View the CIP Project List(PDF, 225KB)
Arlington County · Arlington County · Budget documents
Open the original document More from Arlington County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
ARLINGTON NEIGHBORHOODS PROGRAM 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898
Arlington Neighborhoods Program 13,350 13,894 13,931 7,970 8,011 8,053 8,099 8,146 8,196 8,248 97,898
ECONOMIC DEVELOPMENT 91 731 153 158 162 167 171 176 180 185 2,174
Cultural Affairs - Joint-Use Space Maintenance - 630 50 52 54 56 58 60 62 64 1,086
Cultural Affairs - Public Facilities Maintenance 42 50 52 54 56 58 60 62 64 66 564
Public Art - Civic Facilities (Artworks) 49 51 51 52 52 53 53 54 54 55 524
INFORMATION
TECHNOLOGY/EQUIPMENT
22,422 17,208 22,545 16,568 23,136 26,744 22,312 20,050 17,211 24,420 212,616
Body Scanner Replacement in Detention Center 100 - - - 303 - - - - - 403
Call Premise Equipment (CPE) - 2,020 2,020 - - - - - - 2,525 6,565
Cloud Migration (eGov) 625 631 - - - - - - - - 1,256
Connect Arlington 1,150 1,270 1,225 1,405 980 985 1,065 1,200 1,240 1,340 11,860
Constituent Digital Services - 379 379 399 404 428 433 483 484 489 3,878
Constituent Single Sign-On - 700 - - - - - - - - 700
County Audio Visual Equipment Replacement 300 342 921 859 549 806 1,041 420 1,012 439 6,689
Courthouse Magnetometer / X-Ray Machine 300 - - - - - - 303 - - 603
Criminal Justice Records Management System - - 303 5,050 - - - - - - 5,353
Data Center Consolidation and Refreshment 3,779 - 939 3,242 973 530 - - - - 9,463
DHS Centralized Customer Service & Case Mgmt. 990 - - - - - 535 560 - - 2,085
Enterprise Records Mgmt. System Modernization - - - - - - 1,343 - - - 1,343
Fire Bomb Squad X-Ray Systems 240 - - - - - - - 261 - 501
Fire Breathing Apparatus 460 - - - - 4,080 - - - - 4,540
Fire Command Vehicle - - - - - 2,020 - - - - 2,020
Fire Defibrillators - - - - - - - - - 4,858 4,858
Fire Portable Radios - - - - - 2,121 2,121 - - - 4,242
Fire Records Management System - - - - - 1,010 - - - - 1,010
Fire Station Alerting - - - - - - - - 2,020 - 2,020
Fire Thermal Imaging Cameras - 278 - - - - - - 278 - 556
Fire Utility Task Vehicles (UTV) - 121 121 61 - - - - - - 303
Fire Vehicle Apparatus - - 6,864 - 9,594 2,525 8,476 5,726 - - 33,185
Firefighter Rehab Unit - 909 - - - - - - - - 909
Human Resource & Financial System Enhancements - 202 208 214 221 227 234 241 248 256 2,051
Land Record System - - - - 540 - - - - 1,104 1,644
Network Equipment and Power System 1,732 1,544 2,121 2,096 3,889 3,182 1,919 2,449 2,550 4,495 25,977
Police & Sheriff Public Safety Radios 2,850 2,879 - - - - - - 2,879 2,879 11,487
Police Computer Forensic Equipment - - 414 - - - - 505 - - 919
Police E-Summons System 100 227 111 112 113 114 227 111 112 113 1,340
Police Interview Rooms - - - - 253 - - - - - 253
Police Traffic Equipment Vehicle - 96 - - - - - - - - 96
Police Video Trailers - 253 - - - - 354 - - - 607
Public Safety Mobile Data Computers - - 3,737 - - - - 4,040 - - 7,777
Public Safety Radio System Upgrades - - - - - - - - 1,949 - 1,949
Public Safety Rifle Plates - - - - - - 404 - - - 404
Public Safety Servers and Infrastructure 350 - - - - 505 - - - - 855
Real Estate Assessment System - 1,010 - - - - - - - - 1,010
Revenue and Collection System Enhancement 4,500 - - - 1,250 3,295 - - - 1,569 10,614
Proposed CIP 10 Year Project Summary FY 2025 - FY 2034
1
Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Proposed CIP 10 Year Project Summary FY 2025 - FY 2034
Server Hardware & Data Storage 780 586 603 621 640 659 679 699 720 742 6,729
Sheriff Livescan and Portable Livescan - 303 - - - - 306 - - - 609
Tub Grinder Replacement - - - - - 1,212 - - - - 1,212
Voter Registration Electronic Poll Books - - - - 505 - - - - - 505
Voter Registration Voting Machines 2,000 - - - - - - - - - 2,000
Workforce Device Modernization 2,166 3,458 2,579 2,509 2,922 3,045 3,175 3,313 3,458 3,611 30,236
LOCAL PARKS AND RECREATION
PROGRAMS
24,188 27,445 48,030 37,501 15,909 21,416 24,931 13,231 30,641 65,458 308,750
Arlington Boathouse - - - 15,865 - - - - - 12,215 28,080
Crystal City Parks and Public Space 1,038 6,682 2,695 7,040 660 4,820 - - - - 22,935
Drew Park - 305 115 1,820 - - - - - - 2,240
Emerging Uses Program 1,500 - 1,010 - 505 - 1,010 - 1,010 - 5,035
Fairfax Drive Public Spaces - - - - - - - 900 1,360 11,725 13,985
Feasibility Studies and Implementation - 202 204 206 208 210 212 214 217 219 1,892
Gateway Park (Rosslyn) 1,400 - 29,685 - - - - - - - 31,085
Greenbrier Park/Yorktown High Stadium Field 1,164 - - - - - - - - - 1,164
Kenmore Middle School Athletic Field Conversion 9,842 - - - - - - - - - 9,842
Langston Boulevard Public Space Improvements - - - - - - - - - 2,020 2,020
Long Bridge Park Synthetic Field #3 - 1,041 - - - - - - - - 1,041
Natural Resiliency Program - 1,515 - 1,010 - 1,010 - 1,010 - 1,010 5,555
New Park at 26th Street N and Old Dominion Dr - - - 255 560 4,040 - - - - 4,855
Parks Athletic Courts Program - - 505 - 505 - 505 - 505 - 2,020
Parks Land Acquisition and Public Space Program 1,500 - 3,030 - 3,060 - 3,090 - 3,125 - 13,805
Parks Maintenance Capital Program 4,250 5,710 5,924 5,623 5,742 5,866 5,885 6,005 6,024 6,144 57,173
Penrose Square, Phase 2 - - - - - - 795 - - 3,965 4,760
Quincy Park - - - - - 890 4,040 - 8,920 24,570 38,420
Shirlington Park - - - - - - - 1,030 4,315 - 5,345
Short Bridge Park - - - - - - 5,690 - - - 5,690
Synthetic Turf Program - - 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 21,199
Thomas Jefferson Middle School Lower Field 819 - - - - - - - - - 819
Three Urban Parks - 8,055 - - - - - - - - 8,055
Trail and Bridge Modernization Program 2,675 3,935 2,525 2,550 2,575 2,605 2,070 455 455 405 20,250
Virginia Highlands Park/Nearby Public Space - - - - - - - - - 1,485 1,485
METRO 33,000 34,225 35,230 36,230 37,335 37,835 38,435 40,855 52,060 53,265 398,470
Metro Funding 33,000 34,225 35,230 36,230 37,335 37,835 38,435 40,855 52,060 53,265 398,470
PUBLIC AND GOVERNMENT FACILITIES 54,143 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,244
Ballston Public Parking Garage Floors 1 - 7 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220
Carlin Springs Site - 8,333 - - 4,040 2,000 - - - - 14,373
Columbia Pike Library - - - - 1,010 3,030 11,265 20,425 - - 35,730
Courthouse Complex Renovations & Infrastructure 5,000 3,300 11,035 11,110 - - - - - - 30,445
Courts/Police Building Improvements 8,150 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 39,660
Critical Systems Infrastructure (CSI) Program 1,850 1,313 4,020 4,141 4,262 1,465 1,510 929 960 990 21,440
Crystal City Library - - - 300 600 5,400 - - - - 6,300
Detention Facility Comprehensive Study 815 3,030 3,060 3,090 3,125 - - - - - 13,120
Electric Vehicle Chargers-Public Accessibility 100 505 152 153 177 179 152 153 177 179 1,927
Energy Performance Upgrades -County Buildings 475 707 606 612 591 556 561 480 505 556 5,649
2
Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Proposed CIP 10 Year Project Summary FY 2025 - FY 2034
Energy Resilience Planning & Development - 509 758 765 2,121 - - - - - 4,153
Facility Condition Assessments & Planning Study 25 803 563 318 581 328 333 338 859 348 4,496
Facility Finishes, Furnishings & Equipment - 657 758 333 298 263 283 303 323 343 3,561
Fire Logistics 9,950 - - - - - - - - - 9,950
Fire Station Replacements & Additions 4,100 - - - - 3,535 35,350 255 - - 43,240
Lee Community Center 250 - - - - - 1,215 14,140 - - 15,605
Lubber Run Resiliency Hub 1,250 1,212 - - - - - - - - 2,462
Oakland Street Warehouse 1,355 - - - - - - - - - 1,355
Office Space Utilization & Systems Furniture 6,020 - 3,940 2,020 4,180 - 1,230 - - - 17,390
Public Facilities Maintenance Program 8,900 8,181 5,359 5,713 5,766 8,800 9,408 10,222 10,730 11,238 84,317
Situational Awareness Intelligence Unit, EOC & 4,003 4,040 4,850 - - - - - - - 12,893
Trade Center Optimization Plan - 415 430 - - - - - - - 845
Trade Center-NOC Relocation - - - - 6,060 - - - - - 6,060
County Facility Renewable Energy Assessment and 300 1,263 1,248 1,133 1,145 606 657 707 758 808 8,625
Electric Vehicle Chargers-Internal Accessibility 250 505 202 204 206 208 210 212 214 217 2,428
REGIONAL PARTNERSHIPS AND
CONTINGENCIES
4,183 1,166 1,077 1,094 1,111 1,129 1,147 1,165 1,184 1,203 14,459
Northern Virginia Criminal Justice Academy 127 128 - - - - - - - - 255
Northern Virginia Regional Park Authority 731 738 768 776 783 791 799 807 815 823 7,831
Capital Administration & Contingent 3,325 300 309 318 328 338 348 358 369 380 6,373
STORMWATER MANAGEMENT 29,605 37,355 36,100 35,675 48,635 37,490 24,720 30,215 30,100 24,360 334,255
Detention Vaults & Overland Relief Maintenance 100 105 105 110 110 110 110 115 115 120 1,100
33rd Street North to Williamsburg Capacity - 160 1,115 1,175 1,010 1,260 - - - - 4,720
Capacity Project Feasibility Studies 150 155 160 165 165 170 170 175 175 175 1,660
Columbia Pike at South Greenbrier Street 1,000 1,190 820 8,980 5,200 - - - - - 17,190
Concord Mews Pond Retrofit 250 1,545 - - - - - - - - 1,795
Crossman Run Watershed Capacity Improvements - 3,420 3,140 1,600 15,425 12,990 - - - - 36,575
Dumbarton Street Culvert-Downstream 3,000 1,545 - - - - - - - - 4,545
Dumbarton Street Culvert-Upstream 3,000 1,545 - - - - - - - - 4,545
Flood Resiliency Design & Construction Guideline 150 - - - - - - - - - 150
Flood Risk Reduction Program 1,500 1,590 1,995 2,205 1,070 1,100 1,130 1,190 1,220 1,250 14,250
Floodplain Channel & Split Stream Maintenance 100 105 105 110 110 110 110 115 115 120 1,100
Four Mile Run Flood Control Project Maintenance 500 50 55 55 55 55 55 60 60 60 1,005
Green Streets & Infrastructure Program 375 235 425 435 435 445 445 460 460 475 4,190
Gulf Branch and South Walter Reed Green Streets 540 - 210 - - - - - - - 750
Langston Boulevard Culvert at North Sycamore 440 - - - - - - - - - 440
Lower Long Branch Flood Risk Reduction Project - - - - - 645 665 700 720 740 3,470
Lubber Run Watershed Capacity Improvements 1,500 3,610 3,075 1,260 6,455 6,560 6,240 14,870 13,385 10,005 66,960
Manhole & Catch Basin Rehabilitation 250 260 265 275 275 280 280 290 290 295 2,760
Military Road Culvert at Gulf Branch 2,090 1,030 - - - - - - - - 3,120
Miscellaneous Expansion/ Capacity Projects - 310 - 325 - 335 - 345 - 355 1,670
North Thomas Street 255 875 1,125 - - - - - - - 2,255
3
Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Proposed CIP 10 Year Project Summary FY 2025 - FY 2034
Outfall Rehabilitation Program 925 1,725 1,305 875 1,475 1,510 1,510 1,555 1,555 1,595 14,030
Quebec Street Outfall Rehabilitation 450 - - - - - - - - - 450
Sidewalk Underdrains 50 50 55 55 55 55 55 60 60 60 555
Sparrow Pond Watershed Retrofit 450 - - - - - - - - - 450
Spout Run Watershed Capacity Improvements 7,900 8,130 8,630 8,340 7,630 7,805 6,920 5,815 4,490 4,305 69,965
Stohman's Run Watershed Capacity Improvements 250 515 1,310 - - - - - - - 2,075
Stormwater Frames and Covers 250 260 265 275 275 280 280 290 290 295 2,760
Stormwater Mains Rehabilitation & Replacement 1,000 1,545 2,120 2,455 2,725 3,080 3,250 3,450 3,565 3,775 26,965
Stream Resiliency Program 250 260 2,915 275 3,000 280 3,080 290 3,165 295 13,810
Terra Cotta/ Corrugated Metal Pipe Upgrades 205 215 225 240 240 250 250 260 260 265 2,410
Torreyson Run Watershed Capacity Improvements 1,725 4,140 4,860 5,340 1,635 - - - - - 17,700
Washington Boulevard Pond Retrofit - 155 795 - - - - - - - 950
Water Quality Project Feasibility & Concept De 150 155 160 165 165 170 170 175 175 175 1,660
Williamsburg at North Underwood Capacity - 155 865 960 1,125 - - - - - 3,105
Gulf Branch Stream Resiliency 800 2,320 - - - - - - - - 3,120
TRANSPORTATION 259,142 201,500 285,850 198,549 208,312 125,902 158,575 106,984 137,283 172,411 1,854,508
Arlington View Trail Connector 400 156 4,845 5,038 - - - - - - 10,439
Army Navy Drive Complete Street 7,100 2,000 - - - - - - - - 9,100
Army Navy Drive Transit Center 150 - - - 34 35 - - - - 219
ART Fare Collection System 244 802 - - - - - - - - 1,046
ART Fleet & Equipment Replacement 10,637 10,051 6,050 - 10,429 - 11,916 - - 18,601 67,684
ART Fleet Transition to ZEB 900 930 37,920 1,103 30,542 5,474 21,274 3,764 5,221 27,048 134,176
ART Operations and Maintenance Facility 27,404 - - - - - - - - - 27,404
Ballston-MU Metrorail Station West Entrance 950 14,282 69,667 54,913 37,201 - - - - - 177,013
BIKEArlington 1,307 1,344 4,776 4,432 4,749 4,520 4,177 4,592 8,920 8,582 47,399
Bridge Maintenance 1,040 986 1,026 1,068 1,101 1,134 1,167 1,205 1,238 1,276 11,241
Bridge Renovation / Replacement 5,371 12,018 5,330 440 1,020 2,914 3,063 - - - 30,156
Bus Bay Expansion-East Falls Church Metro Station 8,190 394 - - - - - - - - 8,584
Bus Stop Accessibility Improvements 926 883 921 954 985 1,020 1,056 1,099 1,133 1,182 10,159
Bus Stop and Shelter Program 627 645 556 522 538 560 603 645 664 687 6,047
Capital Bikeshare 1,395 1,211 1,683 1,639 1,650 1,917 2,348 2,172 2,175 2,381 18,571
Columbia Pike Streets 40,027 3,588 532 255 - - - - - - 44,402
Court House Metrorail Station New Elevators 206 64 3,730 2,933 12,265 24,425 13,848 - - - 57,471
Crystal City - Potomac Yard Transitway Upkeep 489 - - - - - - - - - 489
Crystal City Metro Station East Entrance 39,852 48,891 38,321 - - - - - - - 127,064
Crystal City, Pentagon City, Potomac Yard Street 11,128 12,230 18,846 21,423 26,086 2,685 4,118 8,932 21,137 22,975 149,560
Curb & Gutter Missing Links 129 130 135 140 145 150 155 160 165 170 1,479
East Falls Church Metro Station Second Entrance - - - - - - - - 400 400 800
Improvements Outside Major Corridors 14,849 16,069 17,787 16,748 5,974 8,682 8,754 7,494 17,637 10,474 124,468
Intelligent Transportation Systems 6,387 3,290 1,913 2,456 619 1,229 657 1,304 696 1,383 19,934
Langston Blvd Multimodal Improvements 400 200 800 2,250 2,000 4,800 12,940 15,100 9,700 3,500 51,690
Microtransit Implementation Plan 70 500 - - - - - - - - 570
Mobility Hub Pilot 565 - - - - - - - - - 565
Neighborhood Complete Streets 3,599 1,343 1,467 1,690 1,804 1,823 1,878 1,924 1,980 2,037 19,545
Parking Meters 206 419 298 581 328 601 1,535 1,040 152 146 5,306
Parking Technology 646 1,130 888 566 586 596 616 783 651 677 7,139
4
Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Proposed CIP 10 Year Project Summary FY 2025 - FY 2034
Paving 13,489 12,980 13,488 13,661 14,192 14,374 14,933 15,124 15,712 15,911 143,864
Pentagon City Metro Station Second Elevator 3,893 - - - - - - - - - 3,893
Premium Network Transit (PrTN): Columbia Pike
Transit Stations
4,258 3,558 109 - - - - - - - 7,925
PrTN: Transit ITS and Security Program 1,046 458 446 459 293 185 191 197 203 209 3,687
PrTN: Transitway Extension to Pentagon City 7,431 12,106 4,271 - - - - - - - 23,808
PrTN: ART Fleet Expansion 4,463 - - - 5,616 - 3,404 - - - 13,483
PrTN: Transitway Extension (Potomac Ave-
Alexandria)
20 37 3,142 3,066 1,491 - - - - - 7,756
Rosslyn-Ballston Arterial Street Improvements 7,053 10,292 17,177 28,774 14,483 8,580 7,977 3,630 10,395 14,309 122,670
Shirlington Bus Station Expansion 310 - - - 600 5,850 5,150 - - - 11,910
Sidewalk, Curb, Gutter Proactive Zone Maintenance 1,029 1,071 1,106 1,141 1,171 1,207 1,243 1,284 1,320 1,357 11,929
Signals & ITS Maintenance 1,355 1,440 1,506 1,586 1,666 1,752 1,842 1,927 2,017 2,108 17,199
Strategic Network Analysis and Planning 498 593 610 628 647 667 687 707 729 750 6,516
Street Lighting 2,506 1,896 2,023 2,133 1,530 1,633 1,807 1,669 1,783 1,974 18,954
Street Safety Improvements (SSI) 2,502 2,283 2,348 2,418 2,492 2,569 2,644 2,724 2,808 2,892 25,680
Trail Light Maintenance Program 20 21 21 22 23 23 24 25 26 26 231
Transit Strategic Plan Updates - - - - 585 - - - - - 585
Transportation Asset Management 203 209 214 221 227 234 241 247 255 263 2,314
Transportation Systems & Traffic Signals 6,908 3,346 4,486 4,904 3,046 2,550 2,627 2,706 2,787 2,871 36,231
WALKArlington 3,421 2,016 861 1,349 750 771 810 837 864 888 12,567
Transit Operating Costs & Program Administration 13,543 15,638 16,551 19,036 21,444 22,942 24,890 25,693 26,515 27,334 213,586
WATER AND SEWER INFRASTRUCTURE 71,715 105,815 110,130 110,820 88,095 64,445 80,290 105,035 41,810 101,730 879,885
Activated Sludge Effluent Pump Station 1 800 1,550 2,675 4,970 1,655 - - - - - 11,650
Asset Management System Replacement 1,000 1,035 265 - - - - - - - 2,300
Blue Plains Capital Improvements 1,210 1,705 1,825 2,775 3,010 2,605 2,130 1,455 885 1,555 19,155
Finished Water Reliability & Interconnections 500 2,070 2,140 11,050 22,100 22,800 34,200 - - - 94,860
Grit System Upgrades 300 595 1,175 635 - - - - - - 2,705
Improvements to Eads St Property - 10 - 10 - 10 - 10 - 10 50
Manhole Rehabilitation 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155
Odor Control - - - 550 550 - - - - - 1,100
Re-Gen Phase II 10,600 4,865 - - - - - - - - 15,465
Re-Gen Phase III 17,200 58,030 62,925 50,575 21,755 - - - - - 210,485
Regional Source Water Resiliency - - - - - - - - - 60,500 60,500
Secondary Clarifiers - - - - - - 1,140 5,170 7,755 4,145 18,210
Sewer-Force Mains 2,100 155 160 165 165 170 170 175 175 180 3,615
Sewer-Improvements for Development 900 260 265 275 275 285 285 295 295 300 3,435
Sewer-Infiltration and Inflow 3,000 3,105 3,210 3,315 3,315 3,420 3,420 3,525 585 605 27,500
Sewer-Large Diameter Main Rehabilitation 2,780 2,185 4,140 2,550 3,090 2,340 100 4,220 1,040 2,050 24,495
Sewer-Main Replacement Program 2,000 2,590 3,210 3,315 3,315 3,420 3,420 3,525 3,525 3,630 31,950
Technology Enhancements 725 1,365 60 2,630 2,735 2,935 3,050 65 65 65 13,695
Trades Center Equipment & Improvements - 1,035 - - - - - - - - 1,035
Transmission Mains Resiliency 150 310 3,745 - - - - - - - 4,205
USACE Coastal Storm Resiliency 200 - - - - - 5,700 - - - 5,900
Washington Aqueduct Capital 7,800 8,075 8,345 8,620 8,620 8,890 8,890 67,915 9,165 9,440 145,760
Water/Sewer Frames/Covers 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155
Water-Improvements for Development 500 520 535 550 550 570 570 585 585 605 5,570
Water-Large Diameter Main & Valve Rehabilitation 1,000 1,035 1,070 1,105 1,105 1,140 1,140 1,175 1,175 1,210 11,155
5
Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Proposed CIP 10 Year Project Summary FY 2025 - FY 2034
Water-Large Meter Vault Rehabilitation &
Replacement
200 205 215 220 220 230 230 235 235 240 2,230
Water-Main Cleaning and Lining Program 1,600 1,655 1,710 1,770 1,770 1,825 1,825 1,880 1,880 1,935 17,850
Water-Main Replacement Program 7,000 6,725 6,955 7,180 7,735 7,980 8,550 8,810 8,810 9,075 78,820
Water-Pump Station Improvements 2,250 110 265 830 - 125 - 130 - 135 3,845
Water-Pump Station Rehabilitation - 105 - 110 - 115 - 115 - 120 565
Water-Small Diameter Valve Rehabilitation &
Replacement
300 310 320 330 330 340 340 350 350 365 3,335
Water-Tank Rehabilitation 100 - 105 2,320 830 115 - 115 - 120 3,705
WPCP Maintenance Capital 2,000 2,070 2,140 2,210 2,210 2,280 2,280 2,350 2,350 2,420 22,310
WPCP Technology Enhancements 3,500 2,070 535 550 550 570 570 585 585 605 10,120
GRAND TOTAL 511,839 484,197 596,232 477,482 470,418 352,596 423,374 376,571 338,136 470,414 4,501,259
6
Source: Arlington County website. First collected Oct 18, 2026.