RecordWell Data

10 Year Project Summary FY 2025 - FY 2034(PDF, 767KB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 TOTAL ARLINGTON NEIGHBORHOODS PROGRAM 13,350 13,894 1 3,931 7 ,970 8 ,011 8 ,053 8 ,099 8 ,146 8 ,196 8 ,248 97,898 Arlington Neighborhoods Program 13,350 13,894 1 3,931 7 ,970 8 ,011 8 ,053 8 ,099 8 ,146 8 ,196 8 ,248 9 7,898 ECONOMIC DEVELOPMENT 91 731 15 3 15 8 16 2 16 7 17 1 176 18 0 18 5 2 ,174 Cultural Affairs - Joint-Use Space Maintenance - 630 5 0 5 2 5 4 5 6 5 8 6 0 6 2 6 4 1 ,086 Cultural Affairs - Public Facilities Maintenance 42 50 5 2 5 4 5 6 5 8 6 0 6 2 6 4 6 6 5 64 Public Art - Civic Facilities (Artworks) 49 51 5 1 5 2 5 2 5 3 5 3 5 4 5 4 5 5 5 24 INFORMATION TECHNOLOGY/EQUIPMENT 22,422 17,208 22,545 16,568 23,136 26,744 22,312 20,050 17,211 24,420 212,616 Body Scanner Replacement in Detention Center 100 - - - 3 03 - - - - - 4 03 Call Premise Equipment (CPE) - 2,020 2 ,020 - - - - - - 2 ,525 6 ,565 Cloud Migration (eGov) 625 631 - - - - - - - - 1 ,256 Connect Arlington 1,150 1,270 1 ,225 1 ,405 9 80 9 85 1 ,065 1 ,200 1 ,240 1 ,340 1 1,860 Constituent Digital Services - 379 3 79 3 99 4 04 4 28 4 33 4 83 4 84 4 89 3 ,878 Constituent Single Sign-On - 700 - - - - - - - - 7 00 County Audio Visual Equipment Replacement 300 342 9 21 8 59 5 49 8 06 1 ,041 4 20 1,012 4 39 6 ,689 Courthouse Magnetometer / X-Ray Machine 300 - - - - - - 3 03 - - 6 03 Criminal Justice Records Management System - - 3 03 5 ,050 - - - - - - 5 ,353 Data Center Consolidation and Refreshment 3,779 - 9 39 3 ,242 9 73 5 30 - - - - 9 ,463 DHS Centralized Customer Service & Case Mgmt. 990 - - - - - 5 35 5 60 - - 2 ,085 Enterprise Records Mgmt. System Modernization - - - - - - 1 ,343 - - - 1 ,343 Fire Bomb Squad X-Ray Systems 240 - - - - - - - 2 61 - 5 01 Fire Breathing Apparatus 460 - - - - 4 ,080 - - - - 4 ,540 Fire Command Vehicle - - - - - 2 ,020 - - - - 2 ,020 Fire Defibrillators - - - - - - - - - 4 ,858 4 ,858 Fire Portable Radios - - - - - 2 ,121 2 ,121 - - - 4 ,242 Fire Records Management System - - - - - 1 ,010 - - - - 1 ,010 Fire Station Alerting System - - - - - - - - 2 ,020 - 2 ,020 Fire Thermal Imaging Cameras - 278 - - - - - - 2 78 - 5 56 Fire Utility Task Vehicles (UTV) - 121 1 21 6 1 - - - - - - 3 03 Fire Vehicle Apparatus - - 6 ,864 - 9 ,594 2 ,525 8 ,476 5 ,726 - - 3 3,185 Firefighter Rehab Unit - 909 - - - - - - - - 9 09 Human Resource & Financial System Enhancements - 202 2 08 2 14 2 21 2 27 2 34 2 41 2 48 2 56 2 ,051 Land Records System - - - - 5 40 - - - - 1 ,104 1 ,644 Network Equipment and Power System 1,732 1,544 2 ,121 2 ,096 3 ,889 3 ,182 1 ,919 2 ,449 2 ,550 4 ,495 2 5,977 Police & Sheriff Public Safety Radios 2,850 2,879 - - - - - - 2 ,879 2 ,879 1 1,487 Police Computer Forensic Equipment - - 4 14 - - - - 5 05 - - 9 19 Police E-Summons System 100 227 1 11 1 12 1 13 1 14 2 27 1 11 1 12 1 13 1 ,340 Police Interview Rooms - - - - 2 53 - - - - - 2 53 Police Traffic Equipment Vehicle - 96 - - - - - - - - 9 6 Police Video Trailers - 253 - - - - 3 54 - - - 6 07 Public Safety Mobile Data Computers - - 3 ,737 - - - - 4 ,040 - - 7 ,777 Public Safety Radio System Upgrades - - - - - - - - 1 ,949 - 1 ,949 Public Safety Rifle Plates - - - - - - 4 04 - - - 4 04 Public Safety Servers and Infrastructure 350 - - - - 5 05 - - - - 8 55 Real Estate Assessment System - 1,010 - - - - - - - - 1 ,010 Revenue and Collection System Enhancement 4,500 - - - 1 ,250 3 ,295 - - - 1 ,569 1 0,614 Server Hardware & Data Storage 780 586 6 03 6 21 6 40 6 59 6 79 6 99 7 20 7 42 6 ,729 Sheriff Livescan and Portable Livescan - 303 - - - - 3 06 - - - 6 09 Tub Grinder Replacement - - - - - 1 ,212 - - - - 1 ,212 Voter Registration Electronic Poll Books - - - - 5 05 - - - - - 5 05 Voter Registration Voting Machines 2,000 - - - - - - - - - 2 ,000 Workforce Device Modernization 2,166 3,458 2 ,579 2 ,509 2 ,922 3 ,045 3 ,175 3 ,313 3 ,458 3 ,611 3 0,236 LOCAL PARKS AND RECREATION PROGRAMS 24,188 27,445 48,030 37,501 15,909 21,416 24,931 13,231 30,641 65,458 308,750 Arlington Boathouse - - - 1 5,865 - - - - - 1 2,215 2 8,080 Crystal City Parks and Public Space 1,038 6,682 2 ,695 7 ,040 6 60 4 ,820 - - - - 2 2,935 Drew Park - 305 1 15 1 ,820 - - - - - - 2 ,240 Emerging Uses Program 1,500 - 1 ,010 - 5 05 - 1 ,010 - 1 ,010 - 5 ,035 Fairfax Drive Public Spaces - - - - - - - 9 00 1,360 1 1,725 1 3,985 Feasibility Studies and Implementation - 202 2 04 2 06 2 08 2 10 2 12 2 14 2 17 2 19 1 ,892 Gateway Park (Rosslyn) 1,400 - 2 9,685 - - - - - - - 3 1,085 Adopted CIP 10 Year Project Summary FY 2025 - FY 2034 G - 1 Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 TOTAL Adopted CIP 10 Year Project Summary FY 2025 - FY 2034 Greenbrier Park/Yorktown High Stadium Field 1,164 - - - - - - - - - 1,164 Kenmore Middle School Athletic Field Conversion 9,842 - - - - - - - - - 9,842 Langston Boulevard Public Space Improvements - - - - - - - - - 2,020 2,020 Long Bridge Park Synthetic Field #3 - 1,041 - - - - - - - - 1,041 Natural Resiliency Program - 1,515 - 1,010 - 1,010 - 1,010 - 1,010 5,555 New Park at 26th Street N and Old Dominion Dr. - - - 255 560 4,040 - - - - 4,855 Parks Athletic Courts Program - - 505 - 505 - 505 - 505 - 2,020 Parks Land Acquisition and Public Space Program 1,500 - 3,030 - 3,060 - 3,090 - 3,125 - 13,805 Parks Maintenance Capital Program 4,250 5,710 5,924 5,623 5,742 5,866 5,885 6,005 6,024 6,144 57,173 Penrose Square, Phase 2 - - - - - - 795 - - 3,965 4,760 Quincy Park - - - - - 890 4,040 - 8,920 24,570 38,420 Shirlington Park - - - - - - - 1,030 4,315 - 5,345 Short Bridge Park - - - - - - 5,690 - - - 5,690 Synthetic Turf Program - - 2,337 3,132 2,094 1,975 1,634 3,617 4,710 1,700 21,199 Thomas Jefferson Middle School Lower Field 819 - - - - - - - - - 819 Three Urban Parks - 8,055 - - - - - - - - 8,055 Trail and Bridge Modernization Program 2,675 3,935 2,525 2,550 2,575 2,605 2,070 455 455 405 20,250 Virginia Highlands Park/Nearby Public Space - - - - - - - - - 1,485 1,485 METRO 33,000 34,225 35,230 36,230 37,335 37,835 38,435 40,855 52,060 53,265 398,470 Metro Funding 33,000 34,225 35,230 36,230 37,335 37,835 38,435 40,855 52,060 53,265 398,470 PUBLIC AND GOVERNMENT FACILITIES 54,893 44,858 43,186 32,917 39,712 29,415 64,694 50,714 19,471 19,134 398,994 Ballston Public Parking Garage Floors 1 - 7 1,350 4,750 2,620 500 500 500 500 500 500 500 12,220 Carlin Springs Site - 8,333 - - 4,040 2,000 - - - - 14,373 Columbia Pike Library - - - - 1,010 3,030 11,265 20,425 - - 35,730 Courthouse Complex Renovations & Infrastructure 5,000 3,300 11,035 11,110 - - - - - - 30,445 County Facility Renewable Energy Assessment 300 1,263 1,248 1,133 1,145 606 657 707 758 808 8,625 Courts/Police Building Improvements 8,150 5,335 3,585 2,525 5,050 2,545 2,020 2,050 4,445 3,955 39,660 Critical Systems Infrastructure (CSI) Program 1,850 1,313 4,020 4,141 4,262 1,465 1,510 929 960 990 21,440 Crystal City Library - - - 300 600 5,400 - - - - 6,300 Detention Facility Comprehensive Study 815 3,030 3,060 3,090 3,125 - - - - - 13,120 Electric Vehicle Chargers-Internal Accessibility 250 505 202 204 206 208 210 212 214 217 2,428 Electric Vehicle Chargers-Public Accessibility 100 505 152 153 177 179 152 153 177 179 1,927 Energy Performance Upgrades -County Buildings 475 707 606 612 591 556 561 480 505 556 5,649 Energy Resilience Planning & Development - 509 758 765 2,121 - - - - - 4,153 Facility Condition Assessments & Planning Study 775 803 563 318 581 328 333 338 859 348 5,246 Facility Finishes, Furnishings & Equipment - 657 758 333 298 263 283 303 323 343 3,561 Fire Logistics 9,950 - - - - - - - - - 9,950 Fire Station Replacements & Additions 4,100 - - - - 3,535 35,350 255 - - 43,240 Lee Community Center 250 - - - - - 1,215 14,140 - - 15,605 Lubber Run Resiliency Hub 1,250 1,212 - - - - - - - - 2,462 Oakland Street Warehouse 1,355 - - - - - - - - - 1,355 Office Space Utilization & Systems Furniture 6,020 - 3,940 2,020 4,180 - 1,230 - - - 17,390 Public Facilities Maintenance Program 8,900 8,181 5,359 5,713 5,766 8,800 9,408 10,222 10,730 11,238 84,317 Situational Awareness Intelligence Unit, EOC & DPSCEM Consolidation 4,003 4,040 4,850 - - - - - - - 12,893 Trade Center-NOC Relocation - - - - 6,060 - - - - - 6,060 Trade Center Optimization Plan - 415 430 - - - - - - - 845 REGIONAL PARTNERSHIPS AND CONTINGENCIES 1,683 1,166 1,077 1,094 1,111 1,129 1,147 1,165 1,184 1,203 11,959 Northern Virginia Criminal Justice Academy 127 128 - - - - - - - - 255 Northern Virginia Regional Park Authority 731 738 768 776 783 791 799 807 815 823 7,831 Capital Administration & Contingent 825 300 309 318 328 338 348 358 369 380 3,873 STORMWATER MANAGEMENT 29,605 37,355 36,100 35,675 48,635 37,490 24,720 30,215 30,100 24,360 334,255 33rd Street North to Williamsburg Capacity - 160 1,115 1,175 1,010 1,260 - - - - 4,720 Capacity Project Feasibility Studies 150 155 160 165 165 170 170 175 175 175 1,660 Columbia Pike at South Greenbrier Street 1,000 1,190 820 8,980 5,200 - - - - - 17,190 Concord Mews Pond Retrofit 250 1,545 - - - - - - - - 1,795 Crossman Run Watershed Capacity Improvements - 3,420 3,140 1,600 15,425 12,990 - - - - 36,575 Detention Vaults & Overland Relief Maintenance 100 105 105 110 110 110 110 115 115 120 1,100 Dumbarton Street Culvert-Downstream 3,000 1,545 - - - - - - - - 4,545 Dumbarton Street Culvert-Upstream 3,000 1,545 - - - - - - - - 4,545 Flood Resiliency Design & Construction Guideline 150 - - - - - - - - - 150 G - 2 Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 TOTAL Adopted CIP 10 Year Project Summary FY 2025 - FY 2034 Flood Risk Reduction Program 1,500 1,590 1,995 2,205 1,070 1,100 1,130 1,190 1,220 1,250 14,250 Floodplain Channel & Split Stream Maintenance 100 105 105 110 110 110 110 115 115 120 1,100 Four Mile Run Flood Control Project Maintenance 500 50 55 55 55 55 55 60 60 60 1,005 Green Streets & Infrastructure Program 375 235 425 435 435 445 445 460 460 475 4,190 Gulf Branch and South Walter Reed Green Streets 540 - 210 - - - - - - - 750 Gulf Branch Stream Resiliency 800 2,320 - - - - - - - - 3,120 Langston Boulevard Culvert at North Sycamore 440 - - - - - - - - - 440 Lower Long Branch Flood Risk Reduction Project - - - - - 645 665 700 720 740 3,470 Lubber Run Watershed Capacity Improvements 1,500 3,610 3,075 1,260 6,455 6,560 6,240 14,870 13,385 10,005 66,960 Manhole & Catch Basin Rehabilitation 250 260 265 275 275 280 280 290 290 295 2,760 Military Road Culvert at Gulf Branch 2,090 1,030 - - - - - - - - 3,120 Miscellaneous Expansion/ Capacity Projects - 310 - 325 - 335 - 345 - 355 1,670 North Thomas Street 255 875 1,125 - - - - - - - 2,255 Outfall Rehabilitation Program 925 1,725 1,305 875 1,475 1,510 1,510 1,555 1,555 1,595 14,030 Quebec Street Outfall Rehabilitation 450 - - - - - - - - - 450 Sidewalk Underdrains 50 50 55 55 55 55 55 60 60 60 555 Sparrow Pond Watershed Retrofit 450 - - - - - - - - - 450 Spout Run Watershed Capacity Improvements 7,900 8,130 8,630 8,340 7,630 7,805 6,920 5,815 4,490 4,305 69,965 Stohman's Run Watershed Capacity Improvements 250 515 1,310 - - - - - - - 2,075 Stormwater Frames and Covers 250 260 265 275 275 280 280 290 290 295 2,760 Stormwater Mains Rehabilitation & Replacement 1,000 1,545 2,120 2,455 2,725 3,080 3,250 3,450 3,565 3,775 26,965 Stream Resiliency Program 250 260 2,915 275 3,000 280 3,080 290 3,165 295 13,810 Terra Cotta/ Corrugated Metal Pipe Upgrades 205 215 225 240 240 250 250 260 260 265 2,410 Torreyson Run Watershed Capacity Improvements 1,725 4,140 4,860 5,340 1,635 - - - - - 17,700 Washington Boulevard Pond Retrofit - 155 795 - - - - - - - 950 Water Quality Project Feasibility & Concept Design 150 155 160 165 165 170 170 175 175 175 1,660 Williamsburg at North Underwood Capacity - 155 865 960 1,125 - - - - - 3,105 TRANSPORTATION 259,642 201,500 285,850 198,549 208,312 125,902 158,575 106,984 137,283 172,411 1,855,008 Arlington View Trail Connector 400 156 4,845 5,038 - - - - - - 10,439 Army Navy Drive Complete Street 7,100 2,000 - - - - - - - - 9,100 Army Navy Drive Transit Center 150 - - - 34 35 - - - - 219 ART Fare Collection System 244 802 - - - - - - - - 1,046 ART Fleet & Equipment Replacement 10,637 10,051 6,050 - 10,429 - 11,916 - - 18,601 67,684 ART Fleet Transition to ZEB 900 930 37,920 1,103 30,542 5,474 21,274 3,764 5,221 27,048 134,176 ART Operations and Maintenance Facility 27,404 - - - - - - - - - 27,404 Ballston-MU Metrorail Station West Entrance 950 14,282 69,667 54,913 37,201 - - - - - 177,013 BIKEArlington 1,307 1,344 4,776 4,432 4,749 4,520 4,177 4,592 8,920 8,582 47,399 Bridge Maintenance 1,040 986 1,026 1,068 1,101 1,134 1,167 1,205 1,238 1,276 11,241 Bridge Renovation / Replacement 5,371 12,018 5,330 440 1,020 2,914 3,063 - - - 30,156 Bus Bay Expansion-East Falls Church Metro Station 8,190 394 - - - - - - - - 8,584 Bus Stop Accessibility Improvements 926 883 921 954 985 1,020 1,056 1,099 1,133 1,182 10,159 Bus Stop and Shelter Program 627 645 556 522 538 560 603 645 664 687 6,047 Capital Bikeshare 1,395 1,211 1,683 1,639 1,650 1,917 2,348 2,172 2,175 2,381 18,571 Columbia Pike Streets 40,027 3,588 532 255 - - - - - - 44,402 Court House Metrorail Station New Elevators 206 64 3,730 2,933 12,265 24,425 13,848 - - - 57,471 Crystal City - Potomac Yard Transitway Upkeep 489 - - - - - - - - - 489 Crystal City Metro Station East Entrance 39,852 48,891 38,321 - - - - - - - 127,064 Crystal City, Pentagon City, Potomac Yard Street Improvements 11,128 12,230 18,846 21,423 26,086 2,685 4,118 8,932 21,137 22,975 149,560 Curb & Gutter Missing Links 129 130 135 140 145 150 155 160 165 170 1,479 East Falls Church Metro Station Second Entrance - - - - - - - - 400 400 800 Improvements Outside Major Corridors 15,349 16,069 17,787 16,748 5,974 8,682 8,754 7,494 17,637 10,474 124,968 Intelligent Transportation Systems 6,387 3,290 1,913 2,456 619 1,229 657 1,304 696 1,383 19,934 Langston Blvd Multimodal Improvements 400 200 800 2,250 2,000 4,800 12,940 15,100 9,700 3,500 51,690 Microtransit Implementation Plan 70 500 - - - - - - - - 570 Mobility Hub Pilot 565 - - - - - - - - - 565 Neighborhood Complete Streets 3,599 1,343 1,467 1,690 1,804 1,823 1,878 1,924 1,980 2,037 19,545 Parking Meters 206 419 298 581 328 601 1,535 1,040 152 146 5,306 Parking Technology 646 1,130 888 566 586 596 616 783 651 677 7,139 Paving 13,489 12,980 13,488 13,661 14,192 14,374 14,933 15,124 15,712 15,911 143,864 Pentagon City Metro Station Second Elevator 3,893 - - - - - - - - - 3,893 Premium Network Transit (PrTN): Columbia Pike Transit Stations 4,258 3,558 109 - - - - - - - 7,925 G - 3 Program Project FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 TOTAL Adopted CIP 10 Year Project Summary FY 2025 - FY 2034 PrTN: Transit ITS and Security Program 1,046 458 4 46 4 59 2 93 1 85 1 91 1 97 2 03 2 09 3 ,687 PrTN: Transitway Extension to Pentagon City 7,431 12,106 4 ,271 - - - - - - - 2 3,808 PrTN: ART Fleet Expansion 4,463 - - - 5 ,616 - 3 ,404 - - - 1 3,483 PrTN: Transitway Extension (Potomac Ave- Alexandria) 20 37 3,142 3,066 1,491 - - - - - 7,756 Rosslyn-Ballston Arterial Street Improvements 7,053 10,292 1 7,177 2 8,774 1 4,483 8 ,580 7 ,977 3 ,630 1 0,395 1 4,309 1 22,670 Shirlington Bus Station Expansion 310 - - - 6 00 5 ,850 5 ,150 - - - 1 1,910 Sidewalk, Curb, Gutter Proactive Zone Maintenance 1,029 1,071 1 ,106 1 ,141 1 ,171 1 ,207 1 ,243 1 ,284 1 ,320 1 ,357 1 1,929 Signals & ITS Maintenance 1,355 1,440 1 ,506 1 ,586 1 ,666 1 ,752 1 ,842 1 ,927 2 ,017 2 ,108 1 7,199 Strategic Network Analysis and Planning 498 593 6 10 6 28 6 47 6 67 6 87 7 07 7 29 7 50 6 ,516 Street Lighting 2,506 1,896 2 ,023 2 ,133 1 ,530 1 ,633 1 ,807 1 ,669 1 ,783 1 ,974 1 8,954 Street Safety Improvements (SSI) 2,502 2,283 2 ,348 2 ,418 2 ,492 2 ,569 2 ,644 2 ,724 2 ,808 2 ,892 2 5,680 Trail Light Maintenance Program 20 21 2 1 2 2 2 3 2 3 2 4 2 5 2 6 2 6 2 31 Transit Operating Costs & Program Administration 13,543 15,638 1 6,551 1 9,036 2 1,444 22,942 2 4,890 2 5,693 2 6,515 2 7,334 2 13,586 Transit Strategic Plan Updates - - - - 5 85 - - - - - 5 85 Transportation Asset Management 203 209 2 14 2 21 2 27 2 34 2 41 2 47 2 55 2 63 2 ,314 Transportation Systems & Traffic Signals 6,908 3,346 4 ,486 4 ,904 3 ,046 2 ,550 2 ,627 2 ,706 2 ,787 2 ,871 3 6,231 WALKArlington 3,421 2,016 8 61 1 ,349 7 50 7 71 8 10 8 37 8 64 8 88 1 2,567 WATER AND SEWER INFRASTRUCTURE 71,715 105,815 110,130 110,820 88,095 64,445 80,290 105,035 41,810 101,730 879,885 Activated Sludge Effluent Pump Station 1 (ASE1) 800 1,550 2 ,675 4 ,970 1 ,655 - - - - - 1 1,650 Asset Management System Replacement 1,000 1,035 2 65 - - - - - - - 2 ,300 Blue Plains Capital Improvements 1,210 1,705 1 ,825 2 ,775 3 ,010 2 ,605 2 ,130 1 ,455 8 85 1 ,555 1 9,155 Finished Water Reliability & Interconnections 500 2,070 2 ,140 1 1,050 2 2,100 2 2,800 3 4,200 - - - 9 4,860 Grit System Upgrades 300 595 1 ,175 6 35 - - - - - - 2 ,705 Improvements to Eads St Property - 10 - 1 0 - 1 0 - 1 0 - 1 0 5 0 Manhole Rehabilitation 1,000 1,035 1 ,070 1 ,105 1 ,105 1 ,140 1 ,140 1 ,175 1 ,175 1 ,210 1 1,155 Odor Control - - - 5 50 5 50 - - - - - 1 ,100 Re-Gen Phase II 10,600 4,865 - - - - - - - - 1 5,465 Re-Gen Phase III 17,200 58,030 6 2,925 5 0,575 2 1,755 - - - - - 2 10,485 Regional Source Water Resiliency - - - - - - - - - 6 0,500 6 0,500 Secondary Clarifiers - - - - - - 1 ,140 5 ,170 7 ,755 4 ,145 1 8,210 Sewer-Force Mains 2,100 155 1 60 1 65 1 65 1 70 1 70 1 75 1 75 1 80 3 ,615 Sewer-Improvements for Development 900 260 2 65 2 75 2 75 2 85 2 85 2 95 2 95 3 00 3 ,435 Sewer-Infiltration and Inflow 3,000 3,105 3 ,210 3 ,315 3 ,315 3 ,420 3 ,420 3 ,525 5 85 6 05 2 7,500 Sewer-Large Diameter Main Rehabilitation 2,780 2,185 4 ,140 2 ,550 3 ,090 2 ,340 1 00 4 ,220 1 ,040 2 ,050 2 4,495 Sewer-Main Replacement Program 2,000 2,590 3 ,210 3 ,315 3 ,315 3 ,420 3 ,420 3 ,525 3 ,525 3 ,630 3 1,950 Technology Enhancements 725 1,365 6 0 2 ,630 2 ,735 2 ,935 3 ,050 6 5 6 5 6 5 1 3,695 Trades Center Equipment & Improvements - 1,035 - - - - - - - - 1 ,035 Transmission Mains Resiliency 150 310 3 ,745 - - - - - - - 4 ,205 USACE Coastal Storm Resiliency 200 - - - - - 5 ,700 - - - 5 ,900 Washington Aqueduct Capital 7,800 8,075 8 ,345 8 ,620 8 ,620 8 ,890 8 ,890 6 7,915 9 ,165 9 ,440 1 45,760 Water/Sewer Frames/Covers 1,000 1,035 1 ,070 1 ,105 1 ,105 1 ,140 1,140 1 ,175 1 ,175 1 ,210 1 1,155 Water-Improvements for Development 500 520 5 35 5 50 5 50 5 70 5 70 5 85 5 85 6 05 5 ,570 Water-Large Diameter Main & Valve Rehabilitation 1,000 1,035 1 ,070 1 ,105 1 ,105 1 ,140 1 ,140 1 ,175 1 ,175 1 ,210 1 1,155 Water-Large Meter Vault Rehabilitation & Replacement 200 205 215 220 220 230 230 235 235 240 2,230 Water-Main Cleaning and Lining Program 1,600 1,655 1 ,710 1 ,770 1 ,770 1 ,825 1 ,825 1 ,880 1 ,880 1 ,935 1 7,850 Water-Main Replacement Program 7,000 6,725 6 ,955 7 ,180 7 ,735 7 ,980 8 ,550 8 ,810 8 ,810 9 ,075 7 8,820 Water-Pump Station Improvements 2,250 110 2 65 8 30 - 1 25 - 1 30 - 1 35 3 ,845 Water-Pump Station Rehabilitation - 105 - 1 10 - 1 15 - 1 15 - 1 20 5 65 Water-Small Diameter Valve Rehabilitation & Replacement 300 310 320 330 330 340 340 350 350 365 3,335 Water-Tank Rehabilitation 100 - 1 05 2 ,320 8 30 1 15 - 1 15 - 1 20 3 ,705 WPCP Maintenance Capital 2,000 2,070 2 ,140 2 ,210 2 ,210 2 ,280 2 ,280 2 ,350 2 ,350 2 ,420 2 2,310 WPCP Technology Enhancements 3,500 2,070 5 35 5 50 5 50 5 70 5 70 5 85 585 6 05 1 0,120 GRAND TOTAL 510,589 484,197 5 96,232 4 77,482 4 70,418 3 52,596 4 23,374 3 76,571 3 38,136 4 70,414 4 ,500,009 G - 4

Source: Arlington County website. First collected Oct 18, 2026.