County Manager’sProposed FY 2026 Budget
arlingtonva.us/fy2026
This page intentionally left blank
i
County Board Members
Takis Karantonis
Chair
M
att de Ferranti
Vice Chair
Ma
ureen Coffey
Susan Cunningham
Julius D. “JD” Spain, Sr.
C
ounty Manager’s Office
Mark Schwartz
County Manager
D
eputy County Managers
Michelle Cowan
Shannon Flanagan-Watson
Aaron Miller
D
epartment of Management and Finance
Maria Meredith
Director, Chief Financial Officer
R
ichard Stephenson
Budget Director
Joe Barksdale Emily Hughes
Nicole Billman Meghan Lawler
Danielle Bush Danielle Ruiz
Verna Denchi Alicia Saracina
Jason Friess Karin Talley
Mary Gallagher
ii
This page intentionally left blank
iii
FY 2026 PROPOSED BUDGET
ARLINGTON COUNTY VISION
"Arlington will be a diverse and
inclusive world-class urban community
with secure, attractive residential and
commercial neighborhoods where
people unite to form a caring,
learning, participating, sustainable
community in which each person is
important."
— Adopted by the Arlington County Board January 26, 2002
iv
This page intentionally left blank
v
PRESENTED TO
Arlington County
Virginia
For the Fiscal Year Beginning
July 01, 2024
Executive Director
GOVERNMENT FINANCE OFFICERS ASSOCIATION
Distinguished
Budget Presentation
Award
vi
Government Finance Officers Association of the United States and Canada (GFOA)
presented a Distinguished Budget Presentation Award to Arlington County,
Virginia, for its Annual Budget for the fiscal year beginning July 1, 2024. In order
to receive this award, a governmental unit must publish a budget document
that meets program criteria as a policy document, as a financial plan, as an
operations guide, and as a communications device.
This award is valid for a period of one year only. We believe our current budget
continues to conform to program requirements, and we are submitting it to the GFOA
to determine its eligibility for another award.
vii
COUNTY MANAGER’S FY 2026 PROPOSED BUDGET
CONTENTS
GUIDE
TO READING THE PROPOSED BUDGET .................................................................. 1
CALENDA
R ....................................................................................................................... 5
COUNT
Y MANAGER'S MESSAGE
Count
y Manager’s Message ............................................................................................. 7
Feder
al Funding Vulnerabilities ..................................................................................... 13
Prior
ity Investments with Additional Funding ............................................................... 19
Illust
rative Examples of Reductions in Place of Revenue Increases .............................. 25
Program
Updates ......................................................................................................... 27
Progra
m Update: Equity Resolution Implementation ................................................... 29
Progr
am Update: Youth Well-Being and After School Programming ............................. 31
Progra
m Update: Climate Resilience Priorities ............................................................. 35
Program
Update: Economic Resiliency ......................................................................... 37
Program
Update: Child Care ......................................................................................... 39
Program
Update: Vision Zero Implementation ............................................................. 41
Progr
am Update: Jail Medical Care ............................................................................... 43
Progra
m Update: Restaurant Districts .......................................................................... 45
Reven
ue Enhancement and Compliance Evaluation ....................................................... 47
Housi
ng Affordability .................................................................................................... 51
Develo
pment Fund Restructuring .................................................................................. 57
Multi-Y
ear Forecast and Future Outlook ........................................................................ 65
FY 202
6 Proposed Budget Reductions and Realignments .............................................. 69
SECTION A BUDGET SUMMARIES
Fund
Descriptions ......................................................................................................... 85
Expen
diture Summary (All Funds) ................................................................................ 91
viii
CONTENTS
All Funds Revenue and Expenditure Detail .................................................................... 94
General
Fund Summary ................................................................................................. 95
County
Government Summary ....................................................................................... 99
GASB 87 an
d 96 Summary ........................................................................................... 101
Expenditu
re Comparison ............................................................................................. 103
Proposed Bu
dget Position Changes ............................................................................. 105
Compens
ation Summary ............................................................................................. 109
SECTION B REVENUES ............................................................................................. 119
SECTION C GENERAL FUND DEPARTMENT SUMMARIES
County
Board Office Summary..................................................................................... 175
Office of the County Board .............................................................................................. 178
County Board Auditor ..................................................................................................... 179
Ten-Year History ............................................................................................................ 180
Office
of the County Manager Summary ...................................................................... 183
Main Office .................................................................................................................... 186
Communications and Public Engagement ........................................................................... 188
Office of Human Rights ................................................................................................... 190
Office of the Independent Policing Auditor ......................................................................... 192
Ten-Year History ............................................................................................................ 194
Departm
ent of Management and Finance Summary .................................................... 199
Management and Budget................................................................................................. 203
Accounting, Reporting, and Control .................................................................................. 204
Internal Audit ................................................................................................................ 205
Risk Management ........................................................................................................... 207
Purchasing .................................................................................................................... 208
Department of Real Estate Assessments ............................................................................ 209
Ten-Year History ............................................................................................................ 211
Departme
nt of Technology Services Summary ............................................................ 217
Office of the Chief Information Officer ............................................................................... 222
Enterprise Technology and Applications Services ................................................................ 224
Security, Data Privacy and Records Management ............................................................... 228
Ten-Year History ............................................................................................................ 231
Human Res
ources Department Summary .................................................................... 237
Office of the Director ...................................................................................................... 241
Safety & Worker’s Compensation ..................................................................................... 243
Employee Management Relations ..................................................................................... 246
Employ
ee Benefits and County-Wide Programs .................................................................. 247
Training and Organizational Development ......................................................................... 248
Compensation and Recruitment ....................................................................................... 249
ix
CONTENTS
Human Resources, continued
Employee Services ......................................................................................................... 251
Ten-Year History ............................................................................................................ 253
Co
unty Attorney Summary .......................................................................................... 259
Office of the County Attorney ........................................................................................... 261
Ten-Year History ............................................................................................................ 262
Ci
rcuit Court Summary ................................................................................................ 265
Judiciary ....................................................................................................................... 268
Ten-Year History ............................................................................................................ 272
Cl
erk of the Circuit Court Summary ............................................................................. 275
Circuit Court Clerk’s Office ............................................................................................... 278
Ten-Year History ............................................................................................................ 280
Ge
neral District Court Summary... ............................................................................... 285
Judiciary ....................................................................................................................... 287
Clerk’s Office ................................................................................................................. 288
Ten-Year History ............................................................................................................ 289
Ju
venile and Domestic Relations District Court Summary ........................................... 293
Judiciary ....................................................................................................................... 297
Probation/Intake ............................................................................................................ 298
Community-Based Programs ............................................................................................ 302
Multi-Jurisdictional Programs ........................................................................................... 304
Ten-Year History ............................................................................................................ 305
Of
fice of the Magistrate Summary ............................................................................... 311
Office of the Magistrate ................................................................................................... 313
Ten-Year History ............................................................................................................ 314
Off
ice of the Public Defender Summary ....................................................................... 317
Office of the Public Defender ............................................................................................ 319
Ten-Year History ............................................................................................................ 321
Co
mmonwealth's Attorney Summary ......................................................................... 323
Office of the Commonwealth’s Attorney............................................................................. 325
Ten-Year History ............................................................................................................ 328
Sh
eriff's Office Summary ............................................................................................. 333
Administrative Ser vices ................................................................................................... 337
Judicial Services ............................................................................................................. 339
Corrections .................................................................................................................... 343
Alcohol Safety Action Program (ASAP) .............................................................................. 347
Ten-Year History ............................................................................................................ 349
Of
fice of the Commissioner of Revenue Summary ....................................................... 355
Administration ............................................................................................................... 358
Business Tax ................................................................................................................. 359
Personal Property ........................................................................................................... 361
Compliance ................................................................................................................... 363
Ten-Year History ............................................................................................................ 364
x
CONTENTS
Office of the Treasurer Summary ................................................................................ 367
Administration, Technology, and Special Projects ............................................................... 370
Accounting and Treasury Management .............................................................................. 371
Operations .................................................................................................................... 375
Compliance and Litigation ............................................................................................... 379
Ten-Year History ............................................................................................................ 383
Offi
ce of the Electoral Board and Voter Registration Summary ................................... 387
Office of the Electoral Board and Voter Registration ............................................................ 389
Ten-Year History ............................................................................................................ 391
Depa
rtment of Public Safety Communications and Emergency Management ............... 395
Emergency Management ................................................................................................ 399
Emergency Communications ............................................................................................ 402
Administration and Public Affairs ...................................................................................... 405
Ten-Year History ............................................................................................................ 407
Poli
ce Department Summary ....................................................................................... 413
Office of the Chief .......................................................................................................... 419
Systems Management Division: Management and Administration ........................................ 421
Human Resources Management ....................................................................................... 422
Support Management ..................................................................................................... 424
Wellness and Employee Development ............................................................................... 426
Criminal Investigations Division: Management and Administration ....................................... 428
Criminal Investigations Section ........................................................................................ 429
Operations Division: Management and Administration ........................................................ 432
Patrol Section ................................................................................................................ 433
Special Operations ......................................................................................................... 435
Tactical Operations ......................................................................................................... 437
Homeland Security ......................................................................................................... 438
Community Engagement Division: Management and Administration .................................... 439
Community Outreach ...................................................................................................... 440
Youth Outreach .............................................................................................................. 442
Business Outreach .......................................................................................................... 443
Ten-Year History ............................................................................................................ 445
Fire
Department Summary .......................................................................................... 453
Office of the Fire Chief .................................................................................................... 456
Emergency Services Program ..... ..................................................................................... 457
Support Services Program ............................................................................................... 459
Personnel Services Program ............................................................................................ 462
Ten-Year History...................................................................................................... ..... 464
Depa
rtment of Environmental Services Summary ....................................................... 471
Office of the Director ...................................................................................................... 478
Decision Support and Mapping Program (GIS) ................................................................... 479
Transportation Program Support ...................................................................................... 482
Transportation Planning and Capital Project Management .................................................... 484
Transit Program ............................................................................................................. 487
Development Services .................................................................................................... 490
Commuter Services Program ........................................................................................... 492
Transportation Engineering and Operations ....................................................................... 497
Capital Assets Support .................................................................................................... 506
Engineering Bureau ........................................................................................................ 507
xi
CONTENTS
Department of Environmental Services, continued
Facilities Design and Construction .................................................................................... 508
Real Estate Bureau ......................................................................................................... 510
Facilities Management Bureau .......................................................................................... 511
Arlington Initiative to Rethink Energy (AIRE) ..................................................................... 514
Operations Management ................................................................................................. 518
Water, Sewer, and Streets Bureau ................................................................................... 519
Solid Waste Bureau ........................................................................................................ 521
Ten-Year History ........................................................................................................... 527
Depa
rtment of Human Services Summary ................................................................... 545
Departmental Management and Leadership ....................................................................... 554
Management and Administration (Economic Independence Division) ..................................... 558
Community Assistance .................................................................................................... 560
Housing Assistance and Homeless Programs ...................................................................... 563
Public Assistance ............................................................................................................ 570
Employment Services ..................................................................................................... 581
Management and Administration (Public Health Division)..................................................... 584
Community Health Services ............................................................................................. 586
School Health ................................................................................................................ 592
Community Health Protection .......................................................................................... 597
Management and Administration (Behavioral Healthcare Division) ........................................ 606
Psychiatric Services ........................................................................................................ 607
Client Services Entry ...................................................................................................... 611
Outpatient Services ........................................................................................................ 617
Residential and Specialized Clinical Services ...................................................................... 622
Management and Administration (Child and Family Services Division) ................................... 635
Planning and Support Services ......................................................................................... 636
Child Welfare ................................................................................................................. 639
Behavioral Healthcare ..................................................................................................... 647
Management and Administration (Aging and Disability Services Division) .............................. 653
Agency on Aging ............................................................................................................ 654
Community Supports and Coordination Services Bureau ...................................................... 660
Clinical and Developmental Services Bureau ...................................................................... 669
Regional Older Adult Facilities Mental Health Support Team (RAFT) ...................................... 678
Ten-Year History ............................................................................................................ 681
Depart
ment of Libraries Summary .............................................................................. 703
Administrative Services ................................................................................................... 707
Collections and Access Services ....................................................................................... 708
Public Services ............................................................................................................... 710
Ten-Year History ............................................................................................................ 713
Depa
rtment of Parks and Recreation Summary ........................................................... 717
Departmental Management and Leadership ....................................................................... 723
Urban Agriculture and Consumer Education ....................................................................... 726
Planning, Design, and Construction Management ............................................................... 729
Park Management and Construction .................................................................................. 731
Forestry and Landscaping ................................................................................................ 734
Conservation and Interpretation ....................................................................................... 738
Facilities and Operations ................................................................................................. 740
Youth Services Section .................................................................................................... 743
55+ Programs ............................................................................................................... 746
Therapeutic Recreation Programs ..................................................................................... 748
xii
CONTENTS
Department of Parks and Recreation, continued
Community Arts Programs ............................................................................................... 750
Sports and Camp Programs ............................................................................................. 751
Registration and Scheduling ............................................................................................ 753
Ten-Year History ............................................................................................................ 754
Arlin
gton Economic Development Summary ................................................................ 767
Director’s Office/Operations Group ................................................................................... 771
Business Investment Group ............................................................................................. 774
Small Business Assistance (BizLaunch) ............................................................................. 776
Real Estate Development Group ....................................................................................... 778
Arlington Arts and Cultural Affairs .................................................................................... 780
Ten-Year History ............................................................................................................ 783
Depar
tment of Community Planning, Housing and Development Summary ................. 789
Director’s Office ............................................................................................................. 793
Business Operations Division ........................................................................................... 794
Comprehensive Planning Program .................................................................................... 795
Urban Design ................................................................................................................. 797
Current Planning ............................................................................................................ 799
Code Enforcement Services ............................................................................................. 801
Arlington Neighborhoods Program .................................................................................... 802
Neighborhood and Commercial Revitalization ..................................................................... 803
Historic Preservation ....................................................................................................... 804
Housing Division ............................................................................................................ 806
Ten-Year History ............................................................................................................ 812
Non-Dep
artmental....................................................................................................... 819
Debt S
ervice ................................................................................................................ 823
Regiona
ls/Contributions ............................................................................................. 831
Washi
ngton Metropolitan Area Transit Authority - Metro ............................................ 839
SECTION D ENTERPRISE, SPECIAL REVENUE and INTERNAL SERVICE FUNDS
Balls
ton Quarter Tax Increment Financing Area Fund Summary ................................ 843
Ten-Year History ............................................................................................................ 845
Trave
l and Tourism Promotion Fund Summary ............................................................ 847
Ten-Year History ............................................................................................................ 852
Ballsto
n Business Improvement District Summary ...................................................... 855
Ten-Year History ............................................................................................................ 857
Rossly
n Business Improvement District Summary ...................................................... 859
Ten-Year History ............................................................................................................ 861
National
Landing Business Improvement District Summary ........................................ 863
Ten-Year History ............................................................................................................ 865
xiii
CONTENTS
Housing and Community Development Fund Summary ............................................... 867
Ten-Year History ............................................................................................................ 879
Hou
sing Choice Voucher Fund Summary ..................................................................... 885
Ten-Year History ............................................................................................................ 890
Stor
mwater Management Fund Summary ................................................................... 895
Ten-Year History ............................................................................................................ 902
Tran
sportation Capital Fund Summary ........................................................................ 907
Ten-Year History ............................................................................................................ 914
Crys
tal City, Potomac Yard, and Pentagon City Tax Increment Financing Area Fund
Summary ..................................................................................................................... 919
Ten-Year History ............................................................................................................ 924
Col
umbia Pike Tax Increment Financing Area Fund Summary ..................................... 927
Ten-Year History ............................................................................................................ 929
Uti
lities Fund Summary ............................................................................................... 931
Water, Sewer, Streets Bureau .......................................................................................... 938
Water Sewer Records ..................................................................................................... 941
Customer Services Office ................................................................................................ 942
Water Pollution Control Bureau ........................................................................................ 945
Debt Service and Other ................................................................................................... 947
Ten-Year History ............................................................................................................ 948
Bal
lston Public Parking Garage Fund Summary ........................................................... 955
Ten-Year History ............................................................................................................ 957
Bal
lston Public Parking Garage - Eighth Level Fund Summary..................................... 961
Ten-Year History ............................................................................................................ 963
CPHD
Development Fund Summary ............................................................................. 967
Policy, Research, and Information Management ................................................................. 973
Counter Services ............................................................................................................ 974
Zoning Enforcement ....................................................................................................... 975
Zoning Plan Review ........................................................................................................ 977
Board of Zoning Appeals ................................................................................................. 979
Construction Permit Administration Services ...................................................................... 980
Construction Field Inspection Services .... .......................................................................... 981
Construction Plan Review Services.................................................................................... 982
Ten-Year History ............................................................................................................ 983
Aut
omotive Equipment Fund Summary ....................................................................... 991
County Administrative and Vehicle Repair Section .............................................................. 994
School Fleet Repair Section ............................................................................................. 996
Ten-Year History ............................................................................................................ 997
Pri
nting Fund Summary ............................................................................................. 1003
Ten-Year History .......................................................................................................... 1005
xiv
CONTENTS
SECTION E PAY-AS-YOU-GO CAPITAL AND SHORT-TERM FINANCING
General
Capital Projects Fund ................................................................................... 1009
General
Obligation (GO) Bonds ................................................................................. 1025
Short-Ter
m Financing ................................................................................................ 1041
Capital
Program Project Lists .................................................................................... 1045
Utilit
y Capital Projects Fund ...................................................................................... 1053
Stormwa
ter Capital Projects Fund ............................................................................. 1059
SECTION F GLOSSARY and APPENDICES
Glossar
y .................................................................................................................... 1065
Governmental Funds’ Summaries .............................................................................. 1078
Select
ed Fiscal Indicators ......................................................................................... 1083
FY 2024
Fund Balance Carryover and Utilization of County Manager Contingent ....... 1085
FY 2026
Proposed One-Time Funding Summary ........................................................ 1087
Tax an
d Fee Compendium ......................................................................................... 1089
Opioid Se
ttlement Reserve ........................................................................................ 1091
Budget
Process ......................................................................................................... 1093
Financ
ial and Debt Management Policies ................................................................... 1097
Compre
hensive Plan Summary .................................................................................. 1105
Housing Summary ..................................................................................................... 1115
Arlington County Profile ............................................................................................ 1119
xv
GUIDE TO READING THE PROPOSED BUDGET
The budget is broken down by sections. Although the Table of Contents outlines what is contained
in each section, this guide serves to assist the reader in better understanding how the budget is
structured.
C
OUNTY MANAGER'S BUDGET MESSAGE
The County Manager, who serves as the Chief Administrative Officer of the County, summarizes the
proposed budget, highlighting the most significant issues addressed in the budget and the major
policy issues the County Board will be addressing during their budget deliberations.
B
UDGET SUMMARIES (Section A)
Section A contains fund descriptions, tables , and charts that summarize the budget . The major
components of this section are as follows:
Fund Descriptions: For accounting purposes, fiscal activities in the County are separated by
fund type. The fund descriptions outline the categories of funds used for budget purposes.
This section also includes a table that shows which departments are budgeted in which funds.
Expenditure Summary - All Funds: This summary illustrates all the County Government
and School Board expenditures by fund type.
Expenditure and Revenue Summary by Fund: This summary shows FY 2026 proposed
revenues and expenses broken out by accounting categories for all funds which will be
appropriated as part of the adopted budget (excluding Schools funds). Note that transfers out
to other funds are included in the expenditures of the source fund.
Pie Charts : The revenue chart illustrates the revenue sources that comprise Arlington's
General Fund revenues. The expense chart details how the budget is distributed among
various services within the General Fund.
General Fund Summary : This summary illustrates major categories of General Fund
expenditures and revenues. The General Fund is the primary operating fund of the County.
County Government Summary : This summary provides a three -year (F Y 20 24 Actual,
FY 2025 Adopted, and FY 20 26 Proposed) detail of staffing levels (authorized full-time
equivalent positions, or FTEs) and expenditures by department and fund.
Summary of Impacts of GASB 87 and 96 Implementation: This summary shows FY 2024
actual expenditures and revenues received for Governmental Accounting Standard Board
(GASB) standards for Statement No. 87 on leases and Statement No. 96 for subscription -
based software.
Expenditure Comparison: This summary provides a three -year department-level detail of
expenditures, including the change between the current year adopted budget and the proposed
budget.
Proposed Budget Position Changes: This chart summarizes the changes in full time
equivalent positions (FTEs) between the FY 20 25 adopted budget and the FY 2026 proposed
budget, highlighting positions added, transferred between departments, frozen, or eliminated.
Compensation Summary: This section includes information on the General Fund and all
fund totals budgeted in FY 2026 for employee salaries and benefits, and historical information
on employee compensation and retirement rates.
1
FY 2026 PROPOSED BUDGET
GUIDE TO READING THE PROPOSED BUDGET
REVENUE SUMMARY (Section B)
A summary of proposed tax and fee changes, and descriptions of major revenue sources are included.
GENERAL FUND DEPARTMENT BUDGET NARRATIVES (Section C)
Arlington County government services are provided by departments that focus on particular areas
such as human services or public safety. These departments typically, but not always, can be further
subdivided into various lines of business. Section C provides information about each of the County's
General Fund departments.
The Department Summary Narrative provides the following information:
Mission Statement : The department mission statement is a brief comment about the
department's function in County government.
Department Budget/General Fund Budget: A pie chart indicating how the department’s
proposed expenditure budget relates in size to the entire General Fund budget. The pie chart
also notes what percent of the department’s budget is from federal/state funding, local funding
(net tax support), and other funding (generally fees).
Department Lines of Business : An organization chart with the principal divisions or first
tier of the department’s organizational structure and the department’s lines of business. Lines
of business are shown in bold type; some lines of business also list sub-activities. A separate
budget narrative for each bolded line of business is included as a part of the Department
narrative.
Significant Budget Changes : This section highlights the major issues and changes in
expenditures, revenues, and full-time equivalent positions (FTEs). Remarks are included with
up (↑ ) and down (↓ ) arrows to indicate whether the budget changes show increases or
decreases.
Department Financial Summary : The Department Financial Summary is intended to
provide information regarding the categories of expenditures, revenues , and full -time
equivalent positions (FTEs) by providing the FY 20 24 actual, FY 20 25 adopted budget,
FY 2026 proposed budget, and the percent change from FY 20 25 to FY 2026. Expenses and
revenues are categorized as follows:
Personnel - This category includes expenses for salaries, wages, and employee fringe
benefits such as retirement, health, and life insurance.
Non-Personnel - This category includes expenses for goods or services provided to the
County by vendors or by County internal service funds (see Glossary for definition of
internal service funds); expenses for items that are used or consumed in the course of
operation of the program or department; and expenses for initial, additional, or
replacement items of office or operating equipment not funded through the capital
budget.
Intra-County Charges and Inter-Departmental Credit - These categories represent
charges by one unit of County government to support another unit's activities.
Fees - These are monies received by the County as payment for services, goods, or use
of a facility. Examples are residential refuse disposal fees, user fees for recreation
facilities, and various permit and inspection fees.
Grants - Grants are a contribution of funding, usually from state or federal agencies,
to be used for a specific purpose or activity.
Net Tax Support - The funds that the County Board may allocate from local tax
revenues to fully finance or to supplement revenues received by a department or
2
FY 2026 PROPOSED BUDGET
GUIDE TO READING THE PROPOSED BUDGET
program. Net tax support is the remainder determined by subtracting all department
specific state and federal aid, fees, and charges from the total cost of the programs.
The Position Summary (FTEs) shows authorized permanent positions and temporary
positions by full-time equivalent (see glossary for further information on how FTEs are
calculated). The summary also identifies any FTEs that are frozen, meaning the positions
are not funded or authorized in the FY 2026 proposed budget but may be restored in a
future budget.
Expenses & Revenues by Line of Business - Except in the smallest departments,
the department summary narrative also includes a table which summarizes the breakout
of the departmental expenditure budget and revenue budget by lines of business,
reflecting FY 2024 actual expenses , FY 2025 adopted expenses, FY 2026 proposed
expenses, the percent change from FY 202 5 to FY 202 6, FY 2026 proposed revenue,
and FY 2026 net tax support.
Authorized FTEs by Line of Business – The table shows authorized full -time
equivalents by line of business for FY 202 5 adopted and FY 202 6 proposed.
The FY 2025 adopted column includes both permanent and temporary positions. For
FY 2026, the permanent and temporary positions appear in separate columns followed
by a total column.
Line of Business Narratives
More specific information about how departments provide services and accomplish their goals is
provided in the line of business narratives.
Program Mission: The line of business narratives begin with a Program Mission, stating why
the program exists, and a brief description of key activities and services provided.
Performance Measures: Line of business narratives contain performance measures, which
typically span six years from FY 2021 Actual to FY 2026 Estimate. Measures are developed to
reflect programmatic goals, objectives, and resources. These measures are designed to track
performance and are regularly updated to better reflect changing goals. When measures are
revised, prior year data is often not available. Current and proposed fiscal year measures are
expressed as estimates.
Ten Year History: The history displays major changes within the department over time and
summarizes expenditures, revenue , and authorized FTEs. Entries shown in italics indicate
adjustments made during the course of the fiscal year through supplemental appropriations
and are not actions taken as part of the adopted budget process.
Section C also contains information on other General Fund expenditure categories not included in
departmental budgets including expenditures for Debt Service, Metro, Regionals/Contributions, and
Non-Departmental (including certain insurance costs, building rent, contingents, and other
miscellaneous expenses).
ENTERPRISE, SPECIAL REVENUE, AND INTERNAL SERVICE FUNDS (Section D)
Found in Section D a re summaries of the funds that are not represented in the General Fund
(excluding Pay-As-You-Go, General Obligation (GO) bonds, Utilities Capital, Stormwater Capital, and
Short-term Financing). Definitions of fund types are located in Section A under Fund Descriptions.
Operating (fund) statements are also included for these funds. These operating statements include
budgeted amounts in the FY 2025 Adopted column while the FY 2025 Re-Estimate column includes
a projection of FY 2025 actual expenses and revenues.
3
FY 2026 PROPOSED BUDGET
GUIDE TO READING THE PROPOSED BUDGET
PAY-AS-YOU-GO CAPITAL AND MASTER LEASE (Section E)
Pay-As-You-Go Capital refers to County projects, typic ally valued at $100,000 or more, that are
financed in the same fiscal year the project is initiated. No borrowing or issuing of bonds is
undertaken to implement these projects. Section E summarizes the projects plann ed by Arlington
County in FY 2026 for general capital projects, stormwater capital, and utilities capital. A description
of projects funded through short-term financing is also included.
GLOSSARY AND APPENDICES (Section F)
A glossary is located in Section F . The glossary defines key budget and accounting terms used
throughout the entire document. The glossary also contains commonly used acronyms. Also
included in Section F is a consolidated summary of the governmental operating funds displaying
revenues, expenditures, and beginning and ending balances for each fund. This section also includes
a description of the County’s budget process, information on the County’s financial and debt
management policies, a description of the County’s comprehensive plan, a summary of the County’s
housing programs, a chart with selected fiscal indicators for the County, and the Arlington County
Profile.
4
FY 2026 BUDGET CALENDAR
The calendar for development of the FY 202 6 budget is provided below. The fiscal year begins
July 1, 2025, and ends June 30, 2026.
September 2024 Budget kickoff for departmental staff. This includes policy and
line item direction and fiscal parameters for developing requests.
October, November Departments submit budgets to the Department of Management
and Finance, Management and Budget Section. Budget staff
reviews submissions.
December, January County Manager develops budget recommendations . Various
public outreach activities including an on-line budget feedback
tool.
February 22
County Manager’s FY 202 6 Proposed Budget is submitted to the
County Board.
February - March County Board holds a series of budget work sessions with County
departments, Constitutional Offices, and the School Board.
March County Manager provides a FY 202 5 mid-year review of
expenditures and revenues to the County Board.
March 13 Arlington County Schools releases Proposed FY 2026 Budget.
March 25 County Board holds a public hearing on the proposed FY 202 6
budget including County expenses and real estate tax, personal
property tax rates, and other taxes and fees.
March 27 County Board holds a second public hearing on the proposed
FY 2026 budget including County expenses and real estate tax,
personal property tax rates, and other taxes and fees.
April 9 County Board adopts FY 202 6 Budget and Appropriations
Resolutions for the County government, the public schools, and
Pay-As-You-Go Capital. County Board adopts the CY 202 5 real
estate tax rates and other FY 2026 taxes and fees.
May 1 School Board adopts FY 2026 school budget.
July 1 FY 2026 begins.
5
This page intentionally left blank
6
MARK SCHWARTZ, COUNTY MANAGER
2100 CLARENDON BLVD., SUITE 302
ARLINGTON, VA 22201
703.228.3120
countymanager@arlingtonva.us
Fiscal Year 2026 Proposed Budget Message
To the County Board and the Arlington Community:
My Fiscal Year 2026 budget proposal balances many changing
variables while carrying out the County Board’s direction to
uphold our community’s values.
Since December 2024 when I received budget guidance from
the County Board, we have experienced a heightened level of
uncertainty as:
• Various proposals swirl across the Potomac that could affect close to $90
million in Federal funding that is part of our $1.7 billion budget. For more
details, please read the Federal Funding Vulnerabilities section that follows.
• Employees, contractors, non-profits and businesses who work with the Federal
government are facing uncertain futures due to staff cuts, litigation and
stopgap appropriations
• Families face the frightening prospect of losing members who could be subject
to heightened enforcement of Federal immigration laws
• The commercial office market, already under stress, tries to calibrate to a
federal return to office work mandate while potential cuts to Federal jobs and
office space are announced
This uncertainty arrives against a background of an estimated $25 million gap for
Fiscal Year 2026 between revenue projections and expense estimates to provide the
current level of services.
The December 2024 Proposed Budget guidance directed me to maintain
commitments to:
• our safety net programs – including affordable housing, housing grants,
eviction prevention, community health, food assistance
• climate resilience
• Our outstanding County staff and ensuring they are compensated in line with
economic and competitive conditions and honoring our collective bargaining
agreements
• Our children – through childcare, youth well-being/programming, and support
of Arlington Public Schools
• Public safety – by ensuring staffing for our first responders
• Equity Resolution - analyzing how we deliver services to our community
7
COUNTY MANAGER’S MESSAGE
• Transportation – through increased safety efforts through Vision Zero and
funding higher ART bus operating costs,
• Policies that maintain our triple-AAA rating, fund all debt and meet all financial
commitments
The essential elements of the Proposed Budget
My proposed budget includes the following core elements:
• Increasing our economic stabilization reserve from 1.3% to 2% (+$11.5
million in one -time funds, increasing the total funding from $21.5 million to
$33.0 million) to allow flexibility in addressing the uncertainties noted above
• Maintaining ongoing services by funding essential and mandated increases
• Almost $13 million in ongoing funding cuts to current programs, staff and
services (detailed in the reduction impact statements write-up)
• Suggested revenue increases of $12 million through increased fees, a proposed
1% increase in the Meals Tax, and adjusted and increased contributions from
Falls Church for fire and emergency medical services
• Compensation increases of 3.5% for County staff not in bargaining units; 4%
for those covered by the Service, Labor, Trades collective bargaining
agreement, steps equating to 9% on average for Police, and steps equating to
11% on average for Fire
• Funding increased costs for housing grants (plus $2.5 million, for a new total
of $17.6 million), shelter contracts, meals on wheels, and other social service
and childcare costs while tightening eligibility around eviction prevention
services
• Restructuring the Development Fund to bring it into fiscal balance
• PAYG funding of $18.3 million ($6.2 million ongoing and $12.1 million one -
time)
• Buying down the Barcroft debt service by $5 million from its current level of
$120 million to $115 million
• Funding Arlington Public Schools consistent with the revenue sharing principles
• Continued investment in environmental efforts including $0.5 million for
Climate Action Planning as well as funding for tree water, invasive plant
management, continued expansion of the EV fleet, and more funding for the
tree canopy fund
• Additional staff to assist with revenue collection and ongoing funding for
Clarendon nightlife oversight.
8
COUNTY MANAGER’S MESSAGE
The Road Not Taken (Yet) and the Road Ahead
In addition to detailed write-ups on what is included in my proposed budget I have
included an alternative set of budget reductions (consistent with the guidance from
the County Board) that would allow balancing of the budget without revenue
increases. To be clear, I am not recommending these cuts for adoption by the Board
in FY 2026. However, they are provided to answer the question posed by the Board
in its December budget guidance asking that I make “Proposals for program and
service reductions, restructuring or eliminations if [I am] not able to present a
balanced budget within current tax rates.”
These alternatives mention specific programs and services but are meant to be
illu
strative of the types of cuts that would be needed if additional revenues were
not available for FY 2026, or if the fiscal challenges for FY 2027 (noted below) come
to pass. Included in these illustrations are programs and facilities that many in our
community, including me, cherish.
Also, in a follow up to this message, you will find a summary of items that are not
part of the proposed budget but deserve consideration if additional funding becomes
available during the process. These are items that are worthwhile but given current
limitations I recommend their funding be deferred to some future date.
As I mentioned during the economic preview late last year, it is important to focus
not just on the upcoming Fiscal Year, but the several ahead. We know that a year
from now, at a minimum, we will be facing the following challenges:
• How we fund Metro train and bus service. For FY 2025 and FY 2026, we have
used balances available to us to buy time for a long-term solution to WMATA’s
challenges. We are working with our regional partners as part of DMVMoves
to prepare options for a new Governor and for our regional partners that would
solve the WMATA budget gaps. Without assistance from the Federal
government or from Virginia, Arlington could face additional annual costs of
$14 million starting in FY 2027 and $45 million in FY 2028.
• How we replace the generous donation from Boeing that supports operating
costs for the Long Bridge Aquatics facility. With my proposed budget, I am
suggesting $1.7 million in general funds be provided to begin this transition in
FY 2026; with this shift, Boeing support stretches out to FY 2030.
• Collective Bargaining – in FY 2026, we will begin a new round of negotiating
agreements with IAFF and ACOP.
• ConnectArlington – Capital funding has been used to support oversite and
maintenance of our ConnectArlington fiber infrastructure. These funds will not
9
COUNTY MANAGER’S MESSAGE
be sufficient in FY 2027 to maintain these assets and General Fund support will
be required in the out-years.
• Jail Medical – the planned shift to providing medical care in the jail through in-
house medical management team rather than contractors is expected to result
in a higher level of care but could also have a significant fiscal impact for the
County.
By The Numbers:
Last month, real estate assessments were completed for Arlington residents and
business owners. The total assessed value of all residential and commercial property
in Arlington increased 2.0 percent for 2025, compared to 2.5 percent growth in 2024.
New construction contributed to 0.5 percent of the 2.0 percent tax base increase –
slowing from prior years.
Residential tax base increased 3.5 percent while commercial property values grew
0.1 percent. The average single -family property value increased from $824,700 to
$854,900.
The overall proposed budget is $1.69 billion, a 2.2 percent increase over the adopted
FY 2025 budget. As noted above, this budget assumes no real estate tax rate
increase but does propose an increase to the meals tax from 4% to 5%, as well as
increased fees across many service areas.
With the assessment change and the proposed tax rates, the average residential
tax/fee burden will increase $356 or 3.2 percent. This includes a $312 increase in
real estate taxes, $31 increase in water/sewer rates, and a $13 increase in the
personal property tax burden. If you are a renter, the average increase for apartment
unit assessments is 0.4%. This translates to an average cost burden increase of $14.
Apartment dwellers who own cars would see their average tax burden increase by
about $6 for each vehicle owned, for a total tax burden increase of around $20.
The proposed reductions fall mainly into two categories – reductions that will limit
services in some less critical areas, and reductions that reflect changing demands or
alternate ways of providing services and can be taken without impact on services.
The proposed budget reduces close to 20.75 filled positions and about 10.25 vacant
positions in addition to 13 position freezes. Detailed descriptions of these cuts follow
in a separate section.
10
COUNTY MANAGER’S MESSAGE
Next Steps
With the proposal of the budget on February 22, the next step is for the County Board
to advertise all taxes and fees for consideration for final adoption at the April 9, 2025,
meeting. A series of budget work sessions have been scheduled for consideration of
these proposals.
Conclusion
In preparing this budget, I attempted to provide flexibility and contingencies to deal
with the uncertainty we face. The budget speaks to the values of our community –
looking out for those without, and ensuring basic services are done well. Each year
we review our budget closely and suggest changes that will improve service and
enhance the quality of life in Arlington. Fiscal Year 2026 will be another year where
most of our residents will receive excellent services and County government will
continue to provide the essentials of daily life – water, sewage, public safety, safe
roads and outstanding public and park spaces. Even so, the changing commercial
real estate landscape and the changes in Federal policy are reminders of the need to
remain vigilant, flexible and steadfast in our commitment to our values.
I look forward to the discussion over the next seven weeks which will lead to the
adoption of a Fiscal Year 2026 budget.
Respectfully submitted,
Mark Schwartz
County Manager
11
This page intentionally left blank
12
COUNTY MANAGER’S MESSAGE
FEDERAL FUNDING VULNERABILITIES
Arlington, like most jurisdictions in the region, faces an uncertain future of both direct
federal aid and indirect aid issued through the state under the new federal
administration.
Federal funds provide resources for a wide variety of human service, public safety,
transportation, Schools, and other programmatic areas. In FY 2024, nine different
federal departments provided direct operating grant or aid funding to the County.
Excluding COVID-pandemic funding, the County and Schools received $88 million in
direct or indirect federal funding in FY 2024; the amount of funding is subject to
change each year depending on federal appropriations . The largest examples of
Federal funding include the Housing Choice Voucher program ($24.3 million) and aid
to schools ($21.9 million).
In addition to support for County programs , many non-profits in the region rely on
federal funding for programs (e.g. food assistance) and a number of businesses rely
on federal contracts for work.
The table below illustrates Federal programs, and the level of reimbursement received
by Arlington County in FY 2024. The table includes County and Schools funding.
However, the table does not include federal commitments for infrastructure on
projects like the Mount Vernon Bridge and WMATA capital assistance, and other
projects with pass-through funding from the Commonwealth.
Following this table are additional details on health and h uman service programs
provided by the County and supported with federal funding. The table includes the
number of staff supported by the federal revenues, clients served, and grant amount
for FY 2024. There are many more program s like these which serve individuals in
our community. More details on these other programs will be provided through the
FY 2026 budget process.
13
COUNTY MANAGER’S MESSAGE
14
COUNTY MANAGER’S MESSAGE
15
COUNTY MANAGER’S MESSAGE
16
COUNTY MANAGER’S MESSAGE
17
COUNTY MANAGER’S MESSAGE
18
COUNTY MANAGER’S MESSAGE
PRIORITY INVESTMENTS WITH ADDITIONAL FUNDING
One-Time Funding Unallocated
In my proposed budget, I have left $1.5 million in one -time funding unallocated for
the Board’s consideration – not because we lack pressing needs for funding but to
allow for further development and work on the highest and best use of this funding.
Prudent use of this one -time funding for one -time needs can address needs in our
community; however, I would caution against utilizing one-time funding to fill ongoing
needs.
Priority Areas if Additional Ongoing Funding Were Available
Were additional ongoing funding to become available, the following investments
should be considered. These investments are not ranked in priority order. However,
if funds become available during budget deliberations, the County Manager can
provide an assessment of relative priorities.
• C ompensation: Additional salary increases for those not in collective
bargaining units - given inflationary pressures, ongoing raises of an additional
0.5% would be appropriate for the workforce ($1.1 million).
• P
arks & Recreation
o Co nversion of temporary staff to permanent ($793,000, 15.0 FTEs) :
Begun in FY 2024, but subsequently paused, this would ensure that
more community center staff would be eligible for benefits and allow
better scheduling and retention of DPR staff.
o A
urora Hills Senior Center expansion ($115,000, 1.0 FTE): Expanding
programming at Aurora Hills 55+ Program would provide more
opportunities for social engagement and fitness program options. This
potential expansion aligns this senior center with the programming
offered at the other four centers.
o P
ark Service Area Manager ($226,200, 1.0 FTE): PNR divides
management of the park system into four Park Service Areas (PSAs).
For optimal operation, each PSA should have a dedicated Park Manager.
However, due to a previous budget reduction action, there have not been
four park managers since 2010. The two areas in North Arlington, PSAs
one and two, each have a dedicated Park Manager while PSAs three and
19
COUNTY MANAGER’S MESSAGE
four in South Arlington, have been shared by one Park Manager for over
a decade. With the continuous expansion and development of athletic
fields, trails, green space, and the park system now home to 78
playgrounds (32 of which have been added to the inventory since 2012
and nine being added in the last three years), the need has arisen for
an additional Park Manager position within the PNR Division. The
additional Park Manager for PSA three or four would also provide
dedicated oversight and comprehensive service and maintenance of
playgrounds consistent with those in other service areas.
• Libraries
o Fundi
ng for temporary staff ($232,438): with the stabilization of
operating hours, staffing models, and vacancy rates post -covid,
Libraries requires additional temporary staffing support to maintain
service levels at each library branch.
o Li
braries conversion of temporary staff to permanent ($ 505,000, 5.5
FTEs): Begun in FY 2023, the final phase of converting of temporary
staff to permanent includes converting 5.5 positions and allows for
equitable and fair treatment of all libraries staff, as temporary
employees and permanent library assistants perform similar duties.
• E
nvironmental Services
o B us Shelter Cleaning : Increase frequency and level of service of bus
shelter cleaning ($30,000, 0.75 FTE) - the County’s bus shelters need
to be cleaned on a regular basis to preserve the appearance and
structural integrity. Funding is needed to increase cleaning of the 309
shelters (285 standard and 24 specialty) and concrete bus stop pads
and perform miscellaneous minor repairs at bus shelters throughout the
County. This funding would increase the frequency from twice annually
to monthly for Columbia Pike.
• H
ousing & Human Services
o P ublic Assistance Bureau ($200,000 net tax support, 4.0 FTEs): Growth
in PAB caseloads for SNAP, MA, TANF, and Childcare assistance has not
been accompanied by growth in staffing levels, which has created
challenges in meeting SNAP timeliness and accuracy standards, as
established by the Virginia Department of Social Services. Given these
increasing caseloads, and flat staffing levels, the Public Assistance
Bureau experienced high levels of turnover in FY 2022 and FY 2023.
20
COUNTY MANAGER’S MESSAGE
Additional Benefits Program Specialists and a supervisor would assist
with easing caseload ratios.
o D evelopmental Disability Supervisor 1.0 FTE - Similar to the current
organizational structure of the Adult Services Program, a new team lead
in Developmental Services would assist the two clinical managers with
administrative responsibilities for DS and provide technical expertise to
Support Coordinators on general questions, guidance and giving
direction on the nuances of DBHDS processes. The team lead would
maintain a small caseload of more complex cases and assist with
outreach and education and alleviate the caseloads of the current
program managers to a more manageable number.
• I
nternal Services
o C ounty Attorney I ($180,000, 1.0 FTE) : an additional Attorney I position
would support the increased workload related to BZA appeals/petitions
for writ of certiorari and FOIA requests/writ of mandamus.
o D
TS ServiceNow Development ($173,412, 1.0 FTE): Adding a resource
for the County’s ServiceNow system, which is a platform used to manage
IT related issues and requests and asset management, would fill an
expertise gap and allow the department to address the backlog of
improvements.
o D
TS Data Architect ($200,209, 1.0 FTE) : Data architecture plays an
important role in identifying and defining data standards across County
systems so that systems can interoperate and seamlessly coexist. The
County currently has 100+ datasets for inter -application and public
consumption with approximately 1000+ hits per minute from various
systems that use this data. Currently, this role is staffed by a single
position for the County, making it challenging to effectively manage the
growth of County data a nd support existing datasets and operational
data projects.
• P
ublic Safety & Judicial
o Additional position for the Independent Policing Auditor and one
additional position for the Arlington County Police Department’s Office
of Professional Responsibility ($250,000, 2.0 FTEs): With more than
three years of experience under Chapter 69 of the A rlington County
Code both the IPA and OPR have developed a strong working
relationship but there remains more to be done to realize the
21
COUNTY MANAGER’S MESSAGE
expectations of the ordinance and the memorandum of understanding
among the IPA, OPR and the Community Oversight Board.
An additional position for the IPA - a Deputy Independent Policing
Auditor would participate in and monitor administrative
investigations and conduct use of force reviews; develop policies,
standards and methodologies for pattern/practice reviews,
investigations, training/policy recommendations, and data
collection; establish and maintain relationships with internal and
external stakeholders; and assist with publishing newsletters,
periodic reports including annual reports, making public
appearances and presenting to the community and other key
stakeholders.
An additional member of OPR (a civilian analyst) would intake
public complaints; coordinate communication between OPR and
the IPA ensuring notification of public complaints; assist
compiling case reports, computer aided dispatch (CAD) printouts,
complainant interviews, and digital evidence for transmittal to the
IPA and COB; Redact body worn and in car camera video for the
IPA and COB; assist developing investigative plans, complete
officer notifications and interview scheduling; prepare reports,
memorandums, administrative investigations, officer training and
disciplinary records,; assist with Use of Force Reviews, by
collecting and redacting administrative reviews memorandums,
reviewing video, and completing monthly reports; assist with
monthly Internal Investigative Report (IIR) for review by the IPA
and COB; assist in processing FOIA requests, and subpoenas
o Fi
re Facility Operations Manager ($213,134, 1.0 FTE): the Fire
Department currently has a uniform Resource Officer responsible for the
logistics office and the entire fleet program. With the growth in scope
and scale of both operations, it is advisable to split these responsibilities
into two roles.
o P
SCEM Contract Support for Call Taking ($134,000) : in FY 2025, PSCEM
has implemented a pilot program utilizing contract support for call
taking. This allows the Emergency Communications Center to maintain
necessary staffing when there are vacancies or to backfill for staff on
leave.
o T
he Commonwealth’s Attorney has identified a number of pressures in
her office and recommended the establishment of additional positions
22
COUNTY MANAGER’S MESSAGE
such as an Assistant Commonwealth Attorney or resources for
community engagement.
o J DR Management Analyst ($142,395, 1.0 FTE): Funding for this position
has been frozen since FY 2022. Reestablishing funding would provide
more resources for coordinating and leading prevention, diversion, and
community-based interventions focused on struggling youth.
23
This page intentionally left blank
24
COUNTY MANAGER’S MESSAGE
ILLUSTRATIVE EXAMPLES OF REDUCTIONS IN PLACE OF REVENUE
INCREASES
Board Guidance directed me to provide “Proposals for program and service
reductions, restructuring or eliminations if the Manager is not able to present a
balanced budget within current tax rates.” Meaning, what other options are available
if current tax rates are left at current levels to balance the budget. I have reviewed
a number of programs which I do not recommend reducing but would meet the
guidance set out by the County Board.
In determining which items to include on this list, I have considered programs that
are not mandated, have lower service or demand levels, or where we may gain
efficiencies by contracting out rather than delivering with staff. Some of these
reductions and program changes could be considered in place of revenue
recommendations or in future year budgets. These options total $12-$13 million.
1
• Facilities ($2.4 million): Close or adjust hours at libraries, eliminate
programming at some community centers, reduce park restrooms hours
• Human Service programs ($1.5 million): Eliminate or outsource community
programs
• Housing ($4.3 million): Initiate a Housing Grant waitlist, reduce ongoing
funding to AHIF, consolidate CPHD housing information center
• Transportation ($0.3 million): Reduce/eliminate ART route s, look at other
paratransit service options
• Planning & Economic Development ($1.0 million): Reduce resources in
programs like Planning, Urban Design, Historic Preservation, Cultural Affairs,
Small Business Assistance & support to Partnerships
• Employee Compensation ($2.2 million): Reduce pay & benefits offered to
employees (across the board pay increases of 3.5% would be reduced to 2.5%)
• Courts & Constitutional Offices ($0.7 million, to be determined FTEs): Reduce
resources to these office since the County provided tax support funding over
what the state provides to support these offices
• Other Miscellaneous Services ($0.4 million): Reduce Parks support for trail &
park maintenance, reduce support for County special events, reduce various
department compliance efforts not required by statute, eliminate the cable
television complaint line
1 By describing $12 to $13 million in cuts, this analysis does more than called for in Board
guidance, which only asked for cuts associated with tax rates. The cuts below would offset
an increase in the meals tax, and also offset the proposed fee increases.
25
COUNTY MANAGER’S MESSAGE
• Other items to consider that require additional analysis (amounts to be
determined): delay planning efforts, defer capital maintenance, reduce public
service hours across multiple departments, slow implementation of solar
projects at County facilities
26
COUNTY MANAGER’S MESSAGE
PROGRAMATIC UPDATE
PROGRAM UPDATES
The County Board provided guidance in December 2024 on the preparation of the
FY 2026 County Manager’s Proposed Budget. At that time, the Board directed the
County Manager to provide programmatic updates on a number of priorities
including:
• Equity Resolution Implementation
• Youth Well-Being and After School Programming
• Climate Resilience Priorities
• Economic Resiliency
• Child Care
• Vision Zero Implementation
• Jail Medical Care
• Restaurant Districts
The following section will provide summaries and will be discussed as a part of the
appropriate departmental work session.
27
This page intentionally left blank
28
COUNTY MANAGER’S MESSAGE
PROGRAM UPDATE
EQUITY RESOLUTION IMPLEMENTATION
The advancement of equity continues to be a focal point of Arlington County
Government. In Arlington, we strive to be a community where all are valued,
educated, healthy, and safe regardless of race. Through the programs and services
we provide, our focus is on closing race-based outcome gaps so that race does not
predict one’s success while improving outcomes for everyone.
The work of all employees should be grounded in the Equity Resolution adopted by
the Board in 2019. The County continues to implement this framework, with the effort
led by the Office of Realizing Arlington’s Commitment to Equity (RACE), the Office of
Human Rights , our Employee Resource Groups (ERG) , and various initiatives led
across departments to improve outcomes in our services and programs.
Our focus remains race explicit, not race exclusive. This allows us to appropriately
address disparities to achieve and improve the outcomes for all as we provide
services to the Arlington community. Examples of ongoing equity -focused priorities
include:
• Department-based equity initiatives: E xamples include developing
employee training programs, establishing Racial Equity Action Plans via
departmental equity teams, supporting ERGs, and strategizing to advance equity
policies via the inter- departmental Racial Equity Core Team (RECT) that
represents 20 departments Countywide.
• RACE to Rebuilding Trust and Community Grants: In April 2024, this
program awarded its first round of funding of nearly $2.4 million to 22 Arlington
human services nonprofit organizations. The selected agencies submitted
proposals aligned with the program’s intent to eliminate, reduce, and prevent
racial and social disparities for Arlington residents historically overlooked and
disregarded in the County’s funding of community groups. The grantees entered
into agreements with the County that included accountability measures based
on their individual goals to ensure their success. Building on the program’s first
year experience, in September 2024 the County announced a second round of
grant funding, with selected organizations to be announced in Spring 2025.
• Relaunch of the Dialogues on Race and Equity (DRE) Together Partners
Program: Begun in 2020, DRE is an active collaboration with several dozen local
civic associations, nonprofit organizations, faith partners, and businesses
designed to foster deeper understanding and meaningful change around racial
equity. The program creates a safe space for partners to learn via facilitated
training and tools, engage in open dialogue to explore actionable steps toward
equity, and build a sustainable equity network across the community.
29
This page intentionally left blank
30
COUNTY MANAGER’S MESSAGE
PROGRAM UPDATE
YOUTH WELL-BEING AND AFTER SCHOOL PROGRAMMING
The County and Arlington Public Schools (APS) focus on supporting teens continues
with the proposed FY 2026 budget. A significant impetus for the additional
investments was to address the immediate substance use and mental health crisis
with a particular focus on those youth most at risk. Notably, the number of overdoses
has declined over the last two years (2024 year-end AARI report), indicating the need
to continue with a mix of intervention, prevention and education approaches.
As part of the adopted FY 2025 budget, $0.9 million in ongoing fun ding was dedicated
to teen support. This was largely focused on adding new staff capacity (3.0 FTEs in
Juvenile & Domestic Relations (JDR) and 2.0 FTEs in the Department of Parks and
Recreation (DPR)) to expand a variety of programs described below. The majority of
positions have been filled or are in active recruitment, including the Teen Coordinator
in DPR who started this month.
The County Board added $2.0 million in one-tim
e funding in FY 2025 to support multi-
year pilots of after -school programs both at schools and in the community. In
FY 2025, it is anticipated that $0.5 million will be spent; continuation of these
programs through FY 2026 is estimated to cost $0.7 million (some programs began
in the second semester so full school year programming is anticipated). This leaves
approximately $0.8 million for future allocation. Additional new or expanded
programs are being considered; given the one -time nature of the funding and
possible budget reductions at both the County and APS, careful thought is being given
before starting programs that might be unable to continue. Alternatively, the
remaining one-time funding could be used in FY 2027 to continue the recently started
programs if ongoing funding is not available.
As discussed during the FY 2025 budget process, the County, in collaboration with
A
PS, anticipates kicking off a new strategic planning process focused on children and
youth wellbeing later this spring. This process will include broad-based engagement
with students, families, community service providers, and other stakeholders and is
intended to look at all aspects (health, family supports, programming, etc.) of how
to help Arlington’s youth thrive. The results of that planning process could help
prioritize future investments or reprioritization of existing services.
The following section provides details on the enhanced programming provided over
the last two years. The programs that are funded with the $2.0 million in one -time
funding are noted with an asterisk and reflect the estimated budget amounts for
FY 2026.
In addition to these enhanced programs, the County provides significant
programming to youth; in DPR alone, the investment totals $4.1 million. Non-profits
31
COUNTY MANAGER’S MESSAGE
and other community organizations also provide a range of youth services, and
funding has been provided to some via the County’s RACE NOFA process. The County
has revamped its communications approach for teen programming and services,
including a new comprehensive website and regular pop- ups and face -to-face
engagement at schools with teens. This engagement has helped inform some of the
programming pilots, particularly as teens have expressed interest in work and college
readiness assistance.
School-B
ased Programming & Family Support
APS and the County collaborated to introduce new programming pilots at Kenmore
Middle School and Wakefield High School.
Programming
• *Kenmore After School ($140k) – This 3 day per week program began in
October and has steadily increased in both attendance and space at Kenmore.
There is regular attendance of 30.
• *Wakefield Programming (budget estimate included above in Kenmore due to
shared staffing) – A one day per week drop -in program began early in 2025.
DPR has also begun special events tailored to other events happening at
Wakefield, for example an ESPN-like Game Day event before basketball games
with about 200 attendees.
• *Future Ready Workshop (APS-led; $28k) – This after-school program provides
career exploration and job readiness / skills for Wakefield students. The
curriculum was specifically tailored for this program; each cohort is after -
school for 3 -4 weeks. The in itial cohort began in January with eight
participants; cohorts will continue through the school year.
Family Support Programs
Parents and stakeholders expressed interest in family support programs in a wide
range of areas, including proactively addressing substance use and help for new
immigrant families and how to advocate / support their children’s education and
career readiness. These programs also help address chronic absenteeism. The
workshops, which will be held at Wakefield and Kenmore, typically run for 3 -7
sessions over a multi-week period and will begin later this spring. Provided by Edu-
Futuro, the sessions will be in Spanish and English. The estimated cost for a full
school year of programming is estimated at $86k and funded from the one -time $2
million allocation.
Community-Based Programming (DPR)
• *Arlington Mill teen program expansion ($150k)
• *Gunston and TJ teen program expansion ($154k)
• *Teen after-school life skills ($105k)
• *College visit program ($50k)
32
COUNTY MANAGER’S MESSAGE
Department of Human Services
DHS led the County’s initial response to the youth substance use crisis with several
investments, including AARI and Narcan distribution / training, the Crisis Intervention
Center and Mobile Outreach Support team. In the FY 2024 budget, four DHS
counselors were added for school- based mental health / substance use support in
coordination with APS.
DHS has also revamped its Adverse Childhood Experiences (ACES) campaign. Led
by the Child and Family Services Division, this program provides events, training and
family supports for harm reduction, parenting and family strengthening. The FY 2026
budget continues to include $80k in ongoing funding for this program.
DHS, APS and JDR are also partnering for a pilot program to provide bi-lingual wrap-
around case management services for youth and families that are currently in mental
health / substance use crisis. Procurement is underway; $200k of one-time funding
was allocated in FY 2024. It should be noted that continuation of the Hazel Health
mental health support program at APS is also a possible need for consideration.
Juvenile & Domestic Relations – Court Services
The Court Services Unit provides a number of youth diversion and after -school
programs for both court-involved and at-risk youth. As part of the FY 2025 budget,
two FTEs were added to support and expand these programs.
• Girls’ Outreach – this daily after-school counseling program supports teenage
girls, most of whom are not court -involved, for three to eight months in
duration. In FY 2026, it is estimated that 35 clients will be served.
• Young Achievers – this daily after-school counseling program supports court-
involved teenage boys from six to eight months in duration. In FY 2026, it is
estimated that 23 clients will be served.
• RISE Mentor program – this program connects high- need youths with 1:1
mentors which has proven to be a successful model for long- term positive
outcomes. Because of the lack of a staff coordinator, it has historically served
less than 20 clients with only one monthly contact; this is anticipated to
increase to 35 youth with up to four monthly contacts in 2026 with future
growth anticipated as the program stabilizes.
33
This page intentionally left blank
34
COUNTY MANAGER’S MESSAGE
PROGRAM UPDATE
CLIMATE RESILIENCE
The adopted FY 2025 budget funded several climate and energy resilience initiatives
including $2.5 million in one -time funds to accelerate the goals identified in the
Community Energy Plan, Forestry & Natural Resource Plan, Biophilic City and Equity
Resolutions as they align with Arlington’s sustainability and climate goals. Since the
spring of 2024, the County has made progress implementing the County Board
environmental priorities, and the FY 2026 budget maintains that momentum by
including $0.5 million (one-time) for the Climate Action Plan.
• Education and Outreach - Enhancing and expanding public-facing education
and outreach programs is an important step in advancing Arlington County's
sustainability and climate goals. By fostering greater awareness and
understanding of sustainable practices, we can inspire our community to take
meaningful action toward a greener, more resilient future. In FY 2025, the
County mobilized its Green Team at Libraries to engage residents in energy-
saving programs, hosted interactive panel discussions on electric vehicles and
sustainable transportation options, residential solar co-op programs, and home
electrification upgrades and held four community special events reaching
thousands to create accessible pathways for residents to learn and contribute
to energy and climate program awareness and participation. The County also
launched the new Biophilic Arlington webpage, and the GetGreen Arlington
mobile application in partnership with EcoAction Arlington, designed to nudge
residents and business to take climate action. In FY 2026, we will continue
programming and expand public -facing education and outreach to create a
climate hub on the County website, a climate communications toolkit to
coordinate messaging with external partners and stakeholders and launch a
climate communications campaign.
• Natural Resources - A priority of the Board and community is to continue
investments in our natural resources -- they improve public health, cool our
neighborhoods, and mitigate impacts of climate change and flooding. In
FY 2025, significant ongoing funding was added to support the Circuit Tree
Maintenance Program and Invasive Plant Management Program ; in FY 2026,
$100,000 in one -time funding has been proposed to continue our efforts in
invasive plant management. The County adjusted its street tree maintenance
cycle from 17.7 years to 5-years and made progress managing invasive plants
on 370 acres of public lands. The FY 2026 budget proposes one-time funding
of $151,000 to support implementation of the new Deer Management Program,
necessary to balance deer populations with local ecosystems to protect the
health of Arlington’s forests and the plants, animals, and people that rely on
35
COUNTY MANAGER’S MESSAGE
them. With little plantable space remaining on County -owned land,
opportunities to expand tree canopy on public land are limited. One -time
funding of $240,000 for the Tree Canopy Fund, managed by EcoAction
Arlington, will direct tree planting resources to private properties, where
significant plantable space remains available. One-time funding ($123,000) is
also included to support contracted tree establishment watering for County
trees in the first season after watering.
• Transit and Sustainable Buildings - The County’s capital investment in
transit and sustainable buildings continues to drive remarkable progress, as
demonstrated by the completion of three innovative projects designed to
reduce environmental impacts while benefiting our community. The ART
Operations and Maintenance Facility (AOMF), which opened in December 2024,
now serves as ART’s central hub for bus maintenance and operations. This
facility showcases cutting -edge sustainability features, including an
underground stormwater vault, bioretention basins, and an 835 -panel solar
array—the largest at any County property. Originally designed for LEED Gold
certification, the AOMF is currently undergoing the application process for LEED
Platinum, setting a new standard for commitment to green infrastructure.
Similarly, substantial completion of Fire Station 8 highlights the County’s focus
on clean energy solutions, as the facility includes a 113 -panel solar array.
Designed for LEED Silver certification, it is now applying for LEED Gold,
reflecting the County’s shared dedication to environmental stewardship and
responsible development. Also, the 1212 Irving Street Group Home achieved
Earth Craft Net Zero Ready. The facility includes solar panels and geothermal,
among other sustainable features.
• Strategic Planning for the Environment - In FY 2025 our strategic planning
reaffirms the Board’s commitment to sustainability and climate action. The
release of the Carbon Roadmap Years 3 -5 strategies in October 2024, led by
the AIRE team, builds on the momentum of the 2022 launch. This roadmap
offers a framework of policies, actions, programs, and projects to achieve our
energy and climate goals forward. Additionally, the completed Carbon Neutral
Transportation Master Plan provides a path to decarbonize transportation in
Arlington County—an essential component of reducing emissions county-wide.
Further, the Risk Assessment and Management Plan (RAMP) has e nabled
informed prioritization of stormwater investments. Proposed funding in
FY 2026 for Climate Action Fund Planning ($0.5 million) will continue this vital
strategic planning work allowing us to update the Community Energy Plan into
the Climate Action Plan. This Plan will continue us on the path toward a
cleaner, sustainable, and stronger future.
36
COUNTY MANAGER’S MESSAGE
PROGRAM UPDATE
ECONOMIC RESILIENCY
The County’s economic development priorities continue to be guided by Arlington
Economic Development’s (AED) strategic plan for economic growth. This strategy
calls for Arlington to focus on five goals:
• building and promoting a world-class business environment,
• reimagining our commercial centers and corridors,
• growing the tech economy,
• supporting small businesses, and
• investing in the arts, culture, and tourism sectors.
In FY 2025, AED made significant progress on advancing each of these goals thanks
to continued County investment and support. In the FY 2026 proposed budget,
$750,000 of one-time funding is included for tools and incentives aimed at continuing
to attract and retain tenants in our commercial market.
In November 2024, the County Board adopted a new Policy on the Transformation of
Commercial Office Buildings and associated regulatory changes to encourage the
conversion of obsolete office buildings. The transformation of older, vacant office
buildings is critical to addressing the oversupply of obsolete office, high office vacancy
rates, and office devaluation. This new policy has already resulted in applications for
office conversions with several projects already underway.
AED’s business investment and small business development programs helped attract
and retain businesses while also growing a stronger business ecosystem especially
related to technology companies. The Arlington Innovation Fund (AIF) successfully
awarded nine Catalyst Grants to tech startups all of whom have remained in business.
Funding from the AIF allowed AED to engage thousands of tech entrepreneurs and
workers through unique programming. The BizLaunch small business program
continues to engage entrepreneurs with programming and to support businesses
impacted by redevelopment by providing relocation assistance through the ReLaunch
program. BizLaunch also supported numerous businesses on Columbia Pike impacted
by ongoing infrastructure upgrades.
The Arlington Visitors and Convention Services (ACVS) team continues to leverage
prior year investments to attract a record number of visitors to Arlington. These
efforts contributed to visitor spending totaling $4.5B (2023). To sustain the recovery
of the tourism and hospitality sectors, ACVS is now exploring the creation of a
Tourism Improvement District to provide a dedicated funding source for destination
marketing and promotion.
AED’s Cultural Affairs Division, in partnership with the Arts Commission, provide d
significant new support to Arlington’s arts organizations and artists thanks to a
37
COUNTY MANAGER’S MESSAGE
significant increase in Arts Grants Program funding. Progress also continues on the
creation of a consolidated arts campus with renovation of 3700 Four Mile Run and
new temporary outdoor arts space at 2700 S. Nelson Street.
38
COUNTY MANAGER’S MESSAGE
PROGRAM UPDATE
CHILDCARE
The County has made significant investments in supporting childcare, particularly
through two grant opportunities. This past year, the County Board allocated $5 million
to support affordability and quality improvements for childcare providers. In August
2024, the County Board awarded $4.4 million to five childcare providers for capital
investments in support of affordable childcare slots. These investments, which ranged
from subsidizing rent to supporting the buildout of new facilities, resulted in 136 new
slots for up to 25 years – a cost of $2,018 for each year of an affordable slot. The
remaining funding - $0.6 million – will fund grants to support capacity building and
quality improvements for center and family day care home providers. Award
recommendations for the second grant will come before the Board in spring 2025.
As part of the Ready Regions effort to coordinate early childhood care and education
services across Virginia, the state has implemented Virginia Quality Birth to Five
(VQB5) to guide quality measurement and improvement in publicly funded
classrooms. VQB5 measures the quality of teacher-child interactions and instruction
through the Classroom Assessment and Scoring System (CLASS) and requires two
observations for each classroom per year. In FY 2025, Arlington County has 325
publicly funded early childhood classrooms; each of these classrooms received an
observation in the fall of 2024 and will receive a second observation in the spring of
2025. DHS staff coordinates all the CLASS observations for Arlington classrooms
(primarily conducted by contractors) and is also responsible for ensuring the
completion of CLASS observation reports, provision of teacher feedback following
CLASS observations, inputting of CLASS observation information into an online state
system and offering of local CLASS trainings.
Beyond VQB5, DHS staff serves on the Ready Region Capital Area’s Implementation
and Governance Teams and regularly convenes Arlington partners to accomplish
Ready Regions tasks such as assessing Arlington need/interest for additional Mixed
Delivery programming, as well as coordinating enrollment across all publicly funded
programs. For all this work - which will continue in FY 2026 and beyond - Arlington
received an initial FY 2025 allocation of $287,496, and was just recently awarded an
additional $154,427, bringing the FY 2025 total award to $441,92 3. The FY 2026
proposed budget includes an additional 1.0 Management Analyst ($185,935) and
funding for additional contracted classroom observers ($128,838).
39
COUNTY MANAGER’S MESSAGE
The State Child Care Subsidy Program is also locally administered by DHS staff, and
as of February 10, 2025, the Program has served 512 children from 373 families in
FY 2025. Also as of February 10, 2025, there were 114 children from 93 families on
the Program's waitlist, which is expected to be cleared by the end of March 2025.
There are several proposed changes to the State Child Care Subsidy Program in the
Governor's Proposed FY 2026 budget, including:
• Increasing family co-payments up to a maximum of 7% of a household's
income;
• Limiting how long parents can receive the Subsidy while looking for work
to 90 days (except in extraordinary circumstances);
• Revising attendance requirements for children enrolled in the Subsidy
Program to align with pre-pandemic requirements; and
• No longer enrolling new school-age children into the Subsidy Program after
June 30, 2025, unless they qualify as hard to serve.
40
COUNTY MANAGER’S MESSAGE
PROGRAM UPDATE
VISION ZERO
Arlington adopted Vision Zero in 2019 with a goal of providing a safer, more equitable
transportation network for everyone. We are a small county with big safety dreams
– to eliminate all traffic fatalities and severe injuries by 2030.
Vision Zero initiatives continue from previously allocated funding. Of $2.5 million
appropriated in FY 2025, approximately $2.2 million is dedicated to ‘quick -build’ or
small-scale safety improvement projects. The remaining funds are planned for
tactical projects, such as installing speed humps in school slow zones, conducting
safety pilot projects and implementing other short-term safety improvements.
Last year, 20+ quick-build safety projects were constructed, 5+ safety-driven capital
transportation projects were completed, the Speed Safety Camera Program
(PhotoSPEED) was launched, the Red-Light Safety Camera program was expanded,
and the County partnered with APS to install school zone updates at all 40+ school
zones in Arlington.
The County remains committed to prioritizing transportation safety projects and
investments across all departments and programs which is why $1.25 million is
proposed in PAYG to continue this important work. This PAYG funding is combined
with bond and Transportation Capital funding totals $2.53 million to advance $1.8
million in ‘quick -build’ projects identified through safety analyses, such as crash
hotspot analysis and High- Injury Network safety audits. The Proposed Budget also
includes $250,000 to help Police continue to implement the PhotoSPEED program.
The remaining funds will be used for additional projects to pilot new safety tools,
enhancements to school zones, invest in small capital projects and support
community outreach efforts. These projects not only improve safety within our
transportation system but also promote equity, accessibility, and a higher quality of
life for all transportation users.
Leading Vision Zero Implementation through Collaboration
The Department of Environmental Services’ Vision Zero Team leads Arlington’s vision
zero efforts, collaborating with various County departments, Arlington Public Schools
(APS), regional transportation authorities, the Virginia Department of Transportation
(VDOT), and a team of dedicated external stakeholders. Collaboration is essential for
implementing safety infrastructure, initiatives, and public education to reduce injuries
within the County’s transportation grid.
The following initiatives are a result of these collaborations in 2024:
• Infrastructure:
o Constructed 20+ quick-build safety projects, 5+ safety-driven capital
transportation projects and 13 traffic signal upgrade projects
o Reduced the speed limit on five corridors
41
COUNTY MANAGER’S MESSAGE
o Worked with APS to install school zone updates at all 40+ school zones
in Arlington Worked with ACPD to launch the Speed Safety Camera
Program (PhotoSPEED) at 10 school zone locations and expand the
program to 8 additional locations and to expand the Red- Light Safety
Camera program (PhotoRED) to 6 new locations
o Hosted three safety pilot projects to test new transportation tools
(tactical speed humps, centerline hardening, temporary bus platforms)
o Worked with Arlington County Commuter Services who maintained
120+ micro-mobility corrals within the county and promoted use
through an advertisement campaign
• Assessments:
o Evaluated and implemented spot changes at 34 newly identified crash
hot spots
o Conducted six High-Injury Network safety audits and implemented spot
changes
o Continued implementation of action items from the Transportation
Safety Equity Analysis
o Assessed 50+ critical crash locations and implemented spot changes
• Public Education Efforts include:
o Engaged with 880+ people online and 630+ in -person during the
Annual Safety Engagement on Vision Zero
o Hosted the Critical Crash Mitigation campaign with a targeted monthly
theme and estimated reach of about 240,000 impressions per month
o Hosted five Vision Zero public education events with community
giveaways
o Worked with partners like Arlington County Commuter Services, Public
Safety Communications & Emergency Management, and ACPD who
hosted 160+ transportation safety- related education events with
8,850+ attendees and shared 30+ campaigns or outreach initiatives
o Worked with ACPD who conducted 380+ child safety seat checks
• Report-A-Problem
o Received 5,000+ public requests related to safety or maintenance,
with an average response time of 15 calendar days
42
COUNTY MANAGER’S MESSAGE
PROGRAM UPDATE
SHERIFF INMATE MEDICAL CARE
1 Bronson J, Berzofsky, M, Indicators of mental health problems reported by prisoners and
jail inmates, 2011-12. U.S. Department of Justice, Bureau of Justice Statistics, June 2017.
In keeping with our commitment to an equitable, just, and compassionate criminal
legal system in Arlington County, we have been meeting with Sheriff Jose Quiroz and
his team on operations at the Arlington County Detention Center.
The Arlington County Sheriff has engaged a corrections healthcare expert and
consulting team to review medical care, mental health services, and substance abuse
treatments provided within the detention center.
Preliminary Plan : The Sheriff has proposed a preliminary plan to transition
management of day-to-day provision of medical care from contracted services to an
in-house medical management team. As more individuals in the detention center
need acute mental health and substance abuse services, the Sheriff believes that
such a transition will provide higher levels of care for the most acute cases at a time
with state and federal resources, especially for mental health care and alcohol and
substance abuse, continue to undergo drastic cuts. It is generally accepted that
nationwide, some 40% of the jail population in the United States has a mental health
disorder,
1 not including substance abuse, and jail caseload in Arlington County
continues to reflect a similar percentage.
Advancing the Plan: While funds have not been allocated for the larger transition
plan at this time, staff have been working with the Sheriff to transition key positions,
including a Chief Medical Officer; and to develop plans for additional oversight and
medical care capacity through the onboarding of a health services administrator and
advanced practice providers.
In keeping with the commitment to an equitable, just, and compassionate criminal
legal system in Arlington County, staff have been meeting with Sheriff Jose Quiroz
and his team on operations at the Arlington County Detention Center. Staff will
continue to work closely with the Sheriff to realize the goal of expanded medical
capacity and will be evaluating transition plans and funding needs throughout 2025.
43
This page intentionally left blank
44
COUNTY MANAGER’S MESSAGE
PROGRAM UPDATE
RESTAURANT DISTRICTS
The County has seen tremendous growth in restaurant, bar and nightlife environment
over the last ten to twenty years. Development of commercial properties has
contributed to the tax base supporting County services and has drawn economic
activity which contributes to a variety of taxes (e.g. , sales & meals). At times, the
growth in economic activity has created tension where vibrant commercial districts
and residential developments begin to mix.
Various areas of the County with coexisting commercial and residential developments
have experienced increases in pedestrian and vehicular traffic along with noise,
congestion, and other issues impacting public safety and residential living. In order
to provide appropriate levels of public safety and ensure safe communities and
neighborhoods, this budget proposes augmenting code enforcement and public safety
in the areas of the County that are experiencing increased volumes of restaurant,
bar, and night life entertainment . S ome of the proceeds from the proposed one
percent increase in the Meals Tax will be dedicated to these efforts.
This proposal includes permanent enhancements to the operating hours and staffing
of our Code Enforcement Inspectors, Fire Marshal’s Office, and Police Department.
The County’s enforcement resources will be available beyond the typical business
operating hours Monday through Friday. Better addressing issues as they arise in
the evening and weekend hours will be done with partnership, education, and
resource support to community members, business owners and operators. While
enforcement is an option for noncompliance, our primary goal is to expand on
collaborative programs such as the Arlington Restaurant Initiative and Clarendon Live
Entertainment Group.
45
This page intentionally left blank
46
COUNTY MANAGER’S MESSAGE
REVENUE ENHANCEMENT AND COMPLIANCE EVALUATION
As part of the FY 2026 budget preparation process, a review was conducted to identify
areas where compliance and performance could be positively impacted with additional
attention, resources, process improvements and/or policy adjustments. The primary
objective of this effort was to optimize existing revenue streams through better
compliance. While this review process largely found that compliance levels for most
major revenue streams are already high, several short - and medium -term
opportunities were identified as outlined below.
Short-Term Revenue Opportunity Areas Incorporated into the FY 2026
Proposed Budget
The evaluation identified a few key areas with additional revenue opportunity that
could be achieved in the short term and have been incorporated into the FY 2026
proposed budget. These areas include:
• Business Tax and Transient Occupancy Tax Compliance: The
Commissioner of Revenue’s Office continues to review market behavior and
identified the need for additional staff to increase the number of compliance
audits conducted annually for both business tax and transient occupancy tax
revenue. In one example, Commissioner’s staff observed a disconnect between
holders of Accessory Home Stay (AHS) permits and Business License p ermit
holders, which suggests a knowledge gap for many participating in the AHS
program. The County seeks to increase compliance through better education
and outreach as well as through additional auditing efforts. The FY 2026
Proposed Budget includes funding for two additional positions (a tax auditor
and a quality assurance manager) to increase the number of audits for
increased compliance. These position costs are offset by an additional net FY
2026 revenue of approximately $0.4 million.
• General Delinquencies and Collections: The Treasurer’s Office continues to
review and analyze delinquent payment and collections behavior to identify
areas for focused efforts. Overall compliance in certain key areas, such as
vehicle personal property tax and parking ticket fines, has declined in recent
years and requires additional follow -up and collections efforts to close
accounts. Additionally, delinquent collections in areas like ambulance billing
and court fines and fees pose an ongoing challenge. The FY 2026 Proposed
Budget includes funding for two additional collections positions that are offset
47
COUNTY MANAGER’S MESSAGE
by increases in revenue through delinquent collections. Staff anticipates net
positive revenue growth from these positions in future fiscal years.
• Commercial Real Estate Assessments: Commercial real estate
assessments continue to grow more complex each year with Arlington’s unique
mix of density and diverse land uses. Additionally, shifts in remote work trends
and other commercial market pressures have led to the softening of the market
and an increase in the number of assessment appeals submitted to the County
and the Board of Equalization annually. The FY 2026 Proposed Budget includes
the addition of a Deputy Real Estate Assessor to aid the County in its ability to
produce high-quality, accurate commercial assessments and also to describe
and defend those assessments during the appeals process. This position’s costs
are offset by a projected reduction in commercial tax base losses as a result
of appeals.
• Interest Income: As a part of Arlington’s significant financial software system
upgrade, which was completed in late summer 2024, several business process
improvement areas were identified and implemented. A key process
improvement area was enforcing contractual payment terms in the accounts
payable process. Using the new system to help enforce these contractual terms
in an automated manner will result in additional interest earnings.
• Parking Meter Fees: The County is conducting a performance parking pilot
project that uses technology to obtain detailed data on parking occupancy.
Those data have been compared to meter transactions to estimate parking
meter payment compliance. The Department of Environmental Services and
Police Department continue to work together to harness this information to
help inform operational parking enforcement strategies to support and increase
parking meter compliance in the project area.
Meter compliance within the project area has hovered around 50%, which
supported the County’s decision to include additional ACPD enforcement staff
in the FY 2025 budget process. However, recruitment and retention efforts for
these enforcement positions ha ve proven a challenge as high vacancy rates
persist and impact the ability to drive higher compliance solely through active
enforcement. While this manual enforcement approach is still critical to
improve compliance in the short term, the County is also pursuing technology
and policy changes that would reduce the reliance on these hard- to-fill
positions in the future. See “Parking Enforcement Process and Technology”
item below for more details.
• Parking Enforcement in Residential Parking Zones : The Residential
Parking Program is transitioning to a new software system and to year-round
enforcement. A vital part of this transition is the addition of a new position to
48
COUNTY MANAGER’S MESSAGE
support the program. Digital permitting will make it possible for Police to
conduct enforcement more efficiently and have better data. Funding has been
added to the FY 2026 proposed budget for half of the year to support the
transition.
• Traffic Violation Fines: Arlington currently has two camera- based
enforcement programs, one for red lights and one for school speed zones, to
help enforce safe driving behavior. The FY 2026 proposed budget reflects a
continued commitment to increasing the number of cameras for each program,
which will make Arlington streets safer and result in additional revenue, as
allowable within Commonwealth of Virginia limitations. The County continues
to focus these efforts in high- risk areas that require additional e nforcement
strategies to protect the public.
Medium-Term Revenue Opportunity Areas for Future Budget Consideration
The evaluation also identified opportunity areas that will require additional time and
research to improve compliance. These areas will continue to be evaluated by staff
with the goal of realizing compliance gains in FY 2027 and beyond.
• Parking Enforcement Process and Technology : Arlington continues to
embrace technological advancements to support parking enforcement process
improvements at meters, in permitted residential parking zones, and
elsewhere in the community. The County is currently exploring new
technologies that will enable more efficient enforcement activities through the
use of license plate readers (LPRs) and related ticketing software in order to
issue tickets in a more automated manner without placing a physical ticket on
the windshield. To support these outcomes, the County needs to implement
new ticketing software, upgrade LPR and parking meter equipment, and make
minor Arlington County Code adjustments. Over the next couple years, this
technology transition could allow staff to implement contactless enforcement
of residential and commercial parking zones and make more efficient use of
available patrol staff.
• Interjurisdictional Agreements: Arlington has agreements with other local
jurisdictions for certain shared services. Several of these agreements are long
standing and are in the process of being collaboratively reviewed and updated
to ensure the agreements, including shared costs, align with the respective
benefits received by the member jurisdictions. The County anticipates that
updates to these agreements will result in a reduction to Arlington County’s
portion of these shared costs. The proposed budget includes additional
revenue from the City of Falls Church to adjust their contribution towards Fire
Department services. The introduction of the Kelly Day in 2022 has led to
higher staffing for Fire Station 6 and an accompanying higher contribution from
49
COUNTY MANAGER’S MESSAGE
Falls Church. Discussions are ongoing with Falls Church over a new long-term
agreement to adjust contributions.
• General Delinquencies and Collections: The Treasurer’s Office continues to
review and analyze delinquent payment and collection behavior to identify
areas for focused efforts. Overall compliance in certain key areas, such as
vehicle personal property tax and parking ticket fines, has declined i n recent
years and requires additional follow-up and collections efforts. Future focused
activities may include requests for additional staff which would be more than
offset by anticipated additional revenue.
Ongoing Opportunity Areas
Other revenue streams across the County were explored during this review process,
most of which already have strong compliance rates and do not necessitate further
action as a part of this proposed budget. Additionally, staff identified a few other
challenging areas that could result in additional revenue through improved
compliance but at the cost of complex implementation efforts and legislative changes
at both the County and Commonwealth of Virginia levels. Examples include regional,
multi-jurisdictional reciprocity programs for parking and traffic violation fines and
conditioning the issuance of certain building and development permits upon payment
of any other delinquent taxes. In both these examples, the potential revenue impact
to the County is estimated to be minimal, whereas the necessary policy groundwork
and technology solutions are anticipated to be very complex and costly.
Consequently, these areas are not included in the FY 2026 Proposed Budget.
Staff will continue to re -evaluate revenue streams like these to identify where the
cost to improve compliance would be offset by the additional revenue generated.
Additionally, staff will continue to monitor and highlight areas where compliance may
begin to decrease without additional focus.
50
COUNTY MANAGER’S MESSAGE
HOUSING AFFORDABILITY
Affordable housing remains one of our community’s biggest challenges. With so many
residents facing rising housing costs coupled with housing supply shortfalls, solutions
must be multifaceted. To address those needs, the FY 2026 proposed budget includes
a prioritization of funding to address critical needs in our community including funding
important housing services – the Housing Grants program and the eviction prevention
program – on an ongoing basis. The FY 2026 proposed budget also continues to meet
the commitments for AHIF (the Affordable Housing Investment Fund) and the
landmark preservation of the Barcroft Apartments, a housing complex which
preserves 1,335 affordable housing units.
The proposed budget includes $100.8 million—about 6% of the County’s budget—in
investments in housing affordability, as outlined in the table below. The budget
follows the County Board guidance of maintaining the prior year’s ongoing funding
level to the Affordable Housing Investment Fund (AHIF) of $9.7 million and adds $2.0
million in one-time AHIF funding. Other investments include $5 million (one-time) for
Barcroft debt (principal payment to the County’s line of credit), $ 17.6 million to
support the County’s Housing Grants program, $29.3 million of federal support in the
form of Housing Choice Vouchers, and $2. 1 million in eviction prevention support.
Support for our most vulnerable through the Permanent Supportive Housing program
totals $7.0 million. Details about these programs are described below.
51
COUNTY MANAGER’S MESSAGE
FY 2026 Proposed Budget Funding for Housing
Direct Housing Assistance:
Housing Grants $17.6 million
Housing Choice Vouchers $29.3 million
Permanent Supportive Housing $7.0 million
Eviction Prevention $2.1 million
Shelters $6.8 million
Real Estate Tax Relief for the Elderly and Disabled &
Disabled Veterans $5.0 million
Affordable Housing Supply:
Affordable Housing Investment Fund $12.3 million
Barcroft Debt Principal Payment $5.0 million
Columbia Pike TIF $2.3 million
Other:
Other Housing Programs $13.3 million
TOTAL $100.8 million
Direct Housing Assistance
Housing Grants: T he County’s Housing Grants Program provides rental assistance
to low-income Arlington residents who meet at least one of the following criteria: 65
years of age or older, totally and permanently disabled, working families with at least
one child under the age of 18, youth aging out of foster care, and clients of a County-
operated or County-supported mental health program. These grants cover a portion
of monthly rent; the amount is determined based on household income, household
size, and total rent with a goal of having tenants pay no more than 40 percent of
their income towards rent.
Additionally,
in FY 2026, the County will fund one new position to support the increase
in Housing Grants caseloads and will fund the Housing Grants Program entirely from
ongoing funding. In FY 2026, the projected number of households served will increase
6.1 percent, from 1,680 to 1,783. Currently, 87.2 percent of Housing Grants clients
are at or below 30 percent of Area Median Income (AMI).
Housing Choice Voucher Program (HCVP): T he federally funded and locally
administered Arlington Housing Choice Voucher Program helps low- income families
52
COUNTY MANAGER’S MESSAGE
at or below 50% of Area Median Income, the elderly, and people with disabilities
obtain safe, decent, and affordable housing in the private market. In recent years,
there has been an increase in the number of Housing Choice Vouchers allocated to
Arlington County. In FY 2026, the projected number of households receiving a
Housing Choice Voucher will increase to 1,714.
Permanent Supportive Housing: T he County’s Permanent Supportive Housing
(PSH) program provides affordable housing and supportive services for individuals
and families who are homeless or at risk of becoming homeless as well as those who
have very low incomes and serious, persistent issues such as substance use, mental
illness or other disabilities, or HIV/AIDS. Demand for Permanent Supportive Housing
subsidies continues to grow, as evidenced by the PSH waitlist; however, DHS has
capped the local program admissions due to unbalanced staffing to caseload ratios.
In FY 2024, there were 345 contracted units from all funding sources (local, state,
and federal). The number of contracted units are projected to be 356 units in FY 2025
and 351 units in FY 2026.
Expanded Asset Management through CAF Inspections: Th
e COVID -19
pandemic strained the conditions of Committed Affordable Units (CAFs), as in-person
inspections were shifted to virtual reviews, and non- emergency maintenance and
repairs often were deferred due to safety and resource considerations. In FY 2023,
the County Board approved $150,000 in one -time funding to enable increased HQS
(now National Standards for the Physical Inspection of Real Estate or NSPIRE)
inspections in the CAF portfolio. With these funds, CPHD completed over 1500 CAF
unit inspections spanning 19 different properties in spring 2023, focusing on
properties that have not had substantial renovations within the last five years. For
FY 2024, CPHD completed approximately 2,000 CAF unit inspections across
approximately 20 properties and anticipates completing approximately 1,300 CAF
unit inspections in FY 2025. Additionally, staff has supported community and resident
organizations by providing outreach and education, technical assistance and support
for resident meetings, and connections to other County agencies and organizations
that may provide additional resident support and assistance. Staff plans to continue
these efforts in FY 2026.
In addition, in January of 2025, D
HS contracted with a vendor to expand its capacity
to provide NSPIRE inspections to HCV and PSH properties. DHS projects that the
vendor will complete 160 quality control inspections, 160 annual inspections, 40 re-
inspections, and 25 initial move -in inspections each month for the remainder of
FY 2025 and continuing in FY 2026.
Real Estate Tax Relief: T he Real Estate Tax Relief Program provides an exemption
and/or deferral of real estate taxes for qualified Arlington homeowners ages 65 and
older and certain totally and permanently disabled homeowners who have the
property title and meet income, asset, and other eligibility requirements.
The availability of this program supports seniors and permanent/totally disabled
ho
meowners to continue living in Arlington. Approximately 900 homeowners receive
53
COUNTY MANAGER’S MESSAGE
full or partial exemptions or deferrals in tax relief each year. In the calendar tax years
2025 and 2026, the total number of homeowners participating in the program is
projected to remain flat.
Eviction Prevention: T he Department of Human Services (DHS) has historically
provided eviction prevention assistance to Arlington residents in need to assist them
with rent, rent arrears, security deposits, and utility payments. Since the onset of
the COVID-19 pandemic, DHS has experienced an exponential increase in requests
from Arlington residents for eviction prevention assistance. The table below details
growth in this program in recent years.
Fiscal
Year
Unduplicated
count of
residents
served
Average number
of times
residents
received
assistance
Total
Payments
Average
Payment
Amount
FY 2020 1,555 1.6 2,500 $1,001
FY 2021 1,586 2.6 4,091 $1,230
FY 2022 1,685 1.5 2,517 $1,618
FY 2023 1,898 1.9 3,527 $2,131
FY 2024 1,379 1.4 1,931 $2,069
FY 2025* 1,027 1.3 1,289 $1,695
*FY 2025 data is through January 21, 2025.
Effective July 1, 2023, eligibility requirements were further tightened to serve only
households who had a late notice on rent, or an eviction notice and a way to pay their
rents moving forward, and a $3,000 cap on assistance per household annually was
implemented. (Exceptions to the $3,000 cap can be granted by the Economic
Independence Division Director.)
For FY 2026, the eviction prevention program will maintain all of the aforementioned
eligibility requirements but will apply a further eligibility requirement of a household
needing to be in a new or renewed lease for at least six months prior to requesting
eviction prevention assistance, with exceptions made for households who recently
lost their job or had another unforeseen financial emergency beyond their control.
This requirement is intended to deter landlords from approving leases in the first
place for households who are overly rent-burdened.
While eviction prevention assistance is expected to decrease over time, the need for
eviction prevention assistance remains high in our community, so I am allocating
$2.1 million of ongoing funding in the FY 2026 budget as the program transitions to
a more stable long-term level.
Shelters: D
HS manages several shelters for the homeless, short- term transitional
housing, and for survivors of domestic violence. These contracts are currently being
newly competitively procured, so the FY 2026 proposed budget includes an additional
$2.5 million in ongoing funding to enhance case management at these shelters ,
54
COUNTY MANAGER’S MESSAGE
enhance street outreach to unsheltered residents, and to increase bed and shelter
overflow capacity, resulting in a total program budget of $6.8 million.
Affordable Housing Supply
Each of these initiatives in the proposed budget meets the goals and objectives
contained in the Affordable Housing Master Plan, which underwent a review in 2022.
The County Board’s Housing Arlington initiative, bolstered by investments in AHIF, is
also underway and efforts will continue into FY 2026.
Preserving Barcroft Apartments: B
eginning with the FY 2024 adopted budget,
both balances and new revenue in the Columbia Pike Tax Increment Financing Area
(TIF) are dedicated to the County’s largest investment in preserving affordable
housing along Columbia Pike – preserving the affordability of the 1,335-unit Barcroft
Apartments. Funding from the TIF is coupled with AHIF funding to pay principal and
debt service on the $130 million balance remaining on the County’s $150 million line
of credit, which was used to fund a County acquisition loan in December 2021 to Jair
Lynch Real Estate Partners to enable acquisition of the property. This County loan, in
combination with a $160 million low-rate loan from the Amazon Housing Equity Fund,
will support the future renovation and redevelopment of Barcroft units while
preserving 1,335 as affordable homes.
The FY 2026 budget also proposes use of $5 million of one-ti
me funding to buy-down
principal on the line of credit, thereby reducing future debt service.
Affordable Housing Investment Fund and Housing Development Resources:
The County’s Affordable Housing Investment Fund (AHIF) remains our main vehicle
to both preserve and create long- term affordable housing by making low- interest
loans available to developers. Over the past five years, the County has produced or
preserved an average of 598 committed affordable units (CAFs) annually. As of
June 30, 2024, the County has 119 CAFs that are affordable to households earning
less than 30 percent of the area median income (AMI), and we anticipate this number
increasing as deeply affordable units are committed at Crystal Houses and Barcroft
in future years.
Annual County Board budget appropriations are one source of funding for AHIF, but
the
County also relies on annual loan repayments and developer contributions from
site plan projects to provide funding for new projects. Since FY 2020, net tax support,
including Columbia Pike TIF contributions, has accounted for approximately 46
percent of the annual AHIF budget; the remaining 54 percent has been funded with
loan repayments, developer contributions, and other sources such as federal dollars.
These sources help diversify AHIF’s funding. The FY 2026 proposed budget includes
$12.3 million ($9.7 million ongoing, $2.0 million one-time, and $0.6 million in federal
HOME funding) in AHIF funding, which coupled with funding from the Columbia Pike
TIF, will meet the debt service costs on the $150 million line of credit used to support
the County’s loan to the Barcroft project while also supporting other pipeline projects
such as Crystal Houses.
55
COUNTY MANAGER’S MESSAGE
Further, the County has a renewed focus on community benefits as part of site plan
projects for funding as well as land opportunities, particularly because land can be
the most difficult and costly portion to obtain for an affordable housing project. In
this regard, the County continues to work on the Crystal Houses infill project, which
includes the conveyance of a 0.9-acre parcel of land to the County for development
of committed affordable housing. In FY 2023, the County concluded a 12 -month
process to identify a master developer for the Crystal Houses site that includes both
the County parcel and infill parcels to be conveyed by the Washington Housing
Conservancy and Amazon. These efforts will continue in FY 2026 with additional
commitments of AHIF funds to the Crystal House infill project, led by True Ground
Housing Partners (formerly the Arlington Partnership for Affordable Housing) and EYA
as the selected master developer for the site.
56
COUNTY MANAGER’S MESSAGE
DEVELOPMENT FUND RESTRUCTURING
Creation of the Development Fund
In the FY 2008 adopted budget, the Inspection Services Division (ISD) and the Zoning
section within the Planning Division of Community Planning, Housing, and
Development (CPHD) shifted to an enterprise fund. Enterprise funds are used to
account for the financing of services to the public where the operating expenses
involved are usually recovered in the form of charges to users. With the
establishment of an enterprise fund, along with fee increases in both ISD and Zoning,
the revenues generated were dedicated to specific Development Services operations
with the goal of achieving a higher level of customer service. The increased, and now
dedicated, revenue was used to make further enhancements in technology, staffing,
and infrastructure associated with delivering quality customer service.
Fiscal Impact of Development Activity
While development activity has always fluctuated, Arlington experienced a significant
expansion of development activity related to the arrival of Amazon’s HQ2 , followed
quickly by the changing mac ro-economic environment during and post- COVID that
was marked by challenges in the commercial office market in a period of higher
interest rates. As development activity slowed and costs continued to rise, the
Development Fund has taken various steps to reduce expenses including holding
positions vacant and reducing other non-personnel costs where feasible. Even after
these cost saving measures, the Development Fund has continued to see
expenditures exceed lower revenue levels, and reserve funds were used to offset
these lower revenue receipts.
The following table shows the lack of real revenue growth over the last six years.
Fiscal Year Revenue % Change
FY 2018 $19,226,185
FY 2019 $18,547,159 (-3.5%)
FY 2020 $18,265,113 (-1.5%)
FY 2021 $18,294,213 0.2%
FY 2022 $21,147,640 15.6%
FY 2023 $17,385,022 (-17.8%)
FY 2024 $14,905,121 (-14.3%)
*Note: FY 2024 actual revenues above exclude $2M transferred from
the General Fund at FY 2024 close out.
Over this same period, expenses have increased over 40% with the final
implementation of the new Permitting system, normal compensation cost increases,
57
COUNTY MANAGER’S MESSAGE
contractual increases, and the addition of staff to meet the complexity and permitting
activity of Amazon HQ2 as well as meet demand and improve customer service. In
hindsight, the purchase and implementation of the Permitting system significantly
impacted the fiscal stability of the fund by over -utilizing the fund’ s reserves for
technology development. If the project had been debt financed initially, as opposed
to cash financed, the technology costs for implementation and software development
and maintenance would have been spread over a longer period of time and not
drained reserves , which had been set- aside to manage varying economic
environments. Moving forward, the technology surcharge of 10% will continue to be
utilized and earmarked to support day-to-day technology costs.
The following table shows the expense growth over the last six years.
Fiscal Year Expense % Change
FY 2018 $17,936,137
FY 2019 $18,191,004 1.4%
FY 2020 $19,945,240 9.6%
FY 2021 $21,121,854 5.9%
FY 2022 $23,322,855 10.4%
FY 2023 $24,822,069 6.4%
FY 2024 $25,620,232 3.2%
While fees were adjusted over the years for normal market inflationary increases, the
fee study and analysis conducted in FY 2023 and FY 2024 showed that the overall fee
structure was behind on cost recovery . In FY 2025, fees were adjusted in varying
percentages to increase the cost recovery of the Fund as part of a planned multi-year
implementation approach. As development activity has continued to be stagnant,
the cost recovery of the Fund has continued to erode. Looking forward, the recovery
of development activity will, in part, depend on inflation and interest rates.
Development Fund Fiscal Sustainability
Following the review of the Development Fund’s fee structure in FY 2023 and FY 2024
and additional analysis through FY 2025, several recommendations are proposed to
return the Fund to sound financial stability in FY 2026. Recommendations, which are
based on the premise that fee revenues and operating expenses must balance,
include continued fee adjustments, expenditure reductions to meet the anticipated
construction volume, and shifting some costs within the Zoning Division to the
General Fund based on review and analysis of the contribution to the enterprise fund
philosophy of cost recovery and responsibility.
Fee Adjustments
For FY 202 6 fee changes, the recommendations include additional adjustments to
both CPHD and DES fee s to align with target cost recovery levels . For all fees, the
58
COUNTY MANAGER’S MESSAGE
degree of adjustment varies depending on current cost recovery, target cost
recovery, fee type, and anticipated impact to the development community. T he
Department of C ommunity Planning, Housing, and Development (CPHD) and
Department of Environmental Services ( DES) Development Services Fee b oard
reports for the FY 2026 Proposed Budget provide more detail of the various proposed
fee adjustments. The following summarizes the recommended Development Services
fee changes.
Inspection Services Division (CPHD, Development Fund) : Fees will be adjusted as
follows:
• Building permits for New Construction, Additions and Alterations will
increase between 70% and 79%, which will bring these fees up to a level
of 100% aggregate cost recovery.
• Trade Permits (mechanical, electrical, plumbing, fire, demolition, and
elevator) will increase 70% which will bring these fees up to a level of 100%
aggregate cost recovery.
• The building filing fee will be increased from 35% to 50% of the total permit
fee to allow for a timelier collection of the up -front costs associated with
reviewing building permit plans. These fees are paid at the time of permit
application filing.
• Additionally, two new fees are being recommended to recover staff costs :
(1) a fee for Cross-Connection which involves staff time to ensure potable
water is not contaminated by sewer water and (2) a new fee for Certificate
of Occupancy inspections.
Zoning Division (CPHD, Development Fund): Recommendations to achieve 100% cost
recovery for the Zoning Division include:
• Adjustments to Zoning fees are based on a target cost recovery level of
70% of the cost to deliver Zoning Services
o As mentioned later in the write up, the calculated 70% aggregate
cost recovery target for Zoning fees includes the assumption that
$1.7M of Zoning’s costs (approximately 30%) are not permit-
related; therefore, General Fund support is recommended to cover
these costs.
• Additionally, various fees were adjusted up or down based on the level
of staff effort, complexity of application material and staff processing ,
and anticipated impact to the development community.
• Lastly, one new fee is being recommended for Electrical Vehicle Chargers
on special exception projects and an existing fee for Expanded Housing
Option (EHO) is being eliminated.
Planning Division (CPHD, General Fund): Fees generally will be adjusted as follows:
• In line with achieving a target cost recovery level of 100%, fees will be
adjusted at varying percentages based on their existing cost recovery
59
COUNTY MANAGER’S MESSAGE
levels, but fees will not increase more than 200% over last year or
exceed 100% cost recovery.
DES (General Fund / Stormwater Fund): Fee recommendations are as follows:
• DES Development Services fees are recommended to increase to 100%
cost recovery in FY 2026 as part of the second year of a multi -year fee
adjustment plan. In FY 2025, it was recommended that any significant fee
increases be increased gradually over a period of three years. In FY 2026,
due to budget constraints, it is now recommended that these fees be
increased to full cost recovery in year two.
• The percentage of fee increase varies depending on the current level of cost
recovery. To get to a level of 100% cost recovery for all fees in FY 2026,
some fee increases are proposed to increase significantly, such as the Civil
Engineering Plan base fee and Revision base fee, Maintenance of Traffic
Plan fees, certain Plat Review and Bond Administration fees, and certain
Stormwater Quality review fees.
Expense Reduction Recommendations
To realign and restructure the Development Fund, a number of expenditure
reductions and realignments are proposed for FY 2026. This includes a combination
of personnel and non-personnel expense reductions and shifting some costs to the
General Fund based on a review of work activities.
Personnel and Non-personnel expen diture reductions: For FY 2026, three vacant
positions will be frozen and four filled positions eliminated to further reduce costs to
meet the lower revenue projected based on development activity. In addition,
various non-personnel accounts are reduced to achieve expenditure savings.
Cost Shift to General Fund: It is proposed that some expenses shift to the General
Fund. A review of the activities provided by the Zoning Division were determined to
neither directly impact development related activity nor generate revenues through
fees to be self -sustaining ($1.7 million) . For example, in order to enforce the
County’s zoning ordinances , s taff issue warning and violation notices as well as
respond to zoning complaints that require a level of effort that is higher than the
offsetting revenue received. Additionally, Zoning staff support the Board of Zoning
Appeals which is non- permit related work and is not offset by fee revenues .
Therefore, the costs associated with these activities are recommended to be funded
out of general net tax support rather than fees charged for development services. In
addition, two positions filled by the Department of Environmental Services ($300K)
are being shifted back to the General Fund based on the type and activity of work
provided. A brief summary of the potential services delivery impacts of these
reductions are noted below ( more details can be found in the CPHD Development
Fund budget narrative).
60
COUNTY MANAGER’S MESSAGE
• There are no service delivery impacts as a result of the non -personnel
reductions, DES position transfers to the General Fund, or the transfer in of
$1.7M in General Funds to the Zoning Division.
• Freeze and eliminate two Zoning enforcement positions : increased response
times for complaints , certificate of occupancy inspections, special exception
use permits, and active site plan inspections. The prioritization of work and
potential use of overtime hours may occur to complete time sensitive requests.
• Freeze and eliminate two Zoning Technicians: it is anticipated that CPHD will
continue to meet or nearly meet established review times, with the exception
of sign permits.
• Eliminate a Principal Planner position: the work of this position will be absorbed
by other staff , but the time taken to review complex zoning determinations
may increase
• Freeze and e liminate two positions in Inspection Field and Plan Review
Services: reduced amount of time on-site per inspection and increasing review
times for commercial buildings and new residential buildings
Looking Forward in a Multi-Year Approach to Fiscal Stability
As mentioned above, construction activity can change rapidly. Over the last several
years, the construction environment was also severely influenced by an abrupt
economic shutdown and a shift in the needs of commercial office space. Moving
forward, the local and national environment will continue to evolve. For this region,
the next four years will be influenced by policies of a new federal administration,
inflation and interest rate changes, federal workforce return to office mandates and
reductions in force.
Customer Impacts of Fee Changes
The following sample projects show the impact customers will see from the proposed
FY 2026 fee recommendations.
61
COUNTY MANAGER’S MESSAGE
62
COUNTY MANAGER’S MESSAGE
63
This page intentionally left blank
64
COUNTY MANAGER’S MESSAGE
MULTI-YEAR FORECAST & FUTURE OUTLOOK
Consis
tent with the County’s debt and financial policies, staff has prepared two scenarios of
a multi-year financial forecast. This forecast is intended to help inform, and provide greater
awareness to, the Board and the community of medium and long-term budget pressures as
policy and service delivery choices are considered. The County is required to adopt a
balanced budget annually, so any projected shortfalls would be eliminated through a
combination of expenditure and service reductions, revenue increases (either increased taxes
or fees), or a combination of the two.
Like othe
rs in the region and nationally, the County faces macro-economic challenges:
• Impact of federal policy changes
• Commercial office vacancy rates
• Inflation, interest rates and tariffs
Therefor
e, like FY 2026, FY 2027 and out -years are expected to require difficult decisions
that may include additional reduction options, revenue enhancements, or deferral of capital
projects.
Because
revenues are currently difficult to forecast, this outlook assumes that budgets will
follow the current trend for the foreseeable future, with anticipated budget gaps of $40 million
to $65 million in FY 2027 with out-years ranging from annual deficits of $1 9 million to $46
million as shown in the chart below. The first scenario (in blue) assumes a continuation of
historic revenue trends while the second scenario (in orange) anticipates a slowdown in the
regional economy and resulting decreases in revenue over the next few years followed by a
return to historic trends in the out-years.
-$39.8 -$42.7
-$20.0 -$18.6 -$21.8
-$65.0
-$46.1
-$21.3 -$19.7 -$22.9
-$70
-$60
-$50
-$40
-$30
-$20
-$10
$0
Forecast
FY 2027
Forecast
FY 2028
Forecast
FY 2029
Forecast
FY 2030
Forecast
FY 2031
Forecasted Budget Shortfalls (in millions)
65
COUNTY MANAGER’S MESSAGE
FUTURE BUDGET PRESSURES
A structurally balanced budget is critical as the County prepares and adapts to the changing
economic environment with higher interest rates and uncertainty in the commercial office
market. The County’s continued investment in affordable housing and the support of
residents that use it, mental health services, WMATA budget challenges, and employee
compensation will require the County to balance its priorities in budgets in the coming years.
Revenue
While Arlington remains a convenient hub that attracts new global headquarters due to
proximity to the Nation’s Capital and a highly educated workforce, the overall office market
has struggled with high vacancy rates as the demand for office space has shifted after the
pandemic. For reference, the office vacancy rate in 2020 as the p andemic emerged was
around 15 percent; as of 2024, the office vacancy rate has increased to around 24 percent.
Resulting from the factors noted above, existing office property values decreased by double
digits over 2024 values. These decreased office values also reflect the aging of some of the
office inventory in the County, which makes it difficult to attract new tenants or convert to
alternative uses.
In CY 2
025, a slight increase in apartment property values (both existing and new
construction) helped to neutralize the significant decline in office values, resulting in a total
commercial property increase of 0.1 percent. Since commercial property values (excluding
apartments) make up 19 percent of the CY 2025 tax base, continued assessment declines in
office properties over the next several years will place more of the tax burden on residential
properties and impact the amount of funding available for vital County services.
The fore
cast assumes a lower growth rate for real property assessments when compared to
the last ten- to-fifteen-year average. The first scenario projects 1.5 percent growth for
CY 2027 and then 2.0 percent growth for out years, while the second scenario leaves values
flat in CY 2027 and then projects a modest 1.2 percent increase for out years.
Other tax g
rowth in the first scenario is assumed to increase from 1% to 3% depending on
the source, with stronger growth assumed for the BPOL tax and more gradual growth for
consumption taxes. However, should the region experience an economic slowdown or a
significant change in the employment market, tax growth could be significantly impacted;
the second scenario illustrates how this could unfold, with assumptions of revenue declines
ranging from -12.0 percent to -4.0 percent in FY 2027 and returning to slower growth in
out-years.
Non-tax revenues ha
ve increased at various rates but have largely lagged that of tax
revenues. Certain non- tax revenues such as interest income have helped offset these but
are not expected to continue on an ongoing basis; only anticipated ongoing interest revenue
is included in the forecast for FY 2027 and beyond.
Expend
itures
On the expenditure side, the forecast assumes that the County will continue our
commitments to our workforce, address the core needs of our growing population, and
maintain support for our schools in line with the revenue sharing principles as well as meet
our obligations for WMATA.
66
COUNTY MANAGER’S MESSAGE
FUTURE BUDGET PRESSURES
Along with these normal budget pressures, FY 2027 and beyond will also require funding for
inflationary pressures for goods and services and the impact of potential tariffs on those costs
while human service and housing program demand continues or grows as noted below and
other priorities. In addition, the forecast assumes that the County will transition from
supporting the operations of the Long Bridge Aquatics Center from the Boeing donation funds
to County support over a multi -year period. Any changes in service levels to fund priority
areas will be considered in each year’s budget process.
Invest
ments in our workforce : Maintaining our competitiveness will be essential to
continuing the County’s effort to retain a high- quality workforce and recruit talented
employees. Each year, compensation and benefits will be evaluated to determine how we
continue to be competitive and realize our Total Compensation Philosophy while fulfilling the
commitments of the collective bargaining agreements.
The fo
recast assumes that the overall budget for salaries will increase 3% on an annual basis,
with a range of salary increases occurring on anniversary dates for individual employees.
However, because current Collective Bargaining Agreements with IAFF (Fire) and ACOP
(Police) expire at the end of FY 2026, there is some uncertainty in the impact of compensation
in FY 2027 and beyond. Additionally, recent pressures related to health insurance are
increasing total compensation costs.
Any sc
enarios where revenue growth slows substantially, or contracts , may require the
County to consider lower compensation increases ; the table below shows the reduction in
assumed expense at lower levels of compensation increases comparing to the assumptions
in the forecast for FY 2027.
Salary increase
assumption
Expenses reduced
by (compared to
FY 2027)
2% $5 million
1% $10 million
0% $15 million
67
Housing Affordability & Human Services: Demand for housing and h uman s ervices
continues to grow – including significant increases in SNAP, TANF, and childcare applications
in recent years as well as continued high levels of housing assistance through Housing Grants,
Eviction Prevention, Housing Choice Vouchers, Permanent Supportive Housing, and other
programs as detailed in the Housing Section of the County Manager’s Message.
The County continues to respond to health and human service needs while also weighing
options for policy changes in these programs – such as the proposed change to Eviction
Prevention eligibility as well as the potential to implement a waitlist for housing grants in the
future. Human services demand also ha s the potential to change and be complicated by
federal funding changes and regional economic shifts.
Potential policy changes and responses to changing demands will have to be weighed in each
year’s budget process. T his multi-year forecast does no t reflect any ne w i nvestments or
changes in implementation as we monitor the efficacy of these programs, the availability of
state and federal funds, and the longer-term implementation of programs.
COUNTY MANAGER’S MESSAGE
FUTURE BUDGET PRESSURES
Metr
o: The WMATA operating budget totals $2.6 billion while the capital budget totals $2.4
billion. The operating budget is funded primarily from passenger fares and other revenues
with the balance paid by the local funding jurisdictions.
Juris
dictional operating subsidies used to fund WMATA are usually constrained at three
percent maximum annual growth. In FY 2026, subsidy increases exceeded this cap due to
continued low ridership revenues, substantial growth in operating costs, and the expiration
of pandemic-era federal operating funds. Arlington’s share of the local jurisdictional operating
subsidy, net of revenues, is approximately seven percent of the regional total. Arlington’s
subsidy for WMATA in FY 2026 is increasing by $19 million (16%) over FY 2025.
The
WMATA proposed FY 2026 budget includes a 3% increase in total subsidies, plus an
additional $95 million to replace the expiring federal funding used in the FY 2025 budget.
The budget also includes additional investment in Metrobus service in DC and Arlington
County as part of year one of the Better Bus network. To meet this large increase in operating
subsidies since FY 2024, Arlington has drawn down its balance of existing state transit aid
balances at the Northern Virginia Transportation Commission (NVTC) coupled with the
additional one-time funding from Commonwealth’s two-year agreement that matched 50%
of WMATA’s substantial operating budget increases in FY 2025 and FY 2026.
In FY 2025 and FY 2026, the Commonwealth of Virginia provided a 50% match to the
substantial increase in WMATA’s operating subsidy above FY 2024 levels. There is no
commitment yet to continue this match beginning in FY 2027. Should it fall on Arlington to
assume this funding obligation, the County will use its remaining transit balances to meet a
portion of WMATA’s projected FY 2027 operating budget but may still face a general fund
contribution of approximately $75 million, a $25 million (48%) increase over FY 2026 levels.
This level of funding is expected to continue indefinitely at an approximately 3% increase
annually.
Addi
tionally, this forecast does not include the potential impacts of federal changes to funding
for WMATA including the possible reduction or elimination of Passenger Rail Investment and
Improvement Act funding, which provides $150 million in capital funding annually to support
WMATA in FY 2026. This amount is matched by $150 million of capital funding split equally
between Maryland, the District, and Virginia.
Debt
: Debt service as forecasted in the FY 2026 budget is expected to increase by six percent
and to continue at a moderate level over the next few fiscal years as the County continues
to execute projects per the Adopted FY 2025 – FY 2034 Capital Improvement Plan. This is
due to several large, planned projects such as improvements to Gateway Park in Rosslyn as
well as 2020 and Courthouse improvements. These are in addition to existing debt service
for prior capital commitments for parks and facilities maintenance capital, Metro, paving,
Lubber Run Community Center, Long Bridge Aquatics and Fitness Center, Jennie Dean Park,
and Fire Station 8.
To
minimize debt service increases, staff annually works to identify opportunities to defer
issuance of debt in upcoming bond sales to the extent project (s) may be advancing slower
than estimated. These deferrals may yield short- term savings in debt service but will
potentially increase out- year debt service costs once the project advances and bonds are
issued. In FY 2026, budgeted debt service increased by $3.5 million. This is $2 million lower
68
COUNTY MANAGER’S MESSAGE
FUTURE BUDGET PRESSURES
than original estimates due to timing of project implementations and a deferral to a future
fiscal year of bonds that were originally planned to be issued in 2025. Staff will continue to
monitor annual project needs to balance outstanding debt issued for projects with their
cashflow requirements to help minimize the impacts on general fund support needed for debt
service.
Oper
ating Impact of New Facilities: The forecast includes funding for the operating costs
of capital projects as they come online including the transition of some technology costs from
a capital funding model to operating. The adopted CIP includes proposed new investments
including a new fire station with operating impacts beginning in FY 2030 and a new library
beginning in FY 2034.
Long-T
erm Plans: The County has in place a number of long-term plans, ranging from the
Affordable Housing Master Plan to the Forestry and Natural Resources Plan to the Master
Transportation Plan to the Community Energy Plan. Most of these plans are incorporated into
the Comprehensive Plan. Over the last year, the County has undertaken several new plans
and updates to existing plans, including the Master Transportation Plan update, a risk
assessment and management plan (RAMP) building on the adopted Stormwater Master Plan,
a Water Distribution System Master Plan update, and a Solid Waste Management Plan update.
Given that these plans are multi-year in nature, with most assumed to be implemented over
many years, and in some cases decades, the anticipated costs are not reflected in this multi-
year forecast but are considered and evaluated during every budget and CIP cycle.
Arlin
gton Public Schools (APS): The estimates shown for the Schools’ transfer reflect the
current revenue-sharing percentage (46.8 percent of local taxes) as outlined in the Revenue
Sharing Principles adopted by the County Board and School Board in January 2015; this
percentage may change in future years based on future years’ budget deliberations. APS,
like the County, will also face compensation, inflationary, and capital pressures.
68b
Multi-Year Financial Forecast
REVENUE
Adopted
FY 2025
Proposed
FY 2026 % chg
Forecast
FY 2027 % chg
Forecast
FY 2028 % chg
Forecast
FY 2029 % chg
Forecast
FY 2030 % chg
Forecast
FY 2031 % chg
Real Estate 931,240,150 4.6% 948,702,800 1.9% 965,654,130 1.8% 985,348,710 2.0% 1,005,437,180 2.0% 1,025,927,420 2.0% 1,046,827,470 2.0%
Less Crystal City TIF Real Estate (6,538,150) 49.3% (5,578,170) -14.7% (4,593,600) -17.7% (4,593,600) - (4,890,290) 6.5% (5,489,620) 12.3% (6,100,940) 11.1%
Less Columbia Pike TIF Real Estate (2,355,630) 35.5% (2,309,890) -1.9% (2,487,700) 7.7% (2,694,260) 8.3% (2,904,940) 7.8% (3,119,840) 7.4% (3,339,040) 7.0%
Less Ballston Quarter TIF Real Estate (1,781,730) 21.1% (1,600,070) -10.2% (1,459,920) -8.8% (1,459,920) - (1,485,130) 1.7% (1,536,050) 3.4% (1,587,990) 3.4%
Personal Property 146,802,147 2.9% 150,132,147 2.3% 151,782,147 1.1% 154,192,147 1.6% 156,652,147 1.6% 159,162,148 1.6% 161722149 1.6%
BPOL 89,823,887 7.9% 96,242,581 7.1% 98,167,433 2.0% 101,112,456 3.0% 104,145,829 3.0% 107,270,204 3.0% 110,488,310 3.0%
Sales* 57,700,000 9.3% 56,500,000 -2.1% 57,630,000 2.0% 58,780,000 2.0% 59,960,000 2.0% 61,160,000 2.0% 62,380,000 2.0%
Meals* 50,500,000 12.2% 67,000,000 32.7% 68,340,000 2.0% 69,710,000 2.0% 71,100,000 2.0% 72,520,000 2.0% 73,970,000 2.0%
TOT 26,000,000 18.2% 29,000,000 11.5% 29,580,000 2.0% 30,470,000 3.0% 31,380,000 3.0% 32,320,000 3.0% 33,290,000 3.0%
Other Taxes 43,637,000 3.0% 45,205,000 3.6% 45,660,000 1.0% 46,120,000 1.0% 46,580,000 1.0% 47,050,000 1.0% 47,520,000 1.0%
SUBTOTAL: TAXES 1,335,027,674 5.0% 1,383,294,398 3.6% 1,408,272,490 1.8% 1,436,985,533 2.0% 1,465,974,796 2.0% 1,495,264,262 2.0% 1,525,169,959 2.0%
State 95,484,483 6.3% 100,473,138 5.2% 101,477,869 1.0% 102,492,648 1.0% 103,517,575 1.0% 104,552,750 1.0% 105,598,278 1.0%
Federal 18,681,302 -19.2% 19,548,425 4.6% 19,548,425 - 19,548,425 - 19,548,425 - 19,548,425 - 19,548,425 -
Other Revenue 125,603,830 11.0% 154,649,129 23.1% 151,145,620 -2.3% 152,657,076 1.0% 154,183,647 1.0% 155,725,484 1.0% 157,282,739 1.0%
SUBTOTAL: OTHER 239,769,615 6.0% 274,670,692 14.6% 272,171,915 -0.9% 274,698,149 0.9% 277,249,647 0.9% 279,826,659 0.9% 282,429,441 0.9%
CARRYOVER FUNDS - General 75,438,144 38.8% 28,917,686 -61.7% 6,022,808 -79.2% 6,114,158 1.5% 5,423,347 -11.3% 5,518,388 1.8% 5,615,329 1.8%
TOTAL REVENUE 1,650,235,433 6.4% 1,686,882,776
2.2% 1,686,467,212 0.0% 1,717,797,840 1.9% 1,748,647,790 1.8% 1,780,609,309 1.8% 1,813,214,730 1.8%
EXPENDITURES
Adopted
FY 2025
Proposed
FY 2026 % chg
Forecast
FY 2027 % chg
Forecast
FY 2028 % chg
Forecast
FY 2029 % chg
Forecast
FY 2030 % chg
Forecast
FY 2031 % chg
Salaries 358,626,030 2.0% 380,278,856 6.0% 391,687,000 3.0% 403,438,000 3.0% 415,541,000 3.0% 428,007,000 3.0% 440,847,000 3.0%
Benefits 161,327,639 1.8% 167,989,460 4.1% 178,916,017 6.5% 185,442,127 3.6% 191,298,700 3.2% 196,337,477 2.6% 201,509,912 2.6%
Compensation one-time 12,041,416 34.3% 5,605,618 -53.4% - - - - - - - - - -
SUBTOTAL: PERSONNEL 531,995,085 2.5% 553,873,934 4.1% 570,603,017 3.0% 588,880,127 3.2% 606,839,700 3.0% 624,344,477 2.9% 642,356,912 2.9%
Ongoing Operating Expenses 246,031,154 11.3% 262,043,789 6.5% 268,056,633 2.3% 274,355,869 2.3% 280,855,425 2.4% 288,086,810 2.6% 295,464,143 2.6%
One-time Operating Expenses 17,150,388 15.0% 12,168,230 -29.0% - - - - - - - - - -
Metro 49,753,571 4.0% 51,246,178 3.0% 75,744,745 47.8% 106,256,725 40.3% 112,192,661 5.6% 115,628,675 3.1% 119,167,770 3.1%
Contingents (CM) 2,000,000 0.0% 2,000,000 0.0% 2,000,000 - 2,000,000 - 2,000,000 - 2,000,000 - 2,000,000 -
Economic Development Grants 1,500,000 0.0% 1,500,000 0.0% 1,500,000 - 1,500,000 - 1,500,000 0.0% 1,500,000 0.0% 1,500,000 0.0%
One-time Economic Development Grants 932,819 76.4% 1,132,819 21.4% 1,022,808 -9.7% 1,114,158 8.9% 423,347 -62.0% 518,388 22.4% 615,329 18.7%
Ongoing AHIF 9,673,250 0.0% 9,673,250 0.0% 9,673,250 - 9,673,250 - 9,673,250 - 9,673,250 - 9,673,250 -
One-time AHIF 11,000,000 128.5% 2,000,000 -81.8% - - - - - - - - - -
Regionals 8,904,057 16.1% 9,181,630 3.1% 9,181,630 - 9,181,630 - 9,181,630 - 9,181,630 - 9,181,630 -
Ongoing Capital 6,000,000 0.0% 6,180,000 3.0% 6,489,000 5.0% 6,813,450 5.0% 7,154,123 5.0% 7,511,829 5.0% 7,887,420 5.0%
One-time Capital 16,438,000 228.8% 12,080,000 -26.5% - - - - - - - - - -
Debt 84,647,699 6.4% 88,195,000 4.2% 91,237,107 3.4% 94,940,393 4.1% 100,563,847 5.9% 107,561,307 7.0% 113,262,232 5.3%
Debt Service for Short-term Finance 9,206,316 5.0% 11,000,000 19.5% 12,000,000 9.1% 12,600,000 5.0% 13,230,000 5.0% 13,891,500 5.0% 14,586,075 5.0%
OPEB 14,100,000 0.0% 13,000,000 -7.8% 13,000,000 - 13,000,000 - 13,000,000 - 13,000,000 - 13,000,000 -
SUBTOTAL: NONPERSONNEL 477,337,254 12.7% 481,400,896 0.9% 489,905,173 1.8% 531,435,475 8.5% 549,774,282 3.5% 568,553,389 3.4% 586,337,849 3.1%
Schools Ongoing
(based on 46.8% of tax revenue) 624,792,951 5.1% 647,381,778 3.6% 659,071,525 1.8% 672,509,229 2.0% 686,076,205 2.0% 699,783,675 2.0% 713,779,541 2.0%
Schools One-time 14,936,131 7.9% - -100.0% - - - - - - - - - -
Transfers to Other Funds 1,174,012 2.7% 2,726,168 132.2% 2,726,168 - 2,726,168 - 2,726,168 - 2,726,168 - 2,726,168 -
Operating Impact from CIP** 3,914,000 4,673,000 19.4% 5,622,000 20.3% 6,162,000 9.6% 10,730,000 74.1%
TOTAL EXPENSES 1,650,235,433 6.4% 1,685,382,776 2.1% 1,726,219,882 2.4% 1,800,224,000 4.3% 1,851,038,355 2.8% 1,901,569,708 2.7% 1,955,930,470 2.9%
Shortfall/Surplus $ (millions)
Adopted
FY 2025
Proposed
FY 2026
Forecast
FY 2027
Forecast
FY 2028
Forecast
FY 2029
Forecast
FY 2030
Forecast
FY 2031
Revenue 1,650,235,433 1,686,882,776 1,686,467,212 1,717,797,840 1,748,647,790 1,780,609,309 1,813,214,730
Expenditures 1,650,235,433 1,685,382,776 1,726,219,882 1,800,224,000 1,851,038,355 1,901,569,708 1,955,930,470
Cumulative Deficit/Surplus+ - 1,500,000 (39,752,670) (82,426,160) (102,390,565) (120,960,399) (142,715,740)
Annual Deficit/Surplus (39,752,670) (42,673,489) (19,964,406) (18,569,834) (21,755,341)
*Sales and meals tax estimates include growth attributable to the Ballston Quarter development and are net of contributions to the Ballston Quarter TIF.
**The operating impact from the CIP is an estimate of future year operating costs including new facilities coming online and the transition of technology from capital to operating expenses.
+Arlington County is required to adopt a balanced budget each year. Deficits that appear in out-years will be reduced by the actions taken to balance the prior year.
68c
Multi-Year Financial Forecast: Scenario Two
REVENUE
Adopted
FY 2025
Proposed
FY 2026 % chg
Forecast
FY 2027 % chg
Forecast
FY 2028 % chg
Forecast
FY 2029 % chg
Forecast
FY 2030 % chg
Forecast
FY 2031 % chg
Real Estate 931,240,150 4.6% 948,702,800 1.9% 938,490,510 -1.1% 953,845,520 1.6% 972,946,290 2.0% 992,107,180 2.0% 1,011,651,270 2.0%
Less Crystal City TIF Real Estate (6,538,150) 49.3% (5,578,170) -14.7% (4,593,600) -17.7% (4,593,600) - (4,890,290) 6.5% (5,489,620) 12.3% (6,100,940) 11.1%
Less Columbia Pike TIF Real Estate (2,355,630) 35.5% (2,309,890) -1.9% (2,290,540) -0.8% (2,453,340) 7.1% (2,659,210) 8.4% (2,869,190) 7.9% (3,083,380) 7.5%
Less Ballston Quarter TIF Real Estate (1,781,730) 21.1% (1,600,070) -10.2% (1,459,920) -8.8% (1,459,920) - (1,485,130) 1.7% (1,536,050) 3.4% (1,587,990) 3.4%
Personal Property 146,802,147 2.9% 150,132,147 2.3% 151,782,147 1.1% 154,192,147 1.6% 156,652,147 1.6% 159,162,148 1.6% 161,722,149 1.6%
BPOL 89,823,887 7.9% 96,242,581 7.1% 92,392,878 -4.0% 95,164,664 3.0% 98,019,604 3.0% 100,960,192 3.0% 103,988,998 3.0%
Sales* 57,700,000 9.3% 56,500,000 -2.1% 53,675,000 -5.0% 54,211,750 1.0% 55,024,926 1.5% 56,125,425 2.0% 57,247,933 2.0%
Meals* 50,500,000 12.2% 67,000,000 32.7% 61,640,000 -8.0% 62,256,400 1.0% 63,190,246 1.5% 64,454,051 2.0% 65,743,132 2.0%
TOT 26,000,000 18.2% 29,000,000 11.5% 25,520,000 -12.0% 25,775,200 1.0% 26,161,828 1.5% 26,685,065 2.0% 27,218,766 2.0%
Other Taxes 43,637,000 3.0% 45,205,000 3.6% 45,660,000 1.0% 46,120,000 1.0% 46,580,000 1.0% 47,050,000 1.0% 47,520,000 1.0%
SUBTOTAL: TAXES 1,335,027,674 5.0% 1,383,294,398 3.6% 1,360,816,475 -1.6% 1,383,058,821 1.6% 1,409,540,411 1.9% 1,436,649,200 1.9% 1,464,319,938 1.9%
State 95,484,483 6.3% 100,473,138 5.2% 101,477,869 1.0% 102,492,648 1.0% 103,517,575 1.0% 104,552,750 1.0% 105,598,278 1.0%
Federal 18,681,302 -19.2% 19,548,425 4.6% 19,548,425 - 19,548,425 - 19,548,425 - 19,548,425 - 19,548,425 -
Other Revenue 125,603,830 11.0% 154,649,129 23.1% 151,145,620 -2.3% 152,657,076 1.0% 154,183,647 1.0% 155,725,484 1.0% 157,282,739 1.0%
SUBTOTAL: OTHER 239,769,615 6.0% 274,670,692 14.6% 272,171,915 -0.9% 274,698,149 0.9% 277,249,647 0.9% 279,826,659 0.9% 282,429,441 0.9%
CARRYOVER FUNDS - General 75,438,144 38.8% 28,917,686 -61.7% 6,022,808 -79.2% 6,114,158 1.5% 5,423,347 -11.3% 5,518,388 1.8% 5,615,329 1.8%
TOTAL REVENUE 1,650,235,433 6.4%
1,686,882,776 2.2% 1,639,011,197 -2.8% 1,663,871,129 1.5% 1,692,213,405 1.7% 1,721,994,247 1.8% 1,752,364,708 1.8%
EXPENDITURES
Adopted
FY 2025
Proposed
FY 2026 % chg
Forecast
FY 2027 % chg
Forecast
FY 2028 % chg
Forecast
FY 2029 % chg
Forecast
FY 2030 % chg
Forecast
FY 2031 % chg
Salaries 358,626,030 2.0% 380,278,856 6.0% 391,687,000 3.0% 403,438,000 3.0% 415,541,000 3.0% 428,007,000 3.0% 440,847,000 3.0%
Benefits 161,327,639 1.8% 167,989,460 4.1% 178,916,017 6.5% 185,442,127 3.6% 191,298,700 3.2% 196,337,477 2.6% 201,509,912 2.6%
Compensation one-time 12,041,416 34.3% 5,605,618 -53.4% - - - - - - - - - -
SUBTOTAL: PERSONNEL 531,995,085 2.5% 553,873,934 4.1% 570,603,017 3.0% 588,880,127 3.2% 606,839,700 3.0% 624,344,477 2.9% 642,356,912 2.9%
Ongoing Operating Expenses 246,031,154 11.3% 262,043,789 6.5% 268,056,633 2.3% 274,355,869 2.3% 280,855,425 2.4% 288,086,810 2.6% 295,464,143 2.6%
One-time Operating Expenses 17,150,388 15.0% 12,168,230 -29.0% - - - - - - - - - -
Metro 49,753,571 4.0% 51,246,178 3.0% 75,744,745 47.8% 106,256,725 40.3% 112,192,661 5.6% 115,628,675 3.1% 119,167,770 3.1%
Contingents (CM) 2,000,000 0.0% 2,000,000 0.0% 2,000,000 - 2,000,000 - 2,000,000 - 2,000,000 - 2,000,000 -
Economic Development Grants 1,500,000 0.0% 1,500,000 0.0% 1,500,000 - 1,500,000 - 1,500,000 0.0% 1,500,000 0.0% 1,500,000 0.0%
One-time Economic Development Grants 932,819 76.4% 1,132,819 21.4% 1,022,808 -9.7% 1,114,158 8.9% 423,347 -62.0% 518,388 22.4% 615,329 18.7%
Ongoing AHIF 9,673,250 0.0% 9,673,250 0.0% 9,673,250 - 9,673,250 - 9,673,250 - 9,673,250 - 9,673,250 -
One-time AHIF 11,000,000 128.5% 2,000,000 -81.8% - - - - - - - - - -
Regionals 8,904,057 16.1% 9,181,630 3.1% 9,181,630 - 9,181,630 - 9,181,630 - 9,181,630 - 9,181,630 -
Ongoing Capital 6,000,000 0.0% 6,180,000 3.0% 6,489,000 5.0% 6,813,450 5.0% 7,154,123 5.0% 7,511,829 5.0% 7,887,420 5.0%
One-time Capital 16,438,000 228.8% 12,080,000 -26.5% - - - - - - - - - -
Debt 84,647,699 6.4% 88,195,000 4.2% 91,237,107 3.4% 94,940,393 4.1% 100,563,847 5.9% 107,561,307 7.0% 113,262,232 5.3%
Debt Service for Short-term Finance 9,206,316 5.0% 11,000,000 19.5% 12,000,000 9.1% 12,600,000 5.0% 13,230,000 5.0% 13,891,500 5.0% 14,586,075 5.0%
OPEB 14,100,000 0.0% 13,000,000 -7.8% 13,000,000 - 13,000,000 - 13,000,000 - 13,000,000 - 13,000,000 -
SUBTOTAL: NONPERSONNEL 477,337,254 12.7% 481,400,896 0.9% 489,905,173 1.8% 531,435,475 8.5% 549,774,282 3.5% 568,553,389 3.4% 586,337,849 3.1%
Schools Ongoing
(based on 46.8% of tax revenue) 624,792,951 5.1% 647,381,778 3.6% 636,862,110 -1.6% 647,271,528 1.6% 659,664,912 1.9% 672,351,826 1.9% 685,301,731 1.9%
Schools One-time 14,936,131 7.9% - -100.0% - - - - - - - - - -
Transfers to Other Funds 1,174,012 2.7% 2,726,168 132.2% 2,726,168 - 2,726,168 - 2,726,168 - 2,726,168 - 2,726,168 -
Operating Impact from CIP** 3,914,000 4,673,000 19.4% 5,622,000 20.3% 6,162,000 9.6% 10,730,000 74.1%
TOTAL EXPENSES 1,650,235,433 6.4% 1,685,382,776 2.1% 1,704,010,467 1.1% 1,774,986,299 4.2% 1,824,627,063 2.8% 1,874,137,859 2.7% 1,927,452,660 2.8%
Shortfall/Surplus $ (millions)
Adopted
FY 2025
Proposed
FY 2026
Forecast
FY 2027
Forecast
FY 2028
Forecast
FY 2029
Forecast
FY 2030
Forecast
FY 2031
Revenue 1,650,235,433 1,686,882,776 1,639,011,197 1,663,871,129 1,692,213,405 1,721,994,247 1,752,364,708
Expenditures 1,650,235,433 1,685,382,776 1,704,010,467 1,774,986,299 1,824,627,063 1,874,137,859 1,927,452,660
Cumulative Deficit/Surplus+ - 1,500,000 (64,999,270) (111,115,170) (132,413,658) (152,143,612) (175,087,952)
Annual Deficit/Surplus (64,999,270) (46,115,900) (21,298,488) (19,729,954) (22,944,340)
*Sales and meals tax estimates include growth attributable to the Ballston Quarter development and are net of contributions to the Ballston Quarter TIF.
**The operating impact from the CIP is an estimate of future year operating costs including new facilities coming online and the transition of technology from capital to operating expenses.
+Arlington County is required to adopt a balanced budget each year. Deficits that appear in out-years will be reduced by the actions taken to balance the prior year.
68d
FY 2026 Proposed Budget Reductions and Realignments
General Fund Impact
Summary of Reductions and Realignments
Arlington Economic Development
Cultural Affairs – Eliminate the Arts Truck Program $24,700 -
Description of Current Service: The Arlington Arts Truck provides a mobile platform for artists-in-residence
to engage Arlington residents in interactive art projects from April to October.
Impact of Reduction: Elimination of the Arts Truck will reduce the 35 -pop up art and cultural program
offerings across the County.
Cultural Affairs staff who manage the Arts Truck are being reassigned to support programming and
community engagement at the new 3700 S Four Mile Run and 2700 Nelson consolidated Cultural Affairs
Division (CAD) Campus. The new consolidated CAD campus fulfills the community’s vision to establish
this area as an arts anchor as described in the 2018 Four Mile Run Valley Area Plan and in alignment with
AED’s strategic plan.
Cultural Affairs – Eliminate Arts Enterprise Specialist
Position
$133,507 1.0 (F)
Description of Current Service: The Arts Enterprise Specialist currently manages the Lee Arts Center (LAC)
Studios program, temporary staffing, and facility operations at 5722 Langston Boulevard. Programming
includes a fully equipped membership- based professional studio for artists work ing in Ceramics and
Printmaking, a mini gallery with rotating exhibitions of visiting and resident artists, master workshops
and training throughout the year. The existing LAC studios facility and programs will relocate from 5722
Langston Boulevard to the new Shared Studio facility located at 3700 S. Four Mile Run following a
multimillion-dollar renovation, which is anticipated for completion in the summer of 2025.
Impact of Reduction: This position’s funding will be replaced with one -time funds until the incumbent
retires at the end of FY 2026. The future elimination of this position will impact AED’s capacity to offer
programming and manage the new Shared Studios facility in Ceramics, Printmaking, and Textiles at 3700
S Four Mile Run, which will be delivered in FY 2026. Impacts will likely include fewer new paying members
to the studios and a decrease in the quantity and quality of arts programming offered at the new studio.
Community Planning, Housing and Development
Comprehensive Planning – Eliminate a Principal Planner $202,431 1.0 (V)
Description of Current Service: The Comprehensive Planning team provides master planning work that
monitors and maintains all elements of the Comprehensive Plan; develops and reviews County land use
policy; undertakes sector plans, small area plans, and General Land Use Plan (GLUP) stud
ies and
amendments; staffs committees for long range planning and zoning ordinance reviews and amendments
and conducts special zoning studies and prepares Zoning Ordinance amendments.
Title, Description, and Impact
Reduction
Net Tax Support
Funding
(OT = One-time
Savings)
Full Time
Equivalents
(V = Vacant /
F = Filled)
69
Impact of Reduction: A reduction of one Principal Planner position will reduce overall capacity for
countywide land use policy and regulatory work including coordinating overall planning and development
activities growth corridors. This reduction could result in the suspension or scaling back of project scopes,
reduced project pace or progress, and diminished resources to work with key stakeholders in areas of the
County that experience high development activity and changes in the built environment.
Code Enforcement – Eliminate a Code Enforcement
Inspector
$138,548 1.0 (V)
Description of Current Service: There are currently ten inspector positions and two supervisory positions
in Code Enforcement. Code Enforcement Inspectors inspect existing buildings, structures, and systems
for unsafe conditions. One supervisor position and two inspector positions are currently frozen due to
budgetary constraints. With the additional reduction of one inspector position, Code Enforcement will have
six staff members.
Impact of Reduction: As a result of the proposed reduction, Code Enforcement will no longer be able to
conduct proactive inspections, and the average time for compliance will increase from 63 to approximately
90 days. With the resumption of the hoarding task force, the typica l response time for investigation will
increase from 3-5 days to 5-8 days should this position be eliminated.
County Board Office
County Board Auditor – Freeze a Senior Auditor position $138,184 1.0 (V)
Description of Current Service: Continue to freeze a vacant Senior Auditor position that was created as a
part of the FY 2023 adopted budget.
Impact of Reduction: This reduction may limit the execution of the audit workplan in FY 2026. This
proposal is for a freeze of one position in FY 2026
Environmental Services (DES) – General Fund
Multiple Lines of Business – Chargeback Adjustments $102,580 -
Description of Current Service: In addition to the DES General Fund Budget, DES manages other
enterprise funds, such as the Stormwater Utility Fund and the Utility Fund. As part of routine financial
management, DES reviews the most appropriate fund source and cost sharing for programs a nd
activities. The following funding changes are recommended in FY 2026:
• Charge Utilities Fund for a portion of fleet costs (rental book) associated with the Solid Waste
Bureau providing grit hauling services for the Water Pollution Control Plant ($37,100).
• Charge the Stormwater Fund for the administrative and overhead support provided by the Water
Sewer Streets Bureau ($65,480).
Impact of Reduction: The expenditure savings will transfer the General Fund costs to these enterprise
funds resulting in General Fund savings.
Facilities Management Bureau (FMB) – Reduce Custodial
Level of Service
$287,000 -
Description of Current Service: FMB manages custodial services through a mix of in -house staff and
contractors across approximately 90 County -owned facilities. Cleaning is provided in fully utilized
buildings five days per week.
Impact of Reduction: Office cleaning will be reduced from five to three days a week for the following
locations: Trades Center, Justice Center, Central Library, 2020 N 14th Street, and Court Square West.
Restrooms, locker rooms, and public facing areas in all of these buildings will continue to be cleaned
daily.
70
FMB – Convert One County Custodian to Contract $52,170 1.0 (V)
Description of Current Service: FMB manages custodian services at approximately 90 County facilities
with a combination of in -house staff and contracted services. Custodian services has two supervisors
overseeing the efforts of six in-house staff and over 100 contracted services employees.
Impact of Reduction: Over the past several years, as County incumbents in the custodian positions retire,
the County has gradually rebalanced the personnel mix toward contracted staff. One additional custodian
position has retired, and these services will now be provided by the custodian contract at an anticipated
savings of $52,170.
Transit – Reduce Frequency on ART Route 43 $448,329 -
Description of Current Service: ART 43 currently provides travel between Crystal City, Rosslyn, and
Courthouse. The route has a limited number of stops to make travel time faster. The current frequency
of service is ten minutes during the morning and afternoon peak commute times and 20 minutes during
the off-peak. The average weekday ridership is 431 passengers and 7.9 passengers per revenue hour,
compared to the operations standard 9 passengers per hour. ART 43 currently operates 49.1 revenue
hours per weekday.
Impact of Reduction: This reduction would provide 20 -minute headways all day on ART 43. The
alternative Metrorail connection runs approximately every 17 - 18 minutes.
Development Services – Eliminate a vacant
Administrative Technician $104,222 1.0 (V)
Description of Current Service: This position provides administrative support to the Development Services
bureau including creating requisitions and purchase orders, purchasing operating supplies for the bureau,
and processing public improvement bond transactions.
Impact of Reduction: Because this position is currently vacant, most of these duties have already been
transferred to a budget specialist in the Director’s Office with the remaining duties, like P-card purchases,
being absorbed by staff within Development Services.
Arlington County Commuter Services (ACCS) – Transfer
1.5 positions from general fund to ACCS funding
$302,388 -
Description of Current Service: As part of routine financial management, DES reviews program budgets
to determine the most appropriate funding sources. This review identified 1.5 positions that can be
transferred to ACCS:
• A Transit contracted position (1.0 FTE) that provides marketing support related to ART, STAR,
and planning processes.
• 0.5 FTE of a Transportation Planning Principal position that provides taxi -cab program
coordination for the County.
Impact of Reduction: The funding source for the above positions will change and will no longer be funded
from the General Fund. Instead, Congestion Mitigation and Air Quality (CMAQ) grant funding and Shared
Mobility Device fee revenue will fund these positions. The redirection of funds for existing ACCS programs
will be managed through efficiencies gained based on recommendations from the recently adopted
Commuter Assistance Strategic Plan.
71
Fire Department
Multiple Lines of Business – Training Budget Reduction $99,752 -
Description of Current Service: The Fire Department provides training to ensure firefighter certifications,
education, and skills remain current and applicable. The training budget supports a variety of education
including advanced life support, continuing medical education requiremen ts, fire marshal, and specialty
team education and certification. The budget also allows for some professional development
opportunities.
Impact of Reduction: This proposal reduces funding across the Department in training budgets for its
special operations, recruitment, logistics, Office of the Fire Marshal, and academy lines of business.
Funding will be adjusted across the Department to ensure that all requ ired education and training is
funded for its operational staff.
Human Resources Department
Office of the Director – Senior Staff
Administrative/Management Specialist
$129,290 1.0 (F)
Description of Current Service: The Senior Staff Administrative/Management Specialist is the
administrative assistant to the Department Director. This position supports the director and the
management team with meetings, presentations, and legislative coordination as well as provides
department-wide support by assisting with accounts payable functions and serving as HRD’s HR liaison.
Impact of Reduction: The impacted work will be distributed within the department and work will have to
be prioritized or delayed. Some core HR functions in recruiting, payroll, benefits and
training/organizational will be delayed as staff in those units will have to pick up the functions.
Training & Organizational Development – Staff HR/OD
Specialist – Change Management
$196,406 1.0 (F)
Description of Current Service: The Change Management Specialist supports new ideas and helps to
facilitate and implement change. A recent example is the PRISM+ upgrade of the Human Capital and
Finance systems. This position works with impacted departments to support and guide employe es with
change from planning to implementation.
Impact of Reduction: Elimination of the position will require existing staff to support HR Liaisons with
PRISM+ ongoing and end -user training. Quarterly PRISM+ updates affecting County -wide employees
will be rolled out and training delivered by core team leads in each unit. This could delay support to
departments on payroll, recruiting, training and other issues.
Employee Services – Staff HR/OD Specialist -
HealthSmart
$165,000 1.0 (F)
Description of Current Service: The Staff HR/OD Specialist manages the HealthSmart unit and the overall
planning and organization of health and wellness programs for all County employees.
Impact of Reduction: The elimination of the position will result in a reduction of some county -wide
mental health and wellness programs with fewer staff to organize programs and manage vendors and
related activities.
72
Employee Services – Wellness Programs $42,735 -
Description of Current Service: This budget funds the variety of health and wellness programs available
for all employees. Expenses include contractual services for the health and wellness quarterly movement
classes.
Impact of Reduction: The elimination of the funding will require staff to evaluate alternative ways to
provide a level of health and wellness benefits for employees. Staff will also explore utilizing benefits
funding from our health insurance providers to offer some of these programs.
Employee Benefits and County-Wide Programs –
Adoption Assistance
$30,000 -
Description of Current Service: This is an employee benefit to assist eligible employees who are adopting
a child. The program reimburses eligible employees for qualified adoption expense up to $9,000 per
finalized adoption.
Impact of Reduction: The reduced funding will cut the current $50,000 budget to $20,000 per year, which
is in line with historical expenses for this benefit. Should demand for this program increase, funds will
be identified to assist the eligible employees.
Office of the Director – Advisory and Consulting
Services
$50,000 -
Description of Current Service: The Advisory and Consulting Services budget supports development of
new benefits and retirement plans. Expenses include consultant costs for reviewing, comparing and
advising on available ‘basket of benefit’ plans in the market.
Impact of Reduction: The budget reduction eliminates any consultant funding for future benefit plan
reviews and analysis. The current health and benefits services for County employees are in effect
through the next 3-5 years; therefore, any advisory and benefits consulting services needed for the near
future, such as for retirement plan changes, will require new funding.
Human Services
Child & Family Services – Employment Services
Specialist
$55,461 (net) 1.0 (F)
Description of Current Service: The Employment Coordinator is responsible for program outreach, job
readiness, and training to support youth and families across the Child and Family Services Division. This
position has supported a small summer youth employment program for system involv ed youth for the
last two years as well supporting families seeking family preservation and reunification. Since July 1, the
CFSD Employment Specialist received referrals for 32 young people between the ages of 15 and 21.
Although referral requests include
vocational assessments as well as job readiness and employment
assistance, the actual employment rate for participants has been lower than anticipated.
Impact of Reduction : Youth in the child welfare system will continue to receive case management by
DHS staff but will be referred to SkillSource for specific employment support. The Arlington Employment
Center provides financial support to SkillSource, which is the designated Workforce Investment and
Opportunities Act (WIOA) vendor for youth and young adult employment. The Arlington Employment
Center also conducts an annual Teen Summer Youth Employment Fair that is regularly attended by over
1,000 Arlington youth. DHS will work to further assess youth employment assistance needs as part of
the Arlington Children and Youth Well-being Plan to be launched this year.
73
Economic Independence Division – Reduction to
Eviction Prevention Program
$1,145,982 -
Description of Current Service: The Eviction prevention Program was initially established to stabilize
Arlington households in emergency situations. The program’s eligibility criteria were greatly expanded
during COVID to address the eviction crisis. Over the last few years and like ot her jurisdictions, the
eligibility criteria have been gradually modified giving sufficient lead time to property owners and tenants
alike. The County’s program provides the most generous benefits in the region. Increasingly, some
tenants are being housed in units where they are significantly rent-burdened and often need immediate
financial assistance, which is not sustainable for the tenant, the property owner or the County.
The eviction prevention program provides rent and utility assistance to households at risk of eviction
with the current eligibility requirements of only serving households who are at or below 50% of Area
Median Income, have an eviction or late notice, are in units that are at or below 150% of Fair Market
Rent, have proof of fi
nancial hardship, and can demonstrate their ability to pay moving forward.
Households are subject to a $3,000 cap per calendar year with exceptions approved based on available
funding and extreme need for families.
Impact of Reduction: The program primarily serves vulnerable, minority Arlingtonians. Current eligibility
requirements would remain in effect with an additional restriction prohibiting assistance to households
whose lease is fewer than six months’ old (unless the household rec
ently experienced a fiscal crisis
beyond their control where administrative exceptions will be considered). This change would also impact
Arlington landlords, who will have to be more selective in determining which households can sustain
rental payments long -term. This reduction is likely to increase evictions in the short -term for rent -
burdened households.
Economic Independence Division – Employment
Development Specialist
$141,518 1.0 (F)
Description of Current Service: This position is part of the Business Engagement Team (BET) that
engages with Arlington employers to meet their workforce needs by providing resources and direct
assistance and connects employers with residents looking for employment.
Impact of Reduction: This position is one of two Employment Development Specialists on staff. In FY
2024, the BET served 1,140 employers and offered 153 job recruitment fairs. This reduction will limit
some of the outreach and support provided to Arlington businesses seeking staffing capacity and other
recruitment and retention supports. Staff is looking at ways to maximize the partnership between the
Arlington Employment Center (AEC) and Arlington Economic Development. Job fairs can still be accessed
through joint activities with the Alexandria Workforce Center.
Public Health Division - Risk Communications
Epidemiologist
$135,572 1.0 (F)
Description of Current Service: The Epidemiological Communications Specialist is part of a two -person
team that manages public health communication duties. This position focuses on public health
communications and messaging on exposure, risk, and mitigation strategies for communicable diseases,
and is responsible for conducting research and developing editorial support and communication tools to
prevent and control the spread of communicable diseases.
Impact of Reduction: The remaining Communications Specialist would absorb all public health
communication duties. There is no impact on service delivery during normal operations. During an
extended public health emergency, additional communication assistance may be needed.
Public Health Division - Community Health Protection
Bureau Director
$189,811 1.0 (F)
Description of Current Service: The Community Health Protection Bureau provides initial health
screenings to newly arrived refugees, treatment for tuberculosis (TB), communicable disease surveillance
74
and investigation, environmental health prevention of food -borne illness, and community -wide
emergency preparedness and response planning.
Impact of Reduction: With declining client numbers, the TB and Newcomer Health program can be
transferred to the Community Health Services Bureau with no adverse staff or client impact. Management
of the remaining programs in the Community Health Protection Bureau will be transferred to one of two
Public Health Assistant Division Directors increasing the number of direct reports from three to six. With
this programmatic realignment, the current Community Health Protection Bureau will be disbanded and
operations transferred to remaining staff with no adverse impact. This position’s funding will be replaced
with one-time funds until the incumbent
retires at the end of FY 2026.
Aging & Disability Division – Reduction in
Transportation Services Budget
$300,000 -
Description of Current Service: Transportation services provides reimbursement for transportation costs
to developmental services clients attending group day programs. There are currently 30 clients enrolled
in the program.
Impact of Reduction: In 2024, transportation services transitioned to a reimbursement system for eligible
riders. Riders were moved to Developmental Disabilities (DD) Waiver transportation providers through
ModivCare, Metro Access, STAR, or public transit, reducing overall pro gram costs. This practice aligns
Arlington’s developmental services transportation operations with other Northern Virginia CSBs. In future
years, this reduction could adversely impact families who will be obligated to navigate existing paratransit
services or identify other transportation options. Current riders will not be impacted by this reduction.
Department of Libraries
Public Services – Eliminate Library Assistant $85,346 1.0 (V)
Description of Current Service: The library assistant position provides direct customer service to library
patrons, assists the public with circulation requests, technology assistance, and information about the
library’s programs and policies. In addition, this position performs circulation duties such as issuing
library cards, placing items on reserve, and helping patrons with the use of the library catalog and other
electronic resources.
Impact of Reduction: The library will use temporary employees to fill the gap at the public service desks
created by the elimination of this position. Work that cannot be performed by temporary employees will
be shifted to other library assistants. The elimination of the libra ry assistant position may result in a
reduction in service levels.
Public Services – Eliminate Library Page $29,374 0.50 (V)
Description of Current Service: The Library page position is responsible for shelving books at library
locations.
Impact of Reduction: The library will use temporary employees to fill the gap in shelving created by the
elimination of this position. The elimination of the library page position may result in a reduction in
service levels in the shelving of books at various library locations.
Public Services – Freeze vacant Librarian Supervisor for
six (6) months
$67,830 (OT) -
Description of Current Service: The library supervisor is the manager for a library location or work unit.
This position is responsible for directing the planning and implementation of services, programs, staffing,
and volunteer support. This role also provides leadership and management to staff including
75
development, training, and evaluations.
Impact of Reduction: Aurora Hills will be managed by an acting library supervisor until January 2026.
The acting assignment creates a staffing shortage at Shirlington, and the use of temporary employees is
required to maintain services at the location. The position freeze may result in a reduction in service
levels.
Management and Finance
Risk Management - Claims Analyst position $156,702 1.0 (V)
Description of Current Service : The Risk Management program move from HRD to DMF in Fall 2023
included the reassignment of 2.0 FTEs to support the program (Risk Manager and Claims Analyst). After
promotion of the Claims Analyst into Risk Manager Role and the onboarding of a new Third -Party
Administrator for claims, the Risk Manager and DMF Management evaluated the staff support needs for
the program. After concluding that a full time Claims Analyst FTE was more than the program required,
DMF reassigned two existing administrative support positions to provide part time claims intake support
for the Risk Manager for appropriate coverage.
Impact of Reduction: While the needs of the Risk Management section have been met with the
implementation of program changes and the support of administrative staff, DMF had intended to
reclassify this Claims Analyst position to meet new demands for improved data management, n ew
module support most notably Accounts Receivables, but also financial subledgers and support to
departments for the new PRISM+ ERP through training and workshops.
Management & Budget – Eliminate ongoing funding for
Data Management Software (Arlington Wallet Pipeline)
$20,000 -
Description of Current Service: DMF and DTS deployed a new data pipeline solution (Fivetran) in early
2023 which allowed the County to easily move our PRISM financial data into the County’s Cloud Data
Warehouse on an hourly basis. Having our financial data in the data warehouse not only provides updated
information for Arlington Wallet but also provides the backend for numerous custom financial reports and
dashboards. These tools are utilized by financial analysts and managers across the County.
Impact of Reduction: The PRISM+ project included the upgrade of the County’s primary financial
reporting tool, SplashBI. The new version of SplashBI for Oracle Cloud also includes a data movement
tool that has replaced the Fivetran solution that was used to move our EBS data. Because Fivetran is
now redundant, this contract cost can be eliminated with little to no impact to current operations or end
users. It may have an impact if this type of reporting is expanded beyond Oracle data, but that can be
determined at a later date.
Parks and Recreation (DPR)
Youth Services – Closure of Madison Preschool $108,828 1.25 (F)
Description of Current Service: The Early Childhood Unit provides full- day and half -day preschool
programming for children ages three through five at five County locations. Children explore art, music,
literature, STEM, social studies, and nature through recreational play.
Impact of Reduction: Historically, the Madison Preschool program has been a five day a week, half -day
program. The program has experienced lower enrollment over the past several years. As a result, the
program was reduced to three days a week. Remaining participants will be offered enrollment to fill
vacant slots at DPR’s Carlin Hall or Fairlington Community Center half-day preschool programs.
76
Departmental Management and Leadership –
Temporarily freeze hiring of Deputy Director position for
12 months within the Director’s Office
$281,434 (OT) 1.00 (V)
Description of Current Service: The Deputy Director position provides guidance, direction and
coordination and ensures that the department operates efficiently and effectively in its day -to-day
business to include collaboration across the department, County government and community.
Impact of Reduction: Since its vacancy in 2024, the DPR Director is directly supervising the staff in the
Administration & Strategic Development Team (ASDT). Responsibilities of the position have been
redistributed among existing staff. Postponing the recruitment of this position could mean that certain
non-core projects and initiatives will need to be postponed, or the portfolio of work may need to be re -
prioritized.
Facilities and Operations – Temporarily freeze hiring of
Administrative Assistant A position for 12 months
within the Athletic and Facility Services Division (AFS)
$88,018 (OT) 1.00 (V)
Description of Current Service: The Administrative Assistant A position serves as the first point of contact
for visitors at the Lubber Run Community Center and assists with room setup/breakdown for programs,
classes, and events.
Impact of Reduction: Provision of services can continue with existing facility staff. This reduction will not
have an impact on DPR programming or the community.
Parks and Natural Resources Division– Temporarily
freeze hiring of four positions within the Parks and
Natural Resources (PNR) Division
$193,462 (OT) 4.00 (F)
Description of Current Service: The Parks and Natural Resources Division manages, maintains, enhances
and protects County-owned parks and natural resources.
Impact of Reduction: This reduction will impact park maintenance, operational, and urban forestry duties.
Specifically, in park service areas, the impact could include less staff available for weekend work, refuse
collection, leaf removal, snow removal, and longer response tim es to requests. The impact to Urban
Forestry will include longer review times for development plans and longer response times to service
requests.
Departmental Management and Leadership –
Elimination of Funding for Northern Virginia
Conservation Trust (NVCT)
$86,900 -
Description of Current Service: This program serves residents who currently have a conservation
easement on their land or have an interest in placing a conservation easement on their property. The
NVCT staff
monitor these easements to ensure they remain natural and align with the terms of the
easement. The program also manages lands they own and performs community engagement relating to
conservation and land management. The County, along with other jurisdictions, contribute funds to NVCT
to support this program.
Impact of Reduction: Because County contributions support NVCT operations, elimination of funding may
result in NVCT staff layoffs or redistribution of work to existing staff that work on community engagement
and securing/monitoring conservation easements (for natural lands, c ultural, and historic sites) in
Arlington County. This reduction has no impact to the County’s program or goals set out for land
acquisition in the Public Spaces Master Plan (PSMP).
77
Parks and Natural Resources Division – Selective
reduction of County Mowing
$65,000 -
Description of Current Service: The Division of Parks and Natural Resources contracts county -wide
mowing, which includes turf grass for warm season Bermuda athletic fields throughout the County.
Impact of Reduction: This will reduce selective mowing services for the 31 warm season Bermuda athletic
fields. The fields will be mowed twice a week instead of three times a week between July 1 and October
31. This reduction will have a minimal impact on DPR programming or the community.
Police Department
Operations Division Management and Administration
and Special Operations Section - Operating Supplies
$70,000 -
Description of Current Service: The Police Department purchases operating supplies including electronic
and paper parking tickets, cleaning supplies, ink cartridges and paper, firearms range equipment and
supplies, dog food and equipment for canines, and additional equipment to support overall operations.
Impact of Reduction: The purchase and replacement of some supplies will have to be deferred or delayed
and will be selected based on demands and priority. This could impact specialized needs to assist in
investigations, recruiting and retention, and training.
Public Safety Communications and Emergency Management
Emergency Communications – Reduction in Public
Safety System Personnel
$137,076 1.0 (V)
Description of Current Service: The Department is currently upgrading its Next Generation 9-1-1
system and working with implementation vendors on both a software and maintenance solution for the
Emergency Communications Center. With this implementation, this vacant position’s workload will be
handled as part of the new contract.
Impact of Reduction: With this reduction, contract staff, rather than County staff, will provide system
updates in closer collaboration with County Public Safety Information Technology (PSIT) support.
Emergency Communications – Reduction in Public
Safety Call Taker Support
$102,807 0.75 (V)
Description of Current Service : The Emergency Communications Center receives and processes 9 -1-1
emergency and non -emergency requests for service and dispatch Police, Sheriff, Fire, and Emergency
Medical Services (EMS) via radio. Callers receive CPR, first aid, and medical instructions using structured,
standardized Emergency Medical Dispatch protocols. This work is done 24/7 across four shifts.
Impact of Reduction: The proposed reduction is for a long-time vacant call center position. The service
gap has been met with contract support and overtime.
Technology Services (DTS)
Security – Security Operations Manager $307,730 1.0 (F)
Description of Current Service: This position manages the security operations team.
Impact of Reduction: Eliminating the Security Operations Manager will remove a layer of management
and result in the existing staff of three FTEs and one contractor reporting directly to the Division Chief
78
(CISO). This increase in the direct staff management responsibilities of the Division Chief could impact
attention to staff development over time as well as the speed of communications across DTS divisions.
Enterprise Technology and Applications Services –
Technology Manager II
$235,181 1.0 (F)
Description of Current Service: This Technology Manager II position provides oversight of the Technology
Service Center and the Asset Management functions.
Impact of Reduction: This team structure will be realigned, streamlining functions within the team. This
realignment will remove a management layer that currently assists with more complex customer issues,
creating data reports, and serving as a liaison to departments resultin g in slower resolution times on
some complex items.
Enterprise Technology and Applications Services –
Senior IT Analyst
$216,731 1.0 (F)
Description of Current Service: This Senior IT Analyst manages the team supporting the County’s
Microsoft applications at an enterprise level.
Impact of Reduction: This team will be restructured within the Division. This reduction may impact the
delivery of the Microsoft technology stack, which is a group of technologies and tools developed by
Microsoft that software engineers use to build applications like Teams and Power Apps. The impact would
be to internal County staff and may result in delays in overall support and communication regarding new
Microsoft features.
Enterprise Technology and Applications Services –
Network Analyst
$204,017 1.0 (F)
Description of Current Service: This Network Analyst supports response to customer tickets related to
the County’s landline telephone system. The landline telephone system is being phased out by the
implementation of the TEAMS telephone system, which is expected to be fully implemented in July 2026.
Impact of Reduction: This team will be reduced from four to three staff (1.0 FTE and two contractors).
The three remaining team members are focused on supporting the new Teams phone system. With this
reduction, they will also need to support the legacy telephone system until it is taken offline.
Office of the Chief Information Officer – Senior Staff
Admin/Management Specialist
$92,811 0.5 (F)
Description of Current Service: This position coordinates public facing communications, such as GovTech
and Digital County Awards on the behalf of DTS, internal communications to County staff, and
department events such as the DTS all staff meetings and the CIO Employee Council meetings.
Impact of Reduction: The reduction of this position would remove department support for the
development of internal and public facing communications, such as staff notifications, policy
documentation, and preparing DTS staff for public speaking engagements at conferences. These duties
would shift to managers and leadership.
Enterprise Technology and Applications Services –
OnBase Contractor Conversion to FTE
$69,037 -
Description of Current Service: This contractor currently provides support for the management and
maintenance of the County’s OnBase application. All County departments, the County Board, and the
public utilize OnBase.
79
Impact of Reduction: There will be no degradation of service by converting this contractor position to a
staff position.
Enterprise Technology and Applications Services –
Department mobile phone savings
$15,000 -
Description of Current Service: The department issued mobile lines to a majority of department staff
during the pandemic to improve communication in a remote and hybrid work environment.
Impact of Reduction: With the implementation of the TEAMS telephone system, department staff
members can receive telephone calls (internal call and external calls from the public) directly on their
computers. This reduces the need for the number of cellular devices deployed for business
communication.
Enterprise Technology and Applications Services –
Decommissioning of Analogue Telephone Infrastructure
$584,814 -
Description of Current Service: Plain Old Telephone Service (POTS) used for analog communications and
Session Initiation Protocol (SIP) trunks that support the analog communication are part of the County’s
landline telephone infrastructure.
Impact of Reduction: As part of the telephone replacement project, DTS has identified that the POTS
lines and SIP Trunks can be decommissioned in late FY 2025 and will result in an ongoing cost reduction
to the County.
County Attorney’s Office
Personnel Service Line Reduction, Assistant County
Attorney III
$240,393 1.0 (F)
Description of Current Service: This Assistant County Attorney III position is dedicated solely to legal
services specifically related to collective bargaining.
Impact of Reduction: In light of the current budget constraints, the impact of reducing the Assistant
County Attorney III position is mitigated by the overlap of other attorneys , who can handle collective
bargaining in addition to other practice areas.
Multiple Departments
Reduction in Debt Service $2,000,000 -
Description of Current Service: The debt service budget funds both existing debt service for previously
issued bonds as well as new debt service on the planned bond sale in May or June of 2025.
Impact of Reduction: Several projects to be funded from the planned bond sale in FY 2025 have been
adjusted since the adopted FY 2025 was approved in April 2024. This will permit the County to reduce
the FY 2025 bond sale, thereby reducing debt service which begins in FY 2026 by $2 million. A $2 million
reduction in debt service will not impact the County’s ability to fund its debt service obligations in FY
2026.
Vacancy Savings from Early Retirement Incentive $750,000 -
Description of Current Service: Over the past few months, the County implemented a Voluntary
Retirement Incentive Program for those reaching the rule of 78 (age plus years of service = 78) and a
updated 02.28.25
80
DROP Early Exit Incentive Program for those who originally expected to retire after July 1, 2025. Over
fifty individuals opted into these early retirement options and will retire by April 25, 2025.
Impact of Reduction: By holding one third of the positions vacant through the first quarter of FY 2026,
it is anticipated that $750,000 in savings will be generated.
NOTES:
• OT
= One-time savings
• V = Vacant position
• F = Filled position
FY 2026 Proposed Budget Reductions and Realignments
Other Funds
Department of Environmental Services (DES) – Other Funds
Auto Fund – Continue Freezing 2nd Night Shift Supervisor $129,234 (OT) -
Description of Current Service: The Automotive Equipment Fund has almost 60 positions that manage and
maintain the County and Schools vehicle fleet. The 2nd Night Shift Supervisor position is currently vacant
and was frozen in FY 2024 as a budget reduction. The Equipment Bureau in the Auto Equipment Fund has
reorganized staffing to accommodate the supervisor vacancy.
Impact of Reduction: With the position currently vacant and the reorganization of workload, there is
minimal impact expected in FY 2025. However, as the County transitions to an electric fleet and requires
new skillsets, staffing levels in the Equipment Bureau may need to be r e-evaluated to support a diverse
and changing fleet.
Print Fund - Transition Print Shop to an Outsourced
Model
$318,866 -
Description of Current Service: The Print Shop is an internal service fund, funded through
chargebacks for services to departments. DES recommends transitioning from an on -premise
model to an outsourced model over the next 12 – 18 months. The fund is no longer able to cover
expenses as demand for printed materials has dropped.
Impact of Reduction: The print shop currently has seven authorized FTEs. Four are proposed to be
eliminated mid-way through FY 2026, of which 2 will be vacant due to planned retirements. The remaining
three positions will be used to help transition the County to an outsourced print model and to manage
mail services. The future staffing model and budget will be finalized during the transition project. Any
remaining functions will be transferred to the General Fund in a future budget year.
Community Planning, Housing and Development – Other Funds
Development Fund – Reduction in Non-personnel
Expenses
$647,702 -
Description of Current Service: This reduction reduces operating equipment, printing, and office supplies
to better align with actual spending history.
Impact of Reduction: The reduction in non-personnel expenses is anticipated to have no or nominal impact
to service delivery.
updated 02.28.25
81
Inspections Services – Transfer Two Positions from
Development Fund to the General Fund
$205,248 -
Description of Current Service: The Department of Environmental Services (DES) has two positions that
have been funded from CPHD’s Development Fund: a Permit Processing Specialist and a Construction
Management Specialist.
Impact of Reduction: There is no service or customer impact to transferring the costs of both positions to
the General Fund.
Zoning Enforcement – Freeze a Zoning Inspector
Supervisor
$130,439 1.0 (V)
Description of Current Service: The Zoning Enforcement Section has one Zoning Enforcement Supervisor
that oversees the work of seven Zoning Inspectors. The Supervisor provides direction, reviews cases, and
assists in complex regulatory and zoning administrative matters.
Impact of Reduction: The reduction of the supervisory position will require the repurposing of one of the
existing Inspector positions into a supervisory role in order to ensure appropriate oversight of the zoning
enforcement function. This will result in one fewer inspector positions. The effect of this reduction will be
an increase in complaint response times from two to five days to roughly five to ten days, depending on
the case. Certificate of Occupancy inspection response times will likely also increase due to the increased
workload on the remaining inspectors; however, these inspections are scheduled at the request of the
customer and would be prioritized to the extent possible. Response times for special exception use permit
and active site plan inspections would also increase, and an increase in the use of overtime to complete
time sensitive requests will also likely occur.
Zoning Enforcement – Eliminate a Zoning Inspector $131,365 1.0 (F)
Description of Current Service : The Zoning Enforcement Section has seven Zoning Inspectors. Zoning
Inspectors respond to zoning complaints, perform Certificate of Occupancy inspections, and support public
notice activities for the County Board and monthly Board of Zoning Appeals hearing
s. Inspectors also
conduct inspections for use permit reviews for County Board items and site inspections for special
exception use permit and site plan projects under construction.
Impact of Reduction: The reduction of an Inspector position would increase complaint response times
from two to five days to roughly five to ten days, depending on the case. Certificate of Occupancy
inspection response times will likely also increase due to the increased workl oad on the remaining
inspectors; however, these inspections are scheduled at the request of the customer and would be
prioritized to the extent possible. Response times for special exception use permit and active site plan
inspections would also increase, and an increase in the use of overtime to complete time sensitive requests
will also likely occur.
Zoning Counter Services – Eliminate one Zoning
Technician (F) and Freeze one Zoning Technician (V)
$218,834 2.0 (1 F, 1 V)
Description of Current Service: In the past, the Zoning Counter Services team consisted of eight Zoning
Technicians. However, due to multi-year process re-engineering and internal reassignment efforts within
Zoning, the hiring of specialized customer experience staff for the walk-in Permit Arlington Center (PAC),
and expenditure right-sizing, the currently number of Zoning Technicians is six. This proposed reduction
would further reduce the number of Zoning Technicians to four positions. Zoning Technicians review
select zoning permits, provide support for in-person services, answer calls and respond to email inquiries.
updated 02.28.25
82
Impact of Reduction: The reduction of two Zoning Technicians may result in longer review times for
permits reviewed by the team. However, with the exception of sign permits, it is anticipated that the
team will continue to meet or nearly meet established review times for perm its reviewed by the team.
Zoning Technicians- will focus more on specialized work that requires their technical expertise, and on
providing subject matter expert level support for in-person services. Zoning technicians will continue to
provide phone coverage for general customer support.
Zoning Policy, Research and Information Management
Section – Eliminate a Principal Planner
$165,343 1.0 (F)
Description of Current Service: This Zoning Principal Planner position performs research and analysis to
assess complex development proposals for compliance with the Arlington County Zoning Ordinance
(ACZO); drafts correspondence on behalf of the Zoning Administrator; represents the Zoning Division on
interdepartmental project teams; tracks, researches, and executes zoning ordinance amendments that
improve text clarity; and performs map corrections. This position also provides internal customer service
and support to numerous other County departments on a variety of zoning matters.
Impact of Reduction: This position assists in the completion of complex zoning determinations and, if
eliminated, will increase response times for this work from 36 days to approximately 40 days, as these
more difficult requests will be assumed by the remaining Associate Planner. Zoning ordinance text
corrections will either be deferred or redirected to other staff. and may lead to an overall reduction in the
number of Zoning ordinance text amendment
s completed annually. Overall, the work of this position
would need to be absorbed by other Zoning Division staff.
Inspection Field Services - Freeze a Building Inspector $136,036 1.0 (V)
Description of Current Service: There are currently eight Building Inspectors on the Field Services Team,
with one frozen position. This proposed reduction, when combined with the frozen position, will further
reduce the number of available Building Inspectors to six. Inspectors perform in-field building inspections
for residential and commercial buildings.
Impact of Reduction: The reduction of one Building Inspector will result in a decrease in the time each
inspector can spend onsite during an inspection to comply with the State law of completing inspections
within 48 hours. The reduced amount of time on-site per inspection, depending on the specifics of each
site, could lessen the quality of the inspection.
Inspection Plan Review Services - Eliminate a
Construction Plan Reviewer
$170,456 1.0 (F)
Description of Current Service: There are currently two Plan Reviewers that review construction plans for
plumbing, mechanical, electrical and energy conservation systems.
Impact of Reduction: This reduction will reduce the capacity of the systems Plan Reviewer team by 50%,
potentially doubling the existing review times for Commercial buildings (new, additions and alterations)
and new Residential buildings.
Arlington Economic Development (AED) – Travel & Tourism Fund
Arlington Convention and Visitors Services (ACVS) –
Eliminate AED Specialist I Position
$88,526 1.0 (F)
Description of Current Service: The AED Specialist I (Visitor Services & Film Office Coordinator) position
has supported in-person visitor services through the former Mobile Visitors Center (MVC), on-site services
at meetings and events, administrative coordination for requests to film in Arlington, and
mailing/fulfillment of tourism-related marketing materials.
updated 03.19.25
83
Impact of Reduction: The evolution of ACVS’s operations and services have made most duties within
this position obsolete. The Mobile Visitors Center (MVC) was discontinued at the end of FY 2024 due to
dramatically decreased use by visitors during and after the pandemic as well as increased reliance by
visitors on information gathering via mobile phones. Additionally, there has been virtually no demand by
hotels and meeting planners for on-site, in-person services at meetings and events. Lastly, with the
expiration and re-competition of ACVS’s Mailing and Fulfillment Services contract, an external vendor
now provides a comprehensive combination of fulfillment, warehousing and inventory management for
all marketing materials. This centralized fulfillment approach is more efficient and cost-effective than
handling these tasks internally.
With the major responsibilities of the AED Specialist I no longer needed, remaining duties (specifically the
administrative coordination of filming requests) can be absorbed into the Visitor & Convention Services
Manager (AED Specialist II) position. There fore, shifting these ACVS resources from personnel to non -
personnel will help mitigate proposed trade and promotion cuts to preserve revenue-generating sales and
marketing activities.
Arlington Convention and Visitors Services (ACVS) -
Eliminate Ongoing Transfer from General Fund to Fund
202 (TOT)
$246,700 -
Description of Current Service: Attracting meeting, group, leisure and business travelers to Arlington for
overnight hotel stays is a core function of the Arlington Convention and Visitors Service (ACVS). Through
targeted sales, marketing and visitor services initiatives, ACVS competes
with national and regional
destinations, elevating Arlington’s brand recognition and increasing visitation and local spending.
Impact of Reduction: Growth in travel and tourism tax receipts coupled with the reallocation of the AED
Specialist I noted above have resulted in an increased ongoing budget for tourism promotion for FY 2026;
thus, this reduction in support from the General Fund will not have an impact on ACVS’s current promotion
efforts.
NOTES:
• OT = One-time savings
• V = Vacant position
• F = Filled position
updated 02.28.25
84
FY 2026 PROPOSED BUDGET SUMMARY
FUND DESCRIPTIONS
GENERAL FUND
The General Fund is the primary operating fund of the County and is used to account for the majority
of services including fire and police protection, human services, community services such as libraries
and parks, and transit operations. The General Fund also provides financing for the operations of
other funds such as capital outlay for infrastructure improvements and construction and the County's
public school system. Debt service expenditures for the payments of principal and interest on the
County's general long-term debt (excluding bonds and other long-term debt serviced by the Utilities,
Ballston Garage, or School Operating Funds) are included in this fund. The major sources of revenue
include real estate taxes, other local taxes, licenses, permits, fees, and other miscellaneous charges.
Revenues from the state and federal government are also included in this fund.
ENTERPRISE FUNDS
Enterprise funds are used to account for the financing of services to the general public where the
operating expenses involved are usually recovered in the form of charges to users.
Utilities Fund
The Utilities Fund is a self -supporting or enterprise fund. This fund includes the operations,
maintenance, and construction of the County's water and sanitary sewer system. Debt service on
general obligation bonds issued to finance the construction of the sanitary sewer system, water
distribution system, and wastewater treatment facility are accounted for in this fund. Revenues for
this fund are generated through user charges and payments from other jurisdictions for use of the
systems, and system connec tion fees. The Utilities Fund is managed by the Department of
Environmental Services.
Department of Community Planning, Housing and Development (CPHD) Development Fund
This fund includes the operations of the Zoning Administration, Counter Services, Enforcement, Plan
Review, and Board of Zoning Appeals Sections of the Zoning Division as well as the Permit Processing,
Code Compliance, and Plan Review Sections of the Inspection Services Division . The costs of these
programs are fully supported by the fees they charge for permitting, plan review , and inspection
services in building construction and zoning. The funding for these programs was segregated from
the General Fund into the new enterprise fund beginning in FY 2009 as part of an effort to provide a
higher level of customer service . This fund is managed by the Department of Community Planning,
Housing, and Development.
Ballston Public Parking Garage Funds
These enterprise funds account for the financing of the operation of the garage for the general public.
All of the operating expenses are recovered from the users of the garage. Two separate funds have
been established for the garage – one for floors one through seven, and another for the eighth floor,
which was constructed at a later date and under separate financing from the first seven floors. These
funds are managed by the Departments of Environmental Services and Management and Finance.
Stormwater Fund
Effective January 1, 2024, the Stormwater Fund implemented a stormwater utility fee. The fee, based
on each property’s non -permeable or impervious area, replaces the previous sanitary district tax,
which was based on the property’s real estate assessment. These funds are used to pay for costs
necessary to operate the County’s stormwater drainage infrastructure and to support related
85
FY 2026 PROPOSED BUDGET SUMMARY
FUND DESCRIPTIONS
stormwater management programs. The Stormwater Fund is managed by the Department of
Environmental Services.
INTERNAL SERVICE FUNDS
Internal service funds are used to account for the financing of services provided by one Arlington
County government department or agency to another Arlington County department or agency or
another government, where the service is provided on a cost reimbursement basis.
Automotive Equipment Fund
This fund accounts for the costs of operating and maintaining the automotive and construction
equipment used by County departments and agencies. The acquisition and replacement of
automotive equipment is accounted for in this fund. Revenue is derived primarily from user charges
to recover actual costs that include depreciation of equipment. This program is managed by the
Department of Environmental Services.
Printing Fund
This fund accounts for the costs of operating a central printing operation , which provides printing
and duplicating services for County departments and agencies. Revenue is derived principally from
user charges for specific services. The printing operation is managed by the Department of
Environmental Services.
SPECIAL REVENUE FUNDS
Special revenue funds are used to account for the proceeds of specific revenue sources which are
legally restricted to expenditures for specified purposes.
Ballston Quarter Tax Increment Financing Area (TIF) Fund
The Ballston Quarter TIF funds revenue bonds issued by the Ballston Quarter Community
Development Authority (CDA). These bonds funded $43.4 million of public infrastructure
improvements as well as a debt service reserve fund, capitalized interested through project
stabilization, and certain costs of issuance. The CDA gives the County a financing mechanism to fund
certain public infrastructure costs associated with the Ballston Quarter public-private redevelopment.
This fund accounts for a portion of the incremental real estate tax, sales and use tax, and meals tax
revenues generated within the TIF district boundaries in each year following the base year set as of
January 1, 2015, and until the earlier of the fina l maturity of bonds, March 1, 20 46, or the date on
which all of the bonds have been paid in full. The TIF district includes the parcels within the CDA
boundaries and also the parcels currently occupied by Insight Property Group. This fund is managed
by the Department of Management and Finance.
Travel and Tourism Promotion Fund
This fund accounts for the operations of various programs to promote tourism and business travels
in the County. One fourth of one percent of the revenue generated by the transient occupancy tax,
dedicated to tourism and marketing in Arlington, is accounted for in this fund. Arlington Economic
Development manages this fund.
Ballston Business Improvement District (BID) Fund
This fund accounts for the operations of a service district in Ballston within specified boundaries of
the business area to provide enhanced services such as marketing, community events, and minor
physical enhancements such as banners and wayfinding, beautification, and transportation
enhancements such as bike racks and bus shelters . The revenue supporting the fund is generated
86
FY 2026 PROPOSED BUDGET SUMMARY
FUND DESCRIPTIONS
from an additional real estate tax assessment for properties in the district. Arlington Economic
Development (AED) manages this fund.
Rosslyn Business Improvement District (BID) Fund
This fund accounts for the operations of a service district in Rosslyn within specified boundaries of
the business area to provide enhanced services such as beautification, cleaning, maintenance,
marketing and promotion, community activities, parking, and transportation. The revenue supporting
the fund is generated from an additional real estate tax assessment for properties in the district.
Arlington Economic Development (AED) manages this fund.
National Landing Business Improvement District (BID) Fund
This fund accounts for the operations of a service district in Crystal City, Potomac Yard, and Pentagon
City within specified boundaries of the business area to provide enhanced services such as economic
development, business recruitment and retention, information and marketing, landscaping and
beautification, and street and sidewalk cleaning. In September 2019, the Arlington County Board
passed an ordinance to expand the boundaries of the BID to include parcels from the Arlington portion
of Potomac Yard an d Pentagon City submarkets which expanded its geographic boundaries by 76
percent. In April 2020, the County Board passed an ordinance to change the name from the Crystal
City BID to the National Landing BID . The revenue supporting the fund is generated from an
additional real estate tax assessment for properties in the district. Arlington Economic Development
(AED) manages this fund.
Housing and Community Development Fund
This fund accounts for the operations of various housing community development programs, which
are financed by block grant and other grant assistance from the U.S. Department of Housing and
Urban Development. The Department of Community Planning, Housing , and Development manages
this fund.
Housing Choice Voucher Fund
This fund accounts for the revenue from the U.S. Department of Housing and Urban Development
for Housing Choice Voucher housing assistance. This program provides tenant based and project -
based housing assistance to benefit eligible Arlington County residents. The federal funds are used
for the administrative costs of the program as well as for the rental subsidy payments. The Housing
Choice Voucher program is managed by the Department of Human Services.
Columbia Pike Tax Increment Financing (TIF) Fund
This fund accounts for a portion of the incremental real estate tax re venue generated by properties
within the Columbia Pike Neighborhoods Special Revitalization District and the Columbia Pike Special
Revitalization District . Funds are used to support affordable housing initiatives within these
boundaries needed to mitigate the impact of redevelopment along Columbia Pike. Beginning with
the FY 2024 budget, tax revenues from this fund will support debt service related to the preservation
of affordable housing units at Barcroft Apartments.
The County Board approved the establishment of the financing mec hanism and fund in December
2013 with a real estate assessment tax base value established as of January 1, 2014. In the adopted
FY 2018 budget, the County Board adjusted the TIF’s baseline to the CY 2018 assessed value. The
fund is jointly managed by the Departments of Management and Finance and Community Planning,
Housing, and Development.
87
FY 2026 PROPOSED BUDGET SUMMARY
FUND DESCRIPTIONS
CAPITAL PROJECTS FUNDS
Transportation Capital Fund
This fund accounts for the tax revenue from a commercial real estate transportation district
established at the end of CY 2007. Beginning in FY 2014, this fund also accounts for the local 30%
share of the new tax and fee revenues implemented as part of HB 2313. The tax revenue provides
a dedicated funding stream to support transportation infrastructure projects throughout the County.
Effective July 1, 2013 with the passage of HB 2313, any decrease in the commercial real estate tax
rate will result in an equivalent revenue decrease allocated to the County through the Northern
Virginia Transportation Authority (NVTA). The Fund also provides the flexibility to leverage outside
funding sources as opportunities arise. The Transportation Capital Fund is managed by the
Department of Environmental Services.
Crystal City, Potomac Yard, and Pentagon City Tax Increment Financing (TIF) Fund
This fund accounts for a portion of the incremental real estate tax revenue generated by properties
in Crystal City, Potomac Yard, and Pentagon City. Funds are used to pay for infrastructure
improvements to further the revitalization of Crystal City and development of the adjacent areas of
Potomac Yard and Pentagon City. The County Board approved the establishment of the financing
mechanism and fund in October 2010 with a real estate assessment tax base value established as of
January 1, 2011. The fund is jointly managed by the Departments of Environmental Services ,
Management and Finance, Economic Development, Parks and Recreation, and Community Planning,
Housing, and Development.
Pay-As-You-Go General Capital, Utilities, and Stormwater Capital Funds
These Capital Projects Funds account for the purchase and/or constructi on of major capital facilities
including buildings, roads, stormwater drainage infrastructure, and other long -lived improvements.
Pay-As-You-Go financing for utilities construction, stormwater, and capital improvements is provided
primarily by local tax revenues and utility user fees (fund transfers), developer contributions , and
miscellaneous fees and charges. These Pay -As-You-Go capital appropriations are approved as part
of the annual operating budget.
General Obligation (GO) Bond Funds
These fund dollars are derived from the public sale of municipal bonds for which principal and interest
(debt service) is paid to investors for the use of the money. Debt service is paid from the General
Fund by local tax revenues. The bond funded projects are developed and approved by the County
Board as part of the biennial Capital Improvement Plan (CIP). General obligation bonds are also
included in the bond referenda which are submitted for approval by voters during the November
elections. This fund source finances large capital infrastructure projects such as roads, new or
renovated parks and facilities, transportation infrastructure, and other County assets. The average
useful life of a project financed is generally ten or more years.
Short-term Financing
This fund source is another source of capital financing to acquire equipment and technology and to
perform certain capital maintenance projects that have an average useful life between three and ten
years. Due to the short-term maturities of these financing vehicles, interest rates are typically lower
than rates on long -term bonds. The County typically procures the goods and services using
temporary funding sources, and then draws funds from the financing institution to reimburse the
temporary sources. S imilar to GO bonds, principal and interest for the financing is paid from the
General Fund.
88
FY 2026 PROPOSED BUDGET SUMMARY
FUND DESCRIPTIONS
SCHOOL FUNDS
School Operating Fund
This fund accounts for the general day -to-day o perations of the County's public school system,
financed primarily from County General Fund transfer and from state and federal grants and taxes
to be used for educational programs.
School Comprehensive Services Act Fund
This fund accounts for programs and services for at -risk youth with em otional and behavioral
problems and their families. The Comprehensive Services Act, passed by the Virginia General
Assembly in 1993, restructured the funding streams to better meet the needs of eligible children and
their families. State funding provides approximately one-third of the funding for these expenditures
with the balance coming from the County’s General Fund transfer.
School Debt Service Fund
This fund accounts for the payment of princi pal and interest on obligated debts incurred for major
school construction projects . This fund is supported entirely by the County transfer and carryover
funding.
School Food and Nutrition Services Fund
This fund accounts for the operations of the School Food S ervices program. Revenues are derived
from fees, state and federal financing , and other miscellaneous sources relating to School food
service operations.
School Grants and Restricted Programs Fund
This fund accounts for the operations of special school programs financed by fees, and grants from
state, federal, and local sources.
School Capital Projects Fund
This fund accounts for major and minor construction projects as well as major maintenance for the
schools. Funding is from the County’s General Fund transfer.
Community Activities Fund
This fund accounts for the operations of various County-Schools joint facilities and programs, which
include aquatic facilities, extended day programs, Alternatives for Parenting Teens, community
centers, and the Career Center. Financing is primarily provided by a County General Fund transfer
and fees collected for specific activities.
89
FY 2026 PROPOSED BUDGET SUMMARY
FUND DESCRIPTIONS
The foll owing table shows each County department and its associated fund s (excluding Schools
funds).
General Fund
Utilities Fund
CPHD
Development
Ballston Public
Parking Garage
Automotive
Equipment Fund
Printing Fund
Ballston Quarter
TIF
Travel and
Tourism
Rosslyn, Ballston
& National
Landing BIDs
Community
Development Fund
Housing Choice
Voucher Fund
Columbia Pike TIF
Stormwater
Management Fund
Transportation
Capital
Crystal City TIF
Pay-As-You-Go
Capital Fund
Stormwater
Capital Fund
Utilities Capital
Fund
County Board ■
County Manager ■
Management and Finance ■ ■ ■ ■ ■ ■
Technology Services ■ ■
Human Resources ■ ■
County Attorney ■
Circuit Court ■ ■
General District Court ■
Juvenile and Domestic Relations
Court ■ ■
Magistrate ■
Public Defender ■
Commonwealth's Attorney ■
Sheriff ■ ■
Commissioner of the Revenue ■
Treasurer ■ ■
Electoral Board ■ ■
Public Safety Communications
and Emergency Management ■ ■
Police ■ ■
Fire ■ ■
Environmental Services ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
Human Services ■ ■ ■
Libraries ■ ■
Economic Development ■ ■ ■ ■ ■
Community Planning, Housing &
Development ■ ■ ■ ■ ■ ■
Parks and Recreation ■ ■ ■
90
FY 2024
Actuals*
FY 2025
Adopted
FY 2026
Proposed
% Change
'25 Adopted to
'26 Proposed
COUNTY GOVERNMENT
Operating Expenses $883.1 $867.9 $906.0 4.4%
Capital Outlay 20.6 22.4 18.3 -18.6%
Debt Service 82.2 84.6 88.2 4.2%
Other Post Employment Benefits (OPEB) 1
16.7 14.9 13.9 -6.8%
Contingents7
0.9 20.7 11.7 -43.5%
Subtotal 1,003.5 1,010.5 1,038.0 2.7%
OTHER FUNDS3
Ballston Quarter Tax Increment Financing 3.1 2.3 2.7 15.0%
Travel & Tourism Promotion 3.8 1.5 1.5 -6.3%
Ballston Business Improvement District 1.5 1.3 1.2 -8.6%
Rosslyn Business Improvement District 4.7 4.4 4.3 -2.4%
National Landing Business Improvement District 4.6 5.0 5.0 -
Community Development 2.2 3.3 2.9 -12.7%
Housing Choice Voucher Program 24.0 26.6 29.3 10.1%
General Capital - PAYG 71.9 38.7 29.3 -24.3%
Transportation Capital 2
124.4 36.2 35.0 -3.1%
Crystal City Tax Increment Financing 2
11.2 6.5 5.6 -14.3%
Columbia Pike Tax Increment Financing 6.1 2.3 2.3 -
Utilities 112.8 110.5 116.4 5.4%
Utility Capital 30.9 23.3 31.5 35.1%
Stormwater Operating 14.6 19.2 20.1 4.3%
Stormwater Capital 5.2 7.9 4.2 -47.6%
Ballston Parking Garage 4
2.9 3.6 5.6 56.3%
CPHD Development 25.6 29.1 27.3 -6.0%
Automotive Equipment 25.3 19.7 19.0 -3.4%
Printing 5.4 2.0 1.7 -15.8%
Subtotal 480.1 343.6 344.8 -
Less Transfers to Other Funds (23.7) (23.6) (21.0) -11.1%
Less Other Fund Transfers5
(20.7) (17.5) (20.9) 19.4%
COUNTY GOVERNMENT SUBTOTAL 1,439.3 1,313.0 1,340.9 2.1%
SCHOOL BOARD 6
School Operating Fund 641.6 693.2 TBD -
School Children's Services (CSA) 6.2 5.0 TBD -
School Debt Service 64.6 67.3 TBD -
School Capital Projects 11.9 4.8 TBD -
School Food Services Fund 13.9 14.5 TBD -
School Grants and Restricted Programs 29.1 21.4 TBD -
Community Activities Fund 18.6 21.9 TBD -
School Board Subtotal 785.9 828.0 - -
TOTAL COUNTY GOVERNMENT AND SCHOOL BOARD $2,225.2 $2,141.0 $1,340.9 -
1 Other Post Employment Benefits (OPEB) includes a transfer to the OPEB Trust Fund and funding for Line of Duty Death and Health Benefits Trust Fund.
4 Ballston Parking Garage includes the 8th level internal service fund.
5 Includes Other Fund transfers to General Fund and inter-fund transfers.
Numbers may not add due to rounding.
EXPENDITURE SUMMARY (ALL FUNDS)
(Figures in Millions of Dollars)
7 Contingents include housing and Covid-19 response efforts. The COVID-19 response includes only those costs charged directly to a County-wide account in FY 2024; many
other costs were spread throughout department operations and are included in County Services above. In FY 2025 and FY 2026, COVID-19 Response includes the budget for
the COVID Contingent.
2 Expenses do not include utilization of fund balance for FY 2025 and FY 2026. Refer to fund narrative for total expenditures.
3 General Obligation Bond (GO bond) funding is not included above.
6 The FY 2026 Proposed School Board budget was not available at the time of publication.
* FY 2024 expenditures include GASB 87 and 96 adjustments for leases and technology subscriptions. For more department details, see the GASB 87 and 96 Summary.
91
This page intentionally left blank
92
General Fund
Ballston Quarter
Tax Increment
Financing Fund
Travel and
Tourism
Promotion
Fund
Ballston
Business
Improvement
District
Rosslyn
Business
Improvement
District
National
Landing
Business
Improvement
District
Community
Development
Fund
Housing
Choice
Voucher
Program
Pay-As-You-
Go Capital
Projects
Transportation
Capital Fund 5
EXPENDITURES BY CATEGORY
Personnel Services $382,356,797 - $678,206 - - - $456,775 $1,516,327 - $3,527,112
Employee Benefits 172,863,180 - 226,100 - - - 157,836 607,733 - 1,223,648
Contractual Services 114,973,305 $2,662,487 97,465 $1,162,383 $4,130,496 $4,796,560 - 85,206 - 122,500
Internal Services 1
10,289,673 - - - - - - 17,435 - 5,680
Other Charges 2
123,205,295 - 448,229 - - - - 27,085,671 - 312,511
Materials and Supplies 19,283,479 - - 30,429 108,128 125,564 - 6,000 - 347,100
Capital Outlay 888,603 - - - - - - - - 600
Interfund Transfers 671,000,765 - - - - - - - - 6,294,586
Other Expenditures 3
190,521,679 - - 24,343 86,503 100,451 2,296,095 - $29,260,000 23,189,386
TOTAL EXPENDITURES $1,685,382,776 $2,662,487 $1,450,000 $1,217,155 $4,325,127 $5,022,575 $2,910,706 $29,318,372 $29,260,000 $35,023,123
REVENUES BY CATEGORY
Local Taxes $1,383,294,398 $2,662,487 $1,450,000 $1,217,155 $4,325,127 $5,022,575 - - - $23,006,191
Licenses, Permits and Fees 22,908,162 - - - - - - - - -
Fines & Forfeitures, Use of Money & Property 41,210,117 - - - - - - $80,000 - -
Outside Charges for Services 78,393,190 - - - - - - - - -
Miscellaneous Revenue 2,203,930 - - - - - - 20,000 - 12,016,932
Commonwealth of Virginia 100,473,138 - - - - - - - - -
Federal Government 19,548,425 - - - - - $2,910,706 29,345,685 - -
Transfers from Other Funds 9,933,730 - - - - - - - $18,260,000 -
Other Revenue 4
28,917,686 - - - - - - - 11,000,000 -
TOTAL REVENUES $1,686,882,776 $2,662,487 $1,450,000 $1,217,155 $4,325,127 $5,022,575 $2,910,706 $29,445,685 $29,260,000 $35,023,123
NOTES:
1 Internal Services primarily includes County vehicle maintenance and fuel, Print Shop charges for printing services, and intra-county charges.
2 Other Charges primarily includes public assistance payments in the Department of Human Services, County leases and rentals, and County utilities.
3 Other Expenditures primarily includes debt service, master lease funding, regional contributions, and the Affordable Housing Investment Fund.
4 Other Revenue primarily includes prior year fund balance and proceeds from lease purchases.
5 Expenses do not include utilization of fund balance for FY 2026. Refer to fund narrative for total expenditures.
ALL FUNDS REVENUE AND EXPENDITURE DETAIL - FY 2026 PROPOSED BUDGET
93
Crystal City Tax
Increment
Financing
Fund5
Columbia Pike
Tax Increment
Financing Fund
Utilities
Fund
Utilities
Capital
Stormwater
Operating
Stormwater
Capital
Ballston
Public
Parking
Garage
Ballston
Public Pkg
Garage - 8th
Level
CPHD
Development
Fund
Automotive
Equipment
Fund
Printing
Fund
EXPENDITURES BY CATEGORY
Personnel Services $394,653 $330,096 $23,493,814 - $5,691,698 - - - $12,811,464 $5,116,358 $271,854
Employee Benefits 148,201 - 8,878,816 - 2,080,371 - - - 4,907,905 2,081,994 246,019
Contractual Services 250 - 7,302,795 - 3,078,369 - $1,440,258 $196,399 2,967,085 751,500 162,214
Internal Services 1
- - 8,216,327 - 3,192,727 - - - 4,269,199 70,597 9,447
Other Charges 2
3,100 1,979,794 18,006,175 - 347,794 - 565,703 26,755 2,205,237 463,351 820,000
Materials and Supplies 1,000 - 9,180,260 - 267,077 - 13,220 27,631 132,805 1,944,950 180,000
Capital Outlay - - 203,000 - - $2,590,000 - - 30,000 6,166,611 -
Interfund Transfers - - 10,330,238 - 3,921,643 - - - - 130,000 -
Other Expenditures 3
5,030,966 - 30,771,196 $31,538,918 1,484,735 1,570,000 2,506,366 779,606 - 2,272,167 -
TOTAL EXPENDITURES $5,578,170 $2,309,890 $116,382,621 $31,538,918 $20,064,414 $4,160,000 $4,525,547 $1,030,391 $27,323,695 $18,997,528 $1,689,534
REVENUES BY CATEGORY
Local Taxes $5,578,170 $2,309,890 - - - - - - - - -
Licenses, Permits and Fees - - $285,000 - $1,243,164 - - - $23,970,660 - -
Fines & Forfeitures, Use of Money & Property - - 345,160 $360,000 - $250,000 - - - - -
Outside Charges for Services - - 117,343,790 20,870,000 17,786,951 - $3,162,000 $387,600 92,774 $23,578,096 $1,065,122
Miscellaneous Revenue - - 194,544 - - - - - 4,376,183 445,500 -
Commonwealth of Virginia - - - - - - - - - - -
Federal Government - - - - - - - - - - -
Transfers from Other Funds - - - 10,308,918 255,000 3,910,000 - - 1,734,821 476,916 297,312
Other Revenue 4
- - - - - - 1,363,547 642,791 - 300,000 -
TOTAL REVENUES $5,578,170 $2,309,890 $118,168,494 $31,538,918 $19,285,115 $4,160,000 $4,525,547 $1,030,391 $30,174,438 $24,800,512 $1,362,434
NOTES:
1 Internal Services primarily includes County vehicle maintenance and fuel, Print Shop charges for printing services, and intra-county charges.
2 Other Charges primarily includes public assistance payments in the Department of Human Services, County leases and rentals, and County utilities.
3 Other Expenditures primarily includes debt service, master lease funding, regional contributions, and the Affordable Housing Investment Fund.
4 Other Revenue primarily includes prior year fund balance.
5 Expenses do not include utilization of fund balance for FY 2026. Refer to fund narrative for total expenditures.
ALL FUNDS REVENUE AND EXPENDITURE DETAIL - FY 2026 PROPOSED BUDGET
94
FY 2024
Actual 5
FY 2025
Adopted
FY 2026
Proposed
% Change
'25 Adopted to
'26 Proposed
EXPENDITURES
County Services 1
$835.3 $818.1 $854.8 4.5%
Metro Operations 47.8 49.8 51.2 3.0%
County Debt Service 82.2 84.6 88.2 4.2%
Other Post Employment Benefits (OPEB) 2
16.7 14.9 13.9 -6.8%
Contingents
COVID-19 Response 3
0.9 - - -
Affordable Housing Investment Fund (AHIF) 4
- 20.7 11.7 -43.5%
Subtotal County Services 983.0 988.1 1,019.7 3.2%
Capital 20.6 22.4 18.3 -18.6%
Subtotal County 1,003. 5 1,010.5 1,038.0 2.7%
Schools Transfer (ongoing) 615.1 624.8 647.4 3.6%
Schools Transfer (one-time) - 14.9 - -100.0%
Subtotal Schools 615.1 639.7 647.4 1.2%
TOTAL EXPENDITURES $1,618.6 $1,650.2 $1,685.4 2.1%
REVENUES
Real Estate Tax $902.4 $920.6 $939.2 2.0%
Personal Property Tax $148.7 $146.8 $150.1 2.3%
BPOL Tax 89.4 89.8 96.2 7.1%
Sales Tax 54.7 57.7 56.5 -2.1%
Transient Tax 24.7 26.0 29.0 11.5%
Utility Tax 17.0 16.5 17.2 4.2%
Meals Tax 48.9 50.5 67.0 32.7%
Communications Sales Tax 5.0 5.1 4.9 -4.7%
Other Local Taxes 23.7 22.0 23.1 5.2%
Subtotal Taxes 1,314. 5 1,335.0 1,383.3 3.6%
Licenses, Permits & Fees 14.4 17.8 22.9 28.9%
Use of Money and Property 52.5 22.8 41.2 81.1%
Outside Charges for Services 68.8 72.4 78.4 8.3%
Commonwealth 96.7 95.5 100.5 5.2%
Federal Government 25.9 18.7 19.5 4.6%
Miscellaneous Revenue 35.8 2.4 2.2 -9.7%
Transfers & Other 21.0 10.2 9.9 -3.0%
Subtotal Other 315. 2 239.8 274.7 14.6%
Total Revenue (excluding Fund Balance) 1,629.7 1,574.8 1,658.0 5.3%
Prior Year Fund Balance 214.0 75.4 28.9 -61.7%
TOTAL REVENUES & FUND BALANCE $1,843.7 $1,650.2 $1,686.9 2.2%
Numbers may not add due to rounding.
1 Includes General Fund transfers to other operating funds.
2 Includes transfer to the OPEB Trust Fund and funding for Line of Duty Death and Health Benefits Trust Fund.
3 COVID-19 Response includes only those costs charged directly to a County-wide account in FY 2024; many other costs were spread throughout
department operations and are included in County Services above.
GENERAL FUND SUMMARY
(Figures in Millions of Dollars)
5 FY 2024 expenditures include GASB 87 and 96 adjustments for leases and technology subscriptions. For more department details, see the GASB 87
and 96 Summary.
4 The federal HOME portion of AHIF is budgeted in the Community Development Fund. Additional AHIF funding is budgeted in the Columbia Pike TIF.
95
This page intentionally left blank
96
FY 2026 Proposed Budget General Fund Expenditures
FY 2026 Proposed Budget General Fund Revenues
Management &
Administration, 4%
Courts &
Constitutionals, 6%
Public Safety, 11%
Environmental
Services, 8%
Human Services, 12%
Community Services,
5%
Planning &
Development, 1%
Non-Departmental,
Regionals, Metro, 8%
Debt/Capital, 7%
Schools, 38%
97
This page intentionally left blank
98
FY 2024 FY 2025 FY 2026
FY 2026
Proposed FY 2024 FY 2025 FY 2026
Adopted Adopted Proposed FTEs Frozen/ Actual Adopted Proposed
FTEs FTEs FTEs Funding
Eliminated
Expense3 Expense Expense
GENERAL FUND
County Board 12.00 13.00 13.00 1.00 $2,005,305 $2,206,442 $2,644,795
County Manager 37.00 37.00 39.00 - 6,546,156 7,384,366 8,147,236
Management and Finance 63.00 66.50 66.50 1.00 10,484,790 11,766,374 12,179,988
Human Resources 57.38 54.58 52.08 4.00 10,681,374 11,619,543 11,195,717
Technology Services 91.00 94.00 91.50 4.50 30,326,902 31,533,999 31,707,044
County Attorney 20.00 20.00 19.00 1.00 4,189,539 4,470,932 4,647,273
Commissioner of Revenue 53.00 53.00 54.00 1.00 6,376,969 6,614,865 7,195,387
Treasurer 62.66 61.66 63.66 - 7,392,422 8,413,441 8,927,075
Electoral Board 9.80 9.80 9.80 - 1,934,942 2,695,487 2,146,929
Circuit Court Judiciary 10.30 10.30 10.30 - 1,432,136 1,416,629 1,445,371
Clerk of the Circuit Court 34.50 34.50 34.50 - 4,594,725 4,690,136 4,940,525
General District Court 1.00 1.00 1.00 - 357,161 414,198
443,555
Juvenile and Domestic Relations Court 60.30 63.30 63.30 1.00 7,965,133 8,484,791 9,572,746
Commonwealth's Attorney 48.00 49.00 49.00 - 5,764,379 6,888,240 7,471,391
Office of the Magistrate - - - - 23,632 30,832
30,832
Office of the Public Defender - - - - 430,328 520,421
520,421
Sheriff 298.00 297.00 297.00 22.00 52,833,228 53,568,432 55,093,260
Police 491.00
504.00 503.00 40.60 85,251,069 89,236,326 93,792,176
Public Safety Comms. & Emergency Mgmt. 73.75 72.75 73.00 1.75 15,249,588 14,946,997 15,768,743
Fire 371.00 372.00 374.00 - 78,360,884 78,188,063 83,861,837
Environmental Services 407.65 401.32 401.32 2.00 118,131,089 122,101,432 127,126,079
Human Services 794.77 804.52 819.72 4.00 186,670,832 193,669,584 203,844,435
Libraries 140.19 142.19 140.69 2.50 18,343,891 19,350,512 18,932,971
Parks and Recreation 411.12 411.10 409.36 7.25 56,853,651 64,169,536 65,415,563
Economic Development 52.10 50.30 50.30 2.00 9,841,823 10,216,840 9,859,702
Community Planning, Housing & Devel. 82.00 82.00 80.00 2.00 12,627,627 13,143,269 13,027,784
Non-Departmental/Other - - - - 107,508,656 75,847,325 68,453,187
Regionals/Contributions - - - - 7,593,593 8,904,057 9,181,630
Metro - - - - 47,842,394 49,753,571 51,246,178
Debt S
ervice - - - - 82,212,861 84,647,699 88,195,000
SUBTOTAL FOR FUND 3,681.52 3,704.82 3,715.03 97.60 979,827,077 986,894,339 1,017,014,830
TRANSFERS TO OTHER FUNDS
Utilities Capital 104,918
100,000
100,000
T
ravel & Tourism Promotion 68,834
246,700 -
CP
HD Development 2,000,000 -
1,734,821
Automotive Equipment -
-
339,035
S
tormwater 105,591
290,000
255,000
Pr
inting 777,258
297,312 297,312
Fund 199 (formerly Trust & Agency) -
240,000
-
O
ther Post Employment Benefits Trust 79,798
-
-
SU
BTOTAL 3,136,400 1,174,012 2,726,168
Schools Transfer 615,076,373 639,729,082 647,381,778
General Capital Projects 20,577,320 22,438,000 18,260,000
TOTAL TRANSFERS TO OTHER FUNDS 638,790,092 663,341,094 668,367,946
GENERAL FUND TOTAL 3,681.52 3,704.82 3,715.03 97.60 $1,618,617,169 $1,650,235,433 $1,685,382,776
OTHER FUNDS - OPERATING AND CAPITAL
Ballston Quarter Tax Increment Financing - - - - $3,143,317 $2,315,252 $2,662,487
Travel & Tourism Promotion 7.00 7.00 6.00 1.00 3,761,958 1,546,700 1,450,000
Ballston Business Improvement District - - - - 1,472,939 1,331,772 1,217,155
Rosslyn Business Improvement District - - - - 4,715,487 4,430,845 4,325,127
National Landing Business Improvement Dist. - - - - 4,623,589 5,047,694 5,022,575
Community Development 4.50 4.50 4.50 - 2,151,454 3,334,639 2,910,706
Housing Choice Voucher Program 14.60 14.10 16.10 - 23,962,836 26,638,864 29,318,372
General Capital - PAYG - - - - 71,867,429 38,666,466 29,260,000
Transportation Capital1
41.00 42.50 43.50 - 124,370,813 36,153,059 35,023,123
Crystal City Tax Increment Financing1
6.50 6.50 6.50 - 11,246,239 6,506,510 5,578,170
Columbia Pike Tax Increment Financing - - - - 6,100,502 2,344,230 2,309,890
Utilities 254.95 255.95 256.95 - 112,764,399 110,464,539 116,382,621
Utility Capital - - - - 30,908,537 23,343,000 31,538,918
Stormwater Operating 53.50 54.50 55.50 - 14,590,064 19,245,293 20,064,414
Stormwater Capital - - - - 5,240,002 7,935,000 4,160,000
Ballston Public Parking Garage - - - - 2,770,002 3,419,121 4,525,547
Ballston Public Parking Garage - 8th Level - - - - 137,271 136,151 1,030,391
CPHD Development 136.00 136.00 132.00 7.00 25,620,233 29,078,292 27,323,695
Automotive Equipment 58.00 57.33 57.33 1.00 25,264,800 19,671,924 18,997,528
Printing 7.00 7.00 7.00 4.00 5,426,945 2,006,626 1,689,534
TOTAL OTHER FUNDS 4
583.05 585.38 585.38 13.00 480,138,815 343,615,977 344,790,253
LESS GENERAL FUND TRANSFERS (638,790,092) (663,341,094) (668,367,946)
LESS OTHER FUND TRANSFERS2
(20,656,418) (17,489,105) (20,887,764)
TOTAL COUNTY GOVERNMENT 5
4,264.57 4,290.20 4,300.41 110.60 $1,439,309,474 $1,313,021,211 $1,340,917,319
[1] Expenses do not include utilization of fund balance for FY 2025 and FY 2026. Refer to fund narrative for total expenditures .
[2] Includes Other Fund transfers to General Fund and inter-fund transfers.
[4] General Obligation Bond (GO bond) funding is not included above.
Accounting, Reporting and Control – Official Website of Arlington County Virginia Government (arlingtonva.us)
COUNTY GOVERNMENT SUMMARY
[3] Expenditures include GASB 87 and 96 adjustments for leases and te chnology subscriptions. For more department details, see t he GASB 87 and 96 Summary.
[5] The implementation of GASB 84 caused some funds, which were previously reported as fiduciary activities, to be included as part of the County's government-wide net
position. Those accounts are not shown in the table above but are included in the County's Annual Comprehensive Financial Repor t. See the ACFR on the County's website
for more information:
updated 03.01.25
99
This page intentionally left blank
100
FY 2024 FY 2024 FY 2024 FY 2024 FY 2024 FY 2024
Actual GASB 87 & 96 Total Actual GASB 87 & 96 Total
Expense Expense Expense Revenue Revenue Revenue
GENERAL FUND
County Board $2,005,305 - $2,005,305 - - -
County Manager 6,546,156 - 6,546,156 $20,062 - $20,062
Management and Finance 10,484,790 - 10,484,790 621,628 - 621,628
Human Resources 10,681,374 - 10,681,374 - - -
Technology Services 29,840,280 $486,622 30,326,902 246 $486,622 486,868
County Attorney 4,189,539 - 4,189,539 8,916 - 8,916
Commissioner of Revenue 6,376,969 - 6,376,969 729,380 - 729,380
Treasurer 7,392,422 - 7,392,422 1,751,923 - 1,751,923
Electoral Board 1,934,942 - 1,934,942 323,277 - 323,277
Circuit Court Judiciary 1,432,136 - 1,432,136 63,004 - 63,004
Clerk of the Circuit Court 4,594,725 - 4,594,725 1,854,037 - 1,854,037
General District Court 357,161 - 357,161 76,099 - 76,099
Juvenile and Domestic Relations Court 7,965,133 - 7,965,133 2,017,995 - 2,017,995
Commonwealth's Attorney 5,764,379 - 5,764,379 2,239,422 - 2,239,422
Office of the Magistrate 23,632 - 23,632 1,735 - 1,735
Office of the Public Defender 430,328 - 430,328 - - -
Sheriff 52,833,228 - 52,833,228 12,609,675 - 12,609,675
Police 85,251,069 - 85,251,069 2,101,651 - 2,101,651
Public Safety Comms. & Emergency Mgmt. 15,249,588 - 15,249,588 1,648,031 - 1,648,031
Fire 78,360,884 - 78,360,884 11,147,767 - 11,147,767
Environmental Services 118,180,757 (49,669) 118,131,089 63,490,851 1,488,069 64,978,920
Human Services 186,670,832 - 186,670,832 54,694,797 (4,995) 54,689,802
Libraries 18,343,891 - 18,343,891 354,788 - 354,788
Parks and Recreation 56,853,651 - 56,853,651 15,806,891 521 15,807,412
Economic Development 9,841,823 - 9,841,823 577,167 - 577,167
Community Planning, Housing & Devel. 12,627,627 - 12,627,627 933,950 - 933,950
Non-Departmental/Other 107,559,634 (50,977) 107,508,657 1,452,305,128 2,315,748 1,454,620,876
Regionals/Contributions 7,593,593 - 7,593,593 - - -
Metro 47,842,394 - 47,842,394 - - -
Debt Service 82,212,861 - 82,212,861 - - -
Transfers to Other Funds 3,136,399 - 3,136,399 - - -
Schools Transfer 615,076,373 - 615,076,373 - - -
General Capital Projects Transfer 20,577,320 - 20,577,320 - - -
GENERAL FUND TOTAL $1,618,231,193 $385,976 $1,618,617,169 $1,625,378,420 $4,285,965 $1,629,664,385
OTHER FUNDS - OPERATING AND CAPITAL
Ballston Quarter Tax Increment Financing $3,143,317 - $3,143,317 $3,311,182 - $3,311,182
Travel & Tourism Promotion 3,761,958 - 3,761,958 3,761,958 - 3,761,958
Ballston Business Improvement District 1,472,939 - 1,472,939 1,291,609 - 1,291,609
Rosslyn Business Improvement District 4,715,487 - 4,715,487 4,789,331 - 4,789,331
National Landing Business Improvement District 4,623,589 - 4,623,589 4,753,593 - 4,753,593
Community Development 2,151,454 - 2,151,454 2,151,454 - 2,151,454
Housing Choice Voucher Program 23,962,836 - 23,962,836 23,962,836 - 23,962,836
General Capital - PAYG 69,863,912 $2,003,517 71,867,429 62,560,878 $2,003,517 64,564,395
Transportation Capital 124,354,255 16,558 124,370,813 78,707,552 (17,529) 78,690,023
Crystal City Tax Increment Financing 11,246,239 - 11,246,239 16,394,993 - 16,394,993
Columbia Pike Tax Increment Financing 6,100,502 - 6,100,502 1,935,457 - 1,935,457
Utilities 112,757,599 6,800 112,764,399 109,811,003 16,158 109,827,161
Utility Capital 30,908,537 - 30,908,537 19,274,227 - 19,274,227
Stormwater Management 14,589,768 296 14,590,064 17,683,443 296 17,683,738
Stormwater Capital 5,240,002 - 5,240,002 3,379,524 - 3,379,524
Ballston Public Parking Garage 2,770,002 - 2,770,002 3,117,875 - 3,117,875
Ballston Public Parking Garage - 8th Level 137,271 - 137,271 376,067 - 376,067
CPHD Development 25,620,233 - 25,620,233 16,905,122 - 16,905,122
Automotive Equipment 25,264,800 - 25,264,800 31,661,813 - 31,661,813
Printing 2,641,831 2,785,113 5,426,945 2,630,204 2,785,113 5,415,317
TOTAL OTHER FUNDS $475,326,531 $4,812,284 $480,138,815 $408,460,118 $4,787,556 $413,247,674
The County's FY 2024 Annual Financial Comprehensive Financial Report is available online at: https://www.arlingtonva.us/Government/Departments/DMF/Arlington-County-Accounting-Reporting-and-Control
The County implemented Governmental Accounting Standards Board (GASB) standards 87 and 96 beginning in FY 2022. GASB 87 revised the accounting and financial
reporting of leases for local governments by establishing a single model for lease accounting based on the foundational principle that leases are financings of the right to use an
underlying nonfinancial asset. Accordingly, the majority of lease obligations will now be reflected as liabilities and assets on the statement of financial positions. GASB 96
addresses the accounting treatment and financial reporting of subscription-based information technology agreements (SBITA). If a SBITA is identified, the government must
recognize a subscription liability and a subscription asset at the commencement of the SBITA term.
Summary of Impacts of GASB 87 and 96 Implementation
101
This page intentionally left blank
102
% Increase
FY 2024 FY 2025 FY 2026 '25 Adopted to
Actual 1
Adopted Proposed '26 Proposed
GENERAL ADMINISTRATION
County Board $2,005,305 $2,206,442 $2,644,795 19.9%
County Manager 6,546,156 7,384,366 8,147,236 10.3%
Management and Finance 10,484,790 11,766,374 12,179,988 3.5%
Human Resources 10,681,374 11,619,543 11,195,717 -3.6%
Technology Services 30,326,902 31,533,999 31,707,044 0.5%
County Attorney 4,189,539 4,470,932 4,647,273 3.9%
Subtotal: General Administration 64,234,067 68,981,656 70,522,053 2.2%
COURTS AND CONSTITUTIONALS
Commissioner of Revenue 6,376,969 6,614,865 7,195,387 8.8%
Treasurer 7,392,422 8,413,441 8,927,075 6.1%
Electoral Board 1,934,942 2,695,487 2,146,929 -20.4%
Circuit Court 1,432,136 1,416,629 1,445,371 2.0%
Clerk of the Circuit Court 4,594,725 4,690,136 4,940,525 5.3%
General District Court 357,161 414,198 443,555 7.1%
Juvenile and Domestic Relations Court 7,965,133 8,484,791 9,572,746 12.8%
Commonwealth's Attorney 5,764,379 6,888,240 7,471,391 8.5%
Office of the Magistrate 23,632 30,832 30,832 -
Office of the Public Defender 430,328 520,421 520,421 -
Sheriff 52,833,228 53,568,432 55,093,260 2.8%
Subtotal: Courts and Constitutionals 89,105,055 93,737,472 97,787,492 4.3%
PUBLIC SAFETY
Police 85,251,069 89,236,326 93,792,176 5.1%
Public Safety Comms. & Emergency Mgmt. 15,249,588 14,946,997 15,768,743 5.5%
Fire 78,360,884 78,188,063 83,861,837 7.3%
Subtotal: Public Safety 178,861,540 182,371,386 193,422,756 6.1%
ENVIRONMENTAL SERVICES 118,131,089 122,101,432 127,126,079 4.1%
HUMAN SERVICES 186,670,832 193,669,584 203,844,435 5.3%
COMMUNITY SERVICES
Libraries 18,343,891 19,350,512 18,932,971 -2.2%
Parks and Recreation 56,853,651 64,169,536 65,415,563 1.9%
Subtotal: Community Services 75,197,542 83,520,048 84,348,534 1.0%
PLANNING AND DEVELOPMENT
Economic Development 9,841,823 10,216,840 9,859,702 -3.5%
Community Planning, Housing & Devel. 12,627,627 13,143,269 13,027,784 -0.9%
Subtotal: Planning and Development 22,469,450 23,360,109 22,887,486 -2.0%
OTHER
Non-Departmental/Other 107,508,656 75,847,325 68,453,187 -9.7%
Regionals/Contributions 7,593,593 8,904,057 9,181,630 3.1%
Metro 47,842,394 49,753,571 51,246,178 3.0%
Debt Service 82,212,861 84,647,699 88,195,000 4.2%
Subtotal: Other 245,157,503 219,152,652 217,075,995 -0.9%
TOTAL GENERAL FUND OPERATIONS $979,827,077 $986,894,339 $1,017,014,830 3.1%
EXPENDITURE COMPARISON
103
% Increase
FY 2024 FY 2025 FY 2026 '25 Adopted to
Actual 1
Adopted Proposed '26 Proposed
OTHER FUNDS - OPERATING & CAPITAL
Ballston Quarter Tax Increment Financing $3,143,317 $2,315,252 $2,662,487 15.0%
Travel & Tourism Promotion 3,761,958 1,546,700 1,450,000 -6.3%
Ballston Business Improvement District 1,472,939 1,331,772 1,217,155 -8.6%
Rosslyn Business Improvement District 4,715,487 4,430,845 4,325,127 -2.4%
National Landing Business Improvement District 4,623,589 5,047,694 5,022,575 -
Community Development 2,151,454 3,334,639 2,910,706 -12.7%
Housing Choice Voucher Program 23,962,836 26,638,864 29,318,372 10.1%
General Capital - PAYG 71,867,429 38,666,466 29,260,000 -24.3%
Transportation Capital
2
124,370,813 36,153,059 35,023,123 -3.1%
Crystal City Tax Increment Financing 2
11,246,239 6,506,510 5,578,170 -14.3%
Columbia Pike Tax Increment Financing 6,100,502 2,344,230 2,309,890 -1.5%
Utilities 112,764,399 110,464,539 116,382,621 5.4%
Utilities Capital 30,908,537 23,343,000 31,538,918 35.1%
Stormwater Operating 14,590,064 19,245,293 20,064,414 4.3%
Stormwater Capital 5,240,002 7,935,000 4,160,000 -47.6%
Ballston Public Parking Garage 2,770,002 3,419,121 4,525,547 32.4%
Ballston Public Parking Garage - 8th Level 137,271 136,151 1,030,391 656.8%
CPHD Development 25,620,233 29,078,292 27,323,695 -6.0%
Automotive Equipment 25,264,800 19,671,924 18,997,528 -3.4%
Printing 5,426,945 2,006,626 1,689,534 -15.8%
TOTAL OTHER FUNDS $480,138,815 $343,615,977 $344,790,253 -
Less Other Fund Transfers 3
(20,656,418) (17,489,105) (20,887,764) 19.4%
TOTAL COUNTY REQUIREMENTS $1,439,309,474 $1,313,021,211 $1,340,917,319 2.1%
[3] Includes Other Fund transfers to General Fund and inter-fund transfers.
[1] FY 2024 expenditures include GASB 87 and 96 adjustments for leases and technology subscriptions. For more department
details, see the GASB 87 and 96 Summary.
[2] Expenses do not include utilization of fund balance for FY 2025 and FY 2026. Refer to fund narrative for total expenditures.
EXPENDITURE COMPARISON
104
FTE Changes:
FY 2025 Adopted to
FY 2026 Proposed
GENERAL FUND
County Board Office
Added a Policy Director position 1.00
Continue to Freeze a Senior Auditor (1.0 FTE) -
Total County Board Office 1.00
County Manager's Office
Transferred in a Principal Environmental Management Specialist to the Climate Policy Office from DES 1.00
Tr
ansferred in an Associate Environmental Management Specialist to the Climate Policy Office from DE S 1.00
To
tal County Manager's Office 2.00
Department of Management & Finance
Eliminate a vacant Claims Analyst position in Risk Management (1.00)
Add a Real Estate Assessments Deputy Director position 1.00
Total Department of Management & Finance -
Department of Technology Services
Add a temporary Staff IT Technician, charged to the Capital PC Replacement Program 1.00
Add a Senior IT Analyst, funded with a reallocation of non-personnel budget 1.00
Eliminate a filled Phone Team Network Analyst (1.00)
Eliminate a filled Tech Manager II position (1.00)
Eliminate a filled Security Operation Manager (1.00)
Eliminate a filled Senior IT Analyst (1.00)
Eliminate a filled Senior Staff Communications position (0.50)
Total Department of Technology Services (2.50)
Human Resources
Add an Employee Assistance Program position with existing program funding 1.00
Add a Recruitment Specialist 0.50
Eliminated one administrative support position that were funded with one-time in FY 2025 (1.00)
Eliminate a filled Staff HR/OD Specialist (1.00)
Eliminate a filled HealthSmart Staff HR/OD Specialist (1.00)
Eliminate a filled Senior Staff Admin/Management Specialist (1.00)
Total Human Resources (2.50)
County Attorney
Eliminate a filled Attorney III (1.00)
Total County Attorney (1.00)
Juvenile and Domestic Relations Court
Continued freeze of a Management Analyst (1.0 FTE) -
To
tal Juvenile and Domestic Relations Court -
Sheriff
Continue to freeze Deputy Sheriffs (22.00 FTEs) from prior Board action -
Total Sheriff -
FY 2026 PROPOSED BUDGET POSITION CHANGES
This table details the added and eliminated full-time equivalent positions (FTEs) in the FY 2026 Proposed Budget.
Italic text indicates the FTE was added during FY 2025 but after the FY 2025 budget was adopted.
updated 03.01.25
105
FTE Changes:
FY 2025 Adopted to
FY 2026 Proposed
Commissioner of Revenue
Continue to freeze a Customer Advocate Management Specialist (1.0 FTE) -
Add a Tax Auditor IV 1.00
Total Commissioner of Revenue 1.00
Treasurer
Add two positions to support collections 2.00
Total Treasurer 2.00
Public Safety Communications & Emergency Management
Transferred in a Towing Policy Management Analyst from Police 1.00
Add an engineer to support the public safety radio system, funded through contract savings 1.00
Eliminate a vacant Public Safety Telecommunicato r (0.75)
Eliminate a vacant Emergency Communications System Specialist (1.00)
Total Public Safety Communications & Emergency Management 0.25
Police
Transferred out a Towing Policy Management Analyst to the Department of Public Safety Communications and
Emergency Management (1.00)
Continue to freeze sworn positions (40.60 FTEs) from prior Board action -
Tota
l Police (1.00)
Fire
Added a position to support the new station pharmacy program 1.00
Add a position to support community engagement and safety in the Fire Marshal's Office 1.00
Total Fire 2.00
Department of Environmental Services (DES)
Transferred a Principal Environmental Management Specialist from AIRE to the Climate Policy Office in CMO (1.00)
Transferred an Associate Environmental Management Specialist from AIRE to the Climate Policy Office in CMO (1.00)
Converted a vacant custodian to a contracted position (midway through FY 2025 as part of FY 2025 adopted budget) (1.00)
Added a position to support facility planning efforts as part of the FY 2025 - 2034 Adopted CIP 1.0 0
Added a position to support solar installations and maintenance as part of the FY 2025 - 2034 Adopted CIP 1.00
Add a program manager for the High Density Concrete Maintenance Program 1.00
Add a contract specialist in Transportation Engineering and Operations 1.00
Eliminate a vacant Administrative Technician (1.00)
Convert a vacant Custodial Worker to a contracted position (1.00)
Add a position to support the Residential Permit Parking Program 1.00
Total Department of Environmental Services -
updated 03.01.25
106
FTE Changes:
FY 2025 Adopted to
FY 2026 Proposed
Department of Human Services (DHS)
Added a Management Analyst to the Quality Assurance and Administration Division 1.00
Added a grant-funded Senior Housing Assistance Program Specialist t o support the Permanent Supportive Housing
Program 1.00
Added a grant-funded Human Services Specialist t o support the Permanent Supportive Housing Program 1.00
Added a grant-funded Administrative Specialist to support the Permanent Supportive Housing Program 1.00
Added a grant-funded Peer Recovery Specialist t o support the Permanent Supportive Housing Program 1.00
Added grant-funded Limited Term Behavioral Health Specialists to support the First Episode Psychosis Program 2.00
Added a grant-funded Behavioral Health Specialist to support outpatient therapy 0.50
Removed a grant-funded Behavioral Health (Resident/Supervisee) due to the grant ending in a prior fiscal year (1.00)
Added a grant-funded Behavioral Health Therapist (Licensed) to support the Mobile Outreach Support Team (MOST) for
the Marcus Alert program 1.00
Added a grant-funded Behavioral Health Supervisor to support the Mobile Outreach Support Team (MOST) for the Marcus
Alert progra m 1.00
Added a grant-funded Behavioral Health Specialist to support the Mobile Outreach Support Team (MOST) for the Marcus
Alert program 1.00
Added a grant-funded Behavioral Health Emergency Services Clinician to help the Division meet the administrative and
personnel needs of Community Service Board programs. 1.00
Added a grant-funded Psychiatrist to provide critical psychiatric consultation, evaluation, and medication management
services to individuals who have intellectual and/or development disabilities 0.20
Added a Human Services Clinician II to provide support to the Adult Services Program guardianship efforts 1.0
0
Added a Behavioral Health Therapist (Licensed) to support the Senior Adult Mental Health program 0.50
Removed a dentist position in Public Health that was funded with one-time in FY 2025 (1.00)
Convert three Benefits Program Specialist and one Benefits Program Supervisor to permanent positions in the Economic
Independence Division 4.00
Add a Developmental Specialist II in the Aging and Disability Division 1.00
Add a Housing Grants Navigator 1.00
Add a Management Analyst for the Virginia Quality Birth to Five childcare improvement initiative in the Child and Family
Services Division 1.00
Eliminate a filled Employment Development Specialist (1.00)
Eliminate a filled Community Health Protection Bureau Director, backfilled with one-time funding until incumbent's
retirement, position will be eliminated in FY 2027 budget -
Eliminate a filled Employment Services Specialist. (1.00)
Eliminate a filled Risk Communications Epidemiologist (1.00)
Total Department of Human Services 15.20
Libraries
Freeze a vacant Branch Manager for six months (1.0 FTE) -
Eliminate a filled Library Page position (0.50)
Eliminate a Library Assistant (1.00)
Continue to freeze a Library Assistant position (1.0 FTE) -
Total Libraries (1.50)
Economic Development
Continue to freeze Cultural Affairs Program Coordinator (1.0 FTE) -
Eliminate a filled Arts Enterprise Specialist, backfilled with one-time funding until incumbent's retirement, position will be
eliminated in FY 2027 budget -
Total Economic Development -
Community Planning, Housing and Development
Eliminate vacant Comprehensive Planne r (1.00)
Eliminate vacant ISD Code Enforcement position (1.00)
Total Community Development, Housing and Development (2.00)
updated 03.01.25
107
FTE Changes:
FY 2025 Adopted to
FY 2026 Proposed
Parks and Recreation
Eliminated limited term DPR Programmer as part of prior board action (0.50)
Technical adjustment to align Recreation Supervisor positions 0.015
Close Madison Preschool (1.25)
Temporary freeze of a vacant Administrative Assistant (1.0 FTE) -
Temporary freeze of a vacant Deputy Director (1.0 FTE) -
Temporary freeze of vacant positions in DROP (4.0 FTEs) -
Total Parks and Recreation (1.74)
NET POSITION CHANGES: GENERAL FUND 11.22
OTHER FUNDS
Travel and Tourism
Eliminate filled AED Specialist I (1.00)
Total Travel and Tourism (1.00)
Housing Choice Voucher
Added a Senior Management Analyst 1.00
Added a Housing Choice Voucher Supervisor 1.00
Total Housing Choice Voucher 2.00
Stormwater
Add an Engineer I 1.00
Total Stormwater 1.00
Transportation Capital
Add a position to support Capital Bikeshare 1.00
Total Transportation Capital 1.00
Utilities Fund
Add a Training Coordinator 1.00
Total Utilities Fund 1.00
CPHD Development Fund
Freeze a Zoning Inspector Supervisor (1.0 FTE) in Zoning Enforcement -
Eliminate a filled Zoning Inspector in Zoning Enforcement (1.00)
Eliminate a filled Zoning Technician in Zoning Counter Services (1.00)
Freeze a Zoning Technician (1.0 FTE) in Zoning Counter Services -
Eliminate a filled Principal Planner in Zoning Policy, Research, and Information Management Section (1.00)
Freeze a Building Inspector (1.0 FTE) in Inspection Field Services -
Eliminate a filled Construction Plan Reviewer (1.00)
Total CPHD Development Fund (4.00)
Automotive Equipment Fund
Continue to freeze the second Night Shift Supervisor (1.00 FTE) -
Total Automotive Equipment Fund -
Print Fund
Eliminate four positions midway through FY 2026 as the Print Shop is transitioned to an outsourced model (4.00)
Total Print Fund (4.00)
NET POSITION CHANGES: OTHER FUNDS (4.00)
NET POSITION CHANGES: ALL FUNDS 7.22
updated 03.01.25
108
COMPENSATION SUMMARY
Note: Percentages may not add to 100 percent due to rounding.
FY 2026 Percent FY 2026 Percent
Proposed of Total Proposed of Total
Pay (Salaries) $436,681,713 68.86% $382,356,797 68.40%
Retirement 95,327,685 15.03% 85, 489,529 15.29%
FICA 31,050,897 4.90% 27,177,717 4.86%
Health Insurance - Employees 45,186,604 7.13% 39,066,232 6.99%
Health/Life Insurance - Retirees 875,000 0.14% 875,000 0.16%
Life Insurance - Employees 555,795 0.09% 482,398 0.09%
Commuting & Transportation 2,617,665 0.41% 2,191,689 0.39%
Tuition Reimbursement 378,800 0.06% 378,800 0.07%
Unemployment/Short-Term Disability 280,000 0.04% 280,000 0.05%
Workers Compensation 5,246,006 0.83% 4,900,000 0.88%
Transfer to OPEB Trust Fund 13,000,000 2.05% 13,000,000 2.33%
Miscellaneous 2,972,760 0.47% 2,775,810 0.50%
T
otal $634,172,926 100% $558,973,971 100%
ALL FUNDS GENERAL FUND
Compensation
109
This page intentionally left blank
110
Pay Enhancements – FY 2004 to FY 2026
The following provides a history of key pay enhancements.
Fiscal
Year
COLA/Market
Pay
Adjustment
Other Changes
FY 2026 3.5% merit increase for non -bargaining employe es and 2%
range movement
4.0% salary increase for Service /Labor/Trade s employees
and 2% range movement
Fire: Step increases in line with the IAFF CBA and the
grade/step structure, average increase is 11%
Police: Step increases in line with the ACOP CBA and the
grade/step structure, average increase is 9%
Funding for access to child and elder care
FY 2025 4.75% merit increase for non-bargaining employees
4.75% salary increase for Service/Labor/Trades employees
Fire: Step increases in line with the IAFF CBA and the
grade/step structure
Police: Step increases in line with the ACOP CBA and the
grade/step structure
Implementation of the new pay plan
Proposed ne w
retirement plan for new general employees
(non-bargaining) with a combination of a 1% defined benefit
(pension) w
ith a lower employee contribution of 2.5% of pay.
The County will also provide a 7.5% contribution to a 401(a)
account. The
plan would be effective January 1, 2025.
updated 3.20.2025
111
COMPENSATION SUMMARY
Fiscal
Year
COLA/Market
Pay
Adjustment
Other Changes
FY 2024 4.5% merit increase for General employees
4.5% salary increase for Service/Labor/Trades employees
8.5% merit increase for Sheriff uniform employees
Related range movements, which means that the lowest part
of the pay range and highest part of the range will move.
Fire: Implementation of a grade and step structure with 4%
steps plus a longevity bonus for those at range maximum
Police: Implementation of a grade and step structure with
most ACOP members receiving at least 10% increases in year
one and 2.5% step increases planned for years 2 and 3
County Board pay will increase to $95,734 for the Chair and
$89,851 for members
$2,000 (gross) one-time bonus for all qualifying staff
Increase paid parental leave from 8 to 10 weeks
Increase in the flexible spending account dependent care
match from $1,500 to $2,000
Increase in the County’s contribution for the health savings
accounts for those on the high deductible health plan from
$700 individual/$1,400 dependent to $950/$1,900
Increase in adoption assistance from $5,000 to $9,000
Establishing 16 hours of paid bereavement (based on a
40 hour work week); leave does not carry over from one fiscal
year to the next
Increasing DROP from three to four years
In June after budget adoption, the County Board approved a
new maximum annual salary cap for County Board Members
($116,343) and the Board Chair ($121,806) effective January
1, 2024
112
COMPENSATION SUMMARY
Fiscal
Year
COLA/Market
Pay
Adjustment
Other Changes
FY 2023 5.25% merit increase for General employees, 13.5% for
uniformed Police, and 8.50% for uniformed Sheriff and Fire
employees
5.0% increase to the minimum and maximum of General
Employee grades/ranges and up to 5.5% increase to the
minimum and maximum of uniform public safety
grades/ranges
Increase to pay-for-performance budget of 0.5%
2.5-hour reduction in Police work week for uniformed
positions
$1.5 million for the first year of a multi-year effort to address
pay compression
$1,600 (gross) one-time bonus
One-time referral bonus for hard to fill positions - $1,000
upon hire and $1,000 after 6 months
DHS Clinical Services – one-time retention bonus of $3,500
gross for existing employees; signing bonus $1,500 gross at
hiring, $1,500 gross later for new employees
Police signing bonus of $1,500 (gross) upon hire and again
after one year (one-time)
Fire – uniform employees one-time retention bonus of $1,600
gross
Optional one-time cash-out 40 hours of comp ensation time
for General Employees with balances of 80 hours or more and
for Public Safety Employees with balances of 120 hours or
more
One-time allowance for front-line staff ($1,000 gross)
One-time funding for additional bonuses, merit awards, and
retention efforts ($500,000)
A one-time increase to shift differential from $0.75 to $1.00
per hour for B shift and from $1.00 to $1.30 per hour for
C shift
A one -time increase to language premium from $0.69 to
$0.92 per hour
Double the CDL bonus to $2,000 (one-time)
One-time Fire Swiftwater Premium of $0.70 per hour for techs
and $1.40 per hour for specialists
Increase several premium pays in Police including Patrol Field
Training Officer premium from $1.34 to $3.00 per hour, Civil
Disturbance Unit premium from $0.30 to $0.75 per hour, and
SWAT premium from $0.60 to $1.00 per hour.
113
COMPENSATION SUMMARY
Fiscal
Year
COLA/Market
Pay
Adjustment
Other Changes
FY 2022 1% effective
January 1,
2022
Additional 1% market adjustment effective January 1, 2022,
approved at close-out of FY 2021
$450 (net) one-time bonus approved at close-out of FY 2021
1% merit increases included
$900 (net) one-time bonus
5.0% increase to the minimum and maximum of each pay
range for general employees
1.0% increase to the minimum and maximum of each pay
range for public safety employees
Lowest base pay rate / living wage increas ed to $17.00/hour
from $15.00/hour for all permanent and temporary
employees, excluding student assistants
Increased dependent care match from $1,000 to $1,500
Increased Live Where You Work benefit
Increased paid parental leave from 6 to 8 weeks
Increased maximum tuition reimbursement from $1,900 to
$2,200 per year
Added Juneteenth Day as a paid holiday
FY 2021
None No compensation increases
Increased paid parental leave from 4 to 6 weeks
Increased dependent care match from $500 to $1,000
Increased vacation leave accrual for new/recent hires from 13
days to 16.25 days
Added a one-time Election Day holiday
Eliminated Presidents Day holiday and add a floating holiday
Introduced a Consumer Driven Health Plan
FY 2020 None Merit increases included
2.0% increase to the minimum and maximum of each pay
range
Increased public safety compensation in Fire, Police and
Sheriff by 5.5% as part of the continued implementation of
the maintenance study completed in FY 2018.
Expanded dental plan options
Introduced a voluntary, employee paid, long term disability
insurance plan
114
COMPENSATION SUMMARY
Fiscal
Year
COLA/Market
Pay
Adjustment
Other Changes
FY 2019 None Merit increases included
1.0% increase to the minimum and maximum of each
grade/range
Increased public safety compensation in Fire, Police and
Sheriff as part of the first-year of a five-year classification and
maintenance study for all job classes in the County.
Lowest base pay rate / living wage increas ed to $15.00/hour
from $14.50/hour for all permanent and temporary
employees, excluding student assistants
Added Adoption Assistance ($5,000/child)
Increased volunteer leave from 4 hours to 8 hours
Increased location pay from $80/month to $110/month for
uniformed Sheriff and Police positions
FY 2018 None Merit increases included
Increased Transit Subsidy by $50 per month
Implemented a Dependent Care Flexible Spending Account
(FSA) employer match of $500 per employee
FY 2017 None Merit increases included
1.75% increase to the maximum of each grade/range and
implementation of open pay ranges
Lowest base pay rate increasing to $14.50/hour from
$13.13/hour for all permanent employees
Eliminated steps 2 & 3
Implemented a Commercial Driver’s License (CDL) bonus
program
Increased New Parent Leave from 2 weeks to 4 weeks
FY 2016 None Merit/step increases included
FY 2015 1.00% for
Step 19
employees
Merit/step increases included
Added extra Christmas and New Year’s holidays, CY 2014
only, due to timing of the holidays
FY 2014 None Merit/step increases included
Eliminated one County Holiday (Columbus Day)
FY 2013 None Added Step 19, dropped Step 1
Added Christmas Eve and New Year’s Eve holidays, CY 2012
only, due to timing of the holidays
Merit/step increases included
Living wage increased to $13.13 per hour
FY 2012 None
Text truncated. Open the original for the full document.
Source: Arlington County website. First collected Oct 6, 2026.