Adopted Capital Improvement P lan Fiscal Years 2025 - 2 034 arlingtonva.us/ciparlingtonva.us/cip COUNTY BOARD LIBBY GARVEY CHAIR TAKIS P. KARANTONIS VICE CHAIR MAUREEN COFFEY SUSAN CUNNINGHAM MATT DE FERRANTI COUNTY MANAGER’S OFFICE MARK SCHWARTZ COUNTY MANAGER ARLINGTON COUNTY VISION "Arlington will be a diverse and inclusive world-class urban community with secure, attractive residential and commercial neighborhoods where people unite to form a caring, learning, participating, sustainable community in which each person is important." - Adopted by the Arlington County Board January 2002 ^ ^ ^^^ $ Arlington County Trades Center National Airport Pentagon Arlington National Cemetery Marine Corps War MemorialArlington County Government Center LEE HWY WILSON BLVD INTERSTATE 66 EB INTERSTATE 66 WB S GLEBE RD INTERSTATE 395 SB INTERSTATE 395 NB COLUMBIA PIKE KING ST GEORGE WASHINGTON MEMORIAL PKWY RICHM OND HW Y MILITARY RD S EADS ST OLD DOMINION DR 23RD ST S N GEORGE MASON DR ARMY NAVY DR WILLIAMSBURG BLVD N Q UINCY ST LORCOM LN S WALTER REED DR CRYSTAL DR N PERSHING DR PATRICK HENRY DR 10TH ST N S GEORGE MASON DR CLARENDON BLVD W ASHINGTON BLVD 15TH ST S N HARRISON ST N SYCAM ORE ST N Q UAKER LN S FOUR MILE RUN DR RAMP YORKTOWN BLVD ARLINGTON BLVD N CARLIN SPRINGS RD N LYNN ST S HAYES ST FAIRFAX DR S ARLIN GTON RID GE RD S CARLIN SPR ING S RD JOHN M ARSHALL DR SPOUT RUN PKWY N W ESTM ORELAND ST INTERSTATE 395 HOV LANES NB CHAIN BRIDGE RD MEMORIAL AVE ROUTE 233 LEESBURG PIKE S JEFFERSON ST N VEITCH ST LITTLE FALLS RD KEY BRIDGE N GLEBE RD S FILLM ORE ST NELLY CUSTIS DR MEMORIAL BRIDGE ROO SEVELT BLVD N W OODSTOCK ST N CO URTHO USE RD 12TH ST S S M ANCHESTER ST CHESTERBROOK RD HENDERSON RD N SCOTT ST FAIRFAX DR RAMP RAMP RAMP N QUAKER LN RAMP RAMP Arlington County, Virginia A. Overview The Capital Improvement Plan (CIP) is one of the most significant planning processes for Arlington County and Arlington Public Schools. This plan typically identifies the capital needs of the community over a ten-year period. The CIP is a planning document updated biennially and subject to change as the community's needs become more defined and individual projects move along in their respective planning and budgeting processes. The effective use of a CIP process provides for considerable advance project identification, planning, evaluation, scope definition, design, public discussion, cost estimating, and financial planning. The objectives used to develop the CIP include: • Meeting our regional and regulatory obligations • Maintaining the County’s existing assets • Addressing the environment • Focusing on community resiliency across many service areas • Responding to emerging service demands and maintaining flexibility in a rapidly changing environment • Addressing financial sustainability The CIP is the primary instrument for planning the funding and timing of the needs and priorities approved by the County Board. The funding and implementation of CIP projects follow in the form of bond referenda, the annual appropriation of Pay-As-You-Go (PAYG) projects by the Board as part of the annual operating budget, and the approval / receipt of other funding sources identified in this document. B. Capital Project Definition Capital projects result in economic activities that lead to the acquisition, construction, or extension of the useful life of capital assets. Capital assets include land, facilities, parks, playgrounds and outdoor structures, streets, bridges, pedestrian and bicycle systems, water and sewer infrastructure, technology systems and equipment, traffic control devices, and other items of value from which the community derives benefit for a significant number of years. Capital expenditures and operating expenditures are primarily differentiated by two characteristics: dollar amount of the expenditure and the useful life of the asset acquired, constructed, or maintained. Capital expenditures will help acquire assets and enhance or extend their useful life. Generally, land acquisition, feasibility studies, planning, design, construction, asset rehabilitation, enterprise technology acquisition, and project Implementation, are activities associated with capital projects. Capital projects are typically funded with a variety of County sources – the primary two of which include PAYG and bond funds. However , they differ in scale and scope of projects they typically fund. Bond funds are usually reserved for large investment items such as new construction or major renovations or alterations, while PAYG funds smaller scale renovations or maintenance type projects. In general, capital projects in the CIP: • Have a total project cost in excess of $100,000. • Range from construction of new buildings to renovations, additions, or conversions, or demolition of existing facilities. Arlington County, Virginia CAPITAL IMPROVEMENT PLAN - INTRODUCTION CIP 2025-2034 1 • Have a minimum useful life of 10 years, significantly extend the useful life of an asset, or significantly alter the nature and character of an asset (i.e. not to include annual asset maintenance costs, annual warranty cost or other ongoing costs). T he CIP has also traditionally been the vehicle by which planning for technology capital investments occurs. In general, technology capital projects in the CIP: • H ave an estimated cost in excess of $25,000 and/or require six months or 1,000 hours for implementation. • Include applications systems, network design, telecommunications infrastructure, enterprise hardware and software systems, web design, document imaging, data base design and development, consultin g s ervices (business process studies, requirements analysis or other studies), and technology associated with new construction and/or renovation and relocation projects. • Have a minimum useful life of three years, significantly extend the useful life of an asset (i.e. not to include annual software and hardware maintenance, or other ongoing costs), provide a significant enhancement to functionality, or represent a change of platform or underlying structure. C . CIP Development Process C apital projects originate from a variety of sources. County Board appointed commissions, advisory groups, and task forces typically advise the Board or develop long -term plans that recommend certain types of improvements. In some cases, individual reside nts request improvements to their streets, playgrounds or other County facilities. Neighborhood associations and business groups may also suggest projects and work with County staff on projects. Some projects are initiated by staff based on adopted County master plans, such as the Transportation Master Plan or the Storm Water Master Plan. Each cycle, the County asks many residents for their preferences through pop-up events and surveys. P rojects typically come forward through the sponsoring department that is responsible for their implementation but may also come from staff that exercise operational control over an asset. Investments were prioritized based on the ability to deliver value to the County and their alignment with the priorities of key stakeholders such as the County Board, County Government and the public. A s discussed in more detail under “Financial & Debt Management Policies” below, the consolidated recommendations were considered against various debt capacity scenarios to develop the final adopted CIP. Throughout the process, the team consulted with program managers and other subject matter experts within the departments. D. F inancial & Debt Management Policies Th e Board-adopted Financial and Debt Management Policies provide the parameters for the amounts and timing of bond- financed projects to be included in the CIP, ensuring that the CIP is financially sustainable and that it supports the County’s triple-A bond ratings. E. Sour ces of Capital Funds F unding for capital improvements comes from several sources. These funds are generated through local taxes, bond financing, short term financing fees, charges, outside funding or other similar sources. The availability of these funds is sensitive to economic cycles. P ay-As-You-Go (PAYG) comes from annual appropriations and is part of the adopted operating budget. PAYG funding provides the greatest flexibility since it is not constrained by tax -exempt bond requirements and historically has funded maintenance capital projects and regional partnership programs. Projects that are typically smaller in scale as well as minor renovations are likely candidates for PAYG funding. . PAYG also: 2 • Has no debt service cost that must be paid on the expenditure; • Is available at the start of the fiscal year; • Competes with operating programs for funding; • Does not have to be approved through referendum; and • Can be carried over at the end of each fiscal year. B ond financing r efers to debt financing of projects. Arlington County most often sells general obligation bonds. Bond financing is generated through the borrowing of funds (principal) at a cost (interest) through the sale of municipal bonds. There are several types of bond financing: G eneral obligation bonds - Arlington typically issues general obligation bonds, which must first be approved by the County’s voters and are secured by the full faith and credit of the County. Arlington’s general practice is to schedule bond referenda for even-numbered calendar years and issue any approved referenda in the subsequent two to three fiscal years subject to project funding needs. • R evenue and other types of bonds – Arlington has issued low interest rate revenue bonds through the Virginia Water Revolving Loan Fund (VRLF) run by the Virginia Resources Authority for improvements to the Water Pollution Control Plant. Revenue bonds are typically secured solely by user fees or projected revenues and include no pledge from the General Fund. Revenue and other types of bonds (including those backed by the County’s subject to appropriation pledge) typically carry a higher interest rate than GO bonds and generally have debt service coverage and other financial restrictions. • L ease revenue or annual appropriation bonds – These types of bonds are secured by a “subject to appropriation” pledge by the County Board and do not require voter approval. (See “Lease -purchase finance” below) They generally require the use of a third party to execute the lease transaction, such a s th e Industrial Development Authority (IDA), Virginia Resources Authority, or Virginia Municipal League / Virginia Association of Counties. O ne of the criteria used to determine which projects will be funded with bond proceeds is the useful life of the improvement. Projects funded with bond proceeds generally have a useful life that is similar in length to the repayment schedule of the bonds. Historically, Arlington has issued 20-year general obligation serial bonds and paid the bonds using a two-year step-up schedule of principal repayment, and the average bond principal is outstanding for approximately 11 years. The Board’s financial polici es allow for longer term bonds as long as the term of the bonds does not exceed the useful life of the project, and also allows for alternative amortization structures such as level debt service to better match certain revenue streams. Int er-jurisdictional payments are another source of funding in the capital program. Arlington has agreed to provide services to other jurisdictions through contractual agreements. For example, wastewater treatment services for some areas of Alexandria, Falls Church, and Fairfax County are provided by Arlington’s Water Pollution Contro l Plant. These jurisdictions also share in the cost of capital improvements of this facility, thus reducing the cost to Arlington users. S hort-Term Finance represents another source of capital financing to acquire equipment and technology, and to perform certain capital maintenance projects that result in a more limited extension to useful life . Because of the short- term maturities of these financing vehicles , interest rates are typically lower than rates on long -term bonds. The County typically procures the goods and services using temporary funding sources, and then draws funds from the financing institution to reimburse the temporary sources. I nfrastructure Availability (formerly hook -up) fees are another source of capital funding. These fees are assessed to developers and builders to join the water and sewer systems, based on the cost of capacity (volume) of the systems being 3 “used up” by the customer. These funds are programmed during the annual budget process and can be used only for utilities projects. T he Transportation Capital Fund – Commercial & Industrial Tax is a source of funding authorized by the General Assembly in 2007 enabling the County to levy an additional real estate tax on industrial and commercial properties for transportation initiatives. In April 2008, the County Board adopted a tax of $0.125 per $100 of assessed value for transportation projects. Proceeds of the tax are held in a separate fund. Th e Transportation Capital Fund – NVTA 30% Local Funds is comprised of a 0.7% increase in the local sales tax approved in 2013 by the General Assembly as part of HB 2313. The Northern Virginia Transportation Authority (NVTA) receives the proceeds of this tax and retains 70% for funding of projects that are regional in nature. The remaining thirty percent of this tax is deposited in the Transportation Capital Fund along with the Commercial & Industrial tax. In 2018, The General Assembly repealed two additional taxes and fees that were part of the original 2013 legislation and diverted those funds to the Washington Metropolitan Area Transit Authority (WMATA) Capital Fund beginning in FY 2019. Th e Northern Virginia Transportation Authority (NVTA) – All revenues from the tax adopted by the General Assembly in 2013 as part of HB 2313 are distributed from the State to NVTA. Of these revenues, seventy percent (“Regional Funds”) are retained by NVTA to fund regional transportation projects. By law, each locality’s long-term benefit must be approximately equal to the proportion of the total fees and taxes generated in the locality divided by the total of all fees and taxes received by NVTA. The remaining thirty percent (“Local Share”) will be returned on a pro rata basis to the member localities based on the amount of revenue generated by the taxes and fees within the locality, to be used for locally selected transportation projects and deposited into the Transportation Capital Fund. The NVTA Board will approve projects for regional funding as part of its Six-Year Program (SYP). Th e Crystal City – Potomac Yard – Pentagon City Tax Increment Financing Area was established in 2010 to support the infrastructure investment needed as part of the Crystal City Sector Plan as well as the neighboring areas of Potomac Yard and Pentagon City. Tax increment financing (TIF) is a mechanism used to support development and redevelopment by capturing the projected increase in property tax revenues in the area and investing those related infrastructure improvements. Unlike a special district, it is not an additional or new tax; rather, it redirects and segregates the increased property tax revenues that would normally flow to the General Fund. The amount of tax increment revenue is determined by setting a baseline assessed value of all property in the area on January 1, 2011 and in each subsequent year, tracking the incremental increase in assessed values relative to the base year, and segregating the incremental revenues in a separate fund. Beginning in FY 2019, the County Board approved allocating 25% percent of the incremental revenues to the Crystal City – Potomac Yard – Pentagon City area. Th e Stormwater Management Fund was established by the County Board in CY 2008 by adopting a Sanitary District Tax of $0.01 per $100 of assessed real property value to fund operating and capital costs to upgrade and expand the County’s stormwater drainage and sewer infrastructure. The Sanitary District tax rate was then increased in CY 2010 to $0.013 per $100 of assessed real property value and in CY 2021 to $0.017 per $100 of assessed real property value. Proceeds of this tax are held in a separate fund. Recognizing the significance of the stormwater investment that is needed, the voters approved the November 2020 and November 2022 bond referendum for stormwater water quality and watershed capacity infrastructure improvements. These will be a substantial, long -term investments in the County’s stormwater management system, with multiple generations of taxpayers benefiting. M ore recently, in CY 2024 the County Board implemented a Stormwater Utility, which replaced the tax funding with a utility fee model based on a property’s impervious area. The Calendar Year 2024 utility rate is $258 per Equivalent Residential Unit (ERU) . With this change the Stormwater Management Fund transitioned to an enterprise fund with separate funds for operations and maintenance activities and a separate fund each for Bond funded and P AYG capital funded projects. Enterprise funds are self- supporting and set rates on a cost recovery basis in alignment with financial policies. Stormwater PAYG projects are funded primarily through stormwater utility fee revenue. 4 Developer contributions are also an important source of funding. These are contributions paid by developers to finance specific projects. Examples of these projects are parks, utility undergrounding, and street lighting. F inally, there are grants and reimbursements or other revenue from the state and federal governments. These are funds provided by the Commonwealth of Virginia or the federal government for reimbursement of costs for certain capital improvements. Whenever possible, state or federal reimbursement is sought to offset County tax support and is included in the planning process. (See the Transportation & Pedestrian Initiatives section of the CIP for some current examples.) F . Definition of Terms Used in Capital Planning A rbitrage: Arbitrage is the gain a tax-exempt issuer may be able to obtain by borrowing at a tax-exempt rate and investing at a taxable rate. The Tax Reform Act of 1986 and subsequent amendments relating to the issuance of tax -exempt debt and arbitrage regulations had a dramatic effect on all issuers of tax-exempt debt. Ar bitrage Rebate: Refers to the requirement to rebate to the Federal government investment earnings derived with the proceeds of tax-exempt debt that are in excess of the earnings that would have been earned had the proceeds of the debt been invested at the same interest rate as that paid to the holders of the tax-exempt debt. A rchitecture and Engineering (A&E): Professional services performed to facilitate planning, development, designs, cost estimates and construction of buildings, parks, streets, utilities, and other capital infrastructure. B ond Funding: Funding derived from the public sale of bonds for which interest is paid to buyers. • CIP programs and projects adopted for bond funding are approved by the County Board for inclusion in a bond referendum. • Voters approve each bond referendum. In Arlington, a bond referendum is placed on the ballot for voter approval every other November, concurrent with Congressional/Presidential elections. • Funds cannot be spent until after the referendum is approved by the voters, the Board authorizes the spending and the County has developed cash flow plans. • Spending rules are established based on referendum language and IRS regulations. B ond Issuance Costs: Costs associated with the sale of bonds. Expenditures include fees to bond rating agencies, administrative expenses, legal fees, etc. C apital Planning Process: The process of identifying, planning, evaluating and scoping projects, establishing performance standards, conducting public discussion, estimating costs and financial planning for capital projects. D ebt Service: The amount of principal and interest the County pays on its debt financing. F ull Time Equivalent (FTE): The measure of authorized personnel. It is calculated by equating 2,080 hours of work per year (2,600 for uniformed firefighters) with the full-time equivalent of one position (referred to in the budget as an FTE). O ut Years: All years after the current funding year. For example, in the FY 2025 – FY 2034 CIP, all years after FY 2025 are considered out years. O verhead: The capital project should bear the cost of staff time spent directly on the implementation of the projects funded. In certain cases, the project can also bear the cost of program planning or preliminary business processes used in advance of funding or bringing the project to completion of scope. Rules: This applies to limitations on the use of funds as a result of special revenue requirements. Interjurisdictional agreements for sewer construction reimbursement can only be applied to costs for specific projects in WPCP Capital Sustainment and certain projects within the Sewer-Large Diameter Main Rehabilitation program. Grants can only be spent under the terms and conditions provided with the grant. Bonds can only be used consistent with the language of the 5 referendum and for items consistent with bond counsel determination, etc. Rules are not intended to imply administrative procedures, but rather legal requirements. T otal Project Cost: The CIP reflects the full cost of each project. The total cost includes such items as design, construction, right-of-way, construction management, utility relocations, hardware and software purchases, equipment needed to make the improvement useful, and appropriate overhead and operating costs. 6 GUIDE TO READING THE FY 2025 – FY 2034 CAPITAL IMPROVEMENT PLAN The adopted FY 2025 – FY 2034 Capital Improvement Plan (CIP) provides comprehensive information on the near and longer-term facility and infrastructure capital improvements planned in the County over the next ten years. The book is organized by the following sections: an introductory section, overview, capital funding section, and the program areas under which the projects reside. Each one of these sections represents a key component of the overall picture of the adopted FY 2025 – 2034 CIP: ▪ The Introductory section includes various information on the CIP process, policies , and governance that help provide context and framework under which the CIP is formulated. ▪ The Overview sets the tone for the adopted CIP with the County Manager’s message and provides status of projects underway and summaries of authorized unissued bonds. ▪ The Capital Funding section includes various financial summaries of the CIP by program and funding source. It also includes analysis of the County’s debt capacity as impacted by the adopted CIP. The remaining four sections are dedicated to describing specific programs and projects included under the General Government section, IT and Equipment section, Metro and Transportation section, and the Utilities and Stormwater section. These sections detail the projects by major program areas. ▪ The first part of each of the programs provides a summary overview of the program vision and description as well as costs and funding sources. ▪ The following pages provide a description of each project including project highlights, funding schedules, critical milestones, and operating impacts, if any. In addition, where applicable, the pages have a link to associated master plans, other online project status pages, board reports, sector plans, etc. Like previous CIPs, the adopted FY 2025 – 2034 CIP is largely funded by bond debt, PAYG, and short-term financing. In addition, the Transportation Capital Fund, the Crystal City, Potomac Yard and Pentagon City tax increment financing area, the Utilities Fund and the Stormwater Management Fund are integrated in the comprehensive funding strategy for the CIP. Please note that cost estimates are subject to market pressures and may not reflect the actual costs incurred at project implementation. 7 CIP CALENDAR FEBRUARY 2024 ▪ County Manager presents Proposed FY 2025 PAYG Budget to the County Board ▪ FY 2025 – FY 2034 Capital Improvement Program (CIP) staff kick-off MARCH - APRIL 2024 ▪ Community submits early feedback on CIP Priorities online. ▪ County Board holds budget work sessions on PAYG and the operating budget with County departments and the Fiscal Affairs Advisory Commission APRIL 2024 ▪ County Board adopts FY 2025 Budget, PAYG Capital and Appropriations Resolutions for the County government and the public schools. MAY 2024 ▪ Superintendent submits FY 2025 – FY 2034 Proposed CIP to the School Board – May 16 ▪ County Manager submits FY 2025 – 2034 Proposed CIP to the County Board – May 28 ▪ Various boards and commissions review the FY 2025 – FY 2034 Proposed CIP JUNE 2024 ▪ School Board adopts the School’s FY 2025 – FY 2034 CIP – June 20 ▪ County Board work sessions on CIP – June 4, June 6, June 11, June 25 ▪ CIP Public Hearing – July 10 JULY 2024 ▪ County Board wrap-up work session – July 16 ▪ County Board adopts the FY 2025 – FY 2034 CIP – July 23 ▪ County Board approves the general obligation bond referenda resolutions and the language to be inserted on the ballot for the fall General Election 8 B udgeting, Planning, and Reserves B alanced Budget : Arlington County will adopt an annual General Fund budget in which the budgeted revenues and expenditures are equal (a balanced budget). Any one-time revenues will be used for one -time, non-recurring expenses such as capital, equipment, special studies, debt reduction, and reserve contributions. Lo ng-Term Financial Planning: The County will annually develop a six-year forecast of General Fund revenues, expenditures and will maintain a biennially updated, ten -year Capital Improvement Plan (CIP). The ten-year forecast will incorporate projected reserve levels and impact of the CIP on the County’s debt ratios. G eneral Fund Operating Reserve: An Operating Reserve will be maintained at no less than five and one -half percent of the County’s General Fund budget. The Operating Reserve shall be shown as a designation of total General Fund balance. Appropriations from the Operating Reserve require County Board approval and may only be made to meet a critical, unpredictable financial need. Any draw on the operating reserve will be replenished within the subsequent three (3) fiscal years. S elf-Insurance Reserve: The County will also maintain a self -insurance reserve equivalent to approximately one to two months’ claim payments based on a five-year rolling average. Any draw on the self -insurance reserve requires County Board approval and will be replenished within the subsequent two (2) fiscal years. S tabilization Reserve: Consistent with past practice, the County will maintain a stabilization reserve to address unexpected, temporary events, such as major weather events or a local/regional emergency requiring immediate incurrence of cost in response; revenue declines; new/unfunded state, regional or federal programs; unexpected capital expenditures; and local or regional economic stress. Amounts, in most instances, would be used for one-time (vs. on - going) needs in a fiscal year, and are not intended to be a source of funds to balance the budget during the annual budget development process. U se of contingent monies requires approval by the County Board. The minimum amount of the contingent will be 1.3 percent of the General Fund Budget and will be revisited annually as part of the budget process. Any draw on the stabilization reserve will be replenished within the subsequent two (2) fiscal years. R etirement System Funding: The County will use an actuarially accepted method of funding its pension system to maintain a fully funded position. The County’s contribution to employee retirement costs will be adjusted annually as necessary to maintain full funding. If the County reaches its actuarial -required contribution (defined as County and employee contributions that when expressed as a percent of annual covered payroll are sufficient to accumulate assets to pay benefits when due), the County may reduce its contribution provided that the amount reduced from the annual actuarial requirement will only be used for one-time, non-recurring expenses in order to provide the ability to increase contributions as may be required by future market conditions. O ther Post-Employment Benefits (OPEB) Funding: The County will use an actuarially accepted method of funding its other post-employment benefits to maintain a fully funded position. The County’s contribution to other post-employment benefit costs will be adjusted annually as necessary to maintain full funding. If the County reaches its actuarial -required contribution (defined as County and employee contributions that when expressed as a percent of annual covered payroll are sufficient to accumulate assets to pay benefits when due), the County may reduce its contribution provided that the Arlington County, Virginia FINANCIAL & DEBT MANAGEMENT POLICIES CIP 2025-2034 A - 1 amount reduced from the annual actuarial requirement will only be used for one-time, non-recurring expenses in order to provide the ability to increase contributions as may be required by future market conditions. Capital Improvement Plan 1. The County Manager will biennially submit a ten-year Capital Improvement Plan (CIP) to the County Board. The CIP will address all known facility and infrastructure needs of the County, including the needs of the Arlington County Public Schools. 2. The CIP shall include a detailed description of each capital project, identifying every source of funding, including pay-as-you-go (PAYG), bond financing, and master lease financing. The source of funding will largely be determined based on the useful life of the project. Bond-funded projects will typically have a useful life at least as long as the period over which the bonds will be repaid (generally twenty years). Master lease-financed projects will generally have useful lives of three to ten years and typically include furniture, equipment, rolling stock and technology purchases. PAYG funds provide greater flexibility and will be appropriated annually from general fund revenues. 3. Each project budget shall identify the financial impact on the operating budget, if any. 4. In general, capital projects estimated to cost $100,000 or more should be included in the CIP, including technology and equipment purchases. 5. The County will balance the use of debt financing sources against the ability to utilize PAYG funding for capital projects. While major capital facility projects will generally be funded through bonds, the County will attempt to maintain an appropriate balance of PAYG versus debt, particularly considering the County’s debt capacity and analysis of maintenance capital needs. As part of each biennial CIP process, the County will conduct a comprehensive assessment of its maintenance capital needs. 6. The CIP will include an analysis of the impact the CIP has on the County’s debt capacity, debt ratios and long-term financial plan. 7. Voter referenda to authorize general obligation bonds should only be presented to voters when the analysis of the County’s debt capacity demonstrates the ability of the County to fund the debt service for the bonds based on the County’s “Financial and Debt Service Policies.” Absent a compelling reason to do otherwise, the County should have the capacity to initiate construction projects within the two -year period before the next bond referendum. There should also be a demonstrated capability for the County to complete any project approved by referendum within the eight-year time period mandated under state law for sale of authorized bonds. The term “County” in this specific policy includes the Arlington County Government and any entity that receives bond funding from the County (such as the Arlington County Public Schools and the Washington Metropolitan Area Transit Authority). 8. In the off years of the biennial CIP process, the County will conduct a needs assessment that will reflect, as appropriate, existing master plans and assessments (e.g., the Master Transportation Plan and others) . Given the significant size and diversity of the County’s infrastructure responsibilities, this assessment process will be implemented over the next four to six years. A - 2 Debt Management The County will prudently use debt instruments, including general obligation bonds, revenue bonds, industrial development authority (IDA) revenue bonds, and master lease financing to provide re-investment in public infrastructure and to meet other public purposes, including inter-generational tax equity in capital investment. The County will adhere to the following debt affordability criteria (excluding overlapping and self-supporting debt). 1. The ratio of net tax -supported debt service to general expenditures should not exceed ten percent, within the ten-year projection. 2. The ratio of net tax-supported debt to full market value should not exceed three percent, within the ten -year projection. 3. The ratio of net tax -supported debt to income should not exceed six percent, within the ten-year projection. 4. Growth in debt service should be sustainable and consistent with the projected growth of revenues. Debt service growth over the ten-year projection should not exceed the average ten-year historical revenue growth. 5. The term and amortization structure of County debt will be based on an analysis of the useful life of the asset(s) being financed and the variability of the supporting revenue stream. The County will attempt to maximize the rapidity of principal repayment where possible. In no case will debt maturity exceed the useful life of the project. 6. The County will refund debt when it is in the best financial interest of the County to do so. When a refunding is undertaken to generate interest rate cost savings, the minimum aggregate present value savings will be three percent of the refunded bond principal amount. Variable Rate Debt 1. Variable rate debt exposure should not exceed twenty percent of total outstanding debt. 2. Debt service on variable rate bonds will be budgeted at a conservative rate. 3. Before issuing variable rate bonds, the County will determine how potential spikes in the debt service will be funded. 4. Before issuing any variable rate bonds, the County will determine the impact of the bonds on the County’s total debt capacity under various interest rate scenarios; evaluate the risk inherent in the County’s capital structure, considering both the County’s assets and its liabilities; and develop a method for budgeting for debt service. Moral Obligation Debt or Support On an infrequent basis, the County provides its “moral obligation” support for partners, including regional public safety agencies and affordable housing partners, among others. A moral obligation exists when the County Board has made a commitment to support the debt of another entity to prevent a potential default. The County’s moral obligation will only be authorized after an evaluation of the risk to the County’s balance sheet and stress testing of the financial assumptions underlying the proposed project. A - 3 Derivatives Interest rate swaps and options (Swaps or Derivatives) are appropriate management tools that can help the County meet important financial objectives. Properly used, these instruments can help the County increase its financial flexibility, provide opportunities for interest rate savings or enhanced investment yields, and help the County reduce its interest rate risk through better matching of assets and liabilities. The County must determine if the use of any Swap is appropriate and warranted given the potential benefit, risks, and objectives of the County. 1. The County may consider the use of a derivative product if it achieves one or more of the following objectives:  Provides a specific benefit not otherwise available;  Produces greater than expected interest rate savings or incremental yield over other market alternatives;  Results in an improved capital structure or better asset/liability matching. 2. The County will not use derivative products that are speculative or create extraordinary leverage or risk; lack adequate liquidity; provide insufficient price transparency; or are used as investments. 3. The County will only do business with highly rated counterparties or counterparties whose obligations are supported by highly rated parties. 4. Before utilizing a Swap, the County, its financial advisor and legal counsel shall review the proposed Swap and outline any associated considerations. Such review shall be provided to the Board and include analysis of potential savings and stress testing of the proposed transaction; fixed versus variable rate and swap exposure before and after the proposed transaction; maximum net termination exposure; and legal constraints. 5. Financial transactions using Swaps or other derivative products used in lieu of a fixed rate debt issue should generate greater projected savings than the typical structure used by the County for fixed rate debt. 6. The County will limit the total notional amount of derivatives to an amount not to exceed twenty percent of total outstanding debt. 7. All derivatives transactions will require County Board approval. Special Revenue / Enterprise Funds It is the general policy of the County to avoid designation of discretionary funds in order to maintain maximum financial flexibility. The County may, however, create dedicated funding sources when there are compelling reasons based on state law or policy objectives, as described below. The Utilities Fund was created as a self-sustaining, fee-based enterprise fund under state code to support and maintain development of the County’s water and sewer infrastructure. The Transportation Capital Fund was adop ted pursuant to state legislation for new transportation funding. The Stormwater Management Fund was adopted in lieu of a self-supporting, user fee-based enterprise fund. The CPHD Development Fund was created as a self -sustaining, fee- based enterprise fu nd. Tax Increment Funds were established to support redevelopment and preservation objectives associated with the County’s adoption of master plans, (e.g., the Crystal City Sector Plan adopted in 2010 and the Columbia Pike Neighborhoods Plan adopted in 2013). A - 4 Utilities Fund 1. The County will annually develop a six-year forecast of projected water consumption, revenue, operating expenditures, reserve requirements and capital needs for the Utilities Fund. The six -year forecast will show projected water-sewer rate increases over the planning period. 2. The County will implement water -sewer rate increases in a gradual manner, avoiding spike increases whenever possible. 3. The County will meet or exceed all requirements of any financing agreements or trust indentures. 4. The Utilities Fund will maintain a reserve equivalent to three months’ operations and maintenance expenses. The reserve may be used to address emergencies and unexpected declines in revenue. If utilized, the reserve will be replenished over a three -year period to the minimum reserve level. This reserve is in addition to any financing agreement-required debt service reserve funds. 5. The Utilities Fund will maintain debt service coverage of at least 1.25 times on all debt service obligations. 6. The Utilities Fund will be self-supporting. Transportation Capital Fund 1. New revenue shall not be used to supplant existing transportation funding commitments, and capital investments shall be compliant with state law restrictions on non-supplanting and maintenance of effort requirements. 2. Operating program enhancements (outside base program) that clearly document transportation benefits may be eligible for support from the Transportation Capital Fund. 3. No more than three to five percent of annual expenditures should be for project administration, indirect & overhead costs to support capital projects. 4. A reserve equivalent of ten to twenty percent of annual budgeted revenue will be established. 5. A five to ten-year financial plan and model will be developed that integrates project cashflow forecasts, revenue projections, and financial / debt management policies and will factor in other non-County funding sources, including federal, state, regional, and private funding. 6. The County will prudently balance the use of new transportation funding sources between pay-as-you-go funding and leveraging through new bond issuance. Use of leveraging will be dependent on project size, cash flow, and timing projections. 7. If the County chooses to issue debt supported by dedicated transportation funding sources, such debt will be structured to be self -supporting and will not count against the County’s general tax supported obligation debt ratios or capacity. Debt service coverage on such debt will range from 1.10 to 1.50 times, depending on the type of debt issued. The term on such bonds will not exceed the average useful life of the assets financed, and amortization will be structured to match the supporting revenue stream. 8. The Transportation Capital Fund will be self-supporting. A - 5 Tax Increment Funds 1. The intended use of TIF monies will be specified at the time of TIF creation; changes or additional uses will be determined as part of the annual budget process. 2. The assessed value of TIF areas will not exceed 25 percent of the County’s total assessed valuation. As of January 1, 2016, existing TIF assessed valuation totaled 20 percent of County-wide assessed valuation. 3. The percent of TIF revenue available for the intended uses within a TIF area will be established at the creation of the TIF and will be less than or equal to 40 percent. This percent will be evaluated annually as part of the budget process. 4. The County will prudently balance the use of PAYG funding and leveraging through TIF bond issuances. Use of leveraging will be dependent on project type, size, cashflow and timing projections. Leveraging will only be used for capital projects that meet useful life and other requirements for bond issuance. 5. If the County leverages TIF revenue on its own behalf, it will target a minimum debt service coverage ratio of 2.0 times and establish an appropriate level of debt service reserves and / or other contingencies. 6. The County will establish additional policies pertaining to the leverage of TIF revenue by a private development entity prior to any such issuance. 7. A reserve equivalent to ten percent of annual budgeted revenue will be established. Stormwater Fund 1. The County will annually develop a six-year projection of stormwater operating and capital expenses. The six-year forecast will show projected stormwater utility rate increases over the planning period. 2. The County will implement stormwater utility rate increases in a gradual manner, avoiding spike increases whenever possible. 3. The County will meet or exceed requirements of any financing agreement of trust indentures. 4. The Stormwater Fund will maintain a reserve equivalent to three months’ operations & maintenance expenses. The reserve may be used to address emergencies and unexpected declines in revenue. If utilized, the reserve will be replenished over a three-year period to the minimum reserve level. This reserve is in addition to any financing agreement-required debt service reserve funds. 5. The Stormwater Fund will maintain debt service coverage of at least 1.25 times on all debt service obligations. Such debt will be structured to be self-supporting and will not count against the County’s general obligation debt ratios or capacity if annual net debt service coverage remains above 1.25 times. 6. Prior to each new issuance of G.O. stormwater debt, the County will prepare a projection of net debt service coverage demonstrating that the forecasted future net debt service coverage at currently adopted rates or schedules will be no less than 1.25 times over the life of the bonds. 7. Stormwater financial policies will be reviewed on a periodic basis. 8. The Stormwater Fund will be self-supporting. A - 6 CPHD Development Fund 1. A contingent reserve will be established equivalent to thirty percent of the Fund’s total operating budget based on the fiscal year. This amount is equivalent to three to four months of annual operating expenditures. The reserve may be used to address emergencies and unexpected declines in revenue only after authorization from the County Board. 2. The C PHD Development Fund will be self-supporting. B allston Garage and Ballston Garage 8th Level Funds 1. The C ounty will annually develop a multi -year forecast of garage revenue, operating expenses, and capital maintenance costs to be updated with each County CIP cycle. 2. An e conomic stability reserve equivalent to three months of annual parking revenues will be established to address potential revenue variability, ramping up to this level over a four -year period beginning in FY 2019. Any draws upon this reserve will be replenished within the subsequent three (3) fiscal years. 3. A maintenance reserve will be established based on an assessment of expected capital renewal needs over a 10 - year period. 4. A r eserve will be established for the ensuing year of debt service on the Series 2016B Ballston Quarter CDA bonds allocable to garage improvements. 5. T he County will meet or exceed all requirements of any financing agreements or trust indentures. 6. T he County will target self-sufficiency in consideration of limits imposed on parking user fee raising ability in the garage by the 1984 documents governing original and ongoing development of the garage. A - 7 Parks 21,425,000 Community Conservation 12,000,000 Facilities Infrastructure/Land Acquisition 39,880,000 Metro & Transportation - Total County Referenda 73,305,000 Utilities 162,360,000 Stormwater 35,555,000 Schools 83,110,000 Total All Funds 354,330,000 *Amounts include all authorized unissued bonds after the June 2024 bond sale A - 8 April 17, 1951 Schools $4,875,000 6,208 2,569 3,693 70.7 T otal $4,875,000 November 6, 1951 Courts Building $ 505,000 4,086 7,475 3,389 64.7 Parking Lots 740,000 4,992 7,139 2,147 58.9 Parks and Playgrounds 882,000 6,334 5,595 739 53.1 Streets and Highways 1,318,000 7,465 4,651 2,814 61.6 Storm Drainage $1, 382,000 7,330 4,790 2,540 60.5 T otal $4,827,000 May 27, 1952 Schools $8,280,000 4,854 3,190 1,664 60.3 T otal $8,280,000 November 3, 1953 Streets and Highways $1,720,000 7,035 4,588 2,447 60.5 Water 1,327,000 7,779 3,862 3,917 66.8 Storm Drainage 1, 000,000 6,719 4,668 2,051 59.0 T otal $4,047,000 November 2, 1954 Water $1,700,000 16,207 4,922 11,285 76.7 Incinerator 980,000 11,910 8,386 3,524 58.7 Fire Stations 470,000 13,138 7,271 5,867 64.4 Storm Drainage 200,000 13,196 7,524 5,672 63.7 County Building Sites 600,000 6,776 13,251 6,475 66.2 Swimming Pools 60 0,000 9,064 11,964 2,900 56.9 T otal $4,550,000 November 8, 1955 Sanitary Sewers $1,000,000 7,203 7,014 189 50.7 Streets and Highways 1,330,000 5,930 8,067 2,137 57.6 Storm Drainage 1, 200,000 5,783 8,144 2,361 58.5 T otal $3,530,000 February 2, 1956 Schools $9,430,000 5,720 6,658 938 53.8 T otal $9,430,000 June 5, 1956 Court House $2,200,000 5,933 795 5,138 88.2 Schools 4,492,000 6,167 4,928 1,239 55.6 T otal $6,692,000 A - 9 May 13, 1958 Libraries $ 560,000 7,137 4,982 2,155 58.9 Streets and Highways 1,790,000 7,320 4,869 2,451 60.1 Sidewalks 330,000 6,907 5,145 1,762 57.3 County Building Sites 50,000 6,358 5,299 1,059 54.5 Parks and Playgrounds 293,000 6,701 5,313 1,388 55.8 Sanitary Sewer 770,000 7,762 4,318 3,444 64.3 Storm Drainage 673,000 7,399 4,649 2,750 61.4 Schools 3,500,000 7,391 4,807 2,584 60.6 Total $7,966,000 May 17, 1960 Storm Drainage $1,040,000 6,105 7,112 1,007 53.8 Regional Parks 130,000 5,593 7,642 2,049 57.7 Parks and Recreation Facilities 800,000 5,679 7,379 1,700 56.5 Libraries 250,000 6,275 6,918 643 52.4 Health Clinics 100,000 5,795 7,373 1,578 56.0 Sidewalks 450,000 5,757 7,420 1,663 56.3 Schools 1,750,000 5,650 7,258 1,608 56.2 Streets and Highways 2,660,000 5,853 7,297 1,444 55.5 Fire Stations 40 0,000 6,493 6,654 161 50.6 Total $7,580,000 November 8, 1960 Water $2,172,000 20,535 11,733 8,802 63.6 Sanitary Sewers 675,000 21,434 11,972 9,462 64.2 Total $2,847,000 November 7, 1961 County Land Acquisition $ 500,000 8,493 8,589 96 50.3 Storm Water Drainage 900,000 10,007 7,419 2,588 57.4 Streets and Highways 2,500,000 9,874 7,614 2,260 56.5 Sidewalk 475,000 9,149 8,215 934 52.7 Recreation Facilities 225,000 9,029 8,189 840 52.4 Library 495,000 9,209 8,002 1,207 53.5 Firefighting Facilities 475,000 11,519 5,919 5,600 66.1 Schools 950,000 9,246 7,902 1,344 53.9 Total $6,520,000 November 5, 1963 Storm Water Drainage $1,000,000 12,523 7,494 5,029 62.6 Sewer 5,560,000 12,692 6,957 5,735 64.6 County Land Acquisition 1,000,000 10,409 8,914 1,495 53.9 Library 440,000 9,800 9,425 375 51.0 Schools 1,950,000 10,453 8,648 1,805 54.7 Total $9,950,000 A - 10 November 2, 1965 Storm Water Drainage $ 1,250,000 14,223 8,067 6,156 63.8 Streets and Highways 4,350,000 13,340 8,209 5,131 61.9 County Land Acquisition 1,000,000 12,814 9,321 3,493 57.9 Sidewalk 550,000 12,953 8,352 4,601 60.8 Schools 4,795,000 11,449 9,582 1,867 54.4 Schools, New Junior H.S. 4,250,000 8,413 13,153 4,740 61.0 Total $16,195,000 November 8, 1966 No. Virginia H igher Education $3,000,000 21,100 10,401 10,699 67.0 Total $3,000,000 November 7, 1967 Streets and Sidewalk $7,100,000 15,047 8,031 7,016 65.2 Storm Water Drainage 1,100,000 14,813 7,173 7,640 67.4 Sewer 1,000,000 15,108 6,936 8,172 68.5 Total $9,200,000 June 11, 1968 Schools and Recreation $16,800,000 7,895 9,476 1,581 54.6 Total $16,800,000 November 5, 1968 Transit Facilities $54,000,000 42,721 11,659 31,062 78.6 Schools (W-L Library) 225,000 34,331 19,715 14,616 63.5 Schools (Elementary) 6,900,000 35,993 17,696 18,297 67.0 Schools (New Junior H.S.) 4,150,000 34,485 19,163 15,322 64.3 Recreation Facilities 2,500,000 32,832 19,979 12,853 62.2 Total $67,775,000 November 4, 1969 Paving $ 500,000 19,392 9,380 10,012 67.4 Police Headqtrs.-Jail 2,500,000 20,618 9,562 11,056 68.3 Public Library 550,000 17,866 11,071 6,795 61.7 Swimming Pool 900,000 14,862 13,975 887 51.5 Storm Drainage 1,000,000 21,192 7,947 13,245 72.7 Water System 5,500,000 20,526 8,344 12,182 71.1 Neighborhood Conservation 800,000 16,793 11,611 5,182 59.1 Park Authority 2,160,000 1,654 11,247 9,593 87.2 Total $13,910,000 A - 11 November 2, 1971 Sanitary Sewers $ 6,700,000 11,961 4,176 7,785 74.1 Waste Water Treatment 6,000,000 12,670 3,490 9,180 78.4 Recreation Facilities 3,000,000 9,873 5,999 3,874 62.2 Storm Water Drainage 2,500,000 12,215 4,114 8,101 74.8 Streets and Highways 1,000,000 16,675 10,211 6,464 62.0 Human Resources Center 850,000 15,347 11,520 3,827 57.1 Neighborhood Conservation 800,000 15,365 11,554 3,811 57.1 Technical Education Center 4,600,000 16,182 11,000 5,182 59.5 Schools 2,600,000 15,097 11,929 3,168 55.9 Library 470,000 14,742 11,98 2,758 55.2 Total $28,520,000 November 7, 1972 Ad. Waste Water Treatment $15,000,000 38,705 11,829 26,876 76.6 Schools 6,2 75,000 31,390 18,917 12,473 62.4 Total $21,275,000 *Referendum amended language of 1971 and 1972 referenda to expand how the $21.0 million could be used at the wastewater treatment plant. November 6, 1973 Local and Regional Parks $ 5,000,000 11,186 5,736 5,450 66.1 Sanitary Sewerage 4,500,000 13,613 5,744 7,869 70.3 Streets and Highways 3,000,000 10,903 7,276 3,627 60.0 Public Schools 2,350,000 14,647 15,843 1,196 52.0 Storm Water Drainage 1,500,000 20,034 10,286 9,748 66.1 Human Resources Center 1,000,000 17,462 12,660 4,802 58.0 County Property Yard 700,000 13,860 16,081 2,221 53.7 Nursing Home Sites 500,000 20,281 10,607 9,674 65.7 Fire Stations 300,000 20,867 9,925 10,942 67.8 Total $18,850,000 November 4, 19 75 Wastewater Treatment* $21,000,000 11,020 8,600 2,420 56.2 Transit Facilities 25,000,000 7,543 11,880 4,337 61.2 County Maintenance and Service Facilities 1,500,000 5,003 13,968 8,965 73.6 Sidewalks, Curbs and Gutters, Streets and Highways 3,000,000 7,923 20,553 12,630 72.2 Joint Community Theatre and Schools Auditorium 1,300,000 5,169 23,612 18,443 82.0 Buildings and Building Sites 1,000,000 5,097 22,881 17,784 81.8 Park and Recreation Acquisition and Development 6,000,000 9,036 20,140 11,104 69.0 Community Conservation 2,500,000 8,075 20,128 12,053 71.4 Total $61,300,000 A - 12 November 8, 1977 Water Storage $ 6,200,000 21,464 11,959 9,505 64.2 Storm Drainage 1,000,000 20,433 13,300 7,133 60.6 Streets and Highways 3,000,000 19,942 13,973 5,969 58.8 Neighborhood Conservation 2,500,000 19,193 14,777 4,416 56.5 Local and R egional Parks 2,500,000 18,849 14,868 3,981 55.9 Total $15,200,000 *Referendum amended language of 1977 water bond to change from storage to distribution improvements as permitted use. November 6, 1979 Sanitary Sewerage $ 1,985,000 16,761 9,222 7,539 64.5 Streets and Highways 4,665,000 15,617 10,530 5,087 59.7 Local Parks 4,000,000 9,465 16,577 7,112 63.6 Regional Parks 1,705,000 9,780 16,200 6,420 62.4 Total $12,355,000 November 4, 1980 Water Distribution* $6,000,000 41,328 8,756 32,572 82.5 Total $6,000,000 November 3, 1981 Streets and Highways $ 3,000,000 23,751 12,583 11,168 65.4 Storm Drainage 1,800,000 22,652 13,420 9,232 62.8 Jail Expansion 2,100,000 25,485 11,251 14,234 69.4 Local and Regional Parks 3,000,000 22,886 13,465 9,421 63.0 Community Conservation 1,000,000 21,743 13,520 8,223 61.7 Total $10,900,000 November 8, 1983 Metrorail $13,000,000 21,221 6,615 14,606 76.2 Streets and Highways 3,100,000 20,756 6,922 13,834 75.0 Community Conservation 1,950,000 19,624 7,840 11,784 71.5 Water Distribution 3,100,000 20,048 7,159 12,889 73.7 Total $21,150,000 Average 74.1% November 6, 1984 Local and Regional Parks $ 4,035,000 38,785 21,771 17,014 64.1 Streets and Highways 6,140,000 39,644 20,630 19,014 65.8 Community Conservation 6,800,000 37,935 21,906 16,029 63.4 Metrorail 13 ,000,000 40,111 20,924 19,187 65.7 Total $29,975,000 Average 64.8% A - 13 November 4, 1986 Local and Regional Parks $ 4,895,000 25,899 8,539 17,360 75.2 Streets and Highways 4,315,000 27,382 6,452 20,930 80.9 Community Conservation 10,835,000 25,626 8,741 16,885 74.6 Central Library Expansion 4,025,000 26,974 7,909 19,065 77.3 Total $24,070,000 Average 77.0% November 8, 1988 Local and Regional Parks $ 3,900,000 50,367 14,344 36,023 77.8 Streets and Highways 2,400,000 49,077 12,688 36,389 79.5 Community Conservation 2,900,000 49,295 14,928 34,367 76.8 Public Schools 12,800,000 49,905 12,251 37,654 80.3 Jail 35,000,000 40,731 22,662 18,069 64.3 Wastewater Treatment 12,000,000 52,216 8,970 43,246 85.3 Total $69,000,000 Average 77.3% November 6, 1990 Courts/Police Facility $53,850,000 25,061 17,381 7,680 59.0 Public Schools 23,000,000 31,367 11,833 19,534 72.6 Streets, Highways, and Community Conservation 10,930,000 28,357 11,980 16,377 70.3 Local and Regional Parks and Recreation 4,220,000 27,857 12,544 15,313 69.0 Fire Station #3 2,500,000 28,642 11,319 17,323 71.7 Total $94,500,000 Average 68.5% November 3, 1992 Metrorail $ 17,800,000 58,898 16,057 42,841 78.6 Public Schools 24,425,000 56,903 17,647 39,256 76.3 Higher Education 3,125,000 51,355 23,199 28,156 68.9 Local and Regional Parks and Recreation 11,870,000 51,504 23,176 28,328 69.0 Streets, Highways and Community Conservation 13,415,000 55,185 19,551 35,634 73.8 Wastewater Treatment P lant 36,000,000 61,741 13,243 48,498 82.3 Total $106,635,000 Average 74.8% November 8, 1994 Metrorail $ 7,000,000 45,783 16,166 29,617 73.9 Public School 36,100,000 46,444 15,349 31,095 75.2 Fire Station #3 2,760,000 44,184 16,857 27,327 72.4 Local and Regional Parks and Recreation 13,865,000 43,210 18,278 24,932 70.3 Streets, Highways and Community Conservation 17,690,000 47,062 14,288 32,774 76.7 A - 14 Water Distribution and Wast ewater Treatment 12,200,000 50,049 10,885 39,164 82.1 Total $89,615,000 Average 75.1% November 5, 1996 Metrorail $ 9,560,000 52,289 15,733 36,556 76.9 Public School 29,120,000 53,783 14,510 39,273 78.6 Local and Regional Parks and Recreation 12,920,000 45,336 23,539 21,797 65.8 Streets, Highways and C ommunity Conservation 21,305,000 53,260 14,372 38,888 78.7 Total $72,905,000 Average 75.0% November 3, 1998 Public Schools $50,705,000 35,552 9,721 25,831 78.5 Westover and Shirlington 8,000,000 34,298 10,760 23,538 76.1 Branch Libraries Local and Regional Parks 17,055,000 34,438 10,651 23,787 76.4 And Recreation Street, Highways, and C ommunity Conservation 24,055,000 35,448 9,500 25,948 78.9 Total $99,815,000 Average 77.5% November 7, 2000 Public Schools $ 42,612,500 61,252 14,564 46,688 80.8 Local and Regional Parks 25,875,000 58,973 16,104 42,869 78.6 And Recreation Street, Highways and 34,291,000 63,797 12,583 51,214 83.5 Community Conservation Government Fac.& Higher Ed. 7,210,000 53,571 22,023 31,548 70.9 Utilities 12,070,000 65,109 11,202 53,907 85.3 Total $122,058,500 Average 79.8% November 5, 2002 Public Schools $ 78,996,000 43,877 12,258 31,619 78.2 Community Projects: Community Conservation, Parks, Public Safety, Pedestrian Systems, Streets, Highways, Transit, Metro, Storm Drainage 67,428,500 44,592 11,320 33,272 79.8 Utilities 12,342,000 46,078 9,796 36,282 82.5 Total $158,766,500 Average 80.2% A - 15 November 2, 2004 Public Schools $ 78,128,000 71,594 17,615 53,979 80.3 Local Parks and Recreation 78,395,000 67,588 21,450 46,138 75.9 Transportation & Community Infrastructure 35,944,000 71,697 17,171 54,526 80.7 Metro 18, 536,000 73,248 16,151 57,097 81.9 Total $208,003,000 Average 79.7% November 7, 2006 Public Schools $ 33,712,000 54,130 16,609 37,521 76.5 Local Parks and Recreation 35,550,000 52,257 18,238 34,019 74.1 Community infrastructure 27,300,000 49,905 20,233 29,672 71.2 Metro and Transportation 31,500,000 58,058 11,709 46,349 82.0 Utilities 79, 000,000 59,797 10,878 48,919 84.6 Total $207,062,000 Average 77.7% November 4, 2008 Public Schools $ 99,425,000 76,325 25,360 50,965 75.1 Community infrastructure 10,800,000 68,967 31,321 37,646 68.8 Metro 10,000,000 79,178 22,713 56 ,465 77.7 Utilities 50, 000,000 80,873 20,052 60,821 80.1 Total $170,225,000 Average 77.3% November 2, 2010 Public Schools $ 102,888,000 46,869 14,350 32,519 7 6.6 Local Parks and Recreation 5,975,000 41,745 19,427 22,318 68.2 Community Infrastructure 18,065,000 37,943 22,807 15,136 6 2.5 Metro 34, 100,000 44,896 16,334 28,562 7 3.3 Total $161,028,000 Average 70.2% November 6, 2012 Public Schools $ 42,620,000 90,232 21,383 69,849 80.9 Local Parks and Recreation 50,553,000 70,920 40,039 30,881 6 3.9 Community Infrastructure 28,306,000 80,155 29,607 50,548 73.0 Metro and Transportation 31, 946,000 89,000 22,101 66,899 80.1 Total $153,425,000 Average 74.5% November 4, 2014 Public Schools $ 105,780,000 49,439 16,899 32,540 74.5 Local Parks and Recreation 13,070,000 46,703 19,501 27,202 70.5 Community Infrastructure 39,900,000 44,858 21,073 23,785 68.0 Metro and Transportation 60, 240,000 46,807 19,344 27,463 70.8 Total $218,990,000 Average 71.0% A - 16 November 8, 2016 Public Schools $138,830,000 92,158 23,773 68,385 79.5 Local Parks and Recreation 19,310,000 87,331 28,344 58,987 75.5 Community Infrastructure 98,850,000 85,837 29,339 56,498 74.5 Metro and Transportation 58,78 5,000 90,703 25,244 65,459 79.5 T otal $315,775,000 Average 76.9% N ovember 6, 2018 Public Schools $103,000,000 85,576 18,912 66,664 81.9 Local Parks and Recreation 29,330,000 80,175 24,221 55,954 76.8 Community Infrastructure 37,015,000 76,772 27,089 49,683 73.9 Metro and Transportation 74,57 0,000 83,995 19,754 64,241 81.0 T otal $243,915,000 Average 78.4% N ovember 3, 2020 Public Schools $52,650,000 98,756 25,757 72,999 79.3 Local Parks and Recreation 3,630,000 101,602 23,267 78,355 81.4 Community Infrastructure 7,485,000 91,759 31,903 59,856 74.2 Metro and Transportation 29,940,000 98,730 25,740 72,990 79.3 Stormwater 50,84 0,000 97,847 25,948 71,899 79.0 T otal $144,545,000 Average 78.6% N ovember 2, 2021 Public Schools $23,010,000 73,028 20,014 53,014 78.5 Local Parks and Recreation 6,800,000 74,525 18,350 56,175 80.2 Community Infrastructure 17,035,000 65,805 26,790 39,015 71.1 Metro and Transportation 38,70 0,000 73,680 19,298 54,382 79.2 T otal $85,545,000 Average 77.3% N ovember 8, 2022 Public Schools $165,010,000 69,113 20,616 48,497 77.0 Local Parks and Recreation 22,460,000 70,970 19,318 51,652 78.6 Community Infrastructure 53,300,000 64,211 25,260 38,951 71.8 Metro and Transportation 52,630,000 71,092 19,122 51,970 78.8 Stormwater 39,760,000 71,807 17,697 54,110 80.2 Utilities 177,3 60,000 76,348 13,333 63,105 85.1 T otal $510,520,000 Average 78.6% A - 17 FY25-34 CIP - Board Guidance Adopted July 23, 2024 The FY25-34 Capital Improvement Plan (CIP) reflects our values as a community while considering climate change, office space utilization, and demographics as we plan for capital investments in a fiscally responsible way. At FY 25 budget adoption, the Board identified $3 million available from the PayGo allocation. Our CIP direction outlines the thought and intention behind some of the items added to the Manager’s already strong proposed CIP to further address crucial needs. Climate Change, Resilience and Energy Efficiency The proposed CIP includes capital investments that accelerate progress on our community energy plan and stormwater management plan goals. The Board directs staff to further expand reporting on CEP goals and metrics in future CIPs. 1. Space Utilization in County-occupied properties. The Manager’s proposed CIP invests in robust space planning to reduce our GHG emissions, energy use, and costs through phased studies and i nvestments, including the courts building, the Bozman Government Center, detention facility, w arehouse uses, and future library, park, and fire station investments. The Board amends the CIP to: a. Add a dedicated DES resource planning FTE in FY25 to accelerate this work – doubling our on-staff capacity for facility condition assessments, space utilization studies, and implementation (both construction and change management). b. A dd $250,000 in PayGo funds to support building analysis and conceptual space planning and oppor tunities at Madison Community Center and nearby park and nature center facilities by F Y26. Analysis should consider near-term improvements to better serve current uses and meet environmental goals and opportunities for the future to expand or combine uses with Gulf Branch N ature Center and Old Glebe Park. c. Emphasize continued long-range space planning, especially (i) the ongoing Trade Center/AOMF space utilization and future phasing, including partial APS/ART bus fleet i ntegration, (ii) APS needs and joint use, including child care, (iii) community uses for recreation, pa rks and arts, and (iv) Central Library/Quincy Park/Quincy Site. 2. L ubber Run Resilience Hub. This hub will serve as a demonstration site, complementing public- facing sustainability education and outreach programs, including Empower Arlington to be launched i n FY25 to support residents and businesses in adopting renewable energy hubs. The Manager’s pr oposed CIP includes completion of a large solar array and battery backup. The Board directs staff to: (i) change funding source for back-up natural gas generator ($1.2 million) from Climate Action F und to PayGo, (ii) research and present to the County Board the feasibility of both non-fossil-fuel powered alternatives and a renewable natural gas option for back-up power generation prior to final decision and purchase, and (iii) propose a draft policy for evaluating HV AC and power system purchases that may include fossil fuel powered systems. In FY25 a process for similarly vetting all current and future fossil fuel powered solutions, especially for larger and critical systems. A - 18 3. Continued Phased Replacement of Bus Fleet. Reducing fossil fuel use in our bus fleet and operations remains a priority, along with enhancing overall service efficiency and attracting more riders to our bus system. Bus purchases are spread out over FY27, FY29, FY31, and FY34, so we will revisit these assumptions in upcoming CIPs. Battery electric bus (BEB) technology, operating experience, and purchase prices are expected to evolve rapidly over the timeframe of this CIP, as will Green Natural Gas and fuel techniques, and possibly other forms of fuel and vehicles. Assumptions will be refined following the FY25-26 BEB pilot on ART routes. We anticipate many of these costs to be covered by grant funding. The Board directs staff to breakout the proposed $134M cost for bus fleet replacement and expansion in this CIP to better inform future CIP discussions and planning. a. Phased replacement of current fleet (55 buses) – estimated incremental purchase cost for 1:1 replacement with BEB buses instead of RNG buses: $33.4M for the buses and $26.1M for land and infrastructure totaling $59.6M b. Fleet expansion (11 buses) Estimated incremental purchase cost of BEB buses for proposed 11 buses to expand the ART fleet in FY29 and FY31 BEB buses: $6.4M for the buses and $14.4M for land and infrastructure totaling $20.8M c. Contingency for 1.3:1.0 replacement ratio (20 buses) – Note if this ratio were not to come down to 1:1 as expected, we would need to reconsider tradeoffs on both capital investment and land use. $28.8M for replacement buses and $25.0M for land and infrastructure totaling $53.8M Transportation Safety and Community Accessibility The Board supports continued investment to improve access to safe travel for all modes and abilities. The proposed CIP includes significant investment in Vision Zero, bus stop updates to meet new ADA access requirements, and related safety upgrades. In addition, the Board directs attention in this CIP: 1. Carlin Springs Road Safety Improvements remain a top priority for the Board. Staff confirm the proposed CIP includes sufficient funding for intersection and signal upgrades, school zone speed cameras, easement acquisition for additional sidewalk improvements, and studying additional future improvements. The Board directs additional $500,000 in additional funding from PayGo to this work on South Carlin Springs Road. 2. Increasing Transit ridership while reducing single-occupancy vehicle miles traveled remains a priority. In the FY25 operating budget guidance the Board directed staff to explore opportunities to accelerate Transit Strategic Master Plan elements such as supporting the implementation of a micro- transit pilot and the consolidation of APS and ART routes, as well as studying innovative approaches furthering the goal of reducing single-occupancy vehicle miles traveled. The Board directs staff to consider the capital costs associated with these opportunities in future CIPs and to tap PayGo funds if needed to maintain momentum on transit stop upgrades given new ADA requirements. 3. Adult changing stations. The Board directs an additional $250,000 in FY25 PayGo funds to evaluate four community facilities for installation and plan for at least one installation in FY26. A - 19 Economic Resiliency The Board appreciates the County Manager and staff’s rigor and care in preparing the proposed FY25- FY34 Capital Improvement Plan. Our community remains deeply committed to, and our economic health depends on, infrastructure, schools, community amenities, and financial discipline. The proposed CIP includes almost $880 million ($879.885 million) of reinvestment and upgrades over the 10-year plan into the water and sanitary sewer systems and the Water Pollution Control Plant to ensure continued resiliency and redundancy. We join with many of our community members and advisory commissions in highlighting the need for continued caution with assumptions of revenue growth. 1. Reserves and Debt Service Metrics. Arlington shall continue to earn the coveted AAA+ bond rati ng, w hich helps ensure lowest-cost access to the capital markets. During our Operating Budget discussions, we increased our reserves target to 1.3%. With economic and climate uncertainty l ooming, we encourage the County Manager to continue considering what additional changes to reserves and debt service guardrails may be warranted in future Operating and CIP planning. 2. Revenue Contingency. While we have weathered recent economic disruptions better than most, the B oard acknowledges the revenue risks of slower growth in multifamily residential due to higher interest rates, reduced office rate valuations, and potential shifts in Federal policy and spending. The Board directs staff to consider contingency plans for lower than assumed revenue growth (currently 2.5% in FY26 and FY27, 3% annually thereafter). 3. Managing Cost Risks. a. APS has recently completed a Facilities Condition Assessment of school facilities, including several joint-use facilities. They are commencing five deep dive analyses that may quickly lead to high priority capital projects, including Thomas Jefferson Middle School and C ommunity Center. The FY27-36 CIP will be informed by these needs. b. W MATA. The negotiation on WMATA's long-term operational and capital support can result in a request for additional financial support from Arlington. The Board directs staff to continue analysis of our WMATA projects and other major transportation projects to identify oppor tunities for additional cost savings. Phasing of large WMATA projects should be reviewed in light of these analyses, market costs and updated revenue growth assumptions before the next CIP. A - 20 County Board Agenda Item Meeting of July 22, 2024 County Manager: #### # County Attorney: ***** Staff: Karin Talley, Department of Management and Finance ARLINGTON COUNTY, VIRGINIA DATE: July 21, 2024 SUBJECT: Fiscal Year (FY) 2025 - FY 2034 Capital Improvement Plan Adoption C. M. RECOMMENDATION: 1. Adopt the Fiscal Year 2025 – FY 2034 Capital Improvement Plan. 2. Adopt the attached FY 2025 County Bond Funds Appropriations Resolution (Attachment A). 3. Adopt the revised language to the Stabilization Reserve section of the Financial & Debt Management Policies. 4. Authorize the addition of one (1.0) full-time permanent FTE (full-time equivalent employee) in the General Fund to support facilities planning efforts. The FTE will reside in the General Fund and will charge their time to facilities planning studies as appropriate. 5. Authorize the addition of one (1.0) full-time permanent FTE (full-time equivalent employee) to support installation and maintenance of solar installations on County facilities. The FTE will reside in the General Fund and will charge their time to solar capital projects as appropriate. ISSUES: This is a request for County Board consideration/adoption of the proposed FY 2025 – FY 2034 Capital Improvement Plan and the appropriation of County bond funds. SUMMARY: The adopted CIP provides a 10-year plan for investment in County and School infrastructure and assets, totaling $5.2 billion. The funding sources for the CIP include federal and state grants, bonds, pay-as-you-go (PAYG) funding, and dedicated and legally restricted funding sources such as water-sewer revenues and transportation taxes. BACKGROUND: The adopted CIP covers FY 2025 – FY 2034 and includes investments in County government and Schools capital assets. The biennial 10-year CIP balances funding availability with competing needs for investment. Given current economic and construction market volatility, the CIP was prepared using conservative budget estimates with a primary goal A - 21 of financial sustainability. Investments over the 10-year planning period focus on community and County Board priorities, and County planning processes. DISCUSSION: The table below summarizes the allocation of funds for the FY 2025 – FY 2034 Capital Improvement Plan by program area. The County and School CIPs total $5.2 billion. Program summaries can be found on the following pages. Capital Program Area FY 2025 – FY 2034 Proposed FY 2025 – FY 2034 Adopted $ Change Arlington Neighborhoods $97,898 $97,898 - Economic Development 2,174 2,174 - Information Technology / Equipment 212,616 212,616 Parks & Recreation 308,750 308,750 - Metro 398,470 398,470 - Government Facilities & Energy Management 398,244 398,994 750 Regional Partnerships & Contingencies 14,459 11,959 -2,500 Transportation 1,854,508 1,855,008 500 Subtotal County CIP $3,287,119 $3,285,869 -1,250 Water & Sewer Infrastructure 879,885 879,885 - Stormwater Management 334,255 334,255 - Total County CIP $4,501,259 $4,500,009 -1,250 School Capital Program* 691,060 691,060 - Total County & School CIP $5,192,319 $5,191,069 -1,250 * Schools initial CIP included three options which ranged from $681.3 million to $696.5 million. Changes made by the County Board between the proposed CIP and the adopted CIP include several reallocations from the unallocated contingent of $3 million established by the Board at the adoption of the FY 2025 operating budget. The reallocations include: 1) A replacement of Climate Action Fund (CAF) monies for the Lubber Run resiliency project ($1.25 million) to fund the planned installation of a natural gas back-up generator. The Proposed CIP assumed CAF funds would be allocated from the General Fund CAF contingent to fund a portion of the Lubber Run resiliency project with the installation of a gas generator as part of the total project cost. With the allocation of non-CAF funding to this project, the CAF funding will remain in the General Fund (rather than the CIP) to support other CAF qualifying projects and reduce the CIP by $1.25 million. 2) Addition of $500,000 to the Transportation Program to implement roadwork and easements along S. Carlin Springs Road to facilitate safety improvements, with the possibility of an additional $500,000, or in total, up to $1 million. 3) Addition of $250,000 toward the study of facility improvements to the Madison Community Center. 4) Addition of $250,000 to study the potential for construction of adult changing facilities in targeted public facilities. A - 22 5) Addition of $250,000 to allow for additional resources (1.0 FTE) for the Department of Environmental Services to manage and implement a variety of studies and work funded in the CIP. Arlington Neighborhoods and Economic Development investments total $100.1 million. The Arlington Neighborhoods Program includes a total $97.9 million across the 10-year period for investments in neighborhood beautification, street improvements, residential traffic management park enhancements, street lighting and landscaping projects. Economic Development includes investments of $2.2 million to perform tasks related to maintaining the County’s public art program, public facilities maintenance, and County and School’s joint use facilities maintenance. Information Technology and Public Safety investments cover a wide variety of technology hardware, software, data management, and capital maintenance across all County departments totaling $212.6 million in the adopted CIP. Funding for the County’s information technology investments consist primarily of PAYG and Short-term financing. This funding allows for new features such as Constituent Digital Services, Constituent Single Sign-On, and continued upgrades and enhancements to applications including the Revenue Collection System and Human Resource and Finance System. Funds are primarily used for the replacement and/or refreshment of County assets including network equipment, servers, workforce devices such as PCs and laptops, conference and courtroom equipment, Connect Arlington and funds for Data Center Consolidation. The adopted CIP also reinvests in public safety technology and equipment -- including equipment replacement in the County Courthouse and Detention Center as well as investments in public safety radios, Emergency Call Center (ECC) equipment, mobile data computers, and Fire/Police/Sheriff records management systems. Local Parks and Recreation program investments include $308.8 million in funding for park trail and bridge modernization, parks capital maintenance, synthetic turf replacements and parks master plans. Projects included in the adopted CIP are in alignment with the adopted Public Spaces Master Plan. The CIP continues the park trail and bridge modernization program, including construction for replacement of pedestrian bridges at Alcova Heights Park, Bluemont Park and Rock Springs Park, trail milling and paving, and a trail pavement condition assessment study. Park capital maintenance projects include refreshment of the Public Spaces Master Plan, design for replacement of the Arlington Hall West Playground, construction of the Doctor’s Run Playground replacement and pooled park project improvements at several existing parks. Funding is also included for the FY 2025 and FY 2026 replacement of the existing synthetic turf at Greenbrier Park/Yorktown stadium field, Long Bridge Park Field #3, Thomas Jefferson Middle School Lower Field, and the grass to synthetic turf field conversions at Kenmore Middle School. The CIP also includes master plan program funds for Arlington Boathouse, Rosslyn Gateway Park, Drew Park, Jennie Dean Park Phase 2, Penrose Square Phase 2, Quincy Park, Shirlington Park, Short Bridge Park, Three Urban Parks, New Park at 26th Street N. and Old Dominion Dr., Virginia Highlands Park and Nearby Public Spaces, Crystal City Parks and Public Space, Fairfax Drive Public Spaces, the Emerging Uses Program (pickleball), and the Natural Resiliency Program. A - 23 Metro includes $398.5 million for our required Metro contribution which is in line with the expenditures projected in the previous CIP. Public and Government Facilities & Energy Management includes investments of $399 million. Highlights include capital maintenance of our 89 owned buildings to maintain them in a state of good repair (roof replacements; heating, ventilation, air conditioning (HVAC) upgrades), increasing our electrical energy commitments within County buildings to include solar ready, electric vehicle (EV) charging, equipment replacements and energy resilience. The CIP also includes renovations to the 29-year-old Courts/Police building to include upgrades to courtrooms, addressing space inefficiencies, as well as technology backbone infrastructure improvements. It provides for a comprehensive study of the nearly three-decade old Detention Center and placeholder implementation of recommendations from that study. This CIP continues critical Fire Department investments, including funding for a new fire station on the west end of Columbia Pike. Other facility highlights include Crystal City and Columbia Pike Libraries, Courthouse Complex Renovations and Infrastructure, the consolidation of the Situational Awareness Intelligence Unit, EOC and Department of Public Safety Communications and Emergency Management as well as planning studies for the Lee and Madison Community Centers, and facility condition assessments to provide projected replacement timelines and estimated replacement costs. Transportation funding totals $1,855 million including a number of significant investments for bridge renovation, the Columbia Pike Multi-Modal program, Crystal City, Pentagon City and Potomac Yards Streets program, Metro station entrances, ART facilities, Columbia Pike transit facilities, and numerous other safety and accessibility projects throughout the County. The CIP continues the County’s commitment to developing and managing a multimodal transportation system that expands travel choices, provides equal access to all users, and supports community sustainability goals. This CIP also reflects ongoing support for the implementation of the Vision Zero Action Plan with the goal of eliminating all critical injury crashes in the public right-of-way by 2030. It further ensures maintenance of the County’s transportation infrastructure in a state of good repair. To this end, it includes $143.9 million for paving to maintain the targeted paving condition index (PCI) of 75 – 80, as well as $11.9 million to fund proactive maintenance of sidewalks, curbs, and gutters. The goals of the Transportation Master Plan are considered in the projects that are funded in this adopted CIP. Water and Sewer Infrastructure includes $879.9 million with an emphasis on maintenance capital, wastewater treatment improvements, and drinking water redundancy and resiliency projects. The CIP includes $388.0 million for water-sewer maintenance capital, $169.0 million for water distribution, $3.4 million in sanitary sewer improvements, and $319.5 million to Water Pollution Control Plant improvements. This program maintains a state of good repair for close to 1,000 miles of water and sanitary sewer lines across the county. The Water Distribution Master Plan, Sanitary Master Plan, and Water Pollution Control Plant Solids Master Plan guide and prioritize the projects included in the adopted CIP. Stormwater Management includes $334.4 million for capacity improvements, stream and water quality projects and maintenance capital. The CIP includes $242.2 million for capacity improvements, $41.2 million for water quality projects, and $50.9 million for a variety of A - 24 maintenance capital projects. The program reflects the effort required to enhance and update the County’s stormwater infrastructure to manage urgent needs and long-term resilience, driven primarily by watershed scale projects to minimize the risk of flooding. Over $191 million is being invested in four critical watersheds throughout the county which include Spout Run, Crossman Run, Lubber Run, and Torreyson Run. The CIP also includes water quality projects to reduce pollutants in adherence to the Virginia Department of Environmental Quality’s (DEQ) Municipal Separate Storm Sewer System (MS4) Permit and the Chesapeake Bay Total Maximum Daily Loads (TMDL). Arlington Public Schools adopted its FY 2025 – FY 2034 CIP on June 20, 2024. The Schools’ CIP totals $691.06 million, including $84.0 million of general obligation bonds. The Schools’ 10-year plan includes funding for kitchen improvements, entrance and vestibule renovations, security improvements, moving the Montessori program to the Career Center and synthetic turf field conversion at Kenmore Middle School. County Bond Funds Appropriations: Since a portion of the FY 2025 appropriation is for bond funded projects to be approved on the November 5, 2024 Referenda, appropriation of those projects is requested now but is contingent upon and will not occur until the respective referendum for each project is approved by voters, has been filed with the Circuit Court, and the required 30-day contest period has expired. All project expenditures being appropriated as FY 2025 bond funds are as planned in the FY 2025 – FY 2034 CIP and are consistent with the debt projections included in the CIP. Change to Financial Policy – Stabilization Reserve: The minimum amount for the Stabilization Reserve has been increased from 1.0 percent to 1.3 percent of the General Fund Budget based on action taken by the County Board at the adoption of the FY 2025 Operating Budget. PUBLIC ENGAGEMENT: In the early phases of CIP engagement in March and early April, almost 3,200 people participated, with 2,686 of those being online. Eleven pop-up engagements were held around the County; this form of engagement helped reach a diverse population. In addition to online responses and feedback received at pop-ups, program specific information was discussed at Board work sessions on June 6, June 11 and June 25; a joint worksession with the County/School Board on June 4; a Planning Commission meeting on June 3 as well as other commissions (Park and Recreation Commission, Sports Commission, Forestry and Natural Resources Commission, Fiscal Affairs Advisory Commission, Economic Development Commission and the Transportation Commission); and finally, a CIP public hearing held on July 10. FISCAL IMPACT: Should the CIP be adopted, the annual debt service included in both the Schools’ Adopted CIP and the County’s CIP remains in compliance with the County Board’s limitations on debt issuance and debt service as outlined in the Financial and Debt Management Policies. The planned issuance of new debt, combined with previously issued debt, maintains debt and debt service levels necessary for the County’s triple-AAA bond ratings. Debt service in FY 2025 is consistent with the amounts budgeted in the County and APS’ Adopted FY 2025 A - 25 operating budgets, with moderate growth in annual debt service projected in future fiscal years to support the planned issuance of new bonds over the 10-year planning horizon. A - 26 Attachment A FISCAL YEAR 2025 COUNTY APPROPRIATIONS RESOLUTION Be it resolved by the County Board of Arlington County, Virginia, that the following appropriations of $129,795,000 are hereby made for the Fiscal Year 2025 for Authorized But Unissued Bonds; Be it further resolved that the following appropriations of $129,795,000 will be made only upon approval by voters at the November 5, 2024 ballot and after results have been certified and filed with the Circuit Court and the required thirty day period for contesting each bond referendum has expired: COUNTY BOND FUNDS: Authorized But Unissued Bonds 2024 Referenda1 Total Appropriation Appropriation Appropriation Street and Highway Bond Fund (314) - 13,540,000 13,540,000 Neighborhood Conservation Bond Fund (316) - 0 0 Government Facility Bond Fund (317) 10,300,000 27,855,000 38,155,000 Public Recreation Bond Fund (324) - 7,480,000 7,480,000 Metro Bond Fund (333) - 21,800,000 21,800,000 TOTAL COUNTY BOND FUNDS APPROPRIATIONS: $10,300,000 $70,675,000 $80,975,000 STORMWATER BOND FUND APPROPRIATIONS: 21,780,000 - $21,780,000 UTILITY BOND FUNDS: Water Bond Fund (525) 23,640,000 3,400,000 $27,040,000 Sanitary Sewer Bond (528) - - $0 AWT Plant Bond (530) - - $0 TOTAL UTILITY BOND FUNDS APPROPRIATIONS: $23,640,000 $3,400,000 $27,040,000 TOTAL APPROPRIATIONS FOR COUNTY $55,720,000 $74,075,000 $129,795,000 1 2024 Referenda will be appropriated upon approval by voters at the November 5, 2024 ballot and after results have been certified and filed with the Circuit Court and the required thirty day period for contesting the bonds has expired. A - 27 County Board Agenda Item Meeting of July 23, 2024 County Manager: #### # County Attorney: ***** Staff: Jason Friess, Department of Management & Finance ARLINGTON COUNTY, VIRGINIA DATE: July 20, 2024 SUBJECT: Resolutions and Questions to be included in the 2024 Bond Referenda C. M. RECOMMENDATION: 1. Adopt the resolutions in Attachment A, as summarized below, and the explanation of the referendum questions to appear in publications, at voter registration sites, and polling places as detailed in Attachment B, in order to initiate and facilitate the November 5, 2024, bond referenda. a. Metro and Transportation $ 72,405,000 b. Local Parks and Recreation 25,770,000 c. Community Infrastructure 76,150,000 d. Utilities 14,220,000 TOTAL $188,545,000 2. Adopt the Schools referendum resolution in Attachment C, as summarized below, and the explanation of the referendum question to appear in publications, at voter registration sites, and polling places as detailed in Attachment D, in order to initiate and facilitate the November 5, 2024, bond referenda. a. Arlington Public Schools $ 83,990,000 3. Request that the Electoral Board list the referenda on the ballot in the order detailed in this report as shown in the Ballot Layout section on page 2. 4. Direct the County Manager to take all the steps necessary to ensure that the information provided to voters by the County is printed in both English and Spanish. ISSUES: This is a request for approval for the placement of capital projects, consistent with the County and Schools’ Adopted Capital Improvement Programs (CIP), on the November 2024 ballot for consideration by the voters for general obligation bond funding. SUMMARY: The County Board will approve the Fiscal Year (FY) 2025 – FY 2034 CIP at the July 22, 2024 County Board Meeting, which includes the Schools’ bond referendum request, adopted by the School Board on July 8, 2024. The County’s Adopted CIP includes various projects A - 28 to be considered for a November 2024 County government referenda of $188,545,000 and a Schools’ referendum of $83,990,000. BACKGROUND: The County government’s proposed bond totals are derived from a compilation of individual projects contained in the adopted CIP. These projects are classified into separate categories. If the bond referenda questions are approved by the voters, the County is legally prohibited from reallocating funding from one referenda category to another. Within the referenda categories, however, the County Board may make changes to specific projects to the extent permitted under the language; this flexibility is necessary because of potential rapid changes in construction pricing or other uncontrollable factors. The County Board also has the option of issuing a lesser amount of bonds than that approved by the voters or revising the specific projects, within the proposed authorizing language, to be funded with bond proceeds. Attachment B is a draft of the bond questions and explanations that would appear on the ballot and in informational publications. DISCUSSION: The County and Schools’ Adopted CIPs, which set the parameters for the County and Schools bond referenda requests, reflect a balance of strategic investments and maintaining our existing infrastructure. The adopted referenda requests, which are summarized below, are consistent with the County’s financial and debt management policies. REFERENDUM QUESTION PRIMARY PROJECTS / PROGRAMS AMOUNT Metro and Transportation Metro Capital Improvements, Paving, Bridge Maintenance, Street Lighting, Neighborhood Complete Streets, Curb & Gutter Missing Links, Street Safety Improvements, Sidewalk, Curb, Gutter Proactive Zone Maintenance, WalkArlington, Signals & ITS Maintenance $72,405,000 Local Parks & Recreation Parks Maintenance Capital, Three Urban Parks, Drew Park, Parks Land Acquisition and Open Space, Synthetic Fields, Trail and Bridge Modernization, Nature Resiliency Program, Emerging Uses Program 25,770,000 Community Infrastructure Arlington Neighborhoods Program, Facilities Maintenance Capital, Courts/ Police Building Improvements, Carlin Springs Site, Detention Facility Comprehensive Study, Lee Community Center, Commonwealth Attorney and ASAP Renovation, Office Space Utilization and Systems Furniture, Situational Awareness, EOC, and DPSCEM Consolidation, Trade Center Optimization Plan, ConnectArlington, Fire Logistics 76,150,000 Arlington Public Schools Refresh Legacy Career Center Building to house Montessori Public School of Arlington, Major Infrastructure Projects, Kitchen & Entrance Renovations, Kenmore Synthetic Turf Field 83,990,000 Utilities Washington Aqueduct Capital, Water-Main Replacement Program, Trade Center Equipment & Improvements, 14,220,000 A - 29 Activated Sludge Effluent Pump Station 1 (ASE1), Finished Water Reliability & Interconnections TOTAL $272,535,000 More detail on each of the programs and projects can be found in the CIP documents on the County’s and Schools’ websites. The summary of County projects included in the 2024 bond referenda can be found in the Appendix of the County’s Adopted FY 2025 - FY 2034 CIP, with additional details in the remainder of the County’s CIP document. The Adopted CIP document will be published on the County’s website no later than October 2024. Attachment B includes the proposed bond questions and explanations as they would appear in informational publications distributed by the County at polling places, other County facilities, and on the County’s website. Limitations on the explanations are imposed by state law, including that the explanations must be neutral and not present arguments in favor or against the bond questions. Consistent with state law, the actual ballot will reflect only the proposed bond question. BALLOT LAYOUT It is recommended that the following five bond referenda questions be on one or more rows or windows on the ballot in the following order: a. Metro and Transportation b. Local Parks & Recreation c. Community Infrastructure d. Arlington Public Schools e. Utilities PUBLIC ENGAGEMENT: Community input on the CIP was sought primarily through online channels of communication. During the CIP development process between March and April, staff conducted an online CIP engagement survey and conducted several pop-up events throughout the County to reach residents who do not typically engage online. A significant portion of the CIP engagement and outreach strategy leveraged social media (Facebook, Instagram, Twitter), press releases, County emails, and other communication methods to promote and encourage participation. In addition to the on-line engagement survey, program specific information was discussed at CIP work sessions on June 4, June 6, June 11, and June 25; an in-person and on-line CIP public hearing held on July 10, and a final Board wrap-up work session on July 16. FISCAL IMPACT: The estimated impact on the County’s General Fund, Stormwater fund, and Utility fund from the proposed bond financing plans included in the adopted CIP and the proposed referenda are shown below for Fiscal Years 2025 and 2026. The table below includes all outstanding general obligation and subject to appropriation bonds, planned bond issuance from previously approved referenda, and the planned bonds and associated debt service to be approved as part of the 2024 Bond Referenda. All bonds planned in the CIP comply with the County’s financial and debt management policies. A - 30 PROJECTED COUNTY, SCHOOLS, STORMWATER and UTILITIES DEBT SERVICE FY 2025 and FY 2026 Estimates (In Millions of $) PROJECTED FY 2025 PROJECTED FY 2026 County $86.9 $91.8 Schools 67.2 69.8 TOTAL $154.1 $161.6 Stormwater $1.1 $2.7 Utilities $10.7 $13.1 DESCRIPTION OF ATTACHMENTS Attachment A - 2024 County Bond Referenda Resolutions Attachment B - 2024 County Bond Referenda Questions and Explanations (as they will appear in publications) Attachment C - 2024 School Bond Referendum Resolution Attachment D - 2024 School Bond Referendum Question and Explanations (as it will appear in publications) A - 31 Project Name Description Funding Source Project Cost Current Status Anticipated Completion 6th Street N. & N. Edison Street • Intersection Improvement B onds $658,637 Design Fall 2025 15th Street N. • Street Improvement Bonds $1,764,833 Construction Spring 2025 Hillside Park • Park Bonds $326,788 Construction Fall 2025 S. Buchanan Street • Streetlights Bonds $324,243 Design Spring 2025 S. Manchester Street • Street Improvement Bonds $660,000 Design Winter 2025 Woodstock Park • Park Improvement Bonds $626,000 Design Winter 2025 N Quebec St - 17th St N to 18th St N. • Street Improvement Bonds $1,433,003 Design Spring 2026 S. Kent St - 17th St S. - 21st St S. • Street Improvement Bonds $250,000 Design Spring 2026 N. Montague St - intersection with 1st St • Street Improvement Bonds $722,948 Design Spring 2026 Thrifton Hill Park • Park Improvement Bonds $985,000 Design Winter 2025 Bailey's Branch Park • Park Improvement Bonds $750,000 Design Fall 2026 35th Street N. • Street Lights Bonds $268,710 Design Fall 2025 7th Street S. • Street Improvement Bonds $342,741 Design Spring 2025 The County is currently executing a wide variety of capital projects. These projects are in various phases of implementation with anticipated completion dates as soon as Summer 2024 and as far out as several years in the future, depending on the project’s scale. The following table provides brief summaries and updates on the most significant capital projects in progress. • CAD is used to coordinate the dispatch of various public safety personnel to the scene of emergency situations. ARLINGTON NEIGHBORHOOD PROGRAM INFORMATION TECHNOLOGY Computer Aided Dispatch (CAD) Assessment and Replacement PAYG $7,500,000 Design Fall 2025 A - 32 Project Name Description Funding Source Project Cost Current Status Anticipated Completion Radio System Upgrade • Replacement of critical equipment at the six radio sites used to communicate with other radio sites and keep system operational Short Term Financing $1,930,000 Implementation Fall 2024 Public Safety Radios • Police and Sheriff mobile radios are installed in County vehicles and provide two-way communication between the Emergency Communication Center and public safety vehicles. • Police and Sheriff portable radios are hand-held radios that allow for two-way communication with the Emergency Communications Center and all public safety agencies throughout the National Capital Region. • Project covers replacement of 1,415 portable and mobile radios over a three year period Short Term Financing $8,579,000 Implementation Phase 1 - Spring 2024 Phase 2 - Summer/Fall 2025 Phase 3 - Summer/Fall 2026 Electronic Health Record • Replace the electronic health record system that supports the Community Services Board (CSB) programs including mental health and substance abuse program and migrate existing records into the new system. PAYG $1,375,000 Implementation Fall 2025 Child Welfare Point of Service System • Design and implement a system to manage the authorization and payment of adoption and foster care services for eligible children and families. PAYG $1,250,000 Design Winter 2027 Day Care and In-home Child Care Licensing System • A comprehensive, integrated, day care center and in-home childcare licensing management system. stormwater $600,000 Design Fall 2025 Command Vehicle Technology Refresh • Technology Upgrades: Networking, satellite systems, cellular systems, cameras, computers, etc. Short Term Financing $200,000 Pending delivery Fall 2024 Fire Vehicle Apparatus • Replacement of Ladder Truck, Pumper, and Aerial Tower. Short Term Financing $3,875,422 Pending fabrication and delivery Fall 2024 A - 33 Project Name Description Funding Source Project Cost Current Status Anticipated Completion Fire Vehicle Apparatus • Replacement of six Pumper Trucks. Short Term Financing $6,863,934 Pending fabrication and delivery Fall 2027 Telephone System Upgrade • Modernize the County's voice communication system to support a more mobile workforce, while allowing the County to implement new ways to improve the customer experience. Short-Term Financing $3,300,000 Implementation Summer 2025 Enterprise Finance/Human Resources System • Migrate to new enterprise financial and human resources system Bond Premium / Bonds $14,000,000 User Acceptance Testing Fall 2024 Cloud Migration (eGov) • Transition 23+ eGovernment applications to the public cloud including a readiness assessment, cloud preparation, testing, migration, and post- implementation review. PAYG $1,640,000 Implementation Summer 2027 PARKS & RECREATION Arlington Junction Park • Construct a new park at South Eads Street and Army Navy Drive in Crystal City. Work includes demolition, tree preservation, site work, utilities (water, sanitary, storm, electrical, etc.), asphalt pavement, pavement markings, furnishings, signage, streetlights, landscaping, and an elevated pedestrian boardwalk. Developer Funds $4,884,648 Design Construction- Fall 2025 A - 34 Project Name Description Funding Source Project Cost Current Status Anticipated Completion Bailey’s Branch Park Improvements • Replace the playground, site circulation, site furnishings, landscaping and stormwater management improvements. Arlington Neighborhood Program (formerly Neighborhood Conservation) will also provide funding for this project. Bond Premium / Bonds / ANP Bonds $1,888,000 Design Design- Spring 2025 Construction - Fall 2026 Crystal City Parks and Public Spaces; improvements to 23 rd Street South and S. Eads Park • D esign and construct improvements to the existing 23rd Street South and South Eads Street Park. TI F $500,000 Design Design - Spring 2025 Construction- Fall 2026 Doctors Run Park Playground • Design funding to replace the children's playground and stone dust volleyball court, site circulation, site furnishings, landscaping and stormwater management improvements. PAYG $623,000 Design Design - Fall 2025 Construction Fall 2026 Douglas Park Improvements, Phase 1 • Design and construct Phase 1 park renovations, which include replacement of the picnic shelter, one pedestrian bridge, site furnishings, site circulation, stormwater management improvements, invasive removal in the forested area and reforestation plantings. Bond Premium / Bonds $565,000 Design Design - Spring 2025 Construction- Fall 2026 Gateway Park (Rosslyn) • Design and construction to renovate the park to create better pedestrian connectivity to the surrounding neighborhood of Rosslyn. Developer Funds / Bonds $2,285,000 Scoping Design - Fall 2026; Construction - Fall 2028 Gunston Park Playground and Picnic Shelter Replacement • Replace the playground and picnic shelter. Bonds $1,205,000 Design Design - Fall 2024; Construction - Fall 2025 Jennie Dean Park, Phase 2 • Demolish the existing improvements at 3620 27th Street South, including the existing WETA building, two parking lots and a portion of 27th Street South and construction of the second phase of improvements within the park. Bonds $3,485,000 Design Design - Spring 2025; Construction - Fall 2026 Kenmore Synthetic Field Conversion • Conversion from grass to synthetic of the field at Kenmore Middle School. Bonds / Field Fund / Partnership & Outside Fundraising $10,142,000 Design Design - Spring 2025 Construction - Summer 2027 A - 35 Project Name Description Funding Source Project Cost Current Status Anticipated Completion Lacey Woods Park Improvements • Project involves accessibility upgrades to the restroom building and replacement of the basketball court. PAYG / Bonds $2,203,000 Design Design - Spring 2025; Construction - Spring 2026 Monroe Park Playground • Design and construction to replace the playground, site circulation, site furnishings and stormwater management improvements. Bonds $1,366,000 Design Design - Spring 2025; Construction - Fall 2026 Short Bridge Park Final Design • Design, project management and other soft costs and construction for implementation of Short Bridge Park. The park upgrades include: an interpretive plaza, dog run, riverfront overlook, casual use lawn area, walkways, public art (lighting beneath bridge), site furnishings, significant landscaping and stormwater management. Bonds $1,140,000 Design Design - Spring 2025; Construction - Fall 2026 Three Urban Parks • Maury Park, Herselle Milliken Park and Gumball Park are three small parks located in the Ballston- Virginia Square area with a minimal level of amenities. The upgrades will provide much needed recreational and casual use opportunities to the residents and businesses in this increasingly dense area of the County. Bonds $1,450,000 Planning Fall 2025 Upper Bluemont Park Improvements • Conceptual Design only for the replacement of the tennis courts, court lighting, picnic shelter, restrooms, parking lot, walkways, stormwater management, signage and landscaping. Bonds $575,000 Design Design - Fall 2024 Construction - Fall 2026 Woodmont Center Playground • Design and construction to replace the playground, site circulation, site furnishings, landscaping, stormwater management improvements and milling and paving the small parking lot. Bond Premium / Bonds $1,265,000 Design Design - Spring 2025 Construction - Fall 2026 PUBLIC / GOVERNMENT FACILITIES A - 36 Project Name Description Funding Source Project Cost Current Status Anticipated Completion Courts Police Bldg. Automatic Transfer Switches and Generator Controls • Design & Construct: Electrical upgrade design to replace all six Automatic Transfer Switches (ATS's) and generator controls. PAYG / Bond $1,241,000 Design Construction Winter 2025 Detenti on Center VAV Replacement • Replace existing pneumatic Variable air volume (VAV) to digital and Building Automation System (BAS). Bond $2,935,000 Design Winter 2026 3700 S. Four Mile Run • Pilot electrification project to convert gas boilers to electric boiler and heat pumps. Bond $1,550,000 Design Fall 2025 Madison Center Mechanical Refresh • Convert current HVAC system to a Variable Refrigerant Flow (VRF) System Bond $2,215,000 Design Winter 2026 Equipment Bureau Roof Replacement • Replace the Equipment Bureau roof and preparation for PV panels. Bond $1,560,000 Design Construction Winter 2025 Central Library Restroom refresh, Virginia room air handling unit (AHU), Auditorium AHU, elevator modernization • Target refresh of Central Library's roof, elevators, restrooms and stand alone HVAC units. Bond $3,775,000 Design Construction Fall 2025 Quin cy Site (Building #4) • Replace existing roof and conversion of gas roof top units (RTU's) to electric. Bond $3,300,000 Design Fall 2025 Quincy Site (Building #2) • Replace existing roof and conversion of gas RTU's to electric. Bond $1,100,000 Design Fall 2025 Courts/Police Building Improvements • Elevator Modernization Bond $4,100,000 Design Summer 2026 1425 Quincy • Phase 2 Fire Logistics includes renovating existing office area to create Arlington County Fire Department (ACFD) Logistics Operation Center , consolidating warehouse and office area into one facility, address American with Disabilities Act (ADA) issues, new HVAC system, and providing auxiliary power. Bonds $2,500,000 Planning design Fall 2026 270 0 S. Nelson Street • Phase I: Demolish building located at 2700 S. Nelson Street and 2700 S. Oakland Street • Phase II: Development the Art Park with a new surface lot with paved area and green space. PAYG $1,475,602 Construction Winter 2024 A - 37 Project Name Description Funding Source Project Cost Current Status Anticipated Completion 3108 Columbia Pike Demolition • Demolish building at 3108 Columbia Pike and development of new surface parking lot. PAYG $1,510,882 Construction Fall 2024 2020 14th St. • Replace the air handling units on floors 4 - 7 along with updating the controls from pneumatic to digital . Bonds $1,500,000 Construction Fall 2024 Fire Prevention/ Battalion Chief’s Office Relocation • Renovate the interior of the Bozman building for Fire Prevention & the Battalion Chief’s Office. B onds $1,500,000 Planning Fall 2024 STORMWATER MANAGEMENT Spout Run Watershed Capacity Infrastructure • Watershed- scale project with blended engineering (distributed detention, pipe improvements, tertiary assets installed, and overland relief). Bonds $69,965,000 Design Spring 2034 Sparrow Pond Watershed Retrofit • Retrofit the pond to create a constructed wetland and restore the pond’s volume, improve stormwater treatment, provide habitat, and be make subsequent maintenance easier and less costly. B onds $2,815,000 Construction Fall 2024 • Replace of two undersized culverts that are in poor condition. Bonds $9,090,000 Design • Conduct a watershed-scale Vulnerability and Risk Assessment. Quebec Street Outfall Rehabilitation • Rehabilitate the outfall and address slope erosion on Quebec Street adjacent to the Dover Run Pumping Station. Other Previously Approved Funds $450,000 Construction Spring 2025 Langston Boulevard Culvert at N Sycamore Street • Watershed scale project to increase capacity of culverts crossing Langston Boulevard at North Sycamore Street and provide overland relief pathways to reduce the risk of flooding and damage in adjacent roadways and private areas. Stormwater Utility Fee $440,000 Design Spring 2025 Spring 2026Dumbarton Culverts Replacement A - 38 Project Name Description Funding Source Project Cost Current Status Anticipated Completion Military Road Culvert • Replace Military Road Culvert at Gulf Branch to expand capacity and replace the deteriorating structure. The culvert often overtops during storms, flooding the area including nearby Gulf Run pump station building. Bonds $312,000 Design Spring 2026 TRANSPORTATION (Note: External funding may be under agreement, approved, or anticipated) Arlington View Trail Connector (previously Army Navy Country Club Trail) • Construct a new connection for bicycle and pedestrian access between the Arlington View neighborhood and the Army Navy Country Club driveway connection to Army Navy Drive. T CF (C&I, NVTA Local) $10,843,000 Design Summer 2028 Army Navy Drive Complete Street • Rebuild Army Navy Drive in Pentagon City from 12th Street South to South Joyce Street as a multimodal corridor that includes protected bike lanes, safer pedestrian crossings, street trees, and the ability to accommodate future high-capacity transit. NVTA Regional funds, Federal grants, TIF, Developer Contributions $15,262,000 Construction Fall 2025 ART O&M Facility • Design and construct an operations and maintenance facility for growing fleet of ART buses. Project will include parking for buses as well as space for administration and O&M staff. State grants, NVTA Regional funds, TCF (C&I, NVTA local), Other $95,168,000 Construction Fall 2024 - substantial completion. Fall 2025 - Construction completion with BEB infrastructure Ballston-MU Metro Station West Entrance • Construct a new west entrance to the Ballston- MU Metro station located at the intersection of North Fairfax Drive and North Vermont Street to improve Metrorail access. State grants, Regional funds (NVTA, NVTC), TCF (C&I, NVTA local), Developer Contributions $180,989,000 Design Spring 2029 • Arlington Memorial Trail - Planning, scoping and NEPA documentation to develop a multi-use trail to connect Memorial Avenue to new Columbia Pike interchange. A - 39 Project Name Description Funding Source Project Cost Current Status Anticipated Completion • Arlington Boulevard Trail Southside Improvements - Improve trail conditions and intersections on southside between George Mason Drive and Glebe Road. • Arlington Boulevard Trail East Enhancements, Fairfax Drive - Safety and accessibility improvements at east end of trail. B ridge Renovation: Arlington Ridge / Mt. Vernon Bridge • Replace Arlington Ridge Road bridge over Four Mile Run to address structural deficiencies that have necessitated partial closure of sidewalks. • Shirlington Road Bridge Improvements - Bridge, sidewalk, mid-block intersection upgrades; a new bike and pedestrian bridge crossing. 50% Contribution from the City of Alexandria, State grants, Federal grants, GO Bonds, PAYG, TCF C&I $27,075,000 2 Projects: 1 in Design 1 in Construction Winter 2025 - Summer 2027 Bus Bay Expansion - East Falls Church Metrorail Station • Reconstruct the bus loop at the East Falls Church Metro station and add three bus bays for a total of 7 bus bays with improved bus shelters, increased seating, real-time bus arrival information, and improved ADA access. S tate grants, I-66 Regional funds, TCF (C&I, NVTA local), Other $12,667,000 Procurement for construction Spring 2026 • Columbia Pike Multimodal Streets Project improves transportation options for pedestrians, cyclists, motorists, and transit riders along the three plus mile Columbia Pike corridor. The last four segments are in construction to be completed in 2025. • South Joyce Street to South Orme Street (Segment A) • South Quinn Street to South Courthouse Road (Segment C) • South Courthouse Road to South Garfield Street (Segment D) Columbia Pike Streets TCF C&I, NVTA Regional Funds $161,996,000 (total cost, including for segments completed i i ) 6 Projects: 4 in Construction 1 in Design 1 i Pl i Fall 2027- Fall 2030 Wi nter 2025 - Fall 2027 F ederal grants, State funds, TCF (C&I, NVTA Local) $14,795,000 3 Projects: 2 in Design 1 in Planning BIKEArlington A - 40 Project Name Description Funding Source Project Cost Current Status Anticipated Completion • South Oakland Street to South Wakefield Street (Segment F) • South Glebe Road and 9th Street South Intersection Improvement Project - safety and accessibility improvements at a high injury intersection. • Columbia Pike Bike Boulevard Study - Identify & scope improvements and implement near term improvements for the 9th and 12th Street Bike Boulevards. Columbia Pike Transit Stations • Design and construct transit stations along Columbia Pike to provide safer access to transit, improved bus shelters, increased seating, and real- time bus arrival information. TCF C&I, Federal grants, State grants, and GO bonds $14,635,000 First 8 stations are operational. Construction of the remaining stations will follow the Columbia Pike Multimodal project. Spring 2026 Crystal City Metro Station East Entrance • Construct a new entrance at the east end of the Crystal City metro station to provide easier access from Crystal Drive, the Virginia Railway Express (VRE) Station, and a Crystal City Potomac Yard Transitway station (PPEA Project). F ederal grants, State grants, NVTA Regional funds, TCF (C&I, NVTA local), TIF $146,089,000 Final Design Spring 2027 • 15th Street South/South Clark-Bell Street Realignment • 18th Street South Realignment - improved street alignment between Route 1 and Crystal Drive to improve multimodal connectivity 7 projects: • South Eads Street Complete Street - multimodal improvements from Army Navy Drive to 12th Street South in coordination with DPR Arlington Junction Park (Phase 1) and from 12th Street South to 15th Street South (Phase 2) NVTA Regional funds Federal 5 in Design, 2 in Const. in prior years) 1 in Planning A - 41 Project Name Description Funding Source Project Cost Current Status Anticipated Completion • Long Bridge Drive Multimodal Connection - new multi-use trail facility along Long Bridge Drive that will link to the future Long Bridge (bike/pedestrian bridge to cross Potomac River, to be constructed by VPRA) • Army Navy Drive Protected Bike Lane Missing Link - provide enhanced bike facilities along Army Navy Drive between South Joyce Street and South Lynn Street. • Crystal City to Washington National Airport (CC2DCA) Multimodal Connection - Construct a multimodal connection between Crystal Drive and Washington National Airport (DCA). • Military Road Safety Improvements - multimodal safety improvements on Military Road at intersection with Marcey Road, 36th Road North, and Nelly Custis Drive • North Glebe Road and Cathedral Lane - safety and accessibility improvements • South and West Glebe Road Intersection Improvements - safety and accessibility improvements at high injury intersection • South Carlin Springs Pedestrian Improvements - pedestrian improvements at select locations along corridor. • Lorcom Lane and Nelly Custis Drive intersection Improvements - new signal and multimodal improvements • S. Four Mile Run Complete Streets Project - multimodal safety enhancements between South Walter Reed Drive and Shirlington Road • South Walter Reed Drive Complete Streets Improvements - multimodal improvements between 5th Street South and Columbia Pike Improvements Outside Major Corridors NVTA Local, TCF C&I, State grants, GO Bonds, Federal grants $54,567,000 10 Projects: 7 in Design 2 in Planning Winter 2026 - Winter 2029 S pring 2026 - Fall 2029Crystal City, Pentagon City, Potomac Yard Streets funds, Federal grants, State grants, TCF C&I, Crystal City TIF $95,936,000 A - 42 Project Name Description Funding Source Project Cost Current Status Anticipated Completion • South George Mason Drive Multimodal Improvements Phase 1: Arlington Boulevard to Columbia Pike • Pershing Drive Complete Streets, Phase 2 - M ultimodal improvements east of Washington Boulevard at North Cleveland Street intersection • North Sycamore Street Complete Streets Project - multimodal improvements between Langston Boulevard and 19th Street North • South Irving Street from 6th Street South to 7th Street South improvements • 28th Street South to South Meade Street Pedestrian Improvements • South Irving Street - 2nd street to 6th Street North Improvements • 14th Street North - McKinley Road to North Ohio Street improvements • 8th Road South - South Dinwiddie Street to South Frederick Street Improvements • Extend Crystal City-Potomac Yard Transitway as a bus facility to Pentagon City. • Extension will serve local travel demand within the corridor, including Amazon’s HQ2, as well as enhance connections to Metrorail and improve connections to Columbia Pike. • Wilson Boulevard Streetscape Improvements (Clarendon-VA Square) - pedestrian and intersection improvements and utility undergrounding from North Kenmore Street to 10th Street North, and on 10th Street North from Fairfax/North Jackson Street to North Ivy Street $3, 259,000 Neighborhood Complete Streets Premium Transit Network (PrTN): Transitway Extension to Pentagon City NVTA Local, GO Bonds State grants, NVTA Regional funds, developer contribution, TCF C&I, TIF $27,667,000 Design/ Construction Segment I was completed in 2023; Segment IIA is anticipated to be completed in Spring 2026. The last segment is tied to WMATA's Army Navy Drive Transit Center which is anticipated to be completed in 2031. 5 projects in Design Spring 2025 - Winter 2026 A - 43 Project Name Description Funding Source Project Cost Current Status Anticipated Completion • Wilson Boulevard and North Rhodes Street Intersection Safety Project - intersection improvements including signal and bus stop upgrades, accessibility and crossing improvements, and utility undergrounding • Meade Street Multimodal Improvements from Dark Star Park in Rosslyn to North Marshall Street. • Fort Myer Drive Sidewalk - pedestrian improvements between eastbound and westbound Langston Boulevard and traffic signal upgrades. • North Lynn Street Cycle Track - development of a cycle track between Wilson Boulevard and eastbound Langston Boulevard. • Wilson Boulevard Streetscape Improvements (Rosslyn) - multimodal improvements from North Kent Street to North Oak Street. • North Park Drive and North George Mason Drive Intersection Improvements - safety and accessibility improvements including a new signal • North Ohio Street Safety Improvements - pedestrian accessibility and intersection safety improvements at intersection with 12th Road North • Lorcom Lane Safety Project - multimodal safety improvements from 24th Road North/North Quebec Street to Nelly Custis Drive WATER & SEWER 3 projects: 2 in Design 1 in Construction Fall 2025 - Fall 2026 Ro sslyn-Ballston Arterial Street Improvements W ALKArlington TCF NVTA Local, PAYG $4,402,000 TCF C&I, utility undergrounding fund, developer contributions, NVTA Regional funds Fall 2026 - Fall 2029$43,759,000 6 projects: 4 in Design, 2 in Planning A - 44 Project Name Description Funding Source Project Cost Current Status Anticipated Completion Re-Gen Phase 2 • Phase 2 projects focus on program management and preparing the WPCP site for future solids handling improvements including relocation of existing building functions, demolition of underutilized facilities, and general site work in advance of Re-Gen Phase 3. Utilities PAYG / GO Bonds $15,465,000 Design Fall 2025 Re-Gen Phase 3 • Phase 3 projects implement the Solids Master Plan recommended technology of Thermal Hydrolysis Pretreatment followed by Anaerobic Digestion (THP/AD), as well as replacing or upgrading the remaining solids handling equipment. A higher quality biosolids product will result from these improvements. Utilities PAYG / GO Bonds $210,485,000 Design Spring 2029 Asset Management Software Replacement • Replace the WPCP’s Asset Management S oftware used to track equipment repairs, work orders, warehouse inventory, and purchases. Utilities PAYG / Other Previously Approved Funds / Other Funding $2,300,000 Planning Spring 2027 Gulf Run Sewer Force Main • Rehabilitate approximately 2,191 linear feet of the 10-inch cast-iron force main located uphill from the Gulf Run Pump Station. Utilities PAYG $2,100,000 Design Summer 2025 A - 45 Program Category FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 Total Local Parks & Recreation 24,188 27,445 48,030 37,501 15,909 21,416 24,931 13,231 30,641 65,458 308,750 Transportation Initiatives 1 259,642 201,500 285,850 198, 549 208, 312 125, 902 158, 575 106, 984 137, 283 172, 411 1 ,855,008 Metro 33,000 34,225 35,230 36,230 37,335 37,835 38,435 40,855 52,060 53,265 398,470 Community Conserv/Economic Develop. 13,441 14,625 14,084 8,128 8,173 8,220 8,270 8,322 8,376 8,433 100,072 Public / Government Facilities 54,893 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,994 Information Technology & Public Safety 22,422 17,208 22,545 16,568 23,136 26,744 22,312 20,050 17,211 24,420 212,616 Regional Partnerships 1,683 1,166 1,077 1,094 1,111 1,129 1,147 1,165 1,184 1,203 11,959 Total County Capital 409,269 341,027 450,002 330,987 333,688 250,661 318,364 241,321 266,226 344,324 3,285,869 Water & Sewer Infrastructure 71,715 105,815 110,130 110,820 88,095 64,445 80,290 105,035 41,810 101,730 879,885 Stormwater Management 2 29,605 37,355 35,680 35, 675 49, 055 37, 490 24, 720 30, 215 30, 100 24, 360 334, 255 Schools Capital 5 208,065 42,936 76,450 59, 390 50, 330 50, 000 50, 620 51, 380 51, 700 50, 190 691, 061 Total Program Cost 718,654 527,133 672,262 536,872 521,168 402,596 473,994 427,951 389,836 520,604 5,191,070 Arlington County, Virginia Adopted CIP Program Summary The Adopted FY 2025 - 2034 CIP includes typical capital projects such as maintenance capital, parks, transportation, metro, community conservation, government facilities, information technology, and regionals. The 10-year CIP includes funding that has been previously approved in prior CIPs to show the full expenditure by fiscal year of each capital project. 10 Year Capital Program Costs Summary (000s) (1) Transportation Capital Fund is supported by a commercial real estate tax of $0.125 per $100 of assessed value and 30% of revenues from a regional sales tax collected at the Northern Virginia Transportation Authority (NVTA). The Transportation Capital Fund is supplemented by County PAYG as well as state and federal revenues. (2) Stormwater Management Fund is funded from the Stormwater Utility Fee, Watershed Management Fund, State Grants and project cost sharing with US Army Corps of Engineers. (3) Local and Regional funding for transportation projects from the Northern Virginia Transportation Authority (NVTA) were approved by the General Assembly in 2013. (4) Other previously approved funds: Any funds other than GO Bonds that were approved as part of prior CIPs that are to be spent during the FY 2025-FY 2034 CIP. (5) Includes capital costs from the Arlington Public Schools Adopted FY 2025 - FY 2034 CIP. B - 1 Capital Funding Sources FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 Total Pay-As-You-Go (PAYG) 27,173 26,928 27,327 32,976 30,261 24,512 28,222 27,121 28,000 27,598 280,118 Short Term Financing 9,550 9,141 17,918 7,396 18,340 22,455 15,624 14,951 12,937 18,941 147,253 General Fund GO Bond Issue 77,675 89,075 92,620 87,900 86,120 75,415 127,800 101,155 85,760 117,520 941,040 Schools GO Bond Issue 89,930 31,430 76,150 58,570 50,000 50,000 50,000 50,000 50,000 50,000 556,080 Utilities PAYG 7,993 13,202 19,470 18,050 22,355 19,790 19,930 16,365 12,830 14,065 164,050 Utility GO Bond Issue 3,400 10,820 17,665 33,795 50,545 32,890 48,535 74,355 15,550 73,785 361,340 Stormwater Utility Fee 2 3,835 3,910 3,435 3,945 3,840 4,500 4,295 4,865 4,615 5,170 42,410 Stormwater GO Bond Issue - - 23,825 27,480 44,545 32,740 20,175 25,100 25,235 18,940 218,040 Federal Funding 5,630 5,176 33,892 8,546 25,468 16,419 21,366 4,011 4,176 13,996 138,680 State Funding 26,340 23,287 62,157 29,381 31,310 21,464 29,822 18,720 30,660 44,061 317,202 Developer Contributions and Partnerships 10,185 13,287 30,875 29,475 15,293 20,155 14,487 11,455 11,415 17,025 173,652 Transportation Capital Fund (TCF) - C&I 1 29,747 42,541 35,966 50,021 65,971 25,645 25,561 22,594 26,536 32,200 356,782 TCF - HB2313 Local 3 11,618 17,717 19,270 17,965 18,425 15,203 22,175 14,781 15,873 24,913 177,940 HB2313 Regional 3 4,100 2,873 9,082 27,459 41,346 26,686 36,591 30,803 46,693 43,320 268,953 Tax Increment Financing 20,131 16,902 6,989 15,990 9,236 7,346 4,834 5,265 13,349 14,067 114,109 Other Funding 24,155 19,945 18,657 13,645 6,044 1,675 4,047 5,311 6,385 4,774 104,638 Subtotal New Funding 351,462 326,234 495,298 462,594 519,099 396,895 473,464 426,852 390,014 520,375 4,362,287 Previously Approved Funding Authorized but Unissued Bonds 132,983 103,648 72,255 34,290 - 3,285 - - - - 346,461 Issued but Unspent Bonds 45,599 4,013 713 - - - - - - - 50,325 Other Previously Approved Funds 4 189,110 93,822 106,597 36,513 1,859 2,416 1,630 - 31 19 431,997 Subtotal Previously Approved Funding 367,692 201,483 179,565 70,803 1,859 5,701 1,630 - 31 19 828,783 Total Funding 719,154 527,717 674,863 533,397 520,958 402, 596 475,094 426,852 390,045 520,394 5,191,070 10 Year Capital Program Costs Summary (000s) Arlington County, Virginia Adopted CIP Program Summary B - 2 Adopted Adopted 10-year 10-year FY23-32 FY25-34 $ Change % Change Parks and Recreation 270,578 308,750 38,172 14.1% Transportation 1,755,079 1,855,008 99,929 5.7% Metro 356,400 398,470 42,070 11.8% Public/Government Facilities 293,896 398,994 105,098 35.8% Information Technology & Public Safety 192,432 212,616 20,184 10.5% Regional Partnerships & Contingencies 15,790 11,959 (3,831) -24.3% Community Conservation & Economic Development 86,599 100,072 13,473 15.6% Subtotal County Capital 2,970,774 3,285,869 315,095 10.6% Water and Sewer Infrastructure 617,395 879,885 262,490 42.5% Stormwater Management 331,335 334,255 2,920 0.9% Total County CIP 3,919,504 4,500,009 580,505 14.8% Schools Capital 474,540 691,061 216,521 45.6% Total CIP Program 4,394,044 5,191,070 797,026 18.1% Arlington County, Virginia CIP Comparison by Program Category Parks and Recreation 6% Transportation 40% Metro 8% Public/Government Facilities 7% Information Technology & Public Safety 4% Regional Partnerships & Contingencies 0.4% Community Conservation & Economic Development 2% Water and Sewer Infrastructure 14% Stormwater Management 8%Schools Capital 11% FY23-32 CIP Parks and Recreation 6% Transportation 36% Metro 8% Public/Government Facilities 8% Information Technology & Public Safety 4% Regional Partnerships & Contingencies 0.2% Community Conservation & Economic Development 2% Water and Sewer Infrastructure 17% Stormwater Management 6% Schools Capital 13% FY25-34 CIP B - 3 Adopted Adopted FY23-32 FY25-34 $ Change % Change New Funding State/Federal Funding 429,506 455,882 26,376 6% Developer Contributions 139,476 173,652 34,176 25% General Fund GO Bond 833,328 941,040 107,712 13% Utilities GO Bond 272,170 361,340 89,170 33% PAYG 348,486 444,168 95,682 27% Short Term Financing 142,863 147,253 4,390 3% Sanitary District Tax 40,310 - (40,310) -100% Stormwater Utility Fee Revenue - 42,410 42,410 - Stormwater GO Bond 242,985 217,245 (25,740) -11% Other Funding 91,129 91,077 (52) 0% Transportation Capital Fund (TCF)-C&I 364,107 356,782 (7,325) -2% TCF - HB2313 Local 150,435 177,940 27,505 18% TCF - HB2313 Regional 156,477 268,953 112,476 72% Tax Increment Financing (TIF) 94,067 114,109 20,042 21% Schools GO Bond 345,400 556,080 210,680 61% Schools Other Funds - 12,311 12,311 - Subtotal New Funding 3,650,739 4,360,242 709,503 19% Previously Approved Funding Authorized but Unissued Bonds 79,260 348,506 269,246 340% Issued but Unspent Bonds 114,935 50,325 (64,610) -56% Other Previously Approved Funds 549,110 431,997 (117,113) -21% Subtotal Previously Approved Funding 743,305 830,828 87,523 12% Total Funding Sources 4,394,044 5,191,070 797,026 18% Arlington County, Virginia CIP Comparison by Funding Category State/Federal Funding 9% Developer Contributions 3% General Fund GO Bond 18% Utilities GO Bond 7% PAYG 9% Short Term Financing 3% Sanitary District Tax 0% Stormwater Utility Fee Revenue 1% Stormwater GO Bond 4% Other Funding 2% Transportation Capital Fund (TCF)-C&I 7% TCF - HB2313 Local 3% TCF - HB2313 Regional… Tax Increment Financing (TIF) 2% Schools GO Bond 11% Schools Other Funds 0.2% Authorized but Unissued Bonds 7% Issued but Unspent Bonds 1% Other Previously Approved Funds 8% FY25-34 CIP State/Federal Funding 10% Developer Contributions 3% General Fund GO Bond 19% Utilities GO Bond 6% PAYG 8% Short Term Financing 3% Sanitary District Tax 1% Stormwater Utility Fee Revenue 0% Stormwater GO Bond 6% Other Funding 2% Transportation Capital Fund (TCF)-C&I 8% TCF - HB2313 Local 3% TCF - HB2313 Regional 4% Tax Increment Financing (TIF) 2% Schools GO Bond 8% Authorized but Unissued Bonds 2%Issued but Unspent Bonds 3% Other Previously Approved Funds 12% FY23-32 CIP B - 4 Total FY 25-34 LOCAL PARKS & RECREATION Parks Maintenance Capital 40,990 Arlington Boathouse 16,770 Three Urban Parks in Ballston-Virginia Square 8,055 Drew Park 1,540 Parks Land Acquisition and Open Space 13,805 Synthetic Fields 2,400 Trail & Bridge Modernization 17,075 Shirlington Park 5,345 Gateway Park 11,635 Nature Resiliency Program 5,555 Virginia Highlands Park and Nearby Public Spaces 1,485 Emerging Uses Program 5,035 Fairfax Drive Public Spaces 13,985 Langston Boulevard Public Space Improvements 2,020 New Park at 26th Street N and Old Dominion Dr 4,855 Short Bridge Park 5,690 Quincy Park 36,420 Penrose Square Phase 2 4,760 Sub-total 197,420 INFORMATION TECHNOLOGY ConnectArlington 10,435 TRANSPORTATION Paving 123,445 Curb & Gutter Missing Links 1,460 Bridge Maintenance 7,640 Bridge Renovation and Replacement 4,735 Street Lights 3,220 Neighborhood Complete Streets 5,995 Transportation Systems & Traffic Signals 885 Street Safety Improvements 2,590 1,010 505 1,010 1,010 2,580 25,950 275 - 27,265 1,940 - 1,010 1,010 1,010 1,340 - 1,340 - 28,680 23,630 600 560 - - - - 1,485 Adopted FY 2025 - FY 2034 CIP Debt Summary (in $ thousands) 5,180 2,525 5,075 5,825 9,400 8,385 8,590 8,790 Bond and Master Lease Funding Planning - - 2024 - 8,055 - 2032 7,215 - 2026 2030 315 335 78,370 3,965 - - 3,125 860 13,085 - 31,490 - 4,315 2,020 11,635 - 2028 3,090 3,060 - - - - - - 3,030 - 5,690 - - 4,040 795 890 - - - 255 4,600 - - - 1,030 1,010 2,630 1,965 25,770 995 2,265 40,970 1,830 1,615 315 1,570 - - - 24,695 - 900 Arlington County, Virginia 9,555 - 275 - Adopted 1,540 1,500 3,435 2,400 - - - 1,515 1,500 240 - - 22,035 530 - 1,725 2,085 1,080 295 23,500 200 570 1,380 - 1,050 315 1,120 855 1,340 405 495 530 B - 5 Total FY 25-34 Adopted FY 2025 - FY 2034 CIP Debt Summary (in $ thousands) Bond and Master Lease Funding Planning 2024 20322026 20302028 Arlington County, Virginia Adopted Sidewalk, Curb, Gutter Proactive Zone Maintenance 8,355 WalkArlington 2,325 Signals & ITS Maintenance 5,745 Sub-total 166,395 METRO Metro 239,670 COMMUNITY CONSERVATION Arlington Neighborhoods Program 70,000 Sub-total 70,000 PUBLIC / GOVERNMENT FACILITIES Facilities Maintenance Capital 50,230 Fire Stations Replacements & Additions 35,855 Columbia Pike Library Refresh / Replacement 35,730 Carlin Springs Site 14,120 Courts / Police Building Improvements 34,290 Courthouse Complex Renovations & Infrastructure 14,745 Detention Facility Comprehensive Study 13,120 Lee Community Center 15,605 Commonwealth Attorney and ASAP Renovation 2,870 Office Space Utilization and Systems Furniture 17,390 Situational Awareness Intelligence Unit, EOC & DPSCEM Consolidation 9,760 Trade Center - NOC Relocation 6,060 Trade Center Optimization Plan Implementation 845 Fire Logistics 6,500 Sub-total 257,120 Total FY 25-34 County General Obligation Bond Referenda 941,040 - - 4,040 31,690 - - - 250 35,605 - 52,425 14,000 1,590 525 490 35,455 1,355 1,770 11,415 4,800 14,000 14,000 46,260 49,190 14,000 14,000 47,470 14,745 6,150 - - - - - - - - 36,705 14,000 11,720 99,365 - - - - 6,060 - - - - Total County Bond Referenda 32,380 465 1,125 1,665 1,470 1,575 20,120 435 44,325 28,080 34,695 35,785 14,000 14,000 14,000 755 - - 15,355 410 8,080 - 6,040 13,810 8,485 3,125 14,000 - - 7,595 Planning 203,280 2032203020282026 Adopted 9,175 5,050 8,400 228,955 61,155 39,775 2024 - 845 6,500 3,845 920 4,070 174,325 172,945 161,535 1,875 9,760 - - - - 2,870 - - - - 6,020 5,960 4,180 1,230 - 250 - - B - 6 Total FY 25-34 Adopted FY 2025 - FY 2034 CIP Debt Summary (in $ thousands) Bond and Master Lease Funding Planning 2024 20322026 20302028 Arlington County, Virginia Adopted Adopted Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 FY 25-34 Tub Grinder Replacement 1,212 1,212 Call Premise Equipment (CPE) 2,020 2,020 2,525 6,565 Fire Breathing Apparatus 88 4,080 4,168 Fire Defibrillators 4,858 4,858 Synthetic Turf Program 1,041 1,702 1,997 2,094 1,975 1,007 2,231 3,000 1,511 16,558 Fire Portable Radios 2,121 2,121 4,242 Fire Records Management System 1,010 1,010 Police Computer Forensic Equipment 414 505 919 Fire Thermal Imaging Cameras 278 278 556 Land Records System 540 1,104 1,644 Police & Sheriff Public Safety Radios 2,850 2,879 2,879 2,879 11,487 Fire Station Alerting System 2,020 2,020 Public Safety Radio System Upgrades 1,949 1,949 Data Center Consolidation and Refreshment 939 3,242 973 530 5,684 Public Safety Mobile Data Computers 3,737 4,040 7,777 Enterprise Records Mgmt. System Modernization 1,343 1,343 Public Safety Servers and Infrastructure 350 505 855 Bomb Squad X-Ray Systems 261 261 Police Video Trailers 253 354 607 Network Equipment and Power System 1,732 1,544 2,121 2,096 3,889 3,182 1,919 2,449 2,550 4,495 25,977 Revenue and Collection System Enhancement 3,750 1,250 3,295 1,569 9,864 Public Safety Rifle Plates 404 404 Server Hardware & Data Storage 780 - - - - - - - - - 780 Total General Fund Master Lease Funding 9,550 8,015 10,933 7,335 8,746 17,910 7,148 9,225 12,937 18,941 110,740 Auto Fund Master Lease - Fire Vehicle Apparatus (pg. D-11) - 1,126 6,985 61 9,594 4,545 8,476 5,726 - - 36,513 Short-Term Financing Planning B - 7 Total FY 25-34 Adopted FY 2025 - FY 2034 CIP Debt Summary (in $ thousands) Bond and Master Lease Funding Planning 2024 20322026 20302028 Arlington County, Virginia Adopted Total FY 25-34 Finished Water Reliability & Interconnections 92,795 Regional Source Water Resiliency 60,500 Transmission Mains Resiliency 3,745 Activated Sludge Effluent Pump Station 1 (ASE1) 8,470 USACE Coastal Storm Resiliency 4,730 Grit System Upgrades 1,430 Re-Gen Phase III 25,740 Secondary Clarifiers 15,110 Trades Center Equipment & Improvements 535 Washington Aqueduct Capital 102,990 Water-Main Replacement Program 38,880 Sewer-Large Diameter Main Rehabilitation 6,415 Total Utility Fund GO Bond Referenda 361,340 Total FY 25-34 Stormwater Mains Rehabilitation & Replacement 240 33rd Street North to Williamsburg Capacity 3,445 Miscellaneous Expansion/ Capacity Projects 1,320 Spout Run Watershed Capacity Improvements 53,935 Stohman's Run Watershed Capacity Improvements 1,310 Torreyson Run Watershed Capacity Improvements 11,835 Williamsburg at North Underwood Capacity 2,085 Capacity Project Feasibility Studies 510 Columbia Pike at South Greenbrier Street 11,000 Crossman Run Watershed Capacity Improvements 32,355 Flood Risk Reduction Program 11,160 Lower Long Branch Flood Risk Reduction Project 3,470 Lubber Run Watershed Capacity Improvements 61,850 Water Quality Project Feasibility & Concept Development 865 - - 165 170 175 - 5,800 5,200 - - - 3,940 28,415 - - 23,390 - - - 10,200 1,635 - - - 960 1,125 - - 355 - 16,970 15,435 - 1,310 - - - - 4,200 2,170 2,320 2,470 - - 645 1,365 1,460 - 4,335 13,015 21,110 225 295 345 Stormwater GO Bond Funding Adopted Planning 2024 2026 2028 2030 2032 12,735 8,795 - - 5 95 140 - 1,175 2,270 - - - 285 335 345 1,375 - 14,220 51,460 83,435 122,890 89,335 - - - - 9,905 1,430 - - 3,745 - - 1,285 5,810 - - 4,730 - - - - - - - 5,235 Utilities GO Bond Funding Adopted 2024 2026 2028 2030 - 9,405 535 340 2,490 7,680 8,435 9,840 10,435 505 13,190 44,900 34,200 - - 8,185 60,500 - - - - 7,685 - 8,530 66,965 - - - 2,015 2,140 1,920 Planning 9,875 2032 - 18,055 B - 8 Total FY 25-34 Adopted FY 2025 - FY 2034 CIP Debt Summary (in $ thousands) Bond and Master Lease Funding Planning 2024 20322026 20302028 Arlington County, Virginia Adopted Green Streets & Infrastructure Program 3,155 Outfall Rehabilitation Program 8,325 Stream Resiliency Program 10,385 Washington Boulevard Pond Retrofit 795 Total Stormwater Fund GO Bond Referenda 218,040 Total GO Bond Referenda 1,520,420 Total Debt Funding 1,667,673 188,545 275,710 322,255 397,120 336,790 0 51,305 77,285 45,275 44,175 935 - 625 2,485 2,565 2,650 - 795 - - - - 275 3,280 3,370 3,460 - 435 880 905 207,236 301,024 363,050 427,695 368,668 B - 9 Adopted Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Proposed Total FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY25-34 MAINTENANCE CAPITAL Transportation (pg E- ) 2,830 3,336 3,436 3,536 3,645 3,770 3,879 3,990 4,103 4,218 36,743 Public Facilities (pg C- ) 3,000 3,434 7,104 7,329 6,998 4,810 5,363 5,291 5,830 6,368 55,527 Parks and Recreation (pg C- ) 1,565 2,167 768 1,789 1,810 1,831 1,852 1,874 1,896 1,918 17,470 Enterprise Information Technology (D- ) 5,578 5,926 4,517 9,151 5,285 4,624 5,428 4,846 5,302 4,905 55,562 Energy Efficiency (C- ) 2,375 3,031 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 23,574 Sub-Total 15,348 17,894 18,791 24,672 21,978 16,584 18,102 17,553 18,785 19,169 188,876 REGIONAL PROGRAMS Northern Va Regional Park Authority (pg C- ) 731 738 768 776 783 791 799 807 815 823 7,831 Northern Va Criminal Justice Academy (pg C- ) 127 128 - - - - - - - - 255 Sub-Total 858 866 768 776 783 791 799 807 815 823 8,086 OTHER CAPITAL PROJECTS Transportation (pg. E- ) 1,951 2,618 3,962 4,118 3,990 4,333 5,380 5,156 4,236 4,357 40,101 Public Facilities (C- ) 2,630 1,713 1,321 651 879 591 616 641 1,182 691 10, 915 Parks and Recreation (C- ) 1,155 - 505 700 505 - 505 - 505 - 3,875 Information Technology & Public Safety (D- ) 3,465 1,912 587 613 625 655 1,202 1,284 732 745 11,820 Arlington Neighborhoods Program (pg C- ) 850 894 931 970 1,011 1,053 1,099 1,146 1,196 1,248 10,398 Economic Development 91 731 153 158 162 167 171 176 180 185 2,174 Capital Administration & Contingent (pg C- ) 825 300 309 318 328 338 348 358 369 380 3,873 Sub-Total 10,967 8,168 7,768 7,528 7,500 7,137 9,321 8,761 8,400 7,606 83,156 Total PAYG Funding 27,173 26,928 27,327 32,976 30,261 24,51 2 28, 222 27,121 28, 000 27,598 280,118 PAYG Funding Arlington County, Virginia PAYG SUMMARY CIP 2025-2034 B - 10 In de veloping the CIP, the County establishes its long-range plan for pay-as-you-go (PAYG), bond and short-term financing of its ten-year capital program. In determining the level of capital projects to finance and the method of financing, the County considers its financial ability to undertake these projects and the useful life of the project. This analysis includes a review of debt capacity factors and the impact of the adopted CIP on these debt capacity factors. In Apr il 2008, the County Board approved F inancial and Debt Management Policies that affirmed the County’s existing debt capacity factors. The policies also included guidance on bond term and amortization, specifically that b ond-funded projects will typically have a useful life at least as long as the period over which the bonds will be repaid (the average life of County bonds is 10-12 years and final maturity is generally twenty years; however, longer terms may be considered on very long useful life projects). Finally, the Board’s policies provide d guidance on the use of variable rate debt and derivatives. The Board has periodically adopted revisions to the financial and debt management policies, most recently as part of the Adopted FY 2025 Operating Budget. These policies serve as the financial framework for the CIP, and a full copy of the adopted policies is included in the Financial & Debt Management Policies section. The bond ra ting agencies that rate the County’s debt for potential investors use these debt ratios along with other County and community economic factors as the basis of their ratings. The three major bond rating agencies, Moody’s Investors Service, Standard & Poor’s, and Fitch Ratings currently rate the County Aaa/AAA /AAA (the highest possible). Arlington is one of a select national group of counties that currently hold these coveted Aaa/AAA/AAA ratings from the three major rating agencies. The County 's bond ratings were reaffirmed in May 2024 and historical County bond trading in the secondary market confirms that Arlington belongs within the very top group of municipal credits in the national bond market. The funding levels contained in this CIP are intended to maintain this status. While there is no legal limit in Virginia on the level of debt issued by Virginia counties, Arlington has issued and plans to issue its debt prudently. Arlington will remain within the acceptable range of debt capacity factors with the CIP based on conservative assumptions, as illustrated on the following pages. Und erlying Assumptions The projected ratios shown in the following tables are based on the County ’s Adopted FY 2025 – FY 2034 CIP. It is important to note that the County’s Financial and Debt Management Policies view debt capacity on a combined basis (i.e., County and Schools) as do the bond rating agencies. Arlington County, Virginia DEBT CAPACITY ANALYSIS B - 11 The projected debt ratios are based on conservative revenue growth assumptions: 2.5 % growth in FY 2026 and FY 2027, escalating to 3.0% in FY 2028 and thereafter. Similarly conservative assumptions have been used for projected growth in market value of the County’s tax base (identical to revenue growth assumptions) and per capita income growth of 2.6% in FY 2026, escalating to 3.0% in FY 2027 and beyond. It should be noted that these debt ratios include only general obligation and other tax-supported debt, including bonds issued through the Industrial Development Authority (IDA) or other conduit issuers for County projects where debt service is paid for from the General Fund. For example, these ratios include the subject-to-appropriation Series 2021 IDA revenue notes issued in December 2021 for an acquisition loan the County provided to the affordable housing developer purchasing the Barcroft property. The ratios do not include bonds where the County has provided a moral obligation pledge as credit support to a project (e.g., the Kettler Iceplex facility). In charts C and D of this section, the customary general obligation debt to the tax base ratio chart has been amended to also show the effect of moral obligation or “subject-to-appropriation” backed capital financing. The ratios do not include debt for the Stormwater Fund or for enterprise funds, including debt included for the Utilities Fund that is supported by user fees. Projected Debt Ratios Ratio of Debt Service to General Expenditures No Greater Than 10% -- Over the ten -year planning period, this ratio will range from 8.79% to 9.87%, peaking in FY 2032. Outstanding Debt as Percentage of Market Valuation of Tax Base No Greater than 3% -- The a mount of debt that the County carries is moderate when compared to its tax base. This ratio is projected to range from 1.3% to 1.5% over the ten-year planning period. Ratio of Debt per Capita to Per Capita Income No Greater than 6% -- The County estimates that the Debt-to-Income ratio will range from 4.5% to 5.2%, assuming 2.4% annual growth in per capita income. Growth in Debt Service over the Ten-Year P lanning Period No Greater than Ten -Year Historical Growth in Revenues – Average annual growth in total County and APS debt service is estimated at 3.7% compared to historical average ten-year revenue growth of 4.4%. B - 12 Adopted Total Ado pted Total 2022 2024 2026 2028 2030 FY 23-32 2024 2026 2028 2030 2032 FY 25-34 LOCAL PARKS & RECREATION Parks Maintenance Capital 4,960 8,000 8,000 8,000 8,000 36,960 5, 825 9,400 8,385 8,590 8,790 40,990 Arlington Boathouse 2,925 - 9,460 - - 12,385 - 9,555 - - 7, 215 16,770 Three Urban Parks in Ballston-Virginia Square 1,450 7,975 - - - 9,425 8,055 - - - - 8,055 Jennie Dean Park 4,400 - - - - 4,400 - - - - - - Parks Land Acquisition and Open Space - - 1,000 1,000 1,000 3,000 1,500 3,030 3,060 3,090 3,125 13,805 Synthetic Fields 300 5,398 - - - 5,698 2,400 - - - - 2,400 Trail & Bridge Modernization 1,500 4,400 4,000 3,050 2,050 15,000 3,435 5,075 5,180 2,525 860 17,075 Shirlington Park - - - - 5,290 5,290 - - - 1,030 4,315 5,345 Gateway Park 1,785 - 10,270 - 1,795 13,850 - 11,635 - - - 11,635 Drew Park - - - - - - 1,540 - - - - 1,540 Nature Resiliency Program 2,000 3,500 1,000 1,000 1,000 8,500 1,515 1,010 1,010 1,010 1,010 5,555 Virginia Highlands Park and Nearby Public Spaces - 1,470 2,075 23,530 27,075 - - - - 1,485 1,485 Emerging Uses Program 2,000 1,500 1,000 500 1,000 6,000 1, 500 1,010 505 1,010 1,010 5,035 Fairfax Drive Public Spaces - - - 2,230 11,610 13,840 - - - 900 13,085 13,985 Langston Boulevard Public Space Improvements - - - - - - - - - - 2,020 2,020 New Park at 26th Street N and Old Dominion Dr - - - - - - - 255 4,600 - - 4,855 Short Bridge Park 1,140 5,635 - - - 6,775 - - - 5,690 - 5,690 Quincy Park - - - - 2,865 2,865 - - 890 4,040 31,490 36,420 Penrose Square Phase 2 - 785 3,925 - - 4,710 - - - 795 3,965 4,760 Sub-total 22,460 37,193 40,125 17,855 58,140 175,773 25,770 40,970 23,630 28,680 78,370 197,420 INFORMATION TECHNOLOGY ConnectArlington - - - - - - 995 2,630 1,965 2,265 2,580 10,435 Sub-total - - - - - - 995 2,630 1,965 2,265 2,580 10,435 TRANSPORTATION Paving 7,200 25,180 25,180 25,180 25,180 107,920 22,035 23,500 24,695 25,950 27,265 123,445 Concrete Maintenance - 1,465 1,555 1,645 1,745 6,410 - - - - - - Curb & Gutter Missing Links 65 260 275 295 315 1,210 240 275 295 315 335 1,460 Bridge Maintenance & Renovation 1,470 2,365 2,500 4,530 1,745 12,610 530 2,695 3,810 3,400 1,940 12,375 Street Lights 1,145 480 455 485 515 3,080 1,380 1,050 200 275 315 3,220 Neighborhood Complete Streets - 850 1,105 1,320 1,320 4,595 855 1,120 1,340 1,340 1,340 5,995 Street Safety Improvements - - - - - - 405 495 530 560 600 2,590 Transportation Asset Management - - - - - - - - - - - - Transportation Systems & Traffic Signals - 1,100 480 400 400 2,380 - 315 570 - - 885 Sidewalk, Curb, Gutter Proactive Zone Maintenance - - - - - - 1,470 1,575 1,665 1,770 1,875 8,355 WalkArlington 400 400 400 400 1,600 410 435 465 490 525 2,325 Signals & ITS Maintenance 150 300 300 300 300 1,350 755 920 1,125 1,355 1,590 5,745 Adopted FY 2023 - FY 2032 CIP Arlington County, Virginia General Obligation Bonds (000s) Adopted FY 2025 - FY 2034 CIP Planning Planning General Obligation Bond Referenda Adopted FY 2023 - FY 2032 to Adopted FY 2025 - FY 2034 B - 13 Adopted Total Adop ted Total 2022 2024 2026 2028 2030 FY 23-32 2024 2026 2028 2030 2032 FY 25-34 Adopted FY 2023 - FY 2032 CIP Arlington County, Virginia General Obligation Bonds (000s) Adopted FY 2025 - FY 2034 CIP Planning Planning General Obligation Bond Referenda Adopted FY 2023 - FY 2032 to Adopted FY 2025 - FY 2034 Sub-total 10,030 32,400 32,250 34,555 31,920 141,155 28,080 32,380 34,695 35,455 35,785 166,395 METRO Metro 42,600 44,100 45,800 47,600 49,900 230,000 44,325 46,260 47,470 49,190 52,425 239,670 COMMUNITY CONSERVATION Arlington Neighborhoods Program 5,000 12,000 14,000 16,000 18,000 65,000 14,000 14,000 14,000 14,000 14,000 70,000 Sub-total 5,000 12,000 14,000 16,000 18,000 65,000 14,000 14,000 14,000 14,000 14,000 70,000 PUBLIC / GOVERNMENT FACILITIES Facilities Maintenance Capital 9,500 13,000 14,000 14,500 15,000 66,000 13,810 4,800 8,485 11,415 11,720 50,230 Fire Stations Replacements & Additions 7,400 24,900 - - 3,000 35,300 - - 250 35,605 - 35,855 Columbia Pike Library Replacement - 1,500 3,300 26,850 - 31,650 - - 4,040 31,690 - 35,730 Carlin Springs Site - - - - - - 8,080 - 6,040 - - 14,120 Detention Facility Comprehensive Study - - - - - - 3,845 6,150 3,125 - - 13,120 Commonwealth Attorney and ASAP Renovation - - - - - - 2,870 - - - - 2,870 Office Space Utilization and Systems Furniture - - - - - - 6,020 5,960 4,180 1,230 - 17,390 Situational Awareness Intelligence Unit, EOC & DPSCEM Consolidation - - - - - - 9,760 - - - - 9,760 Nature Centers - - - - 500 500 - - - - - - Courts / Police Building Improvements 13,100 9,000 6,000 15,000 9,000 52,100 9,175 5,050 7,595 4,070 8,400 34,290 Courthouse Complex Renovations & Infrastructure 12,000 - - - - 12,000 - 14,745 - - - 14,745 Facility Condition Assessments - - - 350 - 350 - - - - - - Lee Community Center 250 - - - - 250 250 - - 15,355 - 15,605 Relocate Cultural Affairs Programs to 3700 3,050 3,050 - - - - - - Trade Center - NOC Relocation - - - - - - - - 6,060 - - 6,060 Trade Center Optimization Plan Implementation 2,000 2,000 - - 3,500 7,500 845 - - - - 845 Quincy Site Planning/Fire Logistics 1,000 - 11,700 - - 12,700 6,500 - - - - 6,500 Sub-total 48,300 50,400 35,000 56,700 31,000 221,400 61,155 36,705 39,775 99,365 20,120 257,120 TOTAL GO & REVENUE BONDS 128,390 176,093 167,175 172,710 188,960 833,328 174,325 172,945 161,535 228,955 203,280 941,040 B - 14 Chart A FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Adopted GENERAL OBLIGATION BONDS ISSUED - COUNTY (1) 123,500,000 87,875,000 97,020,000 87,900,000 86,120,000 78,695,000 127,800,000 101,155,000 85,760,000 117,520,000 GENERAL OBLIGATION BONDS ISSUED - SCHOOLS (1) 99,690,000 31,430,000 76,150,000 58,570,000 50,000,000 50,000,000 50,000,000 50,000,000 50,000,000 50,000,000 GENERAL OBLIGATION BONDS RETIRED (97,135,000) (99,274,500) (104,438,500) (107,683,344) (113,459,272) (121,365,472) (127,921,106) (133,168,583) (135,469,511) (131,799,811) NET TAX-SUPPORTED GENERAL OBLIGATION BONDS AT END OF FISCAL YEAR (2) 1,329,675,000 1,349,705,500 1,418,437,000 1,457,223,656 1,479,884,383 1,487,213,911 1,537,092,806 1,555,079,222 1,555,369,711 1,591,089,900 SUBJECT-TO-APPROPRIATION BOND ISSUANCE - - - - - - - - - - SUBJECT-TO-APPROPRIATION BONDS RETIRED (14,260,000) (13,185,000) (12,070,000) (10,365,000) (10,455,000) (9,245,000) (9,300,000) (5,010,000) (5,075,000) (4,100,000) BARCROFT BONDS ISSUED 120,000,000 BARCROFT BONDS RETIRED - - (3,830,000) (4,000,000) (4,180,000) (4,370,000) (4,560,000) (4,770,000) (4,980,000) (5,210,000) NET TAX-SUPPORTED BONDS AT END OF FISCAL YEAR (3) 1,435,580,000 1,442,425,500 1,615,257,000 1,639,678,656 1,647,704,383 1,641,418,911 1,677,437,806 1,685,644,222 1,675,879,711 1,702,289,900 5.52% 5.06% 4.83% 5.69% 6.52% 4.92% 5.37% 2.74% -0.92% SCHOOLS DEBT SERVICE 67,095,384 70,686,868 73,014,277 75,730,619 78,372,966 8 0,975,795 82,948,211 84,580,028 85,288,824 82,626,273 GENERAL OBLIGATION BONDS & REVENUE BONDS 86,789,790 91,583,858 96,215,118 100,864,503 106,608,696 113,564,056 119,146,450 125,550,453 128,987,504 127,802,339 AHIF - BARCROFT LINE OF CREDIT 7,200,000 7,200,000 10,730,000 10,494,675 10,459,350 10,424,400 10,379,275 10,343,700 10,297,125 10,259,000 TOTAL COUNTY DEBT SERVICE (4) 93,989,790 98,783,858 106,945,118 111,359,178 117,068,046 123,988,456 129,525,725 135,894,153 139,284,629 138,061,339 TOTAL TAX SUPPORTED BONDED DEBT SERVICE 161,085,174 169,470,727 179,959,396 187,089,797 195,441,011 204,964,251 212,473,936 220,474,181 224,573,454 220,687,612 153,885,174 162,270,727 169,229,396 176,595,122 184,981,661 194,539,851 202,094,661 210,130,481 214,276,329 210,428,612 % GROWTH IN TAX-SUPPORTED G.O. DEBT SERVICE 7.2% 5.5% 5.1% 4.8% 5.7% 6.5% 4.9% 5.4% 2.7% -0.9% COUNTY ONLY 4.5% % GROWTH IN TAX-SUPPORTED G.O. DEBT SERVICE 5.7% 5.4% 4.3% 4.4% 4.7% 5.2% 3.9% 4.0% 2.0% -1.8% COUNTY / SCHOOLS 3.7% Proposed CIP General Government Expenditures (2.6% less $7MM) GENERAL GOVERNMENT EXPENDITURES (5) 1,833,473,116 1,879,309,943 1,926,292,692 1,984,081,473 2,043,603,917 2,104,912,034 2,168,059,395 2,233,101,177 2,300,094,213 2,369,097,039 growth assumptions 4.17% 2.50% 2.50% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% DEBT SERVICE AS % OF EXPENDITURES 8.79% 9.02% 9.34% 9.43% 9.56% 9.74% 9.80% 9.87% 9.76% 9.32% MARKET VALUATION OF TAXABLE PROPERTY (6) 97,829,427,087 100,372,992,191 103,384,181,957 106,485,707,415 109,680,278,638 112,970,686,997 116,359,807,607 119,850,601,835 123,446,119,890 127,149,503,487 Consistent with FY2016 Adopted Budget 10.59% 2.60% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% NET TAX SUPPORTED DEBT AS % OF MARKET VALUATION (3% 1.5% 1.4% 1.6% 1.5% 1.5% 1.5% 1.4% 1.4% 1.4% 1.3% POPULATION (7) 245,800 248,680 251,560 254,440 257,320 260,200 262,740 265,280 267,820 270,360 DEBT PER CAPITA $5,840 $5,800 $6,421 $6,444 $6,403 $6,308 $6,384 $6,354 $6,257 $6,296 INCOME PER CAPITA (8) $112,830 $115,538 $118,311 $121,150 $124,058 $127,035 $130,084 $133,206 $136,403 $139,677 Consistent with FY2016 Adopted Budget 2.40% 2.40% NET TAX-SUPPORTED GENERAL OBLIGATION DEBT TO INCOME (NOT TO EXCEED 6%) 5.18% 5.02% 5.43% 5.32% 5.16% 4.97% 4.91% 4.77% 4.59% 4.51% (1) Updated for 2023 GO Bond Issuance. 5% coupon rate assumed on all other bond issuance. Includes bonds planned in APS' Proposed FY 2025 - FY 2034 CIP under "MPSA Option 2". (2) Excludes General Obligation bonds issued for the Utilities Fund. (3) Excludes credit support commitments on revenue bonds or lease-backed bond financings. Includes subject to appropriation bonds supported by the County's General Fund. For all subject to appropriation debts, see Chart C. (4) Includes both General Obligation and Subject to Appropriation debt service. Excludes Utilities Fund, Stormwater Fund, Transportation Capital Fund, and STF Debt Service and other debt costs (5) Includes expenditures of General Fund and certain Special Revenue Funds of the County and School Board. Assumes 2.5% growth in FY 2026 and FY 2027, increasing to 3.0% in FY2028 and beyond. (6) Includes real, personal property, and public property. Assumes 2.6% growth in FY 2026, increasing up to 3.0% in FY2027 and beyond. (7) Population as of January 1, 2024 using Arlington County estimates with growth as estimated by MWCOG Round 8.4 Forecasts. (8) Source: Bureau of Economic Analysis with growth of 2.4% consistent with PCPI annual growth in Virginia from 2010 - 2020. Adopted FY 2025 - FY 2034 CIP Arlington County, Virginia Debt Ratio Forecast B - 15 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034 Projection 8.79% 9.02% 9.34% 9.43% 9.56% 9.74% 9.80% 9.87% 9.76% 9.32% Ceiling 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% Ratio of Tax‐Supported Debt Service to General Expenditures Adopted FY 2025 ‐ FY 2034 CIP (NOT TO EXCEED 10%) Chart B B - 16 Chart C FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Adopted Tax-Supported General Obligation Debt $1,329,675,000 $1,349,705,500 $1,418,437,000 $1,457,223,656 $1,479,884,383 $1,487,213,911 $1,53 7,092,806 $1,555,079,222 $1,555,369,711 $1,591,089,900 Tax-Supported Subject to Appropriation ("STA") Debt Capital Equipment Short Term Financing (2) 34,612,458 41,045,115 53,194,087 55,328,287 57,511,458 63,149,087 60,965,372 60,088,772 62,65 2,715 71,661,687 Industrial Development Authority (IDA) Bonds (3) 73,160,000 68,055,000 62,865,000 57,585,000 52,215,000 46,780,000 41,285,000 36,275,000 31,200,000 27,100,000 Subtotal $107,772,458 $109,100,115 $116,059,087 $112,913,287 $109,726,458 $109,929,087 $102,250,372 $96,363,772 $93,852,715 $98,761,687 Project-Supported Subject to Appropriation ("STA") Debt (4) IDA Revenue Refunding Bonds (Ballston Skating Facility) (5) 15,800,000 13,635,000 11,445,000 9,225,000 6,975,000 4,690,000 2,365,000 - - - Subtotal 15,800,000 13,635,000 11,445,000 9,225,000 6,975,000 4,690,000 2,365,000 - - - Total Tax-Supported General Obligation (GO) & ALL STA Financings 1,453,247,458 1,472,440,615 1,545,941,087 1,579,361,942 1,596,585,841 1,601,832,998 1,641,708,178 1,651,442,995 1,649,222,426 1,689,851,587 Total Tax-Supported GO and Tax-Supported STA Financings 1,437,447,458 1,458,805,615 1,534,496,087 1,570,136,942 1,589,610,841 1,597,142,998 1,639,343,178 1,651,442,995 1,649,222,426 1,689,851,587 Total Project-Supported STA Financings 15,800,000 13,635,000 11,445,000 9,225,000 6,975,000 4,690,000 2,365,00 0000 Market Value of Taxable Property 97,829,427,087 100,372,992,191 103,384,181,957 106,485,707,415 109,680,278,638 112,970,686,997 116,359,807,607 119,850,601,835 123,446,119,890 127,149,503,487 Total Tax-Supported GO & ALL STA Financings as Percent of Market Value (Not to Exceed 4%) 1.49% 1.47% 1.50% 1.48% 1.46% 1.42% 1.41% 1.38% 1.34% 1.33% Total Tax-Supported GO & Tax-Supported STA Financings as Percent of Market Value 1.47% 1.45% 1.48% 1.47% 1.45% 1.41% 1.41% 1.38% 1.34% 1.33% Total Project-Supported STA Financings (Credit Enhancement) as Percent of Market Value (2) 0.02% 0.01% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% (1) Excludes Self-supporting debt in the Utility Fund. (2) Includes existing and planned capital equipment short term financing in the General Fund, Auto Fund, Utilities Fund and Schools Fund. (3) Includes the Series 2013, 2017 IDA Bonds, the 2020 A & B IDA Bonds, and Series 2023B IDA bonds. (4) Debt service on these financings is intended to be repaid by user fees or tenant rental income, not by County General Fund revenues. (5) Includes $19.71 million of Series 2020B IDA revenue refunding bonds issued to refinance the construction of two ice rinks, the office space, and the training facility on top of the 8th Level at the Ballston Parking Garage. Summary of Tax‐Supported General Obligation Bonds & Subject To Appropriation‐Type Financings (1) Ratio of Outstanding Debt to Market Value Adopted FY 2025 ‐ FY 2034 CIP As of June 30 B - 17 FY 2025 FY  2026 FY  2027 FY  2028 FY  2029 FY  2030 FY  2031 FY  2032 FY  2033 FY  2034 Project‐Supported 0.02% 0.01% 0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% Tax‐Supported 1.47% 1.45% 1.48% 1.47% 1.45% 1.41% 1.41% 1.38% 1.34% 1.33% Not to Exceed 3% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 3.00% 0.00% 0.50% 1.00% 1.50% 2.00% 2.50% 3.00% 3.50% Ratio of Tax‐Supported & Subject to Appropriation Financing as a Percentage of Market Value  Adopted FY 2025 ‐ FY 2034 CIP Tax‐Supported Project‐Supported Not to Exceed 3% Chart D B - 18 5.18% 5.02% 5.43% 5.32% 5.16% 4.97% 4.91% 4.77% 4.59% 4.51% 0.00% 1.00% 2.00% 3.00% 4.00% 5.00% 6.00% 7.00% FY 2025 FY  2026 FY  2027 FY  2028 FY  2029 FY  2030 FY  2031 FY  2032 FY  2033 FY  2034 Ratio of Tax‐Supported General Obligation Debt to Income Adopted FY 2025 ‐ FY 2034 CIP Not to Exceed 6% Tax‐Supported Debt to Income Not to Exceed 6% Chart E B - 19 Arlington County, Virginia REGIONAL PARTNERSHIPS AND CONTINGENCIES P rogram Description Northern Virginia Regional Park Authority Northern Virginia Regional Park Authority owns and protects more than 10,000 acres of land in 19 parks, including Potomac Overlook, Upton Hill and the W&OD Regional Parks in Arlington. Funds are used to preserve, improve, expand, renovate , and enhance the parks and facilities. This program helps to improve the quality of the parks, encourage greater usage, and continue to serve the needs of the public. This program augments the Public Spaces Master Plan (PSMP) and as well as complements open space, cultural and recreational programs of Arlington County and five other member jurisdictions. Arlington is one of six jurisdictions that share costs associated with NVRPA's capital program. The County's share is based on the percentage distribution of population estimates provided by the US Bureau of the Census. Arlington's capital contribution is from PAYG funding that is appropriated annually as part of the operating budget. The operating contribution is included as part of the general fund's regional partnerships operating budget. N orthern Virginia Criminal Justice Academy In 2006, the principal members agreed to fund the construction of the Emergency Vehicle Operations Center (EVOC). The bond financing contributions towards the NVCJTA partnership continues through 2026. The Northern Virginia Criminal Justice Training Academ y is dedicated to advancing competence and professionalism in law enforcement. The Academy is the largest regional law enforcement training facility in Virginia. Every person employed as a full-time law enforcement officer must meet compulsory minimum training standards. Individuals must first be hired by a supporting agency as a police officer or deputy sheriff before coming to the Academy for training. The training must be obtained from a state certified law enforcement training facility and must be completed within 12 months of the date of appointment. The Academy receives state funding as well as support from the jurisdictions it serves. Arlington is also one of ten supporti ng jurisdictions that provide a proportionate share of the Academy's operating budget based on its sworn population in relation to the total sworn population of all participating agencies. Arlington's capital contribution is from PAYG funding that is appropriated annually as part of the operating budget and pays for our share of debt service on the bonds for the Emergency Vehicle Operations Center. C apital Administration Each year, the capital program allocates funding for administrative support of capital projects tracking, reporting , and procurement in the Department of Management and Finance. C - 1 Arlington County, Virginia REGIONAL PARTNERSHIPS AND CONTINGENCIES CIP 2025 − 2034 10 Y EAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Regional Partnerships 858 866 768 776 783 791 799 807 815 823 8,086 Capital Administration 825 300 309 318 328 338 348 358 369 380 3,873 Total Recommendation 1,683 1,166 1,077 1,094 1,111 1,129 1,147 1,165 1,184 1,203 11,959 P ROGRAM FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 0 0 0 0 0 0 0 0 0 0 PAYG 1,683 1,166 1,077 1,094 1,111 1,129 1,147 1,165 1,184 1,203 11,959 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 1,683 1,166 1,077 1,094 1,111 1,129 1,147 1,165 1,184 1,203 11,959 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 1,683 1,166 1,077 1,094 1,111 1,129 1,147 1,165 1,184 1,203 11,959 C - 2 Arlington County, Virginia CIP 2025 − 2034 REGIONAL PARTNERSHIPS AND CONTINGENCIES: REGIONAL PARTNERSHIPS PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Northern Virginia Criminal Justice Academy 127 128 0 0 0 0 0 0 0 0 255 2. Northern Virginia Regional Park Authority 731 738 768 776 783 791 799 807 815 823 7,831 Total Recommendation 858 866 768 776 783 791 799 807 815 823 8,086 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 0 0 0 0 0 0 0 0 0 0 PAYG 858 866 768 776 783 791 799 807 815 823 8,086 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 858 866 768 776 783 791 799 807 815 823 8,086 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 858 866 768 776 783 791 799 807 815 823 8,086 C - 3 REGIONAL PARTNERSHIPS AND CONTINGENCIES Capital Improvement Plan Regional Partnerships FY 2025-2034 1. NORTHERN VIRGINIA CRIMINAL JUSTICE ACADEMY Project Highlights: • The Northern Virginia Criminal Justice Academy (NVCJA) provides law enforcement training and is comprised of seventeen police and sheriff agencies from Northern Virginia and the District of Columbia. • In 2006, the principal members agreed to fund the construction of the Emergency Vehicle Operations Center (EVOC). • The bond financing contributions towards the NVCJTA partnership continues through 2026. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 127 128 255 Previous Funding Total Funding 127 128 0 0 0 0 0 0 0 0 255 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Changes in funding reflect the completion of bond financing contributions in FY 2026. . C - 4 REGIONAL PARTNERSHIPS AND CONTINGENCIES Capital Improvement Plan Regional Partnerships FY 2025-2034 2. NORTHERN VIRGINIA REGIONAL PARK AUTHORITY Project Highlights: • The Northern Virginia Regional Park Authority (NVRPA) is a multi-jurisdictional agency comprised of Arlington County, Fairfax County, Loudoun County, and the Cities of Alexandria, Falls Church, and Fairfax. • Northern Virginia Regional Park Authority owns and protects more than 10,000 acres of land in 19 parks, including Potomac Overlook, Upton Hill and the W&OD Regional Parks in Arlington. • Funds are used to preserve, improve, expand, renovate and enhance the parks and facilities. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 731 738 768 776 783 791 799 807 815 823 7,831 Previous Funding Total Funding 731 738 768 776 783 791 799 807 815 823 7,831 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Changes from Prior CIP: Funding adjusted based on current and anticipated regional cost allocations. C - 5 Arlington County, Virginia CIP 2025 − 2034 REGIONAL PARTNERSHIPS AND CONTINGENCIES: CAPITAL ADMINISTRATION PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Capital Administration & Contingent 825 300 309 318 328 338 348 358 369 380 3,873 Total Recommendation 825 300 309 318 328 338 348 358 369 380 6,373 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 0 0 0 0 0 0 0 0 0 0 PAYG 825 300 309 318 328 338 348 358 369 380 3,873 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 825 300 309 318 328 338 348 358 369 380 3,873 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 825 300 309 318 328 338 348 358 369 380 3,873 C - 6 REGIONAL PARTNERSHIPS AND CONTINGENCIES Capital Improvement Plan Capital Administration FY 2025-2034 CAPITAL ADMINISTRATION & CONTINGENT Project Highlights: • Funding is for administrative support of capital projects tracking, reporting and procurement in the Department of Management and Finance. • The capital contingent is one-time funding used to fund unforeseen project budget increases or new projects that have been prioritized for funding outside of a budget cycle. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 825 300 309 318 328 338 348 358 369 380 3,873 Previous Funding Total Funding 825 300 309 318 328 338 348 358 369 380 3,873 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 C hanges from Prior CIP: The FY 2025 amount is adjusted based on funds allocated as part of the FY 2025 Adopted Operating Budget. C - 7 Arlington County, Virginia LOCAL PARKS AND RECREATION PROGRAMS P rogram Description The Local Parks and Recreation Capital Improvement Program consists of key projects and program elements that provide for the design and construction of new park facilities and major upgrades or renovations of existing park facilities. The program represents an implementation plan and strategies based upon sound planning to ensure that capital funding is invested strategically for the benefit of the County and its residents. P rogram Summary Local Parks and Recreation projects fall into five main program categories: Parks Maintenance Capital Program, Parks Master Plan Program (including the Emerging Uses Program and the Natural Resiliency Program), Synthetic Turf Program, Trail and Bridge Mode rnization Program, and Parks Land Acquisition and Public Space Program. The FY2025 - FY2034 CIP focuses on funding that supports critical maintenance for existing park amenities as well as the continuation of work on parks that have park master plans that have been adopted by the County Board or have undergone significant community planning efforts. The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing outdoor facilities to ensur e efficient, safe, high-quality facilities. The program funds the replacement or major renovation of outdoor park and recreation facility assets, including athletic fields and courts, field and court lighting, playgrounds, picnic shelters, restrooms, parking and other miscellaneou s park and recreation facilities. The program also addresses accessibility, safety and storm water improve ments that are complementary to renovating the facilities. The ten-year CIP includes Park Master Plan Program funding for several projects in the Crystal City area, including Metro Market Square, Center Park, and 15th Street Park. The CIP also includes funding for Arlington Boathouse per the existing Programmatic Agreement with the National Park Service, National Capital Planning Commission, District of Columbia State Historic Preservation Office and Virginia State Historic Preservation Office for the development of a boathouse and related facilities on the Virgini a side of the Potomac River. The FY 2025 - FY 2034 CIP continues with funding for the Emerging Uses Program and the Natural Resiliency Program that were established during the previous CIP. The Emerging Uses Program is aimed at addressing the recreational needs of users for new recreational activities, previously not provided among the assets within the County. The purpose of the Natural Resiliency Program is to provide funding for the preservation, conservation and renovation of Arlington's natural resources and the design and installation of modifications within various parks to allow temporary flooding and inundation of parkland in prevention of downstream destruction by floodwaters. The Synthetic Turf Program is primarily focused on replacement of existing synthetic turf athletic fields that are approachin g the end of their useful life. Turf replacement typically involves removal of the existing turf and infill, verification of subgrade drainage and planarity, installation of new turf and field lines and backfilling with a turf infill. The funding for FY 2025 - FY 2034 also includes funds to convert the grass fields at Kenmore Middle School to synthetic turf. Conversion involves excavation and exportation of existing soil, installation of drainage base materials, installation of athletic field drainage systems, improv ed stormwater management systems, installation of synthetic turf and infill, and installation of lighting and site amenities, including site furnishings, site circulation, accessibility improvements and landscaping. The Trail and Bridge Modernization Program is largely focused on replacement and major renovation of the County's 35.22 miles of off- street, multi-purpose trails that are approaching the end of their useful life. The other component of this program focuses on the repair or replacement of pedestrian bridges and low-water fords on multi-purpose trails and hiking trails. The purpose of the Parks Land Acquisition and Public Space Program is to have reserves on hand that allow the County to strat egically acquire real property for parks and public spaces based on recommendations in the Public Spaces Master Plan. In addition to the acquisition of real property for park land, the program funds ancillary activities, such as project management, appraisals, surveys, environmental assessments, demolition, site restoration, fencing, and fees to change the general land use plan and zoning classification. M aster Plan Impact The Public Spaces Master Plan (PSMP), adopted in April 2019, is an element of the County's Comprehensive Plan. This CIP seeks funds for a consultant review of that plan now that it has been in place for five years. C - 8 Arlington County, Virginia LOCAL PARKS AND RECREATION PROGRAMS CIP 2025 − 2034 10 Y EAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Maintenance Capital 4,250 5,912 6,128 5,829 5,950 6,076 6,097 6,219 6,241 6,363 59,065 Park Master Plans 3,938 16,557 34,010 25,990 2,230 10,760 12,040 2,940 16,110 56,990 181,565 Trail and Bridge Modernization 2,675 3,935 2,525 2,550 2,575 2,605 2,070 455 455 405 20,250 Parks Land Acquisition and Open Space 1,500 0 3,030 0 3,060 0 3,090 0 3,125 0 13,805 Synthetic Turf Program 11,825 1,041 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 34,065 Total Recommendation 24,188 27,445 48,030 37,501 15,909 21,416 24,931 13,231 30,641 65,458 308,750 P ROGRAM FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 1,400 3,000 18,895 6,310 0 0 0 0 0 5,000 34,605 New Bond Issue 7,480 17,055 23,675 18,530 10,840 12,790 20,940 7,740 23,530 54,840 197,420 PAYG 2,720 2,167 1,273 2,489 2,315 1,831 2,357 1,874 2,401 1,918 21,345 Short Term Finance 0 1,041 1,702 1,997 2,094 1,975 1,007 2,231 3,000 1,511 16,558 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 5,270 0 1,635 1,135 0 0 627 1,386 1,710 2,189 13,952 Tax Increment Financing (TIF) 0 200 850 7,040 660 4,820 0 0 0 0 13,570 Subtotal New Funding 16,870 23,463 48,030 37,501 15,909 21,416 24,931 13,231 30,641 65,458 297,450 Previously Approved Funding Authorized but Unissued Bonds 605 0 0 0 0 0 0 0 0 0 605 Issued but Unspent Bonds 2,675 621 0 0 0 0 0 0 0 0 3,296 Tax Increment Financing (TIF) 1,038 3,061 0 0 0 0 0 0 0 0 4,099 Other Previously Approved Funds 3,000 300 0 0 0 0 0 0 0 0 3,300 Subtotal Previously Approved Funding 7,318 3,982 0 0 0 0 0 0 0 0 11,300 Total Funding Sources 24,188 27,445 48,030 37,501 15,909 21,416 24,931 13,231 30,641 65,458 308,750 C - 9 Arlington County, Virginia CIP 2025 − 2034 LOCAL PARKS AND RECREATION PROGRAMS: MAINTENANCE CAPITAL PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Parks Maintenance Capital Program 4,250 5,710 5,924 5,623 5,742 5,866 5,885 6,005 6,024 6,144 57,173 2. Feasibility Studies and Implementation 0 202 204 206 208 210 212 214 217 219 1,892 Total Recommendation 4,250 5,912 6,128 5,829 5,950 6,076 6,097 6,219 6,241 6,363 59,065 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 2,080 3,745 5,360 4,040 4,140 4,245 4,245 4,345 4,345 4,445 40,990 PAYG 1,565 2,167 768 1,789 1,810 1,831 1,852 1,874 1,896 1,918 17,470 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 3,645 5,912 6,128 5,829 5,950 6,076 6,097 6,219 6,241 6,363 58,460 Previously Approved Funding Authorized but Unissued Bonds 605 0 0 0 0 0 0 0 0 0 605 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 605 0 0 0 0 0 0 0 0 0 605 Total Funding Sources 4,250 5,912 6,128 5,829 5,950 6,076 6,097 6,219 6,241 6,363 59,065 C - 10 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Maintenance Capital FY 2025-2034 1. PARKS MAINTENANCE CAPITAL PROGRAM Project Highlights: • The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing outdoor facilities to ensure efficient, safe, high -quality park and recreation facilities. • The program provides for replacement of existing facilities that are at or near the end of their useful life. • Project replacements and upgrades are prioritized based on fostering equity, as determined through an analysis of census data, combined with park condition assessments. Additionally, real- time staff assessment of existing equipment is considered for variation in use patterns and life and safety issues associated with existing equipment. • For this CIP, various playgrounds are being replaced including Arlington Hall West Park, Doctor’s Run Park, Cherrydale Park, and Bon Air Park Picnic Shelter and Playground. • Other park renovations are scheduled for Douglas Park Phase 2 and strategic replacements of individual park components at a number of parks across the County. • The CIP also includes refreshment of the Public Spaces Master Plan which guides identification and formulation of Master Plan, trail, field, and other parks projects. • The program funds various activities that support parks programs including Capital Asset Management, Equipment at DPR facilities, and Field Funds. Associated Plan(s): Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS C ritical Milestones: • Critical Milestones will be developed independently for each project. To Be Determined • Begin PSMP Study and Analysis Fall 2024 • Recommend PSMP Updates Spring 2025 • Finalize PSMP Refresh Fall 2025 C hanges from Prior CIP: Funding has been adjusted based on anticipated projects and inflation. A list of upcoming maintenance capital projects is provided on the following page. Funding Notes: Grass turf fields are funded through PAYG. Other program elements including playgrounds, athletic courts, lighting, picnic shelters, restrooms, and parking lots may be funded through either PAYG or Bond referenda. Trails, bridges a nd synthetic turf fields are funded through separate programs. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 2,080 3,745 5,360 4,040 4,140 4,245 4,245 4,345 4,345 4,445 40,990 PAYG 1,565 1,965 564 1,583 1,602 1,621 1,640 1,660 1,679 1,699 15,578 Previous Funding Authorized but Unissued Bonds 605 605 Total Funding 4,250 5,710 5,924 5,623 5,742 5,866 5,885 6,005 6,024 6,144 57,173 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 C - 11 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Maintenance Capital FY 2025-2034 2. FEASIBILITY STUDIES AND IMPLEMENTATION Project Highlights: • Master planning funds provide the ability to conduct timely and relevant analyses and studies for new planning initiatives and implementation of these plans and studies that are outside current CIP projects. Associated Plan(s): Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) N eighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 202 204 206 208 210 212 214 217 219 1,892 Previous Funding Total Funding 0 202 204 206 208 210 212 214 217 219 1,892 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Milestones are developed for each study. C hanges from Prior CIP: There is no funding request for FY 2025 to allow DPR to catch up on existing projects. The outyear funding amount is reduced from $300K to $200K (prior to escalation) to better align with staffing capacity. C - 12 FY 2025 List of Projects under Parks Facilities Maintenance Program Project Name Description Funded by (Dollars in Thousands) PAYG Bond Total Capital Asset Manager Staff resources to manage the Parks Capital Asset Program. $175 $175 Parks Field Fund The Parks Field Fund is supported by an annual fee assessed on official affiliated youth and adult sports teams playing on Arlington County rectangular and diamond fields. The fees assessed are directed to support replacement and construction of synthetic turf fields in the County and for specific diamond field enhancements, such as improved irrigation, batting cages or accelerated sod replacement. $290 $290 Public Spaces Master Plan Refresh The purpose of this project is to review and refresh several elements of the 2019 Public Spaces Master Plan (PSMP). Elements to be updated include conducting a needs assessment and performing a statistically valid survey, updating inventory and level of service analyses, reviewing land acquisition criteria, methodologies and priorities, and general narrative updates. $300 $300 Arlington Hall West Playground Replacement Design for the replacement of the playground, site circulation, site furnishings, landscaping, and stormwater management improvements at Arlington Hall West Park. This is one of the older playgrounds in the County and replacement parts are no longer available from the playground manufacturer. Portions of the playground are currently closed. Design funding is requested in FY 2025 and construction funding is requested in FY 2026. $605 $605 Doctors Run Park Playground Replacement Construction of the replacement of the children's playground and stone dust volleyball court, picnic shelter, site circulation and accessibility, site furnishings, landscaping, and stormwater management improvements at Doctors Run Park. This follows on design that was funded in FY 2024. $2,080 $2,080 Pooled Park Project Improvements During a park assessment conducted between 2020 -2023, some parks with few park assets received a low score due to a single park feature that needed to be replaced. Improvements are anticipated at multiple parks, including Dark Star Park, Kirkwood Road Park, Kirkwood Road Neighborhood Park, 18th Street North and North Lincoln Street Park, James W. Haley Park, and Lang Street Community Gardens. Project examples include a retaining wall or fence that needs to be replaced with a new wall or fence. Needs vary by park. $800 $800 Total $1,565 $2,685 $4,250 C - 13 FY 2026 List of Projects under Parks Facilities Maintenance Program Project Name Description Funded by (Dollars in Thousands) PAYG Bond Total Capital Asset Manager Staff resources to manage the Parks Capital Asset Program. $182 $182 Parks Field Fund The Parks Field Fund is supported by an annual fee assessed on official affiliated youth and adult sports teams playing on Arlington County rectangular and diamond fields. The fees assessed are directed to support replacement and construction of synthetic turf fields in the County and for specific diamond field enhancements, such as improved irrigation, batting cages or accelerated sod replacement. $273 $273 Arlington Hall West Playground Replacement Construction for replacement of the playground, site circulation, site furnishings, landscaping, and stormwater management improvements at Arlington Hall West Park. This is one of the older playgrounds in the County and replacement parts are no longer available from the playground manufacturer. Portions of the playground are currently closed. Design funding is requested in FY 2025 and construction funding in FY 2026. $1,845 $1,845 Equipment at DPR Facilities Purchase and replacement of equipment at DPR facilities. $101 $101 Cherrydale Park Playground Replacement Design for a playground replacement at Cherrydale Park. The project also includes replacement of retaining walls, site access, site circulation, site furnishings, landscaping, and stormwater management improvements. The playground at Cherrydale Park is one of the older playgrounds in the County. Portions of the playground are currently closed. Design funding is requested in FY 2026 and construction funding is requested in FY 2027. $677 $677 Douglas Park, Phase 2 Design and Construction Continuation of the full replacement of the amenities in Douglas Park. The Phase 1 improvements to Douglas Park include replacement of the picnic shelter, one pedestrian bridge, site furnishings, site circulation, stormwater management improvements, invasive removal in the forested area and reforestation plantings. The Phase 2 improvements include the remaining amenities, which include replacement of the playground, one additional pedestrian bridge, earthwork, site circulation and site furnishings, including benches, trash and recycling receptacles, picnic tables, signage, bicycle racks, landscaping, and storm water management facilities. $733 $733 Bon Air Park Picnic Shelter and Playground Design and construction for replacing the picnic shelter and playground at the rear of Bon Air Park. This picnic shelter and small playground have long been a favorite destination for group and family picnics. Both the picnic shelter and playground are intended to be redesigned in a manner that acknowledges and anticipates that the area will occasionally flood. $1,900 $1,900 Total $2,168 $3,745 $5,710 C - 14 Arlington County, Virginia CIP 2025 − 2034 LOCAL PARKS AND RECREATION PROGRAMS: PARK MASTER PLANS PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Arlington Boathouse 0 0 0 15,865 0 0 0 0 0 12,215 28,080 2. Crystal City Parks and Public Space 1,038 6,682 2,695 7,040 660 4,820 0 0 0 0 22,935 3. Drew Park 0 305 115 1,820 0 0 0 0 0 0 2,240 4. Emerging Uses Program 1,500 0 1,010 0 505 0 1,010 0 1,010 0 5,035 5. Fairfax Drive Public Spaces 0 0 0 0 0 0 0 900 1,360 11,725 13,985 6. Gateway Park (Rosslyn) 1,400 0 29,685 0 0 0 0 0 0 0 31,085 7. Langston Boulevard Public Space Improvements 0 0 0 0 0 0 0 0 0 2,020 2,020 8. Natural Resiliency Program 0 1,515 0 1,010 0 1,010 0 1,010 0 1,010 5,555 9. New Park at 26th Street N and Old Dominion Drive 0 0 0 255 560 4,040 0 0 0 0 4,855 10. Parks Athletic Courts Program 0 0 505 0 505 0 505 0 505 0 2,020 11. Penrose Square, Phase 2 0 0 0 0 0 0 795 0 0 3,965 4,760 12. Quincy Park 0 0 0 0 0 890 4,040 0 8,920 24,570 38,420 13. Shirlington Park 0 0 0 0 0 0 0 1,030 4,315 0 5,345 14. Short Bridge Park 0 0 0 0 0 0 5,690 0 0 0 5,690 15. Three Urban Parks 0 8,055 0 0 0 0 0 0 0 0 8,055 16. Virginia Highlands Park/Nearby Public Space 0 0 0 0 0 0 0 0 0 1,485 1,485 Total Recommendation 3,938 16,557 34,010 25,990 2,230 10,760 12,040 2,940 16,110 56,990 181,565 C - 15 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 1,400 3,000 18,895 6,310 0 0 0 0 0 5,000 34,605 New Bond Issue 1,500 9,875 12,760 11,940 1,065 5,940 11,535 2,940 15,605 49,990 123,150 PAYG 0 0 505 700 505 0 505 0 505 0 2,720 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 1,000 0 0 0 0 0 0 2,000 3,000 Tax Increment Financing (TIF) 0 200 850 7,040 660 4,820 0 0 0 0 13,570 Subtotal New Funding 2,900 13,075 34,010 25,990 2,230 10,760 12,040 2,940 16,110 56,990 177,045 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 121 0 0 0 0 0 0 0 0 121 Tax Increment Financing (TIF) 1,038 3,061 0 0 0 0 0 0 0 0 4,099 Other Previously Approved Funds 0 300 0 0 0 0 0 0 0 0 300 Subtotal Previously Approved Funding 1,038 3,482 0 0 0 0 0 0 0 0 4,520 Total Funding Sources 3,938 16,557 34,010 25,990 2,230 10,760 12,040 2,940 16,110 56,990 181,565 C - 16 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 1. ARLINGTON BOATHOUSE Project Highlights: • This project has been in the planning process for more than three decades. • A major step forward occurred in May 2019 when the County Board authorized the County Manager to sign a Programmatic Agreement with the National Park Service, National Capital Planning Commission, District of Columbia State Historic Preservation Office and Virginia State Historic Preservation Office for developing a boathouse and related facilities on the Virginia side of the Potomac River on federal land administered by the George Washington Memorial Parkway. • The County has ten years, until 2029, to construct the boathouse on the Lower Rosslyn Site before the agreement expires. • The project involves a Lower Rosslyn Site adjacent to the Potomac River for direct water access and an Upper Rosslyn Site for support facilities on land that the County already owns. • Master planning is anticipated to start in FY 2025 with design of the facilities to follow in FY 2026. This schedule should allow the project at the Lower Site to be under construction by the 2029 agreement expiration date. Associated Plan(s): Forestry and Natural Resources Plan Public Art Master Plan (PAMP) Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS Critical Milestones: • National Park Service completes Environmental Impact Statement 2018 • Programmatic Agreement signed by National Park Service, Arlington County and others 2019 • Begin Master Plan development of Upper and Lower Rosslyn site areas 2025 • Develop final design for Upper and Lower Rosslyn Sites for Boathouse 2026 • Begin construction of Lower Rosslyn Site 2029 • Agreement Expiration Date 2029 Funding Notes: Assumes 60 percent County funding and 40 percent outside funding for construction of the Lower Rosslyn Site in FY 2028. Construction of the Upper Rosslyn Site in FY 2034 assumes $5M in outside/developer funding. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 6,310 5,000 11,310 New Bond Issue 9,555 7,215 16,770 Previous Funding Total Funding 0 0 0 15,865 0 0 0 0 0 12,215 28,080 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 122 125 129 133 137 646 Personnel ($) 116 119 123 127 130 615 Total Impact 0 0 0 0 0 238 244 252 260 267 1,261 Changes from Prior CIP: Changes from the last CIP include construction of the Upper Rosslyn Site in a succeeding fiscal year from construction of the Lower Rosslyn Site. Completion of the Lower Rosslyn Site is dictated by the Programmatic Agreement whereas completion of the Upper Rosslyn Site does not have this time constraint. C - 17 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 2. CRYSTAL CITY PARKS AND PUBLIC SPACE Project Highlights: • Three parks are anticipated to be constructed in Crystal City by the end of the decade. • The first park is Metro Market Square to be located at 18th Street South and Crystal Drive at the site of a future Metro station entrance. • The second Crystal City project is Phase 1 of Center Park, which will be a new, two -acre centrally located park, programmed for active use and as the principal gathering space for the community. • The third Crystal City project is 15th Street Park, which is bound by South Bell Street, 15th Street South, and Crystal Drive. • The timing and order of construction has been updated for this CIP. Associated Plan(s): Crystal City Sector Plan Public Spaces Master Plan (PSMP) Neighborhood(s): Crystal City Critical Milestones: • Master Planning of Metro Market Square 2024 • Design of Metro Market Square 2025 • Construction of Metro Market Square 2026-2027 • Master Planning of Center Park 2026 • Design of Center Park 2027 • Construction of Center Park 2028 • Master Planning of 15th Street Park 2028 • Design of 15th Street Park 2029 • Construction of 15th Street Park 2030 Changes from Prior CIP: Changes from the previous CIP include a re-ordering of projects. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 3,000 1,845 4,845 Tax Increment Financing (TIF) 200 850 7,040 660 4,820 13,570 Previous Funding Issued but Unspent Bonds 121 121 Tax Increment Financing (TIF) 1,038 3,061 4,099 Other Previously Approved Funds 300 300 Total Funding 1,038 6,682 2,695 7,040 660 4,820 0 0 0 0 22,935 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 53 55 113 116 155 160 165 170 987 Personnel ($) 106 109 113 116 120 123 127 130 944 Total Impact 0 0 159 164 226 232 275 283 292 300 1,931 C - 18 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 3. DREW PARK Project Highlights: • The project includes developing a final park master plan, final site design and construction of the new park. • The new elementary school building displaced the former park. The County has assembled a new park along S. Kenmore Street to replace the former park. The new Drew Park is comprised of acquisitions of several private parcels, a YMCA-donated parcel , and an exchange of approximately two acres of property with Arlington Public Schools. • As part of this project, the master plan will be updated and forwarded for adoption to the County Board and then will be followed by final design and construction of the park. Associated Plan(s): Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 305 115 1,120 1,540 PAYG 700 700 Previous Funding Total Funding 0 305 115 1,820 0 0 0 0 0 0 2,240 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 13 13 13 13 13 65 Total Impact 0 0 0 0 0 13 13 13 13 13 65 Critical Milestones: • Anticipate Master Planning to start Spring 2026 • Anticipate Design to start Spring 2027 • Anticipate Construction to start Spring 2028 • Anticipate Construction completion Spring 2029 Changes from Prior CIP: This project is new to the FY 2025 – FY 2034 CIP following the recent acquisition of the duplex property adjacent to this site. C - 19 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 4. EMERGING USES PROGRAM Project Highlights: • This program is designed to respond to emerging recreational and casual use activities in parks and recreation. The need to accommodate new trends in recreation, such as pickleball, mountain biking, skateboarding, and other recommendations, is identified in the 2019 Public Spaces Master Plan (PSMP). • The program will allow for the timely study, design and exploration of biophilic principles as they relate to these projects, and implementation of recreation and casual use needs that impact limited park spaces and conflicts within the County's park syste m. Biophilic principles focus on integrating natural elements into the built environment. • This program will address uses such as the design and construction of a permanent pickleball facility, lining of multi-use courts for tennis and pickleball, design of improvements to natural surface trails, possible construction of a mountain biking area or the creation of a pump track for mountain biking. • Future funding may address skateboarding, dog parks, casual use spaces or other uses raised by the PSMP, community or from various studies or policy changes. Associated Plan(s): Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 1,500 1,010 505 1,010 1,010 5,035 Previous Funding Total Funding 1,500 0 1,010 0 505 0 1,010 0 1,010 0 5,035 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design the reconstruction of existing tennis courts at Walter Reed Community Center for Pickleball 2024 • Reconstruction of the tennis courts at Walter Reed Community Center for Pickleball 2024 • Design of Improvements to natural surface trails and mountain biking improvements 2025 Changes from Prior CIP: No change from the previous CIP. C - 20 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 5. FAIRFAX DRIVE PUBLIC SPACES Project Highlights: • The purpose of this project is to develop park master plans, design and construction for several public spaces along Fairfax Drive. • These public spaces include the existing West End Plaza at the corner of Washington Boulevard and Wilson Boulevard, the existing Triangle Park and future planned expansion of this park, and a new linear park that will replace the section of Fairfax Drive b etween N. Kirkwood Road and the Washington Boulevard and Wilson Boulevard intersection. • These park master plans will be developed concurrently with the goal of achieving a unified park experience. Associated Plan(s): Clarendon Sector Plan Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) N eighborhood(s): Ballston-Virginia Square Clarendon-Courthouse Lyon Village New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 900 1,360 11,725 13,985 Previous Funding Total Funding 0 0 0 0 0 0 0 900 1,360 11,725 13,985 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Develop Park Master Plans for the three park areas 2032 • Design improvement plans for the individual parks 2033 • Construction of improvements to the parks and plazas 2035 C hanges from Prior CIP: This project has been pushed out three years from the previous CIP with the Master Planning process now beginning in FY 2032. C - 21 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 6. GATEWAY PARK (ROSSLYN) Project Highlights: • Gateway Park is located over I -66 in Rosslyn and was constructed in the 1980's. • The current park is difficult and dangerous to access due to the surrounding high-speed roadways. • The park is under -utilized yet presents great potential for everyday park and recreation needs and for a diverse mix of special events and program activities. Associated Plan(s): Forestry and Natural Resources Plan Public Art Master Plan (PAMP) Public Spaces Master Plan (PSMP) Neighborhood(s): North Rosslyn Funding Notes: Other Funding is from outside contributions. DPR anticipates an initial contribution of $5M from the adopted Rosslyn Holiday Inn Development community benefits package. Of the $5M contribution, $500K is in-hand and will provide near-term funding for master planning, possible interim park uses and technical studies, while the remaining $4.5M will provide a portion of the required construction funding in FY 2027. Additional developer funds totaling $13.95M will also go towards construction in F Y 2027. In partnership with the Rosslyn BID and other stakeholders, additional private fundraising is anticipated to support constructio n; a preliminary estimate is $1M which will be refined over the next year. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Developer Contributions 1,400 17,050 18,450 New Bond Issue 11,635 11,635 Other Funding 1,000 1,000 Previous Funding Total Funding 1,400 0 29,685 0 0 0 0 0 0 0 31,085 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 84 87 90 93 96 99 549 Personnel ($) 238 249 260 272 284 297 1,600 Non-Personnel ($) 75 75 Total Impact 0 0 0 0 397 336 350 365 380 396 2,224 Critical Milestones: • Develop Park Master Plan 2024 • Final Park Design anticipated to start 2025 • Final Park Design anticipated to be completed 2026 • Demolition and Construction anticipated to begin 2026 • Construction anticipated to be complete Fall 2028 Project Links: • Projects & Planning page from the Arlington County website.: https://www.arlingtonva.us/Government/Projects/Project- Types/Parks-Projects/Gateway-Park Changes from Prior CIP: The previous CIP had construction of the east and west sides happening independently. This CIP has construction of the east and west sides occurring simultaneously. C - 22 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 7. LANGSTON BOULEVARD PUBLIC SPACE IMPROVEMENTS Project Highlights: • This funding is set aside for currently unspecified future public space project(s) on Langston Boulevard. • It is envisioned that this project might be associated with a future developer -funded project where public space is granted to the County. This funding is for planning, design and construction of this future public space(s). • In 2023, the County Board adopted the Langston Boulevard Area Plan. This Plan calls for evaluation of public space needs periodically to address the changing context and to meet the needs of an evolving Langston Boulevard community. • The Plan recommends that the County design and construct public spaces occurring on public property, rights -of-way, and other areas with public access agreements when it would not be otherwise implemented through private redevelopment. Associated Plan(s): Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 2,020 2,020 Previous Funding Total Funding 0 0 0 0 0 0 0 0 0 2,020 2,020 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Anticipated start of Master Planning Summer 2033 • Anticipated completion of Construction Spring 2036 Changes from Prior CIP: This project is new to the FY 2025 – FY 2034 CIP. C - 23 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 8. NATURAL RESILIENCY PROGRAM Project Highlights: • This program will allow the Department of Parks and Recreation to study and implement projects that manage stormwater and natural resiliency. • Projects in this program will provide recreational opportunities and amenities in concert with addressing or creating flood capacity. • Projects in this program may include forest restoration, stream improvements, large- scale invasive plant removal projects, large-scale native plantings, implementing biophilic principles as part of the County's commitments as a member of the Biophilic Citi es Initiative or park renovation projects that improve the County's sustainability, such as creating flood control projects in parks where flooding is anticipated and allowed to happen to prevent further downstream damage from floodwaters. • Biophilic principles focus on integrating natural design elements into the built environment. Associated Plan(s): Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) Storm Water Master Plan Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 1,515 1,010 1,010 1,010 1,010 5,555 Previous Funding Total Funding 0 1,515 0 1,010 0 1,010 0 1,010 0 1,010 5,555 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design of low-water ford and stream repair in Barcroft Park 2024 • Design Plans for reforestation and removal of invasive plants and m eadow establishment 2025 • Installation of reforestation plantings and removal of invasive plants and meadow establishment 2025 • Repair of low-water ford and stream restoration in Barcroft Park 2025 • Scoping of flood resilient project 2026 • Design of flood resilient project 2026 Changes from Prior CIP: Reduced FY 2026 request from $3.5M to $1.5M to better reflect The current rate of execution for projects under this program utilizing FY 2024 funds. C - 24 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 9. NEW PARK AT 26TH STREET N AND OLD DOMINION DR Project Highlights: • The purpose of this project is to master plan, design and construct an approximately one -acre park on County- owned land. • The site is located at 26th Street North and Old Dominion Drive near Marymount University and near the trailhead for the Zachary Taylor Trail. • The site has potential for active and passive recreation activities. Associated Plan(s): Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) Neighborhood(s): Donaldson Run Old Dominion New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 255 560 4,040 4,855 Previous Funding Total Funding 0 0 0 255 560 4,040 0 0 0 0 4,855 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Non-Personnel ($) 19 20 21 21 81 Total Impact 0 0 0 0 0 0 19 20 21 21 81 Critical Milestones: • Master Plan for new park 2028 • Design for new park based upon Master Plan 2029 • Construction completion for new park 2031 Changes from Prior CIP: This project is new to the FY 2025 – FY 2034 CIP. C - 25 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 10. PARKS ATHLETIC COURTS PROGRAM Project Highlights: • Court Sports are an important part of the recreation experience for many park users. • Court sports include basketball, tennis, pickleball, futsal, volleyball and any other sports that use a hard surface or synthetic surface court. • This program will go into effect after the Public Spaces Master Plan (PSMP) update that is included in FY 2025. • From the recommendations within the PSMP, courts will be improved, upgraded and new courts provided based upon siting criteria from the PSMP. Associated Plan(s): Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 505 505 505 505 2,020 Previous Funding Total Funding 0 0 505 0 505 0 505 0 505 0 2,020 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Refresh of the Public Spaces Master Plan Fall 2025 • Define program to upgrade existing courts and provide new courts where appropriate Fall 2026 Changes from Prior CIP: This project is new to the FY 2025 – FY 2034 CIP. C - 26 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 11. PENROSE SQUARE, PHASE 2 Project Highlights: • Penrose Square is the first and largest of three squares planned within the Columbia Pike Town Center node. • Phase 1 of Penrose Square opened in November 2012 and includes a tree-covered terrace with movable seats and tables, a centrally located paved plaza, a low seating wall, a zero - depth interactive water fountain, mounded lawn areas for casual seating and a public art installation. • Phase 2 will complete the build -out of the Phase 1 features and allow for additional flexible program space. Associated Plan(s): Penrose Square Park Master Plan (2008) Public Art Master Plan (PAMP) Public Spaces Master Plan (PSMP) Neighborhood(s): Arlington Heights Columbia Heights Penrose New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 795 3,965 4,760 Previous Funding Total Funding 0 0 0 0 0 0 795 0 0 3,965 4,760 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Developer to convey Phase 2 parcel to the County Unknown • Design of Penrose Square, Phase 2 2031 • Construction Completion of Penrose Square, Phase 2 2035 Changes from Prior CIP: This project has been pushed out five years from the previous CIP with the d esign process now beginning in FY 2031 and construction in FY 2034. C - 27 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 12. QUINCY PARK Project Highlights: • Quincy Park and Central Library are located adjacent to one another and together form an almost 18-acre block of land. • Quincy Park is the largest park in the Rosslyn -Ballston Corridor and is one of the County's most heavily used parks. • The lighted athletic fields and athletic courts in Quincy Park accommodate the needs for County recreation, drop- in play and also serve the needs of the Washington- Liberty High School baseball and tennis teams. • Quincy Park currently has a picnic shelter, shaded picnic area, playground, walking paths and surface parking. • Quincy Park has approached the age where full replacement and modernization is necessary, which also provides the opportunity to reorganize the placement of the facilities and consolidate parking to create additional open space. Associated Plan(s): Ballston Sector Plan Forestry and Natural Resources Plan Public Art Master Plan (PAMP) Public Spaces Master Plan (PSMP) Neighborhood(s): Ballston-Virginia Square Funding Notes: "Other funding" includes $2M for APS cost-share for Washington-Liberty's diamond field located in the park. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 890 4,040 8,920 22,570 36,420 Other Funding 2,000 2,000 Previous Funding Total Funding 0 0 0 0 0 890 4,040 0 8,920 24,570 38,420 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Develop Master Plan for Quincy Park 2030 • Develop Design improvements for Park renovation 2031 • Anticipated project completion 2035 Changes from Prior CIP: The name of this project has changed from previous CIPs to place the focus on the park component. A major maintenance capital renovation of Quincy Park has been in the CIP since FY 2015 - FY 2024. Funding to develop a master plan for Quincy Park and fund implementation of the park improvements was in the adopted FY 2017 - FY 2026 CIP and FY 2019 - FY 2028 CIP. This CIP continues to provide future funding for the master planning effort and programs future funding for design and implementation of the Quincy Park improvements. This project has been moved up one year from the previous CIP, with Master Planning now beginning in 2030. C - 28 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 13. SHIRLINGTON PARK Project Highlights: • This project will implement the adopted Shirlington Park Master Plan and Design Guidelines which grew out of the Four Mile Run Valley Initiative. • The project focuses on adding park amenities, including strengthening the primary entries at S. Walter Reed Drive and S. Shirlington Road. • Suggested park amenities include adding several overlooks with educational/interpretive components, riparian pathways, plaza areas, enhancements to the existing pedestrian bridge, signage, site furnishings, public art, landscaping, invasive plant removal and storm water management improvements. Associated Plan(s): Four Mile Run Policy Framework Plan (2018) Public Spaces Master Plan (PSMP) Neighborhood(s): Green Valley Shirlington New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 1,030 4,315 5,345 Previous Funding Total Funding 0 0 0 0 0 0 0 1,030 4,315 0 5,345 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Develop Park Master Plan and Design Guidelines 2016-2018 • Design of park improvements 2031 • Construction of park improvements 2033 Changes from Prior CIP: This project has been pushed out three years from the previous CIP with the Master Planning process now beginning in FY 2032. C - 29 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 14. SHORT BRIDGE PARK Project Highlights: • The project in this CIP will implement the planning and development of the 3.5- acre Short Bridge Park at the mouth of Four Mile Run. • Implementing the Short Bridge Park Master Plan will occur in two phases. The first phase is associated with a Department of Environmental Services (DES) multi -use trail connection that links Richmond Highway to the Four Mile Run Trail. The second phase completes the park improvements. • The project includes an interpretive plaza, dog run, casual use lawn area, walkways, public art, site furnishings and significant landscaping and stormwater management facilities. Associated Plan(s): Four Mile Run Design Guidelines Four Mile Run Restoration Master Plan (2006) Public Spaces Master Plan (PSMP) Short Bridge Park Master Plan (January 2018) N eighborhood(s): VARIOUS Funding Notes: Bonds Previous Funding: FY 2023 $1.14M (design) New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 5,690 5,690 Previous Funding Total Funding 0 0 0 0 0 0 5,690 0 0 0 5,690 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 12 13 13 38 Total Impact 0 0 0 0 0 0 0 12 13 13 38 Critical Milestones: • Adoption of Short Bridge Park Master Plan and design guidelines 2018 • Construction of the Short Bridge Park trail by DES began December 2021 2021 • Construction of Short Bridge Park trail completed 2022 2022 • Final Design of improvements at Short Bridge Park 2025 • Construction of improvements at Short Bridge Park 2031 C hanges from Prior CIP: Construction for this project has been pushed out from FY 2025 to FY 2031. C - 30 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 15. THREE URBAN PARKS Project Highlights: • Maury Park, Herselle Milliken Park and Gum Ball Park are three small parks located in the Virginia Square Planning Area and in the Ashton Heights Civic Association. • This project is to develop park master plans for these parks, which currently have a minimum level of amenities. • The project will master plan all three parks simultaneously to identify community needs and priorities while taking into consideration that the parks are located in close proximity and should have complementary rather than duplicative features. Associated Plan(s): Public Spaces Master Plan (PSMP) Virginia Square Sector Plan Neighborhood(s): Ashton Heights Ballston-Virginia Square Funding Notes: Bonds Previous Funding: FY 2023 $500K (master planning) and FY 2024 $950K (design) New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 8,055 8,055 Previous Funding Total Funding 0 8,055 0 0 0 0 0 0 0 0 8,055 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 16 16 17 17 18 18 19 20 141 Total Impact 0 0 16 16 17 17 18 18 19 20 141 Critical Milestones: • Develop park master plans for Maury Park, Herselle Milliken Park and Gum Ball Park 2024 • Develop designs for the Maury Park, Herselle Milliken Park and Gum Ball Park 2026 • Construction of improvements for Maury Park, Herselle Milliken Park and Gum Ball Park 2027 Changes from Prior CIP: Previous CIP had construction in FY 2025, but this has been pushed out to FY 2027, per timelines based on current design process. C - 31 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Park Master Plans FY 2025-2034 16. VIRGINIA HIGHLANDS PARK/NEARBY PUBLIC SPACE Project Highlights: • The purpose of this project is to develop park master plans for three sites located in the Pentagon City area. These include the existing Virginia Highlands Park, a new park to be planned at 20th Street South and South Ives Street and a new parcel to be planned at the former Dominion Substation site. • The project includes master planning these three closely associated sites simultaneously. This allows for a comprehensive plan to provide a mix of recreational and casual use opportunities to ensure the community continues to enjoy a high level of public space service. This approach also minimizes overlapping amenities and creates flexibility to accommodate existing and future public uses in the area. Associated Plan(s): Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) N eighborhood(s): Arlington Ridge Aurora Highlands Pentagon City Funding Notes: All bonds: Virginia Highlands Master Plan $1.47M (FY 2034) , Virginia Highlands Design $2.077M (FY 2035) , 20th/Ives Design $133K (FY 2035) , Dominion Substation Design $95K (FY 2035) , Virginia Highlands Construction $22.258M (FY 2037), 20th/Ives Construction $580K (FY 2037), and Dominion Substation Construction $481K (FY 2037) New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 1,485 1,485 Previous Funding Total Funding 0 0 0 0 0 0 0 0 0 1,485 1,485 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Master plan Virginia Highlands Park and the two new parcels 2034 • Design improvements at Virginia Highlands Park 2035 • Design improvements at 20th Street S. and S. Ives Street 2035 • Design improvements at the former Dominion substation site 2035 • Construction of improvements at Virginia Highlands Park 2037 • Construction of improvements at 20th Street S. and S. Ives Street 2037 • Construction of improvements at former Dominion substation site 2037 Changes from Prior CIP: Master Planning has been pushed out from FY 2028 to FY 2034. Design and construction funding have been pushed out beyond this ten-year CIP. C - 32 Arlington County, Virginia CIP 2025 − 2034 LOCAL PARKS AND RECREATION PROGRAMS: TRAIL AND BRIDGE MODERNIZATION PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Trail and Bridge Modernization Program 2,675 3,935 2,525 2,550 2,575 2,605 2,070 455 455 405 20,250 Total Recommendation 2,675 3,935 2,525 2,550 2,575 2,605 2,070 455 455 405 20,250 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 3,435 2,525 2,550 2,575 2,605 2,070 455 455 405 17,075 PAYG 0 0 0 0 0 0 0 0 0 0 0 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 0 3,435 2,525 2,550 2,575 2,605 2,070 455 455 405 17,075 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 2,675 500 0 0 0 0 0 0 0 0 3,175 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 2,675 500 0 0 0 0 0 0 0 0 3,175 Total Funding Sources 2,675 3,935 2,525 2,550 2,575 2,605 2,070 455 455 405 20,250 C - 33 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Trail and Bridge Modernization FY 2025-2034 1. TRAIL AND BRIDGE MODERNIZATION PROGRAM Project Highlights: • The Trail and Bridge Modernization Program is focused on replacement and major renovation of the 35.22 miles of off - street, multi- purpose trails in the County, as well as replacement or repair of the 59 pedestrian bridges and 11 low-water fords in the Depa rtment of Parks and Recreation inventory. Associated Plan(s): Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 3,435 2,525 2,550 2,575 2,605 2,070 455 455 405 17,075 Previous Funding Issued but Unspent Bonds 2,675 500 3,175 Total Funding 2,675 3,935 2,525 2,550 2,575 2,605 2,070 455 455 405 20,250 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Trail Pavement Condition Assessment 2022 • Milling and Paving Projects on Four Mile Run Trail, Lubber Run Trail and Others 2024 • Construction for replacement of a Bridge in Lubber Run Park 2024 • Design for replacement of one Bridge in Alcova Heights Park 2024 • Design for replacement of two Bridges in Bluemont Park 2024 • Design for the replacement of three bridges in Rock Spring Park 2024 C hanges from Prior CIP: FY 2025 did not require new funding due to existing balances available for FY 2025 project work. Funding in the out years increased from the previous CIP. C - 34 Arlington County, Virginia CIP 2025 − 2034 LOCAL PARKS AND RECREATION PROGRAMS: PARKS LAND ACQUISITION AND OPEN SPACE PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Parks Land Acquisition and Public Space Program 1,500 0 3,030 0 3,060 0 3,090 0 3,125 0 13,805 Total Recommendation 1,500 0 3,030 0 3,060 0 3,090 0 3,125 0 13,805 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 1,500 0 3,030 0 3,060 0 3,090 0 3,125 0 13,805 PAYG 0 0 0 0 0 0 0 0 0 0 0 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 1,500 0 3,030 0 3,060 0 3,090 0 3,125 0 13,805 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 1,500 0 3,030 0 3,060 0 3,090 0 3,125 0 13,805 C - 35 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Parks Land Acquisition and Open Space FY 2025-2034 1. PARKS LAND ACQUISITION AND PUBLIC SPACE PROGRAM Project Highlights: • The purpose of the Parks Land Acquisition and Public Space Program is to strategically acquire real property for parks and public spaces to provide stewardship of natural resources and to be responsive to the recreational and public space needs of the County's urban community. • A priority action in the Public Spaces Master Plan is a recommendation that 30 acres of new public space be added to County park and public space inventory over the next ten (10) years. Associated Plan(s): Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 1,500 3,030 3,060 3,090 3,125 13,805 Previous Funding Total Funding 1,500 0 3,030 0 3,060 0 3,090 0 3,125 0 13,805 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Annual review of progress towards achieving goals of PSMP Annually in January of each year Changes from Prior CIP: The funding level has been increased to align with the goal of acquiring 30 acres of new public space over the next ten years as established in the Public Spaces Master Plan. C - 36 Arlington County, Virginia CIP 2025 − 2034 LOCAL PARKS AND RECREATION PROGRAMS: SYNTHETIC TURF PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Synthetic Turf Program 0 0 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 21,199 2. Greenbrier Park/Yorktown High Stadium Field 1,164 0 0 0 0 0 0 0 0 0 1,164 3. Kenmore Middle School Athletic Field Conversion 9,842 0 0 0 0 0 0 0 0 0 9,842 4. Long Bridge Park Synthetic Field #3 0 1,041 0 0 0 0 0 0 0 0 1,041 5. Thomas Jefferson Middle School Lower Field 819 0 0 0 0 0 0 0 0 0 819 Total Recommendation 11,825 1,041 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 34,065 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 2,400 0 0 0 0 0 0 0 0 0 2,400 PAYG 1,155 0 0 0 0 0 0 0 0 0 1,155 Short Term Finance 0 1,041 1,702 1,997 2,094 1,975 1,007 2,231 3,000 1,511 16,558 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 5,270 0 635 1,135 0 0 627 1,386 1,710 189 10,952 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 8,825 1,041 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 31,065 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 3,000 0 0 0 0 0 0 0 0 0 3,000 Subtotal Previously Approved Funding 3,000 0 0 0 0 0 0 0 0 0 3,000 Total Funding Sources 11,825 1,041 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 34,065 C - 37 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 1. SYNTHETIC TURF PROGRAM Project Highlights: • Arlington County has invested significantly in the construction of synthetic turf fields to meet the demand for athletic fields that serve a wide variety of athletic programs and drop-in use. • The County has 15 rectangular fields with synthetic turf and two diamond fields with synthetic turf bringing the total number of synthetic fields to 17. • Synthetic turf typically has an eight-year useful life. Associated Plan(s): Long Bridge Park Master Plan (2013) Public Spaces Master Plan (PSMP) N eighborhood(s): VARIOUS Funding Notes: Replacement and conversion of fields through the Synthetic Turf Program are typically funded with bonds, short - term financing and other funding. Other funding includes contributions from Arlington Public Schools for their share of fields co - located at high schools and middle schools as well as contributions from Marymount University, George Washington University, and other partnerships. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Short Term Finance 1,702 1,997 2,094 1,975 1,007 2,231 3,000 1,511 15,517 Other Funding 635 1,135 627 1,386 1,710 189 5,682 Previous Funding Total Funding 0 0 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 21,199 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Turf Replacement Construction 3-4 Months • Turf Conversion Design and Construction 12-18 Months C hanges from Prior CIP: No significant change from the previous CIP. C - 38 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 2. GREENBRIER PARK/YORKTOWN HIGH STADIUM FIELD Project Highlights: • Design and construction for the replacement of the synthetic turf surfacing on the stadium athletic field. • Synthetic turf surfacing typically has an eight -year useful life. • The synthetic turf surfacing at all three high school stadium fields is laid over an underlayment pad to reduce the risk of injuries from falls to the surface. Associated Plan(s): Public Spaces Master Plan (PSMP) N eighborhood(s): Yorktown Funding Notes: Cost share with APS (50% County / 50% Schools). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 582 582 Other Funding 582 582 Previous Funding Total Funding 1,164 0 0 0 0 0 0 0 0 0 1,164 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design of Synthetic Turf Replacement Summer 2024 • Bidding for Synthetic Turf Replacement Fall/Winter 2024 • Construction of Synthetic Turf Replacement Spring 2025 C hanges from Prior CIP: No change from the previous CIP. C - 39 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 3. KENMORE MIDDLE SCHOOL ATHLETIC FIELD CONVERSION Project Highlights: • Design and construction for the conversion of two diamond/rectangular combo fields on the campus of Kenmore Middle School. • The fields are currently natural turf and in poor condition. The goal of the project is to convert these fields to synthetic turf surfacing. • Costs include design development, excavation of existing soil to allow for the placement of new turf and installation of storm water management facilities, batting cages, backstops, shade structures, signage, spectator seating, athletic equipment, site fur nishings, accessible walkways, ADA improvements for all park amenities, sports field fencing, donor wall and landscaping. • The project also includes the replacement of existing athletic lighting and the installation of new LED sports lighting. Associated Plan(s): Public Spaces Master Plan (PSMP) N eighborhood(s): Glencarlyn Funding Notes: "Other Funds" include outside group fundraising ($2M), APS Cost Sharing at 70% County / 30% APS ($2.442M). "Other Previously Approved Funds" include Field Fund balances ($1M) and existing synthetic program contingency funds ($2M). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 2,400 2,400 Other Funding 4,442 4,442 Previous Funding Other Previously Approved Funds 3,000 3,000 Total Funding 9,842 0 0 0 0 0 0 0 0 0 9,842 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Operations Costs (+/-) 11 11 12 12 12 13 13 84 Total Impact 0 0 0 11 11 12 12 12 13 13 84 Critical Milestones: • Anticipated start of Design Spring 2025 • Anticipated start of Construction Fall 2026 • Anticipated completion of Construction Summer 2027 Changes from Prior CIP: Funding distributions are updated to reflect outside sources and existing balances. C - 40 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 4. LONG BRIDGE PARK SYNTHETIC FIELD #3 Project Highlights: • Design and construction for the replacement of the synthetic turf surfacing on Field #3 at Long Bridge Park. • Synthetic turf surfacing typically has an eight -year useful life. • Costs include design development, replacement of the synthetic turf and infill, repairs to the base layer and under - drain system, replacement of field amenities and construction administration. Associated Plan(s): Public Spaces Master Plan (PSMP) N eighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Short Term Finance 1,041 1,041 Previous Funding Total Funding 0 1,041 0 0 0 0 0 0 0 0 1,041 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design replacement of the synthetic turf surfacing. Fall 2025 • Bid replacement of the synthetic turf surfacing. Winter 2025 • Construction of the synthetic turf surfacing on Field #3 at Long Bridge Park. Spring 2026 C hanges from Prior CIP: No significant change from the previous CIP. C - 41 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Synthetic Turf Program FY 2025-2034 5. THOMAS JEFFERSON MIDDLE SCHOOL LOWER FIELD Project Highlights: • Design and construction for the replacement of the synthetic turf surfacing on the Lower Field at TJ. • Synthetic turf surfacing typically has an eight -year useful life. • Costs include design development, replacement of the synthetic turf and infill, repairs to the base layer and under - drain system, replacement of field amenities and construction administration. Associated Plan(s): Public Spaces Master Plan (PSMP) N eighborhood(s): Arlington Heights Funding Notes: Cost Share with APS (70% County/30% Schools). New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 573 573 Other Funding 246 246 Previous Funding Total Funding 819 0 0 0 0 0 0 0 0 0 819 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design of the synthetic turf field. Winter 2024/2025 • Bidding of the replacement of the synthetic turf. Spring 2025 • Construction of the replacement of the synthetic turf on the Lower Field at TJ Community Center. Summer 2025 C hanges from Prior CIP: No change from the previous CIP. C - 42 SYNTHETIC ATHLETIC FIELDS Year of Last Replacement FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034 1 Long Bridge Park #1 2019 1 ,270,000 2 Long Bridge Park #4 2019 1 ,067,000 3 Gunston Park Community Field 2020 1,185,000 4 Barcroft Park Baseball Field #6 2019 1 ,947,000 5 Gunston Park Diamond Field 2019 1 ,105,000 6 V irginia Highlands Park Community Field 2021 9 89,000 7 Thomas Jefferson Park Upper Field 2022 1 ,006,000 8 B arcroft Park Community Field 2022 6 26,000 9 Rocky Run Park Community Field 2022 3 43,000 10 Gunston Park Bubble 2023 3 79,000 11 Wakefield High School Stadium 2023 1 ,255,000 12 Washington-Liberty High School Stadium 2024 1 ,505,000 13 Williamsburg Middle School #1 2024 1 ,162,000 1 4 Williamsburg Middle School #2 2024 9 50,000 1 5 Greenbrier Park Stadium 2016 1,164,000 1 ,485,000 1 6 Thomas Jefferson Park Lower Field 2017 819,000 1 ,045,000 1 7/18 Kenmore Middle School #1/#2 (Conversion) 2025 9,842,000 2 ,180,000 1 9 Long Bridge Park #3 2018 1,041,000 1 ,322,000 20 Rosslyn Highlands Park + EST-2025 3 78,000 T otal Costs 1 1,825,000 1,041,000 2,337,000 3,132,000 2,094,000 1,975,000 1,634,000 3,617,000 4,710,000 1,700,000 SOURCES OF FUNDS G O Bonds 2,400,000 PAYG 1,155,000 Short Term Financing 1,041,000 1,702,000 1,997,000 2,094,000 1,975,000 1,007,000 2,231,000 3,000,000 1,511,000 Arlington Public Schools contribution 3,270,000 356,000 627,000 1,386,000 1,710,000 189,000 Marymount University contribution 635,000 George Washington University contribution 779,000 Other /Existing Funding 3,000,000 Other Partnership/Fundraising 2,000,000 - Total Sources 11,825,000 1,041,000 2,337,000 3,132,000 2,094,000 1,975,000 1,634,000 3,617,000 4,710,000 1,700,000 NOTES: The above schedule is the anticipated schedule for sythetic turf replacement, however it is subject to change particularly as the County works with its partners on those fields with shared use. An 8-year useful life is assumed for all synthetic fields. Some schedules have been adjusted to smooth out the funding with an eventual goal of two-three field replacements per year. Costs include replacement of the synthetic turf and infill, repairs to the base layer and under-drain system, replacement of field amenities, field surveys, design and construction administration. Replacment of synthetic turf on the three high school stadium fields shall be performed in separate years to accommodate scheduling of school events. Atheltic fields at Arlington Public Schools assumes a 50/50 cost share at high schools and a 70/30 cost share at middle schools with the County paying 70% of the cost. Actual cost share splits are determined by hours of use. As funding allows, this program will consider conversion of additional fields through financial partnerships with Arlington Public Schools, universities and sports organizations. PROJECTED SYNTHETIC FIELD REPLACEMENT SCHEDULE CAPITAL COSTS FY2025 - FY2034 C - 43 Arlington County, Virginia Arlington County, Virginia CIP 2025 − 2034 ARLINGTON NEIGHBORHOODS PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Arlington Neighborhoods Program 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898 Total Recommendation 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 70,000 PAYG 850 894 931 970 1,011 1,053 1,099 1,146 1,196 1,248 10,398 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 7,850 7,894 7,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 80,398 Previously Approved Funding Authorized but Unissued Bonds 2,000 6,000 6,000 0 0 0 0 0 0 0 14,000 Issued but Unspent Bonds 3,500 0 0 0 0 0 0 0 0 0 3,500 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 5,500 6,000 6,000 0 0 0 0 0 0 0 17,500 Total Funding Sources 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898 C - 44 Arlington County, Virginia Arlington Neighborhoods Program Capital Improvement Plan FY 2025-2034 ARLINGTON NEIGHBORHOODS PROGRAM Project Highlights: • The Arlington Neighborhoods Program (ANP) enhances and preserves residential areas by providing resident -initiated public improvements based upon regularly updated neighborhood plans. • The program funds street improvements, residential traffic management, park enhancement, street lighting, beautification, stormwater management, and landscaping projects. • In 2023, staff worked with Arlington Neighborhood Program Advisory Committee (ArNAC) and surveyed residents and ArNAC members for needs and new project types that could be considered for implementation through this program and included a priority focus via the equity lens. • This CIP includes a new program ($150k) focused on micro-projects throughout the County to include street painting to enhance pedestrian safety and "place -making" which is being done in collaboration with DES Transportation, AED Public Art, and CPHD Urban Design. Neighborhood(s): VARIOUS Funding Notes: Consistent with prior CIPs, PAYG allocations fund staff support and the new "Expanded Project Type" program for smaller projects identified as part of the ANP review. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 70,000 PAYG 850 894 931 970 1,011 1,053 1,099 1,146 1,196 1,248 10,398 Previous Funding Authorized but Unissued Bonds 2,000 6,000 6,000 14,000 Issued but Unspent Bonds 3,500 3,500 Total Funding 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Planning FY 2025 • Design Phase FY 2026-2027 • Construction FY 2028-2029 Changes from Prior CIP: Funding increased in FY 2025 and FY 2026 from the previous CIP. C - 45 Arlington County, Virginia CIP 2025 − 2034 ARLINGTON NEIGHBORHOODS PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Arlington Neighborhoods Program 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898 Total Recommendation 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 70,000 PAYG 850 894 931 970 1,011 1,053 1,099 1,146 1,196 1,248 10,398 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 7,850 7,894 7,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 80,398 Previously Approved Funding Authorized but Unissued Bonds 2,000 6,000 6,000 0 0 0 0 0 0 0 14,000 Issued but Unspent Bonds 3,500 0 0 0 0 0 0 0 0 0 3,500 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 5,500 6,000 6,000 0 0 0 0 0 0 0 17,500 Total Funding Sources 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898 C - 46 Arlington Neighborhoods Program Capital Improvement Plan FY 2025-2034 ARLINGTON NEIGHBORHOODS PROGRAM Project Highlights: • The Arlington Neighborhoods Program (ANP) enhances and preserves residential areas by providing resident -initiated public improvements based upon regularly updated neighborhood plans. • The program funds street improvements, residential traffic management, park enhancement, street lighting, beautification, stormwater management, and landscaping projects. • In 2023, staff worked with Arlington Neighborhood Program Advisory Committee (ArNAC) and surveyed residents and ArNAC members for needs and new project types that could be considered for implementation through this program and included a priority focus via the equity lens. • This CIP includes a new program ($150k) focused on micro-projects throughout the County to include street painting to enhance pedestrian safety and "place -making" which is being done in collaboration with DES Transportation, AED Public Art, and CPHD Urban Design. Neighborhood(s): VARIOUS Funding Notes: Consistent with prior CIPs, PAYG allocations fund staff support and the new "Expanded Project Type" program for smaller projects identified as part of the ANP review. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 7,000 70,000 PAYG 850 894 931 970 1,011 1,053 1,099 1,146 1,196 1,248 10,398 Previous Funding Authorized but Unissued Bonds 2,000 6,000 6,000 14,000 Issued but Unspent Bonds 3,500 3,500 Total Funding 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Planning FY 2025 • Design Phase FY 2026-2027 • Construction FY 2028-2029 Changes from Prior CIP: Funding increased in FY 2025 and FY 2026 from the previous CIP. C - 47 Arlington County, Virginia ECONOMIC DEVELOPMENT Program Description The Economic Development capital improvement program consists of key projects that will provide for economic sustainability a nd a competitive advantage for Arlington while creating important placemaking elements within Arlington. Incorporating this program into this ten-year CIP represents the next step in adequately planning and implementing specific projects to ensure that capital funding is invested strategically for the benefit of the County and its residents. Program Summary The Economic Development projects are grouped into four program areas: Public Art Program, Public Facilities Maintenance, and Joint- Use Facilities Maintenance. For FY 2025 - FY 2034, AED's capital program is supported by multiple funding sources which includes: PAYG, existing project balances, or anticipated future developer contributions to repair and replace equipment the joint -use facilities maintenance spaces (i.e., Thomas Jefferson Middle School Theatre, Gunston Middle School Theater, and the Scenic Studio). The Public Art Program is for public art projects as guided by the Arlington Public Art Master Plan. Arlington's Public Art M aster Plan (adopted in December 2004; updated in November 2021) is an important tool for implementing the Public Art Policy that wa s adopted by the County Board in September 2000. The plan, which guides public art projects initiated by County agencies, private developers, and community organizations, establishes a vision for public art in Arlington. Specifically, it identifies basic principles for how public art should be integrated into Arlington's architecture, gathering places and landscapes. Some projects, particularly in DES and DPR, include public art as part of the base project budget. Program funding is used to implement public art in other CIP projects across the County as opportunities are identified and listed in the Project's attached spreadsheet. This funding will supplement individual project budgets to p rovide for acquisition, construction, or installation of Public Art a s part of County facilities, parks, and infrastructure projects. The specific funding requests in the Project are to maintain the Public Art collection. The Public Facilities Maintenance, and Joint-Use Facilities Maintenance (including Public Benefit Spaces Program) are programs within the CIP designed primarily to identify spaces approved by the County Board as part of special exception site plans. Often, adopted Sector Plans recommend specific uses to be implemented through the review and approval of special exception site plans. Additionally, thro ugh the public process, the community may identify specific community needs and uses which are included withi n the approved special exception site plan. Although most of the funding for such spaces comes from private development, recognizing the public benefit spaces within the CIP allows for a more comprehensive review of all County facilities and provides a tool to ensure adequate funding to operate and maintain these facilities. Master Plan Impact All the program areas intersect with the goals and initiatives identified in Arlington's Framework for Prosperity - Economic Development Strategic Plan. The projects will allow Arlington to maintain its competitive advantage within the region, encourage pa rtnerships between the government and the private and academic sectors, and foster enhanced policymaking. The first goal of the Economic Develop ment Strategic Plan: Arlington will be recognized for its superior business environment which includes world -class facilities, infrastructure, and systems. The fourth goal: Arlington will enjoy high quality places that ensure quality of life and offer amenities that are valued by residents, businesses, and visitors. Projects within the Public Art Program will meet goals and strategies within the Public Art Master Plan. C - 48 Arlington County, Virginia ECONOMIC DEVELOPMENT CIP 2025 − 2034 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Public Art Program 49 51 51 52 52 53 53 54 54 55 524 Public Facilities Maintenance 42 50 52 54 56 58 60 62 64 66 564 Joint Use Facilities Maintenance 0 630 50 52 54 56 58 60 62 64 1,086 Total Recommendation 91 731 153 158 162 167 171 176 180 185 2,174 PROGRAM FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 0 0 0 0 0 0 0 0 0 0 PAYG 91 731 153 158 162 167 171 176 180 185 2,174 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 91 731 153 158 162 167 171 176 180 185 2,174 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 91 731 153 158 162 167 171 176 180 185 2,174 C - 49 Arlington County, Virginia Arlington County, Virginia CIP 2025 − 2034 ECONOMIC DEVELOPMENT: PUBLIC ART PROGRAM -CIVIC FACILITIES 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Public Art - Civic Facilities (Artworks) 49 51 51 52 52 53 53 54 54 55 524 Total Recommendation 49 51 51 52 52 53 53 54 54 55 524 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 0 0 0 0 0 0 0 0 0 0 PAYG 49 51 51 52 52 53 53 54 54 55 524 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 49 51 51 52 52 53 53 54 54 55 524 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 49 51 51 52 52 53 53 54 54 55 524 C - 50 Arlington County, Virginia ECONOMIC DEVELOPMENT Capital Improvement Plan Public Art Program FY 2025-2034 PUBLIC ART - CIVIC FACILITIES (ARTWORKS) Project Highlights: • The Public Art -Civic Facilities Program maintains and provides appropriate restoration of the County's public art inventory. • This program allows for the public artwork to be repaired and conserved in a relatively short period of time so that they may be enjoyed and treasured for many generations. Associated Plan(s): Public Art Master Plan (PAMP) Neighborhood(s): VARIOUS Funding Notes: Additional funds in the outyears may be available from developers or other contributions such as grants, Business Improvement Districts (BIDs), and federal and state funding. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 49 51 51 52 52 53 53 54 54 55 524 Previous Funding Total Funding 49 51 51 52 52 53 53 54 54 55 524 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Maintenance and repair Fall 2024- Spring 2025 Changes from Prior CIP: Funding level is updated to reflect planned expenditures for public artwork restoration. C - 51 Public Art as a Component of County Capital Projects FY 2024 and Beyond Project Name Site Available Funding Sources Total Budget Partners Notes Developer Contributions for Public Art PAYG OTHER Ballston Central United Methodist Church/ APAH 4201 Fairfax Drive, Arlington, VA 22203 $75,000 $75,000 APAH, CPHD Project delivered, dedication 4/15/2024. Compassion N. Courthouse Road and Clarendon Blvd. $96,230 $96,230 Greystar Real Estate Partners Project delivered 12/12/2023. Harris Teeter/ Urba Building 600 N. Glebe Rd. $160,453 $160,453 Southeastern Project delivered, dedication 5/1/2024. West Glebe Road Bridge West Glebe Road Bridge at South Four Mile Run Drive $106,000 artist fee (Transportation Capital Fund and City of Alexandria) $106,000 DES Transportation, Transportation Capital Fund, City of Alexandria Construction cost included as part of larger infrastructure project. Wesley at The Cadence – IMPACT Arts 4333 Arlington Blvd $75,000 $75,000 Wesley Housing Slated to be delivered 2024. Dark Star Park Public Art Maintenance N Meade Street and Fort Meyer Drive TBD $457,000 $ 457,000 DES Transportation, DPR Landscape Architects Project in the planning stage. Will start construction in conjunction with DES and DPR between FY 2026 andFY2028. Public Art Facilities Maintenance Various Locations $48,500 $48,500 Arlington County Project in the planning stage. Corridor of Light Phase III N. Lynn St. TBD TBD DES Transportation Project has not yet started/ Part of a larger infrastructure project. Bozman Lobby Renovations (two projects) 2100 Clarendon Blvd ~$300,000 (includes set aside for future maintenance costs) ~$300,000 Arlington County Slated to be delivered 2024. Arlington Ridge Road Bridge with artist Vicki Scuri Arlington Ridge Road Bridge at South Four Mile Run Drive TBD $154,000 (funding from partners, DES, VDOT and City of Alexandria) $154,000 VDOT, Arlington County and City of Alexandria Construction cost included as part of larger infrastructure project. Arlington Boulevard Bridge repairs Route 50/Arlington Boulevard from Courthouse Road to 10th Street $280,976 $119,024 $400,000 Arlington County Project in the planning stage. Transitway Extension to Pentagon City Crystal City Potomac Yard Transitway north and west to Pentagon City ~$32,000 artist fee ~$32,000 DES Transportation Construction cost included as part of larger infrastructure project. Columbia Pike Transit Stations Columbia Pike $30,000 (Public Art General Fund) $30,000 DES Transportation Construction cost included as part of larger infrastructure project. Short Bridge Park TBD TBD TBD DPR Project has not yet started. Dominion Crystal Substation – invisible 1720 S. Fern St. TBD TBD Dominion Energy Slated to be delivered 2024. C - 52 Public Art as a Component of County Capital Projects FY 2024 and Beyond Project Name Site Available Funding Sources Total Budget Partners Notes Developer Contributions for Public Art PAYG OTHER PenPlace Army Navy Drive (north), South Eads Street (east), 12th Street South (south), and South Fern Street (west) TBD TBD JBG Smith/Amazon Project has not yet started. 1901 North Moore 1901 North Moore $150,000 $150,000 Jefferson Apartment Group Project in the planning stage. TOTAL: $1,199,659 $167,524 $717,000 $2,084,183 Please Note: Funding amounts shown are approximate and may be subject to change based on exact project specifications and future budget adjustments. C - 53 Arlington County, Virginia Arlington County, Virginia CIP 2025 − 2034 ECONOMIC DEVELOPMENT: PUBLIC FACILITIES MAINTENANCE PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Cultural Affairs - Public Facilities Maintenance 42 50 52 54 56 58 60 62 64 66 564 Total Recommendation 42 50 52 54 56 58 60 62 64 66 564 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 0 0 0 0 0 0 0 0 0 0 PAYG 42 50 52 54 56 58 60 62 64 66 564 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 42 50 52 54 56 58 60 62 64 66 564 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 42 50 52 54 56 58 60 62 64 66 564 C - 54 Arlington County, Virginia ECONOMIC DEVELOPMENT Capital Improvement Plan Public Facilities Maintenance FY 2025-2034 CULTURAL AFFAIRS - PUBLIC FACILITIES MAINTENANCE Project Highlights: • The goal of the C ultural Affairs -Public Facilities Maintenance Program is to provide safe and well-maintained facilities for all County residents. These services include maintenance, repair, infrastructure replacement, upgrades , and ground maintenance. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 42 50 52 54 56 58 60 62 64 66 564 Previous Funding Total Funding 42 50 52 54 56 58 60 62 64 66 564 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Cost estimation Fall 2024 • Repair and installation Spring 2025 Changes from Prior CIP: This is a new project for FY 2025 - 2034 CIP. C - 55 Arlington County, Virginia Arlington County, Virginia CIP 2025 − 2034 ECONOMIC DEVELOPMENT: JOINT USE FACILITIES MAINTENANCE PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Cultural Affairs - Joint-Use Space Maintenance and Repairs 0 630 50 52 54 56 58 60 62 64 1,086 Total Recommendation 0 630 50 52 54 56 58 60 62 64 1,086 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 0 0 0 0 0 0 0 0 0 0 0 PAYG 0 630 50 52 54 56 58 60 62 64 1,086 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 0 630 50 52 54 56 58 60 62 64 1,086 Previously Approved Funding Authorized but Unissued Bonds 0 0 0 0 0 0 0 0 0 0 0 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources 0 630 50 52 54 56 58 60 62 64 1,086 C - 56 Arlington County, Virginia ECONOMIC DEVELOPMENT Capital Improvement Plan Joint Use Facilities Maintenance FY 2025-2034 CULTURAL AFFAIRS - JOINT-USE SPACE MAINTENANCE AND REPAIRS Project Highlights: • This project collaboratively addresses the maintenance and repairs of the joint -use spaces which will enable groups and individuals to use the theaters and the scenic studio. Neighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 630 50 52 54 56 58 60 62 64 1,086 Previous Funding Total Funding 0 630 50 52 54 56 58 60 62 64 1,086 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Planning, Assessment, & Procurement Spring 2026 • Order, Delivery & Installation Fall 2026 Changes from Prior CIP: This project is new for the FY 2025-2034 CIP. C - 57 Arlington County, Virginia PUBLIC AND GOVERNMENT FACILITIES P rogram Description This program provides facilities for both existing and evolving services and programs. It encompasses both significant modernization and planned replacement of facilities, based upon facility life cycles and changing program demands and services. It serves to provide a consistent, sustainable inventory of quality public facilities through systematic investment. The program is carefully integr ated with the Facilities Maintenance Capital program by planning for adequate maintenance on 89 buildings, that total over 2.4 M square feet, 32 of which are more than 50 years old. Maintenance is planned through the facilities life cycle and includes periodic renovation, and eventual replacement of obsolete facilities. This CIP continues investment in the Critical Systems Infrastructure program (CSI). CSI is focused on the 24/7/365 maintenance of backup generators, cooling systems, Uninterruptible Power Supplies, Automatic Transfer Switches, and associated monitoring equipment in support of public safety systems and technology. The CIP continues making investments in Facility Finishes, Furnishings, and Equipment (FF&E) as a separate line item within the Facilities Maintenance Program. This ongoing investment in FF&E acknowledges that interior spaces need more than periodic paint and carpet over the building's life cycle. The planning also includes replacement of freestanding furnishings, furniture, and appliances; all of which should integrate in a comprehensive interior design and building refresh. A separate line item is included for investments to transition to hoteling workspaces where appropriate to maximize efficient use of our buildings. The CIP also includes sustained investments in energy efficiency, electrification and decarbonization of buildings, installation of government and publicly accessible electric vehicle charging equipment, renewable energy resources, onsite solar, and energy resilience measures and mechanisms. The AIRE team developed and is implementing a decision-support tool to model energy performance upgrading existing County facilities capital projects in conjunction with energy tracking systems to greater inform building upgrades and retro-commissioning an d to measure progress toward County climate and greenhouse gas emissions reduction goals. P rogram Summary Facilities Management Bureau (FMB) and Facilities, Design and Construction (FDC) use the Facility Condition Assessments (FCA) to determine long-term capital planning needs for the County’s facilities portfolio. Each piece of equipment and building system is included in the database with specific data regarding age, ongoing maintenance required, upcoming repairs, and replacements per the ma nufacturer specifications and industry standards. FCAs are used to aid FMB on the projection of overall building maintenance and larger replacements included as capital projects. However, the FCA data is only one aspect of Capital Maintenance of the County's facilities. Staff compare the hard data, onsite real-time observations, manufacturer's support of equipment, and compatibility with new equipment while developing a program to continue to operate the County's facilities efficiently. M aster Plan Impact The public facilities projects included in the adopted CIP reflect strong linkages to master and other development plans that drive facility planning and acquisitions. Facility planning and design for the projects included in this CIP strive to reflect the guidance provided in the Community Facilities Study such as community participation and building up to extent possible to avoid further reductions in permeable surfaces. C - 44 Arlington County, Virginia PUBLIC AND GOVERNMENT FACILITIES CIP 2025 − 2034 10 YEA R CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total Design and Construction 41,768 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,993 Facilities Maintenance 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757 Energy Efficiency 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,244 Total Recommendation 54,893 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,994 PROGR AM FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 1,000 458 0 0 0 0 0 0 0 0 1,458 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 300 600 5,400 0 0 0 0 6,300 New Bond Issue 27,855 26,960 21,775 21,270 26,495 13,280 56,635 42,730 10,305 9,815 257,120 PAYG 9,275 8,178 11,391 10,847 12,117 6,950 7,559 7,484 8,666 8,819 90,016 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 100 5,962 2,620 500 500 500 500 500 500 500 13,432 Subtotal New Funding 38,210 41,558 35,786 32,917 39,712 26,130 64,694 50,714 19,471 19,134 368,326 Previously Approved Funding Authorized but Unissued Bonds 10,550 800 7,400 0 0 3,285 0 0 0 0 22,035 Issued but Unspent Bonds 5,800 2,500 0 0 0 0 0 0 0 0 8,300 Other Previously Approved Funds 333 0 0 0 0 0 0 0 0 0 333 Subtotal Previously Approved Funding 16,683 3,300 7,400 0 0 3,285 0 0 0 0 30,668 Total Funding Sources 54,893 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,994 C - 45 Arlington County, Virginia CIP 2025 − 2034 PUBLIC AND GOVERNMENT FACILITIES: DESIGN AND CONSTRUCTION PROGRAM 1 0 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Ballston Public Parking Garage Floors 1 - 7 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 2. Carlin Springs Site 0 8,333 0 0 4,040 2,000 0 0 0 0 14,373 3. Columbia Pike Library 0 0 0 0 1,010 3,030 11,265 20,425 0 0 35,730 4. Courthouse Complex Renovations & Infrastructure 5,000 3,300 11,035 11,110 0 0 0 0 0 0 30,445 5. Courts/Police Building Improvements 8,150 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 39,660 6. Crystal City Library 0 0 0 300 600 5,400 0 0 0 0 6,300 7. Detention Facility Comprehensive Study 815 3,030 3,060 3,090 3,125 0 0 0 0 0 13,120 8. Facility Condition Assessments & Planning Studies 775 803 563 318 581 328 333 338 859 348 5,246 9. Facility Finishes, Furnishings & Equipment 0 657 758 333 298 263 283 303 323 343 3,561 10. Fire Logistics 9,950 0 0 0 0 0 0 0 0 0 9,950 11. Fire Station Replacements & Additions 4,100 0 0 0 0 3,535 35,350 255 0 0 43,240 12. Lease Program 0 0 0 0 0 0 0 0 0 0 0 13. Lee Community Center 250 0 0 0 0 0 1,215 14,140 0 0 15,605 14. Oakland Street Warehouse 1,355 0 0 0 0 0 0 0 0 0 1,355 15. Office Space Utilization & Systems Furniture 6,020 0 3,940 2,020 4,180 0 1,230 0 0 0 17,390 16. Situational Awareness Intelligence Unit, EOC & 4,003 4,040 4,850 0 0 0 0 0 0 0 12,893 17. Trade Center-NOC Relocation 0 0 0 0 6,060 0 0 0 0 0 6,060 18. Trade Center Optimization Plan 0 415 430 0 0 0 0 0 0 0 845 Total Recommendation 41,768 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,993 C - 46 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 1,000 0 0 0 0 0 0 0 0 0 1,000 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 300 600 5,400 0 0 0 0 6,300 New Bond Issue 20,105 20,900 19,500 18,745 23,465 7,825 51,080 36,870 4,445 3,955 206,890 PAYG 2,630 1,713 1,321 651 879 591 616 641 1,182 691 10,915 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 Subtotal New Funding 25,085 27,363 23,441 20,196 25,444 14,316 52,196 38,011 6,127 5,146 237,325 Previously Approved Funding Authorized but Unissued Bonds 10,550 800 7,400 0 0 3,285 0 0 0 0 22,035 Issued but Unspent Bonds 5,800 2,500 0 0 0 0 0 0 0 0 8,300 Other Previously Approved Funds 333 0 0 0 0 0 0 0 0 0 333 Subtotal Previously Approved Funding 16,683 3,300 7,400 0 0 3,285 0 0 0 0 30,668 Total Funding Sources 41,768 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,993 C - 47 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 1. BALLSTON PUBLIC PARKING GARAGE FLOORS 1 - 7 Project Highlights: • This project includes a structural engineering study and construction for the building façade. • Funding is also included for design and construction to address flooding / stormwater issues in the garage. Associated Plan(s): Ballston Sector Plan Neighborhood(s): Ballston-Virginia Square Funding Notes: Additional funding is added in FY 2025, FY 2026 and FY 2027 above the levels included in the last CIP. Estimates shown below are placeholders and will be refined after studies are complete. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Other Funding 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 Previous Funding Total Funding 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Design and Procurement of Flooding Remediation FY 2025 • Study to identify façade improvements FY 2025 • Repair / Replace Exterior Façade, new traffic membrane on level 6. FY 2025-FY 2026 • Stormwater Management remediation/ construction FY 2026-FY 2027 Changes from Prior CIP: Funding was increased to reflect the addition of the flooding remediation and facade evaluation studies and projects. C - 48 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 2. CARLIN SPRINGS SITE Project Highlights: • The County demolished and removed a large non-functional empty building at 601 S. Carlin Springs Rd in FY 2024 that was a nuisance and posed risks to the community. • This site is now vacant, providing flexibility for both interim and long-term uses. • Funding is provided for the anticipated phased redevelopment and efficient use of the site to include shared parking. Parking on site would be a shared cost between the County and Virginia Hospital Center assuming approval of an anticipated site plan for a behavioral health care facility. The parking set aside for County uses would be available capacity for future site developme nt with other partners and for future parking as improvements are made to connect the site to the Nature Center. • Funding in FY 2029 and FY 2030 is included for future partnership on the portion of the land expected to remain with the County and improvements to connections to the Long Branch Nature Center and neighboring parkland. These amounts are placeholders and will be refined. Planning funds are included in FY 2026 to support development of these improvements. Funding is also included for a facilities condition assessment of the Long Branch Nature Center in FY 2026 (see the Facilities Condition Assessments and Planning Studies later in this section). Neighborhood(s): Glencarlyn New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 8,080 4,040 2,000 14,120 PAYG 253 253 Previous Funding Total Funding 0 8,333 0 0 4,040 2,000 0 0 0 0 14,373 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Consideration of site plan with VHC FY 2025 Changes from Prior CIP: Funding for the planning study has shifted to FY 2026. Project Links: • South Carlin Springs Property: https://www.arlingtonva.us/Government/Projects/Project- Types/County-Facilities/South-Carlin-Springs-Property C - 49 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 3. COLUMBIA PIKE LIBRARY Project Highlights: • As APS continues its Career Center site development and likely displacement of the current library location, the County has planned for the Columbia Pike Library to move to Columbia Pike in support of Columbia Pike revitalization and placemaking. A parcel was acquired in 2022 for this relocation and is currently being used as contractor parking for APS Career Center construction efforts. • Funding in FY 2029 will provide seed funds for initial planning and design of a replacement library facility with a potential mixed -use development with future construction funding in FY 2031 and FY 2032. • Timing and funding may need to be adjusted to address the final site plan. Associated Plan(s): Commercial Centers Form Based Code Neighborhood(s): Penrose Funding Notes: $1.0M for planning and $34M for design/construction for 15,000sf - 18,000sf of library program space. All estimates will be refined after planning is completed. The operating costs are estimates and will be finalized as the library program is further developed. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 1,010 3,030 11,265 20,425 35,730 Previous Funding Total Funding 0 0 0 0 1,010 3,030 11,265 20,425 0 0 35,730 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Personnel ($) 649 649 Non-Personnel ($) 39 39 Total Impact 0 0 0 0 0 0 0 0 0 688 688 Critical Milestones: • Start design & procurement FY 2029 & FY 2030 • Start construction FY 2031-FY 2032 • Opening FY 2033 Changes from Prior CIP: Timing for design has shifted to FY 2029. Project Links: • Commercial Centers Form Based Code: https://www.arlingtonva.us/Government/Programs/Buildin g/Permits/Form-Based-Code/Commercial C - 50 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 4. COURTHOUSE COMPLEX RENOVATIONS & INFRASTRUCTURE Project Highlights: • This request will provide funds for the design and renovation of two of the four unoccupied floors in 2020 N. 14th Street. • Funding is also included for windows, plumbing and other infrastructure improvements for the entire building. • Renovated floors can be used for hypothermia overflow for the homeless service center and relocating courts programs from Court Square West as a precursor to vacating that building within the next 5-7 years. • Renovated space can also be used to relocate a portion of Facilities Maintenance staff and storage from Court Square West. Associated Plan(s): Court House Sector Plan Neighborhood(s): Clarendon-Courthouse Courthouse New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 3,635 11,110 14,745 Previous Funding Authorized but Unissued Bonds 2,000 800 7,400 10,200 Issued but Unspent Bonds 3,000 2,500 5,500 Total Funding 5,000 3,300 11,035 11,110 0 0 0 0 0 0 30,445 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Window replacement and piping upgrades FY 2025 • Design for 4th and 5th floor FY 2025 - FY 2026 • Construction 4th and 5th floor FY 2027 - FY 2028 C hanges from Prior CIP: In the previous CIP, the scope of this project was to move the Fire Marshall and Battalion Chiefs offices from 1020 N. Hudson Street to 2020 N. 14th Street. The Fire Marshall's office is now moving to the Bozman Government Center (BGC) and this project will focus on programmatic space needs for the Department of Human Services, Department of Environmental Services, and the Courts. Project Links: • Court House Sector Plan, Clarendon Sector Plan Update: https://arlingtonva.s3.amazonaws.com/wp- content/uploads/sites/31/2015/12/Courthouse_SectorPlanAdde ndum_FINAL-12_2_15.pdf C - 51 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 5. COURTS/POLICE BUILDING IMPROVEMENTS Project Highlights: • The project focuses on implementing priorities identified in the Courts Police study, which includes upgrading the remaining court rooms to include technology, furnishings, fixtures and equipment, and ADA upgrades at two courtrooms per year through FY 2030. • Funding is also included to expand the Commonwealth’s Attorney (CWA) office space. FY 2025 PAYG funding is allocated to provide near term space relief with a more permanent solution to follow, with design in FY 2026 and construction in FY 2027. • As part of the Commonwealth’s Attorney expansion, the Alcohol Safety Action Program (ASAP) will eventually be moved to the 2nd floor of the Courts Police building. Associated Plan(s): Court House Sector Plan Neighborhood(s): Clarendon-Courthouse Courthouse Funding Notes: The funding schedule includes $500k in PAYG and $2.87M in bonds for CWA / ASAP scope New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 5,650 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 37,160 PAYG 500 500 Previous Funding Authorized but Unissued Bonds 2,000 2,000 Total Funding 8,150 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 39,660 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Commonwealth's Attorney (CWA) near term Expansion FY 2025 • ASAP Relocation and CWA permanent expansion - Design FY 2026 • ASAP Relocation and CWA permanent expansion - Construction FY 2027 - FY 2028 • Renovate 2 Courtrooms per year FY 2025 - FY 2030 • Renovate Police Space FY 2030 - FY 2034 Changes from Prior CIP: Costs updated to reflect current execution plan and removal/ deferral of funding for level 1 Courthouse entry and security screening improvements. The ASAP Permanent Relocation accelerated timeline and the Commonwealth's Attorney Expansion are new in the FY 2025-2034 CIP. Project Links: • Courthouse Sector Plan Addendum: Courthouse Square (2015): https://arlingtonva.s3.amazonaws.com/wp- content/uploads/sites/31/2015/12/Courthouse_SectorPlanA ddendum_FINAL-12_2_15.pdf C - 52 PUBLIC AND GOVERNMENT FACILITIES Capital Improvement Plan Design and Construction FY 2025-2034 6. CRYSTAL CITY LIBRARY Project Highlights: • In 2020, JBG Smith committed to provide a new library space on the ground floor of their building at 1901 S. Bell St. Due to operating and capital budget considerations as well as space limitations at the S. Bell site, this site plan agreement was terminated and , earlier this year, the County and JBG Smith came to a new agreement for JBG Smith to provide $6.3 million by 2030 to support library operations in Crystal City. Arlington Public Library has kicked off its Future Conversation, which will help inform the future services and offerings at the Crystal City Library Location. • The library site and programming have not yet been determined. Neighborhood(s): Crystal City Funding Notes: Operating costs are anticipated but are yet to be determined. New Fundi

Text truncated. Open the original for the full document.

Source: Arlington County website. First collected Oct 18, 2026.