RecordWell Data

County Manager's Proposed CIP Presentation(PDF, 2MB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 FY 2025 - FY 2034 PROPOSED CIP County Manager’s Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 May 28, 2024 FY 2025 - FY 2034 PROPOSED CIP 2 FY 2025 - FY 2034 PROPOSED CIP Transportation & Roads Public Government Facilities Parks and Recreation Technology & Public Safety Maintenance Capital Arlington Neighborhoods Program Stormwater Management Metro Capital Plan for FY 2025-FY 2034: $4.5B 3FY 2025 - FY 2034 PROPOSED CIP Measured approach Mindful of impacts of debt service on operating budget, uncertain external pressures (e.g. inflation / interest rates) Maintaining County’s Current Asset Inventory e.g., facilities, trails and bridges, technology systems, and roofs Meet Regional, Legal, and Regulatory Obligations e.g., Metro Responding to Emerging Service Demands Addressing Environment & Resiliency Planning for the Future Guiding Principles 4FY 2025 - FY 2034 PROPOSED CIP Economic trends Major Assumptions & Risks Construction inflation – assuming 4% Interest rates on bonds – assuming 5.0% Regulatory changes Unanticipated events that require capital investment 5FY 2025 - FY 2034 PROPOSED CIP Focus on resiliency across many sectors • Situational awareness center • Water supply redundancy • Resilience hub at Lubber Run Major Changes Since Last CIP Barcroft investment on County balance sheet: $120 million outstanding Response to mental health & substance use • Potential partnership with VHC on S. Carlin Springs 6FY 2025 - FY 2034 PROPOSED CIP Major Changes Since Last CIP Response to remote workforce • Evaluation of Courthouse area buildings for further consolidation of space Implementation of recently adopted plans • Plan Langston Boulevard – Lee Center, transportation improvements • Transit Strategic Plan Transportation program trade-offs • Commercial real estate tax outlook • Project complexity & inflation Additional investments in water- sewer infrastructure and resiliency Project Timeline Changes 7FY 2025 - FY 2034 PROPOSED CIP TEN-YEAR GROWTH County: 4.5% APS: 2.4% County/APS: 3.6% (in thousands) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 COUNTY Debt Service 85,323 90,070 94,764 99,367 105,097 112,060 117,631 124,005 127,459 126,273 Annual Inc / (Dec) $ 4,889 4,694 4,603 5,729 6,964 5,571 6,374 3,454 (1,186) Annual Inc / (Dec) % 5.7% 5.2% 4.9% 5.8% 6.6% 5.0% 5.4% 2.8% -0.9% SCHOOLS Debt Service 67,292 69,772 72,124 74,865 77,532 80,159 82,156 83,812 84,545 81,907 Annual Inc / (Dec) $ 2,565 2,352 2,741 2,667 2,627 1,997 1,656 733 (2,638) Annual Inc / (Dec) % 3.8% 3.4% 3.8% 3.6% 3.4% 2.5% 2.0% 0.9% -3.1% AHIF – BARCROFT Debt Service 7,200 7,200 10,730 10,495 10,459 10,424 10,379 10,344 10,297 10,259 Annual Inc / (Dec) $ - 3,530 (235) (36) (35) (45) (35) (47) (38) Annual Inc / (Dec) % 0.0% 49.0% -2.2% -0.3% -0.3% -0.4% -0.3% -0.5% -0.4% Growth in debt service should be sustainable and consistent with the projected growth of revenues. Debt service growth over the ten-year projection should not exceed the average ten-year historical revenue growth. Annual Debt Service Increases Consistent with Debt Policies but Still Significant Ten Year Revenue Growth 2013-2023 4.4% 8FY 2025 - FY 2034 PROPOSED CIP Existing Debt Service & Major Projects Financed 58,463 56,694 55,368 51,610 52,099 51,145 49,685 46,972 42,501 36,411 22,024 21,334 20,644 19,693 17,241 16,259 15,168 14,103 13,062 12,306 4,952 10,368 14,867 22,090 27,710 34,543 40,534 48,626 55,426 58,932 1,505 3,440 5,650 7,735 9,807 11,862 13,995 16,074 18,213 20,358 - 20,000 40,000 60,000 80,000 100,000 120,000 140,000 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 FY2031 FY2032 FY2033 FY2034 THOUSANDS EXISTING VS NEW GENERAL FUND DEBT SERVICE Existing County Existing Metro New County New Metro Major Projects in Existing Debt WMATA ($317MM) Fire Stations 3 & 8 ($25MM) Long Bridge Aquatics & Fitness Center ($42MM) Lubber Run Community Center ($47MM) Arlington Mill Community Center ($30MM) North Quincy Site Acquisition ($27MM) 2020 14th Street North Acquisition ($20MM) Head Start / 2920 S Glebe Road ($11MM) Trades Center ($17MM) TJ Parking Deck ($12MM) 9 FY 2025 - FY 2034 PROPOSED CIP 8.8% 9.0% 9.3% 9.4% 9.5% 9.7% 9.8% 9.8% 9.7% 9.3% 0.0% 1.0% 2.0% 3.0% 4.0% 5.0% 6.0% 7.0% 8.0% 9.0% 10.0% 11.0% FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 FY34 1. Debt Service as % of General Government Expenditures NOT TO EXCEED 10% *Includes APS debt per “MPSA Option 2” on page 34 of the Superintendent’s Proposed CIP presentation on May 16, 2024 Adhering to Debt Policies 10FY 2025 - FY 2034 PROPOSED CIP 4. Growth In Debt Service Over The Ten-Year Planning Period No Greater Than Ten-Year Historical Growth In Revenues Adhering to Debt Policies (Cont.) 2. Ratio of Debt Per Capita To Per Capita Income No Greater than 6% 3. Outstanding Debt As Percentage Of Market Valuation Of Tax Base No Greater Than 3% The CIP remains under this policy and ranges from 1.3% - 1.5% over the ten-year horizon. The CIP peaks in FY 2027 at 5.4% before falling to 4.5% in FY 2034.lip Total County and APS debt service growth is estimated at 3.6% annually compared to 10-year historical average ten-year revenue growth (FY13 – FY23) of 4.4%. 11 FY 2025 - FY 2034 PROPOSED CIP Asset Base and Debt APS Referenda Totals APS % Share County % Share Total 2008-2022 $748.4 46.7% $852.8 53.3% $1,601.2 2010-2022 $649.0 43.8% $832.0 56.2% $1,481.0 2012-2022 $630.9 44.9% $773.9 55.1% $1,404.8 2014-2022 $588.3 47.0% $663.1 53.0% $1,251.3 2016-2022 $482.5 46.7% $549.8 53.3% $1,032.3 2018-2022 $343.7 48.0% $372.9 52.0% $716.6 2020-2022 $240.7 50.9% $232.0 49.1% $472.7 35% 35% 35% 35% 35% 36% 36% 35% 34% 34% 65% 65% 65% 65% 65% 64% 64% 65% 66% 66% 0% 20% 40% 60% 80% 100% 120% FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 County / APS Asset Base APS % of Asset Base County % of Asset Base ($’s in millions) Final Copy ACFR 12-15-2023 (arlingtonva.us) (Government, Fiscal Year 2023) 12FY 2025 - FY 2034 PROPOSED CIP Total County ($174.4M) Community Infrastructure $76.2M Local Parks & Recreation $25.8M Metro and Transportation $72.4M Utilities Utilities $14.2 million Proposed County Government 2024 Bond Referenda 2024 Referenda primarily funds projects in FY 2025 and FY 2026 13FY 2025 - FY 2034 PROPOSED CIP Proposed FY 2025 – FY 2034 Debt Summary Total FY 25-34 LOCAL PARKS & RECREATION Parks Maintenance Capital 40,990 Arlington Boathouse 16,770 Three Urban Parks in Ballston-Virginia Square 8,055 Drew Park 1,540 Parks Land Acquisition and Open Space 13,805 Synthetic Fields 2,400 Trail & Bridge Modernization 17,075 Shirlington Park 5,345 Gateway Park 11,635 Nature Resiliency Program 5,555 Virginia Highlands Park and Nearby Public Spaces 1,485 Emerging Uses Program 5,035 Fairfax Drive Public Spaces 13,985 Langston Boulevard Public Space Improvements 2,020 New Park at 26th Street N and Old Dominion Dr 4,855 Short Bridge Park 5,690 Quincy Park 36,420 Penrose Square Phase 2 4,760 Sub-total 197,420 METRO Metro (pg. E-1) 239,670 COMMUNITY CONSERVATION Arlington Neighborhoods Program 70,000 INFORMATION TECHNOLOGY Connect Arlington 10,435 2032Bond Funding Proposed Planning 2024 2026 2028 2030 5,825 9,400 8,385 8,590 8,790 - 9,555 - - 7,215 8,055 - - - - 1,540 - - - - 1,500 3,030 3,060 3,090 3,125 2,400 - - - - 3,435 5,075 5,180 2,525 860 - - - 1,030 4,315 - 11,635 - - - 1,515 1,010 1,010 1,010 1,010 - - - - 1,485 1,500 1,010 505 1,010 1,010 - - - 900 13,085 - - - - 2,020 - 255 4,600 - - - - - 5,690 - - - 890 4,040 31,490 - 795 3,965 25,770 40,970 23,630 28,680 78,370 44,325 46,260 47,470 49,190 52,425 14,000 14,000 14,000 14,000 14,000 995 2,630 1,965 2,265 2,580 14FY 2025 - FY 2034 PROPOSED CIP Proposed FY 2025 – FY 2034 Debt Summary Total FY 25-34 TRANSPORTATION Paving 123,445 Curb & Gutter Missing Links 1,460 Bridge Maintenance 7,640 Bridge Renovation and Replacement 4,735 Street Lights 3,220 Neighborhood Complete Streets 5,995 Transportation Systems & Traffic Signals 885 Street Safety Improvements 2,590 Sidewalk, Curb, Gutter Proactive Zone Maintenance 8,355 WalkArlington 2,325 Signals & ITS Maintenance 5,745 Sub-total 166,395 PUBLIC / GOVERNMENT FACILITIES Facilities Maintenance Capital 50,230 Fire Stations Replacements & Additions 35,855 Columbia Pike Library Refresh / Replacement 35,730 Carlin Springs Site 14,120 Courts / Police Building Improvements 34,290 Courthouse Complex Renovations & Infrastructure 14,745 Detention Facility Comprehensive Study 13,120 Lee Community Center 15,605 Commonwealth Attorney and ASAP Renovation 2,870 Office Space Utilization and Systems Furniture 17,390 Situational Awareness Center / DPSCEM Consolidation 9,760 Trade Center - NOC Relocation 6,060 Trade Center Optimization Plan Implementation 845 Quincy Site Planning 6,500 Sub-total 257,120 Total County GO Bond Referenda 941,040 2032Bond Funding Proposed Planning 2024 2026 2028 2030 22,035 23,500 24,695 25,950 27,265 240 275 295 315 335 530 1,615 1,725 1,830 1,940 - - - 1,080 2,085 1,570 - 1,380 1,050 200 275 315 410 435 465 490 525 405 495 530 560 600 1,470 1,575 1,665 1,770 1,875 855 1,120 1,340 1,340 28,080 32,380 34,695 35,455 35,785 755 920 1,125 1,355 1,590 1,340 - 315 570 13,810 4,800 8,485 11,415 11,720 - - 250 35,605 - - - 4,040 31,690 - 8,080 - 6,040 - - 9,175 5,050 7,595 4,070 8,400 - 14,745 - - - 3,845 6,150 3,125 - - - 9,760 - - - - 250 - - 15,355 - 2,870 - - - - 6,500 - - - - - - 6,060 - - 845 - - - - 6,020 5,960 4,180 1,230 61,155 36,705 39,775 99,365 20,120 174,325 172,945 161,535 228,955 203,280 15 FY 2025 - FY 2034 PROPOSED CIP $4.5 Billion FY 2025 – FY 2034 10% PAY-AS-YOU-GO 34% GENERAL OBLIGATION BONDS (COUNTY) (Includes Utilities and Stormwater bonds) 10% STATE & FEDERAL 12% TRANSPORTATION CAPITAL FUND (TCF) 16% PREVIOUSLY APPROVED FUNDING 13% OTHER SOURCES (Dedicated or Restricted Fund Sources: Developer Contributions, Short-Term Finance, Tax Increment Financing, and Other Funding) Notes:  The majority of revenue for the CIP is restricted in uses and cannot be spent in other areas  $189 million of the General Obligation fund source is the 2024 Bond Referendum that voters must approve in November 2024 before those projects can be funded (excludes APS) 6% GRANTS How We Pay for the CIP 16 FY 2025 - FY 2034 PROPOSED CIP Potential Capital Projects Subject to Project Labor Agreements (PLAs) All projects will be subject to prevailing wage Project Labor Agreement Considerations • Pilot a project valued at or above $25 million • Larger projects typically have a greater diversity of trades; Design- Build and CMAR contracts almost always exceed this threshold. • Funded with local dollars • Project not yet started or early in planning process Potential Projects • Virginia Highlands Park (FY 2034 & beyond) • Quincy Park (FY 2030 – FY 2034) • Fire Station 7 (FY 2025 & FY 2030 – FY 2031) • Columbia Pike Library (FY 2029 – FY 2032) • Lubber Run Watershed (ongoing) • Crossman Run (FY 2026 – FY 2030) There are a number of other projects that could potentially qualify depending on considerations above. 17FY 2025 - FY 2034 PROPOSED CIP Environmental Compliance & Innovation • Stormwater stream & water quality • Water Pollution Control Plant investments Resiliency • Stormwater infrastructure capacity • Natural resiliency in our parks • Lubber Run Resiliency Hub Vehicle Charging • Infrastructure for County and public use Facility Energy Updates • Energy Performance & renewable energy assessments • Solar on County facilities Transit Investments • Fleet replacement • ART operations and maintenance • Street lighting Investments in FY 2025-2034 CIP Advancing our Environmental & Resiliency Goals 18FY 2025 - FY 2034 PROPOSED CIP Emergency Preparedness • Situational Awareness Center - $12.9 million (FY 2025 – FY2027) • Lubber Run Resiliency Hub - $2.5 million (FY 2025 – FY 2026) Stormwater Capacity $242 million (ongoing) Approach to Resiliency Natural Resiliency Parks Program $5.6 million (ongoing) Technology Redundancy (Cloud) $1.3 million (FY 2025 – FY 2026) Water Supply $169 million (ongoing) 19FY 2025 - FY 2034 PROPOSED CIP Information Technology • Constituent Single Sign On • DHS Centralized Customer Service & Case Management • Police Computer Forensic Equipment • Specialized Fire Equipment • Police Traffic Equipment Vehicle Transportation • ART Fleet Transition to Zero Emission Bus • MicroTransit Implementation Plan Facilities • Crystal City Library • Lee Community Center • Situational Awareness Intelligence Unit • Carlin Springs Site • Lubber Run Resiliency Hub Parks & Recreation • Drew Park • New Park at 26th St. N & Old Dominion Drive • Athletic Courts Program • Langston Boulevard Public Space Improvements Major New Projects in the CIP 20 FY 2025 - FY 2034 PROPOSED CIP 21FY 2025 - FY 2034 PROPOSED CIP Stormwater STORMWATER FUND: $334.3 MILLION • Streams and Water Quality ($41.2 million) • Stream Resiliency / Outfall Rehab / Green Infrastructure/ MS4 Permit Compliance Projects • Maintenance Capital ($50.9 million) • Stormwater Main Rehab & Replacement/ Dumbarton Street & Military Road Culverts • Capacity Improvements ($242.2 million) • Watershed Flood Mitigation – Overland Relief and Infrastructure Improvements • Spout Run: $70.0 million • Torreyson: $17.7 million • Crossman: $36.6 million • Lubber Run: $67.0 million (10-year total) 22FY 2025 - FY 2034 PROPOSED CIP UTILITIES FUND: $879.9 MILLION • Focus on reinvestment in infrastructure, resiliency, and redundancy • Water-Sewer Maintenance ($388.0 million) • Water & Sewer Mains Rehab & Replacements/ Technology/ Washington Aqueduct Capital ( ongoing) • Water Distribution ($169.0 million) • Finished Water Reliability / Regional Source Water Reliability (ongoing) • Sanitary Sewer Improvements ($3.4 million) • Sanitary Sewer Collection Improvements (ongoing) • Water Pollution Control Plant ($319.5 million) • Maintenance Capital / Technology Enhancements / Re-Gen- Phases 2&3 (FY 2025 –29) Utilities (10-year Total) 23FY 2025 - FY 2034 PROPOSED CIP Note: Funding of $44.3 million is proposed to be included in the November 2024 bond referendum package Regional Commitments METRO: $398.5 MILLION • Combination of GO Bonds ($239.7 million) and state transit aid ($158.8 million) • FY 2025 GO bonds will fund the County’s FY 2026 capital contributions (10-year total) 24 FY 2025 - FY 2034 PROPOSED CIP 1,058 Lane-miles of County maintained and managed roads 78 ART buses 990 Bus stops >330 Bus shelters 1 Transitway 1 Bus station 11 Metrorail stations Capital Bikeshare: 110 stations 802 bicycles Shared Micro-Mobility: 1,800 scooters 355 eBikes 36 County- maintained vehicular and pedestrian bridges 729 Multi-space parking meters 679 Single space meters 302 Signalized intersections 300 CCTV cameras 24 Permanent traffic count stations 1 Virginia Railway Express station 190 Uninterruptible power supply units 31 Speed indicator signs 7 Variable message signs 87 School zone flashers 97 Pedestrian flashing beacons 8,614 County-owned streetlights 52,709 Street signs Transportation System Snapshot 25FY 2025 - FY 2034 PROPOSED CIP • $25.7 million for Vision Zero Street Safety Improvements Program • Mix of TCF, PAYG, previously approved and new bonds for focused activities within the Vision Zero Program • Installed improvements at 58 locations and progressed on another 18 safety improvements in CY 2023 • Analysis and safety audits guide development of capital projects in other Complete Streets Programs in the CIP • $123 million for Rosslyn-Ballston Arterial Street Improvements • Includes sidewalk and streetscape improvements along Wilson Boulevard, and implementation of Core of Rosslyn General Government TRANSPORTATION: $1.9 BILLION (Without Metro) • $150 million Crystal City, Pentagon City, and Potomac Yard Street Improvements • Includes various streetscape and safety improvements, as well as design and construction for CC2DCA Multimodal Connection • $52 million for Columbia Pike Improvements • Supports the reconstruction of all remaining segments of Columbia Pike by 2025 and full implementation of the Columbia Pike Transit Stations • $79 million for Bike, Walk, and Capital Bikeshare Programs • Mix of new trails, trail renovations, and enhancements to sidewalk and pedestrian infrastructure • Includes $19 million for e-bikes and station expansion of Capital Bikeshare program Complete Streets Program Highlights include: (10-year Total) 26FY 2025 - FY 2034 PROPOSED CIP • $144 million for Paving • Maintains Pavement Condition Index (PCI) level above 80 (target range: 75 to 80) • $13 million for Sidewalk, Curb, and Gutter Proactive Zone Maintenance • $41 million for Bridge Replacements and Renovations General Government TRANSPORTATION (Cont.) Transit Highlights - leverages external grant funds for the following projects: • $27 million for the ART O&M facility, including first phase of electrification (FY 2025) • $215 million for ART Fleet Replacement, ART Fleet Expansion, and transition of ART fleet and facilities to support Zero Emission Buses (ongoing) • $127 million for the Crystal City East Entrance (FY 2025 – FY 2027) • $177 million for the Ballston West Entrance (FY 2025 – FY 2029) • $32 million for Transitway Extension to Pentagon City and Potomac Avenue (FY 2025 – FY 2029) (10-year Total) 27 FY 2025 - FY 2034 PROPOSED CIP 147 Parks totaling 942 acres; 126 acres of Natural Resource Conservation areas 82 Playgrounds and 6 Spray Playgrounds 76 Basketball Courts and 12 Half Courts 90 Tennis Courts, 11 Pickleball Multi-Use Courts and 5 Practice Courts 54 Rectangular Athletic Fields -- 15 Lighted, 15 synthetic 43 Diamond Athletic Fields -- 19 Lighted, 2 synthetic 19 Combination Athletic Fields -- 3 Lighted 7 Community Gardens 48 Picnic Shelters 9 Dog Parks 55 Miles of Multi-use Trails (35 paved / 20 natural) 70 Bridges and Low- Water Fords 25 Restroom Structures Picnic Tables, Benches, Grills, Kiosks, Drinking Fountains, Park Signs, Fences 250k+ trees in parks, 69% canopy cover (as of 2016 study) Amphitheater, Skate Park, Other Amenities Asset Inventory: Parks and Recreation 28FY 2025 - FY 2034 PROPOSED CIP Park Programs (ongoing) • $10.6 million for Emerging Uses & Natural Resiliency Programs • $20.3 million for the Trail and Bridge Modernization Program • $34.1 million for Synthetic Turf Program • $59.1 million in Parks Maintenance Capital Program • $13.8 million for Land Acquisition Program • $2.0 million for Courts Program General Government (Cont.) PARKS & RECREATION: $308.8 MILLION Park Master Plan Projects • $38.4 million for Quincy Park (FY 2030 – FY 2034) • $31.1 million for Rosslyn Gateway Park (FY2025 – FY 2027) • $28.1 million for Arlington Boathouse (FY 2028 – FY 2034) • $22.9 million for Crystal City Parks & Public Space (FY 2025 – FY 2030) • $14.0 million for Fairfax Drive and Nearby Public Space (FY 2032 – FY 2034) Highlights Include: 29FY 2025 - FY 2034 PROPOSED CIP New Arlington Neighborhoods Program bond funding: $70 million • $7.0 million/year Existing balances, previously approved bond funding and PAYG funding: $27.9 million • Funding will cover construction of projects previously approved during prior Neighborhood Conservation funding rounds and that are scheduled to be completed over the next 1-4 years. PAYG funding is included to cover Neighborhoods Program staff. General Government (Cont.) ARLINGTON NEIGHBORHOODS PROGRAM: $97.9 MILLION (10-year total) 30 FY 2025 - FY 2034 PROPOSED CIP Arlington Economic Development Age: 17 - 114 years 91,276 ft2 3 CSI NOC Sites Age: 14 - 36 years 18,290 ft2 8 Fire Department Age: 0 - 68 years 219,155 ft2 15 Human Services Age: 0 - 67 years 370,182 ft2 12 Libraries Age: 15 - 65 years 153,089 ft2 6 Operations Age: 17 - 74 years 621,110 ft2 15 Parks and Recreation Age: 4 - 239 years 434,839 ft2 18 Public Safety Age: 17 - 72 years 703,357 ft2 7 Transit Age: 7 - 65 yrs 100,655 ft2 7 County-owned buildings in service (2.3 million ft2) 2 vacancies (7,510 ft2) Leased Offices (0.5 million ft2) 4 89 Asset Inventory: Facilities 31FY 2025 - FY 2034 PROPOSED CIP • $102.9 million for Capital Maintenance for 89 buildings, over 2.4 million square feet, 32 of which are over 50 years old. • Replacements incorporate higher energy efficiency equipment • $39.6 million for the Courts/Police Building (ongoing) • Continuation of project to include courtroom upgrades and technology upgrades • $30.4 million for the Courthouse Complex (FY 2025 – FY 2028) • Design and renovation of two of four unoccupied floors on 2020 N 14th St. for DHS, DES, and Courts programs • $43.2 million for Fire Station Replacement & Additions (FY 2025 & FY 2030 – FY 2032) • New Fire Station #7 at 5519 Columbia Pike (West End) General Government (Cont.) PUBLIC/GOVERNMENT FACILITIES: $398.2 MILLION Highlights Include: • $10 million for Fire Logistics (FY 2025) • Construction for Fire logistics relocation to Building 1, Roof replacement, and HVAC electrification • $6.3 million for Crystal City Library (FY 2028 – FY 2030) • $15.6 million for Lee Community Center (FY 2025 & FY 2031 – FY 2032) • Study to provide cost estimates for building options followed by placeholder construction funding in out years • $14.4 million for future planning at the Carlin Springs site (FY 2026 & FY 2029 – FY 2030) • $25.2 million for Energy Efficiency & Resiliency (ongoing) • EV Charging for County & Public, Renewable Energy Installations, Energy Performance Upgrades, Lubber Run Resiliency Hub 32 FY 2025 - FY 2034 PROPOSED CIP Desktop PCs Desktops: 946 4 Year Lifecycle Rolling Replacement Laptop PCs Laptops: 2,695 3.5 Year Lifecycle Rolling Replacement Fiber Optic Cables 70+ Miles Refresh/Replace As Needed Servers: 40 Hosts: 31 7 Year Lifecycle Refresh = Rolling by End-of-Life Core Network Equipment Core Switches: 2 5 Year Lifecycle Distribution Network (Hub-Sites) Switches: 17 5 Year Lifecycle Access Network (In-Building) Switches: 165 5 Year Lifecycle Wi-Fi WAPs: 983 3-5 Year Lifecycle Refreshes 20% each year UPS Power Systems UPS: 137 5 Year Lifecycle Data Center Infrastructure Switches: 83 5 Year Lifecycle Applications Enterprise: 136 Dept/Agency: 317 Refresh = Rolling By End-of-Life Asset Inventory: Hardware & Software 33FY 2025 - FY 2034 PROPOSED CIP Highlights Include: Enterprise System Technology ($111 million; ongoing) • $30.2 million for Workforce Devices (laptops and desktops) and server replacement • $14.0 million for major system replacements/upgrades (e.g. Revenue Collection / records management) • $27.2 million for network equipment & cloud data migration General Government (Cont.) TECHNOLOGY: $212.6 MILLION Public Safety Communication / Vehicles / Equipment ($84.5 million; ongoing) • $18.7 million for applications and hardware • $24.2 million for public safety communication equipment • $36.5 million for public safety vehicles and vehicle technology 34FY 2025 - FY 2034 PROPOSED CIP Projects already underway that will continue FACILITIES, ENERGY & RESILIENCY/ PUBLIC BUILDINGS • Including: Fire Station 8, Courts/Police Renovations, Fire Logistics at 1425 N. Quincy, Central Library Restroom , HVAC and Elevator Refresh, Fire Prevention relocation to Bozman, Solar and EV charging installations PARKS & RECREATION • Including: Bluemont, Doctor's Run, Kenmore Field Conversion, Arlington Boathouse, Gateway Park STORMWATER • Including: Spout Run Watershed, Dumbarton Culverts replacements, Military Road Culvert replacement, Quebec Street Outfall Rehabilitation Existing Commitments 35FY 2025 - FY 2034 PROPOSED CIP TRANSPORTATION • Including: Columbia Pike Multimodal Street Improvements, Columbia Pike Transit Stations, Bridge Renovations,, Transitway Extension to Pentagon City, Complete Streets projects countywide ARLINGTON NEIGHBORHOODS PROGRAM • Including: Approximately 17 projects spread throughout the County involving street improvements, intersection improvements, parks, and beautification UTILITIES • Including: Re-Gen Phases 2 & 3, Gulf Run Sewer Force Main, Asset Management Software Replacement Existing Commitments (Cont.) 36FY 2025 - FY 2034 PROPOSED CIP Parks & Public Facilities Quincy Park Crystal City Fairfax Drive Langston Boulevard 26th & Old Dominion Facilities and Sites Trades Center Carlin Springs Office Space Utilization Lee Community Center Transportation & Transit Planning Transit Strategic Plan New Initiatives MTP update Fire & Emergency Medical Services Columbia Pike Planning for the Future 37FY 2025 - FY 2034 PROPOSED CIP • FY 2025 / FY 2026 o Fire Station 8, new ART O&M facility ($500k - $1.0 million) • FY 2026/2027 o Long Bridge operating costs due to full utilization of Boeing donation ($2.5 million) • Out-years o New library on Columbia Pike (incremental staffing or facility costs based on size and programming) o New library in Crystal City ($750k+: new incremental staff and non-personnel resources required) o New fire station on Columbia Pike ($4 million- $6 million) Impact of Proposed CIP on Future Operating Budget 39 FY 2025 - FY 2034 PROPOSED CIP Highlights • Show project alignment to master plans • Show projects by location/ neighborhood • Bulleted description Map & Project Page Changes CIP Interactive Map 40FY 2025 - FY 2034 PROPOSED CIP Arlington Public Schools Proposed CIP & FY 2024 Referenda APS CIP and 2024 referenda request will be incorporated into the CIP after the School Board adopts their FY 2025 – FY 2034 CIP. APS will adopt their CIP on June 20th. Superintendent’s Ten-Year Proposed CIP is $681 - $696 million depending on the Schools MPSA Plan Superintendent’s proposed 2024 bond referenda includes ($63 million- $78 million): • Move MPSA into Career Center: $35.7 million - $50.9 million • Major Infrastructure projects: $18.5 million • Kenmore turf field conversion: $2.4 million • Kitchen and Entrance / Security Renovations (various): $6.6 million 41 FY 2025 - FY 2034 PROPOSED CIP Proposed CIP presented to County Board Board Work Sessions • June 4: Joint School Board County Board Work Session • June 6: Transportation, Debt, Metro • June 11: Government Facilities, Parks and Recreation, Arlington Neighborhood Program • June 25: Public Safety, Technology, Stormwater, Utilities • July 10: Public Hearing Public Hearing Final Board Mark-Up Board Adoption May 28 May-July July 10 July 16 July 20 FY 2025 - FY 2034 CIP Timeline 42 FY 2025 - FY 2034 PROPOSED CIP County Manager’s Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 May 28, 2024 FY 2025 - FY 2034 PROPOSED CIP

Source: Arlington County website. First collected Oct 18, 2026.