Arlington County, Virginia CIP
2025 − 2034
INFORMATION TECHNOLOGY/EQUIPMENT: PUBLIC SAFETY
COMMUNICATIONS PROGRAM
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
1. Call Premise Equipment
(CPE)
0 2,020 2,020 0 0 0 0 0 0 2,525 6,565
2. Fire Portable Radios 0 0 0 0 0 2,121 2,121 0 0 0 4,242
3. Police & Sheriff Public Safety
Radios
2,850 2,879 0 0 0 0 0 0 2,879 2,879 11,487
4. Public Safety Radio System
Upgrades
0 0 0 0 0 0 0 0 1,949 0 1,949
Total Recommendation 2,850 4,899 2,020 0 0 2,121 2,121 0 4,828 5,404 24,243
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 0 0 0 0 0 0 0 0 0 0
PAYG 0 0 0 0 0 0 0 0 0 0 0
Short Term Finance 2,850 4,899 2,020 0 0 2,121 2,121 0 4,828 5,404 24,243
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 2,850 4,899 2,020 0 0 2,121 2,121 0 4,828 5,404 24,243
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 0 0 0 0 0 0 0 0 0 0 0
Total Funding Sources 2,850 4,899 2,020 0 0 2,121 2,121 0 4,828 5,404 24,243
D - 27
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Public Safety Communications FY 2025-2034
1. CALL PREMISE EQUIPMENT (CPE)
Project Highlights:
• Critical hardware and software used to power the 9-1-1 call
taking environment.
• System is a Next Generation 9 -1-1 Call Processing System
that provides National Capital Region (NCR)
interoperability.
• Joint system with the City of Alexandria.
Associated Plan(s):
Arlington County Emergency Operations plan
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 2,020 2,020 2,525 6,565
Previous Funding
Total Funding 0 2,020 2,020 0 0 0 0 0 0 2,525 6,565
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Planning and Assessment of System 3-6 Months
• Review Procurement Options and Choose
Contract Vehicle (will begin in FY25)
6-9 months
• System, Order, Delivery, and
Implementation
12-18 months
• Equipment Testing 3 months
Changes from Prior CIP:
The timeline for this project has moved from FY 2028 to FY 2026
due to the project being a joint solution between City of
Alexandria and Arlington County. There is the potential that some
State funds may become available in FY 2026 or FY 2027,
however these monies are not assumed for the project at this time.
D - 28
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Public Safety Communications FY 2025-2034
2. FIRE PORTABLE RADIOS
Project Highlights:
• Fire portable radios are hand -held radios that allow for two -
way communication with the Emergency Communications
Center and all public safety agencies throughout the National
Capital Region.
• Radios are replaced as they near end of life as equipment
failure could result in communication delays that increase
response time to critical events.
• The useful life of the equipment is seven years.
Funding Notes: The Fire radio implementation will be funded and implemented over a two-year cycle (FY 2030 and FY 2031) to
better evaluate and update radios and not disrupt operations.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 2,121 2,121 4,242
Previous Funding
Total Funding 0 0 0 0 0 2,121 2,121 0 0 0 4,242
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Survey existing needs of radios and market
trends
3 months
• Review and confirm procurement options 3-6 months
• Phase I Replacement of Radio Assets 9-12 months
• Phase II Replacement of Radio Assets 9-12 months
Changes from Prior CIP:
Funding has been adjusted for inflation and the cost has been split
across FY 2030 and FY 2031 to facilitate project implementation
and avoid disruptions to operations.
D - 29
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Public Safety Communications FY 2025-2034
3. POLICE & SHERIFF PUBLIC SAFETY RADIOS
Project Highlights:
• Police and Sheriff mobile radios are installed in County
vehicles and provide two- way communication between the
Emergency Communication Center and public safety
vehicles.
• Police and Sheriff portable radios are hand -held radios that
allow for two -way communication with the Emergency
Communications Center and all public safety agencies
throughout the National Capital Region.
• Project covers replacement of 1,415 portable and mobile
radios over a three-year period.
• The equipment useful life is seven to 10 years.
Associated Plan(s):
Arlington County Emergency Operations plan
Funding Notes: The total cost of replacement of radios in a cycle is around $8.5M and is funded over a 3-year period. This schedule
is to best serve the public safety agencies and not disrupt operations. FY 2024 was the first year of the replacement, FY 202 5 is the
second year and FY 2026 is the third and final year of the current replacement cycle. The cycle will resume in FY 2033 - FY 2035
according to the equipment’s 10-year useful life.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 2,850 2,879 2,879 2,879 11,487
Previous Funding
Total Funding 2,850 2,879 0 0 0 0 0 0 2,879 2,879 11,487
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Phase 2 Replacement of Radio Assets Summer/Fall 2025
5• Phase 3 Replacement of Radio Assets Summer/Fall 2026
Changes from Prior CIP:
No significant changes from the previous CIP.
D - 30
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Public Safety Communications FY 2025-2034
4. PUBLIC SAFETY RADIO SYSTEM UPGRADES
Project Highlights:
• Covers all the critical hardware and software to enable radio
system communication.
• The County operates six radio station sites each with critical
communication components.
• Project also covers communication solutions in hard-to-reach
corridors to ensure interoperable communications.
Associated Plan(s):
Arlington County Emergency Operations plan
Funding Notes: The Radio System went through many system upgrades in FY 2024 to improve security and redundancy. The
scheduled refresh is in FY 2033, which falls in the 7 -10 year replacement cycle for equipment, however changes will be evaluated
based on demands on the system due to new construction, changes in building location, or other infrastructure changes.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 1,949 1,949
Previous Funding
Total Funding 0 0 0 0 0 0 0 0 1,949 0 1,949
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Survey Existing Radio System Needs prior
to program funding
3-6 months
• Make recommendations for replacement and
prioritize implementation
3-6 months
• Procurement 9-12 months
• Test system and solutions and ensure
redundancy and interoperability
3 months
Ch
anges from Prior CIP:
In the previous CIP, $1.93M was included for system replacement
in FY 2023. Funding has been added to this CIP in FY 2033 in
accordance with the equipment's useful life of ten years and
adjusted for inflation.