CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY
TAX INCREMENT FINANCING AREA
Our Mission: To provide a supplemental financial mechanism for the revitalization of Crystal City,
Potomac Yard, and Pentagon City streets, transit, and public open spaces
Crystal City, Potomac Yard, and Pentagon City together serve as one of Arlington’s largest
commercial office, retail, and hotel districts and include over 17,000 housing units. This area is
experiencing a rapid transition with intensive commercial and residential development. With
Amazon’s selection of Arlington’s Pentagon City and Crystal City neighborhoods for its second
headquarters in November 2018, the pace of commercial redevelopment has accelerated. In 2023,
Amazon opened the first phase of new construction for the company’s headquarters, 2.15 million
square feet of commercial development in Pentagon City. The second phase received approvals to
add an additional 3.35 million square feet of new commercial development, including a 350-foot tall
architecturally iconic flagship building, The Helix. Over 1,000 new multifamily residential units have
been added to the Crystal City, Potomac Yard, and Pentagon City area over the past three years and
there are nearly 6,000 additional housing units in the development pipeline. To learn more about
the Amazon agreement, visit the website at:
https://www.arlingtonva.us/Government/Topics/Amazon/Amazon-in-Arlington-Resources.
The Crystal City Sector Plan (2010) and the Pentagon City Sector Plan (2022) established a vision
for supporting the revitalization for two neighborhoods of this important district. The Plans envisioned
public infrastructure improvements in streets, transit, and public open spaces to support construction
and reconstruction of office, retail, and residential spaces in Crystal City. The near-term infrastructure
improvements include realignment of streets and intersections in Crystal City, as well as investments
in existing parks. Longer-term improvements include additional improvements in Crystal City, as well
as infrastructure projects that implement the Pentagon City Sector Plan. As Crystal City, Potomac
Yard, and Pentagon City undergo large -scale redevelopment, timely investments in public
infrastructure are important.
In October 2010, the Arlington County Board established a tax increment financing area to support
implementation of infrastructure improvements outlined in the Crystal City Sector Plan. This source
may also be used for infrastructure that will support Potomac Yard and Pentagon City. Tax increment
financing (TIF) is a mechanism used to support development and redevelopment by capturing the
projected increase in property tax revenues in the area and investing those funds in improvements
in that area. Unlike a special district, it is not an additional or new tax; rather, it redirects and
segregates the increased property tax revenues that would normally flow to the General Fund so that
it can be used for a specified purpose. The amount of the tax increment revenue was determined by
setting a baseline assessed value of all property in the area on January 1, 2011, tracking the
incremental increase in assessed values relative to the base year in each subsequent year and
segregating the incremental value in a separate fund.
The County Board policy that established the TIF requires the County Manager to revisit the
percentage of incremental revenues going to the TIF each budget cycle and at other key milestones
during the infrastructure planning process. The current TIF increment is 25 percent, which was last
adjusted during the FY 2019 budget process. This increment provides the funding stream necessary
to deliver the CIP commitments in the TIF area using a combination of TIF and other local and outside
funding sources.
481
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA
FUND SUMMARY
SIGNIFICANT BUDGET CHANGES
The FY 2027 adopted expenditure budget for the Crystal City, Potomac Yard, and Pentagon City Tax
Increment Financing Area is $4,835,240, based on current year revenues. The complete spend down
plan reflects utilization of current year revenues and fund balance as capital projects are rarely
completed in a single year and require carryover of funds to be fully executed. The complete FY 2027
execution plan compared to the revised FY 2026 plan is shown in the fund statement. The FY 2027
adopted budget reflects:
Revenues decrease based on changes to the real estate assessment tax base in CY 202 6
compared to CY 2025, partially offset by an adopted 2.0 cent increase to the CY 2026 real estate
tax rate ($742,930).
PROGRAM FINANCIAL SUMMARY
FY 2025 FY 2026 FY 2027 % Change
Actual Adopted Adopted '26 to '27
Capital Projects $20,207,319 $5,578,170 $4,835,240 -13%
Total Expenditures 20, 207,319 5,578,170 4,835,240 -13%
Total Revenues 10,772,623 $5,578,170 $4,835,240 -13%
Change in Fund Balance ($9,434,696) - -
Total Authorized FTEs 6.50 6.50 6.50
The baseline CY 2011 real estate assessment tax base for the TIF is $9.8 billion.
Revenue will be used to supplement other funding sources, examples of which include grant
funds, commercial real estate revenue, and bonds. The majority of capital transportation projects
are funded from multiple sources.
This table reflects the FY 2027 adopted spending plan of current year revenues and does not
show the use of fund balance for the total projected FY 2027 expenditures. See the Fund
Statement for the execution plan.
FY 2027 MAJOR PROJECTS
The TIF funds will be used for the Crystal City, Pentagon City, Potomac Yard Streets program and
the Crystal City Metrorail Station East Entrance, which are focused on the implementation of the
board-Proposed Crystal City Sector Plan.
The goals of these programs are to re -connect the Crystal City street grid, allow for increased
accessibility and mobility by all forms of travel, and create opportunities for new
development. Specific projects are as follows:
Crystal City, Pentagon City, Potomac Yard Streets:
o Crystal City to Ronald Reagan Washington National Airport (DCA) Multimodal Connection: This
project will create a context -sensitive multimodal connection between Crystal City and the
National Airport designed to meet the needs of a broad range of pedestrians, bicyclists, and
micro-mobility users of all ages and abilities. National Environment Policy Act (NEPA)
482
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA
FUND SUMMARY
approvals were secured, and preliminary engineering work is underway with major design
elements to be determined in FY 2027.
o 15th St S / S. Clark Bell Street Realignment: The South Clark Street Extension Project will
connect South Clark Street to South Bell Street at 15th Street South to form a standard 4 -
way intersection and complete the street grid in the northern area of Crystal City. The project
will also create space for the 15th Street South Garden Park, to be located to the north of
15th Street South. Finally, this project will implement the southbound Crystal City -Potomac
Yard Transitway segment on South Clark Street betw een 12th Street South and 15th Street
South. Construction began in FY 2026 and is anticipated to be completed in FY 2027.
o 18
th Street S. Realignment – Clark Bell to Crystal Drive: The project will construct the new
alignment of 18th Street South between Route 1 and Crystal Drive and improve multimodal
connectivity to and from the Crystal City Metrorail Station, MetroWay stop and the planned
future location of the Crystal City Virginia Railway Express (VRE) Station. The project will also
implement streetscape improvements, including new sidewalks, pedestrian ramps, lighting,
and landscaping, as well as improvements for the Crystal City Bike Network. Design is being
coordinated with the Crystal Ci ty Second Entrance and the design of Metro Market Square
Park. The project is expected to start construction in FY 2027.
o Army Navy Drive Protected Bike Lanes: The project will resolve missing links in the protected
bike lane network along Army Navy Drive west of Joyce Street by extending the two -way
cycle track to the terminus of the proposed Arlington View Connector project , west of Nash
Street. The project also includes improved sidewalks, accessible bus stop islands, new
streetlights, storm sewer improvements, curb ramps, pavement markings, and tree plantings.
Construction began in FY 2026 and is expected to be completed in FY 2027.
o 15
th Street S. Safety and Accessibility Improvements: This project will implement multimodal
improvements to 15th Street S. between S. Joyce Street and Hayes Street, with the goal of
enhancing pedestrian safety and improving bus stop access. Construction is anticipated to
begin in FY 2027 and be completed by FY 2028.
o Long Bridge Drive Pedestrian and Bike Connection: This project creates an enhanced
bike/pedestrian facility along Long Bridge Drive that will connect the future Long Bridge
Bicycle and Pedestrian crossing over the Potomac River (constructed by the Virginia Passenger
Rail Authority) to the Crystal City bike network. This facility will also connect to Virginia
Department of Transportation ( VDOT)'s adjacent Boundary Channel Drive ped/bike
improvements and to the Mount Vernon Trail. The project is being coordinated with the
Department of Parks and Recreation (DPR) due to its proximity to Long Bridge Park and the
Long Bridge Aquatic Center. Design development began in FY 2025 . Construction is
anticipated to begin in FY 2028.
Crystal City Metrorail Station East Entrance: This project will design and build a new entrance to
the east end of the Crystal City Metro station to provide better access from Crystal Drive, the
existing and future Crystal City VRE station, and the Transit way. The County executed a
comprehensive design-build agreement with Clark Construction in 2023. Construction began in
July 2024 and the project is expected to be completed in FY 2027.
Additionally, TIF funds will be used for the following Crystal City Open Spaces projects:
23rd Street S. and S. Eads Street Park: This project will provide permanent improvements to this
small urban public space. The existing infrastructure is aging and in need of upgrades for the
space to continue to be a welcome respite for casual use in the Crys tal City area. The public
engagement for this project is complete and the project is in permitting.
Metro Market Square: This project is an important public space located on 18th Street S. and
Crystal Drive at the site of the future Crystal City Metro station east entrance. The Square is
intended to be a retail-oriented, flexible urban public space. The public engagement for the Master
Plan for Metro Market Square is underway.
483
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING AREA
FUND SUMMARY
CRYSTAL CITY, POTOMAC YARD, AND PENTAGON CITY TAX INCREMENT FINANCING
AREA FUND STATEMENT
FY 2025 FY 2026 FY 2026 FY 2027
ACTUAL ADOPTED RE-ESTIMATE ADOPTED
ADJUSTED BALANCE, JULY 1
Construction Reserve $29,523,278 $14,911,699 $20,088,582 $19,266,472
Reserve 600,000 600,000 600,000 500,000
TOTAL BALANCE 30,123,278 15,511,699 20,688,582 19,766,472
REVENUES
Tax Increment Area 5,650,116 5,578,170 4,957,890 4,835,240
Miscellaneous Revenues (250,000) - - -
Grant Revenues 5,372,507 3,462,000 4,511,200 725,000
TOTAL REVENUES 10,772,623 9,040,170 9,469,090 5,560,240
TOTAL REVENUES & BALANCE 40,895,901 24,551,869 30,157,672 25,326,712
EXPENSES
Capital Projects - Current Year 20,207,319 9,040,170 9,469,090 5,560,240
Capital Projects - Carry-Over - 8,397,830 922,110 11,684,720
TOTAL EXPENSES 20,207,319 17,438,000 10,391,200 17,244,960
BALANCE, JUNE 30
Construction Reserve 20,088,583 6,513,869 19,266,472 7,581,752
Reserve 600,000 600,000 500,000 500,000
TOTAL BALANCE $20,688,583 $7,113,869 $19,766,472 $8,081,752
Notes:
1. Most capital projects span multiple years from design to construction completion, and actual
project execution may differ from forecasted. Ending balances at the end of a given fiscal year
are carried forward to the next year.
2. Balances equivalent to a minimum of ten percent of annual budgeted TIF revenues are held
in a reserve in accordance with the County Board’s financial and debt policies.
3. Miscellaneous Revenues in FY 202 5 reflect lower than expected refund from VDOT for the
Boundary Channel project than was anticipated and accrued for in FY 2024 (TIF portion of
refund).
484
CRYSTAL CITY, POTOMAC YARD & PENTAGON CITY TAX INCREMENT FINANCING AREA
TEN-YEAR HISTORY
EXPENDITURE, REVENUE AND FULL-TIME EQUIVALENT TRENDS
$ in 000s
FY 2018
Actual
FY 2019
Actual
FY 2020
Actual
FY 2021
Actual
FY 2022
Actual
FY 2023
Actual
FY 2024
Actual
FY 2025
Actual
FY 2026
Adopted
Budget
FY 2027
Adopted
Budget
EXP $1,816 $4,479 $5,770 $5,888 $5,837 $6,076 $11,246 $20,207 $5,578 $4,835
REV $5,560 $6,370 $5,857 $5,743 $5,548 $7,950 $16,395 $10,773 $5,578 $4,835
FTEs 6.50 6.50 7.00 7.00 7.00 6.50 6.50 6.50 6.50 6.50
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
$0
$5,000
$10,000
$15,000
$20,000
$25,000 FTEs EXP REV
485
CRYSTAL CITY, POTOMAC YARD & PENTAGON CITY TAX INCREMENT FINANCING AREA
TEN-YEAR HISTORY
Fiscal
Year
Description FTEs
FY 2018
Revenues increased based on the in crease in real estate assessments in
CY 2017 compared to CY 2016, offset by a reduction in the TIF increment
from 33 percent to 30 percent.
FTEs decrease by 1.0 FTE to reflect the transfer of a position in the Real
Estate Bureau to the Transportation Capital Fund.
(1.00)
FY 2019 Revenues and expenses decreased based on lower real estate assessments
in CY 2018 compared to CY 2017, and also a reduction in the TIF increment
from 30 percent to 25 percent.
FY 2020 Revenues and expenses increased based on a 3.0 percent increase in
CY 2019 real estate assessment compared to CY 2018 and the adopted tax
rate increase, the planned project expenditures from the Adopted 2019 –
2028 CIP, and the addition of a Principal Planner position that will be split
50/50 between CPHD General Fund and Crystal City TIF due to an
anticipated increase in development activity and ancillary development
activity associated with Amazon ($75,000).
0.50
FY 2021 Revenues decreased based on real estate assessments ($204,790) in
CY 2020 compared to CY 2019.
FY 2022 Revenues decreased based on real estate assessments ($ 1,443,381) in
CY 2021 compared to CY 2020.
FY 2023 The County Board approved an additional one percent merit pay
adjustment for a total increase of 5.25 percent, increased the pay -for-
performance budget by an additional 0.5 percent, and increased the pay
range movement to five percent. Additional compensat
ion changes
approved by the County Board include an optional one-time cash-out of 40
hours of compensation time for those with balances of 80 or more, a one-
time increase in shift differential pay from $0.75 to $1.00 per hour for the
B shift and from $1.00 to $1.30 per hour for the C shift, and a one -time
increase in language premium from $0.69 to $0.92 per hour.
Revenues increased based on real estate assessments ($ 296,930) in
CY 2022 compared to CY 2021.
Authorized FTEs decreased due to a technical adjustment to align positions
with actual staffing levels.
The authorized FTEs for FY 2023 were reduced by 0.5 as a technical
adjustment to realign staffing levels. The FY 2023 Adopted Budget includes
a total of 47.5 FTEs to support the transportation capital program. 41.0
FTEs are funded by Transportation Capital Fund and 6.5 FTEs are funded
by the Crystal City Tax Increment Fund.
(0.50)
486
CRYSTAL CITY, POTOMAC YARD & PENTAGON CITY TAX INCREMENT FINANCING AREA
TEN-YEAR HISTORY
Fiscal
Year
Description FTEs
FY 2024 Revenue decreased ($220,300) based on changes to the real estate
assessment tax base in CY 2023 compared to CY 2022.
FY 2025 Revenue increase d ($2,126,650) based on changes to the real estate
assessment tax base in CY 2024 compared to CY 2023.
FY 2026 Revenue decreased ($928,340) based on changes to the real estate
assessment tax base in CY 2025 compared to CY 2024.
FY 2027 Revenue decreased based on changes to the real estate assessment tax
base in CY 2026 compared to CY 2025, partially offset by an adopted 2.0
cent increase to the CY 2026 real estate tax rate ($742,930).