RecordWell Data

Planning Commission — Agenda Minutes

Chesterfield County · Chesterfield County · Planning Commission · meeting of Mar 17, 2026 · Other

Open the original document More from Chesterfield County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

3/16/2025 Linda Kidd-Fleshman MatoacaComment on unscheduled matters I am writing to express my deep opposition to the proposed high-density subdivision "Marlbank Farms" in rural Matoaca village (a small part of, but not to be confused with the entire Matoaca district). Two community gatherings regarding this proposed subdivision have both been well-attended by community members, NONE of which want this density in our area. The current zoning of this property which allows such density was approved in 2006, BUT it was NOT APPROPRIATE for this area then, and it is certainly NOT APPROPRIATE for this area NOW. Everyone who lives in the village of Matoaca and travels in this area knows this. Gratefully, the County's comprehensive plan has been changed to remove the also inappropriate east-west freeway, which would have destroyed the village of Matoaca; however the proposed local developments by Emerson Companies including "Marlbank Farms" subdivision will still be detrimental to this area. As adjoining property owners, my husband and I are highly opposed to this density and all of the problems it will bring. Given the lack of infrastructure to support it, this project brings ZERO direct or indirect benefit to the Matoaca community. More chaotic traffic, noise, overcrowding of schools (although county officials, but NO teacher, will statistically deny this), overburdened first responders, and destruction of natural resources and wildlife habitats will all be consequences of Mr. Emerson's plan. The loss of viable soil will increase flooding issues due to less absorption and increased runoff, especially a concern for adjoining property owners like us, and those along Big Branch creek. The loss of greenspace and its vegetation, and the increase of asphalt and cement surfaces in this rural area will increase local temperatures. The loss of natural wildlife habitat will force animals to seek food and shelter in neighboring yards, or even the loss of species in this area. The dramatic increase in unnatural lighting will confuse wildlife, decrease species and even prevent stargazing in our area. People live in this community because they like the rural atmosphere, open farmland, trees, wildlife, etc. They live here because they don't want to live in the density of a city--Mr. Emerson seems determined to bring the city to us. The village of Matoaca doesn't want or need more urban sprawl or outside developers reshaping our surrounding landscape for their company's profit. There is no housing shortage here. ONE (1) house per 5 acres would be more appropriate for the property in question in the village of Matoaca, and similar to the surrounding area. March 17, 2026 CPC Online Form Citizen Comments received as of 5 p.m. on 3/16/2026 Continued on page 2 3/16/2025 Linda Kidd-Fleshman MatoacaComment on unscheduled matters We urge you to stop the out of control growth and keep the village of Matoaca a more natural, rural, yet thriving community. Please don't inflict this density on my community, my home. While IMPROPER ZONING was approved 20 years ago, it should NOT be used to harm the current citizens. Just because you can do something (in this case, cram over 300 houses onto rural farmland), doesn't mean you should do it. Thank you for your consideration. Linda Kidd-Fleshman Continued from page 1 3/16/2025 Dennis Fleshman MatoacaComment on unscheduled matters I am writing to express my deep opposition to the proposed high-density subdivision "Marlbank Farms" in rural Matoaca village (a small part of, but not to be confused with the entire Matoaca district). Two community gatherings regarding this proposed subdivision have both been well-attended by community members, NONE of which want this density in our area. The current zoning of this property which allows such density was approved in 2006, BUT it was NOT APPROPRIATE for this area then, and it is certainly NOT APPROPRIATE for this area NOW. Everyone who lives in the village of Matoaca and travels in this area knows this. Gratefully, the County's comprehensive plan has been changed to remove the also inappropriate east-west freeway, which would have destroyed the village of Matoaca; however the proposed local developments by Emerson Companies including "Marlbank Farms" subdivision will still be detrimental to this area. As adjoining property owners, my husband and I are highly opposed to this density and all of the problems it will bring. Given the lack of infrastructure to support it, this project brings ZERO direct or indirect benefit to the Matoaca community. More chaotic traffic, noise, overcrowding of schools (although county officials, but NO teacher, will statistically deny this), overburdened first responders, and destruction of natural resources and wildlife habitats will all be consequences of Mr. Emerson's plan. The loss of viable soil will increase flooding issues due to less absorption and increased runoff, especially a concern for adjoining property owners like us, and those along Big Branch creek. The loss of greenspace and its vegetation, and the increase of asphalt and cement surfaces in this rural area will increase local temperatures. The loss of natural wildlife habitat will force animals to seek food and shelter in neighboring yards, or even the loss of species in this area. The dramatic increase in unnatural lighting will confuse wildlife, decrease species and even prevent stargazing in our area. People live in this community because they like the rural atmosphere, open farmland, trees, wildlife, etc. They live here because they don't want to live in the density of a city--Mr. Emerson seems determined to bring the city to us. The village of Matoaca doesn't want or need more urban sprawl or outside developers reshaping our surrounding landscape for their company's profit. Continued on page 3 Continued from page 2 3/16/2025 Dennis Fleshman MatoacaComment on unscheduled matters There is no housing shortage here. ONE (1) house per 5 acres would be more appropriate for the property in question in the village of Matoaca, and similar to the surrounding area. We urge you to stop the out of control growth and keep the village of Matoaca a more natural, rural, yet thriving community. Please don't inflict this density on my community, my home. While IMPROPER ZONING was approved 20 years ago, it should NOT be used to harm the current citizens. Just because you can do something (in this case, cram over 300 houses onto rural farmland), doesn't mean you should do it. Thank you for your consideration. Dennis Fleshman FORMAL LETTER OF OBJECTION: Case 25SN1184 – Spring Creek Baptist Church Rezoning Submitted by: Chris and Catherine Walker To the Chesterfield County Planning Commission: I am writing to formally object to the rezoning request for Case 25SN1184. My home at 5100 Woolridge Road directly borders the Spring Creek Baptist Church property and the land proposed for this new subdivision. I am already experiencing significant drainage and flooding issues caused by upstream development, and I am deeply concerned that this rezoning will worsen those impacts unless specific protections are put in place. 1. Existing drainage failures are already damaging my property Since the church and the homes behind me were built, stormwater from a church drainage pipe now flows directly through my backyard, creating a stream during rain events. This runoff is eroding my soil, expanding areas of standing water, and making portions of my land unusable. The county’s own Environmental Engineering section acknowledges that: “Runoff generated by the proposed development may result in increased flooding downstream.” My property is that the downstream area is already experiencing flooding. No corrective measures were implemented when the last homes were built, and the drainage problems on my property have increased significantly since that time. 2. Wetlands and environmental concerns When I purchased my home, the rear portion of my lot and the land behind it were posted as wetlands. Those signs have since disappeared, and homes were built extremely close to that area. The staff report states that: “A Resource Protection Area Designation (RPAD) would need to be submitted prior to plan review.” This means wetlands and buffers have not yet been delineated. Rezoning should not proceed until the RPAD is completed and reviewed publicly. 3. My home is on septic, and increased water threatens system failure My property relies on a septic system, and the increased water saturation caused by upstream drainage failures poses a direct threat to its function. Septic systems require dry, uncompacted soil to operate safely. Standing water and soil saturation can cause: • premature septic failure • contamination risks • inability to repair or expand the system I have previously attempted to connect to public sewer and was denied. This leaves me with no alternative if my septic field fails due to increased runoff from this or future development. I am also concerned about the lack of available future septic field locations on my property if the current field becomes unusable due to water saturation. Given these risks, I am requesting that the County assist me in obtaining access to public sewer service so that my home is not placed in jeopardy by conditions outside my control. 4. Increased runoff from the homes already built behind me The drainage problems on my property worsened significantly after the most recent homes were constructed behind me. To my knowledge, no changes were made to prevent increased runoff onto adjacent properties. The Community Meeting notes confirm: “Drainage concerns on adjacent properties.” This is a known and documented issue. My Requests for Protection To ensure my property is not further damaged or devalued, I respectfully request the following before any rezoning approval: 1. A full stormwater and drainage analysis Including: • RPAD/wetlands delineation • downstream capacity study • verification of the church’s drainage system • confirmation that the stormwater pond is functioning as designed 2. Correction of existing drainage failures Before any new development begins. 3. A condition requiring that no additional runoff be directed toward existing homes This must be enforceable and verified. 4. Assistance from the County in obtaining access to public sewer Given: • I am on septic • I was denied sewer access • increased water threatens septic function • future septic field locations may be compromised I am requesting that the County work with me to secure sewer access so that my home is not placed at long-term risk. Conclusion I am not opposed to responsible development. However, I cannot support a rezoning that risks worsening existing drainage failures, threatens my septic system, encroaches on wetlands, and further devalues my property at 5100 Woolridge Road. I respectfully request that the Planning Commission require the protections listed above before considering approval of Case 25SN1184. Sincerely, Chris and Catherine Walker From: craig lott To: Planning, E-Mail Cc: Saunders, Richard Subject: rezoning/planning case #: 25SN1254 Date: Monday, March 16, 2026 10:58:55 PM [You don't often get email from Learn why this is important at https://aka.ms/LearnAboutSenderIdentification ] CAUTION: External Email I plan to attend the meeting (rezoning/planning case #: 25SN1254). I may have misunderstood what I needed to do or missed the deadline to get on the agenda for this planning meeting. If I have the opportunity, I would like to voice my and many if not all of my neighbors’ concerns. I talked with, all or most all of the folks in Ballard Oaks Subdivision, and some of them along Robious, Greenfield, and across Robious from Greenfield, and some in Settlers Landing. While I do not represent everyone in the neighborhoods, everyone that I talked with is in opposition to this development of a 27 unit condominium complex. Last Thursday, I did ask Mr. Rich Saunders, if I could speak at the Planning meeting in opposition to rezoning the parcel of 3.45 acres on Robious Rd. I hope that I have an opportunity to represent my concerns and those of most of my neighbors’. 1. Appropriate use location: I believe that the proposed rezoning and redevelopment of the parcel should be appropriate to the neighborhood and the next door neighbors. The parcel is sandwiched between two senior living facilities with sidewalks that the residents use for exercise, access to Huguenot Park, groceries, ice cream, and their residences. Putting a high traffic, high density development with 60 parking spaces and 27 units would dramatically change the safety and increase the already high risks from Robious Rd, by introducing one more danger point with multiple risks, at least several fold. The risks are too great for this neighborhood. This is way too much traffic for this small parcel at an inappropriate distance from a dangerous intersection where there is a wreck a week, already (Cranbeck and Robious). One entrance into this neighborhood is inappropriate for safety purposes. Planning and Zoning should not be willing to overlook risks and decrease the safety of any future residents by allowing such a design. A cul-de-sac at the end doesn’t make up for too little room for parking and driving. I cannot imagine that a school bus, EMS, or a fire engine would have enough space to do their jobs in this situation. 2. Density: The density is inappropriate for the neighborhood. The neighborhoods on both sides of Robious and backing up to this lot are much less dense and putting a project of the proposed density here, would devalue the homes in the adjacent neighborhoods on all sides. In addition to decreasing the pedestrian friendly design of the existing sidewalks and crosswalk which is under construction at Robious and Cranbeck and Mall Dr. 3. Traffic: Cranbeck Rd already has too much traffic. Putting 27 more units with 60 parking spaces and providing twice that many more trips down Cranbeck and past these two extremely dangerous intersections (Cranbeck and Robious as well as Huguenot and Cranbeck), would increase the risks for every driver on this road and the already high accident rates at both ends. Currently residents have to wait more than 5 minutes to exit their driveway or their cross street subdivision onto Cranbeck several times per day with traffic backed up from one end to the other, in one or both directions, and sometimes at the same time. 4. Water Quantity: Stormwater infiltration is key to recharging the aquifer that feeds the wells in the Ballard Oaks subdivision. Several folks use their wells for irrigation and at least one uses theirs for drinking water. Water tables continue to decrease due to hardening of surfaces, which leads to faster downstream flow of water. This creates less opportunity for water to infiltrate and recharge the groundwater table. In the 20 years that I have lived here, my 100+ year old shallow well has gone from being available all summer, the first few years, to several months, down to one month or little more than the last two years. The additional cost to maintain my trees and yard with more and more expensive treated water can be connected to the increased excess built out nature of this neighborhood. There used to be a protected wetlands in our neighborhood, but my understanding is that it has lost most if not all of its plants due to draining of the groundwater table partially related to hardening of the surfaces, removal of trees and infiltrating green spaces, and curb and gutter ‘old fashioned’ stormwater controls or stormwater ponds that cause the water to heat up before it infiltrates or goes downstream in a smaller quantity because so much evaporates. 5. Water Quality: The watershed drainage area that this project is in is impaired downstream. This is caused by several factors heavily/directly connected with extreme development, old fashioned stormwater engineering controls and ordinances, inappropriate/vague planning, and built out nature being done to most parcels in this area. Increasing the stormwater volume, temperature, and pollutant loads by developing the parcel to 60-80% impervious surfaces, leads to more pollution downstream, in a higher volume, more quickly, adding to the already impaired system. Sincerely, Craig Lott

Source: Chesterfield County website. First collected Oct 17, 2026.