Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Transportation 2 Safety Ensure goals of the Vision Zero Action Plan are incorporated in all capital projects; identify future projects based on data collected and analyzed through the Vision Zero Program, with focus on improvements to the High Injury Network Equity Review project locations to ensure improved access and mobility for those reliant on transit, walking, and biking; advance studies in areas lacking adequate infrastructure and focus capital improvements to expand multimodal access Community Energy Plan Maximize sustainable travel options for residents, workers and visitors with continued investments in prioritizing pedestrian, bicycle, and shared mobility infrastructure, and enhanced transit service Biophilia Minimize adding impervious surface in new capital projects and incorporate more biophilic elements, including street trees, natural plantings, and bio-retention infrastructure where feasible Transportation Advancing County Goals Arlington County Master Transportation Plan The Adopted Master Transportation Plan (MTP) provides policy guidance for Arlington’s transportation system through 2030; it will undergo an update beginning later this year 3 Highlights and Key Takeaways • On-going as well as major projects and initiatives in the 2025 – 2034 timeframe • Complete Streets: Columbia Pike, Crystal City/Pentagon City transformation, Rosslyn is next, Langston Boulevard to follow • Transit: ART O&M, Crystal City 2nd Entrance, Transitway Extensions, Ballston West Entrance, among other large projects • Vision Zero goals embedded in Complete Street projects as well as the Street Safety Improvement program • Future bus purchases assume Battery Electric Buses (BEBs) • Full Adopted TSP implementation starting FY 2026 • Funding for multimodal studies, but not for design or construction • PAYG and Bond requests limited to State of Good Repair (SGR), bridges 4 Proposed 10-Year CIP: $1.5B $000 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10-Yr Total Complete Streets Arlington 115,906 75,633 86,884 97,945 67,991 46,771 56,879 55,861 82,669 76,102 762,641 Arlington Transit Program 112,631 93,601 165,133 63,950 100,579 37,549 57,442 5,705 7,621 48,127 692,338 Maintenance Capital 17,062 16,628 17,282 17,618 18,298 18,640 19,364 19,725 20,478 20,848 185,943 Transportation Capital Program Administration 4,873 5,019 5,169 5,324 5,483 5,648 5,817 5,991 6,170 6,356 55,850 Operating Costs 8,670 10,619 11,382 13,712 15,961 17,294 19,073 19,702 20,345 20,978 157,736 Total Submitted CIP 259,142 201,500 285,850 198,549 208,312 125,902 158,575 106,984 137,283 172,411 1,854,508 Implementation Adjustment (68,088) (48,268) (65,690) (55,192) (58,308) (8,360) (12,976) (7,417) (7,812) (12,066) (344,176) Proposed CIP 191,054 153,232 220,160 143,357 150,004 117,542 145,599 99,567 129,471 160,345 1,510,332 Submitted CIP 5 Key Changes vs FY 2023 Adopted CIP • Cost to transition ART Fleet to ZEB / BEB consolidated under a new program “ART Fleet Transition to ZEB,” for a total cost of $134m across 10 years • FY 2023 Adopted CIP included select elements scattered across multiple programs • Cost escalation on transit projects • Complete Streets portfolio: local placeholder funding removed from out-years due to funding constraints • Street Safety Improvement program funding increased 50% reflecting volume of projects and faster pace of implementation to meet Board and community expectations • Reduced funding for paving and bridge maintenance due to improved condition of assets 6 By Program and Funding Source Almost 80% of funding is from new sources Federal, 7% State, 8% Bonds, 9% TCF - C&I, 19% TCF - NVTA Local, 10%TIF, 5% Regional, 15% PAYG / Other, 6% Existing Funds, 21% By Funding Source Complete Streets, 41% Transit, 37% Maintenance Capex, 10% Operating Costs, 9% Program Admin, 3% By Program 7 Proposed 10-Year CIP: By Funding Source Before implementation adjustment 10-Yr FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Funding: Federal Funding 1,090 4,718 33,892 4,546 25,258 16,419 21,366 4,011 4,176 13,996 129,472 State Funding 15,140 11,587 48,107 16,481 17,710 7,364 15,122 3,320 4,560 17,261 156,652 Developer Contributions 885 902 2,315 12,595 4,428 3,880 3,612 35 0 0 28,652 New Bond Issue 13,540 14,540 16,015 16,365 17,070 17,625 18,425 17,030 17,725 18,060 166,395 PAYG 4,281 5,954 7,398 7,654 7,635 8,103 9,259 9,146 8,339 8,575 76,344 Other Funding 150 357 357 0 34 35 0 0 0 0 933 TCF - C&I 29,747 42,541 35,966 50,021 65,971 25,645 25,561 22,594 26,536 32,200 356,782 TCF - NVTA Local 11,618 17,717 19,270 17,965 18,425 15,203 22,175 14,781 15,873 24,913 177,940 Regional Funding 4,100 2,873 9,082 27,459 41,346 26,686 36,591 30,803 46,693 43,320 268,953 TIF 20,131 16,702 6,139 8,950 8,576 2,526 4,834 5,265 13,349 14,067 100,539 Subtotal New Funding 100,682 117,891 178,541 162,036 206,453 123,486 156,945 106,985 137,251 172,392 1,462,662 Previously Approved Funding Authorized but Unissued Bonds 2,478 268 0 0 0 0 0 0 0 0 2,746 Issued but Unspent Bonds 1,945 617 713 0 0 0 0 0 0 0 3,275 TCF - C&I 58,095 13,494 6,750 4,287 0 29 89 0 31 19 82,794 TCF - NVTA Local 16,200 7,536 2,436 147 327 0 0 0 0 0 26,646 Regional Funding 22,972 24,738 75,227 23,388 0 0 0 0 0 0 146,325 TIF 4,207 3,331 5,143 862 23 2,387 1,541 0 0 0 17,494 Other Prev Approved Funds 52,563 33,624 17,041 7,829 1,509 0 0 0 0 0 112,566 Subtotal Previously Approved Funding 158,460 83,608 107,310 36,513 1,859 2,416 1,630 0 31 19 391,846 Total Funding Sources 259,142 201,499 285,851 198,549 208,312 125,902 158,575 106,985 137,282 172,411 1,854,508 8 Nov. ‘24 Proposed Bond Referendum: $29.8M • 8% lower than FY 2023 Adopted CIP and mostly limited to state of good repair • Reduced Paving ask resulting from improved pavement conditions owing to mild winters Total CIP Program FY 2025 FY 2026 for Ref Paving 11,201 12,590 23,791 Street Lighting 770 584 1,354 Sidewalks 721 743 1,464 Neighborhood Complete Streets 420 430 850 Signals & ITS Maintenance 355 397 752 WALKArlington 200 206 406 Street Safety Improvements 163 235 398 Curb & Gutter Missing Links 111 130 241 Bridge Maintenance 0 524 524 Total 13,941 15,839 29,780 Proposed CIP 9 6 Signals/ITS* Program Investments Multimodal program implements goals of the Master Transportation Plan (MTP) 73 Complete Streets Icons represent recent and active complete streets, transit, and signals projects 11 Transit Program Investments by the Numbers * In addition to signals / ITS projects embedded in 73 Complete Street projects eBuilder CIP Projects Dashboard (arcgis.com) 10 Achieving Racial Equity in the CIP Capital Bikeshare System Surges with Record Ridership • Ridership was up 23% across the system between April 2023 and April 2024 • Arlington trips in April: 33,756; tenth month in a row of record ridership Equity memberships increase • ACCS Capital Bikeshare team has partnered with DHS, APAH, AFAC, APS: REEP (Arlington Education and Employment Program) • 512 equity members in Arlington • 2,655 total regional equity members • Over 4,000 trips taken by equity members in April Proposed CIP continues funding for Capital Bikeshare • $17.3 million for system expansion and replacement • $21 million for CaBi Operations and Maintenance Capital Bikeshare engagement event at Arlington Food Assistance Center 11 Recent Achievements Projects that have started construction: • Columbia Pike Multimodal Improvements Projects Segments C & D • Shirlington Road Pedestrian Bridge • Army Navy Drive Complete Streets • RB Corridor High Priority Phase 2 • Signals projects Projects that have been recently bid for contract: • South Eads Street Phase 1 & 2 (awarded) • N. Ohio Street, 12th Road N to 14th Street N Projects going out to bid (finalizing ITB) • East Falls Church Bus Bay Expansion N. Ohio St. Safety Project ($1.3M) S. Eads St. Complete Streets ($2.9M) Shirlington Road Pedestrian Bridge ($3.3M) Army Navy Drive Complete Streets ($15.3M) 12 Project Accomplishments Boundary Channel Drive Interchange Improvements ($17.6M) West Glebe Road Bridge Reconstruction ($10.7M) 18th St. S (S. Eads St.-S. Fern St.) ($3.8M)Washington Boulevard and 13th Street North Improvements ($4.0M) Arlington Ridge Rd. & S. Lynn St. ($1.2M) 12th Street South Improvement (S. Eads St. – S. Clark St.) ($4.2M) Summer 2023 Fall 2023 Winter 2023-24 Spring/ Summer 2024 13 Transportation and Sustainability • Arlington has invested in complete streets projects, transit service, and Capital Bikeshare to provide options for sustainable travel 14 Household Transportation Trends 2007/2008 Regional Travel Survey 2017/2018 Regional Travel Survey Share of Daily Trips by Mode 34% 29% 42% 49% 39% 25% 19% 31% 24% 38% 23% 29% 13% 16% 13% 15% 21% 10% 9% 5% 3% 2% 4% 2% 5% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Rosslyn-Ballston Route 1 Columbia Pike Shirlington Other Arlington Drive Alone Drive/ride with others Walk Transit Other 28% 25% 37% 44% 39% 13% 20% 29% 25% 32% 30% 32% 16% 18% 18% 22% 17% 11% 8% 6% 7% 6% 3% 5% 5% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Rosslyn-Ballston Route 1 Columbia Pike Shirlington Other Arlington Auto trips down overall • Trend more pronounced in Metro corridors Share of walking trips increased • Over 30 percent of trips in Metro corridors made by walking Data from MWCOG/TPB Regional Household Travel Survey • Conducted every ten years • Arlington pays for oversample • Pre-pandemic travel data, how will trends stabilize? 15 Household Transportation Trends 2007/2008 Regional Travel Survey 2017/2018 Regional Travel Survey 16% 20% 10% 3% 3% 16% 27% 14% 10% 9% 68% 53% 76% 87% 88% 0% 20% 40% 60% 80% 100% Rosslyn-Ballston Route 1 Columbia Pike Shirlington Other Arlington 0 vehicles 0 - 1 vehicle 1+ vehicles 27% 20% 9% 4% 1% 27% 25% 21% 9% 22% 46% 56% 70% 88% 77% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Rosslyn-Ballston Route 1 Columbia Pike Shirlington Other Arlington Vehicles per Household Vehicle ownership down • Significant shift in Rosslyn-Ballston corridor to car-free households Reduction in vehicles per driver • Notable shift outside major corridors Data from MWCOG/TPB Regional Household Travel Survey • Number of vehicles per driver, per household 16 Annual VMT, GHG Levels Declining Even With Ongoing Growth Emissions Impacts on Arlington Roadways Vehicle Miles Traveled (VMT), 2007 – 2022 Greenhouse Gas (GHG) Emissions from On-Road Transportation, 2007 – 2022 17 GHG Impacts from Transportation Sources • 36 percent of GHG emissions in Arlington are generated by on-road transportation – travel within the County and through the County • The GHG emissions from these trips can be minimized by conversion to electric vehicles, and mode shift to non-auto travel • Historic trends in VMT and GHG allow us to infer the impact of multimodal transportation on sustainability into the future • The CIP delivers infrastructure and services to support further shifting travel trends to transit and active modes of transportation 2019 Community Energy Plan GHG Emissions by Sector 18 Plans and Strategic Initiatives Guiding CIP Plans and Strategic Initiatives Guiding CIP 19 FY 2025-2034 CIP Project Slides Review of capital project highlights and state of good repair initiatives for the ten-year program: • Transit capital program • Complete Streets capital program • Capital maintenance program Annual spend intensity • Communicate magnitude of funding spent each fiscal year • Range from $100,000 to $30 million per fiscal year 20 ART Operations and Maintenance Facility ART Fleet Transition to ZEB (Zero Emission Bus) Proposed CIP: $27.4M (Fall 2024, Fall 2025 for BEB infrastructure Total Project Cost: $95.2M Funding: State, TCF Community benefits: • Addresses need for an O&M facility for ART • Includes charging for 12 Battery Electric Buses (BEBs), one fast charger, and solar panels on roof of facility and parking garage Proposed CIP: $134.2M Funding: Federal, State, Regional, TCF, TIF Community benefits: • Expands fleet and infrastructure to support BEBs • Program includes incremental cost of BEBs (vs. RNG buses), pavement reinforcement, charging infrastructure at ART O&M Facility and ART Light Maintenance Facility, and land purchase in FY 2027 and build-out ART Operations and Maintenance Facility NEW 21 ART Fleet Transition to Zero Emission Buses Note: Costs shown are uninflated Assumption Cost of Buses $1.2m Ratio to RNG due to range limitations 1.3 : 1.0 Fleet size at end of CIP period 113 (includes 20 additional buses due to ratio) Land purchase $25m in FY27 (54,000 square feet) Construction (including A&E) $25.5m Mid-life battery replacement $265K per bus after 7 years • Assumptions will be refined following the pilot of BEBs on ART routes • Costs may change significantly owing to multiple variables • Assume conversion to RNG in FY 2025 22 ART Bus Replacement and Expansion ART Fleet & Equipment Replacement ART Fleet Expansion Proposed CIP: $67.7 million Funding: State, TCF Community Benefits: • Replaces aging buses in ART fleet (78 buses) when they reach end of useful life (12 years) • Ensures reliability and accessibility of ART service Proposed CIP: $13.5 million Funding: State, Regional, TCF Community Benefits: • Purchase of 4 BEBs in FY 2025 • Purchases of additional buses in FY 2029 (7 buses) and FY 2031 (4 buses) to support 10-year service plan for ART as per Transit Strategic Plan • Purchase cost reflects RNG buses; incremental cost of BEBs captured in ART Fleet Transition to ZEB program 23 Bus Operations Improvements East Falls Church Station Bus Bays Transitway Extension to Pentagon City Shirlington Transit Station Expansion Proposed CIP: $8.6M (Spring 2026) Total Project Cost: $12.7M Funding: State, Regional, WMATA, TCF Community Benefits: • Enhances multimodal hub, relieves operational congestion, and meets accessibility needs Proposed CIP: $23.8M (Spring 2026 for Segment IIA) Total Project Cost: $27.7M Funding: State, Regional, Developer, TCF, TIF Community benefits: • Dedicated transit lanes, five new transit stations, traffic signal modification, and sidewalk / curb improvements Proposed CIP: $11.9M (FY 2030) Funding: Regional, TCF Community Benefits: • Add bus bays to Shirlington Station to meet future demand • Connect with future service changes by City of Alexandria 24 Crystal City Metrorail Station East Entrance • Proposed CIP: $127.1M • Total Project Cost: $146.1M • Funding: Federal, State, TCF, TIF • Community Benefits: • New second entrance at east end of metro station to improve safety, accessibility, and connectivity to VRE station • Joint venture between JBG Smith, Clark Construction, and county • First county project awarded using the PPEA process (Virginia Public-Private Education Facilities and Infrastructure Act of 2002) • Design underway; construction to start fall 2024 • Expected Completion: Spring 2027 25 Other Metrorail Station Expansion Projects Transportation Project Name Proposed CIP / Expected Completion Funding Project Description Ballston-MU Metrorail Station West Entrance $177.0M ($181.0M total cost) Summer 2029 State, Regional, Developer, TCF Construction of full second (west) entrance to metro station, improving safety and accessibility, as well as pedestrian connection from points west. RFQ was published in May. RFP to be issued this fall; consideration of bids in 2025. Court House Metrorail Station New Elevators $57.5M Spring 2031 Federal, State, Regional, Developer Construct two high-speed elevators to provide enhanced accessibility East Falls Church Metrorail Station Second Entrance $0.8M post-CIP State, TCF Planning/scoping funding for full second (west) entrance to metro station 26 Bus Stop Accessibility Improvements “Level 1” Stops: 205 “Level 2” Stops: 304 • Retrofits existing bus stops to be ADA-compliant • 990 bus stops: 63% are not compliant with current regulations, approximately 10% are not accessible • All non-accessible stops are “Level 3” stops and will need the county to secure easements • New federal guidance on accessibility (PROWAG) will also apply to bus stop improvements Compliance = regrade sidewalk and install pad to curbCompliance = relocation of newspaper boxes Compliance = widen sidewalk/pad, curb ramps, crossings, regrading “Level 3” Stops: 116 Bottom line for Level 3: redesign and rebuild roadway/ sidewalk 27 Bus Stop ADA: Implementation Strategy Close to 70% compliance achieved over CIP period • $10.2m funding in CIP * • Propose advancing Level 1 stops immediately to bring into compliance while concurrently advancing design work on Level 2 and Level 3 to ready for construction • 100% of Level 1 stops projected to be in compliance by FY 2030 * Over and above $6m funding for Bus Stop and Shelter Program which replaces 5-10 bus shelters a year 28 BikeArlington/WalkArlington Programs Transportation Project Name Proposed CIP & Expected Completion Project Description Arlington Memorial Trail $21.2 million FY 2034 Design and construct new multi-use trail to connect Memorial Avenue to Columbia Pike at Joyce Street Arlington Boulevard Trail, multiple phases $22.4 million FY 2028-2037 Segments at Fairfax Drive, Glebe Road to George Mason Drive, and west to Granada Street Capital Bikeshare $17.3 million Purchase of new and replacement bikes, e-bikes, stations Countywide Pedestrian Spot Improvements $8.0 million ongoing Enhance safety and accessibility at locations within existing street system, in partnership with Vision Zero Program Lorcom Lane Sidewalk $1.2 million FY 2026 Build out existing interim pedestrian path between North Oakland Street and North Quebec Street North Park Dr. and George Mason Dr. $1.3 million FY 2025 Install traffic signal and expand curbs at the intersection Studies – various locations $1.2 million ongoing Custis Trail Renovation and Expansion (FY 2025), W&OD / Four Mile Run Connection to Carlin Springs Road (FY 2029) NEW Arlington Blvd. Trail Study Capital Bikeshare 29 Columbia Pike Improvements Columbia Pike Multimodal Improvements Columbia Pike Transit Stations Proposed CIP: $44.5M (FY 2028) Total Project Cost: $162.0M Funding: TCF, Regional Community benefits: • Improved transportation accessibility for pedestrians, cyclists, transit users, motorists • Includes funding for Bike Boulevards Proposed CIP: $8M (FY 2026) Total Project Cost: $14.6M Funding: Federal, State, TCF, GO Bonds Community benefits: • Real-time information, near-level boarding, expanded seating, and improved lighting 30 Crystal City / Pentagon City Streets Transportation Project Name Proposed CIP & Expected Completion Project Description 15th Street South & South Clark/Bell Street $12.6 million FY 2027 Construct multi-use trail between 12th and 18th Streets South, improve pedestrian and bicycle facilities on 15th Street South Army Navy Drive Complete Street * $9.1 million FY 2026 Rebuilds Army Navy Drive with dedicated two-way bicycle facility; enhanced transit, pedestrian facilities; street trees Army Navy Drive Protected Bike Lane $3.8 million FY 2026 Install two-way bicycle facility on Army Navy Drive between South Joyce Street and Memorial Drive CC2DCA Multimodal Connection $54.9 million FY 2029 Construct a multimodal connection from the Crystal City VRE Station to DCA, including connection at Mount Vernon Trail Long Bridge Drive Connection $7.9 million FY 2029 Construct trail along Long Bridge Drive, connecting future Long Bridge Bike/Ped bridge to Clark/Bell multi-use trail South Eads Street Improvements, Phases $19.1 million FY 2034 Construct streetscape and bicycle ehancements on South Eads Street between Army Navy Drive and 23 rd Street South CC2DCA Multimodal Connection Army Navy Drive Complete Streets * Separate CIP Program 31 Improvements Outside Major Corridors (1) * Separate CIP Program Transportation Project Name Proposed CIP & Expected Completion Project Description Arlington Blvd/ Washington Blvd $10.1 million FY 2029 Improve safety for all modes at one of highest crash locations in County; SS4A, Smart Scale applications Arlington View Connector Trail * $10.4 million FY 2028 New multi-use trail connecting Arlington View to Army Navy Drive (previously called the Army Navy Country Club Trail) Four Mile Run Valley Corridor Improvements $8.8 million FY 2028 Build out improvements in phases on FMR Drive, from Shirlington Road to Barcroft Community Center Military Road at Nelly Custis Drive $4.2 million FY 2026 Install roundabout at intersection to improve safety; underground utilities at intersection North Sycamore Street Improvements $4 million FY 2028 Enhance sidewalks, crossings, bicycle facilities, and streetscape from Langston Boulevard to 19 th Street Pershing Drive Improvements $2.8 million FY 2027 Install permanent protected bicycle facilities from Washington Boulevard to North Barton Street Pershing Dr. & N. Cleveland St. S. Four Mile Run Dr. Complete Streets 32 Improvements Outside Major Corridors (2) Transportation Project Name Proposed CIP & Expected Completion Project Description South Carlin Springs Road $2 million FY 2026 Immediate sidewalk improvements in coordination with signal upgrade at 5 th Street South; reviewing options to expand sidewalks north/south South George Mason Drive Improvements (1) $13.5 million FY 2028 Construct separated trail facility from Arlington Boulevard to Columbia Pike, signal at 6 th Street, in partnership with National Foreign Affairs Training Center South George Mason Drive at Four Mile Run $15.5 million FY 2031 Scope, design, and construct intersection safety improvements. Received Regional Roadway Safety Program award for scoping South George Mason Drive (2, 3) $9.9 million + FY 2034, FY 2037 Continue separated trail facility between Columbia Pike and County line. Anticipated ATIIP grant, state funding Walter Reed Drive – 6 th Street to Columbia Pike $8.4 million FY 2028 Improve bicycle facilities, bus stops, and add traffic signal at 9 th Street following Career Center project Studies – various locations $3.4 million ongoing Four Mile Run Trail Crossing at Shirlington Road (FY 2025); Carlin Springs Road Corridor Study (FY 2027); Shirlington Road Multimodal Study (FY 2029); Glebe Road Corridor Multimodal Study (FY 2029); Wilson Boulevard Multimodal Study (FY 2030); North George Mason Drive Study (FY 2030) NEW NEW NEW NEW 33 Langston Multimodal Improvements Transportation Project Name Proposed CIP & Expected Completion Project Description Langston Boulevard Multimodal Improvements $50.3 million ongoing Local and grant funding across the ten-year CIP to advance recommendations identified in Plan Langston Boulevard Langston Boulevard Multimodal Study, Areas 2 & 3 $600,000 FY 2026 Advance feasibility analysis for intersections and segments between North Harrison Street and Lorcom Lane in support of near-term private development Langston Boulevard East End Corridor Improvements, Area 5 $800,000 FY 2028 Perform feasibility and transportation analyses on recommended cross sections from Spout Run Parkway to the Key Bridge NEW NEW 34 Neighborhood Complete Streets Transportation Project Name Proposed CIP & Expected Completion Project Description 8th Road South $348,000 FY 2025 Realign intersections at South Dinwiddie and South Frederick to improve safety of pedestrian crossings and make ADA accessible 14 th Street North $427,000 FY 2025 Construct sidewalk between North Ohio and North McKinley Streets South Irving Street, two phases $783,000 FY 2025 Install sidewalk between 6 th and 7th Street and make sidewalks between 2nd and 6th Streets ADA accessible Shared Street Pilot Projects $100,000 FY 2025 Install signage and markings to designate three shared streets: South Lynn Street (16 th to 20th), North Wakefield Street (Carlin Springs to Wilson), and 12th Street South (Glebe to Walter Reed); monitor travel patterns Projects under consideration $2.4 million FY 2026 Construct sidewalk on North Oakland Street (6 th to Pershing) and 8th Road North (Kensington to Jefferson) NEW 14th Street North Shared Streets Pilot Projects 12th Street South S. Lynn St. 35 Rosslyn-Ballston Arterial Improvements Transportation Project Name Proposed CIP & Expected Completion Project Description Fairfax Drive at Kirkwood Drive Intersection $5.7 million FY 2029 Improve intersection geometry, improve pedestrian refuges, add bicycle lanes, upgrade traffic signals Fort Myer Drive Tunnel Removal $42.4 million FY 2031 Remove grade-separation, convert to two-way operations, with wider streetscape and cycle track North Meade Street Improvements $10.9 million FY 2029 Reconstruct and realign North Meade Street at Arlington Boulevard to improve safety for all modes Rosslyn Multimodal Street Improvements $22.4 million FY 2026-2030 Various streetscape, sidewalk, bicycle improvements to support implementation of Fort Myer Drive project Wilson Boulevard from 10 th to Kenmore Streets $9.2 million FY 2028 Install wider sidewalks, upgrade traffic signals and streetlights, stormwater upgrades, and new street trees Study: Fairfax Drive / 10 th Street Corridor $526,000 FY 2027 Establish a multimodal vision for the County-owned section of VA Route 237 Wilson Blvd. Core of Rosslyn 36 Street Safety Improvements – Vision Zero System Studies / Improvements Arterial Studies / Improvements Capital Program Funding Proposed CIP: $15.1 million Community benefits: • Systemwide and non-arterial safety improvements and modifications • May test temporary treatments; School Slow Zones • Quick build projects, additional PAYG Proposed CIP: $4.7 million Community benefits: • Supports safety initiatives at intersections and along arterials identified through crash analysis • Quick build projects Proposed CIP: $5.7 million Community benefits: • Funding to seed future capital projects identified by data-driven safety studies Wilson Blvd. & N. Rhodes St. 37 Additional Projects / Programs Transportation Project Name Proposed CIP Funding Project Description Traffic Signals $36.2M State, Developer, TCF, PAYG, GO Bonds • 302 signalized intersections; 25 to 35-year useful life but repairs can extend life • About 8 signal rebuilds undertaken each year under the Signals program • Additional rebuilds done as part of Complete Streets or third-party projects Intelligent Transportation Systems $19.9M Regional, TCF • Leverages technology to improve efficiency of transportation operations • Technology at signals, as well as standalone installations (beacons, sensors) Streetlights $19.0M PAYG, GO Bonds, TCF • About 7,800 county-owned and 11,000 owned by Dominion Energy (DE) • Replacements done when problems are identified with infrastructure • Conversion to LED technology underway for DE-owned; older generation LEDs being upgraded for further energy savings and to reduce glare Parking Meters Parking Technology $12.4M State, Developer, PAYG, GO Bonds • 1,408 parking meters, including 729 multi-space and 679 single-space meters • 10-year useful life, component replacement used as cost-saving alternative 38 Proposed CIP: $11.2M Funding: GO Bonds, PAYG Community Benefits: • 36 county-maintained bridges inspected biennially • Average age of 48 years vs. life expectancy of 75 years with proper maintenance • Bridge elements rated on a scale of 0 to 9; County’s goal is between 6 and 7 (“Satisfactory” to “Good”) • Average rating currently 6.4; following replacement of Arlington Ridge Road bridge, all bridges will be above 6 Proposed CIP: $30.2M Funding: Federal, State, City of Alexandria, TCF, GO Bonds, PAYG Community Benefits: • Rehabilitates, upgrades, or replaces bridges • Shirlington Road bridge recently upgraded with widened sidewalks; construction underway for separate pedestrian bridge • Arlington Ridge Road bridge construction to start in FY 2025; City of Alexandria paying 50% of cost not covered by grant funding Bridge Programs Bridge Maintenance Bridge Renovation 39 Paving: Funding and Pavement Condition • Proposed CIP funding $143.9m, combination of GO Bonds and PAYG • 1,058 lane-miles of County-maintained streets • PCI measured annually • County’s goal is between 75 and 80 • 2023 PCI 83.3; however, Public Right- of-Way Accessibility Guidelines (PROWAG) and markings create funding pressures • Majority of bike lanes are in pavement and evaluated as part of PCI Pavement Condition Index (PCI) 40 Sidewalks Program • Proposed CIP funding: $11.9m (GO Bonds, PAYG) • 443 miles of County-maintained sidewalks • FY 2024 1st year of concrete zone maintenance • 2024 Condition Assessment • 20% of sidewalks are rated fair or poor or very poor • Goal is to achieve a rating of good or higher 57% 23% 16% 3% 1% Excellent (100 to 91) Good (90 to 81) Fair (80 to 46) Poor (45 to 31) Very Poor (30 to 0) Sidewalk Mileage By Condition 41 Key Assumptions and Risks • ART Fleet Transition to BEB hinges on ambitious success with state and federal grants • Future cost of ART service operations outstanding • Ballston West Entrance entering RFQ / RFP process • Core of Rosslyn developer contributions rely on timing of redevelopment • CC2DCA reliant on current funding application to NVTA • Recommendations from MTP Update and future studies unfunded in this CIP • Public Right-of-Way Accessibility Guidelines (PROWAG) Federal guidance impacts all transportation programs – costs not factored into this CIP 42 Summary and Conclusion • CIP advances goals of current adopted policy • Incorporates Vision Zero Action Plan, Community Energy Plan, biophilic goals, equity • Policy guidance from the update to the MTP can be considered in the development of the FY 2029 – FY 2038 CIP • Project implementation challenges/risks • Inflation, cost of materials and labor in contracts, impact of evolving federal guidance • Easement negotiations will impact project timelines • Long-term considerations • How does the County anticipate evolving technology? • Look to upcoming MTP update for guidance • What is the future of telework and impact on travel trends? • MWCOG/TPB conducts next Regional Travel Survey in 2027/2028 • How do we harness data to ensure that resources are directed to locations most in need of redesign? Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Transportation

Source: Arlington County website. First collected Oct 18, 2026.