RecordWell Data

Board of Supervisors Meeting - January 28, 2026 — Other

Chesterfield County · Chesterfield County · Board of Supervisors · meeting of Jan 28, 2026 · Other

Open the original document More from Chesterfield County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1/28/2026 Page 1 of 8 Citizen Comments Received Through the Comment Portal January 28, 2026, Board of Supervisors Meeting Comment Type Comment Name District Unscheduled matter With the completion of the Nash Road extension project connecting Beach Road (Route 655) to Iron Bridge Road (Route 10), the county should consider requesting that VDOT extend the Route 36 primary designation from its current endpoint at a seemingly random location west of Matoaca (at the intersection with Route 669/Church Road) along River Road and Nash Road. This corridor serves as a useful route from the Chesterfield Courthouse area to Matoaca and Ettrick and is built to high standards for the most part, with the exception of the Nash Road/River Road intersection, which could probably stand to be rebuilt to make the route continuous. On a similar note, the county should also request that Robious Road be redesignated. At the moment, Robious Road has two route numbers - Route 711 west of Huguenot Road, and Route 675 east of it. This arrangement dates back to when Robious Road had a staggered intersection with Huguenot Road and the route was not continuous. Considering that Route 711 used to be primary back in the day (it used to be Route 44, and honestly it could be primary again), and Route 675 sees quite a bit of traffic itself, it would make more sense for all of Robious Road to be a single number, whether that be Route 711 or an upgrade to a primary designation. Finally, the county should also consider requesting that VDOT upgrade Courthouse Road (Routes 653 Will Weaver Midlothian 1/28/2026 Page 2 of 8 Comment Type Comment Name District and 604) to primary status, as that corridor is a major arterial and part of the National Highway System. About 20 years ago, it was studied as a possible extension of Route 147, and considering the work that is being done at the southern end of Courthouse Road near Iron Bridge Road, I think that idea should be revisited. Unscheduled matter I found out news that there is only going to be $4.7 million dollars in TAP Grant funding for sidewalks in the Richmond Region. But at the same time there are 17 sidewalk projects totaling $23,071,938 in the Richmond Region. Could Chesterfield County officially ask the Central Virginia Transportation Authority to transfer $18,371,938 into the TAP Grant program for the Richmond Region. This would benefit all of the counties. Also I remember coming across something on the website of the CVTA that they have 48 million in funds that haven't been used yet. Carl Schwendeman Midlothian Consider the Exercise of Eminent Domain for the Duval Road Reconstruct ion Project My name is David Sinclair, a residential property owner on the north-side of Duval Road that directly adjoins the Mulligan parcel. I respectfully submit this appeal to oppose the County’s proposed condemnation for the Duval Road project. As presented, the proposed taking is substantially larger and more damaging than is reasonably necessary to construct a two-lane roadway. It would impose disproportionate impacts on my home, utilities, and long-term property rights without public necessity. The County has selected a curved realignment rather than improving the existing David Sinclair Matoaca 1/28/2026 Page 3 of 8 Comment Type Comment Name District roadway alignment. This design shifts Duval Road significantly farther north into my front yard, bringing the roadway materially closer to my home and eliminating the setback and separation that have existed for decades. The change creates permanent loss to privacy, safety, and livability beyond ordinary widening. If the state purpose of the project is a two-lane roadway, I respectfully request an explanation of why the work cannot be accomplished largely within the existing roadbed, or, if additional width is necessary, why the additional lanes cannot be placed on the south-side of Duval Road, where land is owned by developers who will directly benefit from the project. The expanded taking unnecessarily reduces the usable area of my parcel. By shifting the roadway and acquiring an expansive footprint, the County would effectively foreclose reasonable future options such as subdivision potential, accessory structures, and other lawful improvements. This diminishes long-term value and imposes burdens that similarly situated adjoining properties are not being asked to bear. In addition, the requested right-of-way appears sized for a future four-lane roadway, even though no timeline, funding, or adopted plan has been identified for such an expansion. Under Virginia condemnation principles, property should not be taken today merely to reserve space for a project that is not funded, scheduled, or designed. If the County’s present need 1/28/2026 Page 4 of 8 Comment Type Comment Name District is a two-lane roadway, the taking should be limited to what is necessary for that defined purpose. This approach is also inconsistent with the most recent zoning case on the south-side of Duval Road, which required a dedication of only 55 feet, including the shared-use path. My property is being subjected to substantially greater impacts without corresponding justification or consistent treatment. I respectfully request consideration. Unscheduled matter On the agenda packet Chesterfield County said they are going to buy 22,000 linar feet of right of way for a watermain easement along Beech Road. Could Chesterfield County buy up the section of Tidewater and Western Narrow Gauge Railroad as part of this easement and put the watermain next to the railroad bed. So that two miles of Tidewater and Western get turned into a section of rail trail as the watermain is built. Carl Schwendeman Midlothian 24SN1162 - Baldwin Creek Rezoning and Exceptions Could they ask the developer to proffer the former Tidewater and Western Narrow Gauge Railroad bed into a bike path. Such as turn the railroad bed into a section of muti use trails. And allow them to turn some of the single family homes into town homes to make room for saving the railroad bed. But at all costs save the last piece of narrow gauge railroad bed on this zoning case. Carl Schwendeman Midlothian Consider the Exercise of Eminent Domain for the Duval Road Reconstruct ion Project I respectfully oppose the proposed right of way acquisition along Duval Road due to the absence of demonstrated public necessity, the severity of the impacts to existing homeowners, and the Janet Mulligan Matoaca 1/28/2026 Page 5 of 8 Comment Type Comment Name District County’s incomplete negotiation process. The project does not widen Duval Road or add capacity; it replaces the existing two lane roadway with a new alignment shifted onto our residential properties. This raises an essential question: What realized public benefit is achieved by relocating the road rather than improving it in place? No additional lanes are being constructed, no congestion relief is provided, and the realignment imposes significant harm without measurable transportation improvement. The County’s design incorporates a shared use path, yet this facility is required of multi-lot developers as a project amenity, not as a public safety or mobility necessity. Existing residents should not bear disproportionate impacts for infrastructure fully tied and required by this new development. The realignment and added utility easements also impose long term impacts on by right family subdivision lots, particularly by interfering with the prime drain-field areas that make these lots feasible. While the lots are not reduced below minimum acreage, their functional viability is significantly compromised due to the encroachment of new roadway geometry and utility corridors. For the Sinclair and Mulligan parcels, the design causes severe personal impacts: loss of a well, major driveway reconstruction, reduced privacy, roadway proximity, and permanent loss of usable land and development area. These impacts are 1/28/2026 Page 6 of 8 Comment Type Comment Name District avoidable under a conventional widening in place approach or perhaps improving upon the hundreds of adjacent acres owned by the county. Finally, negotiations were left incomplete because essential details were never finalized, and the requested and necessary information for understanding damages were never provided, including limiting our parcel access and the right of way width being greater than the Comprehensive Plan. As such, I respectfully request that the County limit any acquisition to improvements which provide a current public benefit. A 2-lane road, offset and abandoning an existing 2- lane road without completion timelines and based on future needs does not meet the requirements for condemnation. Consider the Exercise of Eminent Domain for the Duval Road Reconstruct ion Project To be clear at the outset: I am not opposed to transportation improvements, nor am I opposed to shared-use paths. My concern today is whether the County has met its obligation to demonstrate necessity, and whether this Board has been given a complete and adequate record to make that finding. What is proposed here is not a routine widening of an existing road. The County is proposing to relocate the roadway centerline onto private parcels, while converting the existing roadway— located along a long- established 30-foot prescriptive right-of-way— into a shared-use path. That distinction matters. The existing roadway is functional and will remain in use, albeit for a different purpose. This Chris Mulligan Matoaca 1/28/2026 Page 7 of 8 Comment Type Comment Name District alone raises a fundamental question: why is it necessary to relocate the vehicular roadway at all, rather than improve it within its historic alignment? The Comprehensive Plan designation of a future 90- foot right-of-way does not, by itself, establish present necessity, nor does it require relocating the roadway onto private land today. Planning guidance is not a substitute for a demonstrated need— especially when the taking involves disproportionately burdening specific parcels. I have requested information necessary to understand and evaluate including: • justification for relocating - rather than widening • alternatives that were considered and rejected, • basis for selecting this offset alignment for this extent of taking. • Traffic requiring immediate improvement That information has not been provided. Without it, negotiations cannot be meaningful, property owners cannot fairly assess reasonableness, and is deemed necessary, as Virginia law requires. I also want to emphasize that the public benefit cited—a shared-use path— does not inherently require relocating the vehicular roadway. If the existing alignment is suitable for a shared-use path, it follows that it is structurally viable, calling into question why the roadway must be moved instead of adapted. Respectfully, the issue before you today is not whether this project is desirable in the abstract, 1/28/2026 Page 8 of 8 Comment Type Comment Name District but whether this taking, in this location, and in this specific configuration, has been justified by evidence rather than assumption. Based on the incomplete record, the lack of disclosed alternatives analysis, & the absence of a demonstrated necessity for relocation, I respectfully request that the Board decline to approve the condemnation at this time or continue the matter until the information is provided & evaluated.

Source: Chesterfield County website. First collected Oct 17, 2026.