection system, and
a wastewater treatment plant
The Department of Environmental Services is respon sible for managing the Utility Fund, which
includes providing and maintaining a water distribution system, a sewage collection system, and a
wastewater treatment plant.
Capital budget development is included in both the annual operating budget process and the biennial
capital improvement plan (CIP). The annual budget process approves and allocates funding for capital
projects using current year ongoing revenue, one-time funding, state and federal grant funds, cost-
share, previously approved bond funding and various dedicated funds. The CIP includes a projected
ten year spend plan of all of the aforementioned sources, various fees, and the approval of new
General Obligation (GO) bonds. Due to these multiple funding sources and the multi -year nature of
project execution, not all of the County’s planned spending on capital projects appears in any one
year of the operating budget. The CIP document shows the multiple year execution of projects.
The County typically uses Pay-As-You-Go (PAYG) to fund assets with useful lives of 10 years or
less. Financed dollars are set on repayment schedules (debt service) concurrent with the
expected useful lives of the financed assets. Long -term financing (e.g., GO bonds) is used
primarily for the County’s large capital infrastructure investments, such as buildings, equipment
at the wastewater plant or major water or wastewater mains, with expected useful lives of 10
or more years. Refer to the Debt Service section of this document and the Adopted Capital
Improvement Plan for more detailed information on the Cou nty’s long-term capital financing
strategy.
The Adopted FY 2025 Utility Fund PAYG Budget Summary, program budget appropriation distribution
graph, project descriptions, and fund statement are included on the following pages.
585
PAY-AS-YOU-GO
UTILITY CAPITAL PROJECTS FUND
Water-Sewer
Maintenance
Capital
60%
Water Distribution
System Improvements
6%
Sanitary Sewer
System
Improvements
2%
Wastewater
Treatment Plant
Capital
Sustainment
32%
Distribution of Fund Budget
FY 2025 ADOPTED PAYG BUDGET SUMMARY
PROGRAM CATEGORY AM OUNT
UTILITIES
Wastewater Treatment Plant Capital Sustainment $7,505,000
Water-Sewer Maintenance Capital 14,093,000
Water Distribution System Improvements 1,335,000
Sanitary Sewer System Improvements 410,000
Tot
al Project Cost 23,343,000
Less: Infrastructure Availability Fees & Other Revenue 7,900,000
Less: Inter-Jurisdictional Partner Contributions 6,250,000
Less: Grant Revenue 750,000
Less: Interest Income & Miscellaneous Revenues 350,000
Less: Transfer in from General Fund 100,000
Net Utilities Funds Support $7,993,000
586
PAY-AS-YOU-GO
UTILITY CAPITAL PROJECTS FUND
FY 2025 ADOPTED UTILITIES BUDGET
Wastewater Treatment Plant Capital Sustainment $7,505,000
Water Pollution Control Plant Maintenance Capital Program. This program provides for
the annual repair, replacement , and upgrade of current equipment and infrastructure at the
plant and lift stations. Major program components include refurbishing or replacing equipment
to prevent premature failure, infrastructure imp rovements, and automating treatment
processes to increase operational efficiency, reliability, and redundancy. Additionally, studies
of alternative treatment processes to increase efficiency and reduce environmental impact are
funded through this program ($840,000).
Solids Master Plan (Re -Gen) Phase 2 – Intermediate Needs. Projects that need to be
completed in advance of Phase 3 which may involve additional equipment replacement or
demolition of underutilized facilities in preparation for the Phase 3 construction ($1,800,000).
Solids Master Plan (Re -Gen) Phase 3 – Class A Biosolids / Long Range Needs. The
Solids Master Plan will modernize solids treatment facilities and create opportunities for
resource recovery. The plant currently produces an alkaline stabilized Class B biosolids product
but is planning to produce Class A biosolids after the plan’s implementation. This phase
implements the long-term solution to producing a Class A biosolids product. The Solids Master
Plan was approved by the County Board in July 2018 with a commitment to continue to
communicate with stakeholders and to collaborate with local utilities. Design for this multi-year
construction began in FY 2024 ($2,925,000).
Technology Enhancements. This program provides funding for the Plant’s Process Control
System (PCS) and other networked cybersecurity relat ed initiatives. Several discrete projects
have been identified as part of this program ($595,000).
Asset Management and Work Order System Replacement. The current asset
management and work order system is nearing end of life . This funding will be used to
implement a replacement system ($170,000).
Primary Clarifier Upgrades. This project will evaluate and rehabilitate / improve equipment
and facilities associated with the primary clarifiers to ensure alignment with industry best
practices. The last upgrade to the system was approximately twenty years ago. A holistic
assessment of the equipment, facilities, process, and future needs is desirable to determine
what improvements are needed to ensure the continued reliability and sustainability of this
system ($50,000).
Activated Sludge Effluent Pump Station #1 (ASE1) Upgrades. This pump station
continuously pumps partially treated wastewater to the filtration and disinfection treatment
process. ASE1 houses four pumps with a capacity of over 50 million gallons per day. This
includes replacing all the pumping equipment, valves, and piping within the station as well as
the associated electrical equipment. More efficient pumps will be specified for the upgrades,
resulting in energy savings ($415,000).
Blue Plains Plant Capital . The District of Columbia Water and Sewe r Authority Blue Plains
Plant processes a portion of Arlington County’s sewage after transmission through Fairfax
County mains. The capital program funds Arlington’s annual payment through Fairfax County
to the Blue Plains Plant for capital improvements. It also funds improvements to the
transmission system. Payment is due under the terms of the October 3, 1994 , Sewage
Conveyance, Treatment, and Disposal Agreement with Fairfax County ($710,000).
587
PAY-AS-YOU-GO
UTILITY CAPITAL PROJECTS FUND
Water-Sewer Maintenance Capital $14,093,000
The funding for these projects comes primarily from a transfer from the Utilities Operating Fund,
which is an enterprise fund. The revenues for this enterprise fund are derived primarily from water
and sewer utility billings. Infrastructure Availability F ees (IAF) charged to new users wh o increase
demands on the system are an additional funding source for these projects. The following projects
and programs are planned to replace and rehabilitate the County’s water distribution and sewage
collection system.
Water main replacement program ($2,300,000)
Non-expansion inflow & infiltration sanitary sewer capital repairs & replacements ($3,000,000)
Large diameter sewer rehabilitation / replacement ($1,570,000)
Water main cleaning and re-lining projects ($1,600,000)
Water / sewer frames and covers ($1,000,000)
Sewer main & sewer force main replacement programs ($2,370,000)
Manhole rehabilitation ($608,000)
Large diameter water main rehabilitation / replacement ($795,000)
Trade Center improvements ($500,000)
Small diameter valve rehabilitation & replacement ($300,000)
Large meter vault rehabilitation & replacement ($50,000)
Water Distribution System Improvements $1,335,000
The water main projects in this program are designed to improve overall capacity or operation of the
water distribution system. These projects are part of the Water System Plan. Funding for these
projects is generated from fees charged to new users who increase demands on the water distribution
system.
Distribution improvements ($500,000)
Pump station improvements ($835,000)
Sanitary Sewer System Improvements $410,000
The sanitary sewer collection improvements are intended to provide additional capacity to existing
sanitary sewer lines to accommodate new development in Arlington County. These projects are part
of the Sanitary Sewer System Plan. Funding for this program is generated from fees charged to new
users who increase demands on the sewer system.
Collection improvements ($410,000)
TOTAL UTILITIES BUDGET $23,343,000
588
PAY-AS-YOU-GO
UTILITY CAPITAL PROJECTS FUND
Most capital projects span multiple years, from design to construction completion. The FY 2023 Actual
and FY 20 24 Re-Estimate columns reflect that funding for capital projects are carried forward each
fiscal year, and ending balances fluctuate, reflecting the carryover of these funds. The FY 20 25
Adopted Budget column is presented in a similar fashion to show planned execution of projects in the
fiscal year. These are staff’s best estimates based on preliminary plans and design and construction
schedules.
FY 2023
ACTUAL
FY 2024
ADOPTED
FY 2024
RE-ESTIMATE
FY 2025
ADOPTED
ADJUSTED BALANCE, JULY 1 $43,392,530 $41,388,583 $41,388,583 $29,568,583
REVENUES:
Infrastructure Availability Fees 6,051,830 7,900,000 7,900,000 7,900,000
Sewage Treatment Service Charges 1,364,145 7,415,000 2,035,000 6,250,000
Grant Revenue - - - 750,000
Interest 670,495 350,000 600,000 350,000
Miscellaneous Revenue 239,757 - - -
TOTAL REVENUE 8,326,227 15,665,000 10,535,000 15,250,000
Transfers In (Out):
Transfer in from General Fund 460,000 100,000 100,000 100,000
Transfer In from Utilities Operating Fund 15,295,000 13,310,000 13,310,000 7,993,000
TOTAL TRANSFERS IN 15,755,000 13,410,000 13,410,000 8,093,000
TOTAL BALANCE, REVENUES AND TRANSFERS
IN 67,473,757 70,463,583 65,333,583 52,911,583
EXPENDITURES:
Capital Projects - Current Year 24,081,227 29,075,000 23,945,000 23,343,000
Capital Projects - Carry-Over 2,003,947 17,060,000 11,820,000 21,832,000
TOTAL CAPITAL EXPENDITURES: 26,085,174 46,135,000 35,765,000 45,175,000
BALANCE, JUNE 30 $41,388,583 $24,328,583 $29,568,583 $7,736,583
UTILITIES CAPITAL PROJECTS FUND
FUND STATEMENT
589
This page intentionally left blank
590
PAY-AS-YOU-GO CAPITAL
STORMWATER CAPITAL PROJECTS FUND
Our Mission: To implement a comprehensive stormwater management program that balances the
following goals: 1) to reduce the potential for stormwater threats to public health, safety, and
property; 2) to reduce the impacts of new and existing urban development on Arlington streams, the
Potomac River, and the Chesapeake Bay; and, 3) to comply with State and federal stormwater, water
quality, and floodplain management regulations.
The Department of Environmental Services is responsible for managing the Stormwater Management
Fund. In prior budget years the Stormwater Management Fund was a combined fund for operations,
maintenance, and capital projects funded through the Sanitary District Tax of $0.017 per $100 of
assessed real property value . Effective January 1, 2024, Arlington County has implemented a
Stormwater Utility, which has replaced the tax funding with utility fee funding based on a property’s
impervious area. More information can be found on the Stormwater Utility Fee website.
Starting in FY 2024, Stormwater Management Fund is now an enterprise fund. With the change in
fund type, there is now a separate fund for operations and maintenance activities and a capital
projects fund dedicated to t he Pay -As-You Go capital program. The Stormwater Management
operating fund can be found in the “Enterprise, Special Revenue, and Internal Service Funds” section
of this budget book.
Capital budget development is included in the annual operating budget pro cess and the biennial
capital improvement plan (CIP). The annual budget process approves and allocates funding for capital
projects using current year ongoing revenue, one-time funding, state and federal grant funds, cost-
share, previously approved bond funding and various dedicated funds. The CIP includes a projected
ten-year spending plan of all the sources, various fees, and the approval of new GO bonds. Due to
these multiple funding sources and the multi -year nature of project execution, not all the County’s
planned spending on capital projects appears in any one year of the operating budget. The CIP
document shows the multiple year execution of projects.
The County typically uses PAYG to fund assets with useful lives of 10 years or less. Financed doll ars
are set on repayment schedules (debt service) concurrent with the expected useful lives of the
financed assets. Long-term financing (e.g., GO bonds) is used primarily for the County’s large capital
infrastructure investments, such as installation or replacement of long segments of stormwater pipe,
land acquisition, and replacement of large culverts under roads with expected useful lives of 10 or
more years. Refer to the Debt Service section of this document and the Adopted Capital Improvement
Plan for more detailed information on the County’s long-term capital financing strategy.
The Adopted FY 20 25 Stormwater Fund P ay-As-You-Go Budget Summary, program budget
appropriation distribution graph, project descriptions, and fund statement are in cluded on the
following pages.
591
PAY-AS-YOU-GO
STORMWATER CAPITAL PROJECTS FUND
Stormwater
Maintenance
Capital
69%
Capacity
Infrastucture
11%
Water &
Stream
Quality
20%
Distribution of Fund Budget
FY 2025 ADOPTED PAYG BUDGET SUMMARY
PROGRAM CATEGORY AMOUNT
STORMWATER MANAGEMENT
Stormwater Maintenance Capital $5,455,000
Stormwater Infrastructure Capacity Improvements 890,000
Streams and Water Quality 1,590,000
Total Project Cost 7,935,000
Less: Grant Revenue 3,540,000
Less: Interest Income & Miscellaneous Revenues 500,000
Net Stormwater Management Fund Support $3,895,000
592
PAY-AS-YOU-GO
STORMWATER CAPITAL PROJECTS FUND
FY 2025 ADOPTED STORMWATER CAPITAL BUDGET
Stormwater Maintenance Capital $5,455,000
Much of Arlington County's stormwater infrastructure was built during the 1940's and 1950's. It is
approaching the end of its useful life, and a regular repair and replacement program is necessary to
ensure the continued functioning of the storm drainage n etwork during storm events in order to
prevent flooding and property damage.
This program provides for the regular replacement of storm sewer mains, catch basins, and end walls
(with their associated outfalls). Particular attention will be paid to the app roximate 11 miles of
corrugated metal pipes and plate arch culverts that have deteriorated more quickly than other
materials. Associated master p lans include the Watershed Management Plan and the Stormwater
System Plan.
Dumbarton Culverts ($3,000,000)
Stormwater Mains rehabilitation/ replacement program ($1,000,000)
Four Mile Run Maintenance Capital program ($500,000)
Stormwater Frames and Covers ($250,000)
Manhole & Catch Basin Rehabilitation ($250,000)
Terra Cotta/ Corrugated Metal Pipe Upgrades ($205,000)
Floodplain Channel & Split Stream Maintenance ($100,000)
Maintenance of Detention Vaults & Overland Relief ($100,000)
Sidewalk Underdrains ($50,000)
Stormwater Infrastructure Capacity Improvements $890,000
The Storm water Infrastructure Capacity Improvements program addresses infrastructure
improvements to the stormwater sewer system. The County’s stormwater capacity system was
predominantly planned and built prior to the adoption of stormwater regulation s and standards that
more consistently and appropriately addressed the effects of increased impervious areas and risks
associated with intense rainfall events and urban flooding. Improvements are designed and
executed on watershed, localized, and parcel -based scales to 1) mitigate flood risks; 2) maintain
system infrastructure in a state of good repair; 3) install tertiary system elements; 4) construct
drainage projects where under capacity; 5) develop overland relief; 6) advance climate adaptation
and resiliency goals; and 7) otherwise implement the adopted Stormwater Master Plan and
underlying studies.
Langston Boulevard Culvert at N. Sycamore ($440,000)
Flood Risk Reduction Programs and Capacity Improvements ($150,000)
Flood resiliency design and construction guidelines manual ($150,000)
Capacity project planning studies ($150,000)
Streams and Water Quality $1,590,000
This program addresses regulatory requirements and policy objectives to reduce stormwater
pollution, rehabilitate and restore natural infrastructure, and promote environmental recovery and
593
PAY-AS-YOU-GO
STORMWATER CAPITAL PROJECTS FUND
restoration in the County’s stream valleys which have been impacted by stormwater runoff from the
County’s increases in impervious surfaces.
Arlington County exceeded the five percent Bay cleanup pollution reduction requirement for the
permit cycle that ended in June 2018. The current permit cycle (ending in CY 2026) re quires a
cumulative 40 percent pollution reduction, with the subsequent permit requiring the full 100 percent
reduction. Progress to date has been made through public investments in green infrastructure and
stream restoration, water quality credit from redevelopment activity regulated under the Stormwater
Management Ordinance, and programmatic efforts such as street sweeping.
Increased program drivers to repair eroded streams and failed stormwater outfalls emerged from
the July 8, 2019, extreme flooding event. Also, continued increases in impervious surfaces from land
development activity (both regulated and unregulated) add to the mitigation pressures on the
program. In FY 2022, DES enhanced Land Disturbance Activity (LDA) requirements with the LDA 2.0
initiative to require further mitigation of runoff impacts related to development.
Gulf Branch & Walter Reed Green Streets ($540,000)
Green Streets and Infrastructure Program ($375,000)
Water Quality Project Feasibility & Concept Design ($150,000)
Outfall Rehabilitation Program ($475,000)
Post-construction capital maintenance for B allston Pon d Watershed Retrofit ($20,000) and
Donaldson Run Tributary B Stream Restoration ($30,000)
TOTAL STORMWATER BUDGET $7,935,000
594
PAY-AS-YOU-GO
STORMWATER CAPITAL PROJECTS FUND
*Prior to FY 2024, the Stormwater capital expenditures were budgeted and accounted for within the
Stormwater Management Fund (a combined operations and capital projects fund). With the adoption
of the stormwater uti lity in FY 2024, the stormwater management fund was separated into an
operating fund and a Pay-As-You-Go capital projects fund.
**Most capital projects span multiple years, from design to construction completion. The FY 20 23
Actual and FY 2024 Re-Estimate columns reflect that funding for capital projects are carried forward
each fiscal year, and ending balances fluctuate, reflecting the carryover of these funds. The FY 2025
Adopted Budget column is presented similarly to the planned execution of projects in the fiscal year.
These are the staff’s best estimates based on preliminary plans and design and construction
schedules.
FY 2023
ACTUAL*
FY 2024
REVISED
FY 2024 RE-
ESTIMATE
FY 2025
ADOPTED
ADJUSTED BALANCE, JULY 1 - $3,892,067 $3,892,067 $2,000,000
REVENUES:
Grants - 1,667,286 1,667,286 3,540,000
Interest - 150,000 150,000 500,000
Misc. Revenue - - - -
TOTAL REVENUE - 1,817,286 1,817,286 4,040,000
Transfers In (Out):
Transfer In from Stormwater Management Fund - 2,336,552 3,336,552 3,895,000
TOTAL TRANSFERS IN - 2,336,552 3,336,552 3,895,000
TOTAL BALANCE, REVENUES AND TRANSFERS IN - 8,045,905 9,045,905 9,935,000
EXPENDITURES:
Capital Projects - Current Year - 2,336,552 3,336,552 3,895,000
Capital Projects - Carry-Over** - 3,709,353 3,709,353 4,040,000
TOTAL CAPITAL EXPENDITURES: - 6,045,905 7,045,905 7,935,000
BALANCE, JUNE 30 - $2,000,000 $2,000,000 $2,000,000
STORMWATER CAPITAL PROJECTS FUND
FUND STATEMENT*
595
This page intentionally left blank
596