RecordWell Data

October 26, 2026 - Common Council Agenda & Packet

City of Verona · Dane County · meeting of Oct 26, 2026 · Agenda packets

Open the original document More from City of Verona

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

111 Lincoln Street Verona, WI 53593 (608) 845-6495 veronawi.gov CITY OF VERONA COMMON COUNCIL AGENDA DATE: Monday, October 26, 2026 TIME: 7:00 PM LOCATION: COUNCIL CHAMBERS 111 LINCOLN ST. VERONA, WI 53593 1. Call to Order 2. Pledge of Allegiance 3. Roll Call 4. Public Comment 5. Approval of the minutes of October 12, 2026 Common Council Meeting 6. Mayor’s Business A. Update on Fitch-Rona EMS - Chief Patrick Anderson 7. Announcements 8. Administrator’s Report 9. Engineer’s Report 10. Committee Reports A. Finance Committee 1. Discussion and Possible Action Re: Payment of the bills 2. Discussion and Possible Action Re: Resolution No. 26-040 Approving the 2027 Fitch-Rona EMS Operating and Capital Budgets 3. Discussion and Possible Action Re: Resolution No. 26-041Approving Exceeding the Levey Limit for Joint EMS Districts B. Personnel Committee 1. Discussion and Possible Action Re: Administrative Policy No. 70 - Generative Artificial Intelligence Policy C. Public Works, Sewer & Water Committee 1. Discussion and Possible Action Re: Request to reconsider April 27, 2026 Council Action Related to South Main Street 1 2. Discussion and Possible Action Re: Ordinance No. 26-1126 Amending Title 8, Chapters 3 and 4, Recycling and Refuse Disposal and Collection 11. New Business A. Discussion and Possible Action Re: Updated Application for a Short-Term Rental License from Michelle Turner for a property located at 136 Paoli St. B. Discussion and Possible Action Re: Ordinance No. 26-1127 - Amending Title 7, Chapter 7 (Special Event Permits) C. Discussion and Possible Action Re: Ordinance No. 26-1128 Amending Title 1, Chapter 2 of the Code of Ordinances, City of Verona Relating to the Submission of False Information to the City D. Discussion and Possible Action Re: Ordinance No. 26-1129, Amending Title 2, Chapter 3, Municipal Officers and Employees (Development Review Agreement Reimbursements) E. Discussion and Possible Action Re: Outstanding Matters Related to the Whispering Coves Development 12. Adjournment Luke Diaz, Mayor POSTED: October 23, 2026 Verona City Hall Verona Public Library Miller’s Market All agendas are posted on the City’s website at: www.veronwi.gov Watch live on the City’s YouTube Channel: https://www.youtube.com/user/VeronaWIMeetings The online meeting agenda and all support materials can be found at www.veronawi.gov. Anyone with questions prior to the meeting may contact the City at (608) 848-9942 or jaulik@veronawi.gov. PUBLIC COMMENT SPEAKING INSTRUCTIONS PUBLIC COMMENT INFOMATION: As permitted by the Wisconsin open meetings law, the Common Council has chosen to list a public comment period on Council meeting agendas to offer an opportunity for valued public comments. The Common Council may not engage in back-and-forth discussion or take formal action during this period. If the item is not currently on the agenda, the Council may consider deferring the subject to a later meeting when specific notice can be given. VIRTUAL PUBLIC COMMENTS: Members of the public can participate in Public Comment by using Zoom via a computer, tablet, or smartphone, or by calling into the meeting using phones, as described immediately below. You will not be able to view the meeting from Zoom. This is only for participating in Public Comment. 2 Virtual public comments can be given by anyone who is a resident or owns or leases property in the City of Verona. This does not include property that is to be annexed into the City of Verona. The speaker shall turn on their video camera, if they have one, and speak into their electronic device for attendees to see and hear. The speaker shall verify that members can see and hear them. The speaker can show information on their virtual screen for all to see but must inform the City Staff ahead of the meeting if this will occur when signing up to speak virtually. Join the virtual meeting via computer, tablet, or smart phone: Join from PC, Mac, iPad, or Android: https://us06web.zoom.us/j/81973745173?pwd=a8xZddjal6ZsLSfCkfCaC1OyNysxyW.1 Passcode: 862183 Join the virtual meeting via phone by dialing: 312 626 6799 Webinar ID: 819 7374 5173 Passcode: 862183 IN-PERSON PUBLIC COMMENTS: In-person public comments can be given by anyone (resident or non-resident of the City of Verona). This would include property that is to be annexed into the City of Verona. If speaking in-person, the speaker does not need to sign up to speak prior to the meeting. During the in-person public comment agenda item, the speaker can walk to the podium and must speak into a microphone. The speaker can submit maps or drawings to City Staff one (1) hour prior to the meeting to ensure that these can be shared virtually. The speaker cannot hand out items in the meeting to members or City Staff as these items cannot be clearly seen virtually. Speakers are not required to register to speak. • WRITTEN PUBLIC COMMENTS: You can send comments to the City Council on any matter, either on or not on the agenda, by emailing jaulik@veronawi.gov or in writing to Common Council, 111 Lincoln Street., Verona, WI, 53593. IF YOU NEED AN INTERPRETER, MATERIALS IN ALTERNATIVE FORMATS, OR OTHER ACCOMODATION TO ACCESS THE MEETING, PLEASE CONTACT THE CITY CLERK AT 845-6495 AT LEAST 48 HOURS PRECEDING THE MEETING. EVERY REASONABLE EFFORT WILL BE MADE TO ACCOMMODATE YOUR REQUEST. 3 CITY OF VERONA COMMON COUNCIL MINUTES October 12, 2026 Council Chambers 1. Call to Order: Mayor Diaz called the meeting to order at 7:00 p.m. 2. Pledge of Allegiance 3. Roll Call: Mara Helmke, Chris Weiss, Patrick Lytle, Beth Tucker Long, Lachlann Swanson, Alejandro Hernandez, Phil Hoechst and Spencer Harrison. Also Present: City Administrator Jamie Aulik, City Engineer Rick Eilertson, Public Works Director Bryan Manning, Planning Director Lucas Sivertsen, and Attorney Bryan Kleinmaier. 4. Public Comment • Chad Wiese, VASD, spoke in support of Resolution No. 26-035. • Jen Murphy, VASD School Board, spoke in support of Resolution No. 26-035. • Scott Wareing, Sub-Zero, gave an overview of the company and spoke in support of their proposed project. He added that are willing to work with the City, but continue to look at other communities. 5. Approval of the minutes of September 28, 2026 Common Council Meeting Motion by Helmke, seconded by Harrison to approve the minutes from the September 28, 2026 Common Council meeting. Motion carried 8-0. 6. Mayor’s Business A. Discussion and Possible Action Re: Resolution No. 26-035 - Authorizing a Tax Bill Insert Regarding State Voucher School Funding Impact Motion by Helmke, seconded by Lytle to approve Resolution No. 26-035 - Authorizing a Tax Bill Insert Regarding State Voucher School Funding Impact. Helmke stated that the insert should say that the information is coming from the school district and provide contact information for the district. Tucker Long encouraged the school district to include a percentage of the tax bill that is going to fund voucher schools. Motion carried 8-0. 4 7. Announcements: Helmke stated that the free e-waste event is on Saturday. 8. Administrator’s Report: Aulik stated that IPAV starts October 20th and runs through October 30th at City Hall. 9. Engineer’s Report: Eilertson presented the Engineer’s Report, and it was entered into the record. 10. Committee Reports A. Finance Committee 1. Discussion and Possible Action Re: Payment of the bills Motion by Helmke, seconded by Weiss to pay the bills in the amount of $3,731,898.22. Motion carried 8-0. B. Plan Commission 1. Discussion and Possible Action Re: Resolution No. 26-036 for a certified survey map to create one (1) lot located at 201 South Main Street. Motion by Swanson, seconded by Harrison to approve Resolution No. 26-036 for a certified survey map to create one (1) lot located at 201 South Main Street. Motion carried 8-0. 2. Discussion and Possible Action Re: Resolution No. 26-037 for a certified survey map to create one (1) lot located at 2681 Country View Court in the Town of Verona. Motion by Swanson, seconded by Harrison to approve Resolution No. 26-037 for a certified survey map to create one (1) lot located at 2681 Country View Court in the Town of Verona. Motin carried 8-0. 3. Discussion and Possible Action Re: Resolution No. 26-038 for a certified survey map to create one (1) lot located at 2506 Spring Rose Road in the Town of Verona. Motion by Swanson, seconded by Harrison to approve Resolution No. 26-038 for a certified survey map to create one (1) lot located at 2506 Spring Rose Road in the Town of Verona. Motion carried 8-0. 4. Discussion and Possible Action Re: Resolution No. 26-039 for a certified survey map to create two (2) lots located east of 2157 Davis Hill Drive in the Town of Verona. 5 Motion by Swanson, seconded by Hoechst to approve Resolution No. 26-039 for a certified survey map to create two (2) lots located east of 2157 Davis Hill Drive in the Town of Verona. Motion carried 8-0. C. Public Works, Sewer & Water Committee 1. Discussion and Possible Action Re: Request to reconsider April 27, 2026 Council Action Related to South Main Street Motion by Tucker Long, seconded by Harrison to direct staff to create a pros and cons list to find the safest scenario by either creating a pedestrian crossing at South Main St. or a multi-directional bike lane on the east side of South Main St. and to have the traffic engineer available at the next meeting this item is discussed. Motion carried 8-0. Motion by Tucker Long, seconded by Harrison to direct staff to pause the project until we have more information. Motion carried 8-0. 11. New Business A. Discussion and Possible Action Re: Scope of Services and Cost Estimate - Urban Service Area Amendment (Vandewalle & Associates, Inc.) Motion by Lytle, seconded by Swanson to approve the Scope of Services and Cost Estimate - Urban Service Area Amendment (Vandewalle & Associates, Inc.) with an amount not to exceed $25,000 and subject to final approval by city staff. Motion carried 8-0. B. Discussion and Possible Action Re: Sub-Zero Development Agreement The Common Council may convene in closed session as authorized by Wisconsin Statute 19.85(1)(e) for the purpose of deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever competitive or bargaining reasons require a closed session. The Common Council may reconvene in open session and take action on the closed item. Motion by Swanson, seconded by Helmke to go into closed session as authorized by Wisconsin Statute 19.85(1)(e) for the purpose of deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting other specified public business, whenever competitive or bargaining reasons require a closed session. The Common Council may reconvene in open session and take action on the closed item 8:24 p.m. Motion carried 8-0 on roll call vote. 6 CLOSED SESSION Motion by Swanson, seconded by Helmke to reconvene in open session at 9:12 p.m. Motion carried 8-0. Motion by Hoechst, seconded by Helmke to adjourn at 9:14 p.m. Motion carried 8-0. Respectfully Submitted, Holly Licht, City Clerk 7 Engineer Report 20261026 Page 1 of 6 CITY OF VERONA ENGINEER REPORT for October 26, 2026 MAJOR CONSTRUCTION PROJECTS (CITY ) HYPER DRIVE ROADWAY AND BRIDGE CONSTRUCTION The project includes a new 2-lane roadway from 500 feet north of the USH 18/151 and CTH G/Dairy Ridge interchange to a new intersection located 800 feet northeast of the Military Ridge State Trail. Approximate construction length is 7,000 feet. Project includes a new proposed bridge crossing over the Sugar River and Military Ridge State Trail and realignment and restoration of the Sugar River. The goal is to provide a secondary access point from the south via US 18/151 & CTH G/ Dairy Ridge interchange for Epic’s planned campus growth. Existing roadway infrastructure along Northern Lights Road is at capacity and cannot handle additional traffic during the weekday AM and PM peak hours. Project Website: https://www.veronawi.gov/866/West-Road-Dairy-Ridge-to-Country-View Construction: Construction of Hyper Drive is underway. Bridge construction over Sugar River continues and several piers have been completed. Road construction on Hyper continues. Dairy Ridge Road and Hyper Drive are open to traffic and accessible from both the East and West. MILITARY RIDGE STATE TRAIL The purpose of the Military Ridge State Trail paving project is to provide year round accessibility for cyclists, runners, walkers, and people with mobility devices. The existing bridges will be replaced and the trail will be paved with asphalt. Reconstruction of the bridge west of Lincoln Street began Sept. 14th. Regular project updates are being made to the: Military Ridge State Trail Paving Project web page. MARK DRIVE, RITA AVENUE, PLYMPTON STREET RECONSTRUCTION The project includes the replacement of water main and sanitary sewer, adding new storm sewer, installation of sidewalks, and pavement reconstruction. The overall limits will be broken into two (2) phases and separate bid openings. • Phase 1: Construction is complete. Working through final restoration of landscaping. • Phase 2: Construction is on-going with expected completion of initial layer of asphalt this fall. 8 Engineer Report 20261026 Page 2 of 6 MAJOR DESIGN PROJECTS PUBLIC WORKS FACILITY Staff have restarted conversations with the project architect. Updated layouts will be presented to Public Works Committee. Project Website: https://www.veronawi.gov/757/Public-Works-Utilities-Parks-and-Recreat SOUTHEAST ELEVATED TANK AND WATER BOOSTER STATION DESIGN S An updated report was provided to the City in September 2026. City staff will provide guidance on next steps forward considering developer status. SOUTHWEST ELEVATED TANK PRELIMINARY DESIGN The Water Supply Service Area Plan (WSSAP) is being finalized in October 2026. Elevated tank design is on hold for a review of the neighboring developments. WEST SIDE LIFT STATION UPGRADES This project involves the rehabilitation of the existing West Side Lift Station and converting it from a prefabricated steel can lift station into a submersible lift station. Bids for this project were opened on July 23rd; however, no contract was awarded. The design is currently under review to identify opportunities for cost reductions before a potential rebid. Phase 2 Phase 1 9 Engineer Report 20261026 Page 3 of 6 DEVELOPMENT PROJECTS WHISPERING COVES • Phase 1: The stormwater force main and wetland restoration are outstanding and must be completed prior to City accepting the public improvements. Home building has begun. AVALON RIDGE This project includes the construction of Avalon Court, improvements to Stony Ridge Circle and construction of a fire access lane from Avalon Court to CTH PD. Concrete curb & gutter, sidewalk, lighting, and asphalt binder completed. Drainage grading and restoration is underway throughout the site. It is anticipated that multi-family building construction will begin in Winter 2026. KETTLE CREEK NORTH • Phase 7 & 8: Awaiting punch list work and final surface paving. • Phase 9: 90% Engineering Plans have been submitted for review. 10 Engineer Report 20261026 Page 4 of 6 ARD ENT GLEN • Phases 1 - 4: Contractor completing punch list work. Phase 3 to be surface paved in fall. • Phase 3: Surface asphalt was planned for paving on October 20th and October 21st. • Phase 5 (including Shady Oak Lane): Expected to begin in 2026/2027. • Phase 6: Utility and roadway construction began in August 2026 and will continue into the fall. DNR approved the flood study on Oct. 9, 2023. FEMA issued a Conditional Letter of Map Revision (CLOMR) on May 1, 2024. 11 Engineer Report 20261026 Page 5 of 6 THE APEX AT VERONA – DREGER Phase 1: Restoration and punch list work is underway. Phase 2: Housing is under construction. ALDI (CTH M) This project includes the addition of turn lanes at future Electric Court (Kwik Trip/Alliant Entrance) and CTH M and utility extensions to the Aldi Site. CTH M reopened on October 9th. Construction of Electric Court and the Aldi site will continue into fall. STORMWATER SERVICES PUBLIC STORMWATER PONDS Cohiba Pond, a small man-made dry detention basin on the west side of Cohiba Court, constructed in 1997 as part of the Gateway Estates subdivision, requires maintenance to improve stormwater treatment and general neighborhood aesthetics through native seeding. Regrading/reseeding of Cohiba Pond and stabilization is anticipated between Winter 2026 and Spring 2027. City staff is planning to schedule a neighborhood meeting with adjacent residents before the project starts. RECORDED VIRTUAL PERMITRACK TRAININGS AECOM has created recorded training videos to help users outside of City Staff learn how to navigate PermiTrack and submit inspections. PermiTrack is used by City Staff to manage erosion control inspections for active construction sites and inspections of public and private stormwater facilities. 12 Engineer Report 20261026 Page 6 of 6 These videos provide step-by-step guidance for contractors, authorized erosion control inspectors, and private stormwater facility owners. The recordings are expected to be posted on the City’s Erosion Control and Stormwater Management webpage by early Fall 2026. STORMWATER UTILITY CREDIT APPLICATION POLICY/ FORM AECOM helped prepare a stormwater utility credit application form to meet requirements of Verona’s stormwater utility ordinance requiring a credit policy. An optional Sugar River Supporter Pledge Form was also prepared for consideration. Both forms were approved by the Common Council on September 28th. The next step includes possible promotion to eligible property owners. The fillable PDF forms for the Stormwater Utility Credit Application and Sugar River Supporter Pledge are now available on the City’s website: https://www.veronawi.gov/965/Stormwater-Utility-Credit. 13 CITY OF VERONA 111 Lincoln Street Verona, WI 53593-1520 Jamie J. Aulik, City Administrator Phone: (608) 848-9942 Email: jaulik@veronawi.gov MEMORANDUM To: Mayor and Common Council, City of Verona From: Jamie J. Aulik, City Administrator Date: October 21, 2026 Re: Summary of Agenda Items – October 26, 2026, City Council Meeting Below is a summary of items on the agenda for the upcoming Council meeting: Finance Committee: • Discussion and Possible Action Re: Resolution No. 26-040 Approving the 2027 Fitch-Rona EMS Operating and Capital Budgets o Potential motion: Move to approve Resolution No. 26-040 Approving the 2027 Fitch-Rona EMS Operating and Capital Budgets o The Finance Committee reviewed and discussed the 2027 Fitch-Rona EMS operating and capital budgets with Fitch-Rona EMS Chief Patrick Anderson. • Discussion and Possible Action Re: Resolution No. 26-041 - Approving Exceeding the Levey Limit for Joint EMS Districts o Potential motion: Move to approve Resolution No. 26-041 - Approving Exceeding the Levy Limit for Joint EMS Districts o This resolution allows a municipality participating in a Joint EMS District to exceed the levy limit if it’s approved by all participating municipalities. The criteria are outlined in Wis. Statute 66.0602(3)(h) and state the following criteria must be met to exceed the municipal levy limit: ▪ The total charges assessed by the joint EMS district cannot increase more than the Consumer Price Index (CPI) + 2%. The CPI for this calculation is certified as 3.30%, therefore the allowable increase is 5.30%. The submitted 2027 Fitch-Rona EMS Budget increases the total charges to all three municipalities by 5.29%. 14 ▪ The increase in the amount to pay for such charges would cause the municipality to exceed the levy limit. The City of Verona’s EMS portion increased by $40,597 which represents a 5.54% increase. The increase of $40,597 is the amount the City can exceed the municipal levy limit. ▪ All municipalities served by the joint district must adopt a resolution in favor of exceeding the limit. For the City to qualify, the City of Fitchburg and Town of Verona must also pass a supporting resolution. One caveat is a municipality that passes a supporting resolution is not required to take the adjustment on their levy limit worksheet. Also, the adjustment is base building, meaning if the adjustment is taken, the adjustment is permanent and will not need to be removed in future years even if budgets decrease or the City doesn’t qualify for the adjustment, therefore the levy limit adjustment provides the City with current and future funding flexibility. Personnel Committee: • Discussion and Possible Action Re: Administrative Policy No. 70 - Generative Artificial Intelligence Policy o Potential motion: Move to approve Administrative Policy No. 70 - Generative Artificial Intelligence Policy o The proposed Generative Artificial Intelligence Policy establishes requirements for the safe, responsible, and transparent use of generative AI by City of Verona employees. o The policy designates Microsoft Copilot as the only approved generative AI system for City employees unless otherwise authorized by the City Administrator or designee. Employees must review AI-generated content and independently verify its accuracy, including information, calculations, and data. Disclosure of AI use is required when AI substantially contributes to content distributed externally or presented as official City business, with disclosure practices determined by the department. o The policy prohibits employees from entering confidential, sensitive, or non-public information into AI systems, including personnel records, protected personal information, attorney-client communications, law enforcement-sensitive information, and information exempt from disclosure under Wisconsin's Public Records Law. It also prohibits using 15 AI to create or manipulate images, audio recordings, or videos for City business purposes. o Department directors are responsible for ensuring compliance. Violations may result in disciplinary action or revocation of access to City AI tools. The unauthorized entry of sensitive or confidential information into AI systems is identified as grounds for termination. Public Works, Sewer and Water Committee: • Discussion and Possible Action Re: Request to reconsider April 27, 2026 Council Action Related to South Main Street o Potential motion: o At the October 12, 2026, Common Council meeting, alders directed staff to develop a list of pros and cons for potential alternatives to provide safe bicycle and pedestrian travel along the east side of South Main Street and to have a traffic engineer available at the next meeting. Traffic safety engineering staff will attend the meeting to present information and answer questions. • Discussion and Possible Action Re: Ordinance No. 26-1126 Amending Title 8, Chapters 3 and 4, Recycling and Refuse Disposal and Collection o Potential motion: Move to approve Ordinance No. 26-1126 Amending Title 8, Chapters 3 and 4, Recycling and Refuse Disposal and Collection o The proposed ordinance was prompted by a property routinely placing bulky items in its front yard several days before scheduled collection during the spring and early summer. The ordinance amends the City’s recycling and refuse regulations to incorporate the City’s collection contract with Pellitteri and clarify collection requirements. o The amendments establish requirements for recycling cart placement and preparation, require the City to post its collection contract on the City website, and clarify placement and timing requirements for oversize and bulky waste. More specifically, oversize and bulky waste must be placed immediately behind the curb or adjacent to an alley, where applicable, and may not be placed on snowbanks or the roadway during winter months. The ordinance also clarifies that oversize and bulky waste is subject to the same collection timing requirements as other refuse, including placement before 7:00 a.m. on collection day, but no more than 24 hours in advance. 16 New Business: • Discussion and Possible Action Re: Updated Application for a Short-Term Rental License from Michelle Turner for a property located at 136 Paoli St. o Potential motion: Move to approve the updated Application for a Short- Term Rental License from Michelle Turner for a property located at 136 Paoli St. o The applicant is updating their application to conform to the residency requirement to allow short-term rentals less than seven days. All other information on the application remains the same. • Discussion and Possible Action Re: Ordinance No. 26-1127 - Amending Title 7, Chapter 7 (Special Event Permits) o Potential motion: Move to approve Ordinance No. 26-1127 - Amending Title 7, Chapter 7 (Special Event Permits) o The proposed ordinance was prompted by an incident at Hometown Days. The ordinance amends the Special Event indemnification provision to clarify and expand the scope of the applicant’s responsibility for claims and damages arising from or related to the event, and expressly includes personal injury, property damage, and third-party claims arising from the event. • Discussion and Possible Action Re: Ordinance No. 26-1128 - Amending Title 1, Chapter 2 of the Code of Ordinances, City of Verona Relating to the Submission of False Information to the City o Potential motion: Move to approve Ordinance No. 26-1128 - Amending Title 1, Chapter 2 of the Code of Ordinances, City of Verona Relating to the Submission of False Information to the City o The proposed ordinance is intended to protect the integrity of the City’s permitting, licensing, and approval processes by making it clear that applicants are expected to provide complete and truthful information when seeking City authorizations. While the City has generally relied on the accuracy of information submitted with applications, the Common Council expressed a desire to explicitly state that the City may take appropriate action when a permit, license, approval, or other benefit is obtained through materially false, misleading, or incomplete information. This provision provides a clear enforcement mechanism, helps ensure fairness for applicants who comply with City requirements, and protects the public interest by allowing the City to address situations where decisions were based on inaccurate information. 17 • Discussion and Possible Action Re: Ordinance No. 26-1129 - Amending Title 2, Chapter 3, Municipal Officers and Employees (Development Review Agreement Reimbursements) o Potential motion: Move to approve Ordinance No. 26-1129 - Amending Title 2, Chapter 3, Municipal Officers and Employees (Development Review Agreement Reimbursements) o This ordinance amends Title 2, Chapter 3 of the Municipal Code to authorize the City Administrator or their designee, to administratively execute certain development application agreements, commonly referred to Pre-Annexation or Pre-Development Agreements on behalf of the City. These agreements establish provisions for recovering City costs associated with reviewing and processing development applications, including site plans, conditional use permits, rezones, variances, extraterritorial jurisdiction reviews, and other development-related activities. o Any fees or costs identified in a development application agreement would be in addition to existing fees and costs established by the Municipal Code or Common Council resolutions. The preparation and modification of these agreements would be included among the administrative duties of the City Administrator. • Discussion and Possible Action Re: Outstanding Matters Related to the Whispering Coves Development o Potential motion: o Staff will provide a status on the Whispering Coves Letter of Credit, status of construction, and outstanding invoices. This document may include content generated with AI assistance. City staff are responsible for the final content and accuracy. 18 CITY OF VERONA RESOLUTION NO. R-26-040 A RESOLUTION APPROVING THE 2027 FITCH-RONA EMS OPERATING AND CAPITAL BUDGETS WHEREAS, the City of Verona is a member of the Fitch-Rona EMS District which also includes the City of Fitchburg and the Town of Verona; and WHEREAS, an annual meeting of the municipalities comprising the Fitch-Rona EMS District was held on October 15, 2026 for the purpose of reviewing the District’s annual report and 2026 requested operating and capital budgets, and WHEREAS, the 2027 Fitch-Rona EMS District operating budget includes total expenditures of $4,787,469 of which the City of Verona’s share is $772,760, and WHEREAS, the 2027 Fitch-Rona EMS District has a capital request for an ambulance with the City of Verona’s portion at $172,958, and WHEREAS, the City of Verona did not have a quorum of the Common Council present at the October 15, 2026 annual Fitch-Rona EMS District meeting and therefore was unable to take action on the 2027 Fitch-Rona operating and capital budgets at that meeting. NOW, THEREFORE, BE IT RESOLVED that the Common Council of the City of Verona hereby approves the 2027 Fitch-Rona EMS operating and capital budgets. Passed, signed and dated this 26 day of October , 2026. CITY OF VERONA SEAL ______________________ Luke Diaz, Mayor ______________________ Holly Licht, City Clerk 19 Fitch-Rona EMS District 2027 Operating Budget 1 2026 Budget 2027 Operating Budget Difference 2026 Budget vs. 2027 Budget Percent Change 2 Revenues 3 Run Income $ 2,125,498 2,285,987$ 160,489$ 7.6% 4 Run Income Subtotal 2,125,498$ 2,285,987$ 160,489$ 7.6% 5 6 City of Fitchburg* 1,450,629$ 1,525,670$ 75,041$ 5.17% 7 City of Verona* 732,163$ 772,760$ 40,597$ 5.54% 8 Town of Verona* 93,491$ 98,252$ 4,761$ 5.09% 9 Municipalities Sub-Total 2,276,283$ 2,396,682$ 120,399$ 5.29% 10 11 Interest Income 10,300$ 10,300$ -$ 0.0% 12 Contracted Events 94,500$ 94,500$ -$ 0.0% 13 14 15 Misc. Sub-Total 104,800$ 104,800$ -$ 0.0% 16 Total Revenues 4,506,581$ 4,787,469$ 280,888$ 6.2% 17 18 Expenses 19 Salaries & Wages $ 1,985,174 2,155,643$ 170,469$ 8.6% 20 Scheduled Overtime $ 427,414 428,286$ 872$ 0.2% 21 Unscheduled Overtime $ 202,029 224,025$ 21,996$ 10.9% 22 Soc.Sec.&Medicare Taxes $ 201,838 216,629$ 14,791$ 7.3% 23 Retirement Plan $ 358,138 370,101$ 11,963$ 3.3% 24 Miscellaneous Benefits $ 7,250 7,395$ 145$ 2.0% 25 Health & Dental Ins. $ 488,163 540,209$ 52,046$ 10.7% 26 Worker's Comp. Ins. $ 82,700 70,600$ (12,100)$ -14.6% 27 Income Continuation $ 2,400 2,400$ -$ 0.0% 28 Sick Time Over Cap $ 49,952 32,008$ (17,944)$ -35.9% 29 Medical Director Annual Fee $ 33,000 33,000$ -$ 0.0% 30 Salary Sub-Total 3,838,058$ 4,080,297$ 242,239$ 6.3% 31 32 Oil, Fuel & Lube $ 38,547 42,438$ 3,891$ 10.1% 33 Repair and Replacement Parts $ 66,100 66,100$ -$ 0.0% 34 Medical Supplies $ 165,400 166,400$ 1,000$ 0.6% 35 Office Supplies $ 3,000 3,250$ 250$ 8.3% 36 Postage $ 500 650$ 150$ 30.0% 37 Public Education $ 3,100 3,100$ -$ 0.0% 38 Staff Training $ 32,500 32,500$ -$ 0.0% 39 Staff Support $ 4,000 5,500$ 1,500$ 37.5% 40 Uniforms $ 23,000 23,500$ 500$ 2.2% 41 Personnel Recruitment $ 3,000 4,000$ 1,000$ 33.3% 42 Subscriptions & Dues $ 1,100 1,100$ -$ 0.0% 43 Admin Space Lease $ 7,125 7,125$ -$ 0.0% 44 Facilities Furnishings $ 3,250 3,250$ -$ 0.0% 45 Telephone $ 9,100 9,100$ -$ 0.0% 46 Radio Equipment $ 6,000 6,000$ -$ 0.0% 47 Radio Maintenance $ 4,900 5,000$ 100$ 2.0% 48 Medical Equipment $ 14,000 14,000$ -$ 0.0% 49 Medical Equipment Maint. $ 44,100 61,700$ 17,600$ 39.9% 50 EMT Safety Equipment $ 1,700 1,700$ -$ 0.0% 51 Training Equipment $ 800 1,600$ 800$ 100.0% 52 Office Equipment $ 2,200 2,200$ -$ 0.0% 54 Computer Support $ 25,000 25,000$ -$ 0.0% 55 Accounting Fees $ 19,300 20,500$ 1,200$ 6.2% 56 Legal Fees General $ 4,200 4,200$ -$ 0.0% 58 Assigned Funds - Labor Contract $ 6,000 6,000$ -$ 0.0% 59 Property Insurance $ 44,050 44,100$ 50$ 0.1% 60 Billing Service $ 127,530 137,159$ 9,629$ 7.6% 61 Paramedic Intern Program $ 9,000 10,000$ 1,000$ 11.1% 62 Reserve Funding -$ -$ 0.0% 63 Misc. Expense Sub-Total 668,502$ 707,172$ 38,670$ 5.8% 64 TOTAL EXPENSES 4,506,560$ 4,787,469$ 280,909$ 6.2% 20 CITY OF VERONA RESOLUTION NO. R-26-041 A RESOLUTION APPROVING EXCEEDING THE LEVY LIMIT FOR JOINT EMS DISTRICTS WHEREAS, under state law (sec, 66.0602(1)(ak), Wis Stats.), “Joint emergency medical services district” means a joint emergency medical services district organized by any combination of two or more cities, villages, or towns under sec 66.0301(2) ; and WHEREAS, City of Verona is a member of a joint emergency medical services district (FitchRona EMS); and WHEREAS, the joint emergency medical services district’s total charges assessed for the current year compared to the prior year increased 5.29% which is less than or equal to the percentage change in the Consumer Price Index (CPI) from September 1, 202 5 through August 31, 2026 plus 2%; and WHEREAS, all municipalities covered by the joint emergency medical services district must adopt a resolution supporting the increase in order to qualify for the adjustment to levy limits, and NOW THEREFORE BE IT RESOLVED, by the City of Verona Council that the increase in assessed charges results in the City of Verona exceeding its levy limit, allowing an adjustment in Section D, Line I on the 2026 levy limit worksheet and the City of Verona Council supports the increase. Passed, signed and dated this 26 day of October , 2026. CITY OF VERONA SEAL ______________________ Luke Diaz, Mayor ______________________ Holly Licht, City Clerk 21 CITY OF VERONA ADMINISTRATIVE POLICY NO. 70 GENERATIVE ARTIFICIAL INTELLIGENCE POLICY Title: Generative Artificial Intelligence Policy Policy Source: Personnel Committee Creation Date: XX/XX/2026 Application: Employee Artificial Intelligence Use Revision Date: Indexed as: Generative Artificial Intelligence Policy Total Pages: 5 1. Purpose The purpose of this policy is to establish requirements for the safe, responsible, and transparent use of Artificial Intelligence (AI) by City employees. 2. Scope This policy applies to all employees of the City of Verona. 3. Definitions Generative Artificial Intelligence (Generative AI) is a class of computer software and systems, or functionality within systems, that use large language models, algorithms, deep-learning, and machine learning models, and are capable of generating new content, including but not limited to text, code, images, video, and audio, based on patterns and structures of input data. Traditional Artificial Intelligence (Traditional AI) refers to computer systems that use rules, logic, or classical machine learning to analyze data, recognize patterns, and make predictions, without generating new content. An example of this is a spam email filter, which analyses incoming emails and classifies them as “spam” or “not spam” based on learned patterns. While this policy includes principles that apply to AI technologies generally, this policy only applies to Generative AI systems. 4. Policy 1. Approved AI Systems Microsoft Copilot is the only Artificial Intelligence system approved for use by City employees unless otherwise authorized by the City Administrator or designee. 2. Human Review and Verification 22 Employees shall review all AI-generated content before using it for official City business. All factual information, figures, calculations, and data generated by AI must be independently verified for accuracy. Employees remain responsible for the accuracy and appropriateness of any work product created with the assistance of AI. 3. Disclosure of AI Use When AI is used to substantially create, revise, or generate content that will be distributed externally or presented as official City business, the use of AI shall be disclosed in a manner determined by the department. 4. Protection of Sensitive Information Employees shall not enter confidential, sensitive, or non-public information into any AI system. This includes, but is not limited to, personnel records, payroll information, protected personal information, attorney-client communications, law enforcement sensitive information, and information exempt from disclosure under the Wisconsin Public Records Law. 5. Images, Video, and Audio Employees shall not use AI systems to create, alter, modify, or manipulate images, audio recordings, or video recordings for City business purposes. 5. Non-compliance Department directors are responsible for ensuring compliance with and enforcement of this Policy within their departments. Personnel are expected to use official City AI resources appropriately; misuse may result in disciplinary action. All use of AI resources must reflect a high standard of ethical conduct and professional decorum. Failure to meet these standards may result in revocation of access to City Generative AI tools or related features. The input of sensitive or confidential information into AI systems are grounds for termination. 23 1 ORDINANCE NO. 26-1126 AN ORDINANCE AMENDING TITLE 8, CHAPTERS 3 AND 4, RECYCLING AND REFUSE DISPOSAL AND COLLECTION The Common Council of the City of Verona, Dane County, Wisconsin, do ordain that Title 8, Chapters 3 and 4 of the Code of Ordinances, City of Verona, Wisconsin is hereby amended as follows: 1. Section 8-3-17.5 is created to read as follows: Sec. 8-3-17.5 – Collection of Recycling. Residents shall properly prepare their recycling carts for curbside pickup. Collection shall occur utilizing a cart owned by the collector/hauler with which the City is contracting. The contractor shall empty the carts so long as the carts are placed curbside on their scheduled days. Carts must be placed in an accessible curbside position (within two feet of street) before 7:00 am on the scheduled days , but not more than twenty -four (24) hours prior to such time . Proper preparation of cart includes the cart being placed in an accessible location for the truck (e.g., not behind or within four (4) feet of parked cars, mailboxes, or other obstructions). Proper preparation shall mean all recycling is contained within the cart, cart lid closed, and the carts are placed curbside. 2. Section 8-3-21(d) is created to read as follows: (d) The City shall post the contract between the City and the collector/hauler to the City website, and any residents or properties receiving recycling services from the City shall abide by the rules and regulations contained in the contract. 3. Section 8-4-12(a)(3) is created as follows: (3) Oversize and Bulky Waste shall be placed immediately behind the curb of the public street for collection or shall be placed immediately adjacent to the alley if premises abut on an alley. During winter months, Oversize and Bulky Waste shall not be placed on top of the snowbank, nor shall it be placed in the roadway. 4. Section 8-4-12(b)(1) is amended to read as follows: (1) All garbage and refuse collected by the City under this Chapter shall be placed in collection locations as designated in Subsection (a) above prior to 7:00 am. of the scheduled collection day, but not more than twenty -four (24) hours prior to such time. For avoidance of doubt, this includes Oversize and Bulky Waste. 24 2 5. Section 8-4-18(d) is created to read as follows: (d) The City shall post the contract between the City and the collector/hauler to the City website, and any residents or properties receiving refuse services from the City shall abide by the rules and regulations contained in the contract. 6. This ordinance shall become effective upon passage and publication as required by law. The foregoing ordinance was duly adopted by the Common Council of the City of Verona at a meeting held on ______________, 2026. CITY OF VERONA _______________________ Luke Diaz, Mayor (seal) _______________________ Holly Licht, City Clerk ADOPTED: _______________ PUBLISHED: _______________ 25 26 27 28 ORDINANCE NO. 26-1127 AN ORDINANCE AMENDING TITLE 7, CHAPTER 7, SPECIAL EVENT PERMITS The Common Council of the City of Verona, Dane County, Wisconsin, do ordain that Title 7, Chapter 7 of the Code of Ordinances, City of Verona, Wisconsin is hereby amended as follows: 1. Section 7-7-1(m) is amended to read follows: (m) Indemnification. The applicant shall indemnify, defend and hold harmless the City of Verona and its officers, officials, agents, and employees against all loss or expense (including liability costs and reasonable attorney’s fees) by reason of any claim or suit, or of liability imposed by law upon the City or its officers, officials, agents or employees, for any and all damages related to, arising from, in connection with, caused by, or resulting from the Special Event , including, but not limited to, (i) any injury, including death at any time resulting therefrom, sustained by any person or persons; (ii) any damages to property, including loss of use thereof ; and (iii) in regard to claims filed by third parties relating to access in any way to the Special Event. 2. This ordinance shall become effective upon passage and publication as required by law. The foregoing ordinance was duly adopted by the Common Council of the City of Verona at a meeting held on ______________, 2026. CITY OF VERONA _______________________ Luke Diaz, Mayor (seal) _______________________ Holly Licht, City Clerk ADOPTED: _______________ PUBLISHED: _______________ 29 ORDINANCE NO. 26-1128 AN ORDINANCE AMENDING TITLE 1, CHAPTER 2 OF THE CODE OF ORDINANCES, CITY OF VERONA RELATING TO THE SUBMISSION OF FALSE INFORMATION TO THE CITY The Common Council of the City of Verona, Dane County, Wisconsin, do ordain that Title 1, Chapter 2, of the Code of Ordinances, City of Verona, is amended as follows: 1. The title of Chapter 2 is amended to read “Enforcement of Ordnances; Issuance of Citations; and Provision of Information to the City.” 2. Section 1-2-8 is created to read as follows: Sec. 1-2-8 – False, Misleading, or Incomplete Information Submitted to the City. (a) Authority. The City may deny, suspend, revoke, modify, or otherwise take action regarding any permit, license, registration, approval, authorization, or other benefit issued or granted by the City when such permit, license, registration, approval, authorization, or benefit was obtained through the submission of materially false, misleading, or incomplete information. 3. This ordinance shall become effective upon passage and publication as required by law. The foregoing ordinance was duly adopted by the Common Council of the City of Verona at a meeting held on _______, 2026, effective upon passage and publication as required by law. CITY OF VERONA _______________________________ Luke Diaz, Mayor (seal) _______________________________ Holly Licht, City Clerk ADOPTED: __________________ PUBLISHED: __________________ 30 ORDINANCE NO. 26-1129 AN ORDINANCE AMENDING TITLE 2, CHAPTER 3, MUNICIPAL OFFICERS AND EMPLOYEES The Common Council of the City of Verona, Dane County, Wisconsin, do ordain that Title 2, Chapter 3 of the Code of Ordinances, City of Verona, Wisconsin is hereby amended as follows: 1. Section 2-3-2(e) is created to read as follows: (e) Development review agreement . The Common Council hereby authorizes the City Administrator, or their designee, to execute administratively a development application agreement on behalf of the City, which agreement addresses generally the recovery of costs incurred by the City to review and act on development applications proposed in the City, including, but not limited to, the following activities: site plan, conditional use permit, rezone, variance, and other development activities. Any fees or costs identified in the agreement shall be in addition to, and are not intended to replace, other fees or costs identified in this Code, or in other resoluti ons adopted by the Common Council. The preparation and, if necessary, modification of a development application agreement shall be considered part of the administrative duties of the City Administrator. 2. This ordinance shall become effective upon passage and publication as required by law. The foregoing ordinance was duly adopted by the Common Council of the City of Verona at a meeting held on ______________, 2026. CITY OF VERONA _______________________ Luke Diaz, Mayor (seal) _______________________ Holly Licht, City Clerk ADOPTED: _______________ PUBLISHED: _______________ 31 FIRST AMENDMENT TO WHISPERING COVES DEVELOPMENT AGREEMENT PHASE 1 This First Amendment to Whispering Coves Development Agreement Phase 1 (the "First Amendment") is made this ~ day of fv\. Cl\..~ , 2025, by and between North Neighborh od, LLC, a Wisconsin limited liability company (the "Developer"), and the City of Verona, a Wisconsin municipal corporation (the "City"). A. B. C. D. RECITALS The City, the Developer, and Midthun Property Hwy M LLC, a Wisconsin limited liability' company ("Midthun I") and Midthun Property North West, LLC, a Wisconsin THJS SPACE RESERVED FOR RECORDING DATA RETURN TO: City of Verona Attn: City Clerk 111 Lincoln Street Verona, WI 53593 limited liability company ("Midthun II" and S;~ Exhibit A collectively with Midthun I hereinafter referred to as "Midthun") executed the Whispering Coves Development Agreement Phase 1 (the "Phase 1 Agreement"), which Phase 1 Agreement was recorded with the Dane County Register of Deeds Office on November 12, 2021 as Document No. 5788636. The Phase 1 Agreement governs the terms and conditions for construction and installation of public improvements to serve Phase 1 of the plat known as the Plat of Whispering Coves (the "Plat"). The purpose of this First Amendment is to amend certain terms and conditions regarding the construction and installation of the public improvements to serve Phase 1 of the Plat. Pursuant to its terms, the Phase 1 Agreement may only be amended by a written amendment instrument approved and executed by the City and the Developer. NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the City and the Developer agree as follows: 1. Storm Sewer and Storm Water Management Facilities. Article I, Section B.8.h. is hereby replaced with the following: h. Conditions 1 through 5 approved by the City of Verona Public Works / Sewer & Water Committee at its meeting on August 12, 2020 are expressly incorporated into this Agreement (see Exhibit G attached hereto). Condition 6 shall no longer apply pursuant to the Memorandum dated April 22, 2024 that is attached to this 1 32 First Amendment as Addendum 1. Upon execution of this Agreement, the Developer shall provide an irrevocable letter of credit in the amount of $475,000 to the City to satisfy Condition 5 of Exhibit G. If the Developer fails to construct the lift station in Phase 2 of the development or as required in a subsequent phase as determined by the City Engineer, or if the Developer does not move forward with any subsequent phases of the Plat and the City determines, in its sole discretion, that the lift station needs to be constructed pursuant to City and urban service area storm water standards, the City may draw on the letter of credit to pay all costs associated with constructing the lift station. For avoidance of doubt, the reference to lift station in this subsection and the reference to storm water pumping station in other subsections of this Section 8 are referring to the same facility. 2. Wetland Restoration. Article I, Section B.15. is hereby replaced with the following: 15. Wetland Restoration. a. For Phase 1, the Developer shall restore the wetland area on Outlot 1 and Outlot 2, Block 2 pursuant to plans approved by the City. Among other work, the Developer shall complete a wetland restoration plan, obtain applicable WDNR approval and permits, and complete the work. The wetland restoration work shall be completed pursuant to the plans approved by the City Engineer. (1) The wetland restoration work shall occur over 5 years. (2) The wetland area shall meet or exceed 80% relative cover of native species. (3) Plant diversity - Germination of at least 50% of the seeded/installed native plant species. Additional seeding may be required if this performance standard is not met at the end of 5 years. (4) Erosion and Sediment Control is critical to the success of the wetland. If sediment enters the wetland, whether in Phase 1 or in any future phases of development, it shall be removed by the Developer to the City's satisfaction. (5) The City shall perform a walkthrough after the initial installation of the wetland restoration improvements for Phase 1. ( 6) The City shall inspect the required maintenance annually until the wetland restoration improvements are fully completed by the Developer and accepted by the City. (7) To ensure that the wetland restoration improvements are ultimately completed at the end of the expected five-year period and to ensure that any maintenance or other work during the five-year period is completed by the Developer, notwithstanding anything to the contrary set forth elsewhere herein, until the 5-year wetland restoration plan is fully completed, the letter of credit required 2 33 under Article IV of the Phase 1 Agreement shall not be reduced below (i) the amount reasonably determined by the City Engineer in accordance with Article IV, Section A.4 .. plus (ii) the cost of any the remaining wetland restoration work as reasonably estimated by the City Engineer. b. For avoidance of doubt, the City and the Developer agree and acknowledge that the Developer has received certain parkland credit for the restoration of the wetland area on Outlot 1 block 2. If the Developer fails to restore the wetland area on Outlot 1 block 2 pursuant to the plans approved by the City, the City reserves the right to recalculate City park fees in Article II, Section A.4. and fees may be due from the Developer. 3. Building Permits. a. Consistent with Article V, Section B. of the Phase 1 Agreement and the Subdivision Ordinance, building permits for Phase 1 shall not be issued until the Developer has complied with the provisions of the Phase 1 Agreement; the Developer has installed and the City has accepted, for each phase, the sanitary sewer main and laterals, the water main and laterals, the storm sewer and other storm water management facilities, the gravel base in the streets, and the curb, gutter, sidewalk, and lower layer of asphalt street pavement; and the Developer has furnished lien waivers for all contractors. b. The parties acknowledge that the first year of the wetland restoration work identified in Section 2 of this First Amendment was completed prior to the date of this First Amendment. For the avoidance of doubt, the parties acknowledge that the work to be completed during years 2-5 of the wetland restoration plan does not need to be completed prior to the issuance of building permits for Phase 1. c. Attached hereto and incorporated herein is Addendum 2, which includes two lists that were generated by the City Engineer following a preliminary inspection of the Phase 1 Improvements on February 12, 2025. The lists identified in Addendum 2 are not all encompassing; additional items may come up through the normal course of construction and inspection, in which case those items will need to be corrected prior to acceptance. (1) Addendum 2 contains a list of work under the heading "Whispering Coves Phase 1 Work," and all of this work falls within the scope of the Phase 1 Agreement and Section 3.a. of this Amendment. (2) Addendum 2 also contains a list of work under the heading "Whispering Coves Phase 1B Work" (the "Phase 1B Work"). Assuming all other requirements identified in the Phase 1 Agreement have been satisfied for the issuance of building permits, building permits for Phase 1 may be issued before the Phase 1B Work is completed. The Phase 1B Work shall 3 34 be completed by the Developer on or before June 30, 2025. If the Developer fails to complete the Phase lB Work on or before June 30, 2025, the City may immediately draw on the letter of credit identified in the Phase 1 Agreement and complete the Phase lB Work. Notwithstanding the preceding sentences, the Phase lB Work includes, "Provide temporary cover measures," and this work shall be completed within ten (10) days of the execution of this Amendment. Further, the temporary cover shall be anchored via bolts or other similar measure as approved by the City Engineer such that the cover cannot be moved by unauthorized parties. 4. Exhibit C. Exhibit C to the Phase 1 Agreement contains a summary of the Phase 1 Improvements and lists a number of construction plans. Within ten (10) days of the execution of this Amendment, the Developer shall provide the City with updated plans that reflect the changes made to the improvements as identified in Section 1, Section 2, and Section 3.c.(2) of this Amendment, which updated plans are subject to approval by the City Engineer. Building permits for Phase 1 shall not be issued if the Developer fails to comply with this Section 4. 5. Phase I Agreement. Except as modified herein, the Phase 1 Agreement shall be and remain in full force and effect. [Signature pages to follow] 4 35 IN WITNESS WHEREOF, the parties have hereunto set their hands and seals as of the dates noted below. STATE OF WISCONSIN COUNTY OF DANE CITYz=ONA . By Jh8..-.J Luke iaz Mayor By--=--~----•--­ Holly Licht, City Clerk Personally, came before me this ~day of G,br~ , 2025, the above named Luke Diaz and Holly Licht, to me known to be the Mayor and City Clerk of the City of Verona, and the persons who executed the foregoing instrument and acknowledged the same. l:z1:r ¥:v-Afi<W' Notary Public, State of Wisconsin My Commission: S / 'b IL 2-4 5 36 STATE OF WISCONSIN COUNTY OF DANE NORTH NEIGHBORHOOD, LLC By: Name: Title: Wt • _Personally,..came before me this 1.t\ day of ,¼:,r-1 \ , 2025, the above named 't>O\.V\ ~ joo't.\a S , to me known to be the person who executed the foregoing instrument and acknowledged the same on behalf of North Neighborhood, LLC. Print Name: Bn:\-1: o.ry... M~tb.tV'" Notary Public, State of \\Tisconsin My Commission : e>f\"<'-~ <:>ih.P\ \ lOlS'"" 6 37 Attachments: Exhibit A - Legal Description and Parcel Identification Numbers of the Property Addendum 1 - Memorandum dated April 22, 2024 Addendum 2 -List of Work for Phase 1 and Phase lB This instrument drafted by: Bryan Kleinmaier Stafford Rosenbaum LLP P.O. Box 1784 Madison, WI 53701-1784 7 38 EXHIBIT A LEGAL DESCRIPTION AND PARCEL IDENTIFICATION NUMBERS OF PROPERTY 8 39 ~-=- ~ J! II Professional Services, Inc. --::.=---===-.=-- • Engineers • Surveyors • Planners EXHIBIT A-1 Madison Regional Office 161 Horizon Drive, Suite 101 Verona, WI 53593 608-848.5060 WHISPERING COVES PARCEL OVERALL LEGAL DESCRIPTION Part of the Northeast Quarter of the Northeast Quarter, the Southeast Quarter of the Northeast Quarter, and the Southwest Quarter of the Northeast Quarter of Section 09, and the Southwest Quarter of the Northwest Quarter of Section 10, Township 06 North, Range 08 East, Town of Verona, Dane County, Wisconsin more particularly described as follows: Beginning at the East Quarter Comer of Section 09, aforesaid; thence North 88 degrees 17 minutes 45 seconds West along the South line of the Southeast Quarter of the Northeast Quarter of Section 09 a distance of 1,310.50 feet to the Southeast comer of the Southwest Quarter of the Northeast Quarter of Section 09; thence North 88 degrees 12 minutes 41 seconds West along the South Line of the Southwest Quarter of the Northeast Quarter of Section 09 a distance of 1,313.11 feet to the Center of Section 09; thence North 00 degrees 49 minutes 46 seconds East along the West line of the Southwest Quarter of the Northeast Quarter of said Section, 1,321.27 feet to the Northwest corner of the Southwest Quarter of the Northeast Quarter of Section 09; thence South 88 degrees 02 minutes 27 seconds East along the North line of the Southwest Quarter of the Northeast Quarter of said Section, 1,309.26 feet to the Northeast corner of the Southwest Quarter of the Northeast Quarter of Section 09; thence North 00 degrees 41 minutes 46 seconds East along the West line of the Northeast Quarter of the Northeast Quarter of Section 09 a distance of 1,226.80 feet to the South right-of-way line of County Trunk Highway 'PD'; thence South 79 degrees 09 minutes 33 seconds East along said right-of-way line, 201.09 feet; thence South 87 degrees 44 minutes 38 seconds East along said line, 1108.26 feet to the East line of the Northeast Quarter of Section 09; thence South 00 degrees 34 minutes 24 seconds West along the East line of the Northeast Quarter of Section 09 a distance of 1, 189.60 feet to the Northwest corner of the Southwest Quarter of the Northwest Quarter of Section 1 0; thence South 88 degrees 51 minutes 14 seconds East along the North line of the Southwest Quarter of the Northwest Quarter of Section 1 0 a distance of 1,323.18 feet to the Northeast corner of the Southwest Quarter of the Northwest Quarter of Section 10; thence South 00 degrees 35 minutes 23 seconds West along the East line of the Southwest Quarter of the Northwest Quarter of Section 10 a distance of 1,315.85 feet to the Southeast comer of the Southwest Quarter of the Northwest Quarter of Section 10, aforesaid; thence North 88 degrees 41 minutes 31 seconds West along the South line of the Southwest Quarter of the Northwest Quarter of Section 10, aforesaid, 1,322.85 feet to the Point of Beginning Said parcel containing 6,751,815 square feet or 155.000 acres. 286/0608-102-9001-2; 286/0608-102-9700-2; 286/0608-102-9502-2 286/0608-091-9501-2; 286/0608-091-9001-2; 286/0608-091-8003-2 • Idaho • Illinois • Wisconsin www.j sd inc.corn 40 -------------MADISON I MILWAUKEE I KENOSHA I APPLETON-------------- ; ] I I I I I I I I I I I I I I C.T.H I 'PD' I I ~~~~Ra~AATE ..::;::,.r~-~r -T;~ l'L-:J.;_, ~-- --'L-=--=-t=-•-7 - +.,onHW,,m - SECTION 09-06 , I 'e,I\ I ---- I NOITTliEAST CORNER i -'--l- CORNER FOUND BRASS I ~~ t SECTION 09-06-08 I I l SECTION 10-06-08 IN CONCRETE, CITY ,--J ~ L J 052/0S08- I FOUND ALUMINUM I I ' 1 ~OUND BRASS CAP OF MADISON I J / C> I I MONUMENT I I I tN CONCRCTE QTY MONUMENT 1 .,, ✓ ,in, □ 91 - 61 33 - 2 CD I I I I 'of MADISON' 1 I I .!. 062/0608- I I I I / MONUMENT I I 091-8122-2 ,..., 1 I I I TOWN OF VERONA L~... ! I 062/0608-091-~8003-2' TOWN OFIVERol---- L ___ t l ---~----•u L-9 ~--- J,..._ crrvoFVERONA I PAFfC -CITYOFVERONA 1 --- s:..: r,, I 6,751,815 S.F. I • I ~ _; I 155.000 ACRE I 062/0608- :EI r-... ,,,, 1 1 0 102-9502-2 • I ~- --\ < I 062/060B-091-B001- 2 I 062/060B-091-9501-2 1 062/0608-102-9001.2 - :::c· 1 1 :Z ...J I I t-t - - 1 I ~ 0 I CENTER OF j EAST QUARTER CORNER 1..J I " I (' r-, a:: 1 SECTION 09-06-0B SECTION 09-06-0B e--l-062/060B- I- I : _ _ / / I ~rtFOUND ALUMINUM FOUND BRASS CAP IN I 1 02-9700-2 0■ 1 ~---'- -..J ____ 7 u. MONUMENT CONCRETE, CITY OF I I , ).,,-- _ _ I ----- - - - - - - ,. - • .. ""' MADISON MONUMENT CITY OF VERONA • ' I I l I >- L-2 ·' ,.,.~-,.. e~ -!'!"--a-..:...:.:..i..= - - - -'-'-';....;,.._....-."'1..1-T_,,. _ ____ + I:: ~ l_ zJ~ju..1...1. L-1 J .l.l.J.•\fP..u.a~-11 Ju1ci:..i.: TOWNOFVERONA l'-'2oJTtR ,;- ,- <.> I ir--~,1'r~ffi ~I Er=!1E_=r-:3lff-=lj pJlfd~1E;3:Erf~ J SECTION 10-06-08 I , w J' 1 IL> ~1 11l -CJ 1c:i:: \ 11-LJ I rec--1 r - ,FouNo aRAss cw 1 1 ~ 11,__ I l · a:7~ r,J--' 1 ....1.......iI 11-.1. J!L...1.:~,TOWNOFVERO,k_ - f 1INCONCRETE,CITY : 0 111 -'-~fl o I O u. '-.-- - , ,-r, .,.,:...: 1 or MADISON 1 z M ~1 ; : ~ o ~ c1.TY C?J-~~oNA7. MoruM~r : ~ ~~~...._11 e :u 5 ~.,f-t-rrr;-~~.~ L __ _ , : ~ ~ I 11i-,: i7'-f ...._ I.I I I I : /.~ ! I I I I I I 'Ji'/ • . ! I ... LINE TABLE LINE TABLE LINE BEARING DISTANCE LINE BEARING DISTANCE l-1 N 8817'45" W 1310.50' l-7 S 87'44'38" E 1108.26' 500' 1000' ~ L-2 N 88'12'41" W 1313.11' L-8 S 00'34'24" W 1189.60' 0 I I I N 00·49•45" E 1321.27' L-9 S 88'51'14" E 1323.18' north L-3 SCALE: 1 " = 1 000' L-4 S 88'02'27" E 1309.26' L-10 S 00'35'23" W 1315.85' L-5 N 00'41'46" E 1226.80' L-11 N 88"41'3r W 1322.85' L-6 S 79'09'33~ E 201.09' .:., ~ !! LEGEND NOTES i ~ 1 ~ • • GOVERNMENT CORNER 3/4" REBAR FOUND 1" IRON PIPE FOUND : - - - - - SECTION LINE ~ ---- PARCEL BOUNDARY ~ ------- PLATTED LOT LINE 9 - - - - RIGHT-OF-WAY LINE ..... 1. FIELD WORK PERFORMED ON AUGUST 20, 202.1. 2. BEARINGS FOR THIS SURVEY AND MAP ARE BASED ON 'lliE WISCONSIN COUNTY COOROINA TE SYSTEM, {WCCS), DANE COUNTY. THE SOU'lli LINE OF THE NE QUARTER OF SECTION 09-06-08, RECORDED N88'17'45NW. I::: ~:1-~ ~-1~""1/fia=--------,re,PR""o '-"".E""c"'T,...: ---------- -r.SH::-:::::EET:;-::111LE:=-:::--. --------r1JS0=-;;1PR;::OJE:-=C:,;,,T~NU~M:"::!9:l"ER~ :-r.:SH:-::EET~-:1NU;-:;MB~ER;::-1 ~ i9gjB~~oa . WHISPERING COVES EXHIBIT A-1 17- 7777 c:, •~ 0 9-11$;:o • ._,.., DflAW BY: CHECKED BY: , .:..: MA011?,1iJfiGb_~&i,.w1CE JK TJB .. 1/E"R()NA, vfsco,,a11 Sl!'o!IS DA TE: ~ (~JC •&.500ll PHOOIE I (600}848-2255 FAX SEPT. 17. 2021 .__www, ·sdlnc.com _...i..:;VE~R::::ON:.:.:;:,A,~W1:i.,_ ________ ~.__ __________ _._ ______ ..._ ____ .., 1 41 !!em~ i!fliSiike== # ~!JI Professional Services1 Inc. • Engineers • Surveyors • Planners EXHIBIT A-2 PARCEL 062/0608-102-9700-2 LEGAL DESCRIPTION Madison Regional Office 161 Horizon Drive, Suite 101 Verona. WI 53593 608.848.5060 Part of the Southeast Quarter of the Northwest Quarter of Section 10, Township 06 North, Range 08 East, City of Verona, Dane County, Wiscons in more particularly described as follows: Commencing at the North Quarter corner of Section 10, aforesaid; thence South 00 degrees 36 minutes 54 seconds West along the East line of the Northwest Quarter of Section 10, aforesaid, 2638.51 feet to the Center of Section 10, aforesaid; thence North 88 degrees 41 minutes 32 seconds West along the South line of the Northwest Quarter of Section 10, aforesaid, 946. 7 4 feet to the Point of Beginning; thence continuing North 88 degrees 41 minutes 32 seconds West along said line, 375.97 feet to the West line of the Southeast Quarter of the Northwest Quarter of Section 10, aforesaid ; thence North 00 degrees 35 minutes 23 seconds East along said line, 597.75 feet; thence North 90 degrees 00 minutes 00 seconds East, 376.81 feet; thence South 00 degrees 40 minutes 12 seconds West, 606.34 feet to the Point of Beginning. Said parcel containing 226,589 square feet or 5.202 acres. • Idaho • Illinois• Wisconsin www .jsdinc .com T 1 42 -------- ---- MADISON I MILWAUKEE I KENOSHA I APPLETON -------------, b -..J LANDS NORTli QUARTER CORNE!'! f SECTION 1 0-06-08 FOUND S\JRYEY NAL AND WASHER I I NW-NW I NE- N! .!!Qll I I SECTION 10 I SECTION 10 CSM No, 3366 f : I - - - ::-:.-:-- -,,oroimcf l:!.Em>ua:w;;i~11;r--_-:_- - - ~-~ - - - ~ '-- ,r--,,----- ----- ---- - ---------------~ ; I l SW- NW SECTIONIO L-3 PARCEL 226,589 S.F. 5.202 ACRE LANDS 062/0606- 102-9700-2 062/0608-102-9502- 2 SE-Nlf SECTION lO I I __ !j 1--1 ~ I ~ I j I II? I ~ I = l:E I it r.-.-- ;f ~ 1:I: i ,- , ... I : I ~0 - j I j I I t I I I I I I I L ___ , -~ I I I I I .O.B. ,-,,±1 •• • • • •• • • • • .. • •• • • ··Nee· .. ,•32•w ....... 74' I =---' --~-..,,1:· :..._ - - ~ -· ....... .. .. r··· --,- L-1 - -- - - ___ ____ _ _ ..,._ __ ,,.<,, I ---( " \ \ J I L r-, --,- - .,-- 1' \ \ _.1 ......1 LAN~~ TOWN Of VERONA I -I I I I \ \ 1 ____j ~- OF I I I I \ \ / .....-- - -; I ....... '"" I I 1 1 y,""' ,,. ~ - I I SECllON 10--06-08 -' - .i... ....i.. ~ - ~ r- J . FOUND SURIJEY NAIL ANO WASHER LEGEND NOJES -$- GOVERNMENT CORNER ,. FIELD WORK PERFORMED BY JSD PROFESSIONAL SERVICES, INC. ON PARCEL BOUNDARY MARCH 28 & 29 AND APRIL 04, 2017. - - - - - SECTION LINE 2. BEARINGS FOR THIS SURVEY AND MAP ARE BASED ON THE WISCONSIN ---- RIGHT-OF-WAY LINE COUNTY COORDINATE SY5TEM, (WCCS), - - - CENITRUNE DANE COUNTY. lHE EAST LINE OF ------- PLATTED LOT LINE THE NORTHWEST QUARTER OF SECTION 10-06-07 BEARS N00'36'54"E. ~ C, ~ LINE L-1 L-2 L-3 L-4 LINE TABLE BEARING DISTANCE N88"41'32"W 375.97' N00"35'23NE 597.75' N90'00'00"E 376.81' S00'40't2"W 606.34' 0 I - - 300' I - -SCALE: 1 • = 300' ~ i-,,....,.,....------.,.,P""RO~JE~C~T:,-----------"""T::5::"!' ft[E='T '=11'="ru::::"".-------T JSO=-:::PROJE:-:-=,:CT~K~U::":M::::BER:=",--r.:SH:-:-:EET="NU=M:::-:BER::--i !::: ~ ~ill, WHISPERING COVES EXHIBIT A-2 17- 7777 l;: • ilJiiJ Do.m, • °"""'IN''" • _,.,..., ORAl\tl BY: CHEOl(EO 8Y: ..:.: 111 HOIUZDN DR!\£, SUITE 101 JK T JB 1 .; VERONA, \IISCONSIN 53~~ DA 1£: i:: PHONE: (808)1148-IJ060 VERONA WI 53593 OCTOBER 26, 2021 www.jsdlnc.com-...1..:.~;.;.;.;.:i.....:......:=...:;. ------------- ---- ----- -._---- ~ 43 ,~~ I~ II Professional Services, Inc. • Engineers • Surveyors • Planners EXHIBIT A-3 Madison Regional Office 16'1 Horizon Drive, Suite 701 Verona, WI 53593 608 .848.5060 MIDTHUN PROPERTY HWY M PARCEL LEGAL DESCRIPTION Part of the Southeast Quarter of the Northwest Quarter of Section 10, Township 06 North, Range 08 East, City of Verona, Dane County, Wisconsin more particularly described as follows: Commencing at the North Quarter corner of Section 10, aforesaid; thence South 00 degrees 36 minutes 54 seconds West along the East line of the Northwest Quarter of Section 10, aforesaid, 1,369.59 feet; thence North 89 degrees 23 minutes 06 seconds West, 72.99 feet to the West right-of­ way line of County Trunk Highway 'M' (C. T. H. 'M'), also being the Point of Beginning; thence South 05 degrees 39 minutes 46 seconds East along said right-of-way line, 72.98 feet; thence South 00 degrees 36 minutes 52 seconds West along said right-of-way line, 835.90 feet; thence South 00 degrees 21 minutes 55 seconds East along said right-of-way line, 204.57 feet; thence South 06 degrees 39 minutes 26 seconds West along said right-of-way line, 88. 77 feet; thence South 00 degrees 22 minutes 11 seconds East along said right-of-way line, 66.83 feet to the South line of the Northwest Quarter of Section 1 O; thence North 88 degrees 41 minutes 32 seconds West along the South line of the Northwest Quarter of Section 10, aforesaid, 877.04 feet; thence North 00 degrees 40 minutes 12 seconds East, 606.34 feet; thence North 90 degrees 00 minutes 00 seconds West, 376.81 feet to the West line of the Southeast Quarter of the Northwest Quarter of Section 10, aforesaid; thence North 00 degrees 35 minutes 23 seconds East along the West line of the Southeast Quarter of the Northwest Quarter of Section 10, aforesaid, 668.09 feet to the South right-of-way line of Morningside Boulevard; thence South 88 degrees 50 minutes 39 seconds East along said right-of­ way line, 789.31 feet to a point of curve; thence Northeasterly 27.62 feet along an arc of a curve to the left, having a radius of 350.00 feet, the chord bears North 88 degrees 53 minutes 29 seconds East, 27.61 feet; thence North 86 degrees 37 minutes 50 seconds East, along said right-of-way line, 404.38 feet to a point on a curve; thence Southeasterly 48.49 feet along an arc of a curve to the right, having a radius of 40.00 feet, the chord bears South 40 degrees 23 minutes 30 seconds East, 45.57 feet to the Point of Beginning Said parcel containing 1,374,973 square feet or 31.565 acres. • Idaho • Illinois • Wisconsin www.jsdinc.com 44 0 .... ~ c:, r------------- MADISON I MILWAUKEE I KENOSHA I APPLETON -------------, NW-NW SECTION!O ~Q~~-ggRNER I FOUNO SURVEY NAIL AND WASl-iER I SECTIONlO cs1fNo.SS66 ;: I NE-NW LOT 4 j ~ I .-1 ' .-_-_--:_-:--MOl:ffi_------'-=-f'+::.=.~SO!!!::fO~rt:X~,•x-fW2.!~:._-__:-~-::!-::.:.:~~..1~ /-------------------- sas-oo~i'E 789.J1·- - -- c-1 - - L-7 ,,- - C-2 - I LEGEND sw-mr SEcrioN10 g ad CD (0 kl • f r> 8 z ~ GOVERNMENT CORNER ----PARCEL BOUNDARY - - - - - SECTION UNE ---- RIGHT-OF-WAY UNE - - - crnTERLINE --- --- - PLATTED LOT LINE L-6 062/0608- It) 102-9700-2 I ..I NOTES PARCEL 1,374,973 S.F. 31.565 ACRE 062/0608-102-9502-2 LANDS Sil-NW SECTioN10 1. FlELD WORK PERFORMED BY JSD PROFESSIONAL SERVICES, INC. ON MARCH 28 & 29 ANO APRIL 04, 2017. 2. BEARINGS FOR THIS SURVEY AND MAP ARE BASED ON THE \\1SCONSIN COUNTY COORDINATE SYSTEM, (WCCS), DANE COUNTY. THE EAST LINE OF THE NORiHWEST QUARTER OF SECTION 10-06-07 BEARS N00"36'54"E. 3. COUNTY TRUNK HIGHWAY 'M' RIGHT-OF-WAY PER TRANSPORTATION PROJECT PLAT NO: 5992-09-81 - 4.02. 4. SEE SHEET 2 FOR UNE AND CURVE TABLES. P.O.&: : N89"23'06•w L-1 1 72.~' _ N ~ I I I _....::)._ I I I ,,-­ CENlER OF SECTION 10-06-06 FOUND SURVEY NAIL ANO WASHER 0 150' 300' ~ SCALE: 1" = 300' l:::f.....r""e· "",ft=-------'l':PR""o.E=CT""·----------"""'r,SH,:0:EET=-:::TI;ll.£;-::-·-------'TJSD=-~PR;:::O:-;.£~CT;-N::::-UT:":M-=:lBE:=:R:-r::S~HEET="~NUM8-::-::;:ER~: ; J~N~~/JJJI. WHISPERING COVES EXHIBIT A-3 17- 7777 ~ •---~ " ~ ro • - ORAll,t,I B'r. CHECKED BY: .:.: 101 HOIIIZON DIU',£, SU11E 101 JK f JB ~A. WSCONSIN 536113 DAlE: ~ PHONE: (e08)84&-S08D OCTOBER 26, 2021 www.Jsdlnc.com-..&,.;.VER=O:;.:.N.:.:.A..._Wl..:....;:5_3_5""93..._ _____ __,, ________________ __,_ ____ ... 1 OF 2 = 45 MADISON I MILWAUKEE I KENOSHA I APPLETON LINE TABLE LINE BEARING DISTANCE L-1 S05'39' 46"E 72.98' L-2 S00"21'55.E 204.57' L-3 S06'39'26"W 88.77' L-4 S00':22'11"E 66.83' L-5 N00"40'12"E 606.34' L-6 N9o-oo'oo"w 376.81' L-7 N86'37'50"E 404.38' CURVE TABLE CURVE l£NG1H RADIUS Da.TA CHORD BEARlNG CHORD C-1 27.62' 350.00' 4"31'17" N88'53'29"E 27.61' .:. C-2 48.49' 40.00' 69'27'30" S40'23'30"E 45.57' ,. ~ ., <> ' C ::, - I .. - " I .. ~ ;:, Jlli~~oi.. PROJECT: SHEET TT1I.£: JSO PRO.ECT NUMBER: SHEET NUMBER: WHISPERING COVES EXHIBITA-3 17-7777 Cl~ 0 m;;i,v ~ ~,0 DRAY,tj BY:: CtECl<ED BY:: 2 OF 2 .. 101 HOIU()N ORI\£. SUllE 1111 JK TJB a: ;; YEROMA, YIISCONSIM ~ DATE: PHONE: (608)&49-&0110 OCTOBER 26, 2021 --- www.Jsdlnc.com VERONA WI 53593 46 ADDENDUM I MEMORANDUM DATED APRIL 22, 2024 The memorandum is 29 pages in total. Only page I of the memorandum is included in this Addendum 1. The remaining portion of the memorandum may be viewed at the Verona City Center. 9 47 FDG ~ Whispering Coves Phase 1 April 22, 2024 Whispering Coves Phase 1 Project Coordination North Neighborhood, LLC is submitting the following material as a follow up to the April 2nd coordination meeting with the City of Verona regarding Phase 1 of Whispering Coves: 1. Stormwater JSD completed Attachment 1-Whispering Coves Phase I Stormwater Modeling Analysis with Midthun's Development to verify stormwater management for Phase 1 of Whispering Coves functions independently from Midthun Property HWYM, LLC stormwater management facilities. In accordance with the approved construction plans for Whispering Coves Phase 1, KL Engineering's stormwater modeling and JSD's stormwater modeling analysis Phase 1 of Whispering Coves functions independently of any stormwater management proposed on the Midthun property. This supports North Neighborhood's request to remove the Midthun ponds from the Phase 1 Development Agreement. 2. Wetland Restoration Attachment 2 - Wetland Restoration Concept Plan includes the proposed restoration tasks for the project site. a. Section 15 of the Development Agreement contemplates WDNR approval ofthe wetland restoration plan. Heartland Ecological Group has informed the development team that an herbicide application permit is the only WDNR approval required. b. Heartland Ecological Group is preparing a time line for completion of the restoration tasks and will secure necessary permits for completion of wetland restoration for Year 1. 3. Construction Completion North Neighborhood, LLC is preparing for completion of Phase 1 per the approved construction plans, and outstanding construction tasks outlined in the project punch list. The schedule below outlines the anticipated timeline for completion of Phase 1 Construction. May 13 - June 21: Forcemain & Adjacent Work June 10 - June 28: Concrete Repair & Asphalt Trail Surfacing May 15 - May 30: Landscape Restoration June 10 - June 28: Final Restoration (Forcemain) North Neighborhood, LLC requests a meeting with project stakeholders (City of Verona, North Neighborhood, LLC, Midthun Property HWYM, LLC, JSD Professional Services, and KL Engineering) to further facilitate the advancement of the Whispering Coves neighborhood. Following the coordination meeting, North Neighborhood, LLC will work to secure additional municipal approvals, as requested by City staff. Excitement for the completion of Whispering Coves Phase 1 and start of home construction remains high. North Neighborhood, LLC is motivated to create momentum for the Whispering Coves Community. We appreciate the City's review and consideration of these critical items and welcome any questions, clarifications, or comments. Best, Connor Nett I Project Manager Forward Development Group 48 ADDENDUM2 LIST OF WORK FOR PHASE 1 AND PHASE lB 10 49 Whispering Coves Phase 1 Work Pursuant to the executed Whispering Coves Phase 1 Development Agreement (the "Development Agreement"), the following work must be completed by the Developer, and then inspected and accepted by the City, before building permits for Phase 1 are issued. All terms and conditions in the Development Agreement continue to apply to this work, including, but not limited to, the requirement that lien waivers be provided by contractors before any building permits are issued. o Construct Infiltration Basin 6P • Place 12" of engineered soil throughout infiltration basin bottom. o Grading/Common Ex • Place gravel path from Morning Cove to East project Limits and gravel around wet well and grit manhole to finished grade. • Fill and restore area between 6P and 7P. This area is used as borrow site for infiltration basin 6P. • Lots BL:L 1 to BL:L6 were not graded as shown in the site plans, area South of Morning Cove Circle and North of multi-use path. Remove excess gravel from area between Morning Cove Path ramp and backside of lots. o Erosion Control • TRM not installed at weir location between infiltration basin 6P and pond 3P and at SE corner of Pond 4P o Conduit • Lighting Conduit East of P108 not installed, proposed later phase. • Forcemain Conduit not installed from east side of Harvest Moon to transducer stilling well on west side of Harvest Moon o Reports/Records • Televising Report for Storm Sewer for run C2. This runs from Pond 3P to Infiltration Basin 6P. • Provide missing televising reports from November 2024 o Perform Final Acceptance Walk-Through o Provide Lien Waivers o Remove and replace broken curb and gutter including areas near path crossing at Morning Cove Circle o Remove and replace broken sidewalk squares, various locations. o Remove and replace broken water valve box, asphalt patch required. o Lower Storm Structure C2-3. Rim is approximately 3 feet high. o Re-Grade/Restore around structure C2-4. Existing ground around structure is low. o Repair low spot/ponding on Asphaltic multi-use path o Re-Plumb and secure leaning signs posts o Remove miscellaneous gravel piles including areas near light poles and throughout lots o Clean out curb lines and sweep road to remove sediment and debris 1 50 o Remove miscellaneous concrete blocks, concrete piles and misc lumber/lath from terrace. (mainly at project entrance and intersection of Harvest Moon, evening Sun Way) o Re-grade/smooth topsoil at pond edges. Remove sediment runoff within ponds. (eroded channels, large clumps, debris, rough grade) o Reapply mulch and crimp. Strong winds blew it away. Likely need to seed again (All mulched areas) o Topsoil and restore haul road from future pump house location, along NW edge of Pond 3P, wrapping around to West side of Infiltration basin 6P o Restore area between the dead end of Morning Cove and Pond 3P and infiltration basin 6P. Currently bare soil and not graded to drain. o Repair ruts in terrace and restore project wide o Fill low areas behind curb and sidewalk project wide o Fine grade topsoil near electrical/communication pedestals o Finish grade and extend slopes of topsoil at field inlets along path. Install inlet protection until established around path inlets o Restore and install erosion control measures at Parisi access area to Apex Properties at west end of Evening Sun Way. Whispering Coves Phase 1 B Work City staff recommends to the Common Council that the following work be moved to a Phase 1 B for Whispering Coves, subject to the terms and conditions of the First Amendment to Whispering Coves Development Agreement Phase 1. o Construct Infiltration Basin 6P ■ Install plantings and establish basin vegetation. ■ Install plug in CB C2-5 once vegetation is established. o Forcemain Pump House/Wet well/Grit Manhole • Install sluice gate (May delivery expected) ■ Install permanent well/hatch covers (April delivery expected). Provide temporary cover measures. 2 51

Source: City of Verona website. First collected Oct 24, 2026.