1
Proposed Capital
Improvement Plan (CIP)
FY 2025 – FY 2034
Submission of a 10-Year Plan
for Facilities, Energy &
Resiliency
2
2
Overview
• Energy modeling supporting requested FMB investments in EV
charging, electric heating and facility resiliency
• Selective choices between PPA and direct solar investment to reduce
power demands and GHG emissions
• Essential investments to maintain CSI services and state of good repair
• Consolidation of Emergency Management (DPSCEM) functions in
BGC, leveraging Grant and Tenant Improvement Allowance funding
• Continuation of major capital improvements: Courts-Police Building,
Thomas Building, Central Library and Madison Community Center
• Long range planning for Columbia Pike Library, West-end Columbia
Pike Fire Station, coupled with evaluation of over/under utilized sites
3
3
2.3 mil ft2
of space
managed
0-239
years old
Age range of
buildings
maintained
89
County-
owned
buildings in
service
Asset Inventory: Facilities
9
Agencies
Served
4
4
Equitable
Distribution of
CIP Investments
Projects are guided by our
equity principles:
• Create accessible facilities across
the County for staff and residents
to work and enjoy
• Continue to maintain facilities in a
systematic order to enhance the
user experience
• Identify user and facility needs
across all County departments for
an equitable distribution of funding
Visit the interactive CIP map on the County’s website
Facilities
Construction Capital
Facilities
Maintenance Capital
Facilities Maintenance
Project Type
Legend
5
5
Facilities Design
& Construction
67.0%
Facilities
Management
Bureau
27%
Energy &
Resiliency
6%
$398M CIP over 10 Years, $257M new bonds
Facilities relies on bond funding for both construction and state of good repair
64.56%
22.1%
7.7%
3.69% 1.58% 0.37%
New Bonds (64.56%) PAYG (22.1%)
Previously Approved Funding (7.7%) Other (3.69%)
Developer Contributions (1.58%) Federal Funding (0.37%)
By Program
By Funding Source
6
6
FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total
Energy & Resiliency 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,244
Facilities Management Bureau 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757
Facilities, Design &
Construction 41,018 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,243
Total Recommendation 54,143 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,244
Facilities, Energy & Resiliency Program Summary
$398 million over 10-years
7
7
Project Highlights
Public and County Fleet EVSE
Fairlington Community
Center Cupola Repair
1212 S. Irving Group Home
Construction and Solar Installation
Fire Station #8 Replacement and
Solar Installation
Arlington Child Care Center
Renovation
3700 S. Four Mile Run Renovation
and Boiler Electrification 3108 Columbia Pike Demolition
Court Square West Garage
Repairs
8
8
Energy & Resiliency
9
9
Energy Performance in County Facilities
Analysis, Prioritization and Reporting
• Analysis from the Decarb Tool informs Facilities
Maintenance projects to support GHG
reductions.
• Continue progress for County Energy Use
Intensity (EUI) reductions
Project Types
• Short Payback Period: Faster to implement with
a lower reduction in GHG
• Deep Decarbonization: More substantial
investment that bundles several
decarbonization measures, including HVAC
electrification
GHG
Impact
Payback
Periods
Energy
and Cost
Impact
Project cost $120k
$1,578/ ton avoided
CO2e
Equipment Bureau Lighting Retrofit
2.5% reduction in
annual emissions
from facility baseline
6-year payback
period
10
10
Facility Decarbonization Report Card
• HVAC and Equipment Electrification
• Evaluating different system types
• Implement at end of useful life
• Minimize facility disruption
HVAC and Equipment Electrification Effort Report Card
Location
CY22 CY23 CY 24 CY 25 CY26
RemarksFY23 FY24 FY25 FY26
Cultural Affairs (3700 S. FMR) - Electric-resistance boiler
- Additional time required for Dominion power coordination
*Madison Community Center VRF HVAC system
WSS Engine Shop Heat pump
*Quincy II Electric-resistance RTU
*Quincy IV Electric-resistance RTU
*Walter Reed Community Center - Electric-resistance boiler
- Additional time required for Dominion power coordination
Cherrydale Heat Pump Like-in kind heat pump replacement
Oakland Street Warehouse Electric-resistance RTU
*Fire Station #2 (DHW) Convert gas hot water heater to electric
*Quincy I Renovation and new programmatic use
*Quincy III (Completed)
- Like-in kind natural gas RTU replacement
- Completed prior to FY23 CIP County Board Guidance for
HVAC electrification
Feasibility
Design/Permitting
Procurement
Construction
Decarb Tool Model *
11
11
Solar Screening Process Accelerates onsite solar installations, blending both third-party Purchase Power
Agreements (no CIP funding) and County-owned installations.
On-site Solar at County Facilities
Solar Installation Cost Table
Facility Procurement
Method
Capital
Costs
Annual
Maintenance
Costs
$/kWh kW
Capacity
Annual
GHG
Impact
(tons
CO2e)
County-Owned Solar Facilities
Fire Station 8 - $235,000 $968 $0.13 51 25
AOMF - $2,335,689 $12,428 $0.16 429 213
Planned Installations
Lubber Run
(Coming at July
Board meeting)
Purchase Power
Agreement (PPA) $0 $0 $0.10 227 110
County Owned
and Maintained $700,000 $10,000 $0.11
Equipment Bureau
Purchase Power
Agreement (PPA) $0 $0 $0.11 60 29
County Owned
and Maintained $250,000 $5,500 $0.14
Central Library
Purchase Power
Agreement (PPA) $0 $0 $ 0.11 110 54
County Owned
and Maintained $500,000 $6,000 $ 0.14
89 County facilities
preliminarily screened
for solar feasibility
26 facilities passed
64 did not pass due to current roof conditions,
solar obstructions, or facility-specific issues
17 candidates for
PPA
9 candidates for
County-owned /
maintained
12
12
Number of Solar Panels
Cumulative kW Production
CIP Accelerates Investment in Solar
Projected solar kW capacity increases to over 1,000 kW in FY 26
Projected Installation of Solar Panels by FY and Cumulative kW Production
320
147
905
1273 1273 1273 1273
563 563
500 500 500
0
1000
2000
3000
4000
0
200
400
600
800
1000
1200
1400
FY 23 FY 24 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY32 FY 33 FY 34
Panels kW Capacity Cumulative
13
13
Renewable Energy Assessments and Solar Installations Energy Performance Upgrades – County Buildings
Proposed CIP: $8.6M
Comp Plan or Strategic initiative:
CEP Policy 3.1
Funding Source: PAYG
Community benefits:
• Funds solar on 4-5 sites annually through a blended
approach of third-party PPAs and County-owned.
• Includes funding to complete site assessments
• Possibility for public-private partnerships
• Strategy focuses onsite solar on new construction
followed by recent roof replacements
• Includes additional position to manage installations
Proposed CIP: $5.6M
Comp Plan or Strategic initiative:
CEP Roadmap
Funding Source: PAYG
Community benefits:
• Analysis informs FMB projects to support GHG
reductions
• Focus on short payback periods and provide
planning and analysis for deep decarbonization
projects
• Continue progress for County Energy Use Intensity
(EUI) reductions
FY 2025-2034 CIP Energy & Resiliency Projects
14
14
Lubber Run Resiliency Hub Energy Resilience Planning & Development
Total budget: $2.5M
Comp Plan or Strategic initiative:
Funding Source: Climate Action Fund (CAF)
Community benefits:
• Create resiliency hub to serve community electricity needs during
an event (i.e., long-term power outage), leveraging solar PV
system
• Expand battery storage to support critical support systems at
peak energy demand and backup natural gas generator
• Funding in FY 25 and FY 26.
Total budget: $4.2M
Comp Plan or Strategic initiative: CEP
Funding Source: Federal / PAYG
Community benefits:
Enhance County’s ability to overcome disruptions like extreme
weather, deliberate attacks, grid sensitivity
• Model and implement microgrid and resiliency hubs that support
key service and operational centers
• Implementation of resiliency hubs in FY27 and FY28
• Implementation of microgrid pilot in FY29
FY 2025-2034 CIP Energy & Resiliency Projects
NEW
15
15
4
8
5
6
7
1
2
3
9
Installation Fiscal Year
2023
1. 1212 S Irving St (1)
2. Arlington Mill CC(2)
3. Long Bridge
Aquatics Center (8)
2024
4. Aurora Hill
Recreation Center (4)
2024 (cont.)
5. Central Library (12)
6. Courthouse Surface
Lot (6)
7. Fairlington CC(4)
8. Madison CC (6)
2025
9. Lubber Run CC (8)
Electric Vehicle Chargers
- Internal
Electric Vehicle Chargers
- Public Accessibility
Proposed CIP: $2.4M
Comp Plan or Strategic
initiative:
CEP
Funding Source: PAYG
Community benefits:
• Establishes County as a
leader in EV charging,
leading by example with
its electric vehicle
conversion and
purchasing plan.
• FY 2026 includes $250k in
additional funding to
support public safety fleet
charging
Proposed CIP: $1.9M
Comp Plan or Strategic
initiative:
CEP, Carbon Neutral
Transportation Master Plan
Funding Source: PAYG
Community benefits:
• Increases public access
to community EV
chargers and promotes
private EV ownership
• Includes the siting and
installation of community
EV chargers and flexibility
for fast-charging hubs
Electric Vehicle Chargers
County Building
Community Center
Library
16
16
($ in thousands) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total
1. Energy Resilience Planning &
Development 0 509 758 765 2,121 0 0 0 0 0 4,153
2. Lubber Run Resiliency Hub 1,250 1,212 0 0 0 0 0 0 0 0 2,462
3. Renewable Energy
Assessments and Solar
Installations
300 1,263 1,248 1,133 1,145 606 657 707 758 808 8,625
4. Energy Performance
Upgrades -County Buildings 475 707 606 612 591 556 561 480 505 556 5,649
5.Electric Vehicle Chargers-
Internal Accessibility 250 505 202 204 206 208 210 212 214 217 2,428
6. Electric Vehicle Chargers-
Public Accessibility 100 505 152 153 177 179 152 153 177 179 1,927
Total Recommendation 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,544
Energy & Resiliency Project Summary: $26M
17
17
Facilities Management Bureau
18
18
29%
20.6%18.6%
14.8%
9.1%
7.7%
Interior Construction Electrical
Exterior Enclosure HVAC
Plumbing Miscellaneous
Condition of Assets and Energy Impact
• Analysis of building systems
and infrastructure condition
• Balance proposed
improvements with
decarbonization efforts
• Recommendations are
prioritized:
• Impact to operations
• Bundled to maximize GHG
reductions
• Maximize extension to
facility lifecycle
Madison Community Center
Facility Condition Assessment Database Output
Total FCI: 0.37/1.00
Identified Requirements:
$6.34M
System Group
19
19
Madison Community Center Roof
and Windows
Detention Facility Fire Alarm and
Security Systems Upgrade
Central Library Roof and Mechanical
Improvements
Proposed CIP: $2.5M
Funding Source: Bond
Community benefits:
• Replace the roof and windows at
Madison Community Center to
address deterioration and energy
inefficiencies
• Existing roof is R-11 and
replacement will increase the
efficiency to R-34 minimum
• Additional funding results in a
project total of $4.7M
Proposed CIP: $2M (Fire Alarm) + $300k
(Security System)
Funding Source: Bond
Community benefits:
• Ensure safety of the building tenants by
replacing the existing fire alarm system,
which has reached the end of its useful
life and is no longer supported.
• The security system is used to maintain
proper access and safety to the
Detention facilities and Courthouse
areas to protect staff, inmates, and the
public.
Proposed CIP: $3M
Funding Source: Bond
Community benefits:
• Replace the roof to increase solar
capacity, replace HVAC systems in the
auditorium and historical preservation
room, and modernize the elevator
systems
• Additional funding results in a project
total of $6.8M
FY 2025 – FY 2026 CIP Facilities Maintenance Projects
20
20
Central Library Plaza Repairs Equipment Bureau Door
Replacements
Walter Reed Community Center
Boiler Electrification
Proposed CIP: $2.27M
Funding Source: Bond
Community benefits:
• Improve the plaza by addressing
water intrusion and fall hazards.
• Regrade the plaza surrounding the
facility.
Proposed CIP: $1.8M
Funding Source: Bond
Community benefits:
• Replace 40+ year-old roll-up doors that
have reached the end of their useful
life with more energy efficient doors.
• Existing uninsulated steel slat doors will
be replaced with insulated doors with a
minimum R-8 insulation value, providing
a potential 90% reduction in heat flow.
Proposed CIP: $1.3M
Funding Source: Bond
Community benefits:
• Replace existing gas fired boilers that
are reaching the end of their useful life
with electric resistance units.
• The system is a good candidate for the
County's decarbonization efforts and
measures to reduce GHG emissions.
FY 2025 – FY 2026 CIP Facilities Maintenance Projects
21
21
PUBLIC & GOVERNMENT FACILITIES
Project Name Proposed
CIP
Funding
Source
Year Project Description
Argus House Window
Replacement
$600k PAYG FY 2025 Replacement of windows that have reached their end of useful life (installed 1991). The
existing windows are single pane. Replacement will increase energy efficiency, extend life of
HVAC system, quiet outside noise, and enhance customer experience.
Fire Station #9
Apparatus Bay
Circulation System
$300k PAYG FY 2025 Currently, the apparatus bay does not have a system to circulate and promote air movement
within the space. The system will:
• Reduce summer temperatures in the apparatus bay
• Prevent overheating of critical materials
• Ensure proper storage of medicines in response units
• Increase staff comfort and health.
ACDF Air Compressor
Replacement
$250k PAYG FY 2025 The existing air compressors servicing the Detention Facility are original, have exceeded their
useful life, and are prone to malfunction and failure. These units provide compressed air for
multiple critical mechanical systems within the facility.
Fire Station #5 Bay
Door Replacement
$1.01M Bond FY 2026 Replace the existing roll-up doors with new bi-fold doors that activate faster allowing for
quicker response times and less opportunity for accidental damage.
Court Square West Fan
Coil Unit Replacement
$859k PAYG FY 2026 The fan coil units have reached the end of useful life and are not connected to the building
automation system (BAS). Replacement will increase energy efficiency, add isolation valves for
future maintenance and connect to BAS.
Cherrydale Library
Heat Pump
Replacement
$202k PAYG FY 2026 The heat pumps serving the library spaces have reached the end of their useful life requiring
frequent compressor replacement.
MoCA Gallery Air
Handler Units
$758k PAYG FY 2026 Existing five self contained HVAC units, installed in 2003, are obsolete and can no longer be
serviced. Recent repairs have become harder due to parts no longer being available.
FY 2025-2026 CIP FMB Projects
22
22
PUBLIC & GOVERNMENT FACILITIES
Project Name Proposed
CIP
Source Year Project Description
Court Square West
Electrical Switchboard
Replacement
$1.5M PAYG FY 2025 The electrical switchgear at CSW is at the end of its useful life (58 years old) and is not code compliant.
Failure would close CSW and impact the Emergency Communications Center’s (ECC) alternative site.
ECC UPS Upgrades $350k PAYG FY 2025 Replace uninterruptible power supply (UPS) system and controls to provide redundant back-up power
to the ECC alternate site.
Generator Replacement
Program
$556k PAYG FY 2026 Program to replace emergency generators and install roll-up connections. FY 2026 funding will replace
generator at Fire Station #4 that is nearing the end of its useful life. (Last renovated in 1997). This will
also install roll-up connections at sites for external emergency connections.
Future year planned replacements include:
• ACDF (FY27)
• Courts Police (FY28)
• Central Library (FY29)
• Lee Pumping Station Radio Site (FY29)
• Ballston Radio Site (FY30)
• Shirlington Radio Site (FY31)
Fire Alarm Replacement
Program
$758k PAYG FY 2026 Program to replace obsolete fire alarm systems that have exceeded useful life and replacement parts
are no longer available. FY 2026 funding will be used to replace fire alarms at Quincy III and Quincy IV
(installed in1986). Future year planned replacements include:
• The Thomas Building (2020 14th St) (FY27)
• Fire Stations #3, #5, and #9 (FY28)
• Walter Reed Community Center (FY29)
• Fire Stations #1 and #2 (FY30)
• Cherrydale Library (FY31)
FY 2025 – FY 2026 CIP CSI Projects
23
23
($ in thousands) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total
Critical Systems Infrastructure (CSI)
Program
1,850 1,313 4,020 4,141 4,262 1,465 1,510 929 960 990 21,440
Public Facilities Maintenance
Program
8,900 8,181 5,359 5,713 5,766 8,800 9,408 10,222 10,730 11,238 84,317
Total Recommendation 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757
FMB Project Summary: $106 million
24
24
Facilities Design & Construction
25
25
Courts/Police Building
Improvements
Detention Facility
Comprehensive Study
Courthouse Complex
Renovations & Infrastructure
Situational Awareness
Intelligence Unit (SAIU), EOC &
DPSCEM Consolidation
Proposed CIP: $39.7M
Comp Plan or Strategic initiative:
Courthouse Sector Plan
Funding Source: Bond/PAYG
Community benefits:
• Upgrades 2 courtrooms per year
with technology, furnishings, fixtures
and equipment.
• Expands the Commonwealth
Attorney’s office space
• Relocates the Alcohol Safety
Action Program
Included Projects:
• FY 25 PAYG ($500k) funding
provides near term space relief for
CWA until permanent solution in FY
26/FY 27 ($2.9M).
Proposed CIP: $13.1M
Funding Source: Bond
Comp Plan or Strategic
initiative:
Courthouse Sector Plan
Community benefits:
• Updates the Detention
Center, which is 25 years old
and has deficiencies
• Improves security measures
throughout the building and
adds technology in the
Courtrooms.
Proposed CIP: $30.4M
Comp Plan or Strategic initiative:
Courthouse Sector Plan
Funding Source: Bond
Community benefits:
• Design and renovation of two
unoccupied floors that can be
used for hypothermia overflow for
the homeless service center, courts
programs, and DES programs
• Design FY 25/ FY 26
• Construction FY 27 / FY 28
Related Projects:
• Precursor to vacating Court Square
West within 7-10 years
Proposed CIP: $12.9M
Funding Source: Bonds / Federal
Community benefits:
• Constructs a SAIU and the Emergency
Operations Center (EOC) in Bozman,
allowing safety partners to co-locate
during critical events.
• Design FY25, Construction FY26
• Expands watch desk capabilities and
includes new public safety technology
• The rest of the DPSCEM program will be
relocated after completion
Related Projects:
• DTS will be relocated from the 6th floor of
Bozman to allow for DPSCEM consolidation
FY 2025-2034 CIP FD&C Projects
NEW
26
26
Office Space Utilization and Systems Furniture
Property Name Total SF Term
Exp
Options/
Years Department
1501 Wilson Blvd. 11,132 11/30/29 1/5
Arlington Transportation
Partners / Commuter
Information Center /
Storage
Bozman Government Center
2100 Clarendon Blvd. 181,000 10/31/33 Thru 2119 Headquarters / Storage
Sequoia Plaza
2100 Washington Blvd. 220,613 6/30/30 1/5 or 10 Department of Human
Services
3 Ballston Plaza
1100 N. Glebe Rd. 16,275 1/31/34 1/5 Arlington Economic
Development
Siena Park
2301 Columbia Pike 2,337 7/31/28 1/5 STAR
Proposed CIP: $17.4M
Funding Source: Bond
Goal: Maximize cost and space
effectiveness across the County’s owned
and leased spaces as operational needs
evolve and more employees telework.
• Implement hoteling in BGC: reduce
the size of workspaces and increase
collaborative and privacy spaces
• Couple re-configurations with the
replacements of systems furniture that
is 30+ years old and poses a safety risk
• Consolidate, relocate, or convert
existing facilities
County’s Lease Program
Systems
Furniture
NEW
27
27
Ballston Garage Carlin Springs Site Trade Center Optimization Plan &
Trades Center NOC Relocation
Proposed CIP: $12.2M
Funding Source: Ballston Garage Revenues
Comp Plan or Strategic initiative: Ballston
Sector Plan
Community benefits:
• Address flooding, stormwater, and façade
issues in the parking garage to maintain a
state of good repair
• Design for flooding and façade
repairs FY 25
• Construction FY 26 – FY 27
• Routine maintenance FY27 – FY34
Proposed CIP: $14.4M
Funding Source: Bond / PAYG
Neighborhood:
Glencarlyn
Community benefits:
• Anticipated phased redevelopment of the
vacant site to include shared parking and
coupling with the Long Branch Nature Center
Proposed CIP: $845k
Funding Source: Bond
Comp Plan or Strategic initiative:
Shirlington Design Book
Community benefits:
• Study funded in FY 26/FY 27
• In coordination with APS, explore alternatives for
school bus parking and converting the fleet to
battery electric power.
• Relocate County’s Network Operations Center
(NOC) from the Trades Center to an alternate
location or moving to the cloud.
FY 2025-2034 CIP FD&C Projects
NEW
NEW
28
28
Fire Station Replacements &
Additions
Columbia Pike Library Lee Community Center
Proposed CIP: $43.2M
Funding Source: Bonds
Comp Plan or Strategic initiative:
Neighborhoods Form Based Code
Columbia Pike Neighborhoods Area Plan
Columbia Pike Revitalization Plan
Commercial Centers Form Based Code
Community benefits:
• Improves response times and balances
demand among fire stations due to growing
development along Columbia Pike
• Land acquisition funding of $4M included in
FY 25 to purchase 5519 Columbia Pike for a
new fire station #7
• Design FY30, Construction FY31
Proposed CIP: $35.7M
Comp Plan or Strategic initiative: Commercial
Centers Form Based Code
Funding Source: Bond
Community benefits:
• Moves the current Columbia Pike Library from its
existing location in the APS Career Center to 3108
Columbia Pike
• Funds replacement library with a potential mixed-
use development
• Planning, Design & Procurement FY 29/ FY
30
• Construction FY 31 – FY 32
Related Projects:
• Phased development of APS Career Center will
displace current library
Proposed CIP: $15.6M
Funding Source: Bonds
Comp Plan or Strategic initiative:
Plan Langston Boulevard
Community benefits:
• Study options for the future of the community
center, which requires major infrastructure
upgrades
• Placeholder design and construction
funding included in FY 31 and FY 32
FY 2025-2034 CIP FD&C Projects
NEW
29
29
PUBLIC & GOVERNMENT FACILITIES
Project Name Proposed CIP Funding Source Project Description
Fire Logistics $10.0M Bond Funding to complete construction for relocation of Fire Logistics to 1425 Quincy
(Building 1) from old Fire Station #5 at Aurora Highlights.
Includes roof replacement, office buildout and all electric heating system.
Oakland Street
Warehouse
$1.4M PAYG Renovation of warehouse to support Police logistics. Warehouse has substandard
conditions. Reconfigure back lot storage to allow for Signature Theater expansion.
Crystal City Library $6.3M Developer
Contributions
Developer contributions for a potential library.
Facility Condition
Assessments & Planning
Studies
$4.5M PAYG Funds feasibility studies for planning efforts over the 10-year CIP horizon.
Study to reconfigure the County Board Office space (FY 25)
Study the Long Branch Nature Center (FY 26)
Study the Gulf Branch Nature Center (FY27)
Update Facility Condition Assessment (On-going with completion in FY 29)
Facility Finishes,
Furnishings & Equipment
$3.6M PAYG Scheduled re-investments in existing facilities interior/exterior finishes and furnishings,
consisting of the following elements: interior maintenance capital, chair replacement,
and systems furniture replacement.
FY 2025-2034 CIP FD&C Projects
NEW
30
30
($ in thousands) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total
1. Ballston Public Parking Garage Floors 1 - 7 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220
2. Carlin Springs Site 0 8,333 0 0 4,040 2,000 0 0 0 0 14,373
3. Columbia Pike Library 0 0 0 0 1,010 3,030 11,265 20,425 0 0 35,730
4. Courthouse Complex Renovations &
Infrastructure 5,000 3,300 11,035 11,110 0 0 0 0 0 0 30,445
5. Courts/Police Building Improvements 8,150 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 39,660
6. Crystal City Library 0 0 0 300 600 5,400 0 0 0 0 6,300
7. Detention Facility Comprehensive Study 815 3,030 3,060 3,090 3,125 0 0 0 0 0 13,120
8. Facility Condition Assessments & Planning
Studies 25 803 563 318 581 328 333 338 859 348 4,496
9. Facility Finishes, Furnishings & Equipment 0 657 758 333 298 263 283 303 323 343 3,561
10. Fire Logistics 9,950 0 0 0 0 0 0 0 0 0 9,950
11. Fire Station Replacements & Additions 4,100 0 0 0 0 3,535 35,350 255 0 0 43,240
13. Lee Community Center 250 0 0 0 0 0 1,215 14,140 0 0 15,605
14. Oakland Street Warehouse 1,355 0 0 0 0 0 0 0 0 0 1,355
15. Office Space Utilization & Systems
Furniture 6,020 0 3,940 2,020 4,180 0 1,230 0 0 0 17,390
16. Situational Awareness Intelligence Unit,
EOC & DPSCEM Consolidation 4,003 4,040 4,850 0 0 0 0 0 0 0 12,893
17. Trade Center-NOC Relocation 0 0 0 0 6,060 0 0 0 0 0 6,060
18. Trade Center Optimization Plan 0 415 430 0 0 0 0 0 0 0 845
Total Recommendation 41,018 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,243
FD&C Project Summary: $267 million
31
31
FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total
New Funding
Federal Funding 1,000 458 0 0 0 0 0 0 0 0 1,458
Developer Contributions 0 0 0 300 600 5,400 0 0 0 0 6,300
New Bond Issue 27,855 26,960 21,775 21,270 26,495 13,280 56,635 42,730 10,305 9,815 257,120
PAYG 6,005 8,178 11,391 10,847 12,117 6,950 7,559 7,484 8,666 8,819 88,016
Other Funding 2,600 5,962 2,620 500 500 500 500 500 500 500 14,682
Subtotal New Funding 37,460 41,558 35,786 32,917 39,712 26,130 64,694 50,714 19,471 19,134 367,576
Previously Approved Funding
Authorized but Unissued
Bonds 10,550 800 7,400 0 0 3,285 0 0 0 0 22,035
Issued but Unspent Bonds 5,800 2,500 0 0 0 0 0 0 0 0 8,300
Other Previously
Approved Funds 333 0 0 0 0 0 0 0 0 0 333
Subtotal Previously Approved
Funding 16,683 3,300 7,400 0 0 3,285 0 0 0 0 30,668
Total Funding Sources 54,143 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,244
Facilities and Energy Funding Summary
32
32
Summary & Conclusion
Request is a balanced mix within our funding constrains that addresses
• Energy efficiency
• Energy resiliency leveraging solar power and reduced energy lighting to
reduce GHG
• Expands both public and County EV charging access
• Continues our progression to conversion to electric heating
• Maintains State of Good Repair for our CSI, public, and operating
facilities
• Advances our emergency preparedness with consolidation and
improvements of our response capabilities
• Commits to meet future demands with targeted increases in public
facilities
• New Columbia Pike and Crystal City Libraries
• West-end Columbia Pike Fire Station
33
Proposed Capital
Improvement Plan (CIP)
FY 2025 – FY 2034
Submission of a 10-Year Plan
for Facilities, Energy &
Resiliency