City Council Special Meeting - Low Barrier Shelter — Agenda Packet
City of Charlottesville · Charlottesville City County · City Council · meeting of Mar 25, 2026 · Agenda packets
Open the original document More from City of Charlottesville
This document is no longer listed on City of Charlottesville's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City Council Special Meeting
March 25, 2026
CitySpace, 100 5th Street NE
Charlottesville, VA 22902
AGENDA
Juandiego R. Wade, Mayor
Natalie Oschrin, Vice Mayor
Jen Fleisher
Michael K. Payne
J. Lloyd Snook, III
Kyna Thomas, Clerk
I. Call to Order
II. Roll Call
III. Work Session
Charlottesville City Council will hold a special work session on Wednesday, March 25, from
4:00 p.m. to 6:00 p.m. at CitySpace to receive a presentation from the Low Barrier Shelter
Workgroup outlining a proposed vision for a shelter at Holiday Drive.
The workgroup comprised of community partners including PACEM, The Haven, and BRACH,
will share recommendations and a conceptual path forward for consideration. The session is
designed to provide City Council with an opportunity to receive the presentation, ask
questions, and discuss next steps.
This work session will not include a public comment period.
IV. Adjournment
This is an in- person meeting with an option for the public to view electronically by registering in
advance for the Zoom webinar at www.charlottesville.gov/zoom. The meeting may also be viewed
on the City's streaming platforms and local government Channel 10.
Individuals with disabilities who require assistance or special arrangements to participate in the
public meeting may call (434) 987- 1267 or submit a request via email to ada@charlottesville.gov.
The City of Charlottesville requests that you provide 48 hours’ notice so that proper arrangements
may be made.
4:00 PM - 6:00 PM WORK SESSION – Low Barrier Shelter
LOW BARRIER SHELTER
PRESENTATION TO CITY COUNCIL
March 25, 2026
LOW BARRIER SHELTER AT HOLIDAY DRIVE
SHAYLA WASHINGTON,
EXECUTIVE DIRECTOR
LEAD AGENCY
CAMERON MOORE,
EXECUTIVE DIRECTOR
EMERGENCY THERMAL
SHELTER
OWEN BRENNAN,
EXECUTIVE DIRECTOR
DAY SHELTER
COORDINATED ENTRY &
HOUSING PROGRAMS
MAJOR DONNY WILSON,
CHARLOTTESVILLE CORPS OFFICER
ERIN HANNEGAN,
PRINCIPAL
EMERGENCY YEAR-ROUND
SHELTER
RUSS MITCHELL,
LBS WORKGROUP FACILITATOR
URBAN PLANNING,
ARCHITECTURE, AND
INTERIOR DESIGN
OTHER WORKING GROUP MEMBERS:
DEREK ALLEY
TAMARA BAXTER
TAYLOR HARVEY-RYAN
CLIFF HAURY
ANN KINGSTON
HEATHER KOONTZ
ASHLEY MARSHALL
STEVE KING
SUNSHINE MATHON
LOCKE OGENS
CARMELITA WOOD
ANTHONY WOODARD
INTRODUCTIONS
LOW BARRIER SHELTER AT HOLIDAY DRIVE
EXECUTIVE SUMMARY
• Transformational Impact: Investment in 2000 Holiday Drive will improve outcomes by
strengthening safety, support services, and pathways back to housing for individuals
experiencing homelessness.
• Design Process: Facility design prioritizes service coordination, housing-focused case
management, and flexible program space, informed by partner and community input.
• Capital Cost: Project costs reduced from $9.7M to $8.6M (~11% reduction) through redesign and
value engineering while maintaining core program goals.
• Programs: The facility will support day shelter services, coordinated entry, case management,
housing navigation, and connections to health and workforce supports.
• Near-Term Uses: Contingent on building code official review and approval.
• Transportation Needs & Assumptions: Accessibility to commonly used community
resources, supporting client mobility and partner collaboration.
• Operating Model: Sustainable operations focused on housing-focused staffing and
coordinated service delivery.
LOW BARRIER SHELTER AT HOLIDAY DRIVE
PROGRAMS THAT WILL DRIVE
OUTCOMES
LOW BARRIER SHELTER AT HOLIDAY DRIVE
SUMMARY OF PROGRAMS
• Housing Programming Expansion Goals
o The Haven: Prevention, Housing Navigation, Rapid Re-Housing, Laura Delapp
Haven Housing Fund — All programs will en sure steady exits from shelter to
permanent housing while strengthening the community’s homelessness
response system.
o PACEM: Will increase the number of case managers on staff to provide housing
navigation & potential outreach support as needed.
• Plan to maintain community engagement and support via donations and volunteer
activities.
• Continued partnership with The Salvation Army to ensure transition of clients to
program-based shelter as appropriate.
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DESIGN
LOW BARRIER SHELTER AT HOLIDAY DRIVE
PHASE 1 PROCESS
PHASE 1: VISIONING, PROGRAMMING, DEVELOPMENT OF OPTIONS
AUGUST
2025
Working Group
Meetings (18)
Tour of Open Doors
Harrisonburg
NOVEMBER
5
2025;
INITIAL
PROPOSAL
TO CITY
MANAGER
SEPT 2025 OCT 2025 NOV 2025
Tour of CARITAS
Richmond
Tour of
Holiday Drive
CITY OF CHARLOTTESVILLE
ANNOUNCED INTENT TO
PURCHASE 2000 HOLIDAY
DRIVE FOR A LOW-BARRIER
SHELTER, OCTOBER 6, 2025
The Haven &
M/M join the
Working Group
LOW BARRIER SHELTER AT HOLIDAY DRIVE
PHASE 2 PROCESS, FEEDBACK & INPUT
PHASE 2: REFINEMENT OF PROGRAMMING & DESIGN OPTIONS
DECEMBER
2025
Working Group
Meetings (17)
Design Review
Meetings with
The Haven’s Kitchen
Manager (2)
Presentation to
Staff
Tour of
Holiday
Drive with
Staff
Presentation to
Guests
Meeting /
Email
exchanges
with UVA
Health Clinic
Staff
MARCH
11
2026;
REVISED
PROPOSAL
TO CITY
MANAGER
JAN 2026 FEB 2026 MAR 2026
Presentation to
The Haven FLA
Committee
Guests
Feedback
interviews at
The Haven
Tour of
PACEM
shelter sites
LOW BARRIER SHELTER AT HOLIDAY DRIVE
SUMMARY
OPTION 1
OPTION 2
Fall 2025, PHASE 1 Spring 2026, PHASE 2
OPTION 3
LOW BARRIER SHELTER AT HOLIDAY DRIVE
LOWLOWOWOWWW BBBBABABABABBBBAAABARRRRRRRRIRRIRRIRRIRRR EER E SSSSHEHEESHSHS LTELTLTER AR AT HT HOLIOLIDAYDAYAY DRDRIVEIVE
EXISTING PHASE 1
PROPOSAL
PHASE 2
PROPOSAL
Men 35 - 40 60 + 2 isolation 48 + 2 isolation
Women 15 - 20 30 + 2 isolation 24 + 2 isolation
Gender-Neutral 04 4
Medical Respite 0 10-15 +/- TBD w/ UVA Health
TOTAL BEDS 50 - 60 108 – 113 +/- 80 minimum
QUANTITY OF BEDS
SUBTRACTING 28-33
BEDS FROM
PREVIOUS OPTIONS
ADDING 20-30 BEDS
FROM EXISTING
CONDITIONS
LOW BARRIER SHELTER AT HOLIDAY DRIVE
All percentages are ± 3%
PROPOSED PROGRAM
Health
Clinic
3%
Day
Shelter
10%Eating
20%
Overnight
Shelter
37%
Office &
Resident
Support
18% Shared
Support
12%
Overnight Shelter:
• Separate Men's and
Women's sleeping
quarters
• Non-binary sleeping
quarters
• Associated Bathrooms,
Showers, Laundry, &
Storage
Eating:
• Commercial kitchen &
support
• Dining room
Day Shelter:
• Bathrooms / Showers
• Laundry
• Hygiene Product
Distribution & Storage
• Living Room / Lounge
• Mail, Computers,
Phones, Electricity, WiFi
• Storage
Health Clinic:
• Medical Exam Rooms
• Therapy / Psychiatrist
• Staff Work Room
•S t o r a g e
Shared Support:
• Classroom space
• AA / NA Meetings
• Life Skills Classes
• Wound Care
• Recreational
Activities
• Staff / Volunteer
Training
• Conference / Meeting
Rooms
• Phone / Zoom Rooms
Office & Resident
Support:
• Administrative offices
and associated support
spaces for PACEM, The
Haven, and BRACH
LOW BARRIER SHELTER AT HOLIDAY DRIVE
ALL AREAS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
PROPOSED FIRST FLOOR
STAIR
STAIR
OFFICES
LOUNGE
OFFICES
KITCHEN
DINING
UNFINISHED
BATH-
ROOMS
LAUNDRY
STORAGE
CHECK
IN
MAIN
ENTRANCE
MEETING
&
SUPPORT E
SERVERY
E
LOW BARRIER SHELTER AT HOLIDAY DRIVE
ALL AREAS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
PROPOSED SECOND FLOOR
BEDS BEDS
BEDS
BEDSBEDS
BEDS
STAIR
STAIR
BEDS
BEDS
BEDS
BATH
BATH
BATH
OFFICES
STOR LOUNGE
LOUNGE
E
BEDS
GENDER
NEUTRAL
BEDS
E
PORCH
LOW BARRIER SHELTER AT HOLIDAY DRIVE
PROPOSED BASEMENT
ALL AREAS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
OFFICES
STORAGE
STAIR
E
MEETING
B OCCUPANCY LIMITED TO 50
R-1 (EMERGENCY OVERFLOW)
OCCUPANCY LIMITED TO 10
LOW BARRIER SHELTER AT HOLIDAY DRIVE
ALL AREAS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
PROPOSED FIRST FLOOR WITH CLINIC FIT-OUT
MAIN
ENTRANCE
STAIR
STAIR
OFFICES
LOUNGE
OFFICES
KITCHEN
DINING
CLINICBATH-
ROOMS
LAUNDRY
STORAGE
CHECK
IN
MEETING
&
SUPPORT E
SERVERY
E
LOW BARRIER SHELTER AT HOLIDAY DRIVE
ALL AREAS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
ENLARGED CLINIC FIT-OUT PLAN
WAITING
CLINIC
HALL
STAFF
WKRM
THERAPIST &
PSYCHIATRIST
MEDICAL
EXAM 01
MEDICAL
EXAM 02
STOR.
ELEV.
STORAGE
LOW BARRIER SHELTER AT HOLIDAY DRIVE
EXISTING PHOTOS AT FRONT ENTRY
LOW BARRIER SHELTER AT HOLIDAY DRIVE
OVERALL SITE PLAN
ALL AREAS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
RIER SHELTER AT HOLIDAY DRIVE
RALL SITE PLAN
MAIN
ENTRANCE
KITCHEN
STAFF &
VOLUNTEER
ENTRANCE
STAFF
ENTRANCE
&
DONATION
DROP OFF
CLASSROOM
ENTRANCE
&
STRETCHER
EGRESS
PARKING
PARKING
HOLIDAY
DRIVE
PROPOSED
BUS
SHELTER /
STOP
STREET
PARKING
PARK-LIKE
• BIKE RACKS
(QTY: 40)
• SEATING
• TABLES
• SHADE
• EXTERIOR
LOCKERS
(QTY: 72)
LOW BARRIER SHELTER AT HOLIDAY DRIVE
UNACCOMMODATED PROGRAM
PROGRAM COMPONENTS NOT INCLUDED IN THESE PLANS:
• 3 OFFICES
• 5 WORKSTATIONS
• 1 SMALL (2-3 PERSON) CONFERENCE ROOM OR ZOOM ROOM
• 1 MEDIUM (4-6 PERSON) CONFERENCE ROOM
LOW BARRIER SHELTER AT HOLIDAY DRIVE
CONSTRUCTION COST
LOW BARRIER SHELTER AT HOLIDAY DRIVE
CONSTRUCTION COST SUMMARY
OPTION 1
OPTION 2
Fall 2025, PHASE 1 Spring 2026, PHASE 2
OPTION 3
Spring 2026, PHASE 2
OPTION 3
$9.9M – $9.7M +/-
WHY AREN’T THERE MORE SAVINGS?
• Heavier renovation of existing conditions & less efficient layout
to fit it all into the existing building. ($1.2M raised to $4.5M)
• More site work & kitchen equipment is anticipated than
previously developed and included.
• Addition is more complex and has a higher SF cost than
Phase 1.
• Escalation.
• More cautious estimating based on current market conditions.
$8.6M +/-
LOW BARRIER SHELTER AT HOLIDAY DRIVE
OPTION 3
CLINIC UNFINISHED
OPTION 3 +
CLINIC FIT-OUT
EXISTING GSF: 26,312 GSF +/-
NEW CONSTRUCTION: 3,951 GSF +/-
CONSTRUCTION COST: $8,594,737 +/-
CONSTRUCTION TIMELINE: 12 months +/-
FIT-OUT NSF: 750 NSF +/-
WORK WITH UVA HEALTH TO FUND
CONSTRUCTION COSTS
ALL AREAS, COSTS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
COST BREAKOUTS
LOW BARRIER SHELTER AT HOLIDAY DRIVE
COST DETAILS
FF&E not included.
FF&E typically 10% +/- of construction cost.
ALL AREAS, COSTS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
LOW BARRIER SHELTER AT HOLIDAY DRIVE
THE HAVEN DECISION
PROCESS UPDATE
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DECISION PROCESS UPDATE
In December 2026, The Haven partnered with The Spark Mill to answer this
core question:
Is relocating some or all of our programs
to Holiday Drive in the best interest of our
guests and mission?
In January, a committee of staff, board members, and former guests created
decision-making criteria for how we would answer this question.
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DECISION PROCESS UPDATE
In February, we completed a stakeholder engagement process with 128 participants —
guests, staff, volunteers, and community partners.
Guests 68
Staff 12 (of 25)
Volunteers 25
Community Partners 25
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DECISION PROCESS UPDATE
Final Phase: March 2026
The committee has reviewed all the feedback, matched it with our decision-making
criteria, and drafted a recommendation.
The Haven board discussed this recommendation at their March 17 meeting and
convened again on March 24, voting to accept the FLA Committee's
recommendations.
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DECISION PROCESS UPDATE
Decision Matrix (Ranked in order of category weight)
1. Financial Viability
Assessing economic sustainability and
cost-effectiveness.
2. Service Accessibility
Ensuring services are easily reachable
and available.
3. Proximity
Proximity is not simply a question of
distance — it is a question of whether
The Haven can relocate without
significantly disrupting the ecosystem of
services, relationships, and community
that has formed around its downtown
location over 14 years.
4. Improved Facility and Space
Design
Evaluating the quality, functionality, and
suitability of the physical environment.
5. Mission-Driven Trauma-
Informed Decision Process
This category examines whether the
process by which this decision is being
made reflects The Haven's stated
values.
6. Safety
Safety operates on two distinct planes:
physical safety (road conditions,
lighting, pedestrian infrastructure around
Holiday Drive) and interpersonal safety
(within the shelter environment).
7. Partnership Alignment
Confirming synergy and shared goals
with potential partners (PACEM,
BRACH, City of Cville, Albemarle
County).
8. Community Impact
Measuring the positive influence and
benefit to the broader
Downtown community
9. Mission-Driven
Organizational Identity
Verifying that proposals reinforce The
Haven's core values and organizational
identity.
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DECISION PROCESS UPDATE – INITIAL FINDINGS
Decision Matrix (Ranked in order of category weight)
1. Financial Viability
Assessing economic sustainability and
cost-effectiveness.
2. Service Accessibility
Ensuring services are easily reachable
and available.
3. Proximity
Proximity is not simply a question of
distance — it is a question of whether
The Haven can relocate without
significantly disrupting the ecosystem of
services, relationships, and community
that has formed around its downtown
location over 14 years.
4. Improved Facility and Space
Design
Evaluating the quality, functionality, and
suitability of the physical environment.
5. Mission-Driven Trauma-
Informed Decision Process
This category examines whether the
process by which this decision is being
made reflects The Haven's values.
6. Safety
Safety operates on two distinct planes:
physical safety (road conditions,
lighting, pedestrian infrastructure around
Holiday Drive) and interpersonal safety
(within the shelter environment).
7. Partnership Alignment
Confirming synergy and shared goals
with potential partners (PACEM,
BRACH, City of Cville, Albemarle
County).
8. Community Impact
Measuring the positive influence and
benefit to the broader
Downtown community
9. Mission-Driven
Organizational Identity
Verifying that proposals reinforce The
Haven's core values and organizational
identity.
AREAS OF
STAKEHOLDER
SUPPORT
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DECISION PROCESS UPDATE – INITIAL FINDINGS
Decision Matrix (Ranked in order of category weight)
1. Financial Viability
Assessing economic sustainability and
cost-effectiveness.
2. Service Accessibility
Ensuring services are easily reachable
and available.
3. Proximity
Proximity is not simply a question of
distance — it is a question of whether
The Haven can relocate without
significantly disrupting the ecosystem of
services, relationships, and community
that has formed around its downtown
location over 14 years.
4. Improved Facility and Space
Design
Evaluating the quality, functionality, and
suitability of the physical environment.
5. Mission-Driven Trauma-
Informed Decision Process
This category examines whether the
process by which this decision is being
made reflects The Haven's values.
6. Safety
Safety operates on two distinct planes:
physical safety (road conditions,
lighting, pedestrian infrastructure around
Holiday Drive) and interpersonal safety
(within the shelter environment).
7. Partnership Alignment
Confirming synergy and shared goals
with potential partners (PACEM,
BRACH, City of Cville, Albemarle
County).
8. Community Impact
Measuring the positive influence and
benefit to the broader
Downtown community
9. Mission-Driven
Organizational Identity
Verifying that proposals reinforce The
Haven's core values and organizational
identity.
AREAS OF
STAKEHOLDER
SUPPORT,
CAUTION
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DECISION PROCESS UPDATE – INITIAL FINDINGS
Decision Matrix (Ranked in order of category weight)
1. Financial Viability
Assessing economic sustainability and
cost-effectiveness.
2. Service Accessibility
Ensuring services are easily reachable
and available.
3. Proximity
Proximity is not simply a question of
distance — it is a question of whether
The Haven can relocate without
significantly disrupting the ecosystem of
services, relationships, and community
that has formed around its downtown
location over 14 years.
4. Improved Facility and Space
Design
Evaluating the quality, functionality, and
suitability of the physical environment.
5. Mission-Driven Trauma-
Informed Decision Process
This category examines whether the
process by which this decision is being
made reflects The Haven's values.
6. Safety
Safety operates on two distinct planes:
physical safety (road conditions,
lighting, pedestrian infrastructure around
Holiday Drive) and interpersonal safety
(within the shelter environment).
7. Partnership Alignment
Confirming synergy and shared goals
with potential partners (PACEM,
BRACH, City of Cville, Albemarle
County).
8. Community Impact
Measuring the positive influence and
benefit to the broader
Downtown community
9. Mission-Driven
Organizational Identity
Verifying that proposals reinforce The
Haven's core values and organizational
identity.
AREAS OF
STAKEHOLDER
SUPPORT,
CAUTION
AND CONCERN
LOW BARRIER SHELTER AT HOLIDAY DRIVE
TRANSPORTATION
LOW BARRIER SHELTER AT HOLIDAY DRIVE
THE SALVATION ARMY CENTER OF HOPE
THE HAVEN
DAY SHELTER
THE HAV
REGION 10
CVILLE FREE
CLINIC
UVA MEDICAL CENTER
CITY HALL
HOLIDAY DRIVE SITE
VIRGINIA DMV
COMMUNITY BIKES
CLOTHING CLOSET
SOCIAL SECURITY
ADMINISTRATION
HOMELESSNESS RESOURCES & POINTS OF INTEREST
ALBEMARLE COUNTY
OFFICE BUILDING
VISTA 29
LOW BARRIER SHELTER AT HOLIDAY DRIVE
UVA MEDICAL CENTER
DOWNTOWN
TRANSIT
CENTER
HOLIDAY DRIVE SITE
VIRGINIA
DMV
SOCIAL SECURITY
ADMINISTRATION
ALBEMARLE COUNTY
OFFICE BUILDING
PROPOSED TRANSPORTATION
SHUTTLE SERVICE
TO KEY POINTS
FREE BRIDGE
VICINITY OF 5th
STREET STATION
= PROPOSED STOPS
1 BUS PER HOUR
LOW BARRIER SHELTER AT HOLIDAY DRIVE
TRANSPORTATION COST ESTIMATE & ASSUMPTIONS
• When The Haven conducted their stakeholder feedback process, no group expressed
confidence that Holiday Drive could succeed without a dedicated, reliable, and frequent
shuttle service
• Proposed service details:
o Shuttle bus running a regular loop
o 364 days/year
o 10 hours/day:
7am – 1pm
4 – 7pm
Rough projected annual cost from Jaunt: $411,000
47% is personnel 40% is capital / equipment 13% is other operating costs
LOW BARRIER SHELTER AT HOLIDAY DRIVE
OPERATING PLAN
LOW BARRIER SHELTER AT HOLIDAY DRIVE
Building Owner
CITY OF
CHARLOTTESVILLE
Continuum of Care Lead
Agency
Day Shelter Overnight Shelter
PRIMARY PROPOSED PARTNERSHIPS
MOU AGREEMENTS TBD
LOW BARRIER SHELTER AT HOLIDAY DRIVE
RESPONSIBLITIES
LEAD AGENCY DAY SHELTER OVERNIGHT SHELTER
Coordination efforts across
regional partners Day Shelter Management Overnight Shelter Management
Educational Resources & CoC-
wide professional development 8am – 5pm Operation 16/ 7 or 24/7 Operation
Street Outreach Breakfast Dinner
Data Collection & Reporting
Housing Program administration
with expanded capacity for rental
assistance (Prevention and
Rehousing)
Housing-oriented case manager
offered to every guest
Grant Management Housing Stabilization case
management Transitional Housing Program
Transfer existing onsite
partnerships to Holiday Drive
Bringing volunteers on-site,
including faith-based entities
LOW BARRIER SHELTER AT HOLIDAY DRIVE
STAFFING STRUCTURE
HOUSING PROGRAM
STAFFING EXISTING PROPOSED PROPOSED
RATIO
Shelter Housing Navigators 0.5 Haven +
2.5 PACEM 6 PACEM 13 clients / staff
Housing Stabilization Case
Managers 2 Haven 4 Haven 15 clients / staff
Housing (Rental Subsidy)
Program Administrators 1 FTE Haven 2 Haven 15 community members /
month
Outreach 1 BRACH 3 BRACH +
1 Haven 20 clients / staff
LOW BARRIER SHELTER AT HOLIDAY DRIVE
PACEM ESTIMATED OPERATING BUDGET
Category Existing Proposed Difference
Salaries $650,000 $2.5M + 285%
Supplies $55,000 $312,000 + 382%
Meals (Dinner) $127,500 (in-kind) $438,000 + 244%
Total $942,000 $3.7M + 293%
170
DAYS/YEAR
365
DAYS/YEAR
50
CLIENTS/PER
DAY
80
CLIENTS/PER
DAY
8,500
BED NIGHTS
/YEAR
29,200
BED NIGHTS
/YEAR
LOW BARRIER SHELTER AT HOLIDAY DRIVE
BRACH ESTIMATED OPERATING BUDGET
CATEGORY Existing Proposed Difference
Salaries $314,960 $464,960 + 47%
Operational
Expenses $82,995 $107,775 + 30%
Total $397,955 $572,735 + 44%
LOW BARRIER SHELTER AT HOLIDAY DRIVE
THE HAVEN ESTIMATED OPERATING BUDGET
CATEGORY Existing Proposed Difference
Salaries $1,430,000 $1,740,000 $310,000
Rental Assistance $671,000 $941,000 $270,000
Other Program
Expenses $52,000 $77,000 $25,000
Operational
Expenses $272,000 $272,000 $0
Total $2,424,000 $3,030,000 + $605,000
LOW BARRIER SHELTER AT HOLIDAY DRIVE
ESTIMATED OVERALL OPERATING BUDGET
ORGANIZATION Existing Proposed Difference
PACEM $942,000 $3,700,000 + $2,758,000
BRACH $397,955 $572,735 + $174,780
THE HAVEN $2,424,000 $3,030,000 + $605,000
Grand Total $3,763,955 $7,302,735 + $3,537,780
LOW BARRIER SHELTER AT HOLIDAY DRIVE
CURRENT CONTINUUM OF CARE CATCHMENT AREA
LOW BARRIER SHELTER AT HOLIDAY DRIVE
POTENTIAL NEAR
TERM USES FOR THE
SITE
LOW BARRIER SHELTER AT HOLIDAY DRIVE
• Designated Camping Site (would requi re planning for immediate and long-
term infrastructure needs, policies)
• Temporary / Emergency Overnight Shelter, contingent on BCO review &
approval
• Business Occupancies
• Office space
• Meeting space
• Training, Skill development, not in a school or academic program
INTERIM / TEMPORARY USES UNDER CONSIDERATION & REVIEW
LOW BARRIER SHELTER AT HOLIDAY DRIVE
PROPOSED NEXT STEPS
LOW BARRIER SHELTER AT HOLIDAY DRIVE
PROCUREMENT
OCCUPANCYPHASE 1 PHASE 2 A/E DESIGN PHASE CONSTRUCTION
ESTIMATED AS 12 MONTHS +/-
SCHEMATIC DESIGN, DESIGN
DEVELOPMENT, & WORKING
DRAWINGS
DEVELOPMENT PLAN AND
SITE PLAN APPROVAL
PROCESS WITH CITY OF
CHARLOTTESVILLE
VISIONING &
PROGRAMMING,
DEVELOPMENT OF
OPTIONS
REFINEMENT OF
PROGRAMMING
& DESIGN
OPTIONS
ENTITLEMENTS
ESTIMATED AS 12-18 MONTHS +/-
WE ARE
HERE
CITY OF CVILLE
ANNOUNCED
INTENT TO
PURCHASE 2000
HOLIDAY DRIVE
FOR A LOW-
BARRIER
SHELTER,
OCTOBER 2025
PROJECT TIMELINE
INITIAL
PROPOSAL TO
CITY MANAGER,
NOVEMBER 2025
COMMUNITY ENGAGEMENT
REVISED
PROPOSAL TO
CITY MANAGER
& CITY COUNCIL,
MARCH 2026
F
PHASE 3
OPERATING PLAN,
POLICY & PROCEDURES
COMMUNICATIONS &
COMMUNITY
ENGAGEMENT PLAN
TBD BY THE CITY OF
CHARLOTTESVILLE:
TRADITIONAL, PPP, OTHER?
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DEVELOPMENT OF POLICY & OPERATIONS:
• Hours of Operation & Physical Movement Transitions /
Restrictions in the building
• Suspension / Expulsion Policy
• Time limit for length of stay
• Safety / Security Procedures
• Isolation Room / Gender-Neutral Room Policy
•P e t P o l i c y
• Scheduling / Non-Profit Co-habitation / Shared Space
Guidelines
OUTSTANDING PROGRAM DISCUSSIONS:
• Lunch
• Designated Camping and other interim uses
COMMUNICATIONS & COMMUNITY
ENGAGEMENT STRATEGY AND OUTREACH:
• FAQ Document
• Guest engagement (continued)
• Lived Experience Advisory Council
• Guest Informational Presentations
• Staff engagement (continued)
• Business Community Engagement, specifically
Downtown
• Meadows / Northerly Neighborhood Association
Engagement
• Businesses along Holiday Drive (as a subset of these
stakeholders)
• Fundraising Plan / Philanthropic Partner Engagement
• General Public
• Media / Public Relations / Educational Outreach
PROPOSED PHASE 3 SCOPE
LOW BARRIER SHELTER AT HOLIDAY DRIVE
QUESTIONS, COMMENTS & DISCUSSION
LOW BARRIER SHELTER AT HOLIDAY DRIVE
ACTION ITEMS & FINAL THOUGHTS
LOW BARRIER SHELTER AT HOLIDAY DRIVE
THANK YOU!
2.317
Acres
1.574
1.574
Acres
2 317
2.317
2.317
Acres
Acres
SITE = 3.891 TOTAL ACRES
EXISTING BUILDING
PROS:
SIZE
CONDITION
SITE POTENTIAL
CONS:
NO SPRINKLER
MEANS OF EGRESS
CONSTRUCTION TYPE
ACCESSIBILITY
ELEVATOR SIZE
PROPERTY LINE
c. 1964
c. 1992
c. 1995
LOW BARRIER SHELTER AT HOLIDAY DRIVE
AERIAL LOOKING TOWARD 250 BYPASS
SOUTH FACADES OF 1990’S ADDITIONS
MAIN ENTRACE AT PORTICO
EXISTING PHOTOS
COURTYARD / REAR OF PHASE 1 ADDITIONREAR ENTRY
LOW BARRIER SHELTER AT HOLIDAY DRIVE
EXISTING PHOTOS OF 2000 HOLIDAY DRIVE
• TYPICAL OFFICE BU ILDING FINISHES
• CARPET TILE FLOORS
• ACT CEILINGS
• NON-OPERABLE WINDOWS
• FLUORSCENT LIGHTING
• REQUIREMENTS FOR NEW USES:
• SUFFICIENT PLUMBING FIXTURES
• SPRINKLER SYSTEM
• DURABLE FINISHES
LOW BARRIER SHELTER AT HOLIDAY DRIVE
BED MODULES
• PRIVACY
• SOUND CONTROL
• ADJACENT STORAGE
LOW BARRIER SHELTER AT HOLIDAY DRIVE
LOWLOWOWOWWW BBBBABABABABBBBAAABARRRRRRRRIRRIRRIRRIRRR EER E SSSSHEHEESHSHS LTELTLTER AR AT HT HOLIOLIDAYDAYAY DRDRIVEIVE
EXISTING PROPOSED
@ THE HAVEN 1st FLOOR
(Day Shelter)
TOILETS 4 M / 1 F 5
SHOWERS 3 M / 1 F 3
SINKS 3 M / 1 F 4
CLIENT LAUNDRY 3 sets 6 sets
PLUMBING FIXTURES
LOW BARRIER SHELTER AT HOLIDAY DRIVE
LOWLOWOWOWWW BBBBABABABABBBBAAABARRRRRRRRIRRIRRIRRIRRR EER E SSSSHEHEESHSHS LTELTLTER AR AT HT HOLIOLIDAYDAYAY DRDRIVEIVE
EXISTING PROPOSED
PACEM 2nd FLOOR
(Overnight)
TOILETS 1 per 10* 1 per 8 guests
SHOWERS 1 per 40* 1 per 8
SINKS 1 per 10* 1 per 6
CLIENT LAUNDRY 1 of 24 church
locations provides
laundry
7 sets
(1 set per 12)
PLUMBING FIXTURES
* Ratio based on fixtures at the
Church of the Incarnation, showers
are not always available
LOW BARRIER SHELTER AT HOLIDAY DRIVE
LOCATION PHASE 2 proposed
program
SECOND FLOOR
UNDER BED
(TRUNK / SUITCASE) 2’ D x 3’-6’ W
ADJACENT TO BED IN LOCKERS 1’-4” W x 1’-4” D x 7’ T
IN THE CORRIDOR NEAR
THE BATHROOM IN LOCKERS
(TOILETRIES)
1’-6” W x 2’ D X 2’ T
FIRST
FLOOR
BINS, NEAR FIRST FLOOR LOUNGE
(PRIORITIZED FOR NON-OVERNIGHT GUESTS)
1’-4” W x 2’ D x 1’-2” T
(ON SHELVES SIMILAR TO
EXISTING CONDITION AT
THE HAVEN)
CLIENT STORAGE
ALL AREAS, DIMENSIONS, AND SIZES ARE APPROXIMATE AND WILL CHANGE AS THE DESIGN IS REFINED.
LOW BARRIER SHELTER AT HOLIDAY DRIVE
DOWNTOWN TRANSIT CENTER TO HOLIDAY
DRIVE STOP = ABOUT 20 MINUTES ON 7 OR
8 LINE
BATTERIES PLUS STOP TO DOWNTOWN
TRANSIT CENTER = ABOUT 23 MINUTES ON
7 LINE OR ABOUT 16 MINUTES ON 8 LINE
HYDRAULIC ROAD STOPS TO DOWNTOWN
TRANSIT CENTER = ABOUT 25 MINUTES ON
7 LINE OR ABOUT 20 MINUTES ON 8 LINE
NORTHBOUND AT HOLIDAY DRIVE TO
SOUTHBOUND AT BATTERIES PLUS = ADDS
ABOUT 37 MINUTES ON 7 LINE OR ABOUT
17 MINUTES ON 8 LINE
FROM HOLIDAY DRIVE TO PANTOPS =
APPROXIMATELY 60 MINUTES WITH A
TRANSFER FROM THE 8 LINE TO THE 10
LINE
SIDEWALK MISSING BETWEEN MORTON
DRIVE / EARHART STREET TO REACH THE
BATTERIES PLUS BUS STOP
ROUTE
7
ROUTE
8
HOLIDAY DRIVE
HOLIDAY
DRIVE
SITE
EXISTING TRANSPORTATION
LOW BARRIER SHELTER AT HOLIDAY DRIVE
EXISTING FIRST FLOOR PLAN
MAIN ENTRANCE
ELEV
MUST BE
APPROVED BY
THE BUILDING
CODE OFFICIAL
LOW BARRIER SHELTER AT HOLIDAY DRIVE
EXISTING SECOND FLOOR PLAN
ELEV
MUST BE
APPROVED BY
THE BUILDING
CODE OFFICIAL
LOW BARRIER SHELTER AT HOLIDAY DRIVE
EXISTING BASEMENT PLAN
MUST BE
APPROVED BY
THE BUILDING
CODE OFFICIAL
Source: City of Charlottesville website. First collected Oct 18, 2026.