RecordWell Data

Facilities Presentation(PDF, 3MB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Facilities, Energy & Resiliency 2 2 Overview • Energy modeling supporting requested FMB investments in EV charging, electric heating and facility resiliency • Selective choices between PPA and direct solar investment to reduce power demands and GHG emissions • Essential investments to maintain CSI services and state of good repair • Consolidation of Emergency Management (DPSCEM) functions in BGC, leveraging Grant and Tenant Improvement Allowance funding • Continuation of major capital improvements: Courts-Police Building, Thomas Building, Central Library and Madison Community Center • Long range planning for Columbia Pike Library, West-end Columbia Pike Fire Station, coupled with evaluation of over/under utilized sites 3 3 2.3 mil ft2 of space managed 0-239 years old Age range of buildings maintained 89 County- owned buildings in service Asset Inventory: Facilities 9 Agencies Served 4 4 Equitable Distribution of CIP Investments Projects are guided by our equity principles: • Create accessible facilities across the County for staff and residents to work and enjoy • Continue to maintain facilities in a systematic order to enhance the user experience • Identify user and facility needs across all County departments for an equitable distribution of funding Visit the interactive CIP map on the County’s website Facilities Construction Capital Facilities Maintenance Capital Facilities Maintenance Project Type Legend 5 5 Facilities Design & Construction 67.0% Facilities Management Bureau 27% Energy & Resiliency 6% $398M CIP over 10 Years, $257M new bonds Facilities relies on bond funding for both construction and state of good repair 64.56% 22.1% 7.7% 3.69% 1.58% 0.37% New Bonds (64.56%) PAYG (22.1%) Previously Approved Funding (7.7%) Other (3.69%) Developer Contributions (1.58%) Federal Funding (0.37%) By Program By Funding Source 6 6 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total Energy & Resiliency 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,244 Facilities Management Bureau 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757 Facilities, Design & Construction 41,018 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,243 Total Recommendation 54,143 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,244 Facilities, Energy & Resiliency Program Summary $398 million over 10-years 7 7 Project Highlights Public and County Fleet EVSE Fairlington Community Center Cupola Repair 1212 S. Irving Group Home Construction and Solar Installation Fire Station #8 Replacement and Solar Installation Arlington Child Care Center Renovation 3700 S. Four Mile Run Renovation and Boiler Electrification 3108 Columbia Pike Demolition Court Square West Garage Repairs 8 8 Energy & Resiliency 9 9 Energy Performance in County Facilities Analysis, Prioritization and Reporting • Analysis from the Decarb Tool informs Facilities Maintenance projects to support GHG reductions. • Continue progress for County Energy Use Intensity (EUI) reductions Project Types • Short Payback Period: Faster to implement with a lower reduction in GHG • Deep Decarbonization: More substantial investment that bundles several decarbonization measures, including HVAC electrification GHG Impact Payback Periods Energy and Cost Impact Project cost $120k $1,578/ ton avoided CO2e Equipment Bureau Lighting Retrofit 2.5% reduction in annual emissions from facility baseline 6-year payback period 10 10 Facility Decarbonization Report Card • HVAC and Equipment Electrification • Evaluating different system types • Implement at end of useful life • Minimize facility disruption HVAC and Equipment Electrification Effort Report Card Location CY22 CY23 CY 24 CY 25 CY26 RemarksFY23 FY24 FY25 FY26 Cultural Affairs (3700 S. FMR) - Electric-resistance boiler - Additional time required for Dominion power coordination *Madison Community Center VRF HVAC system WSS Engine Shop Heat pump *Quincy II Electric-resistance RTU *Quincy IV Electric-resistance RTU *Walter Reed Community Center - Electric-resistance boiler - Additional time required for Dominion power coordination Cherrydale Heat Pump Like-in kind heat pump replacement Oakland Street Warehouse Electric-resistance RTU *Fire Station #2 (DHW) Convert gas hot water heater to electric *Quincy I Renovation and new programmatic use *Quincy III (Completed) - Like-in kind natural gas RTU replacement - Completed prior to FY23 CIP County Board Guidance for HVAC electrification Feasibility Design/Permitting Procurement Construction Decarb Tool Model * 11 11 Solar Screening Process Accelerates onsite solar installations, blending both third-party Purchase Power Agreements (no CIP funding) and County-owned installations. On-site Solar at County Facilities Solar Installation Cost Table Facility Procurement Method Capital Costs Annual Maintenance Costs $/kWh kW Capacity Annual GHG Impact (tons CO2e) County-Owned Solar Facilities Fire Station 8 - $235,000 $968 $0.13 51 25 AOMF - $2,335,689 $12,428 $0.16 429 213 Planned Installations Lubber Run (Coming at July Board meeting) Purchase Power Agreement (PPA) $0 $0 $0.10 227 110 County Owned and Maintained $700,000 $10,000 $0.11 Equipment Bureau Purchase Power Agreement (PPA) $0 $0 $0.11 60 29 County Owned and Maintained $250,000 $5,500 $0.14 Central Library Purchase Power Agreement (PPA) $0 $0 $ 0.11 110 54 County Owned and Maintained $500,000 $6,000 $ 0.14 89 County facilities preliminarily screened for solar feasibility 26 facilities passed 64 did not pass due to current roof conditions, solar obstructions, or facility-specific issues 17 candidates for PPA 9 candidates for County-owned / maintained 12 12 Number of Solar Panels Cumulative kW Production CIP Accelerates Investment in Solar Projected solar kW capacity increases to over 1,000 kW in FY 26 Projected Installation of Solar Panels by FY and Cumulative kW Production 320 147 905 1273 1273 1273 1273 563 563 500 500 500 0 1000 2000 3000 4000 0 200 400 600 800 1000 1200 1400 FY 23 FY 24 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY32 FY 33 FY 34 Panels kW Capacity Cumulative 13 13 Renewable Energy Assessments and Solar Installations Energy Performance Upgrades – County Buildings Proposed CIP: $8.6M Comp Plan or Strategic initiative: CEP Policy 3.1 Funding Source: PAYG Community benefits: • Funds solar on 4-5 sites annually through a blended approach of third-party PPAs and County-owned. • Includes funding to complete site assessments • Possibility for public-private partnerships • Strategy focuses onsite solar on new construction followed by recent roof replacements • Includes additional position to manage installations Proposed CIP: $5.6M Comp Plan or Strategic initiative: CEP Roadmap Funding Source: PAYG Community benefits: • Analysis informs FMB projects to support GHG reductions • Focus on short payback periods and provide planning and analysis for deep decarbonization projects • Continue progress for County Energy Use Intensity (EUI) reductions FY 2025-2034 CIP Energy & Resiliency Projects 14 14 Lubber Run Resiliency Hub Energy Resilience Planning & Development Total budget: $2.5M Comp Plan or Strategic initiative: Funding Source: Climate Action Fund (CAF) Community benefits: • Create resiliency hub to serve community electricity needs during an event (i.e., long-term power outage), leveraging solar PV system • Expand battery storage to support critical support systems at peak energy demand and backup natural gas generator • Funding in FY 25 and FY 26. Total budget: $4.2M Comp Plan or Strategic initiative: CEP Funding Source: Federal / PAYG Community benefits: Enhance County’s ability to overcome disruptions like extreme weather, deliberate attacks, grid sensitivity • Model and implement microgrid and resiliency hubs that support key service and operational centers • Implementation of resiliency hubs in FY27 and FY28 • Implementation of microgrid pilot in FY29 FY 2025-2034 CIP Energy & Resiliency Projects NEW 15 15 4 8 5 6 7 1 2 3 9 Installation Fiscal Year 2023 1. 1212 S Irving St (1) 2. Arlington Mill CC(2) 3. Long Bridge Aquatics Center (8) 2024 4. Aurora Hill Recreation Center (4) 2024 (cont.) 5. Central Library (12) 6. Courthouse Surface Lot (6) 7. Fairlington CC(4) 8. Madison CC (6) 2025 9. Lubber Run CC (8) Electric Vehicle Chargers - Internal Electric Vehicle Chargers - Public Accessibility Proposed CIP: $2.4M Comp Plan or Strategic initiative: CEP Funding Source: PAYG Community benefits: • Establishes County as a leader in EV charging, leading by example with its electric vehicle conversion and purchasing plan. • FY 2026 includes $250k in additional funding to support public safety fleet charging Proposed CIP: $1.9M Comp Plan or Strategic initiative: CEP, Carbon Neutral Transportation Master Plan Funding Source: PAYG Community benefits: • Increases public access to community EV chargers and promotes private EV ownership • Includes the siting and installation of community EV chargers and flexibility for fast-charging hubs Electric Vehicle Chargers County Building Community Center Library 16 16 ($ in thousands) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total 1. Energy Resilience Planning & Development 0 509 758 765 2,121 0 0 0 0 0 4,153 2. Lubber Run Resiliency Hub 1,250 1,212 0 0 0 0 0 0 0 0 2,462 3. Renewable Energy Assessments and Solar Installations 300 1,263 1,248 1,133 1,145 606 657 707 758 808 8,625 4. Energy Performance Upgrades -County Buildings 475 707 606 612 591 556 561 480 505 556 5,649 5.Electric Vehicle Chargers- Internal Accessibility 250 505 202 204 206 208 210 212 214 217 2,428 6. Electric Vehicle Chargers- Public Accessibility 100 505 152 153 177 179 152 153 177 179 1,927 Total Recommendation 2,375 4,701 2,966 2,867 4,240 1,549 1,580 1,552 1,654 1,760 25,544 Energy & Resiliency Project Summary: $26M 17 17 Facilities Management Bureau 18 18 29% 20.6%18.6% 14.8% 9.1% 7.7% Interior Construction Electrical Exterior Enclosure HVAC Plumbing Miscellaneous Condition of Assets and Energy Impact • Analysis of building systems and infrastructure condition • Balance proposed improvements with decarbonization efforts • Recommendations are prioritized: • Impact to operations • Bundled to maximize GHG reductions • Maximize extension to facility lifecycle Madison Community Center Facility Condition Assessment Database Output Total FCI: 0.37/1.00 Identified Requirements: $6.34M System Group 19 19 Madison Community Center Roof and Windows Detention Facility Fire Alarm and Security Systems Upgrade Central Library Roof and Mechanical Improvements Proposed CIP: $2.5M Funding Source: Bond Community benefits: • Replace the roof and windows at Madison Community Center to address deterioration and energy inefficiencies • Existing roof is R-11 and replacement will increase the efficiency to R-34 minimum • Additional funding results in a project total of $4.7M Proposed CIP: $2M (Fire Alarm) + $300k (Security System) Funding Source: Bond Community benefits: • Ensure safety of the building tenants by replacing the existing fire alarm system, which has reached the end of its useful life and is no longer supported. • The security system is used to maintain proper access and safety to the Detention facilities and Courthouse areas to protect staff, inmates, and the public. Proposed CIP: $3M Funding Source: Bond Community benefits: • Replace the roof to increase solar capacity, replace HVAC systems in the auditorium and historical preservation room, and modernize the elevator systems • Additional funding results in a project total of $6.8M FY 2025 – FY 2026 CIP Facilities Maintenance Projects 20 20 Central Library Plaza Repairs Equipment Bureau Door Replacements Walter Reed Community Center Boiler Electrification Proposed CIP: $2.27M Funding Source: Bond Community benefits: • Improve the plaza by addressing water intrusion and fall hazards. • Regrade the plaza surrounding the facility. Proposed CIP: $1.8M Funding Source: Bond Community benefits: • Replace 40+ year-old roll-up doors that have reached the end of their useful life with more energy efficient doors. • Existing uninsulated steel slat doors will be replaced with insulated doors with a minimum R-8 insulation value, providing a potential 90% reduction in heat flow. Proposed CIP: $1.3M Funding Source: Bond Community benefits: • Replace existing gas fired boilers that are reaching the end of their useful life with electric resistance units. • The system is a good candidate for the County's decarbonization efforts and measures to reduce GHG emissions. FY 2025 – FY 2026 CIP Facilities Maintenance Projects 21 21 PUBLIC & GOVERNMENT FACILITIES Project Name Proposed CIP Funding Source Year Project Description Argus House Window Replacement $600k PAYG FY 2025 Replacement of windows that have reached their end of useful life (installed 1991). The existing windows are single pane. Replacement will increase energy efficiency, extend life of HVAC system, quiet outside noise, and enhance customer experience. Fire Station #9 Apparatus Bay Circulation System $300k PAYG FY 2025 Currently, the apparatus bay does not have a system to circulate and promote air movement within the space. The system will: • Reduce summer temperatures in the apparatus bay • Prevent overheating of critical materials • Ensure proper storage of medicines in response units • Increase staff comfort and health. ACDF Air Compressor Replacement $250k PAYG FY 2025 The existing air compressors servicing the Detention Facility are original, have exceeded their useful life, and are prone to malfunction and failure. These units provide compressed air for multiple critical mechanical systems within the facility. Fire Station #5 Bay Door Replacement $1.01M Bond FY 2026 Replace the existing roll-up doors with new bi-fold doors that activate faster allowing for quicker response times and less opportunity for accidental damage. Court Square West Fan Coil Unit Replacement $859k PAYG FY 2026 The fan coil units have reached the end of useful life and are not connected to the building automation system (BAS). Replacement will increase energy efficiency, add isolation valves for future maintenance and connect to BAS. Cherrydale Library Heat Pump Replacement $202k PAYG FY 2026 The heat pumps serving the library spaces have reached the end of their useful life requiring frequent compressor replacement. MoCA Gallery Air Handler Units $758k PAYG FY 2026 Existing five self contained HVAC units, installed in 2003, are obsolete and can no longer be serviced. Recent repairs have become harder due to parts no longer being available. FY 2025-2026 CIP FMB Projects 22 22 PUBLIC & GOVERNMENT FACILITIES Project Name Proposed CIP Source Year Project Description Court Square West Electrical Switchboard Replacement $1.5M PAYG FY 2025 The electrical switchgear at CSW is at the end of its useful life (58 years old) and is not code compliant. Failure would close CSW and impact the Emergency Communications Center’s (ECC) alternative site. ECC UPS Upgrades $350k PAYG FY 2025 Replace uninterruptible power supply (UPS) system and controls to provide redundant back-up power to the ECC alternate site. Generator Replacement Program $556k PAYG FY 2026 Program to replace emergency generators and install roll-up connections. FY 2026 funding will replace generator at Fire Station #4 that is nearing the end of its useful life. (Last renovated in 1997). This will also install roll-up connections at sites for external emergency connections. Future year planned replacements include: • ACDF (FY27) • Courts Police (FY28) • Central Library (FY29) • Lee Pumping Station Radio Site (FY29) • Ballston Radio Site (FY30) • Shirlington Radio Site (FY31) Fire Alarm Replacement Program $758k PAYG FY 2026 Program to replace obsolete fire alarm systems that have exceeded useful life and replacement parts are no longer available. FY 2026 funding will be used to replace fire alarms at Quincy III and Quincy IV (installed in1986). Future year planned replacements include: • The Thomas Building (2020 14th St) (FY27) • Fire Stations #3, #5, and #9 (FY28) • Walter Reed Community Center (FY29) • Fire Stations #1 and #2 (FY30) • Cherrydale Library (FY31) FY 2025 – FY 2026 CIP CSI Projects 23 23 ($ in thousands) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total Critical Systems Infrastructure (CSI) Program 1,850 1,313 4,020 4,141 4,262 1,465 1,510 929 960 990 21,440 Public Facilities Maintenance Program 8,900 8,181 5,359 5,713 5,766 8,800 9,408 10,222 10,730 11,238 84,317 Total Recommendation 10,750 9,494 9,379 9,854 10,028 10,265 10,918 11,151 11,690 12,228 105,757 FMB Project Summary: $106 million 24 24 Facilities Design & Construction 25 25 Courts/Police Building Improvements Detention Facility Comprehensive Study Courthouse Complex Renovations & Infrastructure Situational Awareness Intelligence Unit (SAIU), EOC & DPSCEM Consolidation Proposed CIP: $39.7M Comp Plan or Strategic initiative: Courthouse Sector Plan Funding Source: Bond/PAYG Community benefits: • Upgrades 2 courtrooms per year with technology, furnishings, fixtures and equipment. • Expands the Commonwealth Attorney’s office space • Relocates the Alcohol Safety Action Program Included Projects: • FY 25 PAYG ($500k) funding provides near term space relief for CWA until permanent solution in FY 26/FY 27 ($2.9M). Proposed CIP: $13.1M Funding Source: Bond Comp Plan or Strategic initiative: Courthouse Sector Plan Community benefits: • Updates the Detention Center, which is 25 years old and has deficiencies • Improves security measures throughout the building and adds technology in the Courtrooms. Proposed CIP: $30.4M Comp Plan or Strategic initiative: Courthouse Sector Plan Funding Source: Bond Community benefits: • Design and renovation of two unoccupied floors that can be used for hypothermia overflow for the homeless service center, courts programs, and DES programs • Design FY 25/ FY 26 • Construction FY 27 / FY 28 Related Projects: • Precursor to vacating Court Square West within 7-10 years Proposed CIP: $12.9M Funding Source: Bonds / Federal Community benefits: • Constructs a SAIU and the Emergency Operations Center (EOC) in Bozman, allowing safety partners to co-locate during critical events. • Design FY25, Construction FY26 • Expands watch desk capabilities and includes new public safety technology • The rest of the DPSCEM program will be relocated after completion Related Projects: • DTS will be relocated from the 6th floor of Bozman to allow for DPSCEM consolidation FY 2025-2034 CIP FD&C Projects NEW 26 26 Office Space Utilization and Systems Furniture Property Name Total SF Term Exp Options/ Years Department 1501 Wilson Blvd. 11,132 11/30/29 1/5 Arlington Transportation Partners / Commuter Information Center / Storage Bozman Government Center 2100 Clarendon Blvd. 181,000 10/31/33 Thru 2119 Headquarters / Storage Sequoia Plaza 2100 Washington Blvd. 220,613 6/30/30 1/5 or 10 Department of Human Services 3 Ballston Plaza 1100 N. Glebe Rd. 16,275 1/31/34 1/5 Arlington Economic Development Siena Park 2301 Columbia Pike 2,337 7/31/28 1/5 STAR Proposed CIP: $17.4M Funding Source: Bond Goal: Maximize cost and space effectiveness across the County’s owned and leased spaces as operational needs evolve and more employees telework. • Implement hoteling in BGC: reduce the size of workspaces and increase collaborative and privacy spaces • Couple re-configurations with the replacements of systems furniture that is 30+ years old and poses a safety risk • Consolidate, relocate, or convert existing facilities County’s Lease Program Systems Furniture NEW 27 27 Ballston Garage Carlin Springs Site Trade Center Optimization Plan & Trades Center NOC Relocation Proposed CIP: $12.2M Funding Source: Ballston Garage Revenues Comp Plan or Strategic initiative: Ballston Sector Plan Community benefits: • Address flooding, stormwater, and façade issues in the parking garage to maintain a state of good repair • Design for flooding and façade repairs FY 25 • Construction FY 26 – FY 27 • Routine maintenance FY27 – FY34 Proposed CIP: $14.4M Funding Source: Bond / PAYG Neighborhood: Glencarlyn Community benefits: • Anticipated phased redevelopment of the vacant site to include shared parking and coupling with the Long Branch Nature Center Proposed CIP: $845k Funding Source: Bond Comp Plan or Strategic initiative: Shirlington Design Book Community benefits: • Study funded in FY 26/FY 27 • In coordination with APS, explore alternatives for school bus parking and converting the fleet to battery electric power. • Relocate County’s Network Operations Center (NOC) from the Trades Center to an alternate location or moving to the cloud. FY 2025-2034 CIP FD&C Projects NEW NEW 28 28 Fire Station Replacements & Additions Columbia Pike Library Lee Community Center Proposed CIP: $43.2M Funding Source: Bonds Comp Plan or Strategic initiative: Neighborhoods Form Based Code Columbia Pike Neighborhoods Area Plan Columbia Pike Revitalization Plan Commercial Centers Form Based Code Community benefits: • Improves response times and balances demand among fire stations due to growing development along Columbia Pike • Land acquisition funding of $4M included in FY 25 to purchase 5519 Columbia Pike for a new fire station #7 • Design FY30, Construction FY31 Proposed CIP: $35.7M Comp Plan or Strategic initiative: Commercial Centers Form Based Code Funding Source: Bond Community benefits: • Moves the current Columbia Pike Library from its existing location in the APS Career Center to 3108 Columbia Pike • Funds replacement library with a potential mixed- use development • Planning, Design & Procurement FY 29/ FY 30 • Construction FY 31 – FY 32 Related Projects: • Phased development of APS Career Center will displace current library Proposed CIP: $15.6M Funding Source: Bonds Comp Plan or Strategic initiative: Plan Langston Boulevard Community benefits: • Study options for the future of the community center, which requires major infrastructure upgrades • Placeholder design and construction funding included in FY 31 and FY 32 FY 2025-2034 CIP FD&C Projects NEW 29 29 PUBLIC & GOVERNMENT FACILITIES Project Name Proposed CIP Funding Source Project Description Fire Logistics $10.0M Bond Funding to complete construction for relocation of Fire Logistics to 1425 Quincy (Building 1) from old Fire Station #5 at Aurora Highlights. Includes roof replacement, office buildout and all electric heating system. Oakland Street Warehouse $1.4M PAYG Renovation of warehouse to support Police logistics. Warehouse has substandard conditions. Reconfigure back lot storage to allow for Signature Theater expansion. Crystal City Library $6.3M Developer Contributions Developer contributions for a potential library. Facility Condition Assessments & Planning Studies $4.5M PAYG Funds feasibility studies for planning efforts over the 10-year CIP horizon. Study to reconfigure the County Board Office space (FY 25) Study the Long Branch Nature Center (FY 26) Study the Gulf Branch Nature Center (FY27) Update Facility Condition Assessment (On-going with completion in FY 29) Facility Finishes, Furnishings & Equipment $3.6M PAYG Scheduled re-investments in existing facilities interior/exterior finishes and furnishings, consisting of the following elements: interior maintenance capital, chair replacement, and systems furniture replacement. FY 2025-2034 CIP FD&C Projects NEW 30 30 ($ in thousands) FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total 1. Ballston Public Parking Garage Floors 1 - 7 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 2. Carlin Springs Site 0 8,333 0 0 4,040 2,000 0 0 0 0 14,373 3. Columbia Pike Library 0 0 0 0 1,010 3,030 11,265 20,425 0 0 35,730 4. Courthouse Complex Renovations & Infrastructure 5,000 3,300 11,035 11,110 0 0 0 0 0 0 30,445 5. Courts/Police Building Improvements 8,150 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 39,660 6. Crystal City Library 0 0 0 300 600 5,400 0 0 0 0 6,300 7. Detention Facility Comprehensive Study 815 3,030 3,060 3,090 3,125 0 0 0 0 0 13,120 8. Facility Condition Assessments & Planning Studies 25 803 563 318 581 328 333 338 859 348 4,496 9. Facility Finishes, Furnishings & Equipment 0 657 758 333 298 263 283 303 323 343 3,561 10. Fire Logistics 9,950 0 0 0 0 0 0 0 0 0 9,950 11. Fire Station Replacements & Additions 4,100 0 0 0 0 3,535 35,350 255 0 0 43,240 13. Lee Community Center 250 0 0 0 0 0 1,215 14,140 0 0 15,605 14. Oakland Street Warehouse 1,355 0 0 0 0 0 0 0 0 0 1,355 15. Office Space Utilization & Systems Furniture 6,020 0 3,940 2,020 4,180 0 1,230 0 0 0 17,390 16. Situational Awareness Intelligence Unit, EOC & DPSCEM Consolidation 4,003 4,040 4,850 0 0 0 0 0 0 0 12,893 17. Trade Center-NOC Relocation 0 0 0 0 6,060 0 0 0 0 0 6,060 18. Trade Center Optimization Plan 0 415 430 0 0 0 0 0 0 0 845 Total Recommendation 41,018 30,663 30,841 20,196 25,444 17,601 52,196 38,011 6,127 5,146 267,243 FD&C Project Summary: $267 million 31 31 FY 25 FY 26 FY 27 FY 28 FY 29 FY 30 FY 31 FY 32 FY 33 FY 34 10 Year Total New Funding Federal Funding 1,000 458 0 0 0 0 0 0 0 0 1,458 Developer Contributions 0 0 0 300 600 5,400 0 0 0 0 6,300 New Bond Issue 27,855 26,960 21,775 21,270 26,495 13,280 56,635 42,730 10,305 9,815 257,120 PAYG 6,005 8,178 11,391 10,847 12,117 6,950 7,559 7,484 8,666 8,819 88,016 Other Funding 2,600 5,962 2,620 500 500 500 500 500 500 500 14,682 Subtotal New Funding 37,460 41,558 35,786 32,917 39,712 26,130 64,694 50,714 19,471 19,134 367,576 Previously Approved Funding Authorized but Unissued Bonds 10,550 800 7,400 0 0 3,285 0 0 0 0 22,035 Issued but Unspent Bonds 5,800 2,500 0 0 0 0 0 0 0 0 8,300 Other Previously Approved Funds 333 0 0 0 0 0 0 0 0 0 333 Subtotal Previously Approved Funding 16,683 3,300 7,400 0 0 3,285 0 0 0 0 30,668 Total Funding Sources 54,143 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,244 Facilities and Energy Funding Summary 32 32 Summary & Conclusion Request is a balanced mix within our funding constrains that addresses • Energy efficiency • Energy resiliency leveraging solar power and reduced energy lighting to reduce GHG • Expands both public and County EV charging access • Continues our progression to conversion to electric heating • Maintains State of Good Repair for our CSI, public, and operating facilities • Advances our emergency preparedness with consolidation and improvements of our response capabilities • Commits to meet future demands with targeted increases in public facilities • New Columbia Pike and Crystal City Libraries • West-end Columbia Pike Fire Station 33 Proposed Capital Improvement Plan (CIP) FY 2025 – FY 2034 Submission of a 10-Year Plan for Facilities, Energy & Resiliency

Source: Arlington County website. First collected Oct 18, 2026.