RecordWell Data

Maintenance Capital Program(PDF, 831KB)

Arlington County · Arlington County · Budget documents

Open the original document More from Arlington County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Arlington County, Virginia CIP 2025 − 2034 LOCAL PARKS AND RECREATION PROGRAMS: MAINTENANCE CAPITAL PROGRAM 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total 1. Parks Maintenance Capital Program 4,250 5,710 5,924 5,623 5,742 5,866 5,885 6,005 6,024 6,144 57,173 2. Feasibility Studies and Implementation 0 202 204 206 208 210 212 214 217 219 1,892 Total Recommendation 4,250 5,912 6,128 5,829 5,950 6,076 6,097 6,219 6,241 6,363 59,065 CATEGORY FUNDING SOURCES (in $1,000s) FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 10 Year Total New Funding Federal Funding 0 0 0 0 0 0 0 0 0 0 0 State Funding 0 0 0 0 0 0 0 0 0 0 0 Developer Contributions 0 0 0 0 0 0 0 0 0 0 0 New Bond Issue 2,080 3,745 5,360 4,040 4,140 4,245 4,245 4,345 4,345 4,445 40,990 PAYG 1,565 2,167 768 1,789 1,810 1,831 1,852 1,874 1,896 1,918 17,470 Short Term Finance 0 0 0 0 0 0 0 0 0 0 0 Stormwater Utility Fee Revenue 0 0 0 0 0 0 0 0 0 0 0 Other Funding 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Subtotal New Funding 3,645 5,912 6,128 5,829 5,950 6,076 6,097 6,219 6,241 6,363 58,460 Previously Approved Funding Authorized but Unissued Bonds 605 0 0 0 0 0 0 0 0 0 605 Issued but Unspent Bonds 0 0 0 0 0 0 0 0 0 0 0 Tax Increment Financing (TIF) 0 0 0 0 0 0 0 0 0 0 0 Other Previously Approved Funds 0 0 0 0 0 0 0 0 0 0 0 Subtotal Previously Approved Funding 605 0 0 0 0 0 0 0 0 0 605 Total Funding Sources 4,250 5,912 6,128 5,829 5,950 6,076 6,097 6,219 6,241 6,363 59,065 C - 10 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Maintenance Capital FY 2025-2034 1. PARKS MAINTENANCE CAPITAL PROGRAM Project Highlights: • The Parks Maintenance Capital Program provides for recurring, systematic reinvestment in existing outdoor facilities to ensure efficient, safe, high -quality park and recreation facilities. • The program provides for replacement of existing facilities that are at or near the end of their useful life. • Project replacements and upgrades are prioritized based on fostering equity, as determined through an analysis of census data, combined with park condition assessments. Additionally, real- time staff assessment of existing equipment is considered for variation in use patterns and life and safety issues associated with existing equipment. • For this CIP, various playgrounds are being replaced including Arlington Hall West Park, Doctor’s Run Park, Cherrydale Park, and Bon Air Park Picnic Shelter and Playground. • Other park renovations are scheduled for Douglas Park Phase 2 and strategic replacements of individual park components at a number of parks across the County. • The CIP also includes refreshment of the Public Spaces Master Plan which guides identification and formulation of Master Plan, trail, field, and other parks projects. • The program funds various activities that support parks programs including Capital Asset Management, Equipment at DPR facilities, and Field Funds. Associated Plan(s): Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) Neighborhood(s): VARIOUS Critical Milestones: • Critical Milestones will be developed independently for each project. To Be Determined • Begin PSMP Study and Analysis Fall 2024 • Recommend PSMP Updates Spring 2025 • Finalize PSMP Refresh Fall 2025 Changes from Prior CIP: Funding has been adjusted based on anticipated projects and inflation. A list of upcoming maintenance capital projects is provided on the following page. Funding Notes: Grass turf fields are funded through PAYG. Other program elements including playgrounds, athletic courts, lighting, picnic shelters, restrooms, and parking lots may be funded through either PAYG or Bond referenda. Trails, bridges a nd synthetic turf fields are funded through separate programs. New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total New Bond Issue 2,080 3,745 5,360 4,040 4,140 4,245 4,245 4,345 4,345 4,445 40,990 PAYG 1,565 1,965 564 1,583 1,602 1,621 1,640 1,660 1,679 1,699 15,578 Previous Funding Authorized but Unissued Bonds 605 605 Total Funding 4,250 5,710 5,924 5,623 5,742 5,866 5,885 6,005 6,024 6,144 57,173 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 C - 11 LOCAL PARKS AND RECREATION PROGRAMS Capital Improvement Plan Maintenance Capital FY 2025-2034 2. FEASIBILITY STUDIES AND IMPLEMENTATION Project Highlights: • Master planning funds provide the ability to conduct timely and relevant analyses and studies for new planning initiatives and implementation of these plans and studies that are outside current CIP projects. Associated Plan(s): Forestry and Natural Resources Plan Public Spaces Master Plan (PSMP) N eighborhood(s): VARIOUS New Funding FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total PAYG 202 204 206 208 210 212 214 217 219 1,892 Previous Funding Total Funding 0 202 204 206 208 210 212 214 217 219 1,892 Operating Impact FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 Total Total Impact 0 0 0 0 0 0 0 0 0 0 0 Critical Milestones: • Milestones are developed for each study. C hanges from Prior CIP: There is no funding request for FY 2025 to allow DPR to catch up on existing projects. The outyear funding amount is reduced from $300K to $200K (prior to escalation) to better align with staffing capacity. C - 12

Source: Arlington County website. First collected Oct 18, 2026.