Vehicles and Vehicle Technology Program(PDF, 870KB)
Arlington County · Arlington County · Budget documents
Open the original document More from Arlington County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Arlington County, Virginia CIP
2025 − 2034
INFORMATION TECHNOLOGY/EQUIPMENT: VEHICLES AND
VEHICLE TECHNOLOGY PROGRAM
10 YEAR CATEGORY SUMMARY (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
1. Fire Command Vehicle 0 0 0 0 0 2,020 0 0 0 0 2,020
2. Firefighter Rehab Unit 0 909 0 0 0 0 0 0 0 0 909
3. Fire Utility Task Vehicles
(UTV)
0 121 121 61 0 0 0 0 0 0 303
4. Fire Vehicle Apparatus 0 0 6,864 0 9,594 2,525 8,476 5,726 0 0 33,185
5. Police Traffic Equipment
Vehicle
0 96 0 0 0 0 0 0 0 0 96
Total Recommendation 0 1,126 6,985 61 9,594 4,545 8,476 5,726 0 0 36,513
CATEGORY FUNDING SOURCES (in $1,000s)
FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year
Total
New Funding
Federal Funding 0 0 0 0 0 0 0 0 0 0 0
State Funding 0 0 0 0 0 0 0 0 0 0 0
Developer Contributions 0 0 0 0 0 0 0 0 0 0 0
New Bond Issue 0 0 0 0 0 0 0 0 0 0 0
PAYG 0 0 0 0 0 0 0 0 0 0 0
Short Term Finance 0 1,126 6,985 61 9,594 4,545 8,476 5,726 0 0 36,513
Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0
Other Funding 0 0 0 0 0 0 0 0 0 0 0
Subtotal New Funding 0 1,126 6,985 61 9,594 4,545 8,476 5,726 0 0 36,513
Previously Approved Funding
Authorized but Unissued
Bonds 0 0 0 0 0 0 0 0 0 0 0
Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0
Other Previously Approved
Funds 0 0 0 0 0 0 0 0 0 0 0
Subtotal Previously Approved
Funding 0 0 0 0 0 0 0 0 0 0 0
Total Funding Sources 0 1,126 6,985 61 9,594 4,545 8,476 5,726 0 0 36,513
D - 48
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Vehicles and Vehicle Technology FY 2025-2034
1. FIRE COMMAND VEHICLE
Project Highlights:
• Project covers vehicle and technology upgrades needed for
the Fire Command Vehicle.
• Project covers coach repairs, including: awnings, doors,
damaged flooring, slide outs. Project also covers technology
upgrades, including: networking, satellite systems, cellular
systems, cameras, computers, etc.
• Refresh cycle is every five years for technology and 15 years
for the vehicle.
Funding Notes: A full replacement is scheduled in FY 2030. Technology will be replaced every five years, beginning in FY 2035.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 2,020 2,020
Previous Funding
Total Funding 0 0 0 0 0 2,020 0 0 0 0 2,020
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Planning and Procurement 3-6 months
• Equipment Order, Delivery, and Testing 24 months
Changes from Prior CIP:
The project is new to the FY 2025 – FY 2034 CIP.
D - 49
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Vehicles and Vehicle Technology FY 2025-2034
2. FIREFIGHTER REHAB UNIT
Project Highlights:
• A vehicle that responds to major emergencies and activities
where firefighter health and safety is jeopardized.
• The purpose of the vehicle is to get firefighters either back
into the action or back to the station in a safe and healthy
condition.
• The unit provides shelter, medical care, food, and hydration
to emergency personnel on the scene.
• The useful life for the vehicle is 15 years.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 909 909
Previous Funding
Total Funding 0 909 0 0 0 0 0 0 0 0 909
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Planning and Specification Review 2 months
• Review Procurement Options and Order
Equipment
3 months
• Equipment Delivery and Testing 24 months
Changes from Prior CIP:
This project is new to the FY 2025 - FY 2034 CIP.
D - 50
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Vehicles and Vehicle Technology FY 2025-2034
3. FIRE UTILITY TASK VEHICLES (UTV)
Project Highlights:
• Utility Terrain Vehicles are used to support special events
and emergency situations for the Fire Department.
• The Fire Department currently has five vehicles.
• The vehicles are being replaced over a three-year period.
Funding Notes: Two vehicles are scheduled for replacement in FY 2026, another two in FY 2027, and one in FY 2028.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 121 121 61 303
Previous Funding
Total Funding 0 121 121 61 0 0 0 0 0 0 303
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Develop Specifications 3 months
• Place Vehicle Order 6-9 months
• Equipment Delivery and Testing 6 months
• Project Close Out 1 month
Changes from Prior CIP:
The project is new to the FY 2025 - FY 2034 CIP.
D - 51
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Vehicles and Vehicle Technology FY 2025-2034
4. FIRE VEHICLE APPARATUS
Project Highlights:
• Refresh cycle is every eight years per vehicle on a
rolling/rotating basis.
• Project covers replacement of large emergency vehicles in
the Fire Department.
• The inventory of vehicles includes but is not limited to fire
pumpers, rescue vehicles, truck lifts and ladder trucks that are
used by Fire personnel to response to various emergency
situations.
Funding Notes: The overall replacement cost is partially offset by buy-back funds which are funds received when the Fire Department
sells vehicles that are older than eight years.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 6,864 9,594 2,525 8,476 5,726 33,185
Previous Funding
Total Funding 0 0 6,864 0 9,594 2,525 8,476 5,726 0 0 33,185
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Total Impact 0 0 0 0 0 0 0 0 0 0 0
Critical Milestones:
• Review Needs and Specifications 2 months
• Review Procurement Options and Order
Equipment
3 months
• Equipment Delivery and Testing 52 months
• Project Close Out 2 months
Changes from Prior CIP:
Costs are updated from the pr evious CIP based on estimates for
vehicles from the Equipment Bureau. These include the addition
of funds in FY 2030 for the planned new fire station on Columbia
Pike with two vehicles.
D - 52
INFORMATION TECHNOLOGY/EQUIPMENT Capital Improvement Plan
Vehicles and Vehicle Technology FY 2025-2034
5. POLICE TRAFFIC EQUIPMENT VEHICLE
Project Highlights:
• Vehicle used to transport traffic equipment to support public
safety at emergency and special events.
• Police does not currently have a vehicle appropriate to house
and deploy equipment required for various public safety
events.
• The useful life of the vehicle is ten years.
Funding Notes: The initial vehicle purchase is financed from capital funds. Subsequent repair and replacement will be included in
the Auto Equipment Fund budget.
New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Short Term Finance 96 96
Previous Funding
Total Funding 0 96 0 0 0 0 0 0 0 0 96
Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total
Non-Personnel ($) 10 10 11 11 12 12 13 13 92
Total Impact 0 0 10 10 11 11 12 12 13 13 92
Critical Milestones:
• Planning and Evaluation of Needs with
Equipment Bureau
1-3 months
• Review Procurement Options and Order
Equipment
3-6 months
• Vehicle Order and Testing of vehicle 12-18 months
• Project Closeout 1 month
Ch
anges from Prior CIP:
The project is new to the FY 2025 – FY 2034 CIP.