RecordWell Data

CIP Projects by Master Plan(PDF, 670KB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Associated Master Plan Project Name Arlington County Emergency Operations plan Call Premise Equipment (CPE) Police & Sheriff Public Safety Radios Public Safety Radio System Upgrades Ballston Sector Plan Ballston Public Parking Garage Floors 1 - 7 Quincy Park Rosslyn-Ballston Arterial Street Improvements Clarendon Sector Plan Fairfax Drive Public Spaces Rosslyn-Ballston Arterial Street Improvements Columbia Pike Neighborhoods Area Plan Fire Station Replacements & Additions Columbia Pike Revitalization Plan Fire Station Replacements & Additions Commercial Centers Form Based Code Columbia Pike Library Fire Station Replacements & Additions Community Energy Plan ART Fleet & Equipment Replacement ART Fleet Transition to ZEB ART Operations and Maintenance Facility Electric Vehicle Chargers-Public Accessibility Energy Performance Upgrades -County Buildings Energy Resilience Planning & Development Grit System Upgrades Premium Transit Network (PrTN): ART Fleet Expansion Public Facilities Maintenance Program Re-Gen Phase II Re-Gen Phase III Street Lighting Technology Enhancements Trades Center Equipment & Improvements WPCP Maintenance Capital County Facility Renewable Energy Assessment Electric Vehicle Chargers-Internal Accessibility Master Transportation Plan Arlington View Trail Connector Army Navy Drive Complete Street ART Fleet & Equipment Replacement ART Fleet Transition to ZEB Ballston-MU Metrorail Station West Entrance BIKEArlington Bridge Maintenance Bridge Renovation / Replacement Capital Bikeshare Columbia Pike Streets Crystal City Metro Station East Entrance Crystal City, Pentagon City, Potomac Yard Street Curb & Gutter Missing Links Electric Vehicle Chargers-Public Accessibility Improvements Outside Major Corridors Intelligent Transportation Systems Langston Blvd Multimodal Improvements Neighborhood Complete Streets Parking Meters Parking Technology Paving Pentagon City Metro Station Second Elevator PrTN: Columbia Pike Transit Stations ADOPTED PROJECTS BY ASSOCIATED MASTER PLAN G - 5 Associated Master Plan Project Name ADOPTED PROJECTS BY ASSOCIATED MASTER PLAN PrTN: Transit ITS and Security Program PrTN: Transitway Extension to Pentagon City PrTN: Transitway Extension (Potomac Ave- Alexandria) Rosslyn-Ballston Arterial Street Improvements Sidewalk, Curb, Gutter Proactive Zone Maintenance Signals & ITS Maintenance Strategic Network Analysis and Planning Street Lighting Street Safety Improvements (SSI) Trail Light Maintenance Program Transit Strategic Plan Updates Transportation Asset Management Transportation Systems & Traffic Signals WALKArlington Metro Funding Court House Sector Plan Court House Metrorail Station New Elevators Courthouse Complex Renovations & Infrastructure Courts/Police Building Improvements Rosslyn-Ballston Arterial Street Improvements Crystal City Sector Plan Crystal City Metro Station East Entrance Crystal City Parks and Public Space Crystal City, Pentagon City, Potomac Yard Street PrTN: Transitway Extension to Pentagon City PrTN: Transitway Extension (Potomac Ave- Alexandria) East Falls Church Area Plan Bus Bay Expansion-East Falls Church Metro Station East Falls Church Metro Station Second Entrance Langston Blvd Multimodal Improvements Forestry and Natural Resources Plan Arlington Boathouse Drew Park Fairfax Drive Public Spaces Feasibility Studies and Implementation Gateway Park (Rosslyn) Natural Resiliency Program New Park at 26th Street N and Old Dominion Dr Parks Maintenance Capital Program Quincy Park Virginia Highlands Park/Nearby Public Space Four Mile Run Design Guidelines Short Bridge Park Four Mile Run Policy Framework Plan (2018) Shirlington Park Four Mile Run Restoration Master Plan (2006) Short Bridge Park Lee Highway Cherrydale Revitalization Plan Langston Blvd Multimodal Improvements Long Bridge Park Master Plan (2013) Synthetic Turf Program Metropolitan Park Design Guidelines PrTN: Transitway Extension to Pentagon City Neighborhoods Form Based Code Fire Station Replacements & Additions Penrose Square Park Master Plan (2008) Penrose Square, Phase 2 Pentagon Centre Site Guiding Principles PrTN: Transitway Extension to Pentagon City Pentagon City Sector Plan Army Navy Drive Transit Center G - 6 Associated Master Plan Project Name ADOPTED PROJECTS BY ASSOCIATED MASTER PLAN Crystal City, Pentagon City, Potomac Yard Street Pentagon City Metro Station Second Elevator PrTN: Transitway Extension to Pentagon City Pentagon City Planning Task Force Report PrTN: Transitway Extension to Pentagon City Plan Langston Boulevard Langston Blvd Multimodal Improvements Lee Community Center Potomac Yards Design Guidelines PrTN: Transitway Extension (Potomac Ave- Alexandria) Public Art Master Plan (PAMP) Arlington Boathouse Gateway Park (Rosslyn) Penrose Square, Phase 2 Quincy Park Public Art - Civic Facilities (Artworks) Public Spaces Master Plan (PSMP) Arlington Boathouse Crystal City Parks and Public Space Drew Park Emerging Uses Program Fairfax Drive Public Spaces Feasibility Studies and Implementation Gateway Park (Rosslyn) Greenbrier Park/Yorktown High Stadium Field Kenmore Middle School Athletic Field Conversion Langston Boulevard Public Space Improvements Long Bridge Park Synthetic Field #3 Natural Resiliency Program New Park at 26th Street N and Old Dominion Dr Parks Athletic Courts Program Parks Land Acquisition and Public Space Program Parks Maintenance Capital Program Penrose Square, Phase 2 Quincy Park Shirlington Park Short Bridge Park Synthetic Turf Program Thomas Jefferson Middle School Lower Field Three Urban Parks Trail and Bridge Modernization Program Virginia Highlands Park/Nearby Public Space Sanitary Sewer Collection System Plan Manhole Rehabilitation Sewer-Force Mains Sewer-Improvements for Development Sewer-Infiltration and Inflow Sewer-Large Diameter Main Rehabilitation Sewer-Main Replacement Program Shirlington Design Book Trade Center Optimization Plan Short Bridge Park Master Plan (January 2018) Short Bridge Park Storm Water Master Plan Detention Vaults & Overland Relief Maintenance 33rd Street North to Williamsburg Capacity Capacity Project Feasibility Studies G - 7 Associated Master Plan Project Name ADOPTED PROJECTS BY ASSOCIATED MASTER PLAN Columbia Pike at South Greenbrier Street Concord Mews Pond Retrofit Crossman Run Watershed Capacity Improvements Curb & Gutter Missing Links Dumbarton Street Culvert-Downstream Dumbarton Street Culvert-Upstream Flood Resiliency Design & Construction Guideline Flood Risk Reduction Program Floodplain Channel & Split Stream Maintenance Four Mile Run Flood Control Project Maintenance Green Streets & Infrastructure Program Gulf Branch and South Walter Reed Green Streets Langston Boulevard Culvert at North Sycamore Lower Long Branch Flood Risk Reduction Project Lubber Run Watershed Capacity Improvements Manhole & Catch Basin Rehabilitation Military Road Culvert at Gulf Branch Miscellaneous Expansion/ Capacity Projects Natural Resiliency Program North Thomas Street Outfall Rehabilitation Program Quebec Street Outfall Rehabilitation Sidewalk Underdrains Sparrow Pond Watershed Retrofit Spout Run Watershed Capacity Improvements Stohman's Run Watershed Capacity Improvements Stormwater Frames and Covers Stormwater Mains Rehabilitation & Replacement Stream Resiliency Program Terra Cotta/ Corrugated Metal Pipe Upgrades Torreyson Run Watershed Capacity Improvements Washington Boulevard Pond Retrofit Water Quality Project Feasibility & Concept Design Williamsburg at North Underwood Capacity Gulf Branch Stream Resiliency Transit Strategic Plan Army Navy Drive Transit Center ART Fare Collection System ART Fleet & Equipment Replacement ART Fleet Transition to ZEB ART Operations and Maintenance Facility Ballston-MU Metrorail Station West Entrance Bus Bay Expansion-East Falls Church Metro Station Bus Stop Accessibility Improvements Bus Stop and Shelter Program Court House Metrorail Station New Elevators G - 8 Associated Master Plan Project Name ADOPTED PROJECTS BY ASSOCIATED MASTER PLAN Crystal City - Potomac Yard Transitway Upkeep Crystal City Metro Station East Entrance East Falls Church Metro Station Second Entrance Microtransit Implementation Plan Mobility Hub Pilot Pentagon City Metro Station Second Elevator PrTN: Columbia Pike Transit Stations PrTN: Transit ITS and Security Program PrTN: Transitway Extension to Pentagon City PrTN: ART Fleet Expansion PrTN: Transitway Extension (Potomac Ave- Alexandria) Shirlington Bus Station Expansion Transit Strategic Plan Updates Virginia Square Sector Plan Three Urban Parks Vision Zero Action Plan Army Navy Drive Complete Street BIKEArlington Columbia Pike Streets Crystal City, Pentagon City, Potomac Yard Street Improvements Outside Major Corridors Intelligent Transportation Systems Neighborhood Complete Streets Rosslyn-Ballston Arterial Street Improvements Sidewalk, Curb, Gutter Proactive Zone Maintenance Signals & ITS Maintenance Strategic Network Analysis and Planning Street Lighting Street Safety Improvements (SSI) Transportation Systems & Traffic Signals WALKArlington Water System Master Plan Finished Water Reliability & Interconnections Regional Source Water Resiliency Technology Enhancements Trades Center Equipment & Improvements Transmission Mains Resiliency Washington Aqueduct Capital Water/Sewer Frames/Covers Water-Improvements for Development Water-Large Diameter Main & Valve Rehabilitation Water-Large Meter Vault Rehabilitation & Replacement Water-Main Cleaning and Lining Program Water-Main Replacement Program Water-Pump Station Improvements Water-Pump Station Rehabilitation Water-Small Diameter Valve Rehabilitation & Replacement Water-Tank Rehabilitation Watershed Management Plan Lower Long Branch Flood Risk Reduction Project G - 9 Associated Master Plan Project Name ADOPTED PROJECTS BY ASSOCIATED MASTER PLAN WPCP Master Plan Activated Sludge Effluent Pump Station 1 Improvements to Eads St Property Odor Control Re-Gen Phase II Re-Gen Phase III Secondary Clarifiers ART Zero-Emissions Bus Study ART Fleet & Equipment Replacement ART Fleet Transition to ZEB ART Operations and Maintenance Facility PrTN: ART Fleet Expansion G - 10

Source: Arlington County website. First collected Oct 18, 2026.